Loading...
HomeMy WebLinkAboutItem 09 Approval of Change Order No. 1 for the Lakefront Park Improvements in the Amount of $66,944.67 Ocoee florlda AGENDA ITEM COVER SHEET Meeting Date: March 5, 2019 Item # 9 Reviewed By: Contact Name: Jack A. Butler Department Director: Contact Number: 407-554-7063 City Manager: Subject: Approval of Change Order No. 1 for the Lakefront Park Improvements in the Amount of$66,944.67 Background Summary: The City Commission awarded the work of constructing Phase 1 of the Lakefront Park Improvements project to MARBEK Construction, Inc. A major element of that work is construction of a new parking lot between the Lakeshore Center and Bluford Avenue. The city Utilities Department is decommissioning the existing City Hall lift station and replacing it with a larger facility across the street that will also provide service to the downtown commercial area. A connecting pipe is needed to link the existing lift station to the new one. This pipe needs to be installed before the new parking lot is constructed. Issue: Should the City Commission authorize Change Older No. 1 with MARBEK Construction Co. in the amount of$66,944.67? Recommendation: Staff recommends that the City Commission approve the proposed change order. MARBEK Construction Co. is qualified to do the work and the price offered is consistent with the expected cost of construction. The pipe's installation was an expected element of the overall Downtown Sanitary Sewer System project but has been delayed due to issues related to constructing the receiving lift station. It is now necessary for the pipe to be installed as part of the Lakefront Park Improvements project in order to allow that work to proceed without additional delay and cost. Attachments: Proposed Change Order No. 1. Financial Impact: The cost of the connecting underground pipe is covered by the existing Utilities capital budget (Account No. 408-531-00-6302). Type of Item: (please mark with an `x') Public Hearing For Clerk's Dept Use: Ordinance First Reading x Consent Agenda Ordinance Second Reading Public Hearing Resolution Regular Agenda x Commission Approval Discussion&Direction X Original Document/Contract Attached for Execution by City Clerk Original Document/Contract Held by Department for Execution Reviewed by City Attorney Reviewed by Dana Crosb -Collier N/A Reviewed by Finance Dept. • AO i N/A Reviewed by (Utilities) / N/A A ocoee florida CITY OF OCOEE 150 North Lakeshore Drive Ocoee, Florida 34761 *This Change Order Requires Action by the CITY Commission* LAKEFRONT PARK IMPROVEMENTS CHANGE ORDER NO. 1 DATE: March 5, 2019 PURCHASE ORDER:N.A. The following changes are hereby made to the CONTRACT DOCUMENTS. Original CONTRACT PRICE $2,724,956.00 Current CONTRACT PRICE ADJUSTED by previous CHANGE ORDERS $2,724,956.00 Net Increase (Decrease) Resulting from this CHANGE ORDER $66,944.67 The current CONTRACT PRICE including this CHANGE ORDER $2,791,900.67 Original CONTRACT COMPLETION DATE: September 30, 2019 Current CONTRACT COMPLETION DATE adjusted by previous CHANGE ORDERS September 30, 2019 Net Increase Resulting from this CHANGE ORDER 0 days Current CONTRACT COMPLETION DATE including this CHANGE ORDER September 30, 2019 CHANGES ORDERED: I. REQUIRED CHANGES The existing lift station serving the City Hall campus is being decommissioned and converted to a receiving manhole. The CITY needs to install a sanitary sewer conveyance pipeline between the existing City Hall lift station and the future Downtown lift station to be constructed across Bluford Avenue. This pipe needs to be installed prior to constructing the overlaying parking lot, which is part of the CONTRACTOR's original scope of work. II. JUSTIFICATION The CITY has been delayed in constructing the pipeline due to issues related to the design and construction of the new lift station. Rather than wait until the new lift station is ready—which will be after the parking lot is installed—the CITY prefers to install the pipe now and not later need to cut through and restore the new parking lot. III. NARRATIVE OF NEGOTIATIONS The parties discussed the work and negotiated a reasonable price for the job. IV. PAYMENT The additional project cost is being covered by CITY Utility Account 408-531-00-6302, which will become an additional funding source for the Lakefront Park Improvements project. This change order will not impact park funding. Progre3ss payments are subject to the terms of the existing project Agreement. V. APPROVAL AND CHANGE AUTHORIZATION The original project and funding allocation was established by issuance of a CITY purchase order, subject to the terms and conditions contained in the CITY's solicitation, Project Manual, Drawings, Specifications, and/or the CONTRACTOR's service and price proposal, which collectively form the terms of an agreement between the CITY and the CONTRACTOR for the performance of the Work. This proposed change to the agreement requires approval by the CITY Commission under the CITY's Purchasing Rules and Regulations and is consistent with any prior action by the CITY Commission to award the Work to the CONTRACTOR. It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original agreement other than matters expressly provided herein. CONTRACTOR acknowledges, by its execution and acceptance of this Change Order, that the adjustments in contract price and time shown hereon constitute full and complete compensation and satisfaction for all costs and modifications of performance time incurred by the CONTRACTOR as a result of this Change Order. No other claim for increased costs of performance or modifications of time will be granted by the CITY for the Work covered by this Change Order. The CONTRACTOR hereby waives and releases any further claims for cost or time against the CITY arising from or relating to the matters or Work set forth or contemplated by this Change Order. RECOMMENDED BY: ACCEPTED BY: CITY OF OCOEE, FLORIDA MARBEK CONSTRUCTION CO. By: /4 r/ — By: Signature Signature Date: Fe„brte. 27 20.9 Date: Title: Are-c,735r or Svtffor't" 5e cC5 Title: APPROVED BY: CITY OF OCOEE, FLORIDA By: Date: Rusty Johnson, Mayor Attest: Melanie Sibbitt, CITY Clerk FOR USE AND RELIANCE ONLY BY THE APPROVED BY THE CITY OF OCOEE CITY OF OCOEE,APPROVED AS TO FORM COMMISSION IN A MEETING HELD ON AND LEGALITY THIS DAY OF ,20 UNDER ,20 AGENDA ITEM NO. By: CITY Attorney MARBEK Construction Co. 614 E. Hwy 50 Ste 324 Phone 407-468-8378/Fax 352-242-1081 Clermont, Fla. 34711 TO: City of Ocoee PROJECT: Ocoee Lakefront ATTN: Mr.Al Butlet PROPOSAL NO: 1 FROM: Rick A. Marchand DATE: 2/21/2019 WORK PROPOSED: Extension of Bluford Avenue Sewer Extension in accordance with P1 and P2 dated Feb 2019 as requested by the City of Ocoee in accordance with the attached back up and breakdown TOTAL COST OF PROPOSED CHANGE( DEDUCT) $ 66,944.67 CALENDER DAYS EXTENSION OF TIME The Prompt approval or rejection of this proposal is requested so that materials may be purchased if required and the change may be incorporated into the scope of the work. If this proposal is not returned to MARBEK Construction Co. within(7) seven working days from the date of issuance, the proposal shall be considered rejected and the work shall proceed per the contract plans and specifications. Signatures in the spaces below indicate your intent to issue a change order to the contract in the amount shown above. MARBEK Construction Red rot 7X,anc/uted 2/21/2019 Rick A. Marchand MARBEK CONSTRUCTION CO. PROPOSED CHANGE SUMMARY DATE: 2/21/2019 P.C. No. 1 DESCRIPTION: Bluford Avenue Sewer extension SUBCONTRACTORS Foshee $ 57,071.33 $ - $57,071.33 EQUIPMENT/MATERIALS $0.00 $0.00 $0.00 SUBTOTAL $0.00 SALES TAX @ 7% $0.00 $0.00 $0.00 LABOR SUPERVISION $0.00 CARPENTER $0.00 DEMO LABORERS $0.00 SUBTOTAL $0.00 LABOR BURDEN @ 35% $0.00 $0.00 $0.00 ADMINISTRATIVE ESTIMATING $0.00 GEN COND. $0.00 AS-BUILTS/REPORTING $0.00 $0.00 $0.00 SUBTOTAL $57,071.33 OVERHEAD&PROFIT $8,560.70 Bond $1,312.64 TOTAL $66,944.67 COR-19-02-C006-V1R0 Bluford Sanitary Extension Nit Date:2/21/19 FOSHEE CONSTRUCTION CO., INC. 300 Virginia Street 34715 Min nVanL Contact: Jim VanLandegend i Phone: 352-394-7211 Fax: 352-394-3991 Ouote To: Marbek Job Name: Ocoee Lakefront Park Date of Plans: Phone: Revision Date: Fax: Attn: Rick Marchand Email: rick@marbekconstruction,com ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT **SANITARY SEWER** 102 PHYSICAL LOCATE EXISTING UTILITIES 1.00 LS 1,337.33 1,337.33 103 DEMO EXISTING FORCEMAIN 1.00 LS 298.67 298.67 104 RELOCATE VALVE VAULT 1.00 LS 1.331.93 1,331.93 105 CONNECT TO EX.LIFT STATION 12.25'DEEP 1.00 EA 6.381.07 6,381.07 106 CONNECT TO EX.10"GRAVITY PIPE APROX. 1.00 EA 2,006.02 2,006.02 11.9'DEEP 107 CONNECT TO 4"FORCE MAIN IN THREE 1.00 LS 1,776.01 1,776.01 LOCATIONS 108 10"(SDR-26)PVC 12/14' 209.00 LF 60.69 12,684.21 110 4"PVC(DR-25) 100.00 LF 10.69 1,069.00 112 4"90 DEGREE BENDS 4.00 EA 452.76 1,811.04 114 4"22.5 DEGREE BEND 1.00 EA 439.48 439.48 116 SANITARY TESTING 209.00 LF 2.32 484.88 118 PRESSURE TESTING 1.00 LS 1.621.60 1,621.60 120 DEWATERING(WELLPOINT) 300.00 LF 20.50 6,150.00 **SUB-TOTAL SANITARY SEWER** $37,391.24 **GENERAL CONDITIONS/ ADMINISTRATION** 1005 MOBILIZATION&GENERAL CONDITIONS 1.00 LS 9,479.63 9,479.63 1010 SURVEY/LAYOUT/CONSTRUCTION STAKING 1.00 LS 993.97 993.97 1015 CERTIFIEDAS-BUILTS 1.00 LS 1,547.57 1,547.57 **SUB-TOTAL GENERAL CONDITIONS** S12,021.17 **5%OVERHEAD ALLOWANCE** 2005 5%OVERHEAD ALLOWANCE 1.00 LS 2,470.62 2,470.62 **SUBTOTAL 5%OVERHEAD $2,470,62 ALLOWANCE** Page 1 of 2 ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT **10%PROFIT ALLOWANCE** 2020 10%PROFIT ALLOWANCE L00 LS 5,188.30 5,188.30 **SUBTOTAL 10%OVERHEAD** SS,180.30 GRAND TOTAL S57,071.33 NOTES; I.SITE SPECIFIC QUALIFICATIONS: 1)All bypass pumping and sewage contrtol including monitoring is solely the liability of the city of Ocoee. 2)Vault box will bee exposed and above grade along the sidewalk. 3)With relocation of the valve vault positive drainage from the p trap/vault drain is not gaurenteed. 4)No insertion elevations will be changed in the wet well. 5)All dewatering to be discharged into city of Ocoee MS4 Drainage system with no additional filtering included. 6)FCCI takes no liability for proper alignment of existing gravity main to precisely intersect with existing wet well. Jim VanLandegnd Estimator Foshee Construction Co.Inc. Page 2 of 2