HomeMy WebLinkAboutItem 10 Approval of Waterside Water Reclamation Distribution System Project and Award of Construction Contract to Florida Contracting, Inc.
AGENDA ITEM COVER SHEET
Meeting Date: August 16,2005
Item # ~O
Contact Name:
Contact Number:
David A. Wheeler
407 -905-31 00, ext. 1505
Reviewed By:
Department Director:
City Manager:
Subject: Waterside Water Reclamation Distribution System Project
Award of Construction Contract to Florida Contracting, Inc.
Background Summary:
The Waterside Water Reclamation System project generally includes the installation of reuse mains within the
Waterside subdivision in order to supply reuse water for irrigation and to take those customers off potable water for
irrigation. By doing this reuse retrofit project, it will help reduce potable water production and bring the City into
compliance with our CUP permit with the St. Johns River Water Management District. The project includes the
installation of the piping, valves, meters, and other associated appurtenances.
The attached letter from Tetra Tech, Inc. (TTI) is a recommendation to award the contract to Florida Contracting
Tnc. in accordance with the base bid for the directional drill option. The Engineering and Public Utilities staffs
concurs with TTI's recommendation to award the Waterside Water Reclamation Distribution System project to
Florida Contracting, Inc. in the amount of $286,823.00.
Issue:
The Engineering and Public Utilities Departments request that the Mayor and City Commission authorize the award
of the construction contract for the Waterside Water Reclamation System project to Florida Contracting, Inc.
Recommendations
Staff recommends that the City Commission authorize the Mayor and City Clerk to execute a contract with Florida
Contracting, Inc. in the amount of $286,823.00 for the Waterside Water Reclamation Distribution System project in
accordance with the following steps:
. Authorize the Engineering and Public Utilities Departments to execute the Notices of Intent To Award
and secure executed contract documents, bonds and insurance from the contractor.
. Authorize the Mayor and City Clerk to execute the contracts with Florida Contracting, Inc. at such time
as the contract documents are reviewed for compliance by staff and legal counsel, as needed.
Attachments:
Tetra Tech letter on award recommendation
Bid Tabulations
. .'inanciallmpact:
This project is funded from the 2003 Utility Bond issue and is under budget based upon the engineer's estimate.
Type of Item: (please mark with an "x'?
Public Hearing
_ Ordinance First Reading
Resolution
_ Commission Approval
Discussion & Direction
For Clerk's DeDt Use:
_____ Consent Agenda
_____ Public Hearing
_____ Regular Agenda
Original Document/Contract Attached for Execution by City Clerk
Original Document/Contract Held by Department for Execution
Reviewed by City Attorney
Reviewed by Finance Dept.
Reviewed by ( )
~.(] tI
N/A
N/A
N/A
,
City Manager
Robert Frank
Commissioners
Danny Howell. District 1
Scott Anderson. District 2
Rustv Johnson. District 3
Nancy J. Parker. District 4
Mayor
S. Scott Vandergrift
STAFF REPORT
TO:
The Honorable Mayor and City Commissioners
FROM:
David A. Wheeler, P.E., City Engineer
DATE:
August 8, 2005
RE: Watenide Water Reclamation Distribution System Project Award of Construction Contract
to Florida Contracting, Inc.
ISSUE
The Engineering and Public Works Departments request that the Mayor and City Commission authorize the
award of the construction contract for the Waterside Water Reclamation System project to Florida Contracting,
nc.
BACKGROUNDIDISCUSSION
On Thursday, May 26, 2005, bids were received for the Waterside Water Reclamation System project. The
work for this project generally includes the installation of reuse mains within the Waterside subdivision in order
to supply reuse water for irrigation and to take those customers off potable water for irrigation. By doing this
reuse retrofit project, it will help reduce potable water production and bring the City into compliance with our
CUP permit with the St. Johns River Water Management District. The project includes the installation of the
piping, valves, meters, and other associated appurtenances.
This project was publicly advertised in the Orlando Sentinel and through Central Florida Builder's Exchange,
F.W. Dodge Construction Reports, and the Business Alliance. Five contractors submitted bids on this project.
CONTRACTOR
WATERSIDE WATER RECLAMATION
SYSTEM PROJECT
Open Cut Direct Bury Option
Central Florida Tapping & Construction
Services, Inc.
American Persian Engineers & Constructors, Inc.
Cathcart Contracting, Inc.
Gibbs & Register, Inc.
$ 388,802.50
$ 397,390.00
$ 446,454.00
$ 552,000.00
Directional Drill Option
Florida Contracting, Inc.
Gibbs & Register, Inc.
$ 286,823.00
$ 557,000.00
The attached letter from Tetra Tech, Inc. (TTI) is a recommendation to award the contract to Florida Contracting
Inc. in accordance with the base bid for the directional drill option. The Engineering and Public Utilities staffs
concurs with TTI's recommendation to award the Waterside Water Reclamation Distribution System project to
Florida Contracting, Inc. in the amount of $286,823.00. The construction cost of this project is lower than the
engineer's estimate, of approximately $550,000. The project will be funded from the 2003 Utility Bond Issue.
MarkA. Rynning, I'E., MB.A.
'ames E. Christopher, P.E.
larJes W. Drake, P.G.
illiam D. Musser, PE., P.H.
....awrence E.]enkins, PS.M.
SA
engineers, hydrogeologists, surveyors & management con~ultants
ASSOCIATES.
OFFICERS.
Marco H. Rocca, C.M.C.
Roderick K. Cashe, P.E.
Douglas P. Dufresne, P.G.
Jon D. Fox, I'E.
Daniel M-. Nelson. P.E.
June 2, 2005
Les H. Porrerfield, P.E.
Andrew T. Woodcock, P.E., M.B.A.
John P. Toomey, PE.
Jennifer L. Woodall, P,E.
Rafael A. Tcrrcro, P.E., DEE
Jill M. Hudkins, I'E.
Valerie C. Davis, P.G.
Charlos M. Shultz, I'E.
Soan M. Parks,AIcp, QEP
W. Bruce Lafrenz, P.G.
HAI# 98-037.05 AJexisK.Stewart,I'E.
Christopher W Hanlin, PE.
James R. Wamer, PE.
SENIOR ASSOCIATES:
Via Facsimile & U.S. Mail
Mr. David Wheeler, P.E.
Utilities Director
City of Ocoee
150 N. Lakeshore Drive
Ocoee, FL 34761
Subject:
City of Ocoee Bid #B05-04 (Waterside Water Reclamation Distribution System)
Dear Mr. Wheeler:
We have completed our review of the bids submitted for the Waterside Reclaimed Water
Distribution System. The lowest apparent bidder was Florida Contracting with a total lump sum
bid price of $286,823. We have contacted the references provided by the Contractor and have
found that client satisfaction and work quality is good. It is our opinion that the Contractor is
qualified to complete the project. Based on this, we recommend issuance of award to the lowest
apparent bidder, Florida Contracting for a total awarded contract of $286,823. As discussed, this
will conclude Tetra Tech HAl's contractual obligations for the Waterside Reclaimed Water
Distribution System. We can prepare a scope of services for construction administration services
upon the City's request.
If you have any questions, please feel free to contact me or Mr. Mark Rynning at your earliest
convemence.
KL W/smalcorresp/Wheeler-060205 .klw .doc
xc: Joyce Tolbert, City ofOcoee
Mark A. Rynning, M.B.A., P.E., Tt HAl
Melanie Moretta, E.!., Tt HAl
Linda Adams, CCCA, Tt HAl
201 EAST PINE STREET. SUITE 1000 . ORLANDO, FL 32801-2723
TELEPHONE (407) 839-3955 . FAX (407) 839-3790. www.consulthaLcom
Bid Tabulation
for
City of Ocoee
Waterside Reclaimed Water Distribution System
98.037.05
Bid Tab "An (Open Trench)
Bid Date: May 26, 2005
Central FL Tapping & American Persian Engineers and
Construction Services Engineers and Constructors Cathcart Contracting Co. Gibbs & Reaister Inc.
Item Description Unit Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price
U1 Mobilization/Demobilization LS 1 $5,395.00 $5,395.00 $20,000.00 $20,000.00 $13,100.00 $13,100.00 $15,000.00 $15,000.00
U2 General Requirements LS 1 $36,585.00 $36,585.00 $15,000.00 $15,000.00 $58,000.00 $58,000.00 $75,000.00 $75,000.00
U3 Indemnification LS 1 $255.00 $255.00 $500.00 $500.00 $130.00 $130.00 $1,240.00 $1,240.00
U4 Utility Test Pits LS 1 $1,555.00 $1,555.00 $5,000.00 $5,000.00 $1,300.00 $1,300.00 $15,000.00 $15,000.00
U5 Connection to Existing Water Main EA 1 $1,025.00 $1,025.00 $7,500.00 $7,500.00 $1,400.00 $1,400.00 $2,000.00 $2,000.00
U6 Furnish and Install 4" HDPE Reclaimed WM LF 3600 $26.50 $95,400.00 $15.00 $54,000.00 $25.29 $91,044.00 $25.00 $90,000.00
U7 Furnish and Install 6" HDPE Reclaimed WM LF 800 $31.00 $24,800.00 $20.00 $16,000.00 $29.69 $23,752.00 $30.00 $24,000.00
U8 Furnish and Install 8" HDPE Reclaimed WM LF 3400 $35.50 $120,700.00 $30.00 $102,000.00 $33.59 $114,206.00 $37.00 $125,800.00
U9 Furnish and Install 4" DI Gate Valve and Box EA 11 $825.00 $9,075.00 $1,600.00 $17,600.00 $1,130.00 $12,430.00 $1,000.00 $11,000.00
U10 Furnish and Install 6" 01 Gate Valve and Box EA 2 $975.00 $1,950.00 $1,950.00 $3,900.00 $1,242.00 $2,484.00 $1,200.00 $2,400.00
U11 Furnish and Install 8" 01 Gate Valve and Box EA 4 $1,495.00 $5,980.00 $2,890.00 $11.560.00 $1,534.00 $6,136.00 $1,600.00 $6,400.00
U12 Furnish and Install DI Flushing Valve EA 1 $1,050.00 $1,050.00 $1,590.00 $1,590.00 $1,596.00 $1,596.00 $1,500.00 $1,500.00
U13 4" 01 22.5 de9ree bend LB 350 $10.50 $3,675.00 $5.00 $1,750.00 $5.22 $1,827.00 $9.00 $3.150.00
U14 4" 01 45 de9ree bend LB 150 $9.25 $1,387.50 $7.00 $1,050.00 $10.15 $1,522.50 $9.00 $1,350.00
U15 6" DI 22.5 de9ree bend LB 150 $6.85 $1,027.50 $8.00 $1,200.00 $5.12 $768.00 $9.00 $1,350.00
U16 6" DI 45 degree bend LB 1.50 $5.50 $825.00 $10.00 $1510" $5.08 $762.00 $9.00 $1,350.00
U17 8" DI 22.5 degree bend LB 1320 $4.75 $6,270.00 $10.00 $13,200.00 $4.26 $5,623.20 $9.00 $11,880.00
U18 8" DI 45 degree bend LB 660 $4.10 $2,706.00 $12.00 $7,920.00 $4.26 $2,811.60 $9.00 $5,940.00
U19 4" DI Tee LB 80 $6.50 $520.00 $8.50 $680.00 $5.37 $429.60 $9.00 $720.00
U20 6"x4"DITee LB 115 $4.50 $517.50 $9.00 $1,035.00 $5.00 $575.00 $9.00 $1,035.00
U21 8" DI Tee LB 370 $4.75 $1,757.50 $7.00 $2,590.00 $3.60 $1,332.00 $9.00 $3,330.00
U22 8" x4" DI Tee LB 1155 $5.50 $6,352.50 $8.00 $9,240.00 $3.69 $4,261.95 $9.00 $10,395.00
U23 8" x 6" DI Tee LB 175 $5.00 $875.00 $9.00 $1,575.00 $3.64 $637.00 $9.00 $1,575.00
U24 6" x 4" DI Reducer LB 120 $7.70 $924.00 $7.50 $900.00 $5.91 $709.20 $9.00 $1,080.00
U25 8" x 6" DI Reducer LB 95 $6.00 $570.00 $10.00 $950.00 $4.61 $437.95 $9.00 $855.00
U26 Double Service Connection EA 41 $265.00 $10,865.00 $500.00 $20,500.00 $619.00 $25,379.00 $800.00 $32,800.00
U27 Double Service Connection (wI Railroad Crossin9) EA 26 $905.00 $23,530.00 $750.00 $19,500.00 $1,198.00 $31,148.00 $1,800.00 $46,800.00
U28 Single Service Connection EA 3 $300.00 $900.00 $450.00 $1,350.00 $617.00 $1,851.00 $600.00 $1,800.00
U29 Single Service Connection (w/ Railroad Crossing) EA 8 $875.00 $7,000.00 $600.00 $4,800.00 $1,447.00 $11,576.00 $1,500.00 $12,000.00
U30 Asphalt Removal and Temporary Repair SY 1111/111/111/11/111/11/11/11111111/111/1111/1 REMOVED /1/1/1/1/1///11/////11///////////11 REMOVED //////////////////// /11//////////////11 /111111/11////// REMOVED //////////
U31 Removal and Replace Concrete Sidewalk SY 25 $95.00 $2,375.00 $150.00 $3,750.00 $150.00 $3,750.00 $120.00 $3,000.00
U32 Removal and Replace Concrete Driveway SY 115 $85.00 $9,775.00 $250.00 $28,750.00 $165.00 $18,975.00 $150.00 $17,250.00
U33 Maintainence of Traffic LS 1 $3,180.00 $3,180.00 $22.000.00 $22,000.00 $6,500.00 $6,500.00 $25,000.00 $25,000.00
TOTAL LUMP SUM BID (TOTAL OF ITEMS U1 - U33) $388,802.50 $397,390.00 $446,454.00 $552,000.00
Bid Tabulation
for
City of Ocoee
Waterside Reclaimed Water Distribution System
98.037.05
Bid Tab "B"
Bid Date: May 26, 2005
Florida Contracting Co. Inc. Gibbs & Register Inc.
Item Description Unit Quantity Unit Price Total Price Unit Price Total Price
Ul Mobilization/Demobilization LS 1 $15,000.00 $15,000.00 $13,000.00 $13,000.00
U2 General Requirements LS 1 $5,950.00 $5,950.00 $80,000.00 $80,000.00
U3 Indemnification LS 1 $100.00 $100.00 $1,090.00 $1,090.00
U4 Utility Test Pits LS 1 $6,750.00 $6,750.00 $15,000.00 $15,000.00
U5 Connection to ExistinQ Water Main EA 2 $2,800.00 $5,600.00 $2,000.00 $2,000.00
U6 Furnish and Install 4" HDPE Reclaimed WM LF 3,600 $14.00 $50,400.00 $28.00 $100,800.00
U7 Furnish and Install 6" HDPE Reclaimed WM LF 800 $22.00 $17,600.00 $36.00 $28,800.00
U8 Furnish and Install 8" HDPE Reclaimed WM LF 3,400 $26.00 $88,400.00 $39.00 $132,600.00
U9 Furnish and Install 4" DI Gate Valve and Box EA 11 $1,020.00 $11,220.00 $1,000.00 $11,000.00
U10 Furnish and Install 6" DI Gate Valve and Box EA 2 $1,200.00 $2,400.00 $1,200.00 $2,400.00
U11 Furnish and Install 8" DI Gate Valve and Box EA 4 $1,400.00 $5,600.00 $1,600.00 $6,400.00
U12 Furnish and Install DI Flushino Valve EA 1 $1,400.00 $1,400.00 $1,500.00 $1,500.00
U13 4" DI 22.5 deoree bend LB 350 $9.10 $3,185.00 $9.00 $3,150.00
U14 4" DI45 deQree bend LB 150 $6.30 $945.00 $9.00 $1,350.00
U15 6" DI 22.5 degree bend LB 150 $11.00 $1,650.00 $9.00 $1,350.00
U16 6" DI 45 deoree bend LB 150 $11.00 $1,650.00 $9.00 $1,350.00
U17 8" DI 22.5 degree bend LB 1,320 $7.55 $9,966.00 $9.00 $11,880.00
U18 8" DI 45 degree bend LB 660 $7.10 $4,686.00 $9.00 $5,940.00
U19 4" DI Tee LB 80 $5.05 $404.00 $9.00 $720.00
U20 6" x 4" DI Tee LB 115 $5.00 $575.00 $9.00 $1,035.00
U21 8" 01 Tee LB 370 $5.60 $2,072.00 $9.00 $3,330.00
U22 8" x 4" 01 Tee LB 1,155 $6.00 $6,930.00 $9.00 $10,395.00
U23 8" x 6" 01 Tee LB 175 $6.00 $1,050.00 $9.00 $1,575.00
U24 6" x 4" 01 Reducer LB 120 $11.00 $1,320.00 $9.00 $1,080.00
U25 8" x 6" 01 Reducer LB 95 $14.00 $1,330.00 $9.00 ' $855.00
U26 Double Service Connection EA 41 $410.00 $16,810.00 $800.00 $32,800.00
U27 Double Service Connection (w/ Railroad Crossino) EA 26 $580.00 $15,080.00 $1,800.00 $46,800.00
U28 Single Service Connection EA 3 $580.00 $1,740.00 $600.00 $1,800.00
U29 SinQle Service Connection (wi Railroad Crossing) EA 8 $580.00 $4,640.00 $1,500.00 $12,000.00
U30 Asphalt Removal and Temporary Repair SY 45 $26.00 $1,170.00 - -
U31 Maintainence of Traffic LS 1 $1,200.00 $1,200.00 $25,000.00 $25,000.00
TOTAL LUMP SUM BID (TOTAL OF ITEMS U1 - U31) $286,823.00 $557,000.00