Loading...
HomeMy WebLinkAboutItem VII (G) Authorization to Award Vehicle and Materials Storage Building Construction Contract to General Constructors, Inc Agenda 11-02-99 Item VII G "CENTER OF GOOD LIVING-PRIDE OF WEST ORANGE" MAYOR•COMMISSIONER Ocoee S.SCOTT VANDERGRIFT • o CITY OF OCOEE COMMISSIONERS DANNY HOWELL 150 N.LAKESHORE DRIVE SCOTT ANDERSON G OCOEE,FLORIDA 34761-2258 RUSTY JOHNSON •A (407)656-2322 NANCY J.PARKER E� OF GOOD�` CITY MANAGER ELLIS SHAPIRO MEMORANDUM Date: October 25, 1999 To: The Honorable Mayor and Board of City Commissioners From: James W. Shira, P.E., City Engineer/Utilities Director Subject: Utility Department Maintenance Facility On January 1, 1997, the City of Ocoee issued its Series 1997 Water and Sewer System Improvement Revenue Bonds in the amount of $10,150,000.00. The purpose of this bond issue was to fund certain improvements to the water and wastewater system, the sum of those improvements being referred to in the Official Statement as "The Project". A copy of the Official Statement (OS) is attached for your review. The Project is described on pages 33 and 34 of the OS, and you will note that one component of the Project is a Maintenance Facility identified as having an estimated cost of $500,000.00. Also attached is a copy of the Engineering Report which was a part of the Series 1997 Water and Sewer System Improvement Revenue Bonds package. This report also refers to a maintenance facility as a necessary part of the overall Project, and also indicates an estimated cost of $500,000.00. This maintenance facility was intended to serve multiple purposes. First and foremost, it was to provide an enclosed storage area for several pieces of large equipment owned by the utility. These pieces of equipment and their dates of purchase and purchase price are: Bobcat loader and trailer 6/99 $ 22,049.00 Sludge Truck 2/89 $ 64,782.00 Vactor truck 1/96 $151,946.75 TV Truck 8/96 $117,790.00 Backhoe 7/91 $ 25,899.00 Dump truck 10/98 $ 59,386.00 As you can see, the total value of this equipment is itself nearly $450,000.00. It has been our policy to try to keep our equipment in the best possible condition, to extend the life of the equipment and minimize equipment replacement costs. One of the best ways to accomplish this is to shield the equipment from the elements as much as possible. POW! 0r-7 Protect Ocoee's Water Resources We considered constructing a pole barn to cover this equipment, but decided against this approach for a variety of reasons. First, while a pole barn would shield equipment from direct sun, it would provide little protection from rain, nor would it provide any protection for the equipment in the event of a hurricane. Second, the purpose of the building was not limited to storage of large equipment. In addition to storage of large equipment, the maintenance facility was to be used as a small equipment storage building, and also to provide storage for parts and supplies for the water and wastewater utility divisions. Small equipment includes such things as pressure washers, chain saws, concrete saws, hand tools, pumps, spare motors and generators. The total value of this equipment is approximately $300,000.00. Much of this small equipment is now stored outdoors, and although we have it covered with tarps or under whatever makeshift shelter we can find, it is deteriorating rapidly. This equipment needs to be stored completely out of the weather to maximize its useful life. The parts and supplies include water meters, pipe fittings, pipe repair clamps, water system valves, and a variety of electrical equipment needed to maintain our 36 lift stations and the dozens of electrical motors and control panels at the water and wastewater plants. The value of the parts and supplies on hand can at any time, vary between $200,000.00 to $400,000.00. The proposed building contains three separate enclosed areas which will be used to provide secure storage for these equipment and supply materials. We also intend to include within the building, a combined workshop and welding area. This will provide us with a safe, dry environment within which to maintain and repair our equipment, and to operate electrical welding equipment used to repair and fabricate various fittings and fixtures used in the water and wastewater plants. The value of the equipment and supplies to be stored in this building easily approaches, and at times will exceed, one million dollars. On August 5, 1997 the City Commission authorized Gee & Jenson Engineers-Architects- Planners, Inc. to prepare a programming and site evaluation study to provide the city with a conceptual layout and conceptual budget for this maintenance facility. This was Work Order #9 under Gee & Jenson's contract with the City. On March 9, 1998 the City Manager transmitted to the City Commission a Project Activity Plan which included, among many other projects, a Utility Maintenance Facility. On April 7, 1998 the City Commission received a copy of a report from Gee & Jenson, Inc. titled Improvements to the A.D. Mims Wastewater Treatment Plant Programming/Site Evaluation. This report was, and was intended to be, nothing more than a preliminary, conceptual analysis of the feasibility and potential costs involved with the construction of a PoW Protect kcoee's Water Resources maintenance building on the wastewater treatment plant site. Based on the preliminary, conceptual level of information available at that time, Gee & Jenson, Inc. estimated in this report that the maintenance building would cost approximately $490,000.00. Also on April 7, 1998, the City Commission authorized Gee & Jenson to proceed with Work Order #10 which was the development of a design criteria package for the maintenance building. This design criteria package was to be used later, as the basis for bidding a design/build project for the construction of the building. On May 14, 1998 the City informed Gee & Jenson that the City was terminating Work Order #10 and that Gee & Jenson was to cease all activity on the project. On November 20, 1998 letters were sent to Glace & Radcliffe, Inc., Ivey, Harris and Walls, Inc., and Hartman & Assoc., Inc. requesting fee proposals for the design of the maintenance building and associated site work. On January 19, 1999 the City Commission authorized Glace & Radcliffe, Inc. to proceed with this work under Service Authorization No. 99-002. On August 31, 1999 Glace & Radcliffe, Inc. provided to the City an Engineer's Estimate of Probable cost for this project. The estimated total cost of the project was $613,217.28. On October 12, 1999 bids were received for this project. The high bid was $796,900.00 which was $306,900.00 or 63% over Gee & Jenson's $490,000.00 conceptual cost. The high bid was $183,682.72 or 30% over the engineer's estimate, and was $296,900.00 or 59% over the original bond estimate. The low bid was $565,403.00 which was $75,403.00 or 15% over Gee & Jenson's $ 490,000.00 conceptual cost. The low bid was $47,814.28 or 8% under the engineer's estimate, and was $65,403.00 or 13% over the original bond estimate. Because of the volume of work involved in preparing plans and specifications for the many projects that were part of this bond issue, we felt that those projects which would provide the most immediate benefit to the citizens of Ocoee should receive priority. Thus we concentrated our efforts on the design and construction of the various water mains that were funded with bond proceeds. As with any group of projects that are designed and constructed over a period of years, the individual cost of each project is affected by inflation. Using the change in the Consumer Price Index from early 1997 to mid 1999, the original bond estimate of $500,000.00 for this building would need to be adjusted to $523,800.00 to keep pace with the Consumer Price Index. The bond documents envisioned a project timeline of approximately three years, and it would not be realistic to believe that all of the work that was to be performed could be done in such a short period of time that the effects of inflation could be discounted. POINT Protect Ocoee's Water Resources When the original bond estimate of $500,000.00 is adjusted to $523,800.00 to account for the effects of inflation, the low bid of $565,403.00 is less than 5% above the adjusted estimate. The attached spreadsheet shows a breakdown of the conceptual costs provided by Gee & Jenson and the final costs as taken from the low bid. As you can see, the primary increase in cost is in the building systems area. This includes such things as plumbing and electrical work, as well as concrete and concrete block work. All of this work is labor-intensive, and the costs reflect the current condition of the construction trades, in that labor is in short supply compared to the volume of work. If we subtract the building systems from the total job, the Gee & Jenson estimate for the remainder would be $358,875.000 and the remainder of the low bid would be $281,406.00, nearly 28% lower. This shows that the low bid is indeed, very competitive, but also points out the fact that the building trades are very busy, and can thus command a high price for their work. It is important to remember that when Gee & Jenson prepared their conceptual estimate, they did so with absolutely no plans, and only a conceptual idea of the site work involved. Their work was only supposed to provide us with an order-of-magnitude estimate, not a firm construction estimate. It is also important to note that when the original bond estimate of $500,000.00 was prepared nearly three years ago, it was done with even less information than Gee & Jenson had at their disposal. Based on the information above, I believe that the original bond estimate, and the conceptual cost estimate provided by Gee & Jenson have both proven to be exceptionally accurate. I believe the low bid submitted by General Constructors, Inc. in the amount of $565,403.00 is very much in line with all of the previous estimates. I recommend that the City Commission authorize the Mayor and City Clerk to execute a contract with General Constructors, Inc. in the amount of $565,403.00 for the construction of the Vehicle and Material Storage Building Project in accordance with the following steps: • Authorize the Engineering Department to execute the Notices of Intent To Award and secure executed contract documents, bonds and insurance from the contractor. • Authorize the Mayor and City Clerk to execute the contract with General Constructors, Inc. at such time as the contract documents are reviewed for compliance by staff and legal counsel, as needed. PoW ProtectOcoee`s Water Resources OFFICIAL STATEMENT $10,150,000 CITY OF OCOEE, FLORIDA Water and Sewer System Improvement Revenue Bonds, Series 1997 INTRODUCTION The purpose of this Official Statement, includingthe cover vcer page, theSummary th a e Statement and all appendices, is to set forth certain informationprincipal amount of by the City of Ocoee, Florida (the "City") of its $10,150,000 aggregate Water and Sewer System Improvement Revenue Bonds, Series 1997 (the "Series 1997 Bonds"). The Series 1997 Bonds are being issued pursuant to the tutessuand other applicable tion and Laws of the State of Florida, including Chapter 166, Part II, Florida 93-02 provisions of law (the "Act"), the Charter of the City of Ocoee,es l t onNo.amended and adopted by the City Commission of the CitybyResolution No. 96-32, adopted supplemented, in particular as amended and supplemented by the City Commission of the City on December 3, 1996 (collectively, the "Resolution"). ble s The Series 1997 Bonds are being issued, together with other legally (thea Prof und"s to: (i) expand the capacity of and construct and acquire other acquire eria surerobond h " amount to the City's water and sewer system(the "System"), (ii) e t e ual to the Reserve Requirement for the Series 1997 Bonds for deposit into idn o tpay costs in qpremium.e the Reserve Fund established for the benefit of the Sones 199 , of issuance of the Series 1997 Bonds, including the municipalobondf the nsurancSeries 997 Bou seeo additional information concerning the use of the proceeds "ESTIMATED SOURCES AND USES OF FUNDS" herein. The Series 1997 Bonds and the interest thereon are payable solely from and secured by a prior lien upon and a pledge of: (i) the Net Reve f�e Sewe of theSSyst m ystem, (ii) the Sewer De Development System Development Charges, but only to the extent Charges Bond Service Component, (iii) the Water System Dd Se o e Development CCharges, butent, only to the extent of the Water System Development Charges B (iv) until applied in accordance with the provisions of the Resoanle Rebate Fund) eon, certain ys, including ng investments thereof, in the funds and accounts (other S h prior lien on and pledge of the the Resolution (collectively, the "Pledged Funds"). Pledged Funds is on a parity with the lien on and pledge of the Pledged Funds that has been granted to the holders of the City's Water and Sewer System Refunding and Improvement Revenue Bonds, Series 1993 (the "Parity Bonds") currently outstanding in the aggregate principal amount of$7,850,000 and which may, in the future, be granted in connection with the issuance of any Additional Bonds. For additional information concerning the security for and source of payment of the Series 1997 Bonds, see "SECURITY AND SOURCES OF PAYMENT FOR THE SERIES 1997 BONDS" herein. This Official Statement speaks only as of its date and the information contained herein is subject to change. Capitalized terms used but not defined in this Official Statement have the same meanings as used in the Resolution, unless the context clearly indicates otherwise. Complete descriptions of the terms and conditions of the Series 1997 Bonds are set forth in the Resolution, a summary of certain provisions of which is attached to this Official Statement as Appendix D. The description of the Series 1997 Bonds, the documents authorizing and securing the same, and the information from various reports and statements contained herein are not comprehensive or definitive. All references herein to such documents, reports and statements are qualified by the entire, actual content of such documents, reports and statements. Copies of such documents, reports and statements referred to herein that are not included in their entirety in this Official Statement may be obtained, after payment of applicable copying and mailing costs, from the City of Ocoee, at 150 North Lakeshore Drive, Ocoee, Florida 34761, Attention: City Manager. SECURITY AND SOURCES OF PAYMENT FOR THE SERIES 1997 BONDS General The Series 1997 Bonds are payable solely from and secured by a prior lien upon and pledge of(i) the Net Revenues derived from the operation of the System, (ii) the Sewer System Development Charges, but only to the extent of the Sewer System Development Charges Bond Service Component, (iii) the Water System Development Charges, but only to the extent of the Water System Development Charges Bond Service Component, and (iv) until applied in accordance with the provisions of the Resolution, certain moneys, including investments thereof, in the funds and accounts (other than the Rebate Fund) established by the Resolution (collectively, the "Pledged Funds"). In the Resolution, the City irrevocably pledges the Pledged Funds to the payment of the principal of, redemption premium, if any, and interest on the Series 1997 Bonds and the Parity Bonds, the reserves for the Series 1997 Bonds and the Parity Bonds and all other payments required under the Resolution. The Series 1997 Bonds and the interest thereon do not constitute a general , indebtedness of the City within the meaning of any constitutional, statutory or charter 2 provision or limitation, and the City has not pledged its full faith and credit for the payment of the principal of, redemption premium, if any, and interest on the Series 1997 Bonds. No Series 1997 Bondholder shall ever have the right to require or compel the exercise of the ad valorem taxing power of the City or taxation of any real or personal property of or in the City for the payment of the principal of, redemption premium, if any, and interest on the Series 1997 Bonds or the making of any reserve or other payments provided for in the Resolution. The Series 1997 Bonds and the indebtedness evidenced thereby do not constitute a lien upon the System, or any part thereof, or on any other property of or in the City, but shall constitute a lien only on the Pledged Funds all in the manner provided in the Resolution. The Resolution establishes the Revenue Fund, the Debt Service Fund (which includes the Principal Account, the Interest Account and the Redemption Account), the Reserve Fund, the Sewer System Development Charges Fund, the Water System Development Charges Fund and the Construction Fund. All such funds and accounts will be held by the City as trust funds, but no independent trustee has been appointed to hold the moneys in such funds for the benefit of the Holders of the Series 1997 Bonds. For information on all funds and accounts and the disposition and flow of revenues, see "APPENDIX D — SUMMARY OF CERTAIN PROVISIONS OF THE RESOLUTION—Funds and Accounts; Flow of Funds." The designation and establishment of the various funds and accounts by the Resolution does not require the establishment of any completely independent, self-balancing funds as such term is commonly defined and used in government accounting, but rather is intended solely to constitute an earmarking of certain revenues of the System for certain ourposes and to establish certain priorities for application of such revenues as provided in :he Resolution. Development Charges Pursuant to the Resolution, Sewer System Development Charges and Water System )evelopment Charges are defined as the impact fees and capital charges levied upon and ollected from new users of the Sewer System and Water System, respectively (or the )roceeds of any security provided for the payment thereof), if any, to the extent the same are awfully available for the acquisition and construction of Sewer Expansion Facilities and Vater Expansion Facilities, respectively, and for Sewer System Development Charges Bond ,ervice Component and for Water System Development Charges Bond Service Component, spectively. Such Development Charges do not include Connection Charges. Pursuant to the City Code and various ordinances of the City, the City imposes water apital charges and sewer capital charges that are based on equivalent residential units 'ERUs"), which are the City's estimates of the average daily water and sewer capacity sage, in gallons per day, for a single family residential household. The City has assigned 3 a value of 300 gallons per day per ERU for water capacity and 270 gallons per day per ERU for sewer capacity. The City imposes a water capital charge of$966 per ERU for the cost of providing water treatment facilities and extending water distribution and treatment lines to a point of reasonable availability for connection to the Water System. The City also imposes a sewer capital charge of$2,865 per ERU for the cost of providing sewage treatment facilities, effluent disposal facilities and pumping stations and extending sewer collection lines to a reasonable point of availability to the Sewer System. Such capital charges are due at the time the City issues a building permit. Only the Sewer System Development Charges Bond Service Component and the Water System Development Charges Bond Service Component, that portion of the debt service on the Series 1997 Bonds and Parity Bonds for a given year determined by multiplying the debt service on the Series 1997 Bonds and Parity Bonds for that given year by the percentage of the cost of the projects financed from the proceeds of the Series 1997 Bonds and Parity Bonds attributable to Sewer Expansion Facilities and Water Expansion Facilities, respectively, are pledged to the Series 1997 Bonds and Parity Bonds. Pursuant to the Resolution, the portion of the projects financed with proceeds of the Series 1997 Bonds and Panty Bonds which is attributable to Sewer Expansion Facilities and Water Expansion Facilities is determined by the Qualified Independent Consultant and set forth in a Project Certificate. The City's Consulting Engineer will set forth in a Project Certificate at the time of delivery of the Series 1997 Bonds that 100% of the Project to be financed with the proceeds of the Series 1997 Bonds are Expansion Facilities. In addition, 100% of the projects financed with the Parity Bonds are Expansion Facilities. Under Florida law, impact fees may be validly imposed against new construction in order to fund capital improvements which are necessitated by such new construction or for debt service for bonds or other obligations issued for such purposes. Proceeds of the fees must be placed in separate accounts and used only for the capital improvements attributable to the new construction. Pursuant to the Resolution, all Sewer System Development Charges are required, upon receipt, to be deposited in the Sewer System Development Charges Fund and all Water System Development Charges are required, upon receipt, to be deposited in the Water System Development Charges Fund. Impact fees have frequently been the subject of litigation in Florida and the City's development charges have not yet been tested in court. There can, therefore, be no assurances that, if challenged, the City's development charges would be found valid. Impact fee revenues fluctuate with the amount of new construction which occurs. There can, therefore, be no assurances that such revenues will not decrease or be eliminated altogether in the event that new construction, for whatever reason, might decrease or cease altogether within the City. 4 • Rate Covenant The City covenants in the Resolution to fix, establish, revise from time to time, whenever necessary, maintain and collect always such fees, rates, rentals and other charges for the use of the products, services and facilities of the System which, together with other Pledged Funds, will always provide Revenues in each year sufficient to pay (i) 100% of the aggregate of the amount needed to pay all Costs of Operation and Maintenance as the same shall become due in such year, 100%of all Bond Service Requirement becoming due in such year on the Outstanding Bonds and 100% of all other deposits to be made pursuant to the Resolution and(ii)together with the Sewer System Development Charges in an amount not greater than the Sewer System Development Charges Bond Service Component and the Water System Development Charges in an amount not greater than the Water System Development Charges Bond Service Component, the aggregate of the amount needed to pay the Cost of Operation and Maintenance as the same shall become due in such year, 110% of the Bond Service Requirement coming due in such year on the Outstanding Bonds, and 100%of all other deposits to be made pursuant to the Resolution. Such rates, fees, rental or other charges shall not be reduced so as to render them insufficient to provide revenues for such purposes. Revenues are defined as all income or earnings, including Connection Charges, received by the City or accrued to the City from the ownership, use or operation of the System and all parts thereof, including investment income, if any, earned on any fund or account created pursuant to the Resolution, and on any fund or account established by the City for the System, all as calculated in accordance with generally accepted accounting principles, but "Revenues" shall not include proceeds from the sale or other disposition of the System or any part thereof, condemnation awards or proceeds of insurance received with respect to the System. Further, "Revenues" do not include Sewer System Development Charges or Water System Development Charges or Contributions in Aid of Construction. Reserve Fund The Resolution provides for the establishment and maintenance of a Reserve Fund and provides for separate accounts within the Reserve Fund for each Series of Bonds issued pursuant to the Resolution. Upon delivery of the Series 1997 Bonds, the City shall deposit a surety bond issued by AMBAC Indemnity in an amount equal to the Reserve Requirement to the separate account in the Reserve Fund established for the benefit of the Series 1997 Bonds. Pursuant to the Resolution, the "Reserve Requirement" is defined as the lesser of: (i) the Maximum Debt Service Requirement, (ii) one and one-quarter times the Average Annual Debt Service Requirement, or (iii) such amount as will not adversely affect the exclusion of interest on the Series 1997 Bonds from the gross income of the holders of the Series 1997 Bonds for purposes of Federal income taxation. The City previously established 5 a separate account in the Reserve Fund for the Parity Bonds which is funded in an amount equal to the Reserve Requirement for such Bonds. Upon delivery of the Series 1997 Bonds, a surety bond issued by AMBAC Indemnity in an amount equal to the Reserve Requirement for the Parity Bonds will be deposited into the separate account of the Reserve Fund for the Parity Bonds and the funds in such account will be used for the Project. Proceeds of the surety bonds on deposit in each account in the Reserve Fund shall be applied in accordance with the provisions of the Resolution solely for the purpose of the payment of Amortization Installments, principal of, or interest on the Outstanding Series of Bonds for which such account was established and for no other Series of Bonds. Therefore, proceeds of the surety bond on deposit in the special account established for the benefit of the Series 1997 Bonds may not be used to pay Amortization Installments, principal or interest on the Parity Bonds and any other Series of Additional Bonds. Any withdrawals from an account in the Reserve Fund shall be subsequently restored from the first moneys available in the Revenue Fund, on a pro rata basis as to all accounts in the Reserve Fund, after all required current payments for Cost of Operation and Maintenance and all current applications and allocations to the Debt Service Fund, including all deficiencies for prior payments, have been made in full. Notwithstanding the foregoing, in no event shall the City be required to deposit into any account in the Reserve Fund an amount greater than that amount necessary to ensure that the difference between the Reserve Requirement for the Series of Bonds for which such account was established and the amounts on deposit in such account on the date of calculation shall be restored not later than 60 months after the date of such deficiency (assuming equal monthly payments into such account for such 60 month period). Additional Bonds Additional Bonds having a lien on and pledge of the Pledged Funds equal to that of the Series 1997 Bonds and Parity Bonds may be issued by the City to finance the cost of acquiring, constructing or completing an Additional Project or refunding any or all outstanding Bonds or any Subordinated Indebtedness. Before issuing Additional Bonds, the City must obtain and file in its public records a statement of an independent certified public accountant of reasonable experience and responsibility (the "CPA Certificate") which provides as follows: (a) stating that the books and records of the City relating to the Pledged Funds have been examined by him or her; (b) setting forth the amount of Pledged Funds which have been received by the City during any 12 consecutive months designated by the City within the 24 months immediately preceding the date of delivery of such Additional Bonds, including the Series 1997 Bonds, with respect to which such statement is made; (c) stating that the amount of the Net Revenues received during the aforementioned 12 month period equals at least 100% of the Maximum Annual Debt Service of all Bonds then 6 Outstanding and such Additional Bonds with respect to which such CPA Certificate is obtained; (d) stating that the amount of the Net Revenues together with the Sewer System Development Charges in an amount not greater than the Sewer System Development Charges Bond Service Component and the Water System Development Charges in an amount not greater than the Water System Development Charges Bond Service Component received during the aforementioned 12 month period equals at least 110% of the Maximum Annual Debt Service of all Bonds then Outstanding and the Additional Bonds with respect to which such CPA Certificate is obtained; (e) stating that the Net Revenues projected for the 12 month period following the issuance of such Additional Bonds is projected by the Consulting Engineer to equal not less than 100% of the Maximum Annual Debt Service on the Bonds and any proposed Additional Bonds; and (f) stating that the Net Revenues together with the Sewer System Development Charges in an amount not greater than the Sewer System Development Charges Bond Service Component and the Water System Development Charges in an amount not greater than the Water System Development Charges Bond Service Component projected for the 12 month period following the issuance of such Additional Bonds is projected by the Consulting Engineer to equal not less than 110%of the Maximum Annual Debt Service on the Bonds and any proposed Additional Bonds. The Net Revenues contained in the CPA Certificate may be adjusted upon recommendation by the Consulting Engineers by including: (a) 100%of the additional Net Revenues which, in the opinion of the Consulting Engineers, would have been derived by the City from rate increases adopted before the Additional Bonds are issued if such rate increases had been implemented before the commencement of the period for which Pledged Funds are being certified; and (b) 100%of the additional Net Revenues which, in the opinion of the Consulting Engineers, will be derived during the first full 12-month period after the date of placing in service the Additional Project financed with the proceeds of the Additional Bonds. The above conditions shall not apply to any Additional Bonds issued for the purpose of refunding any Bonds, provided that the issuance of such Additional Bonds does not increase the aggregate amount of principal and interest on the Outstanding Bonds coming due in the current Fiscal Year and all subsequent Fiscal Years. Subordinated Indebtedness The City may also at any time, or from time to time, issue evidences of indebtedness payable in whole or in part out of the Pledged Funds and which may be secured by a pledge of the Pledged Funds; provided, however, that such pledge shall be, and shall be expressed 7 to be, subordinated in all respects to the pledge of the Pledged Funds created by the Resolution. Investments The Construction Fund, the Revenue Fund, the Debt Service Fund, the Reserve Fund and all accounts and subaccounts in such funds shall be continuously secured in the manner by which the deposit of public funds are authorized to be secured by the laws of the State of Florida. Moneys on deposit in the Construction Fund, the Debt Service Fund, the Reserve Fund(except the reserve account for the Series 1997 Bonds), the Revenue Fund, the Sewer System Development Charges Fund, the Water System Development Charges Fund and all accounts and subaccounts in such funds may be invested and reinvested by the City and as directed by the City in Permitted Investments maturing no later than the date on which the moneys therein will be needed. Any and all income received by the City from the investment of moneys in each fund or account created pursuant to the Resolution, except the Construction Fund, shall be retained in such respective fund or account until the amount required to be on deposit therein shall be on deposit in such fund or account, and thereafter shall be transferred to the Revenue Fund. Any and all income received from the investment of moneys in the Construction Fund shall remain on deposit in such fund until the amounts required to complete the Project are on deposit therein, and thereafter shall be transferred to the Revenue Fund. Nothing contained in the Resolution shall prevent any Permitted Investments acquired as investments of or security for funds held under the Resolution from being issued or held in book-entry form on the books of the Department of Treasury of the United States. Other Covenants Pursuant to the Resolution, the City has additionally covenanted: (i) not to render or cause to be rendered either free of charge or for a nominal charge to any person, firm or corporation, public or private, the services and commodities of the System, provided the City may, on behalf of the City or on behalf of any person, firm or corporation, pay for such facilities, services and commodities with legally available funds of the City, other than Pledged Funds, (ii)to the full extent permitted by law, not to grant any franchise, license or permit for the construction or operation or any competitive water and sewer facilities in the territorial area serviced by the City which the City determines will adversely affect Revenues, and(iii) to diligently enforce and collect the rates, fees and charges for the service and facilities of the System. See "THE SYSTEM — Territorial Agreement" and "SUMMARY OF CERTAIN PROVISIONS OF THE RESOLUTION" in Appendix D hereto. 8 MUNICIPAL BOND INSURANCE The following information has been furnished by AMBAC Indemnity Corporation ',"AMBAC Indemnity") for use in this Official Statement. See Appendix G hereto for a specimen of the AMBAC Indemnity's policy. Payment Pursuant to Municipal Bond Insurance Policy AMBAC Indemnity has made a commitment to issue a municipal bond insurance policy(the "Municipal Bond Insurance Policy") relating to the Series 1997 Bonds effective is of the date of issuance of the Series 1997 Bonds. Under the terms of the Municipal Bond nsurance Policy, AMBAC Indemnity will pay to the United States Trust Company of New York,New York, in New York, New York or any successor thereto (the "Insurance Trustee") hat portion of the principal of and interest on the Series 1997 Bonds which shall become )ue for Payment but shall be unpaid by reason of Nonpayment by the City (as such terms ire defined in the Municipal Bond Insurance Policy). AMBAC Indemnity will make such )ayments to the Insurance Trustee on the later of the date on which such principal and nterest becomes Due for Payment or within one business day following the date on which \MBAC Indemnity shall have received Notice of Nonpayment from the Paying Agent. The nsurance will extend for the term of the Series 1997 Bonds and, once issued, cannot be ;ancelled by AMBAC Indemnity. The Municipal Bond Insurance Policy will insure payment only on stated maturity lates and mandatory sinking fund installment dates, in the case of principal, and on stated lates for payment, in the case of interest. If the Series 1997 Bonds become subject to nandatory redemption and insufficient funds are available for redemption of all outstanding >eries 1997 Bonds, AMBAC Indemnity will remain obligated to pay principal of and interest m outstanding Series 1997 Bonds on the originally scheduled interest and principal payment lates including mandatory sinking fund redemption dates. In the event of any acceleration ,f the principal of the Series 1997 Bonds, the insured payments will be made at such times rid in such amounts as would have been made had there not been an acceleration. In the event the Paying Agent has notice that any payment of principal of or interest nn a Series 1997 Bond which has become Due for Payment and which is made to a Series 997 Bondholder by or on behalf of the City has been deemed a preferential transfer and heretofore recovered from its registered owner pursuant to the United States Bankruptcy :ode in accordance with a final, nonappealable order of a court of competent jurisdiction, uch registered owner will be entitled to payment from AMBAC Indemnity to the extent of -uch recovery if sufficient funds are not otherwise available. 9 The Municipal Bond Insurance Policy does not insure any risk other than Nonpayment, as defined in the Policy. Specifically, the Municipal Bond Insurance Policy does not cover: 1. payment on acceleration, as a result of a call for redemption (other than mandatory sinking fund redemption) or as a result of any other advancement of maturity; 2. payment of any redemption, prepayment or acceleration premium; or 3. nonpayment of principal or interest caused by the insolvency or negligence of any Trustee or Paying Agent, if any. If it becomes necessary to call upon the Municipal Bond Insurance Policy, payment of principal requires surrender of Series 1997 Bonds to the Insurance Trustee together with an appropriate instrument of assignment so as to permit ownership of such Series 1997 Bonds to be registered in the name of AMBAC Indemnity to the extent of the payment under the Municipal Bond Insurance Policy. Payment of interest pursuant to the Municipal Bond Insurance Policy requires proof of Series 1997 Bondholder entitlement to interest payments and an appropriate assignment of the Series 1997 Bondholder's right to payment to AMBAC Indemnity. Upon payment of the insurance benefits, AMBAC Indemnity will become the owner of the Series 1997 Bond, appurtenant coupon, if any, or right to payment of principal or interest on such Series 1997 Bond and will be fully subrogated to the surrendering Series 1997 Bondholder's rights to payment. The insurance provided by the Municipal Bond Insurance Policy is not covered by the Florida Insurance Guaranty Association. AMBAC Indemnity Corporation AMBAC Indemnity is a Wisconsin-domiciled stock insurance corporation regulated by the Office of the Commissioner of Insurance of the State of Wisconsin and licensed to do business in 50 states, the District of Columbia, the Territory of Guam and the Commonwealth of Puerto Rico, with admitted assets of approximately $2,543,000,000 (unaudited) and statutory capital of approximately $1,418,000,000 (unaudited) as of September 30, 1996. Statutory capital consists of AMBAC Indemnity's policyholders' surplus and statutory contingency reserve. AMBAC Indemnity is a wholly owned subsidiary of AMBAC Inc., a 100% publicly-held company. Standard & Poor's Rating Services, a division of The McGraw-Hill Companies, Inc. and Moody's Investors Service have each assigned a triple-A claims-paying ability rating to AMBAC Indemnity. 10 _ T i AMBAC Indemnity has entered into pro rata reinsurance agreements under which a ,ercentage of the insurance underwritten pursuant to certain municipal bond insurance rograms of AMBAC Indemnity has been and will be assumed by a number of foreign and omestic unaffiliated reinsurers. AMBAC Indemnity has obtained a ruling from the Internal Revenue Service to the ffect that the insuring of an obligation by AMBAC Indemnity will not affect the treatment N federal income tax purposes of interest on such obligation and that insurance proceeds presenting maturing interest paid by AMBAC Indemnity under policy provisions abstantially identical to those contained in the municipal bond insurance policy shall be eated for federal income tax purposes in the same manner as if such payments were made y the City. AMBAC Indemnity makes no representation regarding the Series 1997 Bonds or the ivisability of investing in the Series 1997 Bonds and makes no representation regarding, Dr has it participated in the preparation of, the Official Statement other than the information applied by AMBAC Indemnity and presented under the heading "MUNICIPAL BOND 4SURANCE." vailable Information The parent company of AMBAC Indemnity, AMBAC Inc. (the "Company"), is ii abject to the informational requirements of the Securities Exchange Act of 1934, as nended(the "Exchange Act"), and in accordance therewith files reports, proxy statements id other information with the Securities and Exchange Commission (the "Commission"). ich reports, proxy statements and other information may be inspected and copied at the iblic reference facilities maintained by the Commission at 450 Fifth Street, N.W., 'ashington, D.C. 20549 and at the Commission's regional offices at 7 World Trade Center, ew York, New York 10048 and Northwestern Atrium Center, 500 West Madison Street, lite 1400, Chicago, Illinois 60661. Copies of such material can be obtained from the public ference section of the Commission at 450 Fifth Street, N.W., Washington, D.C. 20549 at escribed rates. In addition, the aforementioned material may also be inspected at the fices of the New York Stock Exchange, Inc. (the "NYSE") at 20 Broad Street, New York, ew York 10005. The Company's Common Stock is listed on the NYSE. Copies of AMBAC Indemnity's financial statements prepared in accordance with Itutory accounting standards are available from AMBAC Indemnity. The address of VIBAC Indemnity's administrative offices and its telephone number are One State Street aza, 17th Floor, New York, New York 10004 and (212) 668-0340. 11 Incorporation of Certain Documents by Reference The following documents filed by the Company with the Commission (File No. 1- 10777) are incorporated by reference in this Official Statement: (1) The Company's Annual Report on Form 10-K for the fiscal year ended December 31, 1995, filed on April 1, 1996; (2) The Company's Current Report on Form 8-K dated January 31, 1996 and filed on February 28, 1996; (3) The Company's Current Report on Form 8-K dated March 13, 1996 and filed on March 14, 1996; (4) The Company's Current Report Form 8-K/A, First Amendment to Current Report on Form 8-K dated March 13, 1996 and filed on March 15, 1996; (5) The Company's Quarterly Report on Form 10-0 for the quarterly period ended March 31, 1996 and filed on May 15, 1996; (6) The Company's Quarterly Report on Form 10-0 for the quarterly period ended June 30, 1996 and filed on August 14, 1996; and (7) The Company's Quarterly Report on Form 10-Q for the quarterly period ended September 30, 1996 and filed on November 14, 1996. All documents subsequently filed by the Company pursuant to the requirements of the Exchange Act after the date of this Official Statement will be available for inspection in the same manner as described above under the heading "MUNICIPAL BOND INSURANCE POLICY - Available Information." THE SERIES 1997 BONDS General The Series 1997 Bonds shall be issued in fully registered form, without coupons, in the denomination of$5,000 each, or integral multiples thereof, shall be dated, shall bear interest computed on the basis of a 360-day year of twelve 30-day months at the rates and shall mature on the dates and in the amounts shown on the cover page hereof. 12 The Series 1997 Bonds shall bear interest from the interest payment date next receding the date on which it is authenticated, unless authenticated on an interest payment .ate, in which case it shall bear interest from such interest payment date, or unless uthenticated prior to the first interest payment date, in which case it shall bear interest from :s date. However, if at the time of authentication payment of any interest which is due and ayable has not been made, such Series 1997 Bond shall bear interest from the date to which iterest shall have been paid. The interest on the Series 1997 Bonds shall be payable by the Paying Agent, by check r draft on each interest payment date, to the registered owner thereof at the address as Town on the registration books kept by the Registrar at the close of business on the fifteenth ay of the calendar month immediately preceding such interest payment date (the "Record )ate"). At the written request and expense of a registered owner of$1,000,000 or more of eries 1997 Bonds, interest may be paid to such registered'owner by wire transfer or other tedium acceptable to the City and the Paying Agent. Payment of the principal of all Series 997 Bonds shall be made, when due, upon the presentation and surrender of such Series )97 Bonds at the office of the Paying Agent as the same shall become due and payable. Only Series 1997 Bonds which have endorsed thereon a certificate of authentication ily executed by the Registrar, as authenticating agent, shall be entitled to any benefit or !curity under the Resolution. No Series 1997 Bond shall be valid or obligatory for any irpose unless such certificate of authentication shall have been duly executed by the egistrar. The Series 1997 Bonds, upon surrender thereof at the office of the Registrar with a ritten instrument of transfer satisfactory to the Registrar, duly executed by the Holder ereof or such Holder's attorney duly authorized in writing, may, at the option of the Holder ereof, be exchanged for an equal aggregate principal amount of registered Bonds of the me type and maturity of the Bonds so surrendered. Series 1997 Bonds shall be transferable only upon the books of the City, at the office the Registrar, under such reasonable regulations as the City may prescribe, by the Holder ereof in person or by such Holder's attorney duly authorized in writing upon surrender ereof together with a written instrument of transfer satisfactory to the Registrar duly ecuted and guaranteed by the Holder or such Holder's duly authorized attorney. The City, Registrar and any Paying Agent or fiduciary of the City may deem and treat the person whose name any Outstanding Bond shall be registered upon the books of the City as solute owner of such Bond, whether such Bond shall be overdue or not, for the purpose receiving payment of, or on account of, the principal or Redemption Price, if applicable, d interest on such Bond and for all other purposes, and all such payments so made to any ch Holder, or upon such Holder's order, shall be valid and effectual to satisfy and ;charge the liability upon such Bond to the extent of the sum or sums so paid and neither 13 As the City nor the Registrar nor any Paying Agent or other fiduciary of the City shall be affected by any notice to the contrary. For exchange or transfer of Series 1997 Bonds, the City or the Registrar charge a sufficient amount to reimburse it for any tax, fee, expense or other governmental charge required to be paid with respect to such exchange or transfer. The City and the Registrar shall not be obligated to make any such exchange or transfer of Series 1997 Bonds during the 15 days next preceding an Interest Date on the Series 1997 Bonds, or, in the case of any proposed redemption of Series 1997 Bonds, then during the 15 days next preceding the date of the first mailing of notice of such redemption and continuing until such redemption date. In case any Series 1997 Bond shall become mutilated, or be destroyed, stolen or lost, the City may, in its discretion, issue and deliver, and the Registrar shall authenticate, a new Series 1997 Bond of like tenor as the Series 1997 Bond so mutilated, destroyed, stolen or lost, in exchange and substitution for such mutilated Series 1997 Bond or in lieu of and substitution for the Series 1997 Bond destroyed, stolen or lost, and upon the Holder furnishing the City and the Registrar proof of such Holder's ownership thereof and satisfactory indemnity and complying with such other reasonable regulations and conditions as the City or the Registrar may prescribe and paying such expenses as the City and the Registrar may incur. Optional Redemption The Series 1997 Bonds maturing on or prior to October 1, 2006 are not subject to redemption prior to their respective maturities. The Series 1997 Bonds maturing on or after October 1, 2007 are subject to redemption prior to maturity on or after October 1, 2006, at the option of the City, in whole at any time or in part on any interest payment date in such manner as shall be determined by the City and by lot within a maturity if less than a full maturity from any legally available moneys at a redemption price (expressed as a percentage of the principal amount) as set forth in the following table, plus accrued interest to the redemption date. Period During Which Redeemed Redemption (Both dates inclusive) Price October 1, 2006 through September 30, 2007 102% October 1, 2007 through September 30, 2008 101% October 1, 2008 and thereafter 100% 14 I� Ii Iandatory Redemption The Series 1997 Bonds which mature on October 1, 2016 are subject to mandatory ademption in part prior to maturity by lot, at redemption prices equal to 100% of the rincipal amount thereof plus interest accrued to the redemption date, beginning on )ctober 1, 2011, and on each October 1 thereafter, in the following principal amounts in the ears specified: Principal Year Amount 2011 $295,000 2012 310,000 2013 325000 2014 345,000 2015 365,000 2016* 385,000 .Maturity The Series 1997 Bonds which mature on October 1, 2026 are subject to mandatory ademption in part prior to maturity by lot, at redemption prices equal to 100% of the rincipal amount thereof plus interest accrued to the redemption date, beginning on 'ctober 1, 2017, and on each October 1 thereafter, in the following principal amounts in the ears specified: Principal Year Amount 2017 $405,000 2018 425,000 2019 450,000 2020 475,000 2021 500,000 2022 530,000 2023 560,000 2024 590,000 2025 625,000 2026* 660,000 Maturity 15 Notice of Redemption Notice of redemption of the Series 1997 Bonds must be: (i) filed with the Paying Agent; (ii) mailed, first class mail, postage prepaid, at least 30 days and not more than 60 days prior to the redemption date, to all Holders of Series 1997 Bonds to be redeemed at their addresses as they appear on the registration books as of 15 days before the mailing date; and(iii)mailed by registered or certified mail, postage prepaid, or by telecopy or facsimile transmission, at least 35 days before the redemption date, to the registered securities depositories and two or more nationally recognized municipal bond information services. Failure to mail such notice to one or more Holders of Series 1997 Bonds or any securities depositories or any defect therein shall not affect the validity of the proceedings for such redemption with respect to Holders of Series 1997 Bonds to which notice was duly mailed. Notice of any optional redemption of Series 1997 Bonds shall be given only upon the prior deposit into the Redemption Account of amounts sufficient to pay the principal of, interest accrued from the last interest payment date to the proposed redemption date and premium, if any, with respect to the Series 1997 Bonds to be redeemed. Upon surrender of any Series 1997 Bond for redemption in part only, the Registrar shall authenticate and deliver to the holder thereof a new Series 1997 Bond of an authorized denomination equal to the unredeemed portion of the Series 1997 Bond surrendered the cost of which shall be paid by the City. 16 ESTIMATED SOURCES AND USES OF FUNDS The proceeds to be received from the sale of the Series 1997 Bonds, including accrued interest on the Series 1997 Bonds to the date of delivery, are expected to be applied as follows: Sources of Funds Principal Amount of Series 1997 Bonds $10,150,000.00 Less: Original Issue Discount (130,121.95) Plus: Accrued Interest 11.966.19 Total Sources $10,031,844.24 Uses of Funds Deposit to Construction Fund(1) $ 9,729,612.20 Costs of Issuance) 290,265.85 • Deposit of Accrued Interest to Interest Account 11,966.19 Total Uses $10,031,844.24 (1) Moneys used to fund a portion of the Project. (2) Includes underwriter's discount, costs of issuance and bond insurance and surety bond premiums. 17 SCHEDULED DEBT SERVICE FOR THE SERIES 1997 BONDS Bond Year Series 1997 Bonds Ending Aggregate Parity Bonds Total October 1 Principal(1) Interest Debt Service Debt Service Debt_Service 1997 $ 120,000 $ 403,859.06 $ 523,859.06 $ 646,853.75 $ 1,170,712.81 1998 165,000 534,158.76 699,158.76 647,716.25 1,346,875.01 1999 170,000 527,723.76 697,723.76 647,591.25 1,345,315.01 2000 175,000 520,753.76 695,753.76 646,722.50 1,342,476.26 2001 185,000 513,403.76 698,403.76 644,962.50 1,343,366.26 2002 190,000 505,263.76 695,263.76 647,212.50 1,342,476.26 2003 200,000 496,713.76 696,713.76 648,442.50 1,345,156.26 2004 210,000 487,513.76 697,513.76 648,622.50 1,346,136.26 2005 220,000 477,643.76 697,643.76 647,722.50 1,345,366.26 2006 230,000 467,083.76 697,083.76 645,712.50. 1,342,796.26 2007 240,000 455,813.76 695,813.76 647,562.50 1,343,376.26 2008 255,000 443,813.76 698,813.76 647,437.50 1,346,251.26 2009 265,000 430,808.76 695,808.76 646,162.50 1,341,971.26 2010 280,000 417,028.76 697,028.76 648,737.50 1,345,766.26 2011 295,000 402,468.76 697,468.76 649,875.00 1,347,343.76 2012 310,000 386,612.50 696,612.50 649,575.00 1,346,187.50 2013 325,000 369,950.00 694,950.00 647,837.50 1,342,787.50 2014 345,000 352,481.26 697,481.26 649,662.50 1,347,143.76 2015 365,000 333,937.50 698,937.50 644,762.50 1,343,700.00 2016 385,000 314,318.76 699,318.76 648,425.00 1,347,743.76 2017 405,000 293,625.00 698,625.00 645,075.00 1,343,700.00 2018 425,000 270,843.76 695,843.76 695,843.76 2019 450,000 246,937.50 696,937.50 696,937.50 2020 475,000 221,625.00 696,625.00 696,625.00 2021 500,000 194,906.26 694,906.26 694,906.26 2022 530,000 166,781.26 696,781.26 696,781.26 2023 560,000 136,968.76 696,968.76 696,968.76 2024 590,000 105,468.76 695,468.76 695,468.76 2025 625,000 72,281.26 697,281.26 697,281.26 2026 660.000 37,125.00 697,125.00 697,125.00 Total $10,150,000 $10,587,914.28 $20,737,914.28 $13,596,671.25 $34,334,585 53 (1) Includes Amortization Installments for Term Bonds. 18 THE CITY The City of Ocoee, Florida was incorporated in 1925. It is bounded on the west by Winter Garden, Florida, and on the south by Windermere, Florida, and has a land area of approximately 20.5 square miles, making it the second largest city in land area of the thirteen cities in Orange County. As of April 1, 1996, the population of the City was estimated at 19,261, which ranks the City third in population of the cities in Orange County. The City is governed by a Commission-Manager form of government. The four City Commissioners and the Mayor are elected on staggered two-year terms of office, who in turn appoint the City Manager. History and Organization The City of Ocoee, Florida, is a municipal corporation created under the laws of the State of Florida. The current Mayor and commissioners, the years in which their terms expire, and their principal occupations are as follows: Commissioner Expiration of Term Occupation S. Scott Vandergrift, Mayor February 1997 Real Estate Leon "Rusty" Johnson February 1997 Mail Carrier Jim Gleason February 1998 Business Owner Scott A. Glass February 1997 Attorney Scott Anderson February 1998 Pilot For additional information concerning the City see Appendix A hereto. THE SYSTEM Introduction The Resolution defines the System as, collectively, the Water System and the Sewer System of the City. The Resolution defines the Water System as the complete water system now owned, operated and maintained by the City, together with any and all improvements, extensions and additions thereto hereafter constructed or acquired, together with all lands or interests therein, including plants, buildings, machinery, franchises, pipes, mains, fixtures, equipments and all property, real or personal, tangible or intangible, now or hereafter used in connection therewith. The Resolution defines the Sewer System as the complete sewer 19 system now owned, operated and maintained by the City, together with any and all improvements, extensions and additions thereto hereafter constructed or acquired, together with all lands or interests therein, including plants, buildings, machinery, franchises, pipes, mains, fixtures, equipment and all property, real or personal, tangible or intangible, now or hereafter used in connection therewith. The City initiated central water service in the early 1980's with construction of the Kissimmee Avenue Water Treatment Plant. The City expanded its water treatment service in 1986 by adding the Forest Oaks Water Treatment Plant. The newest water plant (South Water Treatment Plant)was added to the System in 1992 and the Kissimmee Avenue Plant • was removed from service in 1994 due to age and obsolescence. The City initiated central wastewater in 1987 with the acquisition of a private utility named Prima Vista Utilities. Initially the City provided water service to 650 ERUs. See "SECURITY AND SOURCES OF PAYMENT FOR THE SERIES 1997 BONDS -Development Charges" for a description of equivalent residential units and the values assigned by the City for an ERU of water capacity and an ERU of sewer capacity. At the present time, the City provides water and wastewater service to approximately 9,950 and 3,701 ERUs, respectively, located both within and outside the City's corporate limits. Of the water customers, approximately 7,861 ERUs are residential and approximately 2,089 ERUs are commercial. Of the wastewater customers, approximately 2,750 ERUs are residential and 951 ERUs are commercial. The following tables show the historic growth of the System's customers. The following table sets forth the total number of ERUs for the past five years: Historic Number of Water System ERUs Fiscal Year Total Water ERUs 1996 9,950 1995 9,437 1994 8,979 1993 8,505 1992 8,044 Source: City of Ocoee. 20 The following table sets forth the total number of sewer ERUs for the past five years: Historic Number of Sewer System ERUs January 1 Total Sewer ERUs 1996 3,701 1995 3,307 1994 2,917 1993 2,501 1992 2,117 ource: City of Ocoee. Additional water and sewer customers derive principally from new developments onstructed within the City's System service area. The City's municipal code requires all ew developments within its System service area to connect to the wastewater system in ccordance with Florida law. Pursuant to Florida law, a property owner utilizing a properly motioning septic system that can be reasonably connected to a wastewater system must onnect to such system within one year of being notified by the owner of the wastewater ystem of the availability of the wastewater facilities. The owner of a wastewater system lay, with the approval of the Florida Department of Health and Rehabilitation Services, raive the mandatory connection requirement if it fmds that mandatory connection is not squired for public health reasons. Vater and Sewer Territorial Agreements The Water System provides potable water to the City's water service area and the ewer System provides central wastewater service to the City's wastewater service area. The 'ity's water service area and its wastewater service area comprise approximately 15 square files and their boundaries, which include approximately 75% of the City's corporate limits ad certain unincorporated portions of Orange County, Florida (the "County"). The City's later service area is specifically described in the Water Service Territorial Agreement 2ontract No. W-88-06) dated November 14, 1988 between the City and Orange County, lorida (the "County"), as amended ( the "Water Territorial Agreement"). Pursuant to the Tater Territorial Agreement, the City and Orange County have agreed that a designated ortion of the City and unincorporated Orange County will be the exclusive water service rea of the City and that the County will not provide water service within such areas. The 'ity's designated service area may be amended from time to time based on future ircumstances upon the mutual consent of both parties. The parties also agreed to permit ach other to interconnect their water systems and to provide wholesale water service to the 21 1 connecting party at rates to be mutually agreed upon. The term of the Water Territorial Agreement began on November 14, 1988 and is effective for a period of 30 years (the "Initial Term"), with automatic renewals thereafter for one year periods. The Water Territorial Agreement may be canceled by either party after the Initial Term upon providing the other party with six months advance written notice. The City's wastewater service area is specifically described in that certain Orange County/Prima Vista Utility Company, Inc. Sewer Service Territorial Agreement (Contract No. S-87-8) dated June 8, 1987 between the Prima Vista Utility Company, Inc. (the "Utility") and the County, which was assigned by the Utility pursuant to that certain Assignment of Sewer System Territorial Agreement dated December 30, 1987 (collectively, the "Sewer Territorial Agreement"). Under the Sewer Territorial Agreement, the City and Orange County agreed that a designated portion of the City and unincorporated Orange County will be the exclusive sewer service area of the City and that the County will not provide sewer service within such areas. The City's designated sewer service area may be amended from time to time based on future circumstances upon the mutual consent of both parties. The parties also agreed to permit each other to interconnect their sewer systems and to provide wholesale sewer service to the connecting party at rates to be mutually agreed upon. The term of the Sewer Territorial Agreement began on June 8, 1987 and is effective for a period of 30 years (the "Initial Term"), with automatic renewals thereafter for one year periods. The Water Territorial Agreement may be canceled by either party after the Initial Term upon providing the other party with six months advance written notice. Administration The System is administered by the City's Utility Director/City Engineer, who reports directly to the City Manager. The Utility Director/City Engineer is James W. Shira, who has been an employee of the City since 1989. Mr. Shira is responsible for overseeing System construction and for managing the System. Mr. Shira is assisted by the Assistant Utilities Director/Assistant City Engineer, David A. Wheeler. Both Mr. Shira and Mr. Wheeler are professional engineers, registered to practice engineering in the State of Florida. Mr. Shira is also assisted by other City departments, such as the Finance Department, the Planning Department, the Personnel Department and the Public Works Department. The City also employs a Utility Superintendent, Robert Holland. Mr. Holland has been employed by the City since April, 1988. He possesses a Class "A" wastewater license and a Class "C" drinking water license. Mr. Holland is responsible for the overall daily operations of the System facilities and personnel and he reports directly to Mr. Shira. Mr. David Gosnell is the Chief Water Plant Operator and has been employed by the City since October, 1983. Mr. Gosnell possesses a Class "A" drinking water license. Mr. Gosnell is in direct charge of all personnel and facilities related to production and treatment of potable water and he reports directly to Mr. Holland. Mr. Fred Ostrander is the City's Chief Wastewater Plant Operator 22 and has been employed by the City since December, 1987. He possesses a Class "B" wastewater license and a class "C" drinking water license. Mr. Ostrander is in direct charge of all personnel and facilities related to collection, transmission of wastewater, as well as distribution and disposal of treated effluent and he reports directly to Mr. Holland. Employees The System employs 37 persons, not including administrative support from other City departments. Twenty persons are employed by the City to service the Water System and 17 persons are employed by the City to service the Sewer System. The employees of the System are not represented by a union. The City considers its relationship with its employees as amicable. The City contributes to a single employer defined benefit pension plan and trust (the "Pension Plan"). The contribution made by the City is allocated to the Water and Wastewater Fund based on covered payroll of employees whose salaries are charged to the Water and Wastewater Fund. Participation in the Pension Plan is a condition of employment. Benefits fully vest on reaching five years of service. Benefit provisions and all other requirements are established by City ordinance. Members of the Pension Plan are required to make regular contributions to the plan in the amount of 5%of their salary. The City is required to make quarterly contributions to the Pension Plan equal to the difference in each year, between the total aggregate member contributions and the total cost as shown by the most recent actuarial valuation of the Pension Plan. The City offers its employees a single employer deferred compensation plan created in accordance with Section 457 of the Internal Revenue Code (the "Deferred Compensation Plan"). The Deferred Compensation Plan is voluntary and any employee may elect to participate. The Deferred Compensation Plan permits employees to defer a portion of their salary until future years. The deferred compensation is not available to employees until termination, retirement, death, or unforeseeable emergency. Water System The City receives its raw water through withdrawals from five existing City owned deep wells located at each of the City's three existing water treatment plants, which draw water from the upper Floridan Aquifer. The City currently has two additional deep wells under construction which will also draw raw water from the lower Floridan Aquifer. Raw 23 water is treated at each of the City's water treatment plants by a process that includes aeration for removal of hydrogen sulfide, disinfection by free residual chlorination and fluoridation. Treated water is routinely tested for bacteriological and chemical parameters in an outside certified laboratory to ensure compliance with applicable state and Federal regulations. Treated water is pumped to three water storage tanks located at each of the existing water treatment plants and then discharged to the System customers through the water distribution system. The City's three water treatment plants are briefly described below: 1. Jamela Plant. The Jamela Plant is located in the northern portion of the City's service area at Wurst Road and Jamela Drive. The Jamela Plant is the oldest water treatment plant in the Water System and it provides treated water to the northern portion of the City's water service area. Raw water is supplied to the Jamela Plant from two of the City's deep wells, each of which are equipped with a vertical turbine low service pump that are rated at 550 gallons per minute ("gpm") and 2,000 gpm, respectively. Raw water is treated in a 500,000 gallon concrete ground storage tank and discharged into the water distribution system and into a 500,000 steel elevated storage tank by three high service pumps. Two of the high service pumps are rated at 1,000 gpm and one is rated at 1,200 gpm. The Jamela plant is also equipped with a 250 kilowatt standby engine generator which is capable of operating the 2,000 gpm well and a high service pump in the event of a loss of primary power. The Jamela plant is not suitable for future expansion and upgrade. The Jamela Drive plant has its high service pumps and associated electrical panels located below grade in a concrete structure that was previously used as a water storage tank. Also, the existing elevated storage tank at this plant cannot be taken off-line for inspection or repair due to a frozen valve on the pipe which serves both to fill and empty the tank. Due to the deteriorated condition and high maintenance requirements of the Jamela plant, Professional Engineering Consultants, Inc., the Consulting Engineers to the City, has recommended that the Jamela plant be removed from service upon the completion of improvements to the Forest Oaks plant and the South plant. The City anticipates removing the Jamela plant from service in 1998. 2. Forest Oaks Plant. The Forest Oaks plant is located in the northeast portion of the City's service area along Hackney-Prairie Road. The Forest Oaks plant has been in service for ten years and provides treated water to customers in the City's northern water service area. Raw water is supplied to the Forest Oaks plant from two of the City's deep wells, each of which are equipped with a vertical turbine low service pump that are rated at 700 gpm and 2,000 gpm, 24 respectively. A third deep well is presently under construction and will be equipped with a vertical turbine engine rated at 3,500 gpm. Raw water is treated in a 400,000 gallon concrete ground storage tank and discharged into the water distribution system by three high service pumps. Two of the high service pumps are rated at 800 gpm and one is rated at 1,500 gpm. The Forest Oaks plant is equipped with a 275 kilowatt standby engine generator which is capable of operating both deep wells, the 1,500 gpm high service pump and the 800 gpm high service pump in the event of a loss of primary power. 3. South Plant. The South Plant is located in the Southern portion of the City's service area approximately one mile south of State Road 50 and 1/2 mile east of Maguire Road. The South plant was constructed in 1992 and provides treated water to customers in the City's southern water service area. Raw water is supplied to the South plant from a deep well, which is equipped with a vertical turbine low service pump that are rated at 3,500 gpm. A second deep well is currently under construction and will be equipped with a vertical low service pump rated at 3,00 gpm. Raw water is treated in a 670,000 gallon concrete ground storage tank and discharged into the water distribution system by four high service pumps. One of the high service pumps is rated at 370 gpm, two are rated at 540 gpm and the fourth one is rated at 1,350 gpm. The South plant is equipped with a 500 kilowatt standby engine generator which is capable of operating the entire South plant in the event of a loss of primary power. The combined maximum permitted pumping capacity of the three plants is approximately 5.53 million gallons per day ("mgd"). The current average monthly production is approximately 4.10 mgd. The Water System currently serves approximately 8,000 water customers, representing approximately 9,950 ERU's, with an additional 3,519 ERU's reserved through various developer agreements. These ERU's represent approximately 1.1 mgd of reserved capacity. The water consumptive use permits for the five City owned deep wells allow 3.342 mgd average day withdrawal and 6.684 mgd maximum day withdrawal. As shown in the table below, the average daily flow for the Water System in Fiscal Year 1996 was 3.912 mgd. The City's distribution system includes approximately 175 miles of localized piping ranginf in size from 6 to 16 inches in diameter. The distribution system is divided into a northern piping network and a southern piping network, with the northern and southern isolated by a number of closed valves because of significant elevation differences between the central northern portion of the System and the remainder of the System. The City's water distribution system extends to all but the recently annexed northwestern portion of the City. 25 Historic Water Consumption Flows Fiscal Average Daily Year Flow (mgd) 1996 3.912 1995 3.680 1994 3.011 1993 3.072 1992 2.797 Source: City of Ocoee. See "APPENDIX B — ENGINEERING REPORT OF PROFESSIONAL ENGINEERING CONSULTANTS, INC." for additional information concerning the Water System. Sewer System The Sewer System currently consists of approximately 40 miles of sewage collection system piping, one wastewater treatment plant, 32 pumping stations, and 280 acres of property available for effluent disposal. Effluent disposal property consists of 40 acres of property located at the wastewater treatment plant and the City's 240 acre remote effluent disposal site, which the City has leased to Forest Lake Club, Ltd. and which has been converted into the Forest Lake Golf Course (the "Golf Course"). The City owns, operates and maintains approximately 40 miles of wastewater collection system, which utilizes a combination of gravity and force main systems to collect and transport wastewater to the wastewater treatment plant. The gravity wastewater collection system consists of PVC pipes ranging from 6 to 15 inches in diameter. The force main wastewater collection system consists of PVC and ductile iron pipes ranging from 6 to 12 inches in diameter. The City owns, operates and maintains 32 pump stations that are used for wastewater collection and discharge. The wastewater treatment plant is located at 1800 A.D. Mims Road, on a 128-acre site and was purchased from the Utility in 1988. The wastewater treatment plant is a poured in place concrete structure and utilizes a new and efficient Kruger Treatment Process (biodenitrofication) that results in substantial reduction of operation and maintenance expenses. The wastewater plant is equipped with tertiary filters, chemical feed and high- level disinfection facilities. The wastewater treatment plant has an estimated useful life of 50 years. The wastewater plant is staffed by operators with class "B" and "C" wastewater 26 licenses in accordance with state laws and DEP rules. The operation of the wastewater plant is highly automated and is computer controlled. The wastewater plant is staffed 8 hours per day, 5 days per week. Operational anomalies are detected by the automated process control system, and plant personnel are automatically notified by pager that a fault condition has occurred. This high level of control enabled DEP to issue a permit based on 8 hours per day on-site staffing rather than the standard 16 hours per day. The wastewater treatment plant is also capable of producing reclaimed water. Under normal operating conditions, all of the reclaimed water produced by the wastewater treatment plant is discharged to the Golf Course. The current designated treatment capacity at the waste water treatment plant is 3.0 mgd, with a permitted treatment capacity limited by the current permitted effluent disposal capacity of 1.5 mgd. The current average daily flow at the plant is approximately 0.9 mgd, equivalent to approximately 3,701 ERU's, generated by approximately 3,100 existing customers. There are approximately 3,840 ERU's of capacity reserved through various developer agreements. These ERU's represent approximately 1.1 mgd of reserved capacity. Treated wastewater is transported to the Golf Course through a 12 inch low pressure piping system. Effluent disposal is currently accomplished by: (1) irrigating the Golf Course with reclaimed water from the wastewater treatment plant (total capacity of 1.0 mgd); (2) discharging effluent to two on-site percolation ponds located at the site of the wastewater treatment plant (total capacity of 0.5 mgd); and (3) discharging effluent to two percolation ponds located at the Golf Course (total capacity of 1.0 mgd). The following table sets forth the historic wastewater treatment flows from the wastewater facilities: Historic Wastewater Treatment Plant Flows Fiscal Average Daily Year Flow (mgd) 1996 0.9466 1995 0.9430 1994 0.8215 1993 0.8114 1992 0.6750 Source: City of Ocoee. 27 See "APPENDIX B — ENGINEERING REPORT OF PROFESSIONAL ENGINEERING CONSULTANTS, INC." for additional information concerning the Sewer System. Water and Wastewater Rates The System's rates structure includes a base facility charge and a volumetric consumption charge. Water and wastewater rates were adjusted on a System wide basis in 1992 following preparation of detailed cost of service rate studies. Historically, the City has adjusted water and sewer rates to meet increased revenue needs for the incurrence of new debt or to meet increased operating expenses. Because much of the System was originally designed and constructed to meet anticipated future increases in service demands. Since 1991, the monthly combined water and sewer charge for the typical residential customer who uses 10,000 gallons per month has increased from $40.56 to $41.25 per month. The following tables show the System's current rate structure: Existing Water Rates Meter Size (Inches) Base Facility Charge 5/8 $ 7.64 1 19.10 1.5 38.20 2 61.12 3 122.24 4 191.00 6 382.00 8 611.00 10 878.60 12 1,642.60 Plus: Volumetric charge of$0.51 per 1,000 gallons. Source: City of Ocoee Ordinance No. 92-19, adopted August 18, 1992. 28 I Existing Wastewater Rates Meter Size (Tnchesl Base Facility Charge_ 5/8 $ 13.81 1 34.53 . 1.5 69.05 2 110.48 3 220.96 4 345.25 6 690.50 8 1,104.80 10 1,588.15 12 2,969.15 Volumetric charge of$1.47 per 1,000 gallons for residential customers with a 5/8 inch meter up to 12,000 gallons. Source: City of Ocoee Ordinance No. 92-19, adopted August 18, 1992. The City's present water and wastewater rates compare favorably with that of other municipal and county utility systems in the Central Florida area. The following chart resents comparative information for an average residential bill for the City and surrounding p communities. 29 Comparison of Monthly Water and Wastewater Billing in the City of Ocoee and Surrounding Areas" Water Wastewater Total City of Ocoee $12.74 $28.51 $41.25 Otherimil Ttil;t es Brevard County $19.49 Indian River County $41.93 $61.42 32.70 43.98 76.68 Orange County 16.51 Seminole County 42.05 58.56 11.70 30.00 41.70 City of Apopka City of Casselberry 10.25 22.00 32.25 City of Lake Mary 14.00 34.70 48.70 City of Oviedo 19.80 35.00 54.80 City of Sanford 11.50 36.26 47.76 City of Winter Springs 17.14 35.57 52.71 City of Winter Park 7.75 36.33 47.63 7.75 23.81 31.56 City of Kissimmee City of Orlando 9.51 32.20 41.71 City of Melbourne 8.93 33.72 42.65 City of Daytona Beach 20.76 35.44 56.20 23.21 33.48 56.69 City of Titusville City of Cocoa 20.55 60.17 80.72 City of Winter Garden 14.72 34.00 48.72 11.73 26.18 37.91 Average $15.64 $35.38 $51.02 (1) Based on average monthly water and waste water rates in effect as of September, 1996. Amounts shown are exclusive of taxes, franchise fees and outside City surcharges, if any. Based on 10,000 gallons of water usage monthly. Source: City of Ocoee. 30 I i tevenue and Maintenance Fees; Impact Fees; Other Charges and Deposits The City charges its customers a water and wastewater capital charge of$966 and ,2,865,respectively. These charges are derived using a marginal/incremental or standards lriven methodology, which are based on the recovery of a new customer's proportionate ,hare of the present value of capacity-related capital projects during a base period. The City imposes on customers holding water capacity an annual Revenue and vlaintenance Fee of$93 per ERU or a monthly Revenue and Maintenance Fee of$9 per FRU. The Revenue and Maintenance Fee is paid beginning on the 12-month anniversary of he date that the water capacity is acquired until a customer connects to the Water System ind begins paying the rates set forth above. The City also imposes on customers holding sewer capacity an annual Revenue and Maintenance Fee of$121 per ERU or a monthly Revenue and Maintenance Fee of$13 per ERU. The Revenue and Maintenance Fee is paid beginning on the 12-month anniversary of the date a seWer capacity is acquired until a :,ustomer connects to the City Sewer System and begins paying the rates set forth above. B.M.L. Investments, a Florida general partnership, has acquired and holds a substantial portion of such water and sewer capacity and pays approximately one half of the Revenue and Maintenance fees presently received by the City. Collection Practices; Delinquencies All residential and commercial customer meters are read and billed monthly. The bills become delinquent 20 days after the billing date. At such time a $5 penalty is assessed. Utility service is terminated if payment of all charges and penalties is not received within 55 days from the billing date. Restoration of service requires full payment of all current utility charges,penalties and a restoration charge of$20. The customer may also be required to pay an additional deposit to restore service. Accounts which remain delinquent may be forwarded to authorized collection agencies and deposits may be applied to pay such delinquencies. [REMAINDER OF PAGE INTENTIONALLY LEFT BLANK] 31 Accounts receivable and allowance for estimated uncollectible account balances for the past five fiscal years are as follows: Fiscal Accounts Allowance for Estimated Year Receivable Uncollectible Accounts 1996 $802,400 $76,000 1995 677,327 81,000 1994 651,492 79,000 1993 649,308 53,100 1992 310,528 39,500 Source: City of Ocoee, Florida. Regulation The United States Environmental Protection Agency ("EPA") and the Florida Department of Environmental Protection("DEP"), promulgate various re System. Regulations regulations governing operation of the S Y deal primarily with the quality of effluent discharged from sewage treatment facilities, the disposal of sludge generated by the sewage treatment plants, the discharge of pollutants into the groundwater and the nature of waste material discharged into the collection facilities. Associated with the regulations are various monitoring and reporting requirements. The City's sewage treatment plant is properly permitted and does not have a history of permit violations. The City is not facing any EPA or DEP mandated schedules for elimination of discharges, or any sewage related administrative orders or consent decree decisions. The System currently is in compliance with all state and Federal regulations relating to its wastewater treatment facilities and process and the City does not anticipate that it will have any problems remaining in continued compliance with the DEP use permit. In addition to regulation of the sewage treatment facilities, EPA and DEP regulate the quality of the System's water. The City presently is in compliance with all applicable regulations relating to water quality. The consumptive use of water is administered by the St. Johns River Water Management District (the "District") through a consumptive use permitting system, pursuant to which water resources are divided among the permitted consumers. Pursuant to Chapter 373, Florida Statutes, the District issues consumptive use permits for the various wellfields existing within its jurisdiction, including the wellfields that supply water for the System. The provisions of Chapter 373, Florida Statutes, and the regulations promulgated thereunder provide for the issuance of a permit for new uses if the 32 I� proposed use of water (1) is reasonable and beneficial, (2) will not interfere with any presently existing legal uses of water, and (3) is consistent with the public interest. Presently, all applicable consumptive use permits for the water drawn for the System are in place, as well as the consumptive use permits for the two deep wells currently under construction. Such permits are valid until 2006 and provide the City with an increasing allocation of groundwater supplies. THE PROJECT Introduction In order to meet the future capacity demands on the System through the year 2016, the City has established certain long-range planning procedures. The City commissioned a Water, Sewer and Reuse Master Plan (the "Master Plan") in order to specifically determine the potential future capacity demands on the System through the year 2016. The City has also established a long-range capital improvement plan in the form of the Project pursuant to which certain improvements will be made to the System in order to meet future capacity demands through the year 2016. The Project includes improvements to both the Water System and the Sewer System. The estimated total cost of the Project is $10,813,000, of which$4,973,000 will be used for Water System improvements and $5,840,000 will be used for Sewer System improvements. The cost of the Project will be paid for or financed from the following sources: Existing funds from the City's Renewal and Replacement Account and Water and Sewer Capital Account $ 446,387.80 Funds from the separate account in the Debt Service Reserve Fund established for the holders of the Parity Bonds 637,000.00 Proceeds of the Series 1997 Bonds 9,729,612.20 Total Sources $10,813,000.00 Capital Improvements to Water System Proposed capital improvements to the Water System emphasize the construction of enhancements to the Forest Oaks and South water treatment plants and the expansion of the 33 water distribution system. The total estimated cost of such improvements is $4,973,000, as follows: Improvements to Forest Oaks plant $ 553,000 Improvements to South plant 648,000 Enhancements to distribution system 3,123,000 Engineering/Inspection Fee 649,000 $4,973,000 Capital Improvements to Sewer System Proposed capital improvements to the Sewer System emphasize the need to expand the capacity of the existing effluent disposal system to equal the capacity of the wastewater treatment facility. Pursuant to the Master Plan, an expanded reclaimed water system and the initiation of a reclaimed water retrofit program were identified as a cost effective means of expanding the capacity of the City's effluent disposal system. The retrofit program will provide reclaimed water to existing developments located adjacent to the major reclaimed water transmission mains. The City has also identified the expansion of the effluent disposal system at the Golf Course as a means of expanding the effluent disposal capacity of the Sewer System. The City proposes purchasing additional undeveloped acreage near the Golf Course in order to achieve such expansion. The capital improvements plan also identifies the need to construct a modem maintenance facility to provide a centrally located maintenance facility for the System as it is expanded. The total estimated cost of the expansion of the effluent disposal system is $5,840,000, as follows: Reclaimed Water Program $2,790,000 Retrofit Program 1,050,000 Effluent Disposal Expansion 1,500,000 Maintenance Facility 500,000 $5,840,000 SUMMARY OF CONSULTING ENGINEER'S CONCLUSIONS Professional Engineering Consultants, Inc. are the Consulting Engineers for the City with respect to the System. Based on its general familiarity with and review of the System as indicated in the Consulting Engineer's Report attached hereto as Appendix B, which Report should be read in its entirety in conjunction with the following, the Consulting Engineers have concluded that: 34 1. The System is in good condition and has been operated and maintained in accordance with standard utility industry practices, and provides good, reliable and cost-effective water and sewer service to the customers of the System. 2. The System is operated in compliance with current Federal, State and local regulatory requirements. All regulatory permits necessary for the operation of the System are current(renewal in progress) and in good standing. 3. The Project is necessary and provides water and sewer service for new growth. The average annual growth rate of 350 ERUs is reasonable and valid during the 20-year planning period. The Project is technically sound and conforms to proven and industry accepted engineering practice. The Project will provide for water and sewer system improvements and expansion which will meet Federal, State and local regulatory requirements and projected growth-related water and sewer demands for a 20-year period. 4. The proposed Project is or shall be designed in accordance with accepted engineering standards using proven conventional technology. The proposed improvements have or shall be designed with a high level of sensitivity to concerns held by nearby residents regarding aesthetic issues such as odor control, noise, lighting and utility. 5. The City's management and professional staff are well qualified and certified to manage, operate and maintain the System. 6. It is reasonable to assume that all required regulatory permits and/or governmental approvals shall be obtained in a timely manner for regulatory compliance and will be obtained prior to construction of the proposed Project and subsequently all necessary operating permits will be obtained for the completed capital improvements. 7. No material charges have occurred in the Project which will have a negative impact on the cost estimate for successful completion of the Project. 8. Proceeds from the Series 1997 Bonds will be sufficient for design, construction and implementation of the Project as described in the Report. 9. The useful life of the Project is in excess of the weighted life of the Series 1997 Bonds. 10. The adopted water and sewer rates are reasonable and sufficient to meet projected system operating expenses, estimate project cost recovery, debt service coverage for Series 1997 Bonds and renewal and replacement contributions. 35 1111111 --1, 11. Based on the analysis and evaluation contained in the Report, the capital fmancing of the City's proposed Project is economically feasible. HISTORICAL AND PROJECTED SCHEDULE OF NET REVENUES n AND DEBT SERVICE COVERAGE % The information in the following table sets forth the historical and projected Net n Revenues of the System and debt.service coverage. The historical data has been developed from data contained in the audited financial statements of the City for the fiscal years ended September 30, 1994, 1995 and 1996, respectively. The projected revenues and expenditures for the fiscal years ending September 30, 1997, 1998, 1999, 2000 and 2001, respectively, were determined and provided by the City's Consulting Engineers. z ., 4; Z; . c [REMAINDER OF PAGE INTENTIONALLY LEFT BLANK] j 1' r !IC; S Z •r V 14 • • • 36 EnginEEring for City of O . 1997 WatEr and SEwEr REVEnUE Bond Qcoee Tom' w Y 3 ?$ �'• ! j V � w p 14.41V NkNIC Op GOOD City of OCOEE, Florida '' 'fess/ono/ Engineering Consultants, Inc. PEC il :_; it _._.._i! N.T.S. 1, Ir I;.; • _ �. • } l�- -- __L-_-_-- � 11 — — _ ,-ii[_ )i :, --,,-,:,th I E fHT ' I }; r - i—r_ ` � _k I_ �� . " `1+ Ai � 1�''� �. Ai Fr I1 g3� r" L ;� �� x:14: I 1— -. -, �- Ji , .L� �!n 4-� i 4 a �1, -' . fit Wk--4:'4‘_,, .',AmIgar..7Fti959, 1 1-1- 17_,.._ .,_,.1.;:j7,--ig, fir— Ute'..,. [ r - r 1'al "II 1 L ® r ,t1916....! L -, Jr _ IV Ef m9 r - I _ ..;....L..; 13=., m ' `1 . . (y /•gip w__ 1 -- __ I r f -/ ' I — Ell L i 1 . if i ®.w..�:ittn ?ii CITY OF OCOEE ® ' UTILITY SYSTEMS MAP LEGEND .R,R/l I...4 FORCE WARS _MOOT I --�.ENTER NO. ,t 1R SCRoX.IRA PECUTILITY SYSTEM MAP FIGURE 1 .1 TABLE OF CONTENTS SECTION TITLE PAGE NO. 1 INTRODUCTION 1 1.1 Purpose and Scope 1 1.2 Background 1 1.3 Authorization 2 2 DESCRIPTION OF EXISTING WATER AND SEWER SYSTEM 3 2.1 Service Area 3 2.2 Existing Water System 3 2.2.1 Jamela Water Treatment Plant 6 2.2.2 Forest Oaks Water Treatment Plant 6 2.2.3 South Water Treatment Plant 7 2.3 Potable Water Distribution System 7 2.4 Existing Wastewater Facilities 12 2.5 Existing Wastewater Transmission Facilities 14 2.6 Existing Reclaimed Water Facilities and Transmission System 16 2.7 Wastewater System Growth Restrictions 16 2.8 Capital Improvement Program (CIP) 16 3 WATER AND SEWER FLOW PROJECTIONS 18 3.1 Overview 18 3.2 Future Potable Water System and Transmission Facilities 19 3.3 Future Wastewater Facilities 22 3.4 Future Wastewater Expansions and Upgrades 23 3.5 Future Wastewater Transmission Facilities 23 3.6 Future Reclaimed Water System and Transmission Facilities 23 4 RATES AND CHARGES 4.1 Overview 25 4.2 Connection Fee Basis 25 4.3 Water System Charges 25 4.4 Sewer System Charges 25 4.5 Comparison of Water and Sewer Service Charges with Other Communities 27 4.6 Summary of System Charge Schedules 28 TOC-1 TABLE OF CONTENTS (CONT'D) SECTION TITLE PAGE NO. 5 FINANCIAL PROJECTIONS 29 5.1 Overview 29 5.2 Revenues 29 5.3 Operating and Maintenance Expenses 31 6 ORGANIZATIONAL STRUCTURE AND REGULATORY COMPLIANCE 32 6.1 Organizational Structure 32 6.2 Regulatory Agency Compliance 33 7 CAPITAL IMPROVEMENT PROGRAM 34 7.1 Background 34 7.2 Water Capital Improvements 34 7.3 Wastewater Capital Improvements 34 7.4 Maintenance Facility 35 7.5 Total Capital Improvement Program (The Project) 35 7.5.1 Water Treatment Plant Improvements - Cost 36 7.5.2 Water Distribution Facility Improvements - Cost 36 7.5.3 Cost Summary of Potable Water System Improvements 36 7.5.4 Reclaimed Water System Improvements - Cost 37 7.5.5 Available Funding 38 8 CONCLUSIONS 39 8.1 Findings of Fact . . 39 TOC-2 LIST OF TABLES TABLE NO. TITLE PAGE NO. 2-1 Monthly Water Production 5 2-2 Wastewater Treatment Plant No. 2 Flow Data in MGD 14 3-1 Future Water Flow Projections 19 3-2 Required Water Plant Improvements 20 3-3 Distribution System Improvements 20 3-4 Future Wastewater Flow Projections 22 4-1 Existing Rate Structure 26 4-2 Comparative Water and Sewer Service Charges of 10,000 Gallons 27 5-1 Water and Sewer System Historical and Projected Revenues and Expenses and Debt Service Coverage 30 7-1 Water Treatment Plant Improvements 36 7-2 Summary of Water System Costs 37 7-3 Reuse System Improvements 37 LIST OF FIGURES FIGURE 1 NO. TITLE PAGE NO. 1-1 Utility System Map i 2-1 Water and Wastewater Treatment Plant Location Map 4 2-2(A-D) Existing and Proposed Water System 8 2-3(A-B) Wastewater System Map 15 2-4 Existing Reclaimed Water System 17 3-1 Future Reclaimed Water System Map 24 TOC-3 [This page intentionally left blank] Y SECTION 1 INTRODUCTION 1.1 Purpose and Scope The purpose of this Consulting Engineer's Report is to provide pertinent information concerning the issuance of Water and Sewer System Improvement Revenue Bonds, Series 1997 by the City of Ocoee Series 1997 Bonds. This Engineer's Report is also intended to provide a description of the City's existing water and sewer system, provide a financial review of the water and sewer system revenues and expenses, describe future water and sewer capital infrastructure needs and describe proposed capital water and sewer improvements to ensure dependable water and sewer service for future years. The Series 1997 Bonds are being issued to finance the construction of water system capital improvements as defined in the "City of Ocoee Water Master Plan(April 1996)", and Reclaimed Water System Improvements as defined in the "City of Ocoee Reuse Feasibility Study (August 1996)". The Series 1997 Bonds are also being issued to finance the expansion of City's wastewater effluent disposal system. The water and sewer capital projects to be financed from the Series 1997 Bonds are described in Section 7.5 and hereinafter referred to as the "Project". The proposed water and wastewater capital improvements are necessary to provide dependable and cost effective water and sewer service for future years. 1.2 Background The City of Ocoee, Florida, is a municipal corporation created under the laws of Florida. The City of Ocoee is located in western Orange County, Florida, and is approximately 10 miles west of the City of Orlando. The City of Ocoee was incorporated in 1925 and is located in the Metropolitan Orlando urban area. The City of Ocoee operates under the City Manager-City Commission form of government. The City of Ocoee is the second largest City in land area in Orange County and is the fastest growing city (4.7 percent annual population increase) of the 13 cities in Orange County. The City of Ocoee has a land area of approximately 20.5 square miles and a population of 19,261 as of April 1996. The average annual household income as estimated by the West Orange Chamber of Commerce is $36,000, and the median age of an Ocoee resident is 37.2 years old. The City of Ocoee is experiencing a tremendous growth rate and continues to receive a mixture of new residential and commercial development. As Phase I of a large Development of Regional Impact (DRI), a new "West Oaks" regional shopping mall (1.2 million square feet) will open October 2, 1996 and will facilitate additional commercial growth in the southeastern section of the City. The City is located in a unique growth area due to the transportation system alignment for this region of Central Florida. State Roads 50, 437, and 438 are the major roads with direct and easy access to the City of Ocoee. The City is also ideally located at the junction of the -1- East-West Expressway and the proposed Western Beltway. The East-West Expressway is currently operational and the Western Beltway is estimated to be completed by 2002. Other factors influencing the City of Ocoee's growth rate is its proximity to the Orlando Metropolitan area, Walt Disney World, MGM Studios and Universal Studios. The City's unique transportation location brings Ocoee within fifteen minutes of downtown Orlando and the Disney area. The City of Ocoee presently owns and operates a water supply, treatment and distribution system which provides potable water service to the City's water service area. The City's water service area is approximately 15 square miles and currently serves 7,861 residential units and 2,089 commercial equivalent resident units (ERUs) for a total of 9,950 water ERUs. The City's current average daily water demand is 3.0 million gallons per day (MGD). The City of Ocoee presently owns and operates a wastewater treatment, collection and effluent disposal system which provides central wastewater service to the City's wastewater service area. The City's wastewater service area, being identical to the water service area, is approximately 15 square miles and currently services 3,701 ERUs. The City owns and operates one wastewater treatment facility located on A.D. Mims Road. The wastewater treatment facility has a capacity of 3.0 MGD and currently receives an average daily flow of 0.9 MGD. The City of Ocoee initiated wastewater service to the City residents by the acquisition of a private utility titled Prima Vista Utility Company, Inc. in June 1987. The City of Ocoee and Orange County adopted the existing Water and Wastewater Territorial Agreement as part of a City/County Joint Planning Area (JPA) Agreement dated January 1994. The City of Ocoee owns approximately 240 acres of land for effluent disposal and has leased the property to Forest Lake Golf Course, Inc. for joint use as a public golf course. The golf course was completed in December 1994 and normally all of the City's effluent disposal is accomplished at the Forest Lakes Golf Course. 1.3 Authorization In August 1996, Professional Engineering Consultants, Inc. (PEC) received authorization from the City Manager under the Continuing Engineering Contract dated August 1984 to prepare this Engineering Report in support of the issuance of the Series 1997 Bonds. -2- SECTION 2 DESCRIPTION OF EXISTING WATER AND SEWER SYSTEM 2.1 Service Area The City's water and sewer service area is approximately 15 square miles. The City's service area is generally bounded on the west by the City of Winter Garden and Lake Apopka, Ocoee- Apopka Road to the north, Apopka-Vineland Road to the east and Old Winter Garden Road/Roberson Road to the south. The City's service area has been contractually defined by the Orange County/City of Ocoee Water and Sewer Territorial Agreements dated November 14, 1988 and amended January 25, 1994. The Water and Sewer Territorial Agreement was adopted by the City of Ocoee and Orange County to avoid the duplication of water and sewer infrastructure improvements. The Territorial Agreement also provides the City and County with a long-range plan for providing water and sewer service. With the service areas defined, the City and County can plan for service area build-out. The Territorial Agreement has been adopted as part of the City's and County's Comprehensive Plans and have been found to be in compliance with the Growth Management Act. No competing water or sewer service is available within the City's service area. The City's water and sewer area boundaries as well as the treatment plant locations are depicted in Figure 2-1. The City's existing land uses within the water and sewer service area are approximately 22 percent residential, 10 percent commercial, 3 percent public facilities, 11 percent conservation (including water bodies). Approximately 54 percent of the area within the water and sewer service area is undeveloped but designated as future residential and commercial land use. Projected future land usage based on the City's adopted Comprehensive Plan, indicates heavy commercial and industrial growth in the southern service area along S.R. 50. The 1.2 million square foot West Oaks Regional Shopping Mall will open on October 2, 1996. Commercial growth is also expected along S.R. 438 (Silver Star Road). Based on the adopted Comprehensive Plan, the City's water and sewer service area has growth potential to add approximately 9,000 new ERUs over the 20-year planning period. Based on a review of 1995 aerials it is estimated that only 46 percent of the City's water and sewer service area is developed. The City's water and sewer service connections have grown at an average rate of approximately 400 new connections per year since 1992. This annual growth rate has been the fastest growth rate of any similar-sized municipality in the high-growth Central Florida area. 2.2 Existing Water System The City owns and operates three (3) water treatment facilities within its service area as shown in Figure 2-1. A brief description of the existing water treatment plants are as follows: 1. The Jamela Plant, located at Wurst Road in the north portion of the service area, is the City's oldest water treatment plant in service and provides water service to the northern portion of the City's service area. -3- . _ i I I i 1 HiI;-'' i ; l'r-' 1- C ' . r I- TT, ti.1� 1 • I'v i �i I lLv • • "%I-4;i,, 1,_.L..- - - - - . 4. _� 1 .P.,;••,',...;';'•1:41::::,.1:-', ",?. _ ti.. 4,,i! ; , ` u._' i, --i. -- H , FORS- OA II .�1 �s t 4 'I W A T �I a ___� rrT,L1. 11 E --LAN -� r w l � ,. - - r y jl I 1 3. fit' 3 - 1 . i ,-{7-7..,, —� E .�-r F '..; . ASTEWATER • _ 1 : _z�1 f1r r t i s ' 3 TREATMENT j _� 1 r JA�tELA .ii- PLANT N19.2 ; ' i' ' aI WATER ' -,—r�,T 11 I 1 i I T - ,T.� t1T �T I w 3 _ . .‘ ..f_. _ : .1 ,2,,...,,,„ ; . „E„.„..„..„_:_„...:_____.,„:,,,,,,.., ,, ,, ,_ „.., .„:„.„ -- ,, _ _,,,.,..,_, .,._ .,,,„:„,,,,,,,,,„ , :.__,,, ,, . „,, ' fly ] _"''Y �l r-------II - �j •4�'YT E Jy1 _ -1r - ,- ,i�N;L.z1, 0_, F.. • t -f----,.,,,,-.;,,---,- L u�J �. -L"�.--_ _. - J�S 7 .r )� �. .,a d • na•9-'4,.."::`-...1 ^U” I II 1' i T L j 1s ; i —_ "777 --- ` , f r__ _ ti 1 '1F,--4--,::---5. _ j !';‘,?:,-1;.54 i'fz�' -ia . •-4L'' : 1I I 1 si:.6.ql - . -j I� 71 = • .s I 1 k1 _ 8�r _ ' . _._, i•- nj 1 — SOUTH WATER ;- 1 PLANT i 1 - i '•' CITY OF OCOEE j 1 I WATER AND WASTEWATER L ___. _ _-: ! -. .:._ : TREATMENT PLANTS LOCATION MAP LEGEND PIIIII 1 -- - - WATER AND WASTEWATER ----------SERVICE AREA C sass PECENGINEERING CONSULTANTS, INC. FIGURE 2.1 2. The Forest Oaks Plant, located along Hackney-Prairie Road in the northeast portion of the service area, has been in service for approximately ten (10) years and also provides water service to the City's northern service area. 3. The South Plant, located east of Maguire Road and south of the Florida Turnpike in the southern portion of the City's service area, is the City's newest and largest water plant. The plant provides water service to the commercial area along S.R. 50 and the southern service area. The City obtains raw water from a series of deep wells located at the three (3) water treatment plants. The potable water wells draw from the upper Floridan Aquifer. The City's water supply originates from five (5) existing deep wells and the City has two (2) deep wells currently under construction. Table 2-1 presents historical water flow data from 1991 through 1995. The City's three (3) water treatment plants meet regulatory agency requirements for average daily flow, maximum daily flow and peak hourly flow. TABLE 2-1 MONTHLY WATER PRODUCTION Total Monthly>FIow (Flow in Gallons x 1000) No. of Month Days Jamela . Forest Oaks South' per Month Water Water Plant Water Plant Total Plant Flow October 1994 31 22,414 19,671 44,187 86,272 November 1994 30 22,153 18,734 43,225 84,112 December 1994 31 19,615 20,137 40,818 80,570 January 1995 31 18,680 22,858 40,196 81,734 February 1995 28 20,678 20,201 44,525 85,404 March 1995 31 27,043 24,892 53,559 105,494 April 1995 30 36,687 21,166 59,661 117,514 May 1995 31 48,157 29,058 80,332 157,547 June 1995 30 31,703 30,000 72,785 134,488 July 1995 31 30,967 27,170 67,527 125,664 August 1995 31 23,766 30,898 66,631 121,295 September 1995 30 26,049 26,891 56,893 109,833 Average 27,326 24,306 55,862 107,494 -5- The following sections provide brief descriptions of the City-owned water treatment plants. 2.2.1 Jamela Water Treatment Plant Raw water is supplied to the Jamela Plant from two (2) deep wells which penetrate the upper Floridan Aquifer. Well No. 1 has a 12-inch diameter casing, a casing depth of 125 feet, a total depth of 622 feet and is equipped with a U.S. Pumps vertical turbine low service pump rated at 550 gpm. Well No. 2 has a 16-inch diameter casing, a casing depth of 136 feet, a total depth of 650 feet and is equipped with a Worthington vertical turbine low service pump rated at 2,000 gpm. Raw water pumped from the wells is discharged to a 2,500 gpm cascade tray type aerator located on top of the ground storage tank. The aeration partially oxidizes hydrogen sulfide in the raw water. The raw water is disinfected by adding chlorine and is discharged into a 500,000 gallon concrete ground storage tank. Hydrofluosilicic acid is also added to the raw water to provide fluoridation. Treated water is pumped from the ground storage tank by three high service pumps and discharged to the distribution system. Two high service pumps are rated at 1,000 gpm and the third high service pump is rated at 1,200 gpm. A 500,000 gallon elevated steel storage tank is connected to the distribution system downstream of the high service pumps. The tank is connected to the distribution system, stores water for emergency fire flows, and maintains static head (pressure) in the distribution system when the high service pumps are not operating. A 250 kilowatt standby engine generator provides emergency power, and is capable of operating the 2,000 gpm well and a related high service pump. Due to the deteriorated condition and high maintenance requirements of the Jamela plant, PEC has recommended this plant be removed from service when the recommended Forest Oaks and South water plant and water distribution system improvements are completed. The City anticipates the removal of the Jamela WTP from service by 1998. 2.2.2 Forest Oaks Water Treatment Plant The Forest Oaks Plant was built by developers and sold to the City as part of a Developers Agreement in 1986. Raw water is supplied by two deep wells, which penetrate the Floridan Aquifer. Well No. 1 has a 7-inch diameter casing, a casing depth of 609 feet, a total depth of 1,168 feet, withdraws water from the lower Floridan Aquifer and is equipped with a 40 horsepower vertical turbine low service pump rated at 700 gpm. Well No. 2 has a 16-inch diameter casing, a casing depth of 142 feet, a total depth of 366 feet, withdraws water from the upper Floridan Aquifer and is equipped with a 75 horsepower vertical turbine low service pump rated at 1,300 gpm. Presently a third potable well is being constructed and is proposed to deliver 3,500 gpm from the lower Floridan Aquifer. The third well is scheduled to be operational in early 1997. Raw water is pumped from the wells and discharged into a 3,500 gpm cascade type aerator located on top of a 400,000 gallon concrete ground storage tank. The aeration process partially I oxidizes hydrogen sulfide, thereby reducing the hydrogen sulfide concentration in the raw water. -6- The water is discharged into the ground storage tank and is disinfected by adding chlorine. Chlorine is provided by two (2) one-ton chlorine cylinders (one is a standby cylinder) and a chlorine metering station. Hydrofluosilicic acid is also added to the raw water to provide fluoridation. Treated water is pumped from the ground storage tank by three high service pumps and discharged to the distribution system. Two high service pumps are variable speed and rated at 800 gpm and the third high service pump is constant speed and rated at 1,500 gpm. A 12- inch diameter propeller meter measures the treated water flow and has a maximum capacity of 3,500 gpm. A 275 kilowatt standby engine generator provides emergency power, and is capable of operating both wells, a 1,500 gpm high service pump and one 800 gpm high service pump. The standby generator is driven by a diesel engine and is automatically started upon loss of primary power. 2.2.3 South Water Treatment Plant The South Plant was constructed in 1992 and is the City's newest water treatment facility. Raw water is supplied by one deep well, which penetrates the lower Floridan Aquifer. Well No. 1 has a 24-inch diameter casing, a casing depth of 800 feet, a total depth of 1,450 feet and is equipped with a 125 horsepower vertical turbine low service pump rated at 3,500 gpm. A second well has been designed and the construction is underway. The new well is proposed to deliver 3,000 gpm of raw water from the lower Floridan Aquifer and is scheduled for completion by early 1997. Hydrofluosilicic acid is added to the raw water in the well pump discharge line to provide fluoridation. Raw water is pumped from the well and discharged to a 3,000 gpm cascade type `IQ aerator located on top of the ground storage tank. The aeration process partially oxidizes hydrogen sulfide, thereby reducing the hydrogen sulfide concentration in the raw water. The aerator discharges the raw water to the 670,000 gallon concrete ground storage tank where chlorine is added for disinfection. Chlorine is supplied by two (2) one-ton cylinders (one is a standby cylinder) and a chlorine metering station. Treated water is pumped from the ground -ir storage tank by four constant speed high service pumps and discharged to the distribution system. One high service pump is rated at 370 gpm, two pumps are rated at 540 gpm and the fourth pump is rated at 1,350 gpm. A 16-inch diameter propeller meter measures the treated water flow and has a maximum capacity of 6,000 gpm. A 500 kilowatt standby engine generator provides emergency power and is capable of operating the entire South water treatment plant. The standby engine generator is driven by a diesel engine and is automatically started upon loss of primary power. 2t3 Potable Water Distribution System The Ocoee water main distribution system is a network of service lines that presently extend to all but the recently annexed northwestern portions of the City's water service area. The northwestern area was recently annexed (1993) into the City and will require new water distribution mains to provide water service to the proposed developments. Figures 2-2 (A-D) present the water distribution system. t.l _7- 1 1l 1% :I I 11! GRAPHIC SCALE ,ci 1 0 500' 1000' 2000' , 1 6 0 FUTURE / , z © FOREST LAKE < I GOLF CLUB D _ '" Iv FUTURE 12"I'. -- Z la Ir t=... i c4 i EUTURF_12" FUTURE 12"_--„.„ I m 10/17 a /lip • ; wcrn w. 0 IW LL a r-- o. w --- . c FUTURE.- _ II_ / I. W *' Dct I _ rl o r .._. - _.gra.. e 14. —a.omc 6" j l LV • '" ‘'l C j SAHUTE f; v , • I. f' Vi n > i t .I.AI I -- FUTU-RE_6__-_S — -- ...a. 1z �. x MATCH LINE SEE FIGURE 2C FOR CONTINUATION PEcEXISTI TE ND PROPOSED FIGURE 2.2A I s.= • .� � 1• i -�. — — 1.. f.11P‘ .- _ OCrvo ___ 1 INTERCONNECT idellL,* ,. . • , _ _ FUTURE { 1 , ...?:',.,... 4110 1,- -- it 3 In -� ; FOREST OAKS '6-16_7.-..=-."-"-Ji FUTURE if WATER PLANT ' — --- _ ---_.• .1.0. FUTU• 12" l I. i 7, I 11111114.mat 1 I al . - II _1 JAUELA + - �WA"�,ER PLANT r __ __ _ POSSIBLE N . Y7 w.a eca¢ r-[NERCCNC'f L� •" fl. ' leFUTURE 1{-/1 NREpMKCT 1{• s"tiwKi u• R 1 p IN. VolVE C604 LI • .ice 1 i ® d 3 :�. Z. IIjii _ 1 f I 1 - 1 i PROPOSED ' .4 do is f■■ F°T • �� ♦. wry m a lid ;_ 1998), p � , j 3 r ' -......�_ — MATCH LINE SEE FIGURE 2D FOR CONTINUATION PEC EXISTING AND PROPOSED FIGURE 2.2B WATER SYSTEM I MATCH LINE SEE FIGURE 2A FOR CONTINUATION �... r . — -- ---- 1 * w w N i ,e• KISSIMMEE/ / ,2 62 T AVENUE J/ (OFF-UNE) • •s.'e,W I2• •t 0 .®ei 2 WATER PLANT 7 e' • ,2- no, 6_ nGV..ge - eei --e- --- 1 z- 1 4 . , 1(2E 12 I�+ 8- ! 12 E .40 1-----, 5. e , TURE 8- 12- - e -- z- I s.so .. e- 2 URE 10.12 • N 6 6• ` Z gip[ o ` O 1 s1 0 o Sit- ♦ Q `--- 12 ,2 Z 0.11/100k1Urtw1[E z Z L. — 1 ;,,,,,... L . 1 N 1 ® W 2 1 Er SOUTH (0 FUTURE 12" WATER i 1 O 6 ll• I- PUNT -. W W W i 4 J 1I I- - I 1 1 II 1. I 1I 'IM � , '' ' EXISTING AND PROPOSED FIGURE 2.2C J WATER SYSTEM i MATCH LINE SEE FIGURE 28 FOR CONTINUATION di . - k. r .i. ,> , , 6' LI %airs[ f •, ALVEI. r p �- .�� SHUT B ...- p:c9. tisk � : COUNTY I. WYI _ !•Mep '° 1 .i F 9,iL1�E POSSiBIL o 1 - ENCRGENCT f I OCPUO I :w"r1 i I I NITCIKONNCCT 6Imo so I s[[ Z ,. L B- .E V2.li I �. t - •2. r� # F 1, y C t N . tl FUTURE 1YI, ® ' L..—. �_ —.. �. .-.�' W m w • R- 2 12- ,Y 2 R 12- -j - -sat so - - -•—••~=.-'=' --•—•-- • —T—'.__ I _ ) X12• _ : . y 5 i 12 r.,...14'.......r._i -•. B I .�n� - - T/Wt Es_ , 01PRES".. fAs -c _ _-'p 1 f [ ft ' • % I 1 li CITY OF OCOE Al EXISTING AND PROPOSED WATER SYSTEM LEGEND 11 11 16" WATER LINE 8" WATER LINE 14" WATER LINE 6" WATER LINE 12" WATER LINE 4" WATER LINE 10" WATER LINE 2" WATER LINE `"`` VALVE O WATER WELL COLOR CODE I. EXISTING DISTRIBUTION SYSTEM I IMPROVEMENTS REQUIRED FOR A TWO PLANT SYSTEM THROUGH YEAR 1998 I; IMPROVEMENTS REQUIRED FOR A TWO PLANT SYSTEM THROUGH YEAR 2014 ` I' DEVELOPMENT DRIVEN IMPROVEMENTS I 1 ••— WASTEWATER/WATER SERVICE AREA BOUNDARY I PE ' EXISTING AND PROPOSED FIGURE 2 2D ,��, WATER SYSTEM The existing water main distribution system consists of a series of 16-inch, 12-inch, and to a lesser extent, 8-inch and 6-inch pipes, that are comprised of either ductile iron, cast iron, or PVC pipe. A cost-effective distribution network has been planned utilizing 12-inch diameter mains as the maximum size for future mains within the primary distribution system from both a cost and a hydraulics consideration. The water distribution system is divided into two separate piping networks, with north and south portions of the system isolated by a number of closed valves. The north and south regions have been isolated and are operated as two separate water main distributions systems due to the significant elevation differences between the central northern area and the remaining system. U.S. Geological Survey Topographic maps for this area show that the topography within the vicinity of Vignetti Park, in the northwest, is at an elevation of 170 feet National Geodetic Vertical Datum 1929 (NGVD29) while areas in the northeast and southern portions of the City have elevations as low as 90 to 100 feet NGVD29. These significant elevation differences within the service area require separation within the piping network system and pressure adjustments at the treatment plants. Without this system of isolation,pressure from the Jamela plant(highest elevation) would overwhelm both the Forest Oaks plant in the northeast, and portions of the southern network served by the South Water Treatment Plant. The higher elevation in the northern service area requires higher system pressure to be provided by the Forest Oaks Plant to pump the treated water uphill to the north central area to supplement the Jamela Plant from the Forest Oaks Plant. 2.4 Existing Wastewater Facilities The City of Ocoee currently operates one wastewater treatment facility, Wastewater Treatment Plant No. 2, located north of A. D. Mims Road and shown in Figure 2-1. (WWTP No. 1 was taken out of service in 1992). The City of Ocoee acquired Wastewater Treatment Plant No. 2 from Prima Vista Utilities in 1987. The facility is located on a 128-acre site north of A.D. Mims Road. This facility utilized the biological contact stabilization treatment process and had a design treatment capacity of 1.0 MGD. The permitted treatment capacity was 1.0 MGD. The treatment facilities consisted of a "ring steel" package plant with bar screen, aeration, clarification, chlorine contact, aerobic digestion and sludge drying beds. At the time of acquisition, disposal of the treated effluent was via two percolation ponds on the plant site. The total area of the two on-site ponds are 8.57 acres and 5.7 acres. The City also acquired 240 acres of land for effluent disposal. Sludge generated from the biological treatment process was disposed by land spreading on-site but this practice was discontinued in February of 1995. In 1991, the ring-steel treatment plant was expanded to a 2.0 MGD facility. The expanded treatment facility utilized the existing ring-steel structure for the required tankage of an anoxic/aerobic treatment process and sludge digestion along with two new concrete poured-in- place clarifiers, a new chlorine contact tank and modifications to the existing chlorine storage facility for clarification and disinfection. The overall treatment process was considered to be -12- secondary treatment. Effluent disposal consisted of two (2) percolation ponds at the plant site and two (2)Rapid Infiltration Basins (RIBs) located at what is now the Forest Lake Golf Course (referred to as Site No. 8 in FDEP operating permit #DO48-202981). A master effluent pump station located at the treatment plant was used to pump the effluent to the Forest Lake Golf Course. Also in 1991, the City accepted ownership of the privately-owned M&M Utilities and its 0.10 MGD package wastewater treatment plant on the west side of the City. The City removed the existing package plant and connected the existing collection system to the City's WWTP No. 2. The M&M Utilities plant contributed an estimated flow of 0.10 MGD to WWTP No. 2. In 1993 and 1994 the City utilized proceeds from the Series 1992 Water and Sewer Bonds and WWTP No. 2 was expanded to a permitted capacity of 3.0 MGD, with the addition of tertiary filters, chemical feed, and high-level disinfection facilities to achieve the public-access treatment level and monitoring required by FDEP for reuse quality effluent. This facility is a poured-in- place concrete structure and is estimated to last approximately 50 years. The City's expanded WWTP utilizes a new and efficient Kruger Treatment Process (biodenitrofication) that results in substantial reduction of operation and maintenance expenses. In conjunction with the WWTP No. 2 expansion, the 240-acre remote effluent disposal site was converted to the public Forest Lake Golf Course. The City leased the 240-acre effluent disposal site to Forest Lake Golf Course Limited Partners. Private funding of approximately$3.0 million was used to develop the Forest Lakes Golf Course. Two (2) percolation ponds are located on the golf course site and are rated at 1.0 MGD. Effluent disposal currently is accomplished by either; (1) irrigating the golf course with reclaimed water from the treatment plant (1.0 MGD), m discharging to the two (2) on-site percolation ponds (with a total capacity of 0.5 MGD), (3) discharging to the two (2) remote percolation ponds located at the Forest Lake Golf Course for wet weather disposal (with a total capacity of one (1) MGD). The combined permitted reuse capacity of the percolation ponds and golf course is 1.5 MGD. Table 2-2 provides historical wastewater flow data for October 1994 through September of 1995. During this period the City has averaged over 400 new wastewater ERUs per year. -13- TABLE 2-2 WASTEWATER TREATMENT PLANT NO. 2 FLOW DATA IN MGD Flow Data in MGD • ...:. Maxi Mm/ Month AADF Max Day Min;Day ; AADF A.ADF lini ..19940. .. October 0.813 0.910 0.609 1.119 0.749 November 0.821 0.969 0.642 1.180 0.782 December 0.890 1.059 0.671 1.190 0.754 1995: .:: . ... January 0.877 1.242 0.806 1.416 0.919 February 0.848 0.978 0.661 1.153 0.779 March 0.869 1.047 0.728 1.205 0.838 April 0.863 0.965 0.695 1.118 0.805 May 0.856 1.003 0.708 1.172 0.827 June 0.904 1.139 0.807 1.260 0.893 July 1.057 1.607 0.847 1.520 0.801 August 1.189 1.4 1.06 1.177 - 0.892 September 0.983 1.16 0.849 1.180 0.864 Average 0.914 1.123 0.757 1.224 0.825 2.5 Existing Wastewater Transmission Facilities The City's wastewater collection system serves 3,701 Equivalent Residential Units (ERUs) and is shown in Figure 2-3. The City owns, operates, and maintains approximately 40 miles of wastewater collection system. The City utilizes a combination of gravity and force main systems to collect and transport wastewater to WWTP No. 2. The gravity system is comprised of PVC pipe ranging from 6 to 15 inches in diameter. The force main system is constructed of PVC and ductile iron pipe and varies in size from 6 to 12 inches in diameter. The City owns and operates 32 pump stations throughout the collection and transmission system. Additionally, two (2)pump stations pump to the system, however the City does not own these facilities and only assists with the maintenance as required. The owners of the facilities are responsible for cost incurred for maintenance. The City's wastewater facilities are relatively new, improved regularly, and generally well maintained. } -14- • 1 ; I h.y_ 1 3 I• _ • 3i -1�� Ir 7.P.:":41 n •, t4, " ii, f'--X1111'9.r,. , I a[i1,D4. ° : 1. - tr-z�lq 2t '�� . q E t {. ' 1 E Y lw.iC _-. _ -''''.44-11,1V,: II • S 11 _ ;11_11 . _., / � l2-,-ti!"'.,)::.,1 _ j _ 3 ; I -vG�i4 Y - 1. JJii m - - ( _ ` I. :i `' S x3.1.1 1J "T' M i N .,Tyr,-7V- _ » f ti ---- -- ;11 -- --z - 1'-;i1,71E l- .t'.,--...;t1:57::. _' w `' ,t ra ' :1 - Y - 0 _,=s=---� �i ISI i.,+Hi,'-,+ L, _.HW� _ r 'S- !-y. �7s.A _ I,IIr_I'Q; �Ir"� �-- � "'i`'_Yr�a IL �, >t �l r, � ,_-_;:5-1H�— 1 N wD 01 , 14,JI�JU, L IJL � r. i_J) 5 �: - r i � r 1.1 *:. d IIi.J In ii a 41 1 ^��~ iit,-c-.- �4- i 1�r �. > >'i'TT.{ L `1. O J i � � U -L_ 1 71 I t� : _ -7—I\ 2-1 ��1 l y — .-..4, ' 11 M I • hr.s 1 ---- - _ - h -�.� - cI� 1 Ii I I , i �-1, I I l_4 � 1 1 71 Vj _ I 1 I PECEXISTING WASTEWATER COLLECTION SYSTEM FIGURE 2.3A Z N O 6 1 U' Q d W T a K N Q Z w z O L'" ) <Z...., w a N w o Wm o Z O I S _., 7 1 z I S. -- - = ® CC > A 1 I- w w0 z w Ow w 1 z ¢ Y - .. ( F J t> 5 e_''' F >- 5 Z K a2a w U U w VQ1 t-, N w O Q O t 11 k N • I '. 1: T� F- N ry N N O Cl m �O >O N-i. M N 1 ; W . F { 'E_ j 4 C r< lJ . N S ' 7 7 O L 1-- > '6T , ! " ss a4'' ff ——_• : - _ Z y a s � fSr� I = : f' IS . ss �ir - - a • R __ - - - p i `.7 1 v.. - I :1 I —1 U t 7 I AD El EXISTING WASTEWATER COLLECTION SYSTEM FIGURE 2.3B gi 2.6 Existing Reclaimed Water Facilities and Transmission System The City of Ocoee currently provides reclaimed water to the Forest Lake Golf Course for on-site investigation. Under normal conditions, the golf course receives 100 percent of the 914,000 GPD of reclaimed water produced by WWTP No. 2. A 12-inch diameter, low pressure piping system transports the effluent from WWTP No. 2 to holding ponds on the golf course site. Figure 2-4 depicts the existing reclaimed water system. 2.7 Wastewater System Growth Restrictions Currently, constraints on the wastewater treatment system relate to the lack of available area for the disposal of wastewater effluent. Expanding the existing reclaimed water system will relieve these restrictions. 2.8 Capital Improvement Program (CIP) The City of Ocoee is experiencing significant growth throughout the City's water and sewer service area. To provide long-term and cost-effective water and sewer service a Capital Improvement Program (CIP) has been developed and is defined in Section 7. The Capital Improvement Program (The Project) for the twenty (20) year planning period is as follows: Water Treatment and Distribution Improvements $4,973,000 Reclaimed Water Program $2,790,000 Reclaimed Water Program (Retrofit) $1,050,000 A, Effluent Disposal Expansion $1,500,000 Maintenance Facility $500,000 TOTAL $10,813,000 gip i i -16- `i• 1 ; , I .I.111L.,,,,,,...---. • - -. I_ I ______., _. '- - '- r- EFFLUENT I '' I •• - 4,1,44.• .i'---r...'-' . I DISPOSAL I . _ •ii , . ,...H.H., I. , , il , i------"- I 1 : SITE #q-- ' ' _,__,, __ __, i ,__Itiilirlirgr .1 1 . i / ) v __ ___=,_,____,:_-:-, 7.1----7--4______._,. I - - • 1 ;•l .....•...1, / -,--r------ , 1 1 ; 11 • I ' r ..- tan I 1,,UaiR I',•;:-r',•,-.1.,. • 11 1 . _ t ---- V I I ' 1111 11 / ., - - 11 'I- •1 I ,- I:.'it411111111,--r.till° c ,, ,!-;• 't - . _. . :• I-- ---•''..1! ri _...i - LmTig;iffi I L--— ---:--if7----F-- .. .--,-r-r-.1-5•0..\,-‘-=__• --;II I 1 \\ 1--1/4::•;:r'RO-IPT.?7-1 I - -17-,•, , I ';':__..-- .1' ' •,. i I 1 ..-.;••;;.-', 2; ' ''''(‘,, p-'••- 1--.--.• •4 ,,-;,-:,-'11-,,._-,iTP It LI;-.-,-',111.,-,•'`,--',‘._••,- 1 , , . , 1E1-,::-,:•,..---T-E.-&--.E.-"Egi'p : ,__ „Er,--•-•,---------, —r , 1 1 . ,___Jr_r__.:a_c____IEW6},I --.-., ' •. , Ii. t11_ • ' L._---E-----I-47-=-„,.. ----j-A-- 4 1---4:7 r •.' a_-_7:-_..111M. ., .__. El-- F 1.-m.L.,,,,nricpg r_.__ I ' 1.-L* ,, . L___ .T--!-- 1--111 - --- RANSM SSION:zt -.,- -I'..--, -N1•11---7-- _-..: I . -ps. _-7-7i- ' I--1 -II ____„__,, ,,_. ---! AIN • „.......z- 1---,-En-,T,.. 7-1,•..__, T , _ 1 _L-.,4_ _ -,,..-. -,.._-:,_, , __„ 1 7 1 ,-L-,LI)-P . ,La L___i --- .,,---- - 1--- , 1 1 : , iiii 1----,==:-."-71:-,_:-_,,,_--_,4-1 (- -I ' i 1 1 _._Irr,;I'I';'1 '53. ' 4 1,1 , , ____ ... - - I . \\ --1c .. .••• ajjEr-----L=-7:•-i-1- Irr.• .-,,,•••;• ....e: I 'I --- "i• 7-:-..:•:.,,,r7.",".••,:r; -1.77-17. 1. _-_, _-Ii I li 1,-lifj • 2fi • . ••.-Trrjrrsr.nomorr...... rriF, I 'i•••I-r H__-7-30•gml---ixriL •,•-•...,.,..: : , _11 -1 I •.--IT - r - --1-- -•1 -- ----A -- E . I 'TY OF OCOEE , """""-I , ,•,•••f•-13 1' .., L•;- V.1-',•-• 1 • wwT1:31 #2 '' , 1' ll '' 1 riT- .1.3 , ' Tr=.'„r7_,-f •--•,,\.- i ---- 4.•,. _•,i--,7-_-:-.2 ..,,..-= w , 1 • ASTE9 EFFLUENT ii 1$ I .9.E W, ,--- 1 -j_--f-p,--f.,‘-••• r 1.-_,. [J,-,,-„,, ____,.......,...., =,1 ',". ..-5 • i ,PUMP,I STATIONL_.--ii I] _l___ _'._. t__, ___r--11 ::''-• .,__ - - ,,,,.-_,,„,•_ .;fa,,-,. ..,=E,..;‘,L., m _ •:: ,__.--E,-.--:-_,---..,_,E_-_,,,.-1.-_,_4_Fr - ,'''',."•.://,',,,, , _1',-.,------ij--71-1 I I 1 .1 1 i II • 1-,_-=,- I ' • , .1I _ -, ' -...,--[,---r . L ,---.27,7,-,Epro..,-±7,---,---, ,$F,-3, ,,,,,,,,."-:,,,,,,.-Et ,.'w_la‘a• i_....-......--,,,---_-\\?•,..--•:,--....,,:,_-_,. • .,..,±E.i _ I,, I_ __f,-= 11-1,0. ,..,-1---f-r •,•,•,1: . - 1 11 I • 1,--'7.0-.:031," :1_,-5--P_ ''''F.::ez*•I•II'r•I 7d- H,-.11 -,,,,,---z."-----A,O,A4_,:4\V"),•-•:•,-•%•'3 t---/F..,,.....-.±-Fy q , ,, ,,.;, ..-----:---(i,-•rp.,_ ,,,-._--_-------,-.T:, ,-5---,;,-.-„,-,:.--:,.: ::,' --`:.i.--',pw, -'-.--`-':' J -t-t"'"- I'i L' I: 1 - ._. /- -:,., ' :171. EIJI.ii; ..5,--• -E":-.V.":,-;-...... ;,:::::.,4.-.s:,4:•?I' ' ,/.---1--J IA liE0."'4 1-gr.r.---".• • •••••••,..' ,j- , ,,,,., i -• 1••_LT:7 1-----: ,,,,_,--_,:_=„;,..,.,•.,.,.- .....„..:„..,;....--1, i ,---7- II:•./.,' Vt. ''...•,..• 'I'ill i!I ,11•:". ..',,- k_ . -I ,: -I , It•E-V.._=:•.-,.. -.•-7..',.-)t,•\•.•,ri;;•."."-: '--I- - ' • .- ' •-;.1•:, -in,.,:an' :•1.-=';','' 1 _I__!.. . I: •,-- - ______. ! , '''-=---__ ,FEEU__,:-.;,..-,4...4.-.21-..:, -1'w ,-- ,-- ; Li , -... --_-t-- 1 v• •.--..• ..?•-•,..,:c.-----i (••-r,- A^• I I)ft ,0.1 - 2 P t /- • , .- . • ,:___,_,,, „,,...,-;,,,r4::.,' ...,.L. ,...4.i .. F..- ,.., - - '' .j:H ---. la s_i_-,••,I1 I •-•II:r>•-••' '"'•.' Ll,-,•• .... NI ; • - .96_. :,'m. • . /,_-"' ......:NrIwn 4 ' . . -'=- '3------ ' - jrrrArMenr ;;----•: 11----i-:::IL Hirmel •;•'.,----• -• •'..;•••4Fp,,,IM fl-T-,4---C 'f----T- i'--: ' ' _._-i..... -- -i.-1--,. $.6.,.,,.1, ,_ _,..,;--__ i',4*,-._ w---'2.f"- .1-.14! tH 1 i -.,..-._,...,_ .,,,,..„1,,T--.=_,_---i,gtip._,,,,,,,............. EFJI:, J--r---•="17.#•--r-- "-- f.'•W'I- -r- --1-.--.--I.- 41315--"--= •-• MIIIU-144%,...-13.,-, 1 -I,:.:' -'-1 ' --,;.,,T H,T47------L- 4/ 7:--_ ..r.,P,,'::1:',".....LI, 1 ;1____----j---i:3 '--"H.i_j'''Ll--1:-.g iz''-'-: -----2 ---r• - _ .kw,--44.1-,,i iE.-V -----:',__.__ .1._:_'41-.T-1,4---4:!-1:::, --ri*E-TE4'f^14 I 7---- ,--._____,i,a,44:2i. E 4..-:' .i---Ji.._•/..,C-,:' /:, .--r / Pa J--.,•=. -, 1•015.t-. 14 ....:,.,, • -_,..------1F---23*,4--,--c1r1 t a ,L ----- ,--rinic_ ri-1"'""`,'_t)--_1 • • -17--- EL .,, ..,.ra- ... , ' .r. 'dP— ' _ .„,__ 4-..3.47.,,,,TA, ,r_ J.:-.,,.,.-H,_____ rt, ,-,L,,-=.0..--"L—,,, ,,, , --- .p....,,,reg.,...,,,_,,, , „,,...,„.„.p.,..-7-•-...-_-_•-, ,• -,,i_v-„:•.. Ali L. .21hiaa.-.1.-,,r,--,, ,,,,7.7,„1, ,--- • •._:•••': ' x_.,,;•• 1 -r1 - ,,,c•_ ., .,. "T.r.,•,-. ;,-Ti.; I __I_ --.,:./' •,.. ,..'. ..= ,iA ; ;'-`"--''''1.-"-,-' . ,V--' . 4.,..r, -.,- ' ar--,-:" • .,11,.....,..,..... --- • ' -- - - - _,,,,- T-- '--):h1-\ .r."-;r•It--- \--I I-,-, -•,::,-,?:. - - •. ,.'-',,..., II4-ii= '•.:- • '',, ' ' „.,•••; --..--- •--- :--:- ------#;" a..;-.1....,;•:..,,133:-_' A - •"' - 4 F?: . - H-,---.., ' - --..-:2-"T i .- ..,.-_-:,,•31=..!-,, ---::.- --. !....._,-, -_i_ ;- .:.-: ••-L.,..... -------, , . " i6_-'• _ -'- .„, . , I- T ------ - - ,•-•• = '-,- -, , -.1,1,----L,1" ---- ',-.1,k ••.:-•-•••• ------.:-..---, -F_:,-.,---,7',1 , 'A. i;•• t_,_—:,-,----- --i-frir-..--11-173:3.1,L;;_-12..-,••••••,-,-;-.1 4.01 , •-.....::•:.....„, . i • '... ,-- =-'._--4,-,f-,,. . '•1 rII,.1..--!_,,-----. .. .---7,---. 1- • I .:--,t,, ,-- -; ,-,!:±..,F,',',....717".L,F,••..'..7.-_-,- • 61W-4..kr.41.PA pie; . -----•-__,L=---aarim31. • -,_Li:-H , , ' i i.'..:...-..:,;_=-:.4.4..,_.::_.f.s.__•-•-i:__,•__.c_Lto - !---. .,....41...w.... _____•:1_1 .,,, ,_7•• a;_-_-J:=„,_,4--•..--rr-_ ,,it.; r-,----E-;---'7—,---',. ,-T-'-'-,r., ,ri: 1-7-,-ii474---P•1,-..---- --7 -IT r -:_'4.-Lr---,:':"td til r_ +' •±Ell-L0t-i'• - ----- -7 r ' /El%,-_-,• •=t- ,--,.p,...f-----7--,-311,-;'-±kia, %1119.-Ld•-.-_--:-. i .' - ,1___..!_;• -1 ---1 ..,_.,0N. , 7, '-•"5"--''''' ,"--,'-',--,-' .Ilo,•_.,--r.;-•--7,3L) , II (:-.7.='f-2.1.-IF.- ,-Ir, , . ..,.. ---1,.4,--4---„I - - g ---j, , _6;-, E_•-_,Nz L,t,°Q- ----e- a---T-' 1101F-i,A ',HE-1.-,-EiLi) .„,iPLIL ;-ill-r,'„,,,_„1-17„;,,,_•••,,,, $N1 , , ,ai. Did r - _L-q, -;-,OL.1-• , .___-...1 , :1 ',TT'''--i-,--t_ :T.--:' -i- -,-,,11 : . r_I IL •.•afi-_•-••=.-L:Tri-,-----•_-'-'1 1,---,, 1:1 3-..,,..,--. ..--__. ••r- - ,,,,-,,, •:'•1-T-...,f_TF.--.7_r-ff tarEr.r..-..,.--p- --,._, T,_ ,,_,,, .1_•••=f-4.4.--2----- - - -1,,------._=_44, -..7:2,7,T4','', r ,-1---'-,-' li- '-73:1 : . , I,..3F..7-:, I.ii,:17:11.:1 ,_,.7.;,,•:•• EB.Cff-IJ.-..-V •"i'-'7.- 11 '174•'-f:B , , I::,•`.1i'1 41-111--,!-,..,•-•.;••)•.• r Btl-.F.W.0-1-it, . , ___ :-„iii-_. . . .. . , ,. ... , , _I . : _. ,_-_:.-_- __. ...,... ...-A-- - •, •-_:J 1 ..s, • , , -- -- - -- -1- - -..•-• __._....___ - - _.-..,--_ .,-.._• ___ ......_ ._._..._ T . - . : . - ; LE::•,..;-: ; .\,..,T1 4; i ..; ., . i.i •.1 . , [•CarliZ.' . I L . - - r ' `....er. . ,, • --t.,---z1. ,) j-r_17_7,7,7_71f. _••-• ,-.-__2. 1 • : • .11-'1 1E-I11,1.-3F-'111::111,7111."-i- 7 'T--- _ . .., . 1 i PI- .,-rmr-b;-11T ,— i • _1-__-, „ - _ II ' - : " -, -ri. '' • "--- 2. - ••rk•.•••••-,j,.._1 _•:,:: CITY OF OCOEE .. _..... .. :„__Ii....„. - ... . , ., --r - ,,, .. . , -.. EXISTING RECLAIMED WATER SYSTEM t.'-'-- :-.7..T..ri,:;•.:7-_,I7::•- ii' '1,11 'If.1-Di.-_:-,__-:-;•--i . _,.._., ___,_ • ... ri--- i. -7111PF.:-• 0 f. • • r17-: _ , C - ..r..1..r.__,.:li •- - i i PROFESSIONAL ENGINEERING CONSULTANTS, INC. li 1 M - I•.) . ? r_.r . . .,.. .__ rl••••$merlt pl••••••••• 5••••••”•••• Li #0.C..bobror•••...eel 11•••••••.Illo•ftio Ill. elf/...lart 'I • ==. -.--.-- -- ..-J ...- -, .' .r. --1..:: pEcL. .. .. ._ FIGURE • 1 • h 1 L 1 ' • SECTION 3 WATER AND SEWER FLOW PROJECTIONS 3.1 Overview Water and sewer future flow projections have been developed to produce the City's Water Master Plan, Wastewater Master Plan and the Reuse Master Plan. Water and sewer flow projections were developed using a methodology which employs such factors as historical growth rates, land use designations, reserved water and sewer capacity, vested development projects, dwelling unit densities, traffic projections and modelling, socio-economic data and local population projections. PEC has been the City's continuing consulting engineer since 1987 and has assisted the City in development of the following long-range planning documents: City's Comprehensive Plan and All Amendments (adopted 1991) Master Water Plan (1996) Master Sewer Plan (1988) Master Reuse Plan (1996) Water and Sewer Rates (1992) Water and Sewer Impact Fees (1992) Traffic Impact Fees (1995) Traffic Modelling (1994/1995) Consumptive Use Regulations Our involvement in the City's long-range planning process has assisted PEC in developing accurate 20-year projections for the water and sewer systems. The general process used for projecting future water and sewer demand consists of the following steps: 1. Review socio-economic data that was used for impact fee and traffic analysis. 2. Establish a grid or zone system to subdivide the City's water and sewer service area into discrete land units. Traffic area zones (TAZ) were used to provide consistent model parameters in all master planning projects. 3. Project future land uses based on the current and approved (by Florida Department of Community Affairs, DCA) land use designations. 4. Estimate build-out period for the City's water and sewer service area. -18- 5. Review approved vested development projects, zoning applications, and the City's concurrency management program. 6. Review pre-purchased water and sewer capacity and the Revenue and Maintenance Fees. 7. Apply average consumption factors per dwelling unit to develop annual flow projections. The City's current population is estimated to be 19,261 and the population estimate for 2014 is 42,000 people. The increase in population is estimated to be 22,700 people over an 18 year period. The socio-economic analysis for the City of Ocoee indicates an average of 2.8 people per dwelling unit. Based on existing trends per household, the City is expected to add approximately 451 ERUs per year through 2014. The financial projections of our Engineer's Report (Section 5) are based on a conservative annual growth of 350 new ERUs. 3.2 Future Potable Water System and Transmission Facilities Table 3-1 presents future potable water flow projections based on the described methodology. TABLE 3-1 FUTURE WATER FLOW PROJECTIONS ERUs FLOW YEAR (CONNECTIONS) (GALLONS) 1996 9,727 2,936,100 1997 10,077 3,023,100 1998 10,427 3,128,100 1999 10,777 3,233,100 2000 11,127 3,338,100 2001 11,477 3,443,100 Required expansions to allow for the continued growth of the City are required at two (2) water treatment plant sites -- Forest Oaks and South Plants -- and to the potable water distribution system. The following table, Table 3-2, lists the required installations and improvements to the water treatment plants in order to allow for continued City growth. -19- TABLE 3-2 REQUIRED WATER PLANT IMPROVEMENTS FOREST OAKS WTP SOUTH WTP High Service Pumps (3) High Service Pumps (5) Building Improvements Flow Meter Yard Piping Improvements Water Well and Pump Control System Upgrade Flow Meter Generator Upgrade Figure 2-2 (A-D) depicts the necessary piping to allow for City growth. Expansions relate to installing piping in areas of future development and providing additional piping in currently developed areas to provide for greater flows and an increased reliability. The following Table 3-3 lists the projected distribution piping improvements and correspond to the numbering identified in Figure 2-2. TABLE 3-3 DISTRIBUTION SYSTEM IMPROVEMENTS 1. 8-inch East/west from Clarke Road/Hackney Prairie Road to Sawmill(3,450 feet) 2. 12-inch East/west along Hackney Prairie Road to Roth Road (3,400 feet) 3. 12-inch East/west along Ocoee-Clarcona Road to Carpet Street (1,500 feet) 4. 12-inch North/south along Ocoee-Clarcona Road from 15th Street north (4,500 feet) 5. 12-inch East/west along Fullers Cross Road from Ocoee-Apopka Road to Adair Street (6,000 feet) 6. 12-inch East/west from Ocoee-Apopka Road to Ocoee-Clarcona Road at Wurst Road (2,600 feet) 7. 12-inch North/south along Ocoee-Apopka Road from Palm Drive to West Road (10,000 feet) -20- TABLE 3-3 (CONT'D) DISTRIBUTION SYSTEM IMPROVEMENTS 8. 12-inch East/west along West Road from Ocoee-Apopka Road to Ocoee-Clarcona Road (3,000 feet) 9. 12-inch North/south from Ocoee-Clarcona Road to West Road (1,500 feet) 10. 12-inch East/west from Nicole Boulevard to Clarke Road (south of Hackney Prairie Road) (3,000 feet) 11. 12-inch East/west along Wurst Road from Ocoee-Clarcona Road to Little Spring Hill Road (1,800 feet) 12. 12-inch East/west along Wurst Road from Little Spring Hill Road to Jamela WTP Connection (3,200 feet) 13. 6-inch North/south from Franklin Street to Palm Drive (1,900 feet) 14. 6-inch East/west along Franklin Street from Western City limits to Silver Star Road (2,700) 15. 8-inch East/west along Silver Star Road from Silver Bend Boulevard to Ashville Street (1,700 feet) 16. 12-inch East/west from Blue Spruce Road to Clarke Road (2,000 feet) 17. 12-inch North/south from Clarke Road to S.R. 50 (between West Oaks Mall and Lake Lotta Center) (3,400 feet) 18. 12-inch East/west from Marshall Farms Road to Maine Street (1,300 feet) 19. 12-inch East/west along Maine Street from Bluford Avenue to California Avenue (4,000 feet) 20. 12-inch North/south along Blackwood Boulevard from Old Winter Garden Road to Maine Street (2,600 feet) 21. 12-inch East/west along Maine Street from California Avenue to B.C. Terry Road (2,000 feet) 22. 8-inch East/west along S.R. 50 west of Richmond (350 feet) 23. 10-inch East/west along S.R. 50 at Old Winter Garden Road (200 feet) -21- TABLE 3-3 (CONT'D) DISTRIBUTION SYSTEM IMPROVEMENTS 24. 12-inch North/south along Marshall Farms Road from Tomyn Road to S.R. 50 (2,700 feet) 25. 12-inch East/west along Tomyn Road from Marshall Farms Road to Maguire Road (2,800 feet) 26. 12-inch East/west from Maguire Road to South WTP (1,600 feet) 3.3 Future Wastewater Facilities Wastewater flow is anticipated to increase at an average rate of approximately 400 additional ERUs per year for the next 20 years. At 270 gallons per day (gpd) per ERU, these 400 ERUs will produce an additional 108,000 gpd per year. This increase in wastewater flow results in an equivalent increase in available reclaimed water capacity. Table 3-4 shows the wastewater flow projections to 2001. It should be noted that the 400 ERUs per year anticipated growth is an estimate, and actual annual growth may vary. In consideration of this, a conservative estimate of 350 ERUs per year is used for financial projections. The availability of reclaimed water to customers is also dependent on the timely planning, development and construction of the respective reuse transmission and distribution system. TABLE 3-4 FUTURE WASTEWATER FLOW PROJECTIONS ERUs FLOW YEAR (CONNECTIONS) (GALLONS) 1996 3,735 1,008,500 1997 4,085 1,103,000 1998 4,435 1,197,500 1999 4,785 1,292,000 2000 5,135 1,386,500 2001 5,485 1,481,000 -22- 3.4 Future Wastewater Expansions and Upgrades WWTP No. 2 currently has a capacity of 3.0 MGD. This capacity is expected to be sufficient until the year 2018 with an average increase of 350 ERUs per year. Provisions in the design of this facility allow the capacity to be expanded to 4.0 MGD which will meet wastewater demands well beyond the year 2018. Other planned system expansions are to increase effluent disposal capacity, by supplying reclaimed water to the City. 3.5 Future Wastewater Transmission Facilities Although new development within the sewer service area provides for an approximate increase of 400 ERUs per year and wastewater transmission facilities are installed within the new developments by the developers, the City has needed to install only between two to three miles of sanitary sewer and forcemain each year for the past several years. This has been accomplished in conjunction with the City's roadway improvement program. New gravity and force mains have been installed in advance of development in potential high growth areas. Since no major wastewater transmission facility construction is planned for 1997, the City anticipates the normal two to three miles of wastewater transmission system installation within the coming year. 3.6 Future Reclaimed Water System and Transmission Facilities The City intends to expand its existing reclaimed water system in 1997. The Forest Lake Golf Course has reached its reclaimed water disposal capacity (1 MGD). Therefore, the City is pursuing the expansion of its reclaimed water system to accommodate future increasing wastewater effluent flows. The potential reuse sites associated with development projects along the newly constructed Clarke Road and sites surrounding the existing reclaimed water site, the Forest Lake Golf Course, are expected to be the earliest sites to develop. The West Oaks Mall (Site No. 24) is currently under construction and will be completed in October of 1996. This development is expected to accelerate other commercial development along Clarke Road and high density multi- family development in the adjacent area. The development of much of the vacant property along Clarke Road is already vested through plans filed with the City Planning Department. Future land use along the Clarke Road corridor includes residential and commercial uses. Figure 3-1 depicts the proposed reclaimed water system and reclaimed water service area. -23- i I + I l 3 i, • I -rf a aa.Mw.....q I- ,. -1 5 1 I ..__ ; - L F © ' 8 I ?1 GOLF OURSE AND 1 I ,t �,'''' • 1�----� i MEUS�i ' I • F R if ?I CEMET RY IRRIGATION'--: /, " I c I 1 AIN 1 ; PUMP STATION 1 O 1.' J /,,, 1 --I 3 1 I I. r 11 r: 1 I ` I. O r 1 1' �_,-.y' __ ST1A.S.kIPDIPGROut� I I p O ' �i -" IRRIGATION STORAGE TANK 1 1 / r' 20" ;I HOLDING I ICS •;, I ` ri 1,, + REUSE .POND :� 10 r 'MAIN 1 - 'i__.. \ r_,,,,„,„„•_,:._:_____.:,-_0 -- - -I — r .�-, - .-I- 1� L__ IL `- I , ' ▪ "▪E I I7 1 _i - mmmma.a.rt.a,m . - _ r ',F..... F 1 r- I 15 y Y .�r� Q Fs e --_. 1 . �1 p REUSE I r �.H _ _ c �MAIN I n �_ L -1 I -:Fr.I.u1wI.0 IuE11 c t i Uf �I t —3 ri CITY OFO1OEE ,(' I .. - WWTP N I _ •r-i. 4 .- 1 -- - I I R I� }.'',�- ▪- i▪ j'. I MASTTER I 'L....---_--...--, _ .11 r i r. L. C _ R - - >i�-4:l £.I-STING 12 ▪ ! 1 EFFLUENT ' 16"1 REUSE • - - ‘_- _ .i. s.-' EUUSE-MAIN .� 4, PUMP STA.V! MAIN -1= _ -- - - - - - 4-1-,'�r ` LOW PRESS EJ- _l [XII. 12 - f z. t 12 EUSE REU E MAIN I( 1,-.7,.--=-J. ,nwi• t2_- -. . . .- -' n'ETr � '.� MAI ` ._--i.-,-- --1,.„,-_,-_-----,-,,I(..„,....-_:,;\ l F i1^ t 1 Ii,REUS I_' .� _ i. r ▪ 1 1 .• 1,7:1,-.'-j-----,- 1�� _I J_ F -_ -▪ -*-41: ',„_t: .' - T 1 FFFIII 8� REUSE':i f= -i. _1 c 11 12" REUSE,MaJIN ` _ -. _ - -A.En o W• _ Ji 1 �•_ ® �� L . _ ? ® 6x G5E r -?r ! • 1I - _ 1 �� J \ T L _.. - _ - T, j ` ® 1 , I :1 _ 1 - iL__J i s i_:, ' ..,',:,'T....],"---_-:::1-..: I .F II I !:.IT T] -' j {r; 1 © I) 1 - 111}1 I'. 1--, ii_ Ly-t 0• 1: "'l K i _ ., 1 I 1 1:- CITY OF OCOEE - SA.]C _ _ FUTURE RECLAIMED I WATER SYSTEM MAP 1'-1' LEGEND: '__ - I.1i _ EXISTING - _ -F 1 -9 _ PHASE I 1y �•-•-•—PHASE IIY • C ..."....._.PHASE Ix - t PHASE IV - m C�J 1== =i ,,P VI n+oMmnw COMMTAMT6..- • .c I FIGURE 3.1 SECTION 4 RATES AND CHARGES 4.1 Overview The City of Ocoee is a political subdivision of the State of Florida. The City's water and sewer systems are operated and maintained by the Ocoee City Commission through its City Manager, Utility Director and Water and Sewer Department. The Ocoee City Commission has specific legal authority for acquisition, construction and operation of City-owned water and sewer facilities. The authority is derived from home rule powers granted by the Article VIII of the Florida Constitution, the City Charter, Chapters 163 and 166 of Florida Statutes and other provisions of law. Chapter 22 of the City of Ocoee's Code of Ordinances provides for the modification of City Ordinances related to the water and sewer system. 4.2 Connection Fee Basis For the purpose of this Engineer's Report, the existing water and sewer connection fee schedule was assumed to remain unchanged during the FY96-2001 period with the exception of possible automatic adjustments (authorized by Ordinance 92-19) as a result of capital construction cost index changes as identified in the periodical Engineering News Record (ENR). The current connection fees are based on ERUs. The City has assigned a value of 300 gallons per day per ERU for water capacity and 270 gallons per day per ERU for sewer capacity. The existing connection fees were derived using the marginal/incremental or "standards-driven" methodology. This method is based on the recovery of a new customer's proportionate share of the present value of capacity-related capital projects during a base period. The existing connection fee per ERU of incremental water capacity is $966. The connection fee per ERU of incremental sewer capacity is $2,865. The current connection fees for water and sewer were adopted by the City Commission (Ordinance 92-19) and became effective August 18, 1992. 4.3 Water System Charges • The current rate structure is shown in Table 4-1. For purposes of this Engineer's Report, the existing water system charges were assumed to remain unchanged during the FY96-2001 period. The city has the authority to make automatic rate adjustment due to annual increases in the cost of power and chemicals as authorized by Ordinance 92-19. 4.4 Sewer System Charges The current rate structure is shown in Table 4-1. For the purpose of this Engineer's Report, the existing sewer system charges were assumed to remain unchanged during FY96-2001 period. The City has the authority to make automatic rate adjustment due to annual increases in the cost of power and chemicals as authorized by Ordinance 92-19. -25- a , ,1 TABLE 4-1 CITY OF OCOEE EXISTING RATE STRUCTURE WATER Base Facility Charge $ 5/8 inch meter $7.64 1 inch meter $19.10 1-1/2 inch meter $38.20 2 inch meter $61.12 3 inch meter $122.24 4 inch meter $191.00 6 inch meter $382.00 8 inch meter $611.00 Plus: Volumetric (gallons); charge of $0.51 per 1,000 gallons SEWER Base Facility Charge $ 5/8 inch meter $13.81 1 inch meter $34.53 1-1/2 inch meter $69.05 2 inch meter $110.48 3 inch meter $220.96 4 inch meter $345.25 6 inch meter $690.50 8 inch meter $1,104.80 10 inch meter $1,588.15 12 inch Teter $2,969.15 Plus: Volumetric charge of $1.47 per 1,000 gallons for residential customers with a 5/8 / inch meter up to 12,000 gallons -26- 4.5 Comparison of Water and Sewer Service Charges with Other Communities The average monthly water and sewer service bill for customers using 10,000 gallons of water per month are $12.74 and $28.51 respectively, for a total cost of $41.25. A comparison is presented in Table 4-2, showing that the City of Ocoee's charges are reasonable when compared to rates from comparably-sized water and sewer utility systems of other publicly-owned entities in Florida. TABLE 4-2 COMPARATIVE WATER AND SEWER SERVICE CHARGES OF 10,000 GALLONS* ENTITY WATER SEWER TOTAL Titusville 20.55 60.17 80.72 Indian River County 32.70 43.98 76.68 Brevard County 19.49 41.93 61.42 Orange County 16.51 42.05 58.56 Daytona Beach 23.21 33.48 56.69 Melbourne 20.76 35.44 56.20 1 Lake Mary 19.80 35.00 54.80 Sanford 17.14 35.57 52.71 Cocoa 14.72 34.00 48.72 Casselberry 14.00 34.70 48.70 Oviedo 11.50 36.26 47.76 Kissimmee 9.51 32.20 41.71 Winter Springs 11.30 36.33 47.63 Orlando 8.93 33.72 42.65 Seminole County 11.70 30.00 41.70 Ocoee 12.74 28.51 41.25 , Winter Garden 11.73 26.18 37.91 Apopka 10.25 22.00 32:25 Winter Park 7.75 23.81 31.56 * Water and Sewer rates compared in September 1996. -27- y 4.6 Summary of System Charge Schedules The existing water and sewer service charges and other water and sewer revenue sources (connection fees, revenue and maintenance fees) will provide sufficient funds to meet all operation and maintenance expenses, existing and proposed debt service coverage requirements on the Series 1992 and 1997 Bonds, renewal and replacement fund deposits, required reserve funds, and reimbursement of administrative expenses for the system to the City of Ocoee's General Fund. The Water and Sewer Capital Connection fees, along with the net proceeds of the Series 1997 Water and Sewer Revenue Bonds, will provide sufficient funding for the expansion of the water and sewer systems to meet the 20-year growth projections. -28- SECTION 5 FINANCIAL PROJECTIONS 5.1 Overview The procedures required to prepare a fiscal evaluation of the City of Ocoee's water and sewer system include a review of: Annual Financial Reports (Audits) Historical Water and Sewer Accounts Historical Operating Expenses Adopted 1996/1997 Budget Projected Growth Rates Projected Operating Expenses Projected Capital Improvements The City of Ocoee collects traditional water and sewer monthly service charges based on water consumption. The City also collects water and sewer capital fees (impact fees) for capital improvements related to expansion of the water and sewer system. The City also collects a monthly revenue and maintenance fee. This fee is paid by developers that have reserved water and sewer capacity and have not used the reserved capacity within one year of reserving capacity. The City has reserved water and sewer capacity for 3,519 ERUs and 3,840 ERUs, respectively. The developers holding reserved water and sewer capacity will pay a total of $780,121 in revenue and maintenance fees in 1997. Developers retaining reserved water and sewer capacity have paid revenue and maintenance fees since 1989. Starting in 1987 the City presold or reserved water and sewer capacity to finance the acquisition of the City's water and wastewater system and provide funds for system expansion. During this period, the City had limited amounts of water and sewer capacity and the development pressure was high in western Orange County. Since the City has expanded the water and sewer system, the need to pre-sell capacity is no longer valid and the City has opted to use conventional financing methods for future expansion of the,water and sewer system. Since the presale of capacity is no longer planned, the number of customers paying revenue and maintenance fees is expected to decline as the customers connect to the City's water and sewer system. 5.2 Revenues Historical and projected revenues, expenses and debt service requirements are shown in Table 5-1. In projecting revenues for both water and sewer service, an annual conservative growth rate of 350 new water and sewer ERU's was used. The City has averaged approximately 400 new connections per year since 1992 and expect the number of annual connections to increase. The City has allocated (pre-sold) 3,519 ERUs of water capacity and 3,840 ERUs of sewer capacity. -29- .1 $ r .p N W o n 1°Oi 8 04 9i pa g e g Q i w W N O Li a vyl v1 7 O v1 `O `p 1� � Y 8 •r •.• v V! H N H Vf H H H H H H N H H y o0 1 •d 8 h O V1 W r b O V Vl N § h p^ !2 O. 0 u "' $ c.r 00 �= 0D3. N U t•1 O ,r p. O .a N O N lL w; _ '•p - pp v H H H H H H H H H H H H H H.i W t'1 b V1 n P o0 W T V1 h V1 r • B p g y c $ a Ftso .o V1 Oe � r 0 $ « a $ rn rn _ O p o0 00 c' yy. •O N 00 00 O O N v m N. 3 - V O 1��1 Q g 0' V1 ::-�+' �I. Pv. H I. H _ _ ... 4,p 1p fes. N y ..r — H ,7-4 H H Co, H H y H H H H v rn N O ... O N Q V1 0° B a g o c § 8 S h v .p P- 4 § P c 25 c o a e 7p p tc r v c -. el. et app p ^ 3 g i a g p: A.?: N ^ N V �: et ^ 10 t: ^ N tt 00 '.�._.,�C' � H H H � H H H H H H H H H H N D:4:. „ fvr' • a0 onpQ U b rg oo 0o rO.T osg gIifl ! II O N "f H H H Ma 12 8 p 8 8 8 •� o "':•: a - O O O O Nd' pi , N N O ONO cor- O N •.f b p :::►� E N n W h M T t- .fir.° h CT O CT y p. m QQ N1 r, -, w a c .0 V1 cn Vyy1 �•. OO ..-r W .O 3 M 3 3 b en N ` b 0 v N H H H H H H H H H H H H H 6 A E '.: ' 2 $ z;;:Q. p a 8 ::-.§ y1 •- 1,'1 V1 S r O b N .Hp M V1 N V1 V1 PI .•, G �'� .. T O h tP'1 O. O O O O. oro O ero n '� VI v1 A V q ii• r V N p4 T O: O� In M oo N p. n p. O• O� ,, 1p uo C .V. C w- }. < H N „r. H O y r $ N v M V - O� l-1 N f 1 Sb 8 H H H H H H H ,O •D H YV WV1 C IW 6 7p T N T y... o - p B u .2. g �GjV• Y tt {� .0 y u "1 "aIi .C°- 3 a u to o 04 u U u $ .6 n 9 a a ct'1 „s, 3 a.9 7 u p 7 u 0. m� a 2 iflIU�n•1 ue'tou �Cp e• p wK N C '+ {1] Nf p 'O w x w u al mo w x > .±..A a E Y E oC .'Ey^. to t.to C i1 u < 04 "n z $ u `'� •Z w y u e .. u u ti -2 N c .5 < ,4 m o0 B l 1t u u N V Y n n u r II .` $ - 2.u p w OG X. 3 3 h h 9 c u 3 0 o a 8 w h to < < g .p. c c a oC 5 E ° Z The City charges a monthly maintenance fee for the reserved allocation of water and sewer capacity. The City will bill $328,831 for reserved water capacity and $451,260 for reserved sewer capacity in 1997 as charges for monthly maintenance fees. Based only on the reserved water and sewer capacity, the City has pre-sold and reserved ERUs which equals over ten (10) years of projected growth. 5.3 Operating and Maintenance Expenses The proposed 1996/1997 budget and 1995/1996 actual expenditures were used for projecting future operating and maintenance (0 & M) expenses. To project 0 & M expenses, an average of three (3) percent annual increase was applied to all expense categories. This annual increase rate is consistent with historical expenses and anticipated personnel expenses. The three (3) percent value is considered sufficient to provide for increases in both fixed and variable 0 & M expenses. -31- SECTION 6 ORGANIZATIONAL STRUCTURE AND REGULATORY COMPLIANCE 6.1 Organizational Structure The City of Ocoee owns and operates one (1) wastewater treatment plant and three (3) water treatment plants which provide utility service to 9,950 water ERUs and 3701 wastewater ERUs as of September 30, 1996. Under the approved organizational structure, the Utilities Director/City Engineer reports directly to the City Manager. The Utilities Director/City Engineer and the Assistant Utilities Director/Assistant City Engineer are professional engineers registered to practice engineering in the State of Florida. Mr. James W. Shira, P.E. is the Utilities Director/City Engineer and has been with the City of Ocoee since 1989. Mr. David A. Wheeler, P.E. is the Assistant Utilities Director/Assistant City Engineer and has been with the City since August 1996. The Assistant Utilities Director is a new position for the City of Ocoee. Mr. Shira will be responsible for both the overseeing of the construction program and management of the water and sewer system. Mr. Shira is supported by other City departments such as the Finance Department, Planning Department, Personnel Department and Public Works. Mr. Robert Holland is the City's Utility Superintendent and has been employed by the City since April 1988. He possesses a Class "A" wastewater license and a Class "C" drinking water license. Mr. David Gosnell is the Chief Water Plant Operator and has been employed by the City since October 1983. He possesses a Class "A" drinking water license. Mr. Fred Ostrander is the City's Chief wastewater plant operator and has been employed by the City since December 1987. He possesses a Class "B" wastewater license and a Class "C" water license. The City has 29 employees in the utility department. Based on our inspection, we are of the opinion that the City's water and sewer system is in good operating condition and is well maintained. PEC representatives inspected the City's water and sewer system in August 1996. The City's wastewater treatment facility is relatively new (constructed in 1994) and much of the wastewater collection system is relatively new due to recent development within the City. The City's water treatment plants are relatively new (South Plant built in 1992) or currently undergoing major expansion (Forest Oak Water Plant). The water distribution system provides adequate service pressure to meet peak flow and fire flow needs. The City has formal preventative maintenance procedures for the water and sewer system. The staffing for the City-owned treatment facilities is in compliance with the Florida Department of Environmental Protection(FDEP)rules and regulations. As the City's water and sewer system grows, regulatory requirements change, and as the proposed capital improvements are completed, the number of staff positions may increase or be modified to obtain additional personnel with the required technical training and experience. The City's administration has shown a strong awareness of the need to provide continuing personnel growth. It is the opinion -32- of PEC that the organizational structure and experience of the City Water and Sewer Department is of sufficient size and quality to adequately serve the City's current and future water and sewer customers. 6.2 Regulatory Agency Compliance Regulatory requirements for the protection of public water supplies are mandated by the Safe Drinking Water Act (SDWA) and the Florida Administrative Code (FAC). The City of Ocoee samples its water supply and potable water at required intervals for all permitted parameters under federal and state guidelines. The City of Ocoee is currently in full compliance with all federal and state water quality regulations and has had no recent historical problems meeting those regulations. Coordination of the use of water resources in Florida has been performed by five water management districts since 1972. This function of water resource protection includes the issuance of Consumptive Use Permits (CUPs). The City of Ocoee falls within the jurisdiction of the St. Johns River Water Management District(SJRWMD). The City has recently completed the renewal process of its consumptive use permits for all active public supply wells and the addition of two new wells, one each at the Forest Oaks and South Water Treatment Plants. The new consumptive use permits are valid until the year 2006. General conditions of the CUP include water conservation guidelines and the City is encouraged to maximize the use of reclaimed water in lieu of groundwater supplies. The City's renewed CUP has an increasing allocation adjustment of potable water source based on population projections through the year 2010. No problems are anticipated for continuing the CUP allocation in future years as water capacity requirements are increased. The quality and quantity of wastewater facility effluent discharge is controlled by the facility operating permits issued by the Florida Department of Environmental Protection (FDEP). Discharges must meet the restrictions imposed by the Federal Clean Water Act, Clean Water Act Amendments and FAC. Wastewater effluent standards are determined by the type of wastewater treatment and type of effluent disposal method (percolation ponds, reclaimed water irrigation). The City's wastewater treatment plant is an advanced secondary treatment facility producing public-access level of effluent for the reclaimed water system. FDEP recently has notified the City of its intent to issue renewal of its wastewater operating permit. This permit is valid through September 20, 2001. The City's facility is in full compliance of current federal and state regulatory requirements. No problems are anticipated for continuing compliance with the operating permit conditions as future customers are added to the system. -33- SECTION 7 CAPITAL IMPROVEMENT PROGRAM (CIP) 7.1 Background The City of Ocoee is experiencing significant growth throughout the City's water and sewer service area. The City has annexed over two thousand acres of land since 1993 for future residential and commercial development. The 1.2-million-square-foot West Oaks regional shopping mall along Clarke Road will cause significant development of commercial and high density residential growth throughout the City's eastern and southern service area. Due to existing growth and anticipated future growth, the City's water and sewer facilities must be expanded to meet water and sewer service demands. In anticipation of the rapid growth, the City has provided long-range planning procedures for expansion of its water and sewer system. Master planning of the City's water, sewer and reuse system has been completed and the City has established a long-range Capital Improvement Plan (CIP) to meet future capacity demands. To ensure future compliance with the City's concurrency management plan, the City has also provided long-range planning analysis of other important services such as transportation, police, fire and recreational facilities. The City has taken a pro-active planning position to properly prepare for its ongoing growth. 7.2 Water Capital Improvements The City's Water CIP emphasizes the construction of water treatment plant enhancements and expansion of the water distribution system. The water system enhancements are necessary to provide water service to the new growth areas of the City. The water treatment plant construction projects are depicted in Table 3-2. The water distribution system improvements are listed in Table 3-3 and shown in Figure 2-2 (A-D). Section 7.5 contains a summary of the cost estimates for expansion of the City's water treatment and distribution system. These improvements have been identified as necessary to provide water service through the year 2016. The total estimated cost is $4,973,000. 7.3 Wastewater Capital Improvements The total projected wastewater demand for the year 2015 is 2,804,000 MGD. The City's recent expansion of the wastewater treatment facility is expected to provide sufficient wastewater treatment capacity for the twenty (20) year growth period. The City needs to expand its effluent disposal system to match the treatment capacity of the wastewater plant. To determine the cost- effective options for expansion of the City effluent disposal system, the City authorized PEC to complete a Reuse Master Plan for the 20-year growth period. -34- • The Reuse Master Plan identified an expanded reclaimed water system as cost-effective for effluent disposal. The City requires new developments submitted after August 1995 to install reclaimed distribution lines within the development in anticipation of the City's expanded reclaimed distribution system. Also described in the Reuse Master Plan is the initiation of a reclaimed water retrofit program. The purpose of the retrofit program is to provide reclaimed water to existing developments that are adjacent to the major reclaimed water transmission mains. The initial retrofit program will provide reclaimed water to 1,500 existing water and sewer customers along the Clarke Road corridor. The future reclaimed water transmission system is depicted in Figure 2-5. The City has also identified the expansion of the existing effluent disposal system at the Forest Lake Golf Course as beneficial. The City intends to purchase additional undeveloped acreage and modify the existing lease with Forest Lake Golf Course to allow private funding to expand the existing 18-hole golf course to a 27-hole golf course. This proposal allows the City to provide the property for effluent disposal expansion and the golf course to provide private funding for development of a joint-use effluent facility. The expansion of the golf course effluent system is anticipated to cost $1,500,000. The total cost for expansion of the effluent disposal system to provide sufficient disposal capacity for the twenty (20) year growth period is as follows: Reclaimed Water Transmission System Reclaimed Water Retrofit Program $ , 0,000 Effluent Expansion at Golf Course $11,00550,000 TOTAL EFFLUENT DISPOSAL $1 500.000 $5,340,000 7.4 Maintenance Facility As the City's water and sewer system is expanded, the need to provide a modern maintenance facility is enhanced. The City has designated a site on the existing wastewater treatment facility location to provide a centrally located maintenance facility. The estimated cost of the maintenance facility is $500,000. 7.5 Total Capital Improvement Program (The Project) The Project to provide water and sewer service for the 20-year planning period is as follows: Water Treatment and Distribution Improvements $ 4,973,000 Reclaimed Water Program Reclaimed Water Program (Retrofit) $ ,050,000 1 Effluent Disposal Expansion $ 1,050,000 Maintenance Facility $ 1,500,000 TOTAL $ 500,000 $10,813,000 -35- 7.5.1 Water Treatment Plant Improvements - Cost Section 3.2 describes the necessary water treatment plant improvements required at the Forest Oaks and South Water Treatment Plants to allow for continued growth in the City. The costs associated with these improvements are presented in Table 7-1. TABLE 7-1 WATER TREATMENT PLANT IMPROVEMENTS P- VE .;:::.:::: T:: A IlVIP O O FOREST tQ VEM i' S ..:UTI >�.ANT .::::;;;:::: 'IE T . '> High Service Pumps $114,000 High Service Pumps $180,000 (3) (5) • Building 40,000 Flow Meter 60,000 Improvements Yard Piping 50,000 Well and Pump 260,000 Control 30,000 Contractor 90,000 Mobilization Flow Meter 10,000 Contingency 108,000 Generator/Power 140,000 Contractor 77,000 Mobilization Contingency 92,000 TOTAL $553,000 TOTAL $648,000 7.5.2 Water Distribution Facility Improvements - Cost Section 3-2 describes the distribution piping improvements to provide for continued growth in the City. The projected cost corresponding to the construction of these improvements is $3,123,000. 7.5.3 Cost Summary of Potable Water System Improvements Table 7-2 summarizes the Water Treatment Plant and water distribution facility improvements required to expand with the City's growth population. -36- TABLE 7-2 SUMMARY OF WATER SYSTEM COSTS FOREST OAKS $ 553,000 SOUTH PLANT 648,000 DISTRIBUTION SYSTEM 3,123,000 ENG/INSP (15%) 649,000 TOTAL $4,973,000 7.5.4 Reclaimed Water System Improvements - Cost Table 7-3 presents the Reclaimed Water System improvements and associated costs required to expand the City's system to allow for sufficient wastewater effluent disposal. TABLE 7-3 REUSE SYSTEM IMPROVEMENTS PHASE 1 STORAGE TANK $800,000 PUMP STATION (REUSE) $300,000 LOW LIFT STATION (EFFLUENT) $150,000 DISTRIBUTION SYSTEM $350,000 DESIGN, PERMIT, INSP $220,000 SUBTOTAL $1,820,000 PHASE 2 DISTRIBUTION SYSTEM $800,000 PUMPS $50,000 DESIGN, PERMIT, INSP $120,000 SUBTOTAL $970,000 REUSE RETROFIT (1000 ERUS) $1,050,000 GOLF COURSE EFFLUENT DISPOSAL $1,500,000 EXPANSION TOTAL RECLAIMED WATER $5,340,000 SYSTEM COST -37- 7.5.5 Available Funding The City will use existing reserves from the Renewal and Replacement Account and the Water and Sewer Capital (Impact Fees) Account to fund any deficit in available revenues from sale of the Series 1997 Bonds to complete the Project. The City has a fund balance of $1,250,000 in the Renewal and Replacement Account and $1,968,000 in the Capital Account. -38- SECTION 8 CONCLUSIONS 8.1 Findings of Fact Based on PEC's review of the City of Ocoee's water and sewer system, reviews of master plans and studies performed by PEC, review of the City's Comprehensive Plan, review of the City's financial information concerning the water and sewer system and our recent site visits to the major water and sewer facilities, to the best of our belief, PEC concludes the following: 1. The City's water and sewer system is in good condition and has been operated and maintained in accordance with standard utility industry practices, and provides good, reliable and cost-effective water and sewer service to the customers of the water and sewer system. 2. The City's water and sewer system is operated in compliance with current Federal, State and local regulatory requirements. All regulatory permits necessary for the operation of the water and sewer system are current (renewal in progress) and in good standing. 3. The Project is necessary and provides water and sewer service for new growth. The average annual growth rate of 350 ERUs is reasonable and valid during the 20-year planning period. The Project is technically sound and conforms to proven and industry accepted engineering practice. The Project will provide for water and sewer system improvements and expansion which will meet Federal, State and local regulatory requirements and projected growth related water and sewer demands for a twenty (20) year period. 4. The proposed Project is or shall be designed in accordance with accepted engineering standards using proven conventional technology. The proposed improvements have or shall be designed with a high level of sensitivity to concerns held by nearby residents regarding aesthetic issues such as odor control, noise, lighting and utility. 5. The City's management and professional staff are well qualified and certified to manage, operate and maintain the City's water and sewer system. 6. It is reasonable to assume that all required regulatory permits and/or governmental approvals shall be obtained in a timely manner for regulatory compliance and will be obtained prior to construction of the -39- proposed Project and subsequently all necessary operating pcnnits will be obtained for the completed Capital Improvements. 7. No material charges have occurred in the Project which will have a negative impact on the cost estimate for successful completion of the Project. for esign 8. Proceeds from the Series 1997 oBthe Project as described onds will be Sea on 7� construction and implementation 9. The useful life of the Project is iBocess of the weighted life of the Series 1997 Water and Sewer Revenue 10. The adopted water and sewer rates are reasonable and sufficient to meet projected system operating expel bonds and renewal andes, estimate project trecovery, debt replacement (R service coverage for Series 199 & R) contributions. 11. Based on the analysis and evaluation contained in this report, the capital financing of the City of Ocoee's proposed Project is economically feasible. 1 -40- CLOSING DOCUMENT NO. 11 CERTIFICATE OF INCUMBENCY I, the undersigned officer of the City of Ocoee, Florida, DO HEREBY CERTIFY: 1. The following is a correct list of the names of certain officers of the City of Ocoee, Florida, and of the dates of commencement and expiration of their respective terms of office: COMMENCEMENT EXPIRATION OFFICE OFFICER OF TERM OF TERM Mayor S. Scott Vandergrift 11/94 2/97* Commissioner Leon "Rusty" Johnson 11/94 2/97 } Commissioner Jim Gleason 11/95 2/97** Commissioner Scott A. Glass 11/94 2/97 Commissioner Scott Anderson 11/95 2/98 City Manager Ellis Shapiro 02/89 At will of 3 Commission Clerk Jean Grafton 08/88 At will of City Manager City Attorney Foley & Lardner 01/88 At will of Commission 2. The official seal of the City of Ocoee, being the only seal used by said City, is the seal an impression of which is affixed opposite my signature on this certificate. WITNESS my hand and the official seal of the City of Ocoee, Florida, referred to above, this 9th day of January, 1997. CITY OF OCOEE, FLORIDA (SEAL) By: CiClerk In April 1996, Ordinance 96-05, new election dates were set and existing terms were lengthened to accommodate the change. Commissioner Gleason resiged (effective 2/97) to run for Mayor in the February 1997 election. J'BONDS\4128\CERT1 NC 11j7/97I GED I R c.) City of Ocoee Jean Grafton 150 Noun LAaFSUORE DRIVE City Clerk OCOEE, FLORIDA 34761-2258 (407)656-2322 FAx(407)656-5725 August 7, 1997 Dale A. Crosby, P.E. Vice President, Regional Manager Gee &Jenson Engineers-Architects-Planners, Inc. 2701 Maitland Center Parkway Suite 150 Maitland, Florida 32751 Re: DESIGN CRITERIA PROFESSIONAL SERVICES AGREEMENT - IMPROVEMENTS TO THE A. D. MIMS ROAD OCOEE WASTEWATER TREATMENT PLANT - WORK ORDER NO. 9 Dear Mr. Crosby: In regular session on Tuesday, August 5, 1997 the Ocoee City Commission approved the Design Criteria Professional Services Agreement - Improvements to the A.D. Mims Road Ocoee Wastewater Treatment Plant as follows: Work Order No. 9 - $10,400.00 plus Reimbursable Expenses One executed original of the work order is enclosed, and the second original is retained for our files. Sincerely, J Grafton City Clerk jl Enclosurere c: /Jim Shira, City Engineer/Utilities Director(with enclosure) Wanda Horton, Finance Director(with enclosure) "PRIDE OF WEST ORANGE" C05‘,\.°14? Q UV" (�� lam_' '� ` �I • WORK ORDER FOR DESIGN CRITERIA PROFESSIONAL SERVICES AGREEMENT WORK ORDER NO. 9 PROJECT: IMPROVEMENTS TO THE A.D. MIMS ROAD OCOEE WASTEWATER TREATMENT PLANT CITY: OCOEE, FLORIDA DESIGN CRITERIA PROFESSIONAL: GEE & JENSON ENGINEERS-ARCHITECTS- PLANNERS, INC. Execution of the Work Order by City shall serve as authorization of DESIGN CRITERIA PROFESSIONAL to provide for the above project, professional services as set out in the documents which are attached hereto and made a part hereof. ATTACHMENTS: (X) Programming/Site Evaluation DESIGN CRITERIA PROFESSIONAL shall provide said services pursuant to this Work Order, its attachments, exhibits and that certain Agreement dated December 5, 1995 between CITY and DESIGN CRITERIA PROFESSIONAL which is incorporated herein by reference as if it had been set out in its entirety. Whenever the Work Order conflicts with said Agreement, the Agreement shall prevail. TIME FOR COMPLETION: The work authorized by this Work Order shall be completed within sixty (60) days from the date this Work Order is executed by the CITY. COMPENSATION: The CITY shall compensate DESIGN CRITERIA PROFESSIONAL Ten Thousand Four Hundred Dollars ($10,400.00) plus Reimbursable Expenses. DESIGN CRITERIA PROFESSIONAL shall perform all work required by this Work Order; but, in no event, shall DESIGN CRITERIA PROFESSIONAL be paid more than the fixed fee and reimbursables set. IN WITNESS WHEREOF, these parties hereto have made and executed this Work Order on this day of hu 6 Its t` , 199 , for the purposes stated herein. GEE & JENSON ENGINEERS-ARCHITECTS-PLANNERS, INC WITNESS: DESIGN CRITERIA PROFESSIONAL r • By: Dale A. Crosby, P.E., Vice President, Regional Mgr. Date: 7//l f ATTEST: BOARD OF CITY COMMISSIONERS + ' CITY OF OCOEE, FLORLDAft Ockt -eSL4 Grafton, City e+erk S. Scott Vandergrift, Ma Date: Awc4r.a- 4'1 (IV) FOR USE AND RELIANCE ONLY BY THE Approved by Ocoee City Commission CITY OF OCOEE. APPROVED AS TO FORM at a meeting held on ,cQcr c, 1997 AND GALIT�Y THIS 5 DAY OF under Agenda Item o. y, 6 . , 199 . FOLEY & LARDNER Vj a 04 A B ` Y• CITY ATTORNEY Attachment"A" (6/30/97) Design Criteria Professional Services Improvements to the A.D. Mims Road Ocoee Wastewater Treatment Plant, Ocoee, FL Work Order#9—Programming/Site Evaluation Scope of Work The project includes demolition of an existing prefabricated metal storage building and construction of a new prefabricated metal vehicle storage building. The vehicle storage building would store six (6) large trucks, parts storage, workshop and lawn maintenance storage. The project also includes additions/alterations to the existing one-story masonry operations and maintenance building. These additions/alterations include adding a new breakroom, 6-10 new offices and adding/upgrading men's and women's toilet/locker rooms per code. The project also includes site modifications to the existing Wastewater Treatment Plant fenced compound for improved vehicular circulation, additional parking and adding a landscape buffer at the perimeter to visually screen the plant facilities from the adjacent planned park. Professional Services to be provided by the Design Criteria Professional: 1. Develop a building program. 2. Develop a conceptual floor plan. 3. Develop a project schedule and construction budget. 4. Prepare a preliminary building and site code review. 5. Prepare a preliminary site evaluation and conceptual site plan. The evaluation will be prepared after reviewing existing As-Built Site BoundarylTopographiclTree/Utility Survey and Geotechnical Reports for the site. 6. Evaluate existing Operations and Maintenance Building: ADA Accessibility, Roofing, Mechanical and Electrical Systems. Submittals by the Design Criteria Professional to the City: Provide one submittal of five (5) sets of the Programming/Site Evaluation documents. Meetings: The Design Criteria Professional shall attend two (2) Design Criteria Professional/Owner meetings. These meetings shall be conducted in a workshop format. The purpose of these meetings shall be to discuss and exchange information with the established City's representative(s) with regard to the program requirements for the facility. Program needs may be items such as hours of operation, security, type of activities planned for facility, number of persons utilizing the facility, vandalism, immediate/future square footage needs and construction budget. Items to be provided by the City of Ocoee: 1. The City shall appoint a representative who shall on the City's behalf attend above stated meetings, issue directives with regard to the Work, authorize the Work, prepare review comments with regard to the Work and approve the Work. The City's representative shall be: James W. Shira, P.E. City Engineer/Utilities Director, City of Ocoee Name Title 2. At the completion of the Work, the City's representative shall review the Submittal. The City's representative shall provide review comments about the Submittal to the Design Criteria Professional. The Design Criteria Professional will address and/or incorporate those comments during the next phase of Professional Services. 3. Existing As-Built drawings of the Wastewater Treatment Plant, Existing Site Boundary/Topographic/Tree/Utility Survey and Geotechnical Reports for the site. Attachment"B" (6/30/97) Design Criteria Professional Services Improvements to the A.D. Mims Road Ocoee Wastewater Treatment Plant, Ocoee, FL Work Order#9—Programming/Site Evaluation Fees Worksheet Compensation 1. Basic Architectural/Engineering Services $10,400.00 2. Reprographics Reimbursables: reproducibles, blueprints, photocopies. $200.00 (These charges will be billed at cost as they arise. The total amount shown is the amount Not To Be Exceeded unless approved in writing by the City. The following rate schedule represents inhouse printing costs. Printing company rates may vary.) Photocopies: $0.15 per page (8 1/2 x 11-14) $0.20 per page (11x17) Reproducibles: $1.50 per S.F. Blueline Prints: $0.40 per S.F. Method of Payment The Design Criteria Professional shall invoice amount due based on the percent of the total work order services actually performed and completed. Invoices shall be submitted to the City once monthly. We understand that the City shall retain 10% of the total work order fee until one hundred percent (100%) of the work order services are actually performed and completed. 76-IT • • tt'-.4",%-_,P, . i . • .I'LS Wastewater -•_ — `V. .1 ,.s,� -� •r..- _i,. { � tee 'i't :. _�� ( s7` . T" �T' Oita c� tkg" 1,111. �= • l f , . . •., •"r •iv. tom. #►�i�- r-M-. 111+4�12 •''•• ' "%,---. Ir.- 41-416. Air A.411 •:41) •• 11,4• I/0 . .. "' a.,r "r< yry�r i _ki • 4. _ 7 cr'lr._._,. ...' / ' A'460§ek 111 a'AN;-et••53• A. 1.. • ..••,..1•Ic111;:'••••,2 114k •jetb.' 4. \\% , ‘ •tit .► ,I.:• r • • ' „'*-za!!+, ;l`,• •V .! •1' ' w 1 ►; 41.4. iiihr r.,,,i,...- -... 4,4, ---4. -._ ,- s;,:,,,,„,.,..„. •1" `• : ''',..,4-' '"•*.-" • • ' ,N �` ' ••c: �. .; Area of ProiectI..n � . lk• en•I - I1 t � ;►� • . y : � Awr• .zttk•l;;;, i • •a l ! - : �' • i • _ ._,... • .. .. .,--i...z....:..711,':',_,17 •• iff '11--(7••••• # . :,!-. •-•..- -3" lit vi. _ p 4 • • M.� ^ - �,-. �+� N _L�1 ••J �i• . . .,'� , )T••: rM+�• 7' 1 ' '1, ; 1t '. :' 1. ! .a', 5%� • 1 �; , .. •a.,-�� •e mar -y �` 1 az J111111111411; 11),• ,,e' ,♦ .%44 '' . • ' "I' . if ilt .fi "...I r • : -r_V. 1.- � -tea • -«.�.: _ • i 0";". .. ; A, r • •4• �y� •• �,.�., ,..!iii :,� _ - - f gy , t .:-.-_ _: -: •":10, -'....., -, :-.1%,3-.„4.---, '., 't"' ,-›..‘-•••; Liril,,,,ri i 4, . _, : . . .. ....... -4- -...-,a 4- ----- 7 .,..., 7 ill ..id, . ...) , . 4 4iit / • • • . .,..., (,__,•••,..i. 444441f •riii— —--, - ,• i ,'t^"'ti'.wit c 'c *7' a i M.' e. . 1 '' ''''‘:,.,5..1-34P..:-1.14.•- �r • y i� l'.• q S Y 1111;:-. ‘... 7 '-.-Z,....... r•., -1, . , 9 ...- -� c►. •� 'y `• ,. - i;; SI` t _`ice -Y �, - �-.• ' as , • Jam. ', = r • r, ,I _'-:.:' ' : • � - ,t rte' • ii J �1l b�. giti � {{J`�`(.�; � r-• - S • • lf,� rte _ '�t�t=� f Tt,_ i •yam - - rl•►I r - 1r i•-.,• +4f, iC !� FIiir s ; -a ,- _,t `-� ! '+.t t 1t- • �- w.. tea, ,j,_ K - • . _. ,.i A ,,,v -r'r'' ;ff r ".` ! - i' .tp I J fir:4� '�•-. -,• - ,44,....., ' i., .,• •_ •. =t: -i„,(, fl} -tet'- \ I !F ra- 1.'• :° r,' / e7/..10fr-Ar..--- ,,,.-:. -. • =R, ' ' t./ • -' ,e4...'"t.-...•,...,!'.•:....i.- 4-..:- ....'„,a..7" - Ad'. 's' • •J • 14 , . "Pr • � •- - � rr � , ,y ,J ••• i � '�'' e � - • 'a ,',4. I-•.. •S::ZX.-.• - ter" ♦• •. .•, .� - 'w ate- • 1 � ••� t •. .....v.‘ ti t Y. �. �. \ • .', ti '• • .�� V ;►7+ -';_• •`i• •• 7. -)- .• ' i#• Ilkraf: ,�\ .�.•• ..... ' (•:. • nO.. • ti EXHIBIT �'2 • :1,f,: � Y dam: : ,'_ ;. i"'\ '`t�. ," • '} • '•1,•••a•„w!•r_ti. '� J `ss ,;� X 1:4 .11•• i �. ... _• �. `a• -- ♦ .I _ •• - �C: . •i-^•• •::+�,t. •• �•7�� r .s • •_. ..r' ••r.•., • •• ' :,• ,-.111r•-• •. \-�1: ot- , • ... • r •. • itIre • �h �� �� ♦•�--- �� r re r� . • •r 1l _ . . . •....,...._...A., 1. E. • ‘11• •••„1,,F., r • 2• 11"...,1,p-}.-...„7-=•,. `• 7 '.� ;P.N.'••••• y�x - ! 146.40- le- .-'J� L •- ' ll- - T `,b j-L •..t.- ......5; Q'-�-- .te•t • T • •�. ti, wi S ' ; l t y�_� `�IGTZ., s▪ •.--i:f L•..;-••••••:. •-.....F-.Al •-,s•t--'r _t• T t , . . • . -� fir- h .. J` .�' r _ •• ,• • —4:2.'7_ .. rV.--.1--•• 4. c• _t!•..' r.._-re•q' 1•• ' .t • ,r,� 4 - • _ 3-�--^F•y. .'�'�%szi„ `a^• ti. e _ t • •. .•.• � '•r •.lip tfa;.t-•t+,e• -..,;:',L.,- ..oi' -••;•-7'-d•.. -.•�• ' !- '` • - ',7: • r• • ii-of, ' 11.7.f- ' /7. ' -••.‘ •I'' 1..4.eA.45'... ,..-•.b4..: ,. • st .. �. _ �'.•• rt;f-__ • _ --- ♦VJ :4101-jim. \\.. _�•r ••it'd'__, -ter :`c T; ,... •.'' `'r .. ./"q71: . . ,- .- .•_'7 .` !' .'•.rate•. .ry • ' • f• ` Yom` , trr - -.: - 1 -- '-y,.r'. ;f,' ;' ▪• '..' .'4 - .e3'Y-7.' a''�-'`e ! r• _ • . _ � ' k � g. t{ 4- 1 .. ; ,- •.. _=_"�• � _ � � _ t ; •r;!--•;•-7.3••••• 4.,' ; "nil'. ,..-..,,..4 ,.. ..ili • . L.;..; ;PI; V . ••••.NV•--2;1 ... • • ilk t`V..ir-- ‘ .'. - ----'--------.7-=_ ,� 7. � W im''} te PfG��1` - + , 1 _ • _ .36.-...--... ice...!ri ;.. '/T�= ..tT ' l;:( .-. F-. r1 i [ -• _ w 1. ` • s �1' "•+ - •.r: - ' Y'... ...'•I� - ,rf•t _�• �• • ��.� ` y - --.r• 4i (`_�] 37►�• ;---'1 )—; - r • • r•t�"- t . 1 „k =� •vim \ i • . •. '� _ . ; - V•_J'n. I - - - �.1 i{+ - • -!a' -y'�t,•�+`� ' .•••;,t7",..1,`•-2 ce •yam',— _•• T'-.ti'•1 _ .., rJ 'T u .0 L -.., _ '- ti• M T •' 1 S• L•y f 3_, Hgenaa Item VI B OR G000 JAMES W. SHIRA,P.E. CITY ENGINEER/UTILITIES DIRECTOR 150 N.LAKESHORE DRIVE•OCOEE,FLORIDA 34761 PHONE(407)656-2322 EXT. 142•FAX(407)656-7835 MEMORANDUM DATE: July 21, 1997 TO: The Honorable Mayor and Board of City Commissioners FROM: James W. Shira, P.E. City Engineer/Utilities Director SUBJECT: Maintenance Facility at Wastewater Treatment Plant In the 1997 Utility System Bond Issue, one of the proposed projects is a maintenance facility to be constructed at the wastewater treatment plant. This facility is to provide office, storage and maintenance areas for the utility department. The office area in the existing building at the wastewater plant is the same as when the utility was acquired from Prima Vista, yet the utility staff has tripled. The proposed new building will contain additional office space and will also provide covered storage for the expensive rolling stock now owned by the utility. We will have an area under roof for storage of PVC pipe and fittings as well as storage of smaller parts and equipment. The maintenance area will contain space for minor repair work on equipment, a welding area and a meter repair area. Since this will be a major building addition for this utility, we want to make sure we include all of the uses we need now or may need in the future. Not being experts in interior space design, we thought it best to work with someone who can develop a comprehensive plan for this building. The attached letter from Mr. Paul Herwig dated July 15, 1997 describes the series of work orders that will be required. These work orders will result in a design criteria package that will be used as a basis for design by a building contractor. Attached for your consideration and action is a proposal from Gee & Jenson for the first work order, titled Work Order#9. This work order will result in the development of a conceptual floor plan, a project budget and schedule, a conceptual site plan and an evaluation of existing and required mechanical, electrical and plumbing system. The proposed fee for this work order is $10,400. The total estimated fee for work orders 9 through 13 is $48,200. I recommend that the City Commission authorize the Mayor and City Clerk to execute Work Order#9 with Gee & Jenson in the amount of$10,400. THE PRIDE OF WEST ORANGE "CENTER OF GOOD LIVING-PRIDE OF WEST ORANG&. MAYOR•COMMISSIONER S.SCOTT VANDERGRIFT Ocoee o� .0 COMMISSIONERS CITY OF OCOEE DANNY HOWELL pr. • SCOTT ANDERSON V — 150 N. LAKESHORE DRIVE p OCOEE, FLORIDA 34761-2258 SCOTT A.GLASS NANCY J.PARKER et �c.) (407)656-2322 4- )6 (1:34-6j `�A CITY MANAGER 44 of 000v ELLIS SHAPIRO MEMORANDUM DATE: July 17, 1997 TO: Ellis Shapiro, City Maria.er FROM: James W. Shira, P.E. fe City Engineer/Utiliti;,. b ector SUBJECT: Office/Storage Building at WWTP I have received a proposal from Gee & Jenson for the first of several work orders required to develop a set of design criteria for this project. The first work order is for the Programming/Site Evaluation phase and their proposed fee for this work is $10,400. I asked them to provide a breakdown of their estimated fees (attached) for the remaining work orders to get an idea of the total cost for their services. Along with the proposed fee of$10,400 for work order number 9, the breakdown shows the estimated fees for work orders 10 through 13 totaling $37,800, for a total estimated fee of $48,200 to develop a design criteria package and provide bid evaluation and construction document review services. The fees for future work orders 10 through 13 will be finalized as each work order is negotiated, and I expect that the final total fee will be less than$48,200. Since this will be the limit of our expansion of this facility for several years, I think we would be prudent to have a well conceived plan and I believe this firm will provide us with that. If you have no objection to this, I'd like to put Work order# 9 on the first August agenda for City Commission action. Please advise. 7 fS`G l / SA1'16 C:ALL_DATA/WORD/jws97/memalEs WWTPbuildingdoc TIVtply_) / / - „ ,-,, 1 . • 7l,5,9 GEE &JENSON Engineers•Architects•Planners,Inc. SINCE 1951 2701 Maitland Center Parkway,Suite 150 Maitland,FL 32751 Telephone(407)660-1660 Fax(407)660-2852 July 15, 1997 Jim Shira /�%/\I -'- City of Ocoee �, "� 150 Lakeshore Drive i; Ocoee, Florida 34761-2258 U�j. ” / 6 /j Re: Improvements to the A.D. Mims Road ��;/ Ocoee Wastewater Treatment Plant ; � i Dear Mr..Sh;ra: �`� ' This letter is being written in response to your request for an overview regarding total compensation for Work Order#9. The following is based on the estimated hours listed on the "Professional Services Schedule", dated 6/30/97: PROFESSIONAL. EST. AVG. EST. SERVICE HOURS RATE COMP. Work Order#9- Programming/Site Evaluation 160 $65/HR $10,400.00 Develop Building Program Develop Conceptual Floor Plan Project Schedule&Construction Budget Preliminary Building/Site Code Review Preliminary Site Evaluation/Conceptual Site Plan Evaluation of Existing Operations & Maintenance Building: ADA, Roofing &Mechanical/Electrical Systems Work Order#10-Schematic Design 160 $65/HR $10,400.00 Demolition Plan Schematic Site Plan Schematic Floor Plan/Elevations/Building Section Statement of Probable Cost& Project Schedule Work Order#10a—Subsurface Soils Allowance $2,000.00 Explorations Work Order#10b-Survey Allowance $2,000.00 Work Order#11 - Design Criteria Package 240 $65/HR $15.600.00 Performance-Oriented Architectural Drawings: Site Plan, Floor Plan, Roof Plan, Ceiling Plan, Finish & Door Schedules, Building Elevations& Building Section Architectural/Engineering Performance Technical Specification Work Order#12- Bidding/Contract Negot. 60 $65/HR $3,900.00 Prepare Addenda Attend Pre-bid Meeting Attend Bid Opening Evaluation of bids submitted by the design-build firms Work Order#13—Construction Document Review 60 $65/HR $3,900.00 Peer review of signed/sealed Construction Documents prepared by design-build firm Total 680 48,200.00 Egriean g•EB 0002934•Ncnrtecwre•M C000656•Lrwscave NcnMect re a LC C000050•Lana S.rveywg I LB 0002934 Jim Shira/City of Ocoee July 15, 1997 Page-2 Reimbursable costs for Reprographics are in addition to Professional Services, and are estimated at approximately $6,000.00. Hopefully, this compensation breakdown satisfies your request and gives you sufficient information. Please call if I can be of further assistance. Thank you. Sincerely, Paul M. Herwig, R.A. Manager of Architectural S- PMH/mmc \\herwiglshira letter 0715097.doc ON2701 Maitland Center Parkway,Suite 150•Maitland,FL 32751 •Telephone(407)660-1660•Fax(407)660-2852 Engineering 0 EB 0002934•Arcniiecture a AA C000656•Landscape Arcnnecture 0 LC C00005J•Land Surveying a LB 0002934 G -0 E-. ,�, a U co ro �•� «f A cc) = ctl ca CA 0 Ch CA Y a E U 0 A. 0 a..'vv' w 0, w .6 .tj °0 0 a, H • 3 .0 -073. � ow ,w � Cr 0 a VScrS � .. ;; A A .. 2 A c o- 2 2 0 = • ' •fes 0 ., « �t .. r�, . ... Lz. 4) N ...• °� .. a 'O d 7p ami ° ami 4) ami 0 U O � � ami a ami a GL b .+ Q V O O o 0. 0JD O g �+ �^ O O N T EO. 0 8 00g •° .c .6. a a E- a p mo {°.i a a o .0 via 0 .S 0 v r� f-" c c Li. g a Z Z cn cn 5 as z Fa, 00 a, 0 a\ rn a\ a, a\ 00 ON a, 00 0, 0 c�.. O, O, O , O, MO, O, O, O, oOOO U , - V V O, • vi • N 00 N00 00 z 0 00 00 00 0, O, 00 00 CT 00 F� 0 o, ON ON o o, o, rn c o, ON CN ON 0 u - a, N N U Q i v i .- .- - v i 0 i o N N G., 00 a, 00 00 00 O, 00 00 CO a\ 00 00 O, O, 00 00 N A a ON . ON N - ON 00 o, ON o, ., - — Cr -.CZ N - � o o, 0.1 0 00 N N cn �t ,o ,O O, A N a o0 00 O, 00 00 00 00 O, O, oO 00 N O, CO oo O, 00 O, oo O, O, O, N - O, O, .-.. Q, 0 a, O 0 - - — -. — N Q N V1 M NO M h O, ,n 00 A N z z > 00 °; 00 0 ON o, as a a Q o i -- a E" oo N 00 Z : a oo a, o0 00 0, 00 00 00 00 00 00 0o O, 11 O\ aN a, a, O, a, a, o, - a, O, - a, .— N N � —•. N N \ N - - ON N N N O N N N , O 0.0 a G.) N cn N ,o R M cn n , a, kr) •— U ;T.4 U Q N o0 h O U a4 k a o0 A F a A Q E. ,o N N N N N O1 a W Q1 N N I O, O, Cr) N O, O, 00 0000 00 Q E-• ^ N o 0 0, - en o, N [- O O O O O v) A 00 ,o ,o ,o •— •- ,a •- .- cn ,o ,n N az 01 CT 0 .t sl a an° 4 a a°� 4 as °a a -1 co -1 CO ..1 CC1 .- r� .� tea a m . PO ,-.11 w rr ra, cn 4 rte.. CO= 0E0 P-; 0 ,„.:Oo, N 00 O, 0 ••— v v N r, , ,O N 00 O, 0 ••—, Lti, Z N N N N M M M M M en en en en en .1- ,o co M kr) N N ,--• -t -t It Nt 3t 3t 4t 4t y i o ' UU UU40NN 0 N > ° r¢ 4 U a ) TiG L a N 0 ° ° oO 0o00 .o0 ,� H a °ic r aac 4 Q U 41 0 N N N N N N N N C) O `-' `-.„ N 0 y U ti cG 'CC cNO C/) cNd cC tNC cC co 2 7 C t v q O W O ,, ..0 cd .0 .� .0 .- .0 N .0 .0 0 ca co .d --. .b 0 r� 6 P. a a a a a a, a a 30 3 co0 •v c0 H co a� 0) a) a> a) 0) 0) 0) a> b n r� R' p' wA 3P 3 3 CO 3 3 `y 3 CO 3 � vsa, � vi .0 ° el, CO.� a `' fii ' O M O 0 0 0 O O O O O ,� ° u 3 a a w 5 cn 4t cn �n cn ri) cn N cn cn ci) Al in a fs' in rx rs. 4 Ca Agenda 4-7-98 Item VII D •/ P.: v p • OF 6000 JAMES W.SHIRA,P.E. CITY ENGINEER/UTILITIES DIRECTOR 150 N.LAKESHORE DRIVE•OCOEE,FLORIDA 34761 PHONE(407)656-2322 EXT.142•FAX(407)656-7835 MEMORANDUM DATE: March 31, 1998 TO: The Honorable Mayor and Board of City Commissioners FROM: David Wheeler, P.E. 'l;•,✓ Assistant City Engineer/Utilities Director SUBJECT: Maintenance Facility at Wastewater Treatment Plant In July of 1997,the City Commission authorized the Engineering Department to enter into a contract with Gee &Jenson, Inc. to develop a conceptual floor plan,project budget and schedule, conceptual site plan and an evaluation of the existing and required mechanical, electrical, and plumbing systems for renovating the existing Operation Building, a new Maintenance Building and a new Administration Building. Work Order#9 was the contract for performing that plan. The attached report titled Improvements to the A.D. Mims Wastewater Treatment Plant Programming/Site Evaluation report is the culmination of Gee& Jenson's effort. Mr. Paul Herwig will be in attendance to present the report. The general recommendation from Staff is to proceed with the Maintenance Building as the top priority followed by the renovations to the existing Operation Building depending upon remaining available funding and to construct the Administration Building in the future when additional funding becomes a realization. Gee&Jenson's estimated construction cost including contingencies is $490,000. During the work effort, it became apparent that the Maintenance Building was going to cost more than initially planned therefore Staff directed Gee& Jenson to concentrate its efforts towards the Maintenance Building. After construction is completed, Staff and Gee&Jenson will reevaluate potentially completing the renovations to the Operation Building. These renovations generally include new bathroom facilities, HVAC, and some additional offices. Gee & Jenson's Work Order#10 is also included for consideration and action. This work order will include the development of Schematic Design&Design Criteria Package development, St. John's River Water Management District stormwater permitting, assistance to the City in the THE PRIDE OF WEST ORANGE 61t-- bidding, contract negotiation, and construction document review. As a part of the project, geotechnical and surveying support services will also be required and are included. The proposed fee for this work order is a lump sum of$44,700.00 plus a not to exceed cost of $5,000.00 for reimbursable expenses. The Maintenance Building is listed as one of the many projects itemized in the 1997 Revenue Bond Issue at a projected cost of$500,000. At this time the overall revised estimate for the Maintenance Building, based upon more detailed analysis, is projected to be$550,300. There is the ability to adjust the Revenue Bond Issue line item costs up or down as required to meet actual costs and not affect the bond covenants. In addition, the construction estimate includes approximately$105,000; but based upon Staff's involvement in the building's conceptual programming phase, no significant additional costs are anticipated. Therefore change orders totaling any significant amount of money are not anticipated. This building is being designed as shell type of building for storage and small maintenance of utility vehicles and storage of equipment and bulk purchased material used on daily basis by the utility department. I recommend that: The Mayor and City Commission accept the report as presented titled the A.D. Mims Wastewater Treatment Plant Programming/Site Evaluation. The City Commission authorize the Mayor and City Clerk to execute Work Order#10 with Gee & Jenson, Inc. in the amount of 49, 700.00. The Mayor and City Commission to authorize the Engineering Department to proceed with the design development, bid the project and return to the City Commission for approve of award upon recommended selection of a design/build team. attachment 1) A.D. Mims Wastewater Treatment Plant Programming/Site Evaluation report 2) Work Order# 10 with Gee & Jenson, Inc. GEE &JENSON Engineers•Architects•Planners,Inc. SINCE 1951 2701 Maitland Center Parkway,Suite 150 Maitland,FL 32751 Telephone(407)660-1660 IMPROVEMENTS TO THE A.D. MIMS ROAD Fax(407)660-2852 OCOEE WASTEWATER TREATMENT PLANT PROFESSIONAL SERVICES SCHEDULE 3/9/98 PROFESSIONAL WEEKS ESTIMATED NUMBER OF SERVICE SCHEDULED HOURS MEETINGS Work Order#9-Programming/Site Evaluation Develop Building Program Owner Meetings: 2 Develop Conceptual Floor Plan Project Schedule&Construction Budget Preliminary Building/Site Code Review Preliminary Site Evaluation/Conceptual Site PI an Evaluation of Existing Operations&Maintenance Building: ADA, Roofing &Mechanical/Electrical Systems Work Order#10-Maintenance Building Task 1 —Schematic Design & 8 300 Design Criteria Professional/ Design Criteria Package Owner Meetings: 1 City Commission Presentation 1 Includes: Schematic Site Plan Schematic Floor Plan/Elevations/Building Section Statement of Probable Cost& Project Schedule Performance-Oriented Architectural Drawings: Site Plan, Floor Plan, Roof Plan, Ceiling Plan, Finish &Door Schedules, Building Elevations& Building Section ArchitecturavEngineering Performance Technical Specification Task 2—FDEP&SJRWMD Permitting 16 80 Design Criteria Professional/ Owner Meetings: 1 Includes: SJRWMD Permit for Phase I Site FDEP Permit for Phase I Building Geotechnical Analysis for Stormwater Permitting Task 3-Bidding/ Contract Negotiations 8 60 Bid & Prebid Meetings: 2 Includes: Prepare Addenda - Attend Pre-bid Meeting - Attend Bid Opening Evaluation of bids submitted by the design-build firms Task 4-Construction Document Review 2 60 Meetings: 1 Includes: Peer Review of signed/sealed Construction Documents prepared by design-build firm. 1 Erg,neenrg a E8 0002934•Archtlectwe a AA C000656•Landscape Archeecture a LC C000050•Land Surveyng I LB 0002934 IMPROVEMENTS TO THE A.D. MIMS ROAD OCOEE WASTEWATER TREATMENT PLANT PROFESSIONAL SERVICES SCHEDULE 3/9/98 PROFESSIONAL WEEKS ESTIMATED NUMBER OF SERVICE SCHEDULED HOURS MEETINGS Task 5—Geotechnical Engineering Provided upon request. Task 6—Surveying Provided upon request. Items by Owner: • Div. 0&Div. 1 Front-end specification: Instructions to Bidders, etc. • Construction Administration: Pre-construction Meeting, Construction Meetings, Process Pay Requests, Process Change Orders, Review Shop Drawings, Construction Observation, As-Built Drawings, Certifications&Final Close-out. Items by Others(Design-Build Firm): • Construction Documents(signed&sealed) • Engineering Calculations (signed & sealed) including but not limited to Energy Calculations, Structural Calculations, Drainage Calculations • Permit Applications: Building Permits, SJRWMD, FDEP, and all site related Permit Applications ON2701 Maitland Center Parkway,Suite 150•Maitland.F?32751 •Telephone(407)660-1660•Fax(407)660-2852 Engmeenng a EB 0002934•Architecture I AA C000656•Landscape Arceeectu e I LC C000050•Land Stevey ng a LB 0002934 WORK ORDER FOR DESIGN CRITERIA PROFESSIONAL SERVICES AGREEMENT WORK ORDER NO. 9 PROJECT: IMPROVEMENTS TO THE A.D. MIMS ROAD OCOEE WASTEWATER TREATMENT PLANT CITY: OCOEE, FLORIDA DESIGN CRITERIA PROFESSIONAL: GEE & JENSON ENGINEERS-ARCHITECTS- PLANNERS, INC. Execution of the Work Order by City shall serve as authorization of DESIGN CRITERIA PROFESSIONAL to provide for the above project, professional services as set out in the documents which are attached hereto and made a part hereof. ATTACHMENTS: (X) Programming/Site Evaluation DESIGN CRITERIA PROFESSIONAL shall provide said services pursuant to this Work Order, its attachments, exhibits and that certain Agreement dared December 5, 1995 between CITY and DESIGN CRITERIA PROFESSIONAL which is incorporated herein by reference as if it had been set out in its entirety. Whenever the Work Order conflicts with said Agreement, the Agreement shall prevail. TIME FOR COMPLETION: The work authorized by this Work Order shall be completed within sixty (60) days from the date this Work Order is executed by the CITY. COMPENSATION: The CITY shall compensate DESIGN CRITERIA PROFESSIONAL Ten Thousand Four Hundred Dollars ($10,400.00) plus Reimbursable Expenses. DESIGN CRITERIA PROFESSIONAL shall perform all work required by this Work Order; but, in no event, shall DESIGN CRITERIA PROFESSIONAL be paid more than the fixed fee and reimbursables set. IN WITNESS WHEREOF, these parties hereto have made and executed this Work Order on ri this — day of ,4-u 6 us r , 199./_, for the purposes stated herein. GEE & JENSON ENGINEERS_ARCH TECrS-PLp►NNERS, INC WITNESS: DESIGN CRITERIA PROFESSIONAL / If YV.41 �I Dale A. Crosby, P.E., Vice President, Regional Mgr. Date: 7///f7 ATTEST: BOARD OF CITY COMMISSIONERS CITY OF OCOEE, FLORID AI By: " J:i: Grafton, � 1 City ;erk S. Scott Vandergrift, Mayor Date: Ay Au s-?- 19q !) FOR USE AND RELIANCE ONLY BY THE Approved by Ocoee City Commission CITY OF OCOEE. APPRO AS TO FORM.. at a meetingheld on ANDLEGALITY THIS 5DAY OF �. v i i, 1997 l� 199 under Agenda Remo. y 1 FOLEY & LARDNER By: 511/41421 CITY ATTORNEY Attachment "A" Design Criteria Professional Services (6/30/97) Improvements to the A.D. Mims Road Ocoee Wastewater Treatment Plant, Ocoee, FL Work Order #9— Programming/Site Evaluation Scone of Work The project includes demolition of an existing prefabricated metal storage building and construction of a new prefabricated metal vehicle storage building. The vehicle storage building would store six (6) large trucks, parts storage, workshop and lawn maintenance storage. The project also includes additions/alterations to the existing one-story masonry operations and maintenance building. These' additions/alterations include adding a new breakroom, 6-10 new offices and adding/upgrading men's and women's toilet/locker rooms per code. The project also includes site modifications to the existing Wastewater Treatment Plant fenced compound for improved vehicular circulation, additional parking and adding a landscape buffer at the perimeter to visually screen the plant facilities from the adjacent planned park_ Professional Services to be provided by the Design Criteria Professional: 1. Develop a building program. 2. Develop a conceptual floor plan. 3. Develop a project schedule and construction budget' 4. Prepare a preliminary building and site code review. 5. Prepare a preliminary site evaluation and conceptual site plan. The evaluation will be prepared after reviewing existing As-Built Site Boundary/Topographic/Tree/Utility Survey and Geotechnical Reports for the site. 6. Evaluate existing Operations and Maintenance Building: ADA Accessibility, Roofing, Mechanical and Electrical Systems. Submittals by the Design Criteria Professional to the City: Provide one submittal of five (5) sets of the Programming/Site Evaluation documents. Meetings: The Design Criteria Professional shall attend two (2) Design Criteria Professional/Owner meetings. These meetings shall be conducted in a workshop format. The purpose of these meetings shall be to discuss and exchange information with the established City's representative(s) with regard to the program requirements for the facility. Program needs may be items such as hours of operation, security, type of activities planned for facility, number of persons utilizing the facility, vandalism, immediate/future square footage needs and construction budget. Items to be provided by the City of Ocoee: 1. The City shail appoint a representative who shall on the City's behalf attend above stated meetings, issue directives with regard to the Work. authorize the Work, prepare review comments with regard to the Work and approve the Work. The City's representative shall be: James W. Shira. P.E. City Engineer/Utilities Director. City of Ocoee Name Title 2. At the completion of the Work. the City's representative shall review the Submittal. The City's representative shall provide review comments about the Submittal to the Design Criteria Professional. The Design Criteria Professional will address and/or incorporate those comments during the next phase of Professional Services. 3. Existing As-Built drawings of the Wastewater Treatment Plant, Existing Site Boundary/Topographic:Tree/Utility Survey and Geotechnical Reports for the site. Attachment"B" Design Criteria Professional Services (6/30/97) Improvements to the A.D. Mims Road Ocoee Wastewater Treatment Plant. Ocoee. FL Work Order#9—Programming/Site Evaluation Fees Worksheet Compensation 1. Basic Architectural/Engineering Services 510,400.00 2. Reprographics Reimbursables: reproducibles, blueprints, photocopies. $200.00 (These charges•will be billed at cost as they arise. The total amount shown is the amount Not To-Be Exceeded unless approved in writing by the City. The following rate schedule represents inhouse printing costs. Printing company rates may vary.) Photocopies: $0.15 per page (8 1/2 x 11-14) $0.20 per page (11x17) Reproducibles: $1.50 per S.F. Blueline Prints: $0.40 per S.F. Method of Payment The Design Criteria Professional shall invoice amount due based on the percent of the total work order services actually performed and completed. Invoices shall be submitted to the City once monthly. We understand that the City shall retain 10% of the total work order fee until one hundred percent (100%) of the work order services are actually performed and completed. WORK ORDER FOR DESIGN CRITERIA PROFESSIONAL SERVICES AGREEMENT WORK ORDER NO. 10 PROJECT: IMPROVEMENTS TO THE A.D. MIMS ROAD OCOEE WASTEWATER TREATMENT PLANT/MAINTENANCE BUILDING CITY: OCOEE, FLORIDA DESIGN CRITERIA PROFESSIONAL: GEE & JENSON ENGINEERS-ARCHITECTS- PLANNERS, INC. Execution of the Work Order by City shall serve as authorization of DESIGN CRITERIA PROFESSIONAL to provide for the above project, professional services as set out in the documents which are attached hereto and made a part hereof. ATTACHMENTS: Attachment A: Scope of Work for Work Order #10 Tasks 1 through 6 Task 1 - Schematic Design & Design Criteria Package Task 2 - FDEP & SJRWMD Permitting Task 3 - Bidding/Contract Negotiations Task 4 - Construction Document Review Task 5 - Geotechnical Engineering Services Task 6 - Surveying Services Attachment B: Fee Worksheet for Work Order #10 Tasks 1 through 6 DESIGN CRITERIA PROFESSIONAL shall provide said services pursuant to this Work Order, its attachments, exhibits and that certain Agreement dated December 5, 1995 between CITY and DESIGN CRITERIA PROFESSIONAL which is incorporated herein by reference as if it had been set out in its entirety. Whenever the Work Order conflicts with said Agreement, the Agreement shall prevail. TIME FOR COMPLETION: The work authorized by this Work Order shall be completed within sixty (60) days from the date this Work Order is executed by the CITY. COMPENSATION: The CITY shall compensate DESIGN CRITERIA PROFESSIONAL Forty Four Thousand Seven Hundred Dollars ($44,700.00) plus Five Thousand Dollars ($5,000.00) for Reimbursable Expenses. DESIGN CRITERIA PROFESSIONAL shall perform all work required by this Work Order; but, in no event, shall DESIGN CRITERIA PROFESSIONAL be paid more than the fixed fee and reimbursables set. IN WITNESS WHEREOF, these parties hereto have made and executed this Work Order on this day of , 199 , for the purposes stated herein. GEE & JENSON ENGINEERS-ARCHITECTS-PLANNERS, INC WITNESS: DESIGN CRITERIA P' e SIONAL By: et/ew Date: 3//''AP ATTEST: BOARD OF CITY COMMISSIONERS CITY OF OCOEE, FLORIDA By: Jean Grafton, City Clerk S. Scott Vandergrift, Mayor Date: FOR USE AND RELIANCE ONLY BY THE Approved by Ocoee City Commission CITY OF OCOEE. APPROVED AS TO FORM at a meeting held on , 1998 AND LEGALITY THIS DAY OF under Agenda Item No. , 1998. FOLEY & LARDNER By: CITY ATTORNEY Attachment"A" 3/10/98 Design Criteria Professional Services Improvements to the A.D. Mims Road Ocoee Wastewater Treatment Plant/Maintenance Building Work Order#10—Tasks 1 through 6 Scope of Work Refer to Work Order#9/Gee & Jenson Report dated 8/5/97 for Improvements to the A.D. Mims Road Ocoee Wastewater Treatment Plant, Programming/Site Evaluation which will be the subject of Work Order#10. Professional Services to be provided by the Design Criteria Professional: Task 1 —Schematic Design & Design Criteria Package: 1. Prepare evaluation regarding site utilization based upon a field visits, review of the following documents provided by others: boundary/topographic/tree/utility survey, geotechnical report and wetland delineation. The evaluation will also discuss applicable code restriction on the site. 2. Prepare Schematic Floor Plan, Exterior Elevations and Building Section of the Maintenance Building. Prepare Schematic Site Plan. The Schematic Drawings will be developed and refined by Gee & Jenson through a series of Owner/Architect Hands-On Workshops. Ultimately one final set of Schematic Drawings will be presented to the Owner. 3. Prepare Design Criteria Package Documents: Performance oriented Architectural Drawings: Site Plan, Floor Plan, Roof Plan, Ceiling Plan, Finish & Door Schedule, Building Elevations and Building Section, and Architectural/Engineering Performance Oriented Specifications. 4. Prepare an updated statement of probable cost and update project schedule. Task 2— FDEP & SJRWMD Permitting 1. Obtain Geotechnical Report specifically for Stormwater Permitting purposes. 2. Prepare stormwater management permit conceptual grading/drainage site plan. 3. Prepare stormwater management permit drainage calculations and FDEP Site Plan. 4. Prepare and submit FDEP and SJRWMD stormwater permit application with drawing & calculations. 5. Respond to FDEP and SJRWMD permit review comments. Task 3— Bidding/Contract Negotiations 1. Prepare one addendum. 2. Evaluate Bids submitted by the Design/Build Firms. Task 4—Construction Document Review 1. Review one Design Build Contract for compliance with the Design Criteria Package. 2. Review one set of Design Build Firm's signed/ sealed 100% Construction Documents for compliance with the Design Criteria Package. Attachment "A" 3/10/98 Design Criteria Professional Services Improvements to the A.D. Mims Road Ocoee Wastewater Treatment Plant/Maintenance Building Work Order#10—Tasks #1 through #6 Scope of Work, Page Two Task 5—Geotechnical Engineering Coordination 1. Coordination as required with Geotechnical Engineering Consultant. Task 6—Surveying Coordination 1. Coordination as required with Surveying Consultant. Submittals by the Design Criteria Professional to the City: Provide one submittal of the following: Task 1 —Schematic Design & Design Criteria Package: • Schematic Design Plans: Ten (10) Sets of Blueprints. • Site Evaluation Statement • Schematic Drawings Mounted on Display Boards for Meetings • Intermediate blueprints & copies as required for workshop meetings • Design Criteria Package: Twelve (12) sets. • Statement of Probable Cost and updated project schedule. Task 2— FDEP & SJRWMD Permitting • FDEP & SJRWMD Permit Applications to Jurisdictional Agency. Task 3— Bidding/Contract Negotiations • Bid Tabulation and Evaluation. Task 4—Construction Document Review • Written comments regarding Design Build Contract. • Written comments regarding Design Build Firm's signed/sealed 100% Construction Documents. Task 5—Geotechnical Engineering Coordination Not Applicable. Task 6—Surveying Coordination Not Applicable. Meetings: The Design Criteria Professional shall attend five Design Criteria Professional/Owner meetings. These meetings shall be conducted in a workshop format. The purpose of these meetings shall be to discuss and exchange information with the established City's representative(s) with regard to the floor plan layout, exterior elevations and location of building & amenities on the site. An on-site meeting with Jurisdictional Agency will be provided, if required. Attachment "A" 3/10/98 Design Criteria Professional Services Improvements to the A.D. Mims Road Ocoee Wastewater Treatment Plant/Maintenance Building Work Order#10—Tasks#1 through#6 Scope of Work, Page Three Items to be provided by the City of Ocoee: 1. The City shall appoint a representative who shall on the City's behalf attend above stated meetings, issue directives with regard to the Work, authorize the Work, prepare review comments with regard to the Work and approve the Work. The City's representative shall be: James W. Shira, P.E. City Engineer/Utility Division, City of Ocoee Name Title 2. At the completion of Task #1 — Schematic Design and Design Criteria Package, the City's representative shall review the Submittal. The City's representative shall provide review comments about the Submittal to the Design Criteria Professional. The Design Criteria Professional will address and/or incorporate those comments prior to the next phase of Professional Services: Task#3 - Bidding. 3. A Boundary/Topographic/Tree/Utility Survey, Preliminary Geotechnical Investigation and Wetland Delineation documents are required by the Design Criteria Professional to complete Work Order#10. These items may be provided by Design Criteria Professional under this work order, Task#5—Geotechnical Engineering and Task#6—Surveying Services. 4. The City shall appoint a representative who shall on the City's behalf, distribute Bid Packages, Publish and Prepare Bid Advertisements and serve as the clearinghouse for all Bidder Communications. The City shall submit to Gee & Jenson one set of consolidated, written Bidder questions no later than two weeks prior to the Bid Date for Addendum preparation by Gee & Jenson. 5. The City shall appoint a representative who shall on the City's behalf negotiate and administer the Design Build Contract. 6. The City shall submit to Gee & Jenson, prior to execution, one Design Build Contract. The submittal shall include the Contract with related attachments, the Design Build Firm's CPM Project Schedule and Schedule of Values. 7. The City shall submit to Gee & Jenson, prior to Design Build Firm's application for permits, one set of Design Build Firm's signed/sealed 100% Construction Documents. 8. The City shall provide Permit Application Fees. Items by Others (Design-Build Firm) • Construction Documents (signed and sealed). • Engineering Calculations (signed and sealed) including, but not limited to, Energy Calculations and Structural Calculations. • Permit Applications: Building Permits. • Supplemental Geotechnical Investigations. Attachment "B" Design Criteria Professional Services 3/9/98 Work Order#10—Tasks#1 through #5 Fees Worksheet Compensation Task 1 -Schematic Design & Design Criteria Package: Basic Architectural/Engineering Services $22,500.00 *Reprographics Reimbursables: reproducibles, blueprints, photocopies. $1,800.00 Task 2—FDEP & SJRWMD Permitting: Engineering Services for Permit Applications: $6,000.00 Geotechnical Engineering Services for Stormwater Permit $4,000.00 *Reprographics Reimbursables: reproducibles, blueprints, photocopies. $500.00 Task 3— Bidding/Contract Negotiations: Basic Architectural/Engineering Services: $3,900.00 *Reprographics Reimbursables: reproducibles, blueprints, photocopies. $2,500.00 Task 4—Construction Document Review: Basic Design Criteria Professional Services: $3,900.00 *Reprographics Reimbursables: reproducibles, blueprints, photocopies. $200.00 Task 5—Geotechnical Engineering Consultant: $2,200.00 Task 6 —Surveying Services Consultant: $2,200.00 Total Fee $44,700.00 Total Reimbursables $5,000.00 Total Fee + Reimbursables $49,700.00 *Reimbursable charges will be billed at cost as they arise. The total amount shown is the amount Not To Be Exceeded unless approved in writing by the City. The following rate schedule represents inhouse printing costs. Printing company rates may vary. Photocopies: $0.15 per page (8 1/2 x 11-14) $0.20 per page (11x17) Reproducibles: $1.50 per S.F. Blueline Prints: $0.40 per S.F. Method of Payment The Design Criteria Professional shall invoice amount due based on the percent of the total work order services actually performed and completed. Invoices shall be submitted to the City once monthly. We understand that the City shall retain 10% of the total work order fee until one hundred percent (100%) of the work order services are actually performed and completed. IMPROVEMENTS TO THE A.D. MIMS ROAD OCOEE WASTEWATER TREATMENT PLANT WORK ORDER #9 PROGRAMMING/SITE EVALUATION FOR THE CITY OF OCOEE MARCH 6, 1998 DESIGN CRITERIA DOCUMENTS GEE & JENSON Engineers•Architects•Planners,Inc. OA .A �r w •• 1 is 0 44. f*Of 0000 N\ TABLE OF CONTENTS LETTER OF TRANSMITTAL WITH WORK ORDER#9 1. BUILDING CONSIDERATIONS • BUILDING PROGRAM • CONCEPTUAL BUILDING PLANS • MAINTENANCE/STORAGE BUILDING • ADMINISTRATION BUILDING • OPERATIONS BUILDING • REVIEW OF EXISTING OPERATIONS BUILDING • PHOTOS OF EXISTING OCOEE WWTP FACILITIES • RESEARCH AT ORANGE COUNTY UTILITIES 2. SITE EVALUATION • VICINITY MAP AND AERIAL MAP • CONCEPTUAL SITE PLAN • OVERALL SITE PLAN • PHASE I SITE PLAN • PHASING&CO-LOCATION WITH THE OCOEE RECREATION CENTER 3. PRELIMINARY BUILDING CODE REVIEW • MAINTENANCE/STORAGE BUILDING 4. CONSTRUCTION BUDGET • ADMINISTRATION BUILDING • MAINTENANCE/STORAGE BUILDING 5. PROJECT SCHEDULE • MAINTENANCE/STORAGE BUILDING fttitn ,Hsi '�r�`� a aM rx r,-Y zi^4�n F y¢ rK' r:,. 19W k Y. SECTION 0 N E C � x 1k ". .Fu¢ '�fit, ��M�} '� -� N 1` yi, t.'7 4 � c a;a ' fih w sc < g � d�w a GEE & JENSON Engineers - Architects - Planners, Inc. Y, GEE &JENSON Engineers•Architects•Planners,Inc. SINCE 1951 2701 Maitland Center Parkway,Suite 150 Maitland,FL 32751 March 6, 1998 Telephone(407)660-1660 Fax(407)660-2852 City of Ocoee 150 North Lakeshore Drive Ocoee, Florida 34761-2258 Attn: Mr. James W. Shira, P.E. Re: Improvements to the A.D.Mims Road— Ocoee Wastewater Treatment Plant Dear Mr. Shira: The attached drawings,descriptions and diagrams are being provided to document decisions made during the Programming/Site Evaluation Work Order—Work Order#9. An overall Master Planning Evaluation was made concerning the entire Wastewater Treatment Plant site and a series of development options addressed the following: A. Building Considerations: 1. Existing Operations Building 2. Proposed Maintenance/Storage Building 3. Proposed Administration Building B. Site Considerations: 1. Overall Site Plan 2. Phased Improvements 3. Co-Location with the Ocoee Recreation Center Improvements After completing these studies, it was concluded that the first priority for the intended improvements to the Ocoee Wastewater Treatment Plant is the construction of the proposed Maintenance/Storage Building and associated parking. Until the Site Plan is finalized for the Jim Beech Recreation Center,the Administration Building location can not be determined. Improvements to the existing Operations Building appear to be a lower priority regarding the overall Master Plan. We look forward to proceeding with the next phase of work,as this project progresses. Sincerely, L � - Paul M. Herwig, R.A. Manager of Architectural - + ces PMH/cc cc: John Gray Laura Nemethy \\herwig\wo#9.cvrltr.doc Engineering I EB 0032934•Archeeclure I AA C000656•Landscape Architecture I LC 0000050•Land Surveying*LB 0002934 SITE EVALUATION PHASING IMPROVEMENTS & CO-LOCATION WITH RECREATION CENTER March 6, 1998 Page 1 of 1 Introduction Phasing of the WWTP Improvements is driven by priorities and adjacent developments. Modifications to the Jim Beech Recreation Center Site Plan from the original design criteria documents are being developed by the Design-Build Contractor. This work effects the location of the proposed WWTP Administration Building and associated parking and site work. Phase I Based on workshop/meetings with the WWTP personnel,the immediate concern is to replace the existing maintenance/storage facilities with a new facility. In addition, additional parking is required for staff and City-owned vehicles. Future Phases Future phases will include the proposed WWTP Administration Building and associated site work and parking. Another future development is the remodeling and addition to the Operations Building. Additional Concerns Landscaping along the east WWTP property line at the ridge is required as a buffer between the park area and the WWTP. Chain link fencing with motorized gates, signage, site lighting and overall landscaping are essential elements in completing the anticipated improvements to the WWTP complex. WORK ORDER FOR DESIGN CRITERIA PROFESSIONAL SERVICES AGREEMENT WORK ORDER NO. 9 PROJECT: IMPROVEMENTS TO THE A.D. MIMS ROAD OCOEE WASTEWATER TREATMENT PLANT CITY: OCOEE, FLORIDA • DESIGN CRITERIA PROFESSIONAL: GEE & JENSON ENGINEERS-ARCHITECTS- PLANNERS, INC. Execution of the Work Order by City shall serve as authorization of DESIGN CRITERIA PROFESSIONAL to provide for the above project, professional services as set out in the documents which are attached hereto and made a part hereof. ATTACHMENTS: (X) Programming/Site Evaluation DESIGN CRITERIA PROFESSIONAL shall provide said services pursuant to this Work Order, its attachments, exhibits and that certain Agreement dated December 5, 1995 between CITY and DESIGN CRITERIA PROFESSIONAL which is incorporated herein by reference as if it had been set out in its entirety. Whenever the Work Order conflicts with said Agreement, the Agreement shall prevail. TIME FOR COMPLETION: The work authorized by this Work Order shall be completed within sixty (60) days from the date this Work Order is executed by the CITY. COMPENSATION: The CITY shall compensate DESIGN CRITERIA PROFESSIONAL Ten Thousand Four Hundred Dollars ($10,400.00) plus Reimbursable Expenses. DESIGN CRITERIA PROFESSIONAL shall perform all work required by this Work Order; but, in no event, shall DESIGN CRITERIA PROFESSIONAL be paid more than the fixed fee and reimbursables set. IN WITNESS WHEREOF, these parties hereto have made and executed this Work Order on this — day of Au 6 LIS r . 199./__, for the purposes stated herein. GEE & JENSON ENGINEERS-ARCHITECTS-PLANNERS, INC • WITNESS: • DESIGN CRITERIA PROFESSIONAL Aid By: --- Dale A. Crosby, P.E., Vice President, Regional Mgr. Date: -7///f ATTEST: BOARD OF CITY COMMISSIONERS I CITY OF OCOEE, FLORID By: Ji: , Grafton, City erk S. Scott Vandergrift, Mayor Date: ALi us,1- r (T4 FOR USE AND RELIANCE ONLY BY THE Approved by Ocoee City Commission CITY OF OCOEE. APPRO AS TO FORM at a meeting held on i4fi S , 1997 AND GALIT]Y THIS 5 DAY OF under Agenda Item No. cJ S1' , 199_. ! FOLEY & LARDNER By: VJ apc,4 CITY ATTORNEY Attachment "A" Design Criteria Professional Services (6/30/97) Improvements to the A.D. Mims Road Ocoee Wastewater Treatment Plant. Ocoee, FL Work Order#9— Programming/Site Evaluation Scope of Work The project includes demolition of an existing prefabricated metal storage building and construction of a new prefabricated metal vehicle storage building. The vehicle storage building would store six (6) large trucks, parts storage, workshop and lawn maintenance storage. The project also includes additions/alterations to the existing one-story masonry operations and maintenance building. These'additions/alterations include adding a new breakroom, 6-10 new offices and adding/upgrading men's and women's toilet/locker rooms per code. The project also includes site modifications to the existing Wastewater Treatment Plant fenced compound for improved vehicular circulation, additional parking and adding a landscape buffer at the perimeter to visually screen the plant facilities from the adjacent planned park. Professional Services to be provided by the Design Criteria Professional: 1. Develop a building program. 2. Develop a conceptual floor plan. 3. Develop a project schedule and construction budget- 4. Prepare a preliminary building and site code review. 5. Prepare a preliminary site evaluation and conceptual site plan. The evaluation will be prepared after reviewing existing As-Built Site Boundary/Topographic/Tree/Utility Survey and Geotechnical Reports for the site. 6. Evaluate existing Operations and Maintenance Building: ADA Accessibility, Roofing, Mechanical and Electrical Systems. Submittals by the Design Criteria Professional to the City: Provide one submittal of five (5) sets of the Programming/Site Evaluation documents. Meetings: The Design Criteria Professional shall attend two (2) Design Criteria Professional/Owner meetings. These meetings shall be conducted in a workshop format. The purpose of these meetings shall be to discuss and exchange information with the established City's representative(s) with regard to the program requirements for the facility. Program needs may be items such as hours of operation, security, type of activities planned for facility, number of persons utilizing the facility, vandalism, immediate/future square footage needs and construction budget. Items to be provided by the City of Ocoee: 1. The City shall appoint a representative who shall on the City's behalf attend above stated meetings, issue directives with regard to the Work, authorize the Work, prepare review comments with regard to the Work and approve the Work. The City's representative shall be: James W. Shira. P.E. City Engineer/Utilities Director. City of Ocoee Name Title 2. At the completion of the Work, the City's representative shall review the Submittal. The City's representative shall provide review comments about the Submittal to the Design Criteria Professional. The Design Criteria Professional will address and/or incorporate those comments during the next phase of Professional Services. 3. Existing As-Built drawings of the Wastewater Treatment Plant, Existing Site Boundary/Topographic/Tree/Utility Survey and Geotechnical Reports for the site. Attachment "B" (6/30/97) Design Criteria Professional Services Improvements to the A.D. Mims Road Ocoee Wastewater Treatment Plant, Ocoee, FL Work Order#9—Programming/Site Evaluation Fees Worksheet Compensation 1. Basic ArchitecturavEngineenng Services $10,400.00 2. Reprographics Reimbursables: reproducibles, blueprints, photocopies. $200.00 (These charges will be billed at cost as they arise. The total amount shown is the amount Not To• Be Exceeded unless approved in writing by the City. The following rate schedule represents inhouse printing costs. Printing company rates may vary.) Photocopies: $0.15 per page (8 1/2 x 11-14) $0.20 per page (11x17) Reproducibles: $1.50 per S.F. Blueline Prints: $0.40 per S.F. Method of Payment The Design Criteria Professional shall invoice amount due based on the percent of the total work order services actually performed and completed. Invoices shall be submitted to the City once monthly. We understand that the City shall retain 10% of the total work order fee until one hundred percent (100%) of the work order services are actually performed and completed. GEE &JENSON Engineers•Architects•Planners,Inc. SINCE 1951 2701 Maitland Center Parkway,Suite 150 Maitland,FL 32751 Telephone(407)660-1660 IMPROVEMENTS TO THE A.D. MIMS ROAD Fax(407)660-2852 OCOEE WASTEWATER TREATMENT PLANT PROFESSIONAL SERVICES SCHEDULE 3/9/98 PROFESSIONAL WEEKS ESTIMATED NUMBER OF SERVICE " SCHEDULED HOURS MEETINGS Work Order#9-Programming/Site Evaluation Develop Building Program Owner Meetings: 2 Develop Conceptual Floor Plan Project Schedule&Construction Budget Preliminary Building/Site Code Review Preliminary Site Evaluation/Conceptual Site PI an Evaluation of Existing Operations&Maintenance Building: ADA, Roofing &Mechanical/Electrical Systems Work Order#10-Maintenance Building Task 1—Schematic Design & 8 300 Design Criteria ProfessionaV Design Criteria Package Owner Meetings: 1 City Commission Presentation 1 Includes: Schematic Site Plan - Schematic Floor Plan/Elevations/Building Section Statement of Probable Cost&Project Schedule - Performance-Oriented Architectural Drawings: Site Plan, Floor Plan, Roof Plan, Ceiling Plan, Finish&Door Schedules, Building Elevations& Building Section Architectural/Engineering Performance Technical Specification Task 2—FDEP&SJRWMD Permitting 16 80 Design Criteria ProfessionaU Owner Meetings: 1 Includes: SJRWMD Permit for Phase I Site FDEP Permit for Phase I Building Geotechnical Analysis for Stormwater Permitting Task 3-Bidding/ Contract Negotiations 8 60 Bid & Prebid Meetings: 2 Includes: Prepare Addenda Attend Pre-bid Meeting Attend Bid Opening Evaluation of bids submitted by the design-build firms Task 4-Construction Document Review 2 60 Meetings: 1 Includes: - Peer Review of signed/sealed Construction Documents prepared by design-build firm. 1 Eng neenng a EB 0002934•Archrtectu,e e M 0000656•Landscape ArchrtectUre a LC C000050•Land&Peeving a LB 0002934 IMPROVEMENTS TO THE A.D. MIMS ROAD "thes OCOEE WASTEWATER TREATMENT PLANT PROFESSIONAL SERVICES SCHEDULE 3/9/98 PROFESSIONAL WEEKS ESTIMATED NUMBER OF SERVICE SCHEDULED HOURS MEETINGS Task 5—Geotechnical Engineering Provided upon request. Task 6—Surveying Provided upon request. Items by Owner. • Div.0&Div. 1 Front-end specification: Instructions to Bidders, etc. • Construction Administration: Pre-construction Meeting, Construction Meetings, Process Pay Requests, Process Change Orders, Review Shop Drawings, Construction Observation, As-Built Drawings, Certifications&Final Close-out Items by Others(Design-Build Firm): • Construction Documents(signed &sealed) • Engineering Calculations (signed & sealed) including but not limited to Energy Calculations, Structural Calculations, Drainage Calculations • Permit Applications: Building Permits, SJRWMD, FDEP,and all site related Permit Applications ON2701 Maitland Center Parkway,Suite 150•Maitland,F?32751 •Telephone(407)660-1660•Fax(407)660-2852 Engineering•EB 0002934•Arcnnecture#AA C000656•Landscape Architecture 0 LC 0000050•lana Surveying 0 LB 0002934 IMPROVEMENTS TO THE A.D. MIMS ROAD OCOEE WASTEWATER TREATMENT PLANT BUILDING PROGRAM SUMMARY Work Order#9 Programming/Site Selection March 6, 1998 Page 1 of 4 PROGRAMMED SPACES A. Administration Building/Plan A Reception - Function: Controlled waiting area for visitors. Equipment/Furniture: Seating and tables for six. Future reception desk. Secretary- Function: Secretarial office for all of the WWTP office personnel. Initially secretary function will serve as receptionist also. Equipment/Furniture: Chair and desk, files,two guest chairs, computer and fax. Offices (7) - Function: WWTP personnel,private offices. Equipment/Furniture: Chair and desk, files, two guest chairs and computer. Conference Room - Function: Meeting Area for staff and visitors. Equipment/Furniture: Table and chairs for 20+people. Multi- media board, wall mounted computer/monitor. Plans Storage- Function: Plan Storage, reference and copying. Equipment/Furniture: Storage units for tracings. Storage racks for prints. Work tables. Print copy machine. File cabinets for specifications. Office/ Kitchenette- Function: Alcove off of corridor for food storage and preparation and coffee, etc. Equipment/Furniture: Upper and lower cabinets, refrigerator, microwave and sink. Break Room A & B- Function: Multi-Purpose Room to serve as a Break Room, Field Crew Lunch Room, Conference/Training Room and Secondary E.O.C. Equipment/Furniture: Tables and Chairs for 40+people, operable partition, computer/data outlets,kitchenette with upper and lower cabinets,microwave,refrigerator and sink. IMPROVEMENTS TO THE A.D. MIMS ROAD OCOEE WASTEWATER TREATMENT PLANT BUILDING PROGRAM SUMMARY Work Order#9 Programming/Site Selection March 6, 1998 Page 2 of 4 Women's Locker/Toilet/ Shower- Function: Female employee toilets, lockers and showers. Equipment/Furniture: Allow for three lockers and required ADA toilets and showers. Direct access from exterior preferred. Men's Locker/Toilet/ Shower- Function: Male employee toilets, lockers and showers. Equipment/Furniture: Allow for twelve lockers and required ADA toilets and showers. Direct access from exterior preferred. Ancillary Spaces - Public Toilets - Janitor's Closet - Storage - Communications Room - Electrical/Mechanical Rooms - Corridor Areas - Walls & Structure PROGRAMMED SPACES B. Maintenance Storage Building Large Vehicle Storage- Function: Storage for six pieces of equipment: - 24' x 8' Sewer Truck - 28' x 8' Tanker Truck - 32' x 8' Sewer Line Cleaning Truck - 31' x 8' Trailer - 19' x 8' 5 Yard Dump Truck - Tractor Equipment/Furniture: Six bays with 14 foot overhead doors. Ventilation and electricity required. IMPROVEMENTS TO THE A.D. MIMS ROAD OCOEE WASTEWATER TREATMENT PLANT BUILDING PROGRAM SUMMARY Work Order#9 Programming/Site Selection March 6, 1998 Page 3 of 4 WWTP Storage- Function: Storage of miscellaneous parts for repair to pipes and pipe fittings. Equipment/Furniture: Storage units and shelving. Ventilation and electricity required. Ground Maint. - Function: Storage of lawn maintenance equipment. Lawn mowers,edgers, etc. Equipment/Furniture: Work bench, shelving for spare parts. Ventilation and electricity required. Electrician Storage- Function: Electrical supply storage for the WWTP Department. Equipment/Furniture: Shelving and storage units. Ventilation and electricity required. Parts/Workshop Welding- Function: Storage of assorted parts required for the WWTP assemblies. Storage of jack and bore and mud hog equipment. A workshop area and welding area are required. Equipment/Furniture: Shelving and racks for pallets, storage units for storing WWTP parts. Welding area with fire curtain and associated electric power and exhaust/ventilation. Three work benches for various repair tasks are required. Electricity,plumbing and ventilation to be provided. Eyewash and shower are required. Toilet facilities may be required. PROGRAMMED SPACES C. Existing Operations Building Three Offices - Function: Demolition of existing toilets and existing corridor space accommodates space for three offices for operations staff. Equipment/Furniture: Chair and desk, files,two guest chairs, computer,and reference table. IMPROVEMENTS TO THE A.D. MIMS ROAD OCOEE WASTEWATER TREATMENT PLANT BUILDING PROGRAM SUMMARY Work Order#9 Programming/Site Selection March 6, 1998 Page 4 of 4 Women's Lockers/ Toilets/ Showers- Function: Female employee toilets, lockers and showers. Equipment/Furniture: Allow for six half lockers and required ADA toilets and showers. Direct access from exterior is preferred. Men's Lockers/ Toilets/ Showers - Function: Male employee toilets, lockers and showers. Equipment/Furniture: Allow for twelve half lockers and required ADA toilets and showers. Direct access from exterior is preferred. Existing Lobby/ Break Room-Function: Entrance to facility and lobby/display area. Equipment/Furniture: Requires new entrance canopy and interior finishes and lobby furniture. Ancillary Spaces - Janitor's Closet - Walls & Structure - Existing Mechanical/Electrical to remain. Balance of Building- Balance of building (i.e. existing laboratories/blower area, generator, etc.)to remain. OCOEE WASTEWATER TREATMENT PLANT 3/6/98 BUILDING PROGRAM - ADMINISTRATION BUILDING OFFICES PROGRAMMED SF ACTUAL SF Assistant City Engineer 180 235 Utilities Superintendent 180 220 Office#1 150 165 Office#2 150 165 Office#3 150 180 Office#4 150 180 Office#5 150 200 Office#6 150 145 Office#7* 150 Office#8* 150 Subtotal 1,260 1,490 *To Remain in Operations Building ADMINISTRATION/SUPPORT PROGRAMMED SF ACTUAL SF Lobby/Receptionist 200 260 Conference Room 400 430 Plans Room/Storage 300 530 Break Room(40 people) 600 540 Men's Lockers/Showers/Toilets(20 people) 475 600 Womens Lockers/Showers/Toilets(50 people) 160 270 Janitor's Closet 40 25 Mechanical Room 260 225 Electrical/Communications Rooms 145 225 Public Toilets 120 120 Subtotal 2,700 3,225 Offices at 1,490 Administration/Support at 3,225 Subtotal 4,715 Circulation/Walls 1,045 Total SF 5,760 1 OCOEE WASTEWATER TREATMENT PLANT 3/6/98 BUILDING PROGRAM - MAINTENANCE/STORAGE BUILDING MAINTENANCE/STORAGE PROGRAMMED SF ACTUAL SF 6 Bays 3,724 3,725 Electrician Storage 359 340 Ground Maintenance 647 650 WWTP Storage 365 365 Work Counters 1,848 1,850 Welding Room 336 340 Pipe Storage 225 225 Subtotal 7,504 7,495 Maintenance/Storage at 7,495 Circulation/Walls 10 Total SF 7,505 2 OCOEE WASTEWATER TREATMENT PLANT 3/6/98 BUILDING PROGRAM - OPERATIONS BUILDING OPERATIONS/SUPPORT PROGRAMMED SF ACTUAL SF Operations and Electrical Controls Existing* 525 Mechanical Room Existing* 180 Lobby/Break Room Existing* 310 Large Lab Existing* 525 Small Lab Existing* 175 Office#1 Existing(250)* 250 Office#2 Existing* 170 Office#3 Existing* 130 Janitor's Closet 70 70 Men's Lockers/Showers/Toilets 330 330 Women's Lockers/Showers/Toilets 230 230 Circulation 135 225 Subtotal 3,120 3,120 *Existing building=2,370 SF. ANCILLARY PROGRAMMED SF ACTUAL SF Blower Existing 520 Patio Existing 235 Generator Existing 375 Subtotal 1,130 1,130 Operations/Support at 3,120 Ancillary 1,130 Total SF 4,250 Circulation/Walls Included 3 OCOEE WASTEWATER TREATMENT PLANT 3/6/98 BUILDING PROGRAM - PARKING PROGRAMMED SPACES PARKING REQUIREMENTS MINIMUM PHASE I FUTURE PHASES PHASE I&FUTURE Employee Parking Spaces 35 24 15 39 Visitor Parking 10 6 12 18 Handicapped Parking 2 1 1 2 City Vehicle Parking 42 8 38 46 Subtotal 89 39 66 105 Additional Public Parking 40 41 BUILDING ELEVATION BUILDING ELEVATION A.lUES 11 W S1MAU GEE & JENSON Erpkpx - ry..w..,«.... MAINTENANCE / STORAGE BUILDING - WASTEWATER TREATMENT PLANT CITY OF OCOEE 3-6-98 B' f 0 B' 16' N' 1/8' - i'-0' ADMMS7AATION BULDNG (PROPOSED PLAN) PLAN 'A' ADMNSTAATION BULDING (ALTERNATE PLAN) PLAN 'B' GEE & JENSON ADMINISTRATION BUILDING - WASTEWATER TREATMENT PLANT CfTY OF OCOEE 3-6-96 B' ' 0 B' I6' 24' OPERATIONS BUILDING (OFOUNAL PIAN) OPERATIONS BULDING (PROPOSED PLAN) GEE & JENSON OPERAMNS BUILDING - WASTEWATER TREATMENT PLANT CfTY OF OCOEE 3-6-98 0' ♦' 0 B' 16 24' ... ..... . ..... . .... ..... ... .. ....... ...... ... . .... ..... IV EXISTING AEROBIC DIGESTER ls� PROPOSED STORAGE TANK 15� • CN. .......... < % ........... ...... % IA N T AL Sl MATE TREA CITY OF OCOEE 2w 10, o 20* 40' ".0" �z FUTURE BUINUMMa PHAE 4 F. J, 1" lu If If f Z' ------ - MA t. If S -j If i lJr1 17. 'z -I$-p- $op- If F, -- ----- ol 1 If ­ NNSI� - A X W=W von... --------- - ............ ........... ........ 'I Yt ......... ..... ....... . ......... ------ q0 - --- - ----- zw . ...... ..... ... .. 1E.0 Xk guP INZ + X v 5W W Wq Amp 06 L4 8 d kI I I'M ho I t A Wi 0. All ........ . .......... _tf . ... . ..... ad... ..... .. . ... IMPROVEMENTS TO THE A.D. MIMS ROAD OCOEE WASTEWATER TREATMENT PLANT/MAINTENANCE BUILDING REVIEW OF THE EXISTING OPERATIONS BUILDING March 6, 1998 Page 1 of 1 Operational Issues: . The main concerns with the existing Operations Building are as follows: 1. Additional office space is required. 2. Existing toilet/shower facilities do not meet ADA, do not have lockers, and are inconveniently located. 3. The Lobby/Entrance Area is not well defined and does not have a covered entry. 4. The existing interior building circulation is not efficient. Design Options: During workshop/meetings with the WWTP personnel, concerning a revised design for the Operations Building,the plan was redesigned with an addition. The existing building would remain as it is regarding the Operations and Electrical Controls Room,the Mechanical Room,the Lobby/Break Room and the Lab Areas. The Generator and Blower would remain unchanged. The existing toilet rooms would be eliminated, allowing for three offices instead of two. An addition of approximately 750 SF would allow for new toilets, showers and lockers for men and women,which would be ADA accessible. Structurally,this proposed building addition to the northeast would lend itself to the simplest, and least expensive building expansion option. A canopy at the Lobby Entry is planned to identify the public entrance and to provide protection. • _ - - -._ .2 4; • I � _ '{ .1., EN • • { 3. I t E •a - cr. N • •. .. • • �1jj A. K• l' • • • :01'. — • II` )y.,t" OO 4 , ti.•4 0...CC O•1...;.i 4. ,... `O.( Y:• :w a su O E cd v Q bp co CC I co in , 3 ' -"�4.: C A _ i x -,. '• 0 • _'�?t (It _ =-... it ( . Fro --- - ..tr,,..4,- p.i-f.,., , s.,.,, ..,., .,..- -14.41 . ,i,..,.4:,N,.:..., . , ': - : — _ — - 1 },-r..\ CA —14.. . a) Cti CA U Oal . tla as a> rr i iO a,et VD L E. `1 U L t. U cz as ._ in ct tu _ rn 1 lit, , IIS CZ ; t X 0 t G w '''� csi11 }- 1 - —. P ;j'. --7 - 1' i / : . • 1' . V� nx • 2 t 's 3:t 3 el i ,? t i t 1 _� •st J t • .' k ''- . ,t tr 34' I•',..,..."2",'..' '4.i•,1: Lt474_1' � jr. . _ 4 • C CQ 4� - -a ' EC 1 °° cu L 5 _ _ Y - .� - V L w U CQ i '' V 4': a� - > a 0.,;i a> x \,, I . ctl,t•o. 0 u 1y 0 f C—) L Research of Existing Facilities: Orange County Utilities Division 8100 Presidents Drive Orlando, Florida x ,`mR s 11 y - — 1,.44`,ixxli gt i. _ ,, 0 . __ Alt' 11,^(; •. .'' :-.7,3,.-' ppb St` F T ', R ? •t' r � i t I l lstarcoMagg t '.•��. . -^ 1 6 3-tlx t Wastewater Parts in Racks and Pallets. � t,•r4 �'"'r. ,'/';'," i c. ,•,,,``P:',„c,p,'r 't4Y t, 'f �gt5 i _ f l.E kd, t \ i _ • - ..iiia` in p- 1 w 7 i 1�4 , T 'i ill iV •Seffrif _ r tii . r, _ _,_fes .�i.1.% Wastewater Parts at Storage Yard. Research of Existing Facilities: Orange County Utilities Division 8100 Presidents Drive Orlando, Florida ,t1,i \,) .... ......" , . './ ..... r• \I r ,../ , '•.-/ ....../."- ../.. ,,- - • I ,..;',..,.`,1,--'1,:-- 5.',„__-• , S ...,1:1 •,%. fk. . ,. - f[ f ,1 I , ' 1 : • ( ' i 1 • 1 I. A, t 1 . • (' ?"' I 1 1 1 •,) 1• N + • •V Covered Large Pipe Storage. 1 ....,„,,,re .".."-...... .• .rf, .'‘.(.*'1'.7.14r:..1.117114Titr.E,N, ,,...,,....... .,_ ,,,4-,. - ,---- . - , .... , - - .,- '''' 140-01' .., .,:...- .-,i,,,, 4 ,.,...- .7 . . . '''re ,, ,. • xt. ...i .'" i 9.• ,- tr. -lt r .............---.". -' '-.._.........a.- '. ../.. _ • ' r. ....".--- ..../"."..> ,... ....r) . , •,/,...: A .,.., ....-- _ . ....v. ~.... . ., A 1 - ......1......- Y.' ...,....'' ., * t • :';'. ___ . • -• " Covered Small Pipe Storage on Racks. SECTION TWO ONGEE & JENSON Engineers - Architects - Planners, Inc. Vicinity Map—Existing Ocoee Wastewater Treatment Plant Site TALLAHA SEE PENSACOLA ACKSONVILLE atr of ORLANDO I OCOEE 1 TAMPA OCOEE RD. Q CLARCONA—/ MIAMI f:i Q r 0 Z Q f a CLARCONA — cc Z L., o_ OCOEE RD. Y 5 o a a SITE Y U 0_ O 0 1M5 RO. a 0 .p. M 0 IV L.VAS S E ``,NG pVE.. Ian t1-3?)SILVER STAR STARKE LAKE = it ._./ w CITY a e �, a HALL o �y� -J 0 `�O,, 3., / WEST COLONIAL DR. 0 Cly". SCALE: N.T.S. �l>:p .9� F Cq�D�� CORID4 GREENWAY Existing Ocoee Wastewater Treatment Plant—Aerial Plan View • ,,, +"•-..z.:-.V,e- • Ot...! V 14, ‘ .r..f-X • -v -..' '•s t4,44V>weLli.t.‘-s. • ..:, . . 1)/7 .*-'5" .40%5"". •-•;,, ie;, ',, ' - ' V.-*'..-- '. ..1. V:j1 - ''''',;.L.ie sP tiv s'itp•t!..7i!,i-Z-...tf, .Vt , . „*.e.,.%......4.-• .r.t.' • via, , .. . •Lb i•',',-'....1-Nri`x-,"A6 . ',01.0„fit • • ...2.1.,,,,,..a. .. , . .... ,...., ......„: . ,,..,.„...,2‘,;F,... -. ..., °-'*51.4e* :' A- • 6'.. V.* 'e „6-X;:'"e , T. „,,,•,M,:62, -''''.-\ .. ;.,-;,,r,,,,. y.,...t(p..,,,.,9. -,fe.,<4.. . ..?'•).. , x I . ,:.-,r Wt.ef,,,,,I ':_ 4rE * ';-44'44- • "*' A ''ik,,•'-'•" .S't '''' .". 1 '''' t:k'f 4'0E', ' - • ' • •Q.,', •••i• 7' .,t,” ,..*.v,...,0 ,P,Ii e\t'‘.-•':-. 4- -..I•• 41e i,f--..-, , ••1"- . , ••• ••,-, -, . •-•-,* '';',A11" . • •.•' ,. •• ,e,w• .' .' -*"..„; ;. -,, S ,...4_,%,-,N.iNA-- *144•'644,V,X/ .-,•-•41tV s•••...--x...11-,- 4-', 4.-A,. i., •-•* 1 ,k. ‘-•-.i.-'1.1''-.;*.,''''''I' ‘- i ell' • - IP*14.4 SI- 't -5. '. 4. --g.5p, r 4 'real 4` ''''`, '' ,,tc,-.4‘,1,."41 . .;'1.1,k.f-:N.,. ':"`A.1-?., NZ. 4‘ .1--6-.- 4-1.,...,r-.,.,.-- , :-,,-1. - -.41410.. 'Or ... •••tt,-*L ite,tw. fe-,,„,-; sr ; ,..., 4.1.•`' si ' wrell.;:fi:%-fil:14.r.:7;..1..tis.k4I-Z.t.,1 ,:r-''-;t7-:',4,,..,.....'•*-4..s,:*.,''':.. ...441iir,t,:;:#'14.z."...M.:.16r41-4;'`r.k.iiiiii:::i: ',1!.-)1.t._,4 .., ..1,N...„: .4„--v.s..ii. ,4*„.:::51„,,,,,it,,7 irt "c*,-. 40.1... ".'—...'4'..r.;74 .-PiP. , loir „VpL,.. . ,„--- 4c-- 1:04 w.1.171,-41- - i-; ..:4;.1 .••. ,,i,, .....„-,:; ., . -,- ...„,..,.4- ,--:-. -01 - -.. ? - ,q- „41.4.1— --1-r,'1.- • ---- • , .-- i4 --1,,....-7., -4 i-- - -:-... , -ii..t 0.wk- • _.. - ..-.. ..w.., --•a k "." - --.•( '_,,,,.----, t--,-- • .... -.-----..atr- • • -1,r 'v .k, , .•••,-..,,q-• 0 •r- '. 0. ' „,,,,,,At- - - -• Av Ar...4 ..• c..4' '''' --4'.:,-'-`7-,4',4- ' - .' ‘,4.-Nitl._ -,-- • - - ...ti_ c•.,!--.5z-,..- -,,tf,,,d1.-• , .. 4.f, ..,,„,_,,.-t• -. • --',"'::••i- --'"i''....,..-te, .. sr ', - . ••;.g•••••.- . •..;,.,. ', .../:*'";,.--:,,'I.---aitt.:•1 stft k.4.3,--,,‘„ ••....1 ?.., . f,v• • ..-,- "fizsf.,,,-,q.;•=-:-,.. ,-„,',..5--- ....- is. . ... . _ ,,t,..., - - ,... .. -., ;..,,,...;....„-• - . - ,- . -4 - _,,-:- t..-gfilkat • ,t, 144 ,.,.••••‘•e.h*-- .1"1”- ,-'- 44, '-:-., ..?..,r ...-z.:-..--•'-.1!--;;.10,:',.....)":*^Ii''`..Y10+1, I":''•,'"it"'AC"' :A.I. 4,"itts.' ''...'.;-e•'. V.1A4 ' *r- - -"' '''' 6 ‘.72,,-;,'-'-'" .C.;-.•-:`C.J.f 3. . ;-,-: rr .-..-i':::::%::::•'•:,1`t•,:4:ft.74:27itgitz.q.'""7",4::`,,...0A-4-1:rt,''1.-4-..o.i..rs:17" -.- -.-- 4:c- 4')-:‘,..*:$ ' :1)1,-.4-1-1 %.*,"- • .'-'7.----r- ''':- 'f,'i'X'I'e.:•'t;;;•tt.- -• ' . ' - ''' reilft-tfl?nlr.1"irl-?4, 2.„,11.4 iii•Pft?:-.14-Wit #.---A. ' ' ' ''`•,-..." •-, *a$1 -;'•:, ' ,t. • .....'.' i`,„' / ‘'. ---,.. - ,..--4,---letc,.e.,:tt;tt -- ''''.:•„, -: iti",0:441,4;r7:. A„,..' '- 7'' " .e -: ' ' ., . 4.1t•-T '.--NA` ..S. - .6 '''',..• -- ,,. - 2 ‘•Az . . '-k - • %it ',,-.*4-t,-A,,-,v‘':i-.4.3.z„.,.47.i.r0,.o1,-4,z„7,t-,,i.A--e..1 4,r*.,,.,.,,-,.'.4.i.-.,-V'*.A..f.tN,..-,,-4....,1 1.11.4.' ,11t1.•k-- •.,:•f4 I ..__,,-Nik -4-:-,,,,r,,-N.:,,,,4 .., StAkc.",,- - ' :. , 4.,... .";47,.:*;, ' -'.-..''.-.:''' . ' il;"°5-.1 ,:., y.,,,A.4 .• ...•71. . ,.1,, -&,... '• ,,,...i.,n, ..,.. ..,... im. ,,,e-,:-..v.0 .4.. ,..- - •, • 1;:_-7.14., -* ' "... ....,..e - :,,,t;h7,,,,:i5gt::_!".. •::-,a0::,tr.„ .-41116,4.-4(.7, ,;.t. •,,...t- . s , - ..,-.%; ,,,,,,b,••••••:-.66. 4 Ns • — ..• .‘ '.,-mtk."`,4,-:;4-r, A... .•• 1., .•,-*ti•-i"•.t: -..t.+- ''',.-b•`,:. , ,.'W•;if' -. - ''. '''S . ,- "I'l'-V.-;;,%'* %Aire/tit% t tWY'', ki44: '41,1;,1,-e.,2 ,-“.,' w-S •AT3Vit.lter, . •• - '1,_ , ., • ,---.1,3, - ",, ' ,..,4Yit410- ' - W.4-Nik`t,..4-4.Wer,r41.A . 3-*- .-*4., • --' '-' 41:,INtr,7;11;1:: : ‘-`i,-. ' , ..lig:''''1-:•v" - -=k :'.1'. '-4, .- -,.1. -i,, -;,,..4.,v•-,,f7..ifit 47. '-tf‘-.1t'"" ' Az' t? "Waks1-7-tZ.--'4•V;41. ' -- - : '-i- - 4'" - -- ''•" - -x-','''.-.----41-••••`" "•'N '"'"W", •E2._,..,..4 .` rf•:-•r- "-, ,,,' * .y.,--x-' -••, &'„4 tit•OtIftnf ,,,_' ....g..i.' -•••''' '-; : ',Z. : - •+ --••• .'.. 4"P*-.4•;4171.' '-i'4:1"-1-' ,114 4.- •At W.•' * 4?' -- •:?%.-- ,... -,,. : _-?-`,...--',•-wZ,44 -.4,;-7. - r, ---Ailf . '.,'e • ' - .-t-Ovit, ' ,--"%;-. ,•-•4"A,..-:9-;-. •'. :,:i...to.v.-4,4%•< • • , ; _ - ••,- ',.•"•qt,tr-4):--;,.; .4.,;:tz-ik''I--4.'-e,ti,kr' 0. ... - ,. ,,-;.,1'..:-Iv.'_- - •-;,-.24*-**14tVa V ,... t4,-Ja.4.:. itt :4' ---,-,-,Y-',-----.4.0,----4.-1.,-T.-,t -'‘'.i-r- 4 - - ,- 10-14 ' , ...; ,,, - . ,-. ; ."-'•-:•!.• -xP-°':' 'ip,X1, agile' '' 1 ---,Aha-,:;---- , -•,- '''''. ';,4; .--47.-,:f t.' ,,,,, ' 0 .. '- --.-. 6.‘'-,',.. ",14it e• : .I.-6.---elexif • .-: - i =-4-,`;- 4;',,P-- -, . . ..---f-,,,..-0:1.--,:iii. • '1S;tr,,- '" i•li'l "'",,'Op: N., ' - ‘4,, , ,,, .. ..... ; :;-. „- —..t. -.01k.- -s-',..;-!4—,-;,.--4• .4- - - , - --,i,.,-.: -4z•-• ,•-•',N.:,...- ,....*,,b,.%.5. - .7-; i..f‘'-;, ',:-•-.4 ..,,-.p,.-.•„.•,,r,-4 , ,.a.t...,”•;-..•I.A.,*.,-4,,.:,„.•.-...',. !. , •• v.0or. l,,% -,'--‘‘,-r-,.,;....--,;-•T.,.."-ir...e,,-.- •', ,,,i, "!-•..-.•.,,4,.4..1.-b--•(zi.isl.\a,,--.-".t-•.i--...-.-..-•.•.••.-..-,1t":•:,,k;-,•4,k.-4.....-j......V.-.0-.r1Y...`-4,•r0%".•.-4-•;-t•.-,..•1._0"..4. -'.4f•,3.i.a4r 7..-1s.,ZN.4 - e .. '‘.. , '4,---i-, 4,,, ., .,--;-...7r-,I-, -..w,XJ.„'..;`,;,,-!-...:Ite;•!14 ....,-4. - .-- --, - ire..,, it ,-r- '',.: , • A b-rt .- •' ,. - .. .., e..14,4. ,r!i• ....'; :,'- ...-`4..- !'-le.,a07-'I.v-yi,-.•!.,•1•_.-.0.4,,,csi. ,,,,,,,..4. ,.. .- , .•\ :, _f%,. • • • • -• -'.-!- -.-,. AP: ........ - ,•%--- • ,-.•.4 ..-..,•,--• iv ,. ,. ., -.-- ,• .. :74. -. . - - -i • , S.'"41 ifLr,-.',a ,,A7v20,,,,,,'"e-7,,,, `,.,,,,„.1.'-‘4,--- •-•.•1't-1.t.- ..• r ..c.z.,:i. ,.... . " . „....,:. ..., 1, . . ,., , • 1p--?--.rvi; 7`,3.14„,4..4:?,..0•4•.- t ,, .4-„.4.....-1.1jaa.". _ 4 en,,..„' •,.•+,•,,,, , + , ,, , .: •,,O• .,, `'.. :. k.4• 7. , , . - t: -1,,,s' ...-4- ' ,',•• • • k,C:ist - )•*"." ,A6"...ie-Air.. ,• .•/7‘,•,-,-,% -• .,s• • raw. .---,,.. .7 ..,* . . •• j-•'• ,e -- • .igf.... ..","•-••V',.." .."I,v.1'...'1`..:--.4,a. .,..k.„....A i ,...,_.= • •+. .r.Isfee -* r,,,, •-•'.-14 • - " ...s %It • •,. ........-- • ••' -I.. e1/4t..,-,..“..4. ,r..t.d'r.A.i•7.<1..'. ,,_. .t".. .•-•-• sii ‘ "*. /.1'-' — ''..i." "--.' v4-..%. -I' .."-A•'' - * 1---'• • t -a. - •-• gri, -fV`,""4• '-:*S" ,:-",'t t...471. .-••:-. . , ....'..._ ...,,-.;.- . , ' ,hot'Ai ..- ;,,,,N -,' ',...-•• •••••, r Pi.--' ••• ..... ...,:.• -,,,, . .-, ...71 s v., ,..,, ,,. ,..444.,...- -,.-4 ,4 e '''''.'el•:°•:,..6. - I,- 'Ats.,.. 4i.4,4•V- -6 .4..,,.Sh . ii :::•';'•e*-"je. ,' -.. .6. 6 ''..x. - 1.:' %;2,3"."' ..-.".i.A; .• • , :4,4... ----ri.„44:.. • .1"- ,31 ,,. ".• „,1 7.- .;;-„,;••:,:r4 -• .. -..'-"- ,,•.,7 -- ...,,-, ..,-;;;Is -1-1%•,...-- -,,.1r..k.;..•-••.--.7":7-, 1. c 4., '.. •,-'"'-',....,, '....r" •::•4:.. ''14'..,:s -7.:A.,"1:,.._, .., (.2:gt:-:.4`7e. ..... .." 7'4- •''''-'' ,!•-ia-1, or • -g+--trirk..,' --; ,-3.147;) ,,Z •, i 0410, ---..a-fs,e. ',..4.-•;:... s .'•-. & ,414'' 0r., ----;.'-?.4 ....,‘'-1.:1••60' ‘141 . .:',,-6.6aia:6'‘I '-''6:'-', l; ' -`‘ .., -i":1, -':...; ;--. .-A, , -.,•?, No4,1,'',-...1415•.,, •-•,1 - ^'•-.7.:6 _:16V7i, 1.'ller . - -.''''' i _,, ..,. '1,771-C,' ,trf44.71",iP's '. Xiti' ' - --„-. '-(:'(', ' -c,•,44, esAVXS -'11.7.710- 4,:f,Wir, . ;"" ;,=,-. ,A...--tke.,..,,• - 41, -.-,,, -.'.. -'n .•,•?...-!_i -0-: ...A • *--;,-; - - '--,' ' •13,,:i - -11.4..: -_-I " •, ri Ak I. siv,, A%'• • . • '.)0`. 1.41,%---- 'It • •' I. • ...1$74 .... '' - -",&,,,,, -,,. 1.i.Sa- - ,,,A-Tg --,..- .,,,.. ..,ttfilk,-, . 'erit,r, . V'.•C ft -x'''..• 1.;!‘)S ':,... '1,,,,.,, *. ..:'1.. ... V.. %. • ',.1 •'. <Ili.. . ,g,t• '41'. - -.-.0.e''.44' ' 1,:•• v .. ' -..:_r'v.".""•'''''-4-..• .. ''..tr''.; ..,.."'.t' "4:4411%,••:: N.i..---', ,r,..-1,..,:sjit..-.4... •' s*•(.....0-... ,4..1. . h(+•;, ,-‘2"..4 ....,..--4,:.-71, 4•2.1-' •k-kr -5t- •- ' '- ,` ,,..',1„, -1. -w-iv. ;•-•\,./..;l''' •4''' • ...,_ tre.4,,N-.144X• , ^....?, ViP441C .._•f.,' ,-.4 15A',14 _'%.'.?.,Ax`..ItrA4 ).. .v.,,,,,,,-.401/;,-,y,- v t-,;,---„,,-,--, -. .-, - .--—41.4.;.4;:, 4---,-- • .,. -•-.4•-li." - '-.- - ..-it'-': .-.43. PI,40:-.-- %. ':-P r '' *- -..fr, .•.-'-'.' , ). •,•:,• --.1 .-,.. • '1.-..."-1/4,;;; '-•-`,..elv.---1;4.,.;it -.;;4;:;., ' - '47:-,11:1:a .-----i'.;P:•e; ,- ,k..: ,...„.;4•.•_, .14,-,-. ---..--:-.A---t. .;_,"•,,,--ialy: *,-"1,,-.- ••.- • A "''''' lk '-""-i:Nel..)' 1'. eXo'rt4 Itt.':7-•:a-.•, -;41:11,,-4;.;:A7fgr° *41.14.,r-Ps7c,,,,- , 4•"-Arit '';‘"*"r . ' --t •,,,,,v,,N . re•,..,---; .41- --',' - -1:,'' .-•' ''' ti' '-'. -,""*1 A4-',24ivr--" , ta -4-- -" ' ' - . r4s4V.1 v... .-- --;.7,,i-,Fe . - v,,,lv,.4-":5-.,7•14. -- . ....- , . ,-. ts -1 .1.- ...__44,, • 44:- ..,--......_,..,- it. ---.k. ...a . ,..1'...>. -....--.-.4.t. A.,p-,,,•-•--1-,-::-..:.-:.,.-4..,..4 It-:4--;_ 9;-'_-,1:11§- -: *. _ ... . . . ,, ..: ,,--..; , ,;,-„,_.; ,1-5,1c,g 4.-- 4,'Al.., _.- ,•-..er, • 1 .-,tt.v. 1.:4•,,.:4„-it. •tz,...,:t.....„6,:ir...i.". ...;e4., •• , „;r:„-„,, .,........ till; .`4V.Ar 's...., . '. ,7,-,- . 4'---.1,-- -4,---, • -,G,1-. 5,.-11,-e-le -, -,:. .-.A.1,16 :. 1..., "co- - 4, --e•••••$• '.'re... ' 4'__I'll;• +>.•'!.;1 t '4, , • _„,„i„11,..4 ...:1 „;,%1.-4,1„•'-',..11 le s; j.,•it.,.:0-,, 4 ,,Ark„;t., 4‘.,,, •••• .L N• 2 . ,,:„,...,e,„-2.1, ....n. -f-..2.*p...- ..... -;.•-• -_,- ........." . ., t ps -,- - - •TI,. tno.• v .-0-",•,,' :LI-,p 4- • •,-,- 44‘,A.- '4:it •*5-,A ' $. 4' ''"kA,.. ,•'''stt .;0'4,4"...1" , .r. ..,• ,,S• ‘,':;.,,,''. , - ,,,,,,, - '-. ‘ , , _„„<*-'•••• .,-*-* r.;L.',- -'r - -. pc ..e., ''.,,, ...114,. •-•siatr,„i_.- _•.t.,'4..4 .•t- • A . . --'''' ' 's e.-,-- "1--E"."01"4-',...,s • . , , • ,. lo,"414 ,?b,,*,...PilAti• -.s4! - -.7...,.'41 .• ? s. ;,: •",,:t: •..". rt-_,Ft•"ri AS.-5 ,'; ..i.,-e.' .,!.1f,'-el:, ::C,N.,,F- ,'„,.5.4. , , .1.: , -- - - 1,,•,. t-,',1,t, -vieto,. ... --• i-x-- •rtf:t .4tizt.,", ..-_,,::',.,-5.,p.:4.-• -.t_/:-fr ,„, ri.,,,tpv.4fittife ,*4,-)1,,T .t.„,--.Ag•‘i--.; `--;• . ' ,:„.....vt. ge-, -,5,1-1-1,-,,;iz. •-• -•, ,,,,..,*,,,, ,t -,-1•-•,1.,t5t.,- _,:.-...imilg:=- 1„,-, ,,.• ,c,„.# --4- ..-n.R13-5a,,,,,40 it.,14.4- 1 -.v.t!.-.- r. : . .0 ,;,;117.,.,•44..1.9;;;;4,vit-,.._• - 1,,, .,a:..I-.• ,,_, •. ir:. .1i..„, .---4.,..,,:: ,•,-..‘• ‘ •,4i...-• .•:".141r6"•I'' •• ,' ' "''. 111/ge '.. );-, ' 14. r..4r.4yy*.1%.,li'-`'"41*P..... _ '' ,•,,•' '`.4%..t.' s 1.- ..,e- sir.:••:,`.....'..a. ".4$ -•T`,-.1. ..' .. ..; '--, -..- 'It. . - r4irt...-t.,...=. , .'".• - *.r- .. P.: ' '4;".1'- 1, -,t ..i.o. ct ,..14r,,it 1,•-- . - •-• - • .. -- •-1 ,45,•A•4..:• k*,iv, ifo-----,i -tre.7., , .,--z:= ,, • ..- - ..0.-..14--Y. te'.‹,(# - • _;"4 ......',..`, :,;•,'•-•.!lei.2. . , •'4..i41,,-Ii••;;;•••t,-3.Z.:-- ., , , .4. - 4,;;;;.k..."_ry ii.4;ci-ilf 47;attf4:tilf.6._1:11r-r ..-44.::*'..1.1,0' 'Z.,'--...„,'1411'4 itif,•:•41rlyitet;; '. ''.44er..'4' . -,.., ,, a;,_..:.,s r ..._,..--...., -'.--•_ :6.-%.6,0'--,41 ---. .6' .:/e ••'....V “M'e,,,,s' ri.„46.;•71 ***44,1,.. ..,'"',1 ''44---,tA ,,:feW-VIrei•t- -- ..-fiirk z,,,-.6" 7,..L '•!-/..,„ .. '';',-,,,,`,. :5-':'Z -•4‘tt til-::. ,'-,„•','A,,.4i ti.... • -,7".y40- •.,-.. • „,.. , ...., ',. -,•:•-,..-45,.14`3-4,- 3.(4,cf-',,....,`: .,•;• ,. d,.••!':•,,rbt . • .,kerot..... •••••''t. '-.',:.'''t,', -5-i.....-6c,,,,v•-•:"7" - k'-*-* - , . - ----.*--5,e4e-, - : .:6•••••--ryi M" :-/-st'*-3 •,:71--., , -,......., - 54X.,V. . ...1e.2-,.....-. ,__,..4.....,A.b... ...,„ ,A,,,,i _z,..-34.3,9•.f„„p16/4,....,et,- - '.!..-42-•.t - 7/4,, „.!'-f42-rr .6 , .:•.: -; tyi L':-ri•a*V.46,•VI-i-41,4*, AT, -A,If_e'AL , •,..,s/ 4 40.0,11,4• . ...-.4,,-,-..:--• .....;;;.!,.,,-0,...,,i,,,,,..,,_..,..,..,,..: , , ,,__ 1 • ;.'...;..Z, 7,,,1„,,I•' ,,,,,% • .0; ,5 , '' .'', . : ..',,I.....a,,,; ',JP%''-'MVP., *••••i•....'`''..s, - .. 4 i r 1.1 ;y 'Yx d- t ' SECTION THREE a , 14,.... ,.. . .,_.=,,,,,,,-._‘,-,-... ,.,...‘,._ :,,,,,,,„,...„. ,... ..,, GEE & JENSON Engineers - Architects - Planners, Inc. IMPROVEMENTS TO THE A.D. MIMS ROAD OCOEE WASTEWATER TREATMENT PLANT/MAINTENANCE BUILDING PRELIMINARY BUILDING CODE REVIEW (Standard Building Code, 1997 Edition) (SBCCI) March 6, 1998 Page 1 of 3 Based on a discussion with the Mr. Washington of the Ocoee Building Department on March 5, 1998,the following preliminary Building Code interpretations are provided: 1. Occupancy Classification: (Chapters 3 &4) The building is composed of multiple occupancies: a. Group F/Factory—Industrial occupancy at the Workshop/Welding Area. b. Group S/Storage Occupancy—at the WWTP Storage and Electrician's Storage Areas. c. Group S/Special Storage Occupancy—(Enclosed parking garage) at the Large Vehicle Storage Area and Ground Maintenance Storage. Mixed occupancies can be considered a single occupancy if certain criteria of Section 303 are met. Based on the aforementioned,the occupancy classification will be: Group F=Factory—Industrial 2. Type of Construction & Area/Height Limitations: Table 500—Allowable heights and building areas: For proposed building size= 7,500 GSF±with Type VI construction, unprotected, unsprinldered Maximum allowable height=40' Maximum allowable floor area= 10,000 SF—one story. 7,500 GSF±with Type V construction, unprotected, unsprinldered Maximum allowable height= 55' Maximum allowable floor area= 15,000 SF—one story. *7,500 GSF±with Type IV construction,unprotected, unsprinklered Maximum allowable height= 55' Maximum allowable floor area=21,000 SF—one story. The City of Ocoee requires installation of fire sprinklers for commercial buildings over 4,000 SF therefore the facility will require fire sprinklers or a four-hour separation wall to compartmentalize the building. *(Since non-combustible structural members, are anticipated—Type IV, unprotected is the likely type of construction.) IMPROVEMENTS TO THE A.D. MIMS ROAD OCOEE WASTEWATER TREATMENT PLANT/MAINTENANCE BUILDING PRELIMINARY BUILDING CODE REVIEW (Standard Building Code, 1997 Edition) (SBCCI) March 6, 1998 Page 2 of 3 3. Fire Resistance Ratings: Table 600: Per Construction Type IV,unprotected: a. Structural elements need to be non-combustible. b. Horizontal separation from an assumed property line indicates the following: The distance between the existing Operations Building and the proposed Maintenance Storage Facility is 20 ft. If we assume the common property line to be at the wall of the proposed Maintenance/Storage Building,then the percent of wall openings is 40%. Note: Due to the possibility of flammable materials being stored on site in conjunction with PVC pipe adhesives, and fuel for ground maintenance equipment, special consideration may need to be given to a rated flammable storage area or building. 4. Means of Egress: (Chapter 10)—Per Table 1003.1 — Minimum Occupant Load—For Industrial— 100 gross Large Vehicle Storage—38 people WWTP Storage—4 people Ground Maintenance—7 people Electrician Storage—4 people Workshop/Welding—22 people Number of Exits—Per 1004.1.1. Rooms with greater than 50 occupants require two exits. Since each area has direct exterior egress and an occupancy less than 50 people, only one exit per area is required. 5. Accessibility—ADA: (Chapter 11) The facility shall be fully accessible. 6. Fire Sprinklers—Follow NFPA 13 for requirements. 7. Plumbing Requirements: Table 407 of the Plumbing Code allows for some interpretation regarding required plumbing fixtures. IMPROVEMENTS TO THE A.D. MIMS ROAD OCOEE WASTEWATER TREATMENT PLANT/MAINTENANCE BUILDING PRELIMINARY BUILDING CODE REVIEW (Standard Building Code, 1997 Edition) (SBCCI) March 6, 1998 Page 3 of 3 a. Although the Maintenance/Storage Building is only 20 feet from the Operations Building which provides toilets, there may be a requirement to provide toilet facilities in the new construction. b. An eyewash and shower will be required for the welding area. CHAPTER 3 OCCUPANCY CLASSIFICATION SECTION 301 system requirements, as determined by Chapter 9, GENERAL and 4. All other requirements of this code are applied to 301.1 Scope.Provisions of this chapter shall govern the clas- each portion of the building based on the use of that sification of building occupancies. space. 301.2 Occupancy or use categories.Every new and existing 303.2 Height and area.A mixed occupancy building shall be building, structure or part thereof shall, for the purpose of governed by the height and area limitations applying to the this code, be classified according to its use, or occupancy as principal intended use.However each portion of the building a building or structure of one of the following occupancy shall conform to all other requirements of this code for the . groups: occupancy contained therein. Accessory occupancies shall Group A —Assembly(see 304) not exceed the area limitation nor be located at a height Group B —Business (see 305) greater than that permitted for such occupancy group in the Group E —Educational (see 306) type of construction being used. Group F —Factory Industrial (see 307) SECTION 304 Group H —Hazardous (see 308) ASSEMBLY OCCUPANCY—GROUP A Group I —Institutional (see 309) Group M —Mercantile(see 310) 304.1 Scope Group R —Residential (see 311) 304.1.1 Group A occupancy is the use of a building or Group S —Storage(see 312) structure,or any portion thereof,for the gathering togeth- er of persons for purposes such as civic,social or religious 301.3 Uncertain classification. Each occupancy group is functions or for recreation,or for food or drink consump- intended to include buildings as hereinafter defined and those tion or awaiting transportation. of similar character or use. Wherever there is any uncertain- ty as to the classification of a building, the building official 304.1.2 Group A occupancy shall include, among others, shall determine the classification within which it falls, the following: according to the life safety and relative fire hazard involved. Amusement Park Buildings Passenger Depots Auditoriums Public Assembly Halls SECTION 302 Churches Recreation Halls DEFINITIONS Dance Halls Restaurants Gymnasiums Stadiums and Grandstands For definitions, see Chapter 2. Motion Picture Theaters Tents for Assembly SECTION 303 Museums Theaters for Stage MIXED OCCUPANCIES Production 304.2 Subclassifications 303.1 Multiple occupancies.A building that is used for two 304.2.1 Assembly occupancies shall be divided into two or wore occupancies, classified within different occupancy subclassifications as set forth in this section, both of groups,shall be considered a mixed occupancy building. which shall comply with the requirements for Group A occupancy unless otherwise specified: Exception: A building containing two or more occupan- 1. A-1: Large Assembly shall include theaters and cies, none of them Group H, may be considered a single other places of assembly with an occupant load occupancy when: of 1,000 or more persons. Large Assembly shall 1. The required type of construction for the building is also include theaters and other places of assem- determined by applying the height and area limits- bly with a stage requiring proscenium opening pro- tions for each of the applicable occupancy groups to lection and with an occupant load of 700 or more the entire building with the most restrictive type of construction requirements being applied, and persons. 2. The entire building conforms with the most restric- 2. A-2: Small Assembly shall include theaters and tive occupancy group fire protection requirements, other places of assembly with or without a stage as determined by Chapter 7 and 8, and requiring proscenium opening protection and with 3. The entire building conforms with the most restric- an occupant load of 100 or more persons, but with tive occupancy group sprinkler,standpipe and alarm an occupant load less than designated for Large Assembly. STANDARD BUILDING CODE©1997 29 304.2.2-308.2.1 304.2.2 Assembly occupancies with an occupant load less 306.1.3 Parts of buildings used for the congregating or than 100 persons shall be classified as Group B. gathering of 100 or more persons in one room shall be SECTION 305 classified as Group A occupancy,regardless of whether or BUSINESS OCCUPANCY—GROUP B not such gathering is of an educational or instructional nature. 305.1 Scope 306.1.4 Schools for business or vocational training shall 305.1.1 Group B occupancy is the use of a building or be classified in the same occupancies and conform to the structure, or any portion thereof, for office, professional, same requirements as the trade, vocation or business or service type transactions including normal accessory taught, provided the concentration of persons will not storage and the keeping of records and•accounts. exceed that listed in 1003 for the occupancy classification 305.1.2 Group B occupancy shall include, among others, used. the following: SECTION 307 Animal hospitals,kennels, Electronic data processing FACTORY-INDUSTRIAL OCCUPANCY—GROUP F pounds areas Automobile and other Florist and nurseries 307.1 Scope motor vehicle showrooms General post offices 307.1.1 Group F occupancy is use of a building or struc- Automobile or other vehicle Greenhouses ture, or any portion thereof, for assembling, disassem- service stations Laboratories; testing and bling, repairing, fabricating, finishing, manufacturing, Banks research (nonhazardous) packaging or processing operations that are not otherwise Barber shops Laundries; pickup and classified in this code. Beauty shops delivery stations and Bowling alleys self-service 307.1.2 Group F occupancy shall include, among others, Carwashes Libraries (other than the occupancies listed in this section,but does not include Civic administration areas school) buildings used principally for any purpose involving high- Clinics - outpatient Office buildings ly combustible,flammable,or explosive products or mate- Dry cleaning;pick-up and Police stations rials. See 308. delivery stations and Print shops Assembly Plant Mill self-service Professional services; Factory Processing Plant Educational occupancies attorney,dentists, Manufacturing Plant above the 12th grade physician,engineer,etc. Radio and television sta 307.1.3 Portions of Group F occupancy involving highly tions combustible, flammable or explosive products or materi- Telephone exchanges als shall be properly ventilated, protected and separated from the remainder of the building in accordance with the 305.1.3 Assembly occupancies with an occupant load less appropriate NFPA Standard or the entire building will be than 100 persons shall be classified as Group B. classified as Hazardous occupancy. See 308. Exception: Provisions of 403.1.3.4, 403.2, 403.3, SECTION 308 1019.10, 1019.11 and 3103 shall apply to buildings HAZARDOUS OCCUPANCY—GROUP H used for assembly purposes, regardless of occupant load. 308.1 Scope. Group H occupancy is the principal use of a building or structure,or any portion thereof,that involves the 305.1.4 Dry cleaning establishments using solvents which manufacturing, processing, generation, storage, or other use are nonflammable or nonflammable at ordinary tempera- of hazardous materials in excess of the exempt quantities list- tures and only moderately flammable at higher tempera- ed in this section. tures (Class IV System) shall be classified as Group B occupancy. 308.2 Subclassification SECTION 306 308.2.1 Group H hazardous occupancies shall be divided EDUCATIONAL OCCUPANCY—GROUP E into H1 through H4 according to the hazards presented by each material as described below: 306.1 Scope 111: Buildings or parts thereof used for the manufac- 306.1.1 Group E occupancy is the use of a building or turing, processing, generation or storage of materials structure.or any portion thereof,by six or more persons at which present a detonation hazard. Detonation hazards any one time for educational purposes through the 12th _ grade. include explosives,blasting agents,pyrotechnic special effect materials,display fireworks(1.3G,Class B,spe- 306.1.2 Child care facilities which accommodate six or cial) and consumer fireworks (1.4G, Class C, 'c more children of any age who stay less than 24 hours per Common)manufacturing,Class 4 liquid and solid oxi- day shall be classified as Group E. dizers, unclassified detonatable organic peroxides,and 30 STANDARD BUILDING CODE°1997 TABLE 500 TABLE 500 ALLOWABLE HEIGHTS AND BUILDING AREAS Lower case letters in table refer to Notes following table. Height for types of construction is limited to the number of stories and height in feet shown. Allowable building area(determined by definition of"Area,Building")is shown in thousands •f square feet per floor. TYPE CONSTRUCTION I II III IV 1-HOUR IV UNPROT V 1-HOUR V UNPROT. VI 1-HOUR VI UNPROT. Maximum Height In Feet: NL 80' 65' 65' 55' 65' 55' 50' 40' OCCUPANCY uns spr uns spr uns spr uns spr uns spr uns spr uns spr uns apr uns apr j h j . h j h j h j h j h j h j h I A-I ASSEMBLY LARGE (stage requiring proscenium opening protection)a,b Max.No.of stories NL NL NL Ni. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Area:Multistory UA UA UA UA One Story only UA UA UA UA A-1 ASSEMBLY LARGE (no stage requiring proscenium opening protection)a,b Max.No.of Stories NL NL NL NL 1 I 1 1 1 1 I 1 I 1 0 0 0 0 Area:Multistory UA UA UA UA One Story only UA UA UA VA 12.0 36.0 12.0 36.0 8.0 24.0 12.0 36.0 8.0 24.0 A-2 ASSEMBLY SMALL (stage requiring proscenium opening protection)a,b Max.No.of Stories NI. NL NL NL I I 1 I 1 1 1 1 1 1 1 1 1 1 Area:Multistory UA UA UA UA One Story only UA UA UA UA 10.0 30.0 10.0 30.0 6.0 18.0 10.0 30.0 6.0 18.0 4.5 13.5 3.0 9.0 A-2 ASSEMBLY SMALL (no stage requiring proscenium opening protection)a,b Max.No.of Stories NL NL NL Ni. 2 2 2 2 2 2 2 2 2 2 1 I 1 1 Area:Multistory UA UA UA UA 12.0 24.0 12.0 24.0 8.0 16.0 12.0 24.0 8.0 16.0 One Story only UA UA UA UA 12.0 36.0 12.0 36.0 J 8.0 24.0 12.0 36.0 8.0 24.0 7.5 22.5 5.0 15.0 B BUSINESS a,b Max.No.of Stories Ni. Ni. NL Ni. 5 5 5 5 2 5 5 5 2 5 2 2 2 2 Area:Multistory UA UA UA VA 25.5 51.0 25.5 51.0 17.0 34.0 21.0 42.0 14.0 28.0 13.5 27.0 9.0 18.0 One Story only UA VA UA UA 25.5 76.5 25.5 76.5 17.0 51.0 21.0 63.0 14.0 42.0 13.5 40.5 9.0 27.0 E EDUCATIONAL a.b Max.No.of stories NL NL NL NL 2 2 2 2 1 1 2 2 I 1 2 2 1 1 Area:Multistory UA UA UA UA 18.0 36.0 18.0 36.0 18.0 36.0 12.0 24.0 One Story only VA UA UA UA 18.0 54.0 18.0 54.0 12.0 36.0 18.0 54.0 12.0 36.0 12.0 36.0 8.0 24.0 F FACTORY-INDUSTRIAL a.b,g Max.No.of Stories NL NL NL Ni. 3 6 2 4 2 4 2 4 2 4 1 1 1 1 Area:Multistory UA UA UA UA 31.5 63.0 31.5 63.0 21.0 42.0 22.5 45.0 15.0 30.0 One Story only UA UA UA UA 31.5 94.5 31.5 94.5 21.0 63.0 22.5 67.5 15.0 45.0 15.0 45.0 10.0 30.0 H-1 HAZARDOUS c Max.No.of Stories 0 1 0 1 0 1 0 1 0 1 0 1 0 0 0 0 0 0 Area:Multistory One Story only 15.0 12.0 7.5 7.5 5.0 7.5 H-2 HAZARDOUS c Max.No.of Stones 0 1 0 I 0 1 0 1 0 1 0 1 0 1 0 1 0 0 Area:Multistory One Story only 15.0 12.0 7.5 7.5 5.0 7.5 4.0 2.5 H-3 HAZARDOUS c Max.No.of Stones 0 4 0 3 0 2 0 2 0 1 0 2 0 1 0 1 0 0 Area:Multistory 30.0 20.0 10.0 10.0 10.0 One Story only 30.0 20.0 10.0 10.0 7.5 10.0 7.5 4.0 H-4 HAZARDOUS c Max.No.of Stories 0 NL 0 6 0 3 0 4 0 4 0 4 0 4 0 1 0 1 Area:Multistory UA UA 48.0 48.0 32.0 48.0 32.0 One Story only UA UA 72.0 72.0 48.0 72.0 48.0 27.0 18.0 NL=No Limit UA=Unlimited Area (continued) 78 STANDARD BUILDING CODE°1997 TABLE 600 TABLE 600 FIRE RESISTANCE RATINGS REQUIRED FIRE RESISTANCE IN HOURS TYPE IV TYPE V TYPE VI STRUCTURAL TYPE I TYPE II TYPE III 1-Hour 1-Hour 1-Hour ELEMENT Protected Unprotected Protected Unprotected Protected Unprotected PARTY AND FIRE WALLS(a) 4 4 4 4 4 4 4 4 4 INTERIOR BEARING WALLS (I) • Supporting columns,other bearing walls or more than • one floor 4 3 2 1 NC. 1 (h) 0(h) 1 0 Supporting one floor only 3 2 1 1 NC 1 0 1 0 Supporting roofs only 3 2 1 1 NC 1 0 1 0 INTERIOR NONBEARING PARTITIONS See 704.1,704.2 and 705.2 COLUMNS(q) (1) See 605 Supporting other columns or more than one floor 4 3 H(d) 1 NC 1 0 1 0 Supporting one floor only 3 2 H(d) 1 NC 1 0 1 0 Supporting roofs only 3 2 H(d) 1 NC 1 0 1 0 BEAMS,GIRDERS, TRUSSES&ARCHES (1) See 605 Supporting columns or more than one floor 4 3 H(d) 1 NC 1 0 1 0 Supporting one floor only 3 2 H(d) 1 NC 1 0 1 0 Supporting roofs only 1 1/2(e,p) 1(e,f,p) H(d) 1(e,p) NC(e) 1 0 1 0 FLOORS&FLOOR/CEILING (1) See 605 (n) (n,o) (n) (m,n,o) (o) ASSEMBLIES 3 2 H(o) 1 NC 1 0 1 0 ROOFS& ROOF/CEILING See 605 ASSEMBLIES(g) 1 1/2(e,p) 1 (e,f,p) H(d) 1(e,p) NC(e) 1 0 1 0 EXTERIOR BEARING WALLS and gable ends of roof(g,i,j) (%indicates percent of protected and unprotected wall openings permitted.See 705.1.1 for protection requirements.) Horizontal separation (distance from common property line or assumed property line). 0 ft to 3 ft(c) 4(0%) 3(0%) 3(0%)(b) 2(0%) 1(0%) 3(0%)(b) 3(0%)(b) 1(0%) 1(0%) over 3 ft to 10 ft(c) 4(10%) 3(10%) 2(10%)(b) 1(10%) 1(10%) 2(l0%)(b) 2(10%)(b) 1(20%) 0(20%) over 10 ft to 20 ft(c) 4(20%) 3(20%) 2(20%)(b) 1(20%) NC(20%) 2(20%)(b) 2(20%)(b) 1(40%) 0(40%) over 20 ft to 30 ft 4(40%) 3(40%) 1(40%) 1(40%) NC(40%) 1(40%) 1(40%) 1(60%) 0(60%) over 30 ft 4(NL) 3(NL) l(NL) l(NL) NC(NL) 1(NL) ' l(NL) l(NL) 0(NL) EXTERIOR NONBEARING WALLS and gable ends of roof(g,i,j) (%indicates percent of protected and unprotec ed wall openia.s permitted.See 705.1.1 for protection requirements.) Horizontal separation (distance from common property line or assumed property line). 0 ft to 3 ft(c) 3(0%) 3(0%) 3(0%)(b) 2(0%) 1(0%) 3(0%)(b) 3(0%)(b) 1(0%) 1(0%) over 3 ft to 10 ft(c) 2(10%) 2(10%) 2(10%)(b) 1(10%) 1(10%) 2(10%)(b) 2(10%)(b) 1(20%) 0(20%) over 10 ft to 20 ft(c) 2(20%) 2(20%) 2(20%)(b) 1(20%) NC(20%) 2(20%)(b) 2(20%)(b) 1(40%) 0(40%) over 20 ft to 30 ft 1(40%) 1(40%) 1(40%) NC(40%) NC(40%) 1(40%) 1(40%) 0(60%) 0(60%) ever 30 ft(k) NC(NL) NC(NL) NC(NL) NC(NL) NC(NL) NC(NL) NC(NL) 0(NL) 0(NL) For SI. 1 ft=0.305 m. NC=Noncombustible NL=No Limits H=Heavy Timber Sizes 84 STANDARD BUILDING CODE°1997 CHAPTER 10 MEANS OF EGRESS SECTION 1001 TABLE 1003.1 GENERAL MINIMUM OCCUPANT LOAD 1001.1 Scope AREA PER 1001.1.1 Provisions of this chapter shall govern the USE OCCUPAsgs design.construction,and arrangement of elements to pro- (sq ) ft) vide a safe means of egress from buildings and structures. Assembly without fixed seats Concentrated(includes among others.auditoriums, 1001.1.2 In every building hereafter erected, means of churches,dance floors,lodge rooms,reviewing egress shall comply with the minimum requirements of stands,stadiums) 7 net this chapter. Waiting Space 3 net Unconcentrated(includes among others conference 1001.1.3 Means of egress shall consist of continuous and rooms,exhibit rooms,gymnasiums,lounges, unobstructed paths of travel to the exterior of a building. skating rinks,stages,platforms) 15 net Means of egress shall not be permitted through kitchens, Assembly with fixed seats Note I Bowling alleys.allow 5 persons for each alley, closets, restrooms and similar areas nor through adjacent including 15 ft of runway,and other spaces in tenant spaces. accordance with the appropriate listing herein 7 net Business areas 100 gross Exception:Means of egress shall be permitted through Courtrooms without fixed seats 40 net a kitchen area serving adjoining rooms constituting Courtrooms with fixed seats Note I part of the same dwelling unit or guest room. Educational(including Educational Uses Above the 12th Grade) 1001.1.4 When unusually hazardous conditions exist, the Classroom areas 20 net building official may require additional means of egress to Shops and other vocational areas 50 net assure the safety of the occupants. Industrial areas 100 gross Institutional 1001.2 Alterations. A building shall not hereafter be altered Sleeping areas 120 gross Inso as to reduce the capacity of the means of egress to less Outpatientnt treatment and ancillary areas 240 gross than required b y this chapter nor shall anychange of occu- sarea 100 gross 9 ) PResident housing areas 120 gross pancy be made in any building unless such building con- Library forms with the requirements of this chapter. Reading rooms 50 net Stack area 100 gross SECTION 1002 Malls Section 413 DEFINITIONS Mercantile Basement and grade floor areas open to public 30 gross Areas on other floors open to public 60 gross For definitions, see Chapter 2. Storage,stock,shipping area not open to public 300 gross SECTION 1003 Parking garage 200 gross OCCUPANT LOAD AND MEANS OF Residential 200 gross EGRESS CAPACITY Restaurants(without fixed seats) 15 net Restaurants(with fixed seats) Note I 1003.1 Occupant load Storage area-mechanical 300 gross 1003.1.1 For determining the means of egress required, For SI: 1 sq ft=0.0929 m2. the minimum number of persons for any floor area shall in no case be taken less than specified in Table 1003.1. Notes: 1. The occupant load for an area having fixed seats installed shall be 1003.1.2 The occupant load of any occupancy may be determined by the number of fixed seats.Capacity of seats without determined in accordance with 1003.1 when the necessary dividing arms shall equal one person per 18 inches(457 mm).For aisles and means of egress are provided as approved by booths,one person per 24 inches(610 mm). the building official.An aisle, egress and seating diagram 2. See 202 for definitions of gross and net floor areas. 3. The occupant load of floor areas of the building shall be computed shall be provided to the building official to substantiate on the basis of the specific occupancy classification of the building. the occupant load. Where mixed occupancies occur, the occupant load of each occu- pancy area shall be computed on the basis of that specific occupan- cy. STANDARD BUILDING CODE°1997 141 1003.2-1004.1.4 1003.2 Measurement of means of egress be used in computing the required capacity of the exits at 1003.2.1 The width of the means of egress shall be deter- that floor. At no point along the exit path may the exit mined from occupants served in accordance with Table width be decreased.When an exit from an upper floor and 1004. a lower floor converge at an intermediate floor,the capac- ity of the exit from the intermediate floor shall be not less 1003.2.2 The width shall be measured in the clear at its than the sum of the required capacities of such upper and narrowest point. Handrails may project 3 1/2 inches (89 lower floors. mm)and door jambs 1 inch(25.4 mm)on each side of the measured width; however, the clear width of doorways 1003.3.6 The minimum width of exitway access corridors shall not be reduced. shall be in accordance with Table 1004. • 1003.2.3 Objects projecting from walls with their leading 1003.3.7 Exit access corridors shall have fire resistance edges between 27 and 80 inches (686 and 2032 mm) ratings as specified in Table 704.2.4. above the finished floor shall protrude no more than 4 inches (102 mm) into walks, corridors, passageways, or 1003.4 Elevators,escalators,and moving walks.Elevators, aisles. Free-standing objects mounted on posts or pylons escalators and moving walks shall not be used as a compo- may overhang 12 inches (305 mm) maximum from 27 to nent of a required means of egress. 80 inches (686 and 2032 mm) above the ground or fin- ished floor. Exception: Elevators shall be permitted to be used as an accessible means of egress for the purpose of providing 1003.2.4 There shall be a minimum headroom of 6 ft 8 egress for people with physical disabilities only when per- inches(2032 mm),excluding stops,from the walking sur- mined by 1004.3. face to the lowest part of any structural member,fixture or furnishing. SECTION 1004 ARRANGEMENT AND NUMBER OF EXITS Exception: Sloping ceilings permitted by 1203.2. 1004.1 Arrangement of exits 1003.3 Capacity of means of egress 1004.1.1 Exits shall be so located that the distance from 1003.3.1 The width of the means of egress shall be not the most remote point in the floor area, room or space less than the required capacity based on occupant load served by them to the nearest exit,measured along the line from Table 1003.1. of travel, shall be not more than the travel distance speci- fied in Table 1004. 1003.3.2 The capacity of exit stairways constructed in accordance with 1007 shall be not less than the minimum 1004.1.2 Every room or tenant space shall be provided required herein. Exit stairways shall be permitted to be with a minimum of one means of egress. Every room or used as a required exit from all floors which they serve.If, tenant space which has an occupant load of 50 or more for example,three stairways are required to serve the third persons or in which the travel distance from the most floor of a building and a like number are required for the remote point to the entrance to the exit access from the second floor, the total number of stairways required shall room or tenant space exceeds 75 ft (23 m) shall have not be three,not six, and the capacity of the stairway shall be less than two egress doors. determined by the floor having the highest occupant load and not the total occupant load of the building. Exception: Doors in an HPM Facility shall comply with 408.3.9 1003.3.3 The required capacity of an exit access corridor shall be defined as the occupant load using the corridor for 1004.1.3 The common path of travel shall not exceed exit access divided by the required number of exits to 75 ft. which the corridor connects,but not less than the required capacity of the exit element to which the corridor leads. 1004.1.4 Where two or more exits or exit access doors are required,at least two of the exits or exit access doors shall 1003.3.4 The aggregate width of passageways, aisles or be placed a distance apart equal to not less than one half corridors serving as access to exits shall be at least equal of the length of the maximum overall diagonal dimension to the required width of the exit. Where all travel to any of the building or area to be served measured in a straight exit is along the same access to the exit, the width of the line between such exits or exit access doors.The two exits access shall be at least equal to the exit. Where there are or exit access doors shall be so located and constructed to several accesses to an exit, each shall have a width suit- minimize the possibility that both may be blocked by any able for the travel which it may be called on to accommo- one fire or other emergency condition. date. Exception: When exit enclosures are provided as a 1003.3.5 When exits serve more than one floor, only the portion of the required exit and are interconnected by a occupant load of each floor,considered individually, need corridor conforming to the requirements for 1-hour 142 STANDARD BUILDING CODE°1997 TABLE 1004-1004.1.6.3 TABLE 1004 TRAVEL DISTANCE,DEAD-END LENGTH,EXIT AND MEANS OF EGRESS WIDTH MAXIMUM TRAVEL MAXIMUM EGRESS WIDTH PER MINIMUM MINIMUM MINIMUM OCCUPANCY DIST.TO EXIT(tt) DEAD END PERSON SERVED(in) CORRIDOR/ CLEAR OP'G STAIR CLASSIFICATION CORRIDOR AISLE WIDTH OF EXIT WIDTH1° UNSPRK. SPRK. LENGTH(tt) LEVEL12 STAIRS (in) DOORS(in) (in) Group A 200 250 20 0.2 0.3714 441.10 32 44 Group B 200 250 20 0.2 0.3710 4410 32 44 Group E 200 250 20 0.2 0.3714 722 32 44 Group F 200 2507 20 0.2 0.3714 4410 32 44 Group H NP 10013 20 0.4 0.7 4410 32 44 Group I Restrained - Varies 11 Varies 11 20 0.2 0.3714 48 32 44 Group I Unrestrained 150 200 20 0.2 0.3714 443 369 44 Group M 200 250 20 0.2 0.3714 444,10 32 44 Group R 200 250 208 0.2 0.3714 445.10 32 44 Group S 2006 2506.7 20 0.2 0.3714 4410 32 44 ' For SI: 1 in=25.4 mm, 1 ft=0.305 m. Notes: 1. See 1019.10.2. 2. For occupant loads less than 100 persons,44 inches may be used. 3. 96 inches shall be provided in areas requiring the movement of beds. 4. See 413 for covered mall buildings. 5. 36 inches shall be permitted within dwelling units. 6. Maximum travel distance shall be increased to 300 ft if unsprinklered and 400 ft if sprinklered for Group S2 occupancies and open parking structures constructed per 411. 7. See 1004.1.4 for exceptions. 8. See 1026.1.1 for exceptions. 9. 44 inches required in areas requiring movement of beds. 10.36 inches acceptable if stair or corridor serves occupant load of less than 50. 11.See 1024.2.6. 12.Applies to ramps,doors and corridors. 13.For HPM Facilities,as defined in 408,the maximum travel distance shall be 100 ft. 14.Use 0.3 for stairs having tread depths 11 inches or greater and riser heights between 4 inches minimum and 7 inches maximum. rated construction, the exit separation may be mea- responsive devices used to open smoke and heat vents E sured along a direct line of travel within the corridor. shall have a temperature rating a minimum of 45°F (25°C) higher than automatic sprinklers, and a 1004.1.5 Where open stairways or ramps are permitted as response time index (RTI) at least equal to, but not part of the path of travel to required exits,such as between more than three times,that of the automatic sprinklers. mezzanines,balconies and the floor below,the travel dis- Vents shall be capable of being opened by an approved E. tance shall include: manual operation. 1. The distance to reach the stair or ramp. 2. The line of travel on a stair measured in the plane of 1004.1.6.2 Smoke and heat vents shall be located so the stair nosing. that no portion of the vent opening is directly above or c 3. The distance from the end of the stair or ramp to the - within 8 inches of sprinklers. exit. _ 1004.1.6.3 Curtain boards constructed in accordance 1004.1.6 In one-story Group F and Group S buildings with this section shall be provided to subdivide a vent- a equipped with automatic heat and smoke vents complying ed building. with this section and sprinklered, the travel distance may be increased to 400 ft(122 m).Smoke and heat vents shall Exception: be constructed and installed in a manner approved by the 1. When a smoke and heat venting system corn- building official. plies with the guidelines of NFPA 204M. 2. When a building is protected by ESFR sprin- 1004.1.6.1 Smoke andvents s heat hall not operate klers installed in accordance with NFPA 13 1 1 prior to the activation of the sprinkler system. Heat and NFPA 231 or NFPA 231C. STANDARD BUILDING CODE°1997 143 CHAPTER 11 ACCESSIBILITY FOR PEOPLE WITH PHYSICAL DISABILITIES SECTION 1101 SECTION 1102 GENERAL DEFINITIONS 1101.1 Scope For definitions, see Chapter 2. 1101.1.1 Provisions of this chapter shall govern the design and construction of facilities for accessibility to physical- SECTION 1103 ly disabled persons.These provisions are not applicable in ACCESSIBLE ROUTE areas where state mandated accessibility requirements are in effect. 1103.1 Connecting routes 1103.1.1 Accessible routes within the site shall be provid- 1101.1.2 All buildings and structures,including their asso- ed from public transportation stops, accessible parking ciated sites and facilities.shall be accessible with accessi- and accessible passenger loading zones.and public streets ble means of egress for people with physical disabilities, or sidewalks to the accessible building entrance they as required in these provisions. serve. Exceptions: 1103.1.2 At least one accessible route shall connect acces- 1. Buildings and facilities or portions thereof not sible spaces,elements, facilities and buildings that are on required to be accessible in 1103, 1104, 1105 and the same site. Where only one accessible route is provid- 1106. ed, it shall not pass through kitchens. storage rooms, 2. Areas where work cannot reasonably be per- restrooms,closets or similar spaces. formed by persons having a severe impairment (mobility. sight or hearing) are not required to Exceptions: have the specific features providing accessibility 1. A single accessible route shall be permitted to to such persons. pass through a kitchen or storage room in an 3. Group R3 buildings where there are three or less accessible or adaptable dwelling unit. dwelling units in a single structure, and accesso- 2. In other than the offices of health care providers, ry structures and their associated site facilities. transportation facilities and airports, and multi- 4. Temporary structures, sites, and equipment tenant Group M occupancies. floors that are directly associated with the construction process above and below accessible levels,and that have such as construction site trailers, scaffolding, an aggregate area of not more than 3,000 sq ft bridging or materials hoists. (279 m2), and an aggregate occupant load of not 5. In agricultural buildings, access is required only more than 50, need not be served by an accessi- to paved work areas and areas open to the gener- ble route from an accessible level. al public. 6. Access is required only to private garages or car- 1103.1.3 Where floor levels are required to be connected ports that contain accessible parking. by an accessible route,and an interior path of travel is pro- vided between the levels,the accessible route between the 1101.1.3 This section sets minimum requirements for the levels shall also be interior. application of standards for facility accessibility for all persons, including but not limited to occupants, employ- 1103.2 Entrances ees,consumers, students. spectators,participants and vis- 1103.2.1 In each building and structure,and each separate itors. tenancy within a building or structure, at least 50% of its entrances, but not less than one, shall comply with the 1101.1.4 Details, dimensions and construction specifica- accessible route.provisions of CABO/ANSI Al 17.1. tions for items herein shall comply with the requirements of CABO/ANSI A117.1. Exceptions: 1. Entrances to spaces not required to be accessible Exception: Type B dwelling units complying with as provided for in 1105.4. 1110. 2. Loading and service entrances. 1101.2 Maintenance of facilities. Any building. facility, 1103.2.2 When a building or facility has entrances which dwelling unit, or site which is constructed or altered to be normally serve accessible parking facilities,transportation accessible or adaptable under this document shall be main- facilities, passenger loading zones, taxi stands, public mined accessible/adaptable during its occupancy. streets and sidewalks, or accessible interior vertical access,then at least one of the entrances serving each such STANDARD BUILDING CODE°1997 171 x Feh* -,',4- f rt d° s e'����- tet'"#, '� �" - SECTION FOU R a 4^Y '23 b �a. ts - Plars - Architecieea NNSON Engna E & JEd - , GE„f r a d` r s6xty , e€ ,3pynners, Inc. OCOEE WASTEWATER TREATMENT PLANT PRELIMINARY CONSTRUCTION BUDGET STUDY (DESIGN-BUILD) ADMINISTRATION BUILDING (Conventional Construction) S/Unit or Unit/SF $/SF TOTAL Cost for Administration Building Construction (Includes Electrical&HVAC) 5,760 $ 80.00 $ 460,800 Specialties(Lockers/Operable Partitions, etc.) LS $ 20,000.00 $ 20,000 Fire Protection 5,760 $ 1.25 $ 7,200 Site Work at Building Pad Only $ 20,000 Total Cost for Building Construction Only $ 508,000 10%Design Contingency $ 50,800 Subtotal $ 558,800 Revised Access Road&Parking Lot Construction 66,000 $ 2.00 $ 132,000 Landscaping,Civil Work&Min. Site Lighting Allowance $ 50,000 Special Foundations Allowance $ 10,000 Subtotal $ 750,800 20%General Contin. (Overhead/Profit,Insur,Bond&A/E Design Fee) $ 150,160 Total $ 900,960 SAY $ 901,000 Note: I.Does not include Design Criteria Package Fee. 2.Security Fencing to be determined. 3. Does not include connections to existing utilities. OCOEE WASTEWATER TREATMENT PLANT PRELIMINARY CONSTRUCTION BUDGET STUDY - (DESIGN-BUILD) MAINTENANCE/STORAGE BUILDING (Pre-Engineered Metal Building) $/Unit or Unit/SF $/SF TOTAL Pre-Fab.Metal Bldg. Material Del. To Site 7,500 $ 11.00 $ 82,500 Man Doors 7 $ 500.00 $ 3,500 Overhead Coiling Doors 5 $ 800.00 $ 4,000 Large Overhead Coiling Doors 3 $ 1,500.00 $ 4,500 Concrete Slab(Building Only) 7,500 $ 4.00 $ 30,000 Concrete Block Walls-4' high&Interior CMU Walls $ 20,000 Insulation 14,000 $ 0.37 $ 5,180 Erection 7,500 $ 2.50 $ 18,750 Plumbing $ 3,000 Fire Protection 7,500 $ 1.25 $ 9,375 HVAC (Incl.Ventilation & Welding Hood) $ 10,000 Electrical 7,500 $ 2.50 $ 18,750 Bollards, Welding Curtain&Misc. $ 8,000 Site Work at Building Pad Only $ 20,000 Total Cost for Building Construction Only $ 237,555 10% Design Contingency $ 23,756 Subtotal $ 261,311 Parking Lot Construction 50,000 $ 2.00 $ 100,000 Toilet(H.C. Accessible) 1 $ 6,500.00 $ 6,500 Landscaping&Civil Work Allowance $ 30,000 Special Foundations Allowance $ 10,000 Subtotal $ 407,811 20%General Contingency(Overhead/Profit,Insur. &Bond) $ 81,562 Total $ 489,373 SAY $ 490,000 Note: 1.Does not include Design Criteria Package Fee. 2. Walkway Covers to be determined. ... ,,,,-,,:.•.°.„-.-,i,,I., ; •- '., .„`,.'t;7. -.''s;'47-e-'*'$;?*,*--)il,!,'.4i'.5,,':'' -. -'3.-,.--;:!-,-.,q,;-•-;* '''':::;:,i44:'-',,,4cit,,,..,.,, ;Ai7ti.,r -.: --.'",;7:47:,-',7',,,,:'•':-.1..;-Z*,-i'."1.Z4**,..15,...P-1:7;.f.--,*4-.. .,,..,' 7','"4":',.,..' -. : ..=:<"-:',.,"4;,;.,;..:ir.,,v-,',;„!:,.'e-:7--.4?:•-,:4•,,' 'j' .-_,D:,..,,.,";r- ,-.. ,-'•'1'-'!,',.A1,,' •,i.'-f.,,0',",,.:1.4,' ;,..w..4,,,V,,,,..,.7 „-V.:44-ech,,`44?--'` !-.7...'4 - „,,:,;',,- ', ” .,-. •;,.,,,r-,.,;:,.';;;;--iev*,y, ?:,,,i:,*..-,-;,; :;<':',;', ,--1., , .'-,f• --,-: .1.''',-,,r„,;;..„44,,,4,4-41,, -J..14;,1---•-`' '-'‘,--'z,- ' ;V V *Na, ;-,:-.-, '-,-, r l4c,4,v,- -- ,,-.--,-':•;:T.---,,•. tiln*Q y444;:.,,,,z1.4i„ilk*,=-4;,-i.,1 ',-,..;,--:, ,4‘,' l'„,,...",!•:,::,:,4ti-_'1.. ,-frNl'(/*g ',. -o''''''N-i--'''jit-k.•- - 1 :i,'''.-4-<, ,-`,.-'-'--.,---: ,,1 4: ., z .:,.. t."`,1,%4,:.-: ,.,--,,- A•44,,t,.4-zyxistc.-gm,,„,.,,,t1T0*.!--,:, riv.. ,.,'.,--,..,,,,-;.,---:-;„,::.,:-----:?...-iti. ..:•,..4V.:1.7: , -.,..",;t•''::;',q.,-,?-4V:„?,,V *:: 4,.1;0:,'"'.-x----;'-'it°-.;•;:`: "?..:„,''''1i.l.':::.. .ft-ik.-,R„A‘1.4.11Mji',-.'..''4,.",ft ::1-4•.,:•„--4,'.--'-:-. --,-". 1------,---:,-,i---wpyrz:,,,t,...,,.. ---3.-t-T,-,--...-,;.,-,,,-;t--,• '• .:•,;,--,.:F-„,--,,, •_,:._ .,,,,,,„-2-0,-.44 -.---.-;--------- -- •-..4.7--_?:,--..tn,•,--„,..?-./:ti....154)wv-,:•-c ti3-41-14--ck•'1 , --1-yr.l.i.::••r.--':'-.1:y;;;61-5:",',-&,.,ri.Tili41-4.?;fi,t,Nli,!"-'-'''''',‘'"4 :.•..;:i,,,,!.•.,1----'.,',. -: :- ,..,,-,_,-:,zA-,,,,,,,.1::-•-•••,..,:`,.''-.-e, .--*,s.„5-,, ''-1-;...-,-', '=: --..,--''.---.:';-•-,,-,4-::_-!:•,;-';'"1. ---i-i„,*-`7*--,-'7,:. ..:7?-2';-.- •.--;,-. %-•,..-, •••.,-„*,...--.%,- * ,'",p,,,,-. ---,'•-.--'-'• `-'- ;,.:,-,,irtvi?,76, -%-1,`,-,;.v.-r-.,•14 4.'' -'''1.:,-,7'07.49;4 f.'::';'-'_- ; ,:,-',- ,-----.--"- ..,.,4,,,,,`"-, 11. ',..-"' ...„.'-'-• ''',..;,..:A- -,- '''' -,;,.. .::°',' '' ,,$,',.`,'''' t,,,i,:,..;.'," ,-_,- -,`•'-•' '. "...,,,, ,-3'.^-.,",',."4',..r-Ifilgt-''',c- '.....,-,,.--• -_:. ,... ._ .•-, .,,,-,,•4-„,,,,„1----_-1,----4'-'3'A,, Iri .,'-- ,,.,_ -', .-‘,;,-•--,:,-,1,,..:;?e•--4, -.ee • ^:',..-1-' -- • '. :..; ,AVA'' ,' ,- . ':• i *f ;4"., l't.yitl:::if:::::=•.;:,3;7?:'rgl: if;„''''''. FIVE T I 0 -N- ..,;,.,=, . - ,-..,',.;,.•,-;,,,,,:.1...;YJ. ‘-'•.:::./..*--''V',- u S Ers ,,,,A,;:t,kx34'ii-,--,,r+.4-;:-.%.,,,I.,:',7, iApz.,,,ti,*,z-, ---4-47 '.V„,,,,%,°,,,A...''' ''jr•'',1`e',-..,'se:-,-",'"I*4'..,i'„' -,- ,t,,,,,,- 5:'''''''I'''' "1 .-:,'-,,ik-4-: ,,,,:.;,?,,,,%, „:,,,,',-,4--•,:,,,' V"--,7 t,,,..kZIWA,--?, ; .0-,''Zi-,'"j.7'14.„ es,'-i.--#4 ?:fs-e-4,v,, ., fp-,;.. -,,,,A,T442-„,',i,4'19.,,4,1_, 4e''.•-t.V3.4',t:;,..!•,7::4',..44•-., ,- -' :-_,, ;41,,.z.„)..•44,:, - :.,,...,,v0 ,r04,,;:-';',- ,1W4.:- tffteA te47 ',7'''',4'iv,„: inc. 4 .,-..-;-„, 1,-,V-4,?,,,,,V,„„4,'„ -,,,-1:-e4 -,!.. ..-!:,--:-‘4,,,-14-rtn,y, ,,,•-:‘,: ,;;-•-., Architects - ,-.4°:•-•,:-.-?..k..,.', ,,.' • `:.,74' ''-.--'",_',""...r:"..Z'o;-,' 01,'. ..t` '-'. ;....tfA.,2,'", Engineers-i-t ,,, - ;,Ivi4,..-4,10, °.',4-°;%' ,,, JENSON GEE & ---- : ,, z-. .,-,::-..t,,,.,.....4(.111%,,;-_:. ...::::-..•• ,,ls•‘-', 1 ilt;1>:',.3.1-..=S :....,--9..,..4.,--`t't,i,1‘,74.-t.'„ti-%,"-„,..••:...,1t ..,>-.7''''' ;P-..•':•3;.'-ktt;-..,4.Y.t-A../-;,•`-iz”,--2- — .:-:.K*tg'T.-,`,',',11r1F.,,i:.16; -Arch! Planners, gr .-41.1t.".:, ',;°,4,3 z C) • �I r' a (I) E M n Z1 t' W N L co —)1 2 a off a WC ' W . rn ' C a) CD co z J • m W o a a 11 111 ■ ■■■■■I 1 N z 11111=11I 1 E2 = o a Z 11■■■■■■■■11 = w I- o 01E111■■■■■■_ i 1 OW ii) In. _ 0 g unx c co . wco Si ff0Qa MEI' I■■■ ]R!_ , I O 0 (,,, A2 C CD o 0) O •Oizt 'a m o 4t 1 a z a E n .2) 8 2 _C _ 0) N C 3 8 Q p zf N Cj O V 2. , V U 0 C (� +�+ W E S Cl). ( -0 C Cl) C < � v z o v m c0 c3 cg e . _e c � o or ipo JAMES W SHIRR,P.E. CITY ENGINEER/UTILITIES DIRECTOR 150 N.LAKESHORE DRIVE•OCOEE,FLORIDA 34761 PHONE(407)656-2322 EXT.142•FAX(407)656-7835 May 14, 1998 Paul Herwig Gee&Jenson AEP, Inc. 2701 Maitland Center Parkway, Suite 150 Maitland, Florida 32751 RE: Work Order No. 10 Vehicle and Material Storage Building Dear Mr. Herwig: Approximately two weeks ago representatives of the City verbally informed Gee & Jenson to cease work on the development of the Design Criteria Package for the Vehicle and Material Storage Building to be located on the Wastewater Treatment Plant property. In accordance with Section 10 of the Agreement, dated December 5, 1995, the City desires to terminate the services contracted for under Work Order No. 10. The City is taking this action for its convenience with the understanding that it will be billed for labor and expenses incurred to date by Gee&Jenson. Should you wish to discuss this matter further,please do not hesitate to contact this office. Sincerely, CITY of OCOEE David A. Wheeler, P.E. Assistant City Engineer/Utility Director cc: Ellis Shapiro, City Manager James W. Shira, P.E., City Engineer/Utilities Director Paul Rosenthal, Esq., Foley and Lardner THE PRIDE OF WEST ORANGE Ocoee • o t :�, o November 20, 1998 of G000 JAMES W. SHIRA, P.E. CITY ENGINEER/ UTILITIES DIRECTOR 150 N.LAKESHORE DRIVE•OCOEE,FLORIDA 34761 PHONE(407)656-2322 EXT. 142•FAX(407)656-7835 Joe Margio, P.E. Glace and Radcliffe & Inc. 800 S. Orlando Avenue Maitland, Florida 32751 RE: Request for Fee Proposal Vehicle and Material Storage Building Dear Mr. Margio: In January of 1997, the City of Ocoee had a Utility Bond Issue to finance various projects throughout the City. One of those projects was to construct a Vehicle and Material Storage Building at the Ocoee Wastewater Treatment Facility. The City ''', employed Gee & Jenson EAP, Inc. to perform the Conceptual Design Programming/Site Evaluation phase of this project. The initial plan was to complete the project as a design/build approach. Design Criteria documents would be used to competitively bid the project to design/build teams. The City has decided to complete the project as a full design and competitive bid to contractors. Attached, please find a copy of that Evaluation Report completed by Gee & Jenson. The City of Ocoee is requesting that Glace & Radcliffe, Inc. provide us with a fee proposal for designing the project and assisting in the construction phase engineering services. The proposal shall be prepared in accordance with the Continuing Professional Consulting Agreement dated September 1, 1998. The proposal shall be a combination Lump Sum for the Design and Permitting phases and Wage Cost Multiplier for the Bidding and Construction phases. The Ocoee Engineering staff has determined that the following tasks will need to be performed. If you feel that there are additional tasks which we may have over looked please include them in your proposal. Design Phase • Review and familiarization with the Conceptual Design Programming/Site Evaluation Report and the proposed site location. • Geotechnical exploration of the site for design of the structure and the stormwater, facilities will be by one of the City's contracted firms. Scope to be determined by your firm's requirements. THE PRIDE OF WEST ORANGE • Any surveying of the site for design of the facilities will be by one of the City's contracted firms. Scope to be determined by your firm's requirements. • • Detailed design of the site amenities to include site grading, pavement improvements, sewer line relocation and stormwater facilities. • Detailed design of a metal type building for the Vehicle and Material Storage Building, including interior walls, electrical, plumbing, and sprinkler systems. The free standing shelves for the material storage area will be purchased and installed by the City. • Prepare detailed plans and specifications of the project and an opinion of probable construction cost. Permitting Phase • Prepare, submit and secure a stormwater permit in accordance with the St. Johns River Water Management District. • Prepare, submit and secure permits in accordance with the Florida Department of Environmental Protection for connection of the building to the city's drinking water and sanitary sewer systems, if necessary. Bidding Phase • Provide the City with one set of original documents to be used for printing of bid sets to be used during the bidding process. The City will be responsible for advertising and bidding the project. • Provide assistance in response to written questions received during the bidding process. Provide assistance in the preparation of any addendum which may need to be sent out in response to questions and/or changes in the design. • Provide a written review and a recommendation on award based upon the bids received. Construction Phase • Attend and participate in the Pre-Construction Conference to be conducted by the City with the selected contractor. • Review shop drawings for the project • Review and assist the City in response to Requests For Information RFIs from the contractor. • Assist the City in review of Requests for Proposed Changes in the design which will result in contract Change Orders. • Provide every other week observations of the project and provide the City with a written report of that construction observation. • Assist the City in the Substantial and Final Completion Inspections and provide the City with a certification of construction in accordance with plans and specifications of the project. • Assist the City in the preparation of As-Built record drawings of the project. • Assist the City in the Big Weanie Roast for the project dedication. The City will accept written requests for additional information related to the scope of this project. These requests will be accepted until 5:00 P.M. December 3, 1998. All written requests will be answered in writing, with a copy of each response mailed to each of the three engineering firms receiving this letter. You are requested to provide your proposal including a detailed schedule and completion date by 5:00 P.M. December 9, 1998. The Engineering Staff will review the proposals and prepare its staff recommendation to the City Commission for the regular City Commission Meeting to be held on December 15, 1998. If approved, the Service Authorization for this project will be executed on that', day and notice to proceed will be issued the next day. It is the City's desire to be ready' to proceed with the Bidding Phase on or about March 1, 1999. Should you have any questions, please do not hesitate to contact this office. Sincerely, CITY of OCOEE David A. Wheeler, P.E. Assistance City Engineer/Utility Director cc: Jim Shira, City Engineer Ocoee r o � i0j1011 �J�'IaNovember 20, 1998 `. ,.?� �.• •�of coon JAMES W. SHIRA, P.E. CITY ENGINEER/ UTILITIES DIRECTOR 150 N.LAKESHORE DRIVE•OCOEE,FLORIDA 34761 PHONE(407)656-2322 EXT. 142•FAX(407)656-783$ Robert Rutter, P.E. Ivey, Harris & Walls, Inc. 631 South Orlando Avenue, Suite 200 Winter Park, Florida 32789 RE: Request for Fee Proposal Vehicle and Material Storage Building Dear Mr. Rutter: In January of 1997, the City of Ocoee had a Utility Bond Issue to finance various projects throughout the City. One of those projects was to construct a Vehicle and Material Storage Building at the Ocoee Wastewater Treatment Facility. The City employed Gee & Jenson EAP, Inc. to perform the Conceptual Design Programming/Site Evaluation phase of this project. The initial plan was to complete the project as a design/build approach. Design Criteria documents would be used to competitively bid the project to design/build teams. The City has decided to complete the project as a full design and competitive bid to contractors. Attached, please find a copy of that Evaluation Report completed by Gee & Jenson. The City of Ocoee is requesting that Ivey, Harris & Walls, Inc. provide us with a fee proposal for designing the project and assisting in the construction phase engineering services. The proposal shall be prepared in accordance with the Continuing Professional Consulting Agreement dated September 1, 1998. The proposal shall be a combination Lump Sum for the Design and Permitting phases and Wage Cost Multiplier for the Bidding and Construction phases. The Ocoee Engineering staff has determined that the following tasks will need to be performed. If you feel that there are additional tasks which we may have over looked please include them in your proposal. Design Phase • Review and familiarization with the Conceptual Design Programming/Site Evaluation Report and the proposed site location. • Geotechnical exploration of the site for design of the structure and the stormwater facilities will be by one of the City's contracted firms. Scope to be determined by your firm's requirements. THE PRIDE OF WEST ORANGE • Any surveying of the site for design of the facilities will be by one of the City's contracted firms. Scope to be determined by your firm's requirements. • • Detailed design of the site amenities to include site grading, pavement improvements, sewer line relocation and stormwater facilities. • Detailed design of a metal type building for the Vehicle and Material Storage Building, including interior walls, electrical, plumbing, and sprinkler systems. The free standing shelves for the material storage area will be purchased and installed by the City. • Prepare detailed plans and specifications of the project and an opinion of probable construction cost. Permitting Phase • Prepare, submit and secure a stormwater permit in accordance with the St. Johns River Water Management District. • Prepare, submit and secure permits in accordance with the Florida Department of Environmental Protection for connection of the building to the city's drinking water and sanitary sewer systems, if necessary. Bidding Phase • Provide the City with one set of original documents to be used for printing of bid sets to be used during the bidding process. The City will be responsible for advertising and bidding the project. • Provide assistance in response to written questions received during the bidding process. Provide assistance in the preparation of any addendum which may need to be sent out in response to questions and/or changes in the design. • Provide a written review and a recommendation on award based upon the bids received. Construction Phase • Attend and participate in the Pre-Construction Conference to be conducted by the City with the selected contractor. • Review shop drawings for the project • Review and assist the City in response to Requests For Information RFIs from the contractor. • Assist the City in review of Requests for Proposed Changes in the design which will result in contract Change Orders. • Provide every other week observations of the project and provide the City with a written report of that construction observation. • Assist the City in the Substantial and Final Completion Inspections and provide the City with a certification of construction in accordance with plans and specifications of the project. • Assist the City in the preparation of As-Built record drawings of the project. • Assist the City in the Big Weanie Roast for the project dedication. The City will accept written requests for additional information related to the scope of this project. These requests will be accepted until 5:00 P.M. December 3, 1998. All written requests will be answered in writing, with a copy of each response mailed to each of the three engineering firms receiving this letter. You are requested to provide your proposal including a detailed schedule and completion date by 5:00 P.M. December 9, 1998. The Engineering Staff will review the proposals and prepare its staff recommendation to the City Commission for the regular City Commission Meeting to be held on December 15, 1998. If approved, the Service Authorization for this project will be executed on that day and notice to proceed will be issued the next day. It is the City's desire to be ready to proceed with the Bidding Phase on or about March 1, 1999. Should you have any questions, please do not hesitate to contact this office. Sincerely, CITY of OCOEE 4- 0 A-V/44, David A. Wheeler, P.E. Assistance City Engineer/Utility Director cc: Jim Shira, City Engineer Ocoee o` 0 Of cool) JAMES W. SHIRA, P.E. CITY ENGINEER/ UTILITIES DIRECTOR 150 N.LAKESHORE DRIVE•OCOEE,FLORIDA 34761 PHONE(407)656-2322 EXT. 142•FAX(407)656-7835 November 20, 1998 J. Richard Voorhees, P.E. Hartman & Associates, Inc. 201 East Pine Street, Suite 1000 Orlando, Florida 32801 RE: Request for Fee Proposal Vehicle and Material Storage Building Dear Mr. Voorhees: In January of 1997, the City of Ocoee had a Utility Bond Issue to finance various projects throughout the City. One of those projects was to construct a Vehicle and Material Storage Building at the Ocoee Wastewater Treatment Facility. The City employed Gee & Jenson EAP, Inc. to perform the Conceptual Design Programming/Site Evaluation phase of this project. The initial plan was to complete the project as a design/build approach. Design Criteria documents would be used to competitively bid the project to design/build teams. The City has decided to complete the project as a full design and competitive bid to contractors. Attached, please find a copy of that Evaluation Report completed by Gee & Jenson. The City of Ocoee is requesting that Hartman & Associates, Inc. provide us with a fee proposal for designing the project and assisting in the construction phase engineering services. The proposal shall be prepared in accordance with the Continuing Professional Consulting Agreement dated September 1, 1998. The proposal shall be a combination Lump Sum for the Design and Permitting phases and Wage Cost Multiplier for the Bidding and Construction phases. The Ocoee Engineering staff has determined that the following tasks will need to be performed. If you feel that there are additional tasks which we may have over looked please include them in your proposal. THE PRIDE OF WEST ORANGE Mr. Richard Voorhees November 20, 1998 Page 2 Design Phase • Review and familiarization with the Conceptual Design Programming/Site Evaluation Report and the proposed site location. • Geotechnical exploration of the site for design of the structure and the stormwater facilities will be by one of the City's contracted firms. Scope to be determined by your firm's requirements. • Any surveying of the site for design of the facilities will be by one of the City's contracted firms. Scope to be determined by your firm's requirements. • • Detailed design of the site amenities to include site grading, pavement improvements, sewer line relocation and stormwater facilities. • Detailed design of a metal type building for the Vehicle and Material Storage Building, including interior walls, electrical, plumbing, and sprinkler systems. The free standing shelves for the material storage area will be purchased and installed by the City. • Prepare detailed plans and specifications of the project and an opinion of probable construction cost. Permitting Phase • Prepare, submit and secure a stormwater permit in accordance with the St. Johns River Water Management District. • Prepare, submit and secure permits in accordance with the Florida Department of Environmental Protection for connection of the building to the city's drinking water and sanitary sewer systems, if necessary. Bidding Phase • Provide the City with one set of original documents to be used for printing of bid sets to be used during the bidding process. The City will be responsible for advertising and bidding the project. Mr. Richard Voorhees November 20, 1998 Page 3 • Provide assistance in response to written questions received during the bidding process. Provide assistance in the preparation of any addendum which may need to be sent out in response to questions and/or changes in the design. • Provide a written review and a recommendation on award based upon the bids received. Construction Phase • Attend and participate in the Pre-Construction Conference to be conducted by the City with the selected contractor. • Review shop drawings for the project • Review and assist the City in response to Requests For Information RFIs from the contractor. • Assist the City in review of Requests for Proposed Changes in the design which will result in contract Change Orders. • Provide every other week observations of the project and provide the City with a written report of that construction observation. • Assist the City in the Substantial and Final Completion Inspections and provide the City with a certification of construction in accordance with plans and specifications of the project. • Assist the City in the preparation of As-Built record drawings of the project. • Assist the City in the Big Weanie Roast for the project dedication. The City will accept written requests for additional information related to the scope of this project. These requests will be accepted until 5:00 P.M. December 3, 1998. All written requests will be answered in writing, with a copy of each response mailed to each of the three engineering firms receiving this letter. You are requested to provide your proposal including a detailed schedule and completion date by 5:00 P.M. December 9, 1998. Mr. Richard Voorhees November 20, 1998 Page 4 The Engineering Staff will review the proposals and prepare its staff recommendation to the City Commission for the regular City Commission Meeting to be held on December 15, 1998. If approved, the Service Authorization for this project will be executed on that day and notice to proceed will be issued the next day. It is the City's desire to be ready to proceed with the Bidding Phase on or about March 1, 1999. Should you have any questions, please do not hesitate to contact this office. Sincerely, CITY of OCOEE David A. Wheeler, P.E. Assistance City Engineer/Utility Director cc: Jim Shira, City Engineer I' I SERVICES AUTHORIZATION UNDER CONTINUING PROFESSIONAL CONSULTING AGREEMENT VEHICLE and MATERIAL STORAGE BUILDING This Service Authorization,No. 99-002, hereinafter called SA99-002, as of this /9 ry day of IAN u Atz Y , 1999, shall constitute an Addendum to the Continuing Professional Consulting Agreement between the City of Ocoee, Florida (the CITY) and Glace and Radcliffe, Inc. (the CONSULTANT), dated the day of September, 1998, hereinafter referred to as the AGREEMENT. WHEREAS, the CITY and CONSULTANT entered into an AGREEMENT whereby the CITY retained the CONSULTANT to provide professional engineering services as required from time to time, and WHEREAS the CONSULTANT will perform consulting engineering services for the CITY as herein defined. NOW, THEREFORE, in consideration of the mutual covenants and promises hereinafter set forth on the part of both parties to be kept and performed, the parties do mutually agree as follows: Section 1 and 2 - Services of the Consultant The CONSULTANT shall perform the Design, Permitting, Bidding, and Construction Assistance Services as outlined in the attached documentation and listed as: (1) Ocoee Request for Fee Proposal letter, dated November 20, 1998; (2) Ocoee Questions and Answers letter, dated December 8, 1998; and (3) Glace & Radcliffe Fee Proposal letter, dated December 16, 1998, relative to the provision of the Continuing Professional Consulting Agreement. Section 4 - Period of Service The CONSULTANT will complete the Design services in accordance with the attached documentation. The Bidding and Construction Assistance will begin at the City's direction and be completed in accordance with the attached documentation Section 5 - Compensation Compensation by CITY for the Design, Permitting, Bidding, and Construction Assistance Services of this project are provided under this Amendment and shall be in accordance with Section 5 of the Agreement. The Design services will be compensated under paragraph 5.2.2. The Bidding and Construction Assistance services will be compensated under paragraph 5.2.L This Services Authorization shall not exceed Thirty-Four Thousand Five-Hundred-Sixty DOLLARS ($34,560.00) as outlined in the attached documentation. IN WITNESS WHEREOF, the parties have executed this Services Authorization No. SA99- 001 the day and year hereinabove set forth. GLACE & RADCLIFFE,INC. A 1"1'EST: 414 j. (bibi-a,Y4/14tAj By. t'// a• Name: `7'M'i D i '1Q/d 1i,r Title: P2e5/p Ems' (SEAL) Date: // €0, APPROVED: CITY OF OCOEE, FLORIDA ATTEST: 7,/12k- if Grafton, City C = S. Scott Vandergrift, Mayor (SEAL) FOR USE AND RELIANCE ONLY BY THE APPROVED BY THE OCOEE CITY CITY OF OCOEE, FLORIDA APPROVED COMMISSION AT A MEETING HELD AS TO FORM AND LEGALITY this ON ,j R wuA-2v !°I , 1999 11 day of 3ZI J,N.j , 1999. UNDER AGENDA ITEM NO. IL E' FOLEY& L NER By: 6/ City Attorney ENGINEER'S'OPINION OF PROBABLE CONSTRUCTION COST PROJECT TITLE:City of Ocoee Vehicle Storage Building DATE:AUGUST 31,1999 Glace&Radcliffe Project No.98518.01 DESCRIPTION: BUILDING CONSTRUCTION&SITE IMPROVEMENTS. DESCRIPTION ESTIMATED UNIT OF UNIT EXTENDED QUANTITY MEASURE PRICE PRICE SITE WORK Mobilization,bonds permits 1 LS $10,800.00 $10,800.00 Erosions control 1 LS $4,000.00 $4,000 00 Clearing&grubbing 1 LS $2,250.00 $2,250.00 Existing pavement removal 1 LS $5,000.00 $5,000.00 Existing building&slab removal 1 LS $14,000.00 $14,000.00 Existing water line encasement 1 LS $1,100.00 $1,100.00 Existing light pole relocation 2 LS $950.00 $1,900.00 Existing junction box extension&cap 1 LS $4,200.00 $4,200.00 Fence removal&relocation 380 LF $5.00 $1,900.00 Earth work(embankment) 5,350 CY $5.50 $29,425.00 Manhole(1-7) 2 EA $4,355.00 $8,710.00 Type C ditch bottom inlet 3 EA $2,225.00 $6,675.00 Type C modified inlet 1 EA $3,500.00 $3,500.00 Mitered end section(24") 1 EA $600.00 $600.00 24"concrete reinforced pipe 350 LF $30.00 $10,500.00 U-endwall w/baffle 1 EA $2,500 00 $2,500.00 12"Stabilization(Type C) 2,531 SY $8.00 $20,248.00 8"Limerock Base 2,531 SY $9.50 $24,044.50 2"Type S-I asphaltic concrete 2,531 SY $4.90 $12,401.90 50'Retaining wall 1 LS $3,000.00 $3,000.00 Reinforced concrete pad 344 SY $50.00 $17,200.00 Traffic Striping(6"solid white) 1,100 LF $0.45 $495.00 Type D curb 660 LF $8.25 $5,445.00 Type F curb&gutter 165 LF $12.00 $1,980.00 SITE TOTAL $191,874.40 STORAGE BUILDING STRUCTURAL CONSTRUCTION Foundation&walls 1 LS $57,000.00 $57,000.00 Metal Building 1 LS $168,750.00 $168,750.00 Appurtenance 1 LS $20,500.00 $20,500.00 SITE TOTAL $246,250.00 STORAGE BUILDING MECHANICAL CONSTRUCTION Mechanical 1 LS $10,840 00 $10,840.00 Plumbing 1 LS $10,850.00 $10,850 00 Fire Protection 1 LS $19,200.00 $19,200.00 Electrical 1 LS $32,000.00 $32,000.00 MECHANICAL TOTAL $72,890.00 SUBTOTAL $511,014.40 CONTINGENCY 20% $102,202.88 GRAND TOTAL $613,217.28 3DC Project & Construction Management Inc. • Program Management • Project Management • Construction Management • Rescue Management OUR COMMITMENT IS YOUR PEACE OF MIND Our commitment to ethical business practices, reliability, quality, and our fundamental pride in work well done assures our clients that DC Project will meet schedule and budget guidelines, while surpassing quality standards. OUR MISSION Successful projects and satisfied clients. After all, this is the bottom line and your best reason to team up with DC Project. FOUR GENERAT IONS IN CONSTRUCT ION Or1st GENERATION 2nd GENERATION Turn of the Century barn raising ir* Petroleum storage facility under project by Joseph • Daoust. construction by Eugene Daoust. /-",-.1t7,-....-` J ' ^ Design/Build R • 'IMI';-"s' .V R -. i $•; .{i 1. a. r��ii,e 'e,e' ,''r" Services Begin v , , j., w - I . `` i y( :. ,Al _ *7 1948 {4 ���,,. .,', a.* . ,41,. 1908 The Tradition of ,i • lr, fit, Construction Begins _ , Y -m 1936 DC Project Time Line Nakina Church 1900 1 World of Construction 4. I WW II ENDS ,els._ i5 €i-Ei. ill _ . 11 ., . •.I • I. K . . . .A • • • • '••111i11 illi I. ' C �. i!II� i' III R C.■ c IIIj 1� i ' : ,C ‘t '\'' 1 II 11ii1 "» F ,I iii i p1,11 �,, ,4 i,il�, f!!I� i's ," a >' ' Ally.. .. 1'1, o- uell�•1i i!ii ii 1936 ;bili li I?'I � 'll L i' '' ' Rockefeller Center E ' 1111 r! i' 1931T . 1945 15 ' Moscow State University, .-S/"' i Empire State rises 784 feet and is the tallest i , 1925 Building Completed building outside the United States. Tribune Tower opens The Great Depression and Prohibition The War Years Unite Us in a Common Cause 3rd GENERATION 4th GENERATION St. Mathews High School �. N. Paul Daoust �;� °...i'so a 0. continues the family ' � m (1111114 tradition by founding i_ -''�► - o �� / 0 Daoust Construction °~ A ,. + IllJ„1 jjf ' r ° it,° x,K Gi + Ait,. 1 r o•f T� f ' . „ ' +:, , -4)('' A did. . _ `w, 1J10 � . ,:„.,,',Ir'',' ' r � .mss _ . .. 1974 - f Jean and Pierre Daoust bring + a �, a their experience to the DC � 1997 s V. - �� i ' .' s Group of Companies. Pointe Orlando 7_, Entertainment / Retail ra f '--!. I. `.•-' Ill " tfir- . .1._ A.,z- -- o r , 1997 DC Project - �:o l� n(T ;, :� _.- Opens Offices in Notre Dame Hospital it ,, � ���;;f� El, „.... y�i�..R Florida (1982I) 30 Housing Construction 1982 DC Construction Units - Pangnirtung, Management Opens Offices in the Nunavut For Schools High Arctic f:f�. 1950 1974 1982 200C)+ 4. ,•.,.. __,• .iii ____._ i r • , ._ _ , . _ . ...._ ,Hi ,, ,„.„-•-,,, ,„,,,,,..,„, _• illismomi1 iln 3 j i IIl . .. .If ' - -iIiij is )111' 1! a ,. op 14,0 0 € 1998 l ff , R s = g' Orange < •411* �”• 19$4 :_ e: County Courthouse { :, AT&T Building , $, 1 Manhattan 1956 - ! LL-; n' 1975D _ 1998 Frank Lloyd Wright proposes the CN Tower, Toronto Petronas Tower Illinois-Sky City Kuala Lumpur, Malaysia The Post War Boom Brings Expansion Preparing for a Bright New Millennium INST IT UT IONAL • Schools 22 • Churches \ • Hospitals rI. 4F ti. IL �'� •- /l, ■•■��~,1 • -Pis 1 - ...- ... ,..4111.11r4t, -. • • L- �F + W. Hay Detention Centre - y.., � St. Peter and Paul Church > _ : 1.7' , Ld , ---:--'' ,.t" " 11 ,• 4,. .).' .b,Alt �ti 1. . ii h . - Ailithell. • ' • - - ;. Holy Trinity High School \lr , s • ...ail 5,,..4... 4-.IA .. .0: St. Louis 180 Bed Extended Care Facility V. i4►;; 3/ sp' 1' :Mia - .3,-,-- INDUSTRIAL • ;�h•'. yam_ . y .. • Warehouses •• Factories ... r .; F --,7s,,v, ,-, ... ...... /1' 3 ��r• , . ,o, , a 1IL •- :4 Tni... " ii ' , — lis II,1 i _ yi ins 4 , ,,.,_ , .. .„ ., . , , ____ _• __ . . A 4 . ., . 1 ,...sor 1 I , - Learning Institute & Dormitory a 1� I Co-generation Facility This Represents a Small Sampling of our Successfully Completed Projects COMMERCIAL • Retail Centers Z{ \ • Office Buildings ,� i k W '' \ \ , • Hotels / Motels Trillium Office Complex __ `e _ .r. Vii _ , a - ;�. . i ` f N II ; Medical - Opthalmology Centre Interior Bank Fit Up RESIDENT IAL + -,, S. • Multi-unit Apartments and Condominiums }'` • Custom Homes '' n1 r 1 a R • 1 ' It -Ii ,yrs REST ORAT ION / �= , . - .4.1_-...,_ -:_...A i 1 ice'_--- - RENOVATION • r ,;1; ,_ ' -, - _ ..,_..,_i..„.. � 1 �ti r--,-0,0, .r ,0.c • Historic Buildings Condominium High Rise Elmsmere Retirement Residence , 4.-„,:',..:411-41' 1,, — '-'.. ' 1 4'4- VC;4,1} s'#17/4>'1--- w r ice_ i .ill `� ' 't ' •/ ' a %' - I ,t,: `"' ; '1, 1 I sr ...i t ki", k -"Ai%�,r • I III 1 Archbishopt Residence Restoration Precious Blood Monastery Restoration For a Complete Visual Portfolio Visit our Website, www.dcproject.com Program Management • Planning C3. During the early stages of your important building project, the 4 emphasis is on planning. We define objectives, identify tasks i= " and set priorities. We identify the project resource needs and -1d2- 4I assign "who does what and when." This sets the foundation to '" ti assure your project goals are achieved. Computerized Management/Estimating Systems Project Management • Leadership DC Project implements your project's program through cooperative leadership. We direct and manage the Project Team's scope and monitor performance, ensuring that schedule, cost and quality objectives are maintained. Construction Management • Execution Our highly effective Construction Management Service builds on the project's scope and brings our four generations of experience to the team. Using our team building techniques, we assist, advise and manage all aspects of the construction process through occupancy. Rescue Management • Completion Today's construction projects are increasingly complex with tight time constraints and budget considerations. These factors ; , elevate the risk of potential project failure. Our Rescue Management Service offers construction expertise to analyze and recommend recovery actions to overcome obstacles, rescue and complete the project. These services include -"t- • assessment, documentation management, claim support and creation of litigation presentations for settlement, mediation, 1i arbitration and trial. High School Atrium DC Projects system resources, technical capabilities, and strategic approach to projects offer better coordination and control over your project. DC Project as your agent, provides program, project and construction management expertise. From initial concept planning through the construction phases and final occupancy, DC Project is with you all the way. We will manage your project to a successful completion. We analyze your project through Value Management to reduce costs, improve value and enhance quality. Our goal is to bring your project in on time and on budget. Our experience, know how and state-of-the-art systems will give you the edge your project deserves. .1.-' 'i , ' -♦ e t t 41/41/4 - Illr EV' ---....4....,,..s* ' r ! , ay r _ '• .,mow..�. .... :1114 Allir i a PROGRAM MANAGEMENT PROJECT • Feasibility Studies MANAGEMENT • Strategic Planning • Risk Analysis CONSTRUCTION • Concept & Scope • Program Integration T Development • Consultant Development 'GEMENT • Tearn Development • Design Development • Work Breakdown • Status Reporting • Consultant Coordination OCCUPANCY Structures • Contracts Management . Design to Cost Management • Responsibility Matrix • Schedule Management • Value Engineering • Commissioning & Training • Master Time Plan • Budget / Cost • Bid & Procurement • Operations & Maintenance • Cost Modeling Management Management Management • Master Budget Plan • Quality Management • Site Administration • Close Out Administrati.n • Quality Modeling • Value Management • Budget / Cost Control • Permits & Insurance • Schedule Control Management • Quality Control • Construction Administration • Site Safety Management There is No Question.... Construction is in Our Blood TEQ, DC Project's proprietary TEQnik® Method provides our clients the advantage of: T line Management to respect milestones and deadlines by effectively scheduling, streamlining, coordinating and fast-tracking by compressing and sequencing activities. Economy Management to respect budgets by timely and continuous cost evaluations and value enginccring contributions. Quality Management through cohesive bid packages and by selecting quality capable contractors. TRADITIONAL METHOD OWNER ARCHITECT ENGINEER PRELIMINARY DETAIL BID APPOINT CONSTRUCTION DESIGN DESIGN CONTRACTOR "" COST ESTABLISHMENT TIME DC PROJECT'S CONSTRUCTION MANAGEMENT METHOD & DETAIL DESIGN MONEY SEQUENTIAL BID PACKAGES SAVED OWNER DESIGN PRELIMINARY TEAM DESIGN CONSTRUCTION COST ESTABLISHMENT DC Project Streamlines Design and Construction Which Translates in Earlier Completion,Saving Time and Money SUCCESSFUL PROJECTS DON'T JUST HAPPEN . . . they are the result of teamwork, planning and controls. At DC Project, we embrace and promote team building. Our "Open Book" philosophy eliminates adversarial positions and provides confidence and trust. After all, we've been doing it for generations. TEAMWORK + PLANNING + CONTROLS = SUCCESSFUL PROJECTS uogon.rZsuo,J ur suorzrneuee rood 6t8Z£ DPTIOld `opUDIIO 0101 elInS `ez4la inuoTpDuielul 1016 uzoo•peloidop•MMM uzoo•pelozdoppeii& d:Tinule •-E OELO-ZSE (LOT7) 9999-Z9C (L0T7) . lueptse1d •uzpy •g `lsnoDQ eLIeTd 'OUT lueWebDuDJ uotppnz}suo: '8 pe oid z ar W� 'x' ,'--,',1--;-,,1„:'-- ,� ,g'V t ° ice d.4 �� x ai . . rig k s . f e Jy 1,' c ' % # t4�-,,s.," �'�i- x, aka ' 't0 �' £xs-r5 ' 7. r , ,� fJ.Y1t.! ',., ,,;;"').!'.!:'.5.;'''''. ` , --.141'' "°;;1'.::"0:41,4k v., it k r'n K x }•+t( f ���' r .. • r. air ;� '§. : z - z yy'. t Ys� �' DATE SUBMITTED:October 12, 1999 NAME OF BIDDER: DC Project & Construction Mgmt Inc. SECTION 00300 BID FORM SUBMII-IED:Qctober 12, 1999 (Date) PROJECT IDENTIFICATION: CITY OF OCOEE,FLORIDA VEHICLE AND MATERIAL STORAGE BUILDING NAME OF BIDDER: DC Project & Construction Management Inc. 9101 International Drive, Suit 1010 BUSINESS ADDRESS: Orlando,FL 3281 9 PHONE NO.: 407/352-6588 CONTRACTOR'S FLORIDA LICENSE NO.: CG–C 0 2 0 8 9 7 THIS BID IS SUBMITTED TO: City of Ocoee,Florida(hereinafter called Owner) 1. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Amendment to the Agreement with Owner in the form included in the Contract Documents, to perform and furnish all Work as specified or indicated in the Contract Documents for the Contract Price and within the Contract Time indicated in this Bid Form and the Amendment to the Agreement, and in accordance with the other terms and conditions of the Contract Documents. 2. Bidder accepts all of the terms and conditions of the Bidding Documents including without limitation those dealing with the disposition of Bid Bond. This Bid will remain open for ninety (90) calendar days after the day of Bid opening. BIDDER will sign and deliver the required number of counterparts of the Amendment to the Agreement with the Bonds and other documents required by the Bidding Requirements within ten (10) days after the date of OWNER'S Notice of(Intent to)Award. 3. In submitting this Bid, Bidder makes all representations required by the Instructions to Bidders and the Agreement and further warrants and represents that: a. Bidder has examined copies of all the Bidding Documents and of the following Addenda: No. 1 Dated 9/14/99 No._ Dated_ No. 2 Dated 1n/4/99 No.— Dated No. 3 Dated 10/8/99 No._ Dated No. 4 Dated 10/11/99 No. Dated (Receipt of all which is hereby acknowledged)and also copies of the Invitation for Bids and the Instructions to Bidders. b. Bidder has familiarized itself with the nature and extent of the Contract Documents, Work,site, locality, and all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance or furnishing the Work. c. BIDDER has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface of subsurface structures at or 00300-1 DATE SUBMITTED: p i-c j7, 1999 NAME OF BIDDER: IT Projc &Q"n intim Matt. Inc, contiguous to the site (except Underground Facilities) which have been identified in the Supplementary Conditions as provided in paragraph 4.2.1 of the General Conditions. BIDDER accepts the determination set forth in paragraph SC-4.2 of the Supplementary Conditions of the extent of the"technical data"contained in such reports and drawings upon which BIDDER is entitled to rely as provided in paragraph 4.2 of the General Conditions. BIDDER acknowledges that such reports and drawings are not Contract Documents and may not be complete for BIDDER's purposes. BIDDER acknowledges that OWNER and Engineer do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Bidding Documents with respect to Underground Facilities at or contiguous to the site. d. BIDDER has obtained and carefully studied(or assumes responsibility for having done so)all such additional or supplementary examinations, investigations, explorations,tests, studies and data concerning conditions(surface, subsurface and Underground Facilities)at or contiguous to the site or otherwise which may affect cost progress. performance or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences and procedures of construction to be employed by BIDDER and safety precautions and programs incident thereto. BIDDER does not consider that any additional examinations, investigations, explorations, tests,studies or data are necessary for the determination of this Bid for performance and furnishing of the Work in accordance with the times,price and other terms and conditions of the Contract Documents. e. BIDDER is aware of the general nature of Work to be performed by OWNER and others at the site that relates to Work for which this Bid is submitted as indicated in the Contract Documents. f. BIDDER has correlated the information known to BIDDER, information and observations obtained from visits to the site, reports and drawings identified in the Contract Documents and all additional examinations, investigations,explorations,tests,studies and date with the Contract Documents. g. BIDDER has given ENGINEER written notice of all conflicts, errors, ambiguities or discrepancies that BIDDER has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to BIDDER, and the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work for which this Bid is submitted. h. This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; BIDDER has not directly or indirectly induced or solicited any other Bidder to submit a farce or sham Bid; BIDDER has not solicited or induced any person, firm or corporation to refrain from bidding; and BIDDER has not sought by collusion to obtain for itself any advantage over any other Bidder or over OWNER. i. BIDDER hereby agrees to commence WORK under this contract on or before a date to be specified in the NOTICE TO PROCEED and to fully complete all work of the PROJECT within the Contract Time specified in the Amendment to the Agreement (Section 00500B). BIDDER further accepts the provisions of the Amendment to the Agreement as to liquidated damages and agrees to pay as liquidated damages the amount stated in the Amendment to the Agreement(Section 00500B), for each consecutive calendar day completion of the Work is delayed. Completion Schedule 1) The Project shall be substantially complete (successful pressure testing and bacteriological testing of completed water mains) lone-hundred&eighty(180)consecutive calendar days from the official Notice to Proceed. 00300-2 DATE SUBMITTED: Cetcicer 12, 1999 NAME OF BIDDER: DC Project & anstnutim M tt Inc. 2) The Project shall be finally complete(Completed and Ready for Final Payment) two-hundred& seventy (270)days from the official Notice to Proceed. 4. All bid items shall include all materials, equipment. labor, permit fees, taxes, tests, miscellaneous costs of all types, overhead,and profit for the item to be complete, in place.and ready for operation in the manner contemplated by the Contract Documents. Bidder submits the following TOTAL BID OR TOTAL BASE BID to perform all the Work as required by the Drawings and Specifications. 5. In accordance with Article 17 of the Instructions to Bidders, if the Contract is to be awarded, it will be awarded on the basis of the lowest"Total Base Bid"after adjustments for additive or deductive alternates. Additive or deductive alternates(if any)will be considered in determining the lowest responsive, responsible Bidder. The Owner reserves the right to accept any or all additive or deductive alternates,in his sole discretion,prior to the award of the Contract. The Owner also reserves the right to delete any portion of the Work as shown in the bid schedule prior to award and adjust each bidder's"Total Bid"accordingly. 6. The following documents are made a condition of this Bid: a. Bidding Documents and shall include the following: 1. Bid Forms(entire Section 00300,00301,00301A and 00301B) 2. Bid Bond(Surety Bond or Cashier's Check). (Section 00410) 3. Corporate Authority to execute Bid 4. Power of Attorney(for Surety Bond only) 5. Noncollusion Affidavit(Section 00480) 6. Certification of Nonsegregated Facilities(Section 00481) 7. Sworn Statement on Public Entity Crimes(Section 00482) 8. Certification of Nondiscriminatory Labor Practices(Section 00483) b. Executed "Part A,Contract to Perform Continuing Construction Services(dated August, 1998)" (Remainder of Page Left Blank Intentionally.) 00300-3 DATE SUBMITTED: (ij 12, 1999 NAME OF BIDDER: m prnkc# & anstarticta M3nagEmEnt Inc, (Page Left lank Intentionally.) 00300-4 -' ) ) �) 'j /4) �E ZrI i -\_...7,) ,....„, �- � f ' 1, 'A ....., AGc 1`,,)` (`-, in N Vi =-5 's, rd rd U. v (�lam/ (,‘ 1--1 (N rI N Z � � CQ U o U c ��� g a V' w `" V] f cn 7A v) � wd _ -, -, F. w = o00O tl Q .a 7:1 Gz. m - -- - - vi O .. H c w O o = Fes" Ew- W C o = r ,'-' Q o w = = U z Cr Q W u a r. = g w > -0 v in- = 0 - E Q Na c o 0t3 _o �O N o CD p CG Nr o G C E 0 o a2ami u a. -o - t N ,n c c c Q �. •i - O Q 6d — r •Q) cC _ W W o = c 1.) c o � p � a C7 U m U C 2N cn MI b o 0 o c o W o - c � O z - - - I W vv, E < Q = oz II � o � M m C) ccs azs N r C8 6 E^ � cm LT_ 0 2 dd rz cs..k..) U c) i 74 C O A A A A a.) s- U a) .,,,_ ,.. A A til o Q 1r U a. O VI t NN A A t.(, NI A A q C O q U ' • Q co o rn W EO u wa o o U z z Z Q W 1 a U E g W c o o g > v •C o 0 0 a v c aoi E u; Ll > 0 to cuE a. i8a. C.) o23 C E 'Y a a, by ca •C i.. W .E OO Q) cw. U C 0 _ ca O C CCI = N CL d 3 LI ` CA) C CA CC CD CO cc C 0 .n C ._ UO C/� H Ca x v. x —,ii x cy W W W CLQ W W — � 3 t— co o, o — N r„ 7r O :� 0 0 0 0 — — F- 2 (0 0) CIz CO- i a) o0 .�e o C O cC M a) bA cd 0.6 0 H co „ O w E- 2 oz , , \ ._. . '\, 3— c\•\,) 1 0 ,....., ilb CI"- A A , 0 ESz 1- r0 P.,, , c..,) ''C. A O. 7: _o t•-• s.1, E = )-- A A A. p! z A P ,:, , - M ,.) •'.;•- -. + - 2 r' '-// — < .• ,:‘, 0 , .C.) 7:3 a t.,,,p) — C.*: :--)•-r• '73 .— (-.1 0 ,.. ,, m — — — •4. E , ,— i ,,-y" .— ,_ . ' •Y---\e,„., I 1 • . - . •-. )..I., ''') •H k... .1:..0 ..... ,•$,4 '-' '• ki\ - _,-) ---, --.•-N 'A 'A -c-...., 'Z' E = >- cip w • C.7 ;.1.; ...t -o — — ..I ,n en ,--) — _ — ;I.1• C ON C LI' 8 w 0 c-Z' rn o W C" = = U z CID -S . w4 U g E › , / .A. ,.. •--...) a .-..-‘. o ,... --, C.) cn ,7. CU = t... '.---) c• N.' .5 U -0 cr3 '3.0 ,-- .- .,-.. .— • •-= a.) 1.) . E = -c-c ii.i = < a.) ^ ,-, (..7 li) i Ha v) :a = 0.. = 0 tA D cii — U .Ca. -SD - 0 ri , r.: `5 0 -0 2 U up up c7) U 0 U 0 0 0 a. s- 0 t..0 0 CZ LL., '-'-. N u cri .6 crs ca. >-, -.., a) .... 0 — 46 ^ —— — — c-.1 (-- E1 c\I ¢ ¢ z '`,,' c:: 0 aa — >, a) 0 c a c a� a> ao O W F � CO• � � Gs. F Q o z 0 •,9 u t- 8:7 c 1---- .-.: .._ E- Z -- — 1.) .c...) 2 • •;. r .. \ r- h'' ._ = E .7... (-. '. -- Z •-•\ ,.._ ...._ r --, 0 ... ----, --. . - -:- .N. LA --.--_, .2, 0.) --, F.., s - s ,c,• 0 - ,--, -0 1 3 a. 0 I-.1, -1) to n) .- rf-, t•;. -..F \(24 c c ---; z...., k ... , -4.:.} -.4. r".• -3 - k_(\ 7 :-, k• "•.- ..). '..-., __... ...... ...,, \-'\-* . r -...„.. E --. -; .- E vp ''Z -1 cn .-1 c 0:2 cr) r4 C.) ,r; w cu 4-, E.-. c.T.J g .., ,.., as ...-. ---.... .... .1 0 _ — r= 0 E- •r-... g • . , ..,,, ,..., ,.. a) c .- a) .0 W• C) Ts— It u cn = = ,tt ul — E ea u* 7., P ') U I.. = ).- .0 ch .— 0 o > ct .- .....' • a) ., ... •.., > 'E' ..cli., T. ,,, 1:9";‘ O a) 0 oi.1 el cgc t,..,„, o .- ,--, . -....- a) •- ...-• -0 3 = • m• .. c •7. = al u I -r: Cr E cri ,-, = S 0 a) c . a •- -,,, , 2-2 .... . U . U, a .c a ••,:, ,‘.) ,,,, e•,:,7,..., e .... — gc:i ,... 0 G M3 .; It t =CZ ..... S = .. '... Cf, = '' .... 0 "Cl E a) cal 0 0 1.... cn •—. E -a cams •,.-5.- —a ..O. 2 Ea* 7a- a t., •= o.2 z 8 ,,,, 5--0 - -o 44 cn c,1 LLI L'.1 77' ci rn ..7r x E- 2 63 Z N ri ";i -tC ¢ — — G7 Z (b,) o F--. I U U L7 i 0 • a) a) c5 c� a 0 W E- E- cc ^E-cc O w H2 oz DATE SUBMITTED: Cetcber 12, 1999 NAME OF BIDDER: D' prrrjxt & anstrtutial Mitt Inc- 7. The terms used in this Bid, which are defined in the General Conditions or Instructions of the Construction Contract, included as part of the Contract Documents have the meanings assigned to them in the General Conditions or Instructions. 8. The work shall be performed under a Florida Contractor's License. Contract shall not be awarded unless proof of valid license(s)is provided. 9. It is understood that where quantities for unit price work have been presented in the foregoing Schedule of Bid Items, they are approximate only and are solely for purpose of facilitating the comparison of bids, and that the Contractor's compensation will be computed upon the basis as described in the measurement and payment clauses in the specifications contained herein. 10. BASE BID-SCHEDULE OF MANUFACTURERS/SUPPLIERS If the foregoing Schedule of Bid Items is presented in a Base Bid format, the undersigned as Bidder agrees that the Contract, if awarded, will be on the basis of the materials and equipment named in the Contract Documents in accordance with Article 9 of the Instructions to Bidders. The undersigned as Bidder also agrees that for the "Base Bid"equipment and material items listed below the Bidder will provide one of the listed manufacturers/suppliers,by circling "A", "B", or "C". If the Bidder desires to propose an alternate manufacturer/supplier, he may write in the name of such alternate in the substitution list included within this Bid Form, but he must, nevertheless, also circle one of the listed manufacturers/suppliers. If the proposed alternate manufacturer/supplier is determined "not equivalent" by the Engineer, the Bidder must furnish equipment and/or material items by the circled manufactur- er/supplier. If the Bidder fails to indicate which listed manufacturer/supplier he intends to use if an alternate is rejected, he must use the manufacturer/supplier listed as "A". Also, if the Bidder circled more than one listed manufacturer/supplier,he must use the first manufacturer/supplier circled(unless an alternate is approved). 11. SUBSTITUTIONS AND"OR EQUAL" The undersigned as Bidder agrees that substitutions or "or-equal" items will not be considered until after the "Effective Date of the Agreement" and will be evaluated in accordance with paragraphs 6.7.1,6.7.2, and 6.7.3 of the General Conditions. In addition to the reimbursement required under the General Conditions, the Contractor shall also reimburse the Owner for any engineering costs directly attributable to the change in manufacturers/suppliers, caused by the acceptance of proposed alternates, such as; additional field trips for the Engineer, additional redesign costs, and additional review costs, etc. Other costs directly attributable to the change in manufacturers/suppliers caused by the acceptance of proposed alternates, such as; increased electrical requirements, larger building, additional pumps or tankage, etc., shall be borne by others and not the Owner. If Bidder intends to propose substitutions or "or-equal" items after the "Effective Date of the Agreement", it is agreed that these items will be listed on the Substitution List included within this Bid Form,with a deductive amount representing 50 percent of the total savings between the named Base Bid item and the proposed item. "Base Bid" item substitutions providing to the Owner an equipment or material cost savings of less than $1,000 will not be considered. The undersigned as Bidder,also agrees that if a substitution or"or-equal" item is not listed on the Substitution List included with the Bid, all of the savings between the named item and the proposed item will go to the Owner if the Owner accepts the proposed item in accordance with paragraphs 6.7.1., 6.7.2, and 6.7.3 of the General Conditions. The Owner may request,and the undersigned Bidder shall supply,complete information on proposed substitutions. Such information shall be the manufacturer's current published or preprinted information for the specific substitution. 12. As BIDDER, I hereby certify that I am aware and understand that the City of Ocoee at its sole discretion reserves the right to waive technicalities or irregularities, to reject any or all Bids, and/or to accept that Bid which is in the best interest of the City. The Award of this Bid, if made,may be based on considerations other than total cost, and may be awarded based on various considerations, including but not limited to: BIDDER experience and whether the Bid, in the judgement of the City, is the most responsive to City needs. The City of Ocoee encourages the use of minorities and women-owned businesses as subcontractors. 00300-15 DATE SUBMITTED: CL-tri-pr 17, 199c3 NAME OF BIDDER: Ix Project & ClIstrtrtial MTtt Dr. r In ctions: Strike out(X)nonapplicable signature block and complete applicable block. (ALL SIGNATORIES MUST HAVE THEIR NAMES PRINTED OR TYPED BELOW THEIR SIGNATURES) If Bidd- is: SOLE ••OPRIETORSHIP (SEAL) (Individual's Signature) (Individual's Name) doing business as Business Address: Phone No.: Florida License No.: A PARTNERSHIP (SEAL) (Partnership Name) (General Partner's Signature) (General Partner's Name) Business address: \ Phone No.: Florida License No.: 00300-14 DATE SUBMITTED: O±c±er 12, 1999 NAME OF BIDDER: EC Pmsject & CnJit Ins • tions: Strike out(X)nonapplicable signature block and complete applicable block. (ALL SIGNATORIES MUST HAVE THEIR NAMES PRINTED OR TYPED BELOW THEIR SIGNATURES) If Bidder is: A JOINT VEN ' By • (Name) (Address) By ►JOT APP I.lCA3LC (Address) Business Address: Phone No.: Florida License No.: (Each joint venturer must sign. The manner of signing for each individual,partnership,and corporation is a party to the joint venture should be in the manner indicated above.) Florida License No.: 12. List the following in connection with the Surety which is providing the Bid Bond: Surety's Name: American Casualty Company Surety's Address: c/o: Florida Surety Bonds, Inc. 222 S. Westmont Drive, Suite 307 Altamonte Springs, Florida 32714 Name and address of Surety's resident agent for service of process in Florida: Florida Surety Bonds, Inc. 222 S. Westmont Drive, Suite 307 Altamonte Springs, Florida 32714 END OF SECTION 00300-16 DATE SUBMITTED: Cctcter 12, 1999 NAME OF BIDDER: DC Project & Oznsiairtim Mint li-c. Instructions: Strike out(X)nonapplicable signature block and complete applicable block. (ALL SIGNATORIES MUST HAVE THEIR NAMES PRINTED OR TYPED BELOW THEIR SIGNATURES) If Bidder is: A CORPORATION DC Project & Construction Management Inc. (Corporation Name) Florida (State of Incorporation) By Pierre Daoust (Name of person authorized to si President (Title) / ( � n d Signature) Pierre Daoust (Corporate Seal) Attest (Secretary) — —"— Business address: 9101 International Drive, Suite 1010 Orlando, Florida 32819 Phone No.: 407/352-6588 Corporation President: Pierre Daoust Florida License No.: CGCO20897 00300-15 SECTION 00301 QUESTIONNAIRE DATE: October 12, 1999 PROJECT IDENTIFICATION: CITY OF OCOEE, FLORIDA VEHICLE AND MATERIAL STORAGE BUILDING NAME OF BIDDER: DC Project & Construction Management Inc. BUSINESS ADDRESS: 9101 International Drive, Suite 1010 Orlando, Florida 3 281 9 Phone No. 407/352- 6588 CONTRACTOR'S FLORIDA LICENSE NO. CG-CO20897 The undersigned warrants the truth and accuracy of all statements and answers herein contained. Include additional sheets if necessary. 1. Complete the following Table regarding experience with projects similar to the work contemplated under this Continuing Construction Services Agreement. Date of Client's Name& Address(Include Amount of Contract Name of Project &Location Contact Name and Phone#) Contract Pointe Orlarrb B-5 RRinte Crl.arrb Co.elcgrent Cb. Jure 1999 (gland:), FL Mr. Erwin G reisu1 3r $ 5.CM 407/370-2626 Pointe Orland) B-5 Pointe Orland) 1:0,elcianart Go. Aug 1997 Orlarrb, FL Mr. E. Gre s ngar $32.CM 407/370-2626 Focal Canadian Mutt Kral Canadian Mint Jan 1998 Ottawa, Canada Mr. Richert Mi 1a n $ 1.5\1 613/993-6970 Carltrn Place H.S. User Cates District 5B Jan 1999 C'arltcrt Place, Cates Mr. Pierre Itsteller $ 9.CM 613/267-4210 Algrrpin Cbllege Cbllec Assn. Jan 19% Stet Clatter Mr. Jack De $3.2M O to a, Canada 613/727-4723 Recta ding Lyme Lyme Cl ai r1 1 Jan 1996 Clrbl Mr. G. Save $2.CM Ottaia, Canada 613/234-0529 SFF ATPPCHED F(J FCREHER [ S 00301-1 \\ Date of Client's Name& Address(Include. Amount of Contract Name of Project & Location Contact Name and Phone#) Contract 2. Have you ever failed to complete work awarded to you? If so, where and why? ND 3. Have you personally inspected the general alignments of the various utility improvements proposed under this Continuing Construction Services agreement? Describe any anticipated problems with the sites and your proposed solutions. 4. Will you Subcontract any part of the work involving the construction of underground utilities? If so, describe which portions. Yes, al 1 p rticris will be sui:ccrtracted. 00301-2 5. List the names and addresses of the subcontractors to be used for the portions of the contemplated work listed above. Subcontractor Certification Subcontract Name and Address of Subcontractor Registration No. &Name SII NN. To3� CUNCc\Ac lb1/4).JA(I.:0 e:y 6. Disclosure (Section 00100, Article 20). Complete and attach "Sworn Statement on Public Entity Crimes" (Section 00482). 7. State the true and exact, correct, and complete name under which you do business. BIDDER IS: EC Project & Oznstarticri ManagarEnt Irt. END OF SECTION 00301-3 SECTION 00301-A COMPLIANCE WITH FLORIDA TRENCH SAFETY ACT (90-96,LAWS OF FLORIDA) Bidder hereby acknowledges that all costs for complying with the Florida Trench Safety Act are included in the various items of the bid and in the Lump Sum Total Bid Price shown in Section 00300 - Bid Form, "Schedule of Bid Items". For informational purposes only,the bidder is required to further identify these costs in the summary below. Trench Safety Unit of Measure Measure Unit Unit Extended (Description) (LF,SY) (Quantity) Cost Cost A $ $ B CO st I1.1 Ct-V C QRc(.tt-s a.0vaQu $ $ hr CO N Th Ia cx A1•.)Atk-0 D $ $ TOTAL $ BIDDER: EC Project : o• ■ • Managanent Inc. SIGNED: BY: Pierre Daoust (Print or type name) President TITLE: DATE: October 12, 1999 THIS IS NOT A PAY ITEM: The purpose of this form is to gather information on the costs associated with trench safety measures and to insure that the Bidder has considered these costs and included them in the Lump Sum Total Bid price. Contractor will not receive additional payment if actual quantities differ from those estimated or if the Contractor uses a safety measure different than those listed. (Failure to Complete This Form May Result in the Bid Being Declared Non-Responsive.) END OF SECTION 00301A-1 SECTION 00301-B DRUG-FREE WORKPLACE CERTIFICATION IDENTICAL TIE BIDS: Preference shall be given to businesses with drug-free workplace programs. Whenever two or more bids which are equal with respect to price, quantity, and service are received by the State or by any political subdivision for the procurement of commodities or contractual services, a bid received from a business that certifies that it has implemented a drug-free workplace program shall be given preference in the award process. Established procedures for processing tie bids will be followed if none of the tied vendors have a drug-free workplace program (Florida Statutes Section 287.037). In order to have a drug-free workplace program,a business shall: 1. Publish a statement notifying employees that the unlawful manufacture,distribution, dispensing,possession, or use of a controlled substance is prohibited in the workplace and specifying the actions that will be taken against employees for violations of such prohibition. 2. Inform employees about the dangers of drug abuse in the workplace, the business's policy of maintaining a drug-free workplace, and available drug counseling,rehabilitation, and employee assistance programs, and the penalties that may be imposed upon employees for drug abuse violations. 3. Give each employee engaged in providing the commodities or contractual services that are under bid a copy of the statement specified in subsection(1). 4. In the statement specified in subsection (1), notify the employees that, as a condition of working on the commodities or contractual services that are under bid, the employee will abide by the terms of the statement and will notify the employer of any conviction of, or pleas of guilty or nolo contendere to, any violation of Chapter 893 or of any controlled substance law of the United States or any state,for a violation occurring in the workplace no later than five(5)days after such conviction. 5. Impose a sanction on, or require the satisfactory participation in a drug abuse assistance or rehabilitation program is such is available in the employee's community,by any employee who is so convicted. 6. Make a good faith effort to continue to maintain a drug-free workplace through implementation of this section. As the person authorized to sign the statement,I certify that this firm complies fully with the above requirements. Bidder: DO Pro' - C• _AL ; •I u.I.•-. - t Inc. AI Signed: C ., It • By: Pierre Daoust (Print or Type Name) Title: Presi denI- Date: October 12, 1999 END OF SECTION 00301-B-1 Executed in 2Cant's/Tarts SECTION 00410 BID BOND KNOW ALL MEN BY THESE PRESENTS, that we, the undersigned D C Project & ansialuticn Managanat, Ir1C. as Principal, and IITErican, ra9131tY allrarlY Pcading, Ptanoli , as Surety, are hereby held and firmly bound unto the City of Ocoee, Florida, as Owner in the penal sum of five percent of the Contract Bid Ra—oat of Pntar t Rid ($ —5%— ) for payment of which. well and truly to be made, we hereby jointly and severally bind ourselves, successors and assigns. Signed, this 1 7I-h day of n^t-rtrer , 19 9q , The condition of the above obligation is such that whereas the Principal has submitted to the City of Ocoee, Florida a certain Bid, attached hereto and hereby made a part hereof to enter into a contract in writing, for the City of Ocoee Vehicle and Material Storage Building. NOW THEREFORE 1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to pay to Owner upon default of Bidder any difference between the total amount of Bidder's bid and the total amount of the bid of the next lowest, responsible and responsive bidder as determined by Owner for the Work required by the Contract Documents, provided that: 1.1. If there is o such next lowest, responsible and responsive bidder, and Owner does not abandon the Project, then Bidder and Surety shall pay to Owner the penal sum set forth on the face of this Bond, and 1.2. In no event shall Bidder's and Surety's obligation hereunder exceed the penal sum set forth on the face of this Bond. 2. Default of Bidder shall occur upon the failure of Bidder to deliver within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Amendment to the Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents and Contract Documents. 3. This obligation shall be null and void if: 3.1. Owner accepts Bidder's bid and Bidder delivers within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Amendment to the Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents and Contract Documents, or 3.2. All bids are rejected by Owner, or 3.3. Owner fails to issue a Notice of Intent to Award to Bidder within ninety (90) days from the time and date fixed for the opening of Bids (or any extension thereof agreed to in writing by Bidder and, if applicable, consented to by Surety when required by paragraph 5 hereof). 4. Payment under this Bond will be due and payable upon default by Diddcr and within thirty (30) calendar days after receipt by Bidder and Surety of written notice of default from Owner, which notice will be given with reasonable prompmess, identifying this Bond and the Project and including a statement of the amount due. 00410-1 5. Surety waives notice of any and all defenses based on or arising out of any time extension to issue notice of award agreed to in writing by Owner and Bidder, provided that the total time for issuing notice award including extensions shall not in the aggregate exceed 120 days from Bid Due Date wither Surety's written consent. 6. No suit or action shall be commenced under this bond prior to 30 calendar days after the notice of default required in paragraph 4 above is received by Bidder and Surety and in no case later than one year after Bid Due Date. 7. Any suit or action under this Bond shall be commenced only in a court of competent jurisdiction located in the state in which the Project is located. 8. Notices required hereunder shall be in writing and sent to Bidder and Surety at their respective addresses shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier or by United States Registered or Certified Mail, return receipt requested, postage pre-paid, and shall be deemed to be effective upon receipt by the party concerned. 9. Surety shall cause to be attached to this Bond, a current and effective Power of Attorney evidencing the authority of the officer, agent or representative who executed this Bond on behalf of Surety to execute, seal and deliver such Bond and bind the Surety thereby. 10. This Bond is intended to conform to all applicable statutory requirements. Any applicable requirement of any applicable statute that has been omitted from this Bond shall be deemed to be included herein as if set forth at length. If any provision of this Bond conflicts with any applicable provision of any applicable statute, then the provision of said statute shall govern and the remainder of this Bond that is not in conflict therewith shall continue in full force and effect. 11. The term "bid" as used herein includes a bid, offer or proposal as applicable. IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals, and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forth above. 00410-2 BIDDER: trike out (X) non- applicable signature block and complete applicable block. All sire• es ust have their names printed or typed below their signature. If Biddtr is SOLE PROPRIERTORSHIP, complete this signature block (1) (Individual's Signature) (witness) (2) (Indivn • 's Name) (witness) doing business as (SEAL) (Business Address) •(Telephone No.) (Florida Lice.. No.) If Bidder is PAR a•: Sr, ..mplert tins signature block. (1) (Partnership Name) (Witness) (2) (General Partner's Si, ) (Witness) (General ' . is Name) (SEAL) (Business Address) (Telephone No.) (Florida License No.) 00410-3 If Bidder is a CORPORATION.complete this signature r. ATTEST: D C Project & rn Mitt, Ii . / (Corporation Name) (Corporate Scitcuty,Signature) r (Stateof Incorporation) j'll.'s-71_2E .L AOv�1 (Corporate Secretary Name) By: Pierre l:• (Name of person rho to sign-ace Note 1) w •O rdc) (CORPORATE SEAL) (Authorized Signature) Pierre Dbo[.;_st (Corporation President) 9101 Ir termticr l Lk ice, g rite 1010 OrlaQrb FL 32819 (Business Addicts) ( 907) 352-6588 CGCO20897 (Telephone No.) (Florida License No.) 00410-4 SURETY: WITNESS: (If Agent is not a Corporation) Aret.iCan Caan1ty Clart:anY of Rsaaingr (1) N/A (Surety Business Name) y1vania (Witness) CNA Plaza N/A (2) (Witness) Chimp IL 60685 (312) 822-5000 (Principal �Place �of�Business) //IlL.KlV— ATTEST: (If Agent is a Corporation) 'Agent's Signature-Sec Note 2) Jeffrey W. Reich (Surety Agent's Name) (Corporate etre Signature) Att rr y in Fact & Florida Lice 1 alt Patricia L. SI frr (Surety Agent's Title) AgaIt (Corporate Secretary Name) F]LrIth Surety $ISS, Inc. (Business Name of Local Agent for Surety) 227 S. Westmate l)ice, Suite 307 (CORPORATE SEAL) Alter Sims FL 32714 (Business Address of Local Agent) ( ()407) 786-777 A217277 (Telephone No.) (Florida License No.) NOTES: (1) Complete and attach "Corporate Authority to Execute Documents" if executed by any corporate employee other than president or vice-president. (2) Complete and attach a certified copy of 'Tower-of-Attorney" prepared by Surety appointment individual "Attorney-in-Fact" for execution of Bid Bond on behalf of Surety and corresponding notarized "Attorney- in-Fact". (3) Above addresses arc to be used for giving required notice. (4) Any singular reference to Bidder, Surety, Owner or other party shall be considered plural where applicable. (5) Surety companies executing bonds must appear on the Treasury Deparunent's most current list (Circular 570 as amended) and be authorized to transact business in the state where the project is located. 00410-5 POWER OF ATTORNEY APPOINTING INDIVIDUAL ATTORNEY-IN-FACT Know All Men By These Presents, That CONTINENTAL CASUALTY COMPANY, an Illinois corporation, NATIONAL FIRE INSURANCE COMPANY OF HARTFORD, a Connecticut corporation,AMERICAN CASUALTY COMPANY OF READING, PENNSYLVANIA, a Pennsylvania corporation(herein collectively called"the CCC Surety Companies"), are duly organized and existing coriSorations having their principal offices in the City of Chicago, and State of Illinois, and that they do by virtue of the signature and seals herein affixed hereby make,constitute and appoint Jeffrey W. Reich, Susan L. Reich, Deidre A. Eickstaedt, Individually of Altamonte Springs, Florida their true and lawful Attorney(s)-in-Fact with full power and authority hereby conferred to sign, seal and execute for and on their behalf bonds, undertakings and other obligatory instruments of similar nature -In Unlimited Amounts- and to bind them thereby as fully and to the same extent as if such instruments were signed by a duly authorized officer of their corporations and all the acts of said Attorney, pursuant to the authority hereby given are hereby ratified and confirmed. This Power of Attorney is made and executed pursuant to and by authority of the By-Laws and Resolutions, printed on the reverse ereof, duly adopted,as indicated, by the Boards of Directors of the corporations. In Witness Whereof,the CCC Surety Companies have caused these presents to be signed by their Group Vice President and th r corporate seals to be hereto affixed on this 11th day of December , 1998 . CONTINENTAL CASUALTY COMPANY Aso-CASu4& �\ *SUR 44,0(.e. ma` aHYoF'let � NATIONAL FIRE INSURANCE COMPANY OF HARTFORD `� AMERICAN CASUALTY COMPANY OF READING,PENNS LVANIA 1-= coPPOIYE- . erglI ttii Noteaf mote 4 y ' ¼ uuuhi) //�/ '/l44-4 /L\ 1897 HARD • Marvin J.Cashion Group Vice President State of Illinois, County of Cook,ss: On this 11th day of December , 1998 , before me personally came Marvin J. Cashion,to me known,who, being by me duly sworn, did depose and say:that he resides in the City of Chicago, State of Illinois;that he is a Group Vice President of CONTINENTAL CASUALTY COMPANY, NATIONAL FIRE INSURANCE COMPANY OF HARTFORD, and AMERICAN CASUALTY COMPANY OF READING, PENNSYLVANIA described in and which executed the above instrument;that he knows the seals of said corporations;that the seals affixed to the said instrument are such corporate seals;that they were so affixed pursuant to authority given by the Boards of Directors of said corporations and that he signed his name thereto pursuant to like authority, and acknowledges same to be the act and deed of said corporations. e!Jo,qoe ilaj ? . NOTARY jjfjQ._._ PUBLIC cookco, \. My Commission Expires March 6, 2000 Mary Jo Abel Notary P blic CERTIFICATE I, Mary A. Ribikawskis,Assistant Secretary of CONTINENTAL CASUALTY COMPANY, NATIONAL FIRE INSURANCE COMPA Y OF HARTFORD, and AMERICAN CASUALTY COMPANY OF READING, PENNSYLVANIA do hereby certify that the Power of Attorney erein above set forth is still in force, and further certify that the By-Law and Resolution of the Board of Directors of each corporation printed • the reverse hereof are still in force. In testimony whereof I have hereunto subscribed my name and affixed the seals of the said corporation. this 12th day of C T-I-p , 1 clgq . CONTINENTAL CASUALTY COMPANY kt"N' Ug4/3- f,r vNSUR44cF �y`e62"Y°te NATIONAL FIRE INSURANCE COMPANY OF HARTFORD �' Posure 090 �� c?? ` �� oaalfoYb AMERICAN CASUALTY COMPANY OF READING,PENNS LVANIA ZO • s �L_J3� a� JULY 71, / / /_. SEAL t � �tv(`�/// < 1902 a� i N. 1897 MARS • , Mary A. Ribikawskis Assistant Secretary (Rev.10/1/97) SECTION 00501 CORPORATE AUTHORITY TO EXECUTE DOCUMENTS I HEREBY CERTIFY that a meeting of the Board of Directors of DC Project & anstacticn Mjnt Inc-, (Contractor's Corporate Name a corporation under the laws of the S to of Florida ,held on the 12th day of October , 19 99 ,the following resoltitio duly passed and a pted: "RESOLVED,that Pierre Daoust (signature of individual) (typed name of individual) As President of the corporation, is hereby authorized to execute and all documents required (title) to be signed by an officer of the Corporation in order to submit a valid bid,contract and bond for Vehicle and Material Storage Building (project name) between the CITY OF OCOEE,a municipal corporation,and this corporation,and that his execution thereof, attested by the Secretary of the corporation and with corporate seal affixed shall be the official act and deed of this corporation." I FURTHER CERTIFY that said resolution is now in full force and effect. IN WITNESS WHEREOF, I have hereunto set my hand and affixed the offic. seal of the corporation this 12th day of October , 19 99 . (CORPORATE SEAL) (Corporate Secretary) STATE OF Florida Pierre Daoust, Secretary COUNTY OF Orange 12th The foregoing instrument was acknowledged before me this_day of October , 199 9 by Pierre Daoust, President (name of officer or agent,title of officer or agent),of DC Project & Construction Mgmt Inc.(name of corporation acknowledging),a Florida Corporati n (state or place of incorporation) corporation, on behalf of the corporation. He/She is personally known to me or has produced identification Drivers License (type of identification)as identification and did/did not take an oath. • d� "4 Miriam Burgos ��a �/ ,,�t * *My Commission CC742383 Publi 13,2002 Miriam irgos Expires May °oKA My Commission Expires: May 13, 2002 END OF SECTION 00501-1 SECTION 00480 NONCOLLUSION AFFIDAVIT STATE OF ) Florida ss COUNTY OF ) Orange Pierre Daoust ,being first duly swore deposes and says that: 1. He(it)is the Prpsi dent (Owner,Partner,Office,Representative or Agent) of EC Th-pr-l- & Ctnstnrrim Mjnt- Trr_ ,the Bidder that has submitted the attached Bid; 2. He is fully informed respecting the preparation and contents of the attached Bid and of all pertinent circumstances respecting such Bid; 3. Such Bid is genuine and is not a collusive or sham Bid; 4. Neither the said Bidder nor any of its officers, partners, owners, agents, representatives, employees, or parties in interest, including this affidavit, have in any way, colluded, conspired, connived or agreed, directly or indirectly, with any other Bidder, firm or person to submit a collusive or sham Bid in connection with the Contract for which the attached Bid has been submitted; or to refrains from bidding in connection with such Contract; or have in any manner, directly or indirectly, sought by agreement or collusion, or communication, or conference with any Bidder, firm,or person to fix the price or prices in the attached Bid or of any other Bidder, or to fix any overhead,profit, or cost elements of the Bid price or the Bid price in any other Bidder, or to secure through any collusion, conspiracy, connivance, or unlawful agreement any advantage against (Recipient), or any person interested in the proposed Contract; 5. The price or prices quoted in the attached Bid are fair and proper ar not tainted by any collusion, conspiracy, connivance, or unlawful agreement on the part of the Bidder o any oth r of its agents, re entatives, owners, employees or parties in interest,including his affidavit. ,,�� By: Pierre Daoust Title: President Sworn and subscribed to before me this 12th day of October , 19 99 ,in the State of Florisla County of Orange . (/ C4444_ C& Notary Public ei,tiN Miriam Burgos ' * :;r*My Commission CC74�3 My Commission Expires: 17�- i �� ya„,,,Expires May 13,2002 END OF SECTION 00480-1 SECTION 00481 CERTIFICATION OF NONSEGREGATED FACILITIES The Bidder certifies that he does not maintain or provide for his employees any segregated facilities at any of his establishments, and that he does not permit his employees to perform their services at any location, under this control, where segregated facilities are maintained. The Bidder certifies further that he will not maintain or provide for his employees any segregated facilities at any of his establishments, and that he will not permit his employees to perform their services at any location under his control where segregated facilities are maintained. The Bidder agrees that a breach of this certification will be a violation of the Equal Opportunity clause in any contract resulting from acceptance of this Bid.As used in this certification,the term"segregated facilities"means any waiting rooms,work areas,restrooms and washrooms, restaurants and other eating areas, timeclocks, locker rooms and other storage and dressing areas, parking lots, drinking fountains, recreation or entertainment area, transportation, and housing facilities provided for employees on the basis of race, color, religion, or national origin, because of habit, local custom, or otherwise. The Bidder agrees that(except where he has obtained identical certification from proposed subcontractors for specific time periods) he will obtain identical certifications from proposed subcontractors prior to the award of subcontracts exceeding $10,000 which are not exempt from the provisions of the Equal Opportunity clause, and that he will retain such certifications in his files. The nondiscriminatory guidelines as promulgated in Section 202,Executive Order 11246,and as amended by Executive Order 11375 and as amended,relative to Equal Opportunity for all persons and implementations of rules and regulations prescribed by the United States Secretary of Labor are incorporated herein. Note: The penalty for making false statements in offers is prescribed in 18 U.S 4. 1 01. Date October 12, , 1999 DC Proj & ons ion Management Inc. Official Address By: Pi PrrP fanuSt- (including Zip Code): President (Title) kiK Miriam Burgos, Witness ATTACH AND INCLUDE AS PART OF PROPOSAL FORM; FAILURE TO DO SO MAY BE CAUSE FOR DISQUALIFICATION OF YOUR BID. END OF SECTION 00481-1 I SECTION 00482 (Page 1 of 2) SWORN STATEMENT UNDER SECTION 287.133(3)(a), FLORIDA STATUTES,ON PUBLIC ENTITY CRIMES THIS FORM MUST BE SIGNED IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICER AUTHORIZED TO ADMINISTER OATHS. 1. This sworn statement is submitted to City of Ocoee,Florida by Pierre Daoust, President (Print individual's Name&Title) whose business address is 9101 International Drive, Suite 1010 Orlando, Florida 32819 2. I understand that a "public entity crime" as defined in Paragraph 287.133(1)(g), Florida Statutes, means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or with the United States, including,but not limited to, any bid or contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state or of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering,conspiracy,or material representation. 3. I understand that "convicted" or "conviction" as defined in Paragraph 287.133(1)(b), Florida Statutes, means a finding Jf guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trial court of record relating to charges brought by indictment or information after July 1, 1989, as a result of a jury verdict,nonjury trial,or entry of a plea of guilty or nolo contendere. 4. I understand that an"affiliate"as defined in Paragraph 287.133(1)(a),Florida Statutes,means: a. A predecessor or successor of a person convicted of a public entity crime:or b. An entity under the control of any natural person who is active in the management of the entity and who has been convicted of a public entity crime. The term "affiliate" includes those officers, directors, executives, partners,shareholders, employees,members,and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair market value under an arm's length agreement,shall be a prima facie case that one person controls another person. A person who knowingly enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shall be considered an affiliate. 5. I understand that a "person" as defined in Paragraph 287.133(1)(e), Florida Statutes means any natural person or entity organized under the laws of any state or of the United States with the legal power to enter into a binding contract and which bids or applies to bid on contracts for the provision of goods or services let by a public entity, or which otherwise transacts or applies to transact business with a public entity. The term "person" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in management of an entity. 6. Based on information and belief,the statement which I have marked below is true in relation to the entity submitting this sworn statement. (please indicate which statement applies). Neither the entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in management of the entity, nor 00482-1 any affiliate of the entity have been charged with and convicted of a public entity crime subsequent to July 1, 1989. The entity submitting this sworn statement, or one or more of the officers,directors, executives, partners, shareholders, employees, members, or agents who are active in management of the entity, or an affiliate of this entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. The entity submitting this sworn statement, or one or more of the officers,directors, executives,partners, shareholders, employees, members, or agents who are active in management of the entity, or an affiliate of this entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. However,there has been a subsequent proceeding concerning the conviction before a Hearing Officer of the State of Florida,Division of Administrative Hearings. The final order entered by the Hearing Officer determined that it was not in the public interest to place the entity submitting this sworn statement on the convicted vendor list. (Please attach a copy of the final order.) I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 1 (ONE) ABOVE IS FOR THAT PUBLIC ENTITY ONLY AND,THAT THIS FORM IS VALID THROUGH Present . I ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FL RIDA STATUTES FOR CATEGORY TWO OF CHANGE IN THE INFORMATION CONTAINED IN THIS FORM. r (Signature) Pierre Daoust, President Date: October 12, 1999 DC Project & Construction Management Inc. Name of Bidder(Contractor) STATE OF Florida COUNTY OF Orange • PERSONALLY APPEARED BEFORE ME,the undersigned authority, Pierre Daoust • who,after first being sworn by me,affixed his/her signature in the place provided above on this 12th day of October , 19 99 — I ...11(xilitavnic...._44/1_ce2." Notary Public Miriam Burgo g Ma My Commission Expires: Y 13, 2002 END OF SECTION • 00482-2 SECTION 00483 CERTIFICATION OF NONDISCRIMINATORY LABOR PRACTICES This certification relates to a construction contact proposed by the City of Ocoee. Equal Opportunity Employment: The Contractor shall not discriminate on the basis of race, color, national origin,gender,age,handicapped status,veteran status,and/or religion in performing the work governed by this contract. The City is an Equal Opportunity Employer(EOE)and as such encourages all contractors to comply with EOE regulations. Any subcontract the Contractor may enter into shall include this clause with the same degree of application being encouraged. I am the undersigned prospective on contractor or subcontractor. I certify that... (1) I -haemo have not participated in a previous contract or subcontract subject to the Equal Opportunity Clause and (2) If I have participated in a previous contract or subcontract subject to the Equal Opportunity Clause,I have/ have not filed with the Joint Reporting Committee,the Director of the Office of Federal Contract Compliance Programs, or the Equal Employment Opportunity Commission all reports due under the applicable filing requirements. I understand that,if I have participated in a previous contract or subcontract subject to the Equal Opportunity Clause and have failed to file all reports due under the applicable filing requirements,I am not eligible, and will not be eligible,to have my bid or offer considered, or to enter into the proposed contact or subcontract, unless and until I make an arrangement regarding such reports that is satisfactory to the office where the reports are required to be filed. I agree that I will obtain identical certifications from prospective lower-' nstruction subcontractors when I receive bids or offers or initiate negotiations for any lower-tier construction su with a price exceeding$10,000. I also agree that I will retain such certifications in my files. DateOctober 12, . 19 99 By: Le (Signature of Authorized Official) Pierre Daoust, President DC Project & Construction Management Inc. (Name of Prospective Construction Contractor or Subcontractor) 9101 International Drive, Suite 1010 (Address of Prospective Construction Contractor or Subcontractor) Orlando, Florida 32819 407/352-6588 59-3470939 (Telephone Number) (Employer Identification Number) END OF SECTION 00483-1 En c) Project 86 Construction Management Inc. October 12, 1999 Project: City of Ocoee Vehicle and Material Storage Building Alternate Price(s) Please consider the following alternates and adjust our base bid accordingly. 1. Use alternate overhead doors Deduct $ l-';e60.02-- Sincerely, DC PRO C CONSTRUCTION MANAGEMENT INC. Pierre Daoust,B. Adm. President PD/mb lack Miller NFTWORR rook GRE NIMBI Lknae Number.CG920897 9101 -International Drive, Suite 1010, Orlando, Florida, 32819 ='(407) 352-6588 (407) 352-0730 1(407) 719-6795 www.dcproject.com Four Generations in Construction a-mail:pierre(a dcproject.com DATE SUBMITTED: I 0 ? X11 NAME OF BIDDER: W t4 tr K (-45r-121 SECTION 00300 BID FORM SUBMITTED: J v" r 2 q q (Date) PROJECT IDENTIFICATION: CITY OF OCOEE,FLORIDA VEHICLE AND MATERIAL STORAGE BUILDING NAME OF BIDDER: `A/E k-. C :z ¢O r o iJ 1:36, I Ear . BUSINESS ADDRESS: S•C A;rn- F'- PHONE NO.: (q V 4-) 0 CONTRACTOR'S FLORIDA LICENSE NO.: 'C G - L 0 g b'2• THIS BID IS SUBMITTED TO: City of Ocoee,Florida(hereinafter called Owner) 1. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Amendment to the Agreement with Owner in the form included in the Contract Documents, to perform and furnish all Work as specified or indicated in the Contract Documents for the Contract Price and within the Contract Time indicated in this Bid Form and the Amendment to the Agreement, and in accordance with the other terms and conditions of the Contract Documents. 2. Bidder accepts all of the terms and conditions of the Bidding Documents including without limitation those dealing with the disposition of Bid Bond. This Bid will remain open for ninety (90) calendar days after the day of Bid opening. BIDDER will sign and deliver the required number of counterparts of the Amendment to the Agreement with the Bonds and other documents required by the Bidding Requirements within ten (10) days after the date of OWNER'S Notice of(Intent to)Award. 3. In submitting this Bid, Bidder makes all representations required by the Instructions to Bidders and the Agreement and further warrants and represents that: a. Bidder has examined copies of all the Bidding Documents and of the following Addenda: • No. I Dated 9/t 4- No._ Dated No. Dated ((pi- No. Dated_ No. 3 Dated/0/8 No. Dated_ No. 4' Dated itva No._ Dated_ (Receipt of all which is hereby acknowledged)and also copies of the Invitation for Bids and the Instructions to Bidders. b. Bidder has familiarized itself with the nature and extent of the Contract Documents, Work,site, locality,and all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance or furnishing the Work. c. BIDDER has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface of subsurface structures at or 00300-1 DATE SUBMITTED: I 1 NAME OF BIDDER: ioC-(ter, t t•-tP_10 contiguous to the site (except Underground Facilities) which have been identified in the SupplemenUtry Conditions as provided in paragraph 4.2.1 of the General Conditions. BIDDER accepts the determination set forth in paragraph SC-4.2 of the Supplementary Conditions of the extent of the"technical data"contained in such reports and drawings upon which BIDDER is entitled to rely as provided in paragraph 4.2 of the Genel-a1 Conditions. BIDDER acknowledges that such reports and drawings are not Contract Documents and may not be complete for BIDDER's purposes. BIDDER acknowledges that OWNER and Engineer do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Bidding Documents with respect to Underground Facilities at or contiguous to the site. d. BIDDER has obtained and carefully studied(or assumes responsibility for having done so)all such additional or supplementary examinations, investigations,explorations,tests,studies and data concerning conditions(surfae, subsurface and Underground Facilities)at or contiguous to the site or otherwise which may affect cost progress, performance or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences and procedures of construction to be employed by BIDDER and safety precautions and programs incident thereto. BIDDER does not consider that any additional examinations, investigations, explorations, tests, studies or data are necessary for the determination of this Bid for performance and furnishing of the Wdrk in accordance with the times,price and other terms and conditions of the Contract Documents. e. BIDDER is aware of the general nature of Work to be performed by OWNER and others at the site that relatjes to Work for which this Bid is submitted as indicated in the Contract Documents. f. BIDDER has correlated the information known to BIDDER, information and observations obtained from visits to the site, reports and drawings identified in the Contract Documents and all additional examinations, investigations,explorations,tests,studies and date with the Contract Documents. g. BIDDER has given ENGINEER written notice of all conflicts, errors, ambiguities or discrepancies that BIDDER has discovered in the Contract Documents and the written resolution thereof by ENGINEER acceptable to BIDDER, and the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work for which this Bid is submitted. h. This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, fine or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization nr corporation; BIDDER has not directly or indirectly induced or solicited any other Bidder to submit a farce Or sham Bid; BIDDER has not solicited or induced any person, firm or corporation to refrain from bidding; and BIDDER has not sought by collusion to obtain for itself any advantage over any other Bidder or over OWNER. i. BIDDER hereby agrees to commence WORK under this contract on or before a date to be specified in the NOTICE TO PROCEED and to fully complete all work of the PROJECT within the Contract Time specifejd in the Amendment to the Agreement (Section 00500B). BIDDER further accepts the provisions of the Amendment to the Agreement as to liquidated damages and agrees to pay as liquidated damages the amount stated in the Amendment to the Agreement(Section 00500B),for each consecutive calendar day completion of the Work is delayed. Completion Schedule 1) The Project shall be substantially complete (successful pressure testing and bacteriological testing Of completed water mains) 1 one-hundred&eighty(180)consecutive calendar days from the official Notice to Proceed. 00300-2 DATE SUBMITTED: I 0 - iG-c` Zei NAME OF BIDDER: [uf,�7Ct4�-� c.IZ 2) The Project shall be finally complete(Completed and Ready for Final Payment)two-hundred & seventy (270)days from the official Notice to Proceed. 4. All bid items shall include all materials, equipment, labor, permit fees, taxes, tests, miscellaneous costs of all types, overhead,and profit for the item to be complete,in place,and ready for operation in the manner contemplated by the Contract Documents. Bidder submits the following TOTAL BID OR TOTAL BASE BID to perform all the Work as required by the Drawings and Specifications. 5. In accordance with Article 17 of the Instructions to Bidders, if the Contract is to be awarded, it will be awarded on the basis of the lowest"Total Base Bid"after adjustments for additive or deductive alternates. Additive or deductive alternates(if any)will be considered in determining the lowest responsive, responsible Bidder. The Owner reserves the right to accept any or all additive or deductive alternates,in his sole discretion,prior to the award of the Contract. The Owner also reserves the right to delete any portion of the Work as shown in the bid schedule prior to award and adjust each bidder's"Total Bid"accordingly. 6. The following documents are made a condition of this Bid: a. Bidding Documents and shall include the following: 1. Bid Forms(entire Section 00300,00301,00301A and 00301B) 2. Bid Bond(Surety Bond or Cashier's Check). (Section 00410) 3. Corporate Authority to execute Bid 4. Power of Attorney(for Surety Bond only) 5. Noncollusion Affidavit(Section 00480) 6. Certification of Nonsegregated Facilities(Section 00481) 7. Sworn Statement on Public Entity Crimes(Section 00482) 8. Certification of Nondiscriminatory Labor Practices(Section 00483) b. Executed "Part A,Contract to Perform Continuing Construction Services(dated August,1998)" (Remainder of Page Left Blank Intentionally.) 00300-3 DATE SUBMITTED: 10- `2 - c11 NAME OF BIDDER: c,A ,4 ps4& Pa ( ge Left Blank Intentionally.) 00300-4 y t,4 0°1) II U i. H 0 Q ' 0 o ^ E.-. . 4- ") g , ,r; v N .7 Q Q v a, E 0 O 0 L� z v' (� o 0 -.I '"' = , c L, yr t y 4) 4 ,a ^$ .... -) 1 tz, ,..• t b. v_.7% a En w Z Ati o ° ow - AE w og = g o j H w XI a o CI o 2 p U Z cn W U E w > b En — 1 0 ° E c� + C 0- 'i '¢ � t' •0 E U ° 0 w - C N w N O 3 N ^..� 0 ° . 0 b4 O c C 7 E 69 ¢ a°i Q Y b 0 U c X G CD E > ° 2 w a a c 0 0 Q O € c o • HQ 2a c7 5 U coo U Q co 0� 0 0 o d in V • w Zcn 0:1 o - wW H E o z coo s o 0 cu Z a I li it .J II C. s p.J k _tp 11) 03 Q• .• 65W oz 0 H � o z ^ UN. , 4'v 4- til 04 z0 OOr oi) r M N 41 .7:: , 1,,r1 ? Q ± ^.D A 4 0 ,--7s, ,,, 8 , 2, , a, Lr f ., , 4 t i '" t t,)\': A ,),,- .-:', ,r, 'rr n — u . ,.., g--, 1 2 , 6 r"" Fr _ i— At1 fZ e j ti) 3 uo w EWA• W . . a 4.. U a Ap � AOaG4 v ' Oo ,:t.. w a rcv opp o,r — W ` een r. IrlFE"' WN o A . Q o xU c) U2 Q p t x W cs J o _ o > a v > o � E a C a) —s a) E (24 Q V. cG )E t- 0? ^ U °? a) E E E- 7 Y a' c w a .n o 0 " 3 3 CEi co b a� w C W o a as ° E a as 3 ° 09 o w �- co Ca c c a c ° on ..00zi LQ H Q W W W c4 W at W Ca N an0 r.-- oo Q o N t*1 hZ°' O O O Q Q Qz / a IIII ro y 00 Era_ M .a I 4) y� S 0 r I, ri � Q I 0 Q Q II C 0 •� r 0c4 _ 2 r4 \f4 U O r9 y y r s N .1 , Z cry ,t 1 It 3 /� w W L: L A CA rn w W Q o `• W O d M M e 79 kn „'vD - G H N N — M .O W U C4 W a O � � o o G4 C w .a ›- w o CZ) d o 44 C..) =• o A w U 1 x 0 O U v, y v • p N U cd C 0 co c vl co ¢ I 5 ohs so U UNdo M w>, NCD fV 0. F- H kn W .b O in r--- oo O O N- N M z CA 5 W U I U 0 � I 5 I W !, on II G a. V SII ca � ddSd 'I T Q W I'I H Q I o Z cA L'i t/v�7 a c ,0 N 9 N 3 � § Vi H z n 2 4 N '`,, t j\ 4 a '5 tu N 0 � `�Z M` 4 M v. T cL J4 a) N v. r U -a a 9 c ct ss i, 2 - '` A E m U' -a ,. va W `w E -w0 — c0H rugaoaUX r;.T. a 0 '4 OweI a0W `d ,.... A CD � . r rno - u) - g E CI y UU € E � o x U- fl ., J o Hill f'1 S R. . .5 7 q .go S' N o 0 au N Q L 0^ i N C Q y c'j w C7 o © 7 U bA cC N U C Awa H c cd }' 5 n = ;fl Cq cu o 68 m 7 _ = rzaw 2 w ai E CZ o d m W w .— ON N 11 Z 0 0 r. E� it Q I � U U O II m as • • ami -1 c N v 3 Qcs E— E— c7:1 —E— C� CO CO k" O Qz N DATE SUBMITTED: NAME OF BIDDER: Instructions: Strike out(X)nonapplicable signature block and complete applicable block. (ALL SIGNATORIES MUST HAVE THEIR NAMES PRINTED OR TYPED BELOW THEIR SIGNATURES) If Bidder is: SOLE PROPRIETORSHIP (SEAL) (Individual's Signature) (Individual's Name) doing business as Business Address: Phone No.: Florida License No.: A PARTNERSHIP (SEAL) (Partnership Name) (General Partner's Signature) (General Partner's Name) Business address: Phone No.: Florida License No.: 00300-14 DATE SUBMITTED: ( 0-- ci NAME OF BIDDER: UJZ->c,t{ 7. The terms used in this Bid,which are defined in the General Conditions or Instructions of the Construction Contract, included as part of the Contract Documents have the meanings assigned to them in the General Conditions or Instructions. 8. The work shall be performed under a Florida Contractor's License. Contract shall not be awarded unlessP roof of valid license(s)is provided. 9. It is understood that where quantities for unit price work have been presented in the foregoing Schedule of Bid Items, they are approximate only and are solely for purpose of facilitating the comparison of bids, and that the Contractor's compensation will be computed upon the basis as described in the measurement and payment clauses in the specifications contained herein. 10. BASE BID-SCHEDULE OF MANUFACTURERS/SUPPLIERS If the foregoing Schedule of Bid Items is presented in a Base Bid format, the undersigned as Bidder agrees that the Contract, if awarded, will be on the basis of the materials and equipment named in the Contract Documents in accordance with Article 9 of the Instructions to Bidders. The undersigned as Bidder also agrees that for the "Base Bid"equipment and material items listed below the Bidder will provide one of the listed manufacturers/suppliers,by circling "A", "B", or "C". If the Bidder desires to propose an alternate manufacturer/supplier, he may write in the name of such alternate in the substitution list included within this Bid Form, but he must, nevertheless, also circle one of the listed manufacturers/suppliers. If the proposed alternate manufacturer/supplier is determined "not equivalent" by the Engineer, the Bidder must furnish equipment and/or material items by the circled manufactur- er/supplier. If the Bidder fails to indicate which listed manufacturer/supplier he intends to use if an alternate is rejected, he must use the manufacturer/supplier listed as "A". Also, if the Bidder circled more than one listed manufacturer/supplier,he must use the first manufacturer/supplier circled(unless an alternate is approved). 11. SUBSTITUTIONS AND"OR EQUAL" The undersigned as Bidder agrees that substitutions or "or-equal" items will not be considered until after the "Effective Date of the Agreement"and will be evaluated in accordance with paragraphs 6.7.1, 6.7.2,and 6.7.3 of the General Conditions. In addition to the reimbursement required under the General Conditions, the Contractor shall also reimburse the Owner for any engineering costs directly attributable to the change in manufacturers/suppliers, caused by the acceptance of proposed alternates, such as; additional field trips for the Engineer, additional redesign costs, and additional review costs, etc. Other costs directly attributable to the change in manufacturers/suppliers caused by the acceptance of proposed alternates, such as; increased electrical requirements, larger building, additional pumps or tankage, etc., shall be borne by others and not the Owner. If Bidder intends to propose substitutions or "or-equal" items after the "Effective Date of the Agreement", it is agreed that these items will be listed on the Substitution List included within this Bid Form,with a deductive amount representing 50 percent of the total savings between the named Base Bid item and the proposed item. "Base Bid" item substitutions providing to the Owner an equipment or material cost savings of less than $1,000 will not be considered. The undersigned as Bidder,also agrees that if a substitution or"or-equal" item is not listed on the Substitution List included with the Bid, all of the savings between the named item and the proposed item will go to the Owner if the Owner accepts the proposed item in accordance with paragraphs 6.7.1., 6.7.2, and 6.7.3 of the General Conditions. The Owner may request,and the undersigned Bidder shall supply,complete information on proposed substitutions. Such information shall be the manufacturer's current published or preprinted information for the specific substitution. 12. As BIDDER, I hereby certify that I am aware and understand that the City of Ocoee at its sole discretion reserves the right to waive technicalities or irregularities, to reject any or all Bids, and/or to accept that Bid which is in the best interest of the City. The Award of this Bid, if made,may be based on considerations other than total cost, and may be awarded based on various considerations, including but not limited to: BIDDER experience and whether the Bid, in the judgement of the City, is the most responsive to City needs. The City of Ocoee encourages the use of minorities and women-owned businesses as subcontractors. 00300-15 DATE SUBMITTED: 10 - q1 NAME OF BIDDER: ttii-,c H f-".tvte-k Ccs I~p Instructions: Strike out(X)nonapplicable signature block and complete applicable block. (ALL SIGNATORIES MUST HAVE THEIR NAMES PRINTED OR TYPED BELOW THEIR SIGNATURES) If Bidder is: A CORPORATION 'N C.(4 Nr R K Cort-t1 a r -n ►.l (Corporation Name) Ft-O R I h A (State of Incorporation) By -1 GUYrt.Ii4i (Name of person authorized to sign) t �`� I .-_N T (..W (Title) (Authorized Signature) (Corporate Seal) //� Attest � (z_ (Secretary) � Business address: i 7 3 l i I `> N:E Au _ S. A uii-n t. 3%I ( 7 Phone No.: (9 o 4-) -304- to (r7 r7 Corporation President: 3 NA E-S W eS C ere Florida License No.: LO i c o ^ ¢ 4-1 - b ^'z,i (-0 00300-15 1 DATE SUBMITTED: I V I� "Cl NAME OF BIDDER: Loesc t AAs.l& Instructions: Strike out(X)nonapplicable signature block and complete applicable block. (ALL SIGNATORIES MUST HAVE THEIR NAMES PRINTED OR TYPED BELOW THEIR SIGNATURES) If Bidder is: A JOINT VENTURE By (Name) (Address) By (Name) (Address) Business Address: II Phone No.: Florida License No.: It I (Each joint venturer must sign. The manner of signing for each individual,partnership,and corporation that is a party to the joint venture should be in the manner indicated above.) Florida License No.: 12. List the following in connection with the Surety which is providing the Bid Bond: Surety's Name: s F�-'-'- t" (3 c — �5 N Surety's Address: 2/ V q Fit r�C.,tlt ‹m (Sat_ a, 8o3 Name and address of Surety's resident agent for service of process in Florida: 12-Ati N Ara rel S END OF SECTION 00300-16 SECTION 00301 QUESTIONNAIRE DATE: I 0-( -5 5. PROJECT IDENTIFICATION: CITY OF OCOEE, FLORIDA VEHICLE AND MATERIAL STORAGE BUILDING NAME OF BIDDER: Uoe CA4-M k (-ff0 r-po v‘- -tt c5 J BUSINESS ADDRESS: (_73 L 3 I S CvN-t.,cv f ) S .11 Atirn i•qW P. 32-111 Phone Nord 4-) 7 CONTRACTOR'S FLORIDA LICENSE NO. - C) —q-¢ I - - ? 1 —C) The undersigned warrants the truth and accuracy of all statements and answers herein contained. Include additional sheets if necessary. 1. Complete the following Table regarding experience with projects similar to the work contemplated under this Continuing Construction Services Agreement. Date of Client's Name&Address(Include Amount of Contract Name of Project.&Location', Contact Name and Phone Contract 7 Rik- C-^0-10p1 6(14r t=UV Nrti or- volus IA 811197 -Thm_01,_A L .e. t (( , 131 �I sotto A- 6, odo b. $. , F1. (7o4- - -73 -Sel pte tsca) 4 IbtC STPert,t4 Coowr4 ar v61041/11 1/719/171 P I t-n s o+:-► C-`7 3 L S 11 17© a o a �/k►1 k- p I '`cc.E r'7 S 1c �ti.►.r kAte 2es6t-15 (� we�-rn.e w tis C.c l r-� p a t3 s 411-1Lis CI 1 p,,twLis-rt 401 - 532,- I'z..I ‘. Z. Tool eoo P-e•kovPeri bo Co "issg6IJ Ctrti OF Co..-)s oX> f3 C N Mitel3 0-12 5 Z 000 00p et_ 4-o-7-1 O — 34-8 c t Liu& d pit. (� u�wrkst 4A Coc,w14 or olusl i 5(r 131 l t Soft-C, NSO, �" `ion-- Q 73G - 5`��� `��000 00301-1 5. List the names and addresses of the subcontractors to be used for the portions of the contemplated work listed I, above. • Subcontractor Certification Subcontract Name and Address of Subcontractor Registration No. &Name 4-t ts W'51.`-‘14.- 5T . �L6tt'h►L �ov-�w(2v-fs. zit. 00 t Zsi-ri r-OLu1Le•it Oc.c.C c"Loh.►h la COWST'Wuc Twos/ COM"cti-C-r " tYttcstau-. V>.o. CS vg) 15b � 6 q GAe,o e-6`�L c ,mobs FL. A.sp�� c- Mr �Donr. �l- W do•414t. Ettiotto poop ikt.r ,e„uret- cert4 tiss Co_ or O DS FL. 37 7 ( 5 2E44.&44 w 1 �I he mak-NSt41C-0 '� C&rrCr`- t>aC6- 6. Disclosure (Section 00100, Article 20). Complete and attach "Sworn Statement on Public Entity Crimes" (Section 00482). 7. State the true and exact, correct, and complete name under which you do business. BIDDER IS: G---5 C14 ',IX/1/412k_ tzpait-Art t til END OF SECTION 00301-3 SECTION 00301-A COMPLIANCE WITH FLORIDA TRENCH SAFETY ACT (90-96,LAWS OF FLORIDA) Bidder hereby acknowledges that all costs for complying with the Florida Trench Safety Act are included in the various items of the bid and in the Lump Sum Total Bid Price shown in Section 00300 -Bid Form, "Schedule of Bid Items". For informational purposes only,the bidder is required to further identify these costs in the summary below. Trench Safety Unit of Measure Measure Unit Unit Extended (Description) (LF,SY) (Quantity) Cost Cost A el-c At/4..11 01.1 Lid Z $ • O $ B Fog.PA frrz � $ zo0 $ c geos< tVLtLAbEs u/ A Li S $ 4oa $ D $ $ TOTAL $ BIDDER: U.)CSG 6A ttn,+A-ulik Cek13 DY SIGNED: BY: WLScb!'>j (Print or type name) TITLE: 1::)(12%1 AS 1—)tr DATE: O'k Z —cjcr of this form is togather information on the costs associated with trench THIS IS NOT A PAY ITEM: The purpose safety measures and to insure that the Bidder has considered these costs and included them in the Lump Sum Total Bid price. Contractor will not receive additional payment if actual quantities differ from those estimated or if the Contractor', uses a safety measure different than those listed. (Failure to Complete This Form May Result in the Bid Being Declared Non-Responsive.) END OF SECTION 00301A-1 SECTION 00301-B DRUG-FREE WORKPLACE CERTIFICATION IDENTICAL TIE BIDS: Preference shall begiven to businesses with drug-free workplace programs. Whenever two or g kP P �s more bids which are equal with respect to price, quantity, and service are received by the State or by any political subdivision for the procurement of commodities or contractual services,a bid received from a business that certifies that !, it has implemented a drug-free workplace program shall be given preference in the award process. Established procedures for processing tie bids will be followed if none of the tied vendors have a drug-free workplace program (Florida Statutes Section 287.037). In order to have a drug-free workplace program,a business shall: 1. Publish a statement notifying employees that the unlawful manufacture,distribution,dispensing,possession,or use of a controlled substance is prohibited in the workplace and specifying the actions that will be taken against employees for violations of such prohibition. 2. Inform employees about the dangers of drug abuse in the workplace, the business's policy of maintaining a drug-free workplace,and available drug counseling,rehabilitation,and employee assistance programs, and the penalties that may be imposed upon employees for drug abuse violations. 3. Give each employee engaged in providing the commodities or contractual services that are under bid a copy of the statement specified in subsection(1). 4. In the statement specified in subsection (1), notify the employees that, as a condition of working on the commodities or contractual services that are under bid,the employee will abide by the teens of the statement and will notify the employer of any conviction of, or pleas of guilty or nolo contendere to, any violation of Chapter 893 or of any controlled substance law of the United States or any state,for a violation occurring in the workplace no later than five(5)days after such conviction. 5. Impose a sanction on, or require the satisfactory participation in a drug abuse assistance or rehabilitation program is such is available in the employee's community,by any employee who is so convicted. 6. Make a good faith effort to continue to maintain a drug-free workplace through implementation of this section. As the person authorized to sign the statement,I certify that this firm complies fully with the above requirements. Bidder: W SSG b4 ll"AM-41. Cc>41)o (LNC[Di) Signed: • w"— By: (L)C.,4..... -s wt�s CI (Print or Type Name) Title: 122CA k 4 Z`'v`'r Date: (U' I,— —1 9 END OF SECTION 00301-B-1 SECTION 00480 NONCOLLUSION AFFIDAVIT STATE OF ) ss COUNTY OF ) R woes ( J C SCl-t€ ,being first duly swore deposes and says that: 1. He(it)is the b t511— (Owner,Partner,Office,Representative or Agent) of (-X-,ESc t4 v-� ,1� `r3 i2,D • ,the Bidder that has submitted the attached Bid; 2. He is fully informed respecting the preparation and contents of the attached Bid and of all pertinent circumstances respecting such Bid; 3. Such Bid is genuine and is not a collusive or sham Bid; 4. Neither the said Bidder nor any of its officers, partners, owners, agents, representatives, employees, or parties in interest, including this affidavit, have in any way, colluded, conspired, connived or agreed, directly or indirectly, with any other Bidder, firm or person to submit a collusive or sham Bid in connection with the Contract for which the attached Bid has been submitted; or to refrains from bidding in connection with such Contract; or have in any manner,directly or indirectly,sought by agreement or collusion,or communication, or conference with any Bidder, firm,or person to fix the price or prices in the attached Bid or of any other Bidder,or to fix any overhead,profit,or cost elements of the Bid price or the Bid price in any other Bidder, or to secure through any collusion, conspiracy, connivance, or unlawful agreement any advantage against (Recipient), or any person interested in the proposed Contract; 5. The price or prices quoted in the attached Bid are fair and proper and are not tainted by any collusion, conspiracy, connivance, or unlawful agreement on the part of the Bidder or any other of its agents, representatives, owners, employees or parties in interest,including his affidavit. By: C Title: (rtes ibt-p Sworn and subscribed to before me this I day of c C DO 1,, 19 ,in the State of -1 1 ,County of V 0\ t CL Shawna M.Rees ► �!� :. MY COMMISSION#CC828630 EXPIRES N\CUOTADC (20--(213 April 21,2003 Notary Public %tic `' BONDED THRU TROY FAIN INSURANCE,INC My Commission Expires: 14 l Z I - 03 END OF SECTION 00480-1 SECTION 00481 CERTIFICATION OF NONSEGREGATED FACILITIES The Bidder certifies that he does not maintain or provide for his employees any segregated facilities at any of his !I establishments, and that he does not permit his employees to perform their services at any location, under this control, where segregated facilities are maintained. The Bidder certifies further that he will not maintain or provide for his employees any segregated facilities at any of his establishments, and that he will not permit his employees to perform their services at any location under his control where segregated facilities are maintained. The Bidder agrees that a breach of this certification will be a violation of the Equal Opportunity clause in any contract resulting from acceptance of this Bid.As used in this certification,the term"segregated facilities"means any waiting rooms,work areas,restrooms and washrooms, restaurants and other eating areas, timeclocks, locker rooms and other storage and dressing areas, parking lots, drinking fountains, recreation or entertainment area, transportation, and housing facilities provided for employees on the basis of race, color, religion, or national origin, because of habit, local custom, or otherwise. The Bidder agrees that(except where he has obtained identical certification from proposed subcontractors for specific time periods) he will obtain identical certifications from proposed subcontractors prior to the award of subcontracts exceeding$10,000 which are not exempt from the provisions of the Equal Opportunity clause, and that he will retain such certifications in his files. The nondiscriminatory guidelines as promulgated in Section 202,Executive Order 11246,and as amended by Executive Order 11375 and as amended,relative to Equal Opportunity for all persons and implementations of rules and regulations prescribed by the United States Secretary of Labor are incorporated herein. Note: The penalty for making false statements in offers is prescribed in 18 U.S.C. 1001. Date O— (Z ' , 19 M?. 6t.,C Official Address By: J 056A'` (including Zip Code): 'PR. ES t A Eq—)T- 1 7 q-)T'17 3 G, 3 5 cAtv., Acv E • (Title) . D, -rc,N ra , r—t.- '3 Z t t i PART OF PROPOSAL FORM; FAILURE TO DO SO MAY BE ATTACH AND INCLUDE AS CAUSE FOR DISQUALIFICATION OF YOUR BID. END OF SECTION 00481-1 SECTION 00482 (Page 1 of 2) SWORN STATEMENT UNDER SECTION 287.133(3)(a), FLORIDA STATUTES,ON PUBLIC ENTITY CRIMES THIS FORM MUST BE SIGNED IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICER AUTHORIZED TO ADMINISTER OATHS. 1. This sworn statement is submitted to City of Ocoee,Florida by ,yam. C - , (Print individual's Name&Title) whose business address is I: iv i3 S S L✓`-, .tel / 5fa�� .- ' I 2. I understand that a "public entity crime" as defined in Paragraph 287.133(1)(g), Florida Statutes, means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any !I public entity or with an agency or political subdivision of any other state or with the United States,including,but not limited to, any bid or contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state or of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering,conspiracy,or material representation. 3. I understand that "convicted" or "conviction" as defined in Paragraph 287.133(1)(b), Florida Statutes, means a fmding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trial court of record relating to charges brought by indictment or information after July 1, 1989, as a result of a jury verdict,nonjury trial,or entry of a plea of guilty or nolo contendere. 4. I understand that an"affiliate"as defined in Paragraph 287.133(1)(a),Florida Statutes,means: a. A predecessor or successor of a person convicted of a public entity crime:or b. An entity under the control of any natural person who is active in the management of the entity and who has been convicted of a public entity crime. The term "affiliate" includes those officers, directors, executives, partners,shareholders,employees,members,and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of li equipment or income among persons when not for fair market value under an arm's length agreement,shall be a prima facie case that one person controls another person. A person who knowingly enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shall li be considered an affiliate. 5. I understand that a "person" as defined in Paragraph 287.133(1)(e), Florida Statutes means any natural person or entity organized under the laws of any state or of the United States with the legal power to enter into a binding contract and which bids or applies to bid on contracts for the provision of goods or services let by a public entity,or which otherwise transacts or applies to transact business with a public entity. The term "person" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in management of an entity. 6. Based on information and belief,the statement which I have marked below is true in relation to the entity submitting this sworn statement. (please indicate which statement applies). Neither the entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in management of the entity, nor 00482-1 any affiliate of the entity have been charged with and convicted of a public entity crime subsequent July 1, 1989. q to The entity submitting this sworn statement, or one or more of the officers, directors, executives, partners, shareholders, employees, members, or agents who are active in management of the entity, or an affiliate of this entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. The entity submitting this sworn statement, or one or more of the officers, directors, executives,partners, shareholders, employees, members, or agents who are active in management of the entity, or an affiliate of this entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. However,there has been a subsequent proceeding concerning the conviction before a Hearing Officer of the State of Florida,Division of Administrative Hearings. The fmal order entered by the Hearing Officer determined that it was not in the public interest to place the entity submitting this sworn statement on the convicted vendor list. (Please attach a copy of the final order.) I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 1 (ONE) ABOVE IS FOR THAT PUBLIC ENTITY ONLY AND,THAT THIS FORM IS VALID THROUGH I o l(-/2 ?(I ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES FOR CATEGORY TWO OF CHANGE IN THE INFORMATION CONTAINED IN THIS FORM. (Signature) Date: 10-11. — Vi Ll:.t_rt ti-�ertt,j`_ a, 0 t,..,,t J C� -, / iv,,•L s V_1r-S P Ott--;s Name of Bidder(Contractor) s STATE OF --i'j t_-'1''l CtCk_ '`'�„� MY COMMISSION#CC828630 EXPIRES /_ X: - € April 21,2003 COUNTY OF Y LC.-i �.� '•'. p BONDED THRU TROY FAIN INSURANCE,INC PERSONALLY APPEARED BEFORE ME,the undersigned authority,J ck V .`_S \A.k j C.h l C= who,after first being sworn by me,affixed his/her signature in the place provided above on this / /1 1 day of £. 40, /,- ..--, /C.-7,1-4t,/' I , 19 C ,iriciA,01-0 Pc)(2.4V Notary Public My Commission Expires: H z�/ c'i END OF SECTION 00482-2 SECTION 00483 CERTIFICATION OF NONDISCRIMINATORY LABOR PRACTICES This certification relates to a construction contract proposed by the City of Ocoee. Equal Opportunity Employment: The Contractor shall not discriminate on the basis of race, color, national origin,gender,age,handicapped status,veteran status,and/or religion in performing the work governed by this contract. The City is an Equal Opportunity Employer(EOE)and as such encourages all contractors to comply with EOE regulations. Any subcontract the Contractor may enter into shall include this clause with the same degree of application being encouraged. I am the undersigned prospective construction contractor or subcontractor. I certify that... (1) I have/ X have not participated in a previous contract or subcontract subject to the Equal Opportunity Clause and (2) If I have participated in a previous contract or subcontract subject to the Equal Opportunity Clause,I have/ have not filed with the Joint Reporting Committee,the Director of the Office of Federal Contract Compliance Programs, or the Equal Employment Opportunity Commission all reports due under the applicable filing requirements. I understand that,if I have participated in a previous contract or subcontract subject to the Equal Opportunity Clause and have failed to file all reports due under the applicable filing requirements, I am not eligible, and will not be eligible,to have my bid or offer considered, or to enter into the proposed contract or subcontract, unless and until I make an arrangement regarding such reports that is satisfactory to the office where the reports are required to be filed. I agree that I will obtain identical certifications from prospective lower-tier construction subcontractors when I receive bids or offers or initiate negotiations for any lower-tier construction subcontracts with a price exceeding$10,000. I also agree that I will retain such certifications in my files. Date I U — 172-- , 19 i By: (Signature of Authorized Official) W Lis ct-t. Catkfbtuivri a (Name of Prospective Construction Contractor or Subcontractor) (73 fs. Btccv 1r., AvG . S. 95Prtabr'0`', PL 32.liv/ (Address of Prospective Construction Contractor or Subcontractor) OA-) 364--c (17 59 348 c 71i-$ (Telephone Number) (Employer Identification Number) END OF SECTION 00483-1 FROM ,+4ESCiI'ARK CORPORAT ION PI-IOhE NO. : 904 760 9948 Sep. 09 1999 11:1491M 3 SECTION 00410 • BID BOND KNOW ALL MEN BY THESE PRESENTS, that we, the undersigned, We s c hma r k Corpora tion as Principal,and Frontier Insurance Company _, as Surety, are hereby held and firmly bound unto the City of Ocoee, Florida,as Owner in the penal sum ofofer7ffnt of the Contract Bid • • - - • • . •• - - • • • -• 1 11 for payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors and assigns. Signed,this 12th day of October , 19 9 9 . The condition'of the above obligation is such that whereas the Principal has submitted to the City of Ocoee, Florida a certain Bid, attached hereto and hereby made a part hereof to enter into a contract in writing,for the City of Ocoee Vehicle and Material Storage Building. NOW THEREFORE • 1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to pay to Owner upon default of Bidder any difference between the total amount of Bidder's bid and the total amount of the bid of the next lowest, responsible and responsive bidder as • determined by Owner for the Work required by the Contract Documents, provided that: 1.1. If there is o such next lowest, responsible and responsive bidder, and Owner does not abandon the Project, then Bidder and Surety shall pay to Owner the penal sum set forth on the face of this Bond, and 1.2. In no event shall Bidder's and Surety's obligation hereunder exceed the penal sum set forth on the face of this Bond. 2: Default of Bidder shall occur upon the failure of Bidder to deliver within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the•executed Amendment to the Agreement required by the Bidding Documents and any performance and payment bonds required by the • Bidding Documents and Contract Documents. 3. This obligation shall be null and void if: 3.1. Owner accepts Bidder's bid and Bidder delivers within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Amendment to the Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents and Contract Documents,or r i 3.2. All bids arc rejected by Owner,or 3.3. Owner fails to issue a Notice of Intent to Award to.Bidder within ninety(90) days from the time and date fixed for the opening of Bids(or any extension thereof agreed to in writing by Bidder and, if applicable, consented to by Surety when required by paragraph 5 hereof). • 4. Payment under this Bond will be due and payable upon default by Bidder and within thirty (30)calendar days after receipt by Bidder and Surety of written notice of default from Owner, which notice will be given with reasonable promptness, identifying this Bond and the Project and including a statement of the amount due. • 00410-1 SEP 9 '99 11:04 904 760 9948 PAGE.003 I', FROM ,: WESCHMARK CORPORAT I,ON PHONE NO. : 904 760 9948 Sep. 09 1999 11:15AM P4 5. Surety waives notice of any and all defenses based on or arising out of any time extension to issue notice of award agreed to in writing by Owner and Bidder, provided that the total time for issuing notice of award Including extensions shall not in the aggregate exceed 120 days from Bid Due Date without Surety's written cometh. 6. No suit or action shall be commenced under this bond prior to 30 calendar days after the notice of default required in paragraph 4 above is received by Bidder and Surety and in no case later than one year after Bid Due Date. 7. Any suit or actual under this Bond shall be commenced only in a court of competent jurisdiction located in the state in which the Project is located. 8. Notices required hereunder shall be in writing and sent to Bidder and Surety at their respective addresses shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier or by United States Registered or Certified Mail, return receipt requested, postage pre-paid, and shall be deemed to be effective upon receipt by the party concerned. ' I 9. Surety shall cause to be attached to this Bond, a current and effective Power of Attorney evidencing the authority of the officer, agent or representative who executed this Bond on behalf of Surety to execute, seal and deliver such Bond and bind the Surety thereby. 10. This Bond is intended to conform to all applicable statutory requirements. Any applicable requirement of any applicable statue that has been omitted from this Bond shall be deemed to be included herebi as If set forth at length. If any provision of this Bond conflicts with any applicable provision of any applicable statute, then the provision of said statute stall govern and the remainder of this Bond that is not in conflict therewith shall continue in full force and effect. 11. The term "bid"as used herein includes a bid,offer or proposal as applicable. IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals, and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be sighed by their proper officers, the day and year first set forth above. • it .. � a 00410.2 ■ SEP 9 '99 11:05 904 760 9948 PAGE.0041 FROM : I,ESC.4MARK CORPORATION PHONE NO. : 904 760 9948 Sep. 09 1999 11:16AM P5 0-R BIDDER: trike out (X) non - applicable signature block and complete applicable block. All signatures , ust have their names printed or typed below their signature. �. If Bidder is SOLE PROPRIERTORSHIP. complete this signature block �,. (I) (In ' 's Signature) (Witness) (individual's Name) (winless) doing business as ( L) ( • Address) We elepbone No.) (Florida License No.) • aIN if Bidder is PARTNERSHIP.complete this signature block.ass (1) (Partnership Name) (Wimess) .. (2) (General Partner's cure) .`knees) (General Partner's Name) (SEAL) (:. as Address) elepbone No.) (Florida License No.) 00410-3 SEP 9 '99 11.05 904 760 9948 PAGE.0051, FROM : L.ESC-q`1ARK CORPORATION PHONE: NJ. : Jb4 7bb V .413 Sep. U lyyy 11:1bHM F'b ..- If Bidder It a CORPORATION,owlets this signature block. ATTEST: . — Weschmark Corporation I (Corpoar on Name) Corporate Si ertatu e) So. Daytona Florida (sem of Incorporation) .....1100AAIN esc l't� (Corporate Secremrq Name) By; James Wesche (Name of person authorized to sign-see Note 1) eut James Wesche, President ( ) (COI/PORAM SEAL) (AudwrZum) • (eorporadan Presidead 1736 ' scayne Avenue South Daytona, Florida 32119 (Bushnoes Addews) (904) 304-6177 GG-c.DSS?6'i— • (Tokphons No.) Merida License No.) • • • III • eat 00410-4 me SEP 9 '99 11:06 904 760 9948 PAGE.006 FROM. : WESCHMARK CORPORAT ION PHONE NO. : 904 760 9948 Sep. 09 1999 11:1(HM t'f SURETY: • WITNESS: (if Agent is not a Corporation) Frontier Insurance Company (1) (Surety Business Name) (Wi. -. ) (2) it i mess Nashv le, T ipal Business), aia/4 ATTEST; (If Agent is a Corporation) (Surety Agent's -See Note 2) Bradley Harris (Surety Agent's Nano) (Corporate Secretary Signature) Attorney In Fact and .Florida (Surety Agent's Tide) (Corporals Secretary Name) ------ `r Resident Agent Security Bond Associates, Inc. (Business Name of Local Agent for Surety) :mg (CORPORATE SEAL) 2909 Fairgreen Street • Orlando, F (L o32s803ress�Local ) • ( 407) 896 1162 A111883 (Telephone No.) (Florida License No.) • NOTES: (1) Complete and attach "Corporate Authority to Execute Documents" if executed by any corporate employee • other than president or vice-president. (2) Complete and attach a certified copy of "Power-of-Attorney" prepared by Surety appointment individual "Attorney-in-Fact" for execution of Bid Bond on behalf of Surety and corresponding notarized "Attorney- in-Fact". (3) Above addresses are to be used for giving required notice. "' (4) Any singular reference to Bidder, Surety, Owner or other party shall be considered plural where applicable. (5) Surety companies executing bonds must appear on the Treasury Department's most current list (Circular 570 as amended)and be authorized to transact business in the state where the project is located. 00410-5 SEP 9 '99 11:06 904 760 9948 PAGE.007 SECTION 00501 CORPORATE AUTHORITY TO EXECUTE DOCUMENTS I HEREBY CERTIFY that a meeting of the Board of Directors of C.P-1 S(: * Co (Contractor's Corporate Name) a corporation under the laws of the State of FL do i b p ,held on the 30 day of /4-P fit L 19 9 1,the following r solution was duly passed and adopted: "RESOLVED,that c (signature of individual) (typed name of individual) As Pi(t.Es t (sTtNC- of the corporation,is hereby authorized to execute and all documents required (title) to be signed by an officer of the Corporation in order to submit a valid bid,contract and bond for O Co Ct v et-fid 6- vim€-rte►rad STbc�. & (3 Lvy6 - (project name) between the CITY OF OCOEE,a municipal corporation,and this corporation,and that his execution thereof, attested by the Secretary of the corporation and with corporate seal affixed shall be the official act and deed of this corporation." I FURTHER CERTIFY that said resolution is now in full force and effect. IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the corporation this Z- day of bC,T , 19 4 c' . (CORPORATE SEAL) r, I (Corporate Secretary) - STATE OF -t\- p da_ \f COUNTY OF 0\USS`10- The foregoing instrument was acknowledged before me this ty of CSC' pQ_\ , 199 by --: (YDS SCS►... (name of officer or agent,title of officer or agent),of \f v C''SCA,N`V\Cj f-, CIO Y f - (name of corporation acknowledging),a (state or place of incorporation) corporation, on behalf of the corporation. He/She is personally known to me or has produced identification (type of identification)as identification and did/did not take an oath. 7 4110Wilia MY COMMf b1d�elite! • �t�b3p /62/ (Notary Public) liONab#4469141,•20,P. ....... 2� AlNIU�grywC -/ D My Commission Expires: END OF SECTION 00501-1 • O 47°rantier INSURANCE COMPANY ROCK HILL,NEW YORK 12775-8000 (A Stock Company) POWER OF ATTORNEY 4ituty All ,I*iett l;u C..hese Presents: That FRONTIER INSURANCE COMPANY, a New York Corporation, having its principal o ice in Rock Hill,New York,pursuant to the following resolution,adopted by the Board of Directors of the Corporation on the 4th day of November,19:5: "RESOLVED,that the Chairman of the Board,the President,or any Vice President be,and hereby is,authorized to appoint Attorneys-in- Fact to represent and act for and on behalf of the Company to execute bonds,undertakings,recognizances and other contracts of indemnity and writings obligatory in the nature thereof,and to attach thereto the corporate seal of the Company,in the transaction of its surety business; "RESOLVED,that the signatures and attestations of such officers and the seal of the Company may be affixed to any such Power of Attorne or to any certificate relating thereto by facsimile,and any such Power of Attorney or certificate bearing such facsimile signatures or facsimil seal shall be valid and binding upon the Company when so affixed with respect to any bond,undertaking,recognizance or other contract o indemnity or writing obligatory in the nature thereof; "RESOLVED,that any such Attorney-in-Fact delivering a secretarial certification that the foregoing resolutions still be in effect may insert i such certification the date thereof,said date to be not later than the date of delivery thereof by such Attorney-in-Fact." This Power of Attorney is signed and sealed in facsimile under and by the authority of the above Resolution. DOES HEREBY MAKE,CONSTITUTE AND APPOINT: BRADLEY HARRIS of Orlando ,in the State of Florida its true and lawful Attorney(s)-in-Fact with full power and authority hereby conferred in its name,place and stead to sign,execute,acknowled,te and deliver in its behalf,and as its act and deed,without power of redelegation,as follows: Bonds guaranteeing the fidelity of persons holding places of public or private trust;guaranteeing the performance of contracts other tha insurance policies;and executing or guaranteeing bonds and undertakings required or permitted in all actions or proceedings or by la allowed;IN AN AMOUNT NOT TO EXCEED THREE MILLION FIVE HUNDRED THOUSAND($3,500,000.00)DOLLARS;and to bind FRONTIE INSURANCE COMPANY thereby as fully and to the same extent as if such bond or undertaking was signed by the duly authorized officers• FRONTIER INSURANCE COMPANY,and all the acts of said Attorney(s)-in-Fact pursuant to the authority herein given are hereby ratified an confirmed. 3n pitiless whereof,FRONTIER INSURANCE COMPANY of Rock Hill,New York,has caused this Power of Attorney to be signed by its Pr-sident and its Corporate seal to be affixed this 17th day of February ,19 94 FRONTIER INSURANCE COMPANY F2' $EAL'� 1, diki/t ` 1162 Ey.ye va_` BY: State of New York WALTER A.RHULEN,President County of Sullivan ss.: On this 17th day of February ,19 94 ,before the subscriber,a Notary Public of the State .f New York in and for the County of Sullivan,duly commissioned and qualified,came WALTER A.RHULEN of FRONTIER INSURANCE COMPANY t me personally known to be the individual and officer described herein,and who executed the preceding instrument,and acknowledged th- execution of the same,and being by me duly sworn,deposed and said,that he is the officer of the Company aforesaid,and that the seal affixed to th- preceding instrument is the Corporate Seal of the Company,and the Corporate Seal and signature as an officer were duly affixed and subscribed t• the said instrument by the authority and direction of the Corporation,and that the resolution of the Company,referred to in the preceding instrumen, is now in force. elin (`testimony phereof,I have hereunto set my hand,and affixed my official seal at Rock Hill,New York,the day and year above writte . p11130 o CHRISTINE I.LANE ':F -45 Notary Public State of New York Sullivan County Clerk's No.1996 Commission Expires May 2,1998 CERTIFICATION I,JOSEPH P.LOUGHLIN,Secretary of FRONTIER INSURANCE COMPANY of Rock Hill,New York,do hereby certify that the foregoing Resolution adopted by the Board of Directors of this Corporation and the Powers of Attorney issued pursuant thereto,are true and correct,and that both the Resolution and the Powers of Attorney are in full force and effect. of fitness ilii hereof, I have hereunto set my hand and affixed the facsimile seal of the corporation this 12th day .f October ,1999 ��,.,,,,•„'„ �- • Op il_Ln__ ! 'Sµl >1 �• ' �q POq FM 19-5002-A(4/96) ' JOSEPH P.LOUGHLIN,Secretary „•`""'^^""'" • DATE SUBMITTED: 10/1/99 NAME OF BIDDER: CANCO GENERAL CONTRACTORS, INC. SECTION 00300 BID FORM SUBMITTED: OCTOBER 12, 1999 (Date) PROJECT IDENTIFICATION: CITY OF OCOEE,FLORIDA VEHICLE AND MATERIAL STORAGE BUILDING NAME OF BIDDER: CANCO GENERAL CONTRACTORS, INC. BUSINESS ADDRESS: 7616 SOUTHLAND BLVD. PHONE NO.: 407-251-5320 SUITE 105-A, ORLANDO, FL 32809 CONTRACTOR'S FLORIDA LICENSE NO.: CG CO34164 THIS BID IS SUBMITTED TO: City of Ocoee,Florida(hereinafter called Owner) 1. The undersigned Bidder proposes and agrees, if this Bid is accepted,to enter into an Amendment to the Agreement with Owner in the form included in the Contract Documents, to perform and furnish all Work as specified or indicated in the Contract Documents for the Contract Price and within the Contract Time indicated in this Bid Form and the Amendment to the Agreement, and in accordance with the other terms and conditions of the Contract Documents. 2. Bidder accepts all of the terms and conditions of the Bidding Documents including without limitation those dealing with the disposition of Bid Bond. This Bid will remain open for ninety (90) calendar days after the day of Bid opening. BIDDER will sign and deliver the required number of counterparts of the Amendment to the Agreement with the Bonds and other documents required by the Bidding Requirements within ten (10) days after the date of OWNER'S Notice of(Intent to)Award. 3. In submitting this Bid, Bidder makes all representations required by the Instructions to Bidders and the Agreement and further warrants and represents that: a. Bidder has examined copies of all the Bidding Documents and of the following Addenda: No. 1 Dated 9/14/99 No. Dated_ No. 2 Dated 10/4/99 No._ Dated No. 3 Dated 10/8/99 No. Dated No. 4 Dated 10/11/99 No. Dated (Receipt of all which is hereby acknowledged)and also copies of the Invitation for Bids and the Instructions to Bidders. b. Bidder has familiarized itself with the nature and extent of the Contract Documents,Work,site, locality,and all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance or furnishing the Work. c. BIDDER has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface of subsurface structures at or 00300-1 DATE SUBMITTED: 10/12/99 NAME OF BIDDER: CANCO GENERAL CONTRACTORS, INC. contiguous to the site (except Underground Facilities) which have been identified in the Supplementary Conditions as provided in paragraph 4.2.1 of the General Conditions. BIDDER accepts the determination set forth in paragraph SC-4.2 of the Supplementary Conditions of the extent of the "technical data"contained in such reports and drawings upon which BIDDER is entitled to rely as provided in paragraph 4.2 of the General Conditions. BIDDER acknowledges that such reports and drawings are not Contract Documents and may not be complete for BIDDER's purposes. BIDDER acknowledges that OWNER and Engineer do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Bidding Documents with respect to Underground Facilities at or contiguous to the site. d. BIDDER has obtained and carefully studied(or assumes responsibility for having done so)all such additional or supplementary examinations, investigations, explorations,tests, studies and data concerning conditions(surface, subsurface and Underground Facilities)at or contiguous to the site or otherwise which may affect cost progress, performance or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences and procedures of construction to be employed by BIDDER and safety precautions and programs incident thereto. BIDDER does not consider that any additional examinations, investigations, explorations, tests,studies or data are necessary for the determination of this Bid for performance and furnishing of the Work in accordance with the times,price and other terms and conditions of the Contract Documents. e. BIDDER is aware of the general nature of Work to be performed by OWNER and others at the site that relates to Work for which this Bid is submitted as indicated in the Contract Documents. f. BIDDER has correlated the information known to BIDDER, information and observations obtained from visits to the site, reports and drawings identified in the Contract Documents and all additional examinations, investigations,explorations,tests,studies and date with the Contract Documents. g. BIDDER has given ENGINEER written notice of all conflicts, errors, ambiguities or discrepancies that BIDDER has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to BIDDER, and the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work for which this Bid is submitted. h. This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; BIDDER has not directly or indirectly induced or solicited any other Bidder to submit a farce or sham Bid; BIDDER has not solicited or induced any person, firm or corporation to refrain from bidding; and BIDDER has not sought by collusion to obtain for itself any advantage over any other Bidder or over OWNER. i. BIDDER hereby agrees to commence WORK under this contract on or before a date to be specified in the NOTICE TO PROCEED and to fully complete all work of the PROJECT within the Contract Time specified in the Amendment to the Agreement (Section 00500B). BIDDER further accepts the provisions of the Amendment to the Agreement as to liquidated damages and agrees to pay as liquidated damages the amount stated in the Amendment to the Agreement(Section 00500B), for each consecutive calendar day completion of the Work is delayed. Completion Schedule 1) The Project shall be substantially complete (successful pressure testing and bacteriological testing of completed water mains) 1 one-hundred&eighty(180)consecutive calendar days from the official Notice to Proceed. 00300-2 DATE SUBMITTED: 10/12/99 NAME OF BIDDER: CANCO GENERAL CONTRACTORS, INC. 2) The Project shall be finally complete(Completed and Ready for Final Payment)two-hundred& seventy (270)days from the official Notice to Proceed. 4. All bid items shall include all materials, equipment, labor, permit fees,taxes, tests, miscellaneous costs of all types, overhead,and profit for the item to be complete, in place,and ready for operation in the manner contemplated by the Contract Documents.Bidder submits the following TOTAL BID OR TOTAL BASE BID to perform all the Work as required by the Drawings and Specifications. 5. In accordance with Article 17 of the Instructions to Bidders, if the Contract is to be awarded, it will be awarded on the basis of the lowest"Total Base Bid"after adjustments for additive or deductive alternates. Additive or deductive alternates(if any)will be considered in determining the lowest responsive,responsible Bidder. The Owner reserves the right to accept any or all additive or deductive alternates,in his sole discretion,prior to the award of the Contract. The Owner also reserves the right to delete any portion of the Work as shown in the bid schedule prior to award and adjust each bidder's"Total Bid"accordingly. 6. The following documents are made a condition of this Bid: a. Bidding Documents and shall include the following: 1. Bid Forms(entire Section 00300,00301,00301A and 00301B) 2. Bid Bond(Surety Bond or Cashier's Check). (Section 00410) 3. Corporate Authority to execute Bid 4. Power of Attorney(for Surety Bond only) 5. Noncollusion Affidavit(Section 00480) 6. Certification of Nonsegregated Facilities(Section 00481) 7. Sworn Statement on Public Entity Crimes(Section 00482) 8. Certification of Nondiscriminatory Labor Practices(Section 00483) b. Executed "Part A,Contract to Perform Continuing Construction Services(dated August,1998)" (Remainder of Page Left Blank Intentionally.) 00300-3 DATE SUBMITTED: 10/12/99 NAME OF BIDDER: CANCO GENERAL CONTRACTORS, INC. (Page Left Blank Intentionally.) 00300-4 U a) a e 0 0 0 C 0 0 0 0 0 tn 0 cv E,,, .0 0 H ri o v V', 69 I a) H U N C1, E H 'a Z , .13 1- a 0 a U Z A as cn W w - a a ADO g aQ � w ,IWWd rn o WAU "4 x p U z W U x Z > b H = 'O 'U - 0 o O o^ 0 •.G CQ o C O •0 ^ C H 0 >a > b �o A N Q c o • c Y o an o aN (.s9 p oz � b.CW a.) C cu C C) o x 0 N C C Q ctip/ C 0 a,"---• b p Q • Q (7 C U Ga U 0 77).... O rn c 0 O g0 Zev O W W H 5 Q Q CQ 41 oZ >, Irs0 a� Y O O M O O V OA cd U z 0 O aQU O rn w rn U N O H U 0 z O Q' H U Q E— Qa • 0 Q Q • Z a) ci .0 O p N N N 4 M r1 0, 0 u n a) w�.. U a) C Z .5 a) y 2 0., O = v CD z A Ili as V) LT4 w a a ..a .a a a U a En c4 w0 18 w 18 . .s o w• Q a E. g — — N 00 N e N • EN E-1• ~ d cp W a m N O m w vX o U 2 U 4 w a U oNx W (3 2 H U) 0 = O O O U • ;7:1 C un C) N U t-. O a.+ O O Q+ 20 N E ..+ Q 4 • LK O a O v U U 2 a) C >O N >, rn w a) ... E E S.H > L 2 a)) — a) . U W Q• tii o a) .0 Q rx to c c a c 0 131) C wW rn '� cn o . e F D W W W c4 W W Ca p� 0 ;v o CO 0 o N m v wpq z ., r. r. ... .� .., oz CO iti C 0 c 00 .x o 0 pa 0 0 a) a) W a) cg a' U z H a 0 H U H H z 0 0 a za z w 00 z 0 U Q La F-- Q CO v) O ELI W Q Q 0 z t-. aa a+ rN,D 0 O O 0 H oo O �y .." E 0 0 0 cc cr. co H O o Z O O 4- kD H oo Ua) a P. = .0 E E = z U 0 i. O a3 C7 z A •c >- >- >- (1) w w V) V) OP w Q 4, RS t,.,, M M M M 11 O O ,al u un cel,.. 0 N N .� 4„ Oa Wa 0 O Q i V.4 � W CD ai O (.." H CDO CI 1, 1d V.4 U U z l Q w .4 U v `.I; z W H cc 0 0 U O. H U Z a) a) o Q a) OH. c o rn 0 U cd bOA n a" a`") b=A O d vii ...= i. O r-1 U ¢' O bOA C4 Q SL U a .D .o O raa W v a) U U U a) HQ E CI. o c N .) .a H .,_ i. a a x a. CO O oo N f� 0� FT H Ce W W .b • v, vo N 00 0, o N O NN N aaz as U U O O N V N O td) f3. U z N H H U H H z O U z z rn w m U O z 6 Fa O w CZ Ai to U Uv/) 1 [7j o . rn N — z in t A o 2 > a .E .0 vz i 0 a S. U -p L a o .4-• F4' IL r ,t J z ' e a1R o t- 0 ri cn 0 4.1 W C r if • OF 4.7; ❑ t, 111 6-1v rI' w 0' It )L M W• 0 = -b a ,-, tA ra W 0 +�- L A• E,.," N N a W U `z Y c U z cA a 3 8 0 a RS V �. 'i U U" N .= o cow 0 H T10y ° o GW s .v3) C/] > C tom. V) M o 0 Ea) N C'' C --i o cd E w o . H u Hill O U Q N cO bA 6. i0. p6„a ,.. E E c sc U Oyz 0 rn , b o O O ACU co C . N 4+ N i..1 0z E '.. o ca o bA 4. a ., O OVC � y = O 0 b ., pT te O Oa ' 74 I W (a • 3 wa O a o � E-1 E-.FQ c, • cd y Cl. t O = XI L, w E 2 cu o v O WW - • cci E"' 2 O N N m z woz F z ta .174 U U W O 0 Y c r 0) 0) by at 0 z 0 O d DATE SUBMITTED: i 0/19/99 NAME OF BIDDER: CANCO GENRAL CONTRACTORS, INC. 7. The terms used in this Bid,which are defined in the General Conditions or Instructions of the Construction Contract, included as part of the Contract Documents have the meanings assigned to them in the General Conditions or Instructions. 8. The work shall be performed under a Florida Contractor's License. Contract shall not be awarded unless proof of valid license(s)is provided. 9. It is understood that where quantities for unit price work have been presented in the foregoing Schedule of Bid Items, they are approximate only and are solely for purpose of facilitating the comparison of bids, and that the Contractor's compensation will be computed upon the basis as described in the measurement and payment clauses in the specifications contained herein. 10. BASE BID-SCHEDULE OF MANUFACTURERS/SUPPLIERS If the foregoing Schedule of Bid Items is presented in a Base Bid format, the undersigned as Bidder agrees that the Contract, if awarded, will be on the basis of the materials and equipment named in the Contract Documents in accordance with Article 9 of the Instructions to Bidders. The undersigned as Bidder also agrees that for the "Base Bid"equipment and material items listed below the Bidder will provide one of the listed manufacturers/suppliers, by circling "A", "B", or "C". If the Bidder desires to propose an alternate manufacturer/supplier, he may write in the name of such alternate in the substitution list included within this Bid Form, but he must, nevertheless, also circle one of the listed manufacturers/suppliers. If the proposed alternate manufacturer/supplier is determined "not equivalent" by the Engineer, the Bidder must furnish equipment and/or material items by the circled manufactur- er/supplier. If the Bidder fails to indicate which listed manufacturer/supplier he intends to use if an alternate is rejected, he must use the manufacturer/supplier listed as "A". Also, if the Bidder circled more than one listed manufacturer/supplier,he must use the first manufacturer/supplier circled(unless an alternate is approved). 11. SUBSTITUTIONS AND"OR EQUAL" The undersigned as Bidder agrees that substitutions or "or-equal" items will not be considered until after the "Effective Date of the Agreement"and will be evaluated in accordance with paragraphs 6.7.1,6.7.2,and 6.7.3 of the General Conditions. In addition to the reimbursement required under the General Conditions, the Contractor shall also reimburse the Owner for any engineering costs directly attributable to the change in manufacturers/suppliers, caused by the acceptance of proposed alternates, such as; additional field trips for the Engineer, additional redesign costs, and additional review costs, etc. Other costs directly attributable to the change in manufacturers/suppliers caused by the acceptance of proposed alternates, such as; increased electrical requirements, larger building, additional pumps or tankage, etc., shall be borne by others and not the Owner. If Bidder intends to propose substitutions or "or-equal" items after the "Effective Date of the Agreement", it is agreed that these items will be listed on the Substitution List included within this Bid Form,with a deductive amount representing 50 percent of the total savings between the named Base Bid item and the proposed item. "Base Bid" item substitutions providing to the Owner an equipment or material cost savings of less than $1,000 will not be considered. The undersigned as Bidder,also agrees that if a substitution or"or-equal" item is not listed on the Substitution List included with the Bid, all of the savings between the named item and the proposed item will go to the Owner if the Owner accepts the proposed item in accordance with paragraphs 6.7.1., 6.7.2, and 6.7.3 of the General Conditions. The Owner may request,and the undersigned Bidder shall supply,complete information on proposed substitutions. Such information shall be the manufacturer's current published or preprinted information for the specific substitution. 12. As BIDDER, I hereby certify that I am aware and understand that the City of Ocoee at its sole discretion reserves the right to waive technicalities or irregularities, to reject any or all Bids, and/or to accept that Bid which is in the best interest of the City. The Award of this Bid, if made,may be based on considerations other than total cost, and may be awarded based on various considerations, including but not limited to: BIDDER experience and whether the Bid, in the judgement of the City, is the most responsive to City needs. The City of Ocoee encourages the use of minorities and women-owned businesses as subcontractors. 00300-15- i DATE SUBMITTED: 10/12/99 NAME OF BIDDER: CANCO GENRAL CONTRACTORS, INC. Instructions: Strike out(X)nonapplicable signature block and complete applicable block. (ALL SIGNATORIES MUST HAVE THEIR NAMES PRINTED OR TYPED BELOW THEIR SIGNATURES) If Bidder is: SOLE PROPRIETORSHIP (SEAL) (Individual's Signature) (Individual's Name) doing business as Business Address: Phone No.: Florida License No.: A PARTNERSHIP (SEAL) (Partnership Name) (General Partner's Signature) (General Partner's Name) Business address: Phone No.: Florida License No.: 00300-14 • DATE SUBMITTED: 10/1 9/99 NAME OF BIDDER: CANCO GENRAL CONTRACTORS, INC. Instructions: Strike out(X)nonapplicable signature block and complete applicable block. (ALL SIGNATORIES MUST HAVE THEIR NAMES PRINTED OR TYPED BELOW THEIR SIGNATURES) If Bidder is: A CORPORATION CANCO GENERAL CONTRACTORS, INC. (Corporation Name) FLORIDA (State of Incorporation) By JOHN D. PRAHL (Name of person authorized to sign) PRESIDENT ),.211414..((Title) (Authorized Signature) (Corporate Seal) Attest ( retary) Business address: 7616 SOUTHLAND BOULEVARD, SUITE 105-A ORLANDO, FLORIDA 32809 Phone No.: 407-251-5320 Corporation President: JOHN D. PRAHL Florida License No.: CGC 034164 00300-15 r DATE SUBMITTED: 10/12/99 NAME OF BIDDER: CANCO GENERAL CONTRACTORS, INC. Instructions: Strike out(X)nonapplicable signature block and complete applicable block. (ALL SIGNATORIES MUST HAVE THEIR NAMES PRINTED OR TYPED BELOW THEIR SIGNATURES) If Bidder is: A JOINT VENTURE By (Name) (Address) By (Name) (Address) Business Address: Phone No.: Florida License No.: (Each joint venturer must sign. The manner of signing for each individual,partnership,and corporation that is a party to the joint venture should be in the manner indicated above.) Florida License No.: 12. List the following in connection with the Surety which is providing the Bid Bond: Surety's Name: HARTFORD ACCIDENT AND INDEMNITY COMPANY Surety's Address: HARTFORD PLAZA - P. 0. BOX 2103 HARTFORD, CONNECTICUT 06145 Name and address of Surety's resident agent for service of process in Florida: SURETY ASSOCIATES, INC. - JAMES C. CONGELIO 2110 HERSCHEL STREET JACKSONVILLE, FL 32204 END OF SECTION 00300-16 SECTION 00301 QUESTIONNAIRE DATE: 10/12/99 PROJECT IDENTIFICATION: CITY OF OCOEE, FLORIDA VEHICLE AND MATERIAL STORAGE BUILDING NAME OF BIDDER: CANCO GENERAL CONTRACTORS, INC. BUSINESS ADDRESS: 7616 SOUTHLAND BOULEVARD, SUITE 105-A ORLANDO, FLORIDA 32809 Phone No. 407-251-5320 CONTRACTOR'S FLORIDA LICENSE NO. CCC 034164 The undersigned warrants the truth and accuracy of all statements and answers herein contained. Include additional sheets if necessary. 1. Complete the following Table regarding experience with projects similar to the work contemplated under this Continuing Construction Services Agreement. Date of Client's Name& Address(Include Amount of Contract Name of Project&Location Contact Name and Phone#) Contract 00301-1 Date of Client's Name& Address(Include Amount of Contract Name of Project& Location Contact Name and Phone#) Contract 2. Havev ou y ever failed to complete work awarded to you? If so, where and why? NO 3. Have you personally inspected the general alignments of the various utility improvements proposed under this Continuing Construction Services agreement? Describe any anticipated problems with the sites and your proposed solutions. YES 4. Will you Subcontract any part of the work involving the construction of underground utilities? If so, describe which portions. YES ALL SITE UTILITIES 00301-2 1 5. List the names and addresses of the subcontractors to be used for the portions of the contemplated work listed above. Subcontractor Certification Subcontract Name and Address of Subcontractor Registration No. &Name AVnl%v• -Ftog.:q. 39(4 +-lu Co,n/JZ . L)CO PhC_Ri7E— -27(+6 ta14ci vv�a�i L 1 i t`-f2 6. Disclosure (Section 00100, Article 20). Complete and attach "Sworn Statement on Public Entity Crimes" (Section 00482). 7. State the true and exact, correct, and complete name under which you do business. BIDDER IS: CANCO GENERAL CONTRACTORS, INC. END OF SECTION 00301-3 SECTION 00301-A COMPLIANCE WITH FLORIDA TRENCH SAFETY ACT (90-96,LAWS OF FLORIDA) Bidder hereby acknowledges that all costs for complying with the Florida Trench Safety Act are included in the variou items of the bid and in the Lump Sum Total Bid Price shown in Section 00300 - Bid Form, "Schedule of Bid Items". For informational purposes only,the bidder is required to further identify these costs in the summary below. Trench Safety Unit of Measure Measure Unit Unit Extended (Description) (LF,SY) (Quantity) Cost Cost A AL L. $ $ p� B $ $ C $ $ D $ $ TOTAL $ BIDDER: CANCO GENERAL CONTRACTORS, INC. SIGNED: COAZU BY: JOHN D. PRAHL (Print or type name) TITLE: PRESIDENT DATE: 10/12/99 THIS IS NOT A PAY ITEM: The purpose of this form is to gather information on the costs associated with trench safety measures and to insure that the Bidder has considered these costs and included them in the Lump Sum Total Bid price. Contractor will not receive additional payment if actual quantities differ from those estimated or if the Contractor uses a safety measure different than those listed. (Failure to Complete This Form May Result in the Bid Being Declared Non-Responsive.) END OF SECTION 00301A-1 SECTION 00301-B DRUG-FREE WORKPLACE CERTIFICATION IDENTICAL TIE BIDS: Preference shall be given to businesses with drug-free workplace programs. Whenever two •r more bids which are equal with respect to price, quantity, and service are received by the State or by any politic,l subdivision for the procurement of commodities or contractual services,a bid received from a business that certifies th•t it has implemented a drug-free workplace program shall be given preference in the award process. Establishes procedures for processing tie bids will be followed if none of the tied vendors have a drug-free workplace pro u (Florida Statutes Section 287.037). In order to have a drug-free workplace program,a business shall: 1. Publish a statement notifying employees that the unlawful manufacture, distribution,dispensing,possession, o use of a controlled substance is prohibited in the workplace and specifying the actions that will be taken aga. employees for violations of such prohibition. 2. Inform employees about the dangers of drug abuse in the workplace, the business's policy of maintaining drug-free workplace,and available drug counseling,rehabilitation,and employee assistance programs, and th penalties that may be imposed upon employees for drug abuse violations. 3. Give each employee engaged in providing the commodities or contractual services that are under bid a copy o the statement specified in subsection(1). 4. In the statement specified in subsection (1), notify the employees that, as a condition of working on th- commodities or contractual services that are under bid,the employee will abide by the terms of the statemen and will notify the employer of any conviction of, or pleas of guilty or nolo contendere to, any violation o' Chapter 893 or of any controlled substance law of the United States or any state,for a violation occurring in the workplace no later than five(5)days after such conviction. 5. Impose a sanction on, or require the satisfactory participation in a drug abuse assistance or rehabilitation program is such is available in the employee's community,by any employee who is so convicted. 6. Make a good faith effort to continue to maintain a drug-free workplace through implementation of this section. As the person authorized to sign the statement,I certify that this firm complies fully with the above requirements. Bidder: CANCO GENERAL CONTRACTORS, INC. Signed: \IA•61 '/Ok( By: JOHN D. PRAHL (Print or Type Name) Title: PRESIDENT Date: 10/12/99 END OF SECTION 00301-B-1 SECTION 00480 NONCOLLUSION AFFIDAVIT STATE OF FLORIDA ) ss COUNTY OF HILI BORdUGH JOHN D.PRAHL ,being first duly swore deposes and says that: 1. He(it)is the PRESIDENT (Owner,Partner,Office,Representative or Agent) of CANCO GENERAL CONTRACTORS, INC. ,the Bidder that has submitted the attached Bid; 2. He is fully informed respecting the preparation and contents of the attached Bid and of all pertinent circumstances respecting such Bid; 3. Such Bid is genuine and is not a collusive or sham Bid; 4. Neither the said Bidder nor any of its officers, partners, owners, agents, representatives, employees, or parties in interest, including this affidavit, have in any way, colluded, conspired, connived or agreed, directly or indirectly, with any other Bidder, fine or person to submit a collusive or sham Bid in connection with the Contract for which the attached Bid has been submitted; or to refrains from bidding in connection with such Contract; or have in any manner,directly or indirectly, sought by agreement or collusion,or communication,or conference with any Bidder, firm,or person to fix the price or prices in the attached Bid or of any other Bidder,or to fix any overhead,profit,or cost elements of the Bid price or the Bid price in any other Bidder, or to secure through any collusion, conspiracy, connivance, or unlawful agreement any advantage against (Recipient), or any person interested in the proposed Contract; 5. The price or prices quoted in the attached Bid are fair and proper and are not tainted by any collusion, conspiracy, connivance, or unlawful agreement on the part of the Bidder or any other of its agents, representatives, owners, employees or parties in interest,including his affidavit. 0.414412 By: JO D. PRAHL Title: PRESIDENT Sworn and subscribed to before me this 12TH day of OCTOBER , 19 99 ,in the State of FLORIDA ,County of HILLSBOROUGH . t_04.1/ i • 42'.I/'• -444iotary Public My Co!' sion Expires: . \\"\\\\"\\:%"\\\\\\.\\\.\\\\\\\•\\\\\\\\\\\\\:},'°4r, Georgana D.Baldwin )) Notary Public,State of Florida )t ,` a Commission No.CC 637994 )< `E,``` My CommissionE OBfi ION Bonded Through Fla.Notary Scrvicc&Bonding Co. )t 00480-1 SECTION 00481 CERTIFICATION OF NONSEGREGATED FACILITIES The Bidder certifies that he does not maintain or provide for his employees any segregated facilities at any of h s establishments, and that he does not permit his employees to perform their services at any location, under this contr.l, where segregated facilities are maintained. The Bidder certifies further that he will not maintain or provide for h s employees any segregated facilities at any of his establishments, and that he will not permit his employees to perfo their services at any location under his control where segregated facilities are maintained. The Bidder agrees that . breach of this certification will be a violation of the Equal Opportunity clause in any contract resulting from acceptan•- of this Bid.As used in this certification,the term"segregated facilities"means any waiting rooms,work areas,restroo s and washrooms, restaurants and other eating areas, timeclocks, locker rooms and other storage and dressing are.•, parking lots, drinking fountains, recreation or entertainment area, transportation, and housing facilities provided f. employees on the basis of race, color, religion, or national origin, because of habit, local custom, or otherwise. Th- Bidder agrees that(except where he has obtained identical certification from proposed subcontractors for specific tim periods) he will obtain identical certifications from proposed subcontractors prior to the award of subcontra exceeding $10,000 which are not exempt from the provisions of the Equal Opportunity clause, and that he will rets' such certifications in his files. The nondiscriminatory guidelines as promulgated in Section 202,Executive Order 11246,and as amended by Executiv Order 11375 and as amended,relative to Equal Opportunity for all persons and implementations of rules and regulatio prescribed by the United States Secretary of Labor are incorporated herein. Note: The penalty for making false statements in offers is prescribed in 18 U.S.C. 1001. Date OCTOBER 12 , 19 99 . CO'yGENERAL..ONTRACTORS, INC. Official Address By: A (including Zip Code): JOHN il PRAHL PRESIDENT (Title) 7616 SOUTHLAND BOULEVARD, SUITE 105-A ORLANDO, FLORIDA 32809 ATTACH AND INCLUDE AS PART OF PROPOSAL FORM; FAILURE TO DO SO MAY BE CAUSE FOR DISQUALIFICATION OF YOUR BID. END OF SECTION 00481-1 SECTION 00482 (Page 1 of 2) SWORN STATEMENT UNDER SECTION 287.133(3)(a), FLORIDA STATUTES,ON PUBLIC ENTITY CRIMES THIS FORM MUST BE SIGNED IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICER AUTHORIZED TO ADMINISTER OATHS. 1. This sworn statement is submitted to City of Ocoee,Florida by JOHN D. PRAHL, PRESIDENT (Print individual's Name&Title) whose business address is 7616 SOUTHLAND BOULEVARD, SUITE 105-A ORLANDO, FLORIDA 32809 2. I understand that a "public entity crime" as defined in Paragraph 287.133(1)(g), Florida Statutes, means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or with the United States, including,but not limited to, any bid or contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state or of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering,conspiracy,or material representation. 3. I understand that "convicted" or "conviction" as defined in Paragraph 287.133(1)(b), Florida Statutes, means a finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trial court of record relating to charges brought by indictment or information after July 1, 1989,as a result of a jury verdict,nonjury trial,or entry of a plea of guilty or nolo contendere. 4. I understand that an"affiliate"as defined in Paragraph 287.133(1)(a),Florida Statutes,means: a. A predecessor or successor of a person convicted of a public entity crime:or b. An entity under the control of any natural person who is active in the management of the entity and who has been convicted of a public entity crime. The term "affiliate" includes those officers, directors, executives, partners,shareholders,employees,members,and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair market value under an arm's length agreement,shall be a prima facie case that one person controls another person. A person who knowingly enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shall be considered an affiliate. 5. I understand that a "person" as defined in Paragraph 287.133(1Xe), Florida Statutes means any natural person or entity organized under the laws of any state or of the United States with the legal power to enter into a binding contract and which bids or applies to bid on contracts for the provision of goods or services let by a public entity,or which otherwise transacts or applies to transact business with a public entity. The term "person" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in management of an entity. 6. Based on information and belief,the statement which I have marked below is true in relation to the entity submitting this sworn statement. (please indicate which statement applies). xxx Neither the entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in management of the entity, nor 00482-1 any affiliate of the entity have been charged with and convicted of a public entity crime subsequent t July 1, 1989. The entity submitting this sworn statement,or one or more of the officers, directors, executives,partner, shareholders, employees, members, or agents who are active in management of the entity, or an affiliat- of this entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. The entity submitting this sworn statement, or one or more of the officers, directors, executives. partner-, shareholders, employees,members, or agents who are active in management of the entity, or an affiliat of this entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. However,there has been a subsequent proceeding concerning the conviction before a Hearing Officer o the State of Florida,Division of Administrative Hearings. The final order entered by the Hearing Office determined that it was not in the public interest to place the entity submitting this sworn statement on th- convicted vendor list. (Please attach a copy of the final order.) I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR T I: PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 1 (ONE) ABOVE IS FOR THAT PUBLIC ENTITY ONL AND,THAT THIS FORM IS VALID THROUGH . I ALSO UNDERSTAND THAT I AM REQUIRE S TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES FOR CATEGORY TWO OF CHANGE IN THE INFORMATION CONTAINED IN THIS FORM. JOHN D. PRAH (Signature) PRESIDENT Date: OCTOBER 12, 1999 CANCO GENERAL CONTRACTORS, INC. Name of Bidder(Contractor) STATE OF FLORIDA COUNTY OF HILLSBOROUGH PERSONALLY APPEARED BEFORE ME,the undersigned authority, JOHN D. PRAHL who,after first being sworn by me,affixed his/her signature in the place provided above on this 12TH day of OCTOBER 1999 ' I .� >/ > 19, uvly iGeorgann D.Baldwin >; Notary Public,State of Florida >t •. , a Commission > My Commission Expires: � � _ �.,�:. 14ou 1od Through FI Sen ica&Rending:'o. J END OF SECTION `.7.�,»>>>.>,>>,>>.,�•.,> ; 00482-2 l SECTION 00483 CERTIFICATION OF NONDISCRIMINATORY LABOR PRACTICES This certification relates to a construction contract proposed by the City of Ocoee. Equal Opportunity Employment: The Contractor shall not discriminate on the basis of race, color, national origin,gender,age,handicapped status,veteran status,and/or religion in performing the work governed by this contract. The City is an Equal Opportunity Employer(EOE)and as such encourages all contractors to comply with EOE regulations. Any subcontract the Contractor may enter into shall include this clause with the same degree of application being encouraged. I am the undersigned prospective construction contractor or subcontractor. I certify that... (1) I xxx have/ have not participated in a previous contract or subcontract subject to the Equal Opportunity Clause and (2) If I have participated in a previous contract or subcontract subject to the Equal Opportunity Clause,I have/ xxx have not filed with the Joint Reporting Committee,the Director of the Office of Federal Contract Compliance Programs, or the Equal Employment Opportunity Commission all reports due under the applicable filing requirements. I understand that,if I have participated in a previous contract or subcontract subject to the Equal Opportunity Clause and have failed to file all reports due under the applicable filing requirements, I am not eligible,and will not be eligible,to have my bid or offer considered, or to enter into the proposed contract or subcontract, unless and until I make an arrangement regarding such reports that is satisfactory to the office where the reports are required to be filed. I agree that I will obtain identical certifications from prospective lower-tier construction subcontractors when I receive bids or offers or initiate negotiations for any lower-tier construction subcontracts with a price exceeding$10,000. I also agree that I will retain such certifications in my files. Date OCTOBER 12 , 19 99 By: (Signature of Authorized Official) JOHN D. PRAHL, PRESIDENT CANCO GENERAL CONTRACTORS, INC. (Name of Prospective Construction Contractor or Subcontractor) 7616 SOUTHLAND BOULEVARD, SUITE 105-A (Address of Prospective Construction Contractor or Subcontractor) ORLANDO, FLORIDA 32809 407-251-5320 59-2665182 (Telephone Number) (Employer Identification Number) END OF SECTION 00483-1 SECTION 00410 BID BOND KNOW ALL MEN BY THESE PRESENTS, that we, the undersigned, CANCO GENERAL CONTRACTORS INC. as Principal, and HARTFORD ACCIDENT AND INDEMNITY OM,pNy , as Surety, are hereby held an. firmly bound unto the City of Ocoee, Florida, as Owner in the penal sum of five percent of the Contract Bid Fi ccpercent of ellargest amount for which award can be made under the ($ 5% ) f.r payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors an. assigns. Signed, this 12th day of ober , 19 99 . The condition of the above obligation is such th.t whereas the Principal has submitted to the City of Ocoee, Florida a certain Bid, attached hereto and hereby mad. a part hereof to enter into a contract in writing, for the City of Ocoee Vehicle and Material Storage Building. NOW THEREFORE 1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators successors and assigns to pay to Owner upon default of Bidder any difference between the total amount o Bidder's bid and the total amount of the bid of the next lowest, responsible and responsive bidder .• determined by Owner for the Work required by the Contract Documents, provided that: 1.1. If there is o such next lowest, responsible and responsive bidder, and Owner does not abandon the Project, then Bidder and Surety shall pay to Owner the penal sum set forth on the face of this Bond, and 1.2. In no event shall Bidder's and Surety's obligation hereunder exceed the penal sum set forth on the face of this Bond. 2. Default of Bidder shall occur upon the failure of Bidder to deliver within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Amendment to the Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents and Contract Documents. 3. This obligation shall be null and void if: 3.1. Owner accepts Bidder's bid and Bidder delivers within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Amendment to the Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents and Contract Documents, or 3.2. All bids are rejected by Owner, or 3.3. Owner fails to issue a Notice of Intent to Award to Bidder within ninety (90) days from the time and date fixed for the opening of Bids (or any extension thereof agreed to in writing by Bidder and, if applicable, consented to by Surety when required by paragraph 5 hereof). 4. Payment under this Bond will be due and payable upon default by Bidder and within thirty (30) calendar days after receipt by Bidder and Surety of written notice of default from Owner, which notice will be given with reasonable promptness, identifying this Bond and the Project and including a statement of the amount due. 00410-1 BIDDER: trike out (X) non - applicable signature block and complete applicable block. All signatures ust have their names printed or typed below their signature. If Bidder is SOLE PROPRIERTORSHIP, complete this signature block (1) (Individual's Signature) (Witness) (2) (Individual's Name) (Witness) doing business as (SEAL) (Business Address) ( ) (Telephone No.) (Florida License No.) If Bidder is PARTNERSHIP,complete this signature block. (1) (Partnership Name) (Witness) (2) (General Partner's Signature) (Witness) (General Partner's Name) (SEAL) (Business Address) (Telephone No.) (Florida License No.) 00410-3 • SURETY: WITNESS: (If Agent is not a Corporation) HARTFORD AOCIDENT AND INDEMNITY COMPANY (I) (Surety Business Name) (Witness) Hartford Plaza — P.O. Box 2103 (2) (Witness) Hartford, Connecticut 06145 (Princi. I 'lace of Business) ATTEST: (If Agent is a Corporation) (Surety Agent's Signature-See Note 2) Janes C. Congeals) • ��n (Surety Agent's Name) o iraSe rotary Signature) .- ly J. 9j) ) ess Attorney-in-Fact & Florida Resident Agent o ) (Surety Agent's Tide) (Corporate Secretary Name) Debbie Jones, Witness Surety Associates, Inc. (Business Name of Local Agent for Surety) 2110 Herschel Street (CORPORATE SEAL) Jacksonville, Florida 32204 (Business Address of Local Agent) ( 904 ) 388-5002 731642 (Telephone No.) (Florida License No.) NOTES: (1) Complete and attach "Corporate Authority to Execute Documents" if executed by any corporate employee other than president or vice-president. (2) Complete and attach a certified copy of "Power-of-Attorney" prepared by Surety appointment individual "Attorney-in-Fact" for execution of Bid Bond on behalf of Surety and corresponding notarized "Attorney- in-Fact". (3) Above addresses are to be used for giving required notice. (4) Any singular reference to Bidder, Surety, Owner or other party shall be considered plural where applicable. (5) Surety companies executing bonds must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the state where the project is located. 00410-5 HARTFORD ACCIDENT AND INDEMNITY COMPANY Hartford,Connecticut POWER OF ATTORNEY Know all men by these Presents,That HARTFORD ACCIDENT AND INDEMNITY COMPANY,a corporation duly organized under the laws of the State of Connecticut,and having its principal office in the City of Hartford,County of Hartford,State of Connecticut,does hereby make,constitute and appoint A.B.LYNCH,JR.,JAMES C.CONGELIO, TOM S.LOBRANO,HII and BRADFORD WILLIAM BUSH of JACKSONVILLE,FLORIDA its true and lawful Attomey(s)-in-Fact,with full power and authority to each of said Attomey(s)-in-Fact,if more than one is named above, to sign, execute and acknowledge any and all bonds and undertakings on behalf of the Company in its business of guaranteeing the fidelity of persons holding places of public or private trust;guaranteeing the performance of contracts other than insurance policies; guaranteeing the performance of insurance contracts where surety bonds are accepted by states and municipalities,and executing or guaranteeing bonds and undertakings required or permitted in all actions or proceedings or by law allowed,and to bind HARTFORD ACCIDENT AND INDEMNITY COMPANY thereby as fully and to the same extent as if such bonds and undertakings and other writings obligatory in the nature thereof were signed by an Executive Officer of HARTFORD ACCIDENT AND INDEMNITY COMPANY and sealed and attested by one other of such Officers,and hereby ratifies and confirms all that its said Attomey(s)in Fact may do in pursuance hereof. This Power of Attorney is granted under and by authority of the By-Laws of HARTFORD ACCIDENT AND INDEMNITY COMPANY ("the Company")as amended by the Board of Directors at a meeting duly called and held on July 9,1997,as follows: ARTICLE IV SECTION 8.The President or any Vice-President or Assistant Vice President acting with any Secretary or Assistant Secretary,shall have power and authority to appoint,for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, one or more resident Vice-Presidents,resident Assistant Secretaries and Attorneys-in-Fact and at any time to remove any such Resident Vice- President,resident Assistant Secretary,or Attorney-in-Fact,and revoke the power and authority given to him. SECTION 11.Attorneys-in-Fact shall have power and authority,subject to the terms and limitations of the power of attorney issued to them, to execute and deliver on behalf of the Company and to attach the seal of the Company thereto any and all bonds and undertakings,and other writings obligatory in the nature thereof,and any such instrument executed by any such Attorney-in-Fact shall be as binding upon the Company as if signed by an Executive Officer and sealed and attested by one other of such Officers. RESOLVED, that the signatures of such Officers and the seal of the Company may be affixed to any such power of attorney or to any certificate relating thereto by facsimile,and any such power of attorney or certificate bearing such facsimile signatures or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by facsimile signatures and facsimile seal shall be valid and binding upon the Company in the future with respect to any bond or undertaking to which it is attached. In Witness Whereof,HARTFORD ACCIDENT AND INDEMNITY COMPANY has caused these presents to be signed by its Assistant Vice-President,and its corporate seal to be hereto affixed,duly attested by its Secretary,this 15th day September,1997. Attest: HARTFORD ACCIDENT AND INDEMNITY ,...0161(244:0A°:Friet04/00,79:0••••- Richard A.Hermanson,Secretary John F.Burke,Assistant Vice President STATE OF CONNECTICUT SS, COUNTY OF HARTFORD On this 15th day of September,A.D.1997,before me personally came John F.Burke,to me known,who being by me duly sworn,did depose and say: that he resides in the County of Hartford, State of Connecticut that he is the Assistant Vice President of HARTFORD ACCIDENT AND INDEMNITY COMPANY,the corporation described in and which executed the above instrument;that he knows the seal of said corporation;that the seal affixed to the said instrument is such corporate seal;that it was so affixed by order of the Board of Directors of said corporation and that he signed his name thereto by like order. STATE OF CONNECTICUT L$)&ica. X/ 40 SS. • Jean H.Wozniak COUNTY OF HARTFO RDNotary Public CERTIFICATE My Commission Expires June 30,2004 I, the undersigned, Secretary of HARTFORD ACCIDENT AND INDEMNITY COMPANY, a Connecticut Corporation, DO HEREBY CERTIFY that the foregoing and attached POWER OF ATTORNEY remains in full force and has not been revoked;and furthermore,that Article IV,Sections 8 and 11 of the By-laws of HARTFORD ACCIDENT AND INDEMNITY COMPANY,set forth in the Power of Attorney,are now in force. Signed and sealed at the City of Hartford. Dated the 12th day of October 19 99 Thif L 41,* Robert L.Post,Secretary Form S-4054-2 Printed in U.S.A. ACORD DATE(MMIDEVYY) NCERTIFICATE OF UABILITY INSURANCE 10/06/1999 PRCOUCER (904)388-1988 FAX (904)388-8199 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE Construction Insurance Corp. HOLDER.THIS CERTIFICATE DOES NOT AMEND,EXTEND OR 2110 Herschel St. ALTER THE COVERAGE AFFORDED BY THE POUCIES BELOW. Jacksonville, FL 32204 COMPANIES AFFORDING COVERAGE COMPANY Amerisure Insurance Group Attn: M. Sue Esser Ext: A INSURED Canco General Contractors, Inc. COMPANY 5407 Boran Place Tampa, FL 33610-2012 COMPANY COMPANY D• • COVERAGESgMMUMMMMMEMEMMEMVMMEMWMMgREMMMUME6mmgmggmgmaomwoammam THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POUCY PERIOD INDICATED,NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. CO EFFECTIVE TYPE OF INSURANCE POLICY NUMBER POLICY P 'EN LIMITS LTR DATE(MM/DD/YY) DATE(MtA/DDNY) GENERAL LIABILITY GENERAL AGGREGATE 2,000,000 X COMMERCIAL GENERAL LIABILITY PRODUCTS-COMP/OP AGG 2,000,000 CLAIMS MADE X OCCUR PERSONAL&ADV INJURY 1,000,000 A """: CPP1320557 XCU INCL 07/01/1999 07/01/2000 OWNER'S&CONTRACTOR'S PROT EACH OCCURRENCE S 1,000,000 X Blanket Addl Insd FIRE DAMAGE(Any one fire) S 50,000 X Per Pro) Aggregate MED EXP(Any one person) $ 5,000 AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ X ANY AUTO 1,000,000 ALL OWNED AUTOS BODILY INJURY SCHEDULED AUTOS (Per person) A CA1320556 07/01/1999 07/01/2000 X HIRED AUTOS BODILY INJURY X NON-OWNED AUTOS (Per accident) PROPERTY DAMAGE GARAGE LIABILITY AUTO ONLY-EA ACCIDENT ANY AUTO OTHER THAN AUTO ONLY: Matiningegg EACH ACCIDENT AGGREGATE $ EXCESS LIABILITY EACH OCCURRENCE S 5,000,000 A X UMBRELLA FORM CU1320558 07/01/1999 07/01/2000 AGGREGATE S 10,000,000 OTHER THAN UMBRELLA FORM WORKERS COMPENSATION AND EMPLOYERSLIABILITY EL EACH ACCIDENT THE PROPRIETOR/ PARTNERS/EXECUTIVE INCL EL DISEASE-POLICY LIMIT OFFICERS ARE: EXCL EL DISEASE-EA EMPLOYEE OTHER DESCRIPTION OF OPERATIONS/LOCATIONSNEHICLES/SPECIAL ITEMS Re: City of Ocoee VEHICLE AND MATERIAL STORAGE BUILDING :overage afforded will not be canceled or materially changed or renewal refused until at least :30) thirty days prior written notice has been given to Owner (City of Ocoee, FL) and See Attached SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,THE ISSUING COMPANY WILL MAIL 30 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, : .1 C4.“ A $. „ City of Ocoee, FL 150 North Lakeshore Drive WWWWWWWW0000000000000041000000°000000000( Ocoee, FL 34761 AUTHORIZED REPRESENTATIVE ??2,5(1j1,011-44.) • M. Sue Esser/MSE City of Ocoee, FL Certificate issued to City of Ocoee, FL 10/06/1999 Construction Insurance Corp. 10/06/1999 Insured: Canco General Contractors, Inc. Engineer (City of Ocoee Engineering Department) by certified mail. Arm." 06/2 /1999 THIS IS EVIDENCE THAT INSURANCE AS IDENTIFIED BELOW HAS BEEN ISSUED, IS IN FORCE,AND CONVEYS ALL TH RIGHTS AND PRIVILEGES AFFORDED UNDER THE POLICY. PRODUCER PHONE Ext): (gO4)308-I9Q8 COMPANY Construction Insurance Corp. Continental Casualty Company 2II0 Herschel St. Jacksonville, FL 32204 CODE: SUB CODE: AGENCY CUSTOMER ID 00000543 INSURED LOAN NUMBER POLICY NUMBER Canco General Contractors, Inc. IMI95946540 5407 8oran Placa EFFECTIVE DATE EXPIRATION DATE Tampa, FL 33610-2012 07/01/1999 X CONTINUED UNTIL CHECKED THIS REPLACES PRIOR EVIDENCE DATED: POWArCOMOOMONNIgIgglIngalgOOMMOIMONISNONSOMIUMENIMMUNINIMONIMIIMMOIBINNINWIM-OCATION/re: Cjty of Ocoee VEHICLE AND MATERIAL STORAGE BUILDING oovsnm,s/Psn/uaronms AMOUNT OF INSURANCE DEDUCTIBLE All Risk Builders Risk Including Theft of Building Materials Per Project I5,000,000'00 I,000 Flood and Earthquake* 10,000,000.00 25,000 Soft Costs 250,000.00 1,000 Temporary Storage 250,000.00 1,000 In Transit I00,000'00 1,000 Property While Waterborne 50,000.00 1,000 2% Named Storm Wind Deductible *Earthquake Excluded in California & San Madrid Fault THE POLICY IS SUBJECT TO THE PREMIUMS, FORMS, AND RULES IN EFFECT FOR EACH POLICY PERIOD. SHOULD THE POLICY BE TERMINATED, THE COMPANY WILL GIVE THE ADDITIONAL INTEREST IDENTIFIED BELOW 30 DAYS WRITTEN NOTICE,AND WILL SEND NOTIFICATION OF ANY CHANGES TO THE POLICY THAT WOULD AFFECT THAT INTEREST, IN ACCORDANCE WITH THE POLICY PROVISIONS OR AS REQUIRED BY LAW. NAME AND ADDRESS MORTGAGEE ADDMONAL City of Ocoee, FL LOSS PAYEE X Certificate holder 150 North Lakeshore Drive LOAN w Ocoee, FL 34761 IAUTHORIZED REPRESENTATIVE M. Sue Esser/MSE OCT. -11' 991MON1 08:32 CONSTRUCTION TEL: 8132821023 P. 002 ACORD. CERTIFICATE OF LIABILITY INSURANC ID >Isx DATEIMMroD1YV) CO-1 1041/99 PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE DavieBaldwin, Inc. HOLDER.THIS CERTIFICATE DOES NOT AMEND,EXTEND OR P.O. Box 25277 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. Tampa FL 33622 Phone: 813-287-1936 Fax:813-282-1020 INSURERS AFFORDING COVERAGE INSURED .— INSuRERA. Riecorp Insurance INSURER B: - — Canco Genera Contractors, Inc INSURER C. 5407 Boran Pace INSURER D; Tampa FL 336 0-2012 . . I INSURER EI COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED.NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OP MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS, ITR TYPE OF INSURANCE POLICY NUMBER — D% C pgj TA EM AAION — UNITS GENERAL LIABILITY EACH OCCURRENCE S COMMERCIAL GENERAL LIABILITY FIRE DAMAGE(Any ono Oro) I _ I CLAIMS MADE OCCUR MED EXP(Any one perecn) S J __.. PERSONAL II,ADVINJURY S __. GENERAL AGGREGATE $ GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMPIOP AGG t POLICY PRO. 1 JECT —LOC AUTOMOBILE LIABILITY "— COMBINED SINGLE LIMIT 6 ANY AUTO (Ea swami) ALL OWNED AUTOS BODILY INJURY S SCHEDULED AUTOS (Por person) -- HIRED AUTOS— BODILY INJURY S NON-OWNED AUTOS (Per occident) — — •• PROPERTY DAMAGE S (Peracndenq GARAGE LIABILITY AUTO ONLY•EA ACCIDENT S ANY AUTO EA ACC 6 OTHER THANI _ AUTO ONLY; AGG S EXCESS LIABILITY EACH OCCURRENCE _ i i1 OCCUR I-I CLAIMS MADE AGGREGATE S S DEDUCTIBLE -- S I RETENTION S S WORKERS COMPENSATION AND IFIWC S rAl U- x ERTHD • A EMPLOYERS'LIABILITY 62055 04/01/99 04/01/00 E.LIEA HYACCIDENT' i-500,000 7.7. ISEASE-EA EMPLOYEE! 5 5 00,000 i. E.L.DISEASE-POLICYLIMIT 16 500,000 OTHER DESCRIPTION OF OPERATIONSILOCATIONSICLES,EXCLUBIONS ADDED BY ENDORSEMENTISPECIAL PROVISIONS NEN Rel City of Ocoee Vehicle and Material Storage Building. Coverage afforded will not be canceled or materially changed or renewal refused until at leaet(30) thirty days prior written notice hae been given to owner - City of Ocoee & Engineer - City of Ocoee Engineering Dept. by certified mail. CERTIFICATE HOLDER N ADDITIONAL INSURED;INSURER LETTER: CANCELLATION CITYOCO SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BBFOR!THE EXPIRATION DATE THEREOF,THE ISSUING INSURER wiLLICIIEFICIDED MAIL 3 0 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEF City Of Ocoee, FL mns3xnexnaloNt I micauo l]otonsermoustIKEICiRXlCMMM 150 North Lakeshore Drive Ocoee FL 34761 ACORD 25-S(7197) —.VIKQ$D CORPORATION 1988 OCT-11-1999 09 46 8132821023 P.02 4-7 41 DATE SUBMITTED: V'.. NAME OF BIDDER: )Jrr Gon15}facitt5�uc II SECTION 00300 BID FORM SUBMITTED: ID A" l 9 (Date) PROJECT IDENTIFICATION: CITY OF OCOEE,FLORIDA VEHICLE AND MATE L STORAGE BUILDING NAME OF BIDDER: -Pre rL III Atoll ,l t 'k hitt BUSINESS ADDRESS: rill. F/ aaitil PHONE NO.: 1707 — 3703 7C. CONTRACTOR'S FLORIDA LICENSE NO.: C05 p 0:71T— THIS 7 - THIS BID IS SUBMITTED TO: City of Ocoee,Florida(hereinafter called Owner) 1. The undersigned Bidder proposes and agrees, if this Bid is accepted,to enter into an Amendment to the Agreement with Owner in the form included in the Contract Documents, to perform and furnish all Work as specified or indicated in the Contract Documents for the Contract Price and within the Contract Time indicated in this Bid Form and the Amendment to the Agreement, and in accordance with the other terms and conditions of the Contract Documents. 2. Bidder accepts all of the terms and conditions of the Bidding Documents including without limitation those dealing with the disposition of Bid Bond. This Bid will remain open for ninety (90) calendar days after the day of Bid opening. BIDDER will sign and deliver the required number of counterparts of the Amendment to the Agreement with the Bonds and other documents required by the Bidding Requirements within ten (10) days after the date of OWNER'S Notice of(Intent to)Award. 3. In submitting this Bid,Bidder makes all representations required by the Instructions to Bidders and the Agreement and further wan-ants and represents that: a. Bidder has examined copies of all the Bidding Documents and of the following Addenda: No. Dated=1LI No._ Dated No. Dated )0'13 No._ Dated_ No. .5 Dated 10'l9 No. Dated No. J Dated 10-1a- No. Dated (Receipt of all which is hereby acknowledged)and also copies of the Invitation for Bids and the Instructions to Bidders. b. Bidder has familiarized itself with the nature and extent of the Contract Documents,Work,site,locality,and all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance or • furnishing the Work. c. BIDDER has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface of subsurface structures at or 00300-1 • DATE SUBMITTE D: - NAME OF BIDDER ;, .r Cztviailisti4o4 r, ' • contiguous to ' - site (except Underground F- ilities) which have been identified in the Supplem ntary Conditions as prow.-d in paragraph 4.2.1 o • e General Conditions. BIDDER accepts the detenminati n set forth in paragraph SC-4. , e Su.. .•• tary Conditions of the extent of the"technical data"contained such reports and drawings upon which BIDDER is entitled to rely as provided in paragraph 4.2 of the G neral Conditions. BIDDER acknowledges that such reports and drawings are not.Contract Documents and m y not be complete for BIDDER's purposes. BIDDER acknowledges that OWNER and Engineer do not sume responsibility for the accuracy or completeness of information and data shown or indicated in the Bi ding Documents with respect to Underground Facilities at or contiguous to the site. d. BIDDER has obtained and carefully studied(or assumes responsibility for having done so)all such additio al or supplementary examinations,investigations,explorations,tests,studies and data concerning conditions(s i •ce, subsurface and Underground Facilities)at or contiguous to the site or otherwise which may affect cost pro oo ess, performance or furnishing of the Work or which relate to any aspect of the means, methods, tec quer, sequences and procedures of construction to be employed by BIDDER and safety precautions and pro • incident thereto. BIDDER does not consider that any additional examinations, investigations, explo •tions, tests,studies or data are necessary for the determination of this Bid for performance and furnishing of the ork in accordance with the times,price and other terms and conditions of the Contract Documents. e. BIDDER is aware of the general nature of Work to be performed by OWNER and others at the site that Tates to Work for which this Bid is submitted as indicated in the Contract Documents. f. BIDDER has correlated the information known to BIDDER,information and observations obtained from visits to the site, reports and drawings identified in the Contract Documents and all additional examin 'ons, investigations,explorations,tests,studies and date with the Contract Documents. g. BIDDER has given ENGINEER written notice of all conflicts, errors, ambiguities or discrepancie. that • BIDDER has discovered in the Contract Documents and the written resolution thereof by ENGINE R is acceptable to BIDDER, and the Contract Documents are generally sufficient to indicate and •nvey understanding of all terms and conditions for performing and furnishing the Work for which this L id is submitted. h. This Bid is genuine and not made in the interest of or on behalf of any undisclosed person,firm or corpo •tion and is not submitted in conformity with any agreement or rules of any group, association, organizati•n or corporation;BIDDER has not directly or indirectly induced or solicited any other Bidder to submit a f• ce or sham Bid; BIDDER has not solicited or induced any person,firm or corporation to refrain from biddinL; and BIDDER has not sought by collusion to obtain for itself any advantage over any other Bidder o over OWNER. i. BIDDER hereby agrees to commence WORK under this contract on or before a date to be specifiedthe NOTICE TO PROCEED and to fully complete all work of the PROJECT within the Contract Time sp ified in the Amendment to the Agreement (Section 00500B). BIDDER further accepts the provisions f the Amendment to the Agreement as to liquidated damages and agrees to pay as liquidated damages the oust stated in the Amendment to the Agreement(Section 00500B),for each consecutive calendar day complet on of the Work is delayed. Completion Schedule 1) The Project shall be substantially complete (successful pressure testing and bacteriological testing of : completed water mains) lone-hundred&eighty(180)consecutive calendar days from the official Notice "' to Proceed. 00300-2 _ i, .T,.4," DATE SUBMITTED: NAME OF BIDDER: l s� i r. c, 2) The Project sha ..•. ete(Completed and Ready for Final Payment)two-hundred&seventy (270)days from the official Notice to Proceed. 4. All bid items shall include all materials,equipment, labor,permit fees,taxes, tests, miscellaneous costs of all types overhead,and profit for the item to be complete, in place,and ready for operation in the manner contemplated by the Contract Documents.Bidder submits the following TOTAL BID OR TOTAL BASE BID to perform all the Work as required by the Drawings and Specifications. • 5. In accordance with Article 17 of the Instructions to Bidders, if the Contract is to be awarded, it will be awarded o the basis of the lowest"Total Base Bid"after adjustments for additive or deductive alternates. Additive or deductiv alternates(if any)will be considered in determining the lowest responsive,responsible Bidder. The Owner reserve the right to accept any or all additive or deductive alternates,in his sole discretion,prior to the award of the Contract The Owner also reserves the right to delete any portion of the Work as shown in the bid schedule prior to award an adjust each bidder's"Total Bid"accordingly. r - 6. The following documents are made a condition of this Bid: a. Bidding Documents and shall include the following: I. Bid Forms(entire Section 00300,00301,00301A and 00301B) 2. Bid Bond(Surety Bond or Cashier's Check). (Section 00410) 3. Corporate Authority to execute Bid 4. Power of Attorney(for Surety Bond only) 5. Noncollusion Affidavit(Section 00480) 6. Certification of Nonsegregated Facilities(Section 00481) 7. Sworn Statement on Public Entity Crimes(Section 00482) 8. Certification of Nondiscriminatory Labor Practices(Section 00483) b. Executed"Part A,Contract to Perform Continuing Construction Services(dated August,1998)" (Remainder of Page Left Blank Intentionally) 00300-3 ,7.,,,IT,..,,, i,,,,,::i -,,..: ' --1$1-•,,l' p „.„,":„.. .„.. .,, 8,,,,„1,,,t, „,-.,....,0,.. :„ .41. -�,� O Q „.., v.,- O ig��w § (e_,1 k s � �; �. t • �` b -A, 4 '— -a i - di #� t: .'',-4,,,,,, ST 1 k..i )---. Lt ttt����1111 �a , z ., x .i..... . ....,_. - ISI W M . I w0 Fe}} 4 ^`� O O i — ,__ .-r — — .--r c, i •_. . . A 'E'' o t: W U.. ,..•.�. o U I r j• 1 0 'C7 > • c., oU d J-- N o Q caO cn O EA -0 Y 7d Q - .fl Y • O O E N v bA I! L.:-/ 0 Q • N O W W O 'b O O � Qa 0 v as U �� W t E. - z * .. Y -z, (y. ' • r, , 4,-e. '',i) § Fr ...: 't 'J I {' v �' �n 4,141.0T-,\;',t7.,',-,, ' ----e ___ •______ . cz .,..____., , i rA4,' 4.4 01.-0, '4P.,4, '- c)i ( ,„_-%.' Fps - 4 r. , 1 v k.1 (sii. \-3,Q \-_.. (. ) (..r + (1) i W ' 1cwomVDFW — —1 —1 C_) V]J,'-' 4:1L, O4 ' . O Gr•r cd tS•` o o tr) an a• E.� e 1 N N h o co rn o W• U o . I M1 r • i A '7..,"-4� N c 'i' cd 6 0 F 1 t. 3 E o u a 73 -_-1 — 4.4.,6.7,;,,, x4. 2 cu v ►J ami aUi 1 • - o o • ' E - E E-. '` - CCA x Chi p O " a o a`i W :- " N W U W O„ R7 ,' I5, ,. c ' RI O d E N oo en al) o en 3 p 1 nW- C G U t cJ cci Q " 'y W W W r4 W W Q �o N 0 0 — — — — S' . 0• X*Cli PS ro 0... olk ( ) k6i ,sir- ii § • .--r: :,:, . ��J ... . ,4 .1---...d. 4 v, .,., ..,..... ,.‘„,„ , Q ,.,. .,2,,,?:,,,,_„,,......;,, _.149. 4_ :,‘„,„ _,,,... .,...,,,,._,,...,-,,,,„ , t t ......._ '.. AJ „.... „,„....„._,.:, 1 ,r , ....„,..,..„,..., , „_,..,_„....,,,, ..... . .,..r.c.„------,_:.„. )------- \-- - vz. 6 ..z.'‘ \---- - ;',.,=--,0?,,,,_-- -4 >. ?r >. � w w VD V) 'ikrip /) vD .l -4 . -4 -4s b• off. a W ,s 1 _#” — — p vl E _ W ' .,,, M M .-- '° — W;Q s n, to c,-, •o -- �. 4., 0 O W r:7:' t -zs. o 1_. 0 Z tt. . -: --, 1- .". , ��� - • L. A. 1:-*...-.......,,..., ;!` c''w A' 6-3, _ _ kms. `"`".'s,.„ _ ' -J s* * i tz .-. Y t ° b a4 v, ,� t 0 a a t � Y o :� totn 03 U R fl t Q v I ca E..., E— vl isH _ .-. r. _ - - Q Zn,:.q` i R: ..,, r,in , .'''sf?‹ 'dtt. , •.,, R., .....,__,..--, .1 it, CafitZ .'S a -c 0. ill . -—::, h 'r 'Ott'.r t 5,:r I I 1. *-"-7:::, r- c_ i ) ., ...= tkz--4 psi ,,, ,-,1-g -,,,,,0413 .., . qV: ' 1-k::: 6. \-- t -- ...- - ,..., ,,,,,,, ,... , ,_.... t. is vi fw x � w i .. . i. wok' . zul'. ,..r. Ec:74...: E 0 t 0 a) a� a) 131 x a. o o o ^ al 4' `� a ^o _. ,,a . E f� S �I1 .,... .-q N 0 a A ci f _ O a) u) p. 04 N lii a) • '0 man - '4 0 a) 0 Q 0 • Y .--+ (y L b E sii Ilit •b C •..N-� 0 b 0' � - .°G E � Cq .nrFw, .= to ca V V 0 si 3. :•-t2-' D O 0 0 U w Ili W W a c'a °' o F'" Q ,- W > cc o c b I ,,,, ,, , 0 ca W av, -,q,,A,p4, .,2 E ' '4" cn v H - N N 9i" ` �H �I 0 ••P ' C-' :.r DATE SUBMITTED: IO--Ia�CNS Z-1�7t-• NAME OF BIDDER: liTc 7. The terms used in this Bid,which are defined in the General Conditions or Instructions of the Construction Contract, included as part of the Contract Documents have the meanings assigned to them in the General Conditions or Instructions. J 8. The work shall be performed under a Florida Contractor's License. Contract shall not be awarded unless proof of ivalid license(s)is provided. 9. It is understood that where quantities for unit price work have been presented in the foregoing Schedule of Bid Items, they are approximate only and are solely for purpose of facilitating the comparison of bids, and that the I Contractor's compensation will be computed upon the basis as described in the measurement and payment clauses in the specifications contained herein. 10. BASE BID-SCHEDULE OF MANUFACTURERS/SUPPLIERS I If the foregoing Schedule of Bid Items is presented in a Base Bid format,the undersigned as Bidder agrees that the Contract, if awarded, will be on the basis of the materials and equipment named in the Contract Documents in accordance with Article 9 of the Instructions to Bidders. The undersigned as Bidder also agrees that for the "Base Bid"equipment and material items listed below the Bidder will provide one of the listed manufacturers/suppliers,by circling"A", "B", or"C". If the Bidder desires to propose an alternate manufacturer/supplier,he may write in the name of such alternate in the substitution list included within this Bid Form,but he must,nevertheless, also circle one of the listed manufacturers/suppliers. If the proposed alternate manufacturer/supplier is determined "not equivalent"by the Engineer, the Bidder must furnish equipment and/or material items by the circled manufactur- er/supplier. If the Bidder fails to indicate which listed manufacturer/supplier he intends to use if an alternate is rejected, he must use the manufacturer/supplier listed as "A". Also, if the Bidder circled more than one listed Imanufacturer/supplier,he must use the first manufacturer/supplier circled(unless an alternate is approved). 11. SUBSTITUTIONS AND"OR EQUAL" The undersigned as Bidder agrees that substitutions or "or-equal" items will not be considered until after the "Effective Date of the Agreement"and will be evaluated in accordance with paragraphs 6.7.1;6.7.2,and 6.7.3 of the General Conditions. In addition to the reimbursement required under the General Conditions,the Contractor shall also reimburse the Owner for any engineering costs directly attributable to the change in manufacturers/suppliers, I caused by the acceptance of proposed alternates, such as;additional field trips for the Engineer,additional redesign costs, and additional review costs, etc. Other costs directly attributable to the change in manufacturers/suppliers caused by the acceptance of proposed alternates, such as; increased electrical requirements, larger building, additional pumps or tankage, etc., shall be borne by others and not the Owner. If Bidder intends to propose substitutions or "or-equal" items after the "Effective Date of the Agreement", it is agreed that these items will be listed on the Substitution List included within this Bid Form,with a deductive amount representing 50 percent of the _ total savings between the named Base Bid item and the proposed item. "Base Bid" item substitutions providing to the Owner an equipment or material cost savings of less than$1,000 will not be considered. The undersigned as Bidder,also agrees that if a substitution or"or-equal" item is not listed on the Substitution List included with the Bid, all of the savings between the named item and the proposed item will go to the Owner if the Owner accepts the proposed item in accordance with paragraphs 6.7.1., 6.7.2, and 6.73 of the General Conditions. The Owner may request,and the undersigned Bidder shall supply,complete information on proposed substitutions. Such information shall be the manufacturer's current published or preprinted information for the specific substitution. I12. As BIDDER, I hereby certify that I am aware and understand that the City of Ocoee at its sole discretion reserves the right to waive technicalities or irregularities,to reject any or all Bids,and/or to accept that Bid which is in the - best interest of the City. The Award of this Bid,if made,may be based on considerations other than total cost,and may be awarded based on various considerations, including but not limited to: BIDDER experience and whether the Bid,in the judgement of the City,is the most responsive to City needs The City of Ocoee encourages the use of minorities and women-owned businesses as subcontractors 00300-15- ., T. . .. i,. . , DATE SUBMITTED: 10 • `1•1 ST)ZtIC"f s X7.1C NAME OF BIDDER: Tl(E'2, • Instructions: Strike out(X)nonapplicable signature block and complete applicable block. (ALL SIGNATORIES MUST HAVE THEIR NAMES PRINTED OR TYPED BELOW THEIR SIGNATURES) If Bidder is: SOLE PROPRIETORSHIP i /A4 (SEAL) (Individual's Signature) (Individual's Name) II doing business as Business Address: Phone No.: Florida License No.: 1. . . I A PARTNERSHIP 1• (SEAL) j (Partnership Name) I (General Partner's Signature) (General Partner's Name) a: Business address: Phone No.: 1 Florida License No.: I I 0030,`014 4* l 1r I DATE SUBMITTED: Ib ' 12.. C1c1 NAME OF BIDDER: T I(412- L190 5717. 3aCTDr-' • Instructions: Strike out(X)nonapplicable signature block and complete applicable block. (ALL SIGNATORIES MUST HAVE THEIR NAMES PRINTED OR TYPED BELOW THEIR SIGNATURES) iIf Bidder is: A CORPORATION I (Corporation Name) agg 1 ' IIV (State of Incorp�oraattion) 22� By `"? "I"OS SI I (Name of person authorized t�ign) I 116-F ' R 4IIJ P - I ‘..A (Authonzed gnature) (Corporate Seal) Attest IBusiness address: 7.0 x laI 70 47 -- c ; Lo z8 b 31170 - Uk_z1‘ �.�y�_��� /•� Phone No.: � ��� �b . Corporation President: `_: .I e44. l�'I-415T1 SO/,1 Florida License No.: ZZ X F G""1 l b0 -12 7 3s- , 111 v. , _ ii , .. , . ., , - _ P 1 • `:::. .. .: . ._, , . ::_...._ ;.x:..:.00300.-15:. DATE SUBMITTED: 1d,' 12 . 9 7 NAME OF BIDDER: f( 12• 00_flZ AC IVt , e. . Instructions: Strike out(X)nonapplicable signature block and complete applicable block. (ALL SIGNATORIES MUST HAVE THEIR NAMES PRINTED OR TYPED BELOW THEIR SIGNATURES) If Bidder is: !" [, • A JOINT VENTURE By (Name) (Address) • By i (Name) (Address) Business Address: 3 Phone No.: Florida License No.: 1' (Each joint venturer must sign. The manner of signing for each individual,partnership,and corporation that is a party to the I joint venture should be in the manner indicated above.) f. i, 3 Florida License No.: I • t. ' 12. List the following in connection with the Surety which is providing the Bid Bond: Surety's Name: 1� -V/V S W 00 l Surety's Address: Q 'Fito i Folvar b‘102.130) 472. 8 CSR N w l 'p142A , S tA tIT 0 14 : l }o aSToN , "TX 770-4 to ` Name and address of Surety's resident agent for service of process in Florida: ti END OF SECTION 47: '` t, 00300-16 k 11 . aSECTION 00301 QUESTIONNAIRE nDATE: l ' IZ'g1 I PROJECT IDENTIFICATION: CITY OF OCOEE, FLORIDA VEHICLE AND MATERIAL STORAGE BUILDING 111 NAME OF BIDDER: `-16FR (b Uc,WICS, *NC• BUSINESS ADDRESS: V.0 . £ )X (01 7C>g7 11 Cif LAND 0, -FL. 32 lv 1 Phone No. (4b7) 370 • 47o aCONTRACTOR'S FLORIDA LICENSE NO. C. ( - eft to a to72 M The undersigned warrants the truth and accuracy of all statements and answers herein contained. Include additional sheets if necessary. 1. Complete the following Table regarding experience with projects similar to the work contemplated under this 11 Continuing Construction Services Agreement. III1)ateof x ''itQ' -. _ ent' Name;& AddressInclude Amount of 'Contract '"'' Tame..of Project`& [ation' Loma i me.and Phone - Contract 101 VA W' min oN uut w R i, el* o��]e �An ��� �{� 1 a2s 04, 676,04v UL 81 rtv1�JL57�- �L. /Ake ateof 14-sk, #3,38&) �IMmm� . �� et Ac- - � .A) cm fire-- -r ` (}�w�L?)c &, ;° 56. R, 0 431CW co t..K. Bt4t V4- V t'T4- FL-. 0 aDWAIA-00 C •%Lowy..., W-DO 1 NA ft,1--• CM rizeraiU, Ontor::AciA . f,D, 6)1. 11),Da) glat .), 1. . urn*dtsr,�, RA_ • uthe P,,eaAV,.s4�,i1 2x 1.1 qot slid- B* Lot/P1-41a. u3 b L oNJ ria LJ . tm J1 A- ' ( E N+q t/iS J 3ocP3v n ^uo N`C �7^5Y44 too1.0 ShdyAt GIG - etvA- V is/� rut., 14,11-(e hue-4)4 1)1s./}., Fl. •.a. 7 P-15 JJ, -70c)4' Aeoli t� KIN6 YA GAeikv• Ofl� 6`,I1 EI-Fe4Nk �� sroP '".4 Pie. v4-5 , 0 3, ct 13 ou I. gNtivA- 01154/ ft. . J 00301-1 • , Datetof Client's Name&Address(Include Amount of ContractName of Project&Location Contact Name and Phone it) Contract a ,aEjcor mMe lk i'u V;►Ie l-D►sfvey .in, L' krve.. 99 D W.) Q_ CO " 144re&WA 14057152&) ii1 1 2. Have you ever failed to complete work awarded to you? If so, where and why? AA l\lI° i' i i t 3. Have you personally,inspected the general alignments of the various utility improvements proposed under this I . 1 Continuing Construction Services agreement? Describe any anticipated problems with the sites and your proposed solutions. 4 tki f7 . . 1i , _f i ,,,,. 4. Will you Subcontract any part of the work involving the construction of underground utilities? If so, describe which portions. • Yrs Ni` C_Sk6c-en� S 1 IA)A-ktr.SySieM) l I It. f 00301-2 e- 5. 5. List the names and addresses of the subcontractors to be used for the portions of the contemplated work listed above. 11 Subcontractor Certification Subcontract Name and Address of Subcontractor Registration 111flNo. &Name ( l� 1oAker -/051 Gr o4ticn;�{ Dr_ S`u;�4e y Or-I, 7 .3. 81`1 S 340 f Jre + C# F . 27.79 DOPNclly Cdv4'u6o 476 wale Cati+ Ocoee, Ft 34 761 U I I I I t.. { 6. Disclosure (Section 00100, Article 20). Complete and attach "Sworn Statement on Public Entity Crimes" (Section 00482). 7. State the true and exact, correct, and complete name under which you do business. BIDDER IS: &)0 5-nzuoloyiz 1►JG• I I END OF SECTION 00301-3 I SECTION 00301-A COMPLIANCE WITH FLORIDA TRENCH SAFETY ACT (90-96,LAWS OF FLORIDA) Bidder hereby acknowledges that all costs for complying with the Florida Trench Safety Act are included in the various items of the bid and in the Lump Sum Total Bid Price shown in Section 00300 -Bid Form, "Schedule of Bid Items". For informational purposes only,the bidder is required to further identify these costs in the summary below. Trench Safety Unit of Measure Measure Unit Unit Extended (Description) (LF,SY) (Quantity) Cost Cost A 1,61 ' 300 $ s ov $ ) )IJ B $ $ C $ $ D $ $ TOTAL $4 5 BIDDER: iL om --V& SIGNED: c231.--)4 • BY: " iLY .',Spts,1 - (PrN or type name) TITLE: Vice- lZt)otyt " DATE: I ' 12 • 19 THIS IS NOT A PAY ITEM: The purpose of this form is to gather information on the costs associated with trench safety measures and to insure that the Bidder has considered these costs and included them in the Lump Sum Total Bid price. Contractor will pot receive additional payment if actual quantities differ from those estimated or if the Contractor uses a safety measure different than those listed. (Failure to Complete This Form May Result in the Bid Being Declared Non-Responsive.) END OF SECTION 00301A-1 111 SECTION 00301-B DRUG-FREE WORKPLACE CERTIFICATION Preference shall begiven to businesseswith drug-free workplace programs. Whenever two or IDENTICAL TIE BIDS: g rkp p grams more bids which are equal with respect to price, quantity, and service are received by the State or by any political subdivision for the procurement of commodities or contractual services,a bid received from a business that certifies that it has implemented a drug-free workplace program shall be given preference in the award process. Established procedures for processing tie bids will be followed if none of the tied vendors have a drug-free workplace program (Florida Statutes Section 287.037). In order to have a drug-free workplace program,a business shall: 1. Publish a statement notifying employees that the unlawful manufacture,distribution,dispensing,possession,or use of a controlled substance is prohibited in the workplace and specifying the actions that will be taken against employees for violations of such prohibition. 2. Inform employees about the dangers of drug abuse in the workplace, the business's policy of maintaining a drug-free workplace,and available drug counseling,rehabilitation,and employee assistance programs,and the penalties that may be imposed upon employees for drug abuse violations. 3. Give each employee engaged in providing the commodities or contractual services that are under bid a copy of the statement specified in subsection(1). 111 4. In the statement specified in subsection (1), notify the employees that, as a condition of working on the commodities or contractual services that are under bid,the employee will abide by the terms of the statement . and will notify the employer of any conviction of, or pleas of guilty or nolo contendere to, any violation of Chapter 893 or of any controlled substance law of the United States or any state,for a violation occurring in the workplace no later than five(5)days after such conviction. 5. Impose a sanction on, or require the satisfactory participation in a drug abuse assistance or rehabilitation program is such is available in the employee's community,by any employee who is so convicted. 6. Make a good faith effort to continue to maintain a drug-free workplace through implementation of this section. As the person authorized to sign the statement,I certify that this firm complies fully with the above requirements. Bidder. & Q- CDI�,Sf TYLIA - c -�JJ e. Signed: • By: QfZP 1,•osPts� (Print or Type Name) Title: VI 'ISS I l - Date: 1D' END OF SECTION I I 00301-B-1 I a I ISECTION 00501 IMO III CORPORATE AUTHORITY i 1 ' illTO EXECUTE DOCUMENTS 1111 I HEREBY CERTIFY that a meeting of the Board of Directors of 0- 6 �►, 0 • (Contra*, s Corporate '� ame) I a corporation under the laws of the State of ,held on the day of I _, 19 ,the following resolution was duly passed and adopted: "RESOLVED,that (signature of individual) (typed name of individual) I As of the corporation,is hereby authorized to execute and all documents required (title) Ito be signed by an officer of the Corporation in order to submit a valid bid,contract and bond for I (project name) between the CITY OF OCOEE,a municipal corporation,and this corporation,and that his execution thereof, Iattested by the Secretary of the corporation and with corporate seal affixed shall be the official act and deed of this corporation." I I FURTHER CERTIFY that said resolution is now in full force and effect. IIN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the corporation this day of , 19 I (CORPORATE SEAL) ISTATE OF (Corporate Secretary) COUNTY OF IThe foregoing instrument was acknowledged before me this_day of 199 by (name of officer or agent,title of officer or agent),of (name of corporation acknowledging),a (state or place of incorporation) corporation, on behalf of the corporation. He/She is personally known to me or has produced identification (type of identification)as identification and did/did not take an oath. I (Notary Public) IMy Commission Expires: END OF SECTION I 00501-1 t SECTION 00480 NONCOLLUSION AFFIDAVIT STATE OF ) ss COUNTY OF ) ��gg.. vv. p„?..L ,being first duly swore deposes and says that: 1. He(it)is the tE rgesi pear /� (Owner,Partner,Officl.Representative or Agent) of 1 1(7�� JNS�IC-JBlta �/11L, ,the Bidder that has submitted the attached Bid; 2. He is fully informed respecting the preparation and contents of the attached Bid and of all pertinent circumstances respecting such Bid; 3. Such Bid is genuine and is not a collusive or sham Bid; 4. Neither the said Bidder nor any of its officers, partners, owners, agents, representatives, employees, or parties in interest, including this affidavit, have in any way, colluded, conspired, connived or agreed, directly or indirectly, with any other Bidder, firm or person to submit a collusive or sham Bid in connection with the Contract for which the attached Bid has been submitted; or to refrains from bidding in connection with such Contract; or have in any manner,directly or indirectly, sought by agreement or collusion,or communication, or conference with any Bidder, firm,or person to fix the price or prices in the attached Bid or of any other Bidder,or to fix any overhead,profit,or cost elements of the Bid price or the Bid price in any other Bidder, or to secure through any collusion, conspiracy, connivance, or unlawful agreement any advantage against (Recipient), or any person interested in the proposed Contract; 5. The price or prices quoted in the attached Bid are fair and proper and are not tainted by any collusion, conspiracy, connivance, or unlawful agreement on the part of the Bidder or any other of its agents, representatives, owners, employees or parties in interest,including his affidavit. By: • Title: VI CE• ,1+1 jC�' Sworn and subscribed to before me this i } day of � -1 , 19 (1 ,in the State of -11 LIZ-+r?4 ,County of C) SUSAN Q.WATFORD Nc• -Sae of Florida ._s Nov 16,2001 - C '694324a- & /Notary Public Co 'ssion Expires: I END OF SECTION 00480-1 ..SIM • SECTION 00481 CERTIFICATION OF NONSEGREGATED FACILITIES The Bidder certifies that he does not maintain or provide for his employees any segregated facilities at any of his establishments, and that he does not permit his employees to perform their services at any location, under this control, where segregated facilities are maintained. The Bidder certifies further that he will not maintain or provide for his employees any segregated facilities at any of his establishments, and that he will not permit his employees to perform their services at any location under his control where segregated facilities are maintained. The Bidder agrees that a breach of this certification will be a violation of the Equal Opportunity clause in any contract resulting from acceptance of this Bid.As used in this certification,the term"segregated facilities"means any waiting rooms,work areas,restrooms and washrooms, restaurants and other eating areas, timeclocks, locker rooms and other storage and dressing areas, parking lots, drinking fountains, recreation or entertainment area, transportation, and housing facilities provided for employees on the basis of race, color, religion, or national origin, because of habit, local custom, or otherwise. The Bidder agrees that(except where he has obtained identical certification from proposed subcontractors for specific time periods) he will obtain identical certifications from proposed subcontractors prior to the award of subcontracts exceeding$10,000 which are not exempt from the provisions of the Equal Opportunity clause, and that he will retain such certifications in his files. The nondiscriminatory guidelines as promulgated in Section 202,Executive Order 11246,and as amended by Executive Order 11375 and as amended,relative to Equal Opportunity for all persons and implementations of rules and regulations prescribed by the United States Secretary of Labor are incorporated herein. Note: The penalty for making false statements in offers is prescribed in 8 U.S.C. 1001.g Date 1,0 �2 , 19 q 4 . Official Address By: ).( '$. BS1 L (including Zip Code): (Title) 709 i 6M/0 rt/K100 R. lag OO-UA x 0) FL. -;2% ATTACH AND INCLUDE AS PART OF PROPOSAL FORM; FAILURE TO DO SO MAY BE CAUSE FOR DISQUALIFICATION OF YOUR BID. END OF SECTION 00481-1 . I. t SECTION 00482 (Page 1 of 2) SWORN STATEMENT UNDER SECTION 287.133(3)(a), FLORIDA STATUTES,ON PUBLIC ENTITY CRIMES THIS FORM MUST BE SIGNED IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICER AUTHORIZED TO ADMINISTER OATHS. 1. This sworn statement is submitted to City of Ocoee,Florida by 111 n1 ' g• S1sP5i(— (Print individual's Name&Title) whose business address is 11 4,02- (!W STrliAL!TOIZ _r11C • 70 BI 60Z1A&O NM7OAt t OQU JOoJ PL. 321let 2. I understand that a"public entity crime" as defined in Paragraph 287.133(1)(g), Florida Statutes,means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or with the United States,including,but not limited to, any bid or contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state or of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering,conspiracy,or material representation. 3. I understand that "convicted" or "conviction" as defined in Paragraph 287.133(1)(b), Florida Statutes, means a finding of guilt or a conviction of a public entity crime,with or without an adjudication of guilt, in any federal or state trial court of record relating to charges brought by indictment or information after July 1, 1989,as a result of a jury verdict,nonjury trial,or entry of a plea of guilty or nolo contendere. 1.11 4. I understand that an"affiliate"as defined in Paragraph 287.133(1Xa),Florida Statutes,means: 11111 a. A predecessor or successor of a person convicted of a public entity crime:or . b. An entity under the control of any natural person who is active in the management of the entity and who as been convicted of a'public entity crime. The term "affiliate" includes those officers, directors, executiv , partners,shareholders,employees,members,and agents who are active in the management of an affiliate. e ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair market value under an arm's length agreement,shall • a prima facie case that one person controls another person. A person who knowingly enters into a joint ven e with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shill be considered an affiliate. �-' 5. I understand that a "person" as defined in Paragraph 287.133(1Xe), Florida Statutes means any natural person or entity organized under the laws of any state or of the United States with the legal power to enter into a bind' g contract and which bids or applies to bid on contracts for the provision of goods or services let by a public entity,or which otherwise transacts or applies to transact business with a public entity. The term "person" includes th•se officers, directors, executives, partners, shareholders, employees, members, and agents who are active in management of an entity. 6. Based on information and belief,the statement which I have marked below is true in relation to the entity submitt g this sworn statement. (please indicate which statement applies). Neither the entity submitting this sworn statement, or one or more of its officers, directors, executi -s, partners, shareholders, employees, members, or agents who are active in management of the entity, or 00482-1 !l •. any affiliate of the entity have been charged with and convicted of a public entity crime subsequent to July 1, 1989. The entity submitting this sworn statement,or one or more of the officers,directors, executives,partners, shareholders, employees, members, or agents who are active in management of the entity, or an affiliate of this entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. The entity submitting this sworn statement, or one or more of the officers,directors, executives,partners, shareholders, employees, members, or agents who are active in management of the entity, or an affiliate of this entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. However,there has been a subsequent proceeding concerning the conviction before a Hearing Officer of the State of Florida,Division of Administrative Hearings. The final order entered by the Hearing Officer determined that it was not in the public interest to place the entity submitting this sworn statement on the convicted vendor list. (Please attach a copy of the final order.) I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH I (ONE) ABOVE IS FOR THAT PUBLIC ENTITY ONLY AND,THAT THIS FORM IS VALID THROUGH /0•I2•99 . I ALSO UNDERSTAND THAT I AM REQUIRED - TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES FOR CATEGORY TWO OF CHANGE IN THE INFORMATION CONTAINED IN THIS FORM. • cs.. .......-041 fore) • Date: l 0 ' YZ • '1 —1 &) j STIntantc mud , Name of Bidder(Contractor) STATE OF aDv O4 COUNTY OF Vekkri r e-6 PERSONALLY APPEARED BEFORE ME,the undersigned authority, 4-. 1t Ii ( L ` �„i 1 r 4;. who,after first being sworn by me,affixed his/her signature in the place provided above on this 1.i --- day of �'l i , 19`_1.7 • 11 I$tary Pub 'c i L SUSAN Q.WATFORD at N.4ary Public-State of Florida I• 4; P."y'C:)mmission Expires Nov 16,2001 k i i 1 t (. / '7`� , 4i.ill (i Commission#CC696324 rry Commission Expires: `' 6,-/zr =i.„—m•-ab .�• Na- - - - - - 4 END OF SECTION 1 I i 00482-2 111 SECTION 00483 CERTIFICATION OF NONDISCRIMINATORY LABOR PRACTICES This certification relates to a construction contract proposed by the City of Ocoee. Equal Opportunity Employment: The Contractor shall not discriminate on the basis of race, color, national origin,gender,age, handicapped status,veteran status,and/or religion in performing the work governed by this contract. The City is an Equal Opportunity Employer(EOE)and as such encourages all contractors to comply with EOE regulations. Any subcontract the Contractor may enter into shall include this clause with the same 111 degree of application being encouraged. I am the undersigned prospective construction contractor or subcontractor. I certify that... (1) I_ _have/ )C have not participated in a previous contract or subcontract subject to the Equal Opportunity Clause and (2) If I have participated in a previous contract or subcontract subject to the Equal Opportunity Clause,I have/ have not filed with the Joint Reporting Committee,the Director of the Office of Federal Contract Compliance Programs, or the Equal Employment Opportunity Commission all reports due under the applicable filing requirements. I understand that,if I have participated in a previous contract or subcontract subject to the Equal Opportunity Clause and have failed to file all reports due under the applicable filing requirements, I am not eligible, and will not be eligible,to have my bid or offer considered, or to enter into the proposed contract or subcontract, unless and until I make an arrangement regarding such reports that is satisfactory to the office where the reports are required to be filed. I agree that I will obtain identical certifications from prospective lower-tier construction subcontractors when I receive bids or offers or initiate negotiations for any lower-tier construction subcontracts with a price exceeding$10,000. I also agree that I will retain such certifications in my files. Date 1(7 • 2 , 19 19 By: . C � �l.S••uthorized 0 ial) ?osps i t- Il.japc. 1-16+12. C'bNs7)¢UCTO2S, nye • (Name of Prospective Construction Contractor or Subcontractor 7o S t &1zh v0 NATO N�a•t- D a , su►i )t y 012iA•T.C4 D 1 R. ' 2..119 (Address of Prospective Construction Contractor or Subcontractor) • L4b7J 31D • 3470Ll7q LOS. (Telephone Number) (Employer Identification Number) END OF SECTION 00483-1 I Oct-07-99 08:07A P,O2 SECTION 00410 BID BOND KNOW ALL MEN BY THESE PRESENTS, that we, the undersigned, TIGER CONSTRUCTORS, INC. as Principal, and RLI Insurance Company , as Surety, are hereby held and firmly bound unto the City of Ocoee, Florida, as Owner in the penal sum of five percent of the Contract Bid Not to exceed Forty Thoncand anti no/Inn ($40,000.00/5X GAB) for payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors and assigns. Signed, this 7th day of October , 19 99 The condition of the above obligation is such that whereas the Principal has submitted to the City of Ocoee, Florida a certain Bid, attached hereto and hereby made a part hereof to enter into a contract in writing, for the City of Ocoee Vehicle and Material Storage Building. NOW THEREFORE 1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to pay to Owner upon default of Bidder any difference between the total amount of Bidder's bid and the total amount of the bid of the next lowest, responsible and responsive bidder as determined by Owner for the Work required by the Contract Documents, provided that: 1.1. If there is o such next lowest, responsible and responsive bidder, and Owner does not abandon the Project, then Bidder and Surety shall pay to Owner the penal sum set forth on the face of this Bond, and 1.2. In no event shall Bidder's and Surety's obligation hereunder exceed the penal sum set forth on the face of this Bond. 2. Default of Bidder shall occur upon the failure of Bidder to deliver within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Amendment to the Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents and Contract Documents. 3. This obligation shall be null and void if: 3.1. Owner accepts Bidder's bid and Bidder delivers within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Amendment to the Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents and Contract Documents, or 3.2. All bids are rejected by Owner, or 3.3. Owner fails to issue a Notice of Intent to Award to Bidder within ninety (90)days from the time and date fixed for the opening of Bids (or any extension thereof agreed to in writing by Bidder and, if applicable, consented to by Surety when required by paragraph 5 hereof). 4. Payment under this Bond will be due and payable upon default by Bidder and within thirty (30) calendar days after receipt by Bidder and Surety of written notice of default from Owner, which notice will be given with reasonable promptness, identifying this Bond and the Project and including a statement of the amount due. 00410-1 Oct-07-99 08:08A P.03 5. Surety waives notice of any and all defenses based on or arising out of any time extension to issue no ce of award agreed to in writing by Owner and Bidder, provided that the total time for issuing notice of award including extensions shall not in the aggregate exceed 120 days from Bid Due Date with•ut Surety's written consent. 6. No suit or action shall be commenced under this bond prior to 30 calendar days after the notice of def.ult required in paragraph 4 above is received by Bidder and Surety and in no case later than one year al er Bid Due Date. 7. Any suit or action under this Bond shall be commenced only in a court of competent jurisdiction loca ed in the state in which the Project is located. 8. Notices required hereunder shall be in writing and sent to Bidder and Surety at their respective addres.es shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier or by United States Registered or Certified Mail, return receipt requested, postage pre-paid, and shall be deemed to be effective upon receipt by the party concerned. 9. Surety shall cause to be attached to this Bond, a current and effective Power of Attorney evidencing e authority of the officer, agent or representative who executed this Bond on behalf of Surety to exec te, seal and deliver such Bond and bind the Surety thereby. 10. This Bond is intended to conform to all applicable statutory requirements. Any applicable requiremen'of any applicable statute that has been omitted from this Bond shall be deemed to be included'herein as if set forth at length. If any provision of this Bond conflicts with any applicable provision of any appli .•le statute, then the provision of said statute shall govern and the remainder of this Bond that is not in conflict therewith shall continue in full force and effect. 11. The term"bid" as used herein includes a bid, offer or proposal as applicable. IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals, and such of da as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by eir proper officers, the day and year first set forth above. 00410-2 Oct-07-99 08:08A P_05 If Bidder is a CORPORATION,complete this signature block. ATTEST: TIGER CONSTRUCTORS, INC. (Corporation Namc) �'rpo f>c y.Signature) — Florida _Zr--� (State of Incorporation) J© ,A1L.D'$. -'oS pal L (Corporate Secretary Name)I By: S-e..tL ( P 14-1, took (Name of person authorized to sign-see Note 1) Y i (Tide) A _ (CORPORATE SEAL) udiorized Signature) (Corporation President) P.O. Box 617047 Orlando FL 32819 (Business Address) 6407 ) 370-2535 TQi 0000 TZ735 (Telephone No.) (Florida License No.) • • 00410-4 Oct-07-99 08:09A P.06 SURETY: WITNESS: (If Agent is not a Corporation) RLI Insurance Company (1) (Surety Business Name) (Witness) (2) (Witness) 3010 LBJ Freeway, Suite 1020 (Principal Place of Business) -t+ ATTEST: (If Agent is a Corporation) (Surety Agent's Signature-See Note Robert M. Overbey, Jr. I f ,\ (Surety Agent's Name) _ (Corporate Secretary Sig ' re) . Attorney in Fact '$.• TQS�lStl, (Surety Agent's Title) (Corporate Secretary Name) BondPro, Tnc- (Business Name of Local Agent for Surety) (CORPORATE SEAL) R Greenway Plaza, Snitp RI La (iusiness Address of Local Agent) Houston TX 77046 ( 713) 355-1000 A198016 (Telephone No.) (Florida License No.) NOTES: (I) Complete and attach "Corporate Authority to Execute Documents" if executed by any corporate employee other than president or vice-president. (2) Complete and attach a certified copy of "Power-of-Attorney" prepared by Surety appointment individual "Attorney-in-Fact" for execution of Bid Bond on behalf of Surety and corresponding notarized "Attorney- in-Fact". (3) Above addresses are to be used for giving required notice. (4) Any singular reference to Bidder. Surety, Owner or other party shall be considered plural where applicable. (5) Surety companies executing bonds must appear on the Treasury Department's most current list (Circular 570 as amended)and be authorized to transact business in the state where the project is located. 00410-5 4kciAri io V I S I O Ni POWER OF ATTORNEY (Irrevocable) P.O.Box 3967 • Peoria,IL 61612-3967 Know All Men by These Presents: BOND NO. RSB- 3 8 5 8 5 4 That this Power of Attorney is not valid or in effect unless attached to the bond which it authorizes executed,but may be detached by the approving officer if desired. That RLI INSURANCE COMPANY, an Illinois corporation,does hereby make, constitute and appoint ROBERT M OVERBEY JR, MOLLY REAGAN SALAZAR OF HOUSTON, TEXAS its true and lawful Agent and Attorney-in-Fact,with full power and authority hereby conferred,to sign,execute,acknowledge and deliver for and on its behalf as Surety,the following described bond. BID, PERFORMANCE, PAYMENT OR SUPPLY BONDS PROVIDED THE BOND PENALTY AND CONTRACT PRICE DO NOT EXCEED FIVE HUNDRED THOUSAND ($500,000.00) DOLLARS. The acknowledgement and execution of such bond by the said Attorney-in-Fact shall be as binding upon this Company as if such bond had been executed and acknowledged by the regularly elected officers of this Company. All authority hereby conferred shall expire and terminate,without notice, unless used before midnight of JUNE 21 2001 , but until such time shall be irrevocable and in full force and effect. The RLI INSURANCE COMPANY further certifies that the following is a true and exact copy of the Resolution adopted by the Board of Directors of RLI Insurance Company, and now in force to-wit: "All bonds,policies,undertakings, Powers of Attorney, or other obligations of the corporation shall be executed in the corporate name of the company by the President, Secretary, any Assistant Secretary, Treasurer,Vice President,or by such other officers as the Board of Directors may authorize. The President, any Vice President, Secretary and Assistant Secretary, or the Treasurer, may appoint Attorneys-in-Fact or Agents who shall have authority to issue bonds, policies, or undertakings in the name of the Company.The corporate seal is not necessary for the validity of any bonds, policies,undertakings, Powers of Attorney,or other obligations of the corporation.The signature of any such officer and the corporate seal may be printed by facsimile." (Blue shaded area above indicates authenticity) The penal amount of the bond herein described may be increased if there is attached to this Power, written authority so authorizing in the form of an endorsement or letter signed by the President,Vice President,Assistant Vice President, Treasurer,Secretary or Assistant Secretary of the RLI Insurance Company specifically authorizing said increase. IN WITNESS WHEREOF,the RLI Insurance company has caused these presents to be executed by its President with its corporate seal affixed this 23rd day of March, 1998. RLI INSURANCE COMPANY By: • / President State of Illinois SS County of Peoria ) CERTIFICATE On this 23rd day of March, 1998, before me, a Notary Public, I,the undersigned officer of RLI Insurance Company,a stoc corpora- personally appeared Jonathan E. Michael, who being by me duly tion of the State of Illinois,do hereby certify that the attac ed Power sworn,acknowledged that he signed the above Power of Attorney as of Attorney is in full force and effect and is irrevocable;ani further- the aforesaid officer of the RLI INSURANCE COMPANY and acknowl- more,that the Resolution of the Company as set forth in the Power of edged said instrument to be the voluntary act and deed of said Attorney,is now in force.In testimony whereof,I have hereu to set my corporation. hand and the seal of the RLI Insurance Company this* day of 0010Ler , l9y3 . cb RLI INSURANCE COMPANY Notary Public By: . / C c moot President * *OFFICIAL SEAL" * KATHRYN L ESCHMANN * *IMPORTANT:This date must be filled in before it is attac ed to * NOTARY PUBLIC, STATE OF ILLINOIS * the bond and it must be the same date as the bond. * Ny Commission Expires 5/16/2000 * DATE SUBMITTED: 10/12/99 NAME OF BIDDER: GCI/GENERAL CONSTRUCTORS, INC. SECTION 00300 BID FORM SUBMITTED: 10/12/99 (Date) PROJECT IDENTIFICATION: CITY OF OCOEE,FLORIDA VEHICLE AND 1\IATERIAL STORAGE BUILDING NAME OF BIDDER: GCI/GENERAL CONSTRUCTORS, INC. BUSINESS ADDRESS:991 EXPLORER COVE PHONE NO.: (407) 831-8898 ALTAMONTE SPGS, FL 32701 CONTRACTOR'S FLORIDA LICENSE NO.: CG CO17826 THIS BID IS SUBMITTED TO: City of Ocoee,Florida(hereinafter called Owner) I. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Amendment to the Agreement with Owner in the form included in the Contract Documents, to perform and furnish all Work as specified or indicated in the Contract Documents for the Contract Price and within the Contract Time indicated in this Bid Form and the Amendment to the Agreement, and in accordance with the other terms and conditions of the Contract Documents. 2. Bidder accepts all of the terms and conditions of the Bidding Documents including without limitation those dealing with the disposition of Bid Bond. This Bid will remain open for ninety (90) calendar days after the day of Bid opening. BIDDER will sign and deliver the required number of counterparts of the Amendment to the Agreement with the Bonds and other documents required by the Bidding Requirements within ten (10) days after the date of OWNER'S Notice of(Intent to)Award. 3. In submitting this Bid, Bidder makes all representations required by the Instructions to Bidders and the Agreement and further warrants and represents that: a. Bidder has examined copies of all the Bidding Documents and of the following Addenda: No. 1 Dated 9/14/99No. Dated_ No. 2 Dated 10/4/99 No. Dated No. 3 Dated 10/8/99 No. Dated No. 4 Dated 10/11/99,1o. Dated (Receipt of all which is hereby acknowledged)and also copies of the Imitation for Bids and the Instructions to Bidders. b. Bidder has familiarized itself with the nature and extent of the Contract Documents, Work,site,locality,and all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance or furnishing the Work. c. BIDDER has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface of subsurface structures at or 00300-1 1 DATE SUBMITTED: 10/12/99 NAME OF BIDDER: GCI/GENERAL CONSTRUCTORS, INC. contiguous to the site (except Underground Facilities) which have been identified in the Supplementary Conditions as provided in paragraph 4.2.1 of the General Conditions. BIDDER accepts the determination set forth in paragraph SC-4.2 of the Supplementary Conditions of the extent of the"technical data"contained in • such reports and drawings upon which BIDDER is entitled to rely as provided in paragraph 4.2 of the General , Conditions. BIDDER acknowledges that such reports and drawings are not Contract Documents and may not '= be complete for BIDDER's purposes. BIDDER acknowledges that OWNER and Engineer do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Bidding • Documents with respect to Underground Facilities at or contiguous to the site. i,,:,.,•;, d. BIDDER has obtained and carefully studied(or assumes responsibility for having done so)all such additional or su lementa examinations, investigations,explorations,tests,studies and data concerning conditions(surface, E: PP n p ; subsurface and Underground Facilities)at or contiguous to the site or otherwise which may affect cost progress, performance or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences and procedures of construction to be employed by BIDDER and safety precautions and programs •;.' incident thereto. BIDDER does not consider that any additional examinations, investigations, explorations, i Y;- tests,studies or data are necessary for the determination of this Bid for performance and furnishing of the Work in accordance with the times,price and other terms and conditions of the Contract Documents. .n Y" e. BIDDER is aware of the general nature of Work to be performed by OWNER and others at the site that relates • to Work for which this Bid is submitted as indicated in the Contract Documents. f. BIDDER has correlated the information known to BIDDER, information and observations obtained from visits to the site, reports and drawings identified in the Contract Documents and all additional examinations, investigations,explorations,tests,studies and date with the Contract Documents. .%b-,„ g. BIDDER has given ENGINEER written notice of all conflicts, errors, ambiguities or discrepancies that BIDDER has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to BIDDER, and the Contract Documents are generally sufficient to indicate and convey 1.. understanding of all terms and conditions for performing and furnishing the Work for which this Bid is submitted. h. This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; BIDDER has not directly or indirectly induced or solicited any other Bidder to submit a farce or sham Bid; BIDDER has not solicited or induced any person, firm or corporation to refrain from bidding; and z r¢ BIDDER has not sought by collusion to obtain for itself any advantage over any other Bidder or over OWNER. i. BIDDER hereby agrees to commence WORK under this contract on or before a date to be specified in the NOTICE TO PROCEED and to fully complete all work of the PROJECT within the Contract Time specified in the Amendment to the Agreement (Section 00500B). BIDDER further accepts the provisions of the Amendment to the Agreement as to liquidated damages and agrees to pay as liquidated damages the amount ?' stated in the Amendment to the Agreement(Section 00500B), for each consecutive calendar day completion of the Work is delayed. Completion Schedule I) The Project shall be substantially complete (successfulpressure testing and bacteriological testing of P completed water mains) Ione-hundred&eighty(180)consecutive calendar days from the official Notice to Proceed. 00300-2 DATE SUBMITTED: 10/12/99 NAME OF BIDDER: GCI/GENERAL CONSTRUCTORS, INC. 2) The Project shall be finally complete(Completed and Ready for Final Payment)two-hundred & seventy (270)days from the official Notice to Proceed. 4. All bid items shall include all materials, equipment, labor, permit fees, taxes, tests, miscellaneous costs of all types, overhead,and profit for the item to be complete, in place,and ready for operation in the manner contemplated by the Contract Documents. Bidder submits the following TOTAL BID OR TOTAL BASE BID to perform all the Work as required by the Drawings and Specifications. 5. In accordance with Article 17 of the Instructions to Bidders, if the Contract is to be awarded, it will be awarded on the basis of the lowest"Total Base Bid"after adjustments for additive or deductive alternates. Additive or deductive alternates(if any)will be considered in determining the lowest responsive, responsible Bidder. The Owner reserves the right to accept any or all additive or deductive alternates, in his sole discretion,prior to the award of the Contract. The Owner also reserves the right to delete any portion of the Work as shown in the bid schedule prior to award and adjust each bidder's "Total Bid"accordingly. 6. The following documents are made a condition of this Bid: { a. Bidding Documents and shall include the following: 1. Bid Forms(entire Section 00300,00301,00301A and 00301B) 2. Bid Bond(Surety Bond or Cashier's Check). (Section 00410) 3. Corporate Authority to execute Bid 4. Power of Attorney(for Surety Bond only) 5. Noncollusion Affidavit(Section 00480) 6. Certification of Nonsegregated Facilities(Section 00481) 7. Sworn Statement on Public Entity Crimes(Section 00482) 8. Certification of Nondiscriminatory Labor Practices(Section 00483) b. Executed "Part A,Contract to Perform Continuing Construction Services(dated August,1998)" (Remainder of Page Left Blank Intentionally.) 00300-3 DATE SUBMITTED: 10/12/99 NAME OF BIDDER GCI/G NES CONSTRUCTOR, INC. F } .§ (Page Lea Blank Intentionally.) • .§ •{ �> 00300-4 2 4 t, I1, 3\ - `�1 31 1 c 0CS Q �1 Z O a I O A . ..\ ' \ ;A _ 9\ _ c 0 � z 2 o o 3`0 o v "' . rA CN Ez • = '- \s s Z - �----o \- z \ A\ 7 m • E- r 00 ►]tn t) �- 71 c -- ^ ^ - ^ O 0 r r .1y. w 0. o' o a - < o v U U z v z U W H i ',... o > _ H 0 a: -c H o p a F 0 z oo _ p — z -n o - o c F- E 0 H o �o •- • U U . o Q C �� U L 14 CZ N 7 C O 01 W _Lc tn ^. p = O to O L" Z o ^ W E - < N C7 t- c i-1 - • --.. _ O (D r\ H y r 0 0 w r. c c < L o E c = o E C] 2 c. U .- U c U ip = C1 0 0 0 -r In `, a s2 oz m _ I al l a1 •• .A1 . 4 a B� _ �� 745 0 0 V� so r oz S l4 6' V1 atn A o� �� 3 \s\ az Zo fl o 3�' �`' • CS- v ` ,� - •N N e s1` �-- Q . > -'J - � --J-. w �1.. V; ...4‘) Z \--=. \--:_x- z-- --------- e ,, kt t- ,.)---3,,-2- )- 1 v: W • c; CaOE— = Uct O < E ooN wOa — — c — n rn W ° — o O z • z U Gz.1 z -a H U cn Le. C4 0 H U H o0 cn %_ Z ca. > 0 U O " o c o 0 cA — C) r h cc J r O� W C U .� CJ 0.=j C) rn z CJ C/) C) > ^ CC) >> N C7 °d •� E E H cn c C) r u ._ i - > c O U '- 'p ai ` u - L^ 3 o L L ,N co cn CO - cn o Cl) LE L.2 Lt2 Q v v v� .0 •v H✓ 2u 0 —' ca ri W ;D O O O O — — — v) Lr z — — — — — — — — L1 F- u oz cz • C2 cc •-1;;;.• z C.) C.) • c4 0 c4 0 C.' y‘ - C•1 Z 0 C-7 •• .) Fr, f- 2 < < • Z 0 ^ 2,; 3\ . z \ . ,\ a\ - �\ ,TrJ '::- E -9 , c,..„ , �� . a .5. z. c., \.., ,.. ssz, 0 Cr, 3 - ` 3� . 31 • 2.\ , CT: (A\ �c� A a 5 z 5 _ ......„ 0, 7.....5 ,R z ? o 0 a a >- CA w Q v, ▪ c'-', .o _ OE"c4 V N N — a=. 0a wa c wpm o ' >„ G4 o � E-. o z • H 11t- L-7 s 4U 4 U v Z •n. Z o N b- L /r U cA 0 Z r . N-a u C- `u H y C) O U a� `" _ C•.-:- •-• .-• r (5 u 0- 1- th Cn C O C N .1 U G .0 'p 1 o - _ = Q . U L o v) in U U U C2 �' U O. p to C L' . 8- - i-• Q .� H • °' a' N r N 5 1 G G y aC1 C.> cc. T T COp O N C. H H vl L , N W W .D in t� CO C O — N O ._ N N N <• z p z W tiv - C] / \d :� � * 7 : $�. . \ �> . _ rti C •q :» 0 ;4 ■ C 0 CYN \ / / \ 1 / 0 0 0 E- EO IE : VD / ® 2 o \ v; U — 3\ • f„ I U ei Tr, z--- o4 O E-- Zit N — oia �� - r li L G. _ d-* E .'"-• 00 lo, \ c UI • � z L L a- O j ly (.., 17) 8 Alf . .. a C:i W • It C7 • cn FWC.'' r :... " W O E r — — �, < O O cyL • FE. .- c u < — u '� .n • U >, > ` = z �_ X36 ` z < D _ c E H W V-- vi `' `_' ..`�,. a `^ '�. y C C y C Cn V - ,O vr �„ O H W 4 3 G. >< O .:i�� U Z > C u �,-. ..¢� 3O U ti , (V H - �rUOO t • --- ais .L yD0 U c u - o U U `, L W O '6 CO O C al W / U c H orn Z = 2 v c. U v \ W ]Y O L '� N 0 O r N L r -+ \ H v ..- O C O 0U /?; c''' •L _ N •p GA ..... 4. r ad c: t... U p m w C v C. 8 FO - = •r 3_ L / F 2 FE V) ° t `o m u cam- C c. 2 c L r o ta on F, 2 O f.1 N �. pz w oz � E F \ @ � 4,4 \ F . � �. \/ �6 : . «' > \ � / 7t _ . 2 Co •/ 2 0 0 ) 2 0 Q �q m 0 \ $ � w \ 6 • m E- E- 272 , v \ ! / \ o \ DATE SUBMITTED: 10/12/99 NAME OF BIDDERCI/GENERAL CONSTRUCTORS, INC. 7. The terms used in this Bid, which are defined in the General Conditions or Instructions of the Construction Contract, included as part of the Contract Documents have the meanings assigned to them in the General Conditions or Instructions. 8. The work shall be performed under a Florida Contractor's License. Contract shall not be awarded unless proof of valid license(s)is provided. 9. It is understood that where quantities for unit price work have been presented in the foregoing Schedule of Bid Items, they are approximate only and are solely for purpose of facilitating the comparison of bids, and that the Contractor's compensation will be computed upon the basis as described in the measurement and payment clauses in the specifications contained herein. 10. BASE BID-SCHEDULE OF MANUFACTURERS.'SUPPLIERS If the foregoing Schedule of Bid Items is presented in a Base Bid format, the undersigned as Bidder agrees that the Contract, if awarded, will be on the basis of the materials and equipment named in the Contract Documents in accordance with Article 9 of the Instructions to Bidders. The undersigned as Bidder also agrees that for the "Base Bid"equipment and material items listed below the Bidder will provide one of the listed manufacturers/suppliers, by circling "A", "B", or "C". If the Bidder desires to propose an alternate manufacturer/supplier, he may write in the name of such alternate in the substitution list included within this Bid Form, but he must, nevertheless, also circle one of the listed manufacturers/suppliers. If the proposed alternate manufacturer/supplier is determined "not equivalent" by the Engineer, the Bidder must furnish equipment and/or material items by the circled manufactur- er/supplier. If the Bidder fails to indicate which listed manufacturer/supplier he intends to use if an alternate is rejected, he must use the manufacturer/supplier listed as "A". Also, if the Bidder circled more than one listed manufacturer/supplier,he must use the first manufacturer/supplier circled(unless an alternate is approved). 11. SUBSTITUTIONS AND"OR EQUAL" The undersigned as Bidder agrees that substitutions or "or-equal" items will not be considered until after the "Effective Date of the Agreement"and will be evaluated in accordance with paragraphs 6.7.1,6.7.2,and 6.7.3 of the General Conditions. In addition to the reimbursement required under the General Conditions, the Contractor shall also reimburse the Owner for any engineering costs directly attributable to the change in manufacturers/suppliers, caused by the acceptance of proposed alternates, such as; additional field trips for the Engineer, additional redesign costs, and additional review costs, etc. Other costs directly attributable to the change in manufacturers/suppliers caused by the acceptance of proposed alternates, such as; increased electrical requirements, larger building, additional pumps or tankage, etc., shall be borne by others and not the Owner. If Bidder intends to propose substitutions or "or-equal" items after the "Effective Date of the Agreement", it is agreed that these items will be listed on the Substitution List included within this Bid Form,with a deductive amount representing 50 percent of the total savings between the named Base Bid item and the proposed item. "Base Bid" item substitutions providing to the Owner an equipment or material cost savings of less than SI,000 will not be considered. The undersigned as Bidder,also agrees that if a substitution or"or-equal" item is not listed on the Substitution List included with the Bid, all of the savings between the named item and the proposed item will go to the Owner if the Owner accepts the proposed item in accordance with paragraphs 6.7.1., 6.7.2, and 6.7.3 of the General Conditions. The Owner may request. and the undersigned Bidder shall supply,complete inforniation on proposed substitutions. Such information shall be the manufacturer's current published or preprinted information for the specific substitution. 12. As BIDDER, I hereby certify that I am aware and understand that the City of Ocoee at its sole discretion reserves the richt to waive technicalities or irregularities, to reject any or all Bids, and/or to accept that Bid which is in the best interest of the City. The Award of this Bid, if made, may be based on considerations other than total cost, and may be awarded based on various considerations, including but not limited to: BIDDER experience and whether the Bid, in the judgement of the City, is the most responsive to City needs. The City of Ocoee encourages the use of minorities and women-owned businesses as subcontractors. 00300-15 aY DATE SUBMITTED: 10/12/99 NAME OF BIDDER:GCI/GENERAL CONSTRUCTORS, INC. Instru 'ons: Strike out(X)nonapplicable signature block and complete applicable block. (ALL SIGNATO: •S MUST HAVE THEIR NAMES PRINTED OR TYPED BELOW THEIR SIGNATURES If Bidder is: SOLE PROPRIETORS (SEAL) (In .idual's Sie'. ure) (Individual's Name) doine business as ., Business Address: Phone No.: Florida Licens- o.: PARTNERSHIP (SEAL) (Partnership Name) """ (General Partner's Signa' x;N (Gen • ner's Name) Business address: Phone No.: Florid icense No.: a: 00300-14 DATE SUBMITTED: 10/12/99 NAME OF BIDDER:GCI/GENERAL CONSTRUCTORS, INC. Instructions: Strike out(X)nonapplicable signature block and complete applicable block. (ALL SIGNATORIES MUST HAVE THEIR NAMES PRINTED OR TYPED BELOW THEIR SIGNATURES) If Bidder is: A CORPORATION GCI/GENERAL CONSTRUCTORS, INC. (Corporation Name) FLORIDA (State of Incorporation) By TIMOTHY J. FIERRO (Name of person authorized to sign) PRESIDENT (Title) 17/71-77V 2rized Signature) (Corporate S,• ) Attest_ "�' , '11- L. FIERRO (Secretary) Business address: 991 EXPLORER COVE, SUITE 101 ALTAMONTE SPRINGS, FL 32701 PhoneNo.: (407) 831-8898 Corporation President: TIMOTHY J. FIERRO Florida License No.: CG—C017826 00300-15 DATE SUBMITTED: 10/12/99 NAME OF BIDDER: GCI/GENERAL CONSTRUCTORS, INC. Instri ions: Strike out(X)nonapplicable signature block and complete applicable block. (ALL SIGNATOR! MUST HAVE THEIR NAMES PRINTED OR TYPED BELOW THEIR SIGNATURES) If Bidder is: k•= A JOINT VENTURE `E itv By (Name) LS= (Address) • By rs ' • • ) (Address) =fir Business Address: • Phone No.: Florida License •.: j : (Each jo' venturer must sign. The manner of signing for each individual,partnership,and corporation tha ' a party to the r.. joint nture should be in the manner indicated above.) Florida License No.: 12. List the following in connection with the Surety which is providing the Bid Bond: Surety's Name: USF&G/ST. PAUL °' Surety's Address: C/O FINWALL & ASSOCIATES ATTN: MS. FAY FRYE 940 N. FERNCREEK AVENUE ORLANDO, FLORIDA 32853-1067 Name and address of Surety's resident agent for service of process in Florida: SAME AS ABOVE • END OF SECTION 00300-16 SECTION 00301 QUESTIONNAIRE DATE: 10/12/99 PROJECT IDENTIFICATION: CITY OF OCOEE, FLORIDA VEHICLE AND MATERIAL STORAGE BUILDING NAME OF BIDDER: GCI/GENERAL CONSTRUCTORS, INC. BUSINESS ADDRESS: 991 EXPLORER COVE, SUITE 101 ALTAMONTE SPRINGS, FL 32701 Phone No. (407) 831-8898 CONTRACTOR'S FLORIDA LICENSE NO. CG—C017826 The undersigned warrants the truth and accuracy of all staternens and answers herein contained. Include additional sheets if necessary. 1. Complete the following Table regarding experience with projects similar to the work contemplated under this Continuing Construction Services Agreemen:. . Date of Client's Name & Address (Include Amount of Contract Name of Project & Location Contact Name and Phone ) Contract Hangar/Office Facility for ATA Executive Air Center, Inc. @ Orlando Executive Airport 237 N. Crystal Lake Drive 83 Nilson Way Orlando, FL 32803 9/14/98 Orlando, FL 32803 Mr. Donald Dudley - 407-896-2799 $ 665,993.00 Hill Dermaceutical Office/ Hill Dermaceuticals, Inc. Manufacturing/Hangar Facility 2650 Mellonville Ave 2650 Mellonville Avenue Sanforcj FL 32772 10/25/95 Sanford, FL 32772 Mr. Jerry Roth - 407-323-1887 $ 937,659.00 Hill Dermaceutical 10,000 SF Hill Dermaceuticals, Inc. I Addition i 1 2/25/97 (Same as Above) (Same as Above) $ 365,805.00 Water Conserv I City of Orlando 11402 Boggy Creek Rd. 400 S. Orange Ave. I Orlando, FL 32824 Orlando, FL 32801 9/23/92 407-246-2146 $ 948,216.00 i Halliday Manufacturing Facility Halliday Products, Inc. 10,200 SF Addition 6425 Edgewater Dr. j 6425 Edgewater Dr. Orlando, FL 32810 1 2/25/97 Orlando, FL 32810 Mr. Chris Halliday - 407-298-4470 $ 189,949.00 I 1 Seminole Community College District Board of Trustees I 1 11 12,000 SF Office/Maintenance Seminole Community College Facility - Main Sanford Campus 100 Weldon Blvd. 6/14/93 Sanford, FL 32733 Sanford, FL 32733 $ 478,604.00 I I 407-323-1450 I - 00301-1 F] Date of Client's Name & Address (Include Amount of Contract Name of Project& Location Contact Name and Phone#) Contract 11111 The Master's Academy of The Master's Academy of Central FL Central Florida, Inc. 1250 N. Maitland Ave r` 1916 Slavia Rd Maitland, FL 32751 4/29/99 Oviedo, FL 32765 Mr. Mike Batts - 407-843-1681 $2,551,331.00 Kissimmee Utility Authority Kissimmee Utility Authority Administrative Office/ P.O. Box 423219 Warehouse Kissimmee, FL 32742 1701 W. Carrol St 407-933-7777 1/20/92 Kissimmee, FL $2,335,680.92 • Maintenance Facility Additions School Board of Seminole Co. 820 East State Road 434 400 E. Lake Mary Blvd Winter Springs, FL 32708 Sanford, FL 32773 9/23/92 407-320-0000 $1,217,825.00 2. Have you ever failed to complete work awarded to you? If so, where and why? • NO _. t. 111. is 3. Have you personally inspected the general alignments of the various utility improvements proposed under this Continuing Construction Services agreement? Describe any anticipated problems with the sites and your proposed �. solutions. • 4 -11U YES. NONE NOTICED AT THIS TIME. _ Y 4. Will you Subcontract anypart of the work involvingthe construction of underground utilities? If so, describe -'`i, gr t : `•r _41.x:. which portions. YES. SEWER, WATER AND STORM DRAIN. 00301-2 5. List the names and addresses of the subcontractors to be used for the portions of the contemplated work listed above. Subcontractor Certification Subcontract Name and Address of Subcontractor Registration No. &Name A-ntba- c Et-iaGon7D0 ELECTRICAL Po 3o x 737 Occea, r'— lLt7b( t--+'r .4,43 l .ipi Lind VI3 itck ,r'Ave_ U LFC-O-CgTjA PLUMBING 0 r.L t F 32807 RcI2 Satan +Seruec.e,?nL. Ht I vrreo HVAC g t3S N OST L C_0 3.55/ 7 bricvnaa, FL— ea ` IProic.5-ion M roh H� LIA FIRE 1)0-) 0 3 ' i o? F" 3�1t(� I � 3 -6� Uer6o'. t^ t— 347/2 l c u SITE DEVELOPMENT PD ~-Q-'l) Coni-ad c , J.� r"l.0 I�o� S'f�� s`f U or � C.I� 3 ► l � C� i-La.rw6o, Fl— 3 cf -- DRYWALL/FRAMING `S' E COrv�rn��. �� �� Saa a) « �'c.-til - - L-C_ Ott 7 S a--`4 o r l ot. -e l-'t— Saso t- p t N PAINTING -76010 o.Azeoy -, Lt) v .PX' ?ad -L zv2.711a fl MASONRY c -c1i G-P,I\�Gc (-orS ,. CSC.. 0 g IR t n,ple^r C.ev k a-. Spy tr_ 2.;-70 6. Disclosure (Section 00100, Article 20). Complete and attach "Sworn Statement on Public Entity Crimes" (Section 00482). 7. State the true and exact, correct, and complete name under which you do business. BIDDER IS: GCI/GENERAL CONSTRUCTORS, INC. END OF SECTION 00301-3 SECTION 00301-A COMPLIANCE WITH FLORIDA TRENCH SAFETY ACT (90-96,LAWS OF FLORIDA) Bidder hereby acknowledges that all costs for complying with the Florida Trench Safety Act are included in the various items of the bid and in the Lump Sum Total Bid Price shown in Section 00300 - Bid Form, "Schedule of Bid Items". For informational purposes only,the bidder is required to further identify these costs in the summary below. Trench Safety Unit of Measure Measure Unit Unit Extended (Description) (LF,SY) (Quantity) Cost Cost A 14`14 �-o "" L. I% 350. ' $ 1. s 350 B $ S C $ $ D $ $ TOTAL $ BIDDER: GCI/GENERAL CONSTRU TORS, INC. SIGNED: BY: TIMO J. FIERRO (Print or type name) TITLE: PRESIDENT DATE: 10/12/99 THIS IS NOT A PAY ITEM: The purpose of this form is to gather information on the costs associated with trench safety measures and to insure that the Bidder has considered these costs and included them in the Lump Sum Total Bid price. Contractor will not receive additional payment if actual quantities differ from those estimated or if the Contractor uses a safety measure different than those listed. (Failure to Complete This Form May Result in the Bid Being Declared Non-Responsive.) END OF SECTION 00301A-1 mow SECTION 00301-B DRUG-FREE WORKPLACE CERTIFICATION IDENTICAL TIE BIDS: Preference shall be given to businesses with drug-free workplace programs. Whenever two or more bids which are equal with respect to price, quantity, and service are received by the State or by any political subdivision for the procurement of commodities or contractual services,a bid received from a business that certifies that it has implemented a drug-free workplace program shall be given preference in the award process. Established procedures for processing tie bids will be followed if none of the tied vendors have a drug-free workplace program (Florida Statutes Section 287.037). In order to have a drug-free workplace program,a business shall: I. Publish a statement notifying employees that the unlawful manufacture,distribution,dispensing,possession, or use of a controlled substance is prohibited in the workplace and specifying the actions that will be taken against employees for violations of such prohibition. 2. Inform employees about the dangers of drug abuse in the workplace, the business's policy of maintaining a drug-free workplace, and available drug counseling,rehabilitation,and employee assistance programs, and the penalties that may be imposed upon employees for drug abuse violations. 3. Give each employee engaged in providing the commodities or contractual services that are under bid a copy of the statement specified in subsection(1). 4. In the statement specified in subsection (1), notify the employees that, as a condition of working on the commodities or contractual services that are under bid,the employee will abide by the terms of the statement and will notify the employer of any conviction of, or pleas of guilty or nolo contendere to, any violation of Chapter 893 or of any controlled substance law of the United States or any state,for a violation occurring in the workplace no later than five(5)days after such conviction. 5. Impose a sanction on, or require the satisfactory participation in a drug abuse assistance or rehabilitation program is such is available in the employee's community,by any employee who is so convicted. 6. Make a good faith effort to continue to maintain a drug-free workplace through implementation of this section. As the person authorized to sign the statement,I certify that this firm complies fully with the above requirements. Bidder: GCI/G , ' ' CO RUCTORS, INC. i I I I Signed: . By: TIMOT ' J. FIERRO (Print or Type Name) Title: PRESIDENT Date: 10/12/99 END OF SECTION 00301-B-1 "Inquiries: Finwall & Associates Ins., I-.. P. 0. Box 531067 940 N. Ferncreek Ave. Orlando, FL 32853-1067 SECTIO 00410 (407) 898-6000" BID B ND KNOW ALL.MEN BY THESE PRESENTS, that We, the ndersigned,GCI/General Constructors, In. . as Principal, and United States Fidelity and uaranty ompanyas Surety, are hereby held and firmly bound unto the City of Ocoee, Florida, as Owner in the penal sum of five percent of the Contract Bid Five Percent of Amount Bid for payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors and assigns. Signed, this_11th _day of October 19— , The condition of the above obligation is such that whereas the Principal has submitted to the City of Ocoee, arida a certain Bid, attached hereto and hereby made a part hereof to enter into a contract in writing, for the Ci of Ocoee Vehicle and Material Storage Building. NOW THEREFORE 1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to pay to Owner upon defa t of Bidder any difference between the total amount of Bidder's bid and the total amount of the bid of next lowest, responsible and responsive bidder as determined by Owner for the Work required by th Contract Documents, provided that: 1,1. If there is o such next lowest, responsible and responsive bidder, and Owner does not abandon the Project, then Bidder and Surety shall p y to Owner the penal sum set forth on the face of this Bond, and 1.2. In no event shall Bidder's and Surety's obligation hereunder exceed the penal sum set forth on the face of this Bond. 2. Default of Bidder shall occur upon the failure of Bi'der to deliver within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Amendment to the Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents and Contract Documents. 3. This obligation shall be null and void if: 3,1. Owner accepts Bidder's bid and Bidder delivers within the time required by the Bidding Documents (or any extension thereof a: -.. to in writing by Owner) the executed Amendment to the Agreement required by the Bidding s ocuments and any performance and payment bonds required by the Bidding Documents and Co tract Documents, or 3.2, All bids are rejected by Owner, or 3.3. Owner fails to issue a Notice of Intent to A and to Bidder within ninety (90)days from the time and date fixed for the opening of Bids (or : y extension thereof agreed to in writing by Bidder and, if applicable,consented to by Surety w required by paragraph 5 hereof). 4. Payment under this Bond will be due and payable u n default by Bidder and within thirty (30) calendar days after receipt by Bidder and Surety of written otice of default from Owner, which notice will be • given with reasonable promptness, identifying this nd and the Project and including a statement of the amount due, 00410.1 • S. Surety waives notice of any and all defenses • ed on or arising out of any time extension to issue no ice of award agreed to in writing by Owner and Bidder, provided that the total time for issuing notice of award including extensions shall not in the •ggregate exceed 120 days from Bid Due Date wi t Surety's written consent. b. No suit or action shall be commenced under • bond prior to 30 calendar days after the notice of def utt required in paragraph 4 above is received by :idder and Surety and in no case later than one year a r Bid Due Date. 7, Any suit or action under this Bond shall be co„ enced only in a court of competent jurisdiction loca • in the state in which the Project is located. 8, Notices required hereunder shall be in writing d sent to Bidder and Surety at their respective addras es shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier or by United States Registered or Certified Mail return receipt requested, postage pre-paid, and shall be deemed to be effective upon receipt by the •.. concerned. 9. Surety shall cause to be attached to this Bond, : current and effective Power of Attorney evidencing e • authority of the officer, agent or representativ- who executed this Bond on behalf of Surety to execu e, seal and deliver such Bond and bind the Surety ereby, 10, This Bond is intended to conform to all applies.le statutory requirements. Any applicable requirement of any applicable statute that has been omitted fro., this Bond shall be deemed to be included herein as if t forth at length. If any provision of this Bond •nflicts with any applicable provision of any applica,le statute, then the provision of said statute that govern and the remainder of this Bond that is not in conflict therewith shall continue in full force : , effect. 11. The term"bid" as used herein includes a bid,o er or proposal as applicable: IN WITNESS WHEREOF, the Principal and the Surety a:ve hereunto set their hands and seals, and such of -m as are corporations have caused their corporate seals to . hereto affixed and these presents to be signed by a it proper officers, the day and year first set forth above. 00410-2 ......_ __. , .. . BIDDER: trike out (X) non - applicable signature;block and complete applicable block. All signatures ust have their namesrinsed or below their ai tura, -~ If Bidder is SOLE PROPRIERTORSHIP, complete this signature block t (Ind'Qduai's Sunnite) (witness) (individual's Name) - (Winless) doing business as (SEAL) (Business Address) (Telephone N0.) (Florida License No.) If Bidder is PAItTNERRHtP,cony tete thin sfenttturo block._ (1) rship Name) (Witness) (2) (General Ptrtnor's Signature , (witness) \ / / (General Partner's Name) -- \ — (SEAL) (Business Address) Y /(Telephone No.) (Florida License No.) • 00410- . I . __ If Bidder is a CORPORATIO complete this sit�ture block, ATTEST: GCI/General Constructors, Inc. (Cotpo7—tt Name) -� I (Corporate Secretary,Signature) Florida (State of Incorporation) SHARON L. FIERRO (Corporate Secretary Name) By: TIMOTHY J. FIERRO (Name of person authorized to sign-see Note I) PRESIDENT (Tide (Au Signature (CORPORATE SEAL) TI OTHY J. FIERRO (Corporation President) 991 Explorer Cove #101 Altamonte Springs, FL 32701 (Business Address) ( 407) 831-8898 CG—C017826 (Telephone No.) (Florida License No,) • 00410-4 I ISURETY: WITNESS: (If Agent is nota Corporation) .. I United States Fidelity and Guaranty (I) — (Surety Business Name) company (Witness) I P.O. Box 31143 (2) w (witness) Tampa, FL 33631 i - (Principal Piece of Business) /'----- _ Vit? A'T'TEST; (If Agent is a Corporation) (Surety Agent's Signature See Note 2) •I \� Thomas Carter Finwall - "/` -21 ; r� ry5��m�) (Surety Agent's Name) ( (Corporate Attorney In Fact and Floridaill Colleen Finwall Licensed Agent _ (Surety Agent's Title) (Corporate Secretary Name) Finwall & Associates Insurance, Inc. ()Minna Name of Local Agent for Surety) P.O. Box 531067 Al940 N. Ferncreek Avenue (CORPORATE SEAL) I Orlando, FL 32853-1067 (Business Address of Local Agent) il ( 407) 898-6000 A084399 (Telephone No.) (Florida License No.) 111 NOTES: (1) Complete and attach "Corporate Authority to cute Documents" if executed by any corporate employee IIother than president or vice-president. (Z) Complete and attach a certified copy of "Po r-of-Attorney" prepared by Surety appointment indiv dual Po "Attorney-in-Fact" for execution of Bid Bond n behalf of Surety and corresponding notarized"Atto I y- 11 in-Fact". ed notice. (3) Above addresses are to be used for giving requ shall be considered plural here (4) Any singular reference to Bidder, Surety, or other party applicable. Department's most current list(Ci alar j (5) Surety companies executing bonds must agge on the Treasury Deg 570 as amended)and be authorized to transact iness in the state where the project is located. III 110410-5 16, ..-. , ... CORPO• TE AUTHORITY TO EXE UTE DOCUMENTS I HEREBY CERTIFY that a meeting of th Board of Directors of GCI/General Constructors, Inc. Flo ida (CC.a.exvo Corpora.Mantela corporation under the laws of the State of , held on the 3RD day of OCTOBER , 19 99, the fo in! resoluti•' duly passed and adopted: "RESOLVED, that . *10.11111" TIMOT K Y J. FIERRO as PRESIDENT (Avant el N 1 ' (l) I4ai am oftndMdud> - _••` the corporati•n, Is hereby authorized to execute and all documents required to be signed by an officer of the Corporation in ord r to submit a valid bid,contract and bond for City of Ocoee Vehicle & Material '.torage Building, City of Ocoee Engineering omem mono (aid No.) Department, Ocoee, Florida Bid #99-07 between the CITY OF OCOEE,a municipal corporation, and this corporation, and that his execution thereof, attested by the Secretary of the corporation and with corporate seal affixed shall be the official act and deed of this corporation.' I FURTHER CERTIFY that said resolution is now in full force and effect. IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the corporation this 4TH day of OCTOBER , 19 99 (CORPORATE SEAL) / r (Corporate Secretary) STATE OF FLORIDA SHARON L. FIERRO COUNTY OF SEMINOLE The foregoing instrument was acknowledge before me this 4TH day of_OCTOBER. 1999, by SHARON L. FIERRO _ (name of officer or agent, title of officer or agent), of GCI/GENERAL CONSTRUCTORS, INC. (name of corporation acknowledging), a FLORIDA (state or place of incorporation), corporation, on b f of the corporation. He/St tis rsonall Pey known to me or has produced identification (type of identification) as identification and did/did not take an oath, / -""-v ; (Notary Public) SHARON 1.. Mf+cnrtrHua My Commission Expires: Notary Public -State of Florida My Comrniulon Expires Jun 22.2001 Commission•CC657854 00410-6 UNITED STATES FIDELITY AND GUARANTY COMPANY POWER OF ATTORNEY Nf) 40,4200 NO. 107146 x +'V KNOW ALL MEN BY THESE PRESENTS:That UNITED STATES FIDELITY AND GUARANTY COMPANY,a corporation organized and existing under the laws of the State of Maryland and having its principal office at the City of Baltimore,in the State of Maryland,does hereby constitute and appoint Thomas Carter Finwall, Elizabeth S. Hendrick, Margaret Ann Burnett and E. Fay Frye of the City of Winter Park ,State of Florida its true and lawful Attorney(s)-in-Fact,each in their separate capacity if more than one is named above,to sign its name as surety to,and to execute,seal and acknowledge any and all bonds,undertakings,contracts and other written instruments in the nature thereof on behalf of the Company in its business of guaranteeing the fidelity of persons;guaranteeing the performance of contracts; and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. In Witness Whereof,the said UNITED STATES FIDELITY AND GUARANTY COMPANY has caused this instrument to be sealed with its corporate seal, duly attested by the signatures of its Senior Vice President and Assistant Secretary,this 22nd day of January ,A.D. 19 93 . tY UNITED STATES FIDELITY AND GUARANTY COMPANY 5 .. (Signed) By ,224494 A, Senior Vice President &11+ /21 (3. • (Signed) By Assistant Secretary STATE OF MARYLAND) SS: BALTIMORE CITY ) On this 22nddayof January ,A.D. 1993 ,before me personally came Robert J. Lamendola Senior Vice President of the UNITED STATES FIDELITY AND GUARANTY COMPANY and Paul D. Sims ,Assistant Secretary of said Company,with both of whom I am personally acquainted,who being by me severally duly sworn,said,that they,the said Robert J. Lamendola and Paul D. Sims were respectively the SeniotVice President and the Assistant Secretary of the said UNITED STATES FIDELITY AND GUARANTY COMPANY,the corporation described in and which executed the foregoing Power of Attorney;that t.ey each knew the seal of said corporation;that the seal affixed to said Power of Attorney was such corporate seal,that it was so affixed by order of the Board of Dire'tors of said corporation,and that they signed their names thereto by like order as Senior Vice President and Assistant Secretary,respectively,of the Company. My Commission expires the 11th day in .March/ A.D..19 95 . <®1I (Signed) NOTARY PUBLIC This Power of Attorney is granted under and by authority of the following Resolutions adopted by the Board of Directors of the UNITED STATES FIDELITY AND GUARANTY COMPANY on September 24 1992: RESOLVED,that in connection with the fidelity and surety insurance business of the Company,all bonds,undertakings,contracts and other instrumen relating to said business may be signed,executed,and acknowledged by persons or entities appointed as Attorney(s)-in-Fact pursuant to a Power of Attorney issu-d in accordance with these resolutions. Said Power(s)of Attorney for and on behalf of the Company may and shall be executed in the name and on behalf of the Co .any, either by the Chairman,or the President,or an Executive Vice President,or a Senior Vice President,or a Vice President or an Assistant Vice President,jointly wit.the Secretary or an Assistant Secretary,under their respective designations. The signature of such officers may be engraved,printed or lithographed. The signature o each of the foregoing officers and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any certificate relating thereto appointing Attome (s}in-Fact for purposes only of executing and attesting bonds and undertakings and other writingsobligatory in the nature thereofand,unless subseque.tly Y revoked and subject to any limitations set forth therein,any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal shall be valid nd binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding upon the Co .any with respect to any bond or undertaking to which it is validly attached. RESOLVED,that Attorney(s)-in-Fact shall have the power and authority,unless subsequently revoked and,in any case,subject to the terms and lirni .ons • of the Power of Attorney issued to them,to execute and deliver on behalf of the Company and to attach the seal of the Company to any and all bonds and underta 'ngs, and other writings obligatory in the nature thereof,and any such instrument executed by such Attorney(s)-in-Fact shall be as binding upon the Company as if si:•-. by an Executive Officer and sealed and attested to by the Secretary of the Company. 1, Paul D. Sims ,an Assistant Secretary of the UNITED STATES FIDELITY AND GUARANTY COMP NY, do hereby certify that the foregoing is a true excerpt from the Resolution of the said Company as adopted by its Board of Directors on September 24,1992 and t• this Resolution is in full force and effect. I,the undersigned Assistant Secretary of the UNITED STATES FIDELITY AND GUARANTY COMPANY do hereby certify that the foregoing Pow r of Attorney is in full force and effect and has not been revoked. In Testimony Whereof,l have hereunta set my hand and the seal oft ITED STATES FIDELITY AND GUARANTY COMPANY on this 11 t 'ay of October ,1999 � p ��j1:'C: ,a, „IL .r„raae � 18 t �p4 Assistant Secretary` �Ilx FS 3(10.92) SECTION 00480 NONCOLLUSION AFFIDAVIT STATE OF FLORIDA ) ss COUNTY OF SEMINOI)E TIMOTHY J. FIERRO ,being first duly swore deposes and says that: 1. He(it)is the PRESIDENT (Owner,Partner,Office,Representative or Agent) of GCI/GENERAL CONSTRUCTORS, INC. ,the Bidder that has submitted the attached Bid; 2. He is fully informed respecting the preparation and contents of the attached Bid and of all pertinent circumstances respecting such Bid; 3. Such Bid is genuine and is not a collusive or sham Bid; 4. Neither the said Bidder nor any of its officers, partners, owners, agents, representatives, employees, or parties in interest, including this affidavit, have in any way, colluded, conspired, connived or agreed, directly or indirectly, with any other Bidder, firm or person to submit a collusive or sham Bid in connection with the Contract for which the attached Bid has been submitted; or to refrains from bidding in connection with such Contract; or have in any manner, directly or indirectly, sought by agreement or collusion, or communication, or conference with any Bidder, firm,or person to fix the price or prices in the attached Bid or of any other Bidder,or to fix any overhead,profit,or cost elements of the Bid price or the Bid price in any other Bidder, or to secure through any collusion, conspiracy, connivance, or unlawful agreement any advantage against (Recipient), or any person interested in the proposed Contract; 5. The price or prices quoted in the attached Bid are fair and proper and are not tainted by any collusion, conspiracy, connivance, or unlawful agreement on the part of the Bidder or any othe . its agents, representatives, owners, employees or parties in interest,including his affidavit. By: 10TH' J. FIERRO Title: PR IDENT Sworn and subscribed to before me this 12TH day of OCTOBER , 19 99 ,in the State of FLORIDA ,County of SEMINOLE / • SHARON 1. MACARTHUR Notary Public -State1 or Florida 1 / My Commission Expires Jun 22.2001 • ogreG� Notary Public Commission r CC657854 , My Commission Expires: END OF SECTION • 00480-1 SECTION 00481 CERTIFICATION OF NONSEGREGATED FACILITIES The Bidder certifies that he does not maintain or provide for his employees any segregated facilities at any of his establishments, and that he does not permit his employees to perform their services at any location, under this control, where segregated facilities are maintained. The Bidder certifies further that he will not maintain or provide for his employees any segregated facilities at any of his establishments, and that he will not permit his employees to perform their services at any location under his control where segregated facilities are maintained. The Bidder agrees that a breach of this certification will be a violation of the Equal Opportunity clause in any contract resulting from acceptance of this Bid.As used in this certification,the term"segregated facilities"means any waiting rooms,work areas,restrooms and washrooms, restaurants and other eating areas, timeclocks, locker rooms and other storage and dressing areas, parking lots, drinking fountains, recreation or entertainment area, transportation, and housing facilities provided for employees on the basis of race, color, religion, or national origin, because of habit, local custom, or otherwise. The Bidder agrees that(except where he has obtained identical certification from proposed subcontractors for specific time periods) he will obtain identical certifications from proposed subcontractors prior to the award of subcontracts exceeding 510,000 which are not exempt from the provisions of the Equal Opportunity clause, and that he will retain such certifications in his files. The nondiscriminatory guidelines as promulgated in Section 202,Executive Order 11246,and as amended by Executive Order 11375 and as amended,relative to Equal Opportunity for all persons and implementations of rules and regulations prescribed by the United States Secretary of Labor are incorporated herein. Note: The penalty for making false statements in offers is prescribed in 18 U.S.C. 1001. Date OCTOBER 12 , 1999 . GCI/GE CONST -CTORS, INC. Official Address By: (including Zip Code): TIMOTHY J. FI RRO PRES IDENT (Title) 991 EXPLORER COVE, SUITE 101 ALTAMONTE SPRINGS, FL 32701 ATTACH AND INCLUDE AS PART OF PROPOSAL FORM; FAILURE TO DO SO MAY BE CAUSE FOR DISQUALIFICATION OF YOUR BID. END OF SECTION 00481-1 • SECTION 00482 (Page 1 of 2) SWORN STATEMENT UNDER SECTION 287.133(3)(a), FLORIDA STATUTES,ON PUBLIC ENTITY CRIMES 1 THIS FORM MUST BE SIGNED IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICE" AUTHORIZED TO ADMINISTER OATHS. 1. This sworn statement is submitted to City of Ocoee,Florida by TIMOTHY J. FIERRO, PRESIDENT OF GCI/GENERAL CONSTRUCTORS, INC. (Print individual's Name&Title) 7 whose business address is 991 EXPLORER COVE, SUITE 101 1` ALTAMONTE SPRINGS, FL 32701 2. I understand that a "public entity crime" as defined in Paragraph 287.133(1)(8), Florida Statutes, means a violatio of any state or federal law by a person with respect to and directly related to the transaction of business with an, public entity or with an agency or political subdivision of any other state or with the United States,including,but net limited to, any bid or contract for goods or services to be provided to any public entity or an agency or politic.l subdivision of any other state or of the United States and involving antitrust, fraud, theft, bribery, collusio , racketeering,conspiracy,or material representation. 3. I understand that "convicted" or "conviction" as defined in Paragraph 287.133(1)(b), Florida Statutes, means finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal o state trial court of record relating to charges brought by indictment or information after July 1, 1989, as a result of: j� jury verdict,nonjury trial,or entry of a plea of guilty or nolo contendere. ® 4. 1 understand that an"affiliate"as defined in Paragraph 287.133(1)(a),Florida Statutes,means: a. A predecessor or successor of a person convicted of a public entity crime: or b. An entity under the control of any natural person who is active in the management of the entity and who h.. 1 been convicted of a public entity crime. The term "affiliate" includes those officers, directors, executive,, partners,shareholders, employees,members,and agents who are active in the management of an affiliate. Th ownership by one person of shares constituting a controlling interest in another person, or a pooling o I equipment or income among persons when not for fair market value under an arm's length agreement,shall be prima facie case that one person controls another person. A person who knowingly enters into a joint ventur- with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shal be considered an affiliate. 5. I understand that a "person" as defined in Paragraph 287.133(1)(e), Florida Statutes means any natural person o entity organized under the laws of any state or of the United States with the legal power to enter into a bindin: contract and which bids or applies to bid on contracts for the provision of goods or services let by a public entity, o which otherwise transacts or applies to transact business with a public entity. The term "person" includes thos- officers, directors, executives, partners, shareholders, employees, members, and agents who are active • 111 management of an entity. 6. Based on information and belief,the statement which I have marked below is true in relation to the entity submittin: this sworn statement. (please indicate which statement applies). X Neither the entity submitting this sworn statement, or one or more of its officers, directors, executive•, partners, shareholders, employees, members, or agents who are active in management of the entity, n•r 11 111 00482-1 I any affiliate of the entity have been charged with and convicted of a public entity crime subsequent to July 1, 1989. The entity submitting this sworn statement, or one or more of the officers, directors, executives, partners, shareholders, employees, members, or agents who are active in management of the entity, or an affiliate of this entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. The entity submitting this sworn statement, or one or more of the officers, directors, executives, partners, shareholders, employees, members, or agents who are active in management of the entity, or an affiliate of this entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. However,there has been a subsequent proceeding concerning the conviction before a Hearing Officer of the State of Florida, Division of Administrative Hearings. The final order entered by the Hearing Officer determined that it was not in the public interest to place the entity submitting this sworn statement on the convicted vendor list. (Please attach a copy of the final order.) I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 1 (ONE) ABOVE IS FOR THAT PUBLIC ENTITY ONLY AND,THAT THIS FORM IS VALID THROUGH 12/31/99 I ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES FOR CATEGORY TWO OF CHANGE IN THE INFORMATION CONTAINED IN THIS FORM. (Signa e) I /THY J. FIERRO Date: 10/12/99 GCI/GENERAL CONSTRUCTORS, INC. Name of Bidder(Contractor) STATE OF FLORIDA COUNTY OF SEMINOLE PERSONALLY APPEARED BEFORE ME,the undersigned authority, TIMOTHY J. FIERRO who,after first being sworn by me,affixed his/her signature in the place provided above on this 12TH PIL day of OCTOBER , 1949 Notary Publi My Commission Expires: NotSHARaty -StateTM orlda My Commission Expires Jun 22.2001 END OF SECTION Commission�'CC657854 • 00482-2 "' N SECTION 00483 CERTIFICATION OF NONDISCRIMINATORY LABOR PRACTICES This certification relates to a construction contract proposed by the City of Ocoee. Equal Opportunity Employment: The Contractor shall not discriminate on the basis of race, color, national origin, gender, age, handicapped status,veteran status,and/or religion in performing the work governed by this contract. The City is an Equal Opportunity Employer(EOE)and as such encourages all contractors to comply with EOE regulations. Any subcontract the Contractor may enter into shall include this clause with the same degree of application being encouraged. I am the undersigned prospective construction contractor or subcontractor. I certify that... (1) I have/ )X have not participated in a previous contract or subcontract subject to the Equal Opportunity Clause and (2) If I have participated in a previous contract or subcontract subject to the Equal Opportunity Clause,I have/ have not filed with the Joint Reporting Committee, the Director of the Office of Federal Contract Compliance Programs, or the Equal Employment Opportunity Commission all reports due under the applicable filing requirements. I understand that, if I have participated in a previous contract or subcontract subject to the Equal Opportunity Clause and have failed to file all reports due under the applicable filing requirements, I am not eligible, and will not be eligible, to have my bid or offer considered, or to enter into the proposed contract or subcontract, unless and until I make an arrangement regarding such reports that is satisfactory to the office where the reports are required to be filed. I agree that I will obtain identical certifications from prospective lower-tier construction subcontractors when I receive bids or offers or initiate negotiations for any lower-tier construction su'contracts with . price exceeding$10,000. I also agree that I will retain such certifications in my files. Date OCTOBER 12 , 19 99 By: (Si: ature of Au orized Official) TIMOTHY . FIERRO, PRESIDENT GCI/GENERAL CONSTRUCTORS, INC. (Name of Prospective Construction Contractor or Subcontractor) 991 EXPLORER COVE, SUITE 101 (Address of Prospective Construction Contractor or Subcontractor) ALTAMONTE SPRINGS, FL 32701 (407) 831-8898 59-2077843 (Telephone Number) (Employer Identification Number) END OF SECTION I I 00483-1 g RECEIVED ADDENDUM NO. 1 •To: All Plan Holders 0 Date: October 4, 1999 IlOwner: Ocoee Vehicle & Material Storage Building Bid Date: October 13, 1999 / —yr I ey \c.NN - Prepared by: Glace & Radcliffe, Inc. 630 N. Wymore Road N. Maitland, FL 32751 (407)647-6623 ,.� APPROVED BY: �, —; � `- Curtis R Burkett, P.E. —Division Manager I This Addendum sets forth changes and/or additional information as referenced and 1 is hereby made part of, and should be attached to, subject Project Manual and Drawings of the Contract Documents. IThis Addendum is transmitted to all plan holders by facsimile. Immediately subsequent to the receipt of the attached Addendum, please acknowledge receipt of Isame by signing and date below and returning copy of this page by facsimile. I II RECEIVED BY: 10/7/99 IrAuthori e. by Sitature (name) Date TIMOT 'Y J. FIERRO, PRESIDENT I GCI/GENERAL CONSTRUCTORS, INC. Company Name I FAX: (407) 539-0575 ATTN: Brett Long FRN GLH=:E::R r". L I FFE. IMC. -- F'HOI IE HO.i. Oct. 1999 0-4: L'=;F'hl F'1 �J 672:2) GLACE & RAI>CL1k H E 1N .. Gonsultin Engineers coma) ting v 630 N.\\'whore Road,Suite 370• Maitland,Florida 327 I A\VCG, Inc.Company (407)647-6623 fax: (407)530-0575 • 8y RECEJV:.D CI GC FACSIMILE TRANSMITTAL SHEET TO: TIM FIERRO FROM: BRETT LONG COMPANY: GCI/GENERAL DATE: OCTOBER 8, 1999 CONSTRUCTORS, INC. PHONE NUMBER: 407-831-8898 TOTAL NO- OF PAGES INCLUDING COVER: 7 FAX NUMBER: 407-831-1223 PROJECT NUMBER: 98518.01 Re:Addendum #3 for Ocoee Vehicle& Storage Building 0 URGENT 0 EOR REVIEW 0 PLEASE COMMENT ❑PLEASE REPLY In PLEASE RECYCLE NOTES/COMMENTS: Plea.c FAX Addendum Cover for confirmation of receipt to (407)539-0575. RECEIVED BY: 10/11/99 TIMOT J. F RR , PRESIDENT DATE GCI/G NERAL CONSTRUCTORS, INC. E-Mail Address: Phone No. Fax No. wcg@grboa.com (407)647-6623 (407)539-0575 Design ■ Planning ■ Construction Oct- 11 -99 1 L : �► moi' ey ADDENDUM NO. 4 — /— To: All Plan Holders Date: October- 11, 1999 Owner: Ocoee Vehicle & Material Storage Building Bid Date: October 12, 1999 Prepared by: Glace & Radcliffe, Inc. 630 N. Wymorc Road Maitland, FL 32751 (407)647-6623 APPROVED BY: derZ?e/firth/44 Curtis R Burkett, P.E. — Division Manager This Addendum sets forth changes and/or additional information as referenced and is hereby made part of, and should be attached to, subject Project Manual and Drawings of the Contract Documents. This Addendum is transmitted to all plan holders by facsimile. Immediately subsequent to the receipt of the attached Addendum, please acknowledge receipt of same by signing and date below and returning copy of this page by facsimile. RF.CEIVLD BY: _ _ 10/11/99 Authori.ed y S gnu ore (name) Date TI. OTHY J. FIERRO GCI/GENERAL CONSTRUCTORS, INC. Company Name FAX: (407) 539-057; A l I N: Brett Long Doug Ross Construction Services, Inc. State Certified General Contractor#CGC 07575 DATE SUBMITTED: October 12, 1999 NAMEOFBIDDER: Doua Ross Construction Services, Inc. SECTION 00300 BID FORM SUBMITTED: 10—12—9 9 (Date) PROJECT IDENTIFICATION: CITY OF OCOEE,FLORIDA VEHICLE AND MATERIAL STORAGE BUILDING NAMEOFBIDDER: Doug Ross Construction Services , Inc. 513 W. Colonial Dr. #8 BUSINESS ADDRESS: Orlando, FL PHONE NO.: 407-841-7559 CONTRACTOR'S FLORIDA LICENSE NO.: CG c 0 3 7 5 7 5 THIS BID IS SUBMITTED TO: City of Ocoee,Florida(hereinafter called Owner) 1. The undersigned Bidder proposes and agrees, if this Bid is accepted,to enter into an Amendment to the Agreement with Owner in the form included in the Contract Documents, to perform and furnish all Work as specified or indicated in the Contract Documents for the Contract Price and within the Contract Time indicated in this Bid Form and the Amendment to the Agreement, and in accordance with the other terms and conditions of the Contract Documents. 2. Bidder accepts all of the terms and conditions of the Bidding Documents including without limitation those dealing with the disposition of Bid Bond. This Bid will remain open for ninety (90) calendar days after the day of Bid opening. BIDDER will sign and deliver the required number of counterparts of the.Amendment to the Agreement with the Bonds and other documents required by the Bidding Requirements within ten (10) days after the date of OWNER'S Notice of(Intent to)Award. 3. In submitting this Bid, Bidder makes all representations required by the Instructions to Bidders and the Agreement and further warrants and represents that: a. Bidder has examined copies of all the Bidding Documents and of the following Addenda: No. 1 Dated 99=14—9 940._ Dated No. 2 Dated9-14—9_ 9‘10. Dated No. 3 Dated 1Q-8-9`9._ Dated_ No. 4 Dated10—1 1—99.. Dated (Receipt of all which is hereby acknowledged)and also copies of the Invitation for Bids and the Instructions to Bidders. b. Bidder has familiarized itself with the nature and extent of the Contract Documents,Work,site, locality,and all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance or furnishing the Work. c. BIDDER has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface of subsurface structures at or 00300-1 513 West Colonial Drive,Suite#8,Orlando,Florida 32804, Phone(407)841-7559*Fax(407)843-1126 DATE SUBMITTED: 10-1 2-99 NAMEOFBIDDER:Doug Ross Construction Services , Inc. contiguous to the site (except Underground Facilities) which have been identified in the Supplementary Conditions as provided in paragraph 4.2.1 of the General Conditions. BIDDER accepts the determination set forth in paragraph SC-4.2 of the Supplementary Conditions of the extent of the"technical data"contained in such reports and drawings upon which BIDDER is entitled to rely as provided in paragraph 4.2 of the General Conditions. BIDDER acknowledges that such reports and drawings are not Contract Documents and may not be complete for BIDDER's purposes. BIDDER acknowledges that OWNER and Engineer do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Bidding Documents with respect to Underground Facilities at or contiguous to the site. d. BIDDER has obtained and carefully studied(or assumes responsibility for having done so)all such additional or supplementary examinations, investigations,explorations,tests, studies and data concerning conditions(surface, subsurface and Underground Facilities)at or contiguous to the site or otherwise which may affect cost progress, performance or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences and procedures of construction to be employed by BIDDER and safety precautions and programs incident thereto. BIDDER does not consider that any additional examinations, investigations, explorations, tests,studies or data are necessary for the determination of this Bid for performance and furnishing of the Work in accordance with the tunes,price and other terms and conditions of the Contract Documents. e. BIDDER is aware of the general nature of Work to be performed by OWNER and others at the site that relates to Work for which this Bid is submitted as indicated in the Contract Documents. f. BIDDER has correlated the information known to BIDDER,information and observations obtained from visits to the site, reports and drawings identified in the Contract Documents and all additional examinations, investigations,explorations,tests,studies and date with the Contract Documents. g. BIDDER has given ENGINEER written notice of all conflicts, errors, ambiguities or discrepancies that BIDDER has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to BIDDER, and the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work for which this Bid is submitted. h. This Bid is genuine and not made in the interest of or on behalf of any undisclosed person,firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation;BIDDER has not directly or indirectly induced or solicited any other Bidder to submit a farce or sham Bid; BIDDER has not solicited or induced any person, firm or corporation to refrain from bidding; and BIDDER has not sought by collusion to obtain for itself any advantage over any other Bidder or over OWNER. i. BIDDER hereby agrees to commence WORK under this contract on or before a date to be specified in the NOTICE TO PROCEED and to fully complete all work of the PROJECT within the Contract Time specified in the Amendment to the Agreement (Section 00500B). BIDDER further accepts the provisions of the , Amendment to the Agreement as to liquidated damages and agrees to pay as liquidated damages the amount stated in the Amendment to the Agreement(Section 00500B),for each consecutive calendar day completion of the Work is delayed. Completion Schedule 1) The Project shall be substantially complete (successful pressure testing and bacteriological testing of completed water mains) lone-hundred&eighty(180)consecutive calendar days from the official Notice to Proceed. 00300-2 DATE SUBMITTED: 10-12-99 NAMEOFBIDDER:poug Ross Construction Services, Inc. 2) The Project shall be fmally complete(Completed and Ready for Final Payment)two-hundred& seventy (270)days from the official Notice to Proceed. 4. All bid items shall include all materials, equipment, labor,permit fees, taxes, tests, miscellaneous costs of all types, overhead,and profit for the item to be complete,in place,and ready for operation in the manner contemplated by the Contract Documents.Bidder submits the following TOTAL BID OR TOTAL BASE BID to perform all the Work as required by the Drawings and Specifications. 5. In accordance with Article 17 of the Instructions to Bidders, if the Contract is to be awarded, it will be awarded on the basis of the lowest"Total Base Bid"after adjustments for additive or deductive alternates. Additive or deductive alternates(if any)will be considered in determining the lowest responsive,responsible Bidder. The Owner reserves the right to accept any or all additive or deductive alternates,in his sole discretion,prior to the award of the Contract. The Owner also reserves the right to delete any portion of the Work as shown in the bid schedule prior to award and adjust each bidder's"Total Bid"accordingly. 6. The following documents are made a condition of this Bid: ' I a. Bidding Documents and shall include the following: 1. Bid Forms(entire Section 00300,00301,00301A and 00301B) 2. Bid Bond(Surety Bond or Cashier's Check). (Section 00410) 3. Corporate Authority to execute Bid 4. Power of Attorney(for Surety Bond only) 5. Noncollusion Affidavit(Section 00480) 6. Certification of Nonsegregated Facilities(Section 00481) 7. Sworn Statement on Public Entity Crimes(Section 00482) 8. Certification of Nondiscriminatory Labor Practices(Section 00483) b. Executed"Part A,Contract to Perform Continuing Construction Services(dated August, 1998)" (Remainder of Page Left Blank Intentionally.) .Y) 00300-3 DATE SUBMITTED: 10-12-99 NAME OF BIDDER: Doug Ross Construction Services , Inc. • (Page Left Blank Intentionally.) 00300-4 I - , ...AjO 1 I 't'l t.1 o . . O o lrj t� \\ 1. 11' • o ..H.'‘"'''.......-'..' , . :. • T @ j,.., ------- '''. ,,..,..,..c. ..,,..:.,_.,.4 1'.\-- . :.4..., , , tit Q I tiQ r(� Q q G� V;t n cr) W III FW . 000 WUw U O a v Z QLz, Q m',.-t.,=1'..:, .., — jFF' W � p -I-Ico U A 1Y I N m V O W . N m _ ' -oA = • a ; o a E N ", CG o o n I °, O - a q \ L1 E ao o CT o Cn W �. m o 3 y t11 ' ° ° c c °n c (u c _ Ca E = 0 2 w o c c • • C7 R ? AN i� E a c Q WW ° N - o Q a. C7 .= U 0) U O ,0 -b 0 0 0 v ,r, ... - 0 0 w 11:11Z1::: — ,_- I a> ,.. o• z Ex , >, C O U H 6 x I o o 41 V co C) cu -rl «.1 tv cc N a 0 0 U lo 0 W HA A H :4: �O � � n V 1 r.,,, , .:5l1.:.:''Z1'r•4:',:,....:•..:.•,.:' \)‘. ° )C ° • . 0 0 ti 5 ; c.,"2: `‘.!' • 1 —., ..:,,r... c- ,v,. i 1 :.::...... :11P*;\((:)1 Si$44 .' :4)i..S .cL) if b".:' 14.. jz,44S.:(")1%QIN.1 l'.'.::S'S k"... 0.1 �� "1�� G7 �� EZ Rr .�] .-]] ....] .w_l a0H u wok E-1 E-1 WflCn (NI 00 Ca —, Q' en N W U • o u x A W a, a o x :•r....:...:.'.'...::''.:174.rt.l.r.':',r:..1.:''''''.'-''*Z;'7:1.:''i:).!':5'.'...:°..4'.':'.r:.'''.'''.'.'....r':,'':i''..'...:.'u c U1 " at aNi CO U On CI)) • o cG ct v15 .- Gin isI • � ami c o --5'.;4) y :>.'t G4 �3 E ❑ Er' • '` aon 5 a�O ; b ; a� 8 ° H a ca 3 4-1 o w Ean co an c c io c 3 CZ c15 .c cw W W CLQ W W••70.::8,.,•,,,,:. Q. 0 0 — N — c 0 • c O a.) Z = o0 H 1 6 O 0 O En CO co CD - U ,j to a w �- 0 0 0 Ul0 0 U 1 in O 1 Ix •0 O A r W H A POG Pa • O cn w H2 ¢ ¢ O Z s.'t t- „ — --t., el ci 0 . [..4 -A .11.%•• '''.. * ''' et `--sEt.-\Z' Z Q NY -..- 1- \:&. i 4 � �-csvee nCl t �,. s r t l „..a . -- - : 'N' '4' ,._, . s. ;t L \ t/1 v) .a 4 4 ..a ..a Z G7 4) i, ,,WF„ WO "-Iii-.11_, -- . 0 O F ,, ; - N N In WI M 1.:) - — H p G a 06. 04 U) F F .. N G 1”' Q .. U W Z CD Q Cnr U u r W ; n. 0 U Q a) rnrn a) O o .n c p" a VG 7 cc c a to I U ,a Q U ou Uv W 14 yH A w c'.FD .a H oq iNCO cu 0 cp cn (14 "' "p h )4, t--- C ,�Q QUl N P . a U U O 0 U• °' >~ 5 H � cc U m N U cat 3 N s~ . 0 +) U O U U) 1 W 0 P4 •O W Ca CO Ey O w Az a cA t U °) 0 o.. C w °• Is' 0 F Z , _- a z a 2V 1 eP a C7 i its S. Z a 0.4 A �� u, W :: �, 4 GWO E c- _ .. �J • O h i1 I CJ w o �''a 0 j �O W a_ � CO F DE., s c �, ., U w V > = E -� 2c:i >,-i o ` N C4 < ? ca c Cl) W y cd L a+ h y >,' -1. �+ V w C y 0 0 x d y 3 -ria, n' a p< o 0 '' o _ =a o . _ z 0 0 0.. 4-6 L 01 0 Q 0OaCC W . _++ 01 .0 " C .r co o :.,:j c o. .-4 o _ 0 'a EI lx Ty ._ p- 8 o o - U H oa LaW � 30aC - :° I. 0 N D�. n 1 F- O a1 >.To a� o cnt. -.F- c0 wO ca..E o G v �tla W a I-.. :G O N N GC CI ZE F v) U U Li] O ' II 0 0 H c a) 0 a� •.-1 CD U z 0 0 • z 0 0 rn w O� (A I 0 N o 0 oW E- o o H z DATE SUBMITTED: 10—12—9 9 NAMEOFBIDDER:Doug Ross Construction Services , Inc. 7. The terms used in this Bid,which are defined in the General Conditions or Instructions of the Construction Contract, included as part of the Contract Documents have the meanings assigned to them in the General Conditions or Instructions. 8. The work shall be performed under a Florida Contractor's License. Contract shall not be awarded unless proof of valid license(s)is provided. 9. It is understood that where quantities for unit price work have been presented in the foregoing Schedule of Bid Items, they are approximate only and are solely for purpose of facilitating the comparison of bids, and that the Contractor's compensation will be computed upon the basis as described in the measurement and payment clauses in the specifications contained herein. 10. BASE BID-SCHEDULE OF MANUFACTURERS/SUPPLIERS If the foregoing Schedule of Bid Items is presented in a Base Bid format,the undersigned as Bidder agrees that the Contract, if awarded, will be on the basis of the materials and equipment named in the Contract Documents in accordance with Article 9 of the Instructions to Bidders. The undersigned as Bidder also agrees that for the "Base Bid"equipment and material items listed below the Bidder will provide one of the listed manufacturers/suppliers,by circling "A", "B", or "C". If the Bidder desires to propose an alternate manufacturer/supplier, he may write in the name of such alternate in the substitution list included within this Bid Form, but he must, nevertheless, also circle one of the listed manufacturers/suppliers. If the proposed alternate manufacturer/supplier is determined "not equivalent" by the Engineer, the Bidder must furnish equipment and/or material items by the circled manufactur- er/supplier. If the Bidder fails to indicate which listed manufacturer/supplier he intends to use if an alternate is rejected, he must use the manufacturer/supplier listed as "A". Also, if the Bidder circled more than one listed manufacturer/supplier,he must use the first manufacturer/supplier circled(unless an alternate is approved). 11. SUBSTITUTIONS AND"OR EQUAL" The undersigned as Bidder agrees that substitutions or "or-equal" items will not be considered until after the "Effective Date of the Agreement"and will be evaluated in accordance with paragraphs 6.7.1,6.7.2,and 6.7.3 of the General Conditions. In addition to the reimbursement required under the General Conditions, the Contractor shall also reimburse the Owner for any engineering costs directly attributable to the change in manufacturers/suppliers, caused by the acceptance of proposed alternates, such as; additional field trips for the Engineer, additional redesign costs, and additional review costs, etc. Other costs directly attributable to the change in manufacturers/suppliers caused by the acceptance of proposed alternates, such as; increased electrical requirements, larger building, additional pumps or tankage, etc., shall be borne by others and not the Owner. If Bidder intends to propose substitutions or "or-equal" items after the "Effective Date of the Agreement", it is agreed that these items will be listed on the Substitution List included within this Bid Form,with a deductive amount representing 50 percent of the total savings between the named Base Bid item and the proposed item. "Base Bid" item substitutions providing to the Owner an equipment or material cost savings of less than $1,000 will not be considered. The undersigned as Bidder,also agrees that if a substitution or"or-equal"item is not listed on the Substitution List included with the Bid, all of the savings between the named item and the proposed item will go to the Owner if the Owner accepts the proposed item in accordance with paragraphs 6.7.1., 6.7.2, and 6.7.3 of the General Conditions. The Owner may request,and the undersigned Bidder shall supply,complete information on proposed substitutions. Such information shall be the manufacturer's current published or preprinted information for the specific substitution. 12. As BIDDER, I hereby certify that I am aware and understand that the City of Ocoee at its sole discretion reserves the right to waive technicalities or irregularities,to reject any or all Bids, and/or to accept that Bid which is in the best interest of the City. The Award of this Bid,if made,may be based on considerations other than total cost,and may be awarded based on various considerations, including but not limited to: BIDDER experience and whether the Bid,in the judgement of the City,is the most responsive to City needs. The City of Ocoee encourages the use of minorities and women-owned businesses as subcontractors. 00300-15 DATE SUBMITTED: 10—12-99 NAME OF BIDDER: Doug Ross Construction Services , Inc. ens: Strike out(X) pp � lnstru' nonapplicable signature block and complete applicable block. (ALL SIGNATORIES � MUST HAVE THEIR NAMES PRINTED OR TYPED BELOW THEIR SIGNATURES) V If Bidder is: 7-7 SOLE PROPRIETORS' • (SEAL) (In..vidual's Sign... e) (Individual's Name) doing business as Business Address: Phone No.: Florida License777777 ..: • PARTNERSHIP (SEL) (Partnership Name) (General Partner's Signature) 7,77 • (Gene . ' Name) Business address: Phone No.: Florida License No• 00300-14 DATE SUBMITTED: 10-12-9 9 NAMEOFBIDDER: Doug Ross Construction Services, Inc. Instructions: Strike out(X)nonapplicable signature block and complete applicable block. (ALL SIGNATORIES MUST HAVE THEIR NAMES PRINTED OR TYPED BELOW THEIR SIGNATURES) If Bidder is: A CORPORATION Doug Ross Construction Serivices , Inc. (Corporation Name) Florida (State of Incorporation) By Rick A. Mar hand ' (N. e of per•4 n authorized to sign) Vice P - ' . - 4 / Title) AO .0A0' l-grylf'S .t.., i•uthorized .4 .lure) (Corporate Seal Attest 0 ' John Becker (Secretary) Business : dress: 13 West Colonial Drive #8 , Orlando, FL 32804 Phone No.: (407) 841-7559 Corporation President: Doug ROSs Florida License No.: CG C 0 3 7 5 7 5 i 00300-15 DATE SUBMITTED: 10-12-99 NAME OF BIDDER: Doug Ross Construction Services, Inc. Ins' ctions: Strike out(X)nonapplicable signature block and complete applicable block. (ALL SIGNATORIE MUST HAVE THEIR NAMES PRINTED OR TYPED BELOW THEIR SIGNATURES) If Bidder is. AJOINTVE " By (Name) (Address) By e) (Address) Business Address: Phone No.: Florida License (Each jo's enturer must sign. The manner of signing for each individual,partnership,and corporation th. 's a party to the joint v= ture should be in the manner indicated above.) lorida License No.: 12. List the following in connection with the Surety which is providing the Bid Bond: Surety's Name: Capitol Indemnity Corporation Surety's Address: PO Box 5900, Madison Wisconsin 53705-0900 Name and address of Surety's resident agent for service of process in Florida: Guignard Company 1904 Boothe Circle, Longwood, FL 32750 END OF SECTION 00300-16 SECTION 00301 QUESTIONNAIRE DATE: 10-12-99 PROJECT IDENTIFICATION: CITY OF OCOEE, FLORIDA VEHICLE AND MATERIAL STORAGE BUILDING NAME OF BIDDER: Doua Ross Construction Services, Inc. BUSINESSADDRESS:513 West Colonial Dr. #8 , Orlando, FL 32804 Phone No.407-841-7559 CONTRACTOR'S FLORIDA LICENSE NO. CG C037575 The undersigned warrants the truth and'accuracy of all statements and answers herein contained. Include additional sheets if necessary. 1. Complete the following Table regarding experience with projects similar to the work contemplated under this Continuing Construction Services Agreement. Date of Client's Name&Address(Include Amount of Contract Name of Project&location Contact Name.and Phone I) Contract See Attached List 00301-1 Date of Client's Name&Address(Include Amount of Contract Name of Project&Location Contact Name and Phone#) Contract --. - 2. Have you ever failed to complete work awarded to you? If so, where and why? NO 3. Have you personally inspected the general alignments of the various utility improvements proposed under this Continuing Construction Services agreement? Describe any anticipated problems with the sites and your proposed solutions. Yes No Anticipated problems at this time. 4. Will you Subcontract any part of the work involving the construction of underground utilities? If so, describe which portions. Yes all portions . 00301-2 5. List the names and addresses of the subcontractors to be used for the portions of the contemplated work listed above. Subcontract Name and Address of Subcontractor Subcontractor No. Certification Registration No. &Name A)Ol< 114ec A 047 6q I 6. Disclosure (Section 00100, Article 20). Complete and attach "Sworn Statement on Public Entity Crimes" (Section 00482). 7. State the true and exact, correct, and complete name under which you do business. BIDDER IS: Doug Ross Construction Services, Inc. END OF SECTION 00301-3 SECTION 00301-A COMPLIANCE WITH FLORIDA TRENCH SAFETY ACT (90-96,LAWS OF FLORIDA) Bidder hereby acknowledges that all costs for complying with the Florida Trench Safety Act are included in the various items of the bid and in the Lump Sum Total Bid Price shown in Section 00300 -Bid Form, "Schedule of Bid Items". For informational purposes only,the bidder is required to further identify these costs in the summary below. Trench Safety Unit of Measure Measure Unit Unit Extended (Description) (LF,SY) (Quantity) Cost Cost A Bench 1f 1 $ 50.00 $ 50.00 B $ $ C , $ $ D $ $ /---- • TOTAL $ BIDDE l(/ : Doug a C. str • ti . . Services, Inc. SIGNED A41. / 4 O n 11,4 BY: Rick A. Marchand (Print or type name) TITLE: Vice President DATE: 10-12-99 THIS IS NOT A PAY ITEM: The purpose of this form is to gather information on the costs associated with trench safety measures and to insure that the Bidder has considered these costs and included them in the Lump Sum Total Bid price. Contractor will not receive additional payment if actual quantities differ from those estimated or if the Contractor uses a safety measure different than those listed. (Failure to Complete This Form May Result in the Bid Being Declared Non-Responsive.) END OF SECTION 00301A-1 SECTION 00301-B DRUG-FREE WORKPLACE CERTIFICATION IDENTICAL TIE BIDS: Preference shall be given to businesses with drug-free workplace ro . Whenever two or g kP P �s more bids which are equal with respect to price, quantity, and service are received by the State or by any political subdivision for the procurement of commodities or contractual services,a bid received from a business that certifies that it has implemented a drug-free workplace program shall be given preference in the award process. Established procedures for processing tie bids will be followed if none of the tied vendors have a drug-free workplace program (Florida Statutes Section 287.037). In order to have a drug-free workplace program,a business shall: 1. Publish a statement notifying employees that the unlawful manufacture,distribution, dispensing,possession,or use of a controlled substance is'prohibited in the workplace and specifying the actions that will be taken against employees for violations of such prohibition. 2. Inform employees about the dangers of drug abuse in the workplace, the business's policy of maintaining a drug-free workplace,and available drug counseling,rehabilitation,and employee assistance programs, and the penalties that may be imposed upon employees for drug abuse violations. 3. Give each employee engaged'in providing the commodities or contractual services that are under bid a copy of the statement specified in subsection(1). 4. In the statement specified in subsection (1), notify the employees that, as a condition of working on the commodities or contractual services that are under bid,the employee will abide by the terms of the statement and will notify the employer of any conviction of, or pleas of guilty or nolo contendere to, any violation of Chapter 893 or of any controlled substance law of the United States or any state,for a violation occurring in the workplace no later than five(5)days after such conviction. 5. Impose a sanction on, or require the satisfactory participation in a drug abuse assistance or rehabilitation program is such is available in the employee's community,by any employee who is so convicted. 6. Make a .00d faith effort to continue to maintain a drug-free workplace through implementation of this section. As the . rson autho ' -d to sign the • ent,I certify that this finn complies fully with the above requirements. Bidder: Doui•/• 2 s •_• •F. i'an Services, Inc. rdW By: Rick A. Marchand (Print or Type Name) Title: Vice President Date: 10-12-99 END OF SECTION 00301-B-1 SECTION 00410 BID BOND KNOW ALL MEN BY THESE PRESENTS,that we,the undersigned, Doug Ross Construction Services,Inc. as Principal, and Capitol Indemnity Corporation as Surety, are hereby held and firmly 4ound un the ity of Ocoee, Florida as er i the penal sum of(5 percent of the Contract Bid) dlikty ,lV= tioosaAA__.F '492,13 p,nly ic= ($ 36i ‘),15 ) for the paymeni o which, well and trul to be de, hereby jointly and severally bind ourselves, successors and assigns. Signed,this 12th day of October , 1999. The condition of the above obligation is such that whereas the Principal has submitted to the City of Ocoee, Florida a certain Bid, attached hereto and hereby made a part hereof to enter into a contract in writing, for the City of Ocoee Vehicle and Material Storage Building. NOW THEREFORE 1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, adminis ators, successors and assigns to pay to Owner upon default of Bidder any difference between the total amo t of Bidder's bid and the total amount of the bid of the next lowest, responsible and responsive bid er as determined by Owner for the Work required by the Contract Documents,provided that: 1.1. If there is no such next lowest, responsible and responsive bidder, and Owner does not ab.ndon the Project, then Bidder and Surety shall pay to Owner the penal sum set forth on the fact 1 f this Bond, and 1.2. In no event shall Bidder's and Surety's obligation hereunder exceed the penal sum set fo i h on the face of this Bond. 2. Default of Bidder shall occur upon the failure of Bidder to deliver within the time required by the B dding Documents (or any extension thereof agreed to in writing by Owner) the executed Amendment o the Agreement required by the Bidding Documents and any performance and payment bonds required my the Bidding Documents and Contract Documents. 3. This obligation shall be null and void if: 3.1 Owner accepts Bidder's bid and Bidder delivers within the time required by the W dding Documents (or any extension thereof agreed to in writing by Owner) the executed Ame dment to the Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents and Contract Documents,or 3.2 All bids are rejected by Owner,or 3.2 Owner failed to issue a Notice of Intent to Award to Bidder within ninety (90) days from th time and date fixed for the opening of Bids (or any extension thereof agreed to in writing by idder and, if applicable, consented to by Surety when required by paragraph 5 hereof). 4. Payment under this Bond will be due and payable upon default by Bidder within thirty (30) c lendar days after receipt by Bidder and Surety of written notice of default from Owner, which notice ill be given with reasonable promptness, identifying this Bond and the Project and including a statement of the amount due. 00410-1 5. Surety waives notice of and any and all defenses based on or arising out of any time extension to issue notice of award agreed to in writing by Owner and Bidder, provided that the total time for issuing no .ce of award including extensions shall not in the aggregate exceed 120 days from Bid Due Date ithout Surety's written consent. 6. No suit or action shall be commenced under this Bond prior to 30 calendar days after the notice of efault required in paragraph 4 above is received by Bidder and Surety and in no case later than one yea after Bid Due Date. 7. Any suit or action under this Bond shall be commenced only in a court of competent jurisdiction 1.cated in the state in which the Project is located. 8. Notices required hereunder shall be in writing and sent to Bidder and Surety at their respective adiresses shown on the face of this Bond. Such notices may be sent by personal delivery, commercial cou ier or by United States Registered or Certified Mail, return receipt requested, postage prepaid, and s .11 be deemed to be effective upon receipt by the party concerned. 9. Surety shall cause to be attached to this Bond, a current and effective Power of Attorney evidenci g the authority of the officer, agent or representative who executed this Bond on behalf of Surety to e ecute, seal and deliver such Bond and bind the Surety thereby. 10. This Bond is intended to conform to all applicable statutory requirements. Any applicable require ent of any applicable statute that has been omitted from this Bond shall be deemed to be included herein a• if set forth at length. If any provision of this Bond conflicts with any applicable provision of any appi icable statute, then the provision of said statute shall govern and the remainder of this Bond that is of in conflict therewith shall continue in full force and effect. 11. The term"bid"as used herein includes a bid, offer or proposal as applicable. IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals, and such o them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed b their proper officers,the day and year first set forth above. 00410-2 BIDDER: Strike out (x) non-applicable signature block and complete applicable block. All signatures must have their names printed or typed below their signature. If Bidder is SOLE PROPRIETORSHIP, complete this signature block. (1) ndividual's Signature) (Witness) (2) (Individual's Name) (Witness) doing business as (SEAL) (Business Add ( ) (Teleph•-- o.) (Florida Licensed No.) If Bidder is PARTNERSHIP,complete this signature block. (1) (Partnership Name) (Witness) (2) (General Partner's Si: re) (Witness) (SEAL) (Business Address) ( ) (Telepho. o.) (Florida Licensed No.) 00410-3 If Bidder is CORPORATION, complete this signature block. ATTE T: Doug Ross Construction Services,Inc. 1•0 op (Corporation Name) (Corporate Secretary Signature) Florida John Becker (State of Incorporation) (Corporate Secretary Name) By: Rick A. Marchand, Vice Pres . (Name of person authorized to sign- See Note 1) `- ., — pArip me or:41— ` (6. .ice (Authori a Signature) 7 / \, _.... - 'an President) 513 W.Colonial Drive,Suite#8 (CORPORATE SEAL) Orlando,FL 32804 (Business Address) ( (407) ) 841-7559 CG-C037575 (Telephone No.) (Florida Licensed No.) 00410-4 SURETY: WITNESS: (If Agent is not a Corporation) Capitol Indemnity Corporation (1) (Surety Business Name) (Witness) PO Box 5900 (2) (Witness) Madison,WI 53705-0900 (Principa ' ac- of L usin s) 4ur, / ', JR ety Agent's Signature - See Note 2) April L.Lively ATTEST: (If Agent is a Corporation) (Surety Agent's Name) Attorney In Fact&Florida Licensed Resident Agent 6itt- (Surety Agent's Title) (Co orate Secretary Signature) Guignard Company B c- R. Gui• .rd (Business Name of Local Agent for Surety) (Corporate Secretary Name) 1904 Boothe Circle Longwood,Florida 32750 (SEAL) (407) 834-0022 N/A (Telephone No.) (Bond Number) NOTES: (1) Complete and attach"Corporate Authority to Execute Documents" if executed by any corporate employee oth r than president or vice-president. (2) Complete and attach a certified copy of"Power-of-Attorney"prepared by Surety appointing individual "Atto ey-in- Fact" for execution of Bid Bond on behalf of Surety and corresponding notarized"Attorney-in-Fact". (3) Above addresses are to be used for giving required notice. (4) Any singular reference to Bidder, Surety, Owner or other party shall be considered plural where applicable. (5) Surety companies executing bonds must appear on the Treasury Department's most current list (Circular 70 as amended) and be authorized to transact business in the state where the project is located. 00410-5 CORPORATE AUTHORITY TO EXECUTE DOCUMENTS I HEREBY CERTIFY tha a meeting o, the Board . )irectors of Doug Ross Construction ,a Services , Inc. corporation under the laws of the ',tate of Z.,:r d eld on the second day of January , 19 97,the followingre'olutio a �r • . dasipte,: Doug Ross Construction Services , / (Contractor's corporate Name) "RESOLVED,THAT /j_Sat' ���!' Ric'k A. Marc-rand signature of in.'vidual) (type name of individual) As Vi c e Pres i d e n tof the corporation, is hereby authorized to execute and all documents require. to be (title) signed by an officer of the Corporation in order to submit a valid bid, contract and bond for Cit of Ocoee Vehicle & Material S ora. - • ' , • laid : 99i-$ (project name) (Bid No.) between the CITY OF OCOEE, a municipal corporation, and this corporation, and that his execution thereof, attes ed by the Secretary of the corporation and with corporate seal affixed shall be the official act and deed of this corporatio ." I FURTHER CERTIFY that said resolution is now in full force and effect. IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the corporation t is 12 day of October , 1999 . (CORPORATE SEAL) AOLLA, (Corporate Secretary) STATE OF FLORIDA COUNTY OF Orange The foregoing instrument was acknowledged before me this 12 day of October , 19• • by Rick A. Marchand, Vice President (name of officer or agent, title of officer or agent), of Doug Ross Construction Svcs(name of corporation acknowledging), a Florida (state or place of incorporation) corporation, on behalf of the corporation. He/ lis personally known to me ortx- ',bock Ircli $I XXXXXXXXXXXXXXXXXXXXXY C i&e�ti II 1 as identified and did/did not take an oath NOV191)Cuke (Notary Public) My Commission Expires: poti. ANNA PIRAINO MY COMMISSION#CC 821910 * EXPIRES:March 29,2003 1-8004-NOTARY Ra Notary Service a Bonding Co. 00410-6 ATTORNEY-IN-FACT AFFIDAVIT STATE OR COMMONWEALTH OF FLORIDA ) ss COUNTY OR CITY OF SEMINOLE ) Before me, a Notary Public,personally came April L.Lively known to me, and known o be the Attorney-in-Fact of Capitol Indemnity Corporation ,a Wisconsin Corporation,whish (Surety Company) (State) executed the attached bond as surety, who deposed and said that his signature and the corporate seal of said Capitol Indemnity Corporation were affixed by order and authority of said Company's Board of Directors and (Surety Company) that the execution of the attached bond is the free act and deed of Capitol Indemnity Corporation . I (Surety Company) Given under my hand and seal this 12th day of October , 1929. 1 // -/ 42/A ea_74l Jennif r L.McC.$a, (Notary Publi My Commission Expires January 15,2002 . JENNIFER L. McCARTA Notary Public, State of Florida My comm. expires January 15, 2102 END OF SECTION Comm. No. CC708518 00410-7 • _ INDEMNITY CORPORATION :, 4610 UNIVERSITY AVENUE, SUITE 1400, MADISON,WISCONSIN 53705-0900 ' PLEASE ADDRESS REPLY TO P.O.BOX 5900,MADISON,WI 53705-0900 PHONE(608)231-4450•FAX(608)231-2029 POWER OF ATTORNEYNo: 508 76 Know all men by these Presents, That the CAPITOL INDEMNITY CORPORATION, a cora oration of the State of Wisconsin, having principal offices in the City of Madison, Wisconsin, does make, constitute and .appoint ---------------•-------J.W. GUIGNARD, BRYCE R. GUIGNARD, JEFFREY W. REICH M. GARY FRANCIS, DEIDRE A. EICKSTAEDT OR APRIL L. LIVELY its true and lawful Attorney(s)-in-fact, to make, execute, seal and deliver for and on its behalf, as surety, and a. its act and;deed, any and all bonds, undertakings and Contracts of suretyship, provided that no bond or undertaking or i ontract of suretyship...execuledJlncer this authority .e g n 8�bh�0� t of This Power of Attorney is granted and is signed and sealed by facsimile under and by the authority of the following Resolution adopted by the Board of Directors of CAPITOL INDEMNITY CORPORATION at a meeting duly cal ed and held on the 5th day of May 1960:.. "RESOLVED,that the President,and Vice-President,the Secretary or Treasurer,acting individually or otherwise,be and they hereby ar-'granted the power and authorization to appoint by a Power of Attorney for the purposes only of executing and attesting bonds and undertakings, :nd other writings obligatory in the nature thereof, one or more resident vice-presidents, assistant secretaries and attorney(s)-in-fact, each appointee to have the powers and duties usual to such offices to the business of this company;the'signature of such officers and seal of the Company may .re affixed to any such power of attorney or to any certificate relating thereto'by facsimile, and any such power of attorney or certificate bearing such facsimile signatures or facsimile seal shall be valid and binding upon the Company, and any such power so executed and certified by facsimile signa ures and facsimile seal shall be valid and binding upon the Company in the future with respect to any bond or undertaking or other writing obligat•ry in the nature thereof to which it is attached.Any such appointment may be revoked,for cause,or without cause,by any of said officers,at any time." IN WITNESS WHEREOF; the CAPITOL INDEMNITY CORPORATION has caused these presents to be shined by its officer undersigned and its corporate seal to be hereto affixed duly attested by its Secretary,this 1st day of Jun- 1993. CAPITOL INDEMNITY CORPORATION Attest: n niite , oilimulli In li'l' e "( Virgiline M.Schulte,Secretary �GORPORATE9 Geor .Fait,President car SEAL i s , STATE OF`WISCONSIN /9�4isc �"��• 'm�NNun,. COUNTY OF DANE On the 1st day of June, A.D., 1993, before me personally came George A Fait, to me known, who being by e duly sworn, did depose and 'say: that he resides in the County of Dane, State of Wisconsin; that he is the Pres dent of CAPITOL INDEMNITY CORPORATION, the corporation described in and which executed the° above instrum.nt; that he knows the seal of the said corporation; that the'seal affixed to said instrument is such corporate seal; that it was so affixed by order of the Board of Directors of said corporation and that he signed his name thereto by like order. nuoitull \\\ 4..„ Lee y,1s o f wisootisi/ STATE OF WISCONSIN £ PETER :_ ` E. `, Peter E.Hans COUNTY OF DANE rtANs Notary Public,Dane Co.,WI /°TARVP0O'\\\\\s My Commission is Permanent 4/N/IIIItno�\ CERTIFICATE I, the undersigned, duly elected to the office stated below, now the incumbent in CAPITOL IND: MNITY CORPORATION, a Wisconsin Corporation, authorized to make this certificate, DO HEREBY CERTIFY that the fi regoing attached Power o,f Attorney remains in full force and has not been revoked; and furthermore that the Resoluti• of the Board of Directors, set forth in the Power of Attorney is now in force. day of OCTOBER , 1'' 99 Signed and sealed at the City of Madison. Datedthe p�tHI12TUINIiy,�H , r '`' ka t e y, `a CORPORATE r� 4 SEAL :4,°, Paul J Bre :•er,Treasurer *1400#1110 - 1 'Phis power is valid only if the power of attorney number printed in the upper right hand corner appears,in red. Photocopies carbon(copies or other reproductions are not binding on the company. Inquiries concerning this power of attorney may be directed to the Bond Manager at he Home Office of the Capitol IndemnityCorporation. SECTION 00480 NONCOLLUSION AFFIDAVIT STATEOFFlorida ) ss COUNTY OF Orange) Rick A. Marchand ,being first duly swore deposes and says that: 1. He(it)isthe Vice President (Owner,Partner,Office,Representative or Agent) ofpouct Ross Construction Svcs . ,the Bidder that has submittedthe attached Bid; 2. He is fully informed respecting the preparation and contents of the attached Bid and of all pertinent circumstances respecting such Bid; 3. Such Bid is genuine and is not a collusive or sham Bid; 4. Neither the said Bidder nor any of its officers, partners, owners, agents, representatives, employees, or parties • interest, including this affidavit, have in any way, colluded, conspired, connived or agreed, directly or indirectly with any other Bidder, firm or person to submit a collusive or sham Bid in connection with the Contract for whic the attached Bid has been submitted; or to refrains from bidding in connection with such Contract; or have in an manner,directly or indirectly, sought by agreement or collusion,or communication, or conference with any Bidder firm,or person to fix the price or prices in the attached Bid or of any other Bidder,or to fix any overhead,profit,o cost elements of the Bid price or the Bid price in any other Bidder,or to secure through any collusion, conspiracy connivance, or unlawful agreement any advantage •:ainst r ecipient), or any person interested in the propose. Contract; 5. The price or prices quoted in the attache Bid are fair and -roper • . are of tainted by any collusion, conspiracy, connivance, or unlawful agreement on a part of the : r-o• any o. er . '. agents, representatives, owners, employees or parties in interest,includin his affida • . / "By: ._sem�_L � =AM! Rick A. Mar hand Title: Vice President Sworn and subscribed to before me this 12 day of October , 19 99 ,in the State of Fl o r i a ,County of Orange aftAak)( lit An Notary Public My Commission Expires: ifP ANNA PIRAINO MY COMMISSION N CC 821910 END OF SECTION 42•0,Or EXPIRES:March 29,2003 1.800•3-NOTARY Fla Notary Service&Bonding Co. 00480-1 SECTION 00481 CERTIFICATION OF NONSEGREGATED FACILITIES The Bidder certifies that he does not maintain or provide for his employees any segregated facilities at any of hi• establishments, and that he does not permit his employees to perform their services at any location, under this control where segregated facilities are maintained. The Bidder certifies further that he will not maintain or provide for hi• employees any segregated facilities at any of his establishments, and that he will not permit his employees to perfo their services at any location under his control where segregated facilities are maintained. The Bidder agrees that . breach of this certification will be a violation of the Equal Opportunity clause in any contract resulting from acceptant= of this Bid.As used in this certification,the term"segregated facilities"means any waiting rooms,work areas,restroo • and washrooms, restaurants and other eating areas, timeclocks, locker rooms and other storage and dressing areas parking lots, drinking fountains,recreation or entertainment area, transportation, and housing facilities provided fo employees on the basis of race, color, religion, or national origin, because of habit, local custom, or otherwise. Th- Bidder agrees that(except where he has obtained identical certification from proposed subcontractors for specific time periods) he will obtain identical certifications from proposed subcontractors prior to the award of subcontracts exceeding $10,000 which are not exempt from the provisions of the Equal Opportunity clause, and that he will retain such certifications in his files. The nondiscriminatory guidelines as promulgated in Section 202,Executive Order 11246,and as amended by Executive Order 11375 and as amended,relative to Equal Opportunity for all persons and implementations of rules and regulations prescribed by the United States Secretary of Labor are incorporated herein. Note: The penalty for making false statements in offers is prescribed in U.S.C. 11: . Date 10-12-99 , 19 Dou l• • j . 'o _ r tion Services Ile . Official Address By: i �.'�} r1 • • u . 6 . 80 (including Zip Code): Vice President (Title) 513 West Colonial Dr. #8 Orlando, FL 32804 ATTACH AND INCLUDE AS PART OF PROPOSAL FORM; FAILURE TO DO SO MAY BE CAUSE FOR DISQUALIFICATION OF YOUR BID. END OF SECTION 00481-1 SECTION 00482 (Page 1 of 2) SWORN STATEMENT UNDER SECTION 287.133(3)(a), FLORIDA STATUTES,ON PUBLIC ENTITY CRIMES THIS FORM MUST BE SIGNED IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICER AUTHORIZED TO ADMINISTER OATHS. 1. This sworn statement is submitted to City of Ocoee,Florida by Rick A. Marchand, Vice President (Print individual's Name&Title) whose business address is 513 West Colonial Dr. #8 , Orlando, FL 32804 2. I understand that a "public entity crime" as defined in Paragraph 287.133(1)(g), Florida Statutes, means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or with the United States,including,but not limited to, any bid or contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state or of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering,conspiracy,or material representation. 3. I understand that "convicted" or "conviction" as defined in Paragraph 287.133(1)(b), Florida Statutes, means a finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trial court of record relating to charges brought by indictment or information after July 1, 1989,as a result of a jury verdict,nonjury trial,or entry of a plea of guilty or nolo contendere. 4. I understand that an"affiliate"as defined in Paragraph 287.133(1Xa),Florida Statutes,means: a. A predecessor or successor of a person convicted of a public entity crime:or b. An entity under the control of any natural person who is active in the management of the entity and who has been convicted of a public entity crime. The term "affiliate" includes those officers, directors, executives, partners,shareholders,employees,members,and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair market value under an arm's length agreement,shall be a prima facie case that one person controls another person. A person who knowingly enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shall be considered an affiliate. 5. I understand that a "person" as defined in Paragraph 287.133(1)(e), Florida Statutes means any natural person or entity organized under the laws of any state or of the United States with the legal power to enter into a binding contract and which bids or applies to bid on contracts for the provision of goods or services let by a public entity, or which otherwise transacts or applies to transact business with a public entity. The term "person" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in management of an entity. 6. Based on information and belief,the statement which I have marked below is true in relation to the entity submitting this sworn statement. (please indicate which statement applies). XX Neither the entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in management of the entity, nor • 00482-1 IIII any affiliate of the entity have been charged with and convicted of a public entity crime subsequent to July 1, 1989. The entity submitting this sworn statement,or one or more of the officers,directors, executives,partners shareholders, employees,members, or agents who are active in management of the entity, or an affilia of this entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. The entity submitting this sworn statement,or one or more of the officers,directors,executives,partners shareholders, employees, members, or agents who are active in management of the entity, or an affiliat of this entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. However,there has been a subsequent proceeding concerning the conviction before a Hearing Officer o the State of Florida,Division of Administrative Hearings. The final order entered by the Hearing Office determined that it was not in the public interest to place the entity submitting this sworn statement on th convicted vendor list. (Please attach a copy of the final order.) I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 1 (ONE) ABOVE IS FOR THAT PUBLIC ENTITY ONL AND,THAT THIS FORM IS VALID "1',8 UGH 12/2 0 0 0 I ALSO UNDERSTAND THAT I AM REQUIRE TO INFORM THE PUBLIC ENTITY P'•OR TO ENTERING INTO A CONTRACT IN EXCESS OF THRESHOLD AMOUNT PROVIDED IN S:CTION :7.017,FLORIDA STATUTES FOR CATEGORY TWO 0 CHANGE IN THE INFORMATION CONT; I DI IS FORM. (Signature) Date: 10-12-99 Doug Ross Construction Services , Inc. Name of Bidder(Contractor) STATE OF Florida COUNTY OF Orange PERSONALLY APPEARED BEFORE ME,the undersigned authority, R ick A. Marchand who,after first being sworn by me,affixed his/her signature in the place provided above on this twe 1 f th day of October , 1999 (1JWOI9ii9aiiu ) Notary Public +F��rPukh ANNA PIRAINO c MY COMMISSION#CC 821910 My Commission Expires: 1:#no EXPIRES:March 29,2003 1-800-3-NOTARY Re.Notary Bowles&Bonding Go. END OF SECTION 00482-2 SECTION 00483 CERTIFICATION OF NONDISCRIMINATORY LABOR PRACTICES This certification relates to a construction contract proposed by the City of Ocoee. Equal Opportunity Employment: The Contractor shall not discriminate on the basis of race, color, nations origin,gender,age,handicapped status,veteran status,and/or religion in performing the work governed by th. contract. The City is an Equal Opportunity Employer(EOE)and as such encourages all contractors to comp) with EOE regulations. Any subcontract the Contractor may enter into shall include this clause with the sam degree of application being encouraged. I am the undersigned prospective construction contractor or subcontractor. I certify that... (1) I XX have/ have not participated in a previous contract or subcontract subject to the Equal Opportunity Clause and (2) If I have participated in a previous contract or subcontract subject to the Equal Opportunity Clause,I have/ XX have not filed with the Joint Reporting Committee,the Director of the Office of Federal Contract Compliance Programs, or the Equal Employment Opportunity Commission all reports due under the applicable filing regtiirements. I understand that,if I have participated in a previous contract or subcontract subject to the Equal Opportunity Clause an have failed to file all reports due under the applicable filing requirements, I am not eligible, and will not be eligible,t have my bid or offer considered, or to enter into the proposed contract or subcontract, unless and until I make arrangement regarding such reports that is satisfactory to the office where the reports are required to be filed. I agree that I will obtain identical certifications fro . •rospectiv• lower-tier construction subcontractors when I receive bids or offers or initiate negotiations for any low• -tier constructi n subcontracts a price exceeding$10,000. I also agree that I will retain such certifications in my .les. Date 10-12 , 19 99 By Rick. ; = c• - • neo • i„. .„.ao Alt Doug Ross Construction Services, Inc. (Name of Prospective Construction Contractor or Subcontractor) 513 West Colonial Dr. #8 , Orlando, FL 32804 (Address of Prospective Construction Contractor or Subcontractor) 407-841-7559 59-3162843 (Telephone Number) (Employer Identification Number) END OF SECTION 00483-1 Z O . WW a) a) 0) a) 0.. Q M M co 2 O CiI— C) I— a) co o CD CO Z• 0 Lo co o CO N ta z-9toO U CD C > O .- LU p U ti I— co CN �, U co ` CN el U N >.M m(13 C - M o > N <I- > J ILJ � (� to cocn CDQLL m To ` a) J J U LL LL ~ o O LL . i„LJ 05 E E ✓ ai as m E - c p - -5 aa)iaa re Qma Jcu SNC ` Q mo cDav5 0 Sap m � � c N LL o U (o co I Tri 14 > a) >, p 0` ti coE ai a) Tt C V �� � DO) 0 vii � Qco LI) J NJ ` O X Et C cv.) 0Lo a) CQNm0O C a) , j aj � LL JO W 7 •�p J Oa) > CM � (D co a)J co OC - CD Z v2 LL oc� Oce o � O c`a � -5 � o c �� V% tnpM o co - 0) pO o ` CV w ` oo CCp ? a) cNj >, a� -a -a Tj `�' —1ca � > CU � :_.40ZZ > ti - h•- ..?;' o � v ron o c� cov (� � C o0 c o0 0 CU - aa)) Q U V U J �to O k ~ (00 s„.4 a) L Ca) a) LU c Z CC cuv o D E 0 coi N d > c CO5 —1 �' cc VU CD r: oo ti 0 W '� a) �. 'Q C i- W 1= o > L o C F- \` Ore p C > 0 N o w Z 3 C LU O m 0o C d 0 22 Y i rt • a U < w .�t =) Z 0 WW o co co a4 o co Q — — o) o) o) J _ _ E Ci N • N CO M i.e.) M 0 0 I— (0 N Z 5 oM N ti v_ cco to v- g < Eft69 V/ •t— Ef3 7: 175 a) co a) u) o co C C LE ,— M -c - M a) a3 . CU r_ * M ns M J J QD < o� CO > COCD L O OO N ~ mo cn °) � E � aci � 2 CLL V = 'ate viCD-0 - - -Op 0Nc 0 �� Ce mom 0 73 co `n � 0 -, F cci Q r c • cam = = o c� 0 all U — ns o 0 0 a>io0 F- 0 02 o2 coE c r:C0 U h. r- r` ... CO w 0 a) a) aa)) C mc ti ` C c co rn Lk OCJUOr 0 4.- ma) 0 � � M wo C a) 1,_ c U NC OLL Vp� ON � � � J � M CMf� cM � I� `+ W 0 C O � N a) (� u_ a) o Cf)m J >+ a3 (0 2 CLL = ( 2 Cu- Ma? p ` c p o 0 LL a) co a3 a) m (B ` ti m co U a) N O Q-p O) Q-O `� 0 > - ` -J > C� > a) = pulp 0 .Q'-0 j O >,-0 CUT co >.-0 a CU.8 co Lu O Lu EL: >, m �- = c = CU = c = c� I) c Y CO (II it) y � � 0 o •(a LI- -- 0 CD (u LL ON ... a CU O r UO) co N- P2 Jr- p J a) C— D 0 0 W k a1 ~ u) V 0 L = E t.,) Z 65 U cco cc O I- c a) ea Q re 0 cu h 1— U H J L 7 C O 0 CO 12 a) W W co 4. = a) > 2 En 0. Z' > W > E N. a 0 coU C cc O co Y ) u_ ca 0 TD O A > el J J M U J 2 2 0 WW co co co co co _ J Q — O) Mr N- N- C) E h- 0 U I- 0 QZ 0 0 0 0 rn CC n 0 o co 0 0 Lr) v-- I- 05 M rn L o cD 0 < 69 N. CD- EA. 0 • Q • o I— Z N a) M U (n C) N cu U OM a`),:. cum U CO is > M � -0 W o f L � J m O M > Q 1JL o) ` C LL U Ll. Q > O Q > . U LJJ oeS •V LJL 0 -0 .2 Y ' _ co 0 Y a — c 0 0 T3 cii O C Q a) LLI a. IX (a L ` to Ln C C (a 0 O Q C J U o M� ` = uj Q Q o CO N O >, c 0 Cl) oE 0 0 0 O o) U a) (a J m > C M o CA a) C a) 0 c .-. 0N ON EmJU � N 2 � O "0 ONLiN- W mUU OLL = 'fl CMcM EU CCY' E � Z O o - 0 c0) � � O Ou_ = M co O m - 31.0 EO' � O• cca � m � � � � m °'o cU � 5I- 0 UmC�D > U0 °0 � (6 > g)"-) F8 m m .t? fl. 0 C co U L.L Q Cn O ca co 'Y LU E C 14.- N Ca C . m Y ` U .0 O OwU O -1 EL a_ 0 m ! U a) co 0o CU O O Wv- C/) H c/) a) C d ea O N) C •... era O = > .c C .0 to c I O � m e et U O m ; 1'- i- 0. t E8 .0 a) > c VW m c m �' Lm l' a`) oa N M o) mm O H 0 U0 coo c a) c 'L +O- 6' z m = z 0 a0 c z O. aa)) 0 U a co co :: ft co E -c 3 U. LL '� c a) C� as a) > > re02 C)) Z 0 Ja rn rn 0) 5 p t- N Zr) i T 0 U � F- Nin CD 1 CO Z o T o C0 H O CO rn CON ti CO O Q01 T- CO N U a)CO o a � m a) C ►- In N c7 C >, = 0 O * �• ( a) Co a5T H c CU "0 cv 0 p " a co C a) N Uco o M _j m C CON o .F6- aCitJi .aLL a) -0 -I o 0 0 :� a) E c = o�S a3 0 E w o " •— Q-a it Om'J < NC O oU ai 01 03 �c »- U a) — Q aa) w —, -vJ � r0C U - Fa n = a) ` Cti CD CDS ti o o 0 ti moJ ti C ti a) a)-- * CO) a) 4 C ,r N N N- E m ca J T T% ` pCO = CO � � N Cn � � � m = cfl C a) ti .00 CL CL - M CN ':: (/) 0M - M CN - CM EN- '-^ Z Cu N 0V- m � L' O � C0-0 a3 - u- a) Lo C � = CND co 0 YN „ „' 000 o YN N 73 •� Crn .ti 0 � U � � � o � M pU -°o � � o C ca co s ` c � ao .�� 8 p m cv U C f ( � co � _1 0 mo '" V CD 2 N- c! U cf r,- ,-- `).) ti V 0 0 N E C 06 ea N Z a) S ,> L O O 7 C •,- ~ 015 c~n a 3 a Cl) a) j h .I U Z .0 co 0 O v `° 3 0 NN W 0 V) t C 0 'ND d 2 N i- ...,,, a� C o d C O ir) To Q I t co= U U 0 > E Q= O r: W CD CDCD CD CD CD CD W E_. Cr) a) am) rri amLr) a) a) c»ao N. V- 0 M (r) o V" V o co co tm. co CD LO Z of co N co- N Q69. 9 V- 69 !99 0 69- 69 yg 69 to U p O L U C > r co a) Q) M � � ' •a) 1.... c Ute `- = ` >' to ` (U (0 c co Cl) a) N N > N O a) 0 0 U ca CU (�j H Uo C Q co Q LU -, _ i- co _J ` C C M , 0 LL = C i- Q t -Q = o m p .II ,� a U U Si O V 0 a) U sv o C = o Q as CZ a a5,� mom o °' � � - � O, m c N- cu ct0.6 -J RS �- O � � � � � CI) 2 L Vie- O N- O O O) O O �' UO U- (.D a L U C\ h_ L L 1.- 0 C CO NS. >. CD D 0 O � 0 a OQ CU � M 0 •- W O � .� M o.o � _ a> c CL CU Z 5 (D c in O _� °'CD 0 �° > m m � cN - m ` m > � ` m C0 a) ' o M 0D Y00 cu O 1— o p O U U p m V cu 1 l 6. ,.3.. i 1... 0 Z d us c 12) V m C...) F- -12. E d U C cz Q 8 U .N as a p v) co On v u9Y CCU a > '' -J CDm a. _ °E = J re E _as 0 H m ° O m > o ~ as > ° = m c ° m e- 5 J H n U cn a _O F' W to LU Lt) Co ()D co co O J ~ - -. - L) [) L) LSC) in O. � N - N O (r) O ti co O O O N N U I- V Z o Lf) M oo ti 0 0 C) co oto E 0L6— O CV O CD O CSD N 00 U) Z (r) r N 0) CO m O Ps Q EA 69 e- e-- r O CD 0 V b4 64 69 69 6F} 69 (41). VJ 05 64 o 1 c ui O C.) co Ln N Cl) N N m L. > (B a) CSD (- ,. %-- I- 'C 4- 'C cn cu cu cu cu co cu O > N0 ai 0 0 0 0 U 0 c vi c W U co —) m C J P N N E a) E E � � E o —_ -i E E E E E E V~ L c E '' CCI) ', C C C C C C C 'D i) 'D fi _ V -D V V V V V o o N c = = = o = o Q O , o 0 a) o D o w o o o o o o cn o c Cl) E I w Cl) CD Cl) Cl) CD Cl) CI - CD m C -) og c c c c c c D) 0 -2 N 0 0 0 * CO --- (0 _11 cu co J J J � J 1._ o .uN Co .� Z a) CCII O Ll (-CQ 1:3 *-m 2 cu (U (U (U co (c6 a a) 0 o a) E = a) a) m m m 5 .V O 0 0 u = 0 o D D D D D O 0 °) m 0 oo o Co 0 0 0 0 0 0 co 6 m .g CO Kit m m m m m m 0 o .00 -=cu a _ .Q coea c n o. " CD c re `�, Z co w eu �, E a E C = O = _ P. o `O a -a cc = o 'a w .E o N c > d m CU 'n _! N o 'Q C 0cp ` = W Vim) _ ca o j Q 2 O > tn ~ W O - = > >, e4 N > N W m &Z' C C C — ! O � 'U ..r p a> O O O C a C Q �� O cp � o 7 o c) o aL 2 a) !— aC o (a CO CO (a c (a E 0 'C I— m o7 m 3 T. H N v, p > = = 2 o a so NQmsa m > o > > > 0 M N- 0 CE N 0 Q OCT. -12' 99(TUE) 11 29 DOUG ROSS CONSTRUCTION SERICES TEL: 1 407 843 1126 P. O01 u-O0EOO (pagnba a a$ad*MP aldao Pao0IPPv a3Pur iw+aPPI10 I ua ((0001S a9 111111U pnatagnS ad twnaluV NCI NIPaq IW1 aaRlPIKO P+rx=O aVs VIM mama of ua0 vi=amp Alio wayod ps surnasbu, _ I 9 v 0 0/7.#s9 Io 7 7_,I s 1-YV::: , I e1 L)ri/0)/()0 um a demi PNMO aagll%% atuqi►nU aMias+aw inamdtnba \ �wewW alipaataQ 'ma*.Psba m«pug aaltajagm Suwon am;wile apple _ uot.LULLMS SWtOE- -1,511102V, (90 r 113aQi8 40 MINN 4b L'/ •o1 :a3 i uwsns 3.LVQ DATE SUBMITTED: October 12, 1999 NAME OF BIDDER: L.I. & COMPANY, INC. SECTION 00300 BID FORM SUBMITTED: October 12, 1999 (Date) PROJECT IDENTIFICATION: CITY OF OCOEE,FLORIDA VEHICLE AND MATERIAL STORAGE BUILDING NAME OF BIDDER: L.I. & COMPANY, INC. BUSINESS ADDRESS: 4455 Parkbreeze Ct PHONE NO.: 407-299-4632 Orlando, FL 32808 CONTRACTOR'S FLORIDA LICENSE NO.: CG—CO43423 THIS BID IS SUBMITTED TO: City of Ocoee,Florida(hereinafter called Owner) 1. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Amendment to the Agreement with Owner in the form included in the Contract Documents, to perform and furnish all Work as specified or indicated in the Contract Documents for the Contract Price and within the Contract Time indicated in this Bid Form and the Amendment to the Agreement, and in accordance with the other terms and conditions of the Contract Documents. 2. Bidder accepts all of the terms and conditions of the Bidding Documents including without limitation those dealing with the disposition of Bid Bond. This Bid will remain open for ninety (90) calendar days after the day of Bid opening. BIDDER will sign and deliver the required number of counterparts of the Amendment to the Agreement with the Bonds and other documents required by the Bidding Requirements within ten (10) days after the date of OWNER'S Notice of(Intent to)Award. 3. In submitting this Bid, Bidder makes all representations required by the Instructions to Bidders and the Agreement and further warrants and represents that: a. Bidder has examined copies of all the Bidding Documents and of the following Addenda: No. I Dated 9/14 No._ Dated No. 2 Dated 10/4 No. Dated No. 3 Dated 10/8 No. Dated No. 4 Dated 10/11 No. Dated (Receipt of all which is hereby acknowledged)and also copies of the Invitation for Bids and the Instructions to Bidders. b. Bidder has familiarized itself with the nature and extent of the Contract Documents,Work,site, locality,and all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance or furnishing the Work. c. BIDDER has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface of subsurface structures at or 003 00-1 DATE SUBMITTED: October 12, 1999 NAME OF BIDDER: L.I. & COMPANY, INC. contiguous to the site (except Underground Facilities) which have been identified in the Supplementary Conditions as provided in paragraph 4.2.1 of the General Conditions. BIDDER accepts the determination set forth in paragraph SC-4.2 of the Supplementary Conditions of the extent of the"technical data"contained in such reports and drawings upon which BIDDER is entitled to rely as provided in paragraph 4.2 of the General Conditions. BIDDER acknowledges that such reports and drawings are not Contract Documents and may not be complete for BIDDER's purposes. BIDDER acknowledges that OWNER and Engineer do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Bidding Documents with respect to Underground Facilities at or contiguous to the site. d. BIDDER has obtained and carefully studied(or assumes responsibility for having done so)all such additional or supplementary examinations, investigations, explorations,tests,studies and data concerning conditions(surface, subsurface and Underground Facilities)at or contiguous to the site or otherwise which may affect cost progress, performance or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences and procedures of construction to be employed by BIDDER and safety precautions and programs incident thereto. BIDDER does not consider that any additional examinations, investigations, explorations, tests,studies or data are necessary for the determination of this Bid for performance and furnishing of the Work in accordance with the times,price and other terms and conditions of the Contract Documents. e. BIDDER is aware of the general nature of Work to be performed by OWNER and others at the site that relates to Work for which this Bid is submitted as indicated in the Contract Documents. f BIDDER has correlated the information known to BIDDER, information and observations obtained from visits to the site, reports and drawings identified in the Contract Documents and all additional examinations, investigations,explorations,tests,studies and date with the Contract Documents. g. BIDDER has given ENGINEER written notice of all conflicts, errors, ambiguities or discrepancies that BIDDER has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to BIDDER, and the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work for which this Bid is submitted. h. This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; BIDDER has not directly or indirectly induced or solicited any other Bidder to submit a farce or sham Bid; BIDDER has not solicited or induced any person, firm or corporation to refrain from bidding; and BIDDER has not sought by collusion to obtain for itself any advantage over any other Bidder or over OWNER. i. BIDDER hereby agrees to commence WORK under this contract on or before a date to be specified in the NOTICE TO PROCEED and to fully complete all work of the PROJECT within the Contract Time specified in the Amendment to the Agreement (Section 00500B). BIDDER further accepts the provisions of the Amendment to the Agreement as to liquidated damages and agrees to pay as liquidated damages the amount stated in the Amendment to the Agreement(Section 00500B), for each consecutive calendar day completion of the Work is delayed. Completion Schedule I) The Project shall be substantially complete (successful pressure testing and bacteriological testing of completed water mains) lone-hundred&eighty(180)consecutive calendar days from the official Notice to Proceed. 00300-2 DATE SUBMITTED: October 12, 1999 NAME OF BIDDER: L.I. & COMPANY. INC. 2) The Project shall be finally complete(Completed and Ready for Final Payment) two-hundred& seventy (270)days from the official Notice to Proceed. 4. All bid items shall include all materials, equipment, labor, permit fees, taxes, tests, miscellaneous costs of all types, overhead,and profit for the item to be complete, in place,and ready for operation in the manner contemplated by the Contract Documents. Bidder submits the following TOTAL BID OR TOTAL BASE BID to perform all the Work as required by the Drawings and Specifications. 5. In accordance with Article 17 of the Instructions to Bidders, if the Contract is to be awarded, it will be awarded on the basis of the lowest"Total Base Bid"after adjustments for additive or deductive alternates. Additive or deductive alternates(if any)will be considered in determining the lowest responsive, responsible Bidder. The Owner reserves the right to accept any or all additive or deductive alternates, in his sole discretion,prior to the award of the Contract. The Owner also reserves the right to delete any portion of the Work as shown in the bid schedule prior to award and adjust each bidder's"Total Bid"accordingly. 6. The following documents are made a condition of this Bid: a. Bidding Documents and shall include the following: 1. Bid Forms(entire Section 00300,00301,00301A and 00301B) 2. Bid Bond(Surety Bond or Cashier's Check). (Section 00410) 3. Corporate Authority to execute Bid 4. Power of Attorney(for Surety Bond only) 5. Noncollusion Affidavit(Section 00480) 6. Certification of Nonsegregated Facilities(Section 00481) 7. Sworn Statement on Public Entity Crimes(Section 00482) 8. Certification of Nondiscriminatory Labor Practices(Section 00483) b. Executed "Part A,Contract to Perform Continuing Construction Services(dated August, 1998)" (Remainder of Page Left Blank Intentionally.) 00300-3 DATE SUBMITTED: October 12, 1999 NAME OF BIDDER: L.I. & COMPANY, INC. (Page Left Blank Intentionally.) 00300-4 � .E o N. o co crN O M O O N I . . N O Z.,' z 0 t\ O O O M O E•', ^ C M 69 NH = z 4J 3 CO >1 a) a) o 4) ca cu b 0 •U H p cn 0 G C 0 •ri a 0 C �,o ca w O v r,: aJ 1 .0 b �. b JJ O u) I G U .4 a) 5C I 4 al r-. b0 0 H 0 I b a. ►. W •rl I $a Cs s~ 0 a) O O 0 d ;., 0 3.4c/) C a) b cd O 3 .- .0o a) G 4." 4 C 0 G U) 0 H M4-) .-i U) C E) .S E-1 -0 ,--0 -, O of 0t .f0.' -o ad fes' \ O 't7 ro C > ,0 ci 4.) a) a) O .0 a) (J 4) to OC 4) a) aJ o )-I 0 a) 0 4) 3-4 --i aa)) O 'L •rl $-i a) I. 0 0 9 W b W 0 - 3 .0 ] .0.. E- D 0 •rl 7 al •rl C 0 0 H +J `u H 0 Z = ut) f=+ o x 0 a as ,„ W :; w a a a - AWS 1 c . .. W n aeFd w o o U z W ►.a W� f' Qa O r I fa..., - .N E+ . w C a) o lz oc on c {:4.0 'vQ �• . oEe v^ o C7 o Ixw a,.-a 03 c Q Q a a) b o HQ � a C7 5 v c14 o v a ,�Fd 0 0 0 c O z: — o wW v oz r1 'y^ M 17) � O c N c) bA ci z H cn � z a N $� � O U 0 • 4-1 H V • O 11 Q W H Q 0 w H ¢ ¢ CZ z N N M . O O OQ ,t Ln O O CO VDa NO � Cs! O LI-) • O O M C Z a1 O O' M t� I* C u1 N t-. O M 10 CO H M O O M VD O i11 -'Y —I .-1 --1 M N .--1 N a'E O rZ � cocLr O L1-1 —I rO a) O O o > O .-4 .-a 4-1 a) •r1 M CO cd 3.1 I 10 y ,--sr, ro 'Cq OH O q - to cd '0 4-+ 4) 0 cd .0 O ro ,... ).. C >, w 0 G 1 'C cd b —I g1.1 o o 0 cd b a) 1 0 co a) co 3 4-4 0 0 > 1 cd 1 co $a a) 3a O >� c +i •, .0 a) cd a)o a cd co I 3 > -0 co C1 GJ 5 w I 4.) > co cn C C 1 cd .--1 •r-1 C ,—I a I •H 0 0 I ,—I ,-1 W 0 v .- Z a) 'O 1 t~ 4-I 0 'U----.. 4 I H 0 .0 C 0 a) a) O a) O .0 a)yr 4-1O 0 b >, cd "0 A 4J $-i O a) >,O i-+ p N O -0 4_i 1.1 P '0 .4 4 .- .4 "d $a .-i (1) G -0 a) a) •ri C X X a) 0'C C G > a) b0 0iR p H .0 c 01 AcnM O .0 t 1 QH W H W G FT-4 can t• wa a a a .- U a ApE G4 C) m w 0a i g r. N 0 o — ^" o� N r.4 w y Q F W d o • V X4 t o 0 rn 2 w a U I w ci z H 0 O y o II ucc -a is Ii C bA >E X C w w. cii 3 o w to b[n U N g {7a o O O CO I O N M C4 14 til P Az gcl ~ >, 0 a) ooaso Cq o � o c on • U z H i a N U C/ X S 0 • +� H U o 1-a w H Ca H Q m H � Q Q caz Abd rD t a � IN - o vp 00 v a U . a CI .r1 in I.) 00 O �' C 0 w a b7 °'DT x S' H r cok.co .11 o yy CD ;' C7 vo o co -t d H 0 a.. 4 a- c -a• n ?F' k7 R. a 0 ag 0 a b7 c m C •ra p fro 5 co co H D a. cry a. c a• 0 - off CD til 177 CD r 9 Le; Z 11—' ._ 1•C \O o w Z z n ' C li I r Zn y � v o P-3 '3 o tziKt" o aO :O Co CA n �Z 1 O\ V, ' y O C LA o W a © ril — CTI y rii v, to� • "< e - v rt rt ImJ b a' H ch 1-3 .O x1 rt H H Z wr.n Z 0 rpt G a O o � m !HI n n r „ CD ri a• r 0 I-' rt CD CD ti CD r-' no $13 CD rt ON hi rt O rt O CD CD (D rt O 'G O CD LI) fD ❑' O kC O CD `C O a.G. (D a. 0 I I G W a' a. I a. GO G 1 Q I G G rt 01 0 • Co p O rt U) 1 o a a. G 4 I-, I I-. 5" Co a rt O F' w 1--' o a o I-, I l--. ,.: ---.1-10- I M O F-a 1--, Co ri w I w • H fp 0 G G. Aa I-- In CD A) ri ri Q b O a. G rt ri R3 a. G w Cl) a. ri' C) CO O fn ti r a. , 0 1 Z0 rfim W CO O E O O O rt ri a. rt r-, r-, 1/4C C O r-' O I O r-' O Z IJ In W O • Ni S /1 .=: v O I--• WO •- CD h-' N W r-• .. .A' O W r• N r— Z C r-• r-• N F-• L., 00 W N O In W - 8 —' 1O .p... O • O O - N n O ICO O lit --AI cr • b A... ON In • Ina CoOO \ co In a, • `-' (p rn O O .P- W 0 r 6 z d ' as tri Cn O a ▪ C CO O07ff ' ` 3 dl r o H rt • O R'+ CD C'1 O N rd H z • ao CD u7 o' w O r n S � z �o OC A w R.9 4 F" Ivo so lc co o P' g 5 '-r7 O al tIJ El: co'v • `-e a — C7 y v' o n m � H �s �+ kn m 0 °• c 20 0 o a`. %° b o = v°a r0 'o: Nq � y' • o 2 CV a. �, -. - 0 rt n n'". Ccr n c-1 1— Co 0 o a oav 15' ` d ^a dq CO Co 1-4 oro 0 o 0e w a .. -. ICI go c b `Da . t H .1 = < II', co C 7 o fD F4 Q' x w y a g tn" y' ..1 CO ..v'CA Cr1 oCCD •• ° 10 �d AT. C �, , vr� Xnt� CD =°Cr 69 CI' *0 ` r0 "11 /0H CAn � C _ `y g w Odd e) o CCD G 1-1 CDD Li tD N rt D7 tD r-+ p' 0' o a0 oaa ' 1,1/4 m• l•n a o co to cam. `� n� c hi I a a 0 m Q 10 0' a., Q o' cn i 0 o " (`C( a p c rt O CCD fD ¢ o a i p. \,( \. "` ' \� wo o Z o I-0 c b (-) O t.^' V v1 a N Z0 as mt OSI' ooh H r7 r o l) rt o n N ro z DI H z n ,":-.6 P ao r CDZ) L o' w 0 71 C-i n a DATE SUBMITTED: October 12, 1999 NAME OF BIDDER: L.I. & COMPANY. INC Instructions: Strike out(X)nonapplicable signature block and complete applicable block. (ALL SIGNATORIES MUST HAVE THEIR NAMES PRINTED OR TYPED BELOW THEIR SIGNATURES) If Bidder is: SOLE PROPRIETORSHIP N/A (SEAL) (Individual's Signature) (Individual's Dame) doing business as Business Address: Phone No.: Florida License No.: A PARTNERSHIP N/A (SEA-) (Partnership Name) (General Partner's Signature) (General Partner's Name) Business address: Phone No.: it Florida License No.: 00300-14 October 12 DATE SUBMITTED. 1999 NAME OF BIDDER: L.I. & COMPANY, INC 7. The terms used in this Bid,which are defined in the General Conditions or Instructions of the Construction Contract, included as part of the Contract Documents have the meanings assigned to them in the General Conditions or Instructions. 8. The work shall be performed under a Florida Contractor's License. Contract shall not be awarded unless proof of valid license(s)is provided. 9. It is understood that where quantities for unit price work have been presented in the foregoing Schedule of Bid Items, they are approximate only and are solely for purpose of facilitating the comparison of bids, and that the Contractor's compensation will be computed upon the basis as described in the measurement and payment clauses in the specifications contained herein. 10. BASE BID-SCHEDULE OF MANUFACTURERS/SUPPLIERS If the foregoing Schedule of Bid Items is presented in a Base Bid format, the undersigned as Bidder agrees that the Contract, if awarded, will be on the basis of the materials and equipment named in the Contract Documents in accordance with Article 9 of the Instructions to Bidders. The undersigned as Bidder also agrees that for the "Base Bid"equipment and material items listed below the Bidder will provide one of the listed manufacturers/suppliers, by circling "A", "B", or "C". If the Bidder desires to propose an alternate manufacturer/supplier, he may write in the name of such alternate in the substitution list included within this Bid Form, but he must, nevertheless, also circle one of the listed manufacturers/suppliers. If the proposed alternate manufacturer/supplier is determined "not equivalent" by the Engineer, the Bidder must furnish equipment and/or material items by the circled manufactur- er/supplier. If the Bidder fails to indicate which listed manufacturer/supplier he intends to use if an alternate is rejected, he must use the manufacturer/supplier listed as "A". Also, if the Bidder circled more than one listed manufacturer/supplier,he must use the first manufacturer/supplier circled(unless an alternate is approved). 11. SUBSTITUTIONS AND"OR EQUAL" The undersigned as Bidder agrees that substitutions or "or-equal" items will not be considered until after the "Effective Date of the Agreement"and will be evaluated in accordance with paragraphs 6.7.1,6.7.2,and 6.7.3 of the General Conditions. In addition to the reimbursement required under the General Conditions, the Contractor shall also reimburse the Owner for any engineering costs directly attributable to the change in manufacturers/suppliers, caused by the acceptance of proposed alternates, such as; additional field trips for the Engineer, additional redesign costs, and additional review costs, etc. Other costs directly attributable to the change in manufacturers/suppliers caused by the acceptance of proposed alternates, such as; increased electrical requirements, larger building, additional pumps or tankage, etc., shall be borne by others and not the Owner. If Bidder intends to propose substitutions or "or-equal" items after the "Effective Date of the Agreement", it is agreed that these items will be listed on the Substitution List included within this Bid Form,with a deductive amount representing 50 percent of the total savings between the named Base Bid item and the proposed item. "Base Bid" item substitutions providing to the Owner an equipment or material cost savings of less than $1,000 will not be considered. The undersigned as Bidder,also agrees that if a substitution or"or-equal" item is not listed on the Substitution List included with the Bid, all of the savings between the named item and the proposed item will go to the Owner if the Owner accepts the proposed item in accordance with paragraphs 6.7.1., 6.7.2, and 6.7.3 of the General Conditions. The Owner may request,and the undersigned Bidder shall supply,complete information on proposed substitutions. Such information shall be the manufacturer's current published or preprinted information for the specific substitution. 12. As BIDDER, I hereby certify that I am aware and understand that the City of Ocoee at its sole discretion reserves the right to waive technicalities or irregularities, to reject any or all Bids, and/or to accept that Bid which is in the best interest of the City. The Award of this Bid, if made,may be based on considerations other than total cost, and may be awarded based on various considerations, including but not limited to: BIDDER experience and whether the Bid, in the judgement of the City, is the most responsive to City needs. The City of Ocoee encourages the use of minorities and women-owned businesses as subcontractors. 00300-15 DATE SUBMITTED: October 12 19 99 NAME OF BIDDER: L.I. & COMPANY, INC. Instructions: Strike out(X)nonapplicable signature block and complete applicable block. (ALL SIGNATORIES MUST HAVE THEIR NAMES PRINTED OR TYPED BELOW THEIR SIGNATURES) If Bidder is: A CORPORATION L.I. & COMPANY, INC. (Corporation Name) FLORIDA (State of Incorporation) By PAUL LACY (Name of person authorized to sign) PRESIDENT (Title) (Authorized Signature) (G;rporate,,:,;a!) _ _` W. MARK INGRAM (Secretary) Business address: 4455 PARKBREEZE COURT ORLANDO, FL 32808 PhoneNo.: 407-299-4632 Corporation President: PAUL LACY Florida License No.: CG C043423 00300-15 p DATE SUBMITTED: October 12, 1999 NAME OF BIDDER: L.I. & COMPANY. INC. Instructions: Strike out(X)nonapplicable signature block and complete applicable block. (ALL SIGNATORIES MUST HAVE THEIR NAMES PRINTED OR TYPED BELOW THEIR SIGNATURES) If Bidder is: N/A A JOINT VENTURE By (Name) (Address) By (Name) (Address) Business Address: Phone No.: Florida License No.: (Each joint venturer must sign. The manner of signing for each individual,partnership,and corporation that is a party t(1 the joint venture should be in the manner indicated above.) Florida License No.: 12. List the following in connection with the Surety which is providing the Bid Bond: Surety's Name: SURETEK SURETY TEKNICIANS, INC. Surety's Address: 4410 NORTH 56TH STREET TAMPA, FL 33610 Name and address of Surety's resident agent for service of process in Florida: EVELYN ROGERS, VICE PRESIDENT & ATTORNEY—IN—FACT FOR THE MOUNTBATTEN SURET', CO. END OF SECTION 00300-16 N IIIISECTION 00301-A COMPLIANCE WITH FLORIDA TRENCH SAFETY ACT MI (90-96,LAWS OF FLORIDA) Bidder hereby acknowledges that all costs for complying with the Florida Trench Safety Act are included in the 'ous items of the bid and in the Lump Sum Total Bid Price shown in Section 00300-Bid Form, "Schedule of Bid It ms". Ili For informational purposes only,the bidder is required to further identify these costs in the summary below. Trench Safety Unit of 1111 Measure Measure Unit Unit Extended (Description) (LF,SY) (Quantity) Cost Cost IIIA SLOPE SLIDES LF 380 $ 7.50 $ 950.00 - III B $ $ C $ $ IIII D $ $ 1111 TOTAL $ — 950.00 111 BIDDER: L.I. & COMPANY, INC. SIGNED ��/ 11111.117- BY: / ...0" PAUL LACY (Print or type name) IIITITLE: PRESIDENT DATE: OCTOBER 12, 1999 II1 IS NOTA THISPAY ITEM: The purpose of this form is to gather information on the costs associated with nch safety measures and to insure that the Bidder has considered these costs and included them in the Lump Sum To Bid 1111 price. Contractor will not receive additional payment if actual quantities differ from those estimated or if the Con ctor uses a safety measure different than those listed. II (Failure to Complete This Form May Result in the Bid Being Declared Non-Responsive.) II END OF SECTION I 00301A-1 111 SECTION 00301-B DRUG-FREE WORKPLACE CERTIFICATION IDENTICAL TIE BIDS: Preference shall be given to businesses with drug-free workplace programs. Whenever o or more bids which are equal with respect to price, quantity, and service are received by the State or by any po itical subdivision for the procurement of commodities or contractual services,a bid received from a business that certifi that it has implemented a drug-free workplace program shall be given preference in the award process. Estab' hed procedures for processing tie bids will be followed if none of the tied vendors have a drug-free workplace p (Florida Statutes Section 287.037). In order to have a drug-free workplace program,a business shall: • 1. Publish a statement notifying employees that the unlawful manufacture,distribution,dispensing,possessi n,or • use of a controlled substance is prohibited in the workplace and specifying the actions that will be taken • employees for violations of such prohibition. 2. Inform employees about the dangers of drug abuse in the workplace, the business's policy of main . g a drug-free workplace,and available drug counseling,rehabilitation,and employee assistance programs,an the penalties that may be imposed upon employees for drug abuse violations. 3. Give each employee engaged in providing the commodities or contractual services that are under bid a copy of the statement specified in subsection(1). 4. In the statement specified in subsection (I), notify the employees that, as a condition of working o the commodities or contractual services that are under bid,the employee will abide by the terms of the ent and will notify the employer of any conviction 44 or pleas of guilty or nolo contendere to, any violati of Chapter 893 or of any controlled substance law of the United States or any state,for a violation occurring the workplace no later than five(5)days after such conviction. 5. Impose a sanction on, or require the satisfactory participation in a drug abuse assistance or rehabilitation program is such is available in the employee's community,by any employee who is so convicted. 6. Make a good faith effort to continue to maintain a drug-free workplace through implementation of this sectirn. As the person authorized to sign the statement,I certify that this firm complies fully with the above requirements. Bidder. L.I. & COMPANY, NC. Signed: Wain.�_ 1111 By: PAUL LACY (Print or Type Name) Title: PRESIDENT Date: OCTOBER 12, 1999 END OF SECTION 1 I 00301-B-1 I II SECTION 00410 BID BOND# 66592944831-127 I KNOW ALL MEN BY THESE PRESENTS, that we, the undersigned, L. I. & Company, Inc II as Principal, and The Mountbatten Surety Company, Inc. , as Surety, are hereby held and firmly bound unto the City of Ocoee, Florida, as Owner in the penal sum of five percent of the Contract Bid 5% of the amount bid not to exceed Thirty One Thousand Two Hundred m 31,250.00 ) Ifor payment of which, well and truly to be made, we if )9 t �a sevcrafy bind ourselves, successors tnd IIassigns. Signed, this 6th day of October , 19 99 . The condition of the above obligation is such t III whereas the Principal has submitted to the City of Ocoee, Florida a certain Bid, attached hereto and hereby de a part hereof to enter into a contract in writing, for the City of Ocoee Vehicle and Material Storage Building. 1 IINOW THEREFORE 1. Bidder and Surety, jointlyand severally, bind themselves, their heirs, executors, administrat Irs + successors and assigns to pay to Owner upon default of Bidder any difference between the total amo of IBidder's bid and the total amount of the bid of the next lowest, responsible and responsive bidde as determined by Owner for the Work required by the Contract Documents, provided that: N 1.1. If there is o such next lowest, responsible and responsive bidder, and Owner does not aban on the Project, then Bidder and Surety shall pay to Owner the penal sum set forth on the face of this Bond, and Ns 1 1.2. In no event shall Bidder's and Surety's obligation hereunder exceed the penal sum set forth)on the face of this Bond. 2. Default of Bidder shall occur upon the failure of Bidder to deliver within the time required by the Bi ' Documents (or any extension thereof agreed to in writing by Owner) the executed Amendment to the Agreement required by the Bidding Documents and any performance and payment bonds required by e IBidding Documents and Contract Documents. I 3. This obligation shall be null and void if: 1 3.1. Owner accepts Bidder's bid and Bidder delivers within the time required by the Bid ing Documents (or any ext ion thereof agreed to in writing by Owner) the executed Amen ent to the Agreement by the Bidding Documents and any performance and payment bo IIrequired by the Bidding Documents and Contract Documents, or 3.2. All bids are rejected by Owner, or 1 3.3. Owner fails to issue a Notice of Intent to Award to Bidder within ninety (90) days from the and date fixed for the opening of Bids (or any extension thereof agreed to in writing by Bi4Ier IIand, if applicable, consented to by Surety when required by paragraph 5 hereof). 4. Payment under this Bond will be due and payable upon default by Bidder and within thirty (30) cafe days after receipt by Bidder and Surety of written notice of default from Owner, which notice wil be IIgiven with reasonable promptness, identifying this Bond and the Project and including a statement of the amount due. I 00410-1 I Ed Wet'S:80 666T 90 '100 9306817E : 'ON Xe. i 00'g I 1 : WOe d 5. Surety waives notice of any and all defenses based on or arising out of any time extension to issue noti e of award agreed to in writing by Owner and Bidder, provided that the total time for issuing notice f award including extensions shall not in the aggregate exceed 120 days from Bid Due Date witho t Surety's written Consent. 6. No suit or action shall be commenced under this bond prior to 30 calendar days after the notice of defa t required in paragraph 4 above is reccived by Bidder and Surety and in no case later than one year a r Bid Due Date. 7. Any suit or action under this Bond shall be commenced only in a court of competent jurisdiction located in the state in which the Project is located. 8. Notices required hereunder shall be in writing and sent to Bidder and Surety at their respective address s shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier by United States Registered or Certified Mail, return receipt requested, postage pre-paid, and shall deemed to be effective upon receipt by the party concerned. 9. Surety shall cause to be attached to this Bond, a current and effective Power of Attorney evidencing th authority of the officer, agent or representative who executed this Bond on behalf of Surety to execute seal and deliver such Bond and bind the Surety thereby. 10. This Bond is intended to conform to all applicable statutory requirements. Any applicable requirement o any applicable statute that has been omitted from this Bond shall be deemed to be included herein as if se forth at length, If any provision of this Bond conflicts with any applicable provision of any applicabl statute, then the provision of said statute shall govern and the remainder of this Bond that is not conflict therewith shall continue in full force and effect. 11. The term "bid" as used herein includes a bid, offer or proposal as applicable. IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals, and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forth above. II I I I I I 00410-2 bd WUSS:80 666T 90 '130 9Z068bZ 'ON Xdd i008I7 W02ld N BIbb>;R: - truce out (X) nouapplicable signature block and complete applicable block. All signatures ust have their nainesyrinted or typed below their signature. 111 If Bidder is SOLE PROPRIBRTORSHIP, complete this signature block (1) (individual's Signature) (Witness) (2) (Individual's Name) (Witness) doing business as 111 (SEAL) (Business Address) 111 (Telephone No.) (Florida License No.) if Bidder is PARTNERSHIP,complete this signature block. p (1) (Partnership Name) (Witness) (General Partner's Si (2) mature) (witaress) _ (General Partner's Name) I (SEAL) p (Business Address) ( ) (Telephone No.) (Florida License No.) I - 1 I 00410-3 100811 Sd WtiSS:80 6662 90 '100 9E068PZ : '0N Xljd Wald If Bidder is a CORPORATION.complete this signature block. ATTEST: L.I. & Company, Inc. (Corporation Name) (Co Seere®rx3rSignamrc) r/,s, ,e4/42 (State of Incorporation) * t 41, (Corporate Secretary Name) By: v /040 person authorized_ to sign-see ow I/ /tie' (CORPORATE SEAL:) rr^ze�S' Api /Ady (Corporatiorf President) • 4455 Parkbreeze Ct. Orlando, FL 32808 (Business Address) ( 407) 299-4632 C, 2 (Telephone No.) (Florida Lacerate No.T II i I III I I I 00410-4 i 9d W1d9S:80 6661 90 '130 9Z068PZ : '0N Xdd i 00111 : WOZId 1 SURETY: • . WITNESS: (If Agent is not a Corporation) IIThe Mountbatten Surety Company, Inc. (1) (Surety Business Name) (Witness) (Witness) • 33 Rock Hill Rd., Bala Cynwyd, PA 19004 (Principal Place of Business) 111 Vs-1-14-. a A.-4---"" A ATTEST: (If Agent is a Corporation) urery Agent's Signa -See Note 2) EveIvn D Rogers \ vvr_ c II _�a-J } (Surety Agent's Name) cerrefate.goefirr 911,1=21" Attorney-in-Fact Florida Resident Agent III (Surety Agent's Tide) diA a Lcorpeo.aLowatetwj. <6.0 Suretek _ III (Business Name of Local Agent for Surety) III 4410 N. 56th St . (CORPORATE SEAL) Tampa, FL 33610 (Business Address of Local Agent) Ii 1 ( 813) 740-2550 (813) 740-0223 (Telephone No.) (Florida License No.) iiNOTES! (I) Complete and attach "Corporate Authority to Execute Documents" if executed by any corporate emplo ee II other than president or vice-president. (2) Complete and attach a certified copy of Power-of-Attorney" prepared by Surety appointment individ 1 "Attorney-in-Fact" for execution of Bid Bond on behalf of Surety and corresponding notarized "Attorn - mil in-Fact". IN (3) Above addresses are to be used for giving required notice. (4) Any singular reference to Bidder, Surety, Owner or other party shall be considered plural wh re O applicable. (5) Surety companies executing bonds must appear on the Treasury Department's most current list (Circ lar 570 as amended)and be authorized to transact business in the state where the project is located. • 1 1 00410-5 r Ld 14139S:80 666T 90 '130 9E068PE : '0N Xtid 100'8I1 : woad Notary Acknowledgements Individual State of County of On this day of , 19 , before me personally appeared to me known and known to me to lile the person described in and who executed the foregoing instrument, and he thereupon duly acknowledged to me that he executed the same. Notary Public Corporate State of 'PI O itt OA County of D 1'CLY1 ,c- On this /213--d y of } CA' , 19UY9 , before me personally appeared Pu u l La L to me know , who being duly swo , did depos nd say that he resided ih the ©vci.v(.{ e_ (bik of rCand that he i there5( i fith-4' of L I. 8 Goriccn C . , th Corporation described in and which executed the foregoing instrumerft; that he knew the seal of sa d Corporation; that the seal affixed to said instrument was such Corporate seal; that it was affixed b order of the Board of Directors of said Corporation and th. .e signed his name thereto by like ord r. 1 ,i, .00'If 1 //P i labl--1 eP•44.Deems R Bolena Notary Public y *My Commission CC855483 ^%,/Expires August 20,2003 Surety State of Florida County of Hillsborough 6 _c_.) On this /j04--day of , 1999, before me personally appeared Evelyn D. Rogers, who being by me duly sworn, did depose and say that she resided in the City of Tampa, Florida and that she is the Attorney-in-fact of The Mountbatten Surety Company, Inc., the S rety described in and which executed the foregoing instrument; that she knew the seal of the said Sure ; that the seal affixed to said instrument was such surety seal; that it was affixed by order of the Boaid of Directors of said Surety and that she signed her ame thereto by like rder. ., � J Notary Public Notary Pub,,, ::i Commission # CC 788633 L Expires 11/21/2002 i v II THE MOUNTBATTEN SURETY COMPANY, INC. Power of Attorney KNOW ALL MEN BY THESE PRESENTS: That The Mountbatten Surety Company,Inc.,a corporation of the Commonwealth of Pennsylvania,has made,constituted and appointed,and by these presents does make,constitute and appoint Albert Elia, III and/or Evelyn D. Rogers all of Tampa, Florida its true and lawful Attorney-in-Fact,to make,execute and deliver on its behalf insurance policies,surety bonds,undertakings and other instrum nts of a similar nature as follows: NOT TO EXCEED SIX MILLION DOLLARS ($6,000,000.00) Such insurance policies,surety bonds,undertakings and instruments for said purposes,when duly executed by the aforesaid Attorney-in-Fact shall be binding upon the said Corporation as fully and to the same extent as if signed by the duly authorized officers of the Corporation and sealed wi its corporate seal;and all the acts of said Attorney-in-Fact,pursuant to the authority hereby given,are hereby ratified and confirmed. This appointment is made pursuant to the following By-Laws which were duly adopted by the Board of Directors of the said Corporation on Au!ust 28, 1992 with all Amendments thereto and are still in full force and effect: "Article XII: Policies,Bonds,Recognitions,Stipulations,Consents of Surety,Underwriting Undertakings,and Instruments Relating Thereto. Section 12-1. Insurance policies,bonds,recognitions,stipulations,consents of surety and underwriting undertakings of the Corporation,and eleases, agreements and other writings relating in any way thereto or to any claim or loss thereunder,shall be signed in the name and on behalf of the Corporation: a)by the Chairman of the Board,the President or a Vice President,and by the Secretary or an Assistant Secretary;or b)by an Attorney-in-Fact for the Corporation appointed and authorized by the Chairman of the Board,the President,or a Vice President to make such •ignature; or c)by such other officers or representatives as the Board may from time to time determine. The seal of the Corporation shall if appropriate be affixed thereto by any such officer,Attorney-in-Fact or representative.The authority of such Attorney-in-Fact and Agents shall be as prescribed in the instrument evidencing their appointment. Any such appointment and all authority g nted thereby may be revoked at any time by the Board of Directors or by any person empowered to make such appointment." IN WITNESS WHEREOF,The Mountbatten Surety Company,Inc.has caused these presents to be duly signed and its corporate seal to be h reunto affixed and duly attested this 24th day of June, 1998. x0wMe4. / THE MO NTBATTEN SURETY COMPANY,INC. re �o (Sc I Attest: / By: ��� Notarial S al ' Gary .Bragg,gg, ecretary /O Kenneth L.Brier, esident Anthony T.Stewart, otary Public �r !*+ry Lower Merton Twp.,Mon gomery County My Commission Explr Aug.5,2002 Commonwea th of Pennsylvania Member,Pennsylvania A tenon of Notaries County of Montgomery On this 24th day of June, 1998,before me personally appeared Kenneth L.Brier,President of The Mountbatten Surety Company,Inc.with wh m I am personally acquainted,who,being by me duly sworn,said that he resides in the Commonwealth of Pennsylvania,that he is President of The Mountbatten Surety Company,Inc.,the corporation described in and which executed the foregoing instrument;that he knows the corporate s I of the said Corporation;that the seal affixed to said instrument is such corporate seal;that it was so affixed by order of the Board of Directors of said Corporation;and that he signed his name thereto as President of said Corporation by like authority. — (Seal) / i•T � - Notary ublic CERTIFICATE I,the undersigned Secretary of The Mountbatten Surety Company,Inc.do hereby certify that the original Power of Attorney of which the foreg ing is a full,true and correct copy,is in full force and effect on the date of this Certificate and I do further certify that the Officer who executed the said ower of Attorney was one of the Officers authorized by the Board of Directors to appoint an Attorney-in-Fact as provided in Section 12-1 of the By-La s of The Mountbatten Surety Company,Inc. This Certificate may be signed and sealed by facsimile under and by authority of the following provisions f the By-Laws of The Mountbatten Surety Company,Inc.: "Section 12-2. The use of a printed facsimile of the corporate seal of the Corporation and of the signature of the Secretary or an Assistant S cretary on any certification of the correctness of a copy of an instrument executed by an authorized person pursuant to Article XII,Section 12-1 of the By}Laws appointing and authorizing an Attorney-in-Fact to sign in the name and on behalf of the Corporation surety bonds,underwriting undertakings,Or other instruments described in said Section 12-1,with like effect as if such seal and such signature had been manually affixed and made." In Wi ss Whereof,I hav ereunt set my hand d affixed the corporate seal of the Corporation to these presents this 1.- day of C 1k r�f\. , 199 1.�Cq J This power of attorney is my valid with Cod # � 1J.J f a 1 4 3 tnd t e iginal,red stamp affixed hereto. I (seal) Gary . rag Secreta (Stamp) 111 4 SECTION 00480 NONCOLLUSION AFFIDAVIT ISTATE OF ) ss COUNTY OF ) I /0,,/J h1. ,being first duly swore deposes and says that: • li1. He(it)is the /}U/ /0/' / �rL� /c,f /�/ (Owner,Partner,Office,Representative or Agent) II of the Bidder that has submitted the attached Bid; C. 2. He is fully informed respecting the preparation and contents of the attached Bid and of all pertinent circumstances Irespecting such Bid; 3. Such Bid is genuine and is not a collusive or sham Bid; II 4. Neither the said Bidder nor any of its officers, partners, owners, agents, representatives, employees, or parties in interest, including this affidavit, have in any way, colluded, conspired, connived or agreed, directly or indirectly, with any other Bidder, firm or person to submit a collusive or sham Bid in connection with the Contract for which I the attached Bid has been submitted; or to refrains from bidding in connection with such Contract; or have in any manner,directly or indirectly,sought by agreement or collusion,or communication,or conference with any Bidder, firm,or person to fix the price or prices in the attached Bid or of any other Bidder,or to fix any overhead,profit,or I cost elements of the Bid price or the Bid price in any other Bidder,or to secure through any collusion, conspiracy, connivance, or unlawful agreement any advantage against (Recipient), or any person interested in the proposed Contract; 1111 5. The price or prices quoted in the attached Bid are fair and proper and are not tainted by any collusion, conspiracy, connivance, or unlawful agreement on the part of the Bidder or any other of i agents, - . sentatives, owners, employees or parties in interest,including his affidavit. I : : . ,......,.....4,— Title- J� 1 Sworn and subscribed to before me this at day of 0C-0)blV 19 q f in the State of rio vi ' ,County of DYCI,6.0.11 In *44 L>eanna R Baena *My Commission CC655465 %.,"Expires August 20 2003 111 I I , A i 1 ill Notary Public My Commission Expires: 8//20/2 0 t _.._ END OF SECTION 00480-1 I SECTION 00481 �I CERTIFICATION OF NONSEGREGATED FACILITIES The Bidder certifies that he does not maintain or provide for his employees any segregated facilities at any of his establishments,and that he does not permit his employees to perform their services at any location, under this contro, where segregated facilities are maintained. The Bidder certifies further that he will not maintain or provide for s employees any segregated facilities at any of his establishments, and that he will not permit his employees to perfo their services at any location under his control where segregated facilities are maintained. The Bidder agrees that breach of this certification will be a violation of the Equal Opportunity clause in any contract resulting from acceptan of this Bid.As used in this certification,the term"segregated facilities"means any waiting rooms,work areas,restroo and washrooms, restaurants and other eating areas, timeclocks, locker rooms and other storage and dressing . • , U parking lots, drinking fountains, recreation or entertainment area, transportation, and housing facilities provided f•r employees on the basis of race, color, religion, or national origin, because of habit, local custom, or otherwise. Bidder agrees that(except where he has obtained identical certification from proposed subcontractors for specific I periods) he will obtain identical certifications from proposed subcontractors prior to the award of subcon exceeding$10,000 which are not exempt from the provisions of the Equal Opportunity clause, and that he will retain such certifications in his files. I The nondiscriminatory guidelines as promulgated in Section 202,Executive Order 11246,and as amended by Executive Order 11375 and as amended,relative to Equal Opportunity for all persons and implementations of rules and regulations prescribed by the United States Secretary of Labor are incorporated herein. Note: The penalty for making false statements in offers is prescribed in 18 U.S.C. 1001. mis Date l0AZ , 19 Y7 .G . Sit /l! .�%fl f, Official Address (including Zip Code): By: `. (Tide)• ATTACH AND INCLUDE AS PART OF PROPOSAL FORM; FAILURE TO DO SO MAY BE CAUSE FOi DISQUALIFICATION OF YOUR BID. END OF SECTION I I I I 00481-1 I SECTION 00482 (Page 1 of 2) 11 SWORN STATEMENT UNDER SECTION 287.133(3Xa), FLORIDA STATUTES,ON PUBLIC ENTITY CRIMES THIS FORM MUST BE SIGNED IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICERII IAUTHORIZED TO ADMINISTER OATHS. 1. This sworn statement is submitted to City of Ocoee,Florida by IPaul Lacy, President • (Print individual's Name&Title) whose business address is 4455 Parkbreeze Court Orlando, FL 32808 2. I understand that a "public entity crime" as defined in Paragraph 287.133(1)(g),Florida Statutes,means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or with the United States,including,but not I limited to, any bid or contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state or of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering,conspiracy,or material representation. 3. I understand that "convicted" or "conviction" as defined in Paragraph 287.133(1)(b), Florida Statutes, means a l' finding of guilt or a conviction of a public entity crime,with or without an adjudication of guilt, in any federal or state trial court of record relating to charges brought by indictment or information after July 1, 1989,as a result of a Ijury verdict,nonjury trial,or entry of a plea of guilty or nolo contendere. 4. I understand that an"affiliate"as defined in Paragraph 287.133(lXa),Florida Statutes,means: 111 a. A predecessor or successor of a person convicted of a public entity crime:or b. An entity under the control of any natural person who is active in the management of the entity and who has I been convicted of a public entity crime. The term "affiliate" includes those officers, directors, executives, partners,shareholders,employees,members,and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of', equipment or income among persons when not for fair market value under an arm's length agreement,shall be a prima facie case that one person controls another person. A person who knowingly enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shall be considered an affiliate. 5. I understand that a "person" as defined in Paragraph 287.133(lxe), Florida Statutes means any natural person or entity organized under the laws of any state or of the United States with the legal power to enter into a binding contract and which bids or applies to bid on contracts for the provision of goods or services let by a public entity,or which otherwise transacts or applies to transact business with a public entity. The term "person" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in management of an entity. 6. Based on information and belief;the statement which I have marked below is true in relation to the entity submitting this sworn statement. (please indicate which statement applies). Neither the entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees,members, or agents who are active in management of the entity, nor I 00482-1 I 1 any affiliate of the entity have been charged with and convicted of a public entity crime subsequent to July 1, 1989. The entity submitting this sworn statement,or one or more of the officers,directors,executives,partners, shareholders, employees,members, or agents who are active in management of the entity, or an affiliate of this entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. The entity submitting this sworn statement,or one or more of the officers,directors,executives,partners, shareholders,employees,members, or agents who are active in management of the entity, or an affiliate of this entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. However,there has been a subsequent proceeding concerning the conviction before a Hearing Officer of the State of Florida,Division of Administrative Hearings. The final order entered by the Hearing Officer determined that it was not in the public interest to place the entity submitting this sworn statement on the , convicted vendor list. (Please attach a copy of the final order.) II UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 1 (ONE) ABOVE IS FOR THAT PUBLIC ENTITY ONLY AND,THAT THIS FORM IS VALID THROUGH . I ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES FOR CATEGORY TWO OF CHANGE IN THE INFORMATION CONTAINED IN THIS FORM. I — I (Si . it Date: 4/# 2.., I 1‘ • vI*1, 5"YJI;/, Name of Bidder(Contractor) I STATE OF bilI COUNTY OF Oral p--- PERSONALLY APPEARED BEFORE ME,the undersigned authority, PO-U I Lac I who,after first being sworn by me,affixed his/her signature in the place provided above on this ( Z � 1119 I � day of �.(�1 X '-----4a4(AUR / I , Notary PublicDeanna R gm * *MY Commission CC8554ese f A►.,,,r+� august 20.2003i My Commission Expires: g 20/ 2�3 END OF SECTION 1 I 00482-2 SECTION 00483 CERTIFICATION OF NONDISCRIMINATORY LABOR PRACTICES This certification relates to a construction contract proposed by the City of Ocoee. Equal Opportunity Employment: The Contractor shall not discriminate on the basis of race, color, national origin,gender,age,handicapped status,veteran status,and/or religion in performing the work governed by this contract. The City is an Equal Opportunity Employer(EOE)and as such encourages all contractors to comply with EOE regulations. Any subcontract the Contractor may enter into shall include this clause with the simile degree of application being encouraged. I am the undersigned prospective construction contractor or subcontractor. I certify that... (1) I have/ have not participated in a previous contract or subcontract subject to the Equal Opportunity Clause and (2) If I have participated in a previous contract or subcontract subject to the Equal Opportunity Clause,I have/ have not filed with the Joint Reporting Committee,the Director of the Office of Federal Contract Compliance Programs, or the Equal Employment Opportunity Commission all reports due under the applicable filing requirements. I understand that,if I have participated in a previous contract or subcontract subject to the Equal Opportunity Clause aid have failed to file all reports due under the applicable filing requirements, I am not eligible, and will not be eligible,to have my bid or offer considered, or to enter into the proposed contract or subcontract, unless and until I make an arrangement regarding such reports that is satisfactory to the office where the reports are required to be filed. it I agree that I will obtain identical certifications from prospective lower-tier construction subcontractors when I receive bids or offers or initiate negotiations for any lower-tier construction subcontracts with a price exceeding$10,000. I alao agree that I will retain such certificationsiin my files. Date /1y/.2. / , 19 7 9 By: (Si i•' of Authorized Official) • i#4.e--.5.:0C--iv 7 (Name of Prospective ConstructionContractoror Subcontractor) e7-471 am/ ''i (Address of Prospective Construction Contractor or Subcontractor) C7 3 z S�^33 y'D/ 97 907-02911-7G102- (Telephone Number) (Employer Identification Number) END OF SECTION 00483-1 SECTION 00483 CERTIFICATION OF NONDISCRIMINATORY LABOR PRACTICES This certification relates to a construction contract proposed by the City of Ocoee. Equal Opportunity Employment: The Contractor shall not discriminate on the basis of race, color, national origin,gender,age,handicapped status,veteran status,and/or religion in performing the work governed by this contract. The City is an Equal Opportunity Employer(EOE)and as such encourages all contractors to comply with EOE regulations. Any subcontract the Contractor may enter into shall include this clause with the same degree of application being encouraged. I am the undersigned prospective construction contractor or subcontractor. I certify that... (1) I have! have not participated in a previous contract or subcontract subject to the Equ l Opportunity Clause and (2) If I have participated in a previous contract or subcontract subject to the Equal Opportunity Clause,I have/ have not filed with the Joint Reporting Committee, the Director of the Office of Fed Contract Compliance Programs,or the Equal Employment Opportunity Commission all reports due and the applicable filing requirements. I understand that,if I have participated in a previous contract or subcontract subject to the Equal Opportunity Clause and have failed to file all reports due under the applicable filing requirements,I am not eligible,and will not be eligible,to have my bid or offer considered, or to enter into the proposed contract or subcontract, unless and until I make an arrangement regarding such reports that is satisfactory to the office where the reports are required to be filed. I agree that I will obtain identical certifications from prospective lower-tier construction subcontractors when I receive bids or offers or initiate negotiations for any lower-tier construction subcontracts with a price exceeding$10,000. I also agree that I will retain such certifications in my files. Date g./.2/ , 19.P9 By: 4.1406• (Sig of A orized Official) 40'‘° "‘',E9 (Name of Prospective Co 'on Contractor or Subcontractor) Ss e (Addressof Prospective Construction Contractor or Subcontractor) f.//4q.r,Q'o p d.Z 13.4!"- X07 62pP'—rtiot S-7_33 y'D i 97 (Telephone Number) (Employer Identification Number) END OF SECTION 00483-1 :e 4. i` n ♦d � +,rf.OP Oona JAMES W.SHIRR,P.E. CITY ENGINEER/UTILITIES DIRECTOR 150 N.LAKESHORE DRIVE•OCOEE,FLORIDA 34761 PHONE(407)656-2322 EXT.142•FAX(407)656-7835 May 14, 1998 Paul Herwig Gee&Jenson AEP, Inc. 2701 Maitland Center Parkway, Suite 150 Maitland, Florida 32751 RE: Work Order No. 10 Vehicle and Material Storage Building Dear Mr. Herwig: Approximately two weeks ago representatives of the City verbally informed Gee & Jenson to cease work on the development of the Design Criteria Package for the Vehicle and Material Storage Building to be located on the Wastewater Treatment Plant property. In accordance with Section 10 of the Agreement, dated December 5, 1995, the City desires to terminate the services contracted for under Work Order No. 10. The City is taking this action for its convenience with the understanding that it will be billed for labor and expenses incurred to date by Gee&Jenson. Should you wish to discuss this matter further, please do not hesitate to contact this office. Sincerely, CITY of OCOEE David A. Wheeler, P.E. Assistant City Engineer/Utility Director cc: Ellis Shapiro, City Manager James W. Shira, P.E., City Engineer/Utilities Director Paul Rosenthal, Esq., Foley and Lardner THE PRIDE OF WEST ORANGE r- Ocoee November 20, 1998 ••�� OF 000a JAMES W. SHIRA, P.E. CITY ENGINEER/UTILITIES DIRECTOR 150 N.LAKESHORE DRIVE•OCOEE,FLORIDA 347$1 PHONE(407)656-2322 EXT. 142•FAX(407)656-7835 Joe Margio, P.E. Glace and Radcliffe & Inc. 800 S. Orlando Avenue Maitland, Florida 32751 RE: Request for Fee Proposal Vehicle and Material Storage Building Dear Mr. Margio: In January of 1997, the City of Ocoee had a Utility Bond Issue to finance various projects throughout the City. One of those projects was to construct a Vehicle and Material Storage Building at the Ocoee Wastewater Treatment Facility. The City employed Gee & Jenson EAP, Inc. to perform the Conceptual Design Programming/Site Evaluation phase of this project. The initial plan was to complete the project as a design/build approach. Design Criteria !, documents would be used to competitively bid the project to design/build teams. The City has decided to complete the project as a full design and competitive bid to contractors. Attached, please find a copy of that Evaluation Report completed by Gee & Jenson. The City of Ocoee is requesting that Glace & Radcliffe, Inc. provide us with a fee , proposal for designing the project and assisting in the construction phase engineering ', services. The proposal shall be prepared in accordance with the Continuing ', Professional Consulting Agreement dated September 1, 1998. The proposal shall be a combination Lump Sum for the Design and Permitting phases and Wage Cost Multiplier'. for the Bidding and Construction phases. The Ocoee Engineering staff has determined that the following tasks will need to be performed. If you feel that there are additional tasks which we may have over looked please include them in your proposal. Design Phase • Review and familiarization with the Conceptual Design Programming/Site Evaluation' Report and the proposed site location. • Geotechnical exploration of the site for design of the structure and the stormwater facilities will be by one of the City's contracted firms. Scope to be determined byl your firm's requirements. THE PRIDE OF WEST ORANGE • Any surveying of the site for design of the facilities will be by one of the City's contracted firms. Scope to be determined by your firm's requirements. • • Detailed design of the site amenities to include site grading, pavement improvements, sewer line relocation and stormwater facilities. • Detailed design of a metal type building for the Vehicle and Material Storage Building, including interior walls, electrical, plumbing, and sprinkler systems. The free standing shelves for the material storage area will be purchased and installed by the City. • Prepare detailed plans and specifications of the project and an opinion of probable construction cost. Permitting Phase • Prepare, submit and secure a stormwater permit in accordance with the St. Johns River Water Management District. • Prepare, submit and secure permits in accordance with the Florida Department of Environmental Protection for connection of the building to the city's drinking water and sanitary sewer systems, if necessary. Bidding Phase • Provide the City with one set of original documents to be used for printing of bid sets to be used during the bidding process. The City will be responsible for advertising and bidding the project. • Provide assistance in response to written questions received during the bidding process. Provide assistance in the preparation of any addendum which may need to be sent out in response to questions and/or changes in the design. • Provide a written review and a recommendation on award based upon the bids received. Construction Phase • Attend and participate in the Pre-Construction Conference to be conducted by the City with the selected contractor. • Review shop drawings for the project • Review and assist the City in response to Requests For Information RFIs from the contractor. • Assist the City in review of Requests for Proposed Changes in the design which will result in contract Change Orders. • Provide every other week observations of the project and provide the City with a written report of that construction observation. • Assist the City in the Substantial and Final Completion Inspections and provide the City with a certification of construction in accordance with plans and specifications of the project. • Assist the City in the preparation of As-Built record drawings of the project. • Assist the City in the Big Weanie Roast for the project dedication. The City will accept written requests for additional information related to the scope of this project. These requests will be accepted until 5:00 P.M. December 3, 1998. All written requests will be answered in writing, with a copy of each response mailed to '. each of the three engineering firms receiving this letter. You are requested to provide your proposal including a detailed schedule and completion date by 5:00 P.M. December 9, 1998. The Engineering Staff will review the proposals and prepare its staff recommendation to the City Commission for the regular City Commission Meeting to be held on December 15, 1998. If approved, the Service Authorization for this project will be executed on that day and notice to proceed will be issued the next day. It is the City's desire to be ready to proceed with the Bidding Phase on or about March 1, 1999. Should you have any questions, please do not hesitate to contact this office. Sincerely, CITY of OCOEE David A. Wheeler, P.E. Assistance City Engineer/Utility Director cc: Jim Shira, City Engineer Ocoee r4:4;411 a November 20, 1998 'fi of c000• ` JAMES W. SHIRA, P.E. CITY ENGINEER/ UTILITIES DIRECTOR 150 N.LAKESHORE DRIVE•OCOEE,FLORIDA 347611 PHONE(407)656-2322 EXT. 142•FAX(407)656-7835 Robert Rutter, P.E. Ivey, Harris & Walls, Inc. 631 South Orlando Avenue, Suite 200 Winter Park, Florida 32789 RE: Request for Fee Proposal Vehicle and Material Storage Building Dear Mr. Rutter: In January of 1997, the City of Ocoee had a Utility Bond Issue to finance various projects throughout the City. One of those projects was to construct a Vehicle and Material Storage Building at the Ocoee Wastewater Treatment Facility. The City employed Gee & Jenson EAP, Inc. to perform the Conceptual Design Programming/Site Evaluation phase of this project. The initial plan was to complete the project as a design/build approach. Design Criteria documents would be used to competitively bid the project to design/build teams. The City has decided to complete the project as a full design and competitive bid to contractors. Attached, please find a copy of that Evaluation Report completed by Gee & Jenson. The City of Ocoee is requesting that Ivey, Harris & Walls, Inc. provide us with a fee proposal for designing the project and assisting in the construction phase engineering services. The proposal shall be prepared in accordance with the Continuing Professional Consulting Agreement dated September 1, 1998. The proposal shall be a combination Lump Sum for the Design and Permitting phases and Wage Cost Multiplier for the Bidding and Construction phases. The Ocoee Engineering staff has determined that the following tasks will need to be performed. If you feel that there are additional tasks which we may have over looked please include them in your proposal. Design Phase • Review and familiarization with the Conceptual Design Programming/Site Evaluation Report and the proposed site location. • Geotechnical exploration of the site for design of the structure and the stormwater facilities will be by one of the City's contracted firms. Scope to be determined by your firm's requirements. THE PRIDE OF WEST ORANGE • Any surveying of the site for design of the facilities will be by one of the City's contracted firms. Scope to be determined by your firm's requirements. • • Detailed design of the site amenities to include site grading, pavement improvements, sewer line relocation and stormwater facilities. • Detailed design of a metal type building for the Vehicle and Material Storage Building, including interior walls, electrical, plumbing, and sprinkler systems. The free standing shelves for the material storage area will be purchased and installed by the City. • Prepare detailed plans and specifications of the project and an opinion of probable construction cost. Permitting Phase • Prepare, submit and secure a stormwater permit in accordance with the St. Johns River Water Management District. • Prepare, submit and secure permits in accordance with the Florida Department of Environmental Protection for connection of the building to the city's drinking water and sanitary sewer systems, if necessary. Bidding Phase • Provide the City with one set of original documents to be used for printing of bid sets to be used during the bidding process. The City will be responsible for advertising and bidding the project. • Provide assistance in response to written questions received during the bidding process. Provide assistance in the preparation of any addendum which may need to be sent out in response to questions and/or changes in the design. • Provide a written review and a recommendation on award based upon the bids ', received. Construction Phase • Attend and participate in the Pre-Construction Conference to be conducted by the City with the selected contractor. • Review shop drawings for the project • Review and assist the City in response to Requests For Information RFIs from the contractor. • Assist the City in review of Requests for Proposed Changes in the design which will result in contract Change Orders. • Provide every other week observations of the project and provide the City with a written report of that construction observation. • Assist the City in the Substantial and Final Completion Inspections and provide the City with a certification of construction in accordance with plans and specifications of the project. • Assist the City in the preparation of As-Built record drawings of the project. • Assist the City in the Big Weanie Roast for the project dedication. The City will accept written requests for additional information related to the scope of this project. These requests will be accepted until 5:00 P.M. December 3, 1998. All written requests will be answered in writing, with a copy of each response mailed to each of the three engineering firms receiving this letter. You are requested to provide your proposal including a detailed schedule and completion date by 5:00 P.M. December 9, 1998. The Engineering Staff will review the proposals and prepare its staff recommendation to the City Commission for the regular City Commission Meeting to be held on December 15, 1998. If approved, the Service Authorization for this project will be executed on that day and notice to proceed will be issued the next day. It is the City's desire to be ready to proceed with the Bidding Phase on or about March 1, 1999. Should you have any questions, please do not hesitate to contact this office. Sincerely, CITY of OCOEE x9- 0 4-1 /44,-/ David A. Wheeler, P.E. Assistance City Engineer/Utility Director cc: Jim Shira, City Engineer Ocoee o� of 4' of*OF G oa`� JAMES W. SHIRA, P.E. CITY ENGINEER/UTILITIES DIRECTOR 150 N.LAKESHORE DRIVE•OCOEE,FLORIDA 34761 PHONE(407)656-2322 EXT. 142•FAX(407)656-7835 November 20, 1998 J. Richard Voorhees, P.E. Hartman & Associates, Inc. 201 East Pine Street, Suite 1000 Orlando, Florida 32801 RE: Request for Fee Proposal Vehicle and Material Storage Building Dear Mr. Voorhees: In January of 1997, the City of Ocoee had a Utility Bond Issue to finance various projects throughout the City. One of those projects was to construct a Vehicle and Material Storage Building at the Ocoee Wastewater Treatment Facility. The City employed Gee & Jenson EAP, Inc. to perform the Conceptual Design Programming/Site Evaluation phase of this project. The initial plan was to complete the project as a design/build approach. Design Criteria documents would be used to competitively bid the project to design/build teams. The City has decided to complete the project as a full design and competitive bid to contractors. Attached, please find a copy of that Evaluation Report completed by Gee & Jenson. The City of Ocoee is requesting that Hartman & Associates, Inc. provide us with a fee proposal for designing the project and assisting in the construction phase engineering services. The proposal shall be prepared in accordance with the Continuing Professional Consulting Agreement dated September 1, 1998. The proposal shall be a combination Lump Sum for the Design and Permitting phases and Wage Cost Multiplier for the Bidding and Construction phases. The Ocoee Engineering staff has determined that the following tasks will need to be performed. If you feel that there are additional tasks which we may have over looked please include them in your proposal. THE PRIDE OF WEST ORANGE Mr. Richard Voorhees November 20, 1998 Page 2 Design Phase • Review and familiarization with the Conceptual Design Programming/Site Evaluation Report and the proposed site location. • Geotechnical exploration of the site for design of the structure and the stormwater facilities will be by one of the City's contracted firms. Scope to be determined by your firm's requirements. • Any surveying of the site for design of the facilities will be by one of the City's contracted firms. Scope to be determined by your firm's requirements. • • Detailed design of the site amenities to include site grading, pavement improvements, sewer line relocation and stormwater facilities. • Detailed design of a metal type building for the Vehicle and Material Storage Building, including interior walls, electrical, plumbing, and sprinkler systems. The free standing shelves for the material storage area will be purchased and installed by the City. • Prepare detailed plans and specifications of the project and an opinion of probable construction cost. Permitting Phase • Prepare, submit and secure a stormwater permit in accordance with the St. Johns River Water Management District. • Prepare, submit and secure permits in accordance with the Florida Department of Environmental Protection for connection of the building to the city's drinking water and sanitary sewer systems, if necessary. Bidding Phase • Provide the City with one set of original documents to be used for printing of bid sets to be used during the bidding process. The City will be responsible for advertising and bidding the project. Mr. Richard Voorhees November 20, 1998 Page 3 • Provide assistance in response to written questions received during the bidding process. Provide assistance in the preparation of any addendum which may need to be sent out in response to questions and/or changes in the design. • Provide a written review and a recommendation on award based upon the bids received. Construction Phase • Attend and participate in the Pre-Construction Conference to be conducted by the City with the selected contractor. • Review shop drawings for the project • Review and assist the City in response to Requests For Information RFIs from the contractor. • Assist the City in review of Requests for Proposed Changes in the design which will result in contract Change Orders. • Provide every other week observations of the project and provide the City with a written report of that construction observation. • Assist the City in the Substantial and Final Completion Inspections and provide the', City with a certification of construction in accordance with plans and specifications of the project. • Assist the City in the preparation of As-Built record drawings of the project. • Assist the City in the Big Weanie Roast for the project dedication. The City will accept written requests for additional information related to the scope of this project. These requests will be accepted until 5:00 P.M. December 3, 1998. All written requests will be answered in writing, with a copy of each response mailed to each of the three engineering firms receiving this letter. You are requested to provide your proposal including a detailed schedule and completion date by 5:00 P.M. December 9, 1998. Mr. Richard Voorhees November 20, 1998 Page 4 The Engineering Staff will review the proposals and prepare its staff recommendation to the City Commission for the regular City Commission Meeting to be held on December 15, 1998. If approved, the Service Authorization for this project will be executed on that day and notice to proceed will be issued the next day. It is the City's desire to be ready to proceed with the Bidding Phase on or about March 1, 1999. Should you have any questions, please do not hesitate to contact this office. Sincerely, CITY of OCOEE Xf2/4-,://Q.1V/44) David A. Wheeler, P.E. Assistance City Engineer/Utility Director cc: Jim Shira, City Engineer DANNY HOWELL COMMISSIONER -DISTRICT #1 SCOTTANDERSON COMMISSIONER -DISTRICT #1. RUSTYJOHNSON COMMISSIONER - DIST RICT #3 NANCY PARKER COMMISSIONER - DISTRICT #4 ONTRACT TO PERFORM CONSTRUCTION SERVICES EHICLE & MATERIAL TORAGE BUILDING OCTOBER 1999 S. SCOTT VANDERGRIFT MAYOR _Ocoee OF GOG% PREPARED BY GLACE & RADCLIFFE, INC. ELLIS SHAPIRO CITY MANAGER JAMES SHIRR, P.E. CITY ENGINEERAJTILITIES DIRECTOR DAVID WHEELER, P.E. ASSISTANT CITY ENGINEER ADDENDUM NO. 1 To: All Plan Holders Date: October 4, 1999 Owner: Ocoee Vehicle & Material Storage Building Bid Date: October 13, 1999 Prepared by: Glace & Radcliffe, Inc. 630 N. Wymore Road Maitland, FL 32751 (407)647-6623 APPROVED BY: - — - Curtis R Burkett, P.E. - Division Manager This Addendum sets forth changes and/or additional information as referenced and is hereby made part of, and should be attached to, subject Project Manual and Drawings of the Contract Documents. This Addendum is transmitted to all plan holders by facsimile. Immediately subsequent to the receipt of the attached Addendum, please acknowledge receipt of same by signing and date below and returning copy of this page by facsimile. RECEIVED BY: Authorized by Signature (name) Date Company Name FAX: (407) 539-0575 ATTN: Brett Long 1 PROJECT MANUAL The following revisions/additions/deletions to the Project Manual are hereby made. 1. Specification Section 00020 Insert the Invitation to Bid Section 00020. 2. Table of Contents and Indexes Insert the attached Table of Contents, Index and Appendixes. 3. Specification Section 00100 Article 11.3 Remove and replace page 00100-7 with the revised Article 11.3 for First Tier Contract Structure. 4. Specification Section 00300 Remove and replace BID FORM Section 00300 with attached Section 00300 5., Specification Section 00500 Remove and replace AGEEMENT FOR CONSTRUCTION SERVICES Section 00500 with attached Section 00500 6. Specification Section 01000 Insert Division 1 General Requirements with attached Sections 01005 through 01740. 8. Specification Section 08331 Delete Specification Section 08331 in its entirety and replace with attached Specification Section 08331. 7. Specification Section 08710 In Section 3.01A, add the following note to HW 1 — Single Exterior Doors, "No hold opens at fire rated doors". DRAWINGS The following revisions/ additions/deletions to the Drawings are hereby made. 1. Sheet C-3 OVERALL SITE PLAN On sheet C-3, add Revision 1 indicated by the cloud and delta. Coordinates 26, 27, 28, 38, 52, 53, 54 & 55 have been adjusted to accommodate the Pipe Storage Shed. A new leader and Callout "PIPE STORAGE SHED" has been added to indicate the location of the shed structure. The coordinates of the curb and concrete pad have been adjusted to meet shed requirements see Figures 01, 02. 2. Sheet C-5 SITE DRAINAGE/UTILITY PLAN On sheet C-5, remove note "REMOVE EXIST. F.H. ASSEMBLY" and replace with note "F.H. ASSEMBLY TO BE REMOVED BY CITY". The City of Ocoee is responsible for fire hydrant removal and relocation. Remove note " 4" FIRE LINE W/ RP BFP ASSEMBLY" and replace with note "4"FIRE LINE MASTER ASSEMBLY". 3. Sheet C-6 UTILITY DETAILS Replace "FIRE LINE MASTER ASSEMBLY" Detail with edited "FIRE LINE MASTER ASSEMBLY" (Figure 03) 4. Sheet S-1 STRUCTURAL SHEET INDEX, ABBREVIATIONS, SYMBOLS, KEY PLAN AND FINISH SCHEDULE In the Finish Schedule, change the room label from "GROUND MAINTENANCE" to "GENERAL STORAGE". 5. Sheet S-2 FLOOR PLAN On the Floor Plan, change the room label from "GROUND MAINTENANCE" to "GENERAL STORAGE". On the Floor Plan, change the door tag in the Sprinkler Riser Room from j "106A" to "106". lOn the Floor Plan, change the door tags in the Vehicle Storage Room from "103C, 103D and 103 E" to "100C, 1001) and 100E", respectively. On the Floor Plan, add the following note in the Welding Room, "PARTITION WALL BY OWNER". On the Floor Plan, add the following note to the metal building along column line F, "METAL BUILDING PANEL ALONG COLUMN LINE F TO BE TWO HOUR FIRE RATED (UL U647). 6. Sheet S-4 EAST AND WEST ELEVATIONS AND BUILDING SECTIONS On Section 1, revise the following note from 'Provide 3 5/8", 20 ga mtl studs at 18" oc w/ painted gyp bd each side from top of emu to underside of structure" to read "Provide 3 5/8", 20 ga mtl studs at 24" oc w/ 2 layers of 5/8" painted gyp bd each side from top of emu to underside of structure (two hour rated gyp board wall UL U495 and two hour rated emu wall UL U905)". On Section 2, change the room label from "GROUND MAINTENANCE" to "GENERAL STORAGE". 7. Sheet S-6 DOOR SCHEDULE, DOOR DETAILS AND MISCELLANEOUS DETAILS In the Door Schedule, change the room label from "GROUND MAINTENANCE" to "GENERAL STORAGE". In the Door Schedule, add the following door to schedule, "SPRINKLER RISER ROOM, DA -106,3%0", 7'-2", A, HM, PTD, A, PM, PTD, D/-, E/-, E/-, A/-, -, 2, --"• In the Door Schedule, change the fire rating from "-" to "90" and the notes from "--" to "2" for doors DA -1001), DA -100E and DA -104. In the Door Schedule, add the following note to the Notes, "2. Max 100 sq in of wired glass". In the unlabeled detail, add the following callout designation, "G". 8. Sheet S-7 UTILITY SHED PLAN, ELEVATIONS AND SECTIONS On Utility Shed Plan, add the section marker for Sectionl. On Section 1, revise section to show opening in west wall. 9. Sheet MP -2 HVAC/PLUMBING PLAN On Sheet MP -2, revise the all finished floor elevations. Finished floor elevations "F.F.E. 139.00" shall be "F.F.E. 139.25". Finished floor elevation "F.F.E. 135.00" shall be "F.F.E. 135.25". These elevations shall match the finished floor elevations on sheet C-3 OVERALL SITE PLAN. Provide a fire damper in the discharge side of exhaust fan GX-1. Provide with integral sleeve to allow offsetting of damper from the two-hour rated wall. The fire damper shall comply with Underwriters Laboratories (UL) Standard 555 and bear the UL test label with a 1-1/2 hour fire protection rating for penetrations in 1 hour and 2 hour rated partitions. Dampers shall be selected so that the free air space is not less than the connected duct free area. Provide access panel in ductwork to allow inspection of the fire damper. PERMITS & REPORTS The following revisions/ additions/deletions to the Permits and Reports are hereby made 1. Geotechnical Exploration — Appendix A Include "Geotechnical Exploration" Report No. 57782, and "Additional Geotechnical Exploration" Report No. 73942, provided by Universal Engineering Services. 2. St. Johns Water Management District — Appendix B Include the St. Johns Water Management Permit No. 42-095-2128NGM- ERP for stormwater treatment in the construction package. PRE-BID MEETING COMMENTS The following revisions/ additions/deletions to the bid documents are hereby made. 1. Q. Regarding the wire mesh on the shed, can a double layer of wire be used instead of the thicker gauge mesh? The contractor is responsible for any change in the specifications and for the reliability and applicability of the change. 2. Are metal liners in the ceiling required? Do the exterior metal liners vary in height around the building? If so, what are their elevations? Metal wall liners will reach a height just above the upper level door frames. See Sheet S-4 — EAST AND WEST ELEVATIONS AND BUILDING SECTIONS where the liner height is 7'-4" above the upper level finished floor elevation. 3. Regarding the overhead roll -up doors, the specs state that they are electric. No electric connection is shown on the drawings? The specifications have been changed to a MANUAL CLOSING ROLL DOWN DOORS. Remove and replace section 08331 as noted under PROJECT MANUAL of this addendum. 4. In the welding room, who will provide the "free standing" wall? The City will provide the wall as noted "PARTITION WALL BY OTHERS" in the revisions of Sheets S-2 of the DRAWING section of this addendum. Where will the fire hydrant be located? The fire hydrant will be relocated by the city as noted L° F.H. TO BE RELOCATED BY CITY" in Sheet C-5 of this addendum. 6. This job is estimated at 625,000.00. Will contractor be allowed to go over this amount if Change Orders are needed? The job is funded through bond money and it is unlikely that any overrides will be permitted. 7. In the specifications it states that the panels must be Butler panels, is the contractor required to use Butler? The Contractor will assume responsibility and risk for all substitutions and/or equal products. 8. What about the three walled shed? Will there be a door on that structure? The shed has three walls as shown on Sheet S-7 of this addendum. 9. In the fire riser room there is no spec for the door. The fire riser room door has been noted "SPRINKLER RISER ROOM, DA -106, 3'-0", 7'-2", A, HM , PTD, A, PM, PTD, D/-, E/-, E/-, A/-, -, 2, " in Sheet S-7 of this addendum. 10. Where will the on site trailer be placed? The city will make accommodations once the contract has been awarded. 11. How will road access through the site work during road construction? At least a compacted sub -grade must be maintained for vehicle access through the site at all times. 12. Do you require the general contractor to do 50% of the work instead of subcontractor? A first tier contract structure will be used with the general contractor's full time superintendent on site during hours of operation. See the PROJECT MANUAL revision of Specification Section 00500 in this addendum. 13. In Article 27 it talks about permits and licenses. Who will provide? The city will provide the permits and licenses, but it is the responsibility of the contractor to pull/pay for the Building Permit. The plans have been preliminarily approved by the City of Ocoee Building Department and awaiting signature of contractor of record. 14. How will we get geo-technical reports? Geotechnical reports will be included in this addendum. See i PERMITS AND REPORTS appendix in this addendum. 15. Regarding Section 201j of the site plans, will contractor be permitted to discuss 1 f fomdations with the engineers for variance? Contractors may submit shop drawings for design changes. (END) SECTION 00020 INVITATION TO BID CITY OF OCOEE VEHICLE & MATERIAL STORAGE BUILDING CITY OF OCOEE ENGINEERING DEPARTMENT OCOEE, FLORIDA Sealed bids will be received at the office Purchasing Department in the City of Ocoee City Hall, 150 North Lakeshore Drive, Ocoee, Florida 34761 until 2:00 p.m. on Wednesday, October 13, 1999. Sealed bids will then be hand delivered to the room in which the bid opening is to occur. Any bids received after 2:OOp.m. will not be accepted under any circumstances. Any uncertainty regarding the time a bid is received will be resolved against the Bidder. Bids submitted after this designated time will be returned unopened. Description of Work: The scope of work consists of, but not limited to, construction of an approximately 7400 square foot metal storage building, road and parking improvements, utility adjustments and site grading and drainage improvements. Pre -Bid Conference: A pre bid conference will be held for interested firms at 10:00am, Wednesday, September 29, 1999 in the City of Ocoee Wastewater Operations Building 1800 A.D. Mims Road, Ocoee, F134761 Biddine Documents (Project Manual and Drawings: Available for pick up and review at (a cost of $100): City of Ocoee Purchasing Department 150 North Lakeshore Drive Ocoee, Florida 34761 Phone: (407) 656-2322 ex. 190 Art: Joyce Tolbert Bids shall be prepared from complete full size contract documents. Addenda will be sent via registered mail to all holders of complete contract documents up to four (4) days before bid time. Brief addenda may be issued between seventy-two (72) hours and twenty-four (24) hours before bid time by facsimile (FAX) to holders of complete contract documents. Bid Bond: A certified check or bid bond shall accompany each bid. The certified check or bid bond shall be for an amount not less than five percent (5%) of the bid price and shall be made payable to the City of Ocoee as a guarantee that the Bidder will not withdraw for a period of ninety (90) days after bid closing time. Bid Submittal: A single bid shall be submitted for the work. The contract will be awarded pursuant to the requirements of applicable state and federal laws and regulations. Bids shall be enclosed within a sealed envelope on the Bid Form provided in the Project Manual, with the words "Bid for Construction of City of Ocoee Vehicle & Material Storage Building" and the Bidder's name, address and Florida Contractor's License Number clearly shown on the outside thereof. Bidder must acknowledge receipt of all addenda in the prescribed Bid Form. Bids must be signed by an authorized representative of the Bidder. Mailed bids shall be sent to the attention of City Engineer/Utilities Director, City of Ocoee, 150 North Lakeshore Drive, Ocoee, Florida 34761. END OF SECTION 00020-1 CITY OF OCOEE VEHICLE & MATERIAL STORAGE BUILDING GLACE & RADCLIFFE, INC. 670 N. Wymore Road, Suite 370 MAITLAND, FLORIDA 32751 PROJECT NO. 98518.01 CITY OF OCOEE VEHICLE & MATERIAL STORAGE BUILDING TABLE OF CONTENTS DIVISION 0 - BIDDING REQUIREMENTS, CONTRACT FORMS, AND CONDITIONS OF THE CONTRACT SECTION TITLE 00100 Instructions to Bidders 00200 Information Available to Bidders 00300 Bid Form 00301 Questionnaire 00301A Compliance with Florida Trench Safety Act (90-96, Laws of Florida) 00301B Drug-free Workplace Certification 00410 Bid Bond 00480 Noncollusion Affidavit 00481 Certification of Nonsegregated Facilities 00482 Sworn Statement Under Section 287.133(3)(a), Florida Statutes on Public Entity Crimes 00483 Certification of Nondiscriminatory Labor Practices 00501 Corporate Authority to Execute Documents 00500 Agreement For Construction Services 00610 100% Construction Performance Bond Form 00800 Supplementary Conditions 00840 Notice of Intent to Award 00841 Notice to Proceed 00842 Change Order No. 00843 Certificate of Substantial Completion 00881 Exhibit "D" Waiver and Release of Lien Upon Progress Payment 00883 Contractor's Final Affidavit ►a TABLE OF CONTENTS - Continued DIVISION i - GENERAL REQUIREMENTS SECTION TITLE 01005 General Requirements 01010 Summary of Work 01027 Applications For Payment 01030 Special Project Procedures 01035 Modification Procedures 01040 Coordination and Site Conditions 01045 Cutting and Patching 01050 Field Engineering 01065 Permits and Fees 01150 Measurement and Method of Payment 01200 Project Meetings 01300 Submittals 01320 Construction Photographs 01370 Schedule of Values 01400 Quality Control 01410 Testing and Testing Laboratory Services 01430 Soils Investigation 01500 Construction Facilities and Temporary Controls 01568 Temporary Erosion & Sedimentation Control 01700 Contract Closeout 01710 Cleaning 01720 Project Record Documents 01730 Operating and Maintenance Data 01740 Warranties and Bonds DIVISION 2 - SITE WORK SECTION TITLE 02110 Clearing & Grubbing 02140 Dewatering (during construction) 02201 Earthwork 02221 Excavation, Trenching, Backfilling & Embankment 02234 Tree Pruning and Protection 02260 Finish Grading 3 TABLE OF CONTENTS - Continued SECTION TITLE 02444 Chain Length Fencing 02480 Seeding & Mulching; Sodding 02500 Paving 02660 Potable Water System 02705 Drainage Structures and Piping 02731 Manholes DIVISION 3 — CONCRETE SECTION TITLE 03301 Concrete and Reinforcing Steel DIVISION 4 — MASONRY SECTION TITLE 04200 Masonry DIVISION 6 — WOOD & PLASTICS SECTION TITLE 06100 Carpentry Work DIVISION 7 — THERMAL AND MOISTURE SECTION TITLE 07100 Waterproofing and Dampproofing 07900 Joint Sealers 11 TABLE OF CONTENTS - Continued DIVISION 8 — DOORS AND WINDOWS SECTION TITLE 08110 Steel Doors and Frames 08331 Overhead Roll -up Doors 08710 Finish Hardware 08800 Glazing DIVISION 9 — FINISHES SECTION TITLE 09901 Surface Preparation and Shop Prime Painting 09902 Painting DIVISION 10 — SPECIALITIES SECTION TITLE 10200 Louvers 10522 Fire Extinguishers and Accessories DIVISION 13 — METAL BUILDING SECTION TITLE 13121 Pre-engineered Metal Building DIVISION 15 - MECHANICAL SECTION TITLE 15010 Basic Mechanical Requirements 15030 Electrical Requirements for Mechanical Equipment 15060 Pipe and Fittings 5 TABLE OF CONTENTS - Continued DIVISION 15 — MECHANICAL con't. SECTION TITLE 15100 Valves 15250 Thermal Insulation 15300 Fire Protection 15410 Plumbing Piping System 15860 Fans 15870 Air Intake and Relief Vent 15890 Ductwork 15990 Performance Verification DIVISION 16 — ELECTRICAL SECTION TITLE 16010 Basic Electrical Requirements 16030 Electrical Identification 16110 Raceways and Conduit 16120 Wires and Cables 16130 Outlet Boxes 16140 Wiring Devices 16470 Panelboards 16480 Motor Controls and Related Equipment 16500 Lighting DRAWING INDEX SHEET NO. TITLE C-1 Key Sheet C-2 General Notes, Abbreviations, Demolition Plan C-3 Overall Site Plan C-4 Site Grading Plan C-5 Site Drainage / Utility Plan C-6 Utility Details 0 TABLE OF CONTENTS - Continued DRAWING INDEX (con't) SHEET NO. TITLE C-7 Site / Utility Details C-8 Site Details S-1 Structural Sheet Index, Abbreviations, Symbols, Key Plan and Finish Schedule S-2 Building Floor plan S-3 Building North and South Elevations S-4 Building East and West Elevations and Sections S-5 Typical Wall Sections S-6 Door Schedule, Door Details and Miscellaneous Details S-7 Storage Shed Plan, Sections and Elevations FP -1 Fire Protection Site Plan FP -2 Fire Protection Plan FP -3 Fire Protection Details MP -1 Mechanical / Plumbing Legend, Notes and Schedules MP -2 HVAC / Plumbing Floor Plan E-1 Electrical Site Plan, Legend and Schedules E-2 Electrical Floor Plan LIST OF FIGURES FIGURE NO. TITLE 1 Vehicle and Material Storage Building Addendum 1 - Coordinate Revision Sheet C-3 2 Vehicle and Material Storage Building Addendum 1 — Shed Location 3 Vehicle and Material Storage Building Addendum 1 — Utility Detail Sheet C-6 APPENDIX TITLE APPENDICIES A Stormwater Permit No. 42-095-2128NGM-ERP B Proposed WWTP Vehicle and Material Storage Building A.D. Mims Road, City of Ocoee — Report No. 57782 7 it 11.1 Each Bid must identify the names and addresses of the subcontractors listed in the Bid Form "Questionnaire (Section 00301)." If requested by the Owner or Engineer, the Bidder, and any other Bidder so requested, shall, within seven days after the date of the request, submit to Owner an experience statement with I pertinent information as to similar projects and other evidence of qualification for each such subcontractor, person and organization. If Owner or Engineer after due investigation has reasonable objection to any proposed subcontractor, other person or organization, either may, before giving the Notice of Award, i request the Bidder to submit an acceptable substitute without an increase in Contract Price nor Contract Time. If the Bidder declines to make any such substitution, the Owner may elect not to award the Contract to such Bidder. A Bidder's declining to make any such substitution shall not constitute grounds for sacrificing his Bid Security. No Bidder shall be required to employ any subcontractor, other person or organization against whom Bidder has reasonable objection. 11.2 Procedures for approval of other subcontractors after execution of the Amendment to the Agreement (Section 00500B) are described in the General and Supplementary Conditions. 11.3 CONTRACTOR shall perform work with CONTRACTOR performance a high priority. The OWNER will 1 allow First Tier sub -contracting by the CONTRACTOR. CONTRACTOR shall be required to have superintendent on site during hours of operation. CONTRACTOR retains ultimate responsibility for final product quality and adherence to the OWNER's construction schedule. ARTICLE 12 - BID FORM 12.1 One (1) copy of the Bid Form is included in the Contract Documents for the Bidder's use. This copy is printed on colored paper to distinguish this section from the other sections of the Contract Documents, and has tear -out perforations. One (1) additional copy of the Bid Form will also be provided externally to the Contract Documents for the Bidder's Use should reproducing be required. 12.2 Bid Forms must be completed in ink or typed. The Bid price of each item and lump sum "Total Bid" or "Total Base Bid" on the Bid Form must be stated in words and numerals; in case of a conflict, words shall take precedence. 12.3 Bids by corporations must be executed in the corporate name by the president or a vice-president (or other corporate officer accompanied by evidence of authority to sign) and the corporate seal must be affixed and attested by the secretary or an assistant secretary. The corporate address and State of incorporation must be shown below the signature. If requested, the person signing a Bid for a corporation or partnership must produce evidence satisfactory to the Owner of the person's authority to bind the corporation or partnership. If the Bidder is a corporation, and if the Bid is executed by someone other than the President or Vice President of the corporation, attach to the Bid a certified copy of corporate resolutions of the board of directors of the corporation authorizing the person to execute the Bid on behalf of the Corporation. 12.4 Bids by partnerships must be executed in the partnership name and signed by a partner, whose title must appear under the signature and the official address of the partnership must be shown below the signature. 12.5 All names and titles must be typed or printed below the signature. 12.6 The Bid shall contain an acknowledgement of receipt of all Addenda (the numbers of which shall be filled in on the Bid Form). 12.7 The address in which communications regarding the Bid are to be directed must be shown. 12.8 Evidence of authority to conduct business as an out-of-state corporation in the state where the Work is to be performed shall be provided in accordance with Paragraph 3 above. State contractor license number, if any, must also be shown. 12.9 Bids must be priced on a lump sum basis for the base contract and include a separate price for each alternate described in the Specifications as provided for in the Bid Form. The price of the Bid for each 00100-7 1' DATE SUBMITTED: NAME OF BIDDER: (Date) PROJECT IDENTIFICATION: NAME OF BIDDER: BUSINESS ADDRESS: SECTION 00300 BID FORM CITY OF OCOEE, FLORIDA VEHICLE AND MATERIAL STORAGE BUILDING CONTRACTOR'S FLORIDA LICENSE NO.: 17 IIINII IIA THIS BID IS SUBMITTED TO: City of Ocoee, Florida (hereinafter called Owner) 1. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Amendment to the Agreement with Owner in the form included in the Contract Documents, to perform and furnish all Work as specified or indicated in the Contract Documents for the Contract Price and within the Contract Time indicated in this Bid Form and the Amendment to the Agreement, and in accordance with the other terms and conditions of the Contract Documents. 2. Bidder accepts all of the terms and conditions of the Bidding Documents including without limitation those dealing with the disposition of Bid Bond. This Bid will remain open for ninety (90) calendar days after the day of Bid opening. BIDDER will sign and deliver the required number of counterparts of the Amendment to the Agreement with the Bonds and other documents required by the Bidding Requirements within ten (10) days after the date of OWNER'S Notice of (Intent to) Award. 3. In submitting this Bid, Bidder makes all representations required by the Instructions to Bidders and the Agreement and further warrants and represents that: a. Bidder has examined copies of all the Bidding Documents and of the following Addenda: No. _ Dated No. Dated No. _ Dated _ No. _ Dated No. _ Dated No. _ Dated No. _ Dated _ No. Dated (Receipt of all which is hereby acknowledged) and also copies of the Invitation for Bids and the Instructions to Bidders. b. Bidder has familiarized itself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance or furnishing the Work. c. BIDDER has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface of subsurface structures at or 00300-1 DATE SUBMITTED: NAME OF BIDDER: contiguous to the site (except Underground Facilities) which have been identified in the Supplementary Conditions as provided in paragraph 4.2.1 of the General Conditions. BIDDER accepts the determination set forth in paragraph SC -4.2 of the Supplementary Conditions of the extent of the "technical data" contained in such reports and drawings upon which BIDDER is entitled to rely as provided in paragraph 4.2 of the General Conditions. BIDDER acknowledges that such reports and drawings are not Contract Documents and may not be complete for BIDDER's purposes. BIDDER acknowledges that OWNER and Engineer do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Bidding Documents with respect to Underground Facilities at or contiguous to the site. d. BIDDER has obtained and carefully studied (or assumes responsibility for having done so) all such additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions (surface, subsurface and Underground Facilities) at or contiguous to the site or otherwise which may affect cost progress, performance or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences and procedures of construction to be employed by BIDDER and safety precautions and programs incident thereto. BIDDER does not consider that any additional examinations, investigations, explorations, tests, studies or data are necessary for the determination of this Bid for performance and furnishing of the Work in accordance with the times, price and other terms and conditions of the Contract Documents. e. BIDDER is aware of the general nature of Work to be performed by OWNER and others at the site that relates to Work for which this Bid is submitted as indicated in the Contract Documents. f. BIDDER has correlated the information known to BIDDER, information and observations obtained from visits to the site, reports and drawings identified in the Contract Documents and all additional examinations, investigations, explorations, tests, studies and date with the Contract Documents. g. BIDDER has given ENGINEER written notice of all conflicts, errors, ambiguities or discrepancies that BIDDER has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to BIDDER, and the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work for which this Bid is submitted. h. This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, fpm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; BIDDER has not directly or indirectly induced or solicited any other Bidder to submit a farce or sham Bid; BIDDER has not solicited or induced any person, firm or corporation to refrain from bidding; and BIDDER has not sought by collusion to obtain for itself any advantage over any other Bidder or over OWNER. L BIDDER hereby agrees to commence WORK under this contract on or before a date to be specified in the NOTICE TO PROCEED and to fully complete all work of the PROJECT within the Contract Time specified in the Amendment to the Agreement (Section 00500B). BIDDER further accepts the provisions of the Amendment to the Agreement as to liquidated damages and agrees to pay as liquidated damages the amount stated in the Amendment to the Agreement (Section 00500B), for each consecutive calendar day completion of the Work is delayed. Completion Schedule 1) The Project shall be substantially complete (successful pressure testing and bacteriological testing of completed water mains) lone -hundred & eighty (180) consecutive calendar days from the official Notice to Proceed. 00300-2 DATE SUBMITTED: NAME OF BIDDER: 2) The Project shall be finally complete (Completed and Ready for Final Payment) two -hundred & seventy (270) days from the official Notice to Proceed. 4. All bid items shall include all materials, equipment, labor, permit fees, taxes, tests, miscellaneous costs of all types, overhead, and profit for the item to be complete, in place, and ready for operation in the manner contemplated by the Contract Documents. Bidder submits the following TOTAL BID OR TOTAL BASE BID to perform all the Work as required by the Drawings and Specifications. 5. In accordance with Article 17 of the Instructions to Bidders, if the Contract is to be awarded, it will be awarded on the basis of the lowest "Total Base Bid" after adjustments for additive or deductive alternates. Additive or deductive alternates (if any) will be considered in determining the lowest responsive, responsible Bidder. The Owner reserves the right to accept any or all additive or deductive alternates, in his sole discretion, prior to the award of the Contract. The Owner also reserves the right to delete any portion of the Work as shown in the bid schedule prior to award and adjust each bidder's "Total Bid" accordingly. 6. The following documents are made a condition of this Bid: a. Bidding Documents and shall include the following: 1. Bid Forms (entire Section 00300, 00301, 00301A and 00301 B) 2. Bid Bond (Surety Bond or Cashier's Check). (Section 00410) 3. Corporate Authority to execute Bid 4. Power of Attorney (for Surety Bond only) 5. Noncollusion Affidavit (Section 00480) 6. Certification of Nonsegregated Facilities (Section 0048 1) 7. Sworn Statement on Public Entity Crimes (Section 00482) 8. Certification of Nondiscriminatory Labor Practices (Section 00483) b. Executed "Part A, Contract to Perform Continuing Construction Services (dated August, 1998)" (Remainder of Page Left Blank Intentionally.) 00300-3 DATE SUBMITTED: NAME OF BIDDER: (Page Left Blank Intentionally.) 00300-4 \� _z �£ \) ){ \\ 3» k / m �(E 2$) 92 - 3& y $ ) / \/ y / \ \ \ \ ) J \ )/ DATE SUBMITTED: NAME OF BIDDER: (Page Left Blank Intentionally.) 00300-6 DATE SUBMITTED: NAME OF BIDDER: SCHEDULE OF BID ITEMS CITY OF OCOEE VEHICLE AND MATERIAL STORAGE BUILDING Base Bid Item No. Description Estimated Quantity Unit Unit Price (in Words) Unit Price (in Numbers) Total Price (in Numbers) 1.07 Existing Pavement Removal 1 LS 1.08 Existing Building & Slab Removal 1 LS 1.09 Existing Water line encasement 1 LS 1.10 Relocation of Existing Light Poles 2 LS 1.11 Existing Fence Removal & Relocation 380 LF 1.12 Earthwork (Embankment) 5250 CY 1.13 Drainage Improvements 1 LS 1.14 12" Stabilization (Type C) 2531 SY 00300-7 DATE SUBMITTED: NAME OF BIDDER: (Page Left Blank Intentionally.) 00300-8 DATE SUBMITTED: NAME OF BIDDER: SCHEDULE OF BID ITEMS CITY OF OCOEE VEHICLE AND MATERIAL STORAGE BUILDING Base Bid Item No, Description Estimated Quantity Unit Unit Price (in Words) Unit Price (in Numbers) Total Price (in Numbers) 1.15 8" Limerock Base 2531 SY 1.16 2" Type S-1 Asphaltic Concrete 2531 SY 1.17 Reinforced Concrete Pad 344 SY 1.18 Parking Striping 1 LS 1.19 Type D Curb 660 LF 1.20 Type F Curb & Gutter 165 LF 1.21 50'x24' CMU Retaining Wall 1 LS 1.22 Replace Sod (St. Augustine) I LS 00300-9 DATE SUBMITTED: NAME OF BIDDER: (Page Left Blank Intentionally.) 10 OECCS-A DATE SUBMITTED: NAME OF BIDDER: SCHEDULE OF BID ITEMS CITY OF OCOEE VEHICLE AND MATERIAL STORAGE BUILDING Base Bid Estimated Unit Price Unit Price Total Price Item No. Description Quantity Unit (in Words) (in (in Numbers) Numbers) 1.23 Metal Building l LS For any Work items not included in the above bid items, supply all materials and furnish all labor and equipment, perform all Work 1.24 required, pay all costs including permit fees, taxes, insurance, overhead 1 LS and profit necessary for a complete and operational system per the intent of the Specifications and Contract Drawings Total Base Bid (Total of Bid Items 1.01 through 1.23) (In words and II OE -CCS -A DATE SUBMITTED: NAME OF BIDDER: (Page Left Blank Intentionally.) 12 OE -CCS -A DATE SUBMITTED: NAME OF BIDDER: 7. The terms used in this Bid, which are defined in the General Conditions or Instructions of the Construction Contract, included as part of the Contract Documents have the meanings assigned to them in the General Conditions or Instructions. 8. The work shall be performed under a Florida Contractor's License. Contract shall not be awarded unless proof of valid license(s) is provided. 9. It is understood that where quantities for unit price work have been presented in the foregoing Schedule of Bid Items, they are approximate only and are solely for purpose of facilitating the comparison of bids, and that the Contractor's compensation will be computed upon the basis as described in the measurement and payment clauses in the specifications contained herein. 10. BASE BID - SCHEDULE OF MANUFACTURERS/SUPPLIERS If the foregoing Schedule of Bid Items is presented in a Base Bid format, the undersigned as Bidder agrees that the Contract, if awarded, will be on the basis of the materials and equipment named in the Contract Documents in accordance with Article 9 of the Instructions to Bidders. The undersigned as Bidder also agrees that for the "Base Bid" equipment and material items listed below the Bidder will provide one of the listed manufacturers/suppliers, by circling "A", "B", or "C". If the Bidder desires to propose an alternate manufacturer/supplier, he may write in the name of such alternate in the substitution list included within this Bid Form, but he must, nevertheless, also circle one of the listed manufacturers/suppliers. If the proposed alternate manufacturer/supplier is determined "not equivalent" by the Engineer, the Bidder must furnish equipment and/or material items by the circled manufactur- er/supplier. If the Bidder fails to indicate which listed manufacturer/supplier he intends to use if an alternate is rejected, he must use the manufacturer/supplier listed as "A". Also, if the Bidder circled more than one listed manufacturer/supplier, he must use the first manufacturer/supplier circled (unless an alternate is approved). 11. SUBSTITUTIONS AND "OR EQUAL" The undersigned as Bidder agrees that substitutions or "or -equal" items will not be considered until after the "Effective Date of the Agreement" and will be evaluated in accordance with paragraphs 6.7.1, 6.7.2, and 6.7.3 of the General Conditions. In addition to the reimbursement required under the General Conditions, the Contractor shall also reimburse the Owner for any engineering costs directly attributable to the change in manufacturers/suppliers, caused by the acceptance of proposed alternates, such as; additional field trips for the Engineer, additional redesign costs, and additional review costs, etc. Other costs directly attributable to the change in manufacturers/suppliers caused by the acceptance of proposed alternates, such as; increased electrical requirements, larger building, additional pumps or tankage, etc., shall be borne by others and not the Owner. If Bidder intends to propose substitutions or "or -equal" items after the "Effective Date of the Agreement", it is agreed that these items will be listed on the Substitution List included within this Bid Form, with a deductive amount representing 50 percent of the total savings between the named Base Bid item and the proposed item. "Base Bid" item substitutions providing to the Owner an equipment or material cost savings of less than $1,000 will not be considered. The undersigned as Bidder, also agrees that if a substitution or "or -equal" item is not listed on the Substitution List included with the Bid, all of the savings between the named item and the proposed item will go to the Owner if the Owner accepts the proposed item in accordance with paragraphs 6.7.1., 6.7.2, and 6.7.3 of the General Conditions. The Owner may request, and the undersigned Bidder shall supply, complete information on proposed substitutions. Such information shall be the manufacturer's current published or preprinted information for the specific substitution. 12. As BIDDER, I hereby certify that I am aware and understand that the City of Ocoee at its sole discretion reserves the right to waive technicalities or irregularities, to reject any or all Bids, and/or to accept that Bid which is in the best interest of the City. The Award of this Bid, if made, may be based on considerations other than total cost, and may be awarded based on various considerations, including but not limited to: BIDDER experience and whether the Bid, in the judgement of the City, is the most responsive to City needs. The City of Ocoee encourages the use of minorities and women -owned businesses as subcontractors. 00300-15 DATE SUBMITTED: NAME OF BIDDER: Instructions: Strike out (X) nonapplicable signature block and complete applicable block. (ALL SIGNATORIES MUST HAVE THEIR NAMES PRINTED OR TYPED BELOW THEIR SIGNATURES) If Bidder is: SOLE PROPRIETORSHIP (SEAL) (Individual's Signature) (Individual's Name) doing business as Business Address: Phone No.: Florida License No.: A PARTNERSHIP (SEAL) (Partnership Name) (General Partner's Signature) (General Partner's Name) Business address: Phone No.: Florida License No.: 00300-14 DATE SUBMITTED: NAME OF BIDDER: Instructions: Strike out (X) nonapplicable signature block and complete applicable block. (ALL SIGNATORIES MUST HAVE THEIR NAMES PRINTED OR TYPED BELOW THEIR SIGNATURES) If Bidder is: A CORPORATION (Corporation Name) (State of Incorporation) By (Name of person authorized to sign) (Title) (Authorized Signature) (Corporate Seal) Attest (Secretary) Business address: Phone No.: Corporation President: Florida License No.: 00300-15 DATE SUBMITTED: NAME OF BIDDER: Instructions: Strike out (X) nonapplicable signature block and complete applicable block. (ALL SIGNATORIES If Bidder is: ME MUST HAVE THEIR NAS PRINTED OR TYPED BELOW TBEIR SIGNATURES) A JOINT VENTURE By (Name) (Address) By (Name) (Address) Business Address: Phone No.: Florida License No.: (Each joint venturer must sign. The manner of signing for each individual, partnership, and corporation that is a party to the joint venture should be in the manner indicated above.) Florida License No.: 12. List the following in connection with the Surety which is providing the Bid Bond: Surety's Name: Surety's Address: Name and address of Surety's resident agent for service of process in Florida: END OF SECTION 00300-16 SECTION 00500 AGREEMENT FOR CONSTRUCTION SERVICES THIS AGREEMENT is dated as of the day of in the year 19 by and between the City of Ocoee, Florida, a municipal corporation, hereinafter called the OWNER, and , hereinafter called the CONTRACTOR. OWNER and CONTRACTOR, in consideration or the mutual covenants hereinafter set forth, agree as follows: CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows: VEHICLE AND MATERIAL STORAGE BUILDING 16T1-IrK91*1Z4MM The scope of work consists of, but not limited to, construction of an approximately 7400 square foot metal storage building, road and parking improvements, utility adjustments and site grading and drainage improvements. Article 2. ENGINEER The Project has been designed by Glace & Radcliffe, Inc. who is hereinafter called ENGINEER and who is to act as Owner's representative, assume all duties and responsibilities and have the rights and authority assigned to the ENGINEER in the Contract Documents with completion of the Work in accordance with the Contract Documents. ARTICLE 3.. CONTRACT TIME 3.1 The Work shall be Substantially complete (successful pressure testing and bacteriological testing of completed water mains) in Two Hundred and Ten (2 10) consecutive calendar days from the effective date of the Notice to Proceed as provided in paragraph 2.03 of the General Conditions (Commencement of Contract Time; Notice to Proceed). 3.2 The Work shall be Finally Completed and ready for fmal payment in accordance with paragraph 14.13 of the General Conditions (Final Payment and Acceptance) within Two Hundred and Seventy (270) consecutive calendar days from the effective date of the Notice to Proceed as provided in paragraph 2.03 of the General Conditions (Commencement of Contract Time; Notice to Proceed). 3.3 As provided in paragraphs 3.1 and 3.2 above, the Work will be substantially completed on or before 19 , and completed and ready for final payment on or before 19 ,1 t ITIBI 3.4 OWNER and CONTRACTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 3.3 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions (Final Payment and Acceptance). They also recognize the delays, expense and difficulties involved in proving a legal or arbitration proceeding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay the OWNER Five Hundred dollars ($500.00) for each day that expires beyond the time specified in paragraph 3.3 above for substantial completion and One Thousand dollars ($1,000.00) for each day that expires beyond the time specified in paragraph 3.3 above for final completion (readiness for final payment). 3.5 hi addition to the liquidated damages, there shall be additional damages paid by the CONTRACTOR to the OWNER for inexcusable delays by CONTRACTOR. These actual delay damages will include, but not be limited to, delay damage settlements or awards owed by OWNER to others, inspection and engineering services, delay penalties, fines or penalties imposed by regulatory agencies, contract damages, and professional fees (including attorneys' fees) incurred by OWNER in connection with such settlements, awards, delay penalties, regulatory fines or penalties, and contract damages. ARTICLE 4. CONTRACT PRICE 4.1 OWNER shall pay CONTRACTOR for performance of the work in accordance with the Contract Documents in current funds at the Total Base Bid Price of or unit prices presented on the Bid Form, Schedule of Bid Items attached to this Agreement. 4.2 The CONTRACTOR agrees that the Contract Price is a stipulated sum except with regard to those items in the Bid which are subject to unit prices and agrees to perform all of the Work as described in the Contract Documents, subject to additions and deductions by Change Order, and comply with the terms therein for the Total Base Bid stated in the attached Bid Schedule of the Bid Form. ARTICLE 5. PAYMENT CONTRACTOR shall submit applications for Payment in accordance with Article 14 of the General Conditions. Applications for Payment will be processed by ENGINEER as provided in the General Conditions. 5.1 Progress Payments. OWNER shall make progress payments on account of the Contract Price on the basis of CONTRACTOR'S Applications for Payment as recommended by ENGINEER on or before the tenth day after the end of each month for which payment is requested as provided in paragraphs 5.1.1. and 5.1.2 below. All such progress payments will be on the basis of the progress of the Work measured by the Schedule of Values established in paragraph 2.07 of the General Conditions (Finalizing Schedules) (and in the case of Unit Price, Work based on the number of units completed) or, in the event there is no schedule of valves, as provided in the General Requirements. 5.1.1 Prior to Final Completion (paragraph 3.3 above), progress payments will be made in an amount equal to the percentage indicated below, but, in each case, less the aggregate of payments previously made and less such amounts as ENGINEER shall determine, or OWNER may withhold, in accordance with paragraph 14.02.11 of the General Conditions (Review of Application for Progress Payments). Ninety percent (90%) of the value of Work completed, and ninety percent (90%) of the value of materials and equipment not incorporated into the Work but delivered and suitably stored and accompanied by documentation satisfactory to OWNER as provided in paragraph 14.02.A of the General Conditions; with the balance of the value of the work being retainage. 00500-2 5.2 Final Payment - Upon final completion and acceptance of the Work in accordance with Paragraph 14.07.13 of the General Conditions (Final Payment and Acceptance), as supplemented, OWNER shall pay 1 CONTRACTOR an amount sufficient to increase total payments to 100 percent of the Contract Price. However, not less than two percent (20/6) of the contract price shall be retained until Record Drawings, specifications, addenda, modifications and shop drawings, including all manufacturers instructional and parts manuals, are delivered to and accepted by the ENGINEER. ARTICLE 6. INTEREST All monies not paid when due as provided in Article 14 of the General Conditions shall bear interest at the maximum rate allowed by law at the place of the Project. ARTICLE 7. CONTRACTOR'S REPRESENTATIONS In order to induce OWNER to enter into this Agreement CONTRACTOR makes the following representations: 7.1 CONTRACTOR has examined and carefully studied the Contract Documents (including the Addenda listed in paragraph 8) and the other related data identified in the Bidding Documents including "technical data." 7.2 CONTRACTOR has visited the site and become familiar with and is satisfied as to the general, local and site conditions that may affect cost, progress, performance and furnishings of the Work. 7.3 CONTRACTOR is familiar with and is satisfied as to all federal, state and local Laws and Regulations that may affect cost, progress, performance and famishing of the work. 7.4 CONTRACTOR has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site (except Underground Facilities) which have been identified in Section 00200 "Information Available to Bidders." CONTRACTOR accepts the determination set forth in paragraph SC -4.02 of the Supplementary Conditions of the extent of the "technical data" contained in such reports and drawings upon which CONTRACTOR acknowledges that such reports and drawings are not Contract Documents and may not be complete for CONTRACTORs purposes. CONTRACTOR acknowledges that OWNER and ENGINEER do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Contract Documents with respect to Underground Facilities at or contiguous to the site. 7.5 CONTRACTOR has obtained and carefully studied (or assumes responsibility for having done so) all such additional supplementary examinations, investigations, explorations, test, studies and data concerning conditions (surface, subsurface and Underground Facilities) at or contiguous to the site or otherwise which may affect costs, progress, performance or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences and procedures of construction to be employed by CONTRACTOR and safety precautions and programs incident thereto. CONTRACTOR does not consider that any additional examinations, investigations, explorations, tests, studies or data are necessary for the performance and furnishing of the wok at the Contract Price, within the Contract Times and in accordance with the other terms and conditions of the Contract Documents. 7.6 CONTRACTOR is aware of the general nature of work to be performed by OWNER and others at the site that relates to the Work as indicated in the Contract Documents. 7.7 CONTRACTOR has correlated the information know to CONTRACTOR information and observations obtained from visits to the site, reports and drawings identified in the Contract Documents and all additional examinations, investigations, explorations, tests, studies and data with the Contract Documents. 00500-3 7.8 CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities or discrepancies that CONTRACTOR has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to CONTRACTOR, and the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. 7.9 CONTRACTOR shall perform Work with CONRACTOR performance a high priority. The OWNER will allow First Tier sub -contracting by the CONTRACTOR. CONTRACTOR shall be required to have a superintendent on site during hours of operation. CONTRACTOR retains ultimate responsibility for final product quality and adherence to owner's construction schedule. ARTICLE 8. CONTRACT DOCUMENTS The Contract Documents, which comprise the entire Agreement between OWNER and CONTRACTOR concerning the work are attached to this Agreement, made a part hereof and consist of the following: 8.1 Agreement (Section 00500) (pages 1 to 5 , inclusive). 8.2 Exhibits to this Agreement (sheets _ to , inclusive). 8.3 Performance Bond, Payment Bonds and Certificates of Insurance (Section 00610, 00620 and 00650, respectively). 8.4 Notice of Intent to Award and Notice to Proceed (Sections 00840 and 00841, respectively). 8.5 General Conditions (Section 00700 - NSPE - EJCDC Document No. 1910-8 (1996 Edition), as modified and supplemented. 8.6 Supplementary Conditions (Section 00800). 8.7 Part A: Contract to Perform Continuing Construction Services dated August 1998. 8.8 Project Manual bearing the general title "VEHICLE and MAINTENANCE STORAGE BUILDING" and consisting of Divisions 0 through 1, as listed in the Table of Contents thereof. 8.9 Drawings consisting of a cover sheet and the sheets bearing the following general title: CITY OF OCOEE VEHICLE AND MATERIAL STORAGE BUILDING 8.10 Addenda numbers to , inclusive. 8.11 CONTRACTOR's Bid (Section 00300) (pages 1 to _, inclusive). 8.12 Documentation submitted by CONTRACTOR prior to Notice of Award (pages to inclusive) 8.13 The following which may be delivered or issued after the Effective Date of the Agreement and are not attached hereto: All applicable provisions of State and Federal Law, all Written Amendments and other documents amending, modifying or supplementing the Contract Documents pursuant to paragraph 3.04 of the General Conditions. The documents listed in paragraphs 8.2 et seq. above are attached to this Agreement (except as expressly noted otherwise above). 00500-4 There are no Contract Documents other than those listed above in this Article 8. The Contract Documents may only be amended, modified or supplemented as provided in paragraph 3.04 of the General Conditions. ARTICLE 9. MISCELLANEOUS 9.1 Terms used in this Agreement which are defined in Article 1 (Definitions) of the General Conditions shall have the meanings indicated in the General Conditions, as modified in the Supplementary Conditions. 9.2 No assignment by a party hereto of any rights under, or interests in, the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically, but without limitation, moneys that may become due, and moneys that are due, may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. Notwithstanding the foregoing, the OWNER may assign this contract to the State of Florida or any political subdivision, municipality, special district or authority thereof without CONTRACTOR's consent and without recourse. 9.3 OWNER and CONTRACTOR each binds himself, his partners, successors, assigns and legal representatives to the other party hereto, his partners, successors, assigns, and legal representatives in respect to all covenants, agreements, and obligations contained in the Contract Documents. 9.4 Waiver of Jury Trial; Legal Costs. It is mutually agreed by and between the CONTRACTOR and OWNER that each of the parties do hereby waive trail by jury in any action, proceeding or claim which may be brought by either of the parties hereto against the other on any matters concerning or arising out of this Agreement. 9.5 Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon OWNER and CONTRACTOR, who agree that the Contract Documents shall be reformed to replace such stricken provision or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the stricken provision. (Remainder of Page Left Blank Intentionally) 00500-5 IT WITNESS WHEREOF, the parties hereto have signed this Agreement. All portions of the Contract Documents have been signed or identified by OWNER and CONTRACTOR or by ENGINEER on his behalf. This Agreement will be effective on ATTEST: ATTEST: Jean Grafton, City Clerk (SEAL) FOR USE AND RELIANCE ONLY BY CITY OF OCOEE, FLORIDA APPROVED AS TO FORM AND LEGALITY THIS DAY OF '1999. FOLEY & LARDNER By: City Attorney 00500-6 19 M APPROVED: CITY OF OCOEE, FLORIDA S. Scott Vandergrift, Mayor APPROVED BY THE OCOEE CITY COMMISSION AT A MEETING HELD ON '1999 UNDER AGENDA ITEM NO. SECTION 01005 GENERAL REQUIREMENTS PART1- GENERAL 1.01 SCOPE AND INTENT A. Description The work to be done consists of the furnishing of all labor, materials and equipment, and the performance of all work included in this Contract. The summary of the Work is presented in Section 0 10 10. B. Work Included The Contractor shall furnish all labor, superintendents, materials, plant, power, light, heat, fuel, water, tools, appliances, equipment, supplies, and other means of construction necessary of proper for performing and completing the Work. He shall 1 obtain and pay for all required permits. He shall perform and complete the work in the manner best calculated to promote rapid construction consistent with safety of life and property and to the satisfaction of the Engineer, and in strict accordance with the j Contract Documents. The Contractor shall clean up the work and maintain it during J and after construction, until accepted, and shall do all work and pay all costs incidental thereto. He shall repair or restore all structures and property that may be damaged or disturbed during performance of the work. The cost of incidental work described in these General Requirements, for which there are no specific Contract Items, shall be considered as part of the general cost of doing the Work and shall be included in the prices for the various Contract Items. No additional payment will be made therefor. The Contractor shall provide and maintain such modern plant, tools, and equipment as may be necessary, in the opinion of the Engineer, to perform in a satisfactory and j acceptable manner all the work required by this Contract. Only equipment of established reputation and proven efficiency shall be used. The contractor shall be lsolely responsible for the adequacy of his workmanship, materials and equipment, prior approval of the Engineer notwithstanding. C. Public Utility Installations and Structures Public utility installations and structures understood to include all poles, tracks, pipes, wires, conduits, house service connections, vaults, manholes and all other 01005-1 98518.01 appurtenances and facilities pertaining thereto whether owned or controlled by the Owner, other governmental bodies or privately owned by individuals, firms or corporations, used to serve the public with transportation, traffic control, gas, electricity, telephone, sewerage, drainage, water or other public or private property which may be affected by the Work shall be deemed to be included hereunder. The Contract Documents contain data relative to existing public utility installations and structures above and below the ground surface. These data are not guaranteed as to their completeness or accuracy and it is the responsibility of the Contractor to make his own investigations to inform himself fully of the character, conditions and extent of all such installations and structures as may affect the construction operations. The Contractor shall protect all public utility installations and structures from damage during the Work. Access across any buried public utility installation or structure shall be made only in such locations and by means approved by the Engineer. The Contractor shall so arrange his operations as to avoid any damage to these facilities. All required protective devices and construction shall be provided by the Contractor at his expense. All existing public utilities damaged by the contractor which are shown on the Plans or have been located in the field by the utility shall be repaired by the Contractor, at his expense, as directed by the Engineer. No separate payment shall be made for such protection or repairs to public utility installations or structures. Public utility installations or structures owned or controlled by the Owner or other governmental body which are shown on the Plans to be removed, relocated, replaced or rebuilt by the Contractor shall be considered as a part of the general cost of doing the work and shall be included in the prices bid for the various contract items. No separate payment shall be made therefor. Where public utility installations or structure owned or controlled by the Owner or other governmental body are encountered during the course of the work, and are not indicated on the Plans or in the Specifications, and when, in the opinion of the Engineer, removal, relocations, replacement or rebuilding is necessary to complete the work under this Contract, such work shall be accomplished by the utility having jurisdiction, or such work may be ordered, in writing by the Engineer, for the Contractor to accomplish. If such work is accomplished by the utility having jurisdiction it will be carried out expeditiously and the Contractor shall give full cooperation to permit the utility to complete the removal, relocation, replacement or rebuilding as required. If such work is accomplished by the Contractor, it will be paid for as extra work as provided in the Agreement. The Contractor shall, at all times in performance of the Work, employ approved methods and exercise reasonable care and skill so as to avoid unnecessary delay, 01005-2 98518.01 injury, damage or destruction of public utility installations and structures; and shall, at all times in the performance of the Work, avoid unnecessary interference with, or interruption of, public utility services, and shall cooperate fully with the owners thereof to that end. 'I I All Owner and other governmental utility departments and other owners of public i utilities which may be affected by the Work will be informed in writing by the Engineer within two weeks after the execution of the Contract or Contracts covering '1 the Work. Such notice will set out, in general, and direct attention to, the 11 responsibilities of the Owner and other governmental utility departments and other owners of public utilities for such installations and structures as may be affected by Jthe Work and will be accompanied by one set of Plans and Specifications covering the work under such Contract or Contracts. In addition to the general notice given by the Engineer, the Contractor shall give written notice to Owner and other governmental utility departments and other owners of public utilities of the location of his proposed construction operations, at least forty-eight hours in advance of breaking ground in any area or on any unit of the Work. This can be accomplished by making the appropriate contract with the following utility companies. See Section 01040, Coordination and Site Conditions. The maintenance, repair, removal, relocation or rebuilding of public utility I installations and structures, when accomplished by the Contractor as herein provided, shall be done by methods approved by the Engineer. 1.02 PLANS AND SPECIFICATIONS A. Plans The Plans referred to in the Contract Documents bear the general project name and number as shown in the Notice To Bidders (Advertisement). When obtaining data and information from the Plans, figures shall be used in preference of scaled dimensions, and large scale drawings in preference to small scale drawings. B. Copies Furnished to Contractor After the Contract has been executed, the Contractor will be furnished with three sets of paper prints, the same size as the original drawings, of each sheet of the Plans and three copies of the Specifications. Additional copies of the Plans and Specifications, when requested, may be furnished to the Contractor at cost of reproduction. The Contractor shall furnish each of the subcontractors, manufacturers, and material 01005-3 98518.01 suppliers such copies of the Contact Documents as may be required for their work. C. Supplementary Drawings When, in the opinion of the Engineer, it becomes necessary to explain more fully the work to be done or to illustrate the work further or to show any changes which may be required, drawings known as Supplementary Drawings, with specifications pertaining thereto, will be prepared by the Engineer and five paper prints thereof will be given to the Contractor. The Supplementary Drawings shall be binding upon the Contractor with the same force as the Plans. Where such Supplementary Drawings require either less or more than the estimated quantities of work, credit to the Owner or compensating therefor to the Contractor shall be subject to the terms of the Agreement. D. Contractor To Check Plans and Data The Contractor shall verify all dimensions, quantities and details shown on the Plans, Supplementary Drawings, schedules, Specifications of other data received from the Engineer, and shall notify him of all errors, omissions, conflicts, and discrepancies found therein. Failure to discover or correct errors, conflicts or discrepancies shall not relieve the Contractor of full responsibility for unsatisfactory work, faulty construction or improper operation resulting therefrom nor from rectifying such conditions at his own expense. He will not be allowed to take advantage of any errors, or omissions, as full instructions will be furnished by the Engineer, should such errors or omissions be discovered. All schedules are given for the convenience of the Engineer and the Contractor and are not guaranteed to be complete. The Contractor shall assume all responsibility for the making of estimates of the size, kind, and quality of materials and equipment included in work to be done under the Contract. E. Specifications The Technical Specifications consist of three parts: General, Products and Execution. The General Section contains General Requirements which govern the works. Product and Execution Modify and Supplement these by detailed requirements for the work and shall always govern whenever there appears to be a conflict. F. Intent All work called for in the Specifications applicable to this Contract, but not shown on the Plans in their present form, or vice versa, shall be of like effect as if shown or mentioned in both. Work not specified in either the Plans or in the Specifications, 01005-4 98518.01 but involved in carrying out their intent or in the complete and proper execution of the work, is required and shall be performed by the Contractor as though it were specifically delineated or described. The apparent silence of the Specifications as to any detail, or the apparent omission from them of a detailed description concerning any work to be done and materials to be furnished, shall be regarded as meaning that only the best general practice is to prevail and that only material and workmanship of the best quality is to be used, and interpretation of these Specifications shall be made upon that basis. 1.03 MATERIALS AND EQUIPMENT A. Manufacturer The names of proposed manufacturers, material suppliers, and dealers who are to furnish materials, fixtures, equipment, appliances or other fittings shall be submitted to the Engineer for approval, as early as possible, to afford proper investigation and checking. Such approval must be obtained before Shop Drawings will be checked. No manufacturer will be approved for any materials to be furnished under this Contract unless he shall be of good reputation and have a plant of ample capacity. He shall, upon the request of the Engineer, be required to submit evidence that he has manufactured a similar product to the one specified and that it has been previously used for a like purpose for a sufficient length of time to demonstrate its satisfactory performance. All transactions with the manufacturers or subcontractors shall be through the Contractor. Any two or more pieces of material or equipment of the same kind, type or classification, and being used for identical types of service, shall be made by the same manufacturer. B. Delivery The Contractor shall deliver materials in ample quantities to insure the most speedy and uninterrupted progress of the work so as to complete the work within the allotted time. The Contractor shall also coordinate deliveries in order to avoid delay in, or impediment of, the progress of the work of any related Contractor. C. Tools and Accessories The Contractor shall, unless otherwise stated in the Contract Documents, furnish with 01005-5 98518.01 each type, kind or size of equipment, one complete set of suitably marked high grade special tools and appliances which may be needed to adjust, operate, maintain or repair the equipment. Such tools and appliances shall be furnished in approved painted steel cases, properly labeled and equipped with good grade cylinder locks and duplicate keys. Spare parts shall be furnished as specified. Each piece of equipment shall be provided with a substantial nameplate, securely fastened in place and clearly inscribed with the manufacturer's name, year of manufacture, serial number, weight and principal rating data. D. Installation of Equipment The Contractor shall have on hand sufficient proper equipment and machinery of ample capacity to facilitate the work and to handle all emergencies normally encountered in work of this character. Equipment shall be erected in a neat and workmanlike manner on the foundations at the locations and elevations shown on the Plans, unless directed otherwise by the Engineer during installation. All equipment shall be correctly aligned, leveled and adjusted for satisfactory operation and shall be installed so that proper and necessary connections can be made readily between the various units. The Contractor shall furnish, install and protect all necessary anchor and attachment bolts and all other appurtenances needed for the installation of the devices included in the equipment specified. Anchor bolts shall be as approved by the Engineer and made of ample size and strength for the purpose intended. Substantial templates and working drawings for installation shall be furnished. The Contractor shall, at his own expense, famish all materials and labor for, and shall properly bed in non -shrink grout, each piece of equipment on its supporting base that rests on masonry foundations. Grout shall completely fill the space between the equipment base and the foundations. E. Service of Manufacturer's Engineer The Contract prices for equipment shall include the cost of furnishing a competent and experienced engineer or superintendent who shall represent the manufacturer and shall assist the Contractor, when required, to install, adjust, test and place in operation the equipment in conformity with the Contract Documents. After the equipment is placed in permanent operation by the Owner, such engineer or 01005-6 98518.01 superintendent shall make all adjustments and tests required by the Engineer to prove that such equipment is proper and satisfactory operating condition, and shall instruct such personnel as may be designated by the Owner in the proper operation and li maintenance of such equipment. 1.04 INSPECTION AND TESTING A. General Inspection and testing of materials will be performed by the Owner unless otherwise specified. For test specified to be made by the Contractor, the testing personnel shall make the necessary inspections and tests and the reports thereof shall be in such form as will facilitate checking to determine compliance with the Contract Documents. Five copies of the reports shall be submitted and authoritative certification thereof must be furnished to the Engineer as a prerequisite for the acceptance of any material or equipment. 1 If, in the making of any test of any material or equipment, it is ascertained by the Engineer that the material or equipment does not comply with the Contract, the Contractor will be notified thereof and he will be directed to refrain from delivering said material or equipment, or to remove it promptly from the site or from the work J and replace it with acceptable material, without cost to the Owner. Tests of electrical and mechanical equipment and appliances shall be conducted in accordance with recognized test codes of the ANSI, ASME, or the IEEE, except as may otherwise be stated herein. The Contractor shall be fully responsible for the proper operation of equipment during tests and instruction periods and shall neither have nor make any claim for damage which may occur to equipment prior to the time when the Owner formally takes over the operation thereof. B. Costs All inspection and testing of materials furnished under this Contract will be performed by the Owner or duly authorized inspection engineers or inspection bureaus without cost to the Contractor, unless otherwise expressly specified. The cost of shop and field test of equipment and of certain other tests specifically called for in the Contract Documents shall be borne by the Contractor and such costs shall be deemed to be included in the Contract price. 01005-7 98518.01 Materials and equipment submitted by the Contractor as the equivalent to those specifically named in the Contract may be tested by the Owner for compliance. The Contractor shall reimburse the Owner for the expenditures incurred in making such test on materials and equipment which are rejected for non-compliance. C. Inspection of Materials The Contractor shall give notice in writing to the Engineer, sufficiently in advance of his intention to commence the manufacturer or preparation of materials especially manufactured or prepared for use in or as part of the permanent construction. Such notice shall contain a request for inspection, the date of commencement and the expected date of completion of the manufacture or preparation of materials. Upon receipt of such notice, the Engineer will arrange to have a representative present at such times during the manufacture as may be necessary to inspect the materials or he will notify the Contractor that the inspection will be made at a point other than the point of manufacture, or he will notify the Contractor that inspection will be waived. The Contractor must comply with these provisions before shipping any material. Such inspection shall not release the Contractor from the responsibility for furnishing materials meeting the requirements of the Contract Documents. D. Certificate of Manufacture When inspection is waived or when the Engineer so requires, the Contractor shall furnish to him authoritative evidence in the form of Certificates of Manufacturer that the materials to be used in the work have been manufactured and tested in conformity with the Contract Documents. These certificates shall be notarized and shall include copies of the results of physical tests and chemical analyses, where necessary, that have been made directly on the product or on similar products of the manufacturer. The certificates shall be delivered to the Engineer prior to shipment of the materials. E. Shop Tests of Operating Equipment Each piece of equipment for which pressure, duty, capacity, rating, efficiency, performance, function or special requirements are specified shall be tested in the shop of the maker in a manner which shall conclusively prove that its characteristics comply fully with the requirements of the Contract Documents. No such equipment shall be shipped to the work until the Engineer notifies the Contractor, in writing, that the results of such tests are acceptable. Five copies of the manufacturer's actual test data and interpreted results thereof, accompanied by a certificate of authenticity sworn to by a responsible official of the 11011111: I$ 1C&OI manufacturing company, shall be forwarded to the Engineer for approval. The cost of shop tests and of furnishing manufacturer's preliminary and shop test data of operating equipment shall be borne by the Contractor. F. Preliminary Field Tests As soon as conditions permit, the Contractor shall furnish all labor, materials, and instruments and shall make preliminary field tests of equipment. If the preliminary field tests disclose any equipment furnished under this Contract which does not comply with the requirements of the Contract Documents, the Contractor shall, prior to the acceptance tests, make all changes, adjustments and replacements required. The Contractor shall assist in the preliminary field test as applicable. G. Final Field Tests Upon completion of the work and prior to final payment, all equipment and piping installed under this Contract shall be subjected to acceptance tests as specified or required to prove compliance with the Contract Documents. The Contractor shall furnish labor, fuel, energy, water and all other materials, equipment and instruments necessary for all acceptance tests, at no additional cost to the Owner. The Contractor shall assist in the final field tests as applicable. H. Failure of Tests Any defects in the materials and equipment or their failure to meet the tests, guarantees or requirements of the Contract Documents shall be promptly corrected by the Contractor by replacements or otherwise. The decision of the Engineer as to whether or not the Contractor has fulfilled his obligations under the Contract shall be final and conclusive. If the Contractor fails to make these corrections or if the improved materials and equipment, when tested, shall again fail to meet the guarantees or specified requirements, the Owner, notwithstanding its partial payment for work, and materials and equipment, may reject the materials and equipment and may order the Contractor to remove them from the site at his own expense. If the failure during testing is fully or partly due to the equipment provided by the Contractor, as determined by the Engineer, the Contractor shall make all required improvements at no cost to the Owner. In case the Owner rejects any materials and equipment, then the Contractor shall replace the rejected materials and equipment within a reasonable time. If he fails to 01005-9 98518.01 do so, the Owner may, after the expiration of a period of thirty (30) calendar days after giving him notice in writing, proceed to replace such rejected materials and equipment, and the cost thereof shall be deducted from any compensation due or which may become due the Contractor under his Contract. The Owner agrees to obtain other equipment within a reasonable time and the Contractor agrees that the Owner may use the equipment furnished by him without rental or other charges until the new equipment is obtained. I. Final Inspection During such final inspections, the work shall be clean and free from water. In no case will the final estimate be prepared until the Contractor has complied with all requirements set forth and the Engineer has made his final inspection of the entire work and is satisfied that the entire work is properly and satisfactorily constructed in accordance with the requirements of the Contract. 1.05 TEMPORARY STRUCTURES A. Temporary Fences If, during the course of the work, it is necessary to remove or disturb any fence or part thereof, the Contractor shall provide a suitable temporary fence at his own expenses, which shall be maintained until the permanent fence is replaced. The Engineer shall be solely responsible for the determination of the necessity for providing a temporary fence and the type of temporary fence to be used. B. Responsibility for Temporary Structures In accepting the Contract, the Contractor assumes full responsibility for the sufficiency and safety of all temporary structures or work and for any damage which may result form their failure or their improper construction, maintenance or operation and will indemnify and save harmless the Owner and the Engineer from all claims, suites or actions and damages or costs of every description arising by reason of failure to comply with the above provisions. 1.06 SAFETY A. Accident Prevention Precautions shall be exercised at all times for the protection of person and property. 01005-10 98518.01 The safety provisions of applicable laws, building and construction codes shall be observed. The Contractor shall comply with the U.S. Department of Labor Safety ( and Health Regulations for construction promulgated under the Occupational Safety I and Health Act of 1970 (PL 91-596), and under Section 107 of the contract Work Hours and Safety Standards Act (PL 91-54), except where state and local safety standards exceed the federal requirements and except where state safety standards have been approved by the Secretary of Labor in accordance with provisions of the Occupational Safety and Health Act, shall be complied with. B. First Aid The Contractor shall keep upon the site, at each locations where work is in progress, a completely equipped first aid kit and shall provide ready access thereto at all times when men are employed on the work. 1.07 LINES AND GRADES A. Grade All work under this Contract shall be constructed in accordance with the lines and grades shown on the Plans, or as given by the Engineer. The full responsibility for keeping alignment and grade shall rest upon the Contractor. The City will establish bench marks and base line controlling points. Reference marks for lines and grades as the work progresses will be located to cause as little inconvenience to the prosecution of the work as possible. The Contractor shall so place excavation and other materials as to cause no inconvenience in the use of the reference marks provided. He shall remove any obstructions placed by him contrary to this provision. B. Surveys No special survey was conducted for this project. All existing elevations shown on drawings are from As -built drawings. The Contractor shall furnish and maintain, at his own expense, stakes and other such materials, and give such assistance, including qualified helpers, as may be required by the Engineer for setting reference marks. The Contractor shall check such reference marks by such means as he may deem necessary and, before using them, shall call the Engineer's attention to any inaccuracies. The Contractor shall, at his own expense, establish all working or construction lines and grades as required from the reference marks set be the Engineer, and shall be solely responsible for the accuracy thereof. He shall, however, be subject to the check and review of the Engineer. It is the intention not to delay the work for the establishment of reference marks but, 01005-11 98518.01 when necessary, working operations shall be suspended for such reasonable time as the Engineer may require for this purpose. C. Safeguarding Marks The Contractor shall safeguard all points, stakes, grade marks, monuments and bench marks made or established on the work, bear the cost of reestablishing them if disturbed, and bear the entire expense of rectifying work improperly installed due to not maintaining or protecting or to removing without authorization such established points, stakes and marks. The Contractor shall safeguard all existing and known property corners, monuments and marks adjacent to but not related to the work and, of required, shall bear the cost of reestablishing them if disturbed or destroyed. D. Datum Plane All elevations indicated or specified refer to the Mean Sea Level Datum of the U.S.C. & G.S. (N.O.S.) which is 0.80 feet above the Mean Low Water Datum of the U.S. Army Corp. of Engineers E. Refer to Section 01050, Field Engineering. 1.08 ADJACENT STRUCTURES AND LANDSCAPING A. Responsibility The Contractor shall also be entirely responsible and liable for all damage or injury as a result of his operations to all other adjacent public and private property, structures of any kind and appurtenances thereto met with during the progress of the Work. The cost of protection, replacement in their original locations and conditions or payment of damages for injuries to such adjacent public and private property and structures affected by the Work, whether or not shown on the plans, and the reconstruction of such items called for on the Plans or specified shall be included in the various Contract Items and no separate payments will be made therefor. The Contractor is expressly advised that the protection of buildings, structures, tunnels, tanks, pipelines, etc. and related work adjacent and in the vicinity of his operations, wherever they may be, is solely his responsibility. Conditional inspection of buildings or structures in the immediate vicinity of the project which may reasonably be expected to be affected by the Work shall be performed by and be the responsibility of the Contractor. 01005-12 98518.01 i� The Contractor shall, before starting operations, make an examination of the interior and exterior of the adjacent structures, buildings, facilities, etc., and record by notes, measurements, photographs, etc., conditions which might be aggravated by open excavation and construction. Repairs or replacement of all conditions disturbed by ,1 I the construction shall be made to the satisfaction of the Owner and to the satisfaction of the Engineer. This does not preclude conforming to the requirements of the insurance underwriters. Copies of surveys, photographs, reports, etc., shall be given to the Engineer. Prior to the beginning of any excavations the Contractor shall advise the Engineer of all buildings or structures on which he intends to perform work or which performance of the Project Work will affect. B. Protection of Trees All trees and shrubs shall be adequately protected by the Contractor in accordance with ordinances governing the protection of trees. No excavated materials shall be placed so as to injure such tress or shrubs. Tress or shrubs destroyed by negligence of the Contractor or his employees shall be replaced by him with new stock of similar size and age, at the proper season and at the sole expense of the Contractor. 2. Beneath trees of other surface structures, where possible, pipe lines may be built in short tunnels, backfilled with excavated materials, except as otherwise specified, or the trees or structures carefully supported and protected from damage. l3. The Owner may order the Contractor, for the convenience of the Owner, to remove trees along the line or trench excavation. If so ordered the Owner will obtain any permits required for removal of trees. Such tree removal 1 offered shall be paid for under the appropriate Contract Items. C. Lawn Areas Lawn areas shall be left in as good condition as before the starting of the work. i Where sod is to be removed, it shall be carefully removed, and later replaced, or the area where sod has been removed shall be restored with new sod in the manner described in the Workmanship and Materials section. 01005-13 98518.01 D. Restoration of Fences Any fence, or part thereof, that is damaged or removed during the course of the work shall be replaced or repaired by the Contractor and shall be left in as good a condition as before the starting of the work. The manner in which the fence is repaired or replaced and the materials used in such work shall be subject to the approval of the Engineer. The cost of all labor, materials, equipment, and work for the replacement or repair of any fence shall be deemed included in the appropriate Contract Item or items, or if no specific item is provided therefor, as part of the overhead cost of the work, and no additional payment will be made therefor. 1.09 PROTECTION OF WORK AND PUBLIC A. Barriers and Lights During the prosecution of the work, the Contractor shall put up and maintain at all times such barriers and lights as will effectually prevent accidents. The Contractor shall provide suitable barricades, red lights, "danger" or "caution" or "street closed" signs and watchmen at all places where the work causes obstructions to the normal traffic or constitutes in any way a hazard to the public. B. Smoke Prevention The Contractor shall use hard coal, coke, oil or gas as fuel for equipment generating steam. A strict compliance with ordinances regulating the production and emission of smoke will be required. C. Noise The Contractor shall eliminate noise to as great as extent as practicable at all times. Air compressing plants shall be equipped with silencers and the exhaust of all gasoline motors or other power equipment shall be provided with mufflers. In the vicinity of hospitals and schools, special care shall be used to avoid noise or other nuisances. The Contractor shall strictly observe all local regulations and ordinances covering noise control. Except in the event of an emergency, no work shall be done between the hours of 7:00 p.m. and 7:00 a.m., or on Saturdays and Sundays. If the proposed and efficient prosecution of the work requires operations during the night, the written permission of the Owner shall be obtained before starting such items of the work. 01005-14 98518.01 ID. Access to Public Services Neither the materials excavated nor the materials or plant used in the construction of the work shall be so placed as to prevent free access to all fire hydrants, valves or manholes. E. Dust Prevention The Contractor shall prevent dust nuisance from his operations or from traffic by keeping the roads and/or construction areas sprinkled with water at all times. 1.10 CUTTING AND PATCHING A. The Contractor shall do all cutting, fitting or patching of his portion of the Work that 1 may be required to make the several parts thereof join and coordinate in a manner satisfactory to the Engineer and in accordance with the Plans and Specifications. The work must be done by competent workmen skilled in the trade reburied by the 1 restoration. 1.11 CLEANING A. During Construction During construction of the Work, the Contractor shall, at all times, keep the site of the work and adjacent premises as free from material, debris and rubbish as is practicable and shall remove the same from any portion of the site if, in the opinion of the Engineer, such material, debris, or rubbish constitutes a nuisance or is objectionable. ' The Contractor shall remove from the site all of his surplus materials and temporary structure when no further need therefore develops. Contractor shall be responsible Jand liable for all spilling and incur all associated costs including, but not limited to, costs related to repair and maintenance resulting from damages thereof. B. Final Cleaning At the conclusion of the Work, all erection plant, tools, temporary structures and materials belonging to the Contractor shall be promptly taken away, and he shall remove and promptly dispose of all water, dirt, rubbish or any other foreign substances. The Contractor shall thoroughly clean all equipment and materials installed by him 01005-15 98518.01 and shall deliver such materials and equipment undamaged in a bright, clean, polished and new operating condition. 1.12 MISCELLANEOUS A. Protection Against Siltation and Bank Erosion 1. The Contractor shall arrange his operations to minimize siltation and bank erosion on construction site and on existing or proposed water courses and drainage ditches. 2. The Contractor, at his own expense, shall remove any siltation deposits and correct any erosion problems as directed by the Engineer which results from this construction operations. B. Protection of Wetland Areas The Contractor shall properly dispose of all surplus material, including spoil, in accordance with Local, State and Federal regulations. Under no circumstances shall surplus material be disposed of in wetland areas as defined by the Florida Department of Environmental Regulation. C. Existing Facilities The Work shall be so conducted to maintain existing facilities in operation. Requirements and schedules of operations for maintaining existing facilities in service during construction shall be as described in these Specifications. D. Use of Chemicals All chemicals used during project construction or furnished for project operation, whether herbicide, pesticide, disinfectant, polymer, reactant, or of other classification, must show approval of either EPA or USDA. Use of all such chemicals and disposal of residues shall be in strict conformance with instructions. E. Cooperation With Other Contractors and Forces During progress of Work under this Contract, it may be necessary for other contractors and persons employed by the Owner to work in or about the Site. The Owner reserves the right to put such other contractors to work and to afford such access to the Site of the Work to be performed hereunder at such times as the Owner deems proper. The Contractor shall not impede or interfere with the work of such 01005-16 98518.01 other contractors engaged in or about the Work and shall so arrange and conduct his work that such other contractor's may complete their work at the earliest date possible. PART 2 - PRODUCTS (NOT USED) PART 3 - EXECUTION (NOT USED) ** END OF SECTION ** 01005-17 98518.01 SECTION 01010 SUMMARY OF WORK PART1- GENERAL 1.01 LOCATION OF WORK A. All work of this contract is located on property owned by The City of Ocoee, Florida. 1.02 WORK TO BE DONE B. The Contractor shall furnish all labor, materials, equipment, tools, services and incidentals to complete all work required by these Specifications and as shown on the Drawings. C. The Contractor shall perform the Work complete, in place, and ready for continuous service, and shall include repairs, testing, permits, cleanup, replacements and restoration required as a result of damages caused during the construction. D. All materials, equipment, skills, tools and labor which is reasonable and properly inferable and necessary for the proper completion of the Work in a substantial manner and in compliance with the requirements stated or implied by these Specifications or Drawings shall be furnished and installed by the Contractor without additional compensation, whether specifically indicated in the Contract Documents or not. E. The Contractor shall obtain all permits, and shall comply with all Municipal, County, State, Federal, and other codes which are applicable to the proposed construction work. The Owner has obtained a St. Johns River Water Management District construction permit for this period. 1.03 GENERAL DESCRIPTION OF WORK TO BE PERFORMED A. In general, the work consists of construction of an approximately 7400 square foot metal storage building, storage shed, road and parking improvements, utility adjustments and site grading and drainage adjustments. 1.04 SUBSTANTIAL COMPLETION A. In general, the following work shall be completed, tested, and fully operational by the substantial completion date of the project. 01010-1 98518.01 1. Site preparation. 2. Construction of stormwater structures. 3. Construction of roads and road improvements. 4. Construction of the building. 5. Completion of site improvements including grading and sodding. 6. Other site work, piping work, electrical and mechanical work, and other miscellaneous appurtenances. B. Final completion of the entire project shall be completed, tested, and ready for operation in accordance with the Agreement. 1.05 DRAWINGS AND SPECIFICATIONS FURNISHED THE CONTRACTOR FOR CONSTRUCTION A. Three (3) sets of Drawings and Specifications shall be furnished to the Contractor for construction at no charge. Additional sets may be purchased at reproduction costs. 1.06 DISCREPANCY BETWEEN DRAWINGS AND SPECIFICATIONS A. In case of any discrepancy between the Drawings and Specifications, the more stringent requirement shall apply. The Contractor will not be held responsible for the discovery of such discrepancy, but any work done on the item involved after such discovery, and prior to authorization by the Engineer, will be done at the Contractor's risk and expense. B. Refer to supplementary General Conditions SC.9. 1.07 PRE -CONSTRUCTION CONFERENCE A. Ajoint meeting shall be held with representatives of the Contractor and major subcontractors, the Engineer, the Owner, and other invited parties or government agencies which may be affected by or have jurisdiction over the Project. B. This meeting is intended to introduce the various key personnel from each organization and to discuss the Contract Documents, the start of construction, order of work, labor and legal requirements, insurance requirements, names of the major subcontractors, method of payment, shop drawing requirements, protection of existing facilities and other pertinent items associated with the Project. The Contractor shall bring to this conference four (4) copies of his proposed work schedule. 01010-2 98518.01 1.08 ABBREVIATIONS AND A. Whenever is made to the furnishing of materials or testing thereof to conform to the standards of any technical society, organization or body, it shall be construed to mean the latest standard code, specification or tentative specifications adopted and published at the date of advertisement for bids, even though reference has been made to an earlier standard. The following list of specifications is hereby made a part of the Contract the same as if herein repeated in full. In the event of any conflict between any of these specifications, standards, codes or tentative specifications and the specifications, the latter shall govern. In the event that one of the following conflict with another, the decision as to which shall govern will be decided by the Engineer, whose judgement will be final. B. Reference to a technical society, organization, or body may be made in the Specifications by abbreviations, in accordance with the following list. AA - Aluminum Association AAMA - Architectural Aluminum Manufacturers Association AASHTO - The American Association of State Highway and Transportation Officials ACI - American Concrete Institute AGA - American Gas Association AGMA - American Gear Manufacturers Association IEEE - Institute of Electrical and Electronic Engineers AISC - American Institute of Steel Construction ANSI - American National Standards Institute API - American Petroleum Institute ASCE - American Society of Civil Engineers ASME - American Society of Mechanical Engineers ASTM - American Society of Testing Materials AWPA - American Wood Preserver's Association AWS - American Welding Society AWWA - American Water Works Association Fed. SPEC - Federal Specifications CIPRA - Cast Iron Pipe Research Association DIPRA - Ductile Iron Pipe Research Association MUSFA - Metal Lath/Steel Framing Association NAAMM - National Association of Architectural Metals Manufacturers NBHA - National Builders Hardware Association NCPI - National Clay Pipe Institute NEMA - National Electrical Manufacturers Association NFPA - National Fire Protection Association TCA - Tile Council of American Inc. NAVY SPEC - Navy Department Specification 01010-3 98518.01 NEC National Electric Code NLMA - National Lumber Manufacturers Association SAE - Society of Automotive Engineers Standards SDI - Steel Deck Institute SHBI - Steel Heating Boiler Institute SBCC - Standard Building Code Congress International, Inc. FDOT - Florida Department of Transportation U.L., Inc. - Underwriter's Laboratories, Inc. OSHA - Occupation Safety and Health Act CSI - Construction Standard Institute SMACNA - Sheet Metal and Air Conditioning National Association C. When no reference is made to a code, standard, or specification, the standard specifications of the ASTM, the ANSI, the ASME, the IEEE, or the NEMA shall govern. PART 2 - PART 3 - PRODUCTS (NOT USED) EXECUTION (NOT USED) *** END OF SECTION *** 01010-4 98518.01 SECTION 01027 APPLICATIONS FOR PAYMENTS PART 1 - GENERAL 1.01 DESCRIPTION A. Scope of Work: Submit applications for payment to the Owner in accordance with schedule established by Conditions of the Contract and Agreement between Owner and Contractor. B. Related Requirements Described Elsewhere: 1. Agreement between Owner and Contractor. 2. Progress Payments, Retainages and Final Payment: Conditions of the Contract. 1.02 FORMAT AND DATA REQUIRED A. Submit applications typed on forms provided by the Owner, with itemized data typed on 8-1/2 inch X 11 inch or 8-1/2 inch X 14 inch white paper continuation sheets. The City of Ocoee will provide the Contractor with a blank pay request form at the pre -construction meeting for this purpose. B. Provide itemized data on continuation sheets. 1.03 PREPARATION OF APPLICATION FOR EACH PROGRESS PAYMENT A. Application Form: 1. Fill in required information, including that for Change Orders executed prior to date of submittal of application. 2. Fill in summary of dollar values to agree with respective totals indicated on continuation sheets. 3. Execute certification with signature of a responsible officer of Contract firm. 4. Submit a stored material log with each application for payment. 01027-1 98518.01 B. Continuation Sheets: Fill in total list of all scheduled component items of work, with item number and scheduled dollar value for each item. 2. Fill in dollar value in each column for each scheduled line item when work has been performed or products stored. Round off values to nearest dollar, or as specified for Schedule of Values. 3. List each Change Order executed prior to date of submission, at the end of the continuation sheets. List by Change Order Number, and description, as for an original component item of work. 4. To receive approval for payment on component material stored on site, submit copies of the original invoices with the application for payment. Provide a log sheet for all stored materials, which identifies the type, quantity and value of all stored materials. 5. The Contractor shall certify, for each current pay request, that all previous progress payments received from the Owner, under this Contract, have been applied by the Contractor to discharge in full all obligations of the Contractor in connection with Work covered by prior applications for payment, and all materials and equipment incorporated into the Work are free and clear of all liens, claims, security interest and encumbrances. Contractor shall attach to each application for payment like affidavits by all Subcontractors and Suppliers. Contractor shall also attach a "Consent of Surety" to each application for payment. Additionally, a 'Partial Release of Lien" from each subcontractor and supplier shall be attached to each application for payment. 1.04 SUBSTANTIATING DATA FOR PROGRESS PAYMENTS A. When the Owner or the Engineer requires substantiating data, Contractor shall submit suitable information, with a cover letter identifying: 1. Project. 2. Application number and date. 3. Detailed list of enclosures. 4. For stored products: a. Item number and identification as shown on application. b. Description of specific material. C. Proof that stored products paid for on previous estimates have been paid for by Contractor. d. Consent of Surety Letter. 01027-2 98518.01 B. Submit one copy of data and cover letter for each copy of application. 1.05 PREPARATION OF APPLICATION FOR FINAL PAYMENT A. Fill in application form as specified for progress payments. B. Submit a "Consent of Surety" and "Final Release of Lien" with the final application for payment. 1.06 SUBMITTAL PROCEDURE A. When contractor has completed an application for submittal, the application shall be submitted to the Resident Project Representative who shall approve and execute the application for payment. Upon approval by the Resident Project Representative, the Contractor shall submit the application for payment to the Manager of the Financial Services Department. PART 2 - PRODUCTS (NOT USED) PART 3 - EXECUTION (NOT USED) ** END OF SECTION ** 01027-3 98518.01 SECTION 01030 SPECIAL PROJECT PROCEDURES PART1- GENERAL 1.01 In general work shall be completed in the following order: 1. Site Preparation 2. Construction of Stormwater System and Structures 3. Construction of Roads, Parking & Road Improvement 4.. Construction of Building 5. Completion of Site Improvement Including Grading and Sodding 6. Other Site Work, Pipe Work, Electrical Work 1.02 WATERTIGHTNESS A. Special precautions shall be taken in the curing of concrete to reduce concrete cracking as called for in Division 3. 1.03 PUBLIC NUISANCE A. The Contractor shall not create a public nuisance including, but not limited to, encroachment on adjacent lands, flooding of adjacent lands, or excessive noise. B. No extra charge may be made for time lost due to work stoppage resulting from the creation of a public nuisance. 1.04 SUSPENSION OF WORK A. During inclement weather, all work which might be damaged or rendered inferior by such weather conditions shall be suspended. The orders and decisions of the Engineer as to suspensions shall be final and binding. During suspension of the work from any cause, the work shall be suitably covered and protected so as to preserve it from injury by the weather or otherwise; and, if the Engineer shall so direct, rubbish and surplus materials shall be removed. 1.05 SPECIAL REQUIREMENTS A. The following requirements shall govern: 1. No additional payment will be made for pumping or other difficulties encountered due to water. 01030-1 98518.01 2. The Contractor shall, prior to interrupting a utility service (water, sewer, etc.) for the purpose of making cut -ins to the existing lines or for any other purposes, contact the Owner 72 hours in advance and make arrangements for the interruption which will be satisfactory to the Owner. All valves shall be operated by the Owner's personnel. All equipment delivered to the job site shall be properly protected from dirt, dust, dampness, water and any other condition detrimental to the life of the equipment from the date of delivery to the time that control of the equipment is assumed by the Owner. If any equipment is delivered to the job site before any building thereon is enclosed, it shall be housed in a temporary, structurally rigid, watertight enclosure. 4. From investigations, including surveys made at the site, it may be assumed that physical conditions are approximately as indicated on the Drawings, but the nature of the materials below the surface, or the depth to satisfactory foundations, are not guaranteed. Certain information regarding the reputed presence, size, character and location of existing underground structures, pipes and conduits has been shown on the Contract Drawings. There is no certainty of the accuracy of this information, and the location of underground structures shown may be inaccurate and other obstructions than those shown may be encountered. The Contractor hereby distinctly agrees that the Owner and Engineer are not responsible for the correctness or sufficiency of the information given; that in no event is this information to be considered as a part of the Contract; and that consideration for equitable compensation will be made for conditions materially and substantially different from those shown on the Drawings, as determined by the Owner/Engineer. 1.06 JURISDICTIONAL DISPUTES (NOT USED) 1.07 PUMPING A. The Contractor shall supply all equipment necessary and, perform all pumping necessary to prevent flotation of any part of the structures during construction operations. B. The Contractor shall, for the duration of the contract and with his own equipment, pump out water and wastewater which may seep or leak into the structures. Operating areas shall be kept dry at all times. The extent of pumping required in non-operating areas will be determined by the Engineer. 01030-2 98518.01 1.08 HAULING AND CONSTRUCTION OPERATIONS A. The Contractor shall conduct access, hauling, filling and storage operations as specified herein and as shown on the Contract Drawings. 1. On-site borrow areas are designated as follows, in order of first usage: None: All fill material required shall be provided by the Contractor from off site. 2. On-site disposal areas are designated as follows, in order to first usage: None: All spoil material and rubbish shall be delivered and disposed of by the Contractor in a permitted solid waste facility. 1.09 RELOCATIONS A. The Contractor shall be responsible for the relocation of structures, including but not 1 limited to light poles, signs, sign poles, fences, piping, conduits and drains that interfere with the positioning of the work as set out in the Drawings. The cost of all such relocations shall be included in the bid. PART 2 - PRODUCTS (NOT USED) PART 3 - EXECUTION (NOT USED) *** END OF SECTION *** 01030-3 98518.01 SECTION 01040 COORDINATION AND SITE CONDITIONS PART 1.00 GENERAL 1.01 WORK INCLUDED A. This Section shall include, but not be limited to the requirements for the coordination and sequencing of the Work under the Contract, and requirements regarding existing site conditions. 1.02 SUBMITTALS A. The Contractor shall submit the following information as is applicable to site and coordination and site activities in a timely manner and in accordance with the requirements of Section 01300 - Submittals and Section 01400 - Quality Control. B. Subsurface information and utilities: 1. Records or logs of boring or test holes made by the Contractor, if any. 2. Results of exploratory excavations made to verify locations and nature, shape, dimensions, etc. of existing utilities and facilities; submit this 1 information to the Serving Utility on a clean copy of the Contract Drawings. 3. Records of maintenance performed on existing utilities and facilities, if any, and a copy of utility company authorizations. C. Field relocation: J Clearly show proposed relocation of new or existing facilities, or related work affected by the relocation, on a clean copy of the Contract Drawings and submit to the Serving Utility prior to performing any utility relocation. 1.03 SITE CONDITIONS A. Information on site conditions: 01040-1 98518.01 1. General: Information obtained by the Owner regarding site conditions, topography, subsurface information, groundwater elevations, existing construction of facilities as applicable, and similar data will be available for inspection at the office of the Owner or the Serving Utility upon request. Such information is offered as supplementary information only. Neither the Engineer, the Serving Utility or the Owner assumes any responsibility or liability for its accuracy or completeness or for the Contractor's interpretation of such information. 2. Profile elevations: Existing ground elevations shown on the drawings are from As -built drawings. No special topography survey was performed for this project. 3. Control panel: The Owner will establish two vertical and horizontal survey control points within the area of the proposed construction. All monuments, stakes, marks, and other reference information shall be protected and carefully preserved by the Contractor, and in case of their careless or un -necessary destruction or removal by him or his employees, such monuments, stakes, or marks, and other reference information shall be replaced at the Contractors expense. A map showing benchmark locations with descriptions will be provided to the Contractor by the Owner prior to the start of construction. All horizontal coordinates are based on the Owners system. 4. The Contractor shall employ a land surveyor who is licensed in the State of Florida and approved by the Owner to perform the survey and construction staking and to prepare and certify the underground utility as - built drawings. 5. The Contractor shall give the Owner Twenty (20) working days notice for survey control point requirements prior to the start of the construction of any section or portion of the project. 6. The Contractor shall be solely responsible for all work required to transfer line and grade from the survey control points and to perform the required stake -out for the utility pipelines, maintenance access, pipe bridges (where required) on their actual alignments. 01040-2 98518.01 7. Third order accuracy will be required for all construction stake -out and elevations. All levels shall commence on a known benchmark or a known 1 and verified elevation and close onto a different benchmark or verified elevation. All methods and procedures used shall be subject to approval by the Owner and the Serving Utility. B. Subsurface investigation: Subsurface investigations, including test boring, were made in order to access subsurface conditions at particular locations. Neither the Owner nor the Engineer assumes any responsibility whatsoever in respect to the sufficiency or accuracy of the interpretations made of subsurface conditions. No warranty or guarantee is made, either expressed or implied, that the conditions indicated by such 11 investigations are representative of those existing throughout such areas, or any J part thereof, or that any unforeseen development may not occur. C. Boring log: 1. A log of test borings showing a record of the data obtained on subsurface conditions will be included with the Contract Documents for reference only. Said log, being only the opinion of the Engineer as to the character of the materials found and is not to be considered as a part of the Contract Documents. The Owner and owner's geotechnical consultant assume responsibility for 1 the correctness of the information shown on the boring logs only at the specific location of each boring. There is no warranty or guarantee either expressed or implied, that, the conditions indicated by the boring logs are representative of the conditions existing throughout the project area, or that unforeseen developments may not occur. 2. The Contractor may make arrangements with the Owner for permission to conduct, at his own expense, such additional subsurface investigations as may be necessary to verify existing conditions. D. Existing Utilities: 1. Excavation permit: An excavation permit is required for all excavation within Reedy Creek Improvement District property. Specific requirements and procedures for obtaining the excavation permit are provided in the general conditions. 01040-3 98518.01 2. Location: a. Known utilities and facilities adjacent to or within the work area are shown on the Drawings. The locations shown are taken from existing records and the best information available from existing utility plans; however, it is expected that there may be some discrepancies and/or omissions in the locations and quantities shown. Those shown are for the convenience of the Contractor only, and no responsibility is assumed by either the Owner, the Engineer or the Serving Utility for their accuracy or completeness. b. The Contractor shall exercise all reasonable care to verify the locations of existing utilities and facilities shown on the Drawings and to determine the presence of those utilities not shown. Immediate and adjacent areas where excavations are to be made shall be thoroughly checked by visual examination and electronic detection equipment for indications of underground utilities. Where there is reasonable cause to verify the presence or absence of an underground utility, the Contractor shall make exploratory excavations prior to proceeding with major excavation in the area. Where information on buried utilities is required to verify their nature, shape, configuration, dimensions, cover, materials or other properties, the Contractor shall make exploratory excavations as acceptable to the Owner and the Serving Utility. 3. Contractors responsibilities: a. Where the Contractor's operations could cause damage or inconvenience to railway, telephone, telegraph, television, power, gas, oil, water or sewer, the Contractor shall make all arrangements necessary for the protection and preservation of these utilities and services. (Ref: Excavation Permits). The Contractor shall replace existing utilities removed or damaged during construction, unless otherwise provided for in these Contract Documents. b. The Contractor shall notify the Sunshine State One -Call of Florida (800) 432-4770 before you dig not less than seventy two (72) hours prior to planned excavation. Under no circumstances shall the Contractor commence excavation or expose any utility without first obtaining a dig permit from the serving utility. 01040-4 98518.01 Once the permit has been granted and is properly displayed on the construction site the Contractor may locate, expose and provide temporary support for the affected utilities. C. Utility poles less than ten (10) feet from excavations will be protected by the Owner at no expense to the Contractor. The Contractor shall provide protection from damage for all other utility poles. If other utility poles are encountered that interfere with the excavation or construction, the Contractor, shall immediately notify the Owner and the Serving Utility at least seventy-two (72) hours in advance of construction operations to permit necessary arrangements with the Serving Utility for the protection of the interfering poles. d. The Contractor shall be solely and directly responsible to the Owner and the Serving Utility for Damage or injury, expense, loss, inconvenience, delay, actions, suits or claims of any character brought against the Engineer, Owner or the Serving Utility due to injuries or damage resulting from construction operations under this contract. e. Neither the Owner nor its officers or agents shall be held liable to the Contractor for damages resulting from the Contractors failure to properly protect utilities encountered in the work. f. In the event of interruption to water, sewer, storm drainage or other utility services as a result of accidental damage due to construction operations, the Contractor shall immediately notify the Serving Utility or other authority, and shall assist and cooperate with said authority in the restoration of the affected utility in a timely manner and shall pay for the repair and restoration of the utility. g. In the event the Contractor should encounter water service lines that interfere with trenching, the Contractor shall notify the Serving Utility to obtain prior approval to relocate the utility under construction, relocate the water service line or cut the service line, dig through, and restore service to previous conditions using equal or better materials. h. Drainage culverts or structures at or near right angles to a pipeline, and removed by the Contractor, shall be replaced, in kind or better in accordance with Sections TRENCH EXCAVATION AND BACKFILL and CULVERTS. 01040-5 98518.01 4. Utility Companies NAME OF RESPONSIBILITY UTILITY AUTHORITY Electric Florida Power Company 8 North Highland Avenue Winter Garden, FL 34787 Gas Lake Apopka Natural Corp. (Distribution) 1320 South Vineland Road Winter Garden, FL 34787 Telephone Sprint PO Box 153000 Altamonte Springs, FL 32751 Wastewater City of Ocoee 1800 A.D. Mims Road Ocoee, FL 34761 Water City of Ocoee 1800 A.D. Mims Road Ocoee, FL 34761 Streets & City of Ocoee Roads 1800 A.D. Mims Road (Non-FDOT) Ocoee, FL 34761 E. Interfering structures: TELEPHONE NUMBER (800) 700-8744 (407) 656-2734 (800) 339-1811 (407)656-1150 (407)656-1150 (407) 656-1150 1. The Contractor shall take all necessary precautions to prevent damage to existing structures whether on the surface, above ground or under ground. An attempt has been made to show all major utilities and structures on the Contract Drawings. While the information has been compiled from the best available sources, its completeness and accuracy cannot be guaranteed. 01040-6 98518.01 2. The Contractor shall protect all existing structures from damage, whether or not they lie within limits of easements owned or obtained by the Owner. Where existing fences, gates, barns, sheds, buildings or other structures must be removed to properly carry out the work, or are damaged during the work, the Contractor shall restore them to original condition, to the q satisfaction of the Owner or the Serving Utility. 3. The Contractor may remove and replace in equal or better than original condition, small structures such as fences, sign posts, mail boxes, retaining walls, etc. that interfere with the Contractors operations. F. Field Relocation: 1. During construction minor relocations of proposed facilities may be necessary. The Contractor shall make all such relocations only by direction of the Owner or the Serving Utility. If existing structures are encountered that prevent construction as shown in the Drawings, the Contractor shall notify the Owner, Engineer and the Serving Utility before continuing with the work in order that required field corrections and revisions can be made. 2. Where shown in the Drawings or as directed by the Engineer or the Serving Utility, and acceptable to the Owner, the Contractor shall provide for the relocation of existing utilities and facilities to include piping, utilities, equipment structures, electrical conduit, wiring, electrical duct banks, and other items. The Contractor shall use only new materials for the relocation of existing utilities and facilities, and shall match the materials of the existing structures or facilities, unless shown or specified otherwise. The Contractor shall perform relocations of existing facilities and structures in such a manner that will minimize downtime. Relocations and installation of new portions of existing facilities shall be complete and in their relocated position prior to removing existing facilities, unless directed otherwise by the Owner or the Serving Utility. G. Monuments and Markers: 1. The Contractor shall preserve and protect all survey monuments and markers throughout the Project. Should damage occur or removal becomes necessary, the Contractor shall immediately notify the Owner and the Engineer and restore the monument or marker to its original condition. 2. The Contractor shall preserve all private and public monuments that are found. If a monument must be removed, it shall be replaced at the original location using a land surveyor registered in the State of Florida. The 01040-7 98518.01 L, Contractor shall notify the Owner when monuments are encountered. If U.S. government monuments are encountered, the Contractor shall immediately notify the Owner, and reference the monument for later replacement. The Contractor shall provide a minimum ten (10) day advance notification to the Owner, to notify the proper authority. PART 2 - PRODUCTS (NOT USED) PART 3 - EXECUTION (NOT USED) *** END OF SECTION *** 01040-8 98518.01 SECTION 01045 CUTTING AND PATCHING PART 1 - GENERAL 1.01 SCOPE OF WORK A. Contractor shall be responsible for all cutting, fitting, and patching, including excavation and backfill and all incidentals thereof, required to complete the work and to: 1. Make its several parts fit together properly. 2. Uncover portions of the work to provide for installation of ill-timed work. 3. Remove and replace defective work. 4. Remove and replace work not conforming to requirements of Contract Documents. 5. Remove samples of installed work as specified for testing. 6. Provide routine penetrations of non-structural surfaces for installation of piping, electrical conduit, and other items shown on the Drawings. 1.02 RELATED REQUIREMENTS A. Division 2 - Site Work. B. Division 3 - Concrete. 1.03 SUBMITTALS A. Submit a written request to the Engineer fifteen (15) days prior to executing any cutting or alteration. B. Request shall include: 1. Identification of the Project. 2. Description of affected work. 01045-1 98518.01 3. The necessity for cutting, alteration, or excavation. 4. Effect of work on Owner or any separate contractor, or on structural or weatherproof integrity of project. 5. Description of proposed work: a. Scope of cutting, patching, alteration, or excavation. b. Products and/or methods proposed to be used. C. Extent of refinishing to be done. 6. Alternatives to cutting and patching. 7. Cost proposal, when applicable. 8. Written permission of any separate contractor whose work will be affected. C. Submit written notice to the Engineer and Resident Project Representative designating the date and the time the work will be uncovered. PART 2- PRODUCTS 2.01 MATERIALS A. Comply with specifications and standards for each specific product involved. PART 3 - EXECUTION 3.01 INSPECTION A. Inspect existing conditions of Project, including elements subject to damage or to movement during cutting and patching. B. After uncovering work, inspect conditions affecting installation of products, or performance of work. C. Report unsatisfactory or questionable conditions to the Engineer in writing; do not proceed with work until the Engineer has provided further instructions. 3.02 PREPARATION A. Provide adequate temporary support as necessary to assure structural value or 01045-2 98518.01 integrity of affected portion of work. B. Provide devices and methods to protect other portions of Project from damage. C. Provide protection from elements for that portion of the Project which may be exposed by cutting and patching work, and maintain excavations free from water. 3.03 PERFORMANCE A. Execute cutting and demolition by methods which will prevent damage to other work, and will provide proper surfaces to receive installation of repairs. B. Execute excavating and backfilling by methods which will prevent settlement or damage to other work. C. Employ original installer or fabricator to perform cutting and patching for: Weather -exposed or moisture -resistant elements. 2. Sight -exposed finished surfaces. D. Execute fitting and adjustment of products to provide a finished installation to comply with specified products, functions, tolerances, and finishes. E. Restore work which has been cut or removed; install new products to provide completed work in accord with requirements of Contract Documents. F. Fit work airtight to pipes, sleeves, ducts, conduit, and other penetrations through surfaces. G. Where holes in existing masonry are required to be sealed, unless otherwise specified, they shall be sealed with non -shrink grout. The sides of the openings in concrete walls shall be provided with keyed joints and shall be suitably roughened to furnish a good bond and make a watertight joint. All loose or unsound material adjacent to the opening shall be removed and, if necessary, replaced with new material. The method of placing the mortar seal shall provide a suitable means of releasing entrapped air. Surfaces of seals visible in the completed work shall be made to match as nearly as possible the adjacent surfaces. H. Where new pipes are to penetrate existing concrete walls, openings shall be core - drilled or saw -cut. Piping shall be installed in the new opening and the annular space shall be filled with non -shrink grout to provide a watertight seal. Interior and exterior surfaces adjacent to the new opening shall be finished smooth to provide a uniform surface. 01045-3 98518.01 3.04 GENERAL RESTORATION A. The restoration of existing street paving, including underdrains, if any are encountered and broken into, shall be restored by the Contractor and shall be replaced or rebuilt using the same type of construction as was in the original facilities. The Contractor shall be responsible for restoring all such work, including subgrade and base courses where present. The Contractor shall obtain and pay for at his own expense such local or other governmental permits as may be necessary for the opening of streets and shall satisfy himself as to any requirements other than those herein set forth which may affect the type, quality, and manner of carrying on the restoration of surfaces by reason of jurisdiction of such governmental bodies. *** END OF SECTION *** 01045-4 98518.01 SECTION 01050 FIELD ENGINEERING PART 1- GENERAL 1.01 DESCRIPTION A. Scope of Work: The Contractor shall provide and pay for field engineering service for Project including but not limited to: 1. Survey work required in execution of Project. 2. Civil, structural or other professional engineering services specified or required to execute Contractor's construction methods. B. Related Responsibilities: The method of field staking for the construction of the work shall be at the option of the Contractor. The Owner has provided the engineering surveys necessary to establish reference points which in his judgement are necessary to enable the Contractor to proceed with his work. The accuracy of any method of staking shall be the responsibility of the Contractor. All engineering for vertical and horizontal control shall be the responsibility of the Contractor. The Contractor shall be held responsible for the preservation of all stakes and marks. If any stakes or marks are disturbed by the Contractor, the Contractor shall not proceed with any work until he has established such points, marks, lines and elevations as may be necessary for the prosecution of the work. C. Related Requirements Described Elsewhere: Conditions of the Contract. 1.02 QUALIFICATIONS OF SURVEYOR OR ENGINEER A. The surveyor performing services related to the project shall be a registered land surveyor currently licensed in the State of Florida. B. Registered professional engineers of the disciplines required for the Project shall be currently licensed in the State of Florida. 01050-1 98518.01 1.03 SURVEY REFERENCE POINTS A. Locate and protect control points prior to starting site work, and preserve all permanent reference points during construction. Make no changes or relocations without prior written notice to the Engineer. 2. Report to the Engineer when any reference point is lost or destroyed, or requires relocation because of necessary changes in grades or locations. 3. Require surveyor to replace project control points which may be lost or destroyed at no additional cost to the Owner. Establish replacement points based on original survey control. 1.04 PROJECT SURVEY REQUIREMENTS A. Establish a minimum of two permanent bench marks on site, referenced to data established by survey control points. 1. Record locations, with horizontal and vertical data. B. Establish lines and levels, locate and lay out, by instrumentation and similar appropriate means: 1. Site improvements: a. Stakes for grading, fill and topsoil replacement. b. Utility slopes and invert elevations. 2. Batter boards for structures. 3. Building foundation, column locations and floor levels. 4. Controlling lines and levels required for mechanical and electrical trades. C. From time to time, verify layouts by same methods. 1.05 RECORDS A. Maintain a complete, accurate log of all control and survey work as it progresses. 1.06 SUBMITTALS 01050-2 98518.01 A. Submit name and address of surveyor and professional engineer to the Engineer. B. On request of the Engineer, submit documentation to verify accuracy of field engineering work. C. Submit "as -built" drawings in accordance with Section 01720. PART 2 - PRODUCTS (NOT USED) PART 3 - EXECUTION (NOT USED) ** END OF SECTION ** 01050-3 98518.01 SECTION 01065 PERMITS AND FEES PART1- GENERAL A. The Contractor shall obtain and pay for all permits and licenses related to his work as provided for in the Conditions of the Contract except as otherwise provided herein. B. Permits by Owner: The following permit applications have been submitted by the Owner, and obtaining the following permits will be the responsibility of the Owner: C. Permits and Certificates by Contractor include but are not limited to: 1. City of Ocoee Buildine Permit 2. St. Johns River Water Mana¢ement District Permit PART 2 - PRODUCTS (NOT USED) PART 3 - EXECUTION (NOT USED) ** END OF SECTION ** 01065- 1 98518.01 SECTION 01150 MEASUREMENT AND METHOD OF PAYMENT PART1- GENERAL 1.01 DESCRIPTION OF WORK A. The bid items shown on the Proposal Form have been created solely for the purpose of comparison of bids and for use in the preparation of monthly construction estimates. Quantities shown thereon must be considered as approximate only. All work shown on the Drawings, herein specified, or implied in any way in the Drawings or Specifications shall be done regardless of whether or not the work is specifically defined in any bid item. B. All measurement for payment will be based on complete work performed in strict accordance with the Drawings and Specifications. All work completed under this contract shall be measured by the Contractor in the presence of the Owner or his representative according to the methods outlined below. C. The cost to execute all miscellaneous work specified under Division 1 — "General Requirements", whether explicitly stated or incidental to the work, shall be included as part of the lump sum prices and unit prices stated in the Contractor's Bid Schedule. No separate or additional payment will be made for completion of the work specified in Division 1. The Contractor shall include the cost of the Division 1 work in the bid prices of the items to which the work applies. PART 2- PRODUCTS (Not Used) PART 3 - EXECUTION 3.1.01 MOBILIZATION, DEMOBILIZATION, BONDS AND PERMITS A. The work specified in this item consists of the preparatory work and operations in mobilizing for beginning work on the project, including, but not limited to, those operations necessary for the movement of personnel, equipment, supplies and incidentals to the project site, and for the establishment of temporary offices, buildings, safety equipment, first aid supplies, sanitary and other facilities, as required by these Specifications, special provisions, and State and local laws and regulations. The costs of bonds, permits and any required insurance, and any other 01150-1 98518.01 preconstruction expense necessary for the start of the work, excluding the cost of construction materials, shall also be included in this item, The cost of erosion control and demobilization shall also be included in this bid item. Payment of 75 percent of the applicable lump sum price shall be made for the preparatory work and operations in mobilizing for beginning the Work on the project. Payment of the remaining 25 percent shall be made for finalization of this project, including demobilization, contract closeout documents, removal of field office and final site clean-up. Retainage requirements as stated in the General Conditions will apply to this pay item. 3.1.02 GENERAL REQUIREMENTS — DIVISION 1 A. Measurement: Measurement of this item will be based upon the overall percentage of the total value of work performed to date, proportioned to the original contract amount. B. Payment: Payment of the appropriate percentage of the lump sum price shall be full compensation for furnishing all labor, materials, equipment and services necessary to provide the all of the work specified in "Division I — General Requirements "herein. This item shall include, but not be limited to, the following: • Special Project Coordination • Project Meetings • Field Engineering and Surveying • Materials Testing • Preparation and submittal of Pay Requests • Preparation and submittal of Shop Drawings • Audio -Visual Documentation • Preparation and submittal of record drawings and documents • Erosion and Sediment Control • Cleanup Payment of the lump sum bid price will not exceed 80 percent until the project record drawings have been submitted by the Contractor and accepted by the Owner. 3.1.03 INDEMNIFICATION A. Payment for Indemnification: In consideration of the Contractor's Indemnity Agreement as set out in the Contract Documents, Owner specifically agrees to give the Contractor a minimum of $1000.00, and other good and valuable consideration, receipt of which is acknowledged upon signing of the Agreement. 01150-2 98518.01 3.1.04 CLEARING AND GRUBBING A. Measurement of this item will be based upon the percentage of the total value of work performed to date, proportioned to the original contract amount B. Payment of this item shall be based on the work completed in accordance with the Drawings and Specifications and the lump sum price. The lump sum bid price set forth in the Bid Schedule shall be considered full compensation for the clearing and grubbing and the disposal of materials and debris, and other labor and materials required to clear the construction area required to work as shown on the Drawings and specified herein. 3.1.05 BUIDLING PERMIT ALLOWANCE Payment of 75 percent of the applicable lump sum price shall be made for the permits incurred on the project. Payment of the remaining 25 percent shall be made for finalization of this project. Retainage requirements as stated in the General Conditions will apply to this pay item. 3.1.06 COLOR AUDIONIDEO RECORD The applicable lump sum price shall be full compensation for all labor, materials and equipment necessary to furnish the audio-visual tape recording, video tape identification and log as a pre -construction record. No work shall proceed until the complete video pre -construction record is received by the engineer and the Contractor has received the Engineer's approval of such documentation. 1, 3.1.07 EXISTING PAVEMENT REMOVAL A. Measurement of this item shall be based on the actual number of square yards within the specified pay limits. B. Payment of this item shall be based on the actual number of square yards completed and accepted, within the pay limits, and the unit bid price. The unit bid price set forth in the Bid Schedule shall be considered full compensation for all cutting, removal of existing materials, temporary patching, disposal of material and other labor and materials required to remove pavement as shown on the Drawings and specified herein. 3.1.08 EXISTING BUILDING AND SLAB REMOVAL 01150-3 98518.01 A. Measurement of this item will be based upon the percentage of the total value of work performed to date, proportioned to the original contract amount. B. Payment of this item shall be based on the work completed in accordance with the Drawings and Specifications and the lump sum price. The lump sum bid price set forth in the Bid Schedule shall be considered full compensation for removal of existing building, building slab, and appurtenences; the disposal of materials; and other labor and materials required to remove the building and slab as shown on the Drawings and specified herein. 3.1.09 EXISTING WATERLINE ENCASEMENT A. Measurement of this item will be based upon the percentage of the total value of work performed to date, proportioned to the original contract amount. B. Payment of this item shall be based on the work completed in accordance with the Drawings and Specifications and the lump sum price. The lump sum bid price set forth in the Bid Schedule shall be considered full compensation for furnishing all plant, labor, materials, and equipment, and constructing the encasement, including excavation, backfill, compaction, bridging, over -excavation, tests, inspection, and clean-up. Clean up is considered to be 10 percent of the cost of installation. No separate payment will be made for sheeting, shoring, dewatering, or supporting structures. A. Measurement of this item will be based upon the actual number of light poles relocated within the specified pay limits. B. Payment of this item shall be based on on the actual number of linear feet removed, relocated, and accepted, within the pay limits, and the unit bid price. The unit bid price set forth in the Bid Schedule shall be considered full compensation for all other labor, materials, and equipment necessary to relocate lights as shown on the Drawings and specified herein. 3.1.11 EXISTING FENCE REMOVAL & RELOCATION A. Measurement of this item will be based upon the actual number of linear feet of fence removed and relocated within the specified pay limits. B. Payment of this item shall be based on the actual number of linear feet removed, relocated, and accepted, within the pay limits, and the unit bid price. The unit bid price set forth in the Bid Schedule shall be considered full compensation for all O1fI.YlE �:I. : 1 1 other labor, materials, and equipment necessary to remove and re -install fences as shown on the Drawings and specified herein. 3.1.12 EARTHWORK (EMBANKMENT) A. Measurement of this item shall be based on the actual number of cubic yards within the specified pay limits. B. Payment of this item shall be based on the actual number of cubic yards completed and accepted, within the pay limits, and the unit bid price. The unit bid price set forth in the Bid Schedule shall be considered full compensation for all excavation, trenching, removal of unsuitable material, backfill, fill, disposal of waste and surplus material, and grading required to complete the work shown on the Drawings and i specified herein. No separate payment will be made for sheeting, shoring, dewatering, or supporting structures. 3.1.13 DRAINAGE IMPROVEMENTS A. Measurement of this item will be based upon the percentage of the total value of work performed to date, proportioned to the original contract amount B. Payment of this item shall be based on the work completed in accordance with the Drawings and Specifications and the lump sum price. The lump sum bid price set forth in the Bid Schedule shall be considered full compensation for furnishing all plant, labor, materials, and equipment, and installing pipe structures, including pipe connections, extra depth of structure as may be required, excavation, backfill, compaction, bridging, coatings, dewatering, sheeting, shoring, supporting adjacent structures, special bedding, over -excavation, adjustments to final grade, tests, inspection, and clean-up. Clean up is considered to be 10 percent of the cost of installation. 3.1.14 TYPE C STABILIZATION A. Measurement for payment shall be the actual number of square yards of stabilized subgrade of each required thickness, satisfactorily constructed. Measurement shall be along the roadway centerline and to the actual width constructed, within the limits and dimensions shown on the drawings. At intersections, measurement shall be along the centerline of the principal road, with offsets measured at not more than 5 -foot intervals to points on the curve of the return, across the intersection along a line connecting the backs of the returns, continuing through the following return as above, with area calculated by trapezoid approximation. B. Payment of the applicable unit price shall be full compensation for furnishing all 01150-5 98518.01 plant, labor, materials, and equipment, and constructing the stabilized subgrade, including preliminary grading, furnishing stabilizing materials, mixing stabilizing materials to the depth required to obtain the specified post compaction depth, final grading and compaction to the cross-section shown, complete and ready for subsequent construction. 3.1.15 LIMEROCK BASE A. Measurement for payment will be the actual number of square yards of limerock base of each required thickness, satisfactorily constructed. Measurement shall be along the roadway centerline and to the actual width constructed, within the limits and dimensions shown on the drawings. At intersections, measurement shall be along the centerline of the principal road, with offsets measured at not more than 5 -foot intervals to points on the curve of the return, across the intersection along a line connecting the backs of the returns, continuing through the following return as above, with area calculated by trapezoid approximation. B. Payment of the applicable unit price shall be full compensation for furnishing all plant, labor, materials, and equipment, and constructing the limerock base, including placing the limerock, final grading and compaction to the cross-section shown, installing the prime coat, and sanding, complete and ready for subsequent construction. 3.1.16 TYPE S-1 ASPHALTIC CONCRETE A. Measurement for payment will be the actual number of square yards of 1 -1/2 -inch Type S-1 asphaltic concrete surface course satisfactorily constructed. Measurement shall be along the roadway centerline and to the actual width constructed, within the limits and dimensions shown on the drawings. At intersections, measurement shall be along the centerline of the principal road, with offsets measured at not more than 5 -foot intervals to points on the curve of the return, across the intersection along a line connecting the backs of the returns, continuing through the following return as above, with area calculated by trapezoid approximation. B. Payment of the applicable unit price shall be full compensation for furnishing all plant, labor, materials, and equipment, and constructing the 1 -1/2 -inch asphaltic concrete surface course to the cross-section shown, complete and ready for subsequent construction. 3.1.17 REINFORECD CONCRETE PAD 01150-6 98518.01 A. Measurement for payment will be the actual number of linear feet of "Type F Curb and Gutter" satisfactorily constructed. Measurement shall be along the back of the curb and gutter, or gutter. B. Payment of the applicable unit price shall be full compensation for furnishing all plant, labor, materials, and equipment, and constructing the curb and gutter, or gutter complete, including formwork and finishing, as shown or specified 3.1.18 PARKING STRIPING A. Measurement for payment will be the actual number of linear feet of "6" Solid White Parking Striping" satisfactorily completed. Measurement shall be along the centerline of the striping. B. Payment of the applicable unit price shall be full compensation for furnishing all labor, materials, equipment and incidentals, required to stripe parking as shown on Drawings or specified herein. 3.1.19 TYPE D CURB A. Measurement for payment will be the actual number of linear feet of "Type D Curb" satisfactorily constructed. Measurement shall be along the back of the curb and gutter, or gutter. B. Payment of the applicable unit price shall be full compensation for furnishing all plant, labor, materials, and equipment, and constructing the curb and gutter, or gutter complete, including formwork and finishing, as shown or specified. 3.1.20 TYPE F CURB AND GUTTER A. Measurement for payment will be the actual number of linear feet of "Type F Curb and Gutter" satisfactorily constructed. Measurement shall be along the back of the curb and gutter, or gutter. B. Payment of the applicable unit price shall be full compensation for furnishing all plant, labor, materials, and equipment, and constructing the curb and gutter, or gutter complete, including formwork and finishing, as shown or specified 3.1.21 RETAINING WALL A. Measurement of this item will be based upon the percentage of the total value of work performed to date, proportioned to the original contract amount 01150-7 98518.01 B. Payment of this item shall be based on the work completed in accordance with the Drawings and Specifications and the lump sum price. The lump sum bid price set forth in the Bid Schedule shall be considered full compensation for all plant, labor, materials, testing, and equipment, and constructing the retaining wall complete, including formwork and finishing, as shown on the Drawings and specified herein. 3.1.22 REPLACE SOD A. Measurement of this item will be based upon the percentage of the total value of work performed to date, proportioned to the original contract amount. B. Payment of this item shall be based on the work completed in accordance with the Drawings and Specifications and the lump sum price. The lump sum bid price set forth in the Bid Schedule shall be considered full compensation for all labor and materials required to replace sod as shown on the Drawings and specified herein. 3.1.23 METAL BUILDING A. Measurement of this item will be based upon the percentage of the total value of work performed to date, proportioned to the original contract amount. B. Payment of this item shall be based on the work completed in accordance with the Drawings and Specifications and the lump sum price. The lump sum bid price set forth in the Bid Schedule shall be considered full compensation for all labor and materials required to construct the metal building shown on the Drawings and specified herein. 3.1.24 WORK ITEMS NOT INCLUDED A. Measurement of this item will be based upon the percentage of the total value of work performed to date, proportioned to the original contract amount. B. Payment of this item shall be based on the work completed in accordance with the Drawings and Specifications and the lump sum price. The lump sum bid price set forth in the Bid Schedule shall be considered full compensation for all labor and materials required to construct the metal building shown on the Drawings and specified herein *** END OF SECTION *** 01150-8 98518.01 SECTION 01200 PROJECT MEETINGS PART1 GENERAL 1.01 DESCRIPTION A. Scope of Work: 1. The Owner's representative shall schedule and administer a preconstruction meeting, periodic progress meetings, and specifically called meetings throughout the progress of the work. 2. Representatives of contractors, subcontractors and suppliers attending meetings shall be qualified and authorized to act on behalf of the entity each represents. 3. The Contractor shall attend meetings to ascertain that work is expedited consistent with Contract Documents and construction schedules. The Owner's Representative will take written minutes of the preconstruction meeting and each progress meeting; copies of the minutes will be distributed to the Owner and Contractor. B. Related Requirements Described Elsewhere: 1. Conditions of the Contract. 1.02 PRECONSTRUCTION MEETING A. A preconstruction meeting will be scheduled no later than twenty (20) days after date of Award of Contract. B. Location: A central site, convenient for all parties, designated by the Owner. C. Attendance: 1. Owner's representative 2. Engineer and his professional consultants 3. Resident project representative 98518.01 01200-1 4. Contractor's superintendent 5. Major subcontractors 6. Major suppliers 7. Utilities 8. Others as appropriate. D. Suggested Agenda: 1. Distribution and discussion of- a. fa. List of major subcontractors and suppliers b. Projected schedules. 2. Critical work sequencing: Relationships and coordination with other contracts and/or work. 3. Major equipment deliveries and priorities. 4. Project coordination: Designation and responsible personnel. 5. Procedures and processing of: a. Field decisions b. Proposal requests C. Submittals d. Change orders e. Applications for payment. 6. Submittal of Shop Drawings, project data and samples. 7. Adequacy of distribution of Contract Documents. 8. Procedures for maintaining Record Documents. 98518.01 01200-2 9. Use of premises: a. Work and storage areas. b. Owner's requirements. C. Access and traffic control. 10. Construction facilities, controls and construction aids. 11. Temporary utilities. 12. Safety and first aid procedures. 13. Check of required Bond and Insurance certifications. 14. Completion time for contract and liquidated damages. 15. Request for extension of contract time. 16. Request for a weekly job meeting for all involved. 17. Security procedures. 18. Procedures for making partial payments. 19. Guarantees on completed work. 20. Equipment to be used. 21. Staking of work. 22. Project inspection. 23. Labor requirements. 24. Laboratory testing requirements. 25. Provisions for material stored on site. 26. Requirements of railroads, highway departments and other organizations. 98518.01 01200-3 27. Housekeeping procedures. 28. Liquidated damages. 29. Posting of signs. 30. Pay request submittal dates. 31. Equal opportunity requirements. 1.03 PROGRESS MEETINGS A. Schedule regular periodic meetings. The progress meetings will be held every thirty (30) days or less with the first meeting thirty (30) days after the preconstruction meeting or thirty (30) days or less after the date of Notice to Proceed. B. Hold called meetings as required by progress of the work. C. Location of the meetings: Project field office of Contractor unless specified otherwise by the Owner. D. Attendance: 1. Engineer and his professional consultants as needed. 2. Contractor 3. Owner's representative 4. Subcontractors as appropriate to the agenda 5. Suppliers as appropriate to the agenda 6. Others as appropriate E. Suggested Agenda: 1. Review approval of minutes of previous meetings. 2. Review of work progress since previous meeting. 3. Field observations, problems, conflicts. 98518.01 01200-4 4. Problems which impede Construction Schedule. 5. Review of off-site fabrication, delivery schedules. 6. Corrective measures and procedures to regain projected schedule. 7. Revisions to Construction Schedule. 8. Progress schedule during succeeding work period. 9. Coordination of schedules. 10. Review submittal schedules; expedite as required. 11. Maintenance of quality standards. 12. Pending changes and substitutions. 13. Shop drawing submittals. 14. Review proposed changes for: a. Effect on Construction Schedule and on completion date. b. Effect on other contracts of the Project. 15. Other business. 16. Construction schedule. 17. Critical/long lead items. F. The Contractor is to attend progress meetings and is to review previous meeting minutes and current agenda items, in order to be prepared to discuss pertinent topics such as deliveries of materials and equipment, progress of the work, etc. G. The Contractor shall provide a current submittal log at each progress meeting. PART 2 PRODUCTS (NOT USED) PART 3 EXECUTION (NOT USED) *** END OF SECTION *** 98518.01 01200-5 SECTION 01300 SUBMITTALS PART 1 - GENERAL 1.01 SUMMARY A. This section specifies requirements for handling submittals. 1.02 GENERAL PROCEDURES A. Coordinate submittal preparation with performance of construction activities, and with purchasing or fabrication, delivery, other submittals and related activities. Transmit in advance of performance of related activities. B. Coordinate transmittal of different submittals for related elements so processing will not be delayed by the need to review concurrently for coordination. The Owner reserves the right to withhold action on a submittal requiring coordination until related submittals are received. 1 1. Processing: Allow two weeks for initial review. Allow more time if processing must be delayed for coordination with other submittals. The Owner will advise the Contractor when a submittal must be delayed for 1 coordination. Allow two weeks for reprocessing each submittal. a. No extension of time will be authorized because of failure to transmit submittals sufficiently in advance of the Work to permit processing. 2. Submittal Preparation: Place a label or title block on each submittal for identification. Provide a 4" x 5" space on the label or beside the title block on Shop Drawings to record Contractor's review and approval markings and action taken. Include the following information on the label for processing and recording action taken. Project name Date Name and address of Owner Name and address of Contractor Name and address of subcontractor Name and address of manufacturer 01300-1 98518.01 3. Submittal Transmittal: Number and Package submittals appropriately for transmittal and handling. Transmit with a transmittal form. Submittals received from other than the Contractor will be returned without action. 1.03 CONTRACTOR'S CONSTRUCTION SCHEDULE A. Submit a fully developed, bar -chart type construction schedule, within 30 days of the date established for Commencement of the Work. Provide a separate bar for each construction activity and a vertical line to identify the first working day of each week. Use the breakdown of units of Work as indicated in the "Schedule of Values". B. Within each time bar indicate estimated completion percentage in 10 percent increments. As Work progresses, place a contrasting mark in each bar to indicate Actual Completion. C. Prepare the schedule on sheets of stable transparency, or other reproducible media, of sufficient width to show data for the entire construction period. D. Secure commitments for performing critical construction operations from parties involved. Coordinate each activity with other activities and show in proper sequence; include minor elements involved in the construction sequence. Indicate sequences necessary for completion of related portions. E. Coordinate the Construction Schedule with the Schedule of Values, list of subcontracts, Submittal Schedule, progress reports, payment requests and other schedules. F. Indicate completion in advance of the date established for Substantial Completion. Indicate Substantial Completion on the Schedule to allow time for the Owner's procedures necessary for certification of Substantial Completion. 1.04 SUBMITTAL SCHEDULE A. Submit the Submittal Schedule within 10 days of the Construction Schedule. Coordinate the Schedule with the list of subcontracts, Schedule of Values and list of products as well as the Construction Schedule. B. Prepare the Schedule in chronological order; include submittals required during the first 90 days of construction. Provide the following information: 01300-2 98518.01 Scheduled date for the first submittal Related Section number Name of subcontractor Description of the construction element covered Scheduled date the Owner's final release or approval 1.05 DISTRIBUTION OF SCHEDULES A. Distribute copies of the Construction and Submittal Schedules to the Owner, Subcontractors, and other parties required to comply with schedule dates. Post copies in the temporary field office. When revisions are made, distribute to the same parties and post in the same locations. B. Revise each Schedule after each meeting or activity, where revisions have been made. Issue the updated Schedules concurrently with report of each meeting. 1.06 DAILY CONSTRUCTION REPORTS A. Prepare a daily construction report, recording information concerning events at the site. Submit duplicate copies to the Owner at weekly intervals. Include the following information. List of subcontractors at the site High and low temperatures, general weather conditions Accidents, stoppages, delays, shortages, losses Emergency procedures Change Orders received implemented Partial Completions Substantial Completions authorized 1.07 SHOP DRAWINGS A. Submit new information, drawn to an accurate scale. Indicate deviations from Contract Documents. Dimensions Identification of products and materials included Notation of coordination requirements Notation of dimensions established by field measurement 1. Except for templates, patterns and similar full size Drawings, submit Shop Drawings on sheets at least 8 1/2" x 11" but no longer than 24" x 36". 01300-3 98518.01 B. PRODUCT DATA Collect Product Data into a single submittal for each element or system. Mark each copy to show applicable choices and options. Where Product Data includes information on several products, some of which are not required, mark copies to indicate the applicable information. Include the following information: Manufacturer's printed recommendations Compliance with recognized trade association standards Compliance with recognized testing agency standards Application of testing agency labels and seals Notation of dimensions verified by field measurement Notation of coordination requirements 1.08 SUBMITTALS A. Submit five (5) copies plus the number required for the Contractor's use of each required shop drawing submitted; submit four (4) copies where required for maintenance manuals. The Owner will retain two (2) copies, and will return the other marked with action taken and corrections or modifications required. B. Unless noncompliance with Contract Document provisions is observed, the submittal may serve as the final submittal. 1.09 DISTRIBUTION A. Furnish copies of final submittal to installers and others required for performance of construction activities. Show distribution on transmittal forms. Do not proceed with installation until an applicable copy of Product Data is in the installer's possession. B. Do not permit use of unmarked copies of Product Data in connection with construction. C. Prepare additional sets for subcontractors, manufacturers, fabricators, installers, and others as required for performance. Show distribution on transmittal forms. PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION (Not Used) ** END OF SECTION ** 01300-4 98518.01 SECTION 01320 CONSTRUCTION PHOTOGRAPHS PART1- GENERAL 1.01 SCOPE OF WORK A. The Contractor shall include three (3) sets of colored construction photographs with each application for payment. The photographs shall detail all of the work completed during the pay period and shall serve as the record of construction in order to satisfy the requirements of these specifications. The Engineer shall have the authority to reject any or all of the photographs and order those areas to be photographed again. The Contractor shall reschedule unacceptable coverage within five days after being notified. B. Photographs shall not be taken more than seven days prior to the submittal of each application for payment in order to satisfy the requirements of these specifications. 1.02 QUALITY ASSURANCE A. The Contractor shall engage the service of a professional photographer. The color photographs shall be prepared by a responsible commercial firm known to be skilled and regularly engaged in the business of colored construction photographs. The photographer shall furnish to the Engineer a list of all equipment to be used for photographing, i.e., manufacturer's names, model number, specifications and other pertinent information. Additional information to be furnished by the photographer shall include the names, addresses and telephone numbers of two references for projects which the photographer has taken colored construction photographs within the last six (6) months. PART 2- PRODUCTS 2.01 GENERAL A. The photographs shall be such as to produce a finished product that will fulfill the technical requirements of the project. The photographs shall produce bright, sharp and clear pictures with accurate colors and shall be free from distortion, tearing, rolls or any other form of picture imperfection. All photographs shall, by electronic means, display on the photograph the month, day and year of the photograph. 01320-1 98518.01 B. All prints shall be color prints, with double weight paper, a smooth surface and glossy finish. Prints shall be 8 inches by 10 inches in size. Each print shall display the month, day and year on the front and shall be identified on the back as follows: Name of Project Orientation of View Name and Address of Photographer. C. The negatives shall remain the property of the photographer. The Contractor shall require the photographer to maintain the negatives for a period of two years from the date of final completion. The photographer shall agree to furnish additional prints to the Owner and Engineer at commercial rates applicable at time of purchase. PART 3 - EXECUTION 3.01 GENERAL A. The photographs taken shall detail all of the construction which has taken place during the payment period. The photographs shall detail each major stage of construction as follows: 1. Prior to mobilization 2. Completion of site clearing 3. Completion of excavation 4. Completion of backfilling 5. Completion of final grading 6. Completion of utilities installation 7. Completion of foundation for the building 8. Completion of building placement 9. Completion of final road base 10. Completion of building construction & parking lot paving 11. Project completion B. Photographs shall be taken from locations which will adequately illustrate the condition of construction and state of progress at each stage of construction. Photographs shall detail all relevant aspects at each stage of the construction and shall detail all conditions. The construction shall be photographed in the direction of pipe installation at intervals not exceeding 1/16 mile, as approved by the Engineer. 6MD10193U&IxSJI113MU 01320-2 98518.01 SECTION 01370 SCHEDULE OF VALUES PART1- GENERAL 1.01 DESCRIPTION A. Scope of Work: 1. Submit to the Engineer, a Schedule of Values allocated to the various portions of the work (lump sum items) at the preconstruction meeting, and as otherwise specified or requested to be submitted earlier as evidence of the Apparent Low Bidder's qualifications. 2. Upon request of the Engineer, support the values with data which will substantiate their correctness. 3. The Schedule of Values shall establish the actual value of the component parts of the Work to be completed, and shall be used as the basis of the Contractor's Application for Payment. B. Related Requirements Described Elsewhere: 1. Conditions of the Construction Contract. 2. Application for Payments: Section 01027 1.02 FORM AND CONTENT OF SCHEDULE OF VALUES A. Type schedule on an 8-1/2 inch x 11 inch or 8-1/2 inch by 14 inch white paper. Contractor's standard forms and computer printout will be considered for approval by the Engineer upon Contractor's request. Identify schedule with: 1. Title of project and location 2. Engineer and project number 3. Name and address of Contractor 4. Contract designation 5. Date of submission 01370-1 98518.01 B. Schedule shall list the installed value of the component parts of the Work in sufficient detail to serve as a basis for computing item prices for progress payments during construction. C. Identify each line item with the number and title of the respective major section of the specifications. D. For each major line item, list sub -values of major products or operations under the item. E. For the various portions of the Work: 1. Each item shall include a directly proportional amount of the Contractor's overhead and profit. 2. For items on which progress payments will be requested for stored materials, break down the value into: a. The cost of the materials, delivered and unloaded, with taxes paid. Paid invoices are required for materials upon request by the Engineer. b. The total installed value. F. The sum of all lump sum values listed in the schedule shall equal the total contract SUM. 1.03 SUBSCREDULE OF UNIT MATERIALS VALUES A. Submit a subschedule of unit costs and quantities for products on which progress payments will be requested for stored products. B. The form of submittal shall parallel that of the Schedule of Values, with each item identified the same as the line item in the Schedule of Values. C. The unit values for the materials shall be broken down into the cost of the material, delivered and unloaded at the site, with taxes paid. Copies of paid invoices for component material shall be included with the payment request in which the material first appears. D. The installed unit value multiplied by the quantity listed shall equal the cost of that item in the Schedule of Values. 01370-2 98518.01 1.04 REVIEW AND RESUBMITTAL A. After review by Engineer, revise and resubmit Schedule of Values and Schedule of Unit Material Values as required. B. Resubmit revised Schedules in same manner as previously submitted schedules. PART 2 - PRODUCTS (NOT USED) PART 3 - EXECUTION (NOT USED) *** END OF SECTION *** 01370-3 98518.01 SECTION 01400 QUALITY CONTROL PART1- GENERAL 1.01 SECTION INCLUDES A. Quality assurance and control of installation. B. References. C. Field samples. D. Inspection and testing laboratory services. E. Manufacturer's field services and reports. 1.02 RELATED SECTIONS A. Section 01300 - Submittals 1.03 QUALITY ASSURANCE/CONTROL OF INSTALLATION A. Monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce Work of specified quality. B. Comply fully with manufacturers' instructions, including each step in sequence. C. Should manufacturers' instructions conflict with Contract Documents, request clarification from Engineer before proceeding. D. Comply with specified standards as a minimum quality for the Work except when more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship. E. Perform work by persons qualified to produce workmanship of specified quality. 01400-1 98518.01 F. Secure Products in place with positive anchorage devices designed and sized to withstand stresses, vibration, physical distortion or disfigurement. 1.04 REFERENCES A. Conform to reference standard by date of issue current on date of Contract Documents. B. Should specified reference standards conflict with Contract Documents request clarification for Engineer before proceeding. C. The contractual relationship of the parties to the Contract shall not be altered from the Contract Documents by mention or inference otherwise in any reference document. 1.05 FIELD SAMPLES A. Install field samples at the site as required by individual specifications Sections for review. B. Acceptable samples represent a quality level for the Work. C. Where field sample is specified in individual Sections to be removed, clear area after field sample has been accepted by Engineer. 1.06 INSPECTION AND TESTING LABORATORY SERVICES A. Owner will appoint, employ, and pay for services of an independent firm to perform inspection and testing. B. The independent firm will perform inspections, tests, and other services specified in individual specification Sections and as required by the Engineer. C. Reports will be submitted by the firm to the Engineer and Contractor, in duplicate, indicating observations and results of tests and indicating compliance or non- compliance with Contract Documents. D. Cooperate with firm; furnish samples of materials, design mix, equipment, tools, storage and assistance as requested. 01400-2 98518.01 1. Notify Engineer and independent firm (24) hours prior to expected time for operations requiring services. 2. Make arrangements with independent firm and pay for additional sample and tests required for Contractor's use. E. Retesting required because of non-conformance to specified requirements shall be performed by the same firm on instructions by the Engineer. Payment for retesting will be charged to the Contractor by deducting inspection or testing charges from the Contract Sum/Price. 1.07 MANUFACTURERS' FIELD SERVICES AND REPORTS A. When specified in individual specification Sections, require material or Product suppliers or manufacturers to provide qualified staff personnel to observe site conditions, conditions of surfaces and installation, quality of workmanship, start-up of equipment, test, adjust, and balance of equipment as applicable, an to initiate instructions when necessary. B. Individual to report observations and site decisions or instructions given to applicators or installers that are supplemental or contrary to manufacturers' written instructions. C. Submit report in duplicate within 30 days of observation to Engineer for review. PART 2 - PRODUCTS (NOT USED) PART 3 - EXECUTION (NOT USED) ** END OF SECTION ** 01400-3 98518.01 SECTION 01410 TESTING AND TESTING LABORATORY SERVICES PART1- GENERAL 1.01 WORK INCLUDED A. The city will provide testing specifically indicated in the contract documents. B. The Owner may at any time during the progress of the work request additional testing beyond that which is specified in the Contract. This testing will be at the Owner's expense. The Contractor will assist the testing laboratory personnel in all ways so as to facilitate access to the location of the material or equipment to be tested. 1.02 RELATED REQUIREMENTS A. General Conditions: Inspections and testing required by laws, ordinances, rules, regulations, orders or approvals of public authorities. B. Respective sections of specifications: Certification of products. C. Testing laboratory inspection, sampling and testing is required for, but not limited to, the following: 1. Section 02100 - Site Preparation 2. Section 02221 - Excavation, Trenching, Backfilling and Embankment. 3. Section 02574 - Pavement Removal and Replacement 4. Section 03300 - Cast -In -Place Concrete 1.03 LIMITATIONS OF AUTHORITY OF TESTING LABORATORY A. Laboratory is not authorized to: 1. Release, revoke, alter, or enlarge on requirements of Contract Documents. 2. Approve or accept any portion of the Work. 3. Perform any duties of the Contractor. 01410-1 98518.01 1.04 CONTRACTOR'S RESPONSIBILITIES A. Cooperate with laboratory personnel, provide access to the Project and to manufacturer's operations. B. Secure and deliver to the laboratory adequate quantities of representational samples of materials proposed to be used and which require testing. C. Provide to the laboratory the preliminary design mix proposed to be used for concrete, and other material mixes which require control by the testing laboratory. D. Materials and equipment used in the performance of work under this Contract are subject to inspection and testing at the point of manufacture or fabrication. Standard specifications for quality and workmanship are indicated in the Contract Documents. The Engineer may require the Contractor to provide statements of certification from the manufacturers and fabricators that the materials and equipment provided by them are manufactured or fabricated in full accordance with the standard specifications for quality and workmanship indicated in the Contract Documents. All costs of this testing and providing statements and certificates shall be a subsidiary obligation of the Contractor, and no extra charge to the Owner shall be allowed on account of such testing and certification. E. Furnish incidental labor and facilities: 1. To provide access to work to be tested. 2. To obtain and handle samples at the project site or at the source of the product to be tested. 3. To facilitate inspections and tests. 4. For storage and curing the test samples. F. Notify laboratory sufficiently in advance of operations to allow for laboratory assignment of personnel and scheduling of tests. 1. When tests or inspections cannot be performed after such notice, reimburse Owner for laboratory personnel and travel expenses incurred due to the Contractor's negligence. G. Employ and pay for the services of the same or a separate, equally qualified independent testing laboratory to perform additional inspections, sampling and 01410-2 98518.01 1 testing required for the Contractor's convenience and as approved by the Engineer. H. If the test results indicate the material or equipment complies with the Contract Documents, the Owner shall pay for the cost of the testing laboratory. If the tests, and any subsequent retests, indicate the material and equipment fail to meet the requirements of the Contract Documents, the Contractor shall pay the laboratory costs incurred in such tests. PART 2 - PRODUCTS (NOT USED) PART 3 - EXECUTION (NOT USED) ** END OF SECTION ** 01410-3 98518.01 SECTION 01430 SOILS INVESTIGATION PART1- GENERAL 1.01 SOILS INFORMATION A. Following is a listing of current soils investigation information which will be made available to the Contractor upon request. Soils investigation information indicated as (Provided) will be given to Contractor along with Contract Documents. Reports that Relate to the Proposed Project at the Present Site Report Date Report Title 4-20-99 GEOTECHNICAL EXPLORATION PROPOSED WWTP VEHICLE AND MATERIAL STORAGE BUILDING REPORT NO. 57782 UNIVERSAL SCIENCES 8-4-99 ADDITIONALGEOTECHNICAL EXPLORATION PROPOSED DRY RETENTION POND REPORT NO. 73942 UNIVERSAL SCIENCES B. All soils investigation information was obtained only for Owner's use in design, and is not included as a part of the Contract Documents. C. Additional investigation: 1. Contractor shall visit site and acquaint itself with site conditions. 2. Prior to bidding, Contractor may make its own subsurface investigations and make its own determination regarding subsurface conditions. 01430-1 98518.01 3. Contractors are invited to conduct check surveys prior to bidding. No claim for additional compensation will be allowed due to difference in elevations encountered after Contract award. *** END OF SECTION *** 01430-2 L'I: : 1 SECTION 01500 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS PART1- GENERAL 1.01 REQUIREMENTS INCLUDED A. Temporary Utilities B. Temporary Controls C. Construction Facilities 1.02 RELATED REQUIREMENTS A. Section 01010 - Summary of Work B. Section 02100 - Site Preparation 1.03 ELECTRICITY, LIGHTING A. Provide and pay for power service required for construction operations, with branch wiring and distribution boxes located to allow service and lighting by means of construction -type power cords. 1.04 TEMPORARY VENTILATION A. Ventilate enclosed areas to assist cure of materials, to dissipate humidity, and to prevent accumulation of dust, fumes, vapors, or gases. 1.05 TEMPORARY WATER SERVICE A. Connect to existing water source for construction operations. B. Contractor will pay for cost of connection. Owner will pay for cost of water used. Exercise measures to conserve water. 1.06 SANITARY FACILITIES A. Provide and maintain required facilities and enclosures. 01500-1 98518.01 PART 2 - PRODUCTS (NOT USED PART 3 - EXECUTION (NOT USED) *** END OF SECTION *** 01500-2 98518.01 SECTION 01568 TEMPORARY EROSION AND SEDIMENTATION CONTROL PART1- GENERAL 1.01 DESCRIPTION A. Scope of work: The Work specified in this Section consists of designing, providing, maintaining and removing temporary erosion and sedimentation controls as necessary. 2. Temporary erosion controls include, but are not limited to, grassing, mulching, netting, watering and reseeding on-site surfaces and soil and borrow area surfaces, and providing interceptor ditches at end of berms and at those locations which will ensure that erosion during construction will be either eliminated or maintained within acceptable limits as established by the regulatory agencies having jurisdiction. Temporary sedimentation controls include, but are not limited to, silt dams, traps, barriers, and appurtenances at the foot of sloped surfaces which will ensure that sedimentation pollution will be either eliminated or maintained within acceptable limits as established by the regulatory agencies having jurisdiction. Contractor is responsible for providing effective temporary erosion and sediment control measures during construction or until final controls become effective. PART 2- PRODUCTS 2.01 EROSION CONTROL A. Seeding, mulching, and sodding is specified in Section 02480. B. Netting: Fabricated of material acceptable to the Owner. 01568-1 98518.01 2.02 SEDIMENTATION CONTROL A. Bales: Clean, seed -free cereal hay type. B. Netting: Fabricated of material acceptable to the Owner. C. Filter Stone: Crushed stone conforming to Florida Department of Transportation specifications. D. Concrete Block: Hollow, non -load bearing type. E. Concrete: Exterior grade not less than one inch thick. PART 3 - EXECUTION 3.01 EROSION CONTROL A. Minimum procedures for grassing are: 1. Scarify slopes to a depth of not less than six inches and remove large clods, rock, stumps, roots larger than 1/2 -inch in diameter and debris. 2. Sow seed within twenty-four (24) hours after the ground is scarified with either mechanical seed drills or rotary hand seeders. 3. Apply mulch loosely and to a thickness of between 3/4 -inch and 1 1/2 -inches. 4. Apply netting over mulched areas on sloped surfaces. 5. Roll and water seeded areas in a manner which will encourage sprouting of seeds and growing of grass. Reseed areas which exhibit unsatisfactory growth. Backfill and seed eroded areas. 3.02 SEDIMENTATION CONTROL A. Install and maintain silt dams, traps, barriers, and appurtenances as shown on the approved descriptions and working drawings. Hay bales which deteriorate and filter stone which is dislodged shall be replaced. 01568-2 98518.01 I I 3.03 PERFORMANCE A. Should any of the temporary erosion and sediment control measures employed by the Contractor fail to produce results which comply with the requirements of the regulatory agency having jurisdiction, the Owner or Engineer, Contractor shall immediately take whatever steps are necessary to correct the deficiency at his own expense. ** END OF SECTION ** 01568-3 98518.01 SECTION 01700 CONTRACT CLOSEOUT PART1- GENERAL 1.01 DESCRIPTION A. Scope of Work: Comply with requirements stated in Conditions of the Contract and in specifications for administrative procedures in closing out the Work. B. Related Requirements Described Elsewhere: 1. Conditions of the Contract. Fiscal provisions, legal submittals and additional administrative requirements. 2. Cleaning: Section 01710 3. Project Record Documents: Section 01720 4. The respective sections of specifications: Closeout Submittals Required of Trades 1.02 SUBSTANTIAL COMPLETIONS A. When Contractor considers the Work as substantially complete, he shall submit to the Engineer. 1. A written notice that the Work, or designated portion thereof, is substantially complete. 2. A list of items to be completed or corrected. B. Within a reasonable time after receipt of such notice, the Engineer will make an inspection to determine the status of completion. C. Should the Engineer determine that the Work is not substantially complete: 1. The Engineer will promptly notify the Contractor in writing, giving the reasons therefor. 2. Contractor shall remedy the deficiencies in the Work and send a second written notice of substantial completion to the Engineer. 01700-1 98518.01 3. The Engineer will reinspect the Work. D. When the Engineer finds that the Work is substantially complete, he will: 1. Prepare and deliver to Owner a tentative Certificate of Substantial Completion on form provided herein, with a tentative list of items to be completed or corrected before final payment. 2. After consideration of any objections made by the Owner as provided in Conditions of the Contract, and when the Engineer considers the Work substantially complete, he will execute and deliver to the Owner and the contractor a definite Certificate of Substantial Completion with a revised tentative list of items to be completed or corrected. 1.03 FINAL INSPECTION A. When Contractor considers the Work is complete, he shall submit written certification that: Contract Documents have been reviewed. 2. Work has been inspected for compliance with Contract Documents. 3. Work has been completed in accordance with Contract Documents. 4. Equipment and systems have been tested in the presence of the Owner's representative and are operational. B. The Engineer will make an inspection to verify the status of completion with reasonable promptness after receipt of such certification. C. Should the Engineer consider that the Work is incomplete or defective: 1. The Engineer will promptly notify the Contractor in writing, listing the incomplete or defective work. 2. Contractor shall take immediate steps to remedy the stated deficiencies, and send a second written certification to the Engineer that the Work is complete. 3. The Engineer will reinspect the Work. D. When the Engineer finds that the Work is acceptable under the Contractor Documents, he shall request the Contractor to make closeout submittals. 01700-2 98518.01 1.04 CONTRACTOR'S CLOSEOUT SUBMITTALS TO ENGINEER A. Evidence of compliance with requirements of governing authorities. B. Project Record Documents: To requirements of Section 01720. C. Warranties and Bonds: To requirements of Section 01740. D. Evidence of Payment and Release of Liens: To requirements of General and Supplementary Conditions. E. Certificate of Insurance for Products and Completed Operations. 1.05 FINAL ADJUSTMENT OF ACCOUNTS A. Submit a final statement of accounting to the Engineer. B. Statement shall reflect all adjustments to the Contract Sum: 1. The original Contract Sum. 2. Additions and deductions resulting from: a. Previous change orders or written amendment. b. Allowances. C. Unit prices. d. Deductions for uncorrected work. e. Penalties and bonuses. f. Deductions for liquidated damages. g. Deductions for reinspection payments. h. Other adjustments. 3. Total Contract Sum, as adjusted. 4. Previous payments. 01700-3 98518.01 5. Sum remaining due. C. Engineer will prepare a final Change Order, reflecting approved adjustments to the Contract Sum which were not previously made by Change Orders. 1.06 FINAL APPLICATION FOR PAYMENT A. Contractor shall submit the final Application for Payment in accordance with procedures and requirements stated in the Condition as of the Contract. PART 2 - PRODUCTS (NOT USED) PART 3 - EXECUTION (NOT USED) *** END OF SECTION *** 01700-4 98518.01 SECTION 01710 CLEANING PART1- GENERAL 1.01 WORK INCLUDED A. Execute cleaning during progress of the work and at completion of the work, as required by General Conditions to leave the site in a neat and satisfactory condition as determined by the Engineer. 1.02 RELATED REQUIREMENTS A. General Conditions 1.03 DISPOSAL REQUIREMENTS A. Conduct cleaning and disposal operations to comply with codes, ordinances, regulations, and anti -pollution laws. B. Contractors shall have all required permits in hand which are required by the fire authority having jurisdiction over the site before any burning takes place. PART 2- PRODUCTS 2.01 MATERIALS A. Use only those cleaning materials which will not create hazards to health or property and which will not damage surfaces. B. Use only those cleaning materials and methods recommended by the manufacturer of the surfaced material to be cleaned. C. Use cleaning materials only on surfaces recommended by cleaning material manufacturer. PART 3- EXECUTION 3.01 DURING CONSTRUCTION A. Execute periodic cleaning to keep the work, the site and adjacent properties free from accumulations of waste materials, rubbish and windblown debris, resulting from construction operations. 01710-1 98518.01 B. Provide on-site containers for the collection of waste materials, debris and rubbish. C. Remove waste materials, debris and rubbish form the site periodically and dispose of at legal disposal areas away from the site. D. As the Engineer deems necessary, he may direct the Contractor to remove waste material, rubbish or debris from the site or to temporarily relocate said material until disposal. 3.02 DUST CONTROL A. Clean interior spaces prior to the start of finish painting and continue cleaning on an as -needed basis until painting is finished. B. Schedule operations so that dust and other contaminants resulting from cleaning process will not fall on wet or newly -coated surfaces. 3.03 FINAL CLEANING A. Employ skilled workmen for final cleaning. B. Remove grease, mastic, adhesives, dust, dirt, stains, fingerprints, labels, and other foreign materials form sight -exposed interior and exterior surfaces. C. Broom clean exterior paved surfaces; rake clean other surfaces of the grounds. D. The work shall be left in a condition as shown on the Drawings and the remainder of the site shall be restored to a condition equal or better than what existed before the work. E. Prior to final completion, or Owner occupancy, Contractor shall conduct an inspection for interior and exterior surfaces, and all work areas to verify that the entire work is clean. F. The Owner and/or Engineer shall determine if the final cleaning is acceptable. *** END OF SECTION*** 01710-2 98518.01 SECTION 01720 PROJECT RECORD DOCUMENTS PART1- GENERAL 1.01 DESCRIPTION A. Scope of Work: Maintain at the site for the Owner one record copy of: 1. Drawings 2. Specifications 3. Addenda 4. Change Orders and other modifications of the Contract 5. Engineer's Field Orders or written instructions 6. Approved Shop Drawings, Working Drawings and Samples 7. Field test records 8. Required permits B. Related Requirements Described Elsewhere: I . Application for Payments - Section 01027 1.02 MAINTENANCE OF DOCUMENTS AND SAMPLES A. Store documents and samples in Contractor's field office apart from documents used for construction. 1. Provide files and racks for storage of documents 2. Provide locked cabinet or secure storage space for storage of samples B. File documents and samples in accordance with CSI format with section numbers as provided herein. C. Maintain documents in a clean, dry, legible, conditions and in good order. Do not use record documents for construction purposes. 01720-1 98518.01 D. Make documents and samples available at all times for inspection by the Engineer and Owner. E. As a prerequisite for monthly progress payments, the Contractor is to exhibit the currently updated 'Record Documents" for review by the Engineer and Owner. 1.03 MARKING DEVICES A. Provide felt tip marking pens for recording information in the color code designated by the Engineer. 1.04 RECORDING A. Label each document 'PROJECT RECORD" in neat large printed letters. B. Record information concurrently with construction progress. 1. Do not conceal any work until required information is recorded. C. Drawings: Legibly mark to record actual construction: 1. Depths of various elements of foundation in relation to finish first floor datum. 2. All underground piping with elevations and dimensions. Changes in piping location. Horizontal and vertical locations of underground utilities and appurtenances, referenced to permanent surface improvements. Actual installed pipe material, class, etc. 3. Location of internal utilities and appurtenances concealed in the construction, referenced to visible and accessible features of the structure. 4. Field changes of dimension and detail. 5. Changes made by Field Order or by Change Order. 6. Details not on original Contract Drawings. 7. Equipment and piping relocations. 8. Major architectural and structural changes including relocation of doors, windows, etc. 01720-2 98518.01 9. Architectural schedule changes according to Contractor's records and shop drawings. D. Specifications and Addenda: Legibly mark each section to record: 1. Manufacturer, trade name, catalog number of supplier of each product and item of equipment actually installed. E. Shop Drawings (after final review and approval): Provide five sets of record drawings for process equipment, piping, electrical systems and instrumentation systems. 1.05 SUBMITTAL A. At Contract closeout, deliver Record Documents to the Engineer for the Owner. B. At the end of the project submit to the Engineer one (1) set of "as -built" mylars and five (5) sets of "as -built bluelines", 24" x 36", showing specific locations, depths, etc. of all construction as located by a registered land surveyor licensed in the State of Florida. Blueline drawings shall be signed and scaled by the registered land surveyor. PART 2 - PRODUCTS (NOT USED) PART 3 - EXECUTION (NOT USED) ** END OF SECTION ** 01720-3 98518.01 SECTION 01730 OPERATING AND MAINTENANCE DATA PART1- GENERAL 1.01 DESCRIPTION A. Scope of Work: 1. Compile product data and related information appropriate for Owner's maintenance and operation of products furnished under Contract. a. Prepare operating and maintenance data as specified in this Section and as referenced in other pertinent Sections of Specifications. 2. Instruct Owner's personnel in maintenance of products and in operation of equipment and systems. B. Related Requirements Described Elsewhere: 1. Special Project Procedures: Section 01030 2. Project Record Documents: Section 01720 3. Warranties and Bonds: Section 01740 1.02 QUALITY ASSURANCE A. Preparation of data shall be done by personnel: 1. Trained and experienced in maintenance and operation of described products. 2. Familiar with requirements of this Section. 3. Skilled in technical writing to the extent required to communicate essential data. 4. Skilled in drafting and competent to prepare required drawings. 01730-1 98518.01 1.03 FORM OF SUBMITTALS A. Prepare data in form of an instructional manual for use by Owner's personnel. B. Format: 1. Size: 8-1/2 inches X 11 inches. 2. Paper: 20 pound minimum, white, for typed pages. 3. Text: Manufacturer's printed data, or neatly typewritten. 4. Drawings: a. Provide reinforced punched binder tab, bind in with text. b. Reduce larger drawings and fold to size of text pages but not larger than 11 inches by 17 inches. 5. Provide fly -leaf for each separate product, or each piece of operating equipment. a. Provide typed description of products and major component parts of equipment. b. Provide indexed tabs. 6. Cover: Identify each volume with typed or printed title "OPERATING AND MAINTENANCE INSTRUCTIONS". List the following: a. Title of Project. b. Identity of separate structures as applicable. C. Identity of general subject matter covered in the manual. C. Binders: 1. Commercial quality three -post binders with durable and cleanable plastic covers. 2. Maximum post width: 2 inches. 01730-2 98518.01 1.04 3. When multiple binders are used, correlate the data into related consistent groupings. CONTENT OF MANUAL A. Neatly typewritten table of contents for each volume, arranged in systematic order. 1. Contractor, name of responsible principal, address and telephone number. 2. A list of each product required to be included, indexed to content of the volume. 3. List with each product, name, address and telephone number of subcontractor or installer and local source of service and spare parts. 4. Identify each product by product name and other identifying symbols as set forth in Contract Documents. B. Product Data: 1. Include only those sheets which are pertinent to the specific product. 2. Annotate each sheet to: a. Clearly identify specific product or part installed. b. Clearly identify data applicable to installation. C. Delete references to inapplicable information. C. Drawings: 1. Supplement product data with drawings as necessary to clearly illustrate: a. Relation of component parts and systems. b. Control and flow diagrams. 2. Coordinate drawings with information in Project Record Documents to assure correct illustration of completed installation. 3. Do not use Project Record Documents as maintenance drawings. 01730-3 98518.01 D. Written text, as required to supplement product data for the particular installation. 1. Organize in consistent format under separate headings for different procedures. 2. Provide logical sequence of instructions of each procedure. E. Copy of each warranty, bond and service contract issued. 1. Provide information sheet for Owner's personnel listing the following: a. Proper procedures in event of failure. b. Instances which might affect validity of warranties or bonds. 1.05 MANUAL FOR MATERIALS AND FINISHES A. Submit five copies of complete manual in final form. B. Content for architectural products, applied materials and finishes: 1. Manufacturer's data, giving full information on products. a. Catalog number, size, composition. b. Color and texture designations. C. Information required for reordering special manufactured products. 2. Instructions for care and maintenance. a. Manufacturer's recommendation for types of cleaning agents and methods. b. Cautions against cleaning agents and methods which are detrimental to product. C. Recommended schedule for cleaning and maintenance. C. Content for moisture protection and weather -exposed products: 1. Manufacturer's data, giving full information on products. 01730-4 98518.01 1.06 0 a. Applicable standards. b. Chemical composition. C. Details of installation. 2. Instructions for inspection, maintenance and repair. MANUAL FOR EQUIPMENT AND SYSTEMS Submit five copies of complete manual in final form. Content, for each unit of equipment and system, as appropriate: 1. Description of unit and component parts. a. Function, normal operating characteristics, and limiting conditions. b. Performance curves, engineering data and tests. C. Complete nomenclature and commercial number of replaceable parts. 2. Operating procedures: a. Start-up, break-in, routine and normal operating instructions. b. Regulation, control, stopping, shut -down and emergency instructions. C. Summer and winter operating instructions. d. Special operating instructions. 3. Maintenance procedures: a. Routine operations. b. Guide to "trouble -shooting". C. Disassembly, repair and reassembly. d. Alignment, adjusting and checking. 4. Servicing and lubrication required. 01730-5 98518.01 5. Manufacturer's printed operating and maintenance instructions. 6. Description of sequence of operation by control manufacturer. 7. Original manufacturer's part list, illustrations, assembly drawings and diagrams required for maintenance. 8. As -installed control diagrams by controls manufacturer. 9. Each contractor's coordination drawings. a. As -installed color coded piping diagrams. 10. Charts of valve tag numbers, with location and function of each valve. 11. List of original manufacturer's spare parts, manufacturer's current prices and recommended quantities to be maintained in storage.. 12. Other data as required under pertinent sections of specifications. C. Content for each electric and electronic system, as appropriate: 1. Description of system and component parts. a. Function, normal operating characteristics, and limiting conditions. b. Performance curves, engineering data and tests. C. Complete nomenclature and commercial number of replaceable parts. 2. Circuit directories of panel boards. a. Electrical service. b. Controls. C. Communications. 3. As installed color coded wiring diagrams. 4. Operating procedures. 01730-6 98518.01 a. Routine and normal operating instructions. b. Sequences required. C. Special operating instructions. 5. Maintenance procedures: a. Routine operations. b. Guide to "trouble -shooting. C. Disassembly, repair and reassembly. d. Adjustment and checking. 6. Manufacturer's printed operating and maintenance instructions. 7. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage. 8. Other data as required under pertinent sections of specifications. D. Prepare and include additional data when the need for such data becomes apparent during instruction of Owner's personnel. 1.07 SUBMITTAL SCHEDULE A. Submit two copies of preliminary draft of proposed formats and outlines of contents of Operation and Maintenance Manuals within 30 days after Notice to Proceed. I 1. The Engineer will review the preliminary draft and return one copy with comments. B. Submit two copies of complete data in final form no later than the Substantial Completion date. Following the Engineer's review of the last shop drawing and/or other submittal one copy will be returned with comments to be incorporated into final copies. C. Submit five (5) copies of approved manual in final form to the Engineer prior to Final Completion inspection. 01730-7 98518.01 1.08 INSTRUCTION OF OWNER'S PERSONNEL A. Prior to final inspection or acceptance, fully instruct Owner's designated operating and maintenance personnel in operation, adjustment and maintenance of products, equipment and systems. B. Operating and maintenance manual shall constitute the basis of instruction. Review contents of manual with personnel in full detail to explain all aspects of operations and maintenance. PART 2 - PRODUCTS (NOT USED) PART 3 - EXECUTION (NOT USED) *** END OF SECTION *** 01730-8 98518.01 SECTION 01740 WARRANTIES AND BONDS PART 1- GENERAL 1.01 DESCRIPTION A. Scope of Work: 1. Compile specified warranties and bonds, as specified in these Specifications. 2. Co -execute submittals when so specified. 3. Review submittals to verify compliance with Contract Documents. 4. Submit to the Engineer for review and transmittal to Owner. B. Related Work Described Elsewhere: 1. Conditions of the Contract. 2. Special Project Procedures: Section 01030 1.02 SUBMITTAL REQUIREMENTS A. Assembly warranties, bonds and service and maintenance contracts, executed by each of the respective manufacturers, suppliers, and subcontractors. B. Provide four (4) original signed copies. C. Table of Contents: Neatly typed, in orderly sequence. Provide complete information for each item. 1. Product of work item. 2. Firm, with name of principal, address and telephone number. 3. Scope. 4. Date of beginning of warranty, bond or service and maintenance contract. 5. Duration of warranty, bond or service and maintenance contract. 01740-1 98518.01 6. Provide information for Owner's personnel: a. Proper procedure in case of failure. b. Instances which might affect the validity or warranty or bond. 7. Contractor, name of responsible principal, address and telephone number. 1.03 FORM OF SUBMITTALS A. Prepare in quadruplicate packets. B. Format: 1. Size: 8-1/2 inches X 11 inches with punched sheets for standard three -post binder. a. Fold larger sheets to fit into binders. 2. Cover: Identify each packet with typed or printed title "WARRANTIES AND BONDS". List the following: a. Title of Project. b. Name of Contractor. C. Binders: commercial quality, three -post binder, with durable and cleanable plastic covers and maximum post width of two inches. 1.04 WARRANTY SUBMITTALS REQUIREMENTS A. For all major pieces of equipment, submit a warranty from the equipment manufacturer. The manufacturer's warranty period shall be concurrent with the Contractor's for one (1) year, unless otherwise specified, commencing at the time of final acceptance by the Owner. B. The Contractor shall be responsible for obtaining certificates of equipment warranty for all major equipment items specified under Divisions 11, 13, 14, 15 and 16 and for equipment items which have at least a I hp motor or which list for more than $1,000. The Engineer reserves the right to request warranties for equipment not classified as major. The Contractor shall still warrant equipment not considered to be "major" in the Contractor's one-year warranty period even though certificates of warranty may 01740-2 98518.01 not be required. C. In the event that the equipment manufacturer or supplier is unwilling to provide a one-year warranty commencing at the date of final completion, the Contractor shall obtain from the manufacturer a two (2) year warranty commencing at the time of equipment delivery to the job site. This two-year warranty from the manufacturer shall not relieve the Contractor of the one-year warranty starting at the time of final completion. D. The Owner shall incur no labor or equipment cost during the guarantee period. E. Guarantee shall cover all necessary labor, equipment and replacement parts resulting from faulty or inadequate design, improper assembly or erection, defective workmanship and materials, leakage, breakage or other failure of all equipment and components furnished by the manufacturer. PART 2 - PRODUCTS (NOT USED) PART 3 - EXECUTION (NOT USED) ** END OF SECTION ** 01740-3 98518.01 SECTION 08331 OVERHEAD ROLL -UP DOORS PART 1 GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required and install door as shown on the Drawings and as specified herein. Roll -up type, overhead steel door, insulated, with insulated vision lites and with manual operation. 1.02 RELATED WORK A. Finish painting is included in Section 09902. 1.03 SUBMITTALS A. Submit to the ENGINEER as provided in Section 01300, complete shop drawing, working drawings, and product data including dimensions, locations, materials, construction, tracks, hardware, bracing, manual operator specifications, door guides, appurtenances and installation details of door proposed. 1.04 DELIVERY, STORAGE AND HANDLING A. Deliver materials in MANUFACTURER'S original, undamaged protective coverings with labels legible and intact. Store materials in protective coverings in a manner to prevent damage from the environment and construction operations. B. Handle in accordance with the MANUFACTURER's instructions. PART PRODUCTS 2.01 GENERAL A. Exterior door and components shall withstand wind pressures, both positive and negative and salient corner conditions as calculated in accordance with the Building Code to meet project wind loading. B. Provide additional, non-standard door bracing, reinforcements, or heavier gauge materials required to conform to wind load. City Of Ocoee 08331-1 G&R Project No. 98518.01 2.02 OVERHEAD ROLL -UP DOOR A. Roll -up doors shall be mounted on the inside wall, equal to Model T23PS, thermal series slat T3 as manufactured by Atlas Roll -lite Door Corp., equal by Cookson, Cornell or equal. Curtain shall be of interlocking slats of formed, galvanized steel with baked coat of primer paint sheet. Slats shall give curtain adequate strength to safely resist wind load specified. Each slat shall be formed of two layers of galvanized steel sheet enclosing an 11/16 -in foamed in placed layer of polyurethane insulation. Slats shall have galvanized malleable iron endlocks locking each end of every slat and to act as wearing surface and maintain slat alignment. Provide windlocks of same material as requried to meet wind load specified. B. The counterbalance, coil brackets, and hood shall be fabricated in accordance with the Manufacturer's standard practice. The coil shall be housed in a 24 gauge galvanized steel hood. Guides shall be fabricated of steel of a minimum 3/16 -inch thickness and with sufficient depth to retain the curtains in the guides against the wind load specified. Guides shall be provided with anchors and continuous weld on wind lock bars and shall be galvanized steel. Finish shall match the slats. C. Close space around hood barrel with an inside, neoprene air baffle attached to hood connection. Air baffle shall extend full length of barrel. Provide neoprene sealing strips on both guides. D. Bottom Bar: Curtain shall be reinforced with a bottom bar consisting of two steel angles. E. Weather Seal: Provide interwoven neoprene astragal at the bottom bar to act as a weatherseal at the floor. F. Spring Counterbalance 1. Counterbalance shall be housed in a steel pipe of diameter and wall thickness to restrict maximum deflection of .03" per foot. 2. Springs shall be Helical Torsion Type designed to include an overload factor of 25% and for optimum ease of operation. Springs are to be grease packed and are to be mounted on a cold rolled steel inner shaft. G. Hand Chain: Pull not to exceed 35 lbs. H. Spring tension shall be adjustable from outside of end bracket plate. City Of Ocoee 08331-2 G&R Project No. 98518.01 I. Ball bearings shall be sealed to minimize wear of pipe shaft rotation around inner shaft. J. Insulated Vision Lites shall be of clear double clear acrylic plastic sections over individual cut outs 5" wide by'/d' high in sets of three cut outs one slat high, 3 cut outs wide (standard accessory by Atlas Door Corporation.) 2.03 FINISH A. Exterior and interior galvanized steel primer coat color shall be as selected by the Engineer from manufacturer's standard color charts. Doors shall be field painted as specified in Division 9. B. All steel components and (where noted) hardware shall be galvanized. Galvanizing shall be of zinc applied by a hot -dipped process. Structural shapes and similar heavy steel shall be galvanized per ASTM A123 and A153 as applicable. Provide a phosphate coating for paint adhesion at the factory. The Manufacturer's certificate shall be furnished to the Engineer stating that galvanizing has been done in accordance with specifications. Galvanized components shall be shipped with no additional surface treatment for priming and finishing in the field. PART 3 EXECUTION 3.01 INSTALLATION A. Overhead roll -up doors shall be installed where indicated, and in accordance with the Manufacturer's printed installation instructions. The installation of the doors shall conform to the methods and materials utilized in testing the doors for Code approval. Horizontal lines shall be level, and vertical lines shall be plumb. Anchors for guides, brackets, and other fasteners shall be located where indicated. 3.02ADJUSTING AND CLEANING A. Adjusting and cleaning shall consist of ensuring smooth operation, lubricating and testing the overhead doors in manual operations to the satisfaction of the Engineer. Overhead coiling doors shall operate smoothly, quietly, and without squeaking and binding as approved. B. Make adjustments required and retest until approved. END OF SECTION City Of Ocoee 08331-3 G&R Project No. 98518.01 APPENDIX A St. Johns Water Management District Stormwater Permit C REGULATION OF STORMWATER MANAGEMENT SYSTEMS CHAPTER 40C-42, F.A.C. PERMIT NO. 42-095-2128NGM-ERP DATE ISSUED Sept. 3 1999 AUTHORIZATION: A modification to an existing system with stormwater treatment by retention to serve Vehicle and Material Storage, a 2.25 acre project to be constructed as per plans received by the District on June 29, 1999 and as amended by sheet(s)C-4, C-5, and C-8, received by the District on August 6, 1999. LOCATION Section: 9 Township: 22 Range: 28 County Name: Orange ISSUED TO: City of Ocoee 150 N. Lakeshore Drive Ocoee, FI 32761 This document shall serve as the formal permit for construction and operation of stormwater management system in accordance with Chapter 40C-42, F.A.C., issued by the staff of the St. Johns River Water Management District on 9/3/1999. This permit is subject to the standard limiting conditions and other special conditions approved by the staff. These conditions are enclosed. This permit is a legal document and should be kept with your other important records. The permit requires the submittal of an As -built certification and may require submittal of other documents. All information provided in compliance with permit conditions should be submitted to the District office from which the permit was issued. An As -built certification form is attached. Complete this form within 30 days of completion of construction of the permitted system, including all site work. Upon receipt of the As -built certification, staff will inspect the project site. Once the project is found to be in compliance with all permit requirements, the permit may be converted to its operation phase and responsibility transferred to the operation and maintenance entity in accordance with chapter 40C- 42.028, F.A.C. Permit issuance does not relieve you from the responsibility for obtaining permits from any federal, Dan Roach, CHAIRMAN Duane Otten StFOer, TREASURER otic Mason, SECRETARY William Kerr FERNANDINA BEACH SNTRERWID ST ADODSTINE e0VE� Reid Hughes Jeff K. Jennings William M. Segal omethas D. Long Clay Albright ` .1, IAaR1DA pueEAw MAITLANO MAITIAND APOPRA EASTI WEIR ., � �rrsire Nenry o..n, E..ulDU.aw F�mcW" John R WMN, AcaNW6 dnclw POST OFFICE BOX 1429 PALATKA, FLORIDA 32178-1429 500 TELEPHONESUNCOM 004-50134500 �50 � SUNCOM 660445D FAX(ExccW+e) 320 Al 25 (Lt9c932FUa5 (Penn85n9) 329-4315 (AAminlstneonlF4Mnp) 320.4508 SERVICE CENTERS 618 E Sal, Stoo 7775BtymttBOWtmy PERMITTING: CPERATIONS: 305 EW on� 2133 N. VAWrn Ra OrWdo. Fbt18532801 407497-4300 S UIV 102 Jttloar.Yt. FW& 32256 MtDaAro. Fb 32904 Mebwmb, FbrM, 32975-/09 TDD 407497-980 904 N30 o 407464-4940 407-752-3100 TDO 407-752-4102 TDD 904446-79DO Too 407.772.,788 REGULATION OF STORMWATER MANAGEMENT SYSTEMS CHAPTER 40C-42, F.A.C. PERMIT NO. 42-095-2128NGM-ERP DATE ISSUED Sept. 3 1999 AUTHORIZATION: A modification to an existing system with stormwater treatment by retention to serve Vehicle and Material Storage, a 2.25 acre project to be constructed as per plans received by the District on June 29, 1999 and as amended by sheet(s)C-4, C-5, and C-8, received by the District on August 6, 1999. LOCATION Section: 9 Township: 22 Range: 28 County Name: Orange ISSUED TO: City of Ocoee 150 N. Lakeshore Drive Ocoee, FI 32761 This document shall serve as the formal permit for construction and operation of stormwater management system in accordance with Chapter 40C-42, F.A.C., issued by the staff of the St. Johns River Water Management District on 9/3/1999. This permit is subject to the standard limiting conditions and other special conditions approved by the staff. These conditions are enclosed. This permit is a legal document and should be kept with your other important records. The permit requires the submittal of an As -built certification and may require submittal of other documents. All information provided in compliance with permit conditions should be submitted to the District office from which the permit was issued. An As -built certification form is attached. Complete this form within 30 days of completion of construction of the permitted system, including all site work. Upon receipt of the As -built certification, staff will inspect the project site. Once the project is found to be in compliance with all permit requirements, the permit may be converted to its operation phase and responsibility transferred to the operation and maintenance entity in accordance with chapter 40C- 42.028, F.A.C. Permit issuance does not relieve you from the responsibility for obtaining permits from any federal, Dan Roach, CHAIRMAN Duane Otten StFOer, TREASURER otic Mason, SECRETARY William Kerr FERNANDINA BEACH SNTRERWID ST ADODSTINE e0VE� Reid Hughes Jeff K. Jennings William M. Segal omethas D. Long Clay Albright ` .1, IAaR1DA pueEAw MAITLANO MAITIAND APOPRA EASTI WEIR ., � 42-095-2128NGM-ERP City of Ocoee September 3, 1999 1. This permit for construction will expire 5 years from the date of issuance unless otherwise specified by a special condition of the permit. 2. Permittee must obtain a permit from the District prior to beginning construction of subsequent phases of any other work associated with this project not specifically authorized by this permit. 3. Stormwater retention and detention storage must be excavated to rough grade prior to building construction or placement of impervious surface within the area served by those systems. Adequate measures must be taken to prevent siltation of these treatment systems and control structures during construction or siltation must be removed prior to final grading and stabilization. 4. The permittee must maintain a copy of this permit complete with all conditions, attachments, exhibits, and permit modifications in good condition at the construction site. The complete permit must be available for review upon request by District representatives. The permittee shall require the contractor to review the complete permit prior to commencement of the activity authorized by this permit. 1 5. All activities shall be implemented as set forth in the plans, specifications, and performance criteria as approved by this permit. Any deviation from the permitted activity and the conditions for undertaking that activity shall be considered a violation of this permit. 6. District authorized staff, upon proper identification, must be granted permission to enter, inspect, and observe the system to insure conformity with the plans and J specifications approved by the permit. 7. Prior to and during construction, the permittee shall implement and maintain all erosion and sediment control measures (best management practices) required to retain sediment on-site and to prevent violations of state water quality standards. All practices must be in accordance with the guidelines and specifications in Chapter 6 of the Florida Land Development Manual: A Guide to Sound Land and Water Management (Florida Department of Environmental' Regulation 1988), which are hereby incorporated by reference, unless a project d specific erosion and sediment control plan is approved as part of the permit, in 1 which case the practices must be in accordance with the plan. If site specific conditions require additional measures during any phases of construction or operation to prevent erosion or control sediment, beyond those specified in the erosion and sediment control plan, the permittee shall implement additional best management practices as necessary, in accordance with the specifications in Chapter 6 of the Florida Lane Development Manual: A Guide to Sound Land and Water Management (Florida Department of Environmental Regulation 1988). The permittee shall correct any erosion or shoaling that causes adverse impacts to the water resources. 8. If the permitted system was designed by a registered professional, within 30 days after completion of the stormwater system, the permittee must submit to the District the following: District Form EN -45 (As Built Certification By a Registered Professional), signed and sealed by an appropriate professional registered in the State of Florida, and two sets of "As Built" drawings when a) required by a special condition of this permit, b) the professional uses "As Built" drawings to support the As -Built Certification, or c) when the completed system substantially differs from permitted plans. This submittal will serve to notify the District staff that the system is ready for inspection and approval. 9. If the permitted system was not designed by a registered professional within 30 days after completion of the stormwater system, the permittee must submit to the District the following: District Form EN -44 (As Built Certification), signed by the permittee and two sets of "As Built" drawings when required by a special condition of this permit, or when the completed system substantially differs from permitted plans. This submittal will serve to notify the District staff that the system is ready for inspection and approval. 10. Stabilization measures shall be initiated for erosion and sediment control on disturbed areas as soon as practicable in portions of the site where construction activities have temporarily or permanently ceased, but in no case more than seven (7) days after the construction activity in that part of the site has temporarily or permanently ceased. 11. Should any other regulatory agency require changes to the permitted system, the permittee shall provide writtennotification to the District of the changes prior to implementation so that a determination can be made whether a permit modification is required. 12. Within thirty days after sale or conveyance of the permitted stormwater management system or the real property on which the system is located, the owner in whose name the permit was granted shall notify the District of such change of ownership. Transfer of this permit shall be in accordance with the provisions of Section 40C-1.612, Florida Administrative Code. All terms and conditions of this permit shall be binding upon the transferee. The permittee transferring the permit shall remain liable for any corrective actions that may be required as a result of any permit violations prior to such sale, conveyance of other transfer. 13. The stormwater management system must be completed in accordance with the permitted plans and permit conditions prior to the initiation of the permitted use of site infrastructure. The system must be complete in accordance with the permitted plans and permit conditions prior to transfer of responsibility for operation and maintenance of the stormwater management system to a local government of other responsible entity. 14. The operation phases of the permit shall not become effective until the requirements of Conditions No. 8 or 9 have been met, the District determines that the system complies with the permitted plans, and the entity approved by the District in accordance with Section 40C-42.027, F.A.C., accepts responsibility for operation and maintenance of the system. The permit cannot be transferred to such an approved responsible operation and maintenance entity until the requirements of Section 40C-42.028, F.A.C., are met and the operation phase of the permit becomes effective. Following inspection and approval of the permitted system by the District in accordance with Section 40C-42.0-28, F.A.C., the permittee shall request transfer of the permit to the responsible approved operation and maintenance entity, if different from the permittee. Until the permit is transferred pursuant to Subsection 40C-42.028(4), F.A.C., the permittee shall be liable for compliance with the terms of the permit. 15. Prior to lot or unit sales, or upon completion of construction of the system, whichever occurs first, the District must receive a final operation and maintenance document(s) approved by the District and recorded, if the latter is appropriate. For those systems which are proposed to be maintained by county or municipal entities, final operation and maintenance documents must be received by the District when maintenance and operation of the system is accepted by the local government entity. Failure to submit the appropriate final document will result in the permittee remaining personally liable for carrying out maintenance and operation of the permitted system. 16. This permit does not eliminate the necessity to obtain any required federal, state, local and special district authorizations prior to the start of any activity approved by this permit. This permit does not convey to the permittee or create in the permittee any property right, or any interest in real property, nor does it authorize any entrance upon or activities on property which is not owned or controlled by the permittee, or convey any rights or privileges other than those specified in the permit and Chapter 40C-42, F.A.C. i 17. The permittee shall hold and save the District harmless from any and all damages, claims, or liabilities which may arise by reason of the activities, f authorized by the permit or any use of the permitted system. 1 18. The permittee shall immediately notify the District in writing of any previously submitted information that is later discovered to be inaccurate. 19. Activities approved by this permit shall be conducted in a manner which do not cause violations of state water quality standards. 20. All wetland areas or water bodies that are outside the specific limits of construction authorized by this permit must be protected from erosion, siltation, scouring or excess turbidity, and dewatering. 21. The operation and maintenance entity shall submit inspection reports to the District two years after the operation phase permit becomes effective and every two years thereafter on District form EN46. The inspection form must be signed and sealed by an appropriate registered professional. 22. Prior to construction, the permittee must clearly designate the limits of construction on-site. The permittee must advise the contractor that any work outside the limits of construction, including clearing, may be a violation of this permit. NOTICE OF RIGHTS 1. A person whose substantial interests are or may be determined has the right to request an administrative hearing by filing a written petition with the St. Johns River Water Management District (District), or may chose to pursue mediation as an alternative remedy under Sections 120.569 and 120.573, Florida Statutes, before the deadline for filing a petition. Choosing mediation will not adversely affect the rights to a hearing if mediation does not result in a settlement. The procedures for pursuing mediation are set forth in Sections 120.569 and 120.57, Florida Statutes, and Rules 28- 106.111 and 28-106.401-.405, Florida Administrative Code. Pursuant to Chapter 28-106 and Rule 40C-1.1007, Florida Administrative Code, the petition must be filed at the office of the District Clerk at District Headquarters, P. O. Box 1429 Palatka, Florida 32178-1429 (4049 Reid St., Palatka, FL 32177) within twenty-six (26) days of the District depositing notice of District decision in the mail (for those 1 persons to whom the District mails actual notice) or within twenty-one (21) days of newspaper publication of the notice of District decision (for those persons to whom the District does not mail actual notice). A petition must comply with Chapter 28-106, Florida Administrative Code. I 2. If the Governing Board takes action which substantially differs from the notice of District decision to grant or deny the permit application, a person whose substantial interests are or may be determined has the right to request an administrative hearing or may chose to pursue mediation as an alternative remedy as described above. Pursuant to District Rule 40C-1.1007, Florida Administrative Code, the petition must be filed at the office of the District Clerk at the address described above, within twenty-six (26) days of the District depositing notice of final District decision the mail (for those persons to whom i the District mails actual notice) or within twenty-one (21) days of newspaper publication of the notice of its final agency action (for those persons to whom the District does not mail actual notice). Such a petition must comply with Rule Chapter 28-106, Florida Administrative Code. 3. A substantially interested person has the right to a formal administrative hearing pursuant to Sections 120.569 and 120.57(1), Florida Statutes, where there is a dispute between the District and the parry regarding an issue of material fact. A petition for formal hearing must comply with the requirements set 'I forth in Rule 28-106.201, Florida Administrative Code. 4. A substantially interested person has the right to an informal hearing pursuant to Sections 120.569 and 120.57(2), Florida Statutes, where no material facts are in dispute. A petition for an informal hearing must comply with the requirements set forth in Rule 28-106.301, Florida Administrative Code. 5. A petition for an administrative hearing is deemed filed upon delivery of the petition to the District Clerk at the District Headquarters in Palatka, Florida. 6. Failure to file a petition for an administrative hearing, within the requisite time frame shall constitute a waiver of the right to an administrative hearing -(Section 28-106.111, Florida Administrative Code). 7. The right to an administrative hearing and the relevant procedures to be followed are governed by Chapter 120, Florida Statutes, and Chapter 28-106, Florida Administrative Code, and Section 40C- 1.1007, Florida Administrative Code. 8. An applicant with a legal or equitable interest in real property who believes that a District permitting action is unreasonable or will unfairly burden the use of his property, has the right to, within 30 days of receipt of notice of the District's written decision regarding a permit application, apply for a special master proceeding under Section 70.51, Florida Statutes, by filing a written request for relief at the office of the District Clerk located at District headquarters, P. O. Box 1429, Palatka, FL 32178-1429 (4049 Reid St., Palatka, FL 32177). A request for relief must contain the information listed in Subsection 70.51(6), Florida Statutes. 9. A timely filed request for relief under Section 70.51, Florida Statutes, tolls the time to request an administrative hearing under paragraph no. 1 or 2 above (Paragraph 70.51(10)(b), Florid)• However, the filing of a request for an administrative hearing under paragraph no. 1 or 2 above waives the right to a special master proceeding (Subsection 70.51 (1 0)(b), Florida Statutes). 10. Failure to file a request for relief within the requisite time frame shall constitute a waiver of the right to a special master proceeding (Subsection 70.51(3), Florida Statutes). 11. Any substantially affected person who claims that final action of the District constitutes an unconstitutional taking of property without just compensation may seek review of the action in circuit court pursuant to Section 373.617, Florida Statutes, and the Florida Rules of Civil Procedures, by filing an action in circuit court within 90 days of rendering of the final District action, (Section 373.617, Florida Statutes). 12. Pursuant to Section 120.68, Florida Statutes, a person who is adversely affected by final District action may seek review of the action in the district court of appeal by filing a notice of appeal pursuant to the Florida Rules of Appellate Procedure within 30 days of the rendering of the final District action. 13. A party to the proceeding before the District who claims that a District order is inconsistent with the provisions and purposes of Chapter 373, Florida Statutes, may seek review of the order pursuant to Section 373.114, Florida Statutes, by the Florida Land and Water Adjudicatory Commission, by filing a request for review with the Commission and serving a copy on the Department of Environmental Protection and any person named in the order within 20 days of adoption of a rule or the rendering of the District order. 14. For appeals to the District Courts of Appeal, a District action is considered rendered after it is signed on behalf of the District, and is filed by the District Clerk. 15. Failure to observe the relevant time frames for filing a petition for judicial review described in paragraphs #11 and #12, or for Commission review as described in paragraph #13, will result in waiver of that right to review. CERTIFICATE OF SERVICE I hereby certify that copy of the foregoing notice of rights has been sent by U.S. Mail to: City of Ocoee 150 N. Lakeshore Drive Ocoee , FI 32761 at 4:00 p.m. this 3rd day of SEPTEMBER 1999 Permit Data Services Director, Gloria Jean Lewis St. Johns River Water Management District Post Office Box 1429 Palatka, FL 32178-1429 (904) 329-4500 Permit #42-095-2128NGM-ERP NOR.DOC.001 Revised 7/17/98 APPENDIX B Geotechnical Exploration UNIVERSAL ENGINEERING SCIENCES GEOTECHNICAL EXPLORATION PROPOSED WWTP VEHICLE AND MATERIAL STORAGE BUILDING A.D. MIMS ROAD, CITY OF OCOEE ORANGE COUNTY, FLORIDA PROJECT NO. 16194-005-01 REPORT NO. 57782 Prepared For: Glace & Radcliffe, Inc. 800 South Orlando Avenue, Suite 200 Maitland, Florida 32751 (407)647-6623 Prepared By: Universal Engineering Sciences 3532 Maggie Boulevard Orlando, Florida 32811 (407)423-0504 April 20, 1999 Consultants in: Geotechnical Engineering • Environmental Sciences • Construction Materials Testing • Threshold Inspections Offices in: Orlando • Gainesville • Riviera Beach • Rockledge • Daytona Beach • Punta Gorda • St. Augustine • Jacksonville • Ocala • Tampa UNIVERSAL ENGINEERING SCIENCES Consultants in: Geclechnical Engineering -Threshold Inspection Environmental Sciences • Construction Materials Testing Glace & Radcliffe, Inc. 800 South Orlando Avenue, Suite 200 Maitland, Florida 32751 Attention: Mr. Curtis Burkett April 20, 1999 Reference: Geotechnical Exploration Proposed Vehicle & Material Storage Building City of Ocoee WWTP, A.D. Mims Road Orange County, Florida Project No, 16194-005-01 Report No. 57782 Dear Mr. Burkett: Offices in • Orlando • Gainesville • Fort Myers • Rockledge • St. Augustine • Daytona Beach • Wast Palm Beach • Jacksonville • Ocala • Tampa • Debary Universal Engineering Sciences, Inc. has completed the subsurface investigation of the site for the proposed WWTP Vehicle & Material Storage on a site located on A.D. Mims Road in Ocoee, Orange County, Florida. The scope of our investigation was planned in conjunction, and was authorized by, you. This report contains the results of our investigations, an engineering interpretation of these with respect to the project characteristics described to us, recommendations for estimated seasonal high groundwater levels, foundation design, pavement design, and site preparation. We appreciate the opportunity to have worked with you on this project and look forward to a continued association. Please do not hesitate to contact us if you should have any questions, or if we may further assist you as your plans proceed. Respectfully submitted, UNI SAL/ENGINEERING SCIENCES, INC. / .Lr& 'ShTrdhar S. Rao Project Engineer Bruce H. Woloshin, P.E. P.E. No. 33734 Manager, Geotechnical Engineering SSR/BHW:eas cc: Client (4) 3532 Maggie Blvd. • Orlando, FI 32811 • (407) 423-0504 • Fax (407) 423-3106 TABLE OF CONTENTS Section Page 1.0 INTRODUCTION..................................................... 1 1.1 GENERAL.....................................................1 2.0 SCOPE OF SERVICES ................................................ 1 2.1 PROJECT DESCRIPTION.........................................1 2.2 PURPOSE ..................................................... 2 2.3 FIELD INVESTIGATION .......................................... 2 2.4 LABORATORY INVESTIGATION ................................... 3 3.0 FINDINGS ..........................................................4 3.1 SURFACE CONDITIONS ......................................... 4 3.2 SUBSURFACE CONDITIONS ...................................... 4 4.0 RECOMMENDATIONS................................................ 5 4.1 GENERAL ..................................................... 5 4.2 GROUNDWATER CONTROL......................................5 4.3 BUILDING FOUNDATIONS ........................................ 6 4.3.1 Bearing Pressure.........................................6 4.3.2 Foundation Size..........................................6 4.3.3 Bearing Depth...........................................6 4.3.4 Bearing Material..........................................6 4.3.5 Settlement Estimates......................................7 4.3.6 Floor Slabs.............................................7 4.4 PAVEMENTS ................................................... 7 4.4.1 General................................................7 4.4.2 Layer Components.......................................7 4.4.3 Stabilized Subgrade.......................................8 4.4.4 Base Course............................................9 4.4.5 Surface Course..........................................9 4.4.6 Effects of Groundwater...................................10 4.4.7 Curbing...............................................10 4.4.8 Construction Traffic ...................................... 10 4.5 SITE PREPARATION ........................................... 10 4.6 CONSTRUCTION RELATED SERVICES ............................ 12 5.0 LIMITATIONS......................................................13 6.0 SUMMARY .........................................................14 l_ Project No. 16194-005-01 Report No. 57782 i_ LLIST OF APPENDICES Section Page i_ APPENDIX A SITE LOCATION MAP ............................................. A-1 F-ATNOWIM-91 BORING LOCATION PLAN ......................................... B-1 BORING LOGS .................................................. B-2 SOILS CLASSIFICATION CHART ................................... B-3 DESCRIPTION OF LABORATORY TEST PROCEDURES ................. B-4 APPENDIX C IMPORTANT INFORMATION ABOUT YOUR GEOTECHNICAL ENGINEERING REPORT ..................................... C-1 CONSTRAINTS AND RESTRICTIONS ................................ C-2 iv Project No. 16194-005-01 - Report No. 57782 1.0 1.1 GENERAL In this report, we present the results of the subsurface investigation of the site for the proposed City of Ocoee WWTP Vehicle & Material Storage located on A.D. Mims Road in Orange County, Florida. We have divided this report into the following sections: • SCOPE OF SERVICES - Defines what we did 'l • FINDINGS - Describes what we encountered • RECOMMENDATIONS - Describes what we encourage you to do • LIMITATIONS - Describes the restrictions inherent in this report ,I • SUMMARY - Reviews the material in this report • APPENDICES - Presents support materials referenced in this report. 2.0 SCOPE OF SERVICES 2.1 PROJECT DESCRIPTION We understand your client is proposing improvements to the WWTP facility off of A.D. Mims Road in Ocoee, Florida. The general location of the subject site is indicated in Appendix A: Site Location Map. Plant improvements include constructing a new maintenance and vehicle building, a new I storage building, added parking, and a new drive areas. No additional stormwater retention areas have been identified and we have assumed earlier ponds on the property have accounted for future development. The proposed development will likely contain a one-story building and parking facilities. We understand you wish to define the soil and groundwater characteristics at the subject lot 1 for design of the building foundations, parking lot grades, and to identify potential subsurface problems. We have received a copy of the site plan indicating the location and layout of the proposed building and associated parking/driveway areas. We used this plan in conducting our field investigation. Although detailed loading conditions are not available, we anticipate structural loading on the order of 5 kips per lineal foot for wall footings and 100 kips for any isolated column loads. Only a nominal amount of fill (1 to 2 feet) is anticipated. l Our study was based on the above considerations. If you anticipate any changes, please inform us so that we can amend and revise our recommendations if necessary. Page 1 of 14 Pages Project No. 16194-005-01 Report No. 57782 2.2 PURPOSE The purposes of this investigation were: • to investigate the general subsurface conditions at the site; • to interpret and review the subsurface conditions with respect to the proposed construction; and • to provide geotechnical engineering recommendations for groundwater control, foundation design, pavement design, and site preparation. This report presents an evaluation of site conditions on the basis of traditional geotechnical procedures for site characterization. The recovered samples were not examined, either visually or analytically, for chemical composition or environmental hazards. Our investigation was confined to the zone of soil likely to be stressed by the proposed construction. Our work did not address the potential for surface expression of deep geological conditions, such as sinkhole development related to karst activity. This evaluation requires a more extensive range of field services than performed in this study. We will be pleased to conduct an investigation to evaluate the probable effect of the regional geology upon the proposed construction, if you desire. 2.3 FIELD INVESTIGATION The subsurface conditions beneath the building area were investigated with a total of seven (7) rotary wash soil borings (designated as B-1 through B-7) advanced to depths of 10 and 20 feet below existing grade, while performing the Standard Penetration Test. The approximate locations of the soil borings are indicated in Appendix B.: Boring Location Plan. We performed the Standard Penetration Test according to the procedures of ASTM D-1586; however, we used continuous sampling to detect slight variations in the soil profile at shallow depths. The basic procedure for the Standard Penetration Test is as follows: A standard split - barrel sampler is driven into the soil by a 140 -pound hammer falling 30 inches. The number of blows required to drive the sampler 1 -foot, after seating 6 inches, is designated the penetration resistance, or N -value; this value is an index to soil strength and consistency. No site survey or a site plan was available for our field investigation. Consider the indicated locations and depths to be approximate. Our drilling crew located the borings based upon estimated distances and relationships to obvious landmarks. Please consider the boring locations indicated on the Boring Location Plan as approximate. Jar samples of the soils encountered will be held in our laboratory for your inspection for 60 days unless we are notified otherwise. Page 2 of 14 Pages Project No. 16194-005-01 Report No. 57782 2.4 LABORATORY INVESTIGATION The soil samples recovered from the soil test borings were returned to our laboratory and then a geotechnical engineer visually examined and reviewed the field descriptions. We selected representative soil samples for laboratory testing consisting of four wash No. 200 determinations and four moisture content determinations. We performed these tests to aid in classifying the soils and to help to evaluate the general engineering characteristics of the site soils. See Appendix B: Boring Logs and Description of Testing Procedures, for further data and explanations. Page 3 of 14 Pages 3.0 FINDINGS 3.1 SURFACE CONDITIONS Project No. 16194-005-01 Report No. 57782 A Universal Engineering Sciences representative performed a visual site inspection of the subject property to gain a "hands-on" familiarity with the project area. Although site specific topographic information has not been provided, it is apparent that the site is relatively flat. Vegetation on the site consists mainly of grass. We examined U.S.G.S. topographic quadrangle maps and the USDA Soil Conservation Service Soil Survey of Orange County for relevant information about the site. A review of the Orange County Soils Survey indicates the presence of St. Lucie Fine Sands and Candler Fine Sands as the native surficial soils at the subject site. According to the Soils Survey, the seasonal high groundwater for these sands exists at depths greater than 6 feet below the natural grade. 3.2 SUBSURFACE CONDITIONS The boring locations and detailed subsurface conditions are illustrated in Appendix B: Boring Location Plan and Boring Logs. The classifications and descriptions shown on the logs are generally based upon visual characterizations of the recovered soil samples and a limited number of laboratory tests. Also, see Appendix B: Soils Classification Chart, for further explanation of the symbols and placement of data on the Boring Logs. Table 1: General Soil Profile, summarizes the soil conditions encountered. TABLE 1: GENERAL SOIL PROFILE Typical Depths Below Existing Grades (feet) General Soil Description 0-12 Medium dense to dense, light to dark brown -tan to gray fine SAND [SP]; trace of silt 12 - 20' Loose to medium dense, dark grayish -brown to gray SAND with silt [SP -SM]; silty SAND to clayey SAND [SM] ' Termination of the Deepest Soil Borings Bracketed Text Indicates Unified Soil Classification At the time of our investigation, the natural groundwater table was encountered at a depth ranging from 6.2 feet to 10.5 feet below existing grade at the test boring locations. Page 4 of 14 Pages 4.0 RECOMMENDATIONS 4.1 GENERAL Project No. 16194-005-01 Report No. 57782 The following recommendations are made based upon a review of the attached soil test data, our understanding of the proposed construction, and experience with similar projects and subsurface conditions. If the assumed structural loadings or the site plan changes significantly from those discussed previously, we request the opportunity to review and possibly amend our recommendations with respect to those changes. Additionally, if subsurface conditions are encountered during construction which were not encountered in the borings, report those conditions immediately to us for observation and recommendations. In this section of the report, we present our detailed recommendations for groundwater control, building foundations, pavements, site preparation, and construction related services. 4.2 GROUNDWATER CONTROL The groundwater table will fluctuate seasonally depending upon local rainfall. The rainy season in Central Florida is normally between June and September. Based upon our review of U.S.G.S. data, Orange County Soils Survey, and regional hydrogeology, we estimate the seasonal high groundwater table on the order of 3.5 to 6.5 feet below the existing ground surface. The existing and estimated seasonal high groundwater table at each location appears in Appendix B: Boring Logs. It should be noted that the estimated seasonal high groundwater levels do not provide any assurance that groundwater levels will not exceed these estimated levels during any given year in the future. Should impediments to surface water drainage exist on the site, or should rainfall intensity and duration, or total rainfall quantities, exceed the normally anticipated rainfall quantities, groundwater levels might once again exceed our seasonal high estimates. We recommend positive drainage be established throughout the life of the project. Although we do not anticipate temporary dewatering will be required for normal construction, a limited amount of temporary dewatering may be required during installation of deep utility lines during the rainy season. We recommend the contract documents provide for determining the depth to the groundwater table just prior to construction, and for any required remedial dewatering. Further, we recommend the groundwater table be maintained at least 24 inches j below all earthwork and compaction surfaces. Page 5 of 14 Pages Project No. 16194-005-01 Report No, 57782 4.3 BUILDING FOUNDATIONS Overall, the soils encountered at the site are suitable for support of the proposed WWTP Vehicle & Material Storage building structure. We recommend the proposed building be supported on shallow spread foundations, or a thickened edge monolithic slab or a post - tensioned slab. Detailed recommendations on the building foundations are presented in the following paragraphs. 4.3.1 Bearing Pressure The maximum allowable net soil bearing pressure for use in shallow foundation design should not exceed 3,000 pounds per square foot (psf). Net bearing pressure is defined as the soil bearing pressure at the foundation bearing level in excess of the natural overburden pressure at that level. The foundations should be designed based on the maximum load, which could be imposed by all loading conditions. 4.3.2 Foundation Size The minimum widths recommended for any isolated column footings and continuous wall footings are 24 inches and 18 inches, respectively. For monolithic foundations, the width of turned -down edge footings should be at least 16 inches and the interior rib foundations should be at least 24 inches. Even though the maximum allowable soil bearing pressure may not be achieved, these width recommendations should control the size of the foundations. 4.3.3 Bearing Death The wall and column foundations should bear at a depth of at least 18 inches below the exterior final grades. For monolithic reinforced or post -tensioned slab, the bottom of the footing should be at least 16 inches below the exterior final grades. It is recommended that stormwater from the roof be diverted away through roof -gutters to reduce the possibility of erosion beneath the exterior footings and prevent softening of the subgrade bearing soil. 4.3.4 Bearing Material The foundations may bear on either the compacted suitable natural soils or compacted structural fill. The bearing level soils, after compaction should exhibit densities equivalent to at least 95 percent of the maximum dry density as determined by ASTM D-1557 (Modified Proctor) to a depth of at least 2 feet below the foundation bearing levels. Page 6 of 14 Pages Project No. 16194-005-01 Report No. 57782 4.3.5 Settlement Estimates Post -construction settlements of the structure will be influenced by several interrelated factors, j such as (1) subsurface stratification and strength/compressibility characteristics; (2) footing I size, bearing level, applied loads, and resulting bearing pressures beneath the foundations; and (3) site preparation and earthwork construction techniques used by the contractor. 1 Our settlement estimates for the structure are based on the use of site preparation/earthwork construction techniques as recommended later in this report. Any deviation from these recommendations could result in an increase in the estimated post -construction settlements of the structure. Due to the sandy nature of the surficial soils following the compaction operations, we expect the majority of settlement to occur in an elastic manner and fairly rapidly during construction. Using the recommended maximum bearing pressure, the assumed maximum structural loads, i and the field and laboratory test data which we have correlated to geotechnical strength and compressibility characteristics of the subsurface soils, we estimate total settlement of the structures could be 1 -inch or less. Differential settlements result from differences in applied bearing pressures and variations in the compressibility characteristics of the subsurface soils. For the building pads prepared as recommended, we anticipate that differential settlements of the structures should be less than '/2 -inch. 4.3.6 Floor Slabs Following completion of the site preparation procedure outlined in the "Site Preparation" section of this report, the native soils underlying the building areas should be suitable for slab -on -grade support. We recommend using a modulus of subgrade reaction of 150 pounds per cubic inch for soil -structure designs for slab -on -grade concrete floors. 4.4 PAVEMENTS 4.4.1 General We recommend using a flexible pavement section on this project. Flexible pavements combine the strength and durability of several layer components to produce an appropriate and cost- effective combination of available materials. 4.4.2 Laver Components For preliminary pavement designs, we recommend using a three -layer pavement section consisting of stabilized subgrade, base course, and surface course. The three -layer pavement may be placed on existing, prepared subgrade or compacted embankment fill. Page 7 of 14 Pages Project No. 16194-005-01 Report No. 57782 For commercial or industrial development, Orange County has divided its pavement requirements into two categories as a function of use and average daily traffic (ADT). Table 2: Orange County Pavement Component Recommendations summarizes the County ordinance published in the Subdivision Regulations effective February 22, 1994. We believe the pavement components indicated in Table 2 should be adequate for the proposed parking lots and driveways. For loading conditions different than those presented in Table 2, we recommend that you have a complete pavement design performed based on projected traffic data. TABLE 2• Pavement Component Recommendations Table 2 assumes minimal truck traffic. Since truck traffic, including garbage pick-up, moving vans, and delivery vehicles, severely impacts the life of a pavement, we recommend a complete traffic study and pavement analysis if you are anticipating truck traffic in excess of 10 percent of the design ADT (see paragraph on Construction Traffic, following). 4.4.3 Stabilized Subgrade We recommend that subgrade materials be compacted in place according to the requirements in the "Site Preparation„ section of this report. Further, if necessary stabilize the subgrade materials to a minimum Limerock Bearing Ratio (LBR) of 40 percent as specified by Florida Department of Transportation (FDOT) requirements for Type B or Type C Stabilized Subgrade. Further, the stabilized subgrade can be imported material or a blend of on-site soils and imported materials. If a blend is proposed, we recommend that the contractor perform a mix design to find the optimum mix proportions. Where soil -cement base courses are used, some jurisdictions such as Orange County have approved pavement designs in which compacted subgrade is used in lieu of stabilized subgrade. In such cases, stabilized subgrade typically is provided beneath full -depth curbs only. An advantage in deleting the stabilized subgrade is a reduction in the tendency of groundwater to "perch” on the less -pervious subgrade materials, particularly where full -depth curbs are not provided. We recommend that stabilized subgrades be provided in conjunction with full -depth curbs for pavement design because compacted subgrades consisting of "clean" sands (as is the case on site) lack stability during compaction and do not contribute to the structural number of the pavement. Page 8 of 14 Pages Component Thickness (inches) Stabilized Base Surface Course Type of Development ADT Subgrade Course Commercial/Industrial <1500 6 8 z >1500 6 10 1 2'/z Development Table 2 assumes minimal truck traffic. Since truck traffic, including garbage pick-up, moving vans, and delivery vehicles, severely impacts the life of a pavement, we recommend a complete traffic study and pavement analysis if you are anticipating truck traffic in excess of 10 percent of the design ADT (see paragraph on Construction Traffic, following). 4.4.3 Stabilized Subgrade We recommend that subgrade materials be compacted in place according to the requirements in the "Site Preparation„ section of this report. Further, if necessary stabilize the subgrade materials to a minimum Limerock Bearing Ratio (LBR) of 40 percent as specified by Florida Department of Transportation (FDOT) requirements for Type B or Type C Stabilized Subgrade. Further, the stabilized subgrade can be imported material or a blend of on-site soils and imported materials. If a blend is proposed, we recommend that the contractor perform a mix design to find the optimum mix proportions. Where soil -cement base courses are used, some jurisdictions such as Orange County have approved pavement designs in which compacted subgrade is used in lieu of stabilized subgrade. In such cases, stabilized subgrade typically is provided beneath full -depth curbs only. An advantage in deleting the stabilized subgrade is a reduction in the tendency of groundwater to "perch” on the less -pervious subgrade materials, particularly where full -depth curbs are not provided. We recommend that stabilized subgrades be provided in conjunction with full -depth curbs for pavement design because compacted subgrades consisting of "clean" sands (as is the case on site) lack stability during compaction and do not contribute to the structural number of the pavement. Page 8 of 14 Pages Project No. 16194-005-01 Report No. 57782 Finally, please note that stabilized subgrade remains a requirement in any case where limerock base course is used. 4.4.4 Base Course We recommend the base course be either limerock or soil -cement. Limerock should have a minimum LBR of 100 percent and should be mined from an FDOT approved source. Place limerock in maximum 6 -inch lifts and compact each lift to a minimum density of 95 percent of the Modified Proctor maximum dry density. For a soil -cement base, we recommend that the contractor perform a soil -cement design with a minimum seven-day strength of 300 pounds per square inch (psi) on the materials he intends to use. Place soil -cement in maximum 6 -inch lifts and compact in place to a minimum density of 95 percent of the Standard Proctor maximum dry density according to specifications in ASTM D-558. Place and finish the soil -cement according to Portland Cement Association requirements. Final review of the soil -cement base course should include manual "chaining" and/or "soundings" seven days after placement. Shrinkage cracks will form in the soil -cement mixture and you should expect reflection cracking on the surface course. Perform compliance testing for either limerock or soil -cement to a depth of 1 -foot at a frequency of one test per 10,000 square feet, or at a minimum of two test locations, whichever is greater. 4.4.5 Surface Course In light duty areas where there is occasional truck traffic, but primarily passenger cars, we recommend using an asphaltic concrete, FDOT Type S -III, which has a stability of 1,000 pounds. In heavy duty areas, where truck traffic is predominant, we recommend using as asphaltic concrete, FDOT Type S -III or S -I, which has a minimum stability of 1,500 pounds. Asphaltic concrete mixes should be a current FDOT approved design of the materials actually used. Test samples of the materials delivered to the project to verify that the aggregate gradation and asphalt content satisfies the mix design requirements. Compact the asphalt to a minimum of 95 percent of the Marshall design density. Page 9 of 14 Pages Project No. 16194-005-01 Report No. 57782 After placement and field compaction, core the wearing surface to evaluate material thickness and to perform laboratory densities. Obtain cores at frequencies of at least one core per 3,000 square feet of placed pavement or a minimum of two cores per day's production. In parking lots, for extended life expectancy of the surface course, we recommend applying a coal tar emulsion sealer at least six months after placement of the surface course. The seal coat will help to patch cracks and voids, and protect the surface from damaging ultraviolet light and automobile liquid spillage. Please note that applying the seal coat prior to six months after placement may hinder the "curing" of the surface course, leading to its early deterioration. 4.4.6 Effects of Groundwater One of the most critical influences on the pavement performance in Central Florida is the relationship between the pavement subgrade and the seasonal high groundwater level. Many roadways and parking areas have been destroyed as a result of deterioration of the base and the base/surface course bond. Regardless of the type of base selected, we recommend that the seasonal high groundwater and the bottom of the base course be separated by at least 12 inches. Our review of the seasonal high groundwater levels suggests that underdrains would be unnecessary for pavement sections constructed at or above the existing grades. In the event that pavements will be "cut in" significantly beneath existing grades, we would be pleased to review the grading plans for the possible need for underdrains. 4.4.7 Curbing We recommend that curbing around the landscaped sections adjacent to the parking lots and driveways be constructed with full -depth curb sections. Using extruded curb sections which lie directly on top of the final asphalt level, or eliminating the curbing entirely, can allow migration of irrigation water from the landscape areas to the interface between the asphalt and the base. This migration often causes separation of the wearing surface from the base and subsequent rippling and pavement deterioration. 4.4.8 Construction Traffic Light duty roadways and incomplete pavement sections will not perform satisfactorily under construction traffic loadings. We recommend that construction traffic (construction equipment, concrete trucks, sod trucks, garbage trucks, moving vans, dump trucks, etc.) be re-routed away from these roadways or that the pavement section be designed for these loadings. 4.5 SITE PREPARATION We recommend normal, good practice site preparation procedures. These procedures include: stripping the site of vegetation, proof -rolling and proof -compacting the subgrade, and filling to grade with engineered fill. Page 10 of 14 Pages Project No. 16194-005-01 Report No. 57782 A more detailed synopsis of this work is as follows: 1. Strip the proposed construction limits of all grass, roots, topsoil, construction debris, and other deleterious materials within and 10 feet beyond the perimeter of the proposed building and in all paved areas. Expect clearing and grubbing to depths of 12 inches. Deeper clearing and grubbing depths may be encountered in heavily vegetated areas where major root systems are encountered. 2. Proof -roll the subgrade with a heavily loaded, rubber -tired vehicle under the observation of a Universal Engineering Sciences geotechnical engineer or his representative. Proof - rolling will help locate any zones of especially loose or soft soils not encountered in the soil test borings. Then undercut, or otherwise treat these zones as recommended by the engineer. 3. Proof -compact the subgrade from the surface by a large roller operated in static mode (a 15- to 20 -ton roller, for example), until you obtain a minimum density of 95 percent of the Modified Proctor maximum dry density (ASTM D-1557), to a depth of 2 feet below the base of the foundations in the building limits and to a depth of 1 -foot below the bottom of the base course in the pavement areas. 4. Test the subgrade for compaction at a frequency of not less than one test per 2,500 square feet per foot of depth improvement in the building area. In paved areas, perform compliance tests on the stabilized subgrade forfull depth at a frequency of one test per 10,000 square feet, or at a minimum of two test locations, whichever is greater. Place fill material, as required. The fill should consist of "clean," fine sand with less than 5 percent soil fines. You may use fill materials with soil fines between 5 and 10 percent, but strict moisture control maybe required. Place fill in uniform 10 -to 12 -inch loose lifts and compact each lift to a minimum density of 95 percent of the Modified Proctor maximum dry density. 6. Perform compliance tests within the fill at a frequency of not less than one test per 2,500 square feet per lift in the building areas, or at a minimum of two test locations, whichever is greater. In paved areas, perform compliance tests at a frequency of not less than one test per 10,000 square feet per lift, or at a minimum of two test locations, whichever is greater. 7. Test all footing cuts for compaction to a depth of 2 feet. Additionally, we recommend you test one out of every four column footings, and one test per every 200 lineal feet of wall footing. Using vibratory compaction equipment at this site may disturb adjacent structures. We recommend you monitor nearby structures before and during proof -compaction. If disturbance is noted, halt vibratory compaction and inform Universal Engineering Sciences immediately. Page 11 of 14 Pages Project No. 16194-005-01 Report No. 57782 We will review the compaction procedures and evaluate if the compactive effort results in a satisfactory subgrade, complying with our original design assumptions. 4.6 CONSTRUCTION RELATED SERVICES We recommend the owner retain Universal Engineering Sciences to perform construction materials tests and observations on this project. Field tests and observations include verification of foundation and pavement subgrades by monitoring proof -rolling operations and performing quality assurance tests on the placement cf compacted structural fill and pavement courses. The geotechnical engineering design does not end with the advertisement of the construction documents. The design is an on-going process throughout construction. Because of our familiarity with the site conditions and the intent of the engineering design, we are most qualified to address problems that might arise during construction in a timely and cost-effective manner. Page 12 of 14 Pages Project No. 16194-005-01 Report No. 57782 5.0 LIMITATIONS During the early stages of most construction projects, geotechnical issues not addressed in this report may arise. Because of the natural limitations inherent in working with the subsurface, it is not possible for a geotechnical engineer to predict and address all possible problems. An Association of Engineering Firms Practicing in the Geosciences (ASFE) publication, "Important Information About Your Geotechnical Engineering Report" appears in Appendix C, and will help explain the nature of geotechnical issues. Further, we present documents in Appendix C: Constraints and Restrictions, to bring to your attention the potential concerns and the basic limitations of a typical geotechnical report. Page 13 of 14 Pages Project No. 16194-005-01 Report No. 57782 6.0 SUMMARY In summary, we understand your client proposes to construct a Vehicle & Material Storage at the existing City of Ocoee WWTP facility on A.D. Mims Road in Orange County, Florida. We have performed field and laboratory investigations to provide geotechnical engineering recommendations for groundwater control, foundation design, pavement design, and site preparation. The soils encountered consist of predominantly medium dense to dense light to dark grayish brown, brown to gray fine sands extending to 12 feet followed by loose to medium dense, light brown to light gray sands with silt to silty sands to the depth of termination of 20 feet. At the time of our investigation, groundwater was encountered at a depth ranging from 6.2 feet to 10.5 feet below grade at the test boring locations. The estimated seasonal high groundwater table could be on the order of 3.5 to 6.5 feet below existing grades. Overall the subsurface conditions at the site are suitable for supporting the proposed Vehicle and Material Storage Building. We recommend the proposed structure be supported on conventional, shallow spread foundations with allowable soil bearing pressures of 3,000 psf. Pavements should be designed as a function of the anticipated traffic loadings. We recommend using a three -layer pavement section consisting of stabilized subgrade, base course, and a surface course. All pavement designs should incorporate the effects of groundwater, irrigated landscape areas, and construction traffic. We recommend normal, good practice site preparation procedures to prepare the subgrade to support the structures and pavements. We hope this report meets your needs and discusses the problems associated with the proposed development. We would be pleased to meet with you and discuss any geotechnical engineering aspects of the project. Page 14 of 14 Pages APPENDIX A 149 •.��!.. + _ \ 0 2000 C / eln F i SCALE, FEET ,13 n E�"'gip✓''. - (� -! . _.\ /oo `in 0 Agpj N r6r r /II -= I� Pea I 12 II -------------- <1* — - liw La (,(Prbtirie Lake y'u r6 i :z SITE .. .I. GaAs O ) Lake1�_I30�� I j , Lake n — •' i1 • 11 j ii n II Landinpi'i�d i 1' • • ' �\ •� ••, .. II 150.. .I ii � n� /' '.,...�� � �r '1 n lei �I�• //Jr � 1F 17 h• _ I ���� / �c::a \• --_�-_ - ' �°n � I ._ _ 150, _ -- '� % IOOL� I �'�:moi"" � ' 1 l ` _ � � '.'•'�:' . Starke Lake - , I — 1 • , til%, ' 98 I :;/ n v it Q 0 1. Ocoee •' BASE MAP: "WINTER GARDEN, FLORIDA" U.S.G.S. QUADRANGLE MAP, PHOTOREVISED 1980 GEOTECHNICAL EXPLORATION CITY OF OCOEE W.W.T.P. VEHICLE & MATERIAL STORAGE BLDG. OCOEE, FLORIDA U.S.G.S. SITE LOCATION MAP UNIVERSAL DRAWN 9Y: G. 9. DATE: 4�23�99 CHECKED 6Y: 'l DATE: D /1 z ENGINEERING SCIENCES PACE N0: A-1 SCALE: AS SHOWN PROJECT N0: 16194-005-01 REPORT NO: 57782 Lp PROJECT NO.: 16194-005-01 UNIVERSAL ENGINEERING SCIENCES REPORT NO.: 57787— BORING LOG PAGE. 5j, PROJECT: W WTP VEHICLE & MATERIAL STORAGE BUILDING SECTION: A.D. MIMS. ROAD OCOEE, FLORIDA CLIENT: GLACE & RADCLIFF, INC. LOCATION: SEE BOING LOCATION PLAN REMARKS: DATE OF READING: BORING DESIGNATION: B-1 SHEET: 1 Of 1 SECTION: TOWNSHIP: RANGE: G.S. ELEVATION (ft): DATE STARTED: 4/15/99 WATER TABLE (ft): 6.2 DATE FINISHED: 4/15/99 DATE OF READING: 4/15/99 DRILLED BY: UES - ORLANDO EST. W.S.W.T. (it): 3.5 TYPE OF SAMPLING: ASTM D-1586 'I.25 a� I III I I I I I 7-16 16 S 9-13 13 BLOWS N -- very loose ATLIMITS G K ORGIFT.1 DEPTH qA PER 6" (BLOWS/ W.T. M DESCRIPTION -200 MC LIMITS CONT NCREMENT FT.) B O 5 I�)I�)(FT./ ._..._.._. ._......... ...... DAY) l%I 3 6-8 14 L LL PI O 8-7-7 14 -- light brown -- loose; light gray to white 5-3-5 Medium dense dark brown fine SAND (SPI 'I.25 a� I III I I I I I 7-16 16 9-13 13 -- very loose -Z '. 4-3 3 -- medium dense 5 ._..._.._. ._......... ...... '.. .... ... .. .......... ........_... 3 6-8 14 8-7-7 14 -- light brown -- loose; light gray to white 5-3-5 9 Medium dense brown fine SAND wit 9-6-7 13 [SP -SMI 10 ....... ...... ....... •.••••...••.•••••.. •..•. p/1�IL1l� TCO1.I1�.1 TC I ,, in n, 'I.25 a� I III I I I I I u PROJECT NO.: 16194.005.01 UNIVERSAL ENGINEERING SCIENCES REPORT NO,: 5770Z BORING LOG PAGE: p -7-.Z PROJECT: W WTP VEHICLE & MATERIAL STORAGE BUILDING BORING DESIGNATION: B-2 SHEET: A.D. MIMS. ROAD SECTION: OCOEE, FLORIDA CLIENT: GLACE & RADCLIFF, INC. LOCATION: SEE BOING LOCATION PLAN REMARKS: > 10.0 DATE FINISHED: BORING DESIGNATION: B-2 SHEET: 1 Of 1 SECTION: TOWNSHIP: RANGE: G.S. ELEVATION III): DATE STARTED: 4/15/99 WATER TABLE If* > 10.0 DATE FINISHED: 4/15/99 DATE OF READING: 4/15/99 DRILLED BY: UES - ORLANDO EST, W.S.W.T. (It): 7.0 TYPE OF SAMPLING: ASTM D-1586 15 20—i.. 1...... _..__. ..I.. .. _.......�........ 25d- I_. _.._. .I ...............__.......__..........__...1..__...................... A BLOWS N Y ATTERBERG K ORG DEPTH M PER 6" (BLOWS/ W.T. M DESCRIPTION -200 (%) MC I%) LIMITS (FT./ CONT (FT.) � INCREMENT FT.) 0 DAY) (%1 LL PI E L 0 Medium dense light yellow fine SAND [SPI 12-14 14 -- loose 2 3 11-9 9 7-9 9 -- light gray to white --dense 16-18-22 40 20-25-25 50 20-17.17 34 20-21-22 43 .'.' .................. 10 _ _.111.._._. _....__.......... ...... onomir TcommKlATrn AT to n' ........................................ ................................... 15 20—i.. 1...... _..__. ..I.. .. _.......�........ 25d- I_. _.._. .I ...............__.......__..........__...1..__...................... M u [REPORT OJECT NO.: 16194-005-01 UNIVERSAL ENGINEERING SCIENCES NO.: 57782BORING LOG GE:—Z =j PROJECT: W WTP VEHICLE & MATERIAL STORAGE BUILDING A.D. MIMS. ROAD OCOEE, FLORIDA CLIENT: GLACE & RADCLIFF, INC. LOCATION: SEE GOING LOCATION PLAN REMARKS: BORING DESIGNATION: B-3 SHEET: 1 Of SECTION: TOWNSHIP: RANGE: G.S. ELEVATION (ft): 55 DATE STARTED: 4/15/99 WATER TABLE (ft): 9.5 DATE FINISHED: 4/15/99 DATE OF READING: 4/15/99 DRILLED BY: UES - ORLANDO EST. W.S.W.T. (ft): 6.0 TYPE OF SAMPLING: ASTM D-1586 55 ATTERBERG K ORG DEPTH M BLOWS N M DESCRIPTION -200 MC LIMITS IFTJ CONT P PER 6' (BLOWS/ W.T. B DAY) 1%I LL PI (FT.) L INCREMENT FT.) E L L 0 Loose gray/brown fine SAND (SPI 8-10 10 10-6 6 -- medium dense; light orange/brown 12-11 11 59-1011 - -mottled ligfif'Li7owntotan '' 21 dense 15-17-19 36 20-18-16 34 -- dark gray - Z 18-14-12 26 .'.'. � � -- medium dense; light gray ................................ ........._.._ _ BORING TERMINATED AT 1 15- 5 20- 20 _.__........_.........._.... .............. .... .. ....... .................................. 25 u PROJECT NO.: 16194-005-01 UNIVERSAL ENGINEERING SCIENCES REPORT NO.: 57787- BORING LOG PAGE: E5-2-4 PROJECT: W WTP VEHICLE & MATERIAL STORAGE BUILDING A.D. MIMS, ROAD OCOEE, FLORIDA CLIENT: GLACE & RADCLIFF, INC. LOCATION: SEE BOING LOCATION PLAN REMARKS: BORING DESIGNATION: B-4 SHEET: 1 Of SECTION: TOWNSHIP: RANGE: G.S. ELEVATION 00: DATE STARTED: 4/15/99 WATER TABLE (ft): 10.5 DATE FINISHED: 4/15/99 DATE OF READING: 4/15/99 DRILLED BY: UES - ORLANDO EST. W.S.W.T. (ft): 6.5 TYPE OF SAMPLING: ASTM D-1586 ATTERBERG K ORG LOWS N M-200 DESCRIPTION MC LIMITSIFT.1 (FTJDAY CONT FT EP 6" (BLOWS/ W.T. B (%1 (%1 (%1 LLPI REMENT FT.1 O 0 Medium dense brown fine SAND ISPI 23-18 18 loose 13-9 9 -- medium dense; yellow/brown 10-16 16 5 .. ..11 14-14...._..28 .._ ....... .......__ Fight blown........ ... ......... 23-22-25 47 S' -- dense; light brown to gray gray 16-16-24 40 14-16-16 32-- dark gray/brown ................................................................ ........... 10 -- loose; dark brown 2-3-5 8 ... 5............23 ............................................... .................. 15 ........................................................................................................................................................................ -- light gray to white 3-3-4 7 ... .................................. .........................._....__..... ..._............. 20 ---------'--'"' BORING TERMINATED AT 20.0' UNIVERSAL ENGINEERING SCIENCES BORING LOG PROJECT: W WTP VEHICLE & MATERIAL STORAGE BUILDING A.D. MIMS, ROAD OCOEE, FLORIDA CLIENT: GLACE & RADCLIFF, INC. LOCATION: SEE GOING LOCATION PLAN REMARKS: PROJECT NO.: 16194-005-01 REPORT NO.: 13;7787— PAGE: UES - ORLAND( BORING DESIGNATION: B-5 SHEET: 1 Of SECTION: TOWNSHIP: RANGE: G.S. ELEVATION III): WATER TABLE (ft): 9.0 DATE OF READING: 4/16/99 EST. W.S.W.T. (ft): 6.0 DATE STARTED: 4/16/99 DATE FINISHED: 4/16/99 DRILLED BY: UES - ORLAND( TYPE OF SAMPLING: ASTM D.1586 ti A Y ATTERBERG K ORG DIFTTH p BLOWS PER 6' N (BLOWS/ W.T. 6 DESCRIPTION -200 MC LIMITS (FT./ CONT L INCREMENT FT.) O I%) (°hl DAY) l%I LL PI E L 0 Medium dense dark gray/brown fine SAND B-14 _ (SPI 7-7 7 -- loose 7-6 B -- light brown x.. lightgray 5 ....... - .._........_.._..........._..... .. _. _..... .........._.................. ..._............. 3-3-4 7 -- medium dense � 4-7-13 20 --dense 13-15-16 31 v '. - 0 35 .' ............................. ................ 1 O .13-152 .. . ....................._._._...;....;:. ............ ........... .................... ....... .........................................._... .................._.............. ..__...... Very loose dark gray/brown SAND with silt 2-1-2 3 (SPSM] .. .. ........ ............... 15 ....._..............._............. ...... .......7 _24 ..... _...._.... Medium dense brown silty SAND (SMI 10-10-6 16 r ................................. .................. . ... ..........__... 20 _................... .__............._..... BORING TERMINATED AT 20.0' 25 ....._... ..... ....... . .... ......._....._ ................ . ..... _........ _..._........... .......... .._......... ... _..... .. ......._... ._. .........._. ... ._.......... u PROJECT NO.: 16194.005-01 UNIVERSAL ENGINEERING SCIENCES REPORT NO.: 57762 BORING LOG PAGE: E5—Z-(i PROJECT: W WTP VEHICLE & MATERIAL STORAGE BUILDING SECTION: A.D. MIMS, ROAD W.T. OCOEE, FLORIDA CLIENT: GLACE & RADCLIFF, INC. LOCATION: SEE GOING LOCATION PLAN REMARKS: DATE OF READING: BORING DESIGNATION: B-6 SHEET: 1 Of SECTION: TOWNSHIP: RANGE: W.T. G.S. ELEVATION 1111: DATE STARTED: 4/16/99 WATER TABLE (ft): 9.0 DATE FINISHED: 4/16/99 DATE OF READING: 4/16/99 DRILLED BY: UES - ORLANDO EST. W.S.W.T. (ft): 6.0 TYPE OF SAMPLING: ASTM D-1586 7PTH BLOWS PER 6" NCREMENT N (BLOWS/ FT.) W.T. Y M B O L DESCRIPTION O Loose brown fine SAND [SPI 3-3-4 7 -- medium dense 5-5-6 11 -- mixed with light gray 10-11-12 23 12-11-12 23 -- light gray 15-14-15 29 Z 13-14-15 29 -- dark gray 10 .....................................................: ...................... ...................................... ................................... -- light brown 6-7-6 13 - brown 20 ._..3.:5.-6....... _... �.�...... __....... onowr- TcannlNATFn t- ATTERBERG K ORD -200 MC LIMITS LFT./ CONT (%) (%)Ll IPI DAY) (%) 4 1 4 u LREPORT OJECT NO.: 16194-005-01 UNIVERSAL ENGINEERING SCIENCES NO.:s778Z. BORING LOG GE: PROJECT: W WTP VEHICLE 6 MATERIAL STORAGE BUILDING DATE STARTED: A.D. MIMS. ROAD WATER TABLE (ft): OCOEE, FLORIDA CLIENT: GLACE h RADCLIFF, INC. LOCATION: SEE BOING LOCATION PLAN REMARKS: UES - ORLANDO BORING DESIGNATION: B-7 SHEET: 1 Of SECTION: TOWNSHIP: RANGE: G.S. ELEVATION (ft): DATE STARTED: 4/16/99 WATER TABLE (ft): 9.5 DATE FINISHED: 4/16/99 DATE OF READING: 4/16/99 DRILLED BY: UES - ORLANDO EST. W.S.W.T. (ft): 6.0 TYPE OF SAMPLING: ASTM D-1586 Y ATTERBERG K ORG DEPTH A M BLOWS PER 6" N (BLOWS/ W.T. M DESCRIPTION -200 (%) MC 1%) LIMITS (FT./ CONT (FT p L INCREMENT FT.) B O LL PI DAY) (%) E L 0 Loose dark brown silty SAND with roots (SMI 3-3-5 8 -- medium dense 6-6-8 14 -- gray/brown, no roots 8-10-10 20 .". 11-15-16 31 -- dense; light gray/brown brown 11-17-32 49 16-17-15 32 '.' -- dark gray/brown ................ _.......... ........._........_........ .................. 10 -- medium dense; gray/brown 15-13-10 23 .' _................ .._..... . ......._....__....._......... .. _..... _. .... ._........ _.. 15 ..... ... ...... ...... _..... ;...; .. ............ .._........ _....__ .. ........... loose 3-4-6 10 ...................._._.._..... ..... _..... ...__........_ ..... _..... ................ .. 20 -'-- ----- BORING TERMINATED AT 20.0' a .........._. _._ _...._.___ _..... I . 25 ............. ................... . ............ i ®UNIVERSAL ENGINEERING SCIENCES SYMBOLS N.anblar d BI d • 1a0.L Weight I Felling ]o In. FMqulnd b IkM u„ SterYdend Spoon Ons Foot Weight of Drill Rods 5 Thin•Wall Shelby Tube Undisturbed Sampler Used ?C% Percent Core Recovery from Rook Pec. Cors Orilling Operations Sample Taken at this Level Sample Not Taken at this Level Change in Soil Strata Free Ground Waters Level Seescnal High Ground Water Level RELATIVE DENSITY (sand -silt) Very Loose - Less Than 4 Blows/FL Loose - 4 - 10 Blows/Ft. Medium - 10 to 30 Blows/Ft. Dense - 30 to 50 Blows/Ft. Very Dense - More Than 50 Blows/Ft. CONSISTENCY (clay) Very Soft - Less Than 2 Blows/FL Soft - 2 to 4 Blows/Ft. Medium - 4 to 8 Blows/Ft. Stitt - 8 to 15 Blows/Ft. Vey Stiff - 15 to 30 Blows/Ft. Hard - More Than 30 Blows/Ft. KEY TO BORING LOGS UNIFIED CLASSIFICATION SYSTEM MAJOn ofimmNe I colour tYYeOL3 nPIc.LL 114YC c{ i yn, �1 i1 q � u � 0W vv qnw 9m..» W ;r..w•ro maV«.Inf.•wrolvo. w Po•^1;r.a•0 9r..w .na s,..w.rW « � J y� € •eee � >$ 9 y mav«. ue4 a ro Ivr 9 �q W W0e GM SmY :rn«.. Gl.wl�.re+in maw« a.yy prn.4. Gr..w•roa.y 10 mal« Q g a � U C « Q SW WwIS:.C•d urour�' pb.IlY zeros. SP Pzny pna•c une+.,e Gn.•ny uncl, lr.,l. or ro en.+ • • q q � $M. Silt, ..K'.. .M.A maV•s SC OI•yry .•ro+.uroaymaw« ML Iror;utie+ln+. wry r.•..ro..Im ma. vmy ar d.yq tin.. +.M, ♦■ 1 E �t C. Im ,.Po: drys ab+u e Clary, 9nelly uy+. uroy dry.. .,w OL OtGWC+94 MC Y•M1C s`R/O.Y+a r z W Ipr 91Yl�trly W • Z a E a q ■c ■ � MX Iror•;•rv: elft. rr.. uW aJ:am.ti01{ fire .YCs ar .fJ. •l•.u: .iN dl Iror..ncdrys er n;n pwaery, l.1 OM o.;.ne d•y.am.awmu n,n 8 2 Is puuary Mi9M' Olp.nl: Sa4 ►T Pwt mua •re 9drr n::+y u;•n: .alt so so 6 g 40 z 320 e /a 7 0 PLASTICITY CHART 10 14 40 30 40 30 00 TO so Yc yw "we LJMn e -a i 10 U 10 14 40 30 40 30 00 TO so Yc yw "we LJMn e -a Project No. 17244-017-01 Report No. 9707-67G DESCRIPTION OF LABORATORY TESTING PROCEDURES WASH 200 TEST The Wash 200 test is performed by passing a representative soil sample over a No. 200 sieve and rinsing with water. The percentage of the soil grains passing this sieve is then calculated. MOISTURE CONTENT DETERMINATION ASTM D-2216 Moisture content is the ratio of the weight of water to the dry weight of soil. Moisture content is measured by drying a sample at 105 degrees Celsius. The moisture content is expressed as a percent of the oven dried soil mass. B-4 APPENDIX C IMPORTANT INFORMATION ABOUT YOUR GEOTECHNICAL ENGINEERING REPORT More construction problems are caused by site subsur- face conditions than any other factor. As troublesome as subsurface problems can be. their frequency and extent have been lessened considerably in recent years. due in large measure to programs and publications of ASFE/ The Association of Engineering Firms Practicing in the Geosciences. The following suggestions and observations are offered to help you reduce the geotechnical -related delays. cost -overruns and other costly headaches that can occur during a construction project. A GEOTECHNICAL ENGINEERING REPORT IS BASED ON A UNIQUE SET OF PROJECT -SPECIFIC FACTORS A geotechnical engineering report is based on a subsur- face exploration plan designed to incorporate a unique set of project -specific factors These typically include: the general nature of the structure involved. its size and configuration: the location of the structure on the site and its orientation; physical concomitants such as access roads, parking lots. and underground utilities, and the level of additional risk which the client assumed by virtue of limitations imposed upon the exploratory program. To help avoid costly problems, consult the geotechnical engineer to determine how any factors which change subsequent to the date of the report may affect its recommendations. Unless your consulting geotechnical engineer indicates otherwise, your geotechnical engineering report should not be used: • When the nature of the proposed structure is changed, for example, if an office building will be erected instead of a parking garage, or if a refriger- ated warehouse will be built instead of an unre- frigerated one. • when the size or configuration of the proposed structure is altered; • when the location or orientation of the proposed structure is modified; • when there is a change of ownership, or • for application to an adjacent site Geotechnical engineers cannot accept responsibility for problems which may develop if they are not consulted after factors consid- ered in their report's development have changed MOST GEOTECHNICAL "FINDINGS" ARE PROFESSIONAL ESTIMATES Site exploration identifies actual subsurface conditions only at those points where samples are taken, when they are taken. Data derived through sampling and sub- sequent laboratory testing are extrapolated by geo- technical engineers who then render an opinion about overall subsurface conditions, their likely reaction to proposed construction activity, and appropriate founda- tion design. Even under optimal circumstances actual conditions may differ from those inferred to exist, because no geotechnical engineer, no matter how qualified. and no subsurface exploration program, no matter how comprehensive, can reveal what is hidden by earth. rock and time The actual interface between mate- rials may be far more gradual or abrupt than a report indicates. Actual conditions in areas not sampled may differ from predictions. Nothing can be done to prevent the unanticipated, but steps can be taken to help minimize their impact. For this reason, most experienced owners retain their geotechnical consultants through the construction stage, to iden- tify variances, conduct additional tests which may be needed. and to recommend solutions to -problems encountered on site. SUBSURFACE CONDITIONS CAN CHANGE Subsurface conditions may be modified by constantly - changing natural forces. Because a geotechnical engi- neering report is based on conditions which existed at the time of subsurface exploration, construction decisions should not be based on a geojechnical engineering report whose adequacy may have Keen affected by time. Speak with the geo- technical consultant to learn if additional tests are advisable before construction starts. Construction operations at or adjacent to the site and natural events such as floods. earthquakes or ground- water fluctuations may also affect subsurface conditions and, thus. the continuing adequacy of a geotechnical report. The geotechnical engineer should be kept apprised of any such events, and should be consulted to determine if additional tests are necessary GEOTECHNICAL SERVICES ARE PERFORMED FOR SPECIFIC PURPOSES AND PERSONS Geotechnical engineers reports are prepared to meet the specific needs of specific individuals A report pre- pared for a consulting civil engineer may not be ade- quate for a construction contractor, or even some other consulting civil engineer Unless indicated otherwise. this report was prepared expressly for the client involved and expressly for purposes indicated by the client Use by any other persons for any purpose, or by the client for a different purpose. may result in problems. No indi- vidual other than the client should apply this report for its intended purpose without first conferring with the geotechnical engineer. No person should apply this report for any purpose other than that originally contemplated without first conferring with the geotechnical engineer Project No. 16194-005-01 Report No. 57782 CONSTRAINTS AND RESTRICTIONS WARRANTY Universal Engineering Sciences has prepared this report for our client for his exclusive use, in accordance with generally accepted soil and foundation engineering practices, and makes no other warranty either expressed or implied as to the professional advice provided in the report. UNANTICIPATED SOIL CONDITIONS The analysis and recommendations submitted in this report are based upon the data obtained from soil borings performed at the locations indicated on the Boring Location Plan. This report does not reflect any variations which may occur between these borings. 1 The nature and extent of variations between borings may not become known until excavation begins. If variations appear, we may have to re-evaluate our recommendations after performing on-site observations and noting the characteristics of any variations. CHANGED CONDITIONS We recommend that the specifications for the project require that the contractor immediately notify Universal Engineering Sciences, as well as the owner, when subsurface conditions are encountered that are different from those present in this report. No claim by the contractor for any conditions differing from those anticipated in the plans, specifications, and those found in this report, should be allowed unless the contractor notifies the owner and Universal Engineering Sciences of such changed conditions. Further, we recommend that all foundation work and site improvements be observed by a representative of Universal Engineering Sciences to monitor field conditions and changes, to verify design assumptions and to evaluate and recommend any appropriate modifications to this report. MISINTERPRETATION OF SOIL ENGINEERING REPORT Universal Engineering Sciences is responsible for the conclusions and opinions contained within this report based upon the data relating only to the specific project and location discussed herein. If the conclusions or recommendations based upon the data presented are made by others, those conclusions or recommendations are not the responsibility of Universal Engineering Sciences. C-2.1 Project No. 16194-005-01 Report No. 57782 CHANGED STRUCTURE OR LOCATION This report was prepared in order to aid in the evaluation of this project and to assist the architect or engineer in the design of this project. If any changes in the design or location of the structure as outlined in this report are planned, or if any structures are included or added that are not discussed in the report, the conclusions and recommendations contained in this report shall not be considered valid unless the changes are reviewed and the conclusions modified or approved by Universal Engineering Sciences. USE OF REPORT BY BIDDERS Bidders who are examining the report prior to submission of a bid are cautioned that this report was prepared as an aid to the designers of the project and it may affect actual construction operations. Bidders are urged to make their own soil borings, test pits, test caissons or other investigations to determine those conditions that may affect construction operations. Universal Engineering Sciences cannot be responsible for any interpretations made from this report or the attached boring logs with regard to their adequacy in reflecting subsurface conditions which will affect construction operations. STRATA CHANGES Strata changes are indicated by a definite line on the boring logs which accompany this report. However, the actual change in the ground may be more gradual. Where changes occur between soil samples, the location of the change must necessarily be estimated using all available information and may not be shown at the exact depth. OBSERVATIONS DURING DRILLING Attempts are made to detect and/or identify occurrences during drilling and sampling, such as: water level, boulders, zones of lost circulation, relative ease or resistance to drilling progress, unusual sample recovery, variation of driving resistance, obstructions, etc.; however, lack of mention does not preclude their presence. WATER LEVELS Water level readings have been made in the drill holes during drilling and they indicate normally occurring conditions. Water levels may not have been stabilized at the last reading. This data has been reviewed and interpretations made in this report. However, it must be noted that C - 2.2 Project No. 16194-005-01 Report No. 57782 fluctuations in the level of the groundwater may occur due to variations in rainfall, temperature, tides, and other factors not evident at the time measurements were made and reported. Since the probability of such variations is anticipated, design drawings and specifications should accommodate such possibilities and construction planning should be based upon such assumptions of variations. LOCATION OF BURIED OBJECTS All users of this report are cautioned that there was no requirement for Universal Engineering Sciences to attempt to locate any man-made buried objects during the course of this exploration and that no attempt was made by Universal Engineering Sciences to locate any such buried objects. Universal Engineering Sciences cannot be responsible for any buried man-made objects which are subsequently encountered during construction that are not discussed within the text of this report. TIME This report reflects the soil conditions at the time of investigation. If the report is not used in a reasonable amount of time, significant changes to the site may occur and additional reviews may be required. C - 2.3 Glace & Radcliffe, Inc. 800 South Orlando Avenue, Suite 200 Maitland, Florida 32751 Attention: Mr. Curtis Burkett Reference: Additional Geotechnical Exploration Proposed Dry Retention Pond City of Ocoee WWTP, A.D. Mims Road Orange County, Florida Project No. 16194-005-01 Report No. 73942 Dear Mr. Burkett: Universal Engineering Sciences, Inc. has completed a limited geotechnical exploration at the location of the proposed dry retention pond at the subject site in Orange County, Florida. The general location of the subject site is indicated in Appendix A: Site Location Map. We have been requested to evaluate the soil and groundwater conditions for design of a proposed dry retention pond at the subject site. The scope of our evaluation was conducted in conjunction with Mr. Brett Long and authorized by you. We were provided with a faxed sketch showing the proposed pond location and recommended locations for the soil borings; we used this drawing in our field investigation. 1.0 FIELD AND LABORATORY INVESTIGATION The subsurface conditions at the proposed pond location were investigated with two rotary wash soil borings (designated as PB -1 and PB -2) advanced to depths of 15 feet below existing grade, while performing the Standard Penetration Test. The soil borings were performed at the approximate locations indicated on the site plan and are indicated in Appendix B: Boring Location Plan. Page 1 of 3 Pages 0504 •Fax (407) 423-3106 3532 Maoaie Blvd. • Orlando, FI 32811 • (407) 423 Offices in •Gas UNIVERSAL • Gainesville ENGINEERING SCIENCES •Fort Myers Consultants in: Geotechnical Engineering • Threshold Inspection • Rockledge Environmental Sciences • Construction Materials Testing • St. Augustine • Daytona Beach • West Palm Beach •Jacksonville • Ocala • Tampa • Debary August 4, 1999 Glace & Radcliffe, Inc. 800 South Orlando Avenue, Suite 200 Maitland, Florida 32751 Attention: Mr. Curtis Burkett Reference: Additional Geotechnical Exploration Proposed Dry Retention Pond City of Ocoee WWTP, A.D. Mims Road Orange County, Florida Project No. 16194-005-01 Report No. 73942 Dear Mr. Burkett: Universal Engineering Sciences, Inc. has completed a limited geotechnical exploration at the location of the proposed dry retention pond at the subject site in Orange County, Florida. The general location of the subject site is indicated in Appendix A: Site Location Map. We have been requested to evaluate the soil and groundwater conditions for design of a proposed dry retention pond at the subject site. The scope of our evaluation was conducted in conjunction with Mr. Brett Long and authorized by you. We were provided with a faxed sketch showing the proposed pond location and recommended locations for the soil borings; we used this drawing in our field investigation. 1.0 FIELD AND LABORATORY INVESTIGATION The subsurface conditions at the proposed pond location were investigated with two rotary wash soil borings (designated as PB -1 and PB -2) advanced to depths of 15 feet below existing grade, while performing the Standard Penetration Test. The soil borings were performed at the approximate locations indicated on the site plan and are indicated in Appendix B: Boring Location Plan. Page 1 of 3 Pages 0504 •Fax (407) 423-3106 3532 Maoaie Blvd. • Orlando, FI 32811 • (407) 423 Project No. 16194-005-01 Report No. 73942 We performed the Standard Penetration Test according to the procedures of ASTM D-1586; however, we used continuous sampling to detect slight variations in the soil profile at shallow depths. The basic procedure for the Standard Penetration Test is as follows: A standard split - barrel sampler is driven into the soil by a 140 -pound hammer falling 30 inches. The number of blows required to drive the sampler 1 -foot, after seating 6 inches, is designated the penetration resistance, or N -value; this value is an index to soil strength and consistency. No site survey or site plan was available for our field investigation. Our drilling crew located the borings based upon estimated distances and relationships to obvious landmarks. Please consider the boring locations and depths indicated on the Boring Location Plan as approximate. We selected representative soil samples for laboratory testing consisting of two Wash No. 200 determinations and two laboratory falling -head permeability tests. Please see Appendix A: Boring Logs and Description of Testing Procedures, for further data and explanations. 2.0 SUBSURFACE CONDITIONS The subsurface conditions encountered at the proposed retention pond area consists of a surficial layer of loose, light, grayish brown to brown fine sand to sand with silt to a depth of 5 feet followed by medium dense, to dense, dark grayish brown to dark reddish brown, silty sand to sand with silt to the depth of termination (15 feet). At the time of our investigation, the groundwater table was encountered at a depth of about 5 feet at PB -1 and 3.7 feet at PB -2. Detailed subsurface conditions are presented in Appendix B: Soil Boring Logs. The groundwater table will fluctuate seasonally depending upon local rainfall. The rainy season in Central Florida is normally between June and September. Based upon our review of U.S.G.S. data, Orange County Soils Survey, regional hydrogeology, recent rainfall data and visual inspection of the soil samples, we estimate the seasonal high groundwater table to be at a depth of 3.5 at PB -1 and 2.5 feet at PB -2 feet below ground surface for the proposed pond design. We recommend an average estimated seasonal high groundwater table depth of 3.0 feet for the design of the retention pond. 3.0 RECOMMENDED POND DESIGN PARAMETERS The permeability tests conducted on surficial sand samples resulted in vertical hydraulic conductivity values of 10 feet and 33.5 feet per day. We recommend an average vertical permeability (Kv) of 21.8 feet per day for the surficial aquifer in the retention pond design and recovery analysis. Since the subsurface soils are generally stratified in nature, horizontal permeability (Kh) are significantly higher (estimated to be about 2 to 30 times Kv) than the vertical permeability value. We recommend a horizontal hydraulic conductivity value of 32.7 feet per day (1.5 times the vertical permeability) for use in the drawdown/recovery evaluation. Based on the subsurface conditions encountered, it is our opinion that the layer of dark grayish brown to brown silty sand existing below the surficial sands will act as a restrictive layer Page 2 of 3 Pages inhibiting the natural infiltration of the stormwater. Therefore, the average depth to the base of the surficial aquifer is estimated to be on the order of 5.5 feet below the existing ground surface. 3.0 CLOSURE We appreciate the opportunity to have worked with you on this project and look forward to a continued association. Please do not hesitate to contact us if you should have any questions, or if we may further assist you as your plans proceed. Respectfully submitted, UNIV R ,PAL ENGINEERING SCIENCES, INC. Shrid ar S. Rao Project Engineer Bruce H. Woloshin, P.E. P.E. No. 36734 Manager -Geotechnical Engineering SSR/BHW:cc cc: Client (6) Attachments: Appendix A-1: Site Location Map Appendix B-1: Boring Location Plan Appendix B-2: Soil Boring Logs Appendix B-3: Soils Classification Chart Appendix B-4: Description of Laboratory Testing Procedures Page 3 of 3 Pages APPENDIX A I'.. ... ...... ......... /I .. . . . .... . . .... •b,, OR, PB -2 f6-�� .......... - - /' k, (NOT TO SCALE) LEGEND 09 STANDARD PENETRATION TEST BORING LOCATION I BORING PERFORMED 07/�O THIS PLAN BASED ON DRAWING PROVIDED By CLIENT. UNIVERSAL ENOINEERING SLiENCES PACE NO: ----------- O Ln Lij L, 0 < U 0 Iii Lj < L4 oz U m Z z uJ 0 2 < <z W cl > m 0 -J 0 C3 < z 0 > � Lu CL0 — W In �- cn Z z 0 3: 2 5 0 L) 0 � L) I z w 0 Lij 0 LLI< C) p: 0 0 Z 0 z Z rx W0 o F- LL LU 0 0 co F- 0 UNIVERSAL ENOINEERING SLiENCES PACE NO: ----------- u UNIVERSAL ENGINEERING SCIENCES PROJECT NO.: 16194.005-01 BORING LOG REPORT NO.: 73942 PAGE: 8-2.1 PROJECT: RETENTIION POND EVELUATION CITY OF OCOEE WWTP IMPROVEMENTS, AD MIMS ROAD ORANGE COUNTY, FLORIDA CLIENT: GLACE k RADCLIFFE LOCATION: SEE BORING LOCATION PLAN REMARKS: BORING DESIGNATION: PB -2 SHEET: 1 Of SECTION: 9 TOWNSHIP: 22 S. RANGE: 28 E. G.S. ELEVATION (ttl: DATE STARTED: 7/30/99 WATER TABLE (RI: 3.7 DATE FINISHED: 7/30/99 DATE OF READING: 07/30/99 DRILLED BY: UES - ORLANDO EST. W.S.W.T. (ft): 2.5 TYPE OF SAMPLING: ASTM D-1586 DEPTH (FT.) A M � E BLOWS PER 6' INCREMENT N (BLOWS/ FT.) W.T. Y M 0 L DESCRIPTION '200 I%I MC f%1 AT7ERBERG LIMITS K (Fr/ DAY) ORG. CONT. I%) LL PI 0 Loose, gray brown fine SAND ISPI 10.0 2-3-7 10Medium 8 12 • • • - • dense, dark brown fine SAND; with silt [SP-SM1 9-9-11 20 JL • • • . Medium dense, gray brown fine SAND ISPI 5 .. ................................................. 12-6-6 12 Medium dense, brown silty fine SAND [SMI ............................................................................................. 43.8 11 Dark brown fine SAND; with silt [SP -SMI Dense, red brown silty fine SAND ISPI; Hardpan 17-20-21 41 Dense, reddish brawn fine SAND; with silt ISPI: hardpan 10 16-22-19 .....................................................-...................................................................................................................... 41 -'. •. . ......................................................... .................. 1516.17-20 37 BORING TERMINATED AT 15 FEET ............................................................................................. 20 _. ...... ...... ... ........ I NO.: 16194-0 UNIVERSAL ENGINEERING SCIENCES PROJECT REPORT NO.: 73942 05-01 BORING LOG PAGE: 0-2.1 PROJECT: RETENTHON POND EVELUATION CITY OF OCOEE WWTP IMPROVEMENTS, AD MIMS ROAD ORANGE COUNTY, FLORIDA CLIENT: GLACE & RADCLIFFE LOCATION: SEE BORING LOCATION PLAN REMARKS: DRG. BORING DESIGNATION: PB -1 SHEET: 1 of 1 SECTION: 9 TOWNSHIP: 22 S. RANGE: 28 E. G.S. ELEVATION (ft): DATE STARTED: 7/30199 WATER TABLE 00: 5.0 DATE FINISHED: 7/30/99 DATE OF READING: 07130/99 DRILLED BY: LIES - ORLANDO EST. W.S.W.T. (ft): 3.5 TYPE OF SAMPLING: ASTM D-1586 A 5 Y G ATTERBER K DRG. DEPTH M BLOWS PER 6" N (BLOWS/ W.T. M B DESCRIPTION -200 MC LIMITS (Fr./ CONT. (FT.) P L INCREMENT FT.) 0 I%) DAY) I%) -F LL - PI L Loose, very light gray fine SAND [SPI 3-4-4 8 33.5 5-5-5 10 medium dense 5 brown .. ............. . . ................ ...... . .. .... ..... .. ... .. ..... .... .. . ..... . .. . .... ..... ... ..... .. ...... . .. ... . ....... . . ... . 15-15-9 24 7-17 Medium dense, dark gray silty brown fine SAND; with organics 101-1 9-9-10 19 12 36 dense, very dark gray brown fine 7.7-7 14Meoium • SAND: with silt ISP -SM) 8-9-9 18 ................. ............ ............ ............... ................. 10— . . ................................................................................ ................. ................. . . ...... Dense, brown ........hardpan like 32 ................. ................. ........... ........... ................. ..... ........ 1515.16-16 BORING TERMINATED AT 15 FEET 20— ... . .................... ... ...... APPENDIX C City of Ocoee Noise Ordinance ORDINAKCS NO. 95-09 AN ORDI.XANCE OF 7-"-" CITY OF OCOEE, FLORIDA ADOPTING A FEW ARTICLE III OF CHAPTER 51 OF CODE OF ORDIHAHCES OF THE CITY OF OCOEE R=.ATING TO L11dITATIONS ON CONSTRUCTION AND CONSTRUCTION RP = ACTIVITIES; PROVIDING FOR DEFINITIONS; PROVIDLNG FOR L7.�IITATIONS ON THE HOURS AIiD DAYS OF CONSTRUCTION' AND CONSTRUCTION RELATED ACTIVITIES WITHIN RESIDENTIAL, ZONES AND n THIN FIVE HUNDRED FEET'( OF RESIDENTIAL ZONES; PROVIDING FOR STATES OF EX.ERGESCY; PROVIDING FOR EXEMPTIONS; PROVIDING FOR ERFORC-v�-(ENT; PROVIDING FOR SEVERABILITY; PROVIDING FOR CODIFICATION; PROVIDING FOR AN EFFECTIVE DATE. haERrAS, the City of Cccee is one of the fastest growing cities in the State of Florida; and WHEREAS, the City Cca=issicn of the City of Ocoee desires to limit the noise generated by cCnstrsction and construction related activities to specific hours, within residential zones and within five hundred feet (500') of any residential zones, in order to maintain a high quality of life for its citizens; and WHEREAS, the weekday hours between 9:00 p.m. and 7:00 a.m. Monday through Saturday, and Sundays and certain holidays have been set aside by the City Commission to preserve the public peace, order, and quiet of the City of OCCee. NOW, THEREFORE, BE IT ENACTED BY THE COi+D{ISSION OF THr CITY OF OCOEE, FLORIDA AS FOLLCFS: a SECTION 1. The City Commission of the City of Ocoee has the authority to adopt this Ordinance pursuant to Article VIII of the Constitution of the State of Florida and Chapter 166, Florida Statutes. SECTION 2. A new Article III of Chapter 51 of the Code of Ordinances of the City of Ocoee, Florida is hereby adopted and reads as follows: ARTICLE III LIMITATIONS OM CONSTRUCTION AND CONSTRUCTION RE1TED ACTIVITIES SECTION 51-50. DEFIMITIONS. For the purpose of this article, the following terms shall have meanings set forth in this section: A. Commercial Zones shall maan all those districts presently and hereinafter zoned for commercial and professional uses, including but not limited to Planned Unit Development - Commercial. B. Emeroency means any occurrence, or threat thereof, whether natural, technological, or man-made, in war or in peace, which results or may result in substantial injury or harm to the population or substantial damage to or loss of property. C. Industrial Zones shall mean all those districts presently and hereafter zoned for industrial uses, including but not limited to Planned Unit Development - Industrial. SECTION 51-51. LIXITATIOSs Obi CONSTRUCTION AND CONSTRUCTION r RELATED ACTIVITIES. r _ Except as provided in Sections 51-52 and 51-53 hereof, no const.---uction or construction related activities shall occur within any residential zones or in any commercial zones or industrial zones located within five hundred feet (5001) of any residential zones (1) between the hours 9:00 p.m. and 7:00 a.m., Monday through Saturday, (2) on Sundays, and (3) on the following holidays: New Year's Day, Easter..Femorial Day, Labor Day, Independence Day, Thanksgiving, and Christmas. For the purposes of this Article, construction and construction related activities include, but are not limited to, land clearing, demolition of a structure or building, construction of a structure or building, and the use of any tool, equipment, motorized devices, manually operated devices or hand powered devices to accomplish the foregoing. ISECTION 51-52. STATES OF A. The holder of a building permit may request that the Building Official declare the existence of an emergency situation by completing a building permit application specifying the likely duration of the emergency, hours and days of operation during which construction and construction related activities are required, the nature of the emergency, and the specific construction and construction related activities to be conducted. Based upon such application, the Building Official may declare the existence of any emergency situation and issue a building permit authorizing construction and construction related activities during the times Otherwise prohibited by Section 51-51 above. The time period covered by the Building Official's emergency declaration sha11 be the minimum necessary to safeguard the public's health, safety, and welfare. B• The provisions of this Article shall be automatically suspended during any time that the Governor of the State of Florida ,has declared that a state of emergency exists within the corporate lixdts of the City. Co For the purposes of this Article, the City Manager may declare that a state of emergency exists within the corporate limits of the City in which case the provisions of this Article shall be automatically suspended during such state of emergency; Provided, however, that any such state of emergency shall extend no longer than thirty (30) days unless extended by a majority vote of the City Commission. ISECTION 5I-53. EMEMPTI055. 11 hon -recurring, routine, or minor household raintenaace and activities not requiring a building permit within residential zones are exempt from the provisions of this Article. SECTION 51-54. EiTFORCM—MYr'. ' The Building Official sha11 be empowered to issue an order ' halting all construction and construction related activities in violation of this Article. Any disputes regarding compliance with ' this Article sha11 result in presentation of a violation to the Code Enforcement Board pursuant to Chapter 7 of the Code of ' Ordinances of the City of Ocoee. SECTION 3. SEVERABILITY. If any section, subsection, sentence, clause, phrase or portion of this Ordinance is for any reason held invalid or unconstitutional by any court of competent jurisdiction, such portion shall be deemed a separate, distinct and independent provision and such holding shall not affect the validity of the remaining portion hereby. SECTION 4. CODIFICATION. It is the intention of the City Commission of the City of Ocoee that the provisions of this Ordinance shall become and be made a part of the Code of Ordinances Of the City of Ocoee; and that the sections of this Ordinance may be renumbered or relettered and the word 'ordinance" may be changed to "chapter•, "article', "section" or other such appropriate word or phrase in order to accomplish such intentions; and regardless of whether such inclusion in the Code is accomplished, sections of this Ordinance may be renumbered or relettered and the correction or typographical errors which do not effect the intent may be authorized by the City Manager, without need for a public hearing, by filing a corrected or recc<ified copy of the same with the City Clerk. SECTIONS. EFFECTIVE DATE. This Ordinance shall become effective immediately upon passage and adoption. PASSES AND ADOPTED this J/•� day of M,4.0Cf� , 1995. ATTEST. J�n Grafton/ City Clerk (SEAS) — FOR USE AND RELIANCE ONLY BY CITY OF OCOEE, FLORIDA APPROVED AS TO FORM ANDGAL Ty this _ day of FOLEYR By FO: 4 Paul Rosenthal, City. Attorney APPROVED: CITY OF OCOEE, FLORIDA S. Scott vandergrift, Na, r ADVERTISED March 9 1995 —READ FIRST TIME 7, 1995 READ SECOND TIY2 AND ADOPTED 'tcA'eek ai , 1995 UNDER AGENDA ITEM NO. ys I I I I ■ t R t F IF I[ t I 11 I I I- ADDENDUM NO.3 To: All Plan Holders Date: October 8, 1999 Owner: Ocoee Vehicle & Material Storage Building Bid Date: October 12, 1999 Prepared by: Glace & Radcliffe, Inc. 630 N. Wymore Road Maitland, FL 32751 (407)647-662/3% APPROVED BY: �K • /GG' Curtis R Burkett, P.E. — Division Manager This Addendum sets forth changes and/or additional information as referenced and is hereby made part of, and should be attached to, subject Project Manual and Drawings of the Contract Documents. This Addendum is transmitted to all plan holders by facsimile. Immediately subsequent to the receipt of the attached Addendum, please acknowledge receipt of same by signing and date below and returning copy of this page by facsimile. Id�y�l►rI�I�7:lVl Authorized by Signature (name) Date Company Name FAX: (407) 539-0575 ATTN: Brett Long BID DATE The final bid date will remain Tuesday, October 12, 1999 at 2:00p.m. as originally shown in the Invitation to Bid. ADDENDUM ORDER The Addendum dated October 4, 1999 is actually Addendum No. 2 and will be referred to as such. PROJECT MANUAL The following revisions/additions/deletions to the Project Manual are hereby made. Specification Section 00300 Change Section 00300, Completion Schedule, item one "one -hundred and eighty (180)" to "two -hundred and ten (210)". 2. Specification Section 01040 Remove Section 01040, item 1.03, sub -section D. The project does not fall within the Reedy Creek Improvement District. Specification Section 01150 Delete Section 01150 item 3.105 "Building Permit Allowance" and replace with the following information: " Payment for the total cost of permits to be calculated at the time the permits are pulled. Allowance in the Bid Form is a not to exceed amount and not a lump sum payment." 4. Specification Section 01650 For clarification of Section 01650, the contractor is responsible for adherence to the existing St. Johns Water Management District Stormwater Permit. The permit was provided to prospective bidders to assist in preparation of bids as an attachment of Addendum No. 2 and will be attached to the Construction Documents at execution. 5. Specification Section 02280 Add Specification Section 02280 in its entirety. DRAWINGS The following revisions/ additions/deletions to the Drawings are hereby made. 1. Sheet C-3 OVERALL SITE PLAN On sheet C-3, bollards (6 total) have been place adjacent to the three large roll -down doors. See attached Figure (Cl) for bollard detail and locations. The (6"x6" REINFORCED CONCRETE, 3000 PSI) shall be 6" thick with 6"x6" welded wire mesh. 2. Sheet S-2 FLOOR PLAN On the Floor Plan, add the following note to the metal building along column line 1 between column lines E & F, "METAL BUILDING PANEL ALONG COLUMN LINE 1 AND BETWEEN COLUMN LINES E & F TO BE TWO HOUR FIRE RATED (UL U647). 3. Sheet S-5 TYPICAL WALL SECTION & DETAILS Add Detail H to the drawing as shown in Figure S 1. 4. Sheet S-6 DOOR SCHEDULE, DOOR DETAILS AND MISCELLANEOUS DETAILS In the Door Schedule, change the fire rating from "--" to "90" and the notes from "-" to "2" for doors DA -100D, DA -100E, DA -103, DA -103A and DA -104. 5. Sheet MP -2 HVAC/PLUMBING PLAN Provide a fire damper in the discharge side of louver located in the "WWTP STORAGE ROOM" adjacent to the roll -down door. Provide with integral sleeve to allow offsetting of damper from the two-hour rated wall. The fire damper shall comply with Underwriters Laboratories (UL) Standard 555 and bear the UL test label with a 1-1/2 hour fire protection rating for penetrations in 1 hour and 2 hour rated partitions. Dampers shall be selected so that the free air space is not less than the connected duct free area. Provide access panel in ductwork to allow inspection of the fire damper. ADDITIONAL COMMENTS The following revisions/ additions/deletions to the bid documents are hereby made. 1. Q. Insurance Requirements indicate the need for flood insurance, if the project is within a flood plane? A. The project is not within a flood plane, thus no flood insurance is required. 2. Q. is colored audio and video required? A. Color audio and video of the site prior to construction is required of a good reproducible quality prior to commencement of construction and will be provided to the city for review and to be retained by the City in the project file. 3. Q. Is a consent of surety required with each and every application for payment? A. Consent of surety will be required with every application for payment. 4 Q. Is it the intent of the City for the Contractor to hire a professional photographer on this project or can they provide the City with copies of the photos taken by the project superintendent? A. The construction photos need not be taken by a professional photographer, but must be of high quality and must be acceptable to the City. Q. Is soil poisoning required? Soil poisoning will be required. Refer to Specification Section 02280. (END) SECTION 02280 TERMITE CONTROL 1.01 DEFINITIONS A. EPA: Environmental Protection Agency. B. Applicator: Pest control applicator. 1.02 SUBMITTALS A. Treatments and application instructions, including EPA -Registered Label, special warranties, and the following: Soil Treatment Application Report: After application of termiticide is completed, submit report for Owner's record information, including the following as applicable: a. Date and time of application. b. Moisture content of soil before application. c. Brand name and manufacturer of termiticide. d. Quantity of undiluted termiticide used. e. Dilutions, methods, volumes, and rates of application used. f. Areas of application. g. Water source for application. B. Applicator Qualifications: An applicator who is licensed according to regulations of authorities having jurisdiction to apply termite control treatment in jurisdiction where Project is located. C. Regulatory Requirements: Formulate and apply termiticides, and label with a Federal registration number, to comply with EPA regulations and authorities having jurisdiction. City of Ocoee 02280-1 G&R Project No. 98518.01 A. Coordinate soil treatment application with excavating, filling, and grading. Treat soil under footings and ground -supported slabs, before construction. E. Warranty: Written warranty, signed by applicator and Contractor certifying that termite control work, consisting of applied soil termiticide treatment, will prevent infestation of subterranean termites for three years from date of Substantial Completion. If subterranean termite activity or damage is discovered during warranty period, re -treat soil and repair or replace damage caused by termite infestation. PART2PRODUCTS 2.01 MATERIAL A. Termiticide: Provide an EPA -registered termiticide complying with requirements of authorities having jurisdiction, in a soluble or emulsible, concentrated formulation that dilutes with water or foaming agent, and formulated to prevent termite infestation. Use only soil treatment solutions that are not harmful to plants. PART 3EXECUTION 3.01 INSTALLATION A. Application: Provide quantity required for application at the label volume and rate for the maximum specified concentration of termiticide, according to manufacturer's EPA - Registered Label, to the slab on grade and a continuous horizontal and vertical termiticidal barrier or treated zone is established around and under building foundation. B. Avoid disturbance of treated soil after application. C. Protect termiticide solution, dispersed in treated soils and fills, from being diluted until ground -supported slabs are installed. Use waterproof barrier according to EPA - Registered Label instructions. D. Post warning signs in areas of application. E. Reapply soil treatment solution to areas disturbed by subsequent excavation, grading, landscaping, or other construction activities following application. END OF SECTION City of Ocoee 02280-2 G&R Project No. 98518.01 DOOR OPENING 4' SCHEDULE 40 G.S, PIPE FILLED W/CDNC. AND PAINTED SAFETY YELLOW. PROPOSED CON. PAD O i Q d s 24' DIA. . i 02500 PSI CONIC. u G 6' T— DETAIL: BOLLARD N.T.S. EXTERIOR BOLLARD WALL DOOR OPENING 3'-0.. 11-01, 1 1-0" NOTE: INSTALL BOLLARD ON EACH SIDE OF THE EXTERIOR OF THE VEHICLE ENTRY DOORS. BOLLARD LOCATION N.T.S. VEHICLE & MATERIAL STORAGE BUIDING ADDENDUM 3 BOLLARD G e GLACE & RADCLIFFE, INC. e Consulting Engineers P R O J. NO.: 98518.01 630 N. Wymore Road ■ Suite 370 consulting MaiHand, Florida 32751.4216 407.647.6623(volSe) 4 . 539.0575(fm) FIGURE: C 1 A WCG, Ins. Company :,7 grLoac'vmolr ad 6 FTG WF2 DETAIL H 3/8" = Y-0" S 2 I I I VEHICLE & MATERIAL STORAGE BUIDLING ADDENDUM 31 DETAIL WF2 G GLACE & RADCLIFFE, INC. Consulting Engineers P R O J. N 0.: 98518.01 N.Wymore Road ■ Suite 370 4%630 Maitland, Florida 32751.4216 AWCG, Ino. Compmy wg@grboae)am(email) .0575(fax) FIGURE: S1 ADDENDUM NO.4 To: All Plan Holders Date: October 11, 1999 Owner: Ocoee Vehicle & Material Storage Building Bid Date: October 12,1999 Prepared by: Glace & Radcliffe, Inc. 630 N. Wymore Road Maitland, FL 32751 (407)647-6623 ��jj APPROVED BY: 'Z /, syr Curtis R Burkett, P.E. — Division Manager This Addendum sets forth changes and/or additional information as referenced and is hereby made part of, and should be attached to, subject Project Manual and Drawings of the Contract Documents. This Addendum is transmitted to all plan holders by facsimile. Immediately subsequent to the receipt of the attached Addendum, please acknowledge receipt of same by signing and date below and returning copy of this page by facsimile. RECEIVED BY: Authorized by Signature (name) Date Company Name FAX: (407) 539-0575 ATTN: Brett Long PROJECT MANUAL The following revisions/additions/deletions to the Project Manual are hereby made. 1. Specification Section 00300 Section 00300-11, delete the note: "Total Base Bid (Total of Bid Items 1.01 through 1.23) (In words and numbers)" Replace with: "Total Base Bid (Total Base Bid Items 1.01 through 1.24) (In words and numbers)" 1 ' • ". 11R] The following revisions/ additions/deletions to the Drawings are hereby made. 1. Sheet C-6 OVERALL SITE PLAN Sheet C-6, Addendum No. 2, Figure 03, remove note: "1. THE CONTRACTOR SHALL CONTACT THE INSPECTOR FOR EXACT ASSEMBLY LENGTH AND HEIGHT ABOVE THE SLAB REQUIRED FOR THE BFP TO BE INSTALLED BY THE CITY OF OCOEE. ALL OTHER PIPE, FITINGS ABD APPURTENANCES SHALL BE INSTALLED BY THE CONTRACTOR." Replace with: "1. THE CONTRACTOR SHALL CONTACT THE INSPECTOR FOR EXACT ASSEMBLY LENGTH AND HEIGHT ABOVE THE SLAB REQUIRED FOR THE BFP. ASSEMBLY AND ALL OTHER PIPE FITTINGS AND APPURTENANCES SHALL BE PROVIDED AND INSTALLED BY THE CONTRACTOR." (END) r �I 1 SECTION 00020 INVITATION TO BID CITY OF OCOEE VEHICLE&MATERIAL STORAGE BUILDING CITY OF OCOEE ENGINEERING DEPARTMENT OCOEE,FLORIDA Sealed bids will be received at the office Purchasing Department in the City of Ocoee City Hall, 150 North Lakeshore Drive,Ocoee,Florida 34761 until 2:00 p.m. on Wednesday,September 29 1999. Sealed bids will then be hand delivered to the room in which the bid opening is to occur. Any bids received after 2:00p.m.will not be accepted under any circumstances. Any uncertainty regarding the time a bid is received will be resolved against the Bidder. Bids submitted after this designated time will be returned unopened. Description of Work: The scope of work consists of, but not limited to, construction of an approximately 7400 square foot metal storage building,road and parking improvements,utility adjustments and site grading and drainage improvements. Pre-Bid Conference: A pre bid conference will be held for interested firms at 10:00am, Wednesday, September 15, 1999 in the City of Ocoee Wastewater Operations Building 1800 A.D. Mims Road,Ocoee,Fl 34761 Bidding Documents(Project Manual and Drawings): Available for pick up and review at(a cost of $100): City of Ocoee Purchasing Department 150 North Lakeshore Drive Ocoee,Florida 34761 Phone: (407)656-2322 ex. 190 Att:Joyce Tolbert Bids shall be prepared from complete full size contract documents. Addenda will be sent via registered mail to all holders of complete contract documents up to four(4) days before bid time. Brief addenda may be issued between seventy-two (72) hours and twenty-four (24) hours before bid time by facsimile (FAX) to holders of complete contract documents. Bid Bond: A certified check or bid bond shall accompany each bid. The certified check or bid bond shall be for an amount not less than five percent(5%)of the bid price and shall be made payable to the City of Ocoee as a guarantee that the Bidder will not withdraw for a period of ninety(90)days after bid closing time. Bid Submittal: A single bid shall be submitted for the work. The contract will be awarded pursuant to the requirements of applicable state and federal laws and regulations. Bids shall be enclosed within a sealed envelope on the Bid Form provided in the Project Manual, with the words "Bid for Construction of City of Ocoee Vehicle & Material Storage Building" and the Bidder's name, address and', Florida Contractor's License Number clearly shown on the outside thereof. Bidder must acknowledge receipt of all addenda in the prescribed Bid Form. Bids must be signed by an authorized representative of the Bidder. Mailed bids shall be sent to the attention of City Engineer/Utilities Director, City of Ocoee, 150 North Lakeshore Drive, Ocoee, Florida 34761. END OF SECTION 00020-1 I 1 SECTION 00100 INSTRUCTIONS TO BIDDERS TABLE OF CONTENTS ARTICLE DESCRIPTION I 1 Defined Terms 2 Copies of Bidding Documents 3 Qualifications of Bidders 4 Examination of Contract Documents and Site 5 Availability of Lands for Work, Etc. I 6 Addenda and Interpretations 7 Bid Security 8 Contract Time 9 Liquidated Damages and Indemnity I 10 Substitute Material and Equipment 11 Subcontractors, etc. 12 Bid Form 13 Submission of Bids 14 Modification and Withdrawal of Bids 15 Opening of Bids I 16 Bids to Remain Subject to Acceptance 17 Award of Contract 18 Taxes 19 Organization of Drawings and Specifications 20 Qualifications of Surety Companies 21 Interpretation of Quantities 22 Construction Safety 23 Special Warranty, Performance Bond, Insurance and Correction Period Requirements 24 Signing of the Amendment to the Agreement 25 Protests 26 Apprentices 27 Licenses and Permits 28 Contingency Allowances 29 Retainage Ill: 30 Pre-Bid Conference I I C. 00100-1 I I I I I I I I (Page Left Blank Intentionally) I I I I I I I I I 00100-2 I SECTION 00100 INSTRUCTIONS TO BIDDERS ARTICLE 1 -DEFINED TERMS Terms used in these Instructions to Bidders which are defined in the General Conditions have the meanings assigned to them in the General Conditions, as supplemented. 1.1 Bidding Documents consist of the Project Manual VEHICLE&MATERIAL STORAGE BUILDING and Drawings, all as may be modified by Addenda. 1.2 The term Agreement refers to the contract for Continuing Horizontal Construction Services and Amendments to the Agreement. 1.3 The term "Apparent Low Bidder" means the Bidder submitting the lowest Bid at the Bid Opening without correction of numerical discrepancies, consideration of alternate or determination f responsiveness and responsibility. 1.4 The term "Successful Bidder" means the Bidder to whom Owner awards or expects to award the Contract. 1.5 The term "Work" as defined in the General and Supplemental Conditions and the Agreement is further described in the Amendment to the Agreement. 1.6 The term "Owner" refers to the City of Ocoee, Florida. 1.7 The term "Engineer" refers to the City of Ocoee Utilities/Engineering Department ARTICLE 2-COPIES OF BIDDING DOCUMENTS 2.1. Complete sets of Bidding Documents in the number and for the sum stated in the Invitation To Bid may be obtained from the City of Ocoee, Engineering Department, 150 North Lakeshore Drive, Ocoee, Florida 34761. This amount represents reproduction costs and is non-refundable. 2.2. Complete sets of full size Bidding Documents shall be used in preparing Bids; neither Owner nor Engineer assume any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents. 2.3. Owner and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids on the Work and do not confer a license or grant for any other use. ARTICLE 3 -QUALIFICATIONS OF BIDDERS All Bidders have been pre-qualified by the City of Ocoee. ARTICLE 4 -EXAMINATION OF CONTRACT DOCUMENTS AND SITE 4.1. It is the responsibility of each Bidder before submitting a Bid to: (a) examine thoroughly the Contract Documents and other related data identified in the Bidding Documents (including "technical data" referred to below); (b) visit the site to become familiar with and satisfy Bidder as to the general, local and site conditions that may affect cost, progress, performance or furnishing of the Work; (c) consider federal, state and local Laws and Regulations that may affect cost, progress, performance or furnishing of the Work; (d) study and carefully correlate Bidder's knowledge and observations with the Contract 00100-3 I I Documents and such other related data; and (e) promptly notify Engineer of all conflicts, errors, ambiguities or discrepancies which Bidder has discovered in or between the Contract Documents and such other related documents. 4.2 Reference is made to the Supplementary Conditions (Part A, Section 00800) for identification of: 4.2.1 Those reports of explorations and tests of subsurface conditions at or contiguous to the site which have been utilized by Engineer in preparation of the Contract Documents. Bidder may rely upon the general accuracy of the "technical data" contained in such reports but not upon other data, interpretations, opinions or information contained in such reports or otherwise relating to the subsurface conditions at the site, nor upon the completeness thereof for the purposes of bidding or construction. 4.2.2 Those drawings of physical conditions in or relating to existing surface and subsurface structures (except Underground Facilities) which are at or contiguous to the site that have been utilized by Engineer in preparation of the Contract Documents. Bidder may rely upon the general accuracy of the "technical data" contained in such drawings but not upon other data, interpretations, opinions or information shown or indicated in such drawings or otherwise relating to such structures, nor upon the completeness thereof for the purposes of bidding or construction. 4.2.3 Copies of investigations and Geotechnical reports are made available to each Bidder with the purchase of complete sets of Bidding Documents. Those reports and related drawings are not part of the Contract Documents, but the "technical data" contained therein upon which Bidder is entitled to rely as provided in Paragraph 4.02 of the General Conditions has been identified and established in Paragraph SC-4.02 of the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion drawn from any "technical data" or any such data, interpretations, opinions or information. 4.3 Information and data shown or indicated in the Contract Documents with respect to existing Underground Facilities at or contiguous to the site is based upon information and data furnished to Owner and Engineer by owners of such Underground Facilities or others, and Owner and Engineer do not assume responsibility for the accuracy or completeness thereof unless it is expressly provided otherwise in the Supplementary Conditions. 4.4 Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions and Underground Facilities, and possible changes in the Contract Documents due to differing or unanticipated conditions appear in Paragraphs 4.02 and 4.03 of the General Conditions. 4.5 Before submitting a Bid each Bidder will be responsible to obtain such additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions (surface, subsurface and Underground Facilities) at or contiguous to the site or otherwise, which may affect cost, progress, performance or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences or procedures of construction to be employed by Bidder and safety precautions and programs incident thereto or which Bidder deems necessary to determine its Bid for performing and furnishing the Work in accordance with the time, price and other terms and conditions of the Contract Documents. 4.6 On request, with advanced notice, Owner will provide each Bidder access to the site to conduct such examinations, investigations, explorations, tests and studies as each Bidder deems necessary for submission of a Bid. Bidder must fill all holes and clean up and restore the site to its former conditions upon completion of such explorations, investigations, tests and studies. 00100-4 4.7 Reference is made to the Supplementary Conditions for the identification of the general nature of work that may be performed at the site by Owner or others (such as utilities and other prime contractors) that relates to the work for which a Bid is to be submitted. On request, Owner will provide to each Bidder for examination access to or copies of Contract Documents (other than portions thereof related to price) for such work, is applicable. 4.8 The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception the Bid is premised upon performing and furnishing the Work required by the Contract Documents and applying the specific means, methods, techniques, sequences or procedures of construction (if any) that may be shown or indicated or expressly required by the Contract Documents, that Bidder has given Engineer written notice of all conflicts, errors, ambiguities and discrepancies that Bidder has discovered in the Contract Documents and the written resolutions thereof by Engineer is acceptable to Bidder, and that the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work. 4.9 The provisions of Article I-4.1 through 4.8, inclusive, do not apply to Asbestos, Polychlorinated Biphenyls (PCBs), Petroleum, Hazardous Waste or Radioactive Material covered by Paragraph 4.06 of the General Conditions. 4.10 The submission of the Bid shall be an indication that the Bidder has considered normal local weather conditions (daily and monthly variations) and accounted for these circumstances in the preparation of the bid and schedule of construction. ARTICLE 5 -AVAILABILITY OF LANDS FOR WORK, ETC. 5.1 The lands upon which the Work is to be performed, rights-of-way and easements for access thereto and other lands designated for use by Contractor in performing the Work are identified in the Contract Documents. All additional lands and access thereto required for temporary construction facilities, construction equipment or storage of materials and equipment to be incorporated in the Work are to be obtained and paid for by Contractor. Easements for permanent structures or permanent changes in existing facilities are to be obtained and paid for by Owner unless otherwise provided in the Contract Documents. 5.2 Each bidder is instructed to fully acquaint himself with the status of easement acquisitions by the Owner at the time of submission of his bid and the possibility of the acquisitions of the parcels remaining to be acquired, if any. The Bidder shall sequence and schedule his work to delay schedule impacts caused by unacquired easements so as not to interfere with the progress of the work in other areas of the Project. The Owner shall not be liable for any damage that may occur to the Contractor for any and all delay through delay of the Owner in securing the necessary right-of-way. The Owner agrees that it shall make every effort to acquire easements with all speed and diligence possible. ARTICLE 6-ADDENDA AND INTERPRETATIONS 6.1 Bidders shall promptly notify Engineer of any ambiguity, inconsistency, or error which they may discover upon examination of the Bidding Documents or the site. All questions about the meaning or intent of the Bidding Documents shall be submitted to Engineer in writing. Replies considered necessary shall be issued through Addenda by registered mail to all parties recorded by Engineer as having received complete sets of Bidding Documents up to seventy-two (72) hours before bid time. Brief addenda which do not materially alter the scope of work may be issued between seventy-two (72) hours and twenty-four (24) hours before bid time by facsimile (fax) to all General Contractors only. Questions received less than seven (7) calendar days prior to the date for opening of Bids shall not be answered. Only questions answered by formal written Addenda shall be i 00100-5 I binding and prospective Bidders are warned that no other source than a formal written Addenda is authorized to give information concerning, or to explain or interpret the Bidding Documents. Failure of any Bidder to receive any such addendum or interpretation shall not relieve such Bidder from its terms and requirements. ARTICLE 7 -BID SECURITY 7.1 Bid Security shall be submitted and shall be made payable to owner, in an amount of not less than five (5)percent of the Bidder's Contract Price and in the form of a cashier's check or a Bid Bond issued by a Surety meeting the requirements of Article 20 of this section and Article 5 of the General Conditions. The Bid Bond shall be issued by a company having a registered agent in the State of Florida. Personal checks are not acceptable. 7.2 The Bid Security of the Bidder shall be retained until such Bidder has executed the Amendment to the Agreement and furnished the required payment and performance bonds, whereupon the Bid Security shall be returned. If the Successful Bidder fails to furnish the qualifications submittals or fails to execute and deliver the Agreement, as Amended, and furnish the required Bonds within ten days of the Notice of Award, Owner may annul the Notice of Award and the Bid Security of that Bidder shall be forfeited. The Bid Security of any Bidder whom Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the ninety-first day after the Bid opening. Bid Security of other Bidders shall be returned approximately seven days after the Bid opening. ARTICLE 8-CONTRACT TIME The number of consecutive calendar days within which, or the date of which, the Work is to be completed(the Contract Time)is set forth in the Amendment to the Agreement(Section 00500B). ARTICLE 9-INDEMNIFICATION 9.1 Provisions for liquidated damages are set forth in the Amendment to the Agreement(Section 00500B). 9.2 All Bidders must state in the Bid Form the amount of consideration required by the Bidder in return for the Bidder's promise of indemnity contained in Paragraphs 6.20 General Conditions and Section 725.00 of the Florida Statutes. The minimum amount shall be $1,000.00. The Bidder must execute an Indemnification Agreement (Section 00660) with the signing of the Amendment to the Agreement as provided in Article 27 of this Section. ARTICLE 10-SUBSTITUTE MATERIAL AND EQUIPMENT The Contract, if awarded, shall be awarded on the basis of material and equipment described in the Drawings or specified in the Specifications with consideration of possible substitute or "or equal" items. Whenever it is indicated in the Drawings or specified in the Specifications that a substitute or "or equal" item of material or equipment may be furnished or used by Contractor if acceptable to Engineer, application for such acceptance shall be considered by Engineer until after the "Effective Date of the Agreement." The procedure for submittal of any such application by Contractor and consideration by Engineer is set forth in the General Conditions, as may be supplemented in Division 1, General Requirements. If a substitution list is provided as part of the prescribed Base Bid Form, Bidders must identify proposed substitute materials. These substitute materials and equipment shall be evaluated after "Effective Date of the Agreement." Only the proposed alternatives, substitutions or "or equal" items listed on the Substitution List shall be evaluated by the Engineer in accordance with the General Conditions. The cost of changes in related work, additional drawings which may be required to illustrate or define the alternate equipment and its relationship to the other parts or portions of the Work shall be paid by the Contractor. No change shall be made in the amount of time in which to complete the Work or in the liquidated damages. If the proposed substituted material or equipment is found to be 00100-6 I unacceptable to the Engineer as an "or equal" item, then the Base Bid material or equipment named in the specification or the Bid Form (circled item) shall be furnished by the Contractor. ARTICLE 11 - SUBCONTRACTORS, ETC. 11.1 Each Bid must identify the names and addresses of the subcontractors listed in the Bid Form "Questionnaire (Section 00301)." If requested by the Owner or Engineer, the Bidder, and any other Bidder so requested, shall, within seven days after the date of the request, submit to Owner an experience statement with pertinent information as to similar projects and other evidence of qualification for each such subcontractor, person and organisation. If Owner or Engineer after due investigation has reasonable objection to any proposed subcontractor, other person or organization, either may, before giving the Notice of Award, request the Bidder to submit an acceptable substitute without an increase in Contract Price nor Contract Time. If the Bidder declines to make any such substitution, the Owner may elect not !, to award the Contract to such Bidder. A Bidder's declining to make any such substitution shall not constitute grounds for sacrificing his Bid Security. No Bidder shall be required to employ any subcontractor, other person or organization against whom Bidder has reasonable objection. 11.2 Procedures for approval of other subcontractors after execution of the Amendment to the Agreement (Section 00500B)are described in the General and Supplementary Conditions. 11.3 No more than 50% of the dollar value of the total Bid amount for the Work may be accomplished by subcontractors. The balance of the Work must be accomplished by the Bidder's own forces. (Work in this respect does not include cost paid to suppliers for materials and equipment furnished for this project). ARTICLE 12 -BID FORM 12.1 One (1) copy of the Bid Form is included in the Contract Documents for the Bidder's use. This copy is printed on colored paper to distinguish this section from the other sections of the Contract Documents, and has tear-out perforations. One (1) additional copy of the Bid Form will also be provided externally to the Contract Documents for the Bidder's Use should reproducing be required. 1 12.2 Bid Forms must be completed in ink or typed. The Bid price of each item and lump sum "Total Bid" or "Total Base Bid" on the Bid Form must be stated in words and numerals; in case of a conflict, words shall take precedence. 12.3 Bids by corporations must be executed in the corporate name by the president or a vice-president (or other corporate officer accompanied by evidence of authority to sign) and the corporate seal must be affixed and attested by the secretary or an assistant secretary. The corporate address and State of incorporation must be shown below the signature. If requested, the person signing a Bid for a corporation or partnership must produce evidence satisfactory to the Owner of the person's authority to bind the corporation or partnership. If the Bidder is a corporation, and if the Bid is executed by someone other than the President or Vice President of the corporation, attach to the Bid a certified copy of corporate resolutions of the board of directors of the corporation authorizing the person to execute the Bid on behalf of the Corporation. 12.4 Bids by partnerships must be executed in the partnership name and signed by a partner, whose title must appear under the signature and the official address of the partnership must be shown below the signature. 12.5 All names and titles must be typed or printed below the signature. 12.6 The Bid shall contain an acknowledgement of receipt of all Addenda(the numbers of which shall be filled in on the Bid Form). 00100-7 I 12.7 The address in which communications regarding the Bid are to be directed must be shown. 12.8 Evidence of authority to conduct business as an out-of-state corporation in the state where the Work is to be performed shall be provided in accordance with Paragraph 3 above. State contractor license number, if any, must also be shown. 12.9 Bids must be priced on a lump sum basis for the base contract and include a separate price for each alternate described in the Specifications as provided for in the Bid Form. The price of the Bid for each alternate will be the amount to be added to or deducted from the price of the base Bid if Owner selects the alternate. 12.10 The Bid price shall include such amounts as the Bidder deems proper for overhead and profit on account of cash allowances named in the Contract Documents as provided in GC-11.02. 12.11 Bids which are incomplete, conditional, or which contain additions not called for, alterations or irregularities of any kind may be rejected. ARTICLE 13-SUBMISSION OF BIDS 13.1 Bids shall be submitted before the time and at the place indicated in the Invitation to Bid, and shall be submitted in an opaque sealed envelope. The envelope shall be marked on the exterior "Bid for Construction, VEHICLE & MATERIAL STORAGE BUILDING" with the name and address of the Bidder and accompanied by the Bid Security and other required documents. If the Bid is sent through the mail or other delivery system, the sealed envelope shall be enclosed in a separate envelope with the notation "SEALED BID ENVELOPE ENCLOSED" on the face thereof. The Owner shall in no way be3 responsible for delays caused by the United States Postal Service or for delays caused by any other occurrence. Bids sent by telegram or telecopy shall not be accepted by the Owner. 13.2 Each Bid must contain the following documents in completed form: (One [1] copy each as provided herein within the Contract Documents and externally to the Contract Documents): 1. Bid Forms(Bidding Documents, entire Section 00300, 00301A and 00301B) 2. Bid Bond(surety bond or cashier's check). (Section 00410) (Original and one (1)copy if required) 3. Corporate authority to execute Bid (any corporate employee other than president or vice-president) (Section 00410) 3 4. Power of Attorney (for surety bond only) 5. Noncollusion Affidavit(Section 00480) 6. Certification of Nonsegregated Facilities (Section 00481) 7. Sworn Statement on Public Entity Crimes (Section 00482) 8. Certification of Nondiscriminatory Labor Practices (Section 00483) 13.3 More than one Bid received for the same work from an individual, firm or partnership, a corporation or3 association under the same or different names shall not be considered. Reasonable grounds for believing that any Bidder is interested in more than one Bid for the same work shall cause the rejection of all such Bids in which the Bidder is interested. If there are reasonable grounds for believing that collusion exists among the Bidders, the Bids of participants in such collusion shall not be considered. I 00100-8 1 I I ARTICLE 14 -MODIFICATION AND WITHDRAWAL OF BIDS 14.1 Bids may be modified or withdrawn by an appropriate document duly executed (in the manner that a Bid must be executed) and delivered to the place where Bids are to be submitted at any time prior to the deadline for submitting Bids. A request for withdrawal or a modification must be in writing and signed by a person duly authorized to do so; and, in case signed by a deputy or subordinate, the principal's proper written authority to such deputy or subordinate must accompany the request for withdrawal or modifications. Withdrawal of a Bid shall not prejudice the rights of a Bidder to submit a new Bid prior to the Bid Date and Time. After expiration of the period for receiving Bids, no Bid may be withdrawn, modified, or explained. 14.2 If within 24 hours after bids are opened, any Bidder files a duly signed written notice with Owner and within 48 hours thereafter demonstrates to the reasonable satisfaction of the Owner that: a) there has been a material and substantial mistake in the preparation of the Bid; and that b) the mistake is of such Igreat consequence that to enforce the Contract would be unconscionable; and that c) the mistake occurred notwithstanding the exercise of reasonable care in the preparation of the Bid; the Bidder may withdraw its Bid, and the Bid Security shall be returned provided that the Owner is not seriously prejudiced, except for the loss of its bargain. ARTICLE 15 -OPENING OF BIDS 15.1 At the specified time and place as indicated in the "Invitation to Bid" Bids shall be opened publicly (unless obviously non-responsive) and read aloud. 15.2 An abstract of the amounts of the Total Bids and suppliers of major equipment or alternates, (if any), shall be prepared and made available to all Bidders within a reasonable time after the opening of Bids. ARTICLE 16-BIDS TO REMAIN SUBJECT TO ACCEPTANCE 16.1 All Bids shall remain open for delivery by the Owner of the Notice of Award for ninety (30) calendar I days after the day of the Bid opening, but Owner may, at his sole discretion, release any Bid and return the Bid Security prior to that date. 16.2 Extensions of time when Bids shall remain open beyond the ninety (30) day period may be made only by mutual agreement between Owner, the Bidder, and the surety, if any, for the Bidder ARTICLE 17 -AWARD OF CONTRACT 17.1 To the extent permitted by applicable state and federal laws and regulations, Owner reserves the right to reject any or all Bids, including without limitation the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful skill or ability or fails to meet any other pertinent standard or criteria established by Owner. Bids may be considered irregular and subject to I rejection if they show serious omission, unauthorized alterations of form, unauthorized alternate bids, incomplete or unbalanced unit prices or irregularities of any kind. Owner also reserves the right to waive all informalities not involving price, time or changes in the Work and to negotiate contract terms with the Bidder. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. Discrepancies between words and', figures will be resolved in favor of the words. 17.2 If the Contract is to be awarded, it shall be awarded on the basis of the lowest "Total Bid" or "Total Base Bid". Additive or deductive alternates determined by the Owner, in its sole discretion, to be acceptable, 00100-9 C I (if any) shall be considered in determining the lowest responsive, responsible Bidder. In evaluating Bids, Owner will consider the qualifications of the Bidders, whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the Bid Form or prior to the Notice of Award. 17.3 A Contract shall be awarded by the Owner pursuant to applicable law. The Owner, in its sole discretion, reserves the right to reject any and all Bids and to waive any informality concerning Bids whenever such rejection or waiver is in the best interest of the Owner. If Bids exceed the amount of funds estimated by the Owner as available to finance the Project, or if bids exceed the continuing construction cost cap of $500,000, the Owner may reject all bids or may award the Contract in the best interest of the Owner. Award of this Contract is contingent upon the City of Ocoee securing adequate bond financing or funding for this Project. The City of Ocoee shall not be required to award this Contract if adequate funding is not available. The ability of a Bidder to obtain a performance and payment bond shall not be regarded as the sole test of such Bidder's competency or responsibility. Nothing contained herein shall place a duty upon the Owner to reject Bids or award the contract based upon anything other than its sole discretion as described herein. By submitting a Bid, Bidder recognizes and accepts that the Owner may reject the Bid based upon the exercise of its sole discretion and Bidder waives any claim it might have for damages or other relief resulting from the rejection of its Bid based on these grounds. 17.4 Owner may consider the qualifications and experience of subcontractors and other persons and organizations (including those who are to furnish the principal items of materials or equipment) proposed for those portions of the Work as to which the identity of Subcontractors and other persons and organizations must be submitted as provided in Articles 11 of these Instructions to Bidders. 17.5 Owner may conduct such investigations as Owner deems necessary to assist in the evaluation of any Bid 3 and to establish the responsibility, qualifications and ability of the Bidders, proposed subcontractors and other persons and organizations to perform the Work in accordance with the Contract Documents to Owner's satisfaction within the prescribed time. Owner reserves the right to reject the Bid of any Bidder 111 who does not pass any such evaluation to Owner's satisfaction. 17.6 One contract for the Work shall be awarded, if award is made, as stipulated in paragraph 17.2, to the Bidder whose evaluation by Owner indicates to Owner that the award will be in the best interests of the Project. The Successful Bidder who is awarded the Contract shall be required to perform the Work as a prime Contractor. No assignment of the Contract shall be allowed without written permission of the Owner. 3 17.7 If the Contract is to be awarded, the Owner will give the Successful Bidder a Notice of Intent to Award within 30 days after the day of the Bid opening. It is the intent, based upon acceptable bid price, to request City Commission's Authorization of Award at the October 18, 1999, regular City Commission meeting and to proceed expeditiously through construction. ARTICLE 18-TAXES 18.1 The Contractor shall pay all applicable taxes and by such means as described by the General Conditions. The Contractor is responsible for reviewing the pertinent State statutes involving the sales tax and complying with all requirements. ARTICLE 19-ORGANIZATION OF DRAWINGS AND SPECIFICATIONS 19.1 Drawings and Specifications for the Work are incorporated as follows: A. Contract to Perform Continuing Construction Services, consisting of: 1. Agreement 2. Exhibits to Agreement 00100-10 1 I I B. Project Manual for Continuing Construction Services, consisting of: 1. Bidding Documents 2. Construction Documents 1 3. Amendment to Agreement 4. Division 0-Bidding and Contract Requirements 5. Division 1 -General Requirements 6. Division 2-15 (Technical Specifications) 7. Appendix C. The Drawings have been separately bound together within a single document. ARTICLE 20-QUALIFICATIONS OF SURETY COMPANIES (If A Bid Bond Is Required) In order to be acceptable to the Owner, a surety company issuing Bid Guaranty Bonds, Performance/Payment Bonds or Maintenance Bond, called for in these Specifications, shall meet and comply with the following minimum standards: I A. Surety must be admitted to do business in the State of Florida and shall comply with the provision of Florida Statute 255.05. B. Surety companies executing bonds must appear on the United States Treasury Department's most current list(Circular 570 as amended). C. Attorneys-in-fact who sign Bid Bonds or Performance/Payment Bonds must file with such bond a Ecertified copy of their power of attorney to sign such bond. D. Agents of surety companies must list their name, address and telephone number on all bonds. E. Surety shall have at least the following minimum ratings; CONTRACT AMOUNT BEST'S RATINGS to 50,000 Class IV B+ or better 50,000 to 500,000 Class V A or better 500,000 to 2,500,000 Class VI A or better 2,500,000 and over Class VII A or better RATINGS SCHEDULE(net worth of Bonding Company) ILClass IV 3,750,000 to 5,000,000 Class V 7,500,000 to 12,500,000 Class VI 25,000,000 to 50,000,000 Class VII 75,000,000 to 100,000,000 F. All bonds must be provided on the forms contained in the Bid Documents. Failure to provide bonds Eon the Owner's forms may result in the rejection of the bid and the forfeiture of the Bid Security. ARTICLE 21 - INTERPRETATION OF QUANTITIES In the case of unit price items, the quantities of work to be done and materials to be furnished under this Contract, as given in the Proposal (Bid Form), are to be considered as approximate only and are to be used solely for the comparison of Bids received. The OWNER and/or his ENGINEER do not expressly or by implication represent that the actual quantities involved shall correspond exactly therewith; nor shall the Bidder plead misunderstanding or deception because of such estimate or quantities or of the character, location or other conditions pertaining to the work. Payment to the CONTRACTOR shall be E00100-11 I I made only for the actual quantities of Work performed or material furnished in accordance with the Drawings and other Contract Documents, and it is understood that the quantities may be increased or diminished as provided in the General Conditions without in any way invalidating any of the unit or lump sum prices bid. ARTICLE 22-CONSTRUCTION SAFETY 22.1 In instances where such is applicable due to the nature of the Work matter with which this Bid is concerned; all materials, equipment, etc., as proposed and offered by Bidders must meet and conform to all Occupational Safety and Health Act (OSHA) requirements. The Bidders' signature upon the Bid Form(Section 00300) is considered certification of conformance to such requirements. I 22.2 In the event this contract requires trench excavation, the requirement of Florida Statutes 553.60, et seq., shall be adhered to by all Bidders. All costs associated with complying with these requirements shall be as detailed in the Certificate of Compliance with Florida Trench Safety Act(Section 00301A). ARTICLE 23 - SPECIAL WARRANTY, PERFORMANCE BOND, INSURANCE AND CORRECTION PERIOD REQUIREMENTS There are special requirements pertaining to Warranty, Performance Bond, Insurance, and the Correction Period which are described in the Bidding Documents. The Bidder must include in his Bid the consideration to be paid by the Owner for the Special Warranty, Performance Bond, Insurance and Correction Period requirements as set forth in the Contract Documents. ARTICLE 24 -SIGNING OF AMENDMENT TO THE AGREEMENT 24.1 When Owner gives a Notice of Award to the Successful Bidder, it shall be accompanied by at least six (6) unsigned counterparts of the Amendment to the Agreement (Section 00500-B) and all other Contract 111 Documents. Within ten (10) days of receipt thereafter, Successful Bidder shall sign and deliver four (4) counterparts of the Amendment to the Owner together with the required Bonds, Insurance Certificates and Endorsements. Within ten(10) days after receipt of the properly executed and completed submittals, Owner shall deliver a fully signed counterpart to Successful Bidder. 3 24.2 A Successful Bidder who is awarded the Contract and fails to execute the Amendment or furnish the required Bonds or insurance certificates and endorsements within the period specified in 24.1 above, shall have its Notice of Award rescinded and shall forfeit its Bid Security to Owner as liquidated damages for its failure to enter into a contract with the Owner. ARTICLE 25 -PROTESTS The Owner is responsible for the resolution of protests by Bidders for contract award, claims, disputes, alleged patent infringements, alleged license fee(s) and other related procurement matters. The following procedures SHALL be used for all such protests. 25.1 Any party with a direct financial interest adversely affected by Owner's procurement decision SHALL file a protest under this Article, or be barred further relief. 25.2 A protest: (a) must be in writing (oral protests shall NOT be acknowledged); (b) adequately state the basis of the protest and the relief requested; and (c) be received by Owner within seven calendar days from the date the basis of the protest was, or should have been, known. 3 00100-12 25.3 After a protest has been properly filed with the Owner, the Owner shall make a determination on the merits of the protest within thirty (30) calendar days of receipt of the protest. If the Owner denies the protest, the Owner may proceed with award of the Contract unless enjoined by order of a Court of competent jurisdiction. 25.4 A protest SHALL be limited to: (a) issues arising from the procurement provisions of the Project Manual; and(b) state or local law. No protest may be filed with respect to basic project design. 25.5 The Owner's legal counsel shall establish procedures to resolve the protest based on Florida law. If the Florida law is not clearly established, the Owner shall rely on decisions issued by other states, Federal courts, the U.S. Comptroller General or other Federal agencies with related procurement experience. ARTICLE 26-APPRENTICES In the event this Contract is in excess of $25,000.00, the apprentice employment requirements of Chapter 446.011(3), Florida Statutes are hereby incorporated: 26.1 The CONTRACTOR agrees: 26.1.1 That he will make a diligent effort to hire for the performance of the Contract a number of apprentices in each occupation which bears to the average number of the journeyman in that occupation to be employed in the performance of the Contract, the ratio of at least one apprentice to every five journeymen. 26.1.2 That he will, when feasible, assure that 25 percent of such apprentices are in their first year of training, except when the number of apprentices to be hired is fewer than four. Feasibility here involves a consideration of the availability of training opportunities for first-year apprentices, the hazardous nature of the work for beginning workers and excessive unemployment of the apprentices in their second and subsequent years of training. 26.1.3 That, during the performance of the Contract, he will make diligent efforts to employ the number of apprentices necessary to meet requirements of subparagraphs 1 and 2. 26.2 The CONTRACTOR agrees to return records of employment by trade of the number of apprentices and apprentices by first year of training and of journeymen the wages paid and hours of work of such apprentices and journeymen, on a form as prescribed by the Bureau of Apprenticeship of the Division of Labor and Employment Opportunities at three-month intervals. Submission of duplicate copies of forms submitted to the United States Department of Labor shall be sufficient compliance with the provisions of this section. 26.3 The CONTRACTOR agrees to supply to the Bureau of Apprenticeship of the Division of Labor and Employment Opportunities, at three-month intervals, a statement describing steps taken toward making a diligent effort and containing a breakdown by craft of hours worked and wages paid for first-year apprentices, other apprentices and journeymen. 26.4 The CONTRACTOR agrees to insert in any subcontract under this Contract the requirements contained in this section. The term "Contractor," as used in such clauses and any subcontract, shall mean the "subcontractor." ARTICLE 27 - LICENSES AND PERMITS 27.1 Permits for this Construction Project obtained by the Owner are limited to those permits listed in Division 1 of the Contract Documents. The Contractor shall be required to comply with all provisions of 00100-13 such permits regarding workmanship, schedules, notification of starting construction, and any other conditions under which the permits are issued. 27.2 The Contractor shall obtain all necessary building permits from the City and is responsible for all associated permit fees. 27.3 The Contractor shall obtain and pay for all federal, state, county, and City permits, licenses, and other authorizations required for the prosecution of the Work, including the cost of all Work performed in compliance with the terms and conditions of such permits, licenses, and authorizations, whether by himself or others. ARTICLE 28 -CONTINGENCY ALLOWANCES A contingency allowance may be included as part of the Schedule of Bid Prices. This allowance is included to cover Contract items identified in Section 01025 - Measurement and Payment. Prior to the initiation of any 3 expenditure of any contingency allowance, an executed formal Change Order is necessary for the utilization of contingency funds. The method for computing Change Order dollar amounts shall be as specified in the General Conditions. ARTICLE 29-RETAINAGE Provisions concerning retainage and Contractors' rights to deposit securities in lieu of retainage are set forth in the Amendment for the Agreement. ARTICLE 30-PRE-BID CONFERENCE A pre-bid conference will be held at the time and place indicated in the "Invitation for Bids." Representatives of Owner and Engineer will be present to discuss the Project. Bidders are encouraged to attend and participate in the conference. Engineer will transmit to all prospective Bidders of record such Addenda as Engineer considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective. 3 END OF SECTION 3 3 3 I 3 00100-14 3 3 SECTION 00200 INFORMATION AVAILABLE TO BIDDERS 1. The Engineer has relied upon the following information. This information is for general information only and shall not be considered a part of the Bidding or Contract Documents. LISTING OF INFORMATION AVAILABLE TO BIDDERS A. Reports and Investigations Title Date Prepared by Availability 1. Geotechnical Exploration 4/20/99 Universal Engineering Sciences By Request Report#57782 2. Additional Geotechnical 8/4/99 Universal Engineering Sciences By Request Exploration B. Drawings and Data Title Date Prepared by Availability City of Ocoee March 1995 City of Ocoee Copy provided in "Noise Ordinance" Appendix of this No.95-09 Project Manual 2. Utilities: Existing utilities have been shown on the Drawings insofar as information is reasonably available; however, it will be the Contractor's responsibility to preserve all existing utilities whether shown on the Drawings or not.If utility conflicts are encountered by the Contractor during construction,the Contractor shall give sufficient notice to the Owners so that they may make the necessary adjustments. Damage to any utilities which, in the opinion of the Owner and Engineer,is caused by carelessness on the part of the Contractor shall be repaired at the Contractor's expense. Any delays ensuing from this damage will be considered as inexcusable. 3. Permits: The Owner has obtained(or is in the process of obtaining)specific construction permits related to this Work prior to advertising. Copies of these permits are provided immediately following this page. During the bid advertisement period for this Work,copies of additional permits received by the Owner will be provided to all Bidders through Addenda.Copies of approved permits received after Bid opening will be provided to the Apparent Low Bidder/Contractor.The Contractor shall strictly adhere to the specific conditions or requirements of all such permits issued by the governmental unit(s)or agency(ies)having jurisdiction over the Work. Whenever there is a difference in the requirements of a jurisdictional body and these Specifications,the more stringent shall apply. END OF SECTION 00200-1 DATE SUBMITTED: NAME OF BIDDER: SECTION 00300 BID FORM SUBMITTED: (Date) PROJECT IDENTIFICATION: CITY OF OCOEE,FLORIDA VEHICLE AND MATERIAL STORAGE BUILDING NAME OF BIDDER: BUSINESS ADDRESS: PHONE NO.: CONTRACTOR'S FLORIDA LICENSE NO.: THIS BID IS SUBMITTED TO: City of Ocoee, Florida(hereinafter called Owner) 1. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Amendment to the Agreement with Owner in the form included in the Contract Documents, to perform and furnish all Work as specified or indicated in the Contract Documents for the Contract Price and within the Contract Time indicated in this Bid Form and the Amendment to the Agreement, and in accordance with the other terms and conditions of the Contract Documents. 2. Bidder accepts all of the terms and conditions of the Bidding Documents including without limitation those dealing with the disposition of Bid Bond. This Bid will remain open for ninety (90) calendar days after the day of Bid opening. BIDDER will sign and deliver the required number of counterparts of the Amendment to the Agreement with the Bonds and other documents required by the Bidding Requirements within ten(10) days after the date of OWNER'S Notice of(Intent to)Award. 3. In submitting this Bid, Bidder makes all representations required by the Instructions to Bidders and the Agreement and further warrants and represents that: a. Bidder has examined copies of all the Bidding Documents and of the following Addenda: No. Dated No. Dated No. Dated No. Dated No. Dated No. Dated 1 No. Dated No. Dated (Receipt of all which is hereby acknowledged)and also copies of the Invitation for Bids and the Instructions to Bidders. b. Bidder has familiarized itself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance or furnishing the Work. c. BIDDER has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface of subsurface structures at 00300-1 3 DATE SUBMITTED: NAME OF BIDDER: or contiguous to the site (except Underground Facilities) which have been identified in the Supplementary Conditions as provided in paragraph 4.2.1 of the General Conditions. BIDDER accepts the determination set forth in paragraph SC-4.2 of the Supplementary Conditions of the extent of the "technical data" contained in such reports and drawings upon which BIDDER is entitled to rely as provided in paragraph 4.2 of the General Conditions. BIDDER acknowledges that such reports and drawings are not Contract Documents and may not be complete for BIDDER's purposes. BIDDER acknowledges that OWNER and Engineer do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Bidding Documents with respect to Underground Facilities at or contiguous to the site. 3 d. BIDDER has obtained and carefully studied(or assumes responsibility for having done so)all such additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions (surface, subsurface and Underground Facilities) at or contiguous to the site or otherwise which may affect cost progress, performance or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences and procedures of construction to be employed by BIDDER and safety precautions and programs incident thereto. BIDDER does not consider that any additional examinations, investigations, explorations, tests, studies or data are necessary for the determination of this Bid for performance and furnishing of the Work in accordance with the times, price and other terms and conditions of the Contract Documents. e. BIDDER is aware of the general nature of Work to be performed by OWNER and others at the site that relates to Work for which this Bid is submitted as indicated in the Contract Documents. f. BIDDER has correlated the information known to BIDDER, information and observations obtained from 3 visits to the site, reports and drawings identified in the Contract Documents and all additional examinations, investigations, explorations, tests, studies and date with the Contract Documents. g. BIDDER has given ENGINEER written notice of all conflicts, errors, ambiguities or discrepancies that BIDDER has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to BIDDER, and the Contract Documents are generally sufficient to indicate and convey3 understanding of all terms and conditions for performing and furnishing the Work for which this Bid is submitted. 3 h. This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; BIDDER has not directly or indirectly induced or solicited any other Bidder to submit a farce or sham Bid; BIDDER has not solicited or induced any person, firm or corporation to refrain3 from bidding; and BIDDER has not sought by collusion to obtain for itself any advantage over any other Bidder or over OWNER. i. BIDDER hereby agrees to commence WORK under this contract on or before a date to be specified in the NOTICE TO PROCEED and to fully complete all work of the PROJECT within the Contract Time specified in the Amendment to the Agreement(Section 00500B). BIDDER further accepts the provisions of 3 the Amendment to the Agreement as to liquidated damages and agrees to pay as liquidated damages the amount stated in the Amendment to the Agreement (Section 00500B), for each consecutive calendar day completion of the Work is delayed. Completion Schedule 1) The Project shall be substantially complete (successful pressure testing and bacteriological testing of completed water mains) lone-hundred & eighty (180) consecutive calendar days from the official Notice to Proceed. 00300-2 1 r DATE SUBMITTED: NAME OF BIDDER: 1 2) The Project shall be finally complete (Completed and Ready for Final Payment) two-hundred & seventy(270)days from the official Notice to Proceed. 4. All bid items shall include all materials, equipment, labor, permit fees, taxes, tests, miscellaneous costs of all types, overhead, and profit for the item to be complete, in place, and ready for operation in the manner contemplated by the Contract Documents. Bidder submits the following TOTAL BID OR TOTAL BASE BID to perform all the Work as required by the Drawings and Specifications. 5. In accordance with Article 17 of the Instructions to Bidders, if the Contract is to be awarded, it will be awarded on the basis of the lowest "Total Base Bid" after adjustments for additive or deductive alternates. Additive or deductive alternates (if any) will be considered in determining the lowest responsive, responsible Bidder. The Owner reserves the right to accept any or all additive or deductive alternates, in his sole discretion, prior to the award of the Contract. The Owner also reserves the right to delete any portion of the Work as shown in the bid schedule prior to award and adjust each bidder's "Total Bid" accordingly. 6. The following documents are made a condition of this Bid: a. Bidding Documents and shall include the following: 1. Bid Forms(entire Section 00300, 00301, 00301A and 00301B) 2. Bid Bond(Surety Bond or Cashier's Check). (Section 00410) 3. Corporate Authority to execute Bid 4. Power of Attorney(for Surety Bond only) 5. Noncollusion Affidavit(Section 00480) 6. Certification of Nonsegregated Facilities(Section 00481) 7. Sworn Statement on Public Entity Crimes(Section 00482) 8. Certification of Nondiscriminatory Labor Practices(Section 00483) b. Executed"Part A, Contract to Perform Continuing Construction Services(dated August, 1998)" (Remainder of Page Left Blank Intentionally.) 00300-3 C DATE SUBMITTED: 3 NAME OF BIDDER: I 3 I 3 I 3 3 (Page Left Blank Intentionally.) 3 I I 3 I 3 00300-4 I 8 4.3 . . , ,,... ,......... . '•••,,s,Akaid•.;,,i m ittAa- 1 lelac,,,'.,,,:,,,,.••. E .,,,....,.„....,.... 0 g qekrarit- ..,:ie 4.) §§....,,,4,-.....* .... ., . cn 0 g ',,pp.:,,,,,,,,,-,.•• -. gi: *t.P2tZi , ci) C4 .,:i CA FW4 t'il -al..!qi' 0.4 I.'j 41,4 likort w,4'-0 ;.,!•,7z..:.•,.:,,,i,:.-1,.. ....... .--- - ,_. — , . ...., ...., . 0 .., . 8 ;._,, —.".", z--10) s.,-; = 8 0 rif .:, z.-., --- ..> 1=1 0 I ,-,„,,,,,,....:,.... 8 4., fg, w0 ;54 'till"T'' 2 0 8 ° o .i ,,,, ,40:,,:,,,,,4-...,,- ,,, ,,, , _ , ,. — I ,. .o I .cnto Q SPR;:-4,4* I; ... ti > ,.. o u 0 rx . , ... . 0 • I ,:g..16.:,,,,:,..,,inz--0,:„.1 44, . .... (..) .I0).„,ki,,,,...11.7-4 „) k E : - A g g, v.3 o t; E g . .4 ,.. 0 0 0 2 o d'241,•:',;'=';,..,:: CC1 E-1 T.. •';-1 0 . — 2 § .-- ' c. 5 a. tr, C 0 .,... 0( CZ ILI ' " g;I: 1-73. e ,... 'ogli,:oga,,:i, , . . -0 - —,.., o ta. . 'E •,7... 0 4.5. E' •K-.:,T,.•'1,,,,,.!?A• 4.. 4 .53, ra. — t.',,,:kpii,&:•,F,7 E 0 = 3 bO be lit 2 .2 g C.) ',11,-•,., 3.-rii*,--,t; 8 0 ...) (.) ..... % fg .s 1 c..)-to c_, 1 .1 .2 :Tii,kirittfit',.e, ..0 a.74 sa ,:iFP4:5'-'---•Pft = a ft; ',1". g = (1) = a al 0 I ,.:„.„,..,.. .„,.......,..„...... ... ...., ,i•,•'•,'',""',' CC CI) ' ':',1:;:',.,4,N,',E,:":. •N .....1 ,). 4.) -1::' — 0 = ) .t.1.). 8 o c.) 0 tx ue ._a u cf) vl 0 Mi m 8 o ,_4 c. fi Q '''' . . —• — E , ... - ,:,,,.,. .. 0 __; 2 (71 ., ms-2,ci, --. co /L. :.. ,•.. E cn 4.1 14 .,,• .-0.illi.; •:•-,2 a'f • 04 $74',' I-. 2 .-...., .. < q Z E I 3 3 3 I 3 I 3 1S as 8 3a I 3 I I 1 A A Era w AO H � az I E „,,,,, „.... ,. %,e,4 ,,. 'tt 8 '-'17,3 z r IL E°r ,,s ,.• I ,„,:to?,,,,,,, „,,,,,;1-zpi, I , -„, .„..4,„ v,.,.... ...... .„,,,,,,-„,,,,,,,,,,, ,.,,, , ,,,,,,,, E iliwklif:244.- c,„:„..,:.e,i,„;."'- t ,,,,,,,,,,.„,,,,,,,,,..„.,.. ,..:4,.,..,,,,,,,. ,,, ,lt;:: 7-Z.1 aa t a� i y x'3 w WQ Wn n ,, UI 4/ vWW a .a A ,..)0El 41 Ow c o O = �� - N .� 00 N N c+1 p�� I a � .„„,,t, 8 t, , :,,,1 :, ,.,1IL . ,,,,,,,-1.4-2;A e y ` �, *I •?s,ti.:;'::',1:41 --IL un *1......•c,....,,,wAkv. a crs U c 023 rsy I ,0, 8 °' `� 0 0 y 0 d o, •2 a > y ob °..' •23 - Et .,„:„..._,,_,::„.,.., ..)E , w ami v� ►e � oGoj u .9 mo E o u °4 •K c o4 1 .,,,,,.. ,„,-,4 .0' C,q w = a8 $ c>a r� ami W ►=, o , w w m 3 0 a4 00 04 04 e4 0 o U I ..• ... . . cQn • P ►e W HA1.4 ►ee W WWa in IL a u' � -. r-- O O O� .~r - -4m. ,fir - cn F" 1r2-7,„,:ki:Pet----;,i-Zi-0",,,,,,„•,,,- Ea z ,,,,,,,,,,' ,---- - I I I I I I I I .2 a� S o0 8 b a 3 I 3 3 wA E. A baa coO W H QQ Az I I ,,,„ ,, ir H , z 8 II , ,,;04,,,,,,,,,' :t' ..., „ , �p I ,,,,,,-,4,,,i,31,,,,,41,,,,, 3 F.,,,, ^. ,,, 44:„.1.,.:4,m,„ f I I , 44,, .,..,....ko., 15z4,,, 14: ,......„.4..b.„4„:„., , ,_,,„,,,,o,,,,,,,,,,,,,,1„,,...„.*: 1 %,1-41,-;,,,,,,,,;,, ..,,,, I ,,,,-,--;-.V,,€,&"'-x.'-,.:" I '; a w a ivi w _ill.., .,W 0 M M M 1 I 1 w 0 1 el ' r - a — Mj - N NO [y ON aU � A O WO � y 3 it,,f,--,--ik,,,„:„..;,,i,,-,1;4, ,,,, , s A 1 ,:„,,., 01,-4,,,,„4:4,,lwi„.4„,„ w ,,,,!„,„76.0,,, ',4A I tri E U ; d E i cj 1 l„„,,., ,, _ ,,,,,02.,..„ �+S gam: I �� , 1 , „.,,,,i0,,,,,,,..„ ,,,,,,,,, , . �� ,„.. .,...„ „„.„,„„„,.,. , ,,., .,„,,„._. ' ' U VU, 6. I 0 ,s2 E—. 8 c4 3 C . 11 w Apo W W aq ye N ° _ 0Uro b cts +E >A � NO ECA V.1 W H 7 oo, ' oo O� O N v7, N N E A Z e C U U O 3 I 0 3 I I a 3 3 11 3 1.4� w A � at Aow O Az 2 d, I 8 s's, , W U E ... O 'a z' 0 i I .: ,, ,... ,,,,,..„,„,„, ,,,,,,„.„„„, ..,,,, ,h1.,,,a4m,,,,,,, ,,, , ,_,,,,,,,,,,,,,,,!„,..i,7::,,,,,,.,,,,„::,,,,,,,.. E 14,,,,,,,,,,:::„...,*.,..„.... „1:41:.,„.,,,4 ,... of:44,4: c ----,;.,.,, ,,..,,,..,, I1= .,,--S:::-.'P'' I0 a:,,,,,,,,:„.:,,,..,,,,-,-,:::-„, „.„..,,,,... ,„ „ ,,„ __,. ....,_... ,,, ,, . „„... . „.._ ,, ,, cn .1.,,,„. w,,, ,,-„,,,:- v) .- _ I :0 - -,,,,,,,„ .,,,,,.:: ..„:ci) w . .., . .. . ,,,, ,,,,.: x 0 *.,:mmsg,„,,,,3,:: ,..t,,,,,..1... I O0 m4 8 § 9-ts:tV PI we E 0 ow. 4,,op.„2.,:iii,„;. 1.1.iii. :::::„..1.,,,,, :.,,,,.,:,....t2„, ,,,,,,,,....: ::: .,,,,t,:li.,,, ,„„ , . ,„,,, -,,,i,,,,,,c. ..:„..,-:-. ,,,i,,N: IU ,,,„4,,,,,,,.., :„ u $ „.4.zi,„:„::.:::., ,,,,.,,, a , .-, W' a ,',,,,,,f01.14, �, s .,„,,, .,,.g - , .5 1 r._, .,... , ... .9.... 00 'a.+ 'd I E ,,,,,,,,:„: ,. -Vid' 2 C7 ,-; `WW F qq eD U U U�w :d q wo� `' 0v ct o. /701 1 E ao cL vo H E-. to c4wOcwW in N o0' rN N N N (NI • 0 is CO ik I U U U r), Gil O 3 I 3 I I a a� S ao3 a 3 3 I I r AO CnH Az csi I E 0 u , o C. , m , — . . . - ' "•• _, ,:....:.i,,iii.,,,,,i.,,,2d,,i,:,„,,,,,,-. —.• ------ ---. -. Ir°:'•'"':''''''Z'''''''''74. —,..„....„,,,,....„„,...g. E , .,.. ...„..,.„..... I ,„,,.... .. ....,..,,, Ec..1 gz itrfammolimli,., I cn P ifglitPgit '' '- 122 •h,onli:,:lom.:'p.,.01--,i,. cn w T,.,.!:'.!!!!:-7,!:-.---:'''-•:::t:::;.::::., ._4(n w .-4 1 _ _ ..., _. l . ::::11.1111Willit A.1.. E L cp z — (...) z _:t.., iii,•,,,::::::,..,,,,,N..-t,..-,4- = I ci) -- ttzlir444.; z c co w tivitoAlit .6 C: C..) 1:01,4K641:,.:ce E ::-.,:oe,::....•.&,•,-„,;..,,,, '-'1A1.7.4.41:-P14-kr. 6 Ellitl!,,Ijiltit C en E ta ilftti. 0 o li 11t*i:Ao'oAI'l 4 lilli*Iteil.A:* .--i 1-4':-161111111 1 8 in C a 0„0:6,0,63iiti.,,,-.4 .. ,:-:-.,:gag,74,,,,,,,,,,s,..„,,, ,,,,...,,,,,,„,0,0.,..,:,,,,„__:::,:,: ... , , , 00 2 gg , 'E .5 2 v 00 () .0 0. E tu rii I •• •• o g 14 1.4 tAZifr:Zet ::, ,o,;::*:,:.,;:_,.:;0:4..i..:11i',,,,,!!,,,,1",,...;,,7::..,!,::,...:::.,,:'.:-'1,,,I, : ;.2 ti:VAINIRS::'.'. rx. .5 „..._,...„:„.._ ...:. '' -- ba aci lifir.',V=ltAg??!.:t :0 U 0 0 ,.. G... g Cho IL, •-ci. 73 0 0 bo on CO U .8 .E = -0 ;CiE ;p_.5 C71 ..,,,,..•,,,L„,,,„.,.:„„„:,,,, ._., U L; r.T4 a, I 0 CI3 .•.#00::•-.:MZ:-M.:-.;_:,,,!,iQ,07:- 0 < ge CO g1:1 j:.JN,::,,:i:•:.A.,.::',:,::,:,: -,::: gil l 14 14 (4 en g 144.'''''''''''''' 00 °N c) ''' (csr ci en ,0-.:,:::: .3m.—:,.:,. .,,:,,. ei (-1 er) en •-.4 . . .. .1 ^.. C ._.,......... ,.„,,.„,.: :,,,., ,.,,,,,grov.:4_,•:„„,„,„, 73 0 E. I U thU W 0 I 3 I 3 I I o u 3 5 j aa'o 3 I 3 r.41.4 th I Q ►� A � w t O F" az 1 DATE SUBMITTED: NAME OF BIDDER: 7. The terms used in this Bid, which are defined in the General Conditions or Instructions of the Construction Contract, included as part of the Contract Documents have the meanings assigned to them in the General Conditions or Instructions. 8. The work shall be performed under a Florida Contractor's License. Contract shall not be awarded unless proof of valid license(s)is provided. 9. It is understood that where quantities for unit price work have been presented in the foregoing Schedule of Bid Items, they are approximate only and are solely for purpose of facilitating the comparison of bids, and that the Contractor's compensation will be computed upon the basis as described in the measurement and payment clauses in the specifications contained herein. 10. BASE BID-SCHEDULE OF MANUFACTURERS/SUPPLIERS If the foregoing Schedule of Bid Items is presented in a Base Bid format, the undersigned as Bidder agrees that the Contract, if awarded, will be on the basis of the materials and equipment named in the Contract Documents in accordance with Article 9 of the Instructions to Bidders. The undersigned as Bidder also agrees that for the "Base Bid" equipment and material items listed below the Bidder will provide one of the listed manufacturers/suppliers, by circling "A", "B", or "C". If the Bidder desires to propose an alternate manufacturer/supplier, he may write in the name of such alternate in the substitution list included within this Bid Form, but he must, nevertheless, also circle one of the listed manufacturers/suppliers. If the proposed alternate manufacturer/supplier is determined "not equivalent" by the Engineer, the Bidder must furnish equipment and/or material items by the circled manufacturer/supplier. If the Bidder fails to indicate which listed manufacturer/supplier he intends to use if an alternate is rejected, he must use the manufacturer/supplier listed as "A". Also, if the Bidder circled more than one listed manufacturer/supplier, he must use the first manufacturer/supplier circled (unless an alternate is approved). 11. SUBSTITUTIONS AND "OR EQUAL" The undersigned as Bidder agrees that substitutions or "or-equal" items will not be considered until after the "Effective Date of the Agreement" and will be evaluated in accordance with paragraphs 6.7.1, 6.7.2, and 6.7.3 of the General Conditions. In addition to the reimbursement required under the General Conditions, the Contractor shall also reimburse the Owner for any engineering costs directly attributable to the change in manufacturers/suppliers, caused by the acceptance of proposed alternates, such as; additional field trips for the Engineer, additional redesign costs, and additional review costs, etc. Other costs directly attributable to the change in manufacturers/suppliers caused by the acceptance of proposed alternates, such as; increased electrical requirements, larger building, additional pumps or tankage, etc., shall be borne by others and not the Owner. If Bidder intends to propose substitutions or "or-equal" items after the "Effective Date of the Agreement", it is agreed that these items will be listed on the Substitution List included within this Bid Form, with a deductive amount representing 50 percent of the total savings between the named Base Bid item and the proposed item. "Base Bid" item substitutions providing to the Owner an equipment or material cost savings of less than $1,000 will not be considered. The undersigned as Bidder, also agrees that if a substitution or "or-equal" item is not listed on the Substitution List included with the Bid, all of the savings between the named item and the proposed item will go to the Owner if the Owner accepts the proposed item in accordance with paragraphs 6.7.1., 6.7.2, and 6.7.3 of the General Conditions. The Owner may request, and the undersigned Bidder shall supply, complete information on proposed substitutions. Such information shall be the manufacturer's current published or preprinted information for the specific substitution. 12. As BIDDER, I hereby certify that I am aware and understand that the City of Ocoee at its sole discretion reserves the right to waive technicalities or irregularities, to reject any or all Bids, and/or to accept that Bid which is in the best interest of the City. The Award of this Bid, if made, may be based on considerations other than total cost, and may be awarded based on various considerations, including but not limited to: BIDDER experience and whether the Bid, in the judgement of the City, is the most responsive to City needs. The City of 00300-15 DATE SUBMITTED: NAME OF BIDDER: Ocoee encourages the use of minorities and women-owned businesses as subcontractors. 3 SCHEDULE OF BASE BID MANUFACTURERS/SUPPLIERS SAMPLE ONLY Equipment Item and(Specification Section) Manufacturer/Supplier Ductile Iron Pipe and Fittings(15062) A. American Cast Iron Pipe Co. B. U.S. Pipe and Foundry C. McWane D. Griffin E. Tyler 3 PVC Pipe and Fittings(15064) A. J-M B. CertainTeed C. Can-Tex D. CPS E. Capco F. North American G. Diamond H. River City Plastics Butterfly Valves(15100, 15103) A. Kennedy 3 B. Mueller C. Clow D. M&H E. Pratt F. American Flow Control G. Keystone3 F. Dezurik Gate Valves(15100, 15101) A. American Flow Control B. Mueller C. U.S. Pipe D. Clow E. Waterous3 F. M&H G. American AVK Valve Boxes(15116) A. Tyler B. Bingham/Taylor C. Russell D. Red Head E. American Flow Control Air Release Valves(15100, 15122) A. APCO B. Val-Matic C. Empire Finishes-Painting(09900) A. Kop-Coat B. Tnemec 00300-16 i DATE SUBMITTED: NAME OF BIDDER: SUBSTITUTION LIST Bidder offers the following substitutions and"or equal"items. Deductible Amount* Equipment Alternative (Indicate Whether Item or Spec Manufacturer/Supplier Lump Sum or Material Section (List One Only) Unit Price) II I I i II *Represents 50 percent of the difference in cost in accordance with the General Conditions(Minimum Deductible Amount per Substitution Item shall be$1,000) (Bidder may make additional copies of this page as required.) 00300-17 DATE SUBMITTED: NAME OF BIDDER: I Instructions: Strike out(X)nonapplicable signature block and complete applicable block. (ALL SIGNATORIES MUST HAVE THEIR NAMES PRINTED OR TYPED BELOW THEIR SIGNATURES) 3 If Bidder is: SOLE PROPRIETORSHIP 3 (SEAL) (Individual's Signature) (Individual's Name) doing business as Business Address: 3 Phone No.: Florida License No.: A PARTNERSHIP 111 (SEAL) (Partnership Name) (General Partner's Signature) (General Partner's Name) Business address: 3 Phone No.: 3 Florida License No.: 00300-18 1 DATE SUBMITTED: NAME OF BIDDER: Instructions: Strike out(X)nonapplicable signature block and complete applicable block. (ALL SIGNATORIES MUST HAVE THEIR NAMES PRINTED OR TYPED BELOW THEIR SIGNATURES) If Bidder is: A CORPORATION (Corporation Name) (State of Incorporation) By (Name of person authorized to sign) (Title) (Authorized Signature) (Corporate Seal) Attest (Secretary) Business address: Phone No.: Corporation President: Florida License No.: 00300-19 3 DATE SUBMITTED: 3 NAME OF BIDDER: Instructions: Strike out(X)nonapplicable signature block and complete applicable block. (ALL SIGNATORIES MUST HAVE THEIR NAMES PRINTED OR TYPED BELOW THEIR SIGNATURES) If Bidder is: A JOINT VENTURE By (Name) (Address) By3 (Name) (Address) 3 Business Address: Phone No.: Florida License No.: 3 (Each joint venturer must sign. The manner of signing for each individual,partnership,and corporation that is a party to the joint venture should be in the manner indicated above) 3 Florida License No.: 3 12. List the following in connection with the Surety which is providing the Bid Bond: Surety's Name: 3 Surety's Address: 1 Name and address of Surety's resident agent for service of process in Florida: tY g 3 1 END OF SECTION 3 00300-20 1 SECTION 00301 QUESTIONNAIRE DATE: PROJECT IDENTIFICATION: CITY OF OCOEE, FLORIDA VEHICLE AND MATERIAL STORAGE BUILDING NAME OF BIDDER: BUSINESS ADDRESS: Phone No. CONTRACTOR'S FLORIDA LICENSE NO. The undersigned warrants the truth and accuracy of all statements and answers herein contained. Include additional sheets if necessary. 1. Complete the following Table regarding experience with projects similar to the work contemplated under this Continuing Construction Services Agreement. Date of Client's Name&Address(Include Amount of Contract Name of Project&Location: Contact Name and Phone#) Contract 1 00301-1 I Date of Client's Name&Address(Include Amount of Contract Name of Project&Location Contact Name and Phone#) Contract 3 3 I I 2. Have you ever failed to complete work awarded to you? If so, where and why? 3 3. Have you personallyinspected the general alignments of the various utilityimProvements proposed under this Continuing Construction Services agreement? Describe any anticipated problems with the sites and your proposed solutions. 3 4. Will you Subcontract any part of the work involving the construction of underground utilities? If so, describe which portions. I I I 00301-2 5. Listthe names and addresses of the subcontractors to be used for the portions of the contemplated work listed above. Subcontractor Certification Subcontract Name and Address of Subcontractor Registration No. &Name I C 6. Disclosure (Section 00100, Article 20). Complete and attach "Sworn Statement on Public Entity Crimes" (Section 00482). 7. State the true and exact, correct, and complete name under which you do business. BIDDER IS: END OF SECTION 00301-3 SECTION 00301-A COMPLIANCE WITH FLORIDA TRENCH SAFETY ACT (90-96,LAWS OF FLORIDA) Bidder hereby acknowledges that all costs for complying with the Florida Trench Safety Act are included in the various items of the bid and in the Lump Sum Total Bid Price shown in Section 00300 -Bid Form, "Schedule of Bid Items". For informational purposes only,the bidder is required to further identify these costs in the summary below. Trench Safety Unit of Measure Measure Unit Unit Extended (Description) (LF,SY) (Quantity) Cost Cost A $ $ B $ $ C $ $ D $ $ TOTAL $ BIDDER: SIGNED: BY: (Print or type name) TITLE: DATE: THIS IS NOT A PAY ITEM: The purpose of this form is to gather information on the costs associated with trench safety measures and to insure that the Bidder has considered these costs and included them in the Lump Sum Total Bid price. Contractor will not receive additional payment if actual quantities differ from those estimated or if the Contractor uses a safety measure different than those listed. (Failure to Complete This Form May Result in the Bid Being Declared Non-Responsive.) END OF SECTION 00301A-1 C SECTION 00301-B DRUG-FREE WORKPLACE CERTIFICATION IDENTICAL TIE BIDS: Preference shall be given to businesses with drug-free workplace programs. Whenever two or more bids which are equal with respect to price, quantity, and service are received by the State or by any political subdivision for the procurement of commodities or contractual services,a bid received from a business that certifies that it has implemented a drug-free workplace program shall be given preference in the award process. Established procedures for processing tie bids will be followed if none of the tied vendors have a drug-free workplace program (Florida Statutes Section 287.037). In order to have a drug-free workplace program,a business shall: 1. Publish a statement notifying employees that the unlawful manufacture,distribution,dispensing,possession,or use of a controlled substance is prohibited in the workplace and specifying the actions that will be taken against employees for violations of such prohibition. 2. Inform employees about the dangers of drug abuse in the workplace, the business's policy of maintaining a drug-free workplace,and available drug counseling,rehabilitation,and employee assistance programs, and the penalties that may be imposed upon employees for drug abuse violations. 3. Give each employee engaged in providing the commodities or contractual services that are under bid a copy of the statement specified in subsection(1). 4. In the statement specified in subsection (1), notify the employees that, as a condition of working on the commodities or contractual services that are under bid,the employee will abide by the terms of the statement and will notify the employer of any conviction of, or pleas of guilty or nolo contendere to, any violation of Chapter 893 or of any controlled substance law of the United States or any state,for a violation occurring in the workplace no later than five(5)days after such conviction. 5. Impose a sanction on, or require the satisfactory participation in a drug abuse assistance or rehabilitation program is such is available in the employee's community,by any employee who is so convicted. 6. Make a good faith effort to continue to maintain a drug-free workplace through implementation of this section. As the person authorized to sign the statement,I certify that this fine complies fully with the above requirements. Bidder: Signed: By: (Print or Type Name) Title: Date: END OF SECTION C 00301-B-1 SECTION 00410 BID BOND KNOW ALL MEN BY THESE PRESENTS, that we, the undersigned, as Principal, and , as Surety, are hereby held and �Y firmly bound unto the City of Ocoee, Florida, as Owner in the penal sum of five percent of the Contract Bid ($ ) for payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors and assigns. Signed, this day of , 19 The condition of the above obligation is such that whereas the Principal has submitted to the City of Ocoee, Florida a certain Bid, attached hereto and hereby made a part hereof to enter into a contract in writing, for the City of Ocoee Vehicle and Material Storage Building. NOW THEREFORE 1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to pay to Owner upon default of Bidder any difference between the total amount of Bidder's bid and the total amount of the bid of the next lowest, responsible and responsive bidder as determined by Owner for the Work required by the Contract Documents, provided that: 1.1. If there is o such next lowest, responsible and responsive bidder, and Owner does not abandon the Project, then Bidder and Surety shall pay to Owner the penal sum set forth on the face of this Bond, and 1.2. In no event shall Bidder's and Surety's obligation hereunder exceed the penal sum set forth on the face of this Bond. 2. Default of Bidder shall occur upon the failure of Bidder to deliver within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Amendment to the Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents and Contract Documents. 3. This obligation shall be null and void if: 3.1. Owner accepts Bidder's bid and Bidder delivers within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Amendment to the Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents and Contract Documents, or 3.2. All bids are rejected by Owner, or 3.3. Owner fails to issue a Notice of Intent to Award to Bidder within ninety (90) days from the time and date fixed for the opening of Bids (or any extension thereof agreed to in writing by Bidder and, if applicable, consented to by Surety when required by paragraph 5 hereof). 4. Payment under this Bond will be due and payable upon default by Bidder and within thirty (30) calendar days after receipt by Bidder and Surety of written notice of default from Owner, which notice will be given with reasonable promptness, identifying this Bond and the Project and including a statement of the amount due. 00410-1 5. Surety waives notice of any and all defenses based on or arising out of any time extension to issue notice of award agreed to in writing by Owner and Bidder, provided that the total time for issuing notice of award including extensions shall not in the aggregate exceed 120 days from Bid Due Date without Surety's written consent. 6. No suit or action shall be commenced under this bond prior to 30 calendar days after the notice of default required in paragraph 4 above is received by Bidder and Surety and in no case later than one year after Bid Due Date. 7. Any suit or action under this Bond shall be commenced only in a court of competent jurisdiction located in the state in which the Project is located. 3 8. Notices required hereunder shall be in writing and sent to Bidder and Surety at their respective addresses shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier or by United States Registered or Certified Mail, return receipt requested, postage pre-paid, and shall be 3 deemed to be effective upon receipt by the party concerned. 9. Surety shall cause to be attached to this Bond, a current and effective Power of Attorney evidencing the authority of the officer, agent or representative who executed this Bond on behalf of Surety to execute, seal and deliver such Bond and bind the Surety thereby. 10. This Bond is intended to conform to all applicable statutory requirements. Any applicable requirement of any applicable statute that has been omitted from this Bond shall be deemed to be included herein as if set forth at length. If any provision of this Bond conflicts with any applicable provision of any applicable statute, then the provision of said statute shall govern and the remainder of this Bond that is not in conflict therewith shall continue in full force and effect. 11. The term "bid" as used herein includes a bid, offer or proposal as applicable. 3 IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals, and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their3 proper officers, the day and year first set forth above. I I 3 3 I 3 00410-2 I BIDDER: trike out (X) non - applicable signature block and complete applicable block. All signatures ust have their names printed or typed below their signature. If Bidder is SOLE PROPRIERTORSHIP, complete this signature block I (1) (Individual's Signature) (Witness) (2) (Individual's Name) (Witness) doing business as (SEAL) (Business Address) (Telephone No.) (Florida License No.) If Bidder is PARTNERSHIP,complete this signature block. (1) (Partnership Name) (Witness) (2) (General Partner's Signature) (Witness) (General Partner's Name) (SEAL) (Business Address) (Telephone No.) (Florida License No.) 00410-3 1 If Bidder is a CORPORATION,complete this signature block. ATTEST: • (Corporation Name) (Corporate Secretary, Signature) (State of Incorporation) (Corporate Secretary Name) By: (Name of person authorized to sign-see Note 1) (Title) (CORPORATE SEAL) (Authorized Signature) I (Corporation President) I (Business Address) 111 (Telephone No.) (Florida License No.) 3 00410-4 I SURETY: I WITNESS: (If Agent is not a Corporation) (1) (Surety Business Name) (Witness) (2) (Witness) Place of Business) (Principal ATTEST: (If Agent is a Corporation) (Surety Agent's Signature-See Note 2) (Surety Agent's Name) (Corporate Secretary Signature) (Surety Agent's Title) (Corporate Secretary Name) (Business Name of Local Agent for Surety) (CORPORATE SEAL) (Business Address of Local Agent) ( ) (Telephone No.) (Florida License No.) NOTES: (1) Complete and attach "Corporate Authority to Execute Documents" if executed by any corporate employee other than president or vice-president. (2) Complete and attach a certified copy of "Power-of-Attorney" prepared by Surety appointment individual "Attorney-in-Fact" for execution of Bid Bond on behalf of Surety and corresponding notarized "Attorney- in-Fact". (3) Above addresses are to be used for giving required notice. (4) Any singular reference to Bidder, Surety, Owner or other party shall be considered plural where applicable. (5) Surety companies executing bonds must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the state where the project is located. 00410-5 1 CORPORATE AUTHORITY 3 TO EXECUTE DOCUMENTS I HEREBY CERTIFY that a meetingof the Board of Directors of (Contractor's Corporate Name) a corporation under the laws of the State of , held on the day of , 19 , the following resolution was duly passed and adopted: "RESOLVED, that (signature of individual) (typed name of individual) as of the corporation, is hereby authorized to execute and all documents required to be signed by an officer of the Corporation in order to submit a valid bid, contract and bond for (project name) (Bid No.) between the CITY OF OCOEE, a municipal corporation, and this corporation, and that his execution thereof, attested by the Secretary of the corporation and with corporate seal affixed shall be the official act and deed of this corporation." I FURTHER CERTIFY that said resolution is now in full force and effect. IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the corporation this day of , 19 (CORPORATE SEAL) I (Corporate Secretary) STATE OF COUNTY OF The foregoing instrument was acknowledged before me this day of by (name of officer or agent, title of officer or agent), of (name of corporation acknowledging), a (state or place of incorporation), corporation, on behalf of the corporation. He/She is personally known to me or has produced identification (type of identification) as identification and did/did not take an oath. (Notary Public) 3 My Commission Expires: I 00410-6 1 SECTION 00480 NONCOLLUSION AFFIDAVIT STATE OF ) ss COUNTY OF ,being first duly swore deposes and says that: 1. He(it)is the (Owner,Partner,Office,Representative or Agent) of ,the Bidder that has submitted the attached Bid; 2. He is fully informed respecting the preparation and contents of the attached Bid and of all pertinent circumstances respecting such Bid; 3. Such Bid is genuine and is not a collusive or sham Bid; 4. Neither the said Bidder nor any of its officers, partners, owners, agents, representatives, employees, or parties in interest, including this affidavit, have in any way, colluded, conspired, connived or agreed, directly or indirectly, with any other Bidder, firm or person to submit a collusive or sham Bid in connection with the Contract for which the attached Bid has been submitted; or to refrains from bidding in connection with such Contract; or have in any manner,directly or indirectly, sought by agreement or collusion, or communication, or conference with any Bidder, firm,or person to fix the price or prices in the attached Bid or of any other Bidder,or to fix any overhead,profit,or cost elements of the Bid price or the Bid price in any other Bidder, or to secure through any collusion, conspiracy, connivance, or unlawful agreement any advantage against (Recipient), or any person interested in the proposed Contract; 5. The price or prices quoted in the attached Bid are fair and proper and are not tainted by any collusion, conspiracy, connivance, or unlawful agreement on the part of the Bidder or any other of its agents, representatives, owners, employees or parties in interest,including his affidavit. E By: Title: Sworn and subscribed to before me this day of , 19 ,in the State of ,County of Notary Public My Commission Expires: END OF SECTION 00480-1 SECTION 00481 CERTIFICATION OF NONSEGREGATED FACILITIES The Bidder certifies that he does not maintain or provide for his employees any segregated facilities at any of his establishments, and that he does not permit his employees to perform their services at any location, under this control, where segregated facilities are maintained. The Bidder certifies further that he will not maintain or provide for his employees any segregated facilities at any of his establishments, and that he will not permit his employees to perform their services at any location under his control where segregated facilities are maintained. The Bidder agrees that a breach of this certification will be a violation of the Equal Opportunity clause in any contract resulting from acceptance of this Bid.As used in this certification,the term"segregated facilities"means any waiting rooms,work areas,restrooms and washrooms, restaurants and other eating areas, timeclocks, locker rooms and other storage and dressing areas, parking lots, drinking fountains, recreation or entertainment area, transportation, and housing facilities provided for employees on the basis of race, color, religion, or national origin, because of habit, local custom, or otherwise. The Bidder agrees that(except where he has obtained identical certification from proposed subcontractors for specific time periods) he will obtain identical certifications from proposed subcontractors prior to the award of subcontracts exceeding$10,000 which are not exempt from the provisions of the Equal Opportunity clause, and that he will retain such certifications in his files. The nondiscriminatory guidelines as promulgated in Section 202,Executive Order 11246,and as amended by Executive Order 11375 and as amended,relative to Equal Opportunity for all persons and implementations of rules and regulations prescribed by the United States Secretary of Labor are incorporated herein. Note: The penalty for making false statements in offers is prescribed in 18 U.S.C. 1001. Date , 19 Official Address By: (including Zip Code): (Title) ATTACH AND INCLUDE AS PART OF PROPOSAL FORM; FAILURE TO DO SO MAY BE CAUSE FOR DISQUALIFICATION OF YOUR BID. END OF SECTION I 00481-1 SECTION 00482 (Page 1 of 2) SWORN STATEMENT UNDER SECTION 287.133(3)(a), FLORIDA STATUTES,ON PUBLIC ENTITY CRIMES THIS FORM MUST BE SIGNED IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICER AUTHORIZED TO ADMINISTER OATHS. 1. This sworn statement is submitted to City of Ocoee,Florida by (Print individual's Name&Title) whose business address is 2. I understand that a "public entity crime" as defined in Paragraph 287.133(1)(g), Florida Statutes,means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or with the United States,including,but not limited to, any bid or contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state or of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering,conspiracy,or material representation. 3. I understand that "convicted" or "conviction" as defined in Paragraph 287.133(1)(b), Florida Statutes, means a finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trial court of record relating to charges brought by indictment or information after July 1, 1989,as a result of a jury verdict,nonjury trial,or entry of a plea of guilty or nolo contendere. 4. I understand that an"affiliate"as defined in Paragraph 287.133(1)(a),Florida Statutes,means: a. A predecessor or successor of a person convicted of a public entity crime:or b. An entity under the control of any natural person who is active in the management of the entity and who has been convicted of a public entity crime. The term "affiliate" includes those officers, directors, executives, partners,shareholders,employees,members,and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair market value under an arm's length agreement,shall be a prima facie case that one person controls another person. A person who knowingly enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shall be considered an affiliate. 5. I understand that a "person" as defined in Paragraph 287.133(1)(e), Florida Statutes means any natural person or entity organized under the laws of any state or of the United States with the legal power to enter into a binding contract and which bids or applies to bid on contracts for the provision of goods or services let by a public entity,or which otherwise transacts or applies to transact business with a public entity. The term "person" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in management of an entity. 6. Based on information and belief,the statement which I have marked below is true in relation to the entity submitting this sworn statement. (please indicate which statement applies). Neither the entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in management of the entity, nor 00482-1 any affiliate of the entity have been charged with and convicted of a public entity crime subsequent to July 1, 1989. The entity submitting this sworn statement, or one or more of the officers,directors, executives,partners, shareholders, employees, members, or agents who are active in management of the entity, or an affiliate of this entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. The entity submitting this sworn statement,or one or more of the officers, directors, executives,partners, shareholders, employees, members, or agents who are active in management of the entity, or an affiliate of this entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. However,there has been a subsequent proceeding concerning the conviction before a Hearing Officer of the State of Florida,Division of Administrative Hearings. The fmal order entered by the Hearing Officer determined that it was not in the public interest to place the entity submitting this sworn statement on the convicted vendor list. (Please attach a copy of the fmal order.) I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 1 (ONE) ABOVE IS FOR THAT PUBLIC ENTITY ONLY AND,THAT THIS FORM IS VALID THROUGH . I ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES FOR CATEGORY TWO OF CHANGE IN THE INFORMATION CONTAINED IN THIS FORM. I (Signature) Date: Name of Bidder(Contractor) 3 STATE OF COUNTY OF PERSONALLY APPEARED BEFORE ME,the undersigned authority, who,after first being sworn by me,affixed his/her signature in the place provided above on this I day of , 19 . I Notary Public 3 My Commission Expires: END OF SECTION 00482-2 3 SECTION 00483 CERTIFICATION OF NONDISCRIMINATORY LABOR PRACTICES This certification relates to a construction contract proposed by the City of Ocoee. Equal Opportunity Employment: The Contractor shall not discriminate on the basis of race, color, national origin,gender,age,handicapped status,veteran status,and/or religion in performing the work governed by this contract. The City is an Equal Opportunity Employer(EOE)and as such encourages all contractors to comply with EOE regulations. Any subcontract the Contractor may enter into shall include this clause with the same degree of application being encouraged. I am the undersigned prospective construction contractor or subcontractor. I certify that... (1) I have/ have not participated in a previous contract or subcontract subject to the Equal Opportunity Clause and (2) If I have participated in a previous contract or subcontract subject to the Equal Opportunity Clause,I have/ have not filed with the Joint Reporting Committee, the Director of the Office of Federal Contract Compliance Programs, or the Equal Employment Opportunity Commission all reports due under the applicable filing requirements. I understand that,if I have participated in a previous contract or subcontract subject to the Equal Opportunity Clause and have failed to file all reports due under the applicable filing requirements, I am not eligible, and will not be eligible,to have my bid or offer considered, or to enter into the proposed contract or subcontract, unless and until I make an arrangement regarding such reports that is satisfactory to the office where the reports are required to be filed. I agree that I will obtain identical certifications from prospective lower-tier construction subcontractors when I receive bids or offers or initiate negotiations for any lower-tier construction subcontracts with a price exceeding$10,000. I also agree that I will retain such certifications in my files. Date , 19 By: (Signature of Authorized Official) I (Name of Prospective Construction Contractor or Subcontractor) (Address of Prospective Construction Contractor or Subcontractor) (Telephone Number) (Employer Identification Number) END OF SECTION k: I 00483-1 SECTION 00501 CORPORATE AUTHORITY TO EXECUTE DOCUMENTS I HEREBY CERTIFY that a meeting of the Board of Directors of (Contractor's Corporate Name) a corporation under the laws of the State of ,held on the day of , 19 ,the following resolution was duly passed and adopted: "RESOLVED,that (signature of individual) (typed name of individual) As of the corporation,is hereby authorized to execute and all documents required (title) to be signed by an officer of the Corporation in order to submit a valid bid,contract and bond for (project name) between the CITY OF OCOEE,a municipal corporation,and this corporation,and that his execution thereof, attested by the Secretary of the corporation and with corporate seal affixed shall be the official act and deed of this corporation." I FURTHER CERTIFY that said resolution is now in full force and effect. IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the corporation this day of , 19 (CORPORATE SEAL) (Corporate Secretary) STATE OF COUNTY OF The foregoing instrument was acknowledged before me this_day of , 199 by (name of officer or agent,title of officer or agent),of (name of corporation acknowledging),a (state or place of incorporation) corporation, on behalf of the corporation. He/She is personally known to me or has produced identification (type of identification)as identification and did/did not take an oath. (Notary Public) My Commission Expires: END OF SECTION 00501-1 EXHIBIT C 100%CONSTRUCTION PERFORMANCE BOND FORM ECITY OF OCOEE C EKNOW ALL MEN BY THESE PRESENTS that ,hereinafter called Principal,and a corporation organized under the laws of the State of , and licensed to do business in the State of Florida,hereinafter called Surety,are held and firmly bound unto the City of Ocoee,hereinafter called Owner,in the Penal Sum of DOLLARS($ ) (words) (numbers) for the payment of which sum well and truly made, Principal and Surety bind ourselves, our heirs, personal representatives,successors and assigns,jointly and severally,firmly by these presents. WHEREAS,Principal has by written Agreement dated 19_,entered into a Contract with Owner for in accordance with the Contract Documents which are incorporated herein by reference and made a part hereof,and are herein referred to as the Contract. EWHEREAS,Surety is authorized to do business in the State of Florida. NOW,THEREFORE,the condition of this obligation is such that if Principal: 1. Promptly and faithfully performs the Contract including,but not limited to, its warranty provisions in the time and manner prescribed in the Contract,and E2. Pays Owner all losses, damages (liquidated or actual, including, but not limited to, damages caused by delays in performance of the Principal),expenses,costs and attorneys'fees,including appellate proceedings,that Owner sustains resulting directly or indirectly from any breach or default by Principal under the Contract,and 3. Pays Owner all losses, damages, expenses, costs, attorneys'fees and other legal costs(including, but not limited to,those for investigative and legal support services), including those incurred in appellate proceedings,that the Owner sustains resulting directly or indirectly from conduct of the Principal including,but not limited to,want of care or skill,negligence,patent infringement,or intentionally wrongful conduct on the part of the Principal, its officers, agents, employees or any other person or entity for whom the Principal is responsible,then this bond is void; otherwise it shall remain in full force and effect. EY In the event that the Principal shall fail to perform any of the terms, covenants and conditions of the Contract during the period in which this Performance Bond is in effect,the Surety shall remain liable to the Owner for all such loss or damage(including reasonable attorneys'fees and other legal costs)resulting from any failure to perform up to the amount of the Penal Sum. In the event that the Surety fails to fulfill its obligations under this Performance Bond,then the Surety shall also indemnify and save the Owner harmless from any and all loss,damage,cost and expense,including reasonable attorneys' fees and other legal costs for all trial and appellate proceedings resulting directly or indirectly from the Surety's failure to fulfill its obligations hereunder. This paragraph shall survive the termination or cancellation of this Performance Bond. The Surety's obligations hereunder shall be direct and immediate and not conditional or contingent upon i 00610-1 E Owner's pursuit of its remedies against Principal, and shall remain in full force and effect notwithstanding (i) 3 amendments or modifications to the Contract entered into by Owner and Principal without the Surety's knowledge or consent, (ii) waivers of compliance with or any default under the Contract granted by Owner to Principal without the Surety's knowledge or consent,(iii)the discharge of Principal from its obligations under the Contract as a result of any proceeding initiated under the Bankruptcy Code of 1978, as the same may be amended, or any similar state or federal law,or any limitation of the liability of Principal or its estate as a result of any such proceeding,or(iv)any other action taken by Owner or Principal that would, in the absence of this clause,result in the release or discharge by operation of law of the Surety from its obligation hereunder. The institution of suit upon this Bond is subject to not less than a four-year and not more than a five-year limitations period in accordance with Section 95.11,Florida Statutes. Any changes in or under the Contract Documents(which include the Plans, Drawings and Specifications)and compliance or noncompliance with any formalities connected with the Contract or the changes therein shall not affect Surety's obligations under this Bond and Surety hereby waives notice of any such changes. Further,Principal and Surety acknowledge that the Penal Sum of this bond shall increase or decrease in accordance with approved changes or other modifications to the Contract Documents. PERFORMANCE BOND-PROVISIONS(In agreement with EJCDC No. 1910-28-A(1996 Edition)) 1. The Contractor and the Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to the Owner for the performance of the Construction Contract, which is incorporated herein by reference. 2. If the Contractor performs the Construction Contract, the Surety and the Contractor shall have no obligations under this Bond,except to participate in conferences as provided in Subparagraph 3.1. 3. If there is no Owner Default,the Surety's obligation under this Bond shall arise after: 3.1 The Owner has notified the Contractor and the Surety at its address described in Paragraph 10 below, that the Owner is considering declaring a Contractor Default and has requested and attempted to arrange a conference with the Contractor and the Surety to be held not later than fifteen days after receipt of such notice to discuss methods of performing the Construction Contract. If the Owner, the Contractor and the Surety agree, the Contractor shall be allowed a reasonable time to perform the Construction Contract,but such an agreement shall not waive the Owner's right, if any, subsequently to declare a Contractor Default;and 3.2 The Owner has declared a Contractor Default and formally terminated the Contractor's right to complete the contract. Such Contractor Default shall not be declared earlier than twenty days after the Contractor and the Surety have received notice as provided in Subparagraph 3.1;and 3.3 The Owner has agreed to pay the Balance of the Contract Price to the Surety in accordance with the term of the Construction Contract or to a contractor selected to perform the Construction Contract in accordance with the terms of the contract with the Owner. 3.3.1 The Surety in accordance with the terms of the Contract: 3.3.2 Another contractor selected pursuant to Paragraph 4.3 to perform the Contract. 4. When the Owner has satisfied the conditions of Paragraph 3,the Surety shall promptly and at the Surety's expense take one of the following actions: 4.1 Arrange for the Contractor, with consent of the Owner, to perform and complete the Construction 00610-2 1 Contract;or 4.2 Undertake to perform and complete the Construction Contract itself, through its agents or through independent contractors;or 4.3 Obtain bids or negotiated proposals from qualified contractors acceptable to the Owner for a contract for performance and completion of the Construction Contract, arrange for a contract to be prepared for execution by the Owner and the contractor selected with the Owner's concurrence, to be secured with performance and payment bonds executed by a qualified surety equivalent to the bonds issued on the Construction Contract, and pay to the Owner the amount of damages as described in Paragraph 6 in excess of the Balance of the Contract Price incurred by the Owner resulting from the Contractor's default;or 4.4 Waive its right to perform and complete, arrange for completion, or obtain a new contractor and with reasonable promptness under the circumstances: 4.4.1. After investigation,determine the amount for which it may be liable to the Owner and,as soon as practicable after the amount is determined, tender payment therefor to the Owner;or 4.4.2. Deny liability in whole or in part and notify the Owner citing reasons therefor. 5. If the Surety does not proceed as provided in Paragraph 4 with reasonable promptness,the Surety shall be deemed to be in default on this Bond fifteen days after receipt of an additional written notice from the Owner to the Surety demanding that the Surety perform its obligations under this Bond,and the Owner shall be entitled to enforce any remedy available to the Owner. If the Surety proceeds as provided in Subparagraph 4.4, and the Owner refuses the payment tendered or the Surety has denied liability,in whole or in part,without further notice the Owner shall be entitled to enforce any remedy available to the Owner. 6. After the Owner has terminated the Contractor's right to complete the Construction Contract, and if the Surety elects to act under Subparagraph 4.1,4.2 or 4.3 above,then the responsibilities of the Surety to the Owner shall not be greater than those of the Contractor under the Construction Contract,and the responsibilities of the Owner to the Surety shall not be greater than those of the Owner under the Construction Contract. To a limit of the amount of this Bond,but subject to commitment by the Owner of the Balance of the Contract Price to mitigation of costs and damages on the Construction Contract,the Surety is obligated without duplication for: 6.1 The responsibilities of the Contractor for correction of defective work and completion of the Construction Contract; 6.2 Additional legal, design professional and delay costs resulting from the Contractor's Default, and resulting from the actions or failure to act of the Surety under Paragraph 4;and 6.3 Liquidated damages, or if no liquidated damages are specified in the Construction Contract, actual damages caused by delayed performance or non-performance of the Contractor. 7. The Surety shall not be liable to the Owner or others for obligations of the Contractor that are unrelated to the Construction Contract, and the Balance of the Contract Price shall not be reduced or set off on account of any such unrelated obligations. No right of action shall accrue on this Bond to any person or entity other than the Owner or its heirs,executors,administrators,or successors. 8. The Surety hereby waives notice of any change, including changes of time,to the Construction Contract or to related subcontracts,purchase orders and other obligations. 9. Any proceeding legal or equitable, under this Bond may be instituted in any court of competent 00610-3 jurisdiction in the location in which the work or part of the work is located and shall be instituted within two years after 3 Contractor Default or within two years after the Contractor ceased working or within two years after the Surety refuses or fails to perform its obligations under this Bond,whichever occurs first. If the provisions of this Paragraph are void or prohibited by law,the minimum period of limitation available to sureties as a defense in the jurisdiction of the suit shall be applicable. 10. Notice to the Surety, the Owner or the Contractor shall be mailed or delivered to the address shown on the signature page. 11. When this bond has been furnished to comply with a statutory or other legal requirement in the location where the construction was to be performed, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. The intent is that this Bond shall be construed as a statutory bond and not as a common law bond. 3 12. Definitions 12.1 Balance of the Contract Price: The total amount payable by the Owner to the Contractor under the Construction Contract after all proper adjustments have been made,including allowance to the Contractor of any amounts received or to be received by the Owner in settlement of insurance or other claims for damages to which the Contractor is entitled, reduced by all valid and3 proper payments made to or on behalf of the Contractor under the Construction Contract. 12.2 Construction Contract: The agreement between the Owner and the Contractor identified on the signature page,including all Contract Documents and changes thereto. 1 12.3 Contractor Default: Failure of the Contractor, which has neither been remedied nor waived, to perform or otherwise to comply with the terms of the Construction Contract. 3 12.4 Owner Default: Failure of the Owner, which has neither been remedied nor waived, to pay the Contractor as required by the Construction Contract or to perform and complete or comply with the other terms thereof. I I (Remainder of Page Left Blank Intentionally) 31 ] 1 1 00610-4 1 C E - IN WITNESS WHEREOF,the Principal and Surety have executed this instrument under their several seals on the day of ,the name and corporate seal of each corporate party being hereto affixed and these presents fully signed by its undersigned representative,pursuant to authority of its governing body. Signed,sealed and delivered in the presence of: Principal BY: (Official Title) C (SEAL) I BY: (Official Title) (SEAL) (Countersignature by Florida Registered Agent) NOTE: If Principal and Surety are corporations,the respective corporate seal should be affixed and attached. Attach a certified copy of Power-of-Attorney appointing individual Attorney-in-Fact for execution of Performance Bond on behalf of Surety. C END OF SECTION 00610-5 EXHIBIT C 100%CONSTRUCTION PAYMENT BOND FORM CITY OF OCOEE KNOW ALL MEN BY THESE PRESENTS that ,hereinafter called Principal,and ,a corporation IL organized under the laws of the State of having its home office in the City of Ocoee,and licensed to do business in the State of Florida,hereinafter called Surety, are held and firmly bound unto the City of Ocoee, hereinafter called Owner, for the use and benefit of claimants as hereinbelow defined,in the Penal Sum of DOLLARS($ ) (words) (numbers) for the payment of which sum well and truly to be made, Principal and Surety bind ourselves, our heirs, personal representatives,successors and assigns,jointly and severally,firmly by these presents. WHEREAS,Principal has by written agreement dated 19_,entered into a contract with Owner for in accordance with the Contract Documents which are incorporated herein by reference and made a part hereof, and are herein referenced to as the Contract. WHEREAS,Surety is authorized to do business in the State of Florida. NOW,THEREFORE,the condition of this obligation is such that if Principal shall promptly make payments to all claimants as defined in Section 255.05 (1), Florida Statutes, supplying Principal with labor,materials, or supplies,used directly or indirectly by Principal in the prosecution of the Work provided for in the Contract,then this obligation shall be void;otherwise,it shall remain in full force and effect subject,however,to the following conditions: 1. This bond is furnished for the sole purpose of complying with the requirements of Section 255.05, Florida Statutes. 2. It is a specific condition of this bond that a claimant's right of action on the bond is limited to the provisions of Section 255.05, Florida Statutes, including, but not limited to, the one-year time limitation within which suits may be brought. Therefore,a claimant,except a laborer,who is not in privity with the Contractor and who has not received payment for his labor,materials or supplies shall,within forty-five(45)days after beginning to furnish labor,materials or supplies for the prosecution of the Work, furnish the Contractor with a notice that he intends to look to the bond for protection. A claimant who is not in privity with the Contractor and who has not received payment for his labor, materials or supplies shall within ninety (90) days after performance of the labor or completion of delivery of the materials or supplies, deliver to the Contractor and to the Surety written notice of the performance of the labor or delivery of the materials or supplies and of the nonpayment. No action for the labor,materials or supplies may be instituted against the Contractor or the Surety unless both notices have been given. No action shall be instituted against the Contractor or the Surety on the bond after one(1)year from the performance of the labor or completion of the delivery of the materials or supplies. 3. The Surety's obligations hereunder shall remain in full force and effect notwithstanding (i) amendments or modifications to the Contract entered into by Owner and Principal without the Surety's knowledge or consent, (ii)', waivers of compliance with or any default under the Contract granted by Owner to Principal without the Surety's knowledge or consent, (iii) the discharge of Principal from its obligations under the Contract as a result of any 00620-1 I 3 proceeding initiated under the Bankruptcy Code of 1978, as the same may be amended, or any similar state or federal law,or any limitation of the liability of Principal or its estate as a result of any such proceeding,or(iv)any other action taken by Owner or Principal that would, in the absence of this clause,result in the release or discharge by operation of law of the Surety from its obligations hereunder. 3 4. Any changes in or under the Contract Documents (which include the Drawings and Specifications) and compliance or noncompliance with any formalities connected with the Contract or the changes therein shall affect Surety's obligations under this Bond and Surety hereby waives notice of any such changes. Further,Principal and Surety acknowledge that the Penal Sum of this Bond shall increase or decrease in accordance with the approved changes or other modifications to the Contract Documents. PAYMENT BOND-PROVISIONS(In agreement with EJCDC No. 1910-28-B(1996 Edition)) 1. The Contractor and the Surety,jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to the Owner to pay for labor,materials and equipment furnished for use in the performance of the Construction Contract,which is incorporated herein by reference. 2. With respect to the Owner,this obligation shall be null and void if the Contractor: 2.1 Promptly makes payment,directly or indirectly,for all sums due Claimants,and 2.2 Defends,indemnifies and holds harmless the Owner from claims,demands,liens or suits by any person or entity whose claims, demand, lien or suit is for payment for labor, materials or equipment furnished for use in the performance of the Construction Contract, provided the Owner has promptly notified the Contractor and the Surety (at the address described in Paragraph 12) of any claims, demands, liens or suits and tendered defense of such claims, demands, liens or suits to the Contractor and the Surety, and provided there is no Owner Default. 3. With respect to Claimants, this obligation shall be null and void if the Contractor promptly makes payment, directly or indirectly,for all sums due. 3 4. The Surety shall have no obligation to Claimants under this Bond until: 4.1 Claimants who are employed by or have a direct contract with the Contractor have given notice to the Surety(at the address described in Paragraph 12)and send a copy,or notice thereof,to the Owner,stating that a claim is being made under this Bond and,with substantial accuracy,the amount of the claim. 4.2 Claimants who do not have a direct contract with the Contractor: 1. Have furnished written notice to the Contractor and sent a copy, or notice thereof, to the Owner, within 90 days after having last performed labor or last furnished materials or equipment included in the claim stating, with substantial accuracy, the amount of the claim and the name of the party to whom the materials were furnished or supplied or for whom the labor was done or performed;and 2. Have either received a rejection in whole or in part from the Contractor, or not received within 30 days of furnishing the above notice any communication from the Contractor by which the Contractor has indicated the claim will be paid directly or indirectly;and 3. Not having been paid within the above 30 days, have sent a written notice to the Surety (at the address described in Paragraph 12)and sent a copy, or notice thereof,to the Owner, stating that a claim is being made under this Bond,and enclosing a copy of the previous written notice furnished to the Contractor. 5. If a notice required by Paragraph 4 is given by the Owner to the Contractor or to the Surety,that is sufficient 00620-2 compliance. 6. When the Claimant has satisfied the conditions of Paragraph 4, the Surety shall promptly and at the Surety's expense take the following actions: 6.1 Send an answer to the Claimant, with a copy to the Owner, within 45 days after receipt of the claim, stating the amounts that are undisputed and that basis for challenging any amounts that are disputed. 6.2 Pay or arrange for payment of any undisputed amounts. 7. The Surety's total obligation shall not exceed the amount of this Bond, and the amount of this Bond shall be credited for any payments made in good faith by the Surety. 8. Amounts owed by the Owner to the Contractor under the Construction Contract shall be used for the performance of the Construction Contract and to satisfy claims, if any under any Construction Performance Bond. By the Contractor furnishing and the Owner accepting this Bond,they agree that all funds earned by the Contractor in the performance of the Construction Contract are dedicated to satisfy obligations of the Contractor and the Surety under this Bond, subject to the Owner's priority to use the funds for the completion of the work. 9. The Surety shall not be liable to the Owner, Claimants or others for obligations of the Contractor that are unrelated to the Construction Contract. The Owner shall not be liable for payment of any costs or expenses of any Claimant under this Bond,and shall have under this Bond no obligations to make payments to,give notices on behalf of,or otherwise have obligations to Claimants under this Bond. 10. The Surety hereby waives notice of any change, including changes of time,to the Construction Contract or to related subcontracts,purchase orders and other obligations. 11. No suit or action shall be commenced by a Claimant under this Bond other than in a court of competent jurisdiction in the location in which the work or part of the work is located of after the expiration of one year from the date(1)on which the Claimant gave the notice required by Paragraph 4.1 or Paragraph 4.2.3, or(2) on which the last labor or service was performed by anyone or the last materials or equipment were furnished by anyone under the Construction Contract, whichever of(1) or (2) first occurs. If the provisions of this Paragraph are void or prohibited by law,the minimum period of limitation available to sureties as a defense in the jurisdiction of the suit shall be applicable. 12. Notice to the Surety, the Owner or the Contractor shall be mailed or delivered to the address shown on the signature page. Actual receipt of notice by Surety,the Owner or the Contractor,however accomplished, shall be sufficient compliance as of the date received at the address shown on the signature page. 13. When this Bond has been furnished to comply with a statutory or other legal requirement in the location where the Construction Contract was to be performed, any provision in the Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. The intent is,that this Bond shall be construed as a statutory Bond and not as a common law bond. 14. Upon request by any person or entity appearing to be a potential beneficiary of this Bond,the Contractor shall i' promptly furnish a copy of this Bond or shall permit a copy to be made. 15.DEFINITIONS 15.1 Claimant: An individual or entity having a direct contract with the Contractor or with a subcontractor of the Contractor to furnish labor,materials or equipment for use in the performance of the Contract. The intent of this Bond shall be to include without limitation in the terms"labor,materials or equipment"that part of 00620-3 3 water,gas,power,light,heat,oil,gasoline,telephone service or rental equipment used in the Construction 3 Contract, architectural and engineering services required for performance of the work of the Contractor and the Contractor's Subcontractors,and all other items for which a mechanic's lien may be asserted in the jurisdiction where the labor,materials or equipment were furnished. 15.2 Construction Contract: The agreement between the Owner and the Contractor identified on the signature page, including all Contract Documents and changes thereto. 15.3 Owner Default: Failure of the Owner, which has neither been remedied nor waived,to pay the Contractor as required by the Construction Contract or to perform and complete or comply with the other terms thereof. I I I 3 3 (Remainder of Page Left Blank Intentionally) 3 3 3 3 I IN WITNESS WHEREOF,the Principal and Surety have executed this instrument under their several seals on this day of , 3 _, the name and corporate seal of each corporate party being hereto affixed and these presents fully signed by its undersigned representative,pursuant to authority of its governing body. 3 00620-4 Signed,sealed and delivered in the presence of: Principal BY: Name and Title (SEAL) Surety BY: Name and Title (SEAL) (Countersignature by a Florida Registered Agent) NOTE: If Principal or Surety are corporations,the respective corporate seals should be affixed and attached. Attach a certified copy of Power-of-Attorney appointing individual Attorney-in-Fact for execution of Payment Bond on behalf of Surety. I 00620-5 EXHIBIT C BIDDER: 1 CONSTRUCTION PERFORMANCE AND PAYMENT BONDS 3 CITY OF OCOEE I , certify that I am the Secretary of the corporation named as Principal in the foregoing Performance and Payment Bonds;that who signed the said Bonds on behalf of the Principal was then of said corporation;that I know(his,her)signature,and(his,her)signature thereto is genuine, and that said Bonds were duly signed,sealed and attested for and in behalf of said corporation by authority of its governing body. Secretary 3 (Corporate Seal) 3 Attach a Certificate of Insurance and/or Policy Binder indicating that Contractor has obtained Comprehensive General Liability,Automobile Liability,Worker's Compensation Insurance and all other required insurance. 3 I I I 00620-6 I 1E; EXHIBIT C (SURETY COMPANY LETTERHEAD) , 19 Mr.James W.Shira,P.E. City Engineer/Utilities Director City of Ocoee 150 N.Lakeshore Drive Ocoee,FL 32761 RE: Authority to Date Bond and Power of Attorney Bond No.: Project Name: CONTRACT TO PERFORM CONTINUING CONSTRUCTION SERVICES City of Ocoee,Bid No. Dear Sir/Madam: Please be advised that as Surety, on the above referenced bond, executed in your behalf, for the captioned project,you', are hereby authorized,to date the bonds and the powers of attorney concurrent with the date of the contract. Best Regards, (Surety Company's Name) Attorney-in-Fact and Florida Resident Agent 1 END OF SECTION C 00620-7 • SECTION 00660 INDEMNIFICATION AGREEMENT (Page 1 of 2) City: City of Ocoee, Florida Engineer: City of Ocoee Engineering Department 150 North Lakeshore Drive Ocoee, Florida 34761 Contract Description: City of Ocoee VEHICLE AND MATERIAL STORAGE BUILDING Hold Harmless/Indemnification: To the fullest extent permitted by laws and regulations, and in consideration of the amount stated on the Bid proposal for indemnification, the Contractor shall defend, indemnify, and hold harmless the City and Engineer, its officers, directors, agents, guests, invitees, and employees from and against all claims, damages, losses, and expenses, direct, indirect, or consequential (including but not limited to fees and charges of engineers, architects, attorneys, and other professionals and court and arbitration costs) arising out of or resulting from any acts of commission, omission or negligence in the performance of the Work by the Contractor, any subcontractor, or any person or organization directly or indirectly employed by any of them to perform or furnish any of the Work or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by a party indemnified hereunder or arises by or is imposed by law and regulations regardless of the negligence of any such party. In any and all claims against the City or Engineer, or any of their officers, directors, agents, or employees by any employee of the Contractor, any subcontractor, any person or organization directly or indirectly employed by any of them to perform or furnish any of the Work or anyone for whose acts any of them may be liable, this indemnification obligation shall not be limited in any way by any limitation on the amount or type of damages, compensation, or benefits payable by or for the Contractor or any such subcontractor or other person or organization under workers' or workmen's compensation acts, disability benefit acts, or other employee benefit acts, nor shall this indemnification obligation be limited in any way by any limitation on the amount or type of insurance coverage provided by the City or Engineer, the Contractor, or any of his subcontractors. Subrogation: The Contractor and his subcontractors shall require their insurance carriers, with respect to all insurance polices, to waive all rights of subrogation against the City and the Engineer. Limitation of Liability: For and in consideration of the sum provided in the Bid Proposal of ($ and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the Contractor shall indemnify and hold harmless the Owner and Engineer as provided herein. The monetary limitation on the extent of the Contractor's liability for Indemnification shall be three times (3x) the Contract Price or (words) ). (figures) 00660-1 INDEMNIFICATION AGREEMENT (Page 2 of 2) Nothing in this Indemnification Agreement shall be deemed to affect the rights, privileges and immunities of the City as set forth in Florida Statutes 768.28. The Indemnifications contained herein shall survive the expiration or earlier termination of the Contract Agreement. 3 Name of Organization(Contractor) By: Owner or Officer ACKNOWLEDGEMENT OF RECEIPT CONSIDERATION FOR INDEMNIFICATION Contractor hereby acknowledges receipt of$ as specific consideration for indemnifications specified in the Contract Documents and any Addenda and modifications made thereto for a project titled "Vehicle and Material Storage Building" Name of Organization(Contractor) By: Owner or Officer Attest: Corporate Secretary/Witness STATE OF ) COUNTY OF ) The foregoing instrument was acknowledged before me this , 19 by of , a corporation, on behalf of the corporation. He/she is (personally known to me) (or has produced) (as identification) and(did/did not) take an oath. I Signature of Person Taking Acknowledgment Name of Acknowledger Title Serial Number, if any END OF SECTION 00660-2 3I C SECTION 00800 EXHIBIT B SUPPLEMENTARY CONDITIONS C These Supplementary Conditions amend or supplement the Standard General Conditions of the Construction Contract (NSPE/ACEC Document No. 1910-8, 1996 edition) and other provisions of the Contract Documents as indicated below. All provisions which are not so amended or supplemented remain in full force and effect. ARTICLE 1. DEFINITIONS AND TERMINOLOGY SC-1.101.A Add the following sentence at the end of Paragraph 1.01.A of the General Conditions: "The terms used in these Supplementary Conditions will have the meanings indicated in the General Conditions. Additional terms used in these Supplementary Conditions have the meanings indicated below, which are applicable to both the singular and plural thereof." SC-1.101.A.12 Add the following language at the end of the first sentence of Paragraph 1.101.A.12. ", the Invitation To Bid and the Instructions to Bidders." SC-1.01.A.41 Delete paragraph 1.01.A.41 in its entirety and replace with the following: "Sections included under Division 1 through Division 16 of the Project Manual." SC-1.01.A.43 Insert the following at the end of the definition: "For the purposes of this Work, Substantial Completion shall mean the successful completion of Demonstration Testing." Add the following new paragraphs at the end of Article 1.01.A of the General Conditions: SC-1.01.A.51 Apparent Successful Bidder - The Bidder submitting the lowest Bid at the Bid Opening without correction of numerical discrepancies or determination of responsiveness or responsibility. SC-1.01.A.52 Approve, Approval. Approved - A limited, conditional or qualified permission to use material, equipment or methods and which interprets the work depicted on a submittal (i.e. shop drawings) from the Contractor to be in general conformance with the design concept and in general compliance with the contract document requirements. SC-1.01.A.53 Bidder - An individual, firm or corporation submitting a proposal and bid for the Work contemplated, acting directly or through a duly authorized representative. SC-1.01.A.54C�t -Same as OWNER SC-1.01.A.55 Compensable Delav - Any delay beyond the control and without the fault or negligence of the Contractor resulting from Owner-caused changes in the Work, differing site conditions, suspensions of the Work, or termination for convenience by Owner. SC-1.01.A.56 Conditions of the Contract-The combined General Conditions and Supplementary Conditions. SC-1.01.A.57 Contractor - Same as Contractor with the inclusion that the Contractor has been pre-qualified and selected by the Owner to provide the services outlined in Article 1 of the Agreement. 00800-1 C SC-1.01.A.58 Correction Period - The time during which the CONTRACTOR must correct defective Work or remove defective Work from the site and replace it with nondefective Work, all at no cost to the OWNER, pursuant to Paragraph 13.07 of the General Conditions, as supplemented. SC-1.01.A.59 Demonstration Testing - A predefined trial period required as a condition and prerequisite of substantial completion during which CONTRACTOR is to operate the entire Work (or any part thereof agreed to by the OWNER) under actual and simulated operating conditions for the purpose (i) of making such minor adjustments and changes to the Work as may be necessary for the Work to comply with the Contract Documents and (ii) of complying with the field test re- quirements in the Contract Documents. SC-1.01.A.60Engineer - The consulting engineer who prepared these Construction Documents or the City's designated Engineer. 3 SC-1.01.A.61 Excusable Delay -Any delay beyond the control and without the fault or negligence of the Contractor, the Owner, or any other contractor caused by events or circumstances such as, but not limited to, acts of God or of the public enemy, acts of intervenors, acts of government other than the Owner, fires, floods, epidemics, quarantine restrictions, freight embargoes, and hurricanes, tornadoes, or new sink holes. Labor disputes and above average rainfall shall give rise only to inexcusable delays. 3 SC-1.01.A.62 Final Completion - Acceptance of the Work by the Owner as evidenced by its signature upon final Certificate of Completion. The fmal Certificate of Completion shall be signed only after the OWNER has assured itself by tests, inspection or otherwise that all of the provisions of the Con- tract Documents have been completely satisfied. SC-1.01.A.63 Float or Slack Time - The time available in the progress schedule during which an unexpected activity 3 can be completed without delaying the substantial completion of the Work. SC-1.01.A.64 Inexcusable Delay - Any delay caused either (i) by events or circumstances within the control of the Contractor, such as inadequate crewing, slow submittals, etc., which might have been avoided by the exercise of care, prudence, foresight, or diligence on the part of the Contractor, or (ii) by weather conditions(other than hurricanes and tornadoes)or labor disputes. SC-1.01.A.65 Low Bidder-Bidder who has submitted the lowest bid proposal for the Work contemplated. SC-1.01.A.66Nonpreiudicial Delay - Any delay impacting a portion of the Work within the available total float or slack time in the progress schedule, and not necessarily preventing completion of the Work within the Contract Time. SC-1.01.A.67 Prejudicial Delay - Any excusable or compensable delay impacting the Work and exceeding the total float available in the progress schedule, thus preventing completion of the Work within the Contract Time unless the Work is accelerated. SC-1.01.A.68 Project Manual - The Invitation for Bids, Instructions to Bidders, Bid Form, Agreement, Amendment to Agreement, Bonds, General Conditions, Supplementary Conditions, Specifications, Addendum and Appendix. SC-1.01.A.69 Start-Up Testing - All field inspections, installation checks, water tests, performance tests, and necessary corrections required of Contractor to demonstrate that individual components of the Work have been properly constructed and do operate in accordance with the Contract Documents for their intended purposes. 00800-2 SC-1.01.A.70 Successful Bidder - The Bidder submitting the lowest Bid at the Bid Opening corrected for numerical discrepancies and determined by Owner to be responsive and responsible, and to whom the Owner expects to award the Bid. SC-1.01.A.71 Unfavorable Weather Conditions - Local weather conditions which directly prevent the Contractor from performing critical path work for a period of more than four (4) hours on each specific work day. SC-1.01.A.72 Utility Coordination Day-A contract day in which the coordination of utilities prevents the Contractor from performing critical path work for a period of more than four (4) hours on each specific work day. ARTICLE 2. PRELIMINARY MATTERS SC-2.02.A Delete Paragraph 2.02.A of the General Conditions in its entirety and insert the following in its place: "A. After the Contract has been executed, the Contractor will be furnished one (1) complete set of reproducible mylar sepias (24"x36") of the Drawings and one (1) complete set of the Project Manual (Contract Requirements and Specifications) and all addenda. The Contractor shall furnish each of the subcontractors, manufacturers, and material men such copies of the Contract Documents as may be required for their work. All copies of the Contract Documents shall be printed from the reproducible sets furnished to the Contractor. All costs of reproduction and printing shall be borne by the Contractor. The Contractor shall submit the aforementioned complete set of reproducible mylar sepias back to the Engineer as Project Record Drawings as addressed in Section 1.07.E of the Contract General Requirements." SC-2.03.A Delete Paragraph 2.03.A of the General Conditions in its entirety and insert the following in its place: A. A notice to proceed may be given at any time within thirty (30) days after the Effective Date of the Agreement. The Contract Time will commence at the time specified in such notice or if no notice is given, thirty (30) days following the Effective Date of Agreement, provided that the Notice to Pro- ceed may not specify a time of commencement later than sixty(60)days after the Effective Date of the Agreement." SC-2.05.B Amend the first sentence of Paragraph 2.05.B of the General Conditions to read as follows: "B. Preliminary Schedules: Within ten (10) working days or twenty (20) calendar days after the Effective Date of the Agreement (unless otherwise specified in the General Requirements), CONTRACTOR shall submit to ENGINEER for its timely review:" SC-2.05.B.1 Add the following at the end of Paragraph 2.05.B.1 of the General Conditions: "The CONTRACTOR expressly acknowledges that unfavorable working conditions will exist at the site of the Work as a result of normal local weather and the anticipated number of unfavorable weather days per respective month are as follows:" C 00800-3 I I ANTICIPATED UNFAVORABLE WEATHER DAYS 1 Month No. Days in Normal Work Week Month No. Days in Normal Work Week 7-Day 6-Day 5-Day 4-Day 7-Day 6-Day 5-Day 4-Day Jan 2 2 1 1 July 6 5 4 3 3 Feb 3 3 2 2 Aug 6 5 4 3 March 3 3 2 2 Sept 5 4 4 3 Apr 2 2 1 1 Oct 3 3 2 2 May 3 3 2 2 Nov 2 2 1 1 31 June 5 4 4 3 Dec 2 2 1 1 3 Contract "Unfavorable Weather Days" shall be determined from the above "Anticipated Unfavorable Weather Days" table and shall be counted from the date of Contract Notice to Proceed through the date of Contract Final Completion. To-be-anticipated unfavorable weather days shall be prorated through partial3 months and shall be rounded up or down as per standard practice (i.e., 0.1 through 0.4 days shall be rounded down to the next whole number and 0.5 through 0.9 shall be rounded up to the next whole number). 1 As a direct result of unfavorable local weather conditions, the CONTRACTOR will not be able to perform critical path work for a period of more than four(4)hours on each specific day. 3 The CONTRACTOR shall take reasonable precautions to mitigate the impact of such unfavorable weather conditions and shall diligently attempt to perform the Work." SC-2.05.CDelete paragraph 2.05.0 of the General Conditions in its entirety and insert the following in its place: "C. Evidence of Insurance: Before any Work at the site is started, the Contractor shall deliver to the Owner, with a copy to the Engineer, certificates(and other evidence of insurance requested by the Owner) which the Contractor is required to purchase and maintain in accordance with Article 5 of these General Conditions." 3 ARTICLE 3. CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE SC-3.01.DAdd the following new paragraph immediately after Paragraph 3.01.0 of the General Conditions which is 3 to read as follows: "D. Each and every provision of law and clause required by law to be inserted in these Contract Documents shall be deemed to be inserted herein, and they shall be read and enforced as though it were included herein, and if through mistake or otherwise, any such provision is not inserted, or if not correctly inserted, then upon the application of either party, the Contract Documents shall forthwith be physically amended to make such insertion." 1 SC-3.05.B SC-3.05.0 Add the following new paragraphs after Paragraph 3.05.A of the General Conditions which are to read as 3 follows; "B.Correlation of Contract Documents. In resolving such conflicts, errors, and discrepancies, the 3 00800-4 documents shall be given precedence in the following order: a. Agreement Modifications i.Advertisement for Bids b. Change Orders j.Bid c. Addenda k.Bonds d. Supplementary Conditions 1.Insurance Certificates e. Instructions to Bidders m. Insurance Endorsements f. General Conditions n. Affidavits" g. Specifications(Divisions 1 through 16) h. Drawings 1. Dimensions 2. Full-size Drawing 3. Large-scale Drawing 4. Small-scale Drawing C. Field Verification. When measurements are affected by conditions already established or where items are to be fitted into constructed conditions, it shall be the CONTRACTOR's responsibility to verify all such dimensions at the site and the actual job dimensions shall take precedence over scale and figure dimensions on the Drawings." ARTICLE 4. AVAILABILITY OF LANDS: SUBSURFACE AND PHYSICAL CONDITIONS: REFERENCE POINTS SC-4.01.DAdd a new paragraph immediately after Paragraph 4.01.0 of the General Conditions which is to read as follows: "D. If all lands and rights-of-way are not obtained as herein contemplated before construction begins, CONTRACTOR shall begin the Work upon such land and rights-of-way as OWNER has previously acquired and no claim for damages whatsoever will be allowed by reason of the delay in obtaining the remaining lands and rights-of-way. Should OWNER be prevented or enjoined from proceeding with the Work, or from authorizing its prosecution, either before or after the commencement, by reason of any litigation, or by reason of its inability to procure any lands or rights-of-way for the Work, CONTRACTOR shall not be entitled to make or assert claim for damage by reason of said delay, or to withdraw from the Agreement except by consent of OWNER. Time for completion of the Work will be extended as provided in Article 12, to such time as OWNER determines will compensate for the time lost by such delay." SC-4.02 The investigations, reports and drawings upon which the Engineer has relied upon are identified in Section 00200. SC-4.04.B.3 Add a new paragraph after Paragraph 4.04.B.2 of the General Conditions which is to read as follows: "3.No claim of the CONTRACTOR under Paragraphs 4.02 and 4.03 shall be allowed unless (1)CON- TRACTOR has given the notice required in subparagraph above, and (2) within forty-five (45) days after CONTRACTOR has given the written notice, CONTRACTOR submits to OWNER a detailed claim setting forth CONTRACTOR'S right to an increase in Contract Price or extension of Contract Time as provided in Articles 11 and 12 of the General Conditions. No claim by the CONTRACTOR hereunder shall be allowed if asserted after final payment under this Contract." SC-4.05.B Add a new paragraph immediately after paragraph 4.05.A of the General Conditions which is to read as follows: B. ENGINEER may check the lines, elevations, reference marks, batter boards, etc., set by Contractor, and Contractor shall correct any errors disclosed by such check. Such a check 00800-5 shall not be considered as approval of Contractor's work and shall not relieve Contractor of the responsibility for accurate construction of the entire Work. Contractor shall furnish personnel to assist Engineer in checking lines and grades." ARTICLE 5. BONDS AND INSURANCE SC-5.04.CAdd the following new paragraph immediately after Paragraph 5.04.B of the General Conditions: 3 "C. The limits of liability for the insurance required by paragraph 5.04 of the General Conditions shall provide coverage for not less than the following amounts or greater where required by Laws and Regulations: 3 1. Workers' Compensation, and related coverages under paragraphs 5.04.A.1 and A.2 of the General Conditions: a. State: b. Applicable Federal (e.g., Longshoreman's): Statutory c. Employer's Liability: $1,000,0003 2. Contractor's General Liability under paragraphs 5.04.A.3 through A.6 of the General Conditions which shall include completed operations and product liability coverages and eliminate the exclusion3 with respect to property under the care, custody and control of Contractor: a. General Aggregate $2,000,000 3 b. Products -Completed Operations Aggregate $1,000,000 c. Personal and Advertising Injury $1,000,0003 d. Each Occurrence(Bodily Injury and Property Damage) $1,000,000 e. Property Damage liability insurance will provide Explosion, Collapse, and Underground 1 coverages where applicable. f. Excess or Umbrella Liability 1) General Aggregate $2,000,000 3 2) Each Occurrence $1,000,000 3. Automobile Liability under paragraph 5.04.A.6 of the General Conditions: a. Bodily Injury: 3 Each person $1,000,000 Each Accident $1,000,000 b. Property Damage: Each Accident $1,000,000 OR c. Combined Single Limit of $1,000,000 4. The Contractual Liability coverage required by paragraph 5.04.B.4 of the General Conditions shall3 provide coverage for not less than the following amounts: 3 00800-6 a. Bodily Injury: ury: Each Accident $1,000,000 Annual Aggregate $2,000,000 b. Property Damage: Each Accident $1,000,000 Annual Aggregate $2,000,000 SC-5.05 Delete Paragraph 5.05 of the General Condition in its entirety. SC 5.06.ADelete paragraph 5.06.A of the General Conditions in its entirety and insert the following in its place: "A. The CONTRACTOR shall purchase and maintain until final payment property insurance upon the Work at the site to the full insurable value thereof (subject to such deductible amounts as may be provided in these Supplementary Conditions or required by Laws and Regulations). This insurance shall include the interests of the OWNER the CONTRACTOR, subcontractors, the ENGINEER, and the ENGINEER's consultants in the Work(all of whom shall be listed as insureds or additional insured parties), shall insure against the perils of fire and extended coverage, shall include "all risk" insurance for physical loss and damage including theft, vandalism and malicious mischief, collapse and water damage, and such other perils as may be provided in these Supplementary Conditions, and shall include damages, losses and expenses arising out of or resulting from any insured loss or incurred in the repair or replacement of any insured property(including but not limited to fees and charges of engi- neers, architects, attorneys, and other professionals). If not covered under the "all risk" insurance, the CONTRACTOR shall purchase and maintain similar property insurance on portions of the Work stored on and off the site or in transit when such portions of the Work are to be included in an Application for Payment. The policies of insurance required to be purchased and maintained by the CONTRACTOR in accordance with this paragraph 5.06 shall comply with the requirements of paragraph 5.04 of the General Conditions concerning prior written notice to OWNER and ENGINEER of cancellation, material change, or renewal refusal." SC-5.06.B Delete Paragraph 5.06.B of the General Conditions in its entirety and insert the following in its place: "B. The CONTRACTOR shall provide to the OWNER within thirty (30) days after the Effective Date of the Agreement, copies of all insurance policies entered into by the CONTRACTOR to achieve compliance with the insurance requirements of these Contract Documents. Should any policy expire within the Contract Time, or any extension thereof, the CONTRACTOR shall provide to the OWNER not later than thirty (30) days prior to the expiration date of such policy, a copy of an acceptable replacement policy providing the types and limits of coverage not less than that provided in the expiring policy." SC-5.06.0 Delete Paragraph 5.06.0 of the General Conditions in its entirety and insert the following in its place: "C. All the policies of insurance (or the certificates or other evidence thereof) required to be purchased and maintained by CONTRACTOR in accordance with paragraphs 5.06.A and 5.06.B will contain a provision or endorsement that the coverage afforded will not be canceled or materially changed or renewal refused until at least thirty (30) days prior written notice has been given to OWNER and ENGINEER by certified mail and will contain waiver provisions in accordance with paragraph 5.07." SC-5.06.DDelete paragraph 5.06.D of the General Conditions in its entirety and insert the following in its place: "D. Where applicable, the CONTRACTOR shall purchase and maintain adequate flood insurance for work within designated flood hazard areas as defined by P.L. 93-234(Flood Disaster Protection Act)." 00800-7 SC-5.06.E Delete paragraph 5.06.E of the General Conditions in its entirety. SC-5.08.ADelete paragraph 5.08.A of the General Conditions in its entirety. SC-5.08.B Delete the last sentence of Paragraph 5.08.B of the General Conditions in its entirety. SC-5.09.ADelete paragraph 5.09.A of the General Conditions in its entirety and insert the following in its place: 1 "A. If Owner has any objection to the coverage afforded by or other provisions of the insurance re- quired to be purchased and maintained by Contractor in accordance with this Article 5 on the basis of its not complying with the Contract Documents, Owner will notify Contractor in writing thereof within ten days of the date of delivery of such certificates to Owner in accordance with paragraph 2.7. Contractor will provide such additional information in respect of insurance provided by him as Owner may reasonably request." ARTICLE 6. CONTRACTOR'S RESPONSIBILITIES SC-6.03.0 Add the following new paragraphs immediately after paragraph 6.02.B in the General Conditions SC-6.03.Dwhich are to read as follows. SC-6.03.E 3 SC-6.03.F SC-6.03.G SC-6.03.H SC-6.03.I "C. Except in the event of an emergency, no work shall be performed (1) before sunrise and after sunset, (2) nor between the hours of 7:00 p.m. and 7:00 a.m. (3) nor on Saturday and Sunday and (4) nor on any holiday of the OWNER . "Regular Working Hours" shall be between 7:00 a.m. and3 7:00 p.m. and shall be established by the CONTRACTOR at the Preconstruction Meeting and shall not exceed 8 hours per day and 40 hours per week. If construction or maintenance work requires operations during other than Regular Working Hours, the CONTRACTOR shall obtain written permission of the OWNER at least forty-eight (48)hours in advance of starting such work, and shall set forth the proposed schedule for overtime to give OWNER ample time to arrange for his personnel to be at the site of the work. CONTRACTOR shall pay for the additional charges to the OWNER on account of such overtime work. Such additional charges shall be a subsidiary obligation of CONTRACTOR and no extra payment shall be made by OWNER on account of such overtime work. D. This Agreement is subject to the applicable provisions of the Contract Work Hours and Safety Standards Act, Public Law 87-581, 87th Congress. No Contractor or Subcontractor contracting for any part of the Work shall require or permit any laborer or mechanic to be employed on the Work in excess of forty hours in any work week unless such laborer or mechanic receives compensation at a rate not less than one and one-half times his basic rate of pay for all hours worked in excess of forty hours in such work week, as the case may be. E. Except as may be otherwise required by law, all claims and disputes pertaining to the classification of labor employed on the project under this Contract shall be decided by Owner's governing body or other duly designated official. F. Contractor shall employ only competent persons to do the work and whenever Owner shall notify Contractor, in writing, that any person on the Work appears to be incompetent, unfaithful, disorderly, or otherwise unsatisfactory, such person shall be removed from the Project and shall not again be employed on it except with the consent of Owner. 3 G. Contractor and Subcontractors shall, insofar as practicable, give preference in the hiring of workers for 00800-8 the Project to qualified local residents with first preference being given to citizens of the United States who have served in the armed forces of the United States and have been honorably discharged therefrom or released from active duty therein. H. Contractor shall reimburse the Owner for additional engineering and/or inspection costs incurred as a result of overtime work in excess of the regular working hours stipulated in Article SC-6.03.B. At Owner's option, overtime costs may either be deducted from the Contractor's monthly payment request or deducted from the Contractor's retention prior to release of final payment. Overtime costs for the Owner's personnel shall be based on the individual's current overtime wage rate. Overtime costs for personnel employed by the Engineer or Owner's independent testing laboratory shall be calculated in accordance with the terms of their respective contracts with the Owner. The hourly overtime rate for the Engineer's RPR will be a maximum of 560.00 per hour. I. No work shall be performed on legal holidays of the OWNER, which for the Work are defined as follows: Holiday Calendar Date New Year's Day January 1 Memorial Day Last Monday in May Independence Day July 4 Labor Day First Monday in September Thanksgiving Day 4th Thursday in November Day after Thanksgiving 4th Friday in November Christmas Eve December 24 Christmas December 25 If Christmas and Christmas Eve fall on a weekend, the preceding Friday and following Monday will be observed as holidays. If Christmas falls on a Monday, the preceding Friday will be observed as a holiday. If Christmas falls on a Saturday, the preceding Thursday will be observed as a holiday." SC-6.05.A.2.d Amend the fifth sentence of Paragraph 6.05.A.2.d of the General Conditions to read as follows: "The application will also contain an itemized estimate of all costs and delays or schedule impacts that will result directly or indirectly from reviews, acceptance and provisions of such substitute, including cost of redesign and ..." SC-6.05.E Add the following to the end of the last sentence of Paragraph 6.05.E of the General Conditions: "and all costs resulting from any delays in the Work while the substitution was undergoing reviews." SC-6.05.GAdd a new paragraph after Paragraph 6.05.F of the General Conditions which is to read as follows: "G. Equipment specifications containing experience clauses requires equipment manufacturers to have a record (min. number installations and years of operation) of satisfactory operation. In lieu of experience, a manufacturer/supplier may provide the equipment with the mutual understanding of all parties that no payment shall be released for such equipment including installation costs until it is demonstrated that the equipment meets the specific design performance requirements. All such monies retained shall be held by the Owner in an interest bearing escrow account from the date of application for payment for such work until the date of demonstrated conformance. All such retained monies and accrued interest shall be released to the Contractor upon demonstrated conformance. All monies not paid by the Owner shall bear interest a 7 percent per annum or the maximum rate provided by law, whichever is less. Where the equipment has failed specified tests to demonstrate conformance to the design requirements, the Contract shall remove said equipment and shall substitute the equipment as 00800-9 approved by the Owner/Engineer as specified having the required experience. The Contractor shall install the substituted equipment as required to provide a complete and functional system without cost to the Owner. (Refer to GC-13.07). No experience restriction will be permitted which unnecessarily reduces competition or innovation." 1 SC-6.06.ADelete Paragraphs 6.06.A and 6.06.B of the General Conditions and insert the following in its place: SC-6.06.B "A. Refer to B. below. B. CONTRACTOR shall not employ any Subcontractor, Supplier or other person or organization (including those who are to furnish the principal items of materials and equipment), whether initially or1 as a substitute, against whom OWNER or ENGINEER may have reasonable objection and shall not be required to employ as a Subcontractor, supplier or any person or organization against whom CON- TRACTOR has reasonable objection. A Subcontractor or other person or organization identified in the CONTRACTOR's Bid and not objected to in writing by OWNER or ENGINEER prior to the exe- cution of the Agreement will be deemed acceptable to OWNER and ENGINEER. All other Subcon- tractors shall be deemed to have been accepted if OWNER or ENGINEER deliver no written objection thereto within forty-five (45) days after CONTRACTOR's written identification of such Subcon- tractors. However, if within said forty-five (45) day period, OWNER or ENGINEER has reasonable objection to any Subcontractor whether identified in the Bid or subsequently, CONTRACTOR shall submit an acceptable substitute without entitlement to any change in Contract Price. If OWNER or ENGINEER demands the substitution of a Subcontractor at any time without having reasonable objection to such Subcontractor, the CONTRACTOR shall comply and shall be entitled to change in Contract Price (by appropriate Change order or Written Amendment) for the difference in cost occa- sioned by such substitution. After acceptance by the OWNER or ENGINEER of any particular Sub- contractor, the CONTRACTOR shall make no substitution without written approval of the OWNER, which may be granted or withheld at OWNER's sole discretion. No acceptance by OWNER or ENGI- NEER of any such Subcontractor, Supplier or any other person or organization shall constitute a waiv3 - er of any right of OWNER or ENGINEER to reject defective work." SC-6.06.E.1 Add a new paragraph after paragraph 6.06.E of the General Conditions which is to read as follows: +� "1.Owner or Engineer may furnish to any such Subcontractor, Supplier or other person or organization, to the extent practicable, evidence of amounts paid on their behalf to Contractor in accordance with Contractor's Applications for Payment." SC-6.08 Reference is made to the General Requirements of the Contract Documents (Division 1) for a listing of permits and licenses obtained by the OWNER before the bid advertisement. 3 SC-6.11.A.1 Add the following two sentences to the end of Paragraph 6.11.A.1 of the General Conditions which are to read as follows: "Use of OWNER's existing buildings by the CONTRACTOR for storage of materials and equipment will not be permitted. Use of existing washrooms, lavatories, sanitary facilities or plumbing facilities by the CONTRACTOR or any of his employees or Subcontractors will not be permitted." 1 SC-6.13.A.4 Add a new paragraph immediately after Paragraph 6.13.A.3 of the General Conditions which is to read as follows: "4.in the event of temporary suspension of the Work, or during inclement weather, or whenever Engineer may direct; Contractor shall, and shall cause Subcontractors, to protect carefully the Work and materials against damage or injury from the weather. If, in the opinion of Engineer, any portion of Work or materials shall have been damaged or injured by reason of failure on the part of the Contractor or any Subcontractors to so protect the Work, such Work and materials shall be removed and replaced at the expense of Contractor." 00800-10 I E - SC-6.13.B Add the following sentence to the end of the first sentence of Paragraph 6.13.B in the General Conditions: "Contractor shall comply with the Trench Safety Act, Florida Law, Chapter 90-96 (CS/SB2626); OSHA (P.L. 91-596); the Contract Work Hours and Safety Standards Act (P.L. 91-54); and the Federal Register 29 CFR part 1926, OSHA Subpart P as well as all other local, state and federal ordinances, laws, and regulations regarding safety." SC-6.17.F.1 Add the following sentence to the end of Paragraph 6.17.F.1 of the General Conditions: "Shop drawings and submittal data shall be reviewed by the ENGINEER for each original submittal and first and second resubmittal; thereafter review time for subsequent resubmittals shall be charged to the CONTRACTOR in accordance with the terms of ENGINEER's Agreement with OWNER." SC-6.20.A.3 Add the following paragraph immediately after Paragraph 6.20.A.2 of the General Conditions which is to read as follows: "3.If, through acts of neglect on the part of Contractor, any other contractor or any subcontractor shall suffer loss or damage on the Work, Contractor shall settle with such other contractor or subcontractor by agreement or arbitration if such other contractor or subcontractor will so settle. If such other contractor or subcontractor shall assert any claim against Owner on such account of any damage alleged to have been sustained, Owner shall notify Contractor, who shall indemnify and save harmless Owner against any such claim." ARTICLE 7. OTHER WORK SC-7.02.0 Add a new paragraph after Paragraph 7.02.B of the General Conditions which is to read as follows: "B.The Contract Time stipulated herein includes an Utility Coordination Allowance (Time) allocated specifically to the CONTRACTOR's responsibility for utility coordination or relocation of utilities at or adjacent to the Project site. The Utility Coordination Allowance shall be shown in a separate identifiable critical activity included at the end of the project schedule. No Contract Time extensions shall be considered related to utility coordination matters including, but not limited to, utility relocations and conflicts, unless the utility related time impacts exceed the Utility Coordination Allowance. Utility Coordination Allowance shall be determined as follows: a. Four (4) regular work days shall be provided for every month of Contract Time. Utility Ecoordination days shall be prorated through partial months and shall be rounded up or down as per standard practice(i.e., 0.1 through 0.4 days shall be rounded down to the next whole number and 0.5 through 0.9 shall be rounded up to the next whole number). b. The total Contract Utility Coordination Allowance shall not exceed the lesser of 1) thirty (30) regular work days, or 2)ten(10)percent of Contract Time. s� A Utility Coordination Day is defined as any Contract Day in which the coordination of utilities prevents the CONTRACTOR from performing critical path work for a period of more than four (4) hours on each specific work day." ARTICLE 8. OWNER'S RESPONSIBILITIES SC-8.11.B a new paragraph immediately after paragraph 8.11.A which is to read as follows: E "B.On request of Contractor prior to the execution of any Change Order involving a fifteen percent(15%) increase in the Contract Price, Owner shall furnish to Contractor responsible evidence that adequate fmancial arrangements have been made by Owner to enable Owner to fulfill the t' 00800-11 increased financial obligations to be undertaken by Owner as a result of such Change Order." ARTICLE 9. ENGINEER'S STATUS DURING CONSTRUCTION SC-9.03.ADelete Paragraph 9.03.A of the General Conditions in its entirety and insert the following in its place: "A. OWNER shall furnish a Resident Project Representative to observe the performance of the Work. The duties, responsibilities and limitations of authority of this Resident Project Representative (and assistants)are set forth at the end of these Supplemental Conditions." ARTICLE 10. CHANGES IN THE WORK SC-10.01.A.1 & SC-10.01.A.2 Add the following new paragraphs after Paragraph 10.01.A of the General Conditions which are to read as follows: "1.At anytime, ENGINEER may request a quotation from CONTRACTOR for a proposed change in the Work. Within twenty-one (21) calendar days after receipt of a request for a quotation for a proposed change, CONTRACTOR shall submit a written and detailed proposal for an increase or decrease in the Contract Price or Contract Time for the proposed change. ENGINEER shall have ten (10) calendar days after receipt of the detailed proposal to respond in writing. The proposal shall include an itemized estimate of all costs and time for performance that will result directly or indirectly from the proposed change. Unless otherwise directed, itemized estimates shall be in accordance with Articles 11 and 12 and in sufficient detail reasonably to permit an analysis by ENGINEER of all material, labor, equip- ment, subcontract, and overhead costs and fees and shall cover all Work involved in the change, whether such Work was deleted, added, changed, or impacted. Any amount claimed for subcontracts shall be similarly supported. Itemized schedule adjustments shall be in sufficient detail to permit an analysis of impact as required in Division 1. Notwithstanding the request for quotation, CONTRAC3 - TOR shall carry on the Work and maintain the progress schedule. Delays in the submittal of the written and detailed quotation will be considered non-prejudicial." 2. The adjustment in Contract Price and/or Contract Time stated in a Change Order shall comprise the total price and/or time adjustment due or owed the CONTRACTOR for the work or changes defined in the Change Order. By executing the Change Order, the CONTRACTOR acknowledges and agrees that the stipulated price and/or time adjustments include the costs and delays for all work contained in the Change Order, including costs and delays associated with the interruption of schedules, extended overheads, delay, and cumulative impacts or ripple effect on all other non-affected work under this contract. Signing of the Change Order constitutes full and mutual accord and satisfaction for the adjustment in contract price or time as a result of increases or decreases in costs and time of perfor- mance caused directly and indirectly from the change, subject to the current scope of the entire work as set forth in the Contract Documents. Acceptance of the waiver constitutes an agreement between OWNER and CONTRACTOR that the Change Order represents an equitable adjustment to the Contract, and that CONTRACTOR will waive all rights to file a claim on this Change Order after it is properly executed." SC-10.05.D Delete Paragraph 10.05.D of the General Conditions in its entirety and insert the following in its place: "No action, either at law or at equity, shall be brought in connection with any such claim, dispute or other matter later than thirty (30)days after the date of which ENGINEER has rendered such written decision in respect thereof. Failure to bring an action within said thirty (30) day period shall result in ENGINEER's decision being final and binding upon OWNER and CONTRACTOR. In no event may any such action be brought after the time at which instituting such proceedings would be otherwise barred by the applicable statute of limitations." I 00800-12 1 ARTICLE 11. CHANGE OF CONTRACT PRICE SC-11.03.C.1 For purposes of Paragraph 11.03.C.1 of the General Conditions, "materially and significantly" shall be defined as a variation of 25 percent. ARTICLE 13. TESTS AND INSPECTIONS: CORRECTION. REMOVAL. OR ACCEPTANCE OF DEFECTIVE WORK SC-13.03.0 Add the following language to the end of Paragraph 13.03.0 of the General Conditions: "Inspections required by the Contract Documents for pre-engineered, prefabricated or precast structural components shall be performed at the place of manufacture upon each stage of manufacture, by a registered professional engineer licensed in the State of Florida (other than the Manufacturer's Specialty Engineer) or a person under his direct supervision. Two (2) copies of a written report of such inspection shall be provided to the ENGINEER prior to delivery to the site and shall be prepared by the inspector and each copy shall bear the seal and signature of the respective registered professional engineer. The costs for these inspections and reports shall be paid for by the CONTRACTOR." SC-13.04.B Amend the second sentence of Paragraph 13.04.B of the General Conditions to read as follows: "... or replacement of work of others) and any additional expenses experienced by OWNER due to delays E., to other contractors, an appropriate deductive Change Order shall be issued. CONTRACTOR shall further bear the responsibility for maintaining schedule and will be excluded from a time extension and the recovery of delay damages due to the uncovering. If, however, ..." SC-13.06.A Add the following to the end of Paragraph 13.06.A of the General Conditions: "CONTRACTOR shall bear the responsibility for maintaining schedule and will be excluded from a time extension to the Contract and the recovery of delay damages for correcting or removing defective work." ARTICLE 14. PAYMENTS TO THE CONTRACTOR AND COMPLETION SC-14.02.A.1 Add the following language to the end of Paragraph 14.02.A.1 of the General Conditions: "The Contractor shall furnish evidence that payment received on the basis of materials and equipment not incorporated and suitably stored, has in fact been paid to the respective supplier(s)within sixty days of payment by Owner. Failure to provide such evidence of payment shall result in the withdrawal of previous approval(s) and removal of the related equipment from the next submitted Application for Payment." SC-14.02.C.1 Amend the first sentence of Paragraph 14.02.C.1 of the General Conditions to read as follows: "Twenty (20) days after presentation of the Application for payment ..." SC-14.02.C.2 Add four new paragraphs immediately after paragraph 14.02.C.1 of the General Conditions SC-14.02.C.3 which are to read as follows: SC-14.02.C.4 SC-14.02.C.5 "2. Should Contractor neglect to pay any undisputed claims, made in writing to Owner within thirty (30) days after completion of the Work, but continuing unsatisfied for a period of ninety (90) days, Owner may pay such claim and deduct the amount thereof from the balance due Contractor. Owner may also, with the written consent of Contractor, use any monies retained, due, or to become due under this Contract for the purpose of paying for both labor and materials for the Work, for which claims have not been filed. 00800-13 3. Security is provided both by the Payment Bond and the power of Owner to retain any monies for claims, but payment by one shall in no way impair or discharge the liability of the other. 4. Any and all liens for work and materials may be paid off by Owner within a reasonable time after filing for record in accordance with State and local laws, a notice of such liens except where the claim on which the lien is filed is being litigated by Contractor, and in such case Owner may pay the amount of any final judgment or decree or any such claim within a reasonable time after such final judgment or decree shall be rendered. 5. All monies paid by Owner in settlement of liens as aforesaid, with the costs and expenses3 incurred by Owner in connection therewith, shall be charged to Contractor, shall bear interest at the rate of three percentage points above the rediscount rate then charged by the Federal Reserve Bank, and shall be deducted from the next payment due Contractor under 3 the terms of this Contract." SC-14.02.D.1.e Add a new paragraph after Paragraph 14.02.D.1.d of the General Conditions which is to read as follows: "e. Liability for liquidated damages has been incurred by the Contractor." SC-14.03.B Add two new paragraphs immediately after paragraph 14.03.A of the General Conditions which are SC-14.03.0 to read as follows: "B.No materials or supplies for the Work shall be purchased by Contractor or Subcontractor subject to any chattel mortgage or under a conditional sale contract or other agreement by which an interest is retained by the seller. Contractor warrants that he has good title to all materials and supplies used by him in the Work, free from all liens, claims or encumbrances. C. Contractor shall indemnify and save Owner harmless from all claims growing out of the lawful demands of Subcontractors, laborers, workmen, mechanics, materialmen, and furnishers of machinery and parts thereof, equipment, power tools, and all supplies, including commissary, incurred in the furtherance of the performance of this Contract. Contractor shall at Owner's request, furnish satisfactory evidence that all obligations of the nature hereinabove designated have been paid, discharged, or waived. If Contractor fails to do so, then Owner may, after3 having served written notice on the said Contractor either pay unpaid bills, of which Owner has written notice, direct, or withhold from the Contractor's unpaid compensation a sum of money deemed reasonably sufficient to pay any and all such lawful claims until satisfactory evidence is furnished that all liabilities have been fully discharged whereupon payment to Contractor shall be resumed, in accordance with the terms of this Contract, but in no event shall the provisions of this sentence be construed to impose any obligations upon Owner to either Contractor or his Surety. In paying any unpaid bills of the Contractor, Owner shall be deemed the agent of Contractor and any payment so made by Owner, shall be considered as payment made under the Contract by Owner to Contractor and Owner shall not be liable to Contractor for any such payment made in good faith." SC-14.07.A.4 Add a new paragraph after Paragraph 14.07.A.3 of the General Conditions which is to read as follows: "4. Notwithstanding any other provision of these Contract Documents to the contrary, OWNER and ENGINEER are under no duty or obligation whatsoever to any Subcontractor, laborer or other party to ensure that payments due and owing by the CONTRACTOR to any of them are or will be made. Such parties shall rely only on the CONTRACTOR'S surety bonds for remedy of nonpayment by him." I 00800-14 SC-14.07.0 Amend Paragraph 14.07.0 of the General Conditions to read as follows: "Sixty(60)days after the presentation to OWNER of the final application for Payment and ..." ARTICLE 15. SUSPENSION OF WORK AND TERMINATION SC-15.01.B Add a new paragraph after Paragraph 15.01.A of the General Conditions which is to read as follows: "B.If the OWNER stops Work under Paragraph 13.05 or suspends the CONTRACTOR's services under Paragraph 13.09, or suspends the Work or any portion thereof because of the CONTRACTOR's failure to prosecute the Work without endangering persons and property, the CONTRACTOR shall be entitled to no extension of Contract Time or increase in Contract Price." SC-15.02.A.5 Add a new paragraph immediately after paragraph 15.02.A.4 of the General Conditions which is to read as follows: "5. If the Work to be done under this Contract shall be abandoned, or if this Contract or any part thereof shall be sublet without the previous written consent of Owner, or if the Contract or any claim thereunder shall be assigned by Contractor otherwise than as herein specified, or at any time Engineer shall certify in writing to OWNER that the rate of progress of the Work or any part thereof is unsatisfactory or that the work or any part thereof is unnecessarily or unreasonably delayed." SC-15.02.B Amend Paragraph 15.02.B of the General Conditions beginning with the second sentence which is to read as follows: "In such case, CONTRACTOR shall not be entitled to receive any further payment beyond an amount equal to the value of the Work actually completed and the value of materials and equipment not incorporated in the Work but delivered and suitably stored, less the aggregate of payments previously made. If the direct and indirect costs of completing the Work, including, but not limited to, fee and charges of engineers, architects, attorneys and other professionals, exceed the unpaid balance of the Con- tract Price, CONTRACTOR shall pay the difference to OWNER. Such costs incurred by OWNER shall be verified by ENGINEER and incorporated in a Change Order, but in finishing the Work, OWNER shall not be required to obtain the lowest price for the Work performed. CONTRACTOR's obligations to pay the difference between such costs and such unpaid balance shall survive termination of the Agreement." ARTICLE 16. DISPUTE RESOLUTION SC-16.01.A Delete Paragraph 16.01.A of the General Conditions in its entirety and insert the following in its place: "A. Disputes between OWNER and CONTRACTOR shall be arbitrated only if and to the extent agreed to by the parties at the time each dispute arises. The CONTRACTOR will carry on the Work and maintain the progress schedule during any dispute, regardless of how resolved, unless otherwise mutually agreed in writing. Venue for any litigation, at law or equity or arbitration, shall lie exclusively in Orange County, Florida. This Contract, or any provision hereof, shall be construed and interpreted, and any litigation arising therefrom, shall be governed by the laws of the State of Florida. The CONTRACTOR and OWNER waive trial by jury in any action, proceeding or claim which may be brought by either of the parties hereto against the other on any matters concerning or arising out of this Contract. In any such action, out of this Contract either party shall bear it's own attorney fees at the trial and appellate level, engineers, architects and other professionals and court costs, including those incurred in appellate proceedings. ARTICLE 17. MISCELLANEOUS 00800-15 I I SC-17.06 Add the following new paragraphs after Paragraph 17.05 of the General Conditions: SC-17.07 SC-17.08 SC-17.09 SC-17.10 "17.06 Both the address given in the Bid Form upon which this Agreement is founded, and Contractor's office at or near the site of the Work are hereby designated as places to either of which notices, letters, and other communications to Contractor shall be certified, mailed, or delivered. The delivering at the above named place, or depositing in a postpaid wrapper directed to the first-named place, in any post office box regularly maintained by the U.S. Postal Department, of any notice, letter or other communication to Contractor shall be deemed sufficient service thereof upon Contractor; and the date of said service shall be the date of such delivery or mailing. The first-named address may be changed at any time by an instrument in writing, executed and acknowledged by Contractor, and delivered to Owner and Engineer. Nothing herein contained shall be deemed to preclude or render inoperative the service of any notice, letter, or other communication upon Contractor personally. 17.07 The form of all submittals, notices, change orders, and other documents permitted or required to be used or transmitted under the Contract Documents shall be determined by the ENGINEER. During the preconstruction meeting, the ENGINEER shall provide to the CONTRACTOR one set of such project administration forms to be utilized during the construction of this project. These forms are referenced as follows: Forms Used by the Engineer and/or R.P.R. Forms Used by the Contractor 00844 Non-Compliance Notice 00861 Periodic Estimate for Partial Payment 00845 Field Order 00862Schedule of Values 00846 Work Directive 00863 Materials Stored On-Site 00847 Request for Proposal for Proposed 00864 Shop Drawing Transmittal 00865 Change Proposal Summary 00848 Daily Construction Report 00866RPR Overtime Authorization 00849 Weekly Construction Progress Report 00867 Stop Work Order 00856 Shop Drawing Log 00868Contractor Request for Information 00858 Shop Drawing Review 00869Concrete Placement Authorization 00859 O&M Manual Review 00870 Hydraulic Test of Concrete Tankage Forms Used by All Parties During Construction 00872 Hydrostatic Pressure Test Report 00850 Construction Accident Report 00875Certificate of Completed 00860 Project Action Report Demonstration 00876 Check-Out Form 00878 Contractor Proposed Change 00879 Final Release of Lien 17.08 The CONTRACTOR shall comply with Florida's Archives and Historical Act (Florida Statutes Chapter 267) and the regulations of the local historic preservation board as applicable and protect against the potential loss or destruction of significant, historical or archaeological data, sites, and properties in connection with the project. 17.09 If apprentices are required or utilized on this project, then the provisions of Chapter 446, Florida Statutes, shall govern. 17.10 If the price of this Agreement/Contract equals or exceeds$50.000 and if the Contractor has 50 or more employees, the Contractor shall file with the Owner, within 30 calendar days after the award of this Agreement/Contract, a report on Standard Form 100 (EEO-1), which has been promulgated jointly by the Office of Federal Contract Compliance Programs, the Equal 00800-16 1 C Employment Opportunity Commission, and Plans for Progress, unless the Contractor has submitted such a report within 12 months preceding the date of award of this Agree- ment/Contract. In addition, the Contractor shall ensure that each construction subcontractor having 50 or more employees and a lower-tier construction subcontract with a price equaling or exceeding $50,000 also files with the Owner, within 30 calendar days after the award to it of the lower-tier construction subcontract, a report on Standard Form 100 (EEO-1) unless the construction subcontractor has submitted such a report within 12 months preceding the date of award of the lower-tier construction subcontract. (Subsequent reports are to be submitted annually in accordance with 41 CFR 60-1.7(a) or at such other intervals as the Director of the Office of Federal Contract Compliance Programs may require.)" I C C 00800-17 I SECTION 00800 DUTIES RESPONSIBILITIES AND LIMITATIONS OF AUTHORITY OF THE RESIDENT PROJECT REPRESENTATIVE A. GENERAL Resident Project Representative (RPR) is OWNER'S Agent at the site, will act as directed by and under the supervision of OWNER, and will confer with OWNER and ENGINEER regarding RPR's actions. RPR's dealings in matters pertaining to the on-site work shall, in general, be only with OWNER, ENGINEER, and CONTRACTOR, and dealings with subcontractors shall only be through or with the full knowledge and approval of CONTRACTOR. B. DUTIES AND RESPONSIBILITIES OF RPR 1. Schedules: Review the progress schedule, schedule of Shop Drawing submittals and schedule of values prepared by CONTRACTOR and consult with OWNER and ENGINEER concerning acceptability. 2. Conferences and Meetings: Attend meetings with CONTRACTORS, such as preconstruction conferences, I progress meetings,job conferences, and other project-related meetings. 3. Liaison: a. Serve as OWNER's liaison with CONTRACTOR, working principally through CONTRACTOR's superintendent, and assist in understanding the intent of the Contract Documents; and assist ENGINEER in serving as OWNER's liaison with CONTRACTOR when CONTRACTOR's operations affect OWNER's on-site operations. b. As requested by CONTRACTOR, obtain from OWNER and ENGINEER additional details or information, when required for proper execution of the work. 4. Shop Drawings and Samples: a. Record date of receipt of Field Shop Drawings and samples. b. Receive samples which are furnished at the site by CONTRACTOR, and notify ENGINEER of availability of samples for examination. c. Advise ENGINEER and CONTRACTOR of the commencement of any Work requiring a Shop Drawing or sample if the submittal has not been approved by the ENGINEER. 5. Review of Work, Rejection of Defective Work, Inspections and Tests: a. Conduct on-site observations of the Work in progress to assist ENGINEER in determiningif the Work �' is, in general, proceeding in accordance with the Contract documents. b. Report to OWNER and ENGINEER whenever the RPR believes that any Work will not produce a completed Project that conforms generally to the Contract Documents or will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated in the Contract Documents, or has been damaged, or does not meet the requirements of any inspection, test or approval required to be made; and advise OWNER and ENGINEER of work RPR believes should be corrected or rejected or should be uncovered for observation, or requires special testing, inspection or 00800-18 approval. c. Verify that tests, equipment and systems startups and operating and maintenance training are conducted in presence of appropriate personnel, and that CONTRACTOR maintains adequate records thereof; observe, record and report to OWNER and ENGINEER appropriate details relative to the test procedures and startups. d. Accompany visiting inspectors representing public or other agencies having jurisdiction over the Project, record the results of these inspections and report to OWNER and ENGINEER. 6. Interpretation of Contract Documents: Report to ENGINEER when clarifications and interpretations of the Contract Documents are needed and transmit to CONTRACTOR clarifications and interpretations as issued by ENGINEER. 7. Modifications: Consider and evaluate CONTRACTOR's suggestions for modifications in Drawings or Specifications and report them with RPR's recommendations to OWNER and ENGINEER. Transmit to CONTRACTOR in writing decisions as issued by OWNER and ENGINEER. 8. Records: a. Maintain at the job site orderly files for correspondence, reports of job conferences, Shop Drawings and samples, reproductions of original Contract Documents including all Work Change Directives, Addenda, Change Orders, Field orders, additional Drawings issued subsequent to the execution of the Contract, ENGINEER's clarifications and interpretations of the Contract Documents, progress reports, and other Project-related documents. b. Prepare a daily report or keep a diary or log book, recording Contractor's hours on the job site, weather conditions, data relative to questions of Work Change Directives, Change Orders, or changed conditions, list of job site visitors, daily activities, decisions, observations in general, and specific observations in more detail as the case of observing test procedures; and send copies to ENGINEER. c. Record names, addresses and telephone numbers of all CONTRACTORS, subcontractors and major suppliers of materials and equipment. 9. Reports: a. Furnish OWNER and ENGINEER periodic reports as required of progress of the Work and CONTRACTOR's compliance with the progress schedule. b. Consult with OWNER and ENGINEER in advance of scheduled major tests, inspections or start of important phases of the Work. c. Draft proposed Change Orders and Work Change Directives, obtaining backup material from CONTRACTOR and recommend to OWNER and ENGINEER Change Orders, Work Change Directives and Field Orders. d. Report immediately to OWNER and ENGINEER upon the occurrence of any accident. 10. Payment Requisitions: Review applications for payment with CONTRACTOR for compliance with the established procedure for their submission and forward with recommendations to ENGINEER, noting particularly the relationship of the payment requested to the schedule of values, Work completed and materials and equipment delivered at the site but not incorporated in the Work. Initial approved percentages of completion with respect to the schedule of values. 00800-19 1 11. Certificates, Maintenance and Operation Manuals: During the course of the Work, verify that certificates, maintenance and operation manuals and other data required to be assembled and furnished by CONTRACTOR are applicable to the items actually installed and in accordance with the Contract Documents, and have this material delivered to ENGINEER for review and forward to OWNER prior to final payment for the Work. 12. Completion: a. Before ENGINEER issues a Certificate of Substantial Completion, submit to CONTRACTOR a list of observed items requiring completion or correction. b. Observe whether CONTRACTOR has had performed inspections required by laws, rules, regulations, , ordinances, codes, or orders applicable to the Work, including but not limited to those to be performed by public agencies having jurisdiction over the Work. 3 c. Conduct fmal inspection in the company of ENGINEER, OWNER and CONTRACTOR and prepare a final list of items to be completed and corrected. d. Observe whether all items on final list have been completed or corrected and make recommendations to ENGINEER concerning acceptance and issuance of the Notice of Acceptability of the Work. C. LIMITATIONS OF AUTHORITY Resident Project Representative: 1. Shall not authorize any deviation from the Contract Documents or substitution of materials or equipment (including "or-equal" items), unless authorized by ENGINEER. 2. Shall not exceed limitations of ENGINEER's authority as set forth in the Agreement or the Contract Documents. 3. Shall not undertake any of the responsibilities of CONTRACTOR, subcontractors, suppliers, or CONTRACTOR's superintendent. 4. Shall not advise on, issue directions relative to, or assume control over any aspect of the means, methods, techniques, sequences or procedures of construction unless such advice or directions are specifically required by the Contract Documents. 5. Shall not advise on, or issue directions regarding, or assume control over safety precautions and programs in connection with the Work. 6. Shall not accept Shop Drawing or sample submittals from anyone other than CONTRACTOR. 7. Shall not authorize OWNER to occupy the Project in whole or in part. 8. Shall not participate in specialized field or laboratory tests or inspections conducted by others, except as specifically authorized by OWNER and ENGINEER. 1 END OF SECTION I 00800-20 Ocoee • o CITY OF OCOEE ,aca o Engineering/Utilities 150 North Lakeshore Drive p00°"� Ocoee, Florida 34761-2258 NOTICE OF INTENT TO AWARD 1E, Date: (Contractor) Project: CITY OF OCOEE Date of Bid Opening: You are notified that your bid dated 199_for the above Contract has been considered and the OWNER,City of Ocoee,Florida,expects to award you a contract for: (Indicate total Work,alternates or sections of Work awarded) The Contract Price of your contract is (in words) Dollars($ ). (in numbers) Six(6)copies of each of the following proposed Contract Documents(except Project Manual and Drawings) accompany this Notice of Intent to Award: • Amendment to the Agreement Between Owner and Contractor • Performance Bond • Payment Bond • Certificate of Insurance and Endorsement-Workman's Compensation • Certificate of Insurance and Endorsement-Comprehensive General Liability • Notice of Intent to Award • Indemnification Agreement You must comply with the following conditions precedent to the award of the contract within ten(10)days of the date of this Notice of Intent to Award,that is by , 1999: 1. You must deliver to the OWNER four(4)fully executed counterparts of the Amendment Agreement. 00840-1 C I 2. You must deliver with the executed Agreement,as Amended,the Payment and Performance Bonds in the form specified in the Bidding Documents. 3. You must provide in writing the correct name and address of the surety which is providing the Payment and Performance Bonds and the correct name and address of the surety's resident agent for service of process in Florida. 4. You must deliver with the executed Agreement completed Certificates and Endorsements of Insurance in the forms specified in the Bidding Documents. Failure to comply with these conditions within the time specified will entitle the OWNER to consider your Bid abandoned,to annul this Notice of Intent to Award,and to declare our Bid Security forfeited. Within ten(10)days after you comply with these conditions,the OWNER will return to you one fully signed counterpart of the Agreement with the Contract Documents attached. I OWNER: CITY OF OCOEE Acknowledge Receipt of Notice CONTRACTOR: I By: (Authorized Signature) (Signature) Mr.James W. Shira,P.E. City Engineer/Utilities Director (print or type name) (Title) (Date) Copy to Engineer (Use Certified Mail, Return Receipt Requested) END OF SECTION I 00840-2 Ocoee CITY OF OCOEE �� a Engineering/Utilities 150 North Lakeshore Drive +,4 :�' ,. Ocoee, Florida 34761-2258 of Goo NOTICE TO PROCEED L L DATE: (Contractor) RE: Notice to Proceed on Project: Project: CITY OF OCOEE You are notified that the Contract Time under the above contract will commence to run on 199 . On that date you are to start performing the Work and your other obligations under the Contract Documents. Based on the Contract Time stated in the Agreement,we calculate that the dates of Substantial Completion and Final Completion are , 199_and , 199_,respectively. Work at the site must be started by , 199_as indicated in the Contract Documents. Enclosed is one set of conformed Drawings and one bound copy of the conformed Project Manual containing: Instruction to Bidders General Conditions I Bid Form Supplementary Conditions Bid Bond Notice of Award Executed Agreement Certificate of Owner's Attorney Payment Bond Specifications Performance Bond General Requirements Forms Certificates of Insurance IOWNER: CITY OF OCOEE Acknowledge Receipt of Notice CONTRACTOR: By: (Authorized Signature) (Signature) Mr.James W. Shira,P.E. City Engineer/Utilities Director (print or type name) (Title) (Date) Copy to Engineer(Use Certified Mail,Return Receipt Requested) END OF SECTION nnRd 1_1 Ocoee CITY OF OCOEE ti rx o Engineering/Utilities a ,' 150 North Lakeshore Drive °a, �. Ocoee, Florida 34761-2258 *00009` ` CHANGE ORDER NO. CITY OF OCOEE PROJECT NO. DATE: CONTRACTOR: AGREEMENT DATE: The following changes are hereby made to the CONTRACT DOCUMENTS. Original CONTRACT PRICE Current CONTRACT PRICE ADJUSTED by previous CHANGE ORDER Net Increase(Decrease)Resulting from this CHANGE ORDER The current CONTRACT PRICE including this CHANGE ORDER ORIGINAL CONTRACT TIME: Consecutive Calendar Days from Notice to Proceed Date: Current CONTRACT TIME adjusted by previous CHANGE ORDERS Date: Net Increase Resulting from this CHANGE ORDER Days: Current CONTRACT TIME Including this CHANGE ORDER Date: 00842-1 I CHANGES ORDERED: I. GENERAL This change order is necessary to cover changes in the work to beP erformed under this Contract. The GENERAL CONDITION, SUPPLEMENTARY CONDITIONS, SPECIFICATIONS and all parts of the Project Manual listed in Article 1,Definitions,of the GENERAL CONDITIONS apply to and govern all work under this change order. II. REQUIRED CHANGES3 I III. JUSTIFICATION 3I IV. NARRATIVE OF NEGOTIATIONS O TIONS V. PAYMENT Change Order Description Net Increase Unit Unit Price Net Increase Item No. (Decrease)Quantity (Decrease)Price I Total Net Increase(Decrease)Change Order No. 3 VI. APPROVAL AND CHANGE AUTHORIZATION 3 This proposed change to the Contract is to be approved by the Ocoee City Commission. I I 00842-2 CITY OF OCOEE _ cl o Engineering/Utilities • 150 North Lakeshore Drive .s° Ocoee, Florida 34761-2258 '`*0f 0000 s. CERTIFICATE OF SUBSTANTIAL COMPLETION OWNER's Project No. ENGINEER's Project No. CONTRACTOR Contract For Contract Date This Certificate of Substantial Completion applies to all Work under the Contract Documents or to the following specified parts thereof: To (Owner) And To (Contractor) The Work to which this Certificate applies has been inspected by authorized representatives of OWNER, CONTRACTOR and ENGINEER,and that Work is hereby declared to be substantially complete in accordance with the Contract Documents on Date of Substantial Completion A tentative list of items to be completed or corrected is attached hereto. This list may not be all-inclusive, and the failure to include an item in it does not alter the responsibility of CONTRACTOR to complete all the Work in accordance with the Contract Documents. When this Certificate applies to a specified part of the work the items in the tentative list shall be completed or corrected by CONTRACTOR within days of the above date of Substantial Completion. The date of Substantial Completion is the date upon which all guarantees and warranties begin,except as follows: 00843-1 I The responsibilities between OWNER and CONTRACTOR for security, operation, safety, maintenance, heat, utilities and insurance shall be as follows: RESPONSIBILITIES: OWNER CONTRACTOR I The following documents are attached to and made a part of this Certificate: I Executed by ENGINEER on , 199 . 1 I (Engineer) By: The CONTRACTOR accepts this Certificate of Substantial Completion on: , 199 . 3 (Contractor) I By: 00843-2 { I • Acknowledgements: The aforementioned change,and work affected thereby,is subject to all provisions of the original contract not specifically changed by this Change Order;and, It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original contract other than matters expressly provided herein. CONTRACTOR acknowledges,by its execution and acceptance of this Change Order,that the adjustments in Contract Price and Time shown hereon constitute full and complete compensation and satisfaction for all costs and modifications of performance time incurred by the CONTRACTOR as a result of this Change Order. No other claim for increased costs of performance or modifications of time will be granted by the OWNER for the Work covered by this Change Order. The CONTRACTOR hereby waives and releases any further claims for cost or time against the OWNER arising from or relating to the matters or Work set forth or contemplated by this Change Order. RECOMMENDED BY: ACCEPTED BY: CITY OF OCOEE,FLORIDA C By: By: Signature Signature Date: Date: Title: Title: APPROVED BY: CITY OF OCOEE,FLORIDA Owner By: S. Scott Vandergrift,Mayor Date Attest: Jean Grafton,City Clerk FOR USE AND RELIANCE ONLY BY THE APPROVED BY THE OCOEE CITY CITY OF OCOEE,APPROVED AS TO FORM COMMISSION IN A MEETING HELD ON AND LEGALITY THIS , 199 OF , 199 UNDER 199_. AGENDA ITEM NO. FOLEY&LARDNER r By: City Attorney 00842-3 Ocoee CITY OF OCOEE Engineering/Utilities NON-COMPLIANCE NOTICE pr.-j 14> 4 1.OF GOO') 150 North Lakeshore Drive (407)656-2322 ext. 142 Ocoee,Florida 34761-2258 (407)656-7835-fax NO. ILPROJECT DATA: NAME: PROJECT NO.: LOCATION: DATE: OTHER: REFERENCE.: • TO (CONTRACTOR): You are hereby notified that the following work or materials does not conform to the requirements of the Contract Documents noted above. Non-complying work may be required to be removed and replaced at no cost to the Owner. Non-compliance Notice was received by Contractor on(date): It shall be your responsibility to determine the corrective action necessary,and to determine whether you wish to ap By: discontinue operations until additional investigation by the Owner or Engineer confirm or refute the initial findings. If you should not correct non-complying work in a timely manner,or continue to perform non-comply work,the Owner may stop the Work.(GC-13.10,Sc- 3.11). DESCRIPTION (of non-conforming work or materials): ISSUED BY: TITLE: IIATTACHMENT S(Listing of attached documents that support description): 1. Contractor Request for Information No. 4. 2. 5. 3. 6. IIO OWNER: 0 CONTRACTOR: 0 ENGINEER: 0 FIELD: 0:SUBCONSULTANT 0 OTHER: 00844-1 Ocoee FIELD ORDER o CITY OF OCOEE Engineering/Utilities OP 150 North Lakeshore Drive Ocoee,Florida 34761-2258 (407)656-2322 ext.142 NO. Goo (407)656-7835-fax PROJECT DATA: ENAME: PROJECT NO.: LOCATION: DATE: OTHER: REFERENCE: TO (CONTRACTOR): You are hereby directed to execute promptly this Field Order which interprets the Contract Documents or orders minor changes in the Work without change in Contract Sum or Contract Time. EIf you consider that a change in Contract Sum or Contract Field Order was received on(date): Time is required,please submit your itemized proposal to the Engineer immediately and before proceeding with this By: Work. If your proposal is found to be satisfactory and in proper order,this Field Order will in that event be Title: superseded by a Change Order. DESCRIPTION (of interpretation or change): ISSUED BY: TITLE: / ATTACHMENTS (Listing of attached documents that support description): 1. Contractor Request for Information No. 4. 2. 5. 3. 6. 0 OWNER: 0 CONTRACTOR: 0 ENGINEER: 0 FIELD: tSUBCONSULTANT: 0 OTHER: • 00845-1 Ocoee CITY OF OCOEE REQUEST FOR PROPOSAL :. ►.: # o Engineering/Utilities FOR PROPOSED CHANGE 1. +� 150 North Lakeshore Drive (407)656-2322 ext. 142 (RFP) Ocoee, Florida 34761-2258 (407)656-7835-fax NO. a coon ` PROJECT DATA: NAME: PROJECT NO: LOCATION: DATE: OTHER: REFERENCE: TO(CONTRACTOR): 111 Please provide the undersigned a proposal for the following change in the work within seven(7)calendar days after receipt of this request. The written proposal must clearly delineate the scope of the proposed change in the work providing an itemized estimate of the time and all material and labor(by trade),subcontract and overhead costs and fees. Any amount claimed for subcontracts must be similarly supported. DESCRIPTION of change in work: Change Order Type: d Deletion 4 Addition 4 Revision 4 Other:( Constraints of Change: Initiated by: d Changes in Owner Requirements 4 Unforeseen Conditions 4 Others:( ) Proposal must be received by: ATTACHMENTS(Listing of attached documents that support description): 1. Contractor Request for Information No. 4. 2. Plan Revisions: 5. 3. 6. Ir 4 OWNER: 4 CONTRACTOR: 4 ENGINEER: 4 FIELD: 4 CONSTRUCTION ADMINISTRATOR: 4 OTHER: 4 SUBCONSULTANT: Date Received From Contractor: Date Returned to Contractor With Comments: Date Returned to City: 00847-1 PRICING INFORMATION: Method of Pricing: A. 4 Established Contract Unit Price(s) B. 4 Negotiated Unit Price(s)(including Overhead and Profit) 3 C. 4 Negotiated Lump Sum(including Overhead and Profit) D. 4 Actual Cost of Work plus Fixed Percent for Overhead and Profit E. 4 A combination of A,B,C,D DESCRIPTION OF WORK: 4 By General Contractor 4 By Subcontractor ITEM OF WORK QUANTITY PRICE TOTAL 1 Attach additional pages if necessary. NET TOTAL COST OF THIS CHANGE PROPOSAL $ EXTENSION OF CONTRACT TIME: As part of this Change Proposal the Contractor requests an extension of the contract time in the amount of additional days. Provide thorough documentation in support of the request for additional time: A requirement of this Change Proposal will be to provide record drawing information for all of the affected items of work RECOMMENDATION BY ENGINEER/CONSTRUCTION ADMINISTRATOR: Comments: I Signature of Engineer/Construction Administrator: Date: I ACCEPTANCE BY OWNER: Comments: Signature: Date: I, ,of agree to the costs and terms of RFP 3 (Name) (Company) (No.) this day of , 199 (day) (month) (year) 00847-2 3 DAILY CONSTRUCTION Ocoee CITY OF OCOEE REPORT ip(cj? ° Engineering/Utilities 150 North Lakeshore Drive (407)656-2322 ext. 142 Day of .4 Goat v. Ocoee,Florida 34761-2258 (407)656-7835-fax PROJECT DATA;. INAME: PROJECT NO.: LOCATION: DATE: EOTHER: REFERENCE: 1. TIME (24 HR.CLOCK) TEMP.RANGE PRECIPITATION WEATHER GROUND CONDITIONS Work Started: AM: Type: 0 Sunny 0 Overcast 0 Dry 0 Saturated Work Stopped: PM: Duration:• 0 Cloudy 0 Windy 0 Wet 0 Frozen 2. RECORD OF LABOR CONTRACTOR TYPE NO. HRS. CONTRACTOR TYPE NO. HRS. 3. EQUIPMENT CONTRACTOR TYPE MODEL HRS. USE 4. MATERIAL RECEIVED RECEIVED BY TYPE QUANTITY USE SUPPLIER O OWNER: 0 CONTRACTOR: 0 ENGINEER: 0 FIELD: 00848-1 ❑SUBCONSULTANT: 0 OTHER: 5. DESCRIPTION OF WORK PERFORMED: 1 I 3 I 6. DELAYS TO WORK: I I 7. DISCUSSIONS AND/OR INSTRUCTIONS: NAME SUBJECT R.F.I.# FIELD ORDER# 3 I 8. VISITORS TO SITE: NAME TITLE REPRESENTING DISCUSSION I 9. TEST RECORD: I TYPE NO. RESULTS PERFORMED BY 33 ATTACH ADDITIONAL SHEET IF NECESSARY TO CLARIFY REPORT Submitted B 0084R-2 3 t E L t I t t C E I E E L C C00848-3 Ocoee WEEKLY CONSTRUCTION CITY OF OCOEE PROGRESS REPORT ?9, oEn jneerinclUblities •e,.„o . 150 Nath Lalaeshae Drive (407)666-7v9 ei 142 Day of 0:oee,Florida 34761-7158 (407)656-7835-fax ' PROJECT DATA: NAME: PROJECT NO.: LOCATION: DATE: OTHER: REFERENCE: 1. WEATHER: MON. TUES. WED. THURS. FRI. SAT. Weather: Temperature: High: High: High: High: High: High: Low: Low: Low: Low Low: Low: 2. CONTRACTOR'S PERSONNEL: 3. CONTRACTOR'S EQUIPMENT 4. CONTRACTOR FOREMAN CREW 5. DISCUSSIONS AND/OR INSTRUCTIONS: NAME SUBJECT R.F.I.# FIELD ORDER# 6. VISITORS TO SITE: NAME TITLE REPRESENTING DISCUSSION ❑OWNER: 0 CONTRACTOR: ❑ENGINEER: 0 FIELD: e 0 SUBCONSULTANT: 0 OTHER: 00849-1 7. CPM SCHEDULING CONSTRAINTS/DELAYS: I 8. WORK PERFORMED: DATE DAYS FROM WORK PERFORMED Day/Mo./Yr. N.T.P. 3 I I I 1 I Signed: 00849-2 Ocoee CONSTRUCTION CITY OF OCOEE ACCIDENT Engineering/Utilities REPORT 4, 54 or 150 North Lakeshore Drive Ocoee,Florida 34761-2258 (407)656-2322 ext. 142 GOO (407)656-7835-fax No.: PROJECT DATA: NAME: PROJECT NO.: LOCATION: DATE: OTHER: ACCIDENT INFORMATION Accident Date: Time Accident Occurred: Names of injured or Deceased: Address Described what occurred: NOTE: Use other side or attach additional sheets as required. Name and Address of Witnesses: Address ICEmployer's Name and Address: Address 1 ir SKETCH: Where Treated(Name and Address): SEND ORIGINAL TO PROJECT MANAGER-IN-CHARGE OF CONSTRUCTION IMMEDIATELY. Signed: CI OWNER: 0 CONTRACTOR: II 0 ENGINEER: 0 FIELD: o SUBCONSULTANT: 0 OTHER: F-00850 i . .. . PERIODIC ESTIMATE FOR PARTIAL PAYMENT City of Name of Contractor: FOR PAY PERIOD PERIODIC Project Name: Address: ESTIMATE to NO. Project No.: Contractor's Project No.: 2. Schedule of Contract Change Orders Additions to Original Contract Price Deductions From Cont.iosice As Shown On Change Orders 1 (7) Contnict Change Related Description Cost of Items Cost of C.O. Owler " Item (4) Added By C.O. Items (5) Completed to / Date(6) No. Date(2) ETOTALS 3. ANALYSIS OF ADJUSTED Contract AMOUNT TO DATE A. Original Contract Amount(Subtotal Col.5 PART 1) $ 1 B. C. Plus: Additions Scheduled in Column 5 Above Less: Deductions Scheduled in Column 7 Above - D. Adjusted Contract Amount to Date $ 4. ANALYSIS OF Work PERFORMED E A. B. Cost of Original Contract Work Performed to Date(Subtotal Col.7 PART 1) Extra Work Performed to Date(Total Col.6 above) $ C. Total Cost of Work Performed to Date $ D. Less: Amount Retained: " _%Cost of Work Performed to Date(Line 4c) " Fixed Amount 1 E. F. Net Amount Earned on Contract Work to Date Add: Material Stored at Close of this Period (90%of ) $ + G. Subtotal of E.and F. $ H. Less: Amount of Previous Certificates for Payment _ 5.CI. Balance Due this Payment CERTIFICATE OF CONTRACTOR $ According to the best of my knowledge and belief,I certify that all items and amount shown on the face of the Periodic Estimate for partial Payment are correct;that all Work has I been performed and/or material supplied in full accordance with the requirements of the referenced Contract,and/or duly authorized deviations,substitutions,alternations,and/or additions;that are foregoing is a true and correct statement of the Contract account up to and including the last day of the period covered by this Periodic Estimate that no part of the"Balance Due This Payment"has been received,and that the undersigned and his subContractors have-(check applicable line). 911 Complied with all the labor provisions of said Contract. 1 II Complied with all the labor provisions of said Contract except in those instances where an honest dispute exists with respect to said labor provisions. Contractor: By: Date: 1 6. CERTIFICATION OF ARCHITECT OR ENGINEER I certify that I have checked and verified the above and foregoing Periodic Estimate for Partial Payment;that to the best of my knowledge and believe it is a true and correct statement of Work performed and/or material supplied by the Contractor; . ,, that all Work and/or material included in this Periodic Estimate has been inspected by me and/or duly authorized representative or assistants and that is has been performed and/or supplied in full accordance with requirements of the referenced Contract; 99 all Work and/or material included in this Periodic Estimate has been inspected and verified by the City's Field Representative. 12 And that partial payment claimed and requested by the Contractor is correctly computed on the basis of Work performed and/or material supplied to date. 1 Company Name: Signed: (Architect or Engineer) Date: 7. PREPAYMENT CERTIFICATION BY FIELD ENGINEER t I certify that to the best of my knowledge and belief that all Work and/or materials under the Contract has been inspected by me and that it has been performed and or supplied m full accordance with the requirements of the Contract. Further,I have checked this estimated against the notes and reports of my inspections of the project,and the periodic reports submitted by the Architect/Engineer. It is my opinion that the statement of Work performed and/or materials supplied is accurate,that the Contractor is observing the requirements of the Contract,and that the Contractor should be paid the amount requested above. I8. City's Field Representative: APPROVED FOR PAYMENT Date: IBy: Date: City of ,Florida E00861-1 PERIODIC ESTIMATE FOR PARTIAL PAYMENT City of Name of Contractor: FOR PAY PERIOD PERIODIC II Project Name: Address: ESTIMATE to NO. Project No.: Contractor's Project No.: COST OF Work COMPLETED TO DATE UNDER ORIGINAL Contract ONLY. Entries must be limited to Work and costs under the original Contract only. (Work and cost data under change orders is to be shown in Part 2 of this form.) Columns(6)and(7). Show all Work completed to date under original Contract. Column(8). Enter the difference between entries in columns(5)and(7). Column(9). Show percent ratio of column(7)to column(5). Item Description of Item Contract Complete to Date Cost of %Comp No. (2) Uncompleted (9) (1) Work (g) Quantity Cost Per Unit Total Cost of Item Quantity Total Cost (3) (4) (5) (6) (7) I 3 I i I I 1 I 1 I 00861-2 PERIODIC ESTIMATE FOR PARTIAL PAYMENT City of Name of Contractor: FOR PAY PERIOD PERIODIC Project Name: Address: ESTIMATE to NO. Project No.: Contractor's Project No.: 1. COST OF Work COMPLETED TO DATE UNDER ORIGINAL Contract ONLY. Entries must be limited to Work and costs under the original Contract only. (Work and cost data under change orders is to be shown in Part 2 of this form.) Columns(6)and(7). Show all Work completed to date under original Contract. Column(8). Enter the difference between entries in columns(5)and(7). Column(9). Show percent ratio of column(7)to column(5). Item Description of Item Contract Complete to Date Cost of %Comp No. (2) Uncompleted (9) (I) Work III a■ (8). Quantity Cost Per Unit(4) Total Cost of Quantity Total Cost (3). item('3) (6) (7) SUBTOTAL CHANGE ORDER ADJUSTMENTS TO DATE Change Order No.I Change Order No.2 Change Order No.3 TOTAL: 00861-3 --------- --- - STORED MATERIALS PREPARED BY: City of Name of Contractor: FOR PAY PERIOD r PERIODIC Project Name: Address: ESTIMATE to NO. Project No.: Contractor's Project No.: Item No. Description Invoice M Invoice Value Last (-)Invoice Value for (+)Invoice For Material (_)Invoice Value Actual Period Cumulative Material Installed This Delivered This Period Material Stored On Site Period I i I I 1 1 t I I TOTAL: -- 00861-4 EXAMPLE OF SURETY LETTER CONSENT TO PARTIAL PAYMENT , 19 Mr. James W. Shira, P.E. City Engineer/Utilities Director City of Ocoee 150 North Lakeshore Drive Ocoee, Florida 34761 SUBJECT: CITY OF OCOEE RE: Bond No. Dear Mr. Shira: Pursuant to the bond executed on , 19 , (SURETY CO.NAME), hereby consents to partial payment under the contract between the City of Ocoee and , in the amount of$ pursuant to Application No. Sincerely, (SURETY CO.NAME) Resident Agent END OF SECTION 00861-5 CONTRACTOR REQUEST °`°� CITY OF OCOEE FOR _ ►.. �D# o Engineering/Utilities INFORMATION ��,, i 150 North Lakeshore Drive (407)656-2322 ext. 142 `'op G.00Ocoee,Florida 34761-2258 (407)656-7835-fax No.: PROJECT DATA: NAME: PROJECT NO.: LOCATION: DATE: OTHER: REFERENCE: QUESTION: BY: DATE: REPLY: BY: DATE: ❑OWNER: 0 CONTRACTOR: ❑ENGINEER: 0 FIELD: 0 SUBCONSULTANTT: 0 OTHER: 00868 CONTRACTOR • Ocoee CITY OF OCOEE PROPOSED Engineering/Utilities CHANGE 150 North Lakeshore Drive (407)656-2322 ext. 142 Ocoee,Florida 34761-2258 (407)656-7835-fax CPC NO. EPROJECT DATA: NAME: PROJECT NO.:_ LOCATION: DATE: OTHER: REFERENCE: DESCRIPTION OF PROPOSED CHANGE:(By Contractor) EProposed Credit$ Days By: Date: RECOMMENDATION:(By Engineer) By: Date: REPLY:(By Owner) By: Date: 1E, 0 OWNER: 0 CONTRACTOR: 0 ENGINEER: 0 FIELD: SUBCONSULTANT: 0 OTHER: 00878 This Instrument Prepared by: Name Address SECTION 00879 EXHIBIT"D" WAIVER AND RELEASE OF LIEN UPON FINAL PAYMENT The undersigned lienor, in consideration of the final payment in the amount of$ ,hereby waives and releases its lien and right to claim a lien for labor,services or materials furnished through , 19 ,to (customer)on the job of (owner of property)to the following described property: WITNESS my hand and seal this day of , 19 Lienor's Name Address By Printed Name Sworn to and subscribed before me by who is personally known to me or produced as identification,and who did take an oath,this day of_ , 19 . Signature of Notary Printed Name of Notary Commission No./Expiration SEAL: END OF SECTION 00879-1 E - This Instrument Prepared by: Name Address SECTION 00881 EXHIBIT"D" WAIVER AND RELEASE OF LIEN UPON PROGRESS PAYMENT The undersigned lienor, in consideration of the sum of$ ,hereby waives and releases its lien and right to claim a lien for labor,services or materials furnished through , 19 ,to (customer)on the job of (owner of property)to the following described property: This waiver and release does not cover any retention or labor,services,or materials furnished after the date specified. WITNESS my hand and seal this day of , 19 Lienor's Name Address By Printed Name Sworn to and subscribed before me by who is personally known to me or produced as identification,and who did take an oath,this day of_ , 19 . Signature of Notary Printed Name of Notary Commission No./Expiration SEAL: END OF SECTION 00881-1 SECTION 00883 EXHIBIT"D" CONTRACTOR'S FINAL AFFIDAVIT STATE OF FLORIDA, COUNTY OF BEFORE ME,the undersigned authority,duly authorized to administer oaths and take acknowledgements, personally appeared who being duly sworn,deposes and says: 1. He is the (title)of (name of business) hereinafter referred to as"Contractor." 2. At all times material hereto,Contractor has been doing business in County,Florida. 3. This Affidavit is made pursuant to Section 713.06(3)(d)(1),Florida Statutes,for the purpose of acknowledging full and fmal payment to the Contractor for work done and materials supplied on real property described as: (property description) 4. That all lienors engaged by the Contractor to perform or provide labor,services and/or materials under the contract between Contractor and the owner of the above-described property have been paid in full,except as follows: Name/Address Amount Due Name/Address Amount Due FURTHER AFFIANT SAYETH NOT. (Signature of Contractor) Sworn to and subscribed before me by who is personally known to me or produced as identification,and who did take an oath,this day of_ , 19_ Signature of Notary Printed Name of Notary Commission No./Expiration SEAL: END OF SECTION 00883-1 i 3 1 7 l 1 1 1 7 1 1 1 7 1 1 1 3 00883-2 3 SECTION 02110 CLEARING AND GRUBBING PART 1 - GENERAL 1.01 DESCRIPTION A. Work under this section of the specifications consists of clearing and grubbing for the construction as shown on the plans,and the disposal of materials and debris resulting from the clearing and grubbing operations. The area of construction shall be cleared as required, subject to the approval of the Owner. The extent of clearing shall be minimized to the width required for installation of the work. The Contractor is expected to visit the sites of the work and determine for himself the extent of the clearing and grubbing necessary for his construction operations. PART 2 -PRODUCTS (Not Applicable) PART 3 -EXECUTION 3.01 CLEARING A. Clearing only consists of the removal of all trees,living or dead, stumps, down timber,brush, rubbish and all other objectionable debris, from the area to be cleared. Trees, stumps and brush may be cut off flush with the surrounding ground surface or removed with a bulldozer at the option of the Contractor. Should selective clearing be desired,the Engineer will select and mark, or otherwise designate,the trees or ornamentals to remain standing. 3.02 CLEARING AND GRUBBING A. On areas specified to be cleared and grubbed, all trees, stumps,down timber,brush and other objects standing on or protruding from the ground shall be removed. All roots shall be grubbed and removed a minimum of 18 inches below the surface of the ground. Holes caused by grubbing operations shall be filled to the level of adjacent ground. 3.03 SELECTIVE CLEARING AND/OR GRUBBING A. Special attention shall be given by the Contractor to saving,protecting and preserving any existing trees, shrubs or other vegetation so designated by the Owner. The Owner or his representative will select and mark, or otherwise designate, trees, ornamentals or other vegetation to be preserved. 02110-1 3 3.04 DISPOSAL A. All material and debris resulting from clearing,or clearing and grubbing, operations shall be disposed of in a manner approved by the Owner. It shall be the responsibility of the Contractor to obtain permits for hauling and disposal in areas where such permits are required and he shall be responsible for any and all damage to surrounding property or areas caused by his hauling operations. 3.04 CLEANUP A. In accordance with the GENERAL CONDITIONS. **END OF SECTION** I I I 3 I I 3 3 I 02110-2 3 SECTION 02140 DEWATERING (DURING CONSTRUCTION) PART 1 - GENERAL 1.01 DESCRIPTION A. Scope of Work: The work to be performed under this Section shall include the design and installation of temporary dewatering systems until completion of construction to remove subsurface waters from structures and piping as necessary. The Contractor shall be responsible for all permitting activities, including permit fees,associated with obtaining applicable permits from the State Water Management District having jurisdiction over the installation and operation of the dewatering systems. B. Related Work Described Elsewhere: 1. Section 02221: Excavation, Trenching, Backfilling and Embankment 1.02 QUALITY ASSURANCE A. Qualifications: The temporary dewatering system shall be designed by a firm who regularly engages in the design of dewatering systems and who is fully experienced, reputable and qualified in the design of such dewatering systems. B. Standards: The dewatering of any excavation areas and the disposal of water during construction shall be in strict accordance with all local and state government rules and regulations. 1.03 SUBMITTALS A. Materials and Shop Drawings: Shop drawings required to establish compliance with the specifications shall be submitted in accordance with the provisions of the General Conditions. Submittals shall include at least the following: 1. Descriptive literature of the temporary dewatering system. 1.04 CRITERIA A. Each system shall maintain groundwater levels during,and between, excavation and backfilling operations at the following levels: 02140-1 3 1. For pipelines,the groundwater level shall be maintained at least two (2) feet 3 below the pipe invert elevation, or at least two (2) feet below the bottom of the excavation, whichever is lower. 3 2. For structures,the groundwater level shall be maintained at least five(5) feet below the bottom of the base slab of the structure, or at least five (5) feet 3 below the bottom of the excavation, whichever is lower. PART 2 - PRODUCTS3 2.01 GENERAL 3 A. The equipment utilized for dewatering shall be standard dewatering equipment of proven ability as designed and manufactured by firms having experience in the design and production of such equipment. The equipment furnished shall be3 designed, constructed and installed in accordance with the best practices and methods. 3 PART 3 - EXECUTION 3.01 INSTALLATION A. Dewatering: The Contractor shall install temporary dewatering systems for the 3 removal of subsurface water encountered during construction of the proposed structures and pipelines as specified above. The Contractor shall also install temporary monitoring wells to prove compliance with the dewatering depth3 requirements specified herein. 3.02 PROTECTION AND SITE CLEAN-UP3 A. At all times during the progress of the Work,the Contractor shall use all reasonable precautions to prevent either tampering with the system or the entrance of foreign 3 material into the groundwater or underground strata. B. Disposal of groundwater from the dewatering system shall be as specified by permits issued for the work and as directed by the Owner. 3 3 3 02140-2 3 C. Immediately upon completion of the use of the dewatering system, the Contractor shall remove all of his equipment,materials, and supplies from the site of the work, remove all surplus materials and debris,fill in all holes or excavations, and grade the site to elevations of the surface levels which existed before work started or as shown on the Drawings. The Contractor shall comply with all governing rules, regulations, and conditions of permits issued for dewatering. ** END OF SECTION ** 02140-3 C SECTION 02201 EARTHWORK PART 1 - GENERAL 1.01 DESCRIPTION OF WORK A. The extent of earthwork is shown on the drawings. 1. Included is preparation of subgrade for walks. B. Related Work Specified Elsewhere: Section 02110 - Site Clearing. Section 02211 - Site Grading. Section 02221 —Excavation, Trenching, Backfilling & Embankment. Section 02500 - Paving (for Compaction Tests under areas to be paved). Section 03300—Cast-In-Place Concrete. 1.02 QUALITY ASSURANCE A. Codes and Standards: Perform earthwork in compliance with applicable requirements of governing authorities having jurisdiction. B. Testing and Inspection Service: The Owner will engage a testing and inspection service, to include testing soil materials proposed for use in the work and field facilities for quality control testing during earthwork operations. 1. Soil survey for satisfactory soil materials and samples of soil materials shall be furnished to the testing services by the Contractor. 2. All test reports must be signed by a licensed engineer. 1.03 JOB CONDITIONS A. Site Information: The data on indicated subsurface conditions are not intended as representations or warranties of the accuracy or continuity between soil borings. It is expressly understood that the Owner will not be responsible for interpretations or conclusions drawn therefrom by the Contractor. The data are made available for the convenience of the Contractor. 1. Additional test borings and other exploratory operations may be made by the 02201- 1 Contractor at no cost to the Owner. B. Existing Utilities: Locate existing underground utilities in the areas of work before starting earthwork operations. Where utilities area to remain in place, provide adequate means of protection during earthwork operations. 3 1. Should uncharted, or incorrectly charted, piping or other utilities be encountered during excavation, consult the utility owner immediately for directions. Cooperate with the Owner, and public and private utility companies in keeping their respective services and facilities in operation. Repair damaged utilities to the satisfaction of the utility owner. 2. Do not interrupt existing utilities serving facilities occupied and used by the Owner or others, except when permitted in writing by the Owner and then only after acceptable temporary utility services have been provided. C. Use of Explosives: The use of explosives is not permitted. D. Temporary Protection: Barricade open excavations made as a part of earthwork operations and post with warning lights. Operate warning lights as recommended by authorities having jurisdiction. 1. Protect structures, utilities, sidewalks, pavements, and other facilities from damages caused by settlement, lateral movement,undermining,washout,and other hazards created by earthwork operations. PART 2 - PRODUCTS 2.01 SOIL MATERIALS A. Backfill and Fill Materials: Soil materials for use as backfill and fill shall be free of rock or gravel larger than 2-inches in any dimension, debris, waste, vegetable, and other deleterious matter. 1. Use excavated or borrow material that has been sampled,tested and certified as satisfactory soil material. B. Subbase Material: Properly graded mixture of natural crushed gravel, crushed stone, crushed slag, natural or processed sand that will readily compact to the required density. 1. Use material complying with AASHTO M147, Grade A, unless otherwise indicated or acceptable to the Owner. 02201- 2 C PART 3 -EXECUTION 3.01 INSPECTION A. Examine the areas and conditions under which earthwork is to be performed and notify the Owner in writing of conditions detrimental to the proper and timely completion of the work. Do not proceed with the work until unsatisfactory conditions have been corrected in an acceptable manner. 3.02 EXCAVATION A. Excavation consists of the removal and disposal of materials encountered when establishing the required grade elevations. 1. No earthwork shall be performed until photographs have been furnished to the Owner as specified in Section 01400, Paragraph 8 Project Photographs. 2. Where it is necessary to cut roots projecting into an excavation or to trim branches for equipment clearance, all severed root ends or cuts to branches over 1/2-inch diameter shall be treated with an asphalt base pruning paint. Backfill over exposed roots as soon as possible. B. Excavation Classifications: The following classifications or excavation will be made when unanticipated rock excavation is encountered in the work. 1. Do not perform such work until material to be excavated has been cross-sectioned and classified by the Owner. a. Such excavation will be paid for on the basis of applicable Contract conditions relative to changes in the work as agreed by the Construction Manager. 2. Earth excavation includes the removal and disposal of pavements and other obstructions visible on the ground surface, underground structures and utilities indicated to be demolished and removed, material of any classification indicated in data on subsurface conditions, and all other materials encountered that are not classified as rock excavation or unauthorized excavation. C. Unauthorized excavation consists of removal of materials beyond indicated elevations without the specific direction of the Owner. Replace unauthorized excavation by backfilling and compacting as specified for authorized excavations of the same classification, unless otherwise directed by the Owner. 02201- 3 1 D. Additional Excavation: When excavation has reached required subgrade elevations, notify the Owner who will make an inspection of conditions. 1. If unsuitable materials are encountered at the required subgrade elevations, carry excavations deeper and replace the excavated material as directed by the Owner. 2. Removal of unsuitable material and its replacement as directed will be paid on the basis of Contract conditions relative to changes in the work. 3. Removal of unsuitable material and its replacement as directed will be paid for under the appropriate bid item in the Bid Proposal. E. Dewatering: Prevent surface water and subsurface or groundwater from flowing into excavations, and flooding the project site and surrounding area. 1. Do not allow water to accumulate in excavations. Remove water from excavations to prevent softening of foundation bottoms,undercutting footing, and soil changes detrimental to the stability of subgrades and foundations. Provide and maintain pumps,well points, sumps, suction and discharge lines, and other dewatering system components necessary to convey the water away from the site. 2. Convey water removed from excavations and rainwater to collecting or run-off areas. Do not use trench excavation for site utilities as temporary drainage ditches. F. Material Storage: Stockpile excavated materials classified as satisfactory soil material where directed,until required for fill. Place, grade, and shape stockpiles for proper drainage. 3 1. Dispose of excess unsatisfactory soil material, trash, and debris, as specified. G. Excavation for Pavements: See Section 02500 - Paving. Cut the surface under pavements to comply with cross-sections, elevations and grades as shown. H. Excavation for Trenches: (On-Site Utilities) See Section 02221 Excavation, Trenching,Backfilling&Embankment. Dig trenches to the uniform width required for the particular item to be installed, sufficiently wide to provide ample working room. Excavate trenches to the depth indicated or required. Excavate the depth of3 trenches to establish the indicated pipe flow lines and invert elevations. Beyond the building perimeter,keep bottoms of trenches sufficiently below finish grade to avoid freeze-ups. 02201-4 I 1. Where rock is encountered, carry the excavation a minimum of 4-inches below the required elevation and backfill to the required elevation with a layer of crushed stone or gravel prior to installing pipe. 2. Grade bottoms of trenches as indicated,notching under pipe bells to provide solid bearing for the entire body of the pipe. 3. Backfill trenches with concrete where excavations pass within 18-inches of column or wall footings and which are carried below the bottom of such footing,or which pass under wall footings. Place concrete to the level of the bottom of adjacent footings. 4. Do not backfill trenches until tests and inspections have been made and backfilling authorized by the Owner. Use care in backfilling to avoid damage or displacement of pipe systems. 3.03 BACKFILL AND FILL A. Ground surface Preparation: Remove vegetation, debris, unsatisfactory soil materials, obstructions, and deleterious materials from ground surface prior to placement of fills. Plow, strip,or break-up sloped surfaces steeper than one vertical to four horizontal so that fill material will bond with existing surface. 1. When the existing ground surface has a density less than that specified under "Compaction" for the particular area classification, break-up the ground surface,pulverize, moisture-condition to the optimum moisture content of the soil material. Compact each layer to the required percentage of maximum dry density or relative dry density for each area classification. Do not place backfill or fill material on surfaces that are muddy, frozen, or contain frost or ice. a. Backfill excavations as promptly as the work permits but not until completion of inspection,testing, approval, and recording location of underground utilities, as required. 3.04 COMPACTION A. General: Control soil compaction during construction, providing the minimum percentage of density specified for each area classification. 1. Percentage of Maximum Density Requirements: a. Building Footings, Slabs and Steps: Compact top 12-inches of subgrade and each layer of backfill or fill material at 95%maximum 02201- 5 1 density (optimum moisture). b. Lawn Areas: Compact each layer of backfill or fill material at 85% maximum density (optimum moisture). c. Walkways: Compact top 6-inches of subgrade and each layer of backfill or fill material at 90% maximum density (optimum moisture). d. Pavements (to include driveways, walks, curbs), see Section 02500 - Paving. B. Moisture Control: Where the or subgrade layer of soil materials must be moisture g Y conditioned before compaction,uniformly apply water to the surface of subgrade,or layer of soil material, to prevent free water appearing on the surface during or subsequent to compaction operations. Remove and replace,or scarify and air dry, soil material that is to wet too permit compaction to specified density. 1. Soil material that has been removed because it is to wet too permit compaction may be stockpiled or spread and allowed to dry. Assist drying by discing,harrowing or pulverizing,until the moisture content is reduced to a satisfactory value. 3.05 FIELD QUALITY CONTROL A. Quality Control Testing During Construction: Testing service must inspect and111 approve subgrades and fill layers before further construction work is performed thereon. 1. Secure representative samples of the fill material and determine the standard density and required moisture content to be maintained by the Moisture- Density Relation Test ASTM D-1557-78. 2. Make in-place soil density tests during compaction operations in accordance with ASTM D-1556-64 (1974). a. Make at least one field density test of the subgrade for every 2,000 sq. ft. of building area, but in no case less than three tests. b. For each compacted layer,make one field density test for every 2,000 sq. ft. of building area, but in no case less than three tests. 3. If, in the opinion of the Owner, based on reports of the testing service and inspection, the subgrade or fills which have been placed are 02201- 6 below the specified density, additional compaction and testing will be required until satisfactory results are obtained. a. The results of density tests of soil-in-place will be considered satisfactory if the average of any four consecutive density tests which may be selected are in each instance equal to or greater than the specified density,and if not more than one density test out of five has a value more than 2% below the required density. 3.06 MAINTENANCE A. Reconditioning Compacted Areas: Where completed compacted areas are disturbed by subsequent construction operations or adverse weather, scarify the surface, re-shape, and compact to the required density prior to further construction. 3.07 DISPOSAL OF EXCESS AND WASTE MATERIALS A. Removal to Designated Areas on Owners Property: 1. Transport excess excavated material classified as satisfactory soil material to designated soil storage areas on the Owner's property. Stockpile soil or spread across the ground, as directed. B. Removal from Owner's Property: 1. Remove waste materials, including excavated material classified as unsatisfactory soil material,trash and debris, and dispose of it off the Owner's property. ***END OF SECTION*** 02201- 7 I SECTION 02221 EXCAVATION TRENCHING BACKFILLING AND EMBANKMENT PART I- GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals necessary to perform all excavation, removal of unsuitable or unsatisfactory material, backfill, fill, embankment and grading required to complete the work shown on the Drawings and specified herein. The work shall include, but not necessarily be limited to, all excavation and trenching; all backfilling; embankment and grading;disposal of waste and surplus materials; and all related work such assheeting,bracing and dewatering. B. The Contractor shall examine the site and review the available data prior to submitting his proposal,taking into consideration all conditions that may affect his work. The Owner and Engineer will not assume responsibility for variations of subsurface conditions. C. The Contractor shall be solely responsible for the means, methods, techniques, sequences and procedures of construction, for safety precautions and programs incident to the work and regulations, ordinances, codes and orders applicable to the furnishing and performance of the work. 1.02 RELATED WORK A. Section 02100A- Site Preparation Utilities B. Section 02140 - Dewatering C. Section 02260 - Finish Grading D. Section 02480 - Seeding& Mulching; Sodding 1.03 APPLICABLE PUBLICATIONS: A. The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only. B. American Association of State Highway and Transportation Officials (AASHTO) Standards: M145-82 The Classification of Soils and Soil Aggregate Mixtures for Highway Construction Purposes. 02221 - 1 C I T180-74 Moisture-Density Relations of Soils Using a 10-1b. (4.54 kg)Rammer and an 18-inch(457 mm) Drop. (Modified Proctor Test). T 191-61 Density of Soil In-Place by the Sand-Cone Method. (R 1982) C. Florida Department of Transportation; "Standard Specifications for Road and Bridge Construction", (FDOT) 1996 edition. D. ASTM D2487: "Unified Classification System." 3 1.04 DEFINITIONS: A. Common Fill: Common fill shall consist of any material classified as SW, SW-SM, SW-SC, SP, SP-SM, or SP-SC under Unified Classification System(ASTM D2487) which does not contain stones larger than 2 inches in any dimension and which has no more than 12 percent of its material by weight passing the No. 200 sieve. B. Unsatisfactory Materials: Unsatisfactory materials shall be materials that do not comply with the requirements for common fill. Unsatisfactory materials include, but are not limited to,those materials containing roots and other organic matter, trash, 3 debris, and stones larger than 2 inches, and materials classified in AASHTO M145 as groups A-2-4, A-2-5, A-2-6, A-2-7, A-4, A-5, A-6, A-7, A-7-5 and A-7-6. Unsatisfactory materials also include man-made fills, refuse, or backfills from previous construction. C. Unyielding Material: Unyielding material shall consist of rock and gravelly soils with stones greater than 2 inches in any dimension,or in pipe installations,maximum size stones as defined by the pipe manufacturer, whichever is smaller. D. Unstable material shall consist of material without the sufficient bearing capacity to support the utility pipe conduit or appurtenance structure. E. Select Common Fill: Select common fill shall meet the requirements for common fill specified above with the exception that select common fill shall not have more than 5 percent of its material by weight passing the No. 200 sieve. Also, the maximum allowable aggregate size for select common fill shall be 1 1/2 inches, or in 3 pipe installations, the maximum size recommended by the pipe manufacturer, whichever is smaller. F. Degree of compaction: Degree of compaction shall be expressed as a percentage of the maximum density obtained by the test procedure presented in AASHTO T180. Field verification will be obtained by the test procedure presented in AASHTO T191. The term "maximum density" shall mean the maximum density determined under AASHTO T180. 02221 -2 I G. Bedding Rock: Coarse aggregate structural bedding and support for utilities appurtenances and structures equal to FDOT Number 57, or as required by pipe manufacturer's recommendations for water mains, force mains and sanitary sewers. 1.05 PROTECTION A. Prior to commencing excavation or dewatering,the Contractor shall take precautions to ensure that existing structures, which may be subject to settlement or distress resulting from excavation or dewatering are protected. Such precautions shall include establishing reference elevation markings on structures which are adjacent to new work and monitoring them to ascertain evidence of settlement or distress throughout construction. If settlement or distress becomes evident, modifications to the excavation, dewatering or protection procedures shall be made to prevent additional settlement or distress and any damage caused to the structure shall be repaired at the Contractor's expense. B. The Contractor shall furnish,put in place, and maintain such sheeting and bracing as may be required to support the sides of excavations,to prevent any movement which could in any way diminish the width of the excavation below that necessary for proper construction, and to protect adjacent structures and other facilities from undermining or other damage. The stability of all excavated faces shall be maintained in compliance with the Occupational Safety and Health Administration's excavation safety standards, 29 C.F.R. S. 1926.650 Subpart P until final acceptance of the work. The Contractor shall also comply with all applicable requirements of the Florida "Trench Safety Act" (90-96, Laws of Florida), and all other applicable rules and regulations. C. The Contractor shall, at all times during construction, provide and maintain proper equipment and facilities to remove all water entering excavations, and shall keep such excavations dry so as to obtain a satisfactory undisturbed subgrade foundation condition until the fills, structures or pipes to be built thereon have been completed to such extent that they will not be floated or otherwise damaged by allowing water levels to return to natural levels. Dewatering shall be conducted in such a manner as to preserve the undisturbed bearing capacity and composition of the subgrade soils at the proposed bottom of the excavation. Grading shall be done as may be necessary to prevent surface water from flowing into the excavation, and any water accumulating therein shall be removed so that the stability of the bottom and sides of the excavations is maintained. 1.06 SUBMITTALS A. Submit to the Owner for review, the proposed methods of construction, including dewatering, excavation, bedding, filling, compaction, and backfilling for the various portions of the work. Review shall be for informational purposes only. The Contractor shall remain responsible for the adequacy and safety of the methods. 02221 - 3 I 1.07 SOIL TESTING A. The Owner will employ the services of a testing laboratory to perform all soils testing. B. The Owner shall have sole authority over the frequency of testing and shall direct the testing laboratory in its work. The Owner may order the excavation down to any depth of backfilled material which has not been tested and have a test performed. 3 The Contractor shall excavate for the test and backfill after the test at no additional cost to the Owner. The Contractor shall re-excavate to the depth required and re- compact any areas found to be improperly backfilled. PART 2 -PRODUCTS 2.01 MATERIALS A. Only common fill or select common fill, as defined above, may be used as backfill unless otherwise directed by the Owner. PART 3 - EXECUTION 3.01 EXCAVATION A. Excavation of every description and of whatever substance encountered shall be performed to the lines and grades indicated. During excavation,material satisfactory for backfilling shall be stockpiled in an orderly manner at a distance from the banks of the excavation, or trench, sufficient to avoid overloading and to prevent slides or cave-ins. Adequate drainage shall be provided for the stockpiles and surrounding areas and measures shall be taken to prevent contamination with unsatisfactory excavated material or other material that may destroy the quality and fitness of the suitable stockpiled material. Should any stockpiled material become so contaminated as to be unsatisfactory, such material shall be removed and replaced with satisfactory on-site or imported material from approved sources at the Contractor's expense. Excavated material not required or not satisfactory for backfill shall be removed from the site. B. Rock excavation shall be understood to mean ledge rock. Rock excavation shall be made to the widths and depths directed by the Owner in the field. Removal of existing concrete foundations shall also be considered rock excavation. Boulder excavation shall be understood to mean only boulders in any kind of excavation exceeding 1 cubic yard in volume which can be excavated without resorting to blasting. Where rock or boulders are encountered,they shall be uncovered,but not excavated, until directed by the Resident Project Representative. No blasting shall be allowed on the project. 02221 - 4 ■ C. All roots 1-1/2 inches and greater in diameter shall be removed for a depth of 18 inches below the bottom of a cut. The excavation shall then be backfilled up to a specified grade in the manner specified. D. Excavation shall be made to the grades on the Drawings and to such widths as will give suitable room for construction of the structures, for bracing and supporting, pumping and draining. The bottom of the excavations shall be rendered firm and dry and in all respects acceptable to the Owner. If, in the opinion of the Owner, the material encountered at the required subgrade elevation, is unsuitable for foundations, it shall be removed to such depth and width and be replaced with suitable materials as directed by the Owner. A thin seal slab of lean concrete may be placed at the base of the completed excavation. E. Any underlying lines, conduits, evidence of previous work, or natural condition discovered during the excavation that may affect the integrity of any foundation shall 1 immediately be brought to the attention of the Owner. F. An imaginary 45 degree line extending downward and outward from the bottom corner of any existing foundation shall not intersect any intended excavation for adjacent foundations or utilities, unless authorized by the Owner. 3.02 TRENCHING A. The trench shall be excavated as recommended by the manufacturer of the pipe to be installed and as shown on Drawings. Trench walls below and above the top of the pipe shall be sloped, or made vertical, as shown on the Drawings. B. The bottoms of trenches shall be accurately graded to provide uniform bearing and support for the bottom half of each section of the pipe. Bell holes shall be excavated to the necessary size at each joint or coupling to eliminate point bearing. The trench bottom shall be free from unyielding material. Where unyielding material is encountered in the bottom of the trench, such material shall be removed 4 inches below the required grade and replaced with select common fill. C. Where unstable material is encountered in the bottom of the trench, such material shall be removed to the depth directed and replaced to the proper grade with select common fill or bedding rock as directed by the Owner. D. Unless otherwise specified or indicated on the Contract drawings,pipe trenches shall be of a depth to provide a minimum cover of three(3)feet from the existing ground surface, or from the indicated finished grade, whichever is lower, to the top of the pipe. The pipe shall be buried a minimum of three (3)feet from the top of the pipe to the existing grade or three (3) feet below the proposed adjoining road surface grade, whichever results in the greatest depth. 3.03 DEMUCKING 02221 - 5 3 A. The Contractor shall remove all muck in areas designated or noted on the Drawings. The muck shall be excavated to the depth required for complete removal, and disposed of at an approved dump site in accordance with all applicable rules and regulations. The Contractor shall notify the Owner if muck is encountered on the site. 3.04 MISCELLANEOUS EXCAVATION A. The Contractor shall perform all the remaining miscellaneous excavation. The Contractor shall make all excavations necessary to permit the completion of the work as shown on the Drawings and specified herein. 3.05 BACKFILLING A. Backfill material shall consist of common fill or select common fill as defined herein and as shown on the drawings. Backfill shall be placed in layers not exceeding 6 inches loose thickness for compaction by hand operated machine compactors, and 12 inches loose thickness for other than hand-operated machines, unless otherwise specified. Each layer shall be compacted to at least 95 percent of the maximum dry 3 density as determined by AASHTO T180 for cohesionless soils unless otherwise specified. The bottoms of all excavations shall be compacted to at least 95 percent of the maximum density prior to backfill. B. Trench Backfilling: For trenches, unyielding material removed from the bottom of the trench and unsuitable or unstable material removed from the trench shall be replaced with common fill or select common fill as shown on the Drawings. Replacement materials and backfill materials shall be placed in layers not exceeding 6 inches loose thickness from the bottom of the trench to 12 inches above the top of pipe and in layers not exceeding 12 inches loose thickness thereafter. In unpaved areas,each layer of replacement material,or backfill material, shall be compacted to at least 95 percent of maximum density. In paved areas, each layer of replacement material, or backfill material, shall be compacted to at least 98 percent of maximum density. The bottoms of all trenches shall be in an undisturbed condition or, if disturbed, shall be compacted to at least 95 percent of maximum density to a depth of at least 1-foot below the trench bottom. Specified densities shall be as determined by AASHTO T180. C. For paved areas, backfill shall be placed up to the elevation indicated and compacted to not less than 98 percent maximum dry density as determined by AASHTO T180 in not more than twelve-inch lifts. Water flooding or jetting methods of compaction will not be permitted. D. For Turfed and Seeded Areas and Miscellaneous Areas; Backfill shall be deposited in layers of a maximum of 12 inch loose thickness, and compacted to 95 percent maximum dry density as determined by AASHTO T180. Compaction by water 02221 - 6 3 3 flooding or jetting will not be permitted. This requirement shall also apply to all other areas not specifically designated above. E. Moisture Control: Where subgrade or layer of soil material must be moisture conditioned before compaction, uniformly apply water to surface or subgrade, or layer of soil material. Prevent free water from appearing on surface during or subsequent to compaction operations. 1. Remove and replace, or scarify and air-dry, soil material that is too wet to permit compaction to specified density. 2. Soil material that has been removed because it is too wet to permit compaction, but is otherwise satisfactory, may be stockpiled or spread and allowed to dry until moisture is reduced to a satisfactory value. 3.06 EMBANKMENT A. All organic material, including peat and roots, and other similar unsuitable material shall be removed from area beneath new embankments. The area shall be graded by filling depressions. All depressions shall be filled in layers and compacted as specified below. If the subgrade slopes are excessive,the subgrade shall be stepped to produce a stable surface for the placement of the embankments. The top six (6) inches of the natural subgrade shall then be compacted to 95 percent of the maximum dry density as determined by AASHTO T180. The Owner will waive this requirement, if, in his opinion, the subgrade will be rendered unstable by such compaction. B. Earth embankments shall be constructed with common fill or select common fill as specified. The material shall be placed in uniform layers not to exceed twelve (12) inches in thickness measured loose. Material too wet for compaction shall be dried prior to compaction and moisture shall be added to materials too dry prior to compaction. When each layer of material has been conditioned to the best practicable moisture content for compaction purposes, it shall be uniformly compacted by an approved roller with a minimum of six (6) passes made for each layer. Material shall be compacted to at least 95 percent of maximum dry density determined by AASHTO T180. C. Select common fill shall be used to raise the subgrade elevation for structures and as backfill around structures where conduit and piping join structures. Select common fill shall be compacted by a minimum of six coverages with approved compaction equipment to at least 95 percent of maximum dry density as determined by AASHTO T180. D. Common fill may be used as fill as indicated on the Drawings, as embankment fill or in other areas as designated by the Engineer. Material conforming to the requirement of common fill shall be placed in layers having a maximum thickness of twelve (12) inches measured before compaction. Each layer of common fill shall 02221 - 7 I be compacted to 95 percent of the maximum dry density as determined by AASHTO 3 T-180. E. The surfaces of filled areas shall be graded to smooth true lines, strictly conforming to grades indicated on the grading plan, and no soft spots or uncompacted areas will be allowed in the work. 3.07 SURPLUS MATERIAL A. Excavated material or borrow fill to be used in construction shall be neatly piled so as to inconvenience, as little as possible,the public and adjoining property owners until used or otherwise disposed of. Suitable excavated material may be used for fill embankments, trench backfill or backfill on the different parts of the work as required. Surplus fill shall become the property of the Contractor, and shall be removed and disposed of by him off the site. B. The Contractor shall remove and dispose of all pieces of rock(ledge) and boulders which are not suitable for use in other parts of the work. Rock disposed of by hauling away to spoil areas is to be replaced by approved surplus excavation obtained elsewhere in the work insofar as it is available. Any deficiency in the backfill 3 material shall be made up with satisfactory material provided by the Contractor at no additional cost to the Owner. Rock may be used in embankment fill only with approval of the Owner. 3.08 GRADING A. Gradingshall beperformed at allplaces that are indicated on the Contract Drawings, g , to the lines, grades, and elevations shown and otherwise as directed by the Owner and shall be performed in such a manner that the requirements for formation of embankments can be followed. During the process of grading,the subgrade shall be maintained in such condition that it will be well-drained at all times. B. In cuts, all loose or protruding rocks on the back slopes shall be removed to line or finished grade of slope. All cut and fill slopes shall be uniformly dressed to the slope, cross-section and alignment shown on the Drawings or as directed by the Engineer. C. The right is reserved to make minor adjustments or revisions in lines or grade, if found necessary, as the work progresses, due to discrepancies on the Drawings or in order to obtain satisfactory construction. *** END OF SECTION *** 02221 - 8 1 I SECTION 02260 FINISH GRADING PART 1 - GENERAL 1.01 WORK INCLUDED A. Finish grading shall be performed after placement of embankment in fill areas and excavation in cut areas has been performed to rough grades. B. Finish grade sub-soil. C. Cut out area to receive stabilizing base course materials for paving and sidewalks. D. Place, finish grade and compact top soil. 1.02 RELATED WORK A. Section 02100: Site Preparation B. Section 02221: Excavation, Trenching, Backfilling, and Embankment. C. Section 02480: Seeding and Mulching; Sodding 1.03 PROTECTION A. Prevent damage to existing fencing,trees, landscaping,natural features,bench marks, pavement and utility lines. Correct damage at no cost to the Owner. PART 2 - PRODUCTS 2.01 MATERIALS A. Topsoil: Friable loam free from subsoil, roots, grass, excessive amount of weeds, stones, and foreign matter; acidity range (pH) of 5.5 to 7.5; containing a minimum of 4 percent and a maximum of 25 percent organic matter. Use topsoil stockpiles on site if conforming to these requirements. 02260-1 3 B. The Owner shall direct tests on Topsoil material to confirm specified values. I PART 3 - EXECUTION 3.01 SUB-SOIL PREPARATION A. Rough grade sub-soil systematically to allow for a maximum amount of natural 3 settlement and compaction. Eliminate uneven areas and low spots. Remove debris, roots, branches, stones, etc. Remove sub-soil which has been contaminated with petroleum products, or that contains unsuitable materials. B. Cut out areas to sub-grade elevation,which are to receive stabilizing base for paving and sidewalks. C. Bring sub-soil to required levels, profiles and contours. Make changes in grade gradual. Blend slopes into level areas. D. Slope grade away from building minimum 2 inches in 10 feet unless indicated otherwise on the Drawings. E. Cultivate sub-grade to a depth of 3 inches, where topsoil is to be placed. Repeat cultivation in areas where equipment, used for hauling and spreading topsoil, has compacted sub-soil. 3.02 PLACING TOPSOIL A. Place topsoil in accordance with these specifications. Place to the following minimum depths,up to finished grade elevations. 1. 6 inches for seeded areas. 2. 4-1/2 inches for sodded areas. 3. 24 inches for shrub beds. 4. 18 inches for flower beds. B. Use topsoil in relatively dry state. Place during dry weather. C. Fine grade topsoil eliminating rough and low areas to ensure positive drainage. I 02260-2 I I Maintain levels, profiles and contours of sub-grades. D. Remove stone, roots, grass, weeds, debris, and other foreign material while spreading. E. Manually spread topsoil around trees,plants,and buildings,to prevent damage which may be caused by grading equipment. F. Lightly compact placed topsoil. 3.03 SURPLUS MATERIAL A. Removes surplus sub-soil and topsoil and stockpile in area designated bythe Owner. mP P P g B. Leave stockpile areas and entire job site clean, raked, and ready to receive sodding and landscaping. *** END OF SECTION *** 02260-3 SECTION 02444 CHAIN LINK FENCING PART 1 —GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment, and such miscellaneous items as Necessary for complete installation of chain link fence system. Fencing to be installed according to manufacturer's specifications unless otherwise indicated and specified herein. B. Contractor's security fencing is at his option and is not specified herein. 1.02 SUBMITTALS A. The Contractor shall submit shop drawings in accordance with the General Conditions. PART 2—PRODUCTS 2.01 MATERIALS A. The fabric, posts, fastenings, fittings and other accessories for chain link Fence shall meet the requirements of AASHTO M 181 with the following changes: 1. The weight of coating of wire fabric shall be 1.8 ounces of zinc per Square foot(Class B). 2. The galvanizing of steel materials shall be hot-dipped galvanized After fabrication. 3. The weight of coating on posts and braces shall be 1.8 ounces of zinc per square foot, both inside and outside to meet the requirements of AASHTO M 111. B. The base metal of the fabric shall be a good commercial quality 9 gage steel wire. The fabric shall be of uniform quality, and shall be 6 foot high with a 2 inch mesh size. 02444-1 C. All posts and rails shall be in accordance with the following schedule: 3 1. End, corner and pull posts: 2" O.D., Schedule 40. Galvanized steel. 2. Line posts and gate frames: 1 %2" O.D., Schedule40. Galvanized steel. 3. Gate posts: 2 %2" O.D., Schedule 40. Galvanized steel. 3 4. Post braces and top rail: 1 1/4" O.D., Schedule 40. Galvanized steel. D. Tension wire shall be No. 7 gage steel wire tensioned along the bottom of the fabric and shall be galvanized at the rate of 1.8 ounces of Zinc per square foot minimum. E. Miscellaneous fittings and hardware shall be zinc coated commercial quality or better steel or zinc coated cast or malleable iron as appropriate for the article. F. Post caps, designed to provide a drive fit over the top of all tubular posts 3 to exclude moisture, shall be provided. PART 3—EXECUTION 3.01 POST SETTING A. All posts shall be set three (3) feet deep in concrete footings, 12" diameter for line, gate, and corner posts. 3 B. After the post has been set, aligned and plumbed, the hole shall be filled with C500 p.s.i. concrete. The concrete shall be thoroughly worked into 3 the hole so as to leave no voids. The exposed surface of the concrete shall be crowned above grade to shed water. C. End, corner,pull and gate posts shall be braced to adjacent posts with a horizontal brace used as a compression member and a galvanized 3/8 inch steel truss rod and truss tig used as a tension member. Corner posts and corner bracing shall be constructed changes of fence alignment of 30 degrees or more. All chain link fence shall be constructed with a top rail and bottom tension wire. I 02444-2 3.02 GATES A. Swing gates shall be two 6-feet wide double hung gates as indicated on the Drawings and hinged to swing through 180 degrees from closed to open and shall be complete with latches, locking device, stops keeper, hinges, fabric and braces. Gates shall be the same height as the fence and the gate fabric shall be the same as the fence fabric. B. Gate leaves less than 8 feet wide shall have truss rods or intermediate braces and gate leaves 8 feet or more in width shall have intermediate braces and diagonial truss rods or shall have tubular members as necessary to provide rigid construction, free from sag or twist. 3.03 PLACING FABRIC A. The fabric shall not be placed until the posts have been permanently positioned and concrete foundations have attained adequate strength. The fabric shall be placed by securing one end and applying sufficient tension to remove all slack before making permanent attachments at intermediate points. B. The fabric shall be fastened to all corner, end and pull posts by substantial and approved means. Tension for stretching the fabric shall be applied by mechanical fence stretchers. **** END OF SECTION**** 02444-3 SECTION 02480 SEEDING AND MULCHING; SODDING PART 1 - GENERAL 1.01 SCOPE OF WORK A. The Contractor shall establish a healthy stand of grass on slopes, shoulders, lawns and other areas as shown on the Drawings and specified herein. 1.02 SUBMITTALS A. The Contractor shall submit shop drawings as required by the General Conditions. The shop drawings shall include information regarding materials, application rates, and grassing methods. B. The Contractor shall submit a topsoil sample to an independent laboratory for analysis. Based on the analysis, the Contractor shall prepare and submit a fertilization program to bring soil conditions to their proper levels to support establishment and healthy growth of grass and sod. PART 2 - PRODUCTS 2.01 MATERIALS A. Loam shall meet the requirements for topsoil specified in Section 02260 and shall be fertile, natural soil, typical of the locality, free from large stones, roots, sticks,peat, weeds and sod and obtained from naturally well drained areas. It shall not be excessively acid or alkaline nor contain toxic material harmful to plant growth. Suitable topsoil stockpiled under other Sections of this Division may be used,but the Contractor shall furnish additional loam at his own expense, if required. B. Fertilizer shall be complete commercial fertilizer, 10-10-10 grade or as determined by the laboratory soil analysis. It shall be delivered to the site in the original unopened containers each showing the manufacturer's guarantee analysis. Store fertilizer so that when used it shall be dry and free flowing. C. Lime shall be ground limestone containing not less than 85 percent calcium and magnesium carbonates. D. Seed shall be from the same or previous year's crop; each variety of seed shall have a percentage of germination not less than 80, a percentage of purity not less than 02480 - 1 I 95%, and shall have not more than one percent weed content. 3 E. Seed shall be a mixture of 80 parts Argentine Bahia and 20 parts Bermuda applied at a rate of 400 pounds per acre. Seed shall be delivered in sealed containers bearing the dealer's guaranteed analysis. F. Sod shall be Argentine Bahia grass or St. Augustine Floratam at the locations shown on the drawings subject to the Owners approval. It shall be well matted with roots and shall be taken up in commercial size rectangles of 12 inches by 24 inches. The 3 sod shall be sufficiently thick to secure a dense stand of live grass. The sod shall be live, fresh, and uninjured at the time of planting. It shall have a soil mat of sufficient thickness adhering firmly to the roots to withstand all necessary handling. It shall be 3 reasonably free of weeds and other grasses. It shall be planted as soon as possible after being dug and shall be shaded and kept moist from the time it is dug until it is planted. G. Mulch shall be dry or green mulch meeting the requirements of FDOT Section 981. PART 3 - PRODUCTS 3 3.01 APPLICATION FOR SEED AND MULCH A. Loam shall be placed to a minimum depth as specified for Topsoil in Section 02260 3 or as otherwise shown on the drawings. 31 B. Lime shall be applied in accordance with the soil analysis report. PP Y P C. Fertilizer shall be applied at the rat of 600 pounds per acre or in accordance with 3 the soil analysis report. 3.02 INSTALLATION OF SEED AND MULCH A. The subgrade of all areas to be loamed and seeded shall be raked and all rubbish, sticks,roots, and stones larger than 2-inch shall be removed. Loam shall be spread and lightly compacted to finish grade. Compacted loam shall not be less than the depth specified. No loam shall be spread in water or while muddy. B. After the loam is placed and before it is raked to true lines and rolled, limestone shall be spread evenly over loam surface and thoroughly incorporated with loam by heavy raking to at least one half the depth of loam. C. Fertilizer shall be uniformly spread and immediately mixed with the upper 2-inches of topsoil. 02480 -2 1 I D. Immediately following this presentation the seed shall be uniformly applied and lightly raked into the surface. Lightly roll the surface and water with fine spray. E. All seeded areas shall be mulched at a rate of 1 '/2 to 2 tons per acre. The mulch shall be stabilized by an approved method to prevent the seed and mulch from being displaced. F. The Contractor shall keep all seeded areas watered and in good condition, reseeding if and when necessary until a good,healthy,uniform growth is established over the entire area seeded, and shall maintain these areas in an approved condition until final acceptance of the Contract. G. On slopes, the Contractor shall provide against washouts by an approved method. Any washout that occurs shall be regarded and reseeded at the Contractor's expense until good sod is established. F H. The Contractor shall maintain the areas in grass in a neat manner by watering, mowing, raking clippings and leaves, and otherwise until the project is completed. 3.03 SOURCES FOR SOD A. The area from which the sod is to be harvested shall be closely mowed and raked as necessary to remove excessive top growth and debris before harvesting. Approved devices, such as sod cutters, shall be used for cutting the sod and due care shall be exercised to retain the native root soil intact. No sod which has been cut for more than 72 hours may be used unless specifically authorized by the Owner after his careful inspection thereof. A letter of certification from the grassing contractor as to when the sod was cut, and what type shall be provided to the Owner upon delivery of the sod to the job site. 3.04 PREPARATION OF THE GROUND FOR SOD A. The areas over which the sod is to be placed shall be sacrificed or loosened to suitable depth. On areas where the soil is sufficiently loose, such as the final lift placement of fill slopes of new embankment, scarifing and loosening of the ground may not be required. B. Soil conditioning with dolemitic limestone suitable for agricultural use shall be performed as recommended by the supplier of the sod. C. Topsoil shall be placed as the final element before laying sod in accordance with Section 02260. 02480 - 3 I 3 3.05 LAYING SOD A. Sodding shall not be performed when weather and soils conditions are, in the Owner's opinion, unsuitable for proper results. The sod shall be placed on the prepared surface, with edges in close contact, and shall be firmly and smoothly embedded by light tamping with appropriate tools. B. Where sodding is used in drainage and swales, the setting of the pieces shall be staggered such as to avoid a continuos seam along the line of flow. Along the edges of such staggered areas the offsets of individual strips shall not exceed six inches. In order to prevent erosion caused by vertical edges at the outer limits, t he outer pieces of sod shall be tamped so as to produce a featheredge effect. C. On areas where the sod may slide, due to height and slope,the Owner may direct that the sod be pegged, with pegs driven through the sod blocks into firm earth, at suitable intervals. D. Any pieces of sod which, after placing, show an appearance of extreme dryness shall be removed from the work. E. Sod shall be placed as soon as finish gradinghas beenperformed to prevent erosion and for sedimentation control. 3.06 CLEANUP A. All debris, rubbish, stone, and related items generated through performance of the work defined in this section shall be removed from the site and legally disposed of. 3.07 MAINTENANCE A. Maintenance shall begin immediately following the last operation of installation for each area and shall continue in accordance with the following requirements. B. The Contractor shall irrigate, mow, and maintain all lawn areas as required to establish good turf growth and throughout construction until final acceptance of the work. C. The Contractor is responsible for repair of all damage to lawn areas up to the final completion date. 3.08 SURVIVAL CHECK A. A final survival check will be performed approximately 12 months after the final completion of installation. The Contractor shall request a final survival check 02480 -4 i approximately 30 days prior to the end of the guarantee period. B. At the time of inspection, the Owner shall determine whether lawn work is acceptable. C. Acceptable lawn work is defined as a uniform well established turf composed of the grass or grasses specified. Scattered bare spots, none of which is larger than one square foot,will be allowed up to a maximum of three percent(3%)of any lawn area. ** END OF SECTION ** 02480 - 5 SECTION 02500 PAVING PART 1 - GENERAL 1.01 DESCRIPTION A. The extent of paving work is shown on the drawings,and shall be in conformity with the lines and grades noted, and cross section shown. B. Related Work Specified Elsewhere: Section 02480—Seeding& Mulching; Sodding 1.02 QUALITY ASSURANCE A. The Owner will employ a testing laboratory to evaluate the materials delivered to and placed at the site. B. Certificates of material compliance, signed by material supplier and Contractor,may be submitted in lieu of material testing when acceptable to the Owner. 1.03 REFERENCE STANDARDS A. The reference to "Standard Specifications" shall mean the Florida Department of Transportation Standard Specifications for Road and Bridge Construction-1998, except for those paragraphs referring to Measurement and Payment. ri Association The references to AASHTO shall mean the American ss ociation of State Highway and Transportation Officials. 1.04 SUBMITTALS A. The job mix formula, materials and construction methods shall be submitted to the Owner for approval before paving begins. 1.05 JOB CONDITIONS A. Grade Control: Establish and maintain required lines and elevations. 02500-1 3 3 B. Weather Limitations: Apply prime and tack coats only when ambient temperatures is above 50 F., and when temperature has not been below 35 F., for 12-hours 3 immediately prior to application. Do not apply when base is wet or contains an excess of moisture. 3 C. Construct surface course only when atmospheric temperature is above 40 F., and when base is dry. Base course may be placed when air temperature is above 30 F., 3 and rising. PART 2 - PRODUCTS3 2.01 MATERIALS 3 A. Prime Coat: 1: The bituminous material to be used for prime coats shall be either Cut-back I Asphalt, Grade RC-70 or RC-250, or emulsified asphalt grades as specified in Section 300-2.1 of the "Standard Specifications" and approved by the 3 Owner Materials shall conform to "Standard Specifications", Section 916 and the AASHTO requirements specified therein. 3 B. Tack Coat: 1. The bituminous material to be used for tack coat shall be Emulsified Asphalt, 3 Grade RS-2. Material shall conform to "Standard Specifications", Section 916.4. 2. The bituminous material to be used for tack coat shall be asphalt-cement, penetration grade 85-100 or Cut-back Asphalt, Grade RC-1S or Emulsified Asphalt, Grade RS-2. Grade shall be approved by the Engineer/Architect. 3 Material shall conform to the "Standard Specification", Section 916. C. Asphaltic Concrete Surface Course: 1. Asphaltic concrete surface course Type S-I shall be composed of a mixture 3 of aggregate,mineral filler, and asphalt cement. 2. The constituents of the mixture shall be combined in such proportions as to produce a mixture having a minimum Marshal stability of 1,500 lbs. for Type S-I. 3 02500-2 I 3. The job mix formula, size and percent of aggregates shall be as specified in the "Standard Specifications" and submitted for approval prior to placement. PART 3 -EXECUTION 3.01 INSPECTION A. Paver must examine the areas and conditions under which paving is to be installed. Notify the Contractor in writing of conditions detrimental to the proper and timely completion of the work. Do not proceed with the work until unsatisfactory conditions have been corrected in a manner acceptable to the Paver. 3.02 EXCAVATION A. Excavation shall be as required for the subgrade and cross section as shown on the drawings. All suitable materials removed from the excavation shall be used as far as practicable in the formation of the embankments, subgrades, shoulders and in such other places as directed by the Owner. No excavated material shall be wasted without permission and where necessary to waste such material, it shall be disposed of in the locations directed by the Owner. Muck and other unsuitable material shall be removed and replaced with suitable material. All material used shall be free of stumps, roots, brush, sod, rubbish, rocks or other unsuitable material. 3.03 SUBGRADES A. Subgrade construction shall consist of bringing the bottom of excavations and top of embankments of the roadway, between the outer limits of the paving or base course, to a surface conforming to the grades, lines and cross sections shown on the drawings, of uniform density, ready to receive the base course. The entire subgrade in both cuts and fills shall be thoroughly plowed and mixed to a depth of at least 12-inches below grade, or that required to obtain compaction. B. The limits of the roadbed included in the designation of subgrade shall be as shown in the profile shown on the drawings. The lines and grades shall be established by the Contractor as shown on the drawings and shall be maintained by means of grade stakes placed in lines parallel to the centerline of the area to be paved and spaces so that string lines may be stretched between the stakes. C. Subgrade after stabilization shall be compacted to a density of 98%of the maximum density as determined by the AASHTO Method T-180. D. The Limerock Bearing Ratio (LBR) shall be 40. Density tests will be paid for by the Owner except all retests required due to failure to meet specifications shall be paid for by the Contractor. 02500-3 I E. After the subgrade has been prepared, it shall be kept free from ruts, depressions and any damage resulting from the hauling or handling of tools and equipment. F. Refer to Final Geotechnical Exploration for further stabilization. 3.04 EMBANKMENTS AND FILL A. Embankments or fill for the roads shall be composed of materials suitable for compaction to the required density and placed in layers of not more than 12- inches in depth,measured loose, for the full width of the embankment or cross-section, and rolled with such compaction equipment as will secure the specified density. B. All materials required to complete the embankment shall be furnished by the Contractor and shall be approved by the Owner before use. C. The Contractor shall be responsible for the stability of all embankments constructed and shall replace at his own expense any portions which,in the opinion of the Owner, have become displaced or eroded. D. All materials used in the construction of all embankments or fill shall be free from stumps,roots,brush, sod,rubbish or any other unsuitable material. Sloped surfaces shall be scarified or stepped, and compacted to provide bond with new material. If an embankment settles and requires additional material to bring it to the required elevation,the surface shall be rescarified and bonded. 3 E. Compaction of each layer shall be to the densityspecified in the preceding paragraph on subgrades, except the upper 6-inches where grassing occurs shall be compacted only to the extent required for grassing. 3.05 BASE COURSE A. Limerock Base: Limerock shall consist of fossiliferous limestone of uniform quality, and shall not contain hard or flinty pieces which will prevent attainment of a smooth pavement surface free from pits or pockets. At the Contractor's option, either Ocala limerock or Miami Oolite limerock may be used, but only one type may be used on this Contract. 1. Limerock shall be composed of not less than 70%carbonates of calcium and magnesium, and not more than 3%of water-sensitive clay material. B. Asphalt: Base Course shall be laid to the compacted thickness shown on the drawings. 02500-4 I C. After completion of compaction,the surface of the base course shall be checked with a template cut to the required crown, and the thickness shall be checked by borings. Any surface irregularities in excess of 1/4-inch or any deficient thickness shall be corrected by scarifying and adding material after which the entire area shall be recompacted. D. The completed base course shall be opened to traffic for a sufficient period of time, as determined by the Owner, to allow the base to become thoroughly cured before the prime and/or wearing surface is laid. Traffic shall be so distributed as to properly cure the entire area of base. The Contractor shall maintain the base to a true and satisfactory surface until the wearing surface is laid. After the base has been under traffic for the required curing period and immediately preceding the application of the prime coat,the base shall again be tested as provided in the preceding paragraph, and any irregularities greater than permitted, shall be corrected by blading. 3.06 SURFACE PREPARATION A. Proof roll prepared base surface to check for unstable areas and areas requiring additional compaction. B. Remove all loose material from compacted base surface immediately before applying prime coat. C. Prime Coat: Apply at the rate of 0.10 to 0.15 gal. per sq. yd., over compacted base. Apply material to penetrate and seal, but not flood, surface. Apply a light uniform cover of sand and allow to cure. D. Tack Coat: Apply to contact surfaces of previously constructed asphalt or portland cement concrete and surfaces abutting or projecting into asphalt concrete pavement. Distribute at rate of 0.02 to 0.08 gal. per sq. yd. of surface. For application on concrete,the rate may exceed the upper limit, if directed by the Engineer/Architect. 3.07 PLACING THE MIX A. General: 1. Place asphalt concrete mixture on clean prepared surface, spread and strike-off. Place inaccessible and small areas by hand. Place each course to grade, cross-section, and compacted thickness. 2. Follow"Standard Specifications" Section 330 for general construction of the surface course as applicable to this project. B. Joints: Make joints between old and new pavements, or between successive days work,to ensure continuous bond between adjoining work. Construct joints to have 02500-5 3 same texture, density and smoothness as other sections of asphalt concrete course. Clean contact surfaces and apply tack coat. C. Curbs: Construct curbs over compacted pavement surfaces. Apply a light tack coat unless pavement surface is still tacky and free from dust. 1. Place curb materials to cross-section indicated or, if not indicated, to local standard shapes, by machine or by hand in wood or metal forms. Tamp hand-placed materials and screed to a smooth finish. Remove forms as soon as material has cooled. D. Patching: Remove and replace paving areas mixed with foreign materials and defective areas. Cut-out such areas and fill with fresh, hot asphalt concrete. Compact by rolling to maximum surface density and smoothness. E. Protection: 1. After final rolling, do not permit vehicular traffic on pavement until it has cooled and hardened. 11 2. Erect barricades to protect paving from traffic until mixture has cooled and attained its maximum degree of hardness. 3.08 TRAFFIC AND LANE MARKINGS A. Cleaning: Sweep and clean surface to eliminate loose material and dust. B. Striping: Use a chlorinated-rubber base traffic lane-marking paint, factory-mixed, quick-drying, and non-bleeding. Color: White, Yellow and Blue C. Provide material complying with FS TT-P-115, Type III,unless otherwise acceptable to the Owner. D. Apply paint with mechanical equipment to produce uniform straight edges. Apply in two coats at manufacturer's recommended rates. 3.09 FIELD QUALITY CONTROL 3 A. General: Test the in-place asphalt concrete course for compliance with requirements for thickness and surface smoothness. Repair or remove and replace unacceptable paving as directed by the Owner. 3 02500-6 I B. Thickness: The compacted thickness of the base or surface courses shall be not less than that shown on the drawing. C. Surface Smoothness: 1. Test finished surface of each asphalt concrete course for smoothness, using 15-foot straightedge applied parallel with the centerline of paved area and extended across all joints. Surfaces will not be acceptable if exceeding the following tolerances for smoothness: a. Base Course Surface: 1/4-inch. b. Wearing Course Surface: 3/16-inch. 2. Check surfaced area at intervals as directed by the Owner. ***END OF SECTION*** 02500-7 SECTION 02660 POTABLE WATER SYSTEM PART 1 - GENERAL 1.01 DESCRIPTION A. Scope of Work: Furnish all labor,materials, equipment and incidentals required for the installation and construction at the locations depicted on the Drawings, or as required by the Contract Documents, all piping, fittings, and appurtenances for potable water. B. The work generally includes on-site potable water mains, and above grade mechanical piping and other miscellaneous work as depicted on the Drawings or specified herein. C. General Design: The equipment and materials specified herein is intended to be standard types of pipe, fittings and appurtenances for use in transporting water. D. Related Requirements: 1. Division 1 - General Requirements 2. Division 2 - Sitework 3. Division 3 - Concrete 4. Division 9 - Painting E. The below listed standards are applicable and are adopted by reference: 1. ANSI/AWWA C 104/A21.4 Cement-Motor Lining for Ductile-Iron Pipe and fittings for Water 02660-1 3 2. ANSI/AWWA C110/A21.10 Ductile-Iron and Gray-Iron Fittings, 3 in. through 48 in. ,for Water and Other Liquids. 3. ANSI/AWWA C111/A21.11 Rubber-Gasket Joints for Ductile-Iron and Gray-Iron Pressure Pipe and Fittings. 4. ANSI/AWWA C 115/A21.15 Flanged Ductile-Iron Pipe with Threaded Flanges. 5. ANSI/AWWA C150/A21.50 Thickness Design of Ductile-Iron Pipe. pe. 6. ANSI/AWWA C151/A21.51 Ductile-Iron Pipe,Centrifugally Cast in Metal3 Molds or Sand Lined Molds for Water or Other Liquids. 3 7. ANSI/AWWA C153/A21.53 Ductile-Iron Compact Fittings, 3 in. Through 16 in, for Water and Other Liquids. 8. ANSI/AWWA C503 Wet-Barrel Fire Hydrants. 9. ANSI/AWWA C506 Back flow Prevention Devices— Reduced Pressure Principal and Double Check Valve Types 10. ANSI/AWWA C508 Swing-Check Valves for Water Works Service—2 inches through 24 inches. 11. ANSI/AWWA C509 Resilient- Seated Gate Valves for Water Supply Service. 3 12. ANSI/AWWA C511 Reduced-Pressure Principal Backflow- Prevention Assembly. 13. ANSI/AWWA C600 Installation of Ductile Iron Water Mains and their Appurtenances. 14. ANSI/AWWA C605 Underground Installation of Poly Vinyl Chloride (PVC) Pressure Pipe and Fittings for Water. 3 15. ANSI/AWWA C651 Disinfecting Water Mains 3 02660-2 I I 16. ANSI/AWWA C702 Cold- Water Meters - Compound Type 17. ANSI/AWWA C900 Polyvinyl Chloride (PVC) Pressure Pipe, 4 inches through 12 inches. 18. ANSI/AWWA C905 Polyvinyl Chloride (PVC) Water Transmission Pipe,Nominal Diameters 14 inches through 36 inches. 19. ASTM D2241 *Poly (Vinyl Chloride) (PVC)Y Plastic Pipe (SDR-PR) 20. ASTM 0F477 *Elastomeric Seals (Gaskets) for Joining Plastic Pipe. 1.02 QUALITY ASSURANCE A. Qualifications: All of the pipe, fittings and appurtenances shall be furnished by manufacturers who are fully experienced,reputable,and qualified in the manufacture of the materials to be furnished. The pipe, fittings and appurtenances shall be designed, constructed, and installed in accordance with the best practices and methods and shall comply with the adapted references and these specifications as applicable. B. Manufacturers of Ductile Iron Pipe and Fitting will be the American Cast Iron Pipe Company, U.S. Pipe and Foundry Company,McWane Cast Iron Pipe Company or Owner approved equal. C. Factory Tests for DIP and DI Fittings: The manufacturer shall perform the factory tests described in ANSI/AWWA C151/A-21.51 and shall submit sworn certifications of the factory tests and their results. D. PVC pipe shall be manufactured by Certain Teed, Diamond Plastics, Eslon, J-M Pipe,North American Pipe Corp., or equal. E. PVC compounds shall be Class 12454A or 12454B in accordance with ASTM D1784. The manufacturer(s)of pipe supplied for this project shall provide a compliance statement for this and for all other qualifications required by this specification as applicable. 1. Cell Classification Tests (ASTM D1784) 2. Hydrostatic Design Stress Testing (ASTM D2837) 3. Quick Burst Testing (ASTM D1599) 4. Pipe Impact Testing (ASTM D2444) 02660-3 I 5. Pipe Stiffness Testing and Flattening Testing (ASTM D2412) 3 6. Sustained Pressure Testing (ASTM D1598 and ASTM D2241) 7. Hydrostatic Proof Testing (ANSI/AWWA C900) F. Quality Control: 1. The manufacturer shall establish the necessary quality control and inspection practice to ensure compliance with the referenced standards and shall provide written warranty for their products. G. All new and relocated project components that will come into contact with drinking water or drinking water treatment chemicals(except components that will come into contact with raw water prior to its treatment by reverse osmosis)will be in conformance with American National Standards Institute/NSF International (ANSI/NSF) Standard 61. Also, all drinking water treatment chemicals supplied under this project except fluoridation chemicals will be in conformance with ANSI/NSF Standard 60 and all fluoridation chemicals supplied under this project will be in conformance with ANSI and American Water Works Association Standard B701, B702, or B703 as applicable. 1.03 SUBMITTALS A. Within seven(7) days after execution of the Contract, submit a list of materials, names of manufacturers and dates of delivery of materials to the project site. 3 B. Shop and Layout Drawings 1. Submit complete shop drawings detailing all of the technical and dimensional data of material to be furnished including weights. 2. Submit layout drawings including restrained joint layouts, fitting and joint layouts, and mechanical piping layouts with support locations. Layout drawings shall be prepared to an appropriate scale with dimensioning. C. Submit Manufacturer Certifications as required by these specifications. D. Submit Florida Licensed Surveyor Certified As-built drawings of water mains and piping with verified vertical and horizontal data as required by these specifications. E. Submit documentation for all tests required by these specifications. 02660-4 I i PART 2 - PRODUCTS 2.01 MECHANICAL JOINT AND PUSH-ON JOINT DUCTILE IRON PIPE AND FITTINGS A. Pipe shall conform to the requirements of ANSI/AWWA C151/A21.51 with thickness design in accordance with ANSI/AWWA C150/A21-50, Latest Editions. All pipes shall be tested and marked in accordance with these standards.1. Pipe diameters equal to or less than 12 inches shall be minimum pressure Class 350 psi. B. Pipe for installation below ground shall be supplied in lengths not in excess of a nominal 20 feet. The pipe shall have either mechanical joint or push-on joints with rubber gaskets in accordance with ANSI/AWWA C111/A21.11. C. Fittings shall be ductile iron or cast iron mechanical joint in accordance with ANSI/AWWA C 110/A21.10 with a minimum pressure rating as follows: 1 1. 350 psi for pipe diameters through 24 inches. D. In lieu of the above requirement compact ductile iron mechanical joint fittings in accordance with ANSI/AWWA C153/A21.53 may be used for pipe diameters 12 inches and smaller; minimum pressure Class 350 psi. E. Rubber gaskets for joints and fittings shall be made of vulcanized styrene butadiene rubber (SBR) in accordance with ANSI/AWWA C111/A21.11. Tee head nuts and bolt for mechanical joints shall also comply with this standard. F. Push-on joint pipe joints shall be in accordance with the applicable parts of ANSI/AWWA C111/A21.11 and shall be American Standard, "Fastite" type or equal. 2.02 FLANGED JOINT DUCTILE IRON PIPE AND FITTINGS A. All above grade pipe and pipe inside pits, tanks, and pump station structures shall be flanged ductile iron pipe conforming to ANSI/AWWA C115/A21.15, latest edition with a minimum special thickness class of 53. 1. Minimum dimension for flanged pipe shall be as shown in Table 2.1. 2. Ductile iron pipe barrels for threaded flanged pipe shall conform to the requirements of ANSI/AWWA C151/A21.51 with taper pipe threads for flanges in accordance with ASME/ANSI B1.20.1. 02660-5 I I Table 2.1 Ductile Iron Pipe for Use with Threaded Flanges 3 Nominal Pipe Size Maximum Working Pipe Nominal Pipe OD Maximum in. Pressure Thickness* in. Nominal psi in. Length 3 250 0.31 3.96 19'-6" 4 250 0.32 4.80 19'-6" 6 250 0.34 6.90 19'-6" 8 250 0.36 9.05 19'-6" 10 250 0.38 11.10 19'-6" 1 12 250 0.40 13.20 19'-6" 14 250 0.42 15.30 19'-6" 3 16 250 0.43 17.40 19'-6" 18 250 0.44 19.50 19'-6" 20 250 0.45 21.60 19'-6" 24 250 0.47 25.80 19'-6" 30 250 0.51 32.00 19'-6" 3 36 250 0.58 38.30 19'-6" I 3. Flanges shall be ductile-iron or gray-iron solid type with an internal taper pipe thread in accordance with ASME/ANSI B1.20.1. They shall be flat-faced with dimensions and bolthole patterns for a water service rating of 250 psi working pressure in accordance with ASME/ANSI B.16.1, Class 125 flanges. Flanges may be back- or spot-faced to conform with flange thickness tolerances. Hollowback flanges are not acceptable. 4. All flanged pipes shall meet the fabrication tolerances specified in ] ANSUAWWA C151/A21.51 and shall be inspected,tested and so marked by the manufacturer. 5. Fittings shall be ductile iron or cast iron flanged joint in accordance with ANSI/AWWA C110/A21.10 with a minimum rating of 250 psi working 3 02660-6 I pressure. 6. Nuts, bolts, and gaskets for flanged joints shall be provided by the manufacturer adequate for the type of service and pressure rating of the joint. Gaskets shall be full face, minimum 1/8-inch thick synthetic rubber with molded annular rings. 2.03 JOINT RESTRAINT FOR DUCTILE IRON PIPE A. Pipe joint restraint for standard mechanical joints shall be incorporated into the design of the follower gland and shall include a restraining mechanism which,when activated, imparts multiple wedging action against the pipe, increasing its resistance as the pressure increases. Flexibility of the joint shall be maintained after burial. Glands shall be manufactured of ductile iron conforming to ASTM A536. Restraining devices shall be of ductile iron heat treated to minimum harness of 370 BI-IN. Dimensions of the gland shall be such that it can be used with a standard mechanical joint bell and tee-head bolts conforming to ANSI A21.11 and ANSI/AWWA C153/A21.53. Twist-off nuts shall be used on the restraining devices to ensure proper actuating of the restraining devices. The mechanical joint restraint system shall be designed for a working pressure of 250 psi with a minimum factor of safety of 2. Restrained joint devices shall be Meg-a-Lug as manufactured by Ebba Iron or equal. Standard mechanical joint retainer glands are not acceptable. B. Pipe joint restraint for push on joint pipe shall be as follows: 1. 4" - 12": American Standard"Fastite"joint with"Fast-Grip" gasket,American "Flex-Ring"joint or equal. C. Pipe joint restraint across flange adapters and couplings shall be by threaded rods as depicted on the Drawings. Threaded rods shall clear the periphery of adapter and coupling flanges and shall span across to the adjacent flange by flange joints. Gusset plates shall be provided as necessary and fabricated out of 3/4-inch thick ASTM A- 36 steel plate, dimensions and number as required. 2.04 LININGS FOR DUCTILE IRON PIPE A. Ductile iron pipe and fittings for potable water mains, shall have standard thickness cement mortar lining and asphaltic material seal coat in accordance with ANSI/AWWA C104/A21.4. 2.05 COATINGS & FINISHES FOR DUCTILE IRON PIPE 02660-7 3 A. All buried or submerged ductile iron pipe and fittings shall receive an exterior asphaltic coating approximately 1 mil thick in accordance with ANSI/AWWA C151A/A21.51. B. All above grade pipe and fittings, exposed to view in the finished work or in non- submerged concrete pits or structures, shall not receive the asphaltic coating but shall be shop primed and field painted in accordance with Division 9 of these specifications. The pipe shall be color coded, labeled as to type of service and marked for flow direction. Asphaltic coating on pipe penetrating the ground or inadvertently applied to above grade pipe shall receive a non-bleeding sealer prior to being painted. 2.06 PVC PRESSURE PIPE 3-INCHES IN DIAMETER AND SMALLER A. Pipe shall have the following properties at 73 °F; 1. Tensile Strength 7,000 psi 1 2. Modules of Elasticity in Tension 400,000 psi 3. Compressive Strength 9,6000 psi 3 4. Flexural Strength 12,700 psi 5. Izod Impact Strength 0.65 r� 6. Relative Hardness (Durometer/Rockwell) 80+3/110-120 7. Cell Designation 12454-B B. Pipe shall be Schedule 80 PVC with solvent weld or threaded fittings meeting ASTM and NSF industry standards. Physical dimensions and tolerances shall be in accordance with ASTM D-1785 with the pipe appropriately marked. C. Schedule 80 solvent weld socket fittings shall be in accordance with ASTM D-2467. Solvent welding shall be in strict accordance with manufacturer's instructions with Schedule 80 solvent weld cement and related products only. Schedule 80 threaded fittings shall be in accordance with ASTM D-2464, all threaded connections shall be taped with teflon tape. All PVC to metal pipe connections shall be flanged. All PVC unions shall have 0-rings seats. 02660-8 I I 2.07 PVC PRESSURE PIPE 4-INCHES IN DIAMETER AND LARGER A. Pipe shall have the following properties at 73 °F. 1. Tensile Strength 7,000 psi 2. Modules of Elasticity in Tension 400,000 psi 3. Izod Impact Strength 0.65 1 4. Cell Designation 12454A or 12454B 5. Hydrostatic Design Basis(HDB) 4,000 psi B. Pipe shall be cast iron (CI) equivalent outside diameter with Elastomeric rubber gasket push-on joints in accordance with ASTM F477. 1. Pipe 4-inches through 12-inches in diameter shall be AWWA C900 DR 18, Pressure Class 150 psi rated at 73.4°F. Dimensions,tolerances, inspection, testing, and pipe marking shall be in accordance with AWWA C900, latest edition. 2. Pipe greater than 12-inches in diameter shall be AWWA C905 DR25, Pressure Rating 165 psi at 73.4 °F. Dimensions, tolerances, inspection, testing, and pipe markings shall be in accordance with AWWA C905, latest edition. C. Fittings shall be of ductile iron in accordance with paragraph 2.01 of this section. D. Pipe shall be supplied in lengths not exceeding a nominal 20 feet. 2.08 JOINT RESTRAINT FOR PVC PRESSURE PIPE 4-IN— 12-IN. A. Where pipe restraint is required, it shall be provided by restraining sufficient length of pipe with mechanical type devices. Mechanical restraint devices for PVC pipe shall meet the following requirements. 1. Push-on joint pipe restraint: Mechanical devices shall be full circumferential contact compression type consisting of two rings connected across the pipe joint with restraining rods and associated hardware. The pipe bell ring shall be a single piece ductile iron retainer ring that slides over the pipe plain end up to the pipe bell. The pipe plain end ring shall be a two piece ductile iron restrainer with a serrated-face to contact the pipe. The restrainer shall be assembled on the pipe with side clamping bolts and nuts. The design tolerances to which the restrainer is machined will prevent over-tightening 02660-9 3 which could weaken or damage the pipe. Ductile iron rings shall be ASTM3 A536, Grade 65-45-12. Connecting bolts shall be in accordance with ANSI/AWWA C111/A21.11. The restraining devices shall be rated for a working pressure equivalent to the pressure rating of the pipe and shall meet or exceed the requirements of UNI-B-13-94, Recommended Performance Specification for Joint Restraint Devices for Use with PVC Pipe. The devices shall be Uni-Flange Block Buster Series 1350 or Owner approved equal. 3. Mechanical Joint Pipe Restraint: Mechanical restrainingdevices shall have a full circumferential contact compression 2-piece split ring restrainer which is assembled on the PVC pipe with slide clamping bolts and nuts. The restrainer shall be designed to attach to Standard mechanical joints with extra long T-bolt studs in 4-inch through 12-inch sizes and with threaded restraining rods in 14-inch through 36-inch sizes. The device shall be of3 ductile iron ASTM A536, Grade 65-45-12. Connection bolts and hardware shall be in accordance with ANSI/AWWA C111/A21.11. The restraining devices shall be rated for a working pressure equivalent to the pressure rating of the pipe and shall meet or exceed the requirements of UNI-B-13-94, Recommended Performance Specification for Joint Restraint Devices for Use with PVC Pipe. The devices shall be Uni-Flange Block Buster Series 1300 or Owner approved equal. 3 2.09 GATE VALVES A. When full open, gate valves shall have a clear waterway equal to the nominal diameter of the pipe. Operating nut or wheel shall have an arrow cast in the metal indicating the direction of opening. Each valve shall have the manufacturer's distinctive marking,pressure rating and year of manufacture cast on the body. Prior to shipment from the factory,each valve shall be tested by applying it to a hydrostatic pressure equal to twice the specified working pressure. Exercise care in transporting and handling valves to avoid damage. Inside valves shall be kept free of dirt and debris. All gate valves shall have mechanical joint ends or flanged ends to fit the pipe run in which they are to be used. Gate valves shall open left or counter- clockwise when viewed from the stem. Buried gate valves shall be furnished with 2-inch square AWWA standard nut operators with a valve box and cover. Gate valves located above ground or inside structures shall be furnished with hand wheel operators and shall have a suitable indicator arrow to give valve position from fully open to fully closed. Unless shown or specified otherwise,manually operated valves shall be equipped with a mechanism which will allow the valve to be opened or closed with a force of not more than 40 lb. applied to the nut, crank, or handwheel. Hydrostatic and leakage tests shall be conducted in strict accordance with 02660-10 3 I ANSI/AWWA C500, latest revision or ANSI/AWWA C509, latest revision, whichever is applicable. B. Double Disc Gate Valves 2 to 2 '/2 Inch: Valves shall conform to ANSI/AWWA C500, latest revision and shall be designed for a minimum working pressure of 200 psi. Valves shall be iron body, bronze mounted, parallel seat, non-rising stem type with 0-ring stem seals. Interior ferrous surfaces of valve, except for finished or wearing, shall be coated with a two-part thermosetting epoxy coating in accordance with AWWA C550, latest revision. Surfaces shall be clean, dry, and free from rust and grease before coating. Exterior surfaces of valve shall be coated as specified hereinafter. Gate valves for this size range shall be as manufactured by Mueller Company, M&H Valve Company or Owner approved equal. C. Resilient Seat Gate Valves 3 to 20 Inch: Resilient Seat Gate Valves shall be used on all potable water lines and on the non-potable system lines. Valves shall conform to ANSI/AWWA C509, latest revision and shall be designed for a minimum working pressure of 150 psi. Valves shall be iron body with non-rising stem and 0-ring stem seals. The valve stem, stem nut, glands and bushings shall be bronze. Valve disc shall be constructed to assure uniform seating pressure between disc seating and body seating surface. Body seating surface shall be resilient seat ring seals made from internally reinforced molded rubber which are attached to the disc ring with stainless steel screws, or by a special corrosion resistant, synthetic elastomer which is permanently bonded to and completely encapsulates a cast iron valve disc. Interior of valve body and valve disc shall be coated with a two-part thermosetting epoxy coating in accordance with AWWA C550, latest revision. Surfaces shall be clean, dry and free from rust and grease before coating. Exterior surfaces of valve shall be coated as specified hereinafter. Gate valves for this size range shall be as manufactured by Mueller Company, American-Darling Company, US. Pipe, Kennedy Valve Company, or approved equal. 2.10 CHECK VALVES A. Check valves for potable water service shall be cast iron bodied per AWWA C508, latest revision, with integral ANSI Class 125 flanges. Valves shall have a field replaceable centrifugally cast bronze body seat located in place with stainless steel screws. The valve shaft shall be a one-piece shaft of Type 17-4PH steel which shall extend through both sides of the valve body. An outside lever and weight shall be attached to one side of the shaft ; an oil filled control dampening device shall be attached to the other side of the shaft. The valve disc shall be of ASTM A126 Grade B cast iron and the disc seat shall be of BUNA-N. The control device shall consist of a side-mounted, oil-filled cylinder which provides (3) closing speed stages. All control stages shall be fully adjustable. Check valves shall be GA Industries, 02660-11 Flomatic, Apco Series 6100, or an approved equal. 3 2.11 VALVE BOXES A. All buried valves shall have cast iron three piece valve boxes. Valve boxes shall be Provided with suitable heavy bonnets and extend to such elevation at or slightly above the finished grade surface as directed by the Owner. The barrel shall have two-piece, sliding type, having 5-1/4- inch shaft. The upper section shall have a flange at the bottom having sufficient bearing area to prevent settling and shall be complete with cast iron covers. Covers shall have "WATER" cast into the top as applicable to service. All valves shall have actuating nuts extended to top of valve boxes. Valve boxes shall be provided with concrete base and valve nameplate engraved with lettering 1/8-inch deep as shown on the Drawings. 2.12 FLEXIBLE COUPLINGS A. Flexible couplings shall be of the sleeve type as shown on the Drawings and as follows: 1. Sleeve type couplings shall be used with all buried piping and where Shown on the Drawings. The couplings shall be of steel and shall be Dresser Style 38,Rockwell Model 413, Baker Allsteel,or equal. The couplings shall be provided with hot dipped galvanized steel bolts and nuts unless indicated otherwise. 2. Flanged adapters shall be Dresser Type 128, Rockwell Model 913, or equal. 3. All couplings shall be furnished with the pipe stop removed. 4. Couplings shall be provided with gaskets of a composition suitable for contact with potable water. 2.13 HARNESSING SYSTEMS A. All expansion joints specified in Paragraph 2.06 and flexible couplings specified in Paragraph 2.07 shall be restrained with threaded tie rods and lugs. Tie rods shall be threaded rods manufactured of ASTM A36 steel and shall be hot dip galvanized. All bolts and washers shall be hot dip galvanized. Lugs for tie rods shall connect to flange bolts and provide a device which allows installation of tie rods outside the periphery of the pipe flanges. Lugs shall be manufactured of ASTM A36 steel, ASTM A283 Grade B, C, or D steel,or ASTM A255 Grade C steel. Lug dimensions 02660-12 I shall conform to AWWA Manual M11, Table 19.7. Washers shall be provided for all lugs; washers shall have a minimum thickness of 1/8 inch. Tie rods for restraint of the above coupling and joints shall be furnished as shown below. PIPE SIZE NUMBER OF TIE RODS ROD SIZE (INCHES) 3 4 5/8 4 4 5/8 6 4 3/4 8 4 3/4 10 4 7/8 12 4 7/8 2.14 PRESSURE GAUGES A. Each pressure gauge shall be a flange-mounted water sensor conforming to ANSI 125-1b. flange drilling specifications. Pressure sensor shall provide a full 360 degree circumferential reading of line fluids, while isolating them from the gauge with a flexible rubber sleeve. Line pressure shall be transferred from the flexible rubber sleeve to the gauge through a captive fluid with a maximum error rate of 2%. Captive sensing fluid shall be ethylene glycol/glycerin. An alternate pressure sensor shall be diagram seals with a ball valve for easy removal of pressure gauge. B. Water body and end flanges shall be carbon steel. All wetted steel parts of the sensor shall be Teflon coated. Sleeve material shall be BUNA N. C. Gauge shall have a 4"minimum diameter. Pressure gauge shall have an operating range of 0— 100 psig or as indicated in specification or drawings. D. Pressure gauges shall be Series 40, in-line water sensor, as manufactured by Red Valve, Carnegie,Pennsylvania, Wika, or an approved equal. Diaphragm seals shall be manufactured by HYET Instrument Co., Bridge City, Texas. 2.15 HOSE BIDS A. Hose bids shall be brass,polished chromium plated, as manufactured by Chicago Faucet Company or equal. Potable water hose bibs shall be No. 952, 3/4-inch or 1- inch with vacuum breaker. Vacuum breakers are not required on hose bibs for non- potable water. 2.16 BALL VALVES A. Ball valves for copper, black steel, and galvanized steel pipe and for below grade PVC pipe shall be Type 1000 as manufactured by Jamesbury, American Valve 02660-13 I Milano Series figure M200, or Owner approved equal. Ball valves shall have threaded ends, bronze body, TFE seats and seals and '/4 turn to open lever handles. Below grade service ball valves shall be supplied with and installed in precast concrete access boxes. 2.17 TAPPING SADDLES FOR PVC WATER MAINS A. Tapping saddles shall be double-strap type saddles suitable for wet-tapping water mains. Each saddle shall be rated for a 200 psi working pressure and shall have a threaded outlet compatible with the tapping valve and other appurtenances furnished. Tapping saddles shall have epoxy coated steel bodies and stainless steel straps and hardware. Tapping saddles shall be Smith-Blair Model 313, Ford Model F-202, JCM Model 402, Mueller Series 10500, Baker Shur Seal-O or an approved equal. 2.18 CORPORATION STOPS A. Corporation stops for connections to cast-iron, ductile iron or steel piping shall be Ford Model F-1000 or FB-1000,McDonald Model 4701-T,Mueller Model H-15008 or H-15013, Hays Model 5200 DF or 4400 DF or an approved equal. 2.19 BACKFLOW PREVENTERS A. Backflow preventers shall be reduced pressure type backflow preventers meeting all applicable AWWA requirements and the Owner's code requirement. Backflow preventers shall be manufactured by Febco, Watts, or an approved equal. B. Backflow Preventers 2 '/2"through 10" shall meet all applicable requirements of AWWA C511 and the USC manual for Cross Connection Control. They shall have fused epoxy coated cast iron bodies, replaceable bronze seats, and OSY resilient seated gate valves. Maximum pressure drop across an 8-inch valve at 1250 gpm shall not exceed 11 1/2 psi. C. Backflow preventers 3/4"through 2"shall meet all applicable requirements of AWWA C506 and the USC Manual for Cross Connection Control. They shall have threaded end bronze bodies with a rated working pressure of 175 psi. Valves must be supplied with resilient seated ball valve shut-offs and test cocks. Maximum pressure drop 3 across a 1-inch valve at 30 gpm shall not exceed 11 psi. 2.20 MASTER COMPOUND METER AND BASKET STRAINER A. Maximum operating pressure shall be 150 psi. Meter registers shall be direct reading, 02660-14 3 I center sweep, roll sealed magnetic drive with low flow indicator. Measuring elements shall be AWWA Class II Turbine, dual suspension nutating disc. Units of measure shall be U.S. gallons per minute. Valve size shall be 6-inch with a low flow accuracy at 95%to 3/4 gpm. Normal operating range at 100% accuracy shall be 1 '/2 to 1400 gpm. Valve shall have a cast bronze maincase and cast iron companion flanges. Casing bolts shall be of type 316 SS. B. A strainer shall be provided for the meter, it shall be easily removed and have an effective straining area of at least double the meter inlet. The strainer shall have a working pressure of 150 psi. Strainer screen shall be made of perforated 18-8 stainless steel plate. The strainer shall have round flanged ends in compliance with Meter Connection Specifications of ANSI/AWWA C701. Cover bolts shall be made of 18-8 SS. Head loss through the strainer shall not exceed 3 psi at maximum meter flow rates. C. Master meter shall be Neptune Tru/Flo, manufactured by Schlumberger Industries Water Division. Meter strainer shall be Neptune, manufactured by Schlumberger Industries - Water Division. 2.21 WET-BARREL FIRE HYDRANT A. Fire hydrants shall have 5 'A inch valve opening and shall comply with AWWA Standard C502 for fire hydrants for water works service. Each hydrant shall have 6- inch mechanical joint ends with harnessing lugs ("dog ears") and shall open by turning to the left(counter-clockwise). Fire hydrant shall be of ample length for 3' —6' depth of bury. Hydrants shall be provided with two 2 '/2-inch hose nozzles and one 4 '/2 -inch pumping nozzle, all having National Standard hose threads. Nozzles shall have caps attached by chains. Operating nuts shall be AWWA Standard (pentagonal, measuring 1 — 1 '/2 -inch point to flat). Fire hydrants shall b equipped with"0-ring"packing. B. All iron parts of the hydrant both inside and outside shall be painted, in accordance with AWWA C502. All inside surfaces and the outside surfaces below the ground line shall be coated with asphalt varnish. They shall be covered with two coats,the first having dried thoroughly before the second is applied. The outside of the hydrant above the finished ground line shall be thoroughly cleaned and thereafter painted with one coat of paint of a durable composition and one additional coat of silver paint. C. Fire hydrants shall be Mueller Super Centrueing 200, American B 84 B-6", Clow Medallion F-2545 or an Owner's approved equal. 02660-15 I I PART 3 - EXECUTION 3.01 DELIVERY, STORAGE AND HANDLING OF DUCTILE IRON PIPE & FITTINGS A. Delivery and Storage: Delivery and storage of the materials shall be in accordance with manufacturer recommendations and ANSI/AWWA C600. B. Handling: Care shall be taken in loading, transporting and unloading to prevent damage to the pipe or fittings and their respective linings and coatings. Pipe or fittings shall not be rolled off the carrier or dropped. Unloading shall be done by lifting with a forklift or crane. All pipe or fittings shall be examined before laying, and no piece shall be installed which is found to be defective. C. If any defective pipe is discovered after it has been laid it shall be removed and replaced with a sound pipe in a satisfactory manner at no additional expense to the Owner. All pipe and fittings shall be thoroughly cleaned before laying, shall be kept clean until they are used in the work, and when installed or laid, shall conform to the lines and grades required. 3.02 INSTALLATION A. Below grade ductile iron pipe and fittings shall be installed in accordance with requirements of ANSI/AWWA C-600 and manufacturer recommendations. Pipes shall be laid to the lines and grades shown on the Drawings with a minimum of 3 feet of cover from proposed finished grades. Pipes shall be laid at a constant slope between elevations specified. Pipe joints may be deflected to a maximum of 75%of manufacturer recommendations to establish alignment, slope, and grade. B. Above grade flanged ductile iron pipe and fittings shall be installed true to alignment and adequately supported. All valves,fittings,equipment,and appurtenances needed upon the pipelines shall be set and jointed as indicated on the Drawings or as required. All pipe and appurtenances connected to equipment shall be supported in such manner as to prevent any strain being imposed on the equipment. Supports shall be provided at each fitting/valve/appurtenance or combination thereof and at a maximum spacing of 6 feet. C. All field cutting of pipe shall be performed in accordance with the requirements of ANSI/AWWA C600 and manufacturer recommendations. Field touch-up of linings shall be per manufacturer recommendations. 02660-16 I I I 3.03 DELIVERY, STORAGE,AND HANDLING OF PVC PIPE A. Delivery and Storage: Delivery and storage of the materials shall be in accordance with manufacturer recommendations and ANSI/AWWA C605. B. Handling: Care shall be taken in loading, transporting and unloading to prevent damage to the pipe. Pipe shall not be rolled off the carrier or dropped. Unloading shall be done by lifting with a forklift or crane. All pipe or fittings shall be examined before laying, and no piece shall be installed which is found to be defective. C. If any defective pipe is discovered after it has been laid it shall be removed and replaced with a sound pipe in a satisfactory manner at no additional expense to the Owner. All pipe and fittings shall be thoroughly cleaned before laying, shall be kept clean until they are used in the work, and when installed or laid, shall conform to the lines and grades required. D. E. INSTALLATION 02660-17 I I A. Below grade PVC pipe shall be installed in accordance with requirements of ANSI/ AWWA C605, manufacturer recommendations and ASTM D2321. Pipes shall be laid to the lines and grades shown on the drawings with a minimum of 3 feet of cover from proposed finished grades. Pipes shall be laid at a constant slope between elevations specified. Pipe joints may be deflected to a maximum of 75% of manufacturer recommendations to establish alignment, slope, and grade. B. All field cutting of pipe shall be performed in accordance with the requirements of ANSI/AWWA C605 and manufacturer's recommendations. Installation of valves and fittings shall be strictly in accordance with manufacturer's instructions. Particular care shall be taken not to over-stress threaded connections. Except for ductile iron mechanical joint fittings, all plastic pipe to metal pipe connections shall be made using flanged connections. Metal piping shall not be threaded into plastic fittings,valves, or couplings, nor shall plastic piping be threaded into metal valves, fittings, or couplings. 3.04 INSTALLATION OF VALVES AND APPURTENANCES A. All valves and appurtenances shall be installed in the locations shown, true to alignment and rigidly supported. Any damage to the above items shall be repaired to the satisfaction of the Owner before they are installed. B. Install all floor boxes, brackets, extension rods, guides, the various types of operators and appurtenances as shown on the drawings that are in masonry floors or walls, and install concrete inserts for hangers and supports as soon as forms are erected and before concrete is poured. Before setting these items, the Contractor shall check all plans and figures which have a direct bearing on their location and he shall be responsible for the proper location of these valves and appurtenances during the construction of structures. C. Pipe for use with flexible couplings shall have plain ends. D. Prior to the installation of sleeve-type couplings,the pipe ends shall be I I 02660-18 I I cleaned thoroughly for a distance of 8 inches. Soapy water may be used as a gasket lubricant. A flower and gasket, in that order, shall be slipped over each pipe to a distance of about 6 inches from the end, and the middle ring shall be placed on the already laid pipe end until it is properly centered over the joint. The other pipe end shall be inserted into the middle rung and brought to proper position in relation to the pipe already laid. The gaskets and followers shall then be pressed evenly and firmly into the middle ring flares. After the bolts have been inserted and all nuts have been made up finger-tight diametrically opposite nuts shall be progressively and uniformly tightened all around the joint by use of a torque wrench of the appropriate size and torque for the bolts. E. Pressure gauges shall not be installed until after the substantial completion date unless otherwise requested by the Owner. F. Valve boxes with concrete bases shall be installed as shown on the drawings. Mechanical joints shall be made in the standard manner. Valve stems shall be vertical in all cases. Place cast iron box over each stem with base bearing on compacted fill and top flush with final grade. Boxes shall have sufficient bracing to maintain alignment during backfilling. Knobs on cover shall be parallel to pipe. Remove any sand or undesirable fill from valve box. 3.06 CLEANING A. At the conclusion of the work, the Contractor shall thoroughly clean the new pipe lines by flushing with water or other means to remove all dirt, stones or other material which may have entered the line during the construction period. The Contractor shall pay for and provide all water,pumps,piping, and related equipment required for cleaning at no additional cost to the owner. B. Flushing will be accomplished using a temporary jumper connection as shown on the Drawings. 3.07 HYDROSTATIC PRESSURE AND LEAKAGE TESTING A. Hydrostatic tests shall consist of a pressure test and a leakage test. Hydrostatic tests shall be conducted on all newly laid pressure pipes,joints, and valves including all service lines. Air testing of pressure pipes will not be permitted under any circumstance. Tests shall be made on sections not exceeding 2,000 feet. The Contractor shall furnish all closure pieces in the pipe as required. Equipment to be furnished by the Contractor shall include,but not be limited to,graduated containers, pressure gauges, hydraulic force pumps, suitable hoses and piping, and temporary jumper connection with reduced pressure backflow prevention device as shown on 02660-19 I Ithe Drawings. The Owner will monitor and approve a satisfactory test. The Contractor shall pay for, provide, and dispose of all flushing and test water at no additional cost to the Owner. 1 B. The Contractor may conduct hydrostatic tests after the trench has been partially backfilled with the joints left exposed for inspection for his informational purposes only. The hydrostatic tests for acceptance shall only be conducted after the trenches have been completely backfilled and compacted as specified Where any section of pipe is provided with concrete thrust blocking, tests will not be made until at least five (5)days have elapsed after the thrust blocking is installed. If high early strength cement is used for the concrete thrust blocking,the time may be reduced to 24 hours. C. All pressure pipe sections to be tested shall be subjected to hydrostatic static pressure and leakage tests. Test pressures for potable water mains shall be 150 psi. D. The duration of pressure and leakage tests shall be for periods of 2 hours each. If during the tests,the integrity of the tested line is in question,the Owner may require 6-hour tests. The basic provisions of AWWA C-600 shall be applicable. E. Pressure Test: Each section of pipe to be tested, as determined by the Owner, shall be slowly filled with water and the specified test pressure shall be applied by means of a pump connected to the pipe in a satisfactory manner. Before applying the specified test pressure, all air shall be expelled from the pipe. To accomplish this, taps shall be made, and appropriate valves installed to ensure bleeding of all air from the main. If defective pipes, fittings,valves, or hydrants are discovered in consequence of the pressure test, all such items shall be removed and replaced by the Contractor with sound material and tests shall be repeated until satisfactory results are obtained. Provisions of AWWA C-600, where applicable, shall apply. IF. Leakage Test: 1. After completion of the pressure test, a leakage test shall be conducted to determine the quantity of water lost by leakage under the specified test pressure. Applicable provisions of AWWA C-600 shall apply. 2. Allowable leakage in gallons per hour for the pipeline shall not be greater than that determined by the formula. 31 L = SD(P) 1/2 133,200 I 02660-20 I I Where: L = Allowable leakage in gallons per hour. S = Length of pipe tested, in feet. D= Nominal diameter of pipe in inches. P= Average test pressure during leakage test in pounds per square inch gauge. 3. Leakage is defined as the quantity of water to be supplied in the newly laid pipe or any valved section under test, which is necessary to maintain the specified leakage test pressure after the pipe has been filled with water and the air expelled. Should any test of pipe laid disclose leakage greater than that allowed, the Contractor shall locate and replace or repair the defective joints, pipe or valves until the leakage from subsequent testing is within the specified allowance. 3.08 DISINFECTION OF WATER MAINS A. Before being placed in service, all new water mains shall be chlorinated in accordance in the specifications below and the procedures outlined in ANSI/AWWA C-651 "Disinfecting Water Mains". A temporary jumper connection shall be provided by the Contractor as shown on the Drawings. B. Sections of pipe to be disinfected shall first be flushed(*full diameter)to remove any solids or contaminated material that may have become lodged in the pipe. If no hydrant is installed at the end of the main, then a blow-off valve shall be provided flarge enough to develop a velocity of at least 2.5 feet per second in the main. The Contractor shall pay for all flushing and disinfecting water at no additional cost to the Owner. C. All taps required for chlorination or flushing purposes,or for temporary or permanent release of air shall be provided for by the Contractor as a part of the construction of water mains. After the disinfection, all such taps shall be sealed to the satisfaction of the Owner. D. Before being placed into service, all new mains and repaired portions of, or extensions to existing mains shall be chlorinated so that the initial chlorine residual is not less than 50 mg/1 and that a chlorine residual of not less than 25 mg/1 remains in the water after standing 24 hours in the pipe. E. Chlorine may be applied as a liquid chlorine (gas-water mixture), or a mixture of water and high-test calcium hypochlorite. The Contractor shall assume responsibility for safe handling of chlorine and shall meet requirements of OSHA and other 02660-21 I regulatory agencies for safe handling of chlorine. 31 F. The preferred point of application of the chlorinating agent is at the beginning of the pipeline extension or any valved section of it, and through a corporation stop inserted 1 in the pipe. The water injector for delivering the chlorine-bearing water into the pipe should be supplied from a tap made on the pressure side of the gate valve controlling the flow into the pipe line extension. G. Valves shall be manipulated by the Owner's personnel so that the strong chlorine solution in the line being treated will not flow back into the line supplying the water. H. Treated water shall be retained in the pipe at lest 24 hours. After this period, the31 chlorine residual at pipe extremities and at other representative points shall be at least 25 mg/l. i I. In the process of chlorinating newly laid pipe, all valves or other appurtenances shall be operable while the pipe line is filled with the chlorinating agent and under normal operating pressure. J. Following chlorination, all treated water shall be thoroughly flushed from the newly laid pipe at its extremity until the replacement water throughout its length shows upon test, a free chlorine residual not in excess of that normally carried in the system. K. After flushing,water samples collected on 2 successive days from the treated piping system, as directed by the Owner, shall show acceptable bacteriological results. All bacteriological sampling and testing shall be provided by the Contractor. All such bacteriological analyses must be performed by a laboratory certified by the State of Florida. L. Proper chain of custody procedures must be followed and samples shall only be i collected by certified laboratory personnel in the presence of the Owner's personnel. 1 M. Copies of testing results and all related correspondence with the Florida Department of Environmental Protection(FDEP) shall be submitted to the Owner. N. Should the initial treatment result in an unsatisfactory bacterial test, the original chlorination procedure shall be repeated by the Contractor until satisfactory results are obtained. O. Approval: The line shall not be placed in service until the requirements of the County Public Health Department, as applicable, are met and the bacteriological test results are approved by the Florida Department of Environmental Protection. I 02660-22 I 3.09 CORRECTION OF NON-CONFORMING WORK A. All non-conforming work shall be repaired or replaced by the Contractor at no additional expense to the Owner. Non-conforming work shall be defined as failure to adhere to any specific or implied directive of these specifications and/or the Drawings, including but not limited to pipe not laid straight, true to the lines and grades as shown on the drawings, damaged or unacceptable materials, excessive misalignment or diameter ring deflection in pipe due to bedding, backfilling or installation, visible or detectable leakage and failure to pass any specified test or inspection. ** END OF SECTION ** 02660-23 SECTION 02705 DRAINAGE STRUCTURES AND PIPING PART 1 - GENERAL 1.01 DESCRIPTION OF WORK A. The extent of drainage structures and piping is shown on the drawings. B. Related Work Specified Elsewhere: Section 02201 - Earthwork Section 02221 -Excavation, Trenching, Backfilling and Embankment Division 3 - Concrete 1.02 SUBMITTALS A. Submit shop drawings of grating, frames, manholes inlets and pipe. B. Submit cut sheets 24-hours in advance of pipe excavation for Owner's approval. PART 2 - PRODUCTS 2.01 GRATING A. Model Type M-R-4996-A3 Heavy Duty Trench Grate by United States Foundry & Manufacturing Company, or Neenah Foundry Company, or equal. B. Furnish trenchg rate ductile iron. C. Provide steel angle frames. 2.02 INLETS A. Concrete base, precast or cast-in-place, at Contractor's option. Use concrete which will attain a 28-day compressive strength of not less than 3,000 psi for cast-in-place or 4,000 psi for precast. 2.03 PIPING A. Reinforced Concrete Pipe (RCP): 02705-1 1. Reinforced Concrete Pipe(Round): ASTM C76-82, Class III, Wall B, with modified tongue-and-groove compression gasket joints complying with ASTM C443-79. 2. Reinforced Concrete Pipe (Oval): ASTM C507-81a. B. Polyvinyl Chloride Pipe (PVC): 1. Pipe and fittings shall be of plastic pipe, Type PSM-SDR-35 PVC, 3 conforming to ASTM D3034-81, SDR- 35. The pipe shall be in 12-1/2-foot or 20-foot nominal lengths or standard increments between. 2. The joints for pipe and fittings shall be rubber gasketed compression type designed to prevent infiltration or exfiltration. Joint lubrication shall be furnished by the manufacturer. PART 3 -EXECUTION 3.01 INLET INSTALLATION A. Join pipes to new inlets and cut-in to existing inlets where shown. B. Set seats level so that grating is flush with concrete structure and paving. 3.02 PIPE INSTALLATION A. Excavation, trenching and backfilling for all piping systems shall conform to the applicable requirements of Section 02221 and any special requirements as shown on the drawings or as specified. Utility companies shall be notified before excavations 3 are started. B. Laser instruments may be used in construction of gravity line pipe installations, or 3 batter boards to support grade lines shall be set over the ditch at intervals not to exceed 25-feet. C. The bottom of the pipe trench shall be shaped to give substantially uniform circumferential support to the lower 1/3 of each pipe. Holes shall be scooped out where the bells or joints occur leaving the entire barrel of the pipe bearing on the pipe bed. Each pipe shall be inspected for defect prior to being lowered into the trench and swabbed or brushed out to insure that no dirt or foreign material gets into the finished line. Trench waters shall be kept out of the pipe and the pipe kept closed by means of a test plug whenever work is not in progress. Pipes shall be handled carefully to avoid breakage. Pipe may be laid in the best manner adapted to securing 02705-2 speed and good results. However, it shall be laid in accordance with the manufacturer's instructions and recommendations. All joints shall be watertight. If the maximum trench width specified in Section 02221 is exceeded for by reason other than by order of the Owner, the Contractor shall install at his own expense, graded rock,pipe encasement or other bedding as may be required by the Owner to support the load of the backfill. Joints shall be made in accordance with the manufacturer's recommendations. 3.03 INSPECTION A. Each catch basin, section of new storm drain or junction box will be inspected by the Owner. Each new section of storm drain shall show from either end on examination, a full circle of light. B. Storm drains shall show no obstructions to flow. Each catch basin or other appurtenance to the system shall be of the specified size and form, watertight and neatly and substantially made with the top set permanently to exact position and grade. ***END OF SECTION*** 02705-3 SECTION 02731 MANHOLES tPART 1 - GENERAL 1.01 SUMMARY A. This Section covers the work necessary to furnish and install precast concrete manholes, complete, as specified and shown on the Drawings. 1.02 REFERENCES A. Codes, Specifications, and Standards Codes, specifications, and standards referred to by number or title shall form a part of this specification to the extent required by the references thereto. Latest revisions shall apply, unless otherwise shown or specified. B. American Society for Testing and Materials (ASTM) Standards ASTM A48 Specification for Gray Iron Castings ASTM A536 Specification for Ductile Iron Castings ASTM C150 Specification for Portland Cement ASTM C478 Specification for Precast Reinforced Concrete Manhole Sections ASTM C581 Practice for Determining Chemical Resistance of Thermosetting Resins Used in Glass Fiber Reinforced Structures Intended for Liquid Service ASTM C582 Specification for Contact-Molded Reinforced Thermosetting Plastic (RTP)Laminates for Corrosion Resistant Equipment ASTM C923 Specification for Resilient Connectors Between Reinforced Concrete Manhole Structures and Pipes ASTM D1248 Standard Specification for Polyethylene Plastics Moulding and EExtrusion Materials 02731 ASTM D3753 Specification for Glass Fiber-Reinforced Polyester Manholes ASTM F477 Specification for Elastomeric Seals (Gaskets) for Joining Plastic Pipes ASTM F894 Specification for Polyethylene (PE) Large Diameter Profile Wall Sewer and Drain Pipe C. Florida Department of Transportation(FDOT) Standards FDOT Specifications Florida Department of Transportation and Standards Standard Specifications for Road and Bridge Construction, Latest Edition. Florida Department of Transportation Road Design Standards, Latest Edition. 3 D. American Association of State Highway and Transportation Officials (AASHTO) Standards 1.03 SUBMITTALS A. Submittals shall be as specified in the General Conditions and in Division 1 -General Requirements. B. Submit the following: 1. Shop and setting drawings for all manholes. 2. Manufacturers data and detail drawings for manhole frames and covers. 3. Material specifications and performance data for pipe to manhole connectors. 4. Certification that all cement used complies with ASTM C150, Type II, is specifically required. I 5. Copies of certified laboratory test reports of seven day compressive test results for each manhole. 1.04 QUALITY ASSURANCE 02731 3 3 A. The manufacturer of eacha of manhole shall submit, in writing, "Certificates of tYP g Compliance" that the unit complies with the provisions of the applicable Specifications. These "Certificates" shall include copies of tests performed in accordance with ASTM or other standards. PART 2 - PRODUCTS 2.01 PRECAST CONCRETE MANHOLES A. Manhole Structures 1. Manholes shall be concentric cone or flat slab top precast concrete manholes conforming to ASTM C478, with a minimum wall thickness of 8 inches. Manholes with flat slab tops shall be used where interior fiberglass lining is specified. Grade rings shall be precast concrete conforming to ASTM C478. 2. Manhole base slabs, risers, corbels and topslabs shall be designed for all g applicable soil and hydrostatic loads and an AASHTO H-20 wheel loading. The Contractor shall submit detailed shop drawings and design calculations pertaining to the design of the various structural elements of the manholes. The shop drawings and calculations shall be signed and sealed by a registered professional engineer licensed in the State of Florida. 3. Cement shall conform to ASTM C150, Type II. 4. Sealing compound for precast concrete manhole joints shall be preformed plastic joint sealer conforming to Federal Specification SS-S-00210, "Ram- Nek" as manufactured by K. T. Snyder Co., Inc., or equal. 5. The manufacturer shall provide openings for sewers entering and leaving the manhole. Flexible boot connectors, "Kor-N-Seal" as manufactured by NPC, Inc., or approved equal, shall be factory installed by the manhole manufacturer. 6. Precast manhole sections shall be steam cured and shall not be shipped from the point of manufacture until at least five days after casting. 7. Lifting holes for handling manholes shall not penetrate the walls of the manhole. Field repair of wall penetrations will not be permitted. Any manhole containing a complete penetration of the wall will be rejected. B. Manhole Frames (Rings) and Covers 02731 1. Manhole frames and covers shall be made of cast iron conforming to ASTM A48, Class 30. Castings shall be smooth, clean, and free from blisters, blowholes, and shrinkage. Standard frames and covers shall be of the traffic type. The cover shall seat firmly into the frame without rocking. 2. Grind or otherwise finish each cover so that it will fit in its frame without rocking. Frame and cover shall be made watertight by means of dovetail groove and gasket in the cover. Frames and covers shall be matchmarked in sets before shipping to the site. Non-penetrating pickholes shall be provided in the cover. 3. Covers shall have the words "ALTAMONTE SPRINGS, FLORIDA - SANITARY" cast thereon in 1-1/2 to 2 inch high letters raised flush with the top of the cover, as specifically shown by the Drawings. 4. Before leaving the foundry, clean castings and subject them to a hammer inspection. Then dip castings twice in a preparation of asphalt or coal tar and oil applied at a temperature of not less than 290 degrees F,nor more than 310 degrees F, and in such manner as to form a firm tenacious coating. 3 5. Manhole frames and cover types designated by the Drawings shall be the 3 following, as manufactured by U.S. Foundry and Manufacturing Corp. (USF), or approved equal: a. "0" ring seal manhole ring and cover,round built-up type (Drawing Designation "A-1"), USF Series 227-AS-ORS. b. Bolted watertight manhole ring and cover, round built-up type (Drawing Designation "A"), USF Series 227-AS-BWT. c. "0" ring seal manhole ring and cover, round slab type (Drawing Designation "B-1), USF Series 1295-AS-ORS. C. Manhole Coatings and Linings - Interior and Exterior 1. Fiberglass Reinforced Plastic (FRP) - Interior a. FRP manhole linings shall be provided where designated on the Drawings. Use flat slab concrete tops where manholes are lined with FRP. b. Fiberglass reinforced plastic(FRP)manhole liner shall be supplied in lengths corresponding to the precast concrete manhole risers and shall 02731 I have the required inside diameter. The liner pipe shall be plain end q pP with no vertical seams allowed. The liner shall be factory installed in the separate manhole sections-riser(barrel) sections and top slab. The FRP liner pipe shall be fabricated in accordance with NBS PS 15-69,and shall consist of premium grade isophthalic polyester resin, fiberglass chopped strand, woven roving, and continuous reinforcements. Minimum liner thickness shall be 3/8 inch. c. The laminate comprising the manhole liner shall consist of a corrosion-resistant barrier comprised of an inner surface and interior layer,plus a structural layer. The inner surface exposed to the sewage environment shall be a 20 mil resin-rich layer reinforced with chemical-resistant C-glass surfacing mat. Resin/glass ratio shall be 90/10 (by weight). The inner surface layer shall be followed with an 80 mil interior layer composed of resin reinforced with two plys of 1.5 oz./sq. ft. chopped strand mat. The resin/glass ratio of the combined inner surface and interior layer shall be 27/73 (plus or minus 5)by weight. The structural layer shall consist of 1.5 oz./sq. ft. chopped strand mat and an additional number of alternating plys of woven roving and chopped strand mat as required to achieve the thickness and physical properties stated in this specification. Fiberglass reinforced plastic laminate shall conform to ASTM C582 and Chemical Resistance Tests shall conform to ASTM C581. Sand fillers not allowed. d. FRP liner shall be designed and fabricated to be installed as a non- load bearing liner to be installed inside a new manhole during the concrete casting process at precaster's manufacturing facility. The flat sheet liner placed on the underside of the manhole's top slab shall be suitably anchored over the total contact surface area, as approved by the Engineer. The FRP liner must be 100% supported/braced during the concrete casting process. The liner shall be designed to withstand normal shipping and installation loads. When properly installed inside a concrete manhole with properly designed and reinforced top slab, manhole shall withstand an AASHTO H-20 loading and all other applicable soil and hydrostatic loads. e. FRP liner shall meet or exceed the following physical properties as listed in Table 1 of NBS PS 15-69: ULT. TENSILE STRENGTH (psi) 15,000 (Hoop) 15,000 (Axial) 02731 I FLEXURAL STRENGTH (psi) 22,000 (Hoop) 22,000 (Axial) FLEXURAL MODULUS (ELAS) (psi) 1,000,000 (Hoop) 1,000,000 (Axial) f. Following field installation,the manhole's FRP joints shall be sealed in the field by the Contractor in accordance with the manufacturer's recommendations, as approved by the Engineer. The manufacturer 3 shall certify as to correct manhole installation. g. Where an existing concrete manhole is to be lined with a fiberglass liner, all of the above requirements remain applicable except that where the vertical liner riser sections are to be installed within existing concrete risers, the annular space between the existing3 manhole and the new liner shall be filled with a high strength cementitious grout which shall leave no void between liner and manhole structure. 2. Coal Tar Epoxy- Interior and Exterior a. Coal tar epoxy interior linings shall be applied to all concrete manholes,unless an alternate lining is specifically designated on the Drawings. This interior lining shall have a dry mil thickness of not less than 30 mils. Coat the exterior of all concrete manholes with coal tar epoxy to a minimum dry mil thickness of 16 mils. Do not apply external linings above the final ground surface elevation, or on top of flat slab manhole tops. b. Surface preparation and coal tar epoxy coating application shall be in accordance with written instructions from the paint manufacturer. All applications shall be performed under controlled conditions at the manhole manufacturer's factory. c. Following field installation, damaged paint areas and joints shall be repaired immediately. d. The concrete adjustment rings for manhole frames and covers, and any other bare concrete above an FRP lining shall receive field applied coatings of coal tar epoxy to provide an internal protective lining. 33:3 e. Coating material shall be as given below, or approved equal: 3 • Tarset, Maxi-Build II, 7080, as manufactured by Porter 02731 I International • Bitumastic No. 300-M,as manufactured by KOP-COAT,Inc. PART 3 - EXECUTION 3.01 INSTALLATION OF PRECAST CONCRETE MANHOLES A. Manhole Base 1. Excavate for manhole and compact the subgrade material to 95 percent of maximum density as determined by AASHTO T180. Whenever the Engineer determines that the in-place material is unsuitable, or cannot be adequately compacted, the existing material shall be stabilized by placing Foundation Stabilization Material, as specified in Section 02220, and compacting it into the existing material. manhole bases shall be as shown on the Drawings. 2. Precast or cast-in-places.g Bench the inside of the manhole base with 2,000 psi concrete to provide smooth channel sections, as shown on the Drawings. Channels shall vary uniformly in size and shape from inlet to outlet. B. Installing Manholes 1. Set each precast concrete manhole unit plumb on a bed of sealant to make a watertight joint with the preceding unit. Point the joints and wipe off the excess sealant. Secure the manhole frame to the grade ring with grout and cement mortar fillet. 2. Assemble units so that the top of the manhole cover shall be flush with the adjoining finish grade. Install precast grade rings to provide for adjustment of the final elevation of the cover. Provide grade rings totalling not less than 6 inches nor more than 12 inches in height between the manhole frame and the top of the concentric cone or flat slab top. 3. Connecting pipe shall be connected into manholes by means of a resilient connector between reinforced concrete manhole structures and pipe (Re: Article 2.01, Products, of this Section). 4. All manhole frames shall be securely anchored to the cone section or flat flab top, as applicable, with three 3/8 inch bolts, nuts, and washers extending through the grade rings. The joint between the casting frame and the grade rings, and between the grade rings and the cone section or flat slab top, shall 02731 I be fully mortared or gasketed and coated with a coal tar epoxy type coating upon reaching its final set. The joints shall be watertight. C. Sealing and Grouting Fill joints between precast sections with both inner and outer rings of plastic sealing compound. Seal exterior of joints with Type II Portland cement mortar. 3.02 SQUARE PRECAST CONCRETE MANHOLES (NOT USED) A. Manholes Provide square precast concrete manholes in accordance with the Florida Department of Transportation Road Design Standards, Latest Edition, Index Number 200, Type J, Alternate B. Reference specific details shown on the Drawings. B. Manhole Frames and Covers Reference Article 2.01, Products, of this Section for manhole frames and covers. Provide "0" ring seal manhole ring and cover,round slab type (drawing designation "B-1"), as shown on the Drawings. C. Manhole Coatings and Linings - Interior and Exterior Reference Article 2.01,Products,of this Section for the manhole's coating and lining type, as designated on the Drawings. D. Reference Article 3.01, Execution, of this Section and Florida Department of Transportation Road Design Standards,Index Number 200,for applicable installation instructions. The concrete flat slab tops shall be set to match the elevation of the adjacent retaining wall, as shown on the Drawings. Do not apply exterior coatings above the finish grade surface elevation at the manhole, or on the flat slab tops. 3.03 FIBERGLASS REINFORCED PLASTIC (FRP) MANHOLES -PRODUCTS AND EXECUTION (NOT USED) A. Manholes 1. Fiberglass reinforced Plastic (FRP)manholes shall be one-piece construction 3 consisting of a 48-inch inside diameter FRP plain end cylinder pipe with an attached FRP concentric reducer cone. The reducer cone shall be 18 inches in height and shall have a 24-inch diameter clear opening. The reducer cone shall have a modified hemispherical shape with at least a 3-inch high FRP 02731 I reinforcement collar and a 4-inch minimum width flat surface to support pre- cast concrete adjustment or grade rings for the cast iron frame and cover. The cylinder pipe-to-reducer cone joint shall be factory-installed. No vertical seams or joints shall be allowed. 2. FRP manholes shall be fabricated with premium grade isophthalic polyester resin, fiberglass chopped strand, woven roving and continuous reinforcements. Sand filler shall not be permitted in the FRP laminate. 3. FRP manholes shall be designed and fabricated in accordance with ASTM D3753-79, Standard Specification for Glass Fiber-Reinforced Polyester Manholes. Fiberglass Reinforced Plastic laminate shall conform to ASTM C582, and Chemical Resistance Tests shall conform to ASTM C581. FRP manholes shall be chemically resistant to normal domestic sanitary sewer environments as well as corrosive soil, groundwater and sea water environments. Manholes shall be designed to withstand a 16,000 pound vertical dynamic wheel load(AASHTO H-20 loading). 4. FRP manholes shall be manufactured by an established national manufacturer with at least five years experience producing FRP sanitary sewer manholes. 5. FRP manholes shall be installed in accordance with manufacturer's current installation instructions. B. Manhole Base 1. FRP manholes shall be field-installed in a cast-in-place concrete base, as detailed on the drawings. 2. Compact the subgrade material to 95 percent of maximum density as determined by AASHTO T-180. Stabilize material that cannot be adequately compacted by placing foundation stabilization material, as specified in Section 02220, and compacting it into the existing material. 3. Bench the inside of the manhole base with 2000 psi concrete to provide smooth channel sections, as shown on the drawings. Channels shall vary uniformly in size and shape from inlet to outlet. C. Manhole Frames and Covers Reference Article 2.01, Products, of this Section for manhole frames and covers. Provide "0" ring seal manhole ring and cover, round built-up type (drawing designation "A-1"), as shown on the X. D. Manhole Coatings and Linings - Interior and Exterior 02731 No coatings or linings are required,except on the top concrete adjustment rings. The concrete adjustment rings for the manhole frame and cover shall receive field applied coatings of coal tar epoxy to provide an internal protective lining. Reference Paragraph C, Manhole Coatings and Linings- Interior and Exterior, Article 2.01 of this Section for materials and application. 3.04 PROFILE REINFORCED HIGH DENSITY POLYETHYLENE (HDPE) MANHOLES -PRODUCTS AND EXECUTION (NOT USED) A. Manholes 1. Profile Reinforced HDPE Manholes with nominal 48" inside diameter riser, shall be fabricated of Profile Reinforced HDPE Pipe meeting the3 requirements of ASTM F-894. Riser and stubouts shall be made of high density, high molecular weight, polyethylene pipe material meeting the requirements of Type III, Class C, Category 5, Grade P34, as defined in ASTM D-1248. Clean rework material generated by the manufacturer's own production may be used so long as the manhole and/or fittings produced meet all the requirements of ASTM F-477. Ring Stiffness Constant(RSC)values for the pipe used to manufacture the manholes shall be Class 160 as defined in ASTM F-894. 2. Manhole shall have an attached HDPE concentric reducer cone at the top with a minimum 24-inch diameter clear opening. The reducer cone shall have a reinforced collar to support pre-cast concrete adjustment rings for the cast iron frame and cover. 3. The bottom section of manholes shall be formed to accept the pipe sizes and 3 configurations shown on the drawings. Manholes shall be equipped with HDPE bottoms and shall be benched in the factory to meet the flow arrangement,plan and elevation, shown on the drawings. Benching channels shall vary uniformly in size and shape from inlet to outlet through the manhole. 4. Provide four (4) anchor connections on the manholes to prevent flotation. Each connection shall be suitable for a 4,000 pound force. 5. Stub-outs must connect to the PVC gravity sewer system. Provide watertight HDPE to PVC connector couplings. 6. Perform installation in accordance with written instructions that are to be provided by the manufacturer. 02731 3 3 B. Manhole Base 1. Install a cast-in-place concrete base under HDPE E manholes,as shown by the drawings. 2. Compact the subgrade material to 95 percent of maximum density as determined by AASHTO T-180. Stabilize material that cannot be adequately compacted by placing foundation stabilization material, as specified in Section 02220, and compacting it into the existing material. 3. Provide stainless steel bolts to anchor the manhole to the base slab, as shown by the Drawings. 4. Provide grout leveling course between the bottom of the HDPE manhole and the concrete base. C. Manhole Frames and Covers Reference Article 2.01, Products, of this Section for manhole frames and covers. Provide bolted watertight manhole ring and cover, round built-up type (drawing designation "A"), as shown on the drawings. D. Manhole Coatings and Linings - Interior and Exterior No coatings or linings are required,except on the top concrete adjustment rings. The concrete adjustment rings for the manhole frame and cover shall receive field applied coatings of coal tar epoxy to provide an internal protective lining. Reference Paragraph C, Manhole Coatings and Linings - Interior and Exterior,Article 2.01 of this Section for materials and application. ***END OF SECTION*** 02731 SECTION 03301 CONCRETE AND REINFORCING STEEL PART 1 GENERAL 1.01 SCOPE OF WORK A. Furnish equipment all labor, materials, a ui ment and incidentals required and perform all concrete work as ordered by the Engineer, as shown on the Drawings and as specified herein. 1.02 SUBMITTALS A. Submit to the Engineer, in accordance with Section 01300, shop drawings showing locations of all joints and accessories. Submit full shop drawings and bar schedules for reinforcing steel. Submit technical data on all materials and components. Submit other data specified herein when required. 1.03 REFERENCE STANDARDS A. American Society for Testing and Materials(ASTM) 1. ASTM A185 - Standard Specification for Steel Welded Wire Fabric, Plain, for Concrete Reinforcement. 2. ASTM A615 - Standard Specification for Deformed and Plain Billet-Steel Bars for Concrete Reinforcement. 3. ASTM C31 - Standard Practice for Making and Curing Concrete Test Specimens in the Field. 4. ASTM C33 - Standard Specification for Concrete Aggregates 5. ASTM C94 - Standard Specification for Ready-Mixed Concrete. 6. ASTM C150 - Standard Specification for Portland Cement. 7. ASTM D1752 - Standard Specification for Preformed Sponge Rubber and Cork Expansion Joint Fillers for Concrete Paving and Structural Construction. B. Where reference is made to one of the above standards, the revision in effect at the time of bid opening shall apply. PART 2 PRODUCTS 2.01 MATERIALS A. Cement shall be domestic portland cement conforming to ASTM C150, Type II. City of Ocoee 03301-1 G&R Project No. 98518.01 3 B. Fine aggregate shall be washed natural sand conforming to ASTM C33. C. Coarse aggregate shall be well graded crushed stone conforming to ASTM C33, size No. 3 67 unless otherwise directed. D. Water shall be potable, clean, and free from deleterious amounts of acids, alkalis, oils, or 3 organic matter. E. No admixtures shall be used unless approved by the Engineer in writing. 3 F. Reinforcing steel shall be deformed, intermediate grade, steel bars conforming to ASTM A615, Grade 40. Rail-steel bars will not be permitted in the work. G. Welded steel wire fabric shall be sized as shown and be in accordance with ASTM A185. H. Concrete aggregates which have been shown by test or actual service to produce concrete of the required strength, durability, watertightness and wearing qualities may be 3 used where authorized by the Engineer. I. Chemical hardener shall be Lapidolith by Sonneborn;Hornolith by A.C. Horn;Penalith3 by W.R. Meadows or equal fluosilicate base material. J. Nonshrink grout shall be Masterflow 713 by the Master Builders Company;Euco N-S by Euclid Chemical Co.;Five Star Grout by U.S. Grout Corp. or equal. K. Bonding compound shall be Sikadur Hi Mod by Sika Corp., similar by Euclid Chemical Corporation; Master Builders or equal. L. Sealant shall be Sikaflex la by Sika Corp.;Vulkem 116 by Master Mechanics or equal. 3 M. Premolded joint filler shall be self-expanding cork conforming to ASTM D1752, Type III, by A.C. Horn, Inc; W.R. Meadows,Inc. or equal. N. Bond Breaker. Provide tape or coating(except where tape is specifically shown) as approved. 1. Bond breaker tape adhesive-backed glazed butyl or polyethylene tape which will satisfactorily adhere to the premolded joint filler or concrete surface as required. The tape shall be the same width as the joint. 2. Bond breaker coating - a nonstaining type bond prevention coating, Williams Tilt-up 3 Compound by Williams Distributors, Inc.; Silcoseal 77, by SCA Construction Supply Division; Superior Concrete Accessories or equal. 2.02 CONCRETE QUALITY concrete shall be designed Unless otherwise specified or directed, for a minimum allowable compressive strength of 3,500 psi at 28 days. Slump shall preferably be City of Ocoee 03301-2 G&R Project No. 98518.01 3 between 2 and 4-in and shall not exceed 5-in. Water shall be kept to a minimum to obtain concrete which is as dense and watertight as possible. The maximum water content shall be 6 gallons per 94 lb sack and the minimum cement factor shall be 5.7 (94 lb) sacks per cubic yard. The above ratios shall be revised for sacks of cement weighing different from 94-lbs per sack. shall be asspecified above except slump shall be between 6 and 7-in and B. Tremae concreteP minimum cement factor shall be 7 sacks per cubic yard. data fromprevious projects to substantiate that C. Submit certified design mixes and historic concrete mix proposed will provide the required strength. 2.03 MIXING CONCRETE A. Ready-mix concrete shall conform to ASTM C94 and the requirements herein, or as otherwise approved by the Engineer. If ready-mix concrete is to be used,the manufacturer shall furnish a statement to the Engineer for his approval giving the dry proportions to be used, with evidence that these will produce concrete of the quality specified. B. Concrete shall be mixed until there is a uniform distribution of the materials and shall be discharged completely before the mixer is recharged. The mixer shall be rotated at a speed recommended by the mixer manufacturer and mixing shall be continued for at least 1-1/2 minutes after all the materials are in the mixer. Concrete shall be placed within 1-1/2 hours of the time at which water was first added, otherwise it shall be rejected. Concrete which has been remixed or retempered, or to which an excess amount of water has been added, shall also be rejected. 2.04 FORMS A. Forms shall be free from roughness and imperfections, substantially watertight and adequately braced and tied to prevent motion when concrete is placed. No wooden spreaders will be allowed in the concrete. B. Wire ties will not be allowed. Metal ties or anchorages which are required within the forms shall be so constructed that the metal work can be removed for a depth of at least 1-in from the surface of the concrete without injury to such surface by spalling or otherwise. Forms shall be thoroughly cleaned before using and shall be treated with oil, or other approved material. PART 3 EXECUTION 3.01 REINFORCING STEEL A. Reinforcement shall be accurately fabricated to the dimensions shown. Stirrups and tie bars shall be bent around a pin having a diameter not less than two times the minimum thickness of the bar. Bends for other bars shall be made around a pin having a diameter not less than six times the minimum thickness except for bars larger than 1-in, in which case the bends shall be made around a pin of 8-bar diameters. All bars shall be bent cold. City of Ocoee 03301-3 G&R Project No. 98518.01 B. Reinforcement shall be shipped to the work with bars of the same size and shape fastened in bundles with metal identification tags giving size and mark securely wired on. The identification tags shall be labeled with the same designation as shown on submitted bar schedules and shop drawings. C. All bars shall be stored off the ground and shall be protected from moisture and be kept free from dirt, oil, or injurious coatings. D. Unless otherwise shown, sp lices in reinforcement shall be lapped not less than 24 diameters. All bar splices shall be staggered wherever possible. When splicing bars of different diameters,the length of lap is based on the larger bar. 3 E. Splices in welded wire fabric shall be lapped not less than 1-1/2 courses or 12-in, whichever is greater. Wire fabric splices shall be tied together with wire ties spaced no more than 24-in on center. F. Before being placed in position, reinforcement shall be thoroughly cleaned of loose mill 3 and rust scale, dirt and other coatings, including ice,that reduce or destroy bond. Where there is delay in depositing concrete after reinforcement is in place, bars shall be reinspected and cleaned when necessary. G. Reinforcement which is to be exposed for a considerable length of time after being placed shall be painted with a heavy coat of cement grout, if required. 3 H. In no case shall any reinforcing steel be covered with concrete until the amount and position of the reinforcements have been checked by the Engineer and his permission given to proceed with the concreting. 3.02 PREPARATION OF SURFACES A. All surfaces to receive bonding compound shall be prepared in accordance with the manufacturer's recommendations before the application of the bonding compound. 3.03 PLACING CONCRETE A. Reinforcement, where required, shall be accurately placed in exact positions shown, shall be secured against displacement with annealed iron wire ties or suitable clips at intersections and shall have a clear space of 2-in between the steel and face of forms unless otherwise indicated. Wire ties passing through the forms for the purpose of holding the steel in proper position will not be allowed. Concrete blocks with wire ties cast therein may be used where approved by the Engineer for the purpose of maintaining the clearance between reinforcement and forms. Reinforcing bars shall be free from rust, scale, dirt, grease and injurious contaminants. B. No concrete shall be placed until forms and method of placement have been approved by the Engineer. Before depositing concrete, all debris, foreign matter, dirt and water shall 3 be removed from the forms. The surface of concrete previously placed, such as manhole base or horizontal construction joint, shall be cleaned and brushed with cement paste. City of Ocoee 03301-4 G&R Project No. 98518.01 I j; Concrete shall not be placed in water or submerged within 24 hours after placing, nor shall running water be permitted to flow over the surface of fresh concrete within 4 days after its placing. C. High frequency mechanical vibrators shall be used to the extent necessary to obtain proper consolidation of the concrete. Care shall be taken to avoid segregation of aggregates by excessive vibration. Concrete adjacent to forms and around pipe stubs shall be carefully spaded or rodded. D. Concrete walls shall be deposited in one continuous operation with concrete brought up evenly on all sides. Chutes shall be of metal, "U" shaped, and provided with a baffle plate at the end, if necessary, to prevent segregation of materials. Chutes shall be placed at an angle of not less than 25 degrees, nor more than 45 degrees from horizontal and they shall be kept clean and free from hardened concrete. E. No concrete shall be mixed or placed during freezing weather without explicit permission. When placing concrete when air temperature is below 40 degrees F, the water, sand and gravel shall be heated so that the temperature of the concrete will be at least 50 degrees F. This temperature shall be maintained for 72 hours after placing. No concrete shall be placed on frozen ground. F. At the base of walls in manholes and structures and where construction joints are used, install waterstops as shown. Provide watertight splices where required in conformance with manufacturer's instructions. Provide approved clips to secure to bulb of waterstops and tie clips to reinforcing steel with steel tying wire to secure waterstops in desired position during concrete placement. 3.04 PLACING TREMIE CONCRETE A. All concrete shall beP laced using a watertight tremie system and provide a foot valve at the discharge end of tremie. B. depositing While de ositin concrete, the discharge end of tremie shall be kept as deeply submerged in the previously placed concrete as conditions will permit. preserve Exercise extreme care to the seal of flowing concrete at discharge end of tremie. Close foot valve completely before lifting or moving tremie. 3.05 CONCRETE ENCASEMENTS AND THRUST BLOCKS A. Concrete encasements shall be placed as shown and as directed by the Engineer. Backfill shall not be placed on the concrete until permitted by the Engineer. B. The backs of thrust block anchors shall be placed against undisturbed earth. The sides of thrust blocks shall be formed. Minimum bearing area shall be as called out on the Drawings or as determined by the Engineer. Felt roofing paper shall be placed to protect pipe joints. Concrete shall not be placed over bolts or nuts, or to prevent the removal of joints. City of Ocoee 03301-5 G&R Project No. 98518.01 3.06 FIELD TESTS A. Sets of three field control cylinder specimens will be taken at random by the Engineer during the progress of the work, in conformity with ASTM C31;the total number of specimens taken on the project shall be not less than one set of specimens on any one day when concrete is placed. When average ultimate 28 day strength of control cylinders in any set falls below the required ultimate strength or below proportional minimum 7 day strengths where proper relation between 7 and 28 day strengths have been established by tests, proportions, water content, or temperature conditions shall be changed to secure the required strength. B. Cooperate in the making of such tests to the extent of allowing free access to the work for the selection of samples, providing heated moist storage facilities for specimens, affording protection to the specimens against injury or loss through his operation and furnishing material and labor required for the purpose of taking concrete cylinder samples, curing boxes and shipping boxes. All shipping of specimens will be paid for by the Owner. C. Slump tests will be made in the field by the Engineer. 3.07 STRIPPING AND FINISHING CONCRETE A. Forms shall not be stripped before the concrete has attained a strength of at least 30 percent of the ultimate design strength, except as otherwise specified. This is equivalent to approximately "100 day-degrees" of moist curing. B. Care shall be exercised to prevent damaging edges or obliterating the lines of chamfers, rustication or corners when removing the forms or doing any other work adjacent thereto. C. Clean all exposed concrete surfaces and adjoining work stained by leakage of concrete, to the satisfaction of the Engineer. D. As soon as forms have been stripped, form ties, if employed, shall be removed and the recess filled to ensure complete watertightness. Any defects in the surface of the walls shall be chipped out and repaired in a workmanlike manner. Defective concrete where it occurs shall be cut to a minimum depth of 1-in,thoroughly roughened and neat cement brushed in. The hole shall then be filled with mortar in the proportion of 1 part cement and 2-1/2 parts sand with a minimum of water. Mortar for filling form tie recesses shall be mixed to a slightly damp consistency(just short of"balling"), pressed into the recess until dense and troweled smooth. Mortar in larger patches shall be applied and allowed to assume a partial set following which it shall be struck off flush with the adjoining surface. Patches shall be kept moist for several days to assure proper curing. E. Concrete to receive dampproofing and concrete not exposed in the finished work shall have off-form finish with fins and other projections removed and tie cones and defects filled as specified. F. Rubbed Finished (Exposed Concrete) 3 City of Ocoee 03301-6 G&R Project No. 98518.01 I .. 1. Immediately upon stripping forms and before concrete has changed in color, all fins shall be carefully removed with a hammer. While the wall is still damp, apply a thin coat of medium consistency neat cement slurry by means of bristle brushes to provide a bonding coat within all pits, air holes or blemishes in the parent concrete; avoid coating large areas of the finished surface with this slurry. 2. Before this slurry has dried or changed color, apply a dry(almost crumbly) grout consisting of one volume cement to 1-1/2 volumes of clean masonry sand having a fineness modulus of approximately 2.25 and complying with gradation requirements of the ASTM for such a material. Grout shall be uniformly applied by means of damp (neither dripping wet nor dry)pads of coarse burlap approximately 6-in square used as a float. Grout shall be well scrubbed into the pits and air holes to provide a dense mortar in the imperfections to be patched. 3. Allow the mortar to partially harden for 1 or 2 hours depending upon the weather. EIf the air is hot and dry, keep the wall damp during this period using a fine, fog spray. When the grout has hardened sufficiently so it can be scraped from the surface with the perpendicular edge of a steel trowel without damaging the grout in the small pits or holes, cut off all that can be removed with a trowel. Grout allowed to remain on the wall too long will get too hard and will be difficult to remove. 4. Allow the surface to dry thoroughly and rub it vigorously with clean dry burlap to completely remove any dried grout. No visible film of grout should remain after this rubbing. The entire cleaning operation for any area must be completed the day it is E" started. Do not leave grout on surfaces overnight. Allow sufficient time for grout to dry after it has been cut with the trowel so it can be wiped off clean with the burlap. 4 5. On the day following the repair of pits, air holes and blemishes, the walls again shall be wiped off clean with dry, used pieces of burlap containing old hardened mortar which will act as a mild abrasive. After this treatment, there shall be no built-up film remaining on the parent surface. If, however, such is present a fine abrasive stone shall be used to remove all such material without breaking through the surface film of the original concrete. Such scrubbing shall be light and sufficient only to remove excess material without working up a lather of mortar or change the texture of the concrete. 6. A thorough wash-down with stiff bristle brushes shall follow the final bagging or Estoning operation in order that no extraneous materials remain on the surface of the wall. The wall shall be sprayed with a fine fog spray periodically to maintain a continually damp condition for at least 3 days after the application of the repair grout. 3.08 FINISHING FLOOR AND SLABS A. Floors and slabs shall be screeded to the established grades and shall be level with a tolerance of 1/8-in when checked with a 12-ft straightedge, except where drains occur, in which case floors shall be pitched to drains as indicated. Failure to meet either of above City of Ocoee 03301-7 G&R Project No. 98518.01 shall be cause for removal, grinding, or other correction as directed by the Engineer. B. Following screeding as specified above,the concrete shall be compacted by hand or approved power tools. 1. The floor or slab shall be compacted to a smooth surface and the floating operation continued until sufficient mortar is brought to the surface to fill all voids. The surfaces shall be tested with a straightedge to detect high and low spots which shall be eliminated. 2. Compaction shall be continued only until thorough densification is attained and a small amount of mortar is brought to the surface. Excessive floating shall be avoided. C. After screeding and compacting procedures are accomplished, floors and slabs for particular conditions shall be finished as specified in the following paragraphs. D. Wood float areas receiving hardener maintaining surface tolerances to a perfectly smooth, hard, even finish free from high or low spots or other defects. E. Concrete for exterior service shall be broomed in the direction of slab drainage maintaining the surface tolerance to provide a non-slip finish as approved. Edge trowel and score concrete in the pattern shown. F. Concrete receiving ceramic and resilient tile shall be steel troweled to a perfectly smooth, hard, even finish free from high or low spots or other defects. At ceramic tile areas, lightly broom after troweling. G. No curing compounds will be allowed on concrete. Use coverings and potable water spray as required and approved. 3.09 CONCRETE RECEIVING CHEMICAL HARDENER A. After 28 days, minimum, concrete cure, apply chemical hardener in three applications to a minimum total coverage of the undiluted chemical of 100 sq ft per gallon and in accordance with manufacturer's recommendations as reviewed. 3.10 GROUTING A. Perform grouting as shown and elsewhere as required. 3.11 SEALANT A. Sealant shall be installed in clean recesses at the locations shown. The application of the3 sealant shall conform to all the manufacturer's recommendations including temperature, moisture, primer, primer cure time and joint and recess preparation. Masking tape shall be applied to each side of the joint prior to the installation of the sealant and removed afterwards along with any spillage to leave a sealant installation with straight edges and a neat orderly appearance. Gray colored sealants shall be used unless otherwise specified City of Ocoee 03301-8 G&R Project No. 98518.01 I as shown. 3.12 BONDING COMPOUND A. Bonding compound shall be applied to the locations shown. The application of the bonding compound shall conform to all manufacturer's recommendations. 3.13 PREMOLDED JOINT FILLER A. Premolded joint fillers shall be installed at all locations shown. 3.14 BOND BREAKER A. Bond breakers shall be provided at the locations shown. Bond breaker tape shall be used at joints to separate the sealant from premolded joint filler and to separate the sealant from concrete at the bottom of the sealant. Tape for these installations shall be the same width as the joint or sealant recess. 3.15 MISCELLANEOUS WORK A. All bolts, anchors, miscellaneous metals or other sleeve steel work required to be set in the concrete forms for attachment of masonry, structural and mechanical equipment shall be set or installed under this Division. Be fully responsible for the setting of such materials, in the forms and shall correct all such not installed in a proper location or manner at his own expense. B. Electric conduits shall be installed in the concrete as required by the Drawings and as specified herein. Outlet boxes and fixtures shall be located in reference to the final floor, wall or ceiling finish and shall be so secured that they will not be displaced by concrete placing. C. Pipes or conduits for embedment, other than those merely passing through shall not be larger in outside diameter than 1/3 the thickness of the slab, wall or beam in which they are embedded, unless indicated on the Drawings, nor shall they be spaced closer than 3 diameters on center, nor so located as to unduly impair the strength of the construction. The Engineer shall approve the location of all conduits and fixtures. END OF SECTION City of Ocoee 03301-9 G&R Project No. 98518.01 SECTION 04200 MASONRY PART 1: GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required and construct all masonry work as shown on the Drawings and as specified herein. B. The work under this Section includes,but is not necessarily limited to, the following: 1. Concrete masonry units(CMU) masonry Split face concrete units(split face CMU) 3. Precast reinforced concrete lintels 4. Masonry joint reinforcing, ties and anchors and installation only of deformed steel bars for wall reinforcing and CMU lintel reinforcing in masonry 5. Insulation inserts in CMU 6. Grouting as specified herein 7. Patching existing masonry removed or damaged during construction. 1.02 RELATED WORK A. The Contract Documents include,but are not limited to the following related requirements. 1. Deformed steel bars for wall reinforcing and CMU lintel reinforcing is furnished under Division 3. 2. Grouting of baseplates and equipment is included in Division 3. 3. Miscellaneous metals are included in Division 5. 4. Caulking is included in Division 7. 5. Masonry waterproofing is included in Division 7. 1.03 SUBMITTALS City of Ocoee 04200-1 G&R Project No. 98518.01 I A. Submit Manufacturer's standard color charts(samples)for initial color selection of pre-colored CMU. Color shall be selected by ENGINEER at the time of shop drawing review. B. Submit to the ENGINEER, in accordance with Section 01300, representative samples 3 of all required masonry including split-face CMU and component and accessory materials. Submit with samples, all certifications and test data required to prove compliance with this Section and Building Code. 3 C. Submit to the ENGINEER documentation that all components submitted comply with the specified reference standards. D. Resubmit as required until approved. 3 E. Sample Panel: Before masonry work is begun, provide a sample panel for ENGINEER's approval. The panel shall be approximately 6-feet long, 4-feet high, and of the same construction as the walls shown for the building(s). The sample panel shall be constructed separate from the Work. The panel shall show both interior and exterior workmanship, coursing,bond, thickness, and tooling of joints, range of color and texture of the masonry and the color of the mortar, all of which shall be as specified. Include one complete exterior and interior control joint to be caulked under Division 7. The accepted panel shall form the standard for acceptable finished work on the project. The panel shall be erected in a location as designated by the ENGINEER and, when directed, shall be completely removed from the job site. 1.04 REFERENCE STANDARDS A. American Society for Testing and Materials (ASTM) 3 1. ASTM A82 - Standard Specification for Steel Wire, Plain, for Concrete Reinforcement. 2. ASTM A153 - Standard Specification for Zinc Coating(Hot-Dip) on Iron and Steel Hardware. 3. ASTM C33 - Standard Specification for Concrete Aggregates. 4. ASTM C90- Standard Specification for Loadbearing Concrete Masonry Units. for Non-Load-Bearing ASTM C129 - Standard Specification Concrete Masonry Units. 6. ASTM C140 - Standard Test Methods of Sampling and Testing Concrete Masonry Units. 3 7. ASTM C144 - Standard Specification for Aggregate for Masonry Mortar. City of Ocoee 04200-2 G&R Project No.98518.01 E . 8. ASTM C150 - Standard Specification for Portland Cement. 9. ASTM C207 - Standard Specification for Hydrated Lime for Masonry Purposes. 1 10. ASTM C270 - Standard Specification for Mortar for Unit Masonry. 11. ASTM C331 - Standard Specification for Lightweight Aggregates for Concrete Masonry Units. 12. ASTM C426 - Standard Test Method for Drying Shrinkage of Concrete Block. 13. ASTM C476- Standard Specification for Grout for Masonry. 14. ASTM D2000 - Standard Classification System for Rubber Products in Automotive Applications, (SAE Recommended Practice J200). 15. ASTM E84 - Standard Test Method for Surface Burning Characteristics of Building Materials. B. Where reference is made to one of the above standards, the revision in effect at the time of bid opening shall apply. 1.05 DELIVERY, STORAGE AND HANDLING A. All perishable materials for the work of this Section shall be delivered stored and handled so as to preclude damage of any nature. Manufactured materials, such as cement and lime, shall be delivered and stored in their original containers, plainly marked with identification of material and maker. Materials in broken containers, or in packages showing water marks or other evidence of damage, shall not be used and shall be removed from the site. B. All masonry shall be shipped stacked with hay or straw protection or other suitable protective device and shall be similarly stacked off the ground on the site. In addition, all masonry stored on the site shall be protected from the weather and staining with the use of tarpaulins or other covering approved by the ENGINEER. C. Split-face CMU shall be particularly well covered and protected during manufacture, storage, shipping and while on the job site to prevent contamination which may lead to efflorescence in the finished work. If efflorescence occurs in the finished work, the ENGINEER may order the removal and replacement of areas so affected. 1.06 COLD WEATHER CONSTRUCTION A. Masonry construction in cold weather shall conform to the applicable requirements of International Masonry Industry, All Weather Council, "Recommended Practices for Cold Weather Masonry" unless otherwise specified herein. Heat and enclosures will City of Ocoee 04200-3 G&R Project No. 98518.01 be the only protection method allowed. No mortar additives shall be used for this purpose. PART 2: PRODUCTS 2.01 MATERIALS-MASONRY A. Concrete Masonry Units (CMU)-(Interior Use) 1. CMU shall conform to ASTM C90, normal weight, Type II, hollow, load bearing units of 8-in by 16-in nominal face size and bed dimension as shown. 2. CMU shall be free from substances that will cause staining or pop-outs and shall be fine, even texture with straight and true edges. All units shall be air cured in covered storage for not less than 28 days before delivery. on the net area(average of three units)when 3. Minunum compressive strength ( ag tested in accordance with ASTM C140 shall be 3500 psi on the net area. Minimum compressive strength of any individual unit shall be not less than 80 percent of the required three-unit average. 4. Water absorption shall not exceed 10 lbs/cu ft (average of three units)when tested in accordance with ASTM C140. 5. Moisture content at time of delivery to job site shall not exceed 35 percent of total absorption. 6. No overall dimension(width, height, or length) shall differ by more than 1/16-in from the specified standard dimension. 7. Oven dry weight of the concrete shall not be less than 130 lbs/cu ft. 8. Units shall be obtained from one MANUFACTURER to ensure even color and texture. 9. Provide special units required by the Drawings, including but not necessarily limited to solid, corner, pilaster, bond beam, lintel and jamb units. B. Split-Face Concrete Masonry Units (Split-Face CMU)-(Exterior Use) 1. Split-face CMU shall be by Rinker-Demaco Architectural Masonry Systems or equal conforming to ASTM C90, normal weight, Type II, hollow, load bearing units except for more stringent provisions listed below. Units shall be 8-in by 16-in nominal face size(with one, center, square edged, 3/8-in by 3/8-in sized vertical score). Units shall have integral water repellant, as specified below, added during manufacture. Amount used shall be as submitted and approved. City of Ocoee 04200-4 G&R Project No. 98518.01 2. Integral water repellant shall be a liquid polymeric admixture resistant to water penetration with a Class E rating in accordance with ASTM E514-74 by Dry- Block Water Repellant Admixture by W.R. Grace& Co-Conn. 3. Minimum compressive strength on the net area(average of three units)when tested in accordance with ASTM C140 shall be 3 500 psi on the net area. Minimum compressive strength of any individual unit shall be not less than 80 percent of the required three-unit average. 4. Water absorption shall not exceed 10 lbs/cu ft (average of three units)when tested in accordance with ASTM C 140. 5. Moisture content at time of delivery to job site shall not exceed 35 percent of total absorption. 6. No overall dimension(width, height, or length) shall differ by more than 1/16-in from the specified standard dimension, except that dimensions measured to a split-face or end shall not be held to this tolerance. 7. Oven dry weight of the concrete shall not be less than 130 lbs/cu ft. 1 8. Provide all internal corner units, external corner units(split-face-both outside planes), and other special units as shown or required. Saw cut units as required to provide special cut units required. 9. Units shall be colored with integrally-mixed, alkali-stable, lightfast, weather-resistant pigment. Color A shall be Rinker-Demaco Grey, color B shall be Rinker-Demaco Charcoal Grey, or equal selected by the ENGINEER. Color shall be maintained uniformly throughout the job within the normal manufacturing tolerances. Provide a list of not less than three projects utilizing integrally-colored units manufactured by the same supplier. C. Insulation for CMU cells at exterior walls and where otherwise noted shall be expanded polystyrene insulating inserts,with a minimum density of 1.0 PCF and a water vapor transmission rate of 1.4 perm-inch in accordance with ASTM C570. Insulation shall be manufactured by Korfil, Inc. or equal. Install in CMU cells at block manufacturer's plant. R value of an 8-in CMU with inserts shall be 4.5. D. Precast lintels shall be minimum 3500 psi concrete with reinforcing placed all as shown. 2.02 REINFORCING,TIES,ANCHORS AND MISCELLANEOUS A. Joint Reinforcement 1. Reinforcement for masonry joints shall be welded wire units prefabricated in straight lengths of not less than 10-ft with matching corner and tee units fabricated from cold-drawn steel wire complying with ASTM A82, with City of Ocoee 04200-5 G&R Project No. 98518.01 deformed continuous side rods and plain cross-rods, butt welded to side rods and a unit width of 1-5/8-in less than thickness of wall or partition. Units shall3 be galvanized after fabrication conforming to ASTM A153, Class B-2, 1.5 oz/sq ft. 2. Reinforcement shall be truss type, fabricated with single pair of galvanized 9 gauge side rods and continuous 9 gauge diagonal cross-rods spaced not more than 16-in o.c. 3. Reinforcement shall be manufactured by Dur-O-Wal;Hohmann and Barnard; AA Wire Products or equal. B. Wall Ties and Anchors 1. Galvanized dove-tailed anchor slots shall be furnished for anchorage to cast-in-place concrete work. Provide at ends of all CMU partitions where3 concrete is adjacent. 2. Approved No. 9 galvanized wire or 16 gauge corrugated non-ferrous metal ties manufactured for use with the anchor slots provided shall be spaced at maximum of 8-in o.c. vertically and in each anchor slot. 3. Ties to concrete deck at tops of nonload bearing CMU partitions and walls shall be No. 9 wire joint stabilizing anchors,Dur-O-Wal D/A 2200 (wire and sheet metal galvanized steel) spaced 32-in o.c. in head joints of CMU. 4. Miscellaneous corrugated metal ties, where ties are not shown on Structural Drawings, shall be 1'/-in wide, 16 gauge, galvanized steel, length to provide embedment as shown or as approved, spaced at 16-in o.c. 5. Allalvanizin shall be hot dipped type conforming to ASTM A153, Class B2. g g 6. Ties and anchors shall be manufactured by Dur-O-Wal;Hohmann and Barnard; AA Wire Products or equal. C. Compressible filler for use in conjunction with masonry shall be 3-lb density, =faced, semi-rigid, asphalt and tar free fiberglass strips. Thickness shall be 3/8-in or as otherwise shown by width required for joint and wall conditions. 3 D. Control joints shall be factory extruded preformed rubber gaskets conforming to ASTM D2000 2AA-805 and shall be as manufactured by Dur-O-Wal;Hohmann and Barnard, Inc.; AA Wire Products or equal. Control joints shall be installed as shown. 3 E. Masonry water repellant shall be clear non-silicone based product with solids in complete solution. The solution shall be non-staining. The solids shall be of a non- City of Ocoee 04200-6 G&R Project No. 98518.01 C diminishing type and shall become an integral part of masonry. Masonry water repellant shall be White-Roc 7 Plus by Sonneborn Building Products, Division of ChemRex Inc.,Minneapolis, MN;Hydrozo Clear Double 7 By Hydrozo, Inc. Lincoln, NE or equal. 2.03 MORTAR AND GROUT MATERIALS A. Portland cement shall conform to ASTM C150 Type II. Masonry cements shall NOT be used. B. Lime for masonry mortar shall be hydrated, conforming to ASTM C207, Type S. C. Sand shall be clean, durable particles, free from injurious amounts of organic matter. The sand shall conform to the limits of ASTM C 144. Sand for grout shall conform to ASTM C144 or C33 as required. D. Water shall be free from oils, acids, alkalis or organic matter and shall be clean and fresh. E. Mortar Coloring 1. For all new construction, obtain exact pigment used in coloring the exterior split- face CMU and mix with mortar to provide approved mortar color. F. Integral type waterproofing for use in all exterior mortar shall be a polymeric admixture resistant to water penetration with a Class E rating in accordance with ASTM E514-74. Integral mortar waterproofing shall be Dry Block Mortar Admixture by W.R. Grace& Co-Conn. G. Non-shrink grout shall be Masterflow 713 as manufactured by the Master Builders Company;Euco N-S by Euclid Chemical Co.;Five Star Grout by U.S. Grout Corporation or equal. Grout shall attain a 28-day compressive strength of 6800 psi. 2.04 MORTAR AND GROUT MIXES A. Ingredients shall be accurately measured by volume in boxes especially constructed for the purpose. Measurement by shovel will not be allowed. Measure materials in a damp, loose condition. B. Portland cement mortar shall conform to ASTM C270, Type S. Provide test data as required to substantiate strength requirements of 1800 psi at 28 days. C. Grout for constructing CMU lintel blocks and for grouting cores to receive embedded anchors or reinforcing shall conform to ASTM C476, Fine Grout, proportioned by volume: 1 part portland cement, 0 to 1/10 part lime and sand equal to 2-1/4 to 3 times the sum of the volumes of cement and lime materials. Strength shall be 2500 psi City of Ocoee 04200-7 G&R Project No.98518.01 cells in a vertical position. The moisture content of the units when laid shall not exceed 35 percent of the total absorption as determined by laboratory test. C. Masonry Bonding 1. CMU shall be laid in running bond unless otherwise shown. 2. Vertically scored split-face CMU shall be laid in running bond, simulating stacked bonded 8-in by 8-in units. 3. Fill all joints with mortar, dense and neat. 4. Both vertical and horizontal joints shall be maintained uniform in spacing. 5. Joints for CMU shall be 3/8-in. Tool concave as approved. 6. Joints of all masonryshall be tooled in accordance with the following: a. Wait until unit mortar is thumb-print hard before tooling joint. This may require as much as 3 hours in the shade and 1 hour in the sun in the summertime. b. The required personnel shall be kept on the job after hours, if necessary, to properly tool joints. D. Sizes shall be as specified and called for on the Drawings, and where "Soaps" and "Splits" are used, the space between these members and the backup material shall be slushed full of mortar and tied-back as approved. E. All ties and joint reinforcing for masonry shall be furnished and installed under this Section. Continuous longitudinal joint reinforcing shall be provided in all CMU walls, interrupted at control joints. Space at 8-in o.c. vertically unless shown otherwise. F. Build in and grout fully all wall reinforcing as shown. G. Loose steel lintels shall be furnished under Division 5 and installed under this Section. Loose lintels shall be set in a full bed of mortar and supported by solid or mortar filled hollow CMU as detailed. H. Install all frames required to be set in masonry, set masonry to allow 3/8-in joint between masonry and frames, build in all frame anchors and fill frames with mortar. o I. Control joints shall be installed at the intersection of masonry walls with structural concrete and elsewhere as detailed on the Drawings. The maximum length, horizontally, between vertical control joints shall be 30-ft, but joints shall be located only as directed or shown. Joints shall be equal in width to the standard mortar joint. 1 City of Ocoee 04200-9 G&R Project No. 98518.01 J. CMU Cell Filling 1. Insulating fill shall be placed at exterior walls and where indicated on the Drawings. 2. Each course shall be filled with the insulating material before starting next course. Care shall be taken to prevent introduction of moisture or mortar while placing fill in cells. K. All masonry slots, chases, or openings required for the proper installation of the work of other Sections shall be constructed as indicated on the Drawings or in accordance with information furnished before the work is started at the points affected. No chase shall cut into any wall constructed of hollow units after it is built, except as directed3 and approved by the ENGINEER. L. Build in all miscellaneous items to be set in masonry for which placement is not specifically provided under separate Divisions, including reglets, lintels, ties, electrical panel boxes, sleeves, vents, grilles, anchors, grounds and exterior electric conduits and fixtures and cooperate with other trades whose work is to be coordinated with the work under this Section. M. All anchorage, attachment and bonding devices shall be set so as to prevent slippage and shall be completely covered with mortar or grout. N. Bed and grout for items coming in contact with masonry where grouting is required, including, but not limited to, wall and joint reinforcing, ties and anchors, pressed metal frame anchors set in masonry. Install all anchor bolts, base plates and seats in masonry walls and build in all items required for the completion of the building as they apply to masonry. O. Surfaces shall be brushed as work progresses and maintained as clean as it is practicable. Unfinished work shall be raked back where possible and toothed only where absolutely necessary. Before leaving fresh or unfinished work, walls shall be I fully covered and protected against rain and wind and before continuing work previously laid shall be swept clean. The tops of walls or other unfinished work shall be protected against all damage by frost or the elements by means of waterproof paper, tarpaulins, boards or other means approved by the ENGINEER. 3.03 REPAIR, POINTING AND FINAL CLEANING A. Exposed masonry shall be protected against staining by wall coverings and excess mortar shall be wiped off the surface as the work progresses to reduce need for cleaning at completion of the work. B. Where ordered, remove masonry units which are loose, chipped, broken, stained or 1 otherwise damaged and units which do not match adjoining units and install new units 1 City of Ocoee 04200-10 G&R Project No. 98518.01 in fresh mortar or grout, pointed to eliminate, as approved by the ENGINEER, evidence of replacement. C. Pointing 1. During the tooling of joints, enlarge any voids or holes, except weep holes and completely fill with mortar matching color as approved by the ENGINEER and tool to match. Point-up all joints at corners, openings and adjacent work to provide a neat, uniform appearance and properly prepare joints for application of sealants where required. 2. Before final cleaning, repoint all unsatisfactory joints as specified above and as required by the ENGINEER. D. Acid solutions shall not be used for cleaning CMU, glazed facing tile, glass block or ceramic veneer units. Upon completion of the work, all surfaces of CMU and glazed wall units shall be washed with soap powder and warm water, applied with a scrubbing brush and then rinsed thoroughly with clear water. Other cleaning methods may be ordered to obtain required appearance. Metal cleaning tools and brushes or abrasive powders shall not be used on glazed surfaces. E. Masonry areas not satisfactorily cleanable will be ordered replaced at no extra cost to the OWNER. END OF SECTION City of Ocoee 04200-11 G&R Project No.98518.01 SECTION 06100 CARPENTRY WORK PART 1 GENERAL 1.01 SCOPE OF WORK A. The CONTRACTOR shall furnish all labor, materials, equipment and incidentals required and install all items of rough carpentry work to be completed as shown on the Drawings and as specified herein. B. Set in place, all pressed metal frames which are to be built into walls. Install metal frames which are to be installed in concrete or other finished openings. Install doors and finish hardware furnished under other Sections. 1.02 RELATED WORK(REQUIREMENTS) A. The Contract Documents include, but are not limited to, the following related sections: 1. Wood forms required for concrete work are included in Division 3. 2. Anchor bolts and other metal appurtenances except as specified herein are included in Division 5. 3. Doors and metal frames are furnished under Division 8. 4. Finish hardware is furnished under Division 8. 1.03 REFERENCE STANDARDS A. American Wood Preservers Association(AWPA) 1. AWPA P5 -Waterborne Preservatives B. Architectural Woodwork Institute(AWI) C. Where reference is made to one of the above standards, the revision in effect at the time of bid opening shall apply. PART 2 PRODUCTS 2.01 MATERIALS- ROUGH CARPENTRY City of Ocoee 06100-1 G&R Project No.98518.01 A. All lumber shall be of sound stock, delivered dry and shall be fully protected at all times from injury and dampness. Split, broken, or otherwise damaged pieces will not be allowed in the work. B. Wood for blocking and nailers and for framing shall be seasoned, 19 percent maximum moisture content, Construction Grade quality and of Douglas Fir; Southern Pine or Ponderosa Pine species. All framing lumber shall be identified by the grade mark of a lumber grading inspection agency approved by the local Building Department. Bridging shall be 1-in by 3-in lumber or metal bridging of equal rigidity. 1. Wood members that will contact masonry or concrete shall be vacuum-pressure treated with 100 percent oxide pure chromated copper arsenate meeting AWPA Standard P-5. Minimum net retention of solid preservative shall be 0.40 lb per cu ft. 2. All treatment shall be performed in accordance with the requirements of the Standard Specifications of the American Wood Preservers Association for treating wood. Apply a heavy coat of the same preservative used in treating to all surfaces cut after treatment. C. Nails, spikes, bolts, nuts and washers where sizes are not indicated or specified, shall be of suitable size and number as approved to securely fasten and hold members in place. Hot dip galvanize after fabrication except where stainless steel is shown. PART 3 EXECUTION 3.01 INSTALLATION A. All rough carpentry shall be accurately cut, fitted and installed as detailed. be installed, where indicated or required,to anchor carpentry securely to B. Anchors shall eq masonry or concrete. C. Forms for structural concrete work shall be as specified under Division 3. Provide all other miscellaneous wood form work as may be required for the completion of the work. D. Temporary wood doors and cloth or transparent plastic covered frames shall be provided for exterior wall openings during winter construction. E. Installation of Doors and Finish Hardware: 1. Doors and finish hardware will be furnished under Division 8 and shall be installed under the work of this Section, except where specifically designated otherwise herein. 2. As soon as the hardware is delivered to the job site, receive, verify and check each set and report to the ENGINEER any defect or shortage. Give notice to the City of Ocoee 06100-2 G&R Project No.98518.01 hardware supplier for all such items which maybe defective or missing. Provide a PP receipt to the hardware supplier for all such items as are found to be correct. 3. Finish hardware, after checking, shall be the responsibility of the CONTRACTOR until it is installed and the project is accepted in its entirety by the OWNER 4. Install metal and wood doors to comply with MANUFACTURER's instructions and with referenced wood door standards for wood doors, all as shown. metal doors accuratelyintheir 5. Fit non-fire-rated respective frames, with the following clearances: a. Jambs and Head-3/32-in. b. Meeting Edges, Pairs of Doors- 1/8-in. c. Bottom-3/8-in, where no threshold. d. Bottom- 1/8-in, at threshold. 7. Fit fire-rated doors with clearances as required by NFPA Standard No. 80. 8. Hardware shall be attached and placed by skilled mechanics in accordance with approved hardware templates provided with the hardware and shall be accurately fitted and adjusted. Lever handles shall be kept covered with heavy cloth and other hardware shall be protected from damage until final acceptance of the entire project by the OWNER 9. Set each edge and joint of threshold in a seal strip of polyurethane sealant. Grout remainder of threshold in mortar. 1 10. Adjust and check each operating item of hardware and each door, to ensure proper operation or function of every unit. Lubricate moving parts with type lubrication recommended by MANUFACTURER(graphite-type if no other recommended). Replace units which cannot be adjusted and lubricated to operate freely and smoothly as intended for the application made. 11. Wherever hardware installation is made more than one month prior to acceptance or occupancy of a space or area, return to the work during the week prior to acceptance or occupancy and make a final check and adjustment of all hardware items in such space or area. Clean and relubricate operating items as necessary to restore proper function and finish of hardware and doors. Adjust door control devices to compensate for final operation of heating and ventilating equipment. City of Ocoee 06100-3 G&R Project No.98518.01 12. All doors shall be in complete and proper operating condition. Remove and replace defective work, including doors or frames that are warped,bowed, or otherwise unacceptable. 13. Immediately after erection, sand smooth all rusted or damaged areas of prime coat on steel and apply touch-up of compatible air-drying primer. END OF SECTION 3I 3 I 3 I I 3 City of Ocoee 06100-4 G&R Project No.98518.01 SECTION 07100 WATERPROOFING AND DAMPPROOFING PART 1: GENERAL 1.01 SCOPE OF WORK A. Furnish all materials, labor, equipment, and incidentals required to perform all the waterproofing and dampproofing, and related work necessary for the proper completion of the project as required by the Drawings and as specified herein. 1.02 APPLICATION SCHEDULE k Masonry water repellent shall be provided on exterior exposed masonry. B. Vapor barrier shall be supplied under interior building slabs on grade. 1.03 RELATED WORK A. Concrete work is included in Division 3. B. Masonry is included in Section 04200. 1.04 SUBMITTALS A. Submit to the ENGINEER for review in accordance with the provisions of Section 01300, shop drawings, working drawings, and product data including detailed product information and colors on materials proposed and material installation methods. B. Submit for review two sets of representative samples of any or all other proposed materials required for the work of this Section, as requested by the ENGINEER. 1.05 REFERENCE SPECIFICATIONS A. American Society for Testing and Materials(ASTM) 1. ASTM D822 -Recommended Practice for Operating Light-and Water-Exposure Apparatus(Carbon Arc Type)for Testing Paint, Varnish,Lacquer, and Related Products 2. ASTM D968 - Test Method for Abrasion Resistance of Organic Coatings by the Falling Abrasive Tester 3. ASTM D1149 - Test Method for Rubber Deterioration Surface Ozone Cracking in a Chamber(Flat Specimens) City of Ocoee 07100-1 G&R Project No. 98518.01 4. ASTM D1653 - Test Method for Water Vapor Transmission of Organic Coating Films 5. ASTM D2369 - Test Method for Volatile Content of Coatings 6. ASTM D2805 -Test Method for hiding Power of Paints by Reflectometry 7. ASTM D3083 - Specification for Flexible Polyvinyl Chloride Plastic lining Sheeting for Road, Canal and Reservoir 3 8. ASTM D5201 -Practice for Calculating Formulation Physical Constants of Paints and Coatings 9. ASTM E96-Test Methods for Water Vapor Transmission Materials 10. ASTM E154-Method of Testing Materials for Use as Vapor Barriers Under Concrete Slabs and as Ground Cover in Crawl Spaces. 11. ASTM G26 -Recommended Practice forOp erating Light-Exposure Apparatus (Xenon Arc Type)With and Without Water for Exposure of Nonmetallic Materials B. Federal Specifications 1. FS-TT-P-19 -Paint, Acrylic Emulsion: Exterior 2. FS-SS-S-1996 - Sealer, Water, and Weather Resistance for Masonry Surfaces. PART 2: PRODUCTS 2.01 MATERIALS A Masonry Water Repellent(Exterior Exposed Masonry) I 1. Masonry water repellent shall be a clear non-silicone based product with solids in complete solution. The solution shall be non-staining. The solids shall be of a non-diminishing type and shall be come an integral part of masonry. Masonry water repellent shall be water based, V.O.C. compliant Hydrozo Enviroseal Double Seven for block or approved equivalent. B. Vapor barrier shall be 10 mil thick polyethylene sheet with a vapor transmission rating of 0.20 perms or less. The material shall conform to ASTM E154. PART 3: EXECUTION I 3.01 INSTALLATION City of Ocoee 07100-2 G&R Project No. 98518.01 ■ L A Installation of Masonry Water Repellent 1. Water repellent shall be applied only after all joints have been caulked and properly cured. Surfaces shall be clean and free from excess dust. New masonry surfaces shall be allowed to cure 30 days prior to application. Surfaces shall receive two complete coats at rates recommended by the MANUFACTURER. The complete installation shall be applied from the bottom-up and in strict compliance with the MANUFACTURER'S instructions. 2. Apply clear waterproofing using brush or airless sprayer as recommended by MANUFACTURER and demonstrated at project mock-up panel. B. Installation of Vapor Bather 1. Vapor barrier shall be installed under all interior slabs-on-grade. Laps between adjacent sheets shall be 10-in minimum. Vapor bather will be carefully inspected prior to concrete placement, by the ENGINEER. Additional polyethylene sheet required for repair and replacement of damaged vapor bather shall be furnished and installed by the CONTRACTOR as directed by the ENGINEER at no additional cost to the OWNER 3.02 CLEAN UP A. At all times keep the premises free from accumulation of waste materials and rubbish. At the completion of the installation remove all tools, scaffolding and surplus materials and remove all of the rubbish from and above the area. B. Remove materials from surfaces where the materials are not required to produce a clean, neat, workmanlike job. END OF SECTION 1 City of Ocoee 07100-3 G&R Project No. 98518.01 SECTION 07900 JOINT SEALERS PART 1 GENERAL 1.01 SCOPE OF WORK A. Furnishequipment,all materials, labor, i ment, and incidentals required to perform all caulking, sealants,joint fillers, and related work necessary for the proper completion of the project as required by the Drawings and as specified herein. 1.02 APPLICATION SCHEDULE A. Caulk all exterior wall joints,between adjacent materials,joints between frames or louvers and adjacent materials, copings, masonry control joints, and all other joints shown on the Drawings or required for the completion of the work. Joints noted as "caulk," "caulking," or "sealant" shall be caulked as specified herein. B. Caulk all interior joints between frames and masonry, at tops of masonry walls, between masonry and structural concrete, floor joints in tile,joints in rooms to be airtight, and all other joints shown on the Drawings or required for the completion of the work. C. Compressible filler. 1.03 RELATED WORK A. Glazing is included in Section 08800. 1.04 SUBMTITALS A. Submit to the ENGINEER for review in accordance with the provisions of Section 01300, shop drawings, working drawings, and product data including detailed product information and colors on materials proposed and material installation methods. B. Submit for review two sets of special-colored sealant samples in representative quantities. Resubmit until approved. C. Submit for review two sets of representative samples of any or all other proposed materials required for the work of this Section as requested by the ENGINEER. 1.05 REFERENCE SPECIFICATIONS SocietyTesting A. American for and Materials (ASTM): City of Ocoee 07900-1 G&R Project No. 98518.01 1 3 1. ASTM C920- Specification for Elastomeric Joint Sealants 2. ASTM D395 -Test Methods for Rubber Property- Compression Set 3. ASTM D412-Test Methods for Rubber Properties in Tension 4. ASTM D573 -Test Method for Rubber-Deterioration in an Air Oven 5. ASTM D695 - Test Method for Compressive Properties of Rigid Plastics p P 6. ASTM D790-Test Methods for Flexural Properties of Unreinforced and3 Reinforced Plastics and Electrical Insulating Materials 7. ASTM D1002- Test Method for Strength Properties of Adhesives in Shear Tension Loading(Metal to Metal) 8. ASTM D1149 - Test Method for Rubber Deterioration- Surface Ozone Cracking 3 in a Chamber(Flat Specimens) 9. ASTM D1708 - Test Method for Tensile Properties of Plastics by Use of Microtensile Specimens 10. ASTM D2228 - Test Method for Rubber Property-Abrasion Resistance(Pico Abrader) 11. ASTM D2240- Test Method for Rubber Property-Durometer Hardness B. Federal Specifications 3 1. FS-HH-F-341 -Fillers, Expansion Joint;Bituminous(Asphalt and Tar) and Nonbituminous(Preformed For Concrete) 3 C. Sealants and Waterproofers Institute(SWI) PART 2 PRODUCTS 2.01 MATERIALS A. Caulking 1. Standards dards a. SWI I City of Ocoee 07900-2 G&R Project No. 98518.01 1 k b. ASTM C920 2. All colors for caulking above grade in the superstructure of the building shall be selected by the ENGINEER 1 3. Exterior and interior sealant for joints on the horizontal plane shall be a two-part, pour grade polyurethane base, ASTM C920-87 Type M, Grade P, Class 25, THC-900 by Tremco; Sonolastic SL2 by Sonneborn; or equal. Primer shall be as recommended by the MANUFACTURER. 4. Exterior and interior sealant for joints on all other surfaces shall be a one-part, gun grade, polyurethane ASTM C920-87 Type S, Grade NS Class 25,Dymonic by Tremco; Sonolastic NP1 by Sonneborn; or equal. Primer shall be as recommended by the MANUFACTURER 5. Joint backing for joints in superstructure shall be approved closed cell polyethylene rods of diameters to suit joint conditions. Where joint depth will not allow for a rod and still provide 1/4-in. minimum depth of sealant, provide approved bond breaker tape at the bottom of the joint. IB. Compressible filler shall be foamed polyurethane strip saturated with polybutylene waterproofing material. When compressed to 50 percent of its original volume, filler shall hold a head of 6 ft. of water, and a head of 10 ft. of water when compressed 60 percent. Filler shall maintain its resiliency to allow for installation in temperatures as slow as 40°F. Filler shall remain waterproof at 50 percent compression between temperatures of-40°F and 200°F. Elongation shall be at least 325 percent with a tensile strength of not less than 53 psi. It The polybutylene compound shall not migrate in the polyurethane strip. Compressible filler shall be Polytite by Sandell Manufacturing Company; Combriband by Secoa Corporation, Division of Phoenix Building Products, Incorporated; or equal. PART 3 EXECUTION 3.01 INSTALLATION CA IVGTaAAaT LOV op XavXK Lvy joints All joints to receive sealant shall be cleaned, primed, backfilled, and caulked in complete accordance with the MANUFACTURER's instructions. 2. Sealant shall be applied generally to a square section configuration. Minimum depth of joint shall be 1/4-in. and maximum '/-in. For joints greater than '/-in. wide, provide sealant in a 2 to 1 width-to-depth ratio. ICity of Ocoee 07900-3 G&R Project No. 98518.01 I 3. The surfaces of all materials adjoining caulked jo ints shall be cleaned free of all 3 smears of sealant or other soiling due to caulking operations. B. Installation of Compressible Filler 1. Install compressible filler according to the MANUFACTURER's written instructions for the situation where it is used. END OF SECTION 3 3 I I 3 I I I I City of Ocoee 07900-4 G&R Project No. 98518.01 SECTION 08110 STEEL DOORS AND FRAMES PART 1 GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required and deliver the following as shown on the Drawings and as specified herein. 1. Steel hollow-metal doors. 2. Pressed-metal door and glass frames. 3. All fasteners, frame closure pieces, system reinforcing and appurtenances required. 4. Doors, frames and components shall be galvanized steel. 1.02 RELATED WORK A. Installation of doors is included in Section 06100. Installation of frames in completed openings is included in Section 06100 but as specified herein. B. Field painting is included in Section 09902. C. Finish hardware is included in Section 08710. 1.03 SUBMITTALS A. Submit to the ENGINEER as provided in Section 01300, shop drawings of all metal doors, frames and appurtenances. 1. Shop drawings shall show elevations and details of each frame type, schedule of doors and frames, door elevations and details, conditions at openings with various wall thicknesses and materials, location and installation requirements for hardware, thickness of materials,joints and connections and trim. B. Hardware templates shall be furnished to the door manufacturer by the CONTRACTOR for correct hardware alignment and reinforcing. C. Provide samples and certification as follows: 1. Door frame corner with 6-in long legs showing construction with the galvanized material specified, welding, touch-up and priming. City of Ocoee 08110-1 G&R Project No.98518.01 2. Door panel corner, 6-in square, showing door and insulating materials, construction and finishing as specified above. 3. Provide certification as approved that all materials, construction requirements and fire ratings herein specified will be met in the project. 1 4. If required by ENGINEER, provide independent laboratory testing, conforming to ASTM E376, of galvanized coating on samples of the door and frame submitted for3 approval to confirm thicknesses of zinc on base metal. 1.04 REFERENCE STANDARDS A. American Society for Testing and Materials(ASTM) 1. ASTM A153 - Specification for Zinc Coatings(Hot-Dip) on Iron and Steel Hardware. 2. ASTM A525 - Standard Specification for General Requirements for Steel Sheet, Zinc-Coated(Galvanized)by the Hot-Dip Process. 3 3. ASTM A526 - Specification for Steel Sheet, Zinc-Coated(Galvanized)by the Hot-dip Process, Commercial Quality. 4. ASTM E376-Practice for Measuring Coating Thickness by Magnetic-Field or Eddy-Current(Electromagnetic)Test Methods. 3 B. American National Standards Institute(ANSI) 3 1. A115 - Specification for Preparation of Steel Doors and Frames for Hardware. C. National Fire Protection Association(NFPA) 3 1. NFPA Standard No. 80 -Fire Doors and Windows. D. Underwriters Laboratories, Inc. (UL) E. Where reference is made to one of the above standards, the revision in effect at the time of bid opening shall apply. 1.05 QUALITY ASSURANCE 3 A. Provide custom hollow metal work manufactured by a single firm specializing in the production of this type of work. Hollow metal work shall conform to Hollow Metal Manufacturers Association(Division of National Association of Architectural Metal 3 City of Ocoee 08110-2 G&R Project No.98518.01 Manufacturers standards for commercial hollow metal doors and frames except where more stringent requirements are specified herein. B. Provide custom hollow metal work by one of the following or equal: 1. Overly Manufacturing Co. 2. Firedoor of Florida 3. Curries Hollow Metal C. Provide fire-rated hollow metal doors and frames investigated and tested as fire door assemblies, complete with type of fire door hardware to be used. Identify each fire door and frame with Underwriters Laboratories labels, indicating applicable fire rating of both door and frame. Construct assemblies to comply with NFPA Standard No. 80 and as herein specified. 1 1.06 DELIVERY, STORAGE AND HANDLING A. Deliver materials in manufacturer's original unopened and undamaged packages with labels legible and intact. Doors and panels shall be individually wrapped in corrugated cardboard with wood strips on vertical edges and banded with metal straps. Store materials in unopened packages in a manner to prevent damage from the environment and construction operations. Handle in accordance with manufacturer's instructions. PART 2 PRODUCTS 2.01 MATERIALS A. Galvanized steel sheets -Zinc-coated carbon steel sheets of commercial quality, complying with ASTM A526, with ASTM A525, G60 zinc coating, mill phosphatized. B. Zinc-rich touch-up primer- 95 percent metallic zinc dust primer in a vehicle compatible with the specified painting system. C. Supports and anchors-Fabricate of not less than 16 gauge sheet metal. Galvanize after 1 fabrication units complying with ASTM A153, Class B. D. Inserts, bolts and fasteners-Hot-dip galvanize, complying with ASTM A153, Class C or D as applicable. E. Rust inhibitive primer- Air drying or baking type as approved compatible with epoxy finish paints. Provide non-standard primer if required to obtain approval for compatibility. 2.02 FABRICATION, GENERAL City of Ocoee 08110-3 G&R Project No.98518.01 I 3 A. Fabricate metal units to be rigid, neat in appearance, and free from defects, warp, or buckle. Accurately form metal to required sizes and profiles. Fit and assemble units in the MANUFACTURER's plant including units which are approved to be partially disassembled and field spliced. Weld exposed joints continuously; grind, dress and make smooth, flush and invisible. Metallic filler to conceal manufacturing defects is not acceptable. Clearly identify work that cannot, where approved,be permanently factory-assembled before shipment, to assure proper assembly at the project site. B. Exposed fasteners-Unless otherwise indicated, provide countersunk flat phillips heads for exposed screws and bolts. 1 C. Prepare metal units to receive mortised and concealed finish hardware, including cutouts, reinforcing, drilling and tapping in accordance with final Finish Hardware Schedule and templates provided by hardware supplier. Comply with applicable requirements of ANSI A 115 series specifications for door and frame preparation for hardware. D. Reinforce metal units to receive surface-applied hardware. Drilling and tapping for surface-applied finish hardware may be done at project site. E. Shop Painting- Clean, treat and paint exposed galvanized surfaces of fabricated metal • units. 1. Clean steel surfaces of mill scale, rust, oil, grease and other foreign materials and apply approved zinc-rich primer to galvanized surfaces damaged in fabrication. 2. Apply pretreatment to cleaned metal surfaces, using cold phosphate solution or hot PPYP P phosphate solution. 3 3. Apply one full shop coat of rust inhibitive primer within time limits recommended by pretreatment manufacturer. Apply a smooth coat of even consistency to provide a uniform dry film thickness of not less than 2.0 mils. 2.03 DOORS A General 1. Provide flush design doors, 1-3/4-in thick, seamless hollow construction, unless otherwise indicated. 2. For single-acting swing doors, bevel both vertical edges 1/8-in in 2-in. 3 3. Provide filler of mineral-wool or other approved insulating material solidly packed full door height to fill voids between inner core reinforcing members. No asbestos products will be allowed. I City of Ocoee 08110-4 G&R Project No.98518.01 B. Galvanized Steel Doors 1. Fabricate doors of two outer, galvanized, stretcher-leveled steel sheets not less than 16 gauge. Construct doors with smooth, flush surfaces without visible joints or seams on exposed faces or stile edges. Provide weep hole openings in the bottom of doors to permit escape of entrapped moisture. 2. Reinforce inside of doors with vertical galvanized sheet steel sections not less than 22 gauge. Space vertical reinforcing 6-in o.c. and extend full door height. Spot-weld at not more than 5-in o.c. to both face sheets. 3. Reinforce tops and bottoms of doors with 16 gauge horizontal steel channels welded continuously to outer sheets. Close top and bottom edges to provide seal, as integral part of door construction while providing recesses for required hardware and appurtenances. C. Finish hardware reinforcement-Reinforce doors using galvanized steel for required finish hardware, as follows: 1. Hinges- Steel plate 3/16-in thick by 1-1/2-in wide by 6-in longer than hinge, secured by not less than six spot-welds. 2. Mortise locksets and dead bolts- 14 gauge steel sheet, secured with not less than two spot-welds. 3. Cylinder locks- 12 gauge steel sheet, secured with not less than two spot-welds. 4. Flush bolts- 12 gauge steel sheet, secured with not less than two spot-welds. steel sheet,Surface-applied closers- 12 gauge secured with not less than six spot-welds. 6. Push plates and pull handles- 16 gauge steel sheet, (except when through bolts are shown or specified), secured with not less than two spot-welds. 7. Other required comparable reinforcements as submitted and approved. 2.04 FRAMES A. Provide pressed metal frames for doors, side-lights, borrowed lights and for other openings where shown, of size and profile as indicated. B. Fabricate frames of full-welded unit construction, with corners mitered, reinforced, continuously welded full depth and width of frame. No field spliced frames will be allowed. City of Ocoee 08110-5 G&R Project No.98518.01 3 C. Form frames of 14 gauge galvanized steel sheets. D. Finish hardware reinforcement-Reinforce frames using galvanized steel for required finish hardware, as follows: 1. Hinges - Steel plate 3/16-in thick by 1-1/2-in wide by 6-in longer than hinge, secured by not less than six spot-welds. 2. Strike plate clips- Steel plate 3/16-in thick by 1-1/2-in wide by 3-in long. 3 3. Surface-applied closers- 12 gauge steel sheet, secured with not less than six spot-welds. 4. Other required comparable reinforcements as submitted and approved. E. Mullions and transom bars-Provide closed or tubular mullions and transom bars where indicated. Fasten mullions and transom bars at crossings and to jambs by butt welding. Reinforce joints between frame members with concealed clip angles or sleeves of same metal and thickness as frame. F. Where installed in masonry, leave vertical mullions in frames open at top for grouting. G. Jamb anchors-Furnish jamb anchors as required to secure frames to adjacent construction, formed of not less than 18 gauge galvanized steel. 1. Masonry construction-Adjustable, flat, corrugated, or perforated, t-shaped to suit frame size, with leg not less than 2-in wide by 10-in long. Provide U.L. approved fixed anchors at labelled openings. Furnish at least three anchors per jamb up to 7-ft-6-in height;four anchors up to 8-ft-0-in jamb height; one additional anchor for3 each 24-in or fraction thereof over 8-ft-0-in height. 2. In-place concrete or masonry-Anchor frame jambs with minimum 3/8-in concealed3 bolts into expansion shields or inserts 6-in from top and bottom and 26-in o.c., unless otherwise shown. Reinforce frames at anchor locations. Apply removable stop to cover anchor bolts unless otherwise indicated. H. Floor anchors-Provide floor anchors for each jamb and mullion which extends to floor, formed of not less than 14 gauge galvanized steel sheet, as follows: 3 1. Monolithic concrete slabs- Clip type anchors, with two holes to receive fasteners, welded to bottom of jambs and mullions. ti I. Head reinforcing-For frames over 4-ft-0-in wide in masonry wall openings, provide continuous steel channel or angle stiffener, not less than 12 gauge for full width of 3 opening, welded to back of frame at head. I City of Ocoee 08110-6 G&R Project No.98518.01 E - J. Spreader bars-Provide removable spreader bar across bottom of frames, tack welded to jambs and mullions. K. Plaster8uards-Provide 26 gauge galvanized steel plaster guards or dust cover boxes, welded to frame, at back of finish hardware cutouts where mortar or other materials might obstruct hardware installation. 2.05 STOPS-DOORS AND FRAMES A. Provide stops in frames to receive glass and doors, where indicated and as shown. B. Form fixed stops integral with frame unless otherwise indicated. 1 C. Provide removable stops where indicated or required, on secured room side of opening, formed of not less than 18 gauge steel sheets. Secure with oval head machine screws spaced uniformly not more than 12-in o.c. Form corners with butted hairline joints. D. Coordinate width of rabbet between fixed and removable stops with type of glass and type of installation indicated. PART 3 EXECUTION 3.01 INSTALLATION A. Install hollow metal units and accessories in accordance with approved shop drawings, MANUFACTURER's data and as specified herein. B. Setting masonry anchorage devices-Provide masonry anchorage devices where required for securing hollow metal frames to in-place concrete or existing masonry construction. Set anchorage devices opposite each anchor location, in accordance with details on shop drawings and anchorage device manufacturer's instructions. Leave drilled holes rough, not reamed and free from dust and debris. C. Placing Frames- Set frames accurately in position, plumbed, aligned, and braced securely until permanent anchors are set. After wall construction is complete, remove temporary braces and spreaders leaving surfaces smooth and undamaged. 1. In new masonry construction, coordinate frame setting with and prior to the building of masonry walls. Provide the required anchors for building in place. 2. At in-place concrete or masonry construction, set frames and secure in place with machine screws and masonry anchorage devices. 3. Place frames at fire-rated openings in accordance with NFPA Standard No. 80. City of Ocoee 08110-7 G&R Project No.98518.01 I 4. Remove spreader bars only after er frames or bucks have been properly set and 3 secured. 3.02 ADJUSTMENT AND TOUCH-UP A. Leave work in complete and proper operating condition. Remove and replace defective 3 work, including doors or frames which are warped,bowed or otherwise unacceptable. B. Immediately after erection, sand smooth any rusted or damaged areas of prime coat and3 apply touch-up of compatible air-drying primer. 3 END OF SECTION I 3 I I I I I I 1 City of Ocoee 08110-8 G&R Project No.98518.01 SECTION 08331 OVERHEAD ROLL-UP DOORS PART 1 GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required and install door as shown on the Drawings and as specified herein. 1. Roll-up type, overhead steel door, insulated, with insulated vision lites and with electric motor operation. 1.02 RELATED WORK A. Finish painting is included in Section 09902. 1.03 SUBMITTALS A. Submit to the ENGINEER as provided in Section 01300, complete shop drawing, working drawings, and product data including dimensions, locations, materials, construction, tracks, hardware, bracing, electric motor operator specifications, door guides, appurtenances and installation details of door proposed. 1 1.04 DELIVERY, STORAGE AND HANDLING A. Deliver materials in MANUFACTURER's original, undamaged protective coverings with labels legible and intact. Store materials in protective coverings in a manner to prevent damage from the environment and construction operations. B. Handle in accordance with the MANUFACTURER's instructions. PART 2 PRODUCTS 2.01 GENERAL A. Exterior door and components shall withstand wind pressures, both positive and negative and salient corner conditions as calculated in accordance with the Building Code to meet project wind loading. B. Provide additional, non-standard door bracing, reinforcements, or heavier gauge materials required to conform to wind load. City Of Ocoee 08331-1 G&R Project No.98518.01 3 2.02 OVERHEAD ROLL-UP DOOR A. Exterior roll-up door shall be mounted on the inside wall, equal to Model T43-PS, thermal series slat T3 with insulated vision lites, as manufactured by Atlas Door Corp., equal by Cookson,North American, or equal. Curtain shall be of interlocking slats of 3 galvanized steel. Slats shall give curtain adequate strength to safely resist wind load specified. Each slat shall be formed of two galvanized steel layers enclosing an 11/16- inch foamed in placed layer of polyurethane insulation. Slats shall have endlocks locking each end of every slat and to act as wearing surface and maintain slat alignment. Provide windlocks of same material as required to meet project wind load. B. The counterbalance,coil brackets, and hood shall be fabricated in accordance with the MANUFACTURER's standard practice. The coil shall be housed in an 20 gauge galvanized steel hood laterally reinforced. Guides shall be fabricated of structural steel of sufficient size,thickness and of depth to retain the curtains in the guides against the project wind load. Guides shall be provided with anchors and continuous weld-on wind lock bars, all galvanized after fabrication. C. Close space around hood barrel with an air baffle attached to hood connection. Air baffle shall extend full length of barrel. Provide sealing strips on both guides. D. Provide approved heavy duty slide bolt with padlocking capability at both jambs, locking into cutouts in guides. E. Provide approved neoprene weatherstripping at interior on each guide and in hood. PP Guides shall consist of structural steel angles of size and thickness to provide adequate slat penetration to satisfy windloading. F. Insulated Vision Lites shall be of clear double clear acrylic plastic sections over individual cut outs 5"wide by 3/e"high in sets of three cut outs one slat high, 3 cut outs wide (standard accessory by Atlas Door Corporation.) G. Electric Door Operators 1. General: Furnish electric door operator assembly of the size and capacity recommended and provided by the door manufacturer; complete with electric motor3 and factory-prewired motor controls, gear reduction unit, solenoid operated brake, clutch, remote control stations, and control devices. 2. Provide a hand-operated disconnect or a mechanism for automatically engaging a sprocket and chain operator and releasing brake for emergency manual operation. Mount disconnect and operator so that they are accessible from floor level. Include 3 an interlock device to automatically prevent the motor from operating when emergency operator is engaged. 3 City Of Ocoee 08331-2 G&R Project No.98518.01 1 1 3. Design operator so that motor may be removed without disturbing the limit-switch adjustment and without affecting the emergency auxiliary operator. 4. Door Operator Type: Provide wall or bracket-mounted door operator units consisting of an electric motor, a worm gear drive from motor to reduction gear box, a chain or worm gear drive from reduction box to a gear wheel mounted on the counterbalance shaft, and a quick-clutch disconnect-release for manual operation. Provide motor, clutch, and drive assembly of horsepower and design as determined by the door manufacturer for the size of door required and as herein specified. 5. Electric Motors a. Provide high-starting torque, reversible, constant duty, Class A insulated electric motors with overload protection. b. Provide motors with the following horsepower ratings sized to move door in either direction, from any position, at not less than 8 inches per second nor more than 12 inches per second: 1) Minimum 1-horsepower, 460-volt -max 11/2 -horsepower 460-volt. c. Coordinate wiring requirements and current characteristics of motors with the building electrical system; see Division 16 Sections of these Specifications. H. Remote Control Station a. Provide momentary-contact, 3-button control stations with pushbutton controls labeled "open," "close," and "stop." Install at location as shown or scheduled. b. Provide interior units, full-guarded type, surface-mounted, heavy-duty, with general purpose NEMA 1 enclosure, unless otherwise shown. I. Safety Edge Device: Provide each door with a pneumatic safety switch, extending full width of the door bottom, and locate within a U-shaped neoprene or rubber astragal mounted to the bottom door rail. Design the unit to operate such that contact with theswitch before fully closing will immediately stop the downward travel and reverse the direction to the fully opened position. Connect to the control circuit through a retracting safety cord. The compressible strip shall also serve as a weatherseal along the bottom of the door. 2.03 FINISH A. All steel components and hardware shall be galvanized. City Of Ocoee 08331-3 G&R Project No.98518.01 3 3 B. Galvanizing shall be of zinc applied by a hot-dipped process. For sheet steel, zinc shall be applied at not less than 0.90 ounces per square foot of steel and in a manner as to provide a ductile coating, tightly adherent to base metal, and conforming to bend tests conducted in accordance with ASTM A525. Structural shapes and similar heavy steel shall be galvanized per ASTM A123 and A153 as applicable. Provide a phosphate coating for paint adhesion at the factory. The MANUFACTURER's certificate shall be furnished to the ENGINEER stating that galvanizing has been done in accordance with these specifications. C. Galvanized components shall be shipped with surface treatment for priming and finishing in the field. Baked-on,prime painted surfaces which are compatible with the finished paint specified in Division 9 may be acceptable if approved. PART 3 EXECUTION 3.01 INSTALLATION A. Door and components shall be installed and adjusted in accordance with the details shown and the approved shop drawings. B. Door shall be tested for full and effective operation by the ENGINEER. C. Make required adjustments to provide operation as approved. END OF SECTION 3 I I I I City Of Ocoee 08331-4 &Ityiocct No.98518.01 SECTION 08710 FINISH HARDWARE PART 1 GENERAL 1.01 SCOPE OF WORK A. Furnish and deliver to the project site all finish hardware for hinged doors as hereinafter specified and scheduled. Provide padlocks as specified and in quantity scheduled. B. Furnish all templates and schedules required by the manufacturers of the metal doors and frames to enable the MANUFACTURER's to make proper provision in their work to receive the finish hardware. All locks, lock strikes and flush bolts shall be made to ANSI standard dimensions. 1.02 RELATED WORK A. Installation of hardware is included under Section 06100. B. Doors are included in Division 8. 1.03 SUBMITTALS A. Samples 1. If required by the ENGINEER, a sample of each item of hardware proposed for use shall be submitted for approval. B. Hardware Schedules 1. Submit to the ENGINEER a complete hardware schedule as provided in Section 01300 for shop drawings. Provide catalogue cuts for each item of hardware. 2. No templates shall be distributed until the hardware schedule and any required samples have been approved by the ENGINEER 3. Provide approved physical hardware items to door manufacturers as required for fabrication onto doors. 1.04 QUALITY ASSURANCE A. The hardware supplier shall have in his/her employ one or more members of the American Society of Architectural Hardware Consultants, who shall be responsible for the preparation and execution of the work of this Section. City of Ocoee 08710-1 G&R Project No.98518.01 I 1.05 DELIVERY, STORAGE AND HANDLING A All hardware shall have the required screws, bolts and fastenings necessary for proper installation, wrapped in paper and packed in the same package as the hardware. Each package shall be legibly labeled, indicating that portion of the work for which it is3 intended. PART 2 PRODUCTS 2.01 MATERIALS A. All hardware shall be best grade, entirely free from imperfections in manufacture and finish. Qualities,weights and sizes specified herein are the minimum that will be accepted. All UL labelled doors shall have UL approved hardware, except that hinges which are not UL approved shall have a melting point of greater than 2000 degrees F. B. Hardware Items 3 1. Hinges - Stainless steel, Stanley FBB191, 4-1/2-in by 4-1/2-in interior and FBB199, 5-in by 4-1/2-in exterior. Equals -Hager, McKinney. 2. Locksets- Sargent 8200 Series, with LNL lever and rosette with wrought box strike, stainless steel, six pin cylinders. Furnish in 8205 operation unless otherwise scheduled. Equals- Corbin Russwin ML2200 Series,NSA Design. Sargent350 Series with rust inhibitor in 3. Door Closers- hydraulic fluid. Covers shall be primed compatible with finished paint specified except with plastic covers, no priming required. Provide with cushion stop arm where no separate stop is provided3 and with other arm functions as scheduled. Equals-LCN4040 Series. 4. Kick Plates - Stainless Steel, 8-in high by 0.050-in thick by 2-in less width of door (LWOD), 1-in LWOD, at double doors. 5. Stops - Ives 436 or 438 as required by floor condition. Other stops as scheduled. Equals-Baldwin, Quality. 6. Flush Bolts-Ives 12-in, self latching type-No. 357, UL listed. Equals-Baldwin, 3 Glynn-Johnson. 7. Sound/Weather Seals -Zero 360 Mortised automatic door bottom x Zero 328 1 Surface type head and jambs. Meeting stile astragal -Zero 328 each leaf on inside. All clear aluminum except provide in bronze anodized finish at bronze anodized doors. Equals-Pemko, Reese. 8. Silencers- Glynn-Johnson GJ 64. Equals-Baldwin, Quality. I City of Ocoee 08710-2 G&R Project No.98518.01 1 9. Thresholds-Zero 655 5-in thresholds in aluminum. Equals -Pemko,Reese. 10. Exit Devices- Sargent 80 Series, all as scheduled. Stainless steel assemblies, covers and crossbars. Equal -Von Duprin. -GlynnJohnson GJ CORxCB1 with required length 11. Coordinator(with Carry Bar) eq of filler bar for full door head width. Primed finish. 12. Chain Bolts- Stanley SP1055, zinc plated, 6-in cases, 8-ft chains. Provide heavy duty barrel bolts, Stanley 1084-8-in zinc plated in conjunction with chain bolts. C. Closers shall be sized as recommended by MANUFACTURER and as approved for size and location of door served. D. On exterior doors, provide hinges with pins not removable when door is closed. Provide 1/2 pair hinges for each 2-ft-6-in or part thereof of door height. E. Provide sound seals where required in Door Schedule for particular doors and frames. F. Provide type of threshold required by the Door Schedule for particular doors and provide weather seals at exterior doors. G. Provide three silencers in lock side jamb of single doors and four silencers in head of double doors. No silencers are required at doors with sound/weather seals. 2.02 FINISHES A. Base metal for Hardware Items 1, 2, 4 and 10 shall be stainless steel. Base metal for Hardware Items 5 and 6 shall be bronze or brass. B. Finish 1. Stainless steel finish shall be US32D. 2. Chrome plated, bronze or brass finish shall be US26D. 2.03 KEYING A. All cylinder locks including padlocks shall be masterkeyed into the existing set at the site as approved. All cylinders shall be construction keyed for CONTRACTOR's use during construction period. Install permanent cylinders when directed. B. Furnish: 1. Three masterkeys City of Ocoee 08710-3 G&R Project No.98518.01 2. Two Change keys with each lock 3 3. Three Construction day keys PART 3 EXECUTION 3.01 SCHEDULE OFHARDWARE SETS A. The following general hardware sets represent hardware for one opening(single or pair of doors). Refer to Materials paragraphs above for additional items required under specified conditions. The quantities of each set are the responsibility of each bidder. The actual content of each set shall be determined by approved hardware sets. HW 1 - Single Exterior Doors Hinges 1 8813 ETL Exit Device 1 Closer-Hold Open Arm 1 Kickplate 3 HW 2- Single Interior Doors (unless otherwise noted) Hinges 1 Lockset 1 Closer 1 Stop 1 Kickplate END OF SECTION 3 I 3 I City of Ocoee 08710-4 G&R Project No.98518.01 SECTION 08800 GLAZING PART 1 GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required and install all glass and glazing as shown and as specified herein. 1.02 SUBMITTALS A. Submit to the ENGINEER two representative samples of each type glazing material specified below. Provide samples of glass in 12-in square minimum size. Resubmit any or all as required until approved. B. Submit to the ENGINEER, as provided in Section 01300, full size shop drawings showing step-by-step glass setting and sealing procedures. Submit certification that wired glass is UL tested and approved. 1.03 REFERENCE STANDARDS A. American Society for Testing and Materials(ASTM). 1. ASTM E774- Specification for Sealed Insulating Glass Units. B. Underwriters Laboratories Inc. (UL). C. National Fire Protection Association(NFPA). standards,Where reference is made to one of the above the revision in effect at the time of bid opening shall apply. 1.04 DELIVERY, STORAGE AND HANDLING A. All materials for the work of this Section shall be delivered, stored and handled so as to preclude damage of any nature. All glazing shall be delivered and stored in its original container, plainly marked with identification of material and maker. Materials in broken containers or in packages showing water marks or other evidence of damage shall not be used and shall be removed from the site. PART 2 PRODUCTS 2.01 MATERIALS City of Ocoee 08800-1 G&R Project No.98518.01 I 3 A. Each piece of glazing shall bear the manufacturer's label showing the strength, grade, thickness, type and quality of the material and all labels shall remain in place until the glass has been set and inspected by the ENGINEER except that safety and insulating 11 glass shall have permanently etched labels. When glass is not cut to size by the manufacturer and is furnished from local stock, the glass and glazing subcontractor shall3 submit an affidavit stating the strength, grade,thickness, type, quality and manufacturer of the glass furnished. B. Insulating Glass 1. Insulating glass for use in glazed exterior frame openings and doors shall be Insulating Glass Certification Council certified and shall meet ASTM E774, Class CBA. Units shall be by Viracon, equal by Guardian Industries, Spectrum Glass Products or equal carrying the MANUFACTURER's ten year guarantee. The units shall consist of two lights of glass, permanently and hermetically sealed together at edges with continuous spacers and dual sealant to maintain a factory dehydrated air space. 2. Provide units consisting of 2 lights, 1/4-in float glass with a 114-in air space, 3/4-in total thickness units at doors. For exterior openings, provide outside light in gray tinted and inside light clear. 3. Provide exterior insulating glass with factory low-emissivity(low E) coating, Designation VE-4-52 units by Viracon or equal which does not change the appearance of the glass and which provides a winter night time U-value of 0.31, a shading coefficient of 0.32 and a relative heat gain of 70 in the specified insulating unit. Coat air space side of outside light(Surface 2) and heat treat the glass being coated. 3 4. Provide dual perimeter seal, inner(primary) seal of polyisobutylene butyl and outer (secondary) seal of structural silicone. 5. Provide aluminum spacer between lights with folded and permanently joined corners as approved to provide continuity around perimeter of each unit. Primary seal shall completely cover sides and corners of spacers between spacers and glass,both sides. 6. Provide approved molecular sieve, silica gel or blend of both for desiccant, selaed into spacers. C. Gray tinted glass where required shall be Solar Gray float glass by PPG Industries, equal by L.O.F.; A.F.G. or equal in thickness and in annealed or tempered as specified. D. All non-labelled interior door glass shall be clear tempered glass, 1/4-in thick Herculite by PPG Industries, equal by L.O.F.; A.F.G. or equal. 1 City of Ocoee 08800-2 G&R Project No.98518.01 E. All labelled interior door glass and glass elsewhere as noted shall be 1/4-in thick clear polished diamond welded wired glass, UL listed. F. Glazing compound shall be 999-A Glazing Silicone by Dow, equal by General Electric or equal. G. Glazing tape for use with the glazing compound shall be Tremco No. 440; Pecora Extru-Seal Butyl Rubber Tape or Dap Inc. Butyl Rubber Sealing Tape or equal. Tape shall be compatible with the glazing compound. H. Setting blocks, 85 plus or minus 5 durometer and spacer blocks, 50 durometer, shall be closed cell neoprene. I. Glazing strips for hollow metal door and bead glazing, shall be adhesive faced closed cell PVC foam strip, 1/8-in thick, 32 durometer hardness. J. Glazing compound for labelled construction glazing shall meet NFPA requirements for a hard setting glazing compound with 90 percent inert and non-flammable components as approved. PART 3 EXECUTION 3.01 INSTALLATION A. General 1. All glazing work shall be performed in accordance with the standards of the Flat Glass Marketing Association's Glazing Manual, latest revision, unless otherwise noted or specified and shall also conform to the approved shop drawings and the manufacturer's glazing instructions. 2. All frame elements shall have been painted where required and shall be thoroughly cleaned before glazing commences. B. Exterior Glazing-Non-gasket system-Inside glazed. 1. Set tape 1/8-in down from top of fixed bead. 2. Run a bead of approved gun-grade sealant from base of tape to bottom of glazing pocket leaving weep holes, where provided, free of sealant. 3. Place setting blocks, insert glass and press against tape and sealant until continuous perimeter contact is made. 4. Run a heel bead of approved sealant along exposed edge of glass. City of Ocoee 08800-3 G&R Project No.98518.01 I 5. Applyglazingbead. 6. Install spacer between glazing bead and glass. 7. Run a continuous finish bead of sealant to fill voids above spacers on interior side and to fill void above tape on exterior side. C. Door and Interior Glazing-Non-Labelled Openings 1. Install continuous glazing strip against rabbet. 2. Set glass in place on setting blocks and install another continuous glazing strip around perimeter of glass. 3. Install glazing beads, setting against glazing strips, firmly, in order to place a small amount of pressure against the strips. E. Labelled Opening Glazing • 1. Bed glazing rabbet in the approved hard-setting compound. 2. Set glass using setting blocks. 3. Face81 ass in the same compound and set beads. 4. Tool compound flush and full between glass and metal surrounds, adding compound as required. 3.02 PROTECTION AND CLEANING A. Clean and remove all labels from all glazing when directed and clean glazing compound from frames around glazing installed under this Section upon completion of the work. All defective or broken glazing and glazing broken because of faulty setting shall be replaced under this Section. B. All glazing shall be protected under this Section from accidental damage with tapes or streamers attached to the sash or frame. No tape or streamer shall contact the glazing. 3 END OF SECTION 33 3 City of Ocoee 08800-4 G&R Project No.98518.01 SECTION 09901 SURFACE PREPARATION AND SHOP PRIME PAINTING PART 1 GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required for the surface preparation and application of shop primers on ferrous metals, excluding stainless steels, as specified herein and as shown on the Drawings. 1.02 RELATED WORK A. Section 09902: Painting. B. Section 13121: Pre-Engineered Metal Building (Structural surface preparation and prime Painting) 1.03 SUBMITTALS A. Submit to the ENGINEER for review in accordance with Section 01300 complete shop drawings, MANUFACTURER's specifications and data on the proposed primers and detailed surface preparation, application procedures and dry mil thickness. B. Submit to the ENGINEER for review in accordance with Section 01300 representative physical samples of the proposed primers. 1.04 REFERENCE SPECIFICATIONS A. Steel Structures Painting Council(SSPC) 1. SSPC-SP-1 Solvent Cleaning 2. SSPC-SP-6 Commercial Blast Cleaning 3. SSPC-SP-7 Brush Blast 4. SSPC-SP-10 Near-White Metal Blast Cleaning PART 2 PRODUCTS 2.01 MATERIALS A. Ferrous Metals(i.e., Mechanical Equipment, etc.): City of Ocoee 09901-1 G&R Project No.98518.01 I 1. Tnemec 1 Coat: 66-BJ45 Gray Epoxy Primer(3.5 -4.5 DFT) 2. Kop-Coat(Carboline) 1 Coat: 340 Gold(3.5 -4.5 DFT) 3. International 1 Coat: Intergard 750HS (3.5 -4.5 DFT) 4. Sherwin-Williams 1 Coat: Recoatable Epoxy Primer(3.5 -4.5 DFT) B. Nonprimed Surfaces: 1. Gears,bearings surfaces, and other similar surfaces that are not to be painted shall be given a heavy shop coat of grease or other suitable rust-resistant coating. This coating shall be maintained as necessary to prevent corrosion during all periods of storage and erection and shall be satisfactory to the ENGINEER up to the time of the final acceptance test. C. Compatibility of Coating Systems: 1. Shop priming shall be done with primers that are guaranteed by the 3 MANUFACTURER to be compatible with their corresponding primers and finish coats specified in Section 09902 for use in the field and which are recommended for use together. 3 D. Masonry: See Section 09902. E. Plastic pipe: See Section 09902. F. Metal surfaces above 250 : See Section 09902. G. Insulated pipe(non-metallic insulation, and building insulation): See Section 09902. H. Repair of cut edges and damage to galvanized steel: 1. Tnemec 1 Coat: 90-97 Tnemec Zinc (2.5 - 3 DFT) 2. Kop-Coat (Carboline) 1 Coat: Organic Zinc(2.5 - 3 DFT) 3. International 1 Coat: Interzinc 308 (2.5 - 3 DFT) 4. Sherwin-Williams City of Ocoee 09901-2 G&R Project No.98518.01 1 Coat: Zinc Clad 4 (2.5 -3 DFT) I. Primers containing lead will not be allowed. PART 3 EXECUTION 3.01 APPLICATION A. Surface Preparation and Priming: 1. Nonsubmerged components scheduled for priming, as defined above, shall be sandblasted clean in accordance with SSPC-SP-10, "Near White," immediately prior to priming. Submerged components scheduled for priming, as defined above, shall be sandblasted clean in accordance with SSPC-SP-10 "Near White," immediately prior to priming. 2. Surfaces shall be dry and free of dust, oil, grease, dirt, rust, loose mill scale, and other foreign material before priming. 3. Shop prime in accordance with approved paint manufacturer's recommendations. 4. Surface preparation for field painting unprimed surfaces or for touch up shall be the same. 5. Plastic pipe surfaces shall be lightly sanded before painting. 6. Wood surfaces shall be dry and sanded to a smooth surface. 7. Bituminous coated pipe shall not be used in exposed locations. Pipe to be exposed in the finished work shall be primed in accordance with the requirements herein. Any bituminous coated pipe which is inadvertently installed in exposed locations shall be sandblasted clean before priming and painting. 8. All primed or previously painted surfaces and nonferrous surfaces shall be cleaned prior to application of successive coats. All nonferrous metals shall be cleaned in accordance with SSPC-SP-1. Test galvanized steel for treatment or any passivation and handle as required. 9. Shop-coated surfaces shall be protected from damage and corrosion before and after installation. Damaged areas shall be repaired immediately upon detection. Abraded or corroded spots shall be cleaned and touched up with the same materials as the shop coat. All shop coated surfaces which are determined to be faded or discolored or which require more than minor touch-up, shall receive new surface preparation and be repainted. Cut edges of galvanized steel and exposed threads and cut ends of galvanized piping, electrical conduit, and metal pipe sleeves shall be solvent cleaned in accordance with SSPC-SP-1 and primed. City of Ocoee 09901-3 G&R Project No.98518.01 3 10. Galvanized steel and stainless steel surfaces shall be cleaned in accordance with SSPC- SP-1. Such surfaces designated not to be painted shall be cleaned to this standard. 11. Aluminum embedded or in contact with concrete shall be painted with one coat of zinc chromate primer followed by one coat of aluminum pigmented asphalt paint. 3 12. Surface temperature and all other application conditions shall be in accordance with approved primer manufacturer's recommendations. Enclosures and auxiliary heat shall be utilized as necessary to achieve compliance. 3.02 FABRICATED AND MANUFACTURED EQUIPMENT A. Unless otherwise indicated, all fabricated and manufactured equipment shall be shop primed. Initial finish coats may be shop or site applied. All further coats shall be site applied. In all cases, final coat shall be site applied. B. Wherever equipment is required to be sandblasted, CONTRACTOR shall protect all motors, drives, bearings, gears, etc., from the entry of grit. Any equipment found to contain grit shall be disassembled, cleaned and reassembled. C. All items to be shop primed shall be blast cleaned as specified for applicable service prior to priming. If, in the opinion of the ENGINEER, any prime coating that has been improperly applied or if material contrary to these Specifications has been used, that coating shall be removed by abrasive blasting to white metal and reprimed in accordance with these Specifications. D. All shop prime coats shall be of the correct materials and applied in accordance with these Specifications. Remove any prime coats not in accordance with these Specifications by blast cleaning and apply the specified prime coat at no additional cost to the OWNER. E. Shop primed surfaces shall be cleaned thoroughly and damaged or bare spots prepared as approved and retouched with the specified primer before the application of successive paint coats in the field. F. Properly protect the shop prime and finish coats against damage from weather or any other cause. G. A shop finish coat shall be equal in appearance and protection quality to a field applied finish coat. If, in the opinion of the ENGINEER, a shop finish coat does not give the appearance and protection quality of other work of similar nature, prepare the surfaces and apply the coat or coats of paint as directed by the ENGINEER to accomplish the desired appearance and protection quality. Submit to the ENGINEER substantial evidence that 3 the standard finish is compatible with the specified finish coat. END OF SECTION City of Ocoee 09901-4 G&R Project No.98518.01 SECTION 09902 PAINTING PART 1 GENERAL 1.01 SCOPE OF WORK A. The work of this section consists of furnishing all materials, labor, equipment, and incidentals required and performing all the painting necessary to complete this Contract in its entirety. B. It is the intent of these Specifications to paint all exposed miscellaneous metal, pipe, conduit,junction boxes, fittings, supports, valves, equipment, gypsum board, steel doors and frames, fascias and all other work obviously required to be painted unless otherwise specified. Minor items omitted in the schedule of work shall be included in the work of this Section where they come within the general intent of the Specifications as stated herein. C. The following surfaces or items are not required to be painted: 1. Portions of metal, other than aluminum, embedded in concrete. This does not apply to the back face of items mounted to concrete or masonry surfaces which shall be painted before erection. Aluminum to be embedded in or in contact with concrete or masonry shall be coated to prevent electrolysis. 2. Stainless steel. 3. Fencing. g 1 4. Concealed surfaces of pipe or crawl spaces. 5. Acoustical ceilings. 6. Tile. 1 7. Exterior concrete, unless otherwise specified, and heavy duty concrete topping. 8. Finish hardware, except door closers that are not finished. 9. Manhole frames and covers. 10. Fiberglass other than piping. City of Ocoee 09902-1 G&R Project No.98518.01 11. Packing glands and other adjustable parts and nameplates of mechanical 3 equipment. 1.02 RELATED WORK 3 A. Waterproofing and Dampproofing are included in Section 07100. 3 B. Surface Preparation and Shop Prime Painting is included in Section 09901. C. Signs Project are included in Division 1. Project D. Pre-Engineered Metal Building(Structural surface preparation and prime Painting)is included in Section 13121. 1.03 REFERENCES A. American Association of State Highway and Transportation Officials(AASHTO) B. American Society for Testing and Materials (ASTM) 1. ASTM C150 - Specification for Portland Cement 3 2. ASTM D4258 -Practice for Surface Cleaning Concrete for Coating C. National Science Foundation(NSF) 1. Standard 61 3 D. Occupational Safety and Health Act(OSHA) 1. Air Pollution Control Rules 2. Color Coding E. Steel Structures Painting Council (SSPC) 1. SSPC-SP-1 - Surface Preparation Specification- Solvent Cleaning 2. SSPC-SP-2 -Surface Preparation Specification-Hand Tool Cleaning 3. SSPC-SP-3 - Surface Preparation Specification-Power Tool Cleaning 4. SSPC-SP-6 - Commercial Blast Cleaning 5. SSPC-SP-10-Near White Metal Blast Cleaning 3 City of Ocoee 09902-2 G&R Project No.98518.01 1.04 SUBMITTALS A. Submit to the ENGINEER for review in accordance with Section 01300 shop drawings, working drawings, and product data including MANUFACTURER's specifications and data on the proposed paint systems and detailed surface preparation, application procedures and dry film thickness. Certify that the systems submitted meet all applicable volatile organic carbon regulations. Equivalent systems are to be submitted at no additional costs to meet any new regulations. B. Submit three sets of 8-in by 8-insamples,les on '/-in hardboard, of all colors required for P �I all types of paint. Include special colors as required. Resubmit until approved. C. Submit to the ENGINEER for review in accordance with Section 01300 color cards, including standard and special colors, for initial color selections. D. Schedule of Painting Operations: Submit to the ENGINEER for review a complete Schedule of Painting Operations within 60 days after the Notice to Proceed. This Schedule is imperative so that the various fabricators may be notified of the proper shop prime coat to apply. Properly notify and coordinate the fabricators' surface preparation and painting operations with these Specifications. This Schedule shall include for each surface to be painted, the brand name,the percent volume of solids, the coverage and the number of coats the CONTRACTOR proposes to use in order to achieve the specified dry film thickness, and color charts. When the Schedule has been approved, apply all material in strict accordance with the approved Schedule and the MANUFACTURER's instructions. Wet and dry paint film gauges shall be made available to the ENGINEER to verify the proper application while work is in progress. 1.05 SPARE MATERIAL A. Furnish one unopenedgallon can of each type and each color of paint used. Pan 1.06 PRE-PAINTING CONFERENCE A. Well in advance of commencement of painting operations,but after major equipment has been delivered, a pre-painting conference shall be held. All parties with an interest in the painting work shall attend, including the CONTRACTOR, the MANUFACTURER, the OWNER, the ENGINEER, and the painting subcontractor. The CONTRACTOR shall contact each party and arrange the meeting. B. The conference shall include an inspection of the areas to be painted by all parties and a discussion of the conformance of each area with the specifications. Important issues such as environmental conditions, climate control systems, original primer, dry film thickness, and monitoring the number of coats that have been field applied shall be discussed and problems shall be resolved. C. A written record of the meeting shall be submitted to the ENGINEER. City of Ocoee 09902-3 G&R Project No.98518.01 3 3 PART 2 PRODUCTS 2.01 MATERIALS A. All painting materials shall be fully equal to those manufactured by the Tnemec3 Company Inc., Carboline Company, International, and Sherwin-Williams Company. The painting schedule has been prepared on the basis of Tnemec, Carboline, International, and Sherwin-Williams products and recommendations for applications. No brand other than those named will be considered for approval unless the brand and type of paint proposed for each item in the following schedule together with sufficient data substantiated by certified tests conducted at no expense to the OWNER, to demonstrate its equality to the paint(s)named, is submitted in writing to the ENGINEER for approval within 30 days after the signing of the Notice to Proceed. The type and number of tests performed shall be subject to the ENGINEER's approval. Color availability to match those colors specified will also be considered as an important property for equality. B. All painting materials shall be delivered to the mixing room in unbroken containers, bearing the MANUFACTURER's brand, date of manufacture and name. They shall be used without adulteration and mixed, thinned, and applied in strict accordance with MANUFACTURER's directions for the applicable materials and surface and with the ENGINEER's approval before using. C. Shop priming shall be done with primers that are guaranteed by the MANUFACTURER to be compatible with the finish paints to be used. Refer to Section 09901 for special3 primers. D. No paint containing lead will be allowed. Oil shall be pure boiled linseed oil. E. Work areas will be designated by the ENGINEER for storage and mixing of all painting materials. Materials shall be in full compliance with the requirements of pertinent codes and fire regulations. Proper containers outside of the buildings shall be provided and used for painting wastes, and no plumbing fixture shall be used for this purpose. F. All recommendations of the paint manufacturer in regard to the health and safety of workmen shall be followed. 2.02 PAINTING SYSTEMS A. All colors will be selected by the ENGINEER from color charts submitted by the CONTRACTOR B. The following surfaces shall have the types of paint scheduled below applied at the dry film thickness (DFT) in mils per coat noted. Some colors will require an additional coat from what is listed to get the proper color coverage. City of Ocoee 09902-4 G&R Project No.98518.01 1. Interior Exposed Masonry a. Tnemec 1 Coat: 54-660 Epoxy Masonry Filler @ 60-80 sq ft/gal 2 Coats: 69-Color Hi-Build Epoxoline II(4-6 DFT per coat) b. Carboline 1 Coat: Epoxy Polyamide Catalyzed Masonry Filler(60-80 sq ft/gal) 2 Coats: 890 (4-6 DFT per coat) c. International 1 Coat: Interlac 895 (60-80 sq ft/gal) 2 Coats: Intergard 760HS (5 DFT per coat) d. Sherwin-Williams 1 Coat: Epoxy Ester Masonry Filler/Sealer, B61 Series(60-80 sq ft/gal) 2 Coats: Sher-Tile Hi Solids Epoxy,B67 Series(4-6 DFT per coat) 2. Exterior nonsubmerged ferrous metals: a. Tnemec 1 Coat: 69-Color Hi-Build Epoxoline II(4-6 DFT) 1 1 Coat: 73-Color Endura-Shield(2-5 DFT) b. Carboline 1 Coat: 890 (4 DFT) 1 Coat: 133 H.B. (3-4 DFT) c. International 1 Coat: Intergard 750HS (5 DFT) 1 Coat: Interthane 990HS or Interthane 870HS (2 DFT) d. Sherwin-Williams 1 Coat: Recoatable Epoxy Primer, B62 Series (5 DFT) 1 Coat: Hi Solids Polyurethane,B65 Series(2.5 DFT) 1 3. Interior nonsubmerged ferrous metals: a Tnemec 1 2 Coats: 69-Color Hi-Build Epoxoline II (4-6 DFT per coat) b. Carboline 1 2 Coats: 890 (4-6 DFT per coat) c. International 1 Coat: Intergard 750HS (5 DFT) City of Ocoee 09902-5 G&R Project No.98518.01 3 1 Coat: Intergard 760HS (5 DFT) d. Sherwin-Williams 1 Coat: Recoatable Epoxy Primer, B62 Series(4-6 mils) 1 Coat: Sher-Tile Hi-Solids Epoxy, B67 Series(4-6 DFT) 4. Pre-engineered metal buildingshopprimed structural framing(conduct "test patch" in 12 x 12 area before painting entire system) (for each different primer): 1stCoat: Tnemec Series N27 F.C. (4-6 DFT per coat) a. Typoxy 2nd Coat: Tnemec Series 69 Color Hi-Build Epoxoline II(4-6 DFT per coat) b. Equal compatible epoxy paint as recommended by paint manufacturer. 5. Exterior galvanized, and non-ferrous metal: a. Tnemec 1 Coat: 69-Color Hi-Build Epoxoline 11 (2-3 DFT) 1 Coat: 74-Color Endura-Shield (2-3 DFT) b. Carboline 1 Coat: 890 (2-3 DFT) 1 Coat: 133 H.B. (3-4 DFT) c. International 1 Coat: Intergard 447 (5 DFT) 1 Coat: Interthane 990HS or Interthane 870HS (2 DFT) d. Sherwin-Williams 1 Coat: Heavy Duty Epoxy, B67 Series(2-3 mils DFT) 1 Coat: Hi-Solids Polyurethane,B65 Series(2.5 DFT) 6. Interior galvanized, and non-ferrous metals: a. Tnemec 2 Coats: 69-Color Hi-Build Epoxoline II (2-3 DFT per coat) b. Carboline 2 Coats: 890 (2-3 DFT per coat) c. International 1 Coat: Intergard 447(5 DFT) 1 Coat: Intergard 760HS (5 DFT) d. Sherwin Williams 2 Coats: Heavy Duty Epoxy, B67 Series(2-3 DFT per coat) City of Ocoee 09902-6 G&R Project No.98518.01 7. Metal surfaces exposed to temperatures above 2500F to 4000F: a. Tnemec 2 Coats: 39-661 Silicone Aluminum(0.7-1.5 DFT per coat) (must cure for 1 hour at 400°F) b. Carboline 2 Coats: 1248 (1-1.5 DFT per coat) c. International 2 Coats: Intertherm 503 (1.5 DFT per coat) d. Sherwin-Williams 2 Coats: Silver Brite Aluminum Paint-B 5952 (1 DFT per coat)good up to 4000F 8. Metal surfaces exposed to temperatures above 4000F a. Tnemec 2 Coats: 39-1261 Silicone Aluminums (1.5 DFT per coat) b. Carboline 2 Coats: 4631 (1.5 DFT per coat) c. International 1 2 Coats: Intertherm 503 (1.5 DFT per coat) d. Sherwin-Williams 2 Coats: Kem Hi Temp Aluminum 7.11 (1.5 DFT per coat) 9. Insulated Pipe: (Block Insulation: Same systems only 3 coats at 2-3 DFT per coat). a. Tnemec 2 Coats: 6-Color Tneme-cryl(2-3 DFT per coat) b. Carboline 2 Coats: 3359 (3 DFT per coat) c. International 2 Coats: Intercryl 530 WB (3 DFT per coat) d. Sherwin-Williams 2 Coats: DTM Acrylic Gloss or Semi Gloss, B66 Series(2-3 DFT per coat) City of Ocoee 09902-7 G&R Project No.98518.01 I 10. Aluminum in contact with dissimilar materials: a. Tnemec 2 Coats: 69-Color Hi-Build Epoxoline(3 DFT per coat) b. Carboline 2 Coats: 890 (3 DFT per coat) c. International 2 Coats: Intergard 750HS (5 DFT per coat) d. Sherwin-Williams 2 Coats: Heavy Duty Epoxy, B67 Series(3 DFT per coat) 11. Plastic Piping-Interior. (Sanding mandatory) a. Tnemec 1 Coat: 69-Color Ili-Build Epoxoline II (4-6 DFT) 3 b. Carboline 3 2 Coats: 890(3 DFT per coat) c. International 2 Coats: Intergard 750HS (5 DFT per coat) d. Sherwin-Williams 2 Coats: Sher-Tile Hi-Solids Epoxy, B67 Series(4-6 DFT per coat) 12. Plastic Piping-Exterior(Sanding mandatory) a. Tnemec 1 Coat: 69-Color Hi-Build Epoxoline II(3-4 DFT) 1 Coat: 73-Color Endura Shield (2-3 DFT) b. Carboline 1 Coat: 890 (4 DFT) 1 Coat: 133 H.B. (2.5 DFT) c. International 1 Coat: Intergard 750HS (3-5 DFT) 1 Coat: Interthane 870HS (4 DFT) d. Sherwin-Williams 1 Coat: Macopoxy 920 Pre-Prime, B58 Series(3-4 DFT per coat) 1 Coat: Hi-Solids Polyurethane, B65 Series(2.5 DFT) City of Ocoee 09902-8 G&R Project No.98518.01 13. Interior Drywall and Plaster Industrial Areas a. TNEMEC 1 Coat: 69 Hi-Build Epoxoline II (Thin 20%) (3-5 DFT) 1 Coat: 69 Hi-Build Epoxoline II (2-3 DFT) b. Carboline 2 Coats: 3359(2 DFT per coat) c. International 1 Coat: 767 Latex Primer Sealer(1 DFT) 1 Coat: Intercry1530 WB (2 DFT) d. Sherwin-Williams 1 Coat: Promar 400 Latex Wall Primer(1 DFT) 1 Coat: Promar 400 Latex Egg Shell Enamel (1.2 DFT) 14. Parking Stall lines on asphalt pavement: Approved reflective pavement marking paint, white in color, conforming to AASHTO standards for materials and installation. a. PPG Industries 1 Coat: Traffic and Zone Marking Paint 11-3 C. Any surfaces not specifically named in the Schedule and not specifically excepted shall be prepared, primed and painted in the manner and with materials consistent with these Specifications. The ENGINEER shall select which of the MANUFACTURER's products, whether the type is indicated herein or not, shall be used for such unnamed surfaces. No extra payment shall be made for this painting. 2.03 COLOR CODING FOR PIPES AND EQUIPMENT A. When color coding is specified, it shall consist of color code painting and identification of all exposed conduits, trough items, and pipelines for the transport of gases, liquid, and semi-liquids including all accessories such as valves, insulated pipe coverings, fittings, junction boxes, bus bars, connectors, and all operating accessories which are integral to be whole functional mechanical pipe and electrical conduit system. Colors shall be as noted in the Paint and Color Coding Schedules attached at the end of this Section. B. All hangers and pipe support floor stands shall be painted the same color and with the same paint as the pipe it supports. The system shall be painted up to but not including the flanges attached to the mechanical equipment nor the flexible conduit connected to electrical motors. When more than one pipe system is supported on the same bracket, the bracket shall be painted the same color as the adjacent wall or ceiling. Colors shall be as noted in the Paint and Color Coding Schedule. City of Ocoee 09902-9 G&R Project No.98518.01 I 3 C. All systems which are an integral part of the equipment, that is originating from the equipment and returning to the same piece of equipment, shall be painted between and up to but not including,the fixed flanges or connections on the equipment. D. The color code establishes, defines, and assigns a definite color for each category of pipe. Pipelines which are not listed on the Schedule of Color Code Paints shall be assigned a color by the ENGINEER and shall be treated as an integral part of the Contract. E. Banding for pipes shall be as specified in the Paint and Color Coding Schedule. Bands shall be 2 in wide and located on each end of the pipe title, at 2 ft from the title bands, and at wall penetrations. 2.04 LETTERING OF TITLES A. Each pipe system shall be labeled with the name of the materials in each pipeline and alongside this an arrow indicating the direction of flow of liquids. Titles shall be as so described in attached schedule. Titles shall not be located more than 20 linear ft apart and shall also appear directly adjacent to each side of any wall the pipeline breaches, adjacent to each side of the valve regulator, flowcheck, strainer cleanout, and all pieces of equipment. B. Titles shall identify the contents by complete name. Identification title locations shall be determined by the ENGINEER but in general they shall be placed where the view is unobstructed and on the two lower quarters of pipe or covering where they are overhead. Title should be clearly visible from operating positions especially those adjacent to control valves. Titles onequipment shall be applied ateye level on machines where possible or at the C. PP upper most broad vertical surface of low equipment. Where more than one piece of the equipment item to be titled exists, the items shall be numbered consecutively as indicated on the mechanical drawings or as directed by the ENGINEER; for example Pump No. 1, Pump No. 2, etc. Titles shall be composed and justified on the left hand side as follows: Pump No. 1 D. Application of titles. 1. The color of the titles shall be black or white, as approved, to best contrast with the color of the pipes and equipment and shall be stencil applied. 2. Stencil text is to be in ALL CAPS worded exactly as shown in the Schedule. Titles are to be printed in a single line. 3 3. Letter sizes: City of Ocoee 09902-10 G&R Project No.98518.01 C Outside Diameter of Pipe or Size of Legend Covering Letters Cl � On) %to 13/4 1/2 ll11/2to2 % 21/to 6 11/4 8 to 10 21/2 More than 10 31/2 Equipment titles are to be 2 in high. 4. Arrow sizes. Where "a" is equal to 3/4 of outside diameter of pipe or covering, the arrow shaft shall be 2 "a" long by_"a"wide. The arrow head shall be an equilateral triangle with sides equal to "a." Maximum "a" dimension shall be 6 in.. 5. When using direction arrows, point arrowhead away from pipe markers and in direction of flow. If flow can be in both directions, use a double-headed directional flow. 2.05 METAL TAGS IA. ForPiP elines smaller than3/.-in in diameter, securely fasten metal tags, 2'/-in x 1/-in, of Birmingham or Stubs 17 gauge brass with lettering etched and filled with enamel. Tags shall be approved by the ENGINEER. 2.06 FABRICATED EQUIPMENT indicated all fabricated equipment shall be shop primed and shop or A. Unless otherwise �! P field finished. B. All items to be shop primed shall be thoroughly cleaned of all loose material prior to priming. If, in the opinion of the ENGINEER, any prime coating shall have been improperly applied or if material contrary to these Specifications shall have been used, that coating shall be removed by sandblasting to white metal and reprimed in accordance with these Specifications. C. All shop prime coats shall be of the correct materials and applied in accordance with C these Specifications. Remove any prime coats not in accordance with these Specifications by sandblasting and apply the specified prime coat at no additional cost to the OWNER. D. Shop primed surfaces shall be cleaned thoroughly and damaged or bare spots retouched with the specified primer before the application of successive paint coats in the field. City of Ocoee 09902-11 G&R Project No.98518.01 I E. Be responsible for and take whatever steps are necessary to properly protect the shop prime and finish coats against damage from weather or any other cause. F. A shop finish coat shall be equal in appearance and protection quality to a field applied +� finish coat. If, in the opinion of the ENGINEER, a shop finish coat does not give the appearance and protection quality of other work of similar nature, prepare the surfaces and apply the coat or coats of paint as directed by the ENGINEER to accomplish the desired appearance and protection quality. Submit to the ENGINEER substantial evidence that the standard finish is compatible with the specified finish coat. G. Wherever fabricated equipment is required to be sandblasted, protect all motors, drives, bearings, gears, etc., from the entry of grit. Any equipment found to contain grit shall be promptly and thoroughly cleaned. PART 3 EXECUTION 3.01 PREPARATION OF SURFACES A. All surfaces to be painted shall be prepared as specified herein or in Section 09901 and shall be dry and clean before painting. Special care shall be given to thoroughly clean interior concrete and concrete block surfaces of all marks before application of finish. 3 B. All metal welds, blisters, etc., shall be ground and sanded smooth in accordance with S SPC-SP-10. All pits and dents shall be filled and all imperfections shall be corrected so as to provide a smooth surface for painting. All rust, loose scale, oil, grease, and dirt shall be removed by use of approved solvents,wire brushing, or sanding. C. Concrete surfaces shall have been finished as specified in Division 3. Report unsatisfactory surfaces to the ENGINEER. Concrete shall be free of dust, oil, curing compounds, and other foreign matter, conforming to ASTM D4258. D. All submerged concrete shall be brush off blast cleaned. Open all bag holes and air entrained holes with minimum aggregate exposure. Provide a uniform surface profile similar to#100 grit sandpaper. 3 E. Concrete block surface shall be smooth and cleaned of all dust, efflorescence, chalk, loose mortar, dirt, grease, oil, tar, and other foreign matter, conforming to ASTM D4258. F. All plastic pipe surfaces shall be lightly sanded before painting. G. Wood surfaces shall be dry. Sand to obtain a smooth surface. All encrustations shall be removed. H. Exposed Pipe: Bituminous coated pipe shall not be used in exposed locations. Pipe which shall be exposed after project completion shall be primed in accordance with the 1 City of Ocoee 09902-12 G&R Project No.98518.01 requirements herein. Any bituminous coated pipe which is inadvertently installed in exposed locations shall be sandblasted clean before priming and painting. After installation all exterior, exposed flanged joints shall have the gap between adjoining flanges sealed with a single component polysulfide sealant to prevent rust stains. I. Primed or Previously Painted Surfaces and Nonferrous Surfaces: All coated surfaces shall be cleaned prior to application of successive coats. All nonferrous metals not to be coated shall be cleaned. This cleaning shall be done in accordance with SSPC-SP-1, Solvent Cleaning. J. Shop-Finished Surfaces: All shop-coated surfaces shall be protected from damage and corrosion before and after installation by treating damaged areas immediately upon detection. Abraded or corroded spots on shop-coated surfaces shall be "Hand Cleaned" and then touched up with the same materials as the shop coat. All shop coated surfaces which are faded, discolored, or which require more than minor touch-up in the opinion of the ENGINEER shall receive new surface preparation before being repainted. Cut edges of galvanized sheets and exposed threads and cut ends of galvanized piping, electrical conduit, and metal pipe sleeves, that are not to be finished painted, shall be "Solvent Cleaned" and primed with zinc dust-zinc oxide metal primer. K. Galvanized and Zinc-Copper Alloy Surfaces: These surfaces to be painted shall be "Solvent Cleaned" and treated as hereinafter specified. Such surfaces not to be painted shall be "Solvent Cleaned." L. Aluminum embedded or in contact with concrete must be painted according to the schedule for aluminum in contact with dissimilar materials. 3.02 WORKMANSHIP A. General: 1. Primer(spot) and paint used for a particular surface shall, in general, be as scheduled for that type of new surface. Confirm with the paint manufacturer that the paint proposed for a particular repaint condition will be compatible with the existing painted surface. Sample repainted areas on the actual site will be required to insure this compatibility. Finished repainted areas shall be covered by the same guarantee specified for remainder of work. 2. At the request of the ENGINEER, samples of the finished work prepared in strict accordance with these Specifications shall be furnished and all painting shall be equal in quality to the approved samples. Finished areas shall be adequate for the purpose of determining the quality of workmanship. Experimentation with color tints shall be fiunished to the satisfaction of the ENGINEER where standard chart colors are not satisfactory. City of Ocoee 09902-13 G&R Project No.98518.01 I 3. Protection of furniture and other movable objects, equipment, fittings and accessories shall be provided throughout the painting operations. Canopies of lighting fixtures shall be loosened and removed from contact with surface, covered3 and protected and reset upon completion. Remove all electric plates, surface hardware, etc., before painting, protect and replace when completed. Mask all machinery name plates and all machined parts not receiving a paint finish Dripped or spattered paint shall be promptly removed. Lay drop cloths in all areas where painting is being done to adequately protect flooring and other work from all damage during the operation and until the finished job is accepted. 4. On metal surfaces apply each coat of paint at the rate specified by the MANUFACTURER to achieve the minimum dry mil thickness required. If material has thickened or must be diluted for application by spray gun, the coating shall be built up to the same film thickness achieved with undiluted material. One gallon of paint as originally furnished by the MANUFACTURER shall not cover a greater area when applied by spray gun than when applied unthinned by brush. Deficiencies in film thickness shall be corrected by the application of an additional coat(s). On masonry, application rates will vary according to surface texture, however, in no case shall the MANUFACTURER's stated coverage rate be exceeded. On porous surfaces, it shall be the painter's responsibility to achieve a protective and decorative finish either by decreasing the coverage rate or by 3 applying additional coats of paint. 5. Paints shall be mixed in proper containers of adequate capacity. All paints shall be thoroughly stirred before use and shall be kept stirred while using. No unauthorized thinners or other materials shall be added to any paint. 6. Only skilled painters shall be used on the work and specialists shall be employed where required. B. Field Priming: 1. Steel members, metal castings, mechanical and electrical equipment, and other metals that are shop primed before delivery at the site will not require a prime coat on the job. All piping and other bare metals to be painted shall receive one coat of primer before exposure to the weather, and this prime coat shall be the first coat as specified in the painting schedule. 2. Equipment which is customarily shipped with a baked-on enamel finish or with a standard factory finish shall not normally be field painted unless the prefinished equipment is specifically color selected and unless the finish has not been damaged in transit or during installation. Surfaces that have been shop painted and have been damaged, or where the shop coats or coats of paint have deteriorated, shall be properly cleaned and retouched before any successive painting is done on them in the field. All such field painting shall match as nearly as possible the original finish. City of Ocoee 09902-14 G&R Project No.98518.01 t C. Field Painting: 1. All painting at the site shall be designated as Field Painting. 2. All paint shall be at room temperature before applying, and no painting shall be done when the temperature is below 500F, in dust-laden air, when rain or snow is falling, or until all traces of moisture have completely disappeared from the surface to be painted. 3. Successive coats of paint shall be tinted so as to make each coat easily distinguishable from each other with the final undercoat tinted to the approximate shafin 4. Finish surfacesof the shallished notcoat.show brush marks or other irregularities. Undercoats shall be thoroughly and uniformly sanded with No. 00 sandpaper or equal to remove defects and provide a smooth even surface. Top and bottom edges of doors shall be painted and all exterior trim shall be back-primed before installation. 5. Painting shall be continuous and shall be accomplished in an orderly manner so as to facilitate inspection. All exterior concrete and masonry paint shall be performed at one continuous manner structure by structure. Materials subject to weathering shall be prime coated as quickly as possible. Surfaces of exposed members that will be inaccessible after erection shall be cleaned and painted before erection. 6. All materials shall be brush painted unless spray painting is specifically approved by the ENGINEER. The CONTRACTOR shall be responsible for all damage caused by overspray or drifting. 7. All surfaces to be painted as well as the atmosphere in which painting is to be done shall be kept warm and dry by heating and ventilation, if necessary, until each coat of paint has hardened. Any defective paint shall be scraped off and repainted in accordance with the ENGINEER's directions. 8. Before final acceptance of the work, all damaged surfaces of paint shall be cleaned and repainted as directed by the ENGINEER. L9. Any pipe scheduled to be painted and having received a coating of a tar or asphalt- compound shall be painted with two coats of Kop-Coat's Inertol Tar Stop, Internationals Tarset Standard 7000 or equal before successive coats are applied per the schedule. Tnemec recommends using 69 Hi-Build Epoxoline II over tar, but a test patch must be run initially to test the paint's compatibility with the tar. 3.03 CLEANUP City of Ocoee 09902-15 G&R Project No.98518.01 I A. The premises shall at all times be kept free from accumulation of waste material and rubbish caused by employees or work. At the completion of the painting remove all tools, scaffolding, surplus materials, and all rubbish from and about the buildings, and3 leave work "broom clean" unless more exactly specified. B. Upon completion, remove all paint where it has been spilled, splashed, or splattered on31 all surfaces, including floors, fixtures, equipment, furniture, etc., leaving the work ready for inspection. 3 3.04 PAINT A General Notes and Guidelines: 1. All color numbers and names herein refer to master color card. Colors of specified equal manufacturers may be substituted with approval of the ENGINEER. 2. Pipe lines, equipment, or other items which are not listed here shall be assigned a color by the ENGINEER and shall be treated as an integral part of the Contract. 3 3. When color coding is specified or directed by the ENGINEER, it shall consist of 3 color code painting and identification of all exposed conduits,through lines and pipelines for the transport of gases, liquids, or semi-liquids including all accessories such as valves, insulated pipe coverings, fittings,junction boxes,bus bars, connectors, and any operating accessories which are integral to a whole functional mechanical pipe and electrical conduit systems. 4. The colors of the Finish Schedule shall be interpreted as follows: Colors Tnemec# Glidden# Carboline# 3 White AA90 4550 White S800 Orange SCO3 Safety Orange 4444 I Yellow BW56 [SCO2] Medium Yellow 6666 Dark Yellow BX36 Robotic Yellow N6251 Green SC07 Safety Green 2383 Light Green AM52 Parrot 6361 Dark Brown AF12 Warm Brown 9218 Dark Green — Crylight Green 4372 90GY 10/250 Tan AF32 Bellows 3216 Ivory AF82 Seashell 3848 Light Grey BG62 Concrete C731 Medium Grey 2047 20YY 43/083 0746II City of Ocoee 09902-16 G&R Project No.98518.01 C Colors Tnemec# Glidden# Carboline# Dark Grey BK33 Silver Grey 2525 Red SCO9 Safety Red 5555 Blue SCO6 Safety Blue S150 Dark Blue 2042 70BG 10/214 A183 Medium Blue 2041 70BG 23/276 0118 Light Blue 2040 70BG 67/126 7107 Aqua AX42 Turquoise Green 82GG 4132 [ 33/374 International SCO4 International Orange N498 1 Orange Dark Bronze BM07 Architectural Brown 2277 Tank Blue BB42 70BG/40/284 8155 1 Blue Green AX22 Blue Lagoon 81GG 10/276 A337 Magenta BP14 3ORB 11/250 S585 5. All moving parts, drive assemblies, and covers for moving parts which are potential hazards shall be Safety Orange#CA26. 1 6. All safety equipment shall be painted in accordance with OSHA standards. 7. All inline equipment and appurtenances not assigned another color shall be painted the same base color as the piping. The pipe system shall be painted with the pipe color up to but not including the flanges attached to pumps and mechanical equipment assigned another color. Tanks shall be painted the color of the piping system that they serve, unless the tank is fiberglass and levels are monitored through the tank. 8. All conduit shall be painted to match its background surface. 9. Building surface colors shall be painted as scheduled in the Finish Schedule or as selected by the ENGINEER. 10. Control panels shall be factory finished. PAINT AND COLOR CODING SCHEDULE Piping and Legend Color Bands Compressed Air Green Red Drains Dark Grey Red Potable Cold Water Blue City of Ocoee 09902-17 G&R Project No.98518.01 I Piping and Legend Color Bands i P 8 Potable Hot Water Blue Red Softened Water Blue White Heating Water Medium Blue Red Sprinkler Red Blue Fuel Oil Red White Gas Red Color selection for the following items are to be selected by the ENGINEER and reviewed with the OWNER during shop drawing review. Submit color charts for color selections. The CONTRACTOR shall coordinate color matching of various3 finish systems as required in these specifications. The CONTRACTOR shall forward approved color samples to Louver manufacturer for color matching as requested by the ENGINEER. 3 Equipment and Building Exterior Equipment, Fans, Galvanized Steel3 Exterior Roof Equipment, Fans, Vents, Hoods H.M. Doors(Exterior) H.M. Door Frames(Exterior) Interior Equipment and Pumps(including factory finished) Masonry Walls(Interior) H.M. Doors(Interior) H.M. Door Frames(Interior) Cranes and Hoists Electrical Conduit and Junction Boxes Roll-up Door(Interior and Exterior Surfaces) 1 END OF SECTION I 3 3 3 City of Ocoee 09902-18 G&R Project No.98518.01 SECTION 10200 LOUVERS PART 1 GENERAL 1.01 SCOPE OF WORK A Furnish all labor, materials, equipment, and incidentals required and install aluminum louvers as shown on the Drawings and as specified herein. 1.02 RELATED WORK A. Caulking is included in Division 7. B. Dampers and ductwork are included in Division 15. C. Grilles and registers are included in Division 15. 1.03 SUBMITTALS A. Submit to the ENGINEER, as provided in Section 01300 shop drawings indicating locations, elevations, materials, free area details of construction, sizes, anchoring and accessories. B. Submit standard color charts for selection by ENGINEER. C. Submit performance data in accordance with AMCA Standards 500 and 511. D. Submit to the ENGINEER for approval two 6"x 6" corner samples of each type of louver for approval showing construction, frame and blade design,blade braces, screen, blank-off panel and finish. 1.04 REFERENCE STANDARDS A. Air Movement and Control Association(AMCA) 1. AMCA 500 -Test Methods for Louvers, Dampers and Shutters. 2. AMCA 511 - Certified Ratings Program for Air Control Devices. B. Where reference is made to one of the above standards, the revision in effect at the time of bid opening shall apply. City of Ocoee 10200-1 G&R Project No. 98518.01 I 3 1.05 DELIVERY, STORAGE AND HANDLING A. Deliver materials in MANUFACTURER's original unopened and undamaged packages 3 with labels legible and intact. Store materials in unopened packages in a manner to prevent damage from the environment and construction operations. PART 2 PRODUCTS 2.01 LOUVERS A. Drainable Blade Louvers 1. Louvers shall be extruded aluminum, stationary type, Airolite Model No. CB6774 equal by Industrial Louver, Airline or equal,4-in frame depth units. Louvers shall be licensed in accordance with AMCA Standard 511. 2. Louvers shall have 45 degree, 0.081-in thick stormproof blades and equal thickness frames. Blades shall be joined to each jamb frame with two fillet welds, each 1-in long, produced with the pulsed gas, metal arc welding process(GMAW/MIG)with a minimum 0.125-in throat. Frames shall be joined at each corner with a full length GMAW fillet weld with a minimum 0.125-in throat. B. Provide with integral sills, heads, and jambs. Provide aluminum caulking stops at perimeter. C. Each exterior louver shall be provided with 1/2-in mesh, 0.063-in aluminum wire bird 1 screen secured within rewireable extruded aluminum frame as approved. Attach to interior face of louver. D. Provide insulated blank-off panels where required to seal off louver area not connected to ductwork or to cover areas not required for free air. Panels shall consist of 1-1/2-in glass fiber board insulation encapsulated and sealed completely in 0.032-in aluminum skins, all securely fastened to louvers and ductwork. 2.02 SILL EXTENSIONS A. Sill extensions where used, shall be provided as 8-gauge aluminum finished the same as louver. 2.03 FINISH3 A. Provide a 1.0 mil thick, epoxy prime and PVF2 Kynar 500 finish system. Finish shall contain 70 to 75 percent minimum PVF2 resin and shall provide on all aluminum louvers and compoents after fabrication. Brake formed aluminum may be formed after finishing I City of Ocoee 10200-2 G&R Project No. 98518.01 if coating integrity is not compromised. Color shall be selected from standard color charts as approved by the ENGINEER. 2.04 FASTENERS A. Fasteners shall be 300 series stainless steel. B. Masonry anchors shall be as specified in Division 5. PART 3 EXECUTION 3.01 INSTALLATION A. Louvers shall be installed in accordance with MANUFACTURER'S approved shop drawings and as shown. Provide all necessary fastenings and anchors required for a complete installation, all to be secure, plumb and true to line. B. Upon completion of the louver installation, all louvers shall be cleaned of all dirt and other foreign materials. C. Louvers shall be protected from damage from subsequent construction operations. END OF SECTION X' City of Ocoee 10200-3 G&R Project No. 98518.01 SECTION 10522 FIRE EXTINGUISHERS AND ACCESSORIES PART 1 GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required to install fire extinguishers with brackets at locations as shown and as directed. 1.02 SUBMITTALS A. Submit to the ENGINEER, as provided in Section 01300, shop drawings showing details of construction and installation of fire extinguishers and brackets. 1.03 DELIVERY, STORAGE AND HANDLING A. Deliver materials in MANUFACTURER's original unopened and undamaged packages with labels legible and intact. Store materials in unopened packages in a manner to prevent damage from environment and construction operations. Handle in accordance with MANUFACTURER's instructions. PART 2 PRODUCTS 2.01 MATERIALS A. Fire extinguishers shall be as specified below by J.L. Industries;Kidde Belleville;Elkhart Brass Mfg. Co. or equal. J.L. Industries model numbers have been used to establish quality and type. B. Units shall be 20 lb capacity carbon dioxide type, U.L. rated for 10 B:C. Units shall be red enameled aluminum cylinders, Sentinel 20 by J.L. Industries. Locate where shown/noted on the plans and provide four(4) additional units to be located as directed. C. Mark Series Fire Extinguisher Brackets, supporting bottom and sides of extinguishers, by J.L. Industries or equal, shall be provided for all fire extinguishers. PART 3 EXECUTION 3.01 INSTALLATION A. Fire extinguishers and brackets shall be installed at the locations shown and as directed. 1 City of Ocoee 10522-1 G&R Project No. 98518.01 I 3 B. Mount brackets for 20 lb units 4 feet 6 inches above finish floor with expansion bolts into masonry. Brackets shall be secured similarly, height as directed. C. All fire extinguishers shall be inspected and certified within thirty days of start-up. END OF SECTION I I I I I 3 3 3 I I I I City of Ocoee 10522-2 G&R Project No. 98518.01 SECTION 13121 PRE-ENGINEERED METAL BUILDING PART 1 GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required to design, fabricate, deliver to project site, and erect the pre-engineered Building as shown on the Drawings and as specified herein. B. Material furnished shall include the structural framing, connections, anchor bolts, framed openings for roof penetrations, and framed openings for doors;metal roofing and insulation with vinyl liner, skylights, metal siding with metal interior wall liner system, metal curbs, pipe flashing, gutters, downpouts, gable trim, flashing, closures, fasteners, sealants, insulation, and all other component parts for a complete weathertight, exterior envelope. Building shall be fully insulated in walls and roof. C. All materials shall be new, fabricated in a workmanlike manner, and free of defects. 1.02 RELATED WORK A. Site preparation and earthwork is included in Division 2. B. Formwork, reinforcement and cast-in-place concrete are included in Division 3. C. Steel doors and frames are included in Section 08110. D. Overhead roll-up doors are included in Section 08331. E. Finish hardware is included in Section 08710. F. Glass and glazing for doors and windows are included in Section 08800. G. Louvers are included in Section 10200. H. Other internal work following erection of building is included in Division 9 through 11, 15, and 16, as applicable. 1.03 SUBMITTALS A. Submit to the ENGINEER as provided complete plans showing superstructure column lines set to coordinate with concrete dimensions shown. Indicate anchor bolt size and locations and foundation reactions in KIPS at all columns. City of Ocoee 13121-1 G&R Project No. 98518.01 I B. Submit product information, specifications, and installation instructions for all components and accessories proposed. C. Submit shop drawings and complete erection drawings for review as provided in Section 01300, including: 1. Anchor bolt and base plate settings. 2. Sidewall, end wall, roof framing, and bracing. 3. Transverse cross-sections and details of openings, covering, and trim. D. Records 1. Furnish the ENGINEER the following records: 3 a. Letter signed and sealed by a professional engineer registered in the state in which the building is to be erected certifying that the structural framing and3 covering panels proposed meet the design criteria set forth by the ENGINEER. Two sets of designcalculations signed and sealed bya Professional b. gn Engineer registered in the state of the project records. c. One set of reproducible "as-built" erection plans. E. Samples 1. Two each of the following samples shall be submitted for approval of materials, finish, color, and texture. a. Full panel width by 12-inch minimum long roofing, and wall panels including liner(if any) in proposed colors and finish. b. Twelve-inch minimum long formed sections of gutter, gutter tailpiece, gable trim, and flashings in proposed colors and finish. 3 c. Each proposed fastener. d. Sealants and closures. F. Color Charts 1. Submit standard MANUFACTURER's color charts for initial color selection. 1 2. Colors shall be selected by ENGINEER and approved by OWNER. 3 City of Ocoee 13121-2 G&R Project No. 98518.01 G. Signed and sealed plans and design calculations shall be submitted to the ENGINEER for approval prior to erection. H. Submit building manufacturers welder certifications. 1.04 DELIVERY, STORAGE, AND HANDLING A. Deliver, store, and handle prefabricated components, sheets, panels, and other manufactured items so they will not be damaged or deformed. Stack materials on platforms or pallets, covered with tarpaulins or other suitable weathertight ventilated covering. Store metal sheets or panels so that water accumulations will drain freely. Do not store sheets or panels in contact with other materials which might cause staining. 1.05 WARRANTY A. Provide 1 year warranty for all furnished components except provide 20 year warranty for wall and roof panels. Provide 20 year extended life endorsement and 10 year weathertightness endorsement for furnished metal curbs, and provide full 20 year weathertightness endorsement for roof panels. If items of this Specification conflict with the issuance of the warranty, provisions for qualifying components as approved shall be made so that the warranty may be issued. PART 2 PRODUCTS 2.01 GENERAL A. The specification is for a pre-engineered metal building by Butler Manufacturing Company, Kansas City, Missouri;Varco-Pruden Buildings,Memphis, Tennessee;or equal. All components listed are those manufactured by Butler Manufacturing Company and are used as a basis for the design. All components provided shall meet or exceed the requirements of the specification and shall be provided by the MANUFACTURER selected by the OWNER. B. Design of the structural system for the Dewatering Building is to be a clear span rigid frame with tapered columns,tapered roof beams, and a gable roof(Butler Type LRF). C. Actual building length and building width to be structural line to structural line, incorporating nominal bays and widths in the MANUFACTURER'S standard sizes. D. Roof to be sloped as shown on drawings. E. All corfiponents and parts of the structural system to be as indicated on the Drawings and in this section of the Specifications. F. All components and parts to be clearly marked. City of Ocoee 13121-3 G&R Project No. 98518.01 I G. Erection Drawings, signed and sealed by a Professional Engineer registered in the state to be supplied for identification and assembly of parts. H. Field modification to be in accordance with best standard procedures and to be the responsibility of the building erector. I. All reactions for the foundation design are to be supplied by the pre-engineered building manufacturer prior to building foundation shop drawing submittal. J. The foundation sizing and reinforcement details are to be based on the MANUFACTURER's building details and are to be compatible with the reactions, loadings, stresses and column locations supplied by the pre-engineered building manufacturer. The foundation sizing and locations as shown on the Drawings are pre- liminary and have been based on realistic reactions for the building dimensions and loadings specified herein. The cost for any required amendments to the foundation material quantities as shown on the Drawings shall be a subsidiary obligation of the CONTRACTOR and shall not result in any additional cost to the OWNER. Anchor bolt locations, size and quantityto be designed by the building manufacturer K. gn and supplied by the CONTRACTOR. 2.02 DESIGN CRITERIA 3 A. Primary and secondary members and covering shall be designed for all applicable loads and combinations of these loads as set forth in the MBMA "Recommended Design Practices Manual", as required by the governing building code, and as specified herein. Roof system shall have a U.L. wind uplift Class 90 rating. B. Design shall allow for concentrated loads for equipment attached to building structure as shown and for the dead load of the structure itself. C. Column reactions shall be vertical and horizontal only. No bending moments will be allowed at the column bases. 3 D. The design, fabrication, and erection of the building shall conform to the applicable sections of the latest edition or revision of the following codes and standards. 1. American Institute of Steel Construction a. Specifications for the Design,fabrication, and Erection of Structural Steel for Buildings 2. American Iron and Steel Institute a. Specifications for the Design of Cold-Formed Steel Structural Members b. Design of Light Gauge Steel Diaphragms3 City of Ocoee 13121-4 G&R Project No. 98518.01 3. American Welding Society a. Structural Welding Code 4. Metal Building Manufacturer's Association a. Recommended Design Practices Manual 5. American Society of Testing and Materials a. Material designation as specified herein by ASTM number 2.03 MATERIAL (FRAMING) A. Primary Framing 1. Rigid Frames: a. Frames shall consist of welded up plate section columns and roof beams complete with necessary splice plates for bolted field assembly. b. Welding shall be done in accordance with the American Welding Society Code for Building Construction. 1) Certification of welder qualifications to be supplied. c. All base plates, cap plates, compression plates, and stiffener plates to be factory-welded into place and have the connection holes shop fabricated. d. All splice plates to be shop fabricated complete with bolt connection holes. e. Columns and roof beams shall be fabricated complete with holes in webs and flanges for the attachment of secondary structural members and bracing. 2. All bolts for field assembly of frame members shall be high strength bolts as indicated on erection Drawings. 3. Endwall Structurals: a. Endwall frames shall consist of endwall corner posts, endwall roof beams, and endwall posts as required by design criteria. 1) All splice plates and connection clips shall be shop fabricated complete with bolt connection holes. 2) Beams and posts shall be shop fabricated complete with holes for the attachment of secondary structural members. B. Secondary Structural Members City of Ocoee 13121-5 G&R Project No. 98518.01 3 1. Purlins and Girts: a. Purlins and girts shall be 12-in deep "Z" sections, precision roll formed. b. Outer flange of all purlins and girls shall contain factory-punched holes for panel connections. 3 2. Eave Struts: a. Eave struts shall be 12-in deep "C"sections. b. Outer flange of all eave struts shall contain factory-punched holes for panel connections. 3. Bracing: 3 a. Diagonal bracing shall be designed by the building manufacturer and attached to columns and roof beams. 3 b. Flange braces, sag angles, etc., when required, shall be supplied by the building manufacturer. 3 c. All bracing locations shall be coordinated with ductwork, piping, door openings, and ventilation openings. D. Structural Painting: 1. All structural steel shall be shop prepared, shop primed, and field painted prior to erection. For additional requirements, see Division 9. Primer products shall be compatible with finish paints system specified in Section 09902. 3 a. Prior to painting all steel shall be cleaned of loose rust, loose mill scale, dirt and other foreign material. Unless otherwise specified the fabricator shall not san-blast, flame clean or pickle prior to painting. Factory cover all steel with one coat of red oxide primer paint formulated to equal or exceed the performance requirements of Federal Specification TT-P-636D, TT-P-664C and SSPC Paint-25. b. Primary Frames 1) Clean all steel per SSPC-SP2. Apply one coat of water reducible alkyd primer by spray or dip method to a minimum coating thickness of 1.0 mil. c. Secondary Structurals 2) Clean all steel per SSPC-SP8. Apply one coat of coil applied polyester primer to a minimum coating thickness of 0.5mil(purlins and girls). 3 City of Ocoee 13121-6 G&R Project No. 98518.01 2.04 MATERIAL (ROOF SYSTEM) A. General 1. The building roof panels shall be precision roll formed MR-24 panels as furnished by Butler Manufacturing Company. 2. Details shall be in accordance with the MANUFACTURER's drawings. 3. Installation shall be in accordance with the MANUFACTURER's drawings. B. Panel Description 1. Panels shall be roll formed to provide a width coverage of 24". a. There shall be two major corrugations, 2" high, spaced 24" on center. b. There shall be minor spaced corrugations, 6" on center between and g perpendicular to the major corrugations. 2. The panel endlaps shall be 6". a. Panels shall be of maximum length so as to minimize panel endlaps. b. Endlaps shall be engineered to occur over and be fastened to a secondary structural member. c. The upper end of all panels shall be marked for the proper location of endlap sealant. 3. Ridge assembly shall be designed to allow for expansion and contraction. 4. Eave panels shall extend beyond the building structural line. 5. Panels shall be factory prepunched at panel ends to match prepunched holes in the eave structural members. Panel end splices shall be factory pre-punched and pre- notched. Panel end splices shall allow for expansion and contraction of the panels. 6. Panel Material and Finish a. Panel material as specified shall be 24 gauge galvanized steel(80,000 psi yield) G90 coating conforming to ASTM Galvanized Specification A-525 (latest issue). b. Exterior finish shall be standard Butler-Cote® 500-FP paint (70% Kynar City of Ocoee 13121-7 G&R Project No. 98518.01 I 500 fluoropolymer). Interior color shall be polyester paint not formulated for exterior weathering. All colors to be selected by ENGINEER and approved by OWNER. C. Panel Design 1. Panel design shall be in accordance with paragraph 2.02 herein. 2. Panel design shall provide for expansion and/or contraction as caused by an ambient temperature range of 120 degrees F without causing harmful buckling, opening of joints, and other detrimental effects. D. Fasteners 1. Insulation, bearing plates, and panel clips shall be fastened to structural members with fasteners as per manufacturer's erection drawings, using factory prepunched holes in structural members. 2. All connections of MR-24 panels to structural members except at eave shall be made with clips with moveable tabs that are seamed into the standing seam sidelap. 3 3. Panel clips shall be fastened to structural members with fasteners as per MANUFACTURER's erection drawing, using factory pre-punched holes in3 structural members. 4. MR-24 panel-to-panel connections shall be made with a positive, field formed standing double-lock seam. E. Accessories 3 1. Accessories to be standard with Butler Manufacturing Company, unless otherwise noted and furnished as specified. Location of standard accessories on the erection drawings as furnished by the MANUFACTURER. Installation of accessories shall be in accordance with the MANUFACTURER's instructions and as shown on the drawings. a. Insulation shall be 6" vinyl faced, fiberglass blanket insulation with a R-19 value. The heat loss caused by the compression of blanket insulation shall be minimized by the use of spacer blocks. b. Vapor retarder/insulation liner shall be 0.0032" minimum thick vinyl. c. Metal curbs and pipe flashings to be Butler standard except that interior faces of curbs must be fully enclosed also. d. Gutters, downspouts, and trim pieces are to be standard Butler3 City of Ocoee 13121-8 G&R Project No. 98518.01 1 Manufacturing products installed in accordance with MANUFACTURER's instructions and as shown on the erection drawings. e. Skylights shall be insulated lite panels as compatible with MR-24 roof panel system. 1) Lite panels shall be translucent cool white, fiberglass reinforced, insulated, plastic panel. The panel shall provide diffused natural light and maintain a weathertight roof system. 2) Provide number of skylights in locations as shown on the Drawings. 3) Panels shall nominal 2'0" wide by 10'6" long. 4) Load capacity shall equal or exceed that of roof panels. 5) Interior and exterior faces of insulated panel shall be factory assembled and sealed, forming a 1" dead air space. f. All miscellaneous trim, gutters, downspouts and accessories are to match adjacent panel colors. F. Panel Application 1. All panels shall be factory cut-to-length according to the erection drawings as furnished by Butler Manufacturing Company. 2. All panels shall be positioned and aligned to hold the 24" module throughout the building length. 3. Prepunched panels shall be positioned and aligned by matching the prepunched holes in the panel with the prepunched roof structurals. 4. Panel sidelaps shall be field seamed; all sidelap sealant shall be factory applied. 5. All endlaps will be at least 6" and fastened together over and to structural members. 6. All panel sidelaps and endlaps shall be sealed with weather sealing compound to prevent the entry of capillary moisture. 7. Fasteners shall be installed with proper tools, in a workmanlike manner according to the recommendations of the MANUFACTURER. 2.05 MATERIAL (WALL SYSTEM) A. General 1. Exterior wall panels shall be Butlerib panels as furnished by Butler Manufacturing Company and installed in accordance with MANUFACTURER's instructions. City of Ocoee 13121-9 G&R Project No. 98518.01 B. Panel Description 3 1. Panels shall be 36" wide with four major corrugations, 1-1/2" high, 12" on center with two minor corrugations between each of the major corrugation the entire length of the panel. 2. Panels shall be one piece from base to building eave. 3 3. The upper end of panels shall be cut to match roof panels and slopes. 4. The bottom end of the panels shall be straight cut. 5. Wall panel ends shall be factory prepunched and shall match prepunched holes in structural steel. 6. Panel Material and Finish a. Panel material shall be ASTM A446, Grade C, 26 gauge steel with zinc3 coating(designated G90) conforming to ASTM A525. b. Exterior panel finish shall be standard Butler-Cote® 500-FP paint (70% Kynar 500 fluoropolymer). Color to be selected by ENGINEER and approved by OWNER. c. Interior finish shall be warm gray, Butler-Cote® 500FP polyester color coat. C. Panel Design 1. Panel design shall be in accordance with paragraph 2.02 herein. 2. Panel design shall provide for expansion and/or contraction as caused by an ambient temperature range of 120 degrees F without causing harmful buckling, 3 opening of joints, and other detrimental effects. D. Accessories 1. Accessories to be standard with Butler Manufacturing Company unless otherwise specified. Standard accessory locations shall be as shown on erection drawings as furnished by the MANUFACTURER. a. All miscellaneous trim and accessories are to match adjacent panels. b. The exterior walls shall be insulated with 4" vinyl faced, fiberglass blanket insulation with an R-13 value. c. Vapor retarder/insulation liner shall be 0.0032" minimum thick vinyl. 3 City of Ocoee 13121-10 G&R Project No. 98518.01 E. Interior Wall Liners 1. MOD-36 Liner Panel shall be nominal 36" wide with major corrugations 9/16" high, 2 9/16" on center. Install liner panels from floor to top of column. 2. Panel shall be formed from 28 gage steel with minimum yield strength of 80,000 psi. 3. Panels finish shall be G60 galvanized steel(per ASTMA-525, latest issue), and 0.60 mil(minimum) stone white polyester paint on exposed side, and 0.30 mil (minimum)wash coat paint (color may vary) on unexposed side. F. Fasteners 1. Butlerib wall panel-to-structural connections shall be made with Scrubolts or self drilling screws. Panel-to-panel connections shall be made with self-drilling screws. 2. Fastener locations shall be as shown on erection drawings as furnished by Butler Manufacturing Company. 3. All exposed fasteners shall be prepainted to match wall color. G. Panel Application 1. Structural system shall be plumb before wall panels are attached. 2. Panels shall be aligned and attached in accordance with erection drawings furnished by Butler Manufacturing Company. 3. All sidelaps shall be at least one corrugation. 4. Panels shall be closed at base by metal closure. 5. Trim materials should be as follows: a. Outside corner trim shall be of the same material and finish as the exterior of wall panel. b. Gutters, downspouts, eave trim and gable trim shall be prepainted galvanized steel. c. Door side trim, drip gutters and base trim shall be: 1) Prepainted galvanized steel. Color to be selected by ENGINEER and approved by OWNER. City of Ocoee 13121-11 G&R Project No. 98518.01 PART 3 EXECUTION 3.01 INSTALLATION A. The pre-engineered building shall be erected on the site as indicated on the Drawings. B. There-en ineered buildingshall not be fabricated or erected until: P g 1. Structural loadings, as required herein to be supplied by the building manufacturer, have been approved by the ENGINEER. 2. The foundation design and details based on the structural loadings, have been approved by the ENGINEER. C. No erection of the pre-engineered building shall take place until the foundation work, the concrete floor slab, plumbing and other incidentals required to be built prior to the building installation have been approved by the ENGINEER. D. No erection of the pre-engineered building shall take place until sufficient components P g � of the building to enable a stable structure to be erected are on site. for ensuringthat all safetyprocedures for the E. The CONTRACTOR is responsible o erection of the building are strictly enforced and that any required ties, stays and temporary works are positioned as necessary to keep the structure stable and secure at3 all times. F. All installation of the building to be to the MANUFACTURER's instructions and requirements. G. The building manufacturer shall provide all necessary framing details to the openings in the walls, roofing and other components where shown on the Drawings. The cost of all such framing shall be included in the installed cost of the pre-engineered building. H. The building manufacturer shall provide, at no additional cost to the OWNER, all necessary repair and touch-up work required as a result of damage to building components due to required cut-outs, penetrations or by mishandling prior to and during erection. 3 END OF SECTION I I City of Ocoee 13121-12 G&R Project No. 98518.01 SECTION 15010 BASIC MECHANICAL REQUIREMENTS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Basic Requirements: Requirements of the Contract Forms, Conditions of the Contract, Specifications, Drawings, and Addenda and Contract Modifications (the Contract Documents), apply to the requirements of each Section of Division 15. B. Conflicts: Nothing contained in this Section shall be construed to conflict in any way with other provisions or requirements of the Contract documents. The intent is that this Section will take precedence. Where differences arise,the Architect shall decide which directions or instructions take precedence. 1.02 SUMMARY A. General: Unless an item is specifically mentioned as being provided by others, the requirements of Division 15 Contract Documents shall be completed. The systems, equipment, devices and accessories shall be installed, finished, tested and adjusted for continuous and proper operation. Any apparatus, material or device not shown on the Drawings but mentioned in these Specifications,or vice versa,or any incidental accessories necessary to make the project complete and operational in all respects, shall be furnished, delivered and installed without additional expense to the Owner. Include all materials, equipment, supervision, operation, methods and labor for the fabrication, installation, start-up and tests necessary for complete and properly functioning systems. B. Code Compliance: Refer to Division 1. Comply with all rules, regulations, standards, codes,ordinances and laws of local,state and federal governments and the amendments and interpretation of such rules, regulations, standards, codes, ordinances and laws of local, state and federal governments by the authorities having lawful jurisdiction. C. NFPA: Comply with the National Fire Codes compiled by the National Fire Protection Association. D. Standard Building Code: Conform in strict compliance to the Southern Building Code Congress International, Inc. (SBCCI), Standard Building Code, 1997 Edition; Standard Mechanical Code, 1997 Edition; Standard Plumbing Code, 1997 Edition; Standard Gas Code, 1997 Edition; and the amendments to these codes which are enforced by the local authority having lawful jurisdiction. E. Notification: Comply with all of the requirements of the Federal "Right-To-Know" Regulations and the Florida "Right-To-Know" Law and provide notification to all parties concerned as to the use of toxic substances. City of Ocoee 15010-1 G&R Project Nof. 98518.01 1.03 DRAWINGS AND SPECIFICATIONS A. Intent: The intent of the drawings and specifications is to establish minimum acceptable quality standards for materials, equipment and workmanship, and to provide operable mechanical systems complete in every respect. diagrammatic, intended to show general B. Equipment Placement: The drawings are gr arrangement, capacity and location of various components, equipment and devices. Each location shall be determined by reference to the general building plans and by actual measurements in the building as built. Reasonable changes in locations ordered by the Architect prior to the performance of the affected Work shall be provided at no additional 3 cost to the Owner. C. Drawing Scale: Due to the small scale of the drawings, and to unforeseen job conditions, all required offsets, transitions and fittings may not be shown but shall be provided at no additional cost. D. Conflict: In the event of a conflict,the Architect will render an interpretation in accordance with the General Conditions. 1.04 DEFINITIONS 3 A. Provide/Install: The word"provide"shall mean furnish,install,connect,test,complete,and 3 leave ready for operation. The word "install" where used in conjunction with equipment furnished by the Owner or under another contract shall mean mount,connect,complete,and leave ready for operation. B. Concealed: The surface of insulated or non-insulated piping or ductwork is concealed from view when standing inside a finished room, such as inside a chase or above a ceiling. C. Exposed: The surface of insulated or non-insulated piping or ductwork is seen from inside a finished room, such as inside an equipment or air handling unit room. D. Protected: The surface of insulated or non-insulated piping or ductwork on the exterior of the building but protected from direct exposure to rain by an overhang, eave, in an unconditioned parking garage or building crawl space. ri E. Unprotected: The surface of insulated on non-insulated piping or ductwork on the exterior of the building and exposed to rain. F. Abbreviations: Abbreviations, where not defined in the Contract Documents, shall be interpreted to mean the normal construction industry terminology, as determined by the Architect. Plural words shall be interpreted as singular and singular words shall be interpreted as plural where applicable for context of the Contract Documents. 1.05 SHOP DRAWINGS A. General: Refer to paragraph entitled"SUBMITTAL" in this section. Include the following data: City of Ocoee 15010-2 G&R Project Nof 98518.01 131 1. Shop Drawings: a. Submit shop drawings for the following: 1) Each piping system. 2) Ductwork systems as defined in Section 15890. 1.06 SUBMITTAL A. General: The provisions of this section are supplemental to the requirements in Division 1, and only apply to the material and equipment covered in Division 15. B. Time: Submit manufacturer's literature, performance data and installation instructions covered in each Section of Division 15 under an individual letter of transmittal within 30 days after Notice to Proceed unless otherwise indicated. C. Submitter's Review: All items required for each section shall be reviewed before submittal. Submittal information for each item shall bear a review stamp of approval, indicating the name of the Contractor and Subcontractor(where applicable), the material suppliers, the initials of submitter and date checked. Responsibility for errors or omissions in submittals shall not be relieved by the Architect's review of submittals. Responsibility for submittals cannot be subrogated to material suppliers by Contractors or Subcontractors. 1. Review of the submittal data,whether indicated with"APPROVED" or with review comments, does not constitute authorization for or acceptance of a change in the contract price. D. Architect's Review: The submittal data shall be reviewed only for general conformance with the design concept of the project and for general compliance with the Contract Documents. Any action indicated is subject to the requirements of the Contract Documents. Reviews of submittal data review shall not include quantities; dimensions (which shall be confirmed and correlated at the job site); fabrication processes; techniques of construction; and co-ordination of the submittal data with all other trades. Copies of the submittal data will be returned marked "APPROVED", "APPROVED AS NOTED", "RETURNED FOR CORRECTION AND RESUBMITTAL", "DISAPPROVED" or "SUBMIT SPECIFIED ITEM". E. Submittal Items: Submittal items shall be inserted in a Technical Information Brochure. Mark the appropriate specification section or drawing reference number in the right hand corner of each item. All typewritten pages shall be on the product or equipment manufacturer's printed letterhead. 1. Manufacturer's Literature: Where indicated, include the manufacturer's printed literature. Literature shall be clearly marked to indicate the item intended for use. 2. Performance Data: Provide performance data,wiring and control diagrams and scale drawings which show that proposed equipment will fit into allotted space(indicate areas required for service access, connections, etc.), and other data required for the City of Ocoee 15010-3 G&R Project Nof. 98518.01 Architect to determine that the equipment complies with the Contract Documents. Where noted, performance data shall be certified by the manufacturer at the design rating points. 3. Installation Instructions: Where requested, each product submittal shall include the manufacturer's installation instructions. Generic installation instructions are not acceptable. Instructions shall be the same as those included with the product when it is shipped from the factory. 4. Written Operating Instructions: Instructions shall be the manufacturer's written operating instructions for the specified product. If the instructions cover more than one model or type of product they shall be clearly marked to identify the instructions that cover the product delivered to the project. Operating Instructions shall be submitted immediately after the product or equipment submittal has been returned from the Architect marked "APPROVED" or"APPROVED AS NOTED". 5. Maintenance Instructions: Information shall be the manufacturer's printed instructions and parts lists for the equipment furnished. If the instructions cover more than one model or type of equipment they shall be marked to identify the instructions for the furnished product. Submit maintenance instructions immediately after the product or equipment submittal has been returned from the Architect 3 marked "APPROVED" or"APPROVED AS NOTED". F. Substitutions: 1. General: Refer to Division 1. Substitutions may be considered for any product or equipment of a manufacturer. See paragraph entitled "MANUFACTURER" in this Section. Any product or equipment may be submitted for review; however,only one substitution per item will be considered. If a substituted product or equipment item is rejected, provide the specified product or equipment. a. Submittal shall include the name of the material or equipment to be substituted, equipment model numbers, drawings, catalog cuts,performance and test data and any other data or information necessary for the Architect to determine that the equipment meets the specification requirements. If the Architect accepts any proposed substitutions, such acceptance will be set forth in writing. b. Substituted equipment with all accessories installed or optional equipment where permitted and found acceptable, must conform to space requirements. Substituted equipment that cannot meet space requirements,whether accepted 3 or not, shall be replaced at no additional expense to the Owner. If the substituted item affects the work of other trades, the Request for Substitution form shall include a list of the necessary modifications. 2. Deviations: The Request for Substitution form shall include a complete list of deviations from the scheduled item stating both the features and functions of the scheduled item and the comparable features and functions of the proposed substitution. City of Ocoee 15010-4 G&R Project Nof. 98518.01 t a. Any deviation not indicated in writing will be assumed to be identical to the specified item even if it is shown otherwise on the submittal data. b. If a deviation not listed is found anytime after review and acceptance by the Architect and that deviation, in the opinion of the Architect, renders the substituted item as unacceptable, the item shall be removed and replaced by the scheduled item at no additional cost to the Owner. c. The Architect shall retain the right to specify modifications to the substituted item,correcting or adjusting for the deviation, if the Architect deems it to be in the best interest of the Owner. 3. Scheduled Item: A scheduled item is a product or item of equipment indicated in the Contract Documents by manufacturer's name and model number identifying a single item. The manufacturer's trade name for a group of products that does not signify a single item including type, style, quality, performance, and sound rating shall not be classified as a scheduled item. Where more than one manufacturer and product model number are indicated, each shall be considered as a scheduled item. 4. Form: When a product or item of equipment is proposed as a substitution a "REQUEST FOR SUBSTITUTION" form shall be completed and submitted with the required data. A copy of the form is included after the end of this section. 5. Rejection: Substituted products or equipment will be rejected if, in the opinion of the Architect, the submittal does not meet any one of the following conditions or requirements: a. The submittal data is insufficient or not clearly identified. The Architect may Cor may not request additional information. 1 b. The product or equipment will not fit the space available and still provide the manufacturer's published service area requirements. c. The product or equipment submitted is not equivalent to or better than the specified item. Products or equipment of lesser quality may be considered provided an equitable financial rebate, satisfactory to the Architect, is to be returned to the Owner. d. The product or equipment submitted has less capacity, efficiency and safety provisions than the specified item. e. The product or equipment submitted does not have warranty, service and Efactory representation equivalent to that specified. f. The Owner prefers not to accept the submitted product. C R Project Nof. 98518.01 City of Ocoee 15010-5 G& � G. Technical Information Brochure: 1. Binder: Include binders with the first submittal for the Technical Information Brochure. Each binder shall be size 3 inch,hard-cover, 3-ring type for 8-1/2" X 11" sheets. Provide correct designation on outside cover and on spine of each binder, i.e., MECHANICAL SUBMITTAL DATA, MECHANICAL OPERATION INSTRUCTION and MECHANICAL MAINTENANCE INSTRUCTIONS. 2. Number: Submit not less than five sets of binders for each of the three mechanical brochures indicated above. Each set shall consist of a minimum of two binders for submittal data and 1 binder each for operating instructions and for maintenance instructions. Additional binders shall be submitted at the request of the Architect. One set of binders shall be retained by the Architect. Three sets of binders shall be maintained for the Owner and the remaining set shall become the property of the Engineer. 3. Index: First sheet in each brochure shall be a photocopy of the "Division 15 Index" of the specifications. Second sheet shall list the firm name, address,phone number, superintendent's name for the contractor and all major subcontractors and suppliers associated with the project. 4. Dividers: Provide reinforced separation sheets tabbed with the appropriate specifications Section reference number for each Section in which submittal data or operation and maintenance instructions is required. 5. Specifications: Insert a copy of the specifications for each Section and all addenda applicable to the Section between each of the Section dividers. 1.07 SHOP DRAWINGS FOR PIPING SYSTEMS A. Requirements: Make Shop Drawings for piping systems at a minimum scale of 1/4 inch per foot on reproducible transparencies to verify clearances and equipment locations. Show required maintenance and operational clearances. Identify Shop Drawings by project name and include names of Architect, Engineer, Contractors, Subcontractors and supplier, date in Shop Drawing title block. Number drawings sequentially and indicate: 1. Architectural and structural backgrounds with room names and numbers, etc., including but not limited to plans, sections, elevations, details, etc. 2. Fabrication and erection dimensions. 3. Arrangements and sectional views. 4. Necessary details, including complete information for making connections to equipment. 5. Descriptive names of equipment. 6. Modifications and options to standard equipment required by Contract Documents. City of Ocoee 15010-6 G&R Project Nof. 98518.01 I I B. Stamp Area: Leave 4 inch by 2-1/2 inch blank area near title block for Architect's shop drawing stamp. The acceptance of a shop drawing by indicating "APPROVED" does not relieve the contractor from full compliance with the sizes and equipment connections shown on the contract documents unless the changes are specifically indicated on the shop drawing. C. Reference Key: Indicate by cross reference the Contract Drawings,notes, or Specification Cparagraph numbers where item(s) occur in the Contract Documents. D. Additional Requirements: See specific Sections for additional requirements. IE1.08 SHOP DRAWINGS FOR DUCT SYSTEMS II A. Requirements: Make Shop Drawings for duct systems at a minimum scale of 1/4 inch per foot on reproducible transparencies to verify clearances and equipment locations. Show required maintenance and operational clearances. Identify Shop Drawings by project name and include names of Architect, Engineer, Contractors, Subcontractors and supplier, date in Shop Drawing title block. Number drawings sequentially and indicate: C 1. Architectural and structural backgrounds with room names and numbers, etc., including but not limited to plans, sections, elevations, details, etc. IL2. Fabrication and erection dimensions. 3. Arrangements and sectional views. 4. Necessary details, including complete information for making connections to air Cdistribution devices and air handling equipment. 5. Kinds of materials and finishes. 6. Descriptive names of equipment. 7. Modifications and options to standard equipment required by contract. B. Stamp Area: Leave 4 inch by2-1/2 inch blank area near title block for Architect's shop E drawing stamp. The acceptance of a shop drawing by indicating "APPROVED" does not relieve the contractor from full compliance with the sizes and connections shown on the contract documents unless the changes are specifically indicated on the shop drawing. C. Reference Key: Indicate by cross reference the Contract Drawings,notes, or Specification paragraph numbers where item(s) occur in the Contract Documents. ID. Ceiling Plans: Provide Shop Drawings,using sepias of architectural reflected ceiling plans, which indicate locations of exposed air distribution devices, sprinkler heads, lights and Caccess panels. E. Additional Requirements: See specific Sections for additional requirements. City of Ocoee 15010-7 G&R Project Nof. 98518.01 1.09 MANUFACTURER'S CHECKOUT A. Start-up and Checkout: At completion of installation and prior to performance verification, 3 a factory trained representative of the manufacturer shall provide start-up and checkout service. After the performance verification the manufacturer's representative shall examine performance information and check the equipment in operation, and sign "Check-Out Memo" for the record. Submit a copy of Memo on each item of equipment where indicated in individual sections of these specifications for inclusion in each Technical Information Brochure. The "Check-Out Memo" shall be included with the performance verification data. Do not request "Instruction in Operation Conference" or request final inspection until Memos have been submitted and found acceptable. 1.10 INSTRUCTION TO OWNER A. General: Instructions to the Owner shall be by competent representatives of the manufacturers involved, with time allowed for complete coverage of all operating procedures. Provide classroom instruction and field training in the design, operation and maintenance of the equipment and troubleshooting procedures. Explain the identification system, operational diagrams, emergency and alarm provisions, sequencing requirements, seasonal provisions, security, safety, efficiency and similar provisions of the systems. On the date of substantial completion, turn over the prime responsibility for operation of the mechanical equipment and systems to the Owner's operating personnel. I B. Training Period: Training period shall encompass a minimum of 4 hours of classroom and 4 hours of hands-on instructions with a maximum period of 4 hours per day. C. Scheduling: Submit any remaining required items for checking at least one week before final inspection of building. When submittal items are found acceptable, notify Owner, in writing, that an"Instruction in Operation Conference" may proceed. Conference will be scheduled by the Owner. After the conference, copies of a memo certifying that the "Instruction in Operation Conference" and "Completed Demonstration" have been made will by signed by Owner and the instructors, and one copy will be inserted in each Technical Information Brochure. PART 2 -PRODUCTS 2.01 MANUFACTURERS A. Specified Products: Manufacturer's names and product model numbers indicated on the drawings and in these specifications establish the type, style, quality, performance, and sound rating of the desired product. Listing of other manufacturers indicates that their equivalent products would be acceptable if they meet the specification requirements, the specific use and installation shown on the drawings, including space and clearance requirements, and the energy consumption and efficiency of the specified product. The listing of additional manufacturers in no way indicates that the manufacturer can provide an acceptable product. City of Ocoee 15010-8 G&R Project Nof. 98518.01 I C B. Space Requirements: All manufactured products furnished on this project must have the It required space and service areas indicated in the manufacturer's printed literature or shown on their shop drawing. When the manufacturer does not indicate the space required for servicing the equipment, the space shown on the drawings or as required by the Architect Cmust be provided. 2.02 MATERIAL AND EQUIPMENT A. General: Material and equipment used shall be produced by manufacturers regularly engaged in the production of similar items, and with a history of satisfactory use as judged by the Architect. B. Specified Equipment: Equipment shall be the capacity and types indicated or shall be C equivalent in the opinion of the Architect. Material and equipment furnished and installed shall be new, recently manufactured, of standard first grade quality and designed for the specific purpose. Equipment and material furnished shall be the manufacturer's standard C item of production unless specified or required to be modified to suit job conditions. Sizes, material, finish, dimensions and the capacities for the specified application shall be published in catalogs for national distribution. Ratings and capacities shall be certified by C a recognized rating bureau. Products shall be complete with accessories,trim, finish,safety guards and other devices and details needed for a complete installation and for the intended use and effect. C. Compatibility: Material and equipment of one and the same kind,type or classification and used for identical or similar purposes shall be made by the same manufacturer. Where more than one choice is available, select the options which are compatible with other products already selected. Compatibility is a basic general requirement of product Cselection. PART 3 - EXECUTION 3.01 WORKMANSHIP 11 A. General: The installation of materials and equipment shall be done in a neat,workmanlike and timely manner by an adequate number of craftsmen knowledgeable of the requirements of the Contract Documents. They shall be skilled in the methods and craftsmanship needed I to produce a first-quality installation. Personnel who install materials and equipment shall be qualified by training and experience to perform their assigned tasks. B. Acceptable Workmanship: Acceptable workmanship is characterized by first-quality appearance and function which conforms to applicable standards of building system construction and exhibits a degree of quality and proficiency which is judged by the C Architect as equivalent or better than that ordinarily produced by qualified industry tradesmen. IE C. Performance: Personnel shall not be used in the performance of the installation of material and equipment who, in the opinion of the Architect, are deemed to be careless or unqualified to perform the assigned tasks. Material and equipment installations not in compliance with the Contract Documents, or installed with substandard workmanship in City of Ocoee 15010-9 G&R Project Nof. 98518.01 the opinion of the Architect, shall be removed and reinstalled by qualified craftsmen at no change in the contract price. 3 3.02 CLEANING AND PROTECTION A. General: Refer to Division 1. 3 B. Housekeeping: Keep interiors of duct and pipe systems clean and free from dirt,rubbish and foreign matter. Close open ends of piping and ductwork at all times throughout the 3 installation. Install 30% efficient filter media over each return air grille and open return duct opening; change media regularly during construction when dirty to keep duct interiors clean. Prevent dust, debris and foreign material from entering the piping and ductwork. 3 C. Equipment Protection: Protect fan motors, switches, equipment, fixtures, and other items 3 from dirt,rubbish and foreign matter. Do not operate air handling equipment if the building is not clean or if dust can enter the coils or the fan housings. D. Equipment Cleanin : Thoroughly clean equipment and entire piping systems internally g g Y upon completion of installation and immediately prior to final acceptance. Open dirt pockets and strainers, blow down each piping system and clean strainer screens of accumulated debris. Remove accumulated dirt, scale, oil and foreign substances. Thoroughly wipe clean internal surfaces of ductwork and air handling units prior to request for substantial completion. E. Building Cleanup: Remove debris, rubbish, leftover materials, tools and equipment from work areas and site. Clean tunnels and closed off spaces of packing boxes, wood frame members and other waste materials used in the installation. Final acceptance shall not be approved until site is cleaned. F. Fixture Cleanup: Remove temporary labels, stickers, etc., from fixtures and equipment. P Do not remove permanent name plates, equipment model numbers, ratings, etc. G. Filter Replacement: Provide filters,with the same efficiency rating as required for the final installation, for the protection of the air moving equipment and ductwork continuously throughout the construction phase. Provide a new set of clean filters for the test and balance of the air side equipment. H. Protection of Finished Installation: Where installation is required in areas previously finished by other trades, protect the area from marring, soiling or other damage. 3.03 CORRECTION OF WORK A. General: At no additional cost to the Owner, rectify discrepancies between the actual installation and contract documents when in the opinion of the T&B Agency or the Architect the discrepancies will affect system balance and performance. B. Drive Changes: Include the cost of all pulley,belt, and drive changes, as well as balancing dampers, valves and fittings, and access panels to achieve proper system balance recommended by the T&B Agency. City of Ocoee 15010-10 G&R Project Nof. 98518.01 3.04 COORDINATION AND ASSISTANCE A. General: Provide all labor,equipment,tools and material required to operate the equipment and systems necessary for the testing and balancing of the systems and for the adjustment, calibration or repair of all electric or pneumatic automated control devices and components. These services shall be available on each working day during the period of final testing and balancing. B. Drawings and Specifications: Provide to the T&B Agency a complete set of project record drawings and specifications and an approved copy of all HVAC shop drawings and equipment submittals. The T&B Agency shall be informed of all changes made to the system during construction, including applicable change orders. C. Coordination: Coordinate the work of all trades and equipment suppliers to complete the modifications recommended by the T&B Agency and accepted by the Architect. Cut or drill holes for the insertion of air measuring devices as directed for test purposes;repair to as-new condition, inserting plastic caps or covers to prevent air leakage. Repair or replace insulation and re-establish the integrity of the vapor retardant. 3.05 PREPARATIONS FOR PERFORMANCE VERIFICATION A. Verification: Prior to commencement of the balancing by the T&B Agency, verify in writing: 1. That air filters have been replaced and are in clean condition. 2. That linkages between dampers and their actuators are secure, non-overloading and non-binding. 3. That ductwork specialties are in their normal operating positions. 4. That fans are operating at the correct rotation and specified RPM. 5. That ductwork has been pressure tested and accepted. 6. That the operating safeties(thermal overloads, firestat/freezestats, smoke detectors, relief valves, etc.), are installed and fully functional. lubricated and can be operated without damage. 7. That equipment has been P 8. That the systems are operational and complete. 9. That no latent residual work remains to be completed. 3.06 PROTECTION OF MATERIALS AND EQUIPMENT A. Requirements: Do not store fiberglass insulation or any equipment within the building until it has been "dried in". If dry space is unavailable and the insulation and equipment must Project Nof. 98518.01J City of Ocoee 15010-11 G&R Proj be installed or stored before the building is "dried in" and completely enclosed, provide polyethylene film cover for protection. B. Replacement of Damaged Stored Material and Equipment: Any material and equipment that has been wet or otherwise damaged prior to installation,in the opinion of the Architect, shall be replaced with new material regardless of the condition of the material and equipment at the time of installation. C. Repair of Damaged Installed Material and Equipment: After installation correct or repair dents, scratches and other visible blemishes. At the direction of Architect replace or repair to "as new" condition equipment which has been damaged during construction. 3.07 COORDINATION OF SERVICES 3.08 CLEAN-UP A. General: Debris and rubbish shall not be disposed into the Owner's containers. ***END OF SECTION*** I 3 I I I I City of Ocoee 15010-12 G&R Project Nof. 98518.01 REQUEST FOR SUBSTITUTION Project Name: Location: Date of Request: Name of Party Requesting Substitute: Reason for Substitution Request: Drawing Spec. Sect. No, Paragraph Specified Item Proposed Substitute: Manufacturer and Model Number: Deviations from the Specified Item: (See paragraph entitled "Deviations".) Manufacturer's Recommendations for Use and Installation: (List recommendations.) Reason for Substitution: to Permit Use of Changes to Other SystemsProposed Substitute: (List changes. Submit drawings if required for clarity.) Acceptance: Technical Data to Support Request for Acce p (List ASTM or other standards designations, testing laboratory reports, experience records, etc.) Other Supporting Data: (Submit brochures, samples, drawings, etc.) REQUEST FOR SUBSTITUTION(Continued) Certification: In making request for substitution, the party whose authorized signature appears below,certifies that all of the following statements are correct and are accepted without exception: The proposed substitution has been personally investigated and is equal or superior in all significant respects to the product specified for the specific applications required; The proposed substitution will be warranted under the same terms required for the specified product; Coordination aspects necessitated by the proposed substitution will be accomplished in a complete and proper fashion by the party signing this form without any additional cost to the Owner; and Claims against the Owner for additional costs related to the proposed substitution which 3 subsequently become apparent after acceptance by the Architect are hereby waived. Credit: If this substitution is acceptable the following credit shall be given to the Owner; CERTIFICATIONEQUIVALENT PERFORMANCE AND ASSUMPTION OF LIABILITY OF Q FOR EQUIVALENT PERFORMANCE The undersigned states that the function, appearance and quality are equivalent or superior to the specified item. I Submitted by: Signature Title Typed Name: Company: Signature shall be by person having authority to legally bind his firm to the above terms. Failure to provide a legally binding signature will invalidate this request. I I I I SECTION 15030 ELECTRICAL REQUIREMENTS FOR MECHANICAL EQUIPMENT PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Basic Requirements: Provisions of Section 15010, BASIC MECHANICAL REQUIREMENTS are part of this Section. 1.02 SUMMARY A. General: Provide electric motors and related electric material and equipment required for all mechanical work. 1.03 RELATION TO OTHER WORK A. Related Sections: Other Sections of Division 15 which relate to the requirements of this Section may include but are not limited to the following: 1. 15050, BASIC MECHANICAL MATERIALS AND METHODS 2. 15300, FIRE PROTECTION 3. 15860, FANS 4. 15990, PERFORMANCE VERIFICATION B. Related Divisions: Other Divisions of these specifications which relate to the requirements of this Section may include but are not limited to the following: 1. Division 16, ELECTRICAL 1.04 APPLICABLE STANDARDS A. General: All equipment,material, accessories,methods of construction and reinforcement, finish quality, workmanship and installation shall be in compliance with the paragraph entitled "Code Compliance" in Section 15010. B. Requirements: The electrical equipment, components and installation shall comply with the requirements of the following regulations: 1. NEC: National Electrical Code (NFPA 70). 2. NEMA: National Electric Manufacturer's Association Standard MG-2. City of Ocoee 15030-1 G&R Project No. 98518.01 PART 2 -PRODUCTS 2.01 ELECTRIC MOTOR A. Manufacturers: Refer to paragraph entitled "MANUFACTURERS" in Section 15010. 1. General Electric 2. Westinghouse 3. Baldor Electric Co. 4. Emerson 5. Lincoln B. General: 1. Provide motors for continuous duty conditions in which they will be required to perform; i.e., general purpose, splashproof, explosion proof, standard load, high torque,or any other special type as required by the equipment motor manufacturer's recommendations. Unless otherwise indicated or required, motors shall be open drip-proof type. 2. Motors installed outdoors shall be totally enclosed fan cooled(TEFC) type. 3. Motor enclosures shall be of the type recommended by the equipment manufacturer for the specific application. 4. All motors shall be furnished for starting in accordance with electric utility company's requirements and shall be compatible with the motor starter and driven load. Motors shall not exceed full-rated nameplate load when operated at any point along the driven equipment's characteristic performance curve. The motor service factor shall not be used to justify exceeding nameplate amperage. 5. Unless otherwise indicated, motors 1/3 horsepower and less shall be single phase. Motors 3/4 horsepower and larger shall be 3 phase, squirrel-cage induction type. 6. Sound power levels for motors shall be no greater than the guidelines recommended by NEMA MG 1-12.49. A motor which, in the opinion of the Architect, generates excessive noise within the occupied area of the building shall be replaced with a quieter operating motor at no additional cost to the Owner. 7. Motors designated to operate with a variable frequency drive shall be approved by the manufacturer of the variable frequency drive equipment and the manufacturer of the motor to insure quiet and stable continuous operation over the entire speed range. 8. Verify the circuit voltage and phase being furnished to the motor. All motors shall be 1750 rpm unless noted otherwise. Motors shall operate with electrical input voltage variations of plus or minus 1 percent of nameplate rating or frequency variations of plus or minus 5 percent of nameplate rating. 1 City of Ocoee 15030-2 G&R Project No. 98518.01 C. Design: Provide NEMA Design B for normal starting torque with Standard MG1-12.42 Class B insulation unless noted otherwise or required by the equipment on which the motor is being used, except that motors for variable-speed service shall have Class F insulation. Motors shall be designed for operation in 40 degree C. ambient at 1.15 service factor on sine wave power at the base voltage and frequency and shall have all copper windings. Motors shall meet or exceed the locked-rotor(starting) and breakdown(maximum)torques for the NEMA rating. Locked rotor current shall not exceed 6 times full-load current. C Motor current density and heating characteristics shall be such that the motor insulation will not fail if subjected to locked-rotor current for 20 seconds. 1 D. Efficiency: Motors 1 horsepower and larger shall be high efficiency design. Nominal efficiency of each motor shall meet or exceed the value listed below when tested in accordance with NEMA MG 1-12.54.1 and shall be labelled on the motor nameplate in II accordance with NEMA MG 1.12.54.2. High-efficiency motors shall be different from the manufacturer's standard product through the use of premium materials, design and improved manufacturing processes to reduce motor losses. TABLE -MOTOR EFFICIENCY 2-Pole 3600 RPM 4-Pole 1800 RPM HP Nominal Minimu Nominal Minimum m 1.0 82.5 81.5 82.5 81.5 1.5 84.0 82.5 84.0 82.5 E. Single Phase: Single phase motors for hard starting applications including air compressors and outdoor installations shall be capacitor start/induction run or capacitor start/capacitor run type designed for the application. Motors for fans and pumps located indoor may be split phase with permanently lubricated sealed ball bearings and shall be selected for quiet operation. Motors 1/8 horsepower and below may be shaded pole type with permanently sealed bearings. 2.02 MOTOR STARTERS IA. Compliance: Motor starters included as an integral part of a factory pre-wired control panel shall be provided by the manufacturer of the equipment it serves and shall comply with the requirements of Section titled "MOTOR CONTROLLER" in Division 16. B. Overload Protection: Unless otherwise indicated, all 3 phase motor starters shall be provided with thermal overload relays on each phase sized in accordance with the actual nameplate full load ampere rating. Single phase motors shall be furnished with built-in thermal protection. City of Ocoee 15030-3 G&R Project No. 98518.01 PART 3 -EXECUTION 3.01 INSTALLATION A. Material and Equipment: Install material and equipment in accordance with details shown on the drawings, submittal drawings and manufacturer's instructions. 3.02 SCHEDULED HORSEPOWER A. Nominal Size: The horsepower scheduled or specified are those nominal sizes estimated eP P to be required by the equipment when operating at specified duties and efficiencies. In the case of pumps and fans, these motors shall be non-overloading at any point of the performance curve. B. Minimum Size: Motor horsepowers shall not be reduced from the scheduled size regardless of the requirements of the selected or submitted equipment. C. Increased Size: If the actual motor horsepower for the equipment furnished is larger than the scheduled size indicated,the proper size feeder,breaker, starter, etc. shall be provided at no additional cost to the Owner. s D. Vibration: Motor vibration in any direction as measured at the bearinghousin housings, when tested in accordance with NEMA Standard MG1-12.06, shall be within the following table: TABLE -VIBRATION LIMITS Speed (RPM) Max. Amplitude (Inch) l 3000-4000 0.0010 1500-2990 0.0015 1000-1499 0.0020 999-&below 0.0025 1. If balance weights are added to the rotor, they shall be permanently secured by welding or riveting. Machine nuts,bolts and screws are prohibited. 3.03 WIRING A. Power: All power wiring including safety disconnect switches,motor starters,over-current protection, connection to equipment, etc. shall be installed according to the requirements of Division 16, ELECTRICAL. B. Interlock: Unless otherwise noted, all interlock wiring, such as remote line voltage thermostats, fan speed controllers, etc. shall be installed by the supplier of that equipment. Interlock wiring shall be installed according to the requirements of Division 16, ELECTRICAL. ect No. 98518.01J 15030-4 G&R Proj City of Ocoee I C. Control: All control wiring exposed in mechanical equipment rooms, fan rooms,return air plenums, etc. shall be in conduit. Low voltage control wiring may be installed without conduit in return air plenums provided the cable is plenum rated and the installation is acceptable to the authority having jurisdiction. ***END OF SECTION*** 1 1 City of Ocoee 15030-5 G&R Project No. 98518.01 SECTION 15050 1 BASIC MECHANICAL MATERIALS AND METHODS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Basic Requirements: Provisions of Section 15010, BASIC MECHANICAL REQUIREMENTS, are part of this Section. 1.02 SUMMARY A. General: Materials listed herein are general mechanical materials to be used for Division 15 sections of the specifications unless noted otherwise. 1.03 ADDITIONAL REQUIREMENTS A. Related Sections: This section relates to the requirements of all sections in Division 15. 1.04 APPLICABLE STANDARDS A. General: All equipment,material, accessories,methods of construction and reinforcement, finish quality,workmanship and installation shall comply with the paragraph entitled"Code Compliance" in Section 15010. B. NFPA: NFPA 704, Standard System for the Identification of the Fire Hazards of Materials. C. Trench Safety Act: Excavation exceeding 5 feet in depth shall comply with OSHA 29 CFR Part 1926.650 Subpart P. 1.05 SUBMITTAL A. General: Refer to paragraph entitled "SUBMITTAL" in Section 15010. Include the following data: 1. Manufacturers Literature: a. Piping system identification markers and tags including a representative sample of each type. b. Each type of pipe hanger and supporting device. c. Fan curbs for roof mounted fans, air intake and relief vents. G&R Project No. 98518.01 City of Ocoee 15050-1J 2. Installation Instructions: a. Roof curbs,rails and equipment support. b. Roof curbs for roof mounted fans, air intake and relief vents including copies shipped with the units. PART 2 -PRODUCTS 2.01 GENERAL and equipment shall be products which will meet with the A. Acceptance: Materials acceptance to the authority having jurisdiction. Where acceptance is contingent upon having the products examined, tested and certified by Underwriters Laboratories or other recognized testing laboratory, the product shall be so examined, tested and certified. B. Material: Refer to the paragraph entitled "MATERIAL AND EQUIPMENT" in Section3 15010. 2.02 IDENTIFICATION OF PIPING AND EQUIPMENT A. General: Comply with ANSI A13.1-1981, "Scheme for Identification of Piping Systems" and OSHA requirements, or as otherwise indicated. B. Manufacturer: 1. Refer to paragraph entitled "MANUFACTURERS" in Section 15010. Model numbers or product type listed for one or more manufacturers are given to provide an example of the item required. C. Markers: Legends or arrows painted with stencils are not acceptable. Markers must have approved color coded background,proper color of legend in relation to background color and flow arrow indicator. Markers higher than 12 feet above the floor shall have minimum 2 inch letters. Markers shall comply with the following table: TABLE - IDENTIFICATION MARKER SIZES O.D. of Pipe or Covering Length of Color Field Size of Letters l3 3/4 to 1-1/4 inch 8 inches 1/2 inch 1-1/2 to 2 inches 8 inches 3/4 inch 1. Manufacturer: 3 a. Pipes 3/4 inch through 5 inch O.D.: Seton, Setmark Type SNA. b. Pipes 6 inch O.D. and Greater: Seton, Setmark Type STR. City of Ocoee 15050-2 G&R Project No. 98518.01 o� I D. Bands: Color coded in minimum widths of 2-1/4 inch for pipe through 12 inch O.D. and 4 inch for pipe 14 inch O.D. and greater. 1. Manufacturer: a. Brady,B-500 Vinyl Cloth, B-350 PermaCode or B-946 Outdoor Film. E. Equipment Labels: Provide either of the following types: Outdoorgrade acrylic plastic to withstand weather, abrasion, grease, 1. Plastic Type: ry acid, chemical and other corrosive conditions; 1/16 inch min. thickness. Sized 3/4 inch x 2-1/2 inch, 1 inch x 2-1/2 inch, 1 inch x 3 inch or 1-1/2 inch x 4 inch as necessary to identify item. a. Manufacturer: 1) Seton, Setonite. 2. Aluminum Type: Engraved, flexible, 0.020 inch thick aluminum. Sized 3/4 inch x 2-1/2 inch, 1 inch x 3 inch, 1-1/2 inch x 4 inch or 3 inch x 6 inch as necessary to identify item. a. Manufacturer: 1) Seton,No. 06505. 2.03 PIPE HANGERS AND SUPPORTING DEVICES A. General: Pipe hangers and supporting devices shall comply with the requirements of this section unless specifically indicated otherwise in other sections of this division. B. Material: Pipe supporting devices apply to all piping unless modified in subsequent sections (i.e., vibration isolation)or detailed on the drawings. 1. Pipe hangers for copper pipe shall be copper or copper-plated, PVC coated steel, clevis type, or split ring. 2. Hangers for all other types of piping shall be galvanized steel clevis type or split ring. Pipe hangers shall be capable of vertical adjustment after erection of the piping. Hanger rods shall be galvanized. 3. Vertical piping riser clamp supports shall be constructed of steel with rounded ears and two or four holes for clamping bolts. Riser clamps shall be galvanized steel, except that riser clamps for copper and brass piping riser clamps shall have electro- plated copper or PVC coating finish. Project No. 98518.01 G&R City of Ocoee 15050-3 4. Manufacturer: 1) Grinnell 2) PHD Manufacturing Inc. 3) Pipe Shields Incorporated 4) B-Line 5) Michigan Hanger C. Beam Clamp: Beam clamps may be used when supporting piping from steel structures. D. Tamp-ins: Lead tamp-ins may be used when installed in a concrete or masonry wall or other vertical surface to support a vertical hanger. Lead tamp-ins will not be permitted to support hangers from the underside of a concrete slab. E. Drilled-in Anchors: Steel anchor set in existing or new concrete by drilling and the use of an expansion device is permitted. The anchor shall be provided with a NPT threaded rod connection. 3 F. Trapeze: For parallel runs of above ground suspended piping,trapeze-type hanger may be used. Provide B-Line Vibra-Clamp or Vibra-Cushin for copper pipes on trapeze hangers. G. Prohibited Type: Powder set type fasteners or inserts shall not be used. 2.04 V-BELT DRIVE A. General: Each motor driven piece of equipment not direct connected shall be provided with a V-belt drive. Belts shall be of correct cross section to fit properly in sheave grooves and shall be carefully matched for each drive. Sheaves shall be cast iron or steel, bored to fit properly on shafts and secured with keys of proper size. Drive rating shall be as 3 recommended by the manufacturer for service but shall be at least 1.5 times the nameplate rating of motor. B. Fan Belt Drives: Fixed pitch sheaves shall be provided. Sheave-to-sheave centerline distances shall not exceed 3 times the sum of the sheave diameters, and shall not be less than the diameter of the larger sheave. C. Belt and Coupling Guards: Each belt drive shall be equipped with an OSHA approved guard. Guards shall be constructed of#12 U.S. standard gage 3/4 inch diamond mesh wire screen, or equivalent,welded to one inch steel angle frames, and shall enclose all belts and sheaves. Tops and bottoms of guards shall be of substantial sheet metal or not less than#18 U.S. standard gage. Braces or supports must not "bridge" sound and vibration isolators. Guards shall allow adequate provision for movement of motor required to adjust belt tension. Provide means for oiling, use of tachometers, and other maintenance and testing operations with guard in place. D. Direct Driven Equipment: Direct-drive motor driven equipment shall have coupling guards in accordance with OSHA Regulations. ect No. 98518.01j G&R Pro City of Ocoee 15050-4 � 2.05 BEARINGS A. General: Under normal loading conditions per NEMA MG1-14.45, bearings shall be 100,000-hour rated unless otherwise specified. Bearings shall be AFBMA Standard sizes. B. Re-greasable: Bearings shall be re-greasable-type unless otherwise indicated as sealed-type non-re-greasable. C. Housing: Bearing housings shall have long,tight running fits or rotating shields to protect against foreign mater entering the bearings and leakage of grease out of the bearing cavity. Housings for re-greasable bearings shall have a capped grease inlet fitting, grease relief plug on the opposite side of the inlet, and a grease reservoir in the cast inner cap. 1 D. Extended Lines: Provide extended lubrication lines and fittings to an accessible location for all bearings concealed by equipment housing,belt guards, etc. E. Factory Lubrication: Bearings shall be provided with grease from the manufacturer. Grease shall be premium moisture resistant containing rust inhibitors and suitable for operation in temperatures from 50 to 250 degrees F. 2.06 FAN, RELIEF AND INTAKE CURB A. Construction: Prefabricated fan, relief and intake curbs, unless otherwise indicated, shall be constructed of 18 gauge galvanized steel with continuous welded seams, 3 inch cant, factory installed wood nailer and insulated with 1-1/2 inch thickness 3 pound density rigid 1 fiberglass insulation. Curb height shall be a minimum 8 inches above the finished roof surface unless otherwise indicated or required. B. Insulated Roofs: Roof curbs on insulated roofs shall have a raised cant the same height as the insulation thickness. C. Manufacturer: 1. Thycurb, Thybar Corporation 2. Louvers &Dampers, Inc. 3. Penn Ventilator 4. Greenheck PART 3 - EXECUTION 3.01 GENERAL A. Concrete Bases and Structural Steel: Concrete bases and structural steel to support equipment and piping installed under each specification section of this division and not specifically shown on the structural or architectural plans shall be furnished. City of Ocoee 15050-5 G&R Project No. 98518.01 3.02 IDENTIFICATION OF PIPING AND EQUIPMENT A. General: Apply after completion of insulation, painting and cleaning work so that final identification is not disfigured. 1. Coordinate with composition and operating temperatures of surface for permanent adhesion of markers and labels to surface. 2. Locate marking and banding to facilitate ease of visual tracking. (For example,mark and band parallel runs of pipe which are side-by-side at the same general place.) Labels on vertical piping shall be 7 foot above the floor. 3. Adhere or affix all identification items permanently except where removal may be necessary for maintenance or service. Where labels or arrows are used, overlap the label ends 2 inches with matching color bands completely encircling the pipe. 4. Apply labels on the bottom lower quarters of overhead pipe. Pipe within 24 inches of a wall does not require a label on the quarter facing the wall. B. Markers and Bands: Provide on piping as follows: 3 i 1. Pipe Concealed in Inaccessible Locations(e.g.,Chases,non-accessible ceilings):g ): No identification required. 2. Exposed Pipe: Markers and bands every 15 feet of pipe length for pipe through 12 inch O.D. and every 30 feet for pipe 14 inch O.D. and greater. 3. Exterior Pipe, Exposed: No identification required unless otherwise indicated. C. Labels: Provide labels of proper size on mechanical system equipment including but not 3 limited to, pumps, chillers, tanks, major piping components such as air separators, air handling equipment, fans, control panels, terminal units, flow stations, reheat coils and similar items. Provide labels on access panels indicating the item accessible through the panel. Equipment labels shall be mechanically fastened with machine screws or rivets; adhesive securing is not acceptable. D. Identification: Coordinate colors and finishes with pipe identification markers. 3.03 HANGERS AND INSERTS A. General: Refer also to other sections which may describe additional requirements for hanging and supporting. B. Location: Provide and properly locate hangers to adequately support piping and equipment. Arrange hangers to permit expansion and contraction. Do not hang piping from fire or smoke walls. Provide pipe hangers at each valve, strainer, and other piping accessory, and at each change of direction. 0-6 G&R Proj City of Ocoee 1505 Ject No. 98518.01 I C. Size: The size of hanger for non-insulated pipes shall be suitable for pipe size to be supported. For insulated piping, the size of the hanger shall be suitable for the pipe size, plus the insulation and an insulation shield. Refer to Section 15250, THERMAL INSULATION, for insulation shield requirements. D. Spacing: Locate pipe supports as indicated in the following table unless noted otherwise in other sections of the specifications or on the drawings: TABLE- HORIZONTAL PIPE HANGER SCHEDULE Material Pipe Size Hanger Spacing Copper Tubing up to 1-1/4 6 foot centers 1-1/2 and above 10 foot centers Cast Iron Pipe All 10 foot centers 1. Vertical Pipe: Vertical piping shall be supported at the base of each vertical riser, and at intervals not exceeding those indicated in the following table: E. Hanger Rods: The size of the hanger rods shall be according to the following table. The rod sizes are based on the maximum hanger spacing indicated in the table above. Pipe Size Minimum Hanger Rod Size, Inches Inches Cast Iron Copper or Steel Up to 6 3/8 I 3/8 * Indicates mechanical joint, ductile iron pipe. F. Pipe Guides: Provide pipe alignment guides to guide expanding pipe to move freely from anchor points in expansion joints, loops or bends. 3.04 ANCHORS A. General: Install a suitable anchor on piping to prevent movement from expansion and contraction by welding or clamping securely to pipe at fitting or coupling. Approval of the Architect of method of anchorage must be obtained before installation of work. Properly anchor piping to remove strains on equipment which would be caused by expansion and contraction. Insulate anchors on piping to prevent moisture condensation problems. C B. Below Grade: Where mechanical joint piping enters the building below grade, the last csection of pipe shall have anchor bolts tied to the building structure. 3.05 V-BELT DRIVE A. Sheaves: To provide the properly sized sheave,V-belt drive fans shall be initially provided with variable pitch sheaves. Upon completion of system balancing by the T&B Agency, the adjustable pitch sheaves shall be replaced with fixed sheaves and belts of the size and Project No. 98518.01 15050-7 G&R City of Ocoee type specified by the T&B Agency. Tag J.encA the adjustable sheaves, turn over to the Owner, and receive written receipt from the Owner accepting these sheaves. B. Vibration of Air Handling Equipment and Fan Units: Field vibration levels will not be acceptable for air handling equipment and fans driven by motors 5 hp or greater, if the maximum vibration velocity or displacement measurement exceeds the following values (when measurements are taken at the bearing supports using a vibration analyzer with the filter set at the operating fan speed): TABLE - MAXIMUM ALLOWABLE FAN VIBRATION JFan Speed(RPM) Maximum Vibration Level 800 or less 5 mils (0.127 mm) max.-displacement 801 and greater 0.20 in/sec. (5 mm/s) max. velocity 3.06 EXCAVATION AND BACKFILL A. General: Provide as necessary accomplish lish excavation and backfilling for mechanical P piping and equipment. Perform in accordance with applicable State and Local codes and with other applicable sections or divisions. See identification tape requirement indicated above. B. Excavation: Excavate to a minimum necessary depth. Provide an even surface to ensure a solid, continuous bearing surface. If cut is too deep,backfill with clean earth and hand tamp. Form depressions at joints to receive collars and couplings. C. Backfill: Backfill shall be with clean earth, able to pass through a No. 10 sieve, free from 1 rocks and debris. Hand tamp backfill in 6 inch layers until 18 inches has been deposited over the buried pipe or conduit,then tamp with a mechanical vibrating tamper in maximum 8 inch layers to a 90 percent compaction. 3.07 FAN, RELIEF AND INTAKE CURB A. General: The top of each curb shall be level, with the pitch built into the curb where roof slopes 1/4 of an inch per foot or more. Exterior curb dimensions shall be coordinated with 3 the counterflashing of the installed equipment. B. Installation: The installation and flashing of the roof curbs shall comply with the requirements of Division 7, THERMAL AND MOISTURE PROTECTION. END OF SECTION I ect No. 98518.01J 15050-8 G&R Proj City of Ocoee I SECTION 15060 PIPE AND FITTINGS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Basic Requirements: Provisions of Section 15010, BASIC MECHANICAL REQUIREMENTS, are a part of this Section. 1.02 SUMMARY A. General: Provide and install pipe and fittings as indicated and including all offsets,fittings, sleeves and similar items required but not necessarily indicated due to drawing scale for complete and operable systems. 1.03 ADDITIONAL REQUIREMENTS A. Related Sections: Other Sections of Division 15 which relate to the requirements of this Section may include but are not limited to the following: 1. 15050, BASIC MECHANICAL MATERIALS AND METHODS 2. 15100, VALVES 3. 15410, PLUMBING PIPING SYSTEM 1.04 SUBMITTAL A. General: Refer to paragraph entitled "SUBMITTAL" in Section 15010. Provide shop drawing and/or manufacturer's data sheet for the following items: 1. Manufacturers Literature: a. Complete design and construction data for dielectric unions and flanges. b. Complete design and construction data for no-hub couplings. c. Manufacturer's data on piping and fittings used, with an indication of each specific application. 1 2. Installation Data: a. Manufacturer's printed installation instructions for no-hub couplings. b. UL approval number, installation materials, and procedures for pipe penetrations of fire-rated walls and floor. City of Ocoee 15060-1 G&R Project No. 98518.01 1.05 APPLICABLE STANDARDS .31 A. General: All equipment,material, accessories,methods of construction and reinforcement, finish quality, workmanship and installation shall be in compliance with the applicable standards and codes listed in paragraph entitled "Code Compliance" in Section 15010. 3 B. Quality and Weight: The quality and weight of materials shall comply with requirements and specifications of the appropriate standards of the American Society of Testing and Materials, American National Standards Institute, American Society of Mechanical Engineers, and the American Welding Society. C. Piping System: All pressurized piping systems shall conform to ASME B31.9, Code for Pressure Piping, Building Services Piping. D. Soldering: Soldering of copper tubing shall be done in accordance with the Copper Development Association, Copper Tube Handbook instructions on Joining and Forming Copper Tube, Soldered Joints. PART 2 -PRODUCTS 2.01 GENERAL3 A.. Application: This section covers the material and installation of various pipe and fittings which may be indicated in other sections of these specifications for use in a specific piping system. Pipe and fittings specified in this section may not be substituted in piping systems for the specific pipe and fitting materials indicated in those individual sections of these specifications. 3 B. Fittings: Fittings shall be at a minimum the same gauge as the connected piping, and shall be compatible with the piping material (i.e., galvanized fittings on galvanized pipe.) The use of field-fabricated fittings is prohibited. C. Lead Content: Pipe,fittings or any other piping device which includes any lead in the alloy shall not be used in any potable water system. 2.02 COPPER ALLOY PIPING A. Pressure Pipe: Copper piping shall be annealed seamless hard temper type "K" or"L" as indicated and shall comply with ASTM B-88. Copper is allowed for pipe sizes up to and including 4 inch diameter. The name or trademark of the manufacturer and the type of pipe shall be permanently marked on each section of pipe at intervals not exceeding 4-1/2 feet. B. Fittings: 1. General: Fittings used in copper alloy piping shall be streamlined pattern, wrought or cast brass conforming to ANSI B 16.22 or wrought bronze conforming to ANSI B16.15. Ocoee 15060-2 G&R Project of No. 98518.01 3 3 2. Union: Unions in 2 inch and smaller copper alloy piping shall be brass or bronze, ground joint for solder connection with hexagonal ball-and-socket joints, bronze metal-to-metal seating surfaces, female ends, and a brass seat ring pressed into the headpiece so it cannot be forced out. 3. Flanges: Flanges shall be used in copper alloy piping larger than 2 inch, and shall comply with ANSI B 16.24.Flanges shall have raised face and gaskets drilled for the pressure (class 150 or 3001b) as required. Gasket material shall be ring-type, 1/16 inch thick compressed heat-resistant fiber or neoprene; gasket shall not contain any asbestos. Flange bolts shall be brass and conform to ASTM A307 hex bolts, with ANSI B18.2 brass hex nuts. 4. Dielectric Isolator: Dielectric couplings shall be rated for at least 150 percent of the maximum working pressure of the piping system and at least 50 degree F. higher than the maximum operating temperature of the piping system in which they are installed. Couplings shall be electroplated steel or brass with inert and non-corrosive thermoplastic lining, or bronze fittings. a. Union: Provide dielectric insulating unions in piping 2 inch and smaller with threaded or solder joint connections. b. Flanges: Flanged dielectric insulating sets shall be used for pipe sizes 2-1/2 inches and larger. Flanged insulation sets shall have phenolic retainer, nitrile rubber seal element, polyethylene sleeves and double washer. c. Manufacturer: 1) Epco 2) Watts 3) Eclipse 4) Grinnell 5) Victaulic 2.03 CAST IRON PIPING A. General: Cast iron pipe and fittings shall be sound,truly cylindrical, smooth,with interior and exterior surfaces concentric, free from cracks, sand holes and other defects, and in uniform thickness of grade specified. Cast iron soil pipe shall meet the requirements of ASTM A-74 and ANSI A21.1. Cast iron pressurized piping shall be class 150 or 250 as indicated or required and conform to ANSI A21.20. B. Fittings and Joints: 1. General: Provide fittings of same weight and manufacture as the pipe in which it is installed. 2. Bell and Spigot: Joints shall be bell and spigot, with hub specifically cast to receive a push-on compression type neoprene gasket; spigot end shall be without a bead. Fittings shall conform to CISPI Standard 310 unless noted otherwise. 0 0-3 G&R Project No. 98518.01 City of Ocoee 15 6 1 3 3. No-Hub: Joints shall be "No-hub" type coupling consisting of a standard CISPI coupling. 4. Threaded Drainage Pipe Fitting: Fittings shall be cast-iron, recessed, and in accordance with ANSI B16.12. 2.04 JOINT FILLER MATERIALS A. Solder: Solder containinglead shall not be used inpotable waterpiping; only 95%tin- 5% 3 antimony(95/5). PART 3 - EXECUTION 3.01 GENERAL A. Installation: Pipe and fittings shall be installed as specified in this section unless specific 3 installation instructions are provided in the individual sections covering the piping system. Install each run with a minimum of joints and couplings, but with adequate and accessible unions for disassembly and maintenance/replacement of valves and equipment. Reduce 3 sizes where indicated using reducing fittings. Align piping at connections within 1/16 inch misalignment tolerance. B. Routing and Placement: Piping shall be run without traps or pockets and pitched a minimum 1 inch in 40 feet in the direction of flow, unless indicated or required to be pitched steeper. Grade piping so that air in the mains and risers will be carried up and discharged at venting points. Coordinate installation with structural and architectural features, and with other piping, equipment and the work of other trades. All piping shall be installed as close to the structure overhead as possible. C. Interior Piping: Interior piping shall be run parallel to the walls and ceilings; avoid diagonal runs. Provide a minimum 6 inch clearance between walls and horizontal piping. D. Exterior Piping: Exterior piping(above and below grade) shall essentially be routed and located as indicated on the drawings; however, actual placement shall be verified by confirming exact location of structures and other utilities in the field and by careful layout prior to execution of the work. 3 E. Insulated Piping: Pipe requiring insulation shall be installed with sufficient clearances to permit proper application of insulation. F. Cast Iron Pipe: Unless otherwise indicated, install 3 inch and larger horizontal storm and waste piping with 1/8 inch per foot slope; piping 2-1/2 inch and smaller shall be installed at a slope of 1/4 inch per foot. Run horizontal vent lines to a minimum grade back to stacks and vertical vent lines as direct as possible. G. Tool Marks: Copper, brass and chromed, polished or painted piping, fittings and connections to fixtures shall not show tool marks. Replace damaged piping and fittings. ect No. 98518.01j G&R Pro City of Ocoee 15060-4 � II H. Potable Water Solder Joints: Samples of solder in potable water piping may be taken from completed joints and tested for lead. If tests indicate lead,the joints will be condemned and all fittings, valves and pipe ends shall be replaced with new materials where such joints occur at no cost to the Owner. 3.02 EXPANSION AND CONTRACTION A. Provision for Expansion: Piping shall be installed with provisions for expansion both horizontally and vertically in all long runs including runouts from risers. Expansion loops and/or expansion elbows shall be provided for expansion and contraction where required and where shown on the drawings. B. Cold-Springing of Pipe: Cold-spring hot piping systems to reduce the amount of thermal expansion of the piping. pipe i e anchors as indicated or asuired to eliminate excessive re C. Pipe Anchors: Providepq IE piping movement in thermal and pressure piping systems. 3.03 UNDERGROUND PIPING CA. Cover and Excavation: Refer to paragraph entitled 'EXCAVATION AND BACKFILL" in Section 15050. Minimum cover for exterior underground piping is three feet over insulation or pipe unless otherwise indicated. See paragraph entitled "PROTECTION" in this section for uninsulated underground piping protection. B. Water and Sewer Separation: Underground water piping and building sewer shall be separated with undisturbed or compacted earth at least 10 feet horizontally if installed at the same level or lower than the sewer. Where potable water piping is closer than 10 feet to a sewer line, place the bottom of the water pipe at least 18 inches above the top of the sewer or the sewer shall be encased in a concrete envelope as required. L C. Identification Tape: Place a color-coded 6 inch wide,0.004 inch thick polyethylene printed plastic identification tape directly above all underground piping systems at approximately 12 inch below finished grade. Tapes shall be continuously printed with "CAUTION" in large bold letters, and the type of service piping shall be indicated on the second printed line. 3.04 JOINTS AND CONNECTIONS A. General: Align all pipe before joints are made. Joints and connections shall be air, gas and Ewater tight. B. Solder Joints: Solder joints shall be used on pipe 2-1/2 inches and smaller. Unless Cotherwise noted the following solder material shall be used: 1. For operating pressures up to 125 psig, 95/5 solder. C. Dissimilar Metals: Dielectric unions or flanges shall be provided at all junctions of copper or brass pipe or fittings and ferrous material to prevent electrolysis and galvanic corrosion. City of Ocoee 15060-5 G&R Project No. 98518.01 Where copper or brass tubing or fittings are anchored, supported, or may come in contact with ferrous piping system materials, isolate the two materials with a non-conducting neoprene spacer. D. No-Hub: Insert ends the full depth of the gasket. Slide the coupling housing over the gasket, and tighten the clamp to the torque recommended by the joint manufacturer. When special torque wrenches are provided for a joining system,joints shall only be made with these wrenches. Provide one spare special torque wrench to the Owner prior to final acceptance. No-hub fittings shall not be used on underground piping or for pipe sizes larger than 10 inches. E. Bell and Spigot Joints: Neoprene gasket shall be inserted in the hub and the spigot shall be pulled into the gasket with a tool made for this purpose. Lubricant as recommended by the gasket manufacturer shall be used on the spigot to ensure proper seating. Provide UL-approved method of sealing Rated Penetrations: pp fire-and fire/smoke rated wall and floor penetrations. Submit method proposed prior to installation. G. Underground Piping: Underground pipingconnections for different types of piping material shall be limited to grooved coupling, dresser coupling, matching flanges, or mechanical joint with retaining rods. 3.05 PIPE SIZE REDUCTIONS AND ENLARGEMENTS space Prohibited Fittings: Screwed bushings are prohibited, except where available prevents use of reducing couplings. B. No-Hub Clamps: No-hub clamps with bushings shall not be used for pipe size reduction. Cast iron fittings are required. C. Reducing Couplings: Eccentric reducing couplings shall be installed throughout steam and water piping to prevent air or water pockets occurring due to a change in pipe size. Eccentric couplings on steam shall bring the pipes flush on the bottom; eccentric couplings on water lines shall bring the pipes flush on top except as otherwise specified or indicated. Concentric reducing couplings in horizontal water circulating piping may be utilized if a 3 manual air vent on the larger pipe adjacent to the reducer is installed. 3.06 FLUSHING AND CLEANING A. Preparation for Testing: Before final testing, flush piping systems with clean water to remove debris. Disconnect all coils and heat exchangers from the system before flushing. Flush all coils and heat exchangers separately to assure that debris does not become lodged in them. Provide temporary valves and drains as required to accomplish flushing. 3 B. Final Flushing: After flushing, thoroughly clean each piping system with appropriate cleanser to remove oil,grease, lacquer,etc.. Thoroughly flush each liquid system with clean water after cleaning. ect No. 98518.01J 15060-6 G&R Proj City of Ocoee C. Chemical cleaning: After the piping is installed, add an aqueous solution of trisodium phosphate in a proportion of one pound per fifty gallons of water in the system. After filling with this solution,the system shall be allowed to circulate for two hours. The system shall then be drained completely. All strainers shall be removed, cleaned and replaced,and the system shall be refilled with fresh water. The Architect shall be given notice of this cleaning operation. If, in the opinion of the Architect, the cleaning operation has not been properly performed,the above procedure shall be repeated. After cleaning system, it shall be tested by litmus paper and shall be left on the slightly alkaline side (pH > 7.5). If the system is still acidic, the trisodium phosphate cleaning shall be repeated. D. Sterilization of Potable Water Systems: After the final testing for leaks, all new potable water lines shall be thoroughly flushed to remove foreign material. Before placing the systems in service,sterilize the new water lines in accordance with the following procedure: 1. Through a 3/4 inch hose connection,pump sufficient sodium hypochlorite to produce a free available chlorine residual of not less than 50 parts per million(PPM). 2. Proceed downstream from the point of chlorine application, opening all faucets and taps until chlorine is detected. Close faucets and taps when chlorine is evident. 3. When chlorinated water has been brought to every faucet and tap with a minimum concentration of 50 PPM chlorine, retain this water in the system for at least 24 hours. At the end of the retention period, no less than 50 PPM of chlorine shall be present at the extreme end of the system. 4. Open all faucets and taps and flush all new lines until the chlorine residual in the water is less than 1.0 PPM. Obtain representative water samples from the system for analysis by the local health department or a bacteriological laboratory recognized and acceptable to the Architect. 5. If all samples tested for coliform organisms are negative, a letter and laboratory reports shall be submitted by the organization certifying successful completion of the sterilization. Submit all test reports to the Architect. If any samples tested indicate the presence of coliform organisms, the entire sterilization procedure shall be repeated until every coliform test is proved negative. 3.07 PRESSURE TESTING A. Pressure Test: Prior to insulating and concealing the piping system, apply a water pressure test to all parts of each system before equipment is connected. Use a hydrostatic pressure of not less than 100 psig or 150 percent of system operating pressure whichever is greater. Test system for a period not less than four hours. There shall be no leaks at any point in the system at this pressure. B. Concealed Work: Leave concealed work uncovered until required tests have been completed, but if necessary, make tests on portions of the work and those portions of the work may be concealed after being inspected and found free of leaks. Make repairs to defects that are discovered as a result of inspections or tests with new materials; caulking G&R Project No. 98518.01 City of Ocoee 15060-7J of screwed joints,cracks or holes will not be accepted. Repeat tests after defects have been eliminated. C. Field Testing: Complete all field testing prior to insulating, wrapping or backfilling. 3 END OF SECTION 3 I 3 3 I 3 I I I I City of Ocoee 15060-8 G&R Project No. 98518.01 I SECTION 15100 VALVES PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Basic Requirements: Provisions of Section 15010, BASIC MECHANICAL REQUIREMENTS are a part of this Section. 1.02 SUMMARY A. General: Provide those valves,cocks and specialties which are required for piping systems specified in other sections of these specifications. 1.03 ADDITIONAL REQUIREMENTS A. Related Sections: Other Sections of Division 15 which relate to the requirements of this Section may include but are not limited to the following: 1. 15050, BASIC MECHANICAL MATERIALS AND METHODS 2. 15060, PIPE AND FITTINGS 3. 15250, THERMAL INSULATION 4. 15410, PLUMBING PIPING SYSTEM 1.04 SUBMITTAL A. General: Refer to paragraph entitled "SUBMITTAL" in Section 15010. Include the following data: 1. Manufacturers Literature: a. Dimensional outline drawing of each valve listed in this section including sizes available and pressure limitations. 2. Installation Instructions: a. Manufacturer's printed installation instructions for all valves including copies shipped with the valves. 1.05 VALVES AND COCKS A. Basic Requirements: Valves may not be indicated in every instance on the drawings,but whether or not shown,all valves,cocks and check valves necessary for the proper operation of the system shall be furnished and installed. City of Ocoee 15100-1 G&R Project No. 98518.01 1.06 APPLICABLE STANDARDS A. General: All equipment,material, accessories,methods of construction and reinforcement, finish quality, workmanship and installation shall be in compliance with the paragraph entitled "Code Compliance" in Section 15010. 3 PART 2 - PRODUCTS 2.01 MANUFACTURER 3 A. General: Refer to paragraph entitled "MANUFACTURERS" in Section 15010. Model numbers or product type listed for one or more manufacturers are given to provide an example of the item required. B. Continuity: Valves of a similar type provided shall be of the same manufacturer. 2.02 BALL VALVES A. 2 inch and smaller: 150 psi SWP, 400 psi WOG. Full port ball,bronze trim, cast bronze or brass body, chromium-plated brass ball,bronze non-blowout stem, Teflon seat, double 3 o-ring stem seals, zinc-coated steel handle with plastic coated hand grip, 90 degree operation from full open to tight shut-off. 1. Manufacturer and Model Number: Red White #5044F and #5049F or equal by Nibco, Stockham, Milwaukee or Apollo. PART 3 - EXECUTION 3.01 GENERAL A. Access: Install valves to provide adequate clearance to permit easy operation of the valve handle and permit servicing of the valve packing. B. Solder Connections: Disassemble prior to installation in piping to prevent heat damage to the seat and seals. 3 C. Piping: Install isolation/shut-off valves at all main risers and main branch takeoffs, to permit isolation of piping sections for drainage. 3 END OF SECTION 3 I City of Ocoee 15100-2 G&R Project No. 98518.01 I SECTION 15250 • THERMAL INSULATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Basic Requirements: Provisions of Section 15010, BASIC MECHANICAL REQUIREMENTS are a part of this Section. 1.02 SUMMARY A. General: Provide thermal insulation as indicated. Materials such as fasteners and retainers not specifically described but required for a complete and proper installation shall be provided. 1.03 ADDITIONAL REQUIREMENTS A. Related Sections: Other Sections of Division 15 which relate to the requirements of this Section may include but are not limited to the following: 1. 15050, BASIC MECHANICAL MATERIALS AND METHODS 2. 15100, VALVES 3. 15410, PLUMBING PIPING SYSTEM 1.04 SUBMITTAL A. General: Refer to paragraph entitled "SUBMITTAL" in Section 15010. Include the following data: 1. Manufacturers Literature: a. Provide data on all types of insulation,jacketing, sealer and adhesive required by this section of these specifications,with indication of each material and its intended application. 2. Performance Data: a. Provide thermal performance, density and vapor permeance for each type of insulation, finish, cover, facing or jacket specified in this section. b. Unless otherwise stated, insulation types and thicknesses specified are based on insulating materials having a"K" value(BTU per hour per square foot per degree temperature difference) per inch of thickness as indicated. a City of Ocoee 15250-1 G&R Project No. 98518.01 3 c. Vapor permeance is based on vapor retardant materials having water vapor transmission rates in perms(grains of vapor per hour per square foot per inch of mercury vapor pressure differential). d. Alternate materials shall be approved on the basis of thicknesses providing equivalent heat transfer or vapor transmission rates. 3. Installation Instructions: a. Provide copy of manufacturer's printed installation instructions for all insulation materials including copies shipped with the material. 3 1.05 APPLICABLE STANDARDS A. General: All equipment,material, accessories,methods of construction and reinforcement, 11 finish quality,workmanship and installation shall comply with the paragraph entitled"Code Compliance" in Section 15010. B. NFPA: All materials and adhesives used shall conform to the requirements of NFPA 90A as to flame spread and smoke developed ratings throughout their operating temperature range. All insulation,jackets, covers, facings and adhesives used to adhere the jacket or facing to the insulation, including fittings and butt strips, shall have a non-combustible fire and smoke hazard rating and label as tested by ASTM E-84, NFPA 255 and UL-723 not exceeding flame spread value of 25 and smoke developed/fuel contributed value of 50. Accessories such as mastics, cements, tapes and cloth for fittings shall have the same ratings. C. ASHRAE: Insulation thermal conductance values and insulation thicknesses shall comply with the requirements of the American Society of Heating, Refrigeration, and Air 3 Conditioning Engineers, Inc. (ASHRAE) Standard 90.1-1989. D. Florida Energy Code: Insulation thermal conductance values and insulation thickness shall comply with the Florida Energy Efficiency Code for Building Construction, 1994 Revision. E. Industry standards: Where compliance with an industry, society or association standard is specified or indicated, certification of such compliance shall be included in the submittal. F. Packaging Information: All products or their shipping cartons shall bear the Underwriter's 3 Label indicating that flame and smoke ratings do not exceed the above criteria. Every package or container of insulation,jacketing, facing,cement,adhesive,or coating delivered to the project site must have a manufacturer's stamp or label attached, giving the brand and 3 a description of the material. All vapor retardants shall be labeled,indicating the thickness, product nomenclature and manufacturer. 1.06 DEFINITIONS A. General: The following definitions apply to this section of these specifications: ect No. 98518.01j 15250-2 G&R Pro City of Ocoee � I 1. Exposed: The exterior surface of the insulation is seen from inside a room, such as piping or duct insulation inside an equipment or air handling unit room. 2. Protected: With reference to insulation material on the exterior of the building but protected from direct exposure to rain by an overhang or eave. Piping or duct insulation located in an unconditioned parking garage or building crawl space. PART 2 - PRODUCTS 2.01 GENERAL A. Materials: The insulation materials and installation procedures shall be as indicated in this section and must be approved by the insulation product manufacturer for each particular application. The actual products to be used must comply with the insulation material for the specific application as indicated in other sections of these specifications. B. Applicability: Products and manufacturers listed may not all be applicable. Use only those products and manufacturers which are indicated as being applicable to a specific insulation condition. Insulating materials shall be resilient and moisture-resistant so that the insulating properties will not be affected by rough handling, water damage and similar construction hazards. All adhesives, sealers and vapor retardant coatings shall be compatible with the materials to which they are applied, and shall not corrode, soften or attack such materials when wet or dry. C. Acceptable Manufacturers: Manufacturers which are listed are those manufacturers who may make one or more of the insulation products required. Listing of a manufacturer does not mean the manufacturer is approved for all applicable insulation conditions. Manufacturers must comply with the requirements of each insulation condition to be acceptable for the application. 2.02 MANUFACTURER A. Refer to paragraph entitled "MANUFACTURERS" in Section 15010. 2.03 FIBERGLASS INSULATION A. General: Inorganic fibrous glass. B. Preformed: Jacketed or unjacketed as indicated, one-piece or half-sectional. 1. Pipe insulation,preformed jacketed fiberglass: Jacketed with factory-applied kraft reinforced foil all-service vapor retardant jacket suitable for use in systems with temperatures from -60 to 350 degrees F. The jacketing shall have a white finish suitable for painting without sizing. Jacket closure system of factory-applied double pressure-sensitive adhesive on longitudinal joints; self-sealing butt strips at circumferential joints which provide closure and positive vapor retardant seal without hard rubbing or the application of heat. Thermal conductivity (K) of 0.24 at 100 degrees F. and vapor transmission of 0.02 perms. City of Ocoee 15250-3 G&R Project No. 98518.01 a. Manufacturer and Product: Owens-Corning Fiberglas ASJ/SSL-II Schuller Micro-Lok with AP-T Plus jacket CertainTeed 500 Snap-On 3 2. Pipe insulation, preformed unjacketed fiberglass: Suitable for field jacketing. Thermal conductivity(K) of 0.23 at 100 degrees F. a. Manufacturer and Product: Owens-Corning Fiberglas No-Wrap Schuller Micro-Lok 2.04 INSULATION JACKETS AND COVERS A. Jacket, Pipe, PVC: All purpose,UL-rated, white vinyl jacket with a minimum 0.015 inch thickness,with or without self-sealing feature, and suitable for painting; NFPA-255 rated not exceeding a flame spread value of 25 or smoke developed/fuel contributed rate of 50. 1. Manufacturer and Product: Pittsburgh-Corning UNI-JAC 3 B. Jacket,Pipe, Aluminum: Aluminum jacketing, 0.016 inches thick, Type 3003 alloy, H-14 temper,circumferentially corrugated,with a continuously laminated moisture retardant of3 one mil polyethylene film and a protective layer of 40 lb. virgin kraft paper. Longitudinal jacket seams shall be provided with modified continuous Pittsburgh Z-lock located on the bottom half of the pipe to shed water. 1. Manufacturer and Product: Childers Products Co. Corrolon 3 General Aluminum Supply Co. (Gasco) Insul-coustic Alcorj ac C. Pipe Fitting Covers, PVC: Insulated polyvinyl-chloride fitting covers of minimum 0.015 inch thickness and in shapes as required; with fiberglass insulation insert. Suitable for temperature range of 0 to 450 degrees F. Acid, alkali and chemical resistant. Suitable for painting if required. NFPA-255 rated not to exceed 25/50 flame spread/smoke developed. City of Ocoee 15250-4 G&R Project No. 98518.01 i 1. Manufacturer and Product: Schuller Zeston 25/50 PVC Insulated Fitting Covers D. Pipe Fitting Covers, Aluminum: Aluminum fitting covers, 0.020 inches minimum thickness, type 3003 alloy, H-14 temper prefabricated fitting covers with baked epoxy moisture retardant for pipe sizes through 24". Field fabricate fitting covers for pipe sizes larger than 24 inch using 0.020 inches thick aluminum roll jacketing with laminated polyethylene/kraft moisture retardant. 1. Manufacturer and Products: Childers Products Ell-Jacs, Gore Ell-Jacs, Tee-Jack, End-Caps, and Flange Jacs E. Pipe Fitting Covers, Reusable: Removable/Reusable covers for valves and strainers manufactured with a jacket of chemically-resistant silicon-coated fiberglass 6 pcf mechanically-bound ceramic fiber insulation for hot piping or 3 pcf resinous-bound fiberglass insulation for cold piping, and fiberglass belting with "D"-ring belts. 1. Manufacturer and Product: Superior Insulation Fitting Covers PART 3 - EXECUTION 3.01 GENERAL A. Field Forming,Fitting and Finishing: Where preformed insulation products are available they shall be used. Provide field formed, fitted and finished insulation systems only if such application is more practical and acceptable to the Architect. B. Pre-installation: 1. Prior to work of this section, carefully inspect the installed work of all trades and verify that all work is complete to the point where this installation may properly commence. 2. Insulation on pipe fittings, valves and pipe joints shall not be installed before the piping is tested and approved. Do not apply insulation adhesives, materials or finishes until the building is adequately closed in and the item to be insulated has been completely installed, tested and proved tight and suitable for insulation. 3. Remove all foreign material, clean and surfaces before applying insulation. ect No. 98518.01J 15250-5 G&R Proj City of Ocoee C. Vapor Retardant Continuity: A continuous, unbroken moisture and vapor seal shall be provided over insulation on cold surfaces where vapor retardant jackets,facings,or coatings are required. Anchors, hangers and other projections shall be insulated and vapor-sealed to prevent condensation. All openings and punctures shall be sealed with a vapor retardant compound. The edges of vapor retardant insulation at valve stems,instrument wells,gauge connections, unions and other raw edges shall be sealed to prevent moisture from penetrating the insulation by sealing on all open ends. D. Workmanship: Insulation materials shall be installed in a workmanlike manner with smooth3 and even surfaces,with jackets drawn tight and smoothly cemented down at all longitudinal and end laps. Jacket and facing laps,joint strips and insulation ends, and straight runs of piping at not more than 21 foot intervals shall be secured and sealed with fire-retardant vapor retardant adhesive. Scrap pieces of insulation shall not be used where a full-length section will fit. All surface finishes shall be extended to protect all interfacing surfaces, ends and raw edges of insulation. Insulation on strainers shall be installed to facilitate cleaning of the strainer. Do not insulate unions,but terminate insulation at both ends neatly with a 45 degree bevel. E. Valves, Cocks and Specialties: Insulate as for the related piping system in which they are located unless otherwise indicated. F. Piping: Insulation thicknesses for piping are given for insulation installed at the locations indicated. Thicknesses are based on the various conditions of temperature, usage and environment which are typically encountered. G. Minimum Thicknesses: Insulation thicknesses which are indicated are minimum thicknesses. The same insulation material may be provided in greater thickness as an aid 3 to installation and handling procedures or due to material availability and procurement considerations, as long as the additional thickness does not reduce critical clearances from other piping,walls, etc. and does not increase the thermal conductance. 3 H. Bands and Fasteners: Metal bands used on pipe insulation shall be 3/4" wide made from brass or aluminum. Bands shall be spaced to hold the ends and center of each section at a maximum spacing of 18 inches on centers. Bands shall not be visible on exposed work. Mechanical fasteners shall be installed in accordance with the manufacturers recommendations. Projecting points and sharp edges of fasteners shall not extend outside the insulation facing; clip off projecting points and provide plastic caps or cement cover finish. 3.02 GLASS FIBER PIPING INSULATION A. Interior, Exposed: Provide as specified for "Interior, Concealed", except where field- fabricated fitting covers are used. Additionally finish with open weave 20x10 mesh glass fabric adhered between two flood coats of white lagging adhesive,overlapping the adjacent pipe insulation 2" and smoothed to a neat uniform finish without noticeable ridges or exposed fabric. Finish materials shall be applied in strict accordance with the manufacturer's recommendations. I City of Ocoee 15250-6 G&R Project No. 98518.01 I 3.03 MISCELLANEOUS ITEMS A. Final Inspection: At final inspection the finished surfaces of all exposed insulation shall be clean and without stains or blemishes. Repair and clean the insulation surfaces and,if necessary to obtain a new appearance, shall coat discolored surfaces with off-white latex water-base semi-gloss paint or lagging adhesive,without a change in the contract price. END OF SECTION 1 City of Ocoee 15250-7 G&R Project No. 98518.01. SECTION 15300 FIRE PROTECTION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Basic Requirements: Provisions of Section 15010, BASIC MECHANICAL REQUIREMENTS, and Section 15030, ELECTRICAL REQUIREMENTS FOR MECHANICAL EQUIPMENT, are a part of this Section. 1.02 SUMMARY A. General: Provide the fire protection systems indicated. 1.03 ADDITIONAL REQUIREMENTS A. Related Sections: Other Sections of Division 15 which relate to the requirements of this Section may include but are not limited to the following: 1. 15050, BASIC MECHANICAL MATERIALS AND METHODS 1.04 SUBMITTAL A. General: Refer to paragraph entitled "SUBMITTAL" in Section 15010. Include the following data: B. Manufacturers Literature: a. Dimensional outline drawing and verification of UL/FM approval for the following list of equipment: 1) Each different type of valve. 2) Each different type of piping hanger. 3) Each type of fire sprinkler head. 4) Fire department connection. 5) Waterflow devices. C. Maintenance Instructions: a. Test procedures and frequency of testing required for each component. &R Project No. 98518.01 City of Ocoee 15300 1 G J b. Instructions to the Owner's designated employees on the operation of the entire system. D. Piping Shop Drawings: Submit 1/8" scale piping shop drawings as prescribed in Section 15010 and as required by codes. Shop drawings shall include sprinkler piping cut lengths, offsets, fittings and devices, elevations, hangar locations, sprinkler head count by type, 3 elevation sections and other installation information. 1.05 APPLICABLE STANDARDS3 A. General: All equipment,material, accessories,methods of construction and reinforcement, finish quality, workmanship and installation shall be in compliance with the paragraph1 entitled "Code Compliance" in Section 15010. B. Revised editions of the NFPA National Fire Codes (NFPA) as indicated in Section 15010: 3 C. Editions of the NFPA National Fire Codes (NFPA), or the latest Revisions of these Codes as adopted by the local authority having lawful jurisdiction, as follows: 1 D. NFPA-Fire Sprinkler System: The fire sprinkler protection systems installation, flushing and testing shall comply with the requirements of NFPA 13, and 24. E. UL/FM Approval: All equipment, valves,couplings,hangers and devices shall be approved by Underwriters' Laboratory (UL) and Factory Mutual (FM) for use in fire protection service. N. Licensure: The fire protection systems shall be installed by a State of Florida Licensed Fire Protection Contractor. PART 2 - PRODUCTS 2.01 MANUFACTURER A. General: Refer to paragraph entitled "MANUFACTURERS" in Section 15010. B. Single Manufacturer: All items of a similar type shall be by the same manufacturer. 2.02 SPRINKLER HEADS A. Provide the following sprinkler heads of proper types, ratings, and spacings for the areas involved. Provide appropriate finishes compatible with space finishes being served. Acceptable manufacturers: Viking, Grinnell, Automatic Sprinkler, Central, Star, and Reliable. 1. Brass Upright and Chrome Pendent: Central Model"A", large orifice. B. Spare Fire Sprinkler Head Cabinet: Provide sufficient spare sprinkler head cabinets to store the required quantities of sprinkler heads. Storage cabinets shall be red gloss, polyester- coated steel construction. Provide a minimum of six spare heads of each type and each &R Project of Ocoee 15300-2 G No. 98518.01 i different temperature ratinginstalled; provide 2 installation tools or wrenches with each P different type of sprinkler head. Cabinet shall have catch-lock and continuous piano hinge. Locate the spare sprinkler head cabinet as directed by the owner's representative 2.03 PIPE AND FITTINGS A. Exterior Pipe and Fittings: 1 1. Provide cement lined ductile iron pipe, Class 52 conforming to ANSI/AWWA C151/A21.51 for Tyton joint pipe or ANSI/AWWA C111/A21.11 for mechanical joint pipe. Acceptable Manufacturers: U.S. Pipe, American Pipe, McWane, or equivalent. 2. Fittings shall be push-on joint ductile iron fittings, 350 PSI, with field loc gaskets, or mechanical joint ductile iron fittings conforming to ANSI/AWWA C110/A21.10 and C111/A21.11. 3. Provide concrete thrust blocks at all fittings, valves, and changes in direction. 4. Provide braces, bridle rods, or restraining systems typical of "MEGALUG" by EBBA, Inc., on all mechanical joint fittings and valves. 5. Provide PVC water main pipe and fittings conforming to AWWA C900, Class 200 PSI, as manufactured by Johns Mansville, Certainteed, PWPipe or equivalent. 6. All exterior site piping shall be buried with a standard, permanent, bright colored, continuous printed plastic tape. Tape shall be intended for direct burial service and buried directly above the service line. The tape shall be 6 inches by 4 mils thick minimum. Tape shall be printed with proper identification of the service located below it. B. Interior Pipe and Fittings: 1. Piping shall be Schedule 40 black steel pipe conforming to ASTM A135 or ASTM A53 and Schedule 10 black steel pipe conforming to ASTM A135. 2. Fittings: (a) Cast iron threaded fittings, ANSI B 16.4 Class 125. (b) Mechanical joint, grooved couplings, as manufactured by Victaulic, Sprink, Gruvlok, or equivalent. All groove couplings and fittings shall be furnished by a single manufacturer. 3. Piping for drainage systems shall be Schedule 40 galvanized steel pipe,ASTM A795 or A135 with galvanized threaded fittings, ANSI B16.4, galvanized coated, both interior and exterior of pipe and fittings. C. Hangers, Supports, and Sleeves: Project No. 98518.01 G&R City of Ocoee 15300-3 UL and FM approved hangers. Acceptable manufacturers: 1. Support piping with pp Grinnell,B-Line, Fee &Mason,Michigan and PHd. 2. Adjustable Clevis: Grinnell Fig. 260. 3. Adjustable Swivel: Grinnell Fig. 69. 4. Beam Clamp: Grinnell Fig. 92 and Grinnell Fig. 218. 5. Riser Clamp: Grinnell Fig. 261. 8. All pipes passing through rated floors or walls shall be sleeved and firestopped to an3 equivalent rating of the floor or wall assembly. Firestop materials shall meet ASTM E814 requirements. 3 2.04 VALVES A. Acceptable Valve Manufacturers: Stockham,Nibco, Grinnell, Mueller, Kennedy,U.S. Pipe, Metroseal, Crane, and Central. B. Interior Valves: 1. Check valves: (a) Iron body, Stockham G-939 swing check valve, flanged body. (b) Bronze body,Nibco KT-403-W threaded check valve with dielectric unions. (c) Grooved iron body, Central Check valve-90 2. Gate valves: (a) Iron body, O.S.&Y. gate valves, Stockham G-634, flanged. (b) Bronze body, O.S.&Y. gate valve,Nibco T-104-0, threaded with dielectric unions. 3. Butterfly valves: (a) Grooved,Nibco GD-4765-8N 2.05 FIRE DEPARTMENT CONNECTION A. Exposed Inlet Connection: Provide exposed cast brass inlet connection. Polished round chrome-plated backplate with embossed letters describing the associated fire protection system, such as, "AUTO. SPKR. STANDPIPE". 1. Potter-Roemer 5751-F Series (Dual-Inlet) 2.06 WATERFLOW DEVICES AND SUPERVISORY SWITCHES City of Ocoee 15300-4 G&R Project No. 98518.01 1 A Sight Drain: Sight drain shall have 2 view windows to provide visual observation of water flow, and shall have female threaded connections. 1. Manufacturer and Model Number: a. Potter-Roemer 6171/6172/6173/6174 B. Inspector's Test and Drain: Test and drain shall be provided with integral sight glass, integral 1/2 inch test orifice and positive positioning of handle for off, test and drain operations. 1. Manufacturer and Model Number: a. G/J Innovations, Inc "Sure-Test" b. AGF Manufacturing, Inc. c. "Testdrain" SYSTEM DRY PIPE A. Dry Pipe Valve: Dry pipe valves shall have cast iron bodies with flanged inlet and outlet connections and threaded drain connection. Valve shall have manufacturer's name, pipe size, pressure rating, and "UL" and "FM" cast into the body. Valve body shall have tappings for test,drain, alarm, air and priming water inlet. Valve shall have tapered bronze seat with 0-ring seals,bronze hinge and pin,malleable iron check clapper, and bolted cover. Valve shall be rated to 175 psig CWP, 350 psig test pressure. B. DryValve Pipe Trim: Providepipe valve trim of the same manufacturer as the dry pipe dry P P valve. Trim shall connect dry pipe valve to other devices,and shall permit setting,resetting and testing of valve and alarm devices without causing the system to operate. Trim shall include air supply valve and piping, angle drain valve, priming water level valve and fill cup,ball drip valve,water pressure and air pressure gauges and gauge valves, air pressure relief valve, alarm test valve,drip cup,priming test valve,priming chamber attachment, fire line attachment, and all interconnecting piping, tubing and fittings. C. Accelerator: Provide air pressure accelerator and trim to decrease action time of dry sprinkler response. D. Automatic Plant Air Maintenance Trim: Air maintenance trim and devices shall connect air supply to the dry pipe system and prevent dry pipe valve operation due to low air pressure, regardless of upstream air pressure. Trim shall include bypass gate valve, isolation valves, strainer, pressure regulator, check valve, and interconnecting piping and fittings. E. Automatic Air Compressor Controller and Pressure Maintenance Trim: Air maintenance trim and devices shall connect air supply to the dry pipe system to prevent dry pipe valve operation due to low air pressure, regardless of upstream air pressure. Trim shall include City of Ocoee 15300-5 G&R Project No. 985 18.01 isolation valves, strainer, pressure regulator, check valve, and bypass gate valve, interconnecting piping and fittings. Provide adjustable pressure switch with normally closed contacts, such that a drop in air pressure causes the switch to close and energize the system air compressor. When the system is pressurized,the contactor shall open and stop the compressor. Provide an unloader valve to automatically bleed off the outlet pressure upstream of the check valve each time the pressure switch contacts open, to prevent the compressor from starting under load. F. Air Compressor: Air compressor for pressurized systems shall be oil-less type, direct-drive dual cylinder type. Compressor shall have replaceable air filter, safety relief valve with test ring, and air outlet, and shall pressurize systems up to 40 psig. PART 3 - EXECUTION 3.1 INSTALLATION A. Install underground piping with a minimum of 3 feet of cover over the top of the pipe. Install service utility tape approximately 18 inches above the pipe. B. Hangers: Pipe hangers on 4 inch and larger piping shall be clevis-type only. All hanger spacing shall comply with the requirements of NFPA-13. II C. Flushing: The entire system shall be flushed with clean water to remove debris resulting from installation. Flush through a burlap bag to retain debris for examination. D. Provide drain valves,pipes and test connections as required by N.F.P.A. 13.Pipe drain lines and test connections to the exterior of the building or as indicated on the drawings. 3 E. Drain plugs shall be installed on trapped sections of piping 50 gallons or less. Auxiliary drain valves, 3/4 inch or larger and plugs shall be installed on trapped sections of pipe greater than 50 gallons. 3.02 HYDROSTATIC TESTS 1 A. General: Above ground and below ground piping systems shall be hydrostatically tested at not less than 200 psi pressure,or at 50 psi in excess of the maximum pressure,whichever is greater, for a period of 2 hours. The test pressure shall be read from a gauge located at the low elevation point of the individual system or portion of the system being tested. The sprinkler piping shall not have leakage exceeding the amounts specified in NFPA 24. Leakage quantities shall be determined by pumping at the specified test pressure from a calibrated container. Repair leaking joints and retest as necessary until all systems have been tested. Test the piping between the check valve in the fire department inlet pipe and the outside connection the same as the balance of the system. Test Blank: Test blanks (blind flanges) used shall be the self-indicating type, with red B. painted lugs protruding beyond the flange to clearly indicate their presence. Number all test blanks to assure removal after the testing is completed. I 3.03 SYSTEM INSPECTION AND CHECKOUT City of Ocoee 15300-6 G&R Project No. 98518.01 I A. General: After the installation is complete,the system shall be inspected by factory trained personnel in accordance with the manufacturer's recommended procedures. B. System Operation: Operate systems as required to demonstrate that the systems are operating in accordance with the design, including line pressure testing. Supply instruments required to read data. Adjust systems to operate at the required performance levels. Advise Architect 7 days prior to testing. Tabulate data and submit on 8-1/2 x 11 inch sheets with time, name of tester and the local authority having jurisdiction and witnessing the test, with one copy for each Technical Information Brochure. 3.04 INSTRUCTIONS TO OWNER B. General: Provide to Owner's designated representatives a minimum of 2 hours classroom and on-site instructions in operation and maintenance of all fire protection systems and equipment. Furnish 6 sets of typed operating instructions. Written and signed acknowledgement of the instructions seminar shall be submitted prior to final acceptance. Submit in writing to the Owner an"Instruction in Operation Conference" notification of the mutually agreed upon time for the conference. At the end of the conference, 6 copies of an Instruction in Operation Conference Memo shall be signed by all parties and one copy shall be inserted in each Technical Information Brochure. END OF SECTION I City of Ocoee 15300-7 G&R Project No. 98518.01 ENGINEERS : TILDEN LOBNITZ COOPER INC. (407) 237-6187 . ADDRESS : 1717 South Orange Avenue, Orlando FL 32806 . LICENSE : P.E. 0046515 IIDESIGNER : CLIFTON JOHN ALFORD DATE : 06-25-1999 FILE : 99079 JOB NAME : OCOEE MAINTAINANCE BUILDING LOCATION : OCOEE, FLORIDA DESIGN DATA. HAZARD : ORDINARY HAZARD GROUP 2 , DRY PIPE SYSTEM DENSITY : .204 Sq Ft AREA PER SPRINKLER : 108 Sq Ft TOTAL CALCULATED AREA : 2268 Sq Ft TOTAL SPRINKLERS CALCULATED : 21 Heads FLOW DATA. TOTAL SPRINKLER FLOW : 532 . 8 Gpm TOTAL HOSE STREAM : 250 . 0 Gpm TOTAL WATER REQUIRED : 782 . 8 Gpm BASE OF RISER NODE : 31FLOW : 532 . 8 Gpm PRESSURE : 31 . 1 Psi AUTHORITY HAVING JURISDICTION : CITY OF OCOEE FIRE MARSHALL PHONE HYDRONICS: FIRE SPRINKLER HYDRAULICS 4 .24 - SUBMITTAL. Page 1 ENGINEERS TILDEN LOBNITZ COOPER INC. (407) 237-6187. ADDRESS : 1717 South Orange Avenue, Orlando FL 32806. Date: 06-25-1999 File: S:\HYDRON43\DATA\99079 .HYD JOB : OCOEE MAINTAINANCE BUILDING SOURCE 1 STATIC : 68 . 0 Psi RESIDUAL : 40 . 0 Psi FLOW : 954 Gpm NODE ELEVATION K- PRESSURE DISCHARGE NO. Feet FACTOR Psi Gpm L1 155 . 5 7 . 8 8 . 1 22 .2 2 154 . 0 7 . 8 10 . 8 25 . 6 3 152 .5 7 . 8 13 . 6 28 . 8 IE4 148 . 5 18 .4 4A 148 . 5 19 . 0 5 155 . 5 7 . 8 8 . 0 22 .1 C6 154 . 0 7 . 8 10 .6 25 .4 7 152 . 5 7 . 8 13 .4 28 . 6 8 148 . 5 18 .2 Ir9 155 . 5 7 .8 8 . 0 22 . 0 10 154 . 0 7 . 8 10 . 6 25 .4 11 152 . 5 7 . 8 13 .4 28 .5 12 148 . 5 18 . 1 13 155 . 5 7 . 8 8 . 0 22 . 0 14 154 . 0 7 . 8 . 10 . 6 25 .4 15 - 152 . 5 7 . 8 13 .4 28 . 5 16 148 . 5 18 . 1 17 155 . 5 7 . 8 8 . 0 22 . 0 18 154 .0 7 . 8 10 .6 25 .4 19 152 .5 7 .8 13 .4 28 . 5 20 148 . 5 18 . 1 21 155 .5 7 . 8 8 . 0 22 . 1 22 154 . 0 7 . 8 10 . 6 25.4 23 152 .5 7 . 8 13 .4 28 . 6 C 24 148 . 5 18 .2 25 155 .5 7 . 8 8 . 1 22 .2 26 154 . 0 7 . 8 10 . 7 25 . 6 27 152 . 5 7 . 8 13 . 6 28 .7 28 148 . 5 18 .4 29 148 . 5 20 . 6 30 148 .5 23 .4 31 139. 0 31. 1 32 142 . 0 31 . 5 33 142 . 0 37 . 6 il34 136 . 0 SOURCE 42 . 7 782 . 8 HYDRONICS: FIRE SPRINKLER HYDRAULICS 4 .24 - SUBMITTAL. Page 2 11 • ENGINEERS TILDEN LOBNITZ COOPER INC. (407) 237-6187 . ADDRESS : 1717 South Orange Avenue, Orlando FL 32806 . Date: 06-25-1999 File: S:\HYDRON43\DATA\99079.HYD JOB : OCOEE MAINTAINANCE BUILDING SPRINKLERS FLOWING 21 Heads II AREA PER SPRINKLER 108 Sq Ft MIN SPRINKLER FLOW 22 Gpm REQUIRED DENSITY .2 Gpm/Sq Ft COMPUTED DENSITY .2 Gpm/Sq Ft TOTAL SPRINKLER FLOW : 532 . 8 Gpm 1 INSIDE HOSE STREAMGpm OUTSIDE HOSE STREAM 250 Gpm TOTAL WATER REQUIRED 782 . 8 Gpm TOTAL SPRINKLER PRESS 36 .7 Psi VALVE FIXED LOSS6 Psi Copyright (1997) SUPPLY PRESS AVAILABLE 48 . 6 Psi by II DEMAND PRESS REQUIRED 42 . 7 Psi Hydronics Engineering PRESSURE CUSHION5 . 9 Psi 34119 Fremont Bl, Suite 609 Fremont, Ca. , 94555 MAXIMUM- VELOCITY 13 .4 F/S (510) 487-9160 I I 3 I II I I I I/ I 1 HYDRONICS : FIRE SPRINKLER HYDRAULICS 4 .24 - SUBMITTAL. Page 3 ENGINEERS : TILDEN LOBNITZ COOPER INC. (407) 237-6187. ADDRESS : 1717 South Orange Avenue, Orlando FL 32806. Date: 06-25-1999 File: S:\HYDRON43\DATA\99079 .HYD JOB : OCOEE MAINTAINANCE BUILDING IL PIPE BEG FLOW K-FACTOR LENGTH C-FACTOR PRESSURE NO. Gpm FITTING TYPE FTG FR- LOSS Psi END DIAMETER TOTAL (Psi/Ft) 1 q= 22 .2 K= 7 .8 L= 9 . 0 Pt 8 . 1 Pt 8 . 1 1 Q. 22 .2 F= F= 0 C= 100 Pe . 6 Pv - . 5 Vel= 8 .2 D= 1 . 049 TL= 9 . 0 .2213 Pf 2 . 0 Pn 7 .6 2 Pt 10 . 8 2 q= 25 . 6 K= 7 . 8 L= 9 . 0 Pt 10 . 8 Pt 10 . 8 2 Q= 47 . 8 F= F= . 0 C= 100 Pe . 6 Pv - .7 Vel= 10 .2 D= 1 .38 TL= 9 . 0 .2403 Pf 2 .2 Pn 10 . 1 3 Pt 13 . 6 3 q= 28 . 8 K= 7.8 L= 4 .3 Pt 13 .6 Pt 13 . 6 3 Q= 76.5 F= LT F= 7 . 0 C= 100 Pe 1 .7 Pv -1 . 0 Vel= 12 . 1 D= 1 . 61 TL= 11 .3 .2711 Pf 3 . 1 Pn 12 . 6 4 Pt 18 .4 4 q= . 0 K= . 0 L= 11 .3 Pt 18 .4 Pt 18 .4 4 - Q= 190 . 5 F= F= . 0 C= 100 Pe . 0 Pv - .2 Vel= 4 . 8 D= 4 . 026 TL= 11 .3 . 0169 Pf .2 Pn 18 .3 8 Pt 18 .2 5 q= 22 . 1 K= 7 . 8 L= 9. 0 Pt 8 . 0 Pt 8 .0 5 Q= 22 . 1 F= F= . 0 C= 100 Pe . 6 Pv - . 5 Vel= 8 .2 D= 1 . 049 TL= 9 . 0 .2186 Pf 2 . 0 Pn 7 .5 6 Pt 10 . 6 I 6 q= 25 .4 K= 7 . 8 L. 9 . 0 Pt 10 .6 Pt 10 .6 6 Q= 47 . 5 F= F= . 0 C= 100 Pe . 6 Pv - .7 Vel= 10 .2 D= 1 .38 TL= 9 . 0 .2375 Pf 2 .1 Pn 9 . 9 7 Pt 13 .4 7 q= 28 . 6 K= 7 . 8 L= 4 .3 Pt 13 .4 Pt 13 .4 7 Q= 76 . 1 F= LT F= 7 . 0 C= 100 Pe 1.7 Pv -1 . 0 Vel= 12 . 0 D= 1 . 61 TL= 11 . 3 .268 Pf 3 .0 Pn 12 . 5 8 Pt 18 .2 8 q= . 0 K= . 0 L= 11 . 3 Pt 18 .2 Pt 18 .2 8 Q= 114 .4 F= F= 0 C= 100 Pe . 0 Pv - . 1 Vel= 2 . 9 D= 4 . 026 TL= 11 . 3 . 0066 Pf . 1 Pn 18 .2 12 Pt 18 . 1 C9 q= 22 . 0 K= 7 . 8 L= 9 . 0 Pt 8 . 0 Pt 8 . 0 9 Q= 22 . 0 F= F= . 0 C= 100 Pe . 6 Pv - .4 Iri Vel= 8 .2 D= 1 . 049 TL= 9 . 0 .2175 Pf 2 . 0 Pn 7 .5 10 Pt 10 .6 /1 HYDRONICS : FIRE SPRINKLER HYDRAULICS 4 .24 - SUBMITTAL. Page 4 ENGINEERS : TILDEN LOBNITZ COOPER INC. (407) 237-6187 . ADDRESS : 1717 South Orange Avenue, Orlando FL 32806 . Date: 06-25-1999 File: S :\HYDRON43\DATA\99079 .HYD JOB : OCOEE MAINTAINANCE BUILDING PIPE BEG FLOW K-FACTOR LENGTH C-FACTOR PRESSURE NO. Gpm FITTING TYPE FTG FR- LOSS PsiII END DIAMETER TOTAL (Psi/Ft) 10 q= 25.4 K= 7 . 8 L= 9. 0 Pt 10 . 6 Pt 10 . 61 10 Q= 47 .4 F= F= . 0 C= 100 Pe . 6 Pv - . 7 Vel= 10 .2 D= 1 .38 TL= 9 . 0 .2364 Pf 2 . 1 Pn 9 . 9 11 Pt 13 .4 11 11 q= 28 . 5 K= 7 . 8 L= 4 . 3 Pt 13 .4 Pt 13 .4 11 Q= 75 . 9 F= LT F= 7 . 0 C= 100 Pe 1 .7 Pv -1 . 0 Vel= 12 . 0 D= 1 . 61 TL= 11 .3 .2668 Pf 3 . 0 Pn 12 .43 12 Pt 18 . 1 12 q= . 0 K= . 0 L= 11 .3 Pt 18 . 1 Pt 18 . 1 12 Q= 38 . 6 F= F= . 0 C= 100 Pe . 0 Pv . 0 Vel= 1 . 0 D= 4 . 026 TL= 11 . 3 . 0009 Pf . 0 Pn 18 . 1 16 Pt 18 . 1 13 q= 22 .0 K= 7 . 8 L= 9 . 0 Pt 8 . 0 Pt 8 . 01 13 - Q= 22 . 0 F= F= . 0 C= 100 Pe . 6 Pv - .4 Vel= 8 .2 D= 1 . 049 TL= 9 . 0 .2174 Pf 2 . 0 Pn 7.5 14 Pt 10 . 61 14 q= 25.4 K= 7 .8 L= 9. 0 Pt 10. 6 Pt 10 .6 14 Q= 47.4 F= F= . 0 C= 100 Pe .6 Pv - .7 Vel= 10.2 D= 1 .38 TL= 9. 0 .2362 Pf 2 . 1 Pn 9. 15 Pt 13 .4 15 q= 28 .5 K= 7 . 8 L= 4 .3 Pt 13 .4 Pt 13 . 15 Q= 75 . 9 F= LT F= 7 . 0 C= 100 Pe 1 .7 Pv -1 . Vel= 12 . 0 D= 1 . 61 TL= 11 .3 .2666 Pf 3 . 0 Pn 12 .4 16 Pt 18 . 1 16 q- . 0 K= . 0 L= 10 . 8 Pt 18 . 1 Pt 18 . 1' 16 Q= 37 .3 F= F= . 0 C= 100 Pe .0 Pv . 0 Vel= . 9 D= 4 . 026 TL= 10 . 8 . 0008 Pf . 0 Pn 18 . 1 20 Pt 18 . 1 17 q= 22 . 0 K= 7 . 8 L= 9 . 0 Pt 8 . 0 Pt 8 . 17 Q= 22 . 0 F= F= . 0 C= 100 Pe . 6 Pv - . Vel= 8 . 2 D= 1 . 049 TL= 9. 0 .2175 Pf 2 . 0 Pn 7 . 18 Pt 10 . 6 18 q= 25 .4 K= 7 . 8 L= 9 . 0 Pt 10 . 6 Pt 10 . 18 Q= 47 .4 F= F= . 0 C= 100 Pe . 6 Pv - . J/ Vel= 10 .2 D= 1 . 38 TL= 9 . 0 .2363 Pf 2 . 1 Pn 9 . 9 19 Pt 13 .4II I I I HYDRONICS : FIRE SPRINKLER HYDRAULICS 4 .24 - SUBMITTAL. Page 5 ENGINEERS TILDEN LOBNITZ COOPER INC. (407) 237-6187 . Irh ADDRESS : 1717 South Orange Avenue, Orlando FL 32806 . Date: 06-25-1999 File: S:\HYDRON43\DATA\99079 .HYD JOB : OCOEE MAINTAINANCE BUILDING ir, PIPE BEG FLOW K-FACTOR LENGTH C-FACTOR PRESSURE NO. Gpm FITTING TYPE FTG FR- LOSS Psi END DIAMETER TOTAL (Psi/Ft) 19 q= 28 . 5 K= 7 .8 L= 4 .3 Pt 13 .4 Pt 13 .4 [ 19 Q= 75 . 9 F= LT F= 7 . 0 C= 100 Pe 1 .7 Pv -1 . 0 Vel= 12 . 0 D= 1 . 61 TL= 11 . 3 .2668 Pf 3 . 0 Pn 12 .4 11( 20 Pt 18 . 1 20 = . 0 K= . 0 L= 10 .2 Pt 18 . 1 Pt 18 . 1 q- 20 Q= 113 .2 F= F= . 0 C= 100 Pe . 0 Pv - . 1 C Vel= 2 . 9 D= 4 . 026 TL= 10 .2 . 0064 Pf . 1 Pn 18 . 1 24 Pt 18 .2 21 q= 22 . 1 K= 7 . 8 L= 9 . 0 Pt 8 . 0 Pt 8 . 0 21 Q= 22 . 1 F= F= . 0 C= 100 Pe . 6 Pv - .5 Vel= 8 .2 D= 1 . 049 TL= 9. 0 .2185 Pf 2 . 0 Pn 7 . 5 22 Pt 10 . 6 22 q= 25 .4 K= 7 . 8 L= 9 . 0Pt 10 . 6 Pt 10 . 6 22 - Q= 47 . 5 F= F= . 0 C= 100 Pe . 6 Pv - . 7 Iri Vel= 10 .2 D= 1 .38 TL= 9 . 0 .2373 Pf 2 . 1 Pn 9. 9 23 Pt 13 .4 23 q= 28 . 6 K= 7 . 8 L= 4 .3 Pt 13 .4 Pt 13 .4 E 23 Q= 76.0 F= LT F= 7 . 0 C= 100 Pe 1 .7 Pv -1 . ( Vel= 12 . 0 D= 1 .61 TL= 11 .3 .2679 Pf 3 . 0 Pn 12 . 5 24 Pt 18 .2 24 q= . 0 K= . 0 L= 10 .2 Pt 18 .2 Pt 18 .2 24 Q= 189 .2 F= F= . 0 C= 100 Pe . 0 Pv - .2 Vel= 4 .8 D= 4 . 026 TL= 10 .2 . 0167 Pf .2 Pn 18 . 1 1111 28 Pt 18 .4 25 q= 22 .2 K= 7 . 8 L= 9 . 0 Pt 8 . 1 Pt 8 . 1 25 Q= 22 .2 F= F= . 0 C= 100 Pe . 6 Pv - .5 Vel= 8 .2 D= 1 . 049 TL= 9 . 0 .2209 Pf 2 . 0 Pn 7 . 6 26 Pt 10 . 7 26 q= 25 . 6 K= 7 . 8 L= 9 . 0 Pt 10 .7 Pt 10 .7 26 Q= 47 .7 F= F= . 0 C= 100 Pe . 6 Pv - . 7 Vel= 10 .2 D= 1 .38 TL= 9 . 0 .2398 Pf 2 .2 Pn 10 . 0 27 Pt 13 . 6 27 q= 28 . 7 K= 7 . 8 L= 4 . 3 Pt 13 . 6 Pt 13 .6 27 Q= 76 . 5 F= LT F= 7 . 0 C= 100 Pe 1 .7 Pv -1 . Vel= 12 . 0 D= 1 . 61 TL= 11 . 3 . 2706 Pf 3 . 1 Pn 12 . 6 28 Pt 18 .4 1 L HYDRONICS: FIRE SPRINKLER HYDRAULICS 4 .24 - SUBMITTAL. Page 6 ENGINEERS TILDEN LOBNITZ COOPER INC. (407) 237-6187 . ADDRESS : 1717 South Orange Avenue, Orlando FL 32806 . Date: 06-25-1999 File: S: \HYDRON43\DATA\99079 .HYD JOB : OCOEE MAINTAINANCE BUILDING PIPE BEG FLOW K-FACTOR LENGTH C-FACTOR PRESSURE NO. Gpm FITTING TYPE FTG FR- LOSS Psi END DIAMETER TOTAL (Psi/Ft) II 28 q= . 0 K= . 0 L= 65 .7 Pt 18 .4 Pt 18 .4 28 Q= 265 .7 F= L F= 4 .0 C= 100 Pe . 0 Pv - .3 Vel= 6 .7 D= 4 . 026 TL= 69 .7 . 0312 Pf 2 .2 Pn 18 . 1 29 Pt 20 . 6 11 29q. . 0 K= . 0 L= 71 .2 Pt 20 . 6 Pt 20 . 6 29 Q= 265.7 F= TL F= 19 . 0 C= 100 Pe . 0 Pv - .3 Vel= 6 .7 D= 4 . 026 TL= 90 .2 . 0312 Pf 2 .8 Pn 20 .3 30 Pt 23 .4il 4 q= . 0 K= . 0 L= 4 .3 Pt 18 .4 Pt 18 .4 29A Q= 267 . 1 F= T F= 20 . 0 C= 120 Pe . 0 Pv - 3 Vel= 6 .7 D= 4 . 026 TL= 24 .3 . 0225 Pf . 5 Pn 18 . 1 4A Pt 19. 0 4A q= . 0 K= . 0 L= 156 . 3 Pt 19. 0 Pt 19 .0 29B - Q= 267 . 1 F= 2T F= 40 . 0 C= 120 Pe .0 Pv - .3 Vel= 6 .7 D= 4 . 026 TL= 196 .3 . 0225 Pf 4 .4 Pn 18 .7 30 Pt 23 .4 30 q= . 0 K= .0 L= 11 . 0 Pt 23 .4 Pt 23 .4 30 Q= 532 . 8 F= LAG F= 20 . 0 C= 100 Pe 4 . 1 Pv -1 .2 Vel= 13 .4 D= 4 . 026 TL= 31 . 0 . 1131 Pf 3 .5 Pn 22 .21 31 Pt 31 . 1 31 q= . 0 K= . 0 L= 5 . 0 Pt 31. 1 Pt 31. 1 31 Q= 532 . 8 F= 4L F= 36 . 0 C= 150 Pe -1.3 Pv -1 . Vel= 12 .2 D= 4 .23 TL= 41. 0 . 042 Pf 1.7 Pn 30 . 1 32 Pt 31 . 5 32 Q= 532 . 8 Pt 31 . 5 11 DDC FIXED PRESSURE LOSS Valve 6 . 0 33 Pt 37 . 6 33 q= . 0 K= . 0 L= 10 . 0 Pt 37 . 6 Pt 37 . 61 33 Q= 532 . 8 F= T2L F= 48 . 0 C= 150 Pe 2 . 6 Pv -1 . ( Vel= 12 .2 D= 4 .23 TL= 58 . 0 . 042 Pf 2 .4 Pn 36 . 61 34 Pt 42 .7 36 Q= 782 . 8 «< SOURCE »> Pt 42 .7 E=>90-Elb T=>TeeBch L=>Lt-Elb C=>ChkVly B=>BfyVly G=>GatVly A=>A1mChkII 11 I I i[ . . . HYDRONICS: FIRE SPRINKLER HYDRAULICS 4 .2 - SUBMITTAL. ENGINEERS : TILDEN LOBNITZ COOPER INC. (407) 237-6187 . ADDRESS : 1717 South Orange Avenue, Orlando FL 32806 . DATE : 06-25-1999 FILE : S :\HYDRON43\DATA\99079 .HYD JOB : OCOEE MAINTAINANCE BUILDING PSI FIRE SPRINKLER HYDRAULIC GRAPH 100 II 90 fil 80 70 60 li 50 . ---- ------------------------0 40 1 30 20 10 0 200 300 400 500 600 700 800 900 1000 FLOW - Gpm 0 0 Supply Curve 41----♦ Demand Curve Static : 68 . 0 Avl Pr : 48 .6 @ 782 Resid : 40 . 0 Req Pr : 42 .7 @ 782 Flow : 954 . 0 Pr Cush : 5 . 9 Copyright : Hydronics Engineering, 1997 . 34119 Fremont Bl, Suite 609, 1: Fremont, CA. 94555 . (510) 487-9160 . SECTION 15410 PLUMBING PIPING SYSTEM PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Basic Requirements: Provisions of Section 15010, BASIC MECHANICAL REQUIREMENTS, are a part of this Section. 1.02 SUMMARY A. General: Provide domestic water piping, drainage waste and vent piping, and other plumbing piping and appurtenances as indicated. 1.03 ADDITIONAL REQUIREMENTS A. Related Sections: Other Sections of Division 15 which relate to the requirements of this Section may include but are not limited to the following: 1. 15050, BASIC MECHANICAL MATERIALS AND METHODS 2. 15100, VALVES 3. 15250, THERMAL INSULATION 1.04 SUBMITTALS A. General: Refer to paragraph entitled "SUBMITTAL" in Section 15010. Provide shop drawing and/or manufacturer's data sheet for the following items: 1. Manufacturers Literature: a. Complete list of all piping materials to be used in this section including valves, pipe schedules, pipe sizes and method of connection for each piping system. 1.05 APPLICABLE STANDARDS A. General: All equipment,material, accessories,methods of construction and reinforcement, finish quality, workmanship and installation shall be in compliance with the paragraph entitled "Code Compliance" in Section 15010. PART 2 - PRODUCTS 2.01 GENERAL A. Application: The plumbing piping system shall only be of the materials indicated. Refer to Section 15060,PIPE AND FITTINGS, and Section 15250,THERMAL INSULATION, G&R Project No. 98518.01 City of Ocoee 15410-1 ) 3 for materialsp ecifications. Insulation shall comply with ASTM E-84 requirements with a flame spread rating not exceeding 25 and with a smoke developed/fuel contributed rating not exceeding 50. 3 B. Valves: All valves used in the plumbing piping shall be 125 psi SWP, 200 psi WOG as specified in Section 15100, VALVES. 3 C. Manufacturer: Refer to paragraph entitled "MANUFACTURERS" in Section 15010. 2.02 DOMESTIC WATER PIPE 3 A. Above Ground: 3 1. Piping shall be copper tube, Type L or K, hard drawn. B. Underground: 1. Type K soft drawn copper tubing without joints. 3 C. Fitting: 1. Copper Piping: Fittings on copper piping shall be solder-type. 2.03 SANITARY WASTE AND VENT PIPING A. Above Ground: 1. Cast iron soil pipe, service weight,with bell and spigot joints. 2. Cast iron soil pipe, service weight, with no-hub couplings. B. Below Ground: 1. Cast iron soil pipe, service weight, with bell and spigot joints. 2.04 VALVES A. General: Refer to the requirements of Section 15100, VALVES, for the complete 3 requirements of all valves indicated in this section. B. Domestic water valves shall be full port ball valves. PART 3 - EXECUTION 3.01 GENERAL A. Slope: Unless otherwise indicated, horizontal sanitary and storm piping 2-1/2 inches and smaller shall be sloped at a minimum of 1/4 inch per linear foot;piping 3 inches and larger shall be sloped a minimum of 1/8 inch per foot. Project No. 98518.01 G&R City of Ocoee 15410-2 I vent branches shall be kept above the highest fixture served bythe B. Vent Piping: Horizontal vent gh vent branch in order to prevent the vent from being used as a waste line. Horizontal vent branches shall be sloped upward to prevent accumulating water or trapping. C. Vent Connections: Vent piping connected to a horizontal pipe shall be taken from the centerline of the pipe. Vent piping shall rise at an angle not exceeding 45 degrees from vertical, to a point at least 6 inches above the flood rim of the highest attached fixture. D. Vent Flashing: All vents extending through the roof and not otherwise indicated to have roof penetration seals or pitch pockets shall be flashed. Provide lead flashing with a minimum five pound per square foot density. Crimp the edge and flatten the flashing to maintain the maximum clear area of the pipe. Extend vents and piping through roof a minimum 8 inches above the finished roof surface unless otherwise indicated. 3.02 INSULATION A. Domestic water piping ishall be insulatleld with 1/2" thick fiberglass insulated and jacketed. 3.03 TESTING A. Sanitary Piping: 1. Water Test: A water test shall be applied to the sanitary and storm drainage systems. If applied to the entire system, all openings in the piping shall be tightly closed, except the highest opening, and the system filled with water to point of overflow. If the system is tested in sections, each opening shall be tightly plugged except the highest opening of the section under test, and each section shall be filled with water. In testing successive sections at least the upper 10 feet of the next preceding section shall be tested,so that no joint or pipe (except the uppermost 10 feet of the system) shall be submitted to a test of less than a 10 foot head of water. The water test shall last for at least 30 minutes. The system shall not experience a drop in water level; if a loss of water is noticed, the system shall be repaired and the test resumed until all sections of the piping are watertight. 2. Pneumatic Air Test: An air test may be made by attaching an air compressor or testing apparatus to any opening and, after closing all other inlets and outlets to the system, forcing air into the system until there is a uniform gauge pressure of 5 psi. This pressure shall be held without introduction of additional air for a period of at least 30 minutes. If the test pressure drops, indicating a leak, the piping shall be repaired and the test resumed until all sections of the piping are air tight. B. Domestic Water Piping: Pressure testing and sterilization shall be performed as described in Section 15060, PIPE AND FITTINGS. END OF SECTION 15410 City of Ocoee 15410-3 G&R Project No. 98518.01 SECTION 15860 FANS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Basic Requirements: Provisions of Section 15010, BASIC MECHANICAL REQUIREMENTS, and Section 15030, ELECTRICAL REQUIREMENTS FOR MECHANICAL EQUIPMENT, are a part of this Section. 1.02 SUMMARY A. General: Provide fans as specified herein and of size, type, capacity, and electrical ,, characteristics indicated. 1.03 ADDITIONAL REQUIREMENTS A. Related Sections: Other Sections of Division 15 which relate to the requirements of this Section may include but are not limited to the following: 1. 15050, BASIC MECHANICAL MATERIALS AND METHODS 2. 15240, VIBRATION ISOLATION 3. 15890, DUCTWORK 4. 15990, PERFORMANCE VERIFICATION B. Related Divisions: Other Divisions of these specifications which relate to the requirements of this Section may include but are not limited to the following: 1. Division 16, ELECTRICAL 1.04 SUBMITTAL A. General: Refer toara h entitled "SUBMITTAL" in Section 15010. Include the P �P following data: 1. Manufacturers ufacturers Literature: a. Dimensional outline drawing for each of the specified fans including operating weight. b. Dimensional drawing of roof curbs. 2. Performance Data: a. Fan brake-horsepower for each fan at scheduled static pressure including drive losses. City of Ocoee 15860-1 G&R Project No. 98518.01 b. Actual motor horsepower, voltage and phase for each fan. c. Fan curve for each fan indicating flow, static (or total) pressure developed, efficiency, and fan speed at the design point. 3 d. Fan sound power levels for each fan at operating conditions. e. Vibration isolators for each fan located inside the building. 3. Installation Instructions: a. Manufacturer's printed instructions for the installation of each type of fan including copies shipped with the equipment. 4. Maintenance Instructions: a. Manufacturer's printed instructions for the maintenance of each type of fan provided. 1.05 APPLICABLE STANDARDS A. General: All equipment,material, accessories,methods of construction and reinforcement, finish quality, workmanship and installation shall be in compliance with the paragraph entitled "Code Compliance" in Section 15010. B. Certification: AMCA certified as to both sound and performance ratings, and in compliance with the requirements of ARI Standard 670-90. C. NFPA: Standard 90A,"Installation for the Installation of Air Conditioning and Ventilating Systems". D. NFPA: Standard 91, "Installation of Blower and Exhaust Systems for Dust, Stock and Vapor Removal or Conveying". PART 2 - PRODUCTS 2.01 MANUFACTURERS A. General: Refer to paragraph entitled "MANUFACTURERS" in Section 15010. Manufacturing Acme Engineering and Com an P Y 2. Greenheck Fan and Ventilator Corp. 3. Loren Cook Company 4. Penn Ventilator Company 5. Aerovent City of Ocoee 15860-2 G&R Project No. 98518.01 I 2.02 GENERAL A. Roof Curb: All roof mounted supply and/or exhaust fans shall be mounted on a roof curb. Refer to paragraph entitled"ROOF CURB AND EQUIPMENT MOUNTING SUPPORTS" in Section 15050. B. Bird Screen: Provide removable bird screens, 1/2" mesh, 16 ga. aluminum or brass wire on each fan unless otherwise noted on the drawings. C. Backdraft Damper: Provide gravity-actuated louvered backdraft damper for each fan unless a motorized control damper is noted on the drawings. Damper blades shall be aluminum construction, with felt on the trailing edges to assure a tight closing seal. D. Vibration Isolation: Isolate the entire rotating assembly and motor of each fan to prevent the transmission of vibration into the structure. E. Fan Access: The hood covering the fan motor and drive shall be hinged to provide access and shall be equipped with an approved locking device to fasten hood in open and closed positions. F. Fan Motor: Refer to paragraph entitled "ELECTRIC MOTOR" in Section 15030. A disconnect switch inside the fan housing is not a requirement. Unless specifically indicated otherwise air handling unit fan motors shall be selected as follows: 1. Less than 5 hp; 135 percent of bhp 2. 5 Hp through 25 hp; 125 percent of bhp 3. Greater than 25 hp; 115 percent of bhp G. V-Belt Drive: Refer to paragraph entitled "V-BELT DRIVE" in Section 15050 for requirements for all belt driven fans. H. Speed Control: Provide a solid-state speed controller for each direct drive motor. Speed controller shall enable full modulation of motor between 40-100% of nameplate capacity for fan balancing. 1 2.03 ROOF MOUNTED EXHAUST A. Centrifugal Type: 1. Fan Hood, Housing, and Base: Weatherproof and constructed of heavy gauge aluminum. 2. Fan Wheel: Backward curved; non-overloading; aluminum; air foil blade type; statically and dynamically balanced; keyed and locked to shaft. 3. Drive Assembly: Motor and drive assembly shall be located out of exhaust air stream, cushioned mounted on multi-directional neoprene vibration isolators and positively ventilated. Supported by a structural frame independent of hood,housing, and curb base. See the fan schedule on the drawing for drive type. City of Ocoee 15860-3 G&R Project No. 98518.01 2.04 SIDEWALL EXHAUST A. Propeller Type: 1. Fan Hood, Housing, and Base: Weatherproof and constructed of heavy gauge3 aluminum. Motor and drive: supported by a structural frame independent of hood, housing, and mounting frame. 2. Fan Wheel: Propeller,non-overloading, aluminum, air foil blade type, statically and dynamically balanced. Wheels: keyed and locked to shaft. 3 3. Drive Assembly: Motor and drive assembly located out of exhaust air stream, cushioned mounted on multi-directional neoprene vibration isolators and positively ventilated. Direct or belt drive type as indicated. PART 3 -EXECUTION 3.01 PLACEMENT AND MOUNTING A. Installation: Fan location shall be as indicated,however, actual placement shall be verified using field measurements and data relating to the equipment approved for actual installation. Mount fan and backdraft damper in strict accordance with manufacturer's instructions. B. Roof Mounted: Verify the location of the roof curb with the structural drawings. Coordinate the installation with the requirements of Division 7, THERMAL AND MOISTURE PROTECTION. 3.02 SOUND AND VIBRATION CONTROL A. Reference: Refer to paragraph entitled"FLEXIBLE DUCT EQUIPMENT CONNECTION in Section 15910, for air side duct connections and to Section 15240, VIBRATION ISOLATION, for vibration hangers. 1. Curb Mounted Units: a. Connect inlet ducts to roof curb inlet flanges using flexible duct connectors. Support ductwork so that the connectors are not in tension and are aligned with ductwork. 3.03 TEST AND BALANCE A. Checkout: Operate all fans, adjust drive speeds to achieve design air flow, and perform other requirements as indicated in Section 15990, PERFORMANCE VERIFICATION. I City of Ocoee 15860-4 G&R Project No. 98518.01 i 3.04 SPARE PARTS A. Belts: Furnish to Owner, with receipt, 1 spare set of belts for each belt driven unit. END OF SECTION 1 1 City of Ocoee 15860-5 G&R Project No. 98518.01 SECTION 15870 AIR INTAKE AND RELIEF VENT PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Basic Requirements: Provisions of Section 15010, BASIC MECHANICAL REQUIREMENTS are a part of this Section. 1.02 SUMMARY A. General: Provide factory assembled air intake and/or relief vent of sizes and operating characteristics as indicated. 1.03 ADDITIONAL REQUIREMENTS A. Related Sections: Other Sections of Division 15 which relate to the requirements of this Section may include but are not limited to the following: 1. 15050, BASIC MECHANICAL MATERIALS AND METHODS 2. 15890, DUCTWORK 3. 15990, PERFORMANCE VERIFICATION B. Related Divisions: Other Divisions of these specifications which relate to the requirements of this Section may include but are not limited to the following: 1. Division 1, ALTERNATES 1.04 SUBMITTAL A. General: Refer to paragraph entitled "SUBMITTAL" in Section 15010. Include the following data: 1. Manufacturers Literature: a. Dimensional outline drawing showing the location of all supports. b. Operating weight. c. Free area of opening. 2. Performance Data: a. Recommended maximum intake or exhaust velocity. b. Pressure drop at design velocity, including bird screen. City of Ocoee 15870-1 G&R Project No. 98518.01 3. Installation Instructions: a. Manufacturer's printed installation instructions including copies shipped with the equipment. 1.05 APPLICABLE STANDARDS 3 A. General: All equipment,material, accessories,methods of construction and reinforcement, finish quality, workmanship and installation shall be in compliance with the paragraph entitled "Code Compliance" in Section 15010. PART 2 -PRODUCTS 2.01 MANUFACTURERS A. General: Refer to paragraph entitled"MANUFACTURERS" in Section 15010. 1. Acme 2. Cook 3. Penn 4. Greenheck 5. Powerline 2.02 GENERAL A. Basic Requirements: Units shall be sized as indicated, low silhouette type, and rain-tight under all operating conditions. Units shall be constructed of fiberglass, spun or extruded 3 aluminum, or galvanized steel. B. Capacity: Units shall pass indicated air quantities at not greater than 0.05 inch w.g. total pressure or as scheduled and, for intakes only, 500 fpm maximum throat and perimeter velocity. C. Bird Screen and Damper: Provide 1/4 inch mesh galvanized steel or stainless steel bird screen. Provide with parallel or opposed blade volume dampers and/or backdraft dampers where indicated. PART 3 -EXECUTION 3.01 PLACEMENT AND MOUNTING A. General: Location shall be essentiallyas shown on the drawings, however, actual placement of the roof curb shall be verified using field measurements and data relating to the equipment approved for actual installation on this project. Mount items in strict accord with manufacturer's instructions. Refer to paragraph entitled "ROOF CURBS AND EQUIPMENT MOUNTING SUPPORTS" in Section 15050. 3.02 DUCT CONNECTIONS City of Ocoee 15870-2 G&R Project No. 98518.01 1 A. Requirements: Connect ducts (where required) to roof curb inlet flanges using flexible connectors. Install connectors properly so that they are not in tension and are aligned with ductwork. END OF SECTION 1 1 City of Ocoee 15870-3 G&R Project No. 98518.01 SECTION 15890 DUCTWORK PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Basic Requirements: Provisions of Section 15010, BASIC MECHANICAL REQUIREMENTS are a part of this Section. 1.02 SUMMARY A. General: Provide complete duct systems as indicated. 1.03 ADDITIONAL REQUIREMENTS A. Related Sections: Other Sections of Division 15 which relate to the requirements of this Section may include but are not limited to the following: 1. 15050, BASIC MECHANICAL MATERIALS AND METHODS 2. 15240, VIBRATION ISOLATION 3. 15250, THERMAL INSULATION 4. 15860, FANS 5. 15870, AIR INTAKE AND RELIEF VENT 6. 15990, PERFORMANCE VERIFICATION B. Related Divisions: Other Divisions of these specifications which relate to the requirements of this Section may include but are not limited to the following: 1.04 SUBMITTAL A. General: Refer to paragraph entitled "SUBMITTAL" in Section 15010. Include the following data: 1. Manufacturers Literature: a. Complete set of published data on factory prefabricated duct construction material including sheet metal gauges, with indication of each material, method of construction, support method, and its intended application and design pressure limitation. b. Complete set of published data on duct sealant,mastic, and gasket material to be used, including its intended application. 2. Performance Data: a. Operating pressure for each duct system. City of Ocoee 15890-1 G&R Project No. 98518.01 I 3. Installation Instructions: printed instructions for the installation of prefabricated a. Manufacturer's ductwork including copies shipped with the material. b. Manufacturer's printed instructions for the installation of the internal acoustical liner. B. Shop Drawings: 1. Refer to the paragraph entitled "SHOP DRAWINGS FOR DUCT SYSTEMS" in Section 15010. Provide detailed shop drawings for the following systems: a. All exhaust systems. 1.05 TERMINOLOGY A. Dimensions: All ductwork dimensions are nominal free clearance internal dimensions which do not include insulation thickness, unless otherwise indicated. B. Finish: Where ductwork is exposed to view in occupied spaces,provide materials free from visual imperfections including pitting, seam marks, stains and discolorations, and other defects including those which would impair painting. Sheet metal in exposed locations shall be mill-phosphatized unless otherwise indicated. 1.06 APPLICABLE STANDARDS A. SMACNA: Use material, weight, thickness, gauge, reinforcing, seams and joints, suspension,workmanship and construction and installation methods as outlined in the Sheet Metal and Air Conditioning Contractors National Association, Inc., HVAC Duct Construction Standards,Metal&Flexible,First Edition, 1985. Manufactured round or oval ductwork shall comply with the manufacturer's published recommendations and installation instructions. Where duct gauge and reinforcement is specified for rectangular ducts, the following nominal metal thicknesses shall be used: 3 TABLE -METAL THICKNESS - DECIMAL INCHES Metal Gauge 26 24 22 20 18 16 14 12 Galvanized .0217 .0276 .0336 .0396 .0516 .0635 .0785 .1084 Aluminum .0320 .0400 .0500 .0630 .0800 .0900 .1000 .1250 Stainless .0178 .0235 .0293 .0355 .0480 .0595 .0751 .10541 B. HVAC Duct Leakage Standard: Duct leakage test methods, apparatus, and reporting shall comply with the requirements of the SMACNA HVAC Air Duct Leakage Test Manual, First Edition, (1985), and as otherwise indicated. I City of Ocoee 15890-2 G&R Project No. 98518.01 1 C. NFPA: The duct system, fittings, sealants and accessories shall comply to NFPA 90A g requiring a flame spread rating of not over 25 and a smoke developed/fuel contributed rating no higher than 50. I D. Underwriters' Laboratories Rating: All flexible fiberglass duct shall be listed Class 1 by the UL-181 standards rating. E. AWS:All welded ductwork shall be installed in conformance to American Welding Society AWS D9-84. F. ASTM: Unless otherwise specified, American Society for Testing and Materials specifications applicable are: Material Type ASTM Number Galvanized Steel ---- A525 Stainless Steel 302, 304 A480 E Cold Rolled Steel ---- A366 Aluminum 3003 H-14 B209 IIPART 2 - PRODUCTS 2.01 Manufacturer: A. General: Refer to paragraph entitled "Manufacturer" in Section 15010. 2.02 SHEET METAL DUCTWORK A. Material: Prime quality 48 inch wide resquare tight coat cold-rolled hot-dipped galvanized steel capable of double seaming without fracture. Conform to the requirements of ASTM A-525 and ASTM-G90 for a minimum galvanizing coat of 1.25 ounces per square foot total Cfor both sides. B. Square and Rectangular Duct Connections: Manufactured air duct connections with gasket tape, integral mastic sealer and bolted connections maybe used for transverse joints. 1. Manufacturer: IEa. Ductmate Industries, Inc. 11 C. Round and Oval Ducts: Manufactured round and oval ducts may be used provided they comply with the manufacture's published standards. City of Ocoee 15890-3 G&R Project No. 98518.011 L 1 1. Manufacturer: a. United-McGill b. Semco 2.03 MISCELLANEOUS A. Support materials: Angles and other structural shapes used in connection with galvanized steel sheets shall be zinc-coated steel. Hanger rods shall be minimum 3/8 inch diameter, hot-rolled mild steel. Rivets, screws, and other accessories shall be made of the same materials as the duct or casing. Minimum screw size shall be No. 8 and minimum rivet diameter shall be 5/32 inch. B. Sealant/Mastic: Low-odor, oil-resistant, non-hardening migrating mastic or liquid neoprene-based cement, applicable for fabrication or installation, shall be used as compounded specifically for sealing fitting components or longitudinal seams in ductwork. Oil- or asphalt-based caulking compounds are not acceptable. 1. Manufacturer: a. Childers b. H. B. Fuller/Foster c. United McGill d. 3M C. Gaskets: Gasket material shall be soft elastomer butyl or neoprene rubber formed for the 3 specific application. PART 3 - EXECUTION 3.01 GENERAL A. Criteria: All duct systems shall be furnished and installed free of noise, chatter,vibration, breathing and pulsation under all conditions of operation. Remove, replace or reinforce to correct adverse conditions. Fiberglass duct is not allowed on the project unless specifically indicated as acceptable. B. Field Conditions: If field conditions are determined to exist which would limit the guarantee of air delivery or system performance, submit notice in writing to the Architect. Prior to ductwork fabrication,verify dimensions at the site,making field measurements and drawings necessary for fabrication and erection. Take precautions to avoid space interferences with beams, columns,joists, pipes, lights, conduit, other ducts, equipment, etc. Make necessary revisions to routing where any spatial or coordination conflicts appear, at no additional cost to the Owner or change in the contract price. C. Preparation for Installation: Ductwork shall be shop-fabricated in lengths sufficient to minimize the number of joints, and shall be preassembled in the shop to the greatest extent I possible to minimize field-assembly of the system. Space duct joints to avoid cutting when installing branch takeoffs, outlet collars, etc. Disassemble ductwork only to the extent City of Ocoee 15890-4 G&R Project No. 98518.01 1 necessary for shipping and handling;match-mark sections for reassembly and coordinated installation. Install concrete inserts for support of the ductwork in coordination with the formwork to avoid delays. D. Installation: Properly support and align ductwork accurately at connections within 1/8 inch misalignment tolerance. Ducts shall be free of sags and bulges. Hang ductwork below concrete floors or roof deck with hangers set prior to pouring concrete, or from self drilling screw anchors. Gun powder set anchors are not permitted. Locate duct runs, except as otherwise indicated,vertically and horizontally, avoiding diagonal runs wherever possible. Parallel runs of horizontal ducts shall be grouped together on trapeze or strap hangers. Hold ducts as close to the structure above as possible. Maintain a minimum 6 inch clearance between walls and duct or duct exterior insulation for inspection. E. Duct Cleaning: Continuously cap open ends of ductwork to prevent entry of dust, debris and foreign material throughout the installation. Where the interior of ductwork has been exposed to dust or debris, clean the interior of the entire ductwork system from the point of debris entry to the duct termination. F. Duct Penetrations: Where it is necessary that ducts be divided due to pipes or other obstructions which must pass through these ducts,provide air-stream deflectors in the duct and increase the duct size to maintain equivalent area around the deflectors. Such changes shall be in accordance with standard SMACNA details and shall be shown on As-Built Drawings. G. Interior Duct Painting: Interior of ductwork visible through registers, grilles, or diffusers shall be painted flat black. H. Prohibited Duct Locations: Do not route ductwork through transformer vaults, or into electrical rooms or elevator equipment spaces unless the ductwork is dedicated to serving that space. Do not install ductwork over elevator equipment, electrical distribution panels or motor control stations. I. Balancing Devices: Due to clarity of the drawings,not all duct balancing dampers may be indicated. However, provide each duct branch and each duct takeoff with a balancing damper to assure correct balance and quiet distribution of indicated air quantities. J. Equipment Connections: Provide and install all duct connections to air handling units and fans and provide flexible connections, elbows and bends which minimize noise and pressure drop. Provide and install all necessary blank-off safing plates or transitions required to facilitate installation. Provide flexible connections between ductwork and all rotating or vibrating equipment. K. Coordination: Coordinate dimensions at interfaces of dissimilar type of ductwork and at interfaces of ductwork with equipment so that proper overlaps,interfaces, etc.,of insulation and continuity of vapor barriers are maintained. Where ducts of two dissimilar metals meet, the joints shall be installed such that the metals do not contact each other. City of Ocoee 15890-5 G&R Project No. 98518.01 operating Exterior Insulated Duct: Provide a seamless insulation finish around damper p eratin g quadrants, splitter adjusting clamps, access doors, and similar operating devices with a metal collar equivalent in depth to insulation thickness and suitably sized to which insulation may be finished. 3.02 SHEET METAL DUCTS A. Construction: Provide corner closures. Longitudinal seams and transverse joints shall be flat and smooth inside. Make slip joints in direction of air flow. Longitudinal joints shall be Pittsburgh lock or double corner seam. Button punch snaplock construction is not acceptable. All welds shall be continuous and corrosion-resistant. Sealant shall be applied over the continuous length of every seam. B. Fittings: Fabricate offsets, turns and elbows with centerline radius equal to 1-1/2 times diameter when possible. No mitered offsets will be allowed. C. Round/Oval: Use manufactured ductwork where round or flat oval is indicated. Where round or oval low pressure ductwork is designated to have internal acoustical/thermal liner, provide factory-fabricated double-wall ductwork. D. Acoustical Liner: Unless otherwise indicated, duct dimensions are clear interior dimensions,not including thicknesses of internal acoustical liner. Internal duct liner shall be cut to assure overlapped and compressed longitudinal corner joints. The liner shall be secured in accordance with the manufacturers' recommendations. Where interior liner is installed downstream from final filters, provide double-wall duct construction or a minimum 8 mil thickness mylar scrim covering to prevent filtered air contact with the fibrous material. E. Vapor Retardant: Where exterior-insulated ductwork connects to ductwork without exterior insulation,the exterior insulation shall overlap the connecting duct a minimum of 4 inches. The vapor retardant on the exterior insulation shall be sealed to the exposed metal duct. 3.03 SUPPLY, RETURN, INTAKE, EXHAUST AND RELIEF DUCTWORK A. General Air Moving Systems: Ductwork shall be constructed of galvanized sheet metal unless otherwise indicated and shall comply with SMACNA Pressure Classification. B. Minimum Requirements: Unless otherwise indicated all ductwork shall comply with the following minimum pressure requirements: 1. 3 inch w.g. Pressure: a. From the supply fan discharge to a terminal unit inlet. 2. 2 inch w.g. Pressure: a. From the supply fan discharge to a room supply air device. City of Ocoee 15890-6 G&R Project No. 98518.01 i b. From the return air inlet device to the inlet of the return fan or air handling fan return connection. 3. 1 inch w.g. Pressure: a. From the discharge side of a terminal unit to the room supply air device. b. From the room exhaust device to the inlet of the roof exhaust fan. C. Toilet exhaust, general exhaust: Ductwork shall not have internal insulation, and does not have to be externally insulated unless otherwise indicated. 3.04 CHANGES IN SHAPE OR DIMENSION A. Criteria: Where duct size or shape is altered to effect a change in area, the following shall apply: 1. Do not exceed a slope of 1 inch in 7 inches for transitions with increasing area. 2. Do not exceed a slope of 1 inch in 4 inches for transitions with decreasing area; 1 inch in 7 inches is preferable and should be used wherever possible. 3. Transition angles shall not exceed 30 degrees at inlet connections to coils or other equipment, nor 15 degrees at outlet connections. 3.05 MATERIALS AND APPLICATIONS FOR SEALING DUCTS 1. Liquid Sealant: Use only for slip type joints where sealant is to fill space between overlapping pieces of metal. Do not use where metal clearances exceed 1/16 inch. 2. Mastics: Use in lieu of liquid sealant as a filler, in grooves and between flanges. 3. Tape: Tape is not allowed to seal sheet metal ducts. 4. Combination of mastic and embedded fabric: Use mastic/mesh/mastic layers as a sealant where pressure equals or exceeds 3 inch w.g. and where any space between metal surfaces at transverse joints, longitudinal seams or duct wall penetrations exceeds 1/16 inch. 5. Surface preparation: Surfaces to receive sealant should be free from oil, dust, dirt, rust,moisture, ice crystals and other substances that inhibit or prevent bonding. Use solvent and apply a face primer if necessary to obtain a clean surface for adhesion. 6. System Preparation: Remove all dirt and foreign material from the entire duct system and clean diffusers, registers and grilles before operating fans. r City of Ocoee 15890-7 G&R Project No. 98518.01 3.06 DUCT ACCESS DOORS A. General: All supply and return ductwork including outdoor air intakes shall be provided with access doors to permit periodic cleaning of the inside surfaces. Refer to paragraph entitled "DUCT ACCESS DOORS" in Section 15910. such that theymaybe accessed bya person B. Location: Duct access doors shall be located standing on a ladder. Access doors located above a ceiling shall not be more than 42 inches above the ceiling unless a work platform is provided. The access doors may be located on the sides or bottom of the ductwork and shall be available in each straight run and not more than 30 feet on centers. All elements of the duct system shall be available for cleaning without passing the cleaning equipment through duct turning vanes. C. Size: The width of the access door shall be a minimum of 1 inch less than the width of the duct. The length of the access door shall be a minimum of 12 inches up to a width of 12 3 inches, a minimum of 18 inches up to a width of 18 inches, and a minimum or 24 inches up to a width of 24 inches. Duct access door for duct cleaning purposed need not be larger than 24 inches by 24 inches. I END OF SECTION I I 3 I I I I City of Ocoee 15890-8 G&R Project No. 98518.01 SECTION 15990 PERFORMANCE VERIFICATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Basic Requirements: Provisions of Section 15010, BASIC MECHANICAL REQUIREMENTS, and Section 15030, ELECTRICAL REQUIREMENTS FOR MECHANICAL EQUIPMENT, are a part of this Section. 1.02 SUMMARY A. General: Verify the performance of the complete heating, ventilating and air conditioning systems of Division 15 by testing and balancing procedures described in this section. The existence of the T&B Agency shall not relieve responsibility for the complete operation of the mechanical systems in conformance with the contract documents. 1.03 ADDITIONAL REQUIREMENTS A. Related Sections: Other Sections of Division 15 which relate to the requirements of this Section may include but are not limited to the following: 1. 15050, BASIC MECHANICAL MATERIALS AND METHODS 2. 15860, FANS B. Related Divisions: Other Divisions of these specifications which relate to the requirements of this Section may include but are not limited to the following: 1. Division 16, ELECTRICAL 1.04 APPLICABLE STANDARDS A. General: All P aq ui ment,material, accessories,methods of construction and reinforcement, finish quality,workmanship and installation shall comply with the paragraph entitled"Code Compliance" in Section 15010. 1.05 TEST AND BALANCE AGENCY A. General: Performance verification shall be performed by an independent T&B Agency. B. Certification: The T&B Agency shall be a certified member of the Associated Air Balance Council (AABC) or the National Environmental Balancing Bureau (NEBB). C. References: The T&B Agency shall have been in business continuously for the previous 3 years and shall specialize in and be limited to testing and balancing HVAC systems. The City of Ocoee 15990-1 G&R Project No. 98518.01 of five previouslysuccessfullycompleted projects of T&B Agency shall submit references similar size, type, scope, and complexity. Supervision: Field work shall be performed under the direct supervision of a full-time D. p employee of the T&B Agency. The final test reports shall be certified and sealed by the supervisor and signed by the employees performing the work. E. Approval: The T&B Agency shall not be affiliated with the construction contractors, equipment manufacturers, sales vendors, or design engineering firms. The T&B Agency shall be acceptable to the Architect and shall not be replaced without the written consent of the Architect. The T&B Agency shall report to the Architect in writing anytime the scheduled services cannot be performed as scheduled or as required. F. Reporting: The T&B Agency shall function as an authorized inspection agency responsible to the Architect and the Owner, and shall list all items which are installed incorrectly, require correction or completion, or which have not been installed in accordance with the contract documents. Prior to beginning system balancing, submit to the Architect for review written procedures to be followed for the testing and balancing work. 1.06 AGENCY APPROVAL A. Name and Qualifications: Submit the name and qualifications of the proposed T&B Agency to the Architect for acceptance within thirty(30)days of Notice to Proceed. If the proposed agency is not submitted within the stated time the Architect shall select the T&B Agency and deduct the cost of their services from the Contract Amount. 1.07 INSTRUMENTATION 3 A. General: All test and balance equipment and instruments shall be furnished by the T&B Agency and shall have been calibrated to the tolerances required in balancing standards within six (6) months of use on this work. A list of equipment and instruments shall be submitted to the Architect prior to commencing test and balancing operations and shall include manufacturer, serial number and certification of last calibration date and method of calibration including test references. Instruments without calibration adjustment capability shall be accompanied with manufacturer's certification of accuracy. Instruments shall have maximum field measuring accuracy, shall be applied as recommended by the manufacturer, and shall have minimum scale and maximum subdivisions with ranges for the values being measured. 1.08 WORK INCLUDED A. General: The T&B Agency shall provide all labor,supervision,professional services,tools, test equipment and instruments (except as otherwise indicated) to perform work of this section; including but not limited to: 1. Where conditions may exist in the system design or construction which may adversely affect system performance, identify the conditions and submit recommended corrections in writing for consideration by the Architect. City of Ocoee 15990-2 G&R Project No. 98518.01 1 g drawin s relevant to performance verification to 2. During construction, review shop confirm that the required piping, ductwork and equipment, and their respective specialties and accessories such as gauges, valves, dampers, access doors, etc., are properly selected, sized and located to permit proper and complete testing and balancing. 3. Perform a minimum of 4 hours of site inspections during construction and prior to the scheduled start of the test and balance work to become familiar with the project, equipment locations, and to verify compliance with documents. After each inspection submit a written report to the Architect indicating the area covered and the results of the inspection. hydronic test and balance of all exhaust airstems s 4. Perform a complete air and yY described on the Contract Documents. 5. Submit the Equipment Test and Systems Balance Report for review and acceptance. 6. Furnish specifications for properly-sized fixed sheaves and belts on fan systems after proper RPM has been established. 7. Test for sound and vibration levels. 1.09 GUARANTY A. General: The T&B Agency shall include a warranty period of ninety (90) days after acceptance of test and balance work. During the warranty period,the Architect may request a re-check or re-setting of any system component requiring testing and balancing. The T&B Agency shall provide technicians, instruments, and tools to assist the Architect in conducting any test required. a guarantee,such as the AABC National Project Certification Performance Guarantee, shall also be provided. PART 2 - PRODUCTS 2.01 REPORT A. Records: Recorded test data shall be at the final balanced condition for each system, and shall be arranged by system using the appropriate designation as established on the Contract Documents. 6 copies of the typewritten, signed,bound and indexed final report shall be submitted to the Architect for review prior to request for substantial completion inspection. The substantial completion inspection shall not be scheduled until the final report has been received and is acceptable to the Architect. Report format shall be similar to forms approved for use by SMACNA or AABC. B. Measurements: Where actual measurements recorded for the final balance show deviations of more than 10 percent from the design,the T&B Agency shall note same in the report and submit recommendations for corrective action to the Architect. I City of Ocoee 15990-3 G&R Project No. 98518.01 I C. Deficiency: Where recorded data can be reasonably interpreted to be inaccurate, inconsistent or erroneous,the Architect may request additional testing and balancing. The T&B Agency shall perform retesting and re-balancing at no additional cost. D. Vibration: Where, in the opinion of the T&B Agency, there is excessive vibration, movement or noise from any piece of equipment, ductwork,pipes, etc., the T&B Agency shall note same in the report and submit recommendations for corrective action to the Architect. E. Test Data: Include the Systems followingdata in the S stems Test and Balance Report: 1. Motors: - Manufacturer -Model and serial number -Rated amperage and voltage -Rated horsepower -Rated RPM - Measured amperage and voltage - Calculated brake-horsepower -Measured RPM 3 - Sheave size, type and manufacturer -Bearing model numbers 2. Fans: - Manufacturer -Model or Serial number, type of fan, number of blades, wheel diameter -Rated CFM, measured CFM - Rated RPM, measured RPM -Design inlet and outlet total and external static pressures -Actual inlet and outlet total and external static pressures - Pulley sizes, types and manufacturers -Belt size and quantity (V-belt drive only) -Bearing model numbers - Inlet vane position - Shaft diameter 2.02 DIAGRAMS A. General: Provide a schematic diagram(i.e., one-line) of duct systems tested. Indicate on the diagram the relative location of all air distribution devices,VAV boxes,heating/cooling coils, points of data measurements (i.e., pitot traverse, temperature, static pressure) fans, air handling units, and similar equipment included in the system which cause a pressure3 drop,such as filter banks,air flow monitors,sound attenuators,etc. Diagrams shall identify each component tested utilizing the conventions shown on the drawings (i.e., AHU-1 or SF-6) and correlate with the data sheets provided in the Test and Balance Report. City of Ocoee 15990-4 G&R Project No. 98518.01 1 PART 3 - EXECUTION 3.01 GENERAL A. Load Conditions: All testing and balancing of systems shall be performed with maximum attainable load. Testing and balancing of all air handling systems shall be accomplished with ceiling tiles in place and enclosing partitions, windows and doors erected. B. Observation: Observe all equipment and exposed piping for noise,movement or vibrations under normal operating conditions and report unacceptable operation to the Architect. C. Measuring Stations: Where measuring stations are installed,each is to be read and recorded in hydronic systems,permanent devices such as flow tubes with manometers, annular ring systems,venturi tubes with portable meters, etc. must be used for final measurements after they are completed and calibrated. D. Balancing/Test Results: Where flow, pressure or balancing meters are provided by the manufacturer of a specific device, (i.e. flow control valves), the T&B Agency shall verify meter operation and calibrate the device with the manufacturer's meter prior to turnover to the Owner. E. Adjusting: Testing and balancing is an iterative process and the T&B Agency may have to perform preliminary adjustments, readjustments and final adjustments as necessary to properly tune the systems. This is a integral part of the balancing procedure and must be anticipated; all adjustments, spot-checking required by the Architect and other reverification shall be performed at no additional cost to the Owner. 3.02 AIR SYSTEMS A. General: The testing and balancing shall include, but is not limited to, the following requirements: 1. Adjust fan speeds to deliver the required cfin and static pressure, and record rpm and full load amperes. Replace drives as required; increasing static pressure by 1 dampering at the fan is not permitted. 2. Observe all equipment and exposed ductwork for noise,movement or vibration under normal operating conditions and report to the Architect. B. Diagrams: On the single-line diagram, indicate the measured flow rates and pressure drops across each component, such as coils, filters, air flow monitoring stations, sound attenuators, louvers, fans, etc. in order of physical arrangement. 3.03 SYSTEM MEASUREMENT A. General: Measurements shall be taken to obtain accurate and consistent readings; i.e. sufficiently downstream from changes in direction, regions of turbulence, or flow convergence. City of Ocoee 15990-5 G&R Project No. 98518.01 when averaged repeatability Repeatability: Take sufficient readings which he g will result in a ep eatabili tY error not to exceed 5 percent. When measuring a single point, repeat readings until two consecutive identical values are obtained. Readings shall be taken with the eye at the level of the indicated value to prevent parallax. Insert pulsation dampeners to eliminate error involved in estimating the median of fluctuating readings. END OF SECTION I I I I 3 I I I I i 1 City of Ocoee 15990-6 G&R Project No. 98518.01 i SECTION 16010 BASIC ELECTRICAL REQUIREMENTS PART 1 - GENERAL 1.01 GENERAL A. Basic Requirements: The Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to work of this section. B. Provisions: Provide all labor, materials, equipment, and incidentals required to make ready for use a complete electrical system as specified herein and shown on the drawings. C. Provide and Install: The word "provide" where used on the Drawings or in this Division shall mean "furnish, install, mount, connect, test, complete, and make ready for operation". The word "install" where used on the Drawings or in this Division shall mean "mount, connect, test, complete, and make ready for operation". The Contractor shall perform all work required by, and in accordance with, the Contract Documents. D. Installation: Provide andP lace in satisfactory condition, ready for proper operation, all conduits, wires, cables, and other material needed for the complete electrical systems required by the Contract Documents. Additional conduits and wiring shall be provided wherever necessary to complete the installation of the specific equipment provided. Include all auxiliaries and accessories for complete and properly operating systems. Provide all electrical systems and any necessary accessories per NEC and local codes and ordinances. It is the intent of these Specifications that the electrical systems shall be suitable in every way for the service required. All material and work which may be reasonably implied as being incidental to the work of this Contract shall be provided at no additional cost to the Contract. E. Field Connections: Provide field connections to equipment provided under other Divisions of these Specifications. Provide all conduit,wire, and interconnections necessary. 1.02 SCOPE OF WORK A. General: The work provided under this Division shall include all labor, materials, permits, inspections and reinspection fees, tools, equipment, transportation, insurance, temporary protection, temporary lighting, supervision and incidental items essential for proper installation and operation, even though not specifically mentioned or indicated but which are usually provided or are essential for proper installation and operation of all Electrical systems as indicated in the contract documents. City of Ocoee 16010-1 G&R Project No. 98518.01 B. Minimum Requirements: The contract documents describe the minimum requirements that must be met for an acceptable installation. C. Notices: Give all notices, file all Plans,pay all fees, obtain all permits and approvals from authorities having jurisdiction. Include all fees in the Bid Price. 1.03 INTERPRETATION OF DRAWINGS A. General: The Drawings are diagrammatic and are not intended to show exact locations of conduit runs, outlet boxes,junction boxes, pull boxes, etc. The locations of equipment, appliances, fixtures, conduits, outlets,boxes and similar devices shown on the Drawings are approximate only. Exact locations shall be as accepted by the Engineer during construction. Obtain in the field all information relevant to the placing of electrical work and in case of interference with other work, proceed as directed by the Engineer and provide all labor and materials necessary to complete the work in an acceptable manner. B. Discrepancies: Notify Architect/Engineer of any discrepancies found during construction of the project and do not proceed with that portion of the project, until a written definitive statement is received providing clear direction. If a conflict exists between the contract documents and any applicable code or standard, the most stringent requirement shall be included for this project. The Engineer shall make the decision regarding questionable areas of conflict. C. Wiring: Each three-phase circuit shall be run in a separate conduit unless otherwise shown on the Drawings. Unless otherwise accepted by the Engineer, conduit shall not be installed exposed unless specifically directed to be exposed. Where circuits are shown as "home-runs" all necessary fittings and boxes shall be provided for a complete raceway installation. D. Surface Supports: Surface mounted panel boxes,junction boxes, conduit, etc., shall be supported by spacers to provide a clearance between wall and equipment. E. Layout: Circuit layouts are not intended to show the number of fittings, or other installation details. Provide all labor and materials necessary to install and place in satisfactory operation all power, control, lighting, and other electrical systems shown. All connections to equipment shall be made as required, and in accordance with the accepted shop and manufacturer's setting drawings. F. Coordination: Coordinate final equipment locations with governing Architectural and Structural drawings. Layout before installation so that all trades may install equipment in spaces available. Provide coordination as required for installation in a neat and workmanlike manner. 1 City of Ocoee 16010-2 G&R Project No. 98518.01 1 1.04 EQUIPMENT SIZE AND HANDLING A. Coordination: Investigate each space in the structure through which equipment must pass to reach its final location. If necessary, the equipment shall be required to be shipped in sections of specific sizes to permit the passing through the necessary areas within the structure. B. Handling: All equipment shall be kept upright at all times. When equipment has to be tilted for ease of passage through restricted areas during transportation, the manufacturer shall be required to brace the equipment suitably, to insure that the tilting does not impair the functional integrity of the equipment. 1.05 RECORD DRAWINGS A. Production: The Contractor shall provide two (2) sets of blue line drawings to maintain and submit record "as-built drawings". One set shall be maintained at the site and at all times be accurate, clear, and complete, showing the actual location of all equipment as installed. The Record Drawings shall show actual locations of all underground lines and accurate wiring diagrams of all power, light and other systems marked in colored pencil "As Installed". The "As-Built" drawings shall show all Electrical work installed complete to the present stage of progress, the outlet from which each homerun is taken, actual routing of all branch wiring and the location of all junction boxes and access panels. These drawings shall be available to the Architect/Engineer's field representatives at all times. B. Completion: At the completion of the Work, transfer onto the Second set all changes marked in colored pencil and submit to the Architect. The "As-Built" drawings shall be made available to the Engineer to make the final punch list of the work completed under this Contract. C. Final: P Upon Contractor's completion of the Engineer's final punch list, transfer all "As- Built" conditions and all requirements by the Engineer to the record drawings. 1.06 ABBREVIATIONS A. Abbreviations: The following abbreviations or initials may be used: A/C Air Conditioning AC Alternating Current ABV CLG Above Ceiling ADA American Disabilities Act AF Ampere Frame AFF Above Finished Floor AFG Above Finished Grade AHU Air Handler Unit City of Ocoee 16010-3 G&R Project No. 98518.01 L 3 AIC Amps Interrupting Capacity 3 AL Alurhinum AMP Ampere ANSI American National Standards Institute ASA American Standards Association AT Ampere Trip ATS Automatic Transfer Switch AUX Auxiliary AWG American Wire Gauge3 BC Bare Copper BIL Basic Impulse Level BRKR BreakerII CAB Cabinet C Conduit CB Circuit Breaker3 CBM Certified Ballast Manufacturers CCTV Closed Circuit Television CKT Circuit CLEC Clock Equipment Cabinet CLG Ceiling COAX Coaxial Cable1 COND Conductor CONN Connection CPU Central Processing Unit CRT Cathode Ray Terminal (Video display terminal) CSTC Communications System Terminal Cabinet CT Current Transformer CU Copper CW Cold Water DC Direct Current DEG Degree DCTC Door Control Terminal Cabinet DGP Data Gathering Panel DISC Disconnect DO Draw Out DN Down 3 DPST Double Pole Single Throw EMT Electrical Metallic Tubing EO Electrically Operated EOL End of Line Resistor EWC Electric Water Cooler EXFA Existing Fire Alarm FAAP Fire Alarm Annunciator Panel FACP Fire Alarm Control Panel FCU Fan Coil Unit City of Ocoee 16010-4 G&R Project No. 98518.01 1 I FLA Full Load Amperes FM Factory Mutual f GFI Ground Fault Interrupter GND Ground HD Heat detector [ HOA Hand-Off-Automatic HORIZ Horizontal HP Horsepower IC Intercom ICU Intensive Care Unit IEEE Institute of Electrical and Electronic Engineers IES Illuminating Engineering Society IMC Intermediate Metallic Conduit IN Inches IPCEA Insulated Power Cable Engineers Association JB Junction Box KV Kilovolt CKVA Kilo-Volt-Amps KW Kilowatts LBS Pounds CLED Light Emitting Diode LT Light LTG Lighting MAX Maximum MCB Main Circuit Breaker MCC Motor Control Center MCP Motor Circuit Protector MIC Microphone MIN Minimum MLO Main Lugs Only MTD Mounted MTG Mounting MUX Multiplex (Transponder)Panel MVA Mega Volt Amps N Neutral NEC National Electrical Code NECA National Electrical Contractors Association NEMA National Electrical Manufacturers Association NFPA National Fire Protection Association NIC Not in Contract NF Non Fused NL Non Linear NO Number Phase II OL Overload OSHA Occupational Safety and Health Administration 1 City of Ocoee 16010-5 G&R Project No. 98518.01 L I P Pole PB Pulibox Ply Post Indicator Valve PNL Panel PR Pair PWR Power PF Power Factor PRI Primary PROJ Projector PT Potential Transformer PVC Polyvinylchloride REF Refrigerator RMS Root-Mean-Square RPM Revolutions Per Minute RECPT Receptacle RSTC Radio/Sound Terminal Cabinet SCA Short Circuit Amps SD Smoke Detector SEC Secondary S/N Solid Neutral SPKR Speaker SPST Single Pole Single Throw SW Switch SWBD Switchboard3 TEL Telephone TTB Telephone Terminal Board TTC Telephone Terminal Cabinet TVEC Television Equipment Cabinet TYP Typical UCR Under Counter Refrigerator UH Unit Heater UL Underwriters Laboratories V Volt II W Wire WP Weatherproof XFMR Transformer 1.07 CODES, FEES, AND STANDARDS A. Application:. The codes, standards and practices listed herein generally apply to the entire project and all specification sections. Other codes, standards or practices that are more specific will be referenced within a particular specification. I City of Ocoee 16010-6 G&R Project No. 98518.01 I B. Requirements: All articles, products, materials, fixtures, forms or types of construction covered in the specifications will be required to meet or exceed all applicable standards of manufacturer,testing, performance, capabilities,procedures and installation according to the requirements of ANSI,NEMA, IEEE, and NEC referenced documents where indicated and the manufacturer's recommended practices. Requirements indicated on the contract documents which exceed but are not contrary to governing codes shall be followed. C. Compliance and Certification: The installation shall comply with the governing state and local codes or ordinances. The completed electrical installation shall be inspected and certified by all applicable agencies that it is in compliance with all codes. D. Applicability: The codes and standards and practices listed herein, and their respective dates are furnished as the minimum latest requirements. 1. State of Florida. 2. Orange County. 3. City of Ocoee. E. Utility Company: Comply an : Com 1Y with latest utility company regulations. F. State Code: Florida Administrative Code. G. State Statutes: Florida Statutes 1. 4A3, (April 1995) The State Fire Prevention Code H. Building Code: Standard Building Code (1994). I. Manuals: Accessibility Requirements Manual (January 1994)Florida Department of Community Affairs. J. Labels: All materials shall be new and free of defects, and shall be U.L. listed,bear the U.L. label or be labeled or listed with an approved, nationally recognized Electrical Testing Agency. Where no labeling or listing service is available for certain types of equipment, test data shall be submitted to validate that equipment meets or exceeds available standards. K. NFPA: National Fire Protection Association (NFPA) Standards City of Ocoee 16010-7 G&R Project No. 98518.01 I I NFPA-13 (1994) Installation of sprinkler systems. NFPA-70 (1993) National Electrical Code. NFPA-101 (1994) Life Safety Code. 1.08 COORDINATION A. General: Compare drawings and specifications with those of other trades and report any discrepancies between them to the Architect. Obtain from the Architect written instructions to make the necessary changes in any of the affected work. All work shall be installed in cooperation with other Trades installing interrelated work. Before installation, all Trades shall make proper provisions to avoid interferences in a manner approved by the Architect. B. Adjustments: Locations of conduit and equipment shall be adjusted to accommodate the work with interferences anticipated and encountered. Determine the exact routing and location of all systems prior to fabrication or installation. C. Priorities: Lines which pitch shall have the right of way over those which do not pitch. For example, plumbing drains shall normally have the right of way. Lines whose elevations cannot be changed shall have the right of way over lines whose elevations can be changed. D. Modifications: Offsets and changes of direction in all conduit systems shall be made as required to maintain proper headroom and pitch of sloping lines whether or not indicated on the drawings. Provide elbows,boxes, etc., as required to allow offsets and changes to suit job conditions. E. Replacement: All work shall be installed in a way to permit removal (without damage to other parts) of all other system components provided under this Contract requiring periodic replacement or maintenance. All conduit shall be arranged in a manner to clear the openings of swinging overhead access doors as well as ceiling tiles. diagrammatic onlyintendingto show general runs F. Layout: The Contract Drawings are gr and locations of conduit and equipment, and not necessarily showing all required offsets, details and accessories and equipment to be connected. All work shall be accurately laid out with other Trades to avoid conflicts and to obtain a neat and workmanlike installation which will afford maximum accessibility for operation, maintenance and headroom. G. Contract Conflicts: Where discrepancies exist in the Scope of Work as to what Trade provides items such as starters, disconnects, flow switches, etc. such conflicts shall be coordinated between the divisions involved. It is the intent of the Contract Documents that all work shall be provided complete as one bid price. City of Ocoee 16010-8 G&R Project No. 98518.01 1 I H. Drawing Conflicts: Where drawing details,plans or specification requirements are in conflict and where sizes of the same item run are shown to be different within the contract documents, the most stringent requirement shall be included in the Contract. Systems and equipment called for in the specification or as shown on the drawings shall be provided under the Contract of each trade as if it was required by both the drawings C and specifications. Prior to ordering or installation of any portion of work which appears to be in conflict, such work shall be brought to Architect's attention for direction as to what is to be provided. I. Working Clearances: Working clearances about electrical equipment shall be as referenced NEC 110-16, and shall include new equipment installed in existing ceiling spaces. J. Motor Circuits: Contractor shall coordinate circuit breaker, wire and conduit sizes with actual motors supplied. All changes required shall be made at no additional cost to the Owner. CPART 2 - PRODUCTS 2.01 MATERIALS AND SUBSTITUTIONS F A. Specified Method: Where several brand names, make or manufacturer are listed as acceptable each shall be regarded as equally acceptable,based on the design selection. Where a manufacturer's model number is listed,this model shall set the standard of quality and performance required. Where no brand name is specified, the source and quality shall be subject to Engineer's review and acceptance. II B. Certification: When a product is specified to be in accordance with a trade association or government standard requested by the Engineer, Contractor shall provide a certificate that the product complies with the referenced standard. Upon request of Engineer, Contractor shall submit supporting test data to substantiate compliance. IIC. Basis of Bid: Each bidder represents that his bid is based upon the manufacturer's, materials, and equipment described in the Contract Documents. D. Space Requirements: Substituted equipment or optional equipment where permitted and accepted, must conform to established space requirements within the project. Accepted substituted equipment which does not meet space requirements, shall be replaced at no additional expense to the Contract. All modifications of related systems as a result of substitutions shall be made at no additional expense to the Contract. Submit all modifications to the Architect/Engineer for acceptance. City of Ocoee 16010-9 G&R Project No. 98518.01 E. Samples: Samples are to be submitted for all substituted light fixtures, wiring devices, and other items deemed necessary by the Engineer to determine that the substituted item meets all specifications and requirements before substitutions are allowed. Samples shall 3 be submitted within 30 days after the award of the contract. 2.02 SHOP DRAWINGS A. General: Shop drawings shall be submitted for every item of equipment and material provided under this Division unless noted herein. One copy shall be submitted to the engineer prior to ordering equipment. Refer to Basis of approval paragraph. B. Responsibility: It is the Contractors responsibility to provide all material in accordance with the plans and specifications. Material not provided in accordance with the plans and specifications will be removed and replaced at the Contractors expense. The contractor shall submit one of the manufacturers specified. No substitutions are allowed. C. Official Record: The shop drawing submittal shall become the official record of the materials to be installed. If materials are installed which do not correspond to the record submittal they shall be removed from the project without any additional cost to the Owner or delays in construction completion. D. Information: The shop drawing record submittal shall include the following information to the extent applicable to the particular item; 1. Manufacturer's name andP roduct designation or catalog number. a. Electrical ratings. b. Standards or specifications of ANSI, ASTM, ICEA, IEEE, ISA,NEMA, NFPA, OSHA, UL, or other organizations, including the type, size, or other designation. c. Dimensioned plan, sections, and elevations showing means for mounting, conduit connections, and grounding, and showing layout of components. d. Materials and finish specifications, including paints. e. List of components including manufacturer's names and catalog numbers. f. Internal wiring diagram indicating all connections to components and the terminals for external connections. g. Manufacturer's instructions and recommendations for installation, operation, and maintenance. h. Manufacturer's recommended list of spare parts. E. Preparation: Prior to submittal, all shop drawings shall be checked for accuracy and contract requirements. Shop drawings shall bear the date checked and shall be accompanied by a statement that the shop drawings have been examined for conformity to Specifications and Drawings. This statement shall also list all discrepancies with the Specifications and Drawings. Shop drawings not so checked and noted shall be returned to Contractor unreviewed. City of Ocoee 16010-10 G&R Project No. 98518.01 I F. Basis of Review: The Engineer's review shall be for compliance with the Specifications and Drawings. G. Responsibility: The responsibility that all dimensions are confirmed and correlated with proper coordination of all other trades shall be included as part of the Contract Documents. The responsibility and the necessity of providing materials and workmanship required by the Specifications and Drawings which may not be indicated on the shop drawings shall be included as part of the Contract Documents. The Contractor is responsible for any delays in job progress occurring directly or indirectly from late submissions or resubmissions of shop drawings,product data, or samples. H. Ordering Equipment:E ui ment: No material shall be ordered or shop work started until the Engineer's has officially received the shop drawings record submittal and has formally released the Contractor for submittal requirements. I. Brochure Requirements: Submit Technical Information Brochures at the start of construction or no later than 30 days after Award of the Contract. Each brochure shall consist of an adequately sized,hard-cover, 3-ring binder for 8-1/2" X 11" sheets. Provide correct designation on outside cover and on end of brochure. When one binder is not enough to adequately catalog all data, an additional binder shall be submitted. J. Brochure Contents: First sheet in the brochure shall be a photocopy of the Electrical Index pages in these specifications. Second sheet shall be a list of Project Addresses for this project. Third sheet shall list Project Information. Provide reinforced separation sheets tabbed with the appropriate specification reference number and typed index for each section in the Electrical Schedule. Technical Information consisting of marked catalog sheets or shop drawings shall be inserted in the brochure in proper order on all items specified and shown on drawings. At the end of the brochure,provide and insert a copy of the specifications for this Division and all addenda applicable to this Division. K. Contractor's Review: Review the brochures before submitting to the Engineer. No request for payment shall be considered until the brochure has been reviewed, stamped and submitted for review. L. Cost: Submit cost breakdown on work in the Technical Information Brochures. The cost of material and labor for each item shall be indicated. The cost of fittings and incidentals are not required. M. Title Drawings: Title drawings to include identification of project and names of Architect-Engineer, Engineer, Contractors, and/or supplier, data,number sequentially and indicate in general; 1. Fabrication and Erection dimensions. 2. Arrangements and sectional views. City of Ocoee 16010-11 G&R Project No. 98518.01 I 3. Necessary details, including complete information for making connections with 3 other work. 4. Kinds of materials and finishes. 5. Descriptive names of equipment. 6. Modifications and options to standard equipment required by the contract. 7. Leave blank area, size approximately 4 by 2-1/2 inches, near title block(for 3 Engineer's stamp imprint). 8. In order to facilitate review of shop drawings, they shall be noted, indicating by cross reference the contract drawings, notes, and specification paragraph numbers where items occur in the contract documents. 9. See specific sections of specifications for further requirements. N. Technical Data: Submit technical data verifying that the item submitted complies with the requirements of the specifications. Technical data shall include manufacturer's name and model number, dimensions, weights, electrical characteristics, and clearances 3 required. Indicate all optional equipment and changes from the standard item as called for in the specifications. Provide drawings, or diagrams, dimensioned and in correct scale, covering equipment, showing arrangement of components and overall coordination. 3 O. Samples: Provide two samples of materials and finishes. Each sample shall be tagged, labeled, or marked, "Sample of for(PROJECT). Accompany samples with copy, in duplicate of manufacturer's instructions regarding installation, and maintenance. P. Same Manufacturer: In general, relays, contactors, starters, motor control centers, 3 switchboards, panelboards, dry type transformers, disconnect switches, circuit breakers, manual motor starter switches, etc., shall be supplied and manufactured by the same manufacturer. 3 2.03 EQUIPMENT, MATERIALS, AND SUPPORTS A. General: Each item of equipment or material shall be manufactured by a company regularly engaged in the manufacturer of the type and size of equipment, shall be suitable for the environment in which it is to be installed, shall be approved for its purpose, environment, and application, and shall bear the UL label. B. Installation Requirements: Each item of equipment or material shall be installed in 3 accordance with instructions and recommendations of the manufacturer,however, the methods shall not be less stringent than specified herein. 3 C. Required Accessories: Provide all devices and materials, such as expansion bolts, foundation bolts, screws, channels, angles, and other attaching means,required to fasten enclosures, conduits, and other electrical equipment and materials to be mounted on 3 structures which are existing or new. I City of Ocoee 16010-12 G&R Project No. 98518.01 1 I I D. Protection: Electrical equipment shall at all times during construction be adequately protected against mechanical injury or damage by the elements. Equipment shall be stored in dry permanent shelters. If apparatus has been damaged, such damage shall be repaired at no additional cost or time extension to the Contract. If apparatus has been subject to possible injury, it shall be thoroughly cleaned, dried out and put through tests as directed by the Manufacturer and Engineer, or shall be replaced, if directed by the Engineer, at no additional cost to the Contract. 2.04 IDENTIFICATION OF EQUIPMENT A. General: All electrical items shall be identified as specified in the Contract Documents. Such identification shall be in addition to the manufacturer's nameplates and shall serve to identify the item's function and the equipment or system which it serves or controls. Refer to Identification Section of the specifications for additional information. 2.05 SURFACE MOUNTED EQUIPMENT A. General: Surface mounted fixtures, outlets, cabinets, panels, etc. shall have a factory applied finish or shall be painted as accepted by Engineer. All conduits and fittings, where allowed to be installed surface mounted, shall be painted to match the finish on which it was installed. Paint shall be in accordance with other applicable sections of these specifications. Refer to additional specifications note herein, regarding conduit, boxes, etc. 2.06 CUTTING AND PATCHING A. Core Drilling: The Contractor shall be responsible for all core drilling as required for work under this section,but in no case shall the Contractor cut into or weld onto any structural element of the project without the written approval of the Architect. B. Cutting and Patching: All cutting, rough patching and finish patching shall be provided as specified in the contract documents. All cutting and patching shall be performed in a neat and workmanlike manner. C. Openings and Sleeves: Locate all openings required for work performed under this section. Provide sleeves, guards or other accepted methods to allow passage of items installed under this section. 11 D. Roof Penetration: Provide roofer with all pitch pans, fittings, etc., required for electrical items which penetrate the roof. Roof penetrations are to be waterproofed in such a manner that roofing guarantees are fully in force. I City of Ocoee 16010-13 G&R Project No. 98518.01 2.07 SLEEVES AND FORMS FOR OPENINGS A. Sleeves: Provide all sleeves for conduits penetrating floors, walls, partitions, etc. Locate all necessary slots for electrical work and form before concrete is poured. Water-tight sleeves shall be line seal type WS. Fire rated partition sleeves shall be mild steel. Size shall be one standard diameter larger than pipe being installed or of a larger diameter to below 1/4" minimum clearance. B. Forms: Provide boxed out forms for conduit penetrations only where allowed by the Architect. Fill opening after conduit installation, with equivalent material. 2.08 TEMPORARY LIGHT AND POWER A. Capacity: Make arrangements with the Owner and pay all related expenses. Temporary light and power shall be provided constantly during the project dependent upon Owner's safety requirements. B. Lighting: Temporary light shall be based on one 200 watt lamp covering each 1,000 square foot of floor area in the building. Each room 100 square foot and over shall have a minimum of one 100 watt lamp with guards. Provide power for motors up to 3/4 horsepower only. Provisions are to be made for electric welders, if required. C. Outlets: Provide outlets located at convenient points so that extension cords of not over fifty (50) feet will reach all work requiring artificial light or power. D. Other Connections: Contractors of all other trades shall furnish their own cords and sockets, as may be required for their work and shall also pay for cost of all temporary wiring of construction offices and shanties used by them. E. New Fixtures: Permanently installed lighting fixtures may be used for temporary lighting at the Contractor's option with the provision that cool white lamps for fluorescent, clear lamps for incandescent and marked temporary for all other types shall be installed. At job completion, all lamps shall be replaced with permanent lamps specified. F. Wiring: All temporary electrical work shall be furnished and installed in conformity with the National Electrical Code and in accordance with the requirements of the local ordinances and shall be maintained in a workmanlike manner throughout their entire construction period and shall be removed after installation of the permanent electrical systems. All extension cords shall be GFCI protected or shall be fed from GFCI circuit breakers. 1 City of Ocoee 16010-14 G&R Project No. 98518.01 1 PART 3 - EXECUTION 3.01 WORKMANSHIP A. General: The installation of materials and equipment shall be performed in a neat, workmanlike and timely manner by an adequate number of craftsmen knowledgeable of the requirements of the Contract Documents. They shall be skilled in the methods and craftsmanship needed to produce a quality level of workmanship. Personnel who install materials and equipment shall be qualified by training and experience to perform their assigned tasks. B. Acceptable Workmanship: Acceptable workmanship is characterized by first-quality appearance and function, conforming to applicable standards of building system construction, and exhibiting a high degree of quality and proficiency which is judged by the Architect as equivalent or better than that ordinarily produced by qualified industry tradesmen. C. Performance: Personnel shall not be used in the performance of the installation of material and equipment who, in the opinion of the Architect, are deemed to be careless or unqualified to perform the assigned tasks. Material and equipment installations not in compliance with the Contract Documents, or installed with substandard workmanship and not acceptable to the Architect, shall be removed and reinstalled by qualified craftsmen, at no change in the contract price. 3.02 PROTECTION AND CLEAN UP A. Protection and Restoration: Suitably protect all equipment provided under this Division during construction. Restore all damaged surfaces and items to "like new" condition before a request for substantial completion inspection. B. Handling: All materials shall be properly protected and all conduit openings shall be temporarily closed by the Contractor to prevent obstruction and damage. Post notice prohibiting the use of all systems provided under this Contract,prior to completion of work and acceptance of all systems by the Owner's representative. The Contractor shall take precautions to protect his materials from damage and theft. The Contractor shall furnish,place and maintain proper safety guards for the C. Safeguards: p p prevention of accidents that might be caused by the workmanship, materials, equipment or systems provided under this contract. D. Cleanup: Keep the job site free from all debris and rubbish. Remove all debris and Lrubbish from the site and leave premises in clean condition on a daily basis. City of Ocoee 16010-15 G&R Project No. 98518.01 3.03 SYSTEMS GUARANTEE A. General: Provide a one-year guarantee. This guarantee shall be by the Contractor to the Owner for any defective workmanship or material which has been provided under this Contract at no cost to the Owner for a period of one year from the date of substantial completion of the System. The guarantee shall include all lamps, for ninety days after date of Substantial Completion of the System. Explain the provisions of guarantee to the Owner at the "Demonstration of Completed System". 3.04 FINAL OBSERVATION A. General: All work shall be completed, and all forms and other information shall be submitted for acceptance one week prior to the request for final observation of the installation. 3.05 SPECIAL CONSIDERATIONS A. Attire: All workmen shall wear proper work clothing attire at all times. Shirts shall not be removed. Cleanliness of clothing shall not cause discomfort or problems with building residents and employees. I ***END OF SECTION*** I I I I 3 I City of Ocoee 16010-16 G&R Project No. 98518.01 1 l I CERTIFICATE OF COMPLETED DEMONSTRATION MEMO Note to Contractor: Do not submit this form at the time Technical Information Brochure is submitted. E Submit five copies of all information listed below for checking at least one week before scheduled completion of the building. After information has been accepted and inserted in each brochure, give the Owner a Demonstration of the Completed Electrical Systems and have the Owner sign five copies of this form. Provide one signed copy for each brochure. After this has been done, a written request for a final inspection of the System shall be made. Re: (Name of Project) (Division Number and Name) This memo is for the information of all concerned that the Owner has been given a Demonstration of the Completed Electrical Systems on the work covered under this Division. This conference consisted of the system operation, a tour on which all major items of equipment were pointed out, and the following items were given to the Owner; (a) Owner's copy of Technical Information Brochure containing approved submittal sheets on all items, including the following; (To be inserted in the Technical Information Brochure after the correct,tab). (1) Maintenance Information published by manufacturer on equipment items. (2) Printed Warranties by manufacturers on equipment items. (3) Performance verification information as recorded by the Contractor. (4) Check-out Memo on equipment by manufacturer's representative. (5) Written operating instructions on any specialized items. (6) Explanation of the one-year guarantee on the system. (b) "As-Built" conditions as described in the record drawing specifications. (c) A demonstration of the System in Operation and of the maintenance procedures which shall be required. (Name of General Contractor) EBy: (Authorized Signature, Title & Date) (Name of SubContractor) By: (Authorized Signature, Title &Date) Brochure, Instruction, Prints, Demonstration &Instruction in Operation Received: (Name of Owner) By: (Authorized Signature, Title, Date) cc: Owner, Architect, Engineer, Contractor, Sub Contractor and General Contractor City of Ocoee 16010-17 G&R Project No. 98518.01 L 3 (List names as stated in cc: above) 1 3 3 3 3 3 3 3 3 3 3 3 I City of Ocoee 16010-18 G&R Project No. 98518.01 1 1 SECTION 16030 ELECTRICAL IDENTIFICATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to work specified of this section. 1.02 DESCRIPTION A. Extent: Electrical identification work as required by the Contract Documents or other specifications. B. Types: Electrical identification work for; 1. Electrical power conductors. 1 2. Conduits,boxes, etc. 3. Distribution Equipment. 1.03 QUALITY ASSURANCE A. Manufacturers: Firms regularly engaged in manufacturer of electrical identification products of types required, whose products have been in satisfactory use in similar service for not less than 3 years. B. NEC Compliance: Comply with NEC as applicable to installation of identifying labels and markers for wiring and equipment. C. UL Compliance: Comply with applicable requirements of UL Standard 969, "Marking and Labeling Systems",pertaining to electrical identification systems. D. ANSI Compliance: Comply with applicable requirements of ANSI Standard A13.1, "Scheme for the Identification of Piping Systems", and ANSI Standard Z53.1 "Color Designation." E. NEMA Compliance: Comply with applicable requirements of NEMA Standard No's. WC-1 and WC-2 pertaining to identification of power and control conductors. F. ADA Compliance: All signage shall meet ADA standards. Identification for maintenance purposes shall be as specified herein. 1.04 SUBMITTALS A. General: Submit shop drawings of all identification materials to be used for this project. City of Ocoee 16030-1 G&R Project No. 98518.01 3 PART 2 - PRODUCTS 2.01 ELECTRICAL IDENTIFICATION MATERIALS 3 A. General: Except as otherwise indicated, provide manufacturer's standard products of 3 categories and types required for each application. B. Cable/Conductor Identification Bands: Provide manufacturer's standard vinyl cloth self- adhesive cable/conductor markers of the wrap-around type; either pre-numbered plastic coated type, or write-on type with clear plastic self-adhesive cover flap; numbered to show circuit identification. C. Engraved Plastic Laminate Nameplates: Provide engraving phenolic plastic laminate,in sizes and thicknesses indicated, engraved with standard pica lettering and wording as specified herein, black face and white core plies (letter color). Punch for mechanical fastening, except where adhesive mounting is necessary because of substrate. Material thickness shall be 1/16 inch. Provide beveled edge in order to eliminate sharp corners. Provide self-tapping stainless steel round head screws. Provide contact type permanent adhesive where screws cannot or shall not penetrate the substrate. Adhesive nameplate shall be permanently installed. Titles shall be 1/2 inch high and all other lettering shall be 1/4 inch high. D. Junction Box Identification: Provide neat indelible felt tip, stenciled marking on junction box and pullbox covers. Letter sizes shall be 1 inch high minimum. Provide non- stenciled markings inside the junction box and on the exterior edge to match the cover markings. 2.02 LETTERING AND GRAPHICS A. General: Coordinate names, abbreviations, and other designations used in electrical identification work,with corresponding designations specified or scheduled. Provide numbers, lettering and wording as indicated or, if not otherwise indicated, as recommended by the manufacturer and as required for proper identification and operation/maintenance of the electrical system equipment. Comply with ANSI A13.1 pertaining to minimum sizes for letters and numbers. PART 3 - EXECUTION 3 3.01 APPLICATION AND INSTALLATION A. Installation: Install electrical identification products as indicated, in accordance with manufacturer's written instructions, as required by the NEC and as specified herein. B. Coordination: Where identification is to be applied to surfaces which require a field 3 finish application, install identification after completion of such application. C. Regulations: Comply with governing regulations and requests of governing authorities for the identification of electrical work. 1 City of Ocoee 16030-2 G&R Project No. 98518.01 and equipment that house potential electrical D. Hazards: Identify all rooms, spaces, hazards, and label with appropriate signage or indicators. 3.02 IDENTIFICATION A. General: Apply cable/conductor identification on each cable/conductor in each box/enclosure/cabinet where conductors of more than one circuit are provided. Match 1 identification with marking system used in panelboards, shop drawings, contract documents, and similar previously established identification for the project's electrical work. B. Color Coding: Color code all power and lighting cable. Use wire colored by integral pigmentation, making the wire 100 percent colored. Where not practicable or available (in larger conductor sizes), color code the wire by using colored plastic tape,painting the ends accessible at junction or pull boxes, or other method acceptable to the Engineer. Use the following chart as applicable; 120/208 CONDUCTOR VOLTS Phase A Black Phase B Red Phase C Blue Neutral White Equip.Ground Green C. Equipment Identification: 1. Nameplates: Install an engraved phenolic plastic laminate nameplate on each unit of electrical equipment in the building. 2. Locations: Provide nameplates for: a. Panelboards, electrical cabinets, and enclosures. (1) Provide a nameplate outside and above the door listing its designation and voltage. 1 - b. Transformers. c. Motor starters. 3. Viewing: Install nameplates at locations indicated and where not otherwise indicated at a location for the best convenience of viewing without interference with operation and maintenance of equipment. END OF SECTION City of Ocoee 16030-3 G&R Project No. 98518.01 SECTION 16110 RACEWAYS AND CONDUIT PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to work of this section. 1.02 DESCRIPTION A. General: Provide all supports, hangers and inserts required to mount conduit,pullboxes and other equipment provided under this Division. B. Support: All items shall be supported orted from the structural portion of the building. PP Supports and hangers shall be of a type approved by Underwriters' Laboratories. Wire shall not be used as a support. Boxes and conduit shall not be supported or fastened to ceiling suspension wires or to ceiling channels. Do not install any devices supported by ceiling tiles. C. Installation: The Contractor out shall layand provide his work in advance of the laying of floors or walls, and shall provide all sleeves that may be required for openings through floors, walls, etc. Where plans call for conduit to be run exposed,provide all inserts and clamps for the supporting of conduit. 1.03 QUALITY ASSURANCE A. Qualifications: Manufacturers shall be regularly engaged in the manufacture of conduit systems and fittings of types and sizes required, and whose products have been in satisfactory use in similar service for not less than 5 years in the USA. B. Compliance: Materials shall comply with the latest edition of the following standards as they apply to the different raceway types specified herein; 1. ANSI: a. ANSI C80.1: Rigid Steel Conduit (RSC) b. ANSI C80.3: Electrical Metallic Tubing (EMT) 2. UL: a. UL 1: Flexible Metal Conduit b. UL 6: Rigid Steel Conduit(RSC) c. UL 360: Liquid-Tight Flexible Metal Conduit d. UL 514: Fittings for Metal Conduit City of Ocoee 16110-1 G&R Project No. 98 518.01 Nonmetallic Conduit(PVC) UL 651: (P ) f. UL 797: Electrical Metallic Tubing (EMT) 3. NEMA: 3 a. NEMA TC2: Rigid Nonmetallic Conduit (PVC) b. NEMA TC3: Fittings for Rigid Nonmetallic Conduit(RNMC) 4. Federal Specifications: a. WW-C-581: Rigid Steel Conduit(RSC) b. WW-C-563: Electrical Metallic Conduit (EMT) c. WW-C-566: Flexible Steel Conduit d. WC-1094A: Nonmetallic Rigid Conduit (PVC) 1.04 SUBMITTALS 3 A. Products: Submit manufacturer's product data, including technical information on each type of raceway system; 1. Conduit- Metal 2. Conduit fittings 3 3. Plastic (PVC) solvent 4. Black mastic coating for conduit 5. Insulating and grounding bushings for conduit 6. Galvanizing and protective coatings for conduit B. Compliance: Product data shall show compliance with this section of the specifications, including U.L. label, manufacturer and manufacturer's written installation instructions. 1.05 CONDUIT A. General: Provide a complete and continuous system of raceways to maintain a protected path for wires and cables to distribute electric power, and low voltage systems throughout the project, utilizing U.L. listed and labeled materials. B. Accessories: Provide conduit accessories of types, sizes, and materials, as specified herein complying with manufacturers published product information, which match and mate conduit and tubing. C. Interior Minimum Size: Minimum conduit size for light and power systems shall be 1/2 inch conduit for all power and lighting circuitry homeruns from panelboard to outlet box at first power consuming devices. D. System Conduit: Provide end bushings on all conduits. I I City of Ocoee 16110-2 G&R Project No. 98518.01 1 E. Pull Strings: Provide pull strings in all emptyraceways. Pull strings shall be nylon and shall be impervious to moisture. Pull strings installed in one inch and smaller conduits shall have a tensile strength of not less than 30 lbs. Pull strings installed in conduits larger than 1 inch shall a tensile strength not less than 200 lbs. F. Conduit Bends: The use of NEC Table 346.10 Exception is not allowed. 1.06 LOCATIONS A. Materials Above Grade: The following conduit types are to be installed above grade where specifically noted herein; 1' tubing(thin wall) Electrical metallic 2. Liquid-tight flexible metal conduit 3. Heavy wall Schedule 40 PVC 4. Galvanized rigid steel conduit B. Materials Below Grade: The following conduit types are to be installed below grade where specifically noted herein; 1. Rigid steel conduit 2. Schedule 40 PVC C. Materials on Roofs: The following conduit types are to be installed on roofs where specifically noted herein; 1. Rigid steel conduit PART 2 - PRODUCTS 2.01 ELECTRICAL METALLIC TUBING A. Fittings: Provide steel set screw or compression fittings. B. Locknuts: Provide locknuts for securing conduit to enclosures with sharp edges for digging into metal, and ridged outside circumference for proper fastening. 2.02 BUSHINGS A. Bushings: Bushings shall be provided on all terminations,mounted on the ends of all EMT connectors 1-1/4 inches and larger and within all equipment. B. Construction: Bushings shall have a flared bottom and ribbed sides, with smooth insides to prevent damage to cable insulation. C. Insulating Ring: Mold a phenolic insulating ring into sizes 1-1/4 inches and larger. City of Ocoee 16110-3 G&R Project No. 98518.01 D. Grounding: Provide a screw type grounding terminal on all sizes. 2.03 RIGID METAL CONDUIT A. Conduit: Conduit ends shall have precision cut hi-torque threads. One end of the conduit shall have a coupling and the other shall be covered with a color-coded plastic thread protector. Conduit shall be manufactured in 10 foot lengths. B. Fittings: Fittings shall be cut groove steel. Cast fittings are not acceptable. g g 2.04 LIQUID-TIGHT FLEXIBLE STEEL CONDUIT3 A. Conduit: Plastic jacketed (PVC) liquid-tight flexible steel conduit with copper bonding conductor, and steel material galvanized inside and outside. 3 B. Fittings: Provide malleable iron fittings with compression type insulated throat. HEAVY WALL PVC CONDUIT (SCHEDULE 2.05 40) A. Conduit: Schedule 40, 90 degrees C. UL rated, PVC conduit shall be composed of High Impact PVC (polyvinyl chloride C-2000 Compound), and shall conform to industry standards, and be UL listed in accordance with Article 347 of National Electrical Code for underground and exposed use. 2.06 EXPANSION FITTINGS A. Type: Conduit expansion fittings shall be malleable iron (hot dipped galvanized inside P g and outside). These fittings shall have a 4 inch expansion chamber to allow approximately Fittings: g p 2 inch movement parallel to conduit run in either direction from normal. packingand internal tinned copper C. Internal Bonding: Fittings shall have factory-installed pP braid packing to serve as a bonding jumper. D. External Bonding: Unless the fitting used is listed by Underwriters Laboratories for use "without external bonding jumpers", an external copper bonding jumper shall be installed with each metal expansion fitting. One end of the fitting shall be clamped on each conduit entering fitting. 2.07 SUPPORTING DEVICES A. Hangers: Hangers shall be made of durable materials suitable for the application involved. Where excessive corrosive conditions are encountered, hanger assemblies shall be protected after fabrication by galvanizing, or approved suitable preservative methods. I City of Ocoee 16110-4 G&R Project No. 98518.01 1 E. B. Materials: Insert anchors shall be installed on concrete or brick construction,with hex head machine screws. Recessed head screws shall be used in wood construction. An electric or hand drill shall be used for drilling holes for all inserts in concrete or similar construction. Installed inserts, brick, shall be near center of brick, not near edge or in joint. Drilled and tapped, and round head machine screws shall be used where steel members occur. All screws,bolts, washers, etc., used for supporting conduit or outlets shall be fabricated from rust-resisting metal, or accepted substitution. Gunpowder set anchors are not permitted. C. Exterior: Supporting devices for exterior use shall be 316 stainless steel unless otherwise cnoted on drawings. D. PVC Coated Conduit: Supporting devices for PVC coated conduit shall be as manufactured by the PVC coated conduit manufacturer and shall match in color and appearance. PART 3 - EXECUTION 3.01 RACEWAY INSTALLATION A. Support: All raceways shall be run in a neat and workmanlike manner and shall be properly supported and in accordance with the latest edition of the NEC. Supporting conduit and boxes with wire is not acceptable. Exposed raceways where allowed, shall be supported with clamp fasteners with toggle bolt on hollow walls, and with lead expansion shields on masonry. All conduits shall be securely fastened in place with at E least one support per eight foot section. Support within one foot of changes in direction. All required hangers, supports and fastenings shall be provided at each elbow and at no more than one foot from the end of each straight run terminating at a box or cabinet. The use of perforated iron for supporting conduits shall not be permitted. The required strength of the supporting equipment and size and type of anchors shall be based on the combined weight of conduit, hanger and cables. Horizontal and vertical conduit runs may be supported by one-hole malleable straps, clamp-backs, or other accepted devices with suitable bolts, expansion shields (where needed) or beam-clamps for mounting to building structure or special brackets. B. Hanger Installation: Where 2 or more conduits 1 inch or larger run parallel trapeze hangers may be used consisting of concrete inserts, threaded solid rods,washers,nuts and galvanized "L" angle iron, or Unistrut cross members. These conduits shall be individually fastened to the cross member of every other trapeze hanger with galvanized cast one hole straps, clamp backs, bolted with proper size cadmium machine bolts, washers and nuts. If adjustable trapeze hangers are used to support groups of parallel conduits, U-bolt type clamps shall be used at the end of a conduit run and at each elbow. J-bolts, or approved clamps,shall be installed on each third intermediate trapeze hanger to fasten each conduit. E, City of Ocoee 16110-5 G&R Project No. 98518.01 cell silicone foam sealant rated to provide a rating equal to the 3 C. Sealant: Provide a closed wall, ceiling, or floor assembly rating. Provide seals for the exterior of conduit penetrations consisting of a cast-in-place sleeve with a compressible rubber gasket between the conduit and the sleeve. Provide seals for the interior of the conduit penetrations consisting of gland type sealing bushing or closed cell silicone foam. Provide duct seal inside an appropriate seal-off fitting to seal the interior of the conduit system from water seepage or hazardous gases. D. Routing: Conduits shall be run parallel to building walls wherever possible, exposed or concealed as specified, and shall be grouped in workmanlike fashion. Crisscrossing of conduits shall be minimized. E. Location: All raceways except those from surface-mounted switches, outlet boxes or panels shall be run concealed from view. Surface mounted devices and equipment shall be specifically noted on the contract drawings. It is the intent that all raceways shall be run concealed unless specifically noted. F. Protection: All raceway runs, whether terminated in boxes or not, shall be capped during the course of construction until wires are pulled in and covers are in place. No conductors shall be pulled into raceways until the raceway system is complete. G. Coordination: All raceways shall be kept clear of mechanical equipment and plumbing fixtures to facilitate future repair or replacement of said fixtures without disturbing wiring. Except where it is necessary for control purposes, all raceways shall be kept away from items producing heat. H. Masonry Installation: All raceway runs in masonry shall be installed at the same time as 3 the masonry so that no face cutting is required, except to accommodate boxes. I. Arrangement: All raceways shall be run connecting outlet to circuits generally as shown 3 on the drawings. Provide circuit connection arrangement shown. Actual final arrangement shall be in accordance with the record drawings section as specified herein. 3 J. Grounding: All branch circuit and feeder raceways shall have a copper system ground conductor within the conduit throughout the entire length of the circuit. All conduit shall be electrically continuous to establish redundant grounding. K. Empty Raceways: Raceways which do not have conductors provided under this Division3 of the specifications shall be left with an acceptable nylon pullcord in raceway. L. Roof Installation: Conduit installations on roofs shall be kept to a bare minimum. Conduit shall be supported above roof at least 6 inches using approved conduit supporting devices. Supports shall be fastened to roof using roofing adhesive as specified in other sections of this specification. M. Firewall Installation: Provide pullboxes,junction boxes, fire barrier at fire rated walls etc., as required by NEC Article 300 where required. 1 City of Ocoee 16110-6 G&R Project No. 98518.01 1 N. Dissimilar Metals: Avoid the use of dissimilar metals to reduce the possibility of electrolysis. Where dissimilar metals are in contact, coat all surfaces with corrosion inhibiting compound before assembling. O. Identification: Provide appropriate identification as required by codes and as indicated on the drawings and in accordance with the methods specified herein. P. Conduits shall be anchored down to prevent floating while pouring in concrete. 3.02 RIGID METALLIC CONDUIT A. Locknuts: Rigid steel box connections shall be made with double locknuts and bushings. Turn down on threads to solidly connect raceway to box or enclosure. B. Bushings: Grounded insulated bushings shall be used on all rigid steel conduits terminating in panels, wire gutters, or cabinets . Bushing shall be impact resistant plastic molded in an irregular shape at the top to provide smooth insulating surface at top and inner edge. Material in these bushings must not melt or support flame. 3.03 PVC CONDUIT A. Floor Penetrations Exposed: Where PVC penetrates a floor in an exposed location from underground or in slab, a black mastic coated steel conduit elbow shall be used. t B. Location: No PVC shall be allowed anywhere except underground or in slab,with the exception that PVC conduit may be used in non-fire rated poured block walls and poured in place columns. C. Floor Penetrations in Block: PVC may also be used for penetrations of floor into concrete block or hollow walls up to first outlet box provided outlet box is at a maximum height of 48 inches above finished floor. D. Ground Conductor Installation: All individual bare copper ground conductors (i.e. service, transformer, or lightning protection grounds) shall be installed in PVC conduit. E. Joints: PVC joints shall be solvent welded. Threads shall not be permitted on PVC conduit and fittings, except for rigid steel to PVC couplings. Installation of PVC conduit shall be in accordance with manufacturer's recommendations. F. Restrict Support: PVC conduit shall not be used to support fixture or equipment. G. Bonds: Field bends shall be made with an approved hotbox. Heating with flame and hand held dryers are prohibited. City of Ocoee 16110-7 G&R Project No. 98518.01 L 3.04 FLEXIBLE CONNECTIONS A. Vibrating Equipment Connection: All connections to motors or other vibrating equipment(except dry type transformers) or at other locations where required shall be made with not less than 12 inches of flexible liquid-tight steel conduit, using special type of connectors with strain relief fittings at both terminations of conduit,Kellems Type 074-09 Series or accepted substitution. B. Normal Type: Flex connectors shall have insulated throat and shall be T &B 3100 Series 3 or accepted substitution. C. Angle Type: Use angle connectors wherever necessary to relieve angle strain on flex conduit. D. Transformer Connection: Connections to dry type transformers shall be made with flexible conduit. 3.05 EXPANSION FITTINGS A. Installation: Provide expansion fittings in each conduit run wherever it crosses an expansion joint. Install the fitting on one side of the joint with its sliding sleeve end flush with joint, and with a length of bonding jumper in expansion equal to at least three times the normal width of joints. 3 B. Location: Provide expansion fittings in each conduit run which is mechanically attached to separate structures to relieve strain caused by shift on one structure in relation to the other. 3.06 ELECTRICAL METALLIC TUBING A. Location: Install Electrical Metallic Tubing(thin wall) inside buildings, above the ground floor where not subject to mechanical injury. B. Handling: All cut ends shall be reamed to remove rough edges. ***END OF SECTION*** 3 I I City of Ocoee 16110-8 G&R Project No. 98518.01 SECTION 16120 WIRES AND CABLES PART I - GENERAL 1.01 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to work specified of this section. 1.02 WIRES AND CABLES A. Description: Provide a complete and continuous system of conductors as specified herein. All conductors shall be in accordance with the latest edition of the NEC. 1.03Q UALITY ASSURANCE A. Qualifications: Manufacturers shall be regularly engaged in the manufacture of wire systems and fittings of types and sizes required, and whose products have been in satisfactory use in similar service for not less than 5 years in the USA. B. Compliance: Materials shall comply with the following standards as they apply to the different wire types specified herein. 1. UL: a. 44 -Rubber insulated wire and cables. b. 83 - Thermoplastic insulated wires. c. 486-A-80 - Wire connectors and soldering lugs for use with copper. d. 486B - Splicing wire connectors e. 493 - Thermoplastic insulated underground feeder and branch circuit cables. 2. NFPA: a. 70 NEC 1.04 SUBMITTALS A. General: Submit product data on all different types of conductors specified. City of Ocoee 16120-1 G&R Project No. 985 18.01 PART 2 - PRODUCTS 2.01 GENERAL A. Conductors: Branch circuit and feeder conductors for electric power shall be copper type. Utilize THHN/THWN insulation for branch circuits and THWN/XHHW insulation for feeders, unless specifically noted otherwise. Conductors #10 AWG and smaller shall be solid, #8 AWG and larger shall be stranded. No aluminum wiring shall be permitted. All wire shall be sized as shown on the drawings. If no size is shown,wire shall be#12 AWG. All wiring shall be manufactured in the USA and of 98 percent resistivity. B. Taps and Splices: All copper taps and splices in#8 AWG or smaller wire shall be fastened together by means of"wirenut" connectors. All taps and splices in wire larger than#8 AWG shall be made with compression type connectors and taped to provide insulation equal to wire. All taps and splices in manholes or in ground pull box shall be made with compression type connectors and covered with Raychem heavywall cable sleeves with sealant coating. Provide sleeve kits as per manufacturer's installation instructions. C. Color Coding, General: All power feeders, grounding conductors and branch circuits #6 AWG and smaller shall be installed with color-coded wire with the same color used for a system throughout the building. Conductors above#6 AWG shall either be fully color- coded or shall have black insulation and be similarly color-coded with tape in all junction boxes and panels in accordance with NEC 310-12. Tape shall cover the conductor insulation within the box or panel in such a manner so as to allow standard markings to be readily observed. D. Colors: Unless otherwise accepted, color-code shall be as indicated in the Identification section of the specifications. E. Submittals: Submit cut sheets on all major types of wires and cables including splicing tape, and terminating/splicing lugs or connectors and cable sleeves. 2.02 MANUFACTURERS A. General: Branch circuit and feeder conductors shall be manufactured by one of the 3 following: General Cable Co.,Pirelli, Rome Cable Corporation, American Insulated Wire Corporation, or Southwire. PART 3 - EXECUTION 3.01 EXECUTION A. General: All wiring shall be installed in conduit (power, low voltage and control wiring), unless otherwise indicated or specified under other Sections of this specification. All wiring shall be installed per the latest edition of the NEC. City of Ocoee 16120-2 G&R Project No. 98518.01 1 *** *** END OF SECTION 1 1 I City of Ocoee 16120-3 G&R Project No. 98518.01 SECTION 16130 OUTLET BOXES PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to work specified of this section. 1.02 DESCRIPTION A. General: Outlet boxes shall be of such form and dimensions as to be adapted to the specific use and location, type of device or fixtures to be used, and number and size of conductors and arrangement, size and number of conduits connecting thereto. B. Ceiling Size: Ceiling outlet boxes shall be 4 inch octagonal or 4 inch square by 1-1/2 inches deep or larger as required for number and size of conductors and arrangement, size and number of conduits terminating at them. C. Wall Size: Switch, wall receptacle and other wall outlet boxes shall be 4 inch square by 1-1/2 inches deep. For exposed masonry, provide one piece 4 inch square by 1-1/2 inches deep wall boxes with appropriate 4 inches square cut tile wall covers. 1.03 QUALITY ASSURANCE A. Qualifications: Manufacturers shall be regularly engaged in the manufacture of conduit systems and fittings of types and sizes required, and whose products have been in satisfactory use in similar service for not less than 5 years in the USA. followingstandards as theyapply to the B. Compliance: Materials shall comply with the PP Y different raceway types specified herein. 1. UL-50 &UL-514 2. NEC 70 1.04 SUBMITTALS A. Submittals: Submit product data on all different types of outlet boxes and associated trim/plaster rings. City of Ocoee 16130-1 G&R Project No. 98518.01 PART 2 - PRODUCTS 2.01 GENERAL PURPOSE BOXES A. General: Provide standard galvanized one-piece steel outlet boxes. Acceptable manufacturers shall be T&B, Steel City,Raco. Trim rings shall also be of one piece construction. Surface mounted outlet boxes shall be cast aluminum with external raised hubs. I PART 3 - EXECUTION 3.01 INSTALLATION OF OUTLET BOXES A. Installation: All flush outlets shall be mounted so that covers and plates shall finish flush with finished surfaces without the use of shims,mats or other devices not submitted or accepted for the purpose. Plates shall not support wiring devices. Wall-mounted devices of different systems (switches,thermostats, etc.) shall be coordinated for symmetry when located near each other on the same wall. Outlets on each side of walls shall have separate boxes. Through-wall type boxes shall not be permitted. Back-to-back mounting shall not be permitted. Trim rings shall be extended to within 1/8 inch of finish wall surface. B. Stud Walls: Outlet boxes mounted in metal stud walls, shall be supported to studs with 2 screws inside of outlet box to a horizontal stud brace between vertical studs. 3.02 MOUNTING HEIGHT A. Mounting Height: Height of wall outlets to center of box above finished floor shall be as follows, unless specifically noted otherwise. Specific heights required by governing institutions and laws shall apply. Switches 4 foot 0 inches to centerline Receptacles 1 foot 6 inches to centerline Branch Panelboards 6 foor 6 inches top of panel trim B. Wall Outlets: Height of wall-mounted fixtures shall be as shown on the drawings. Fixture outlet boxes shall be equipped with fixture studs when supporting fixtures. ***END OF SECTION*** I I City of Ocoee 16130-2 G&R Project No. 98518.01 I I SECTION 16140 WIRING DEVICES PART I - GENERAL 1.01 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to this section. 1.02 DESCRIPTION A. General: Provide factory fabricated wiring devices in type, color and electrical rating for the service indicated to provide convenient access to the electrical system for portable and permanent connections, and control of fixed outlets. B. Ratings: Voltage and ampere ratingof switches and receptacles shall be marked on the g P device, and shall conform to Voltage and Ampacity of system to which applied. Hardware: Devices consist of all the necessary hardware to complete an installation and provide a margin of safety by inaccessibility of live electrical components. 1.03 RECEPTACLES AND SWITCHES QUALITY ASSURANCE A. Manufacturers: Manufacturers shall be companies regularly engaged in manufacture of wiring devices, of types and ratings required, whose products have been in satisfactory use in similar service for not less than 5 years. Acceptable manufacturers are Pass & Seymour, Hubbell, and Leviton Manufacturing. B. Compliance: Comply with the latest edition of the following standards; 1. NEMA WD1, WD3 and WDS 2. UL 5, 20 and 231 3. ANSI/IEEE Standard C62.41-1980 (Formerly IEEE 587) a. Test withstand voltage surges of up to 6000 volts and current surges of up to 200 amperes without damage. C. Warranty: Provide a minimum one-year warranty from time of final acceptance. 1.04 SUBMITTALS A. Wiring Devices: Submit manufacturer's product data on all wiring devices listed on the drawings including; 1. Colors 2. Dimensions 1 City of Ocoee 16140-1 G&R Project No. 98518.01 3. U.L. Label 4. Finish 5. Voltage B. Coverplates and Identification: Submit type of identification used for coverplates to comply with the Identification Section as specified herein. Screws to match coverplate color. 1.05 SEQUENCING AND SCHEDULING A. Coordination: Coordinate with other work including wires/cables, electrical boxes and fittings, and raceways, to properly interface installation of all wiring devices. PART 2 - PRODUCTS RECEPTACLES 2.01 CONVENIENCE RE C A. Twenty Ampere Receptacles: Provide commercial specification grade receptacles, 2-pole, 3-wire grounding,with green hexagonal equipment ground screw, ground terminals and poles internally connected to mounting yoke, 20 ampere, 120 volts, with metal plaster ears, side wiring,NEMA configuration 5-20R unless otherwise indicated. B. Color: Devices shall be brown unless otherwise noted. duplex, C. Ground Fault Circuit Interrupter: Provide commercial specification grade, ground fault circuit interrupter receptacles, grounding type,UL rated Class A, Group 1, 20 ampere ratings, 125 volts, 60 Hz; with solid state ground fault sensing and signalling; with 5 milliampere ground fault trip level; equipped with 15 ampere receptacle configuration,NEMA 5-20R. Device shall contain test and reset pushbuttons,with a visual display of the tripped position. All outside receptacles (weatherproof) shall be 3 duplex G.F.C.I. type. Interrupter shall resist tripping from the effects of radio frequency (RF) signals from 10 to 450 MHz. 2.02 SWITCHES A. Toggle Switches: Provide commercial specification grade, fast-make positive-break, flush single-pole or three-way; silent operation toggle switches, 20 ampere, 120 volt AC or 277 volt AC as required, with mounting yoke insulated from mechanism, equipped with plaster ears, and side-wired screw terminals. Switches shall be brown. 2.03 DEVICE COVERS Provide device covers as follows; I City of Ocoee 16140-2 G&R Project No. 98518.01 1 Description Leviton Hubbell P & S Stainless steel coverplate #302 S/S #302 #302 Weatherproof ---- #5221-5222 WP-8 coverplate PART 3 - EXECUTION 3.01 INSTALLATION OF WIRING DEVICES A. General: Provide wiring devices, in accordance with manufacturer's written instructions, applicable requirements of NEC and National Electrical Contractors Associations "Standard of Installation", and in accordance with recognized industry practices to ensure that products serve intended function. B. Completion: Delay installation of devices until wiring and wall finish is completed. C. Support: Devices shall be securely supported to box,not supported to device plate. Device shall trim out flush with front of plate. Do not support the device by loosening device mounting screws and attaching the coverplate for leveling. D. Adjustment: Provide receptacles and switches only in electrical boxes which are clean, free from excess building materials, debris, etc. Adjust devices to plumb when tightened, and in position to receive faceplate. Devices shall not be leveled by using the mounting screws, outlet boxes shall be flush to wall finish prevent leveling problems. Tighten devices and provide securely, so that there shall be no movement during usage. E. Position: Position ground pin at the top of the device in vertical application, unless otherwise noted. F. Wiring: Provide screw terminal connections using a single conductor only. Do not "back-stab" devices. Provide single whips for all multiple conductor connections within each box. 3.02 APPLICATION OF COVER PLATES A. Mounting: Provide coverplates in true vertical or horizontal alignment as applicable. Plates shall be properly secured by means of screws which have heads with finish matching the plate. Secure plates so as to maintain a snug fit against wall surfaces with no gaps. B. Replacement: Replace all coverplates which are warped, cracked, chipped, or whose color does not match the balance of the installation. Replace screws whose threads do not allow the drawing up tight of the coverplate to the device. City of Ocoee 16140-3 G&R Project No. 98518.01 3.03 CLEANING A. Soiled Devices: Clean devices soiled prior to acceptance inspection, to remove all debris and foreign materials, such as paint, varnish, drywall compound, etc. B. Solutions: Do not use liquid cleaning solutions, etc. on the face of the devices without written direction from the Engineer/Architect. 3.04 TESTING A. Ground testing: Provide ground testing procedures as specified herein. Prior to energizing circuitry, test wiring devices for electrical continuity, and for short circuits. B. Polarity: Subsequentenergization, test wiringdevices for proper polarity, and to to g demonstrate operations as required in this and other sections of this Specification. C. Recording: Record all tests as required in other sections of this specification. ***END OF SECTION*** I I I I I I City of Ocoee 16140-4 G&R Project No. 98518.01 1 SECTION 16470 PANELBOARDS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to work specified of this section. 1.02 DESCRIPTION A. Description: Provide panelboards where shown on the drawings, of a dead front, distributed phase sequence design. Panelboards shall be equipped with thermal-magnetic molded case circuit breakers with frame and trip ratings as indicated in the schedules. 1.03 QUALITY ASSURANCE A. ANSI: the latest edition of the Reference Standards for the American National Standards Institute shall apply as follows; 1. ANSI Y32.2 - Graphic Symbols for Electrical and Electronic Diagrams. 2. ANSI Z55.1 - (R1973) Gray finishes for Industrial Apparatus and Equipment. B. NEMA: National Electrical Manufacturers Association shall apply as follows; 1 1. NEMA PB1-1984 Panelboards 2. NEMA PB 1-57 Gutter space C. NFPA: The latest edition of the National Fire Protection Association shall apply as follows; 1. NFPA 70-1993, National Electrical Code (NEC). D. UL: The latest edition of the Underwriters' Laboratories, Incorporated shall apply as follows; 1. UL Electrical Construction Materials List, panelboards-dead front type. 2. UL 67 Panelboard wiring gutter space, bus heat rise test. 3. UL 50 Cabinets - Rigidity and gauge of steel. E. Listing: Panelboards shall be listed by Underwriters Laboratories and bear the UL or other nationally recognized testing laboratory label. Where required,panelboards shall be listed for use as service entrance equipment. City of Ocoee 16470-1 G&R Project No. 98518.01 1.04 SUBMITTALS A. Shop drawings: 1. Product data shall be submitted on: a. Panel b. Cabinet c. Bus d. Construction e. Dimensions 2. Shop drawings shall be submitted for every panel,and shall clearly indicate all of the following information: a. U.L. Label b. Each circuit breaker amperage rating, circuit number and position/location in panel c. Electrical characteristics of panel d. Main bus rating e. Main device rating f. Mounting type g. Dimensions, (width, depth,height, weight) h. Bus material i. Interrupting capacity of minimum rated breaker j. Panelboard classification 111 1.05 OVERCURRENT PROTECTIVE DEVICES - DESCRIPTION A. Provide overcurrent protection for all wiring and equipment in accordance with the NEC, all federal, state and local codes as required and/or as shown on the drawings. 1.06 OVERCURRENT PROTECTIVE DEVICES - SUBMITTALS A. Shop drawings and product data: Shop drawings shall clearly indicate; 1. Frame sizes and interrupting capacity of all circuit breakers. 2. Device is U.L. Listed, and bears the U.L. Label. 3. Device complies with these specifications, drawings, and applicable standards of NEMA, IEEE, ANSI, and ASA. i City of Ocoee 16470-2 G&R Project No. 98518.01 1 PART 2 - PRODUCTS 2.01 PANELBOARDS A. Equipment: The panelboard bus assembly shall be enclosed in a cabinet and shall be surface or flush mounted as shown in the schedules. The box shall be fabricated from galvanized steel with standard baked enamel finish. Panelboard front shall include a door and shall have a flush, cylinder tumbler-type lock with catch and spring-loaded stainless steel door pull. All panelboard locks shall be keyed alike. All panel cabinets shall be a minimum of 20 inches wide. Fronts shall have adjustable indicating trim clamps which shall be completely concealed when the doors are closed. Doors shall be mounted with completely concealed steel hinges. Panel front shall not be removable with door in the locked position. B. Bus: Panelboard bus structure shall have current ratings as shown on the panelboard schedule. Bus shall be insulated and bus bar connections to the branch circuit breakers shall be of the "distributed phase" or phase sequence type. All current carrying parts of the bus structure shall be tin plated aluminum. A full size insulated neutral bus bar shall be provided. Provide system grounding copper bus bar bonded to the panelboard cabinet for connection of system grounding conductors. This bar shall be mechanically and electrically isolated from the neutral bar except where panelboard is used as service entrance equipment. C. Molded Case Circuit Breakers: All panelboard branch circuit breakers shall be bolt-on thermal-magnetic molded case type. Breakers shall be 1, 2 or 3 pole with an integral crossbar to assure simultaneous opening of all poles in multi-pole circuit breakers. Breakers shall have an overcenter, trip-free, toggle-type operating mechanism with quick- make, quick-break action and active handle indication. Handles shall have "ON", "OFF", and "TRIPPED" positions. Bolt-on circuit breakers shall be able to be installed in the panelboard without requiring additional mounting hardware. D. Switching Type: Single pole, 15 and 20 ampere circuit breakers intended to switch fluorescent lighting loads on a regular basis shall carry the SWD marking. E. Directories: A typed panelboard directory shall be provided for each panelboard and shall indicate the actual circuit number used, room name and type of load. Room names shall be the actual name or room number used not necessarily as shown on the drawing. Panel directories shall include all room numbers and names. Where panel schedules are indicated on the drawings as "receptacles or "lighting", etc., it shall be the responsibility of the Contractor to include the specific area served. F. Bracing: Panelboard as a complete unit shall be braced for a minimum short circuit P rating equal to or greater than the lowest breaker symmetrical interrupting capacity as shown on the schedule. However, all panelboards shall be fully rated. No series ratings are allowed. G. Design Selection: City of Ocoee 16470-3 G&R Project No. 98518.01 L 120/208V 480/277V Square "D",NQOD Square "D",NF Cutler-Hammer: Pow-R-Line 1 Cutler-Hammer: Pow-R-Line 2 General Electric: A-Series General Electric: A-Series I 3 PART 3 - EXECUTION 3.01 INSPECTION A. General: Examine area to receive panelboard and assure that there is adequate clearances to meet NEC requirements and normal maintenance issues. B. Correction: Start work only after any unsatisfactory conditions have been corrected. 3.02 INSTALLATION A. General: Provide panelboards in complete accordance with manufacturer's written instructions and all applicable codes. B. Support: Panelboards shall be rigidly supported and installed per manufacturers recommended supporting instructions,with beams provided if necessary, to suit actual site conditions. Panels shall not be directly mounted to masonry walls. C. Storage and Delivery: Panelboards shall be delivered to the site during that phase of panelboard installation in order to avoid storing panels on site where damage may occur. Replace any damaged parts prior to energizing panel. Cover panelboard to avoid damage to finish. D. Mounting: Do not mount equipment directly to masonry or concrete walls. Provide two uni-strut spacers between wall and panelboard. E. Operations and Maintenance Data: Manufacturer's instructions for tightening bus connections, cleaning, operation and maintenance. 3.03 QUALITY CONTROL A. General: Field test prior to energization; 1. Megger check, and record all data, of phase to phase and phase to ground insulation levels. 2. Continuity. ' City of Ocoee 16470-4 G&R Project No. 98518.01 1 3. Proper phase relationship. 3.04 CHECK-OUT MEMO A. General: Submit check-out memo from panelboard representative. ***END OF SECTION*** t, City of Ocoee 16470-5 G&R Project No. 98518.01 SECTION 16480 MOTOR CONTROLS AND RELATED EQUIPMENT PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to work specified of this section. 1.02 DESCRIPTION OF DISCONNECTS A. General: All disconnect switches shall be heavy-duty type, unless specifically noted otherwise. Switches shall be fusible or non-fusible and sized as noted on the drawings. Ratings: Switches shall be 240 volt rated on systems B. Ra g Y up to and including 120/208V and 600V rated on higher voltage systems. Provide NEMA 1 enclosures, unless otherwise noted. All switches for motors shall be dual horsepower rated. All switches mounted outdoors shall be NEMA Type 3R. C. Lugs: Provide lugs on disconnect switches as required to accept conductors specified on drawings. 1.03 SUBMITTALS FOR DISCONNECTS A. Products: Submit product data on all types of disconnects provided as part of the contract documents. PART 2 - PRODUCTS 2.01 INDIVIDUALLY MOUNTED AC MAGNETIC STARTERS A. Combination Starter and Disconnect: Combination starters and disconnect switches shall be rated in accordance with NEMA Standards, sizes and horsepower rating. Unit shall be mounted on NEMA I enclosures, unless otherwise noted. B. General: Starters shall be equipped with double break silver alloy contacts. All contacts shall be replaceable from front without removing starter from enclosure. Overload relays shall be provided in each phase, and shall be melted alloy or bimetallic type. Thermal units shall be of the one-piece construction and interchangeable. C. Accessories: Starters shall be equipped with auxiliary contacts, as required for proper control functions, minimum of two normally open auxiliary contacts. All starters shall have green "run" pilot light, "Hand-Off-Auto" selector switch, and nameplate. Control voltage shall be as required. Starters shall contain fused control transformers to provide correct control voltage. City of Ocoee 16480-1 G&R Project No. 98518.01 i I PART 3 EXECUTION 3.01 INSPECTION A. Coordination: Examine area to receive motor-control units to assure adequate clearance for motor control unit installation. B. Leveling: Correction: Check that concrete pads are level and free of irregularities for motor control centers. C. Provision: Start work only after unsatisfactory conditions are corrected. 3.02 INSTALLATION A. General: Provide motor control units in accordance with manufacturer's written instructions, and the NEC. 3.03 FIELD QUALITY ASSURANCE A. Testing: Perform tests according to motor control unit manufacturer's instructions. Field tests prior to energization as follows; 1. Megger check of phase to phase to ground insulation levels. 2. Continuity. 3. Short Circuit. 3.04 ADJUSTMENT AND CLEANING A. General: Adjust operating mechanisms for free mechanical movement. B. Connections: Tighten hten bus connections and mechanical fasteners. C. Finish: Touch-up scratched or marred surfaces to match original finish. 3.05 CHECK-OUT MEMO A. General: Submit check-out memo from motor control center representative. ***END OF SECTION*** I City of Ocoee 16480-2 G&R Project No. 98518.01 1 SECTION 16500 E • LIGHTING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to work specified of this section. 1.02 DESCRIPTION A. Description of System: Light fixtures provided under this Division shall be provided complete with lamps and all necessary trim and mounting hardware, and installed as shown on the drawings. Light fixtures shall be neatly and firmly mounted, using standard supports for outlets and fixtures. Lamps shall be included in the system guarantee for a period of 90 days after final acceptance of the building. 1.03 SUBMITTALS A. Shop Drawings: Shop drawings shall be submitted for all fixtures. B. Product Data: Product data shall be submitted for all light fixtures showing: 1. dimensions 2. U.L. Label 3. fusing 4. metal gauge 5. lens/louver thickness 6. finish 7. voltage 8. lamps C. Product data shall be submitted showing manufacturer's written recommendations for storage and protection, and installation instructions. 1.04 PRODUCT STORAGE AND HANDLING A. Protection: Physically protect fixtures against damage as recommended by manufacturer. City of Ocoee 16500-1 G&R Project No. 98518.01 III PART 2 - PRODUCTS 2.01 GENERAL A. Labels: All light fixtures and ballasts shall be UL listed. All light fixtures shall not have any labels exposed to normal viewing angles. This includes manufacturer labels and U.L. labels. All labels shall be concealed within the body of the fixture. No manufacturers name or logo shall appear on the exterior of any light fixtures unless accepted in writing by the engineer. B. Exterior Fixtures: All lighting fixtures mounted outdoors subject to dampness and insects shall have gasketing material between lens door and frame to completely seal interior of fixture. Knockouts and holes in fixtures housing shall be closed and sealed. All fixtures shall be complete with lamps, shielding, brackets, concrete bases, anchor bolts and all necessary fittings and accessories for a complete installation. C. Lamps: Provide two extra lamps for every HID lamp type. Provide ten extra lamps for every fluorescent lamp type. 2.02 ELECTRONIC BALLAST shall3 be electronic a highpower factor and shall be covered by a A. General: Ballast type, three-year warranty against defects. Warranty shall include payment for normal labor costs of replacements of inoperative in-warranty ballasts. Ballast shall be rated for voltage system to which applied. The electronic ballast shall incorporate the following min. features: 1. Ballast shall be high frequency (20-62.5 KHz) and operate without detectable flicker. 2. Ballast shall be constant current rated 95 percent power factor. 3. Ballast shall have a thermo-setting, non-toxic, fire retardant partial filler to serve as a conformal coating and protective insulator against both internal and external damage. 4. Ballast shall have internal regulation of power consumption and light output under input line voltage fluctuations. 5. Ballast shall be minimum "A" sound rated and operate quiet. 6. Ballast case temperature shall not exceed 90 degrees C. 7. Ballast shall have total harmonic distortion of less than 20 percent. 2.03 T-8 FLUORESCENT LAMPS A. Provide lamps as follows: 1. 4 foot lamps, T-8, 32 watts, 3500 degrees K, 80 minimum CRI, 2850 minimum initial lumens, 20,000 average life. I I City of Ocoee 16500-2 G&R Project No. 98518.01 1 PART 3 - EXECUTION 3.01 INSTALLATION A. Instructions: Provide all fixtures in accordance with manufacturer's written instructions Eand NEC. B. Suspended Installation: Pendant mounted fluorescent fixtures installed in exposed ceiling areas are to be suspended from structure with Kindorf channels. Mount outlet box at structure with flexible connection to fixture. C. Coordination: Coordinate fixtures installed in mechanical rooms with piping and ductwork prior to installation and relocate fixtures as required to provide proper illumination and access. 3.02 CLEAN-UP A. Luminaires: Prior to the Owner move-in, the Contractor shall clean all fixtures and remove any dust or dirt. Wash lens and glassware using cleaner such as "Windex" and dry with absorbent cloth. Clean plastic per manufacturer's recommendations; do not wipe. Clean "Alzak" aluminum surfaces (reflectors, fixture cones and the like)per manufacturer's recommendations being careful to remove fingerprints and smudges. ***END OF SECTION*** I E , t II' I I , I City of Ocoee 16500-3 G&R Project No. 98518.01 -I N co cn 1- -I 'U -I oo w 2 cn m m -o 0 0 O K CO 5 m 13 O 0 c '07 0) 0 0) O c 0 < 74: 5- '4,- E00 - < a) c C/, CD CD 0) .. rT co = , ... -' D N O N - 7 7 2 co 7 -• c n O p l• va) � 9 fl a 0 * -= -0 6 , , 0 = 0 a �. o c co to — o 2 co n u) o ED 0 7 m m O 0) O 0 7 0- 7 T-O ,-.;•• O cQ j v fD c0 CD CD < a O CQ 7 • CD c - . St N a co0) ny � K a) to 0 m 0 N 0• m Q N CDj 0 0 a CD W j n C7 0 �• c CD n O n y m5 7 c. �^ a 7 0 3 (0CCW • 7 n N c CI)- a 11)< c n0 , 6: CD (ID 2 w <' Q a a u) c 5.co - a ° o = (D ° SQ a N p) N A t0 cQ y C' v �v a 0 ,� 7c o - O Q° a O 2 0 0 O D O — K * R co a CD 0 _ CD `< 7-�'' cn CD 0 a a)o O 6.a co 3 coa 2 7 CD CDO 00 CD co 13 a o. Ro 0 0co F. 0 C o0 ' 7 * O Cl, 0 _ y 7 en C) c CD Nl 7 c C (U CDD - m f) O n to N D D 0 o U1 -.I �I v �; 0 ani * - b 00 0W �' � 0oo � o o 0 0 0 0 0 0 0 CD CD _ rn En En Cn cri In co cin yq� C •‹ o N N A 0 0 0 0 N ' - b in iv OOOO W In 00 0 0 o 01 0 0 0 0 v 0 0 ER EA En Eft A A W EA En 1 N En En En 93 VI — EA .69 CO 0000 -, ( 0 W WEfl -L N -L93CAN WEA93 0A -• 070 O co Cn A 0 0 CA 0 V " CO 0 0 CO CO W 0 0 A A W C) Cn 00 N -1 O W -co 0 0 0 In 0 C71 - 0 0 0 �I GJ 0 0 0 In 0 in A �1 n D 13 o V -• (00000 cn n.) o o o cn -,1000000 wCDcno1 � 0) 0 W CO 010000 (7. 010000 CT, 000000 0000 CD COK 03CD 0 C CD c c).:. v 0 Oco fD C O y a Q -co - CO O CD 3 a Fri y N CD -0 0 3 CD c o. .+, N in d a o Cl) a m Cl) O = EA EA En W N r 071 EnA 0 V CO CO O 0071 coCD N 01 -A W V O W V CA) 0 W Cn 0 CO V -a a 7' 7 o N CO 7 : 7 CD CD--1 ED N VI O co -'- -IN A 0 Cn — ODN -x CJ1 0) 0) a 01 N.) �IN O cp. A O b Cn 01 in • A O W co W A co 07 CD CD c 0 0 0 c 0 , CD St _? o N. N (O CD N CS "1 N CD 7 O co aa W 0 o CCD A , 0