MEMORANDUM
DATE: October 28, 1999
TO: The Honorable Mayor and Board of City Commissioners
FROM: David Wheeler, P.E. ,e5tarAV
Assistant City Engineer/Utilities Director
SUBJECT: Water Distribution Mains -Phase 1 Project
Change Order Request No. 1
Attached for your review is Change Order Request No. 1 on the Water Distribution Mains -
Phase 1 Project with Wharton-Smith, Inc. The Phase 1 Project included new water mains along
Hackney-Prairie, from the Forest Oaks WTP to Rich Drive; Wurst Road, from the Jamela WTP
to Clarcona-Ocoee Road; and Clarcona-Ocoee Road, from Wurst Road to Fifteenth Street. This
change order request was initiated by City Staff to delete work impacted by inability to obtain
temporary construction easements.
The items included in this change order are:
Item 1-A- Deletion of Water Main on Wurst Road from Peters Avenue to Clarcona-Ocoee
Road:
The residents who lived on both sides of Clarcona-Ocoee Road refused to grant or negotiate with
the City for temporary construction easements necessary to install the water main under
Clarcona-Ocoee Road by the method of boring and jacking a steel casing pipe. Staff and PEC,
Inc. re-evaluated all the pipeline work planned for this general area and determined that the water
main on Wurst Road, from Peters Avenue to and across Clarcona-Ocoee Road, could be
eliminated from the program as well as the water main planned to extend east from Fuller's
Cross Road across private property and along Fifth Street and connect to the water main on
Adair Street.
These two water mains are being replaced with the water mains along Eleventh Street, Peters
Avenue, and through Vignetti Park, which will provide the connection between Clarcona-Ocoee
Road and Adair Street that is required. This project was authorized for award for construction at
the October 5, 1999, City Commission Meeting and should begin construction in early
November. Although approximately 4,600 linear feet of water main was added against an
POVVTlik
Protect Ocoee's Water Resources
approximate 4,000 linear foot reduction, the costs were approximately equal in value and this
does not take into account legal and right-of-way associated with securing easements. The cost
to delete this work was $54,100.00, with no adjustment in contract time.
Item 1-B: Deletion of Water Main on Clarcona-Ocoee Road from Wurst Road to Fifteenth
Street:
The resident who lived on the west side of Clarcona-Ocoee Road at Fifteenth Street was
requesting more compensation than was justified for a temporary construction easement. In
addition, more buried telephone cables were discovered at Wurst Road than was originally
identified during design and would have necessitated negotiating a different unit price for the
water main installation along Clarcona-Ocoee Road. Staff is looking at rerouting the planned
water main layout to accomplish the design intent and has approached Orange County about
open-cutting Clarcona-Ocoee Road to install the water main at Fifteenth Street. The cost to
delete this work was $19,920.00, with no adjustment in contract time.
The total cost reduction for this change order is $74,020.00 with no adjustment in the contract
time. This change order amounts to approximately 18.88 percent reduction in the original bid
price of$392,000.00.
I recommend that the City Commission approve Change Order No. 1 with Wharton-Smith, Inc.
by decreasing the contract amount by $74,020.00, with no adjustment in contract time, and
authorize the Mayor and City Clerk to execute Change Order No. 1.
Attachment
1) Change Order No. 1
Ocoee CITY OF OCOEE
Engineering/Utilities
150 North Lakeshore Drive
tz. Ocoee, Florida 34761-2258
of 6007
CHANGE ORDER NO. 1
CITY OF OCOEE
Water Distribution Mains -Phase 1
PROJECT NO.
DATE:October 14, 1999 CONTRACTOR: Wharton-Smith,Inc.
AGREEMENT DATE: February 16, 1999
The following changes are hereby made to the CONTRACT DOCUMENTS.
Original CONTRACT PRICE $392,000.00
Current CONTRACT PRICE ADJUSTED by previous CHANGE ORDER $392,000.00
Net(Decrease)Resulting from this CHANGE ORDER ($74,020.00)
The current CONTRACT PRICE including this CHANGE ORDER $317,980.00
ORIGINAL CONTRACT TIME:
150 Consecutive Calendar Days from Notice to Proceed Date: July 27, 1999
Current CONTRACT TIME adjusted by previous CHANGE ORDERS Date: July 27,1999
Net Increase Resulting from this CHANGE ORDER Days: 0 days
Current CONTRACT TIME Including this CHANGE ORDER Date: July 27, 1999
00842-1
CHANGES ORDERED:
I. GENERAL
This change order is necessary to cover changes in the work to be performed under this Contract. The
GENERAL CONDITION, SUPPLEMENTARY CONDITIONS, SPECIFICATIONS and all parts of the
Project Manual listed in Article 1, Definitions, of the GENERAL CONDITIONS apply to and govern all
work under this change order.
II. REQUIRED CHANGES
Item 1-A: RPC 001: Delete the 12 inch water main along Wurst Road from Peters Avenue to Clarcona-Ocoee Road
including the crossing of Clarcona-Ocoee Road and all other ancillary items such as valves, fire hydrants, fittings
and the crossing of Wurst Road at Broad Street.
Item 1-B:RPC 002: Delete the 12 inch water main along Clarcona-Ocoee Road from Wurst Road to Fifteenth Street
including the crossing of Clarcona-Ocoee Road at Fifteenth Street and all other ancillary items such as valves and',
fittings.
III. JUSTIFICATION
Item 1-A: RPC 001: The residents who lived on both sides of Clarcona-Ocoee Road refused to grant or negotiate',
with the City for temporary construction easements necessary to install the water main under Clarcona-Ocoee Road
by the method of boring and jacking a steel casing pipe.
Item 1-B: RPC 002: The resident who lived on the west side of Clarcona-Ocoee Road was requesting more
compensation than was justified for a temporary construction easement. In addition, more buried telephone cables'',
were discovered in this area than was originally identified during design and would have necessitated negotiating a,,
different unit price for the installation in this area.
IV. NARRATIVE OF NEGOTIATIONS
Item 1-A:RPC 001: Used contract unit prices for deleted work.
Item 1-B:RPC 002: Used contract unit prices for deleted work.
V. PAYMENT
Change Order Description Net Increase Unit Unit Price Net Increase
Item No. (Decrease)Quantity (Decrease)Price
1-A:RPC 001 Delete 12"water main along Wurst Road ($54,100.00)
from Peters Avenue to Clarcona-Ocoee Road
1-B:RPC 002 Delete 12"water main along Clarcona-Ocoee ($19,920.00)
Road from Wurst Road to Fifteenth Street
Total Net (Decrease)Change Order No.1 ($74,020.00)
00842-2
VI. APPROVAL AND CHANGE AUTHORIZATION
This proposed change to the Contract is to be approved by the Ocoee City Commission.
Acknowledgements:
The aforementioned change, and work affected thereby, is subject to all provisions of the original contract not
specifically changed by this Change Order;and,
It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original
contract other than matters expressly provided herein.
CONTRACTOR acknowledges, by its execution and acceptance of this Change Order, that the adjustments in
Contract Price and Time shown hereon constitute full and complete compensation and satisfaction for all costs and
modifications of performance time incurred by the CONTRACTOR as a result of this Change Order. No other
claim for increased costs of performance or modifications of time will be granted by the OWNER for the Work
covered by this Change Order. The CONTRACTOR hereby waives and releases any further claims for cost or time
against the OWNER arising from or relating to the matters or Work set forth or contemplated by this Change Order.
RECOMMENDED BY: ACCEPTED BY:
CITY OF OCOEE,FLORIDA Wharton-Smith,Inc.
By: By:
Signature Signature
Date: Date:
Title: Title:
APPROVED BY:
CITY OF OCOEE,FLORIDA
Owner
By:
S. Scott Vandergrift,Mayor Date
Attest:
Jean Grafton,City Clerk
FOR USE AND RELIANCE ONLY BY THE APPROVED BY THE OCOEE CITY
CITY OF OCOEE,APPROVED AS TO FORM COMMISSION IN A MEETING HELD ON
AND LEGALITY THIS DAY OF , 199 UNDER
, 199 AGENDA ITEM NO. .
FOLEY&LARDNER
By:
City Attorney
00842-3
0000_ CITY OF OCOEE REQUEST FOR PROPOSAL
Engineering/Utilities FOR PROPOSED CHANGE
Sc 150 North Lakeshore Drive (407)656-2322 ext. 142 (RFP)
�•,,c,,,- Ocoee, Florida 34761-2258 (407) 656-7835-fax NO. 00/
PROJECT
DATA:
NAME: Water Distribution Mains-Phase 1 PROJECT NO:
LOCATION: Wurst Road,Clarcona-Ocoee Road and Hackney-Prairie Road DATE: Ft. 9 b / 499 7
OTHER: leN) ii7 Rood ( &M 4ztrs Si/C.l.>' - o CC�..t4. Occ16 61 REFERENCE:
TO(CONTRACTOR): Wharton-Smith.Inc.
Please provide the undersigned a proposal for the following change in the work within seven(7)calendar days after receipt of this request. The written
proposal must clearly delineate the scope of the proposed change in the work providing an itemized estimate of the time and all material and labor(by trade),
subcontract and overhead costs and fees. Any amount claimed for subcontracts must be similarly supported. Rood
M
DESCRIPTION of change in work: �t t tt. '74XX 0 p D r f/G'! G� 71A ki G lier M G�n C /4-1i �/a t.� rf fid G1
Fr> P/.7'p,s Sfite.- 7'0 CIorcon .4
p - OGD G! /PGoot /^ c�eG/i•) L .J i" C. 6o' v 4 a /
,f74G/Ic f'/G/., i.-i fir! C/c/t.p,G- DGGOL /%COi
Change Order Type Deletion d Addition d Revision d Other:(
Constraints of Change: PrO p c,r-�f,ry D wn tr_C net 6,07,A sidGt GT idXi t /7G/� et J G /4, �,40(Cf--
C/0/C4�G — Ort C� cGd e.41 a/' der.-)Ge),•/GO( eXCer ,Conti: Ar S c7'i ' Fa/ '00
fay r74Gv( 7CE.
Initiated by: (3 Changes in Owner Requirements d Unforeseen Conditions d Others:( )
Proposal must be received by:
ATTACHMENTS(Listing of attached documents that support description):
1. Contractor Request for Information No. 4.
2. Plan Revisions: 5.
3. 6.
d OWNER: e/de,fid' � City OCO L' L d CONTRACTOR: kit/ Rpm l.�nL k./As , 011-s
d ENGINEER: (BAm rey �EG ��z_ d FIELD: FrGi/c. Ji ►a t _ G 1-7 oX Cc,G B L
d CONSTRUCTION ADMINISTRATOR: d OTHER:
d SUBCONSULTANT:
Date Received From Contractor. Date Returned to Contractor With Comments:
Date Returned to City:
00847-1
- - i
PRICING INFORMATION:
Method of Pricing:
A. G Established Contract Unit Price(s)
B. 4 Negotiated Unit Price(s)(including Overhead and Profit)
C. 4 Negotiated Lump Sum(Including Overhead and Profit)
D. 4 Actual Cost of Work plus Fixed Percent for Overhead and Profit
E. 4 A combination of A,B,C,D
DESCRIPTION OF WORK
4 By General Contractor 4 By Subcontractor
la,16 y N fi . f.-.. s Y s .. a .., _ z x *4.Y
... . . ...... ..::......... .. .. .f.:..::...:.::.
��,�'« .� ,x �'EM L�tLL WOFi;IC;: QU#1i�tTtT�C ;.�R€ E ' 'OTAninntiii .
.. .i..l :^.,l..>..'..t:;:.::;`..: ` E: •.:::..:..r.c::.. :.... :.<...:.. ..¢-.:,_ :.:f.:..:<G::l';^t... ISO
�•
n. ..... ....:.. .:•..t................................................n........,.........:.........:..:..:::..::iw.::::r:::.::..::::::..-:.:.:::..:,.<::a.:.:.Yi:YY:Y/..:' .Y>.<'t.>lcy„ :.y.:
SL& A-7,7ceAe�� -f
Attach additional pages if necessary.
NET TOTAL COST OF THIS CHANGE PROPOSAL $ Sy/ l D c °G
EXTENSION OF CONTRACT TIME:
As part of this Change Proposal the Contractor requests an extension of the contract time in the amount of iv A additional days.
Provide thorough documentation in support of the request for additional time:
•
A requirement of this Change Proposal will be to provide record drawing information for all of the affected items of work
RECOMMENDATION BY ENGINEER/CONSTRUCTION ADMINISTRATOR:
Comments:
Signature of Engineer/Construction Administrator: Date:
ACCEPTANCE BY OWNER:
Comments:
Signature: Date:
,of agree to the costs and terms of RFP
(Name) (Company) (No.)
this day of .199
(day) (month) (Year)
00847-2
lvpy 7fi^^ 4eserlf0/1 Qa6,11,14y A / P//</e.) rozi4/ /r(C�
/,0S /2 t..icifc/- is, ^ I, 3SO G.F. )-z,°AF ;\� BGG, "
1, o l2. /�L� �0'dL v° baX z EA /300."/EQ 6G0, °D
I, /l ' /„�� 0 �� va/'e' d- box 3 EA 7aa"/64 Z, /00,
/, 12, Z m c,11 5 a fG v0(vb e- box. 1 EA w4c,4 z G 0,
1./3 Fite, al/Qnr1 Asse,,b/), EA 2,so , "/E4 .5;o . °o
1, z, eat, t j- /. Clorainc I EA l 00. "
(.5 714-44,‘ /Cf 7` 73,shGL74V"/)
/, 3 /J//eL i// /14//y /Jr // PVC / EA 3,',,s v '
Casil5 u)4? 2 " /4,0 PE
SyoG, aa
Ocoee 4. CITY OF OCOEE REQUEST FOR PROPOSAL
+#
c? Engineering/Utilities FOR PROPOSED CHANGE
'4. 150 North Lakeshore Drive (407)656-2322 ext. 142 (RFP)
••,, Ocoee, Florida 34761-2258 (407) 656-7835-fax NO. 002,
PROJECT DATA:
NAME: Water Distribution Mains-Phase 1 PROJECT NO:
LOCATION: Wurst Road.Clarcona-Ocoee Road and Hackney-Prairie Road DATE:
OTHER: r//;ICG"G— DCOeC, [QC.O FI6M h/10/1`? p,:i/ %:, I Ave�'1- REFERENCE:
TO(CONTRACTOR): Wharton-Smith.Inc.
Please provide the undersigned a proposal for the following change in the work within seven(7)calendar days after receipt of this request. The written
proposal must clearly delineate the scope of the proposed change in the work providing an itemized estimate of the time and all material and labor(by trade),
subcontract and overhead costs and fees. Any amount//claimed for subcontracts must be similarly supported.
DESCRIPTION of change in work: i P.l�-11 -fh L por 7`i On aF - A e kiO 74Y M i' Q 4, C//r i — On 6 _
&ad T,5,-. vv,,/-3 IQDG.of 5-c 1,7`11 -14 /s r4\ A✓e" V&, i--7r,/, /'7 -rill Aft c.' i i 4 l
r.li'7/ ,.-,a1.i- Clotea-14- Occee: fiac0(,
Change Order Types)Deletion 4 Addition 4 Revision 4 Other:( )
Constraints of Change: Co-1f liL71s ►..)Wi 1i''�c./-�G/167'e./VAt.n e c66/P.-s / el c 7` iGAGel74,'r.e..9( Diu \
df..5/c e1 , re—s/d(,r,ts 3 4 1'( 107' ro/ /167' rt
6e. leCve_/1 rDran p, CO4e71/4/ 1t00) , ae)0!
re,5;d g-„s de^-�,- Far TCF Fa/ P(rra�d�c.�4/ ci,, l/ S
Initiated by: ()Changes in Owner Requirements 4 Unforeseen Conditions 4 Others:( )
Proposal must be received by:
ATTACHMENTS(Listing of attached documents that support description):
1. Contractor Request for Information No. 4.
2. Plan Revisions: 5.
3. 6.
4 OWNER: 4 CONTRACTOR:
4 ENGINEER: 4 FIELD:
4 CONSTRUCTION ADMINISTRATOR: 4 OTHER:
4 SUBCONSULTANT:
Date Received From Contractor. Date Returned to Contractor With Comments:
Date Returned to City:
00847-1
PRICING INFORMATION:
• Method of Pricing:
A. ()Established Contract Unit Price(s)
B. d Negotiated Unit Price(s)(including Overhead and Profit)
C. d Negotiated Lump Sum(Including Overhead and Profit)
D. d Actual Cost of Work plus Fixed Percent for Overhead and Profit
E. d A combination of A,B,C,D
DESCRIPTION OF WORK
d By General Contractor d By Subcontractor
3
2 P CF. - ✓ F N t I l5
.. ..:..:. < . .._. , . �M OF WORK Qll�l
,
ganntiggattor
masymo
..a.......:.. :ads:.......................... ... -.,..:........................ ..s-..:..:.:'..' .. ,................
Sem Af!71or. td .2_ 1l- . / 71;74'
Attach additional pages if necessary.
NET TOTAL COST OF THIS CHANGE PROPOSAL S
EXTENSION OF CONTRACT TIME:
As part of this Change Proposal the Contractor requests an extension of the contract time in the amount of additional days.
Provide thorough documentation In support of the request for additional time:
•
A requirement of this Change Proposal will be to provide record drawing information for all of the affected items of work
RECOMMENDATION BY ENGINEER/CONSTRUCTION ADMINISTRATOR:
Comments:
Signature of Engineer/Constriction Administrator: Date:
ACCEPTANCE BY OWNER:
Comments:
Signature: Date:
,of agree to the costs end terms of RFP
(Name) (Company)
this day of ,199
(day) (month) (MO
00847-2
GGZ
i.Spu4-1Y>y 4c,c, Ioic/
LOS /Z i'/icA �✓cfcl' inG it; 360 L.F. 6/z,F 3 9,0, "
/,/0 /Z 9 c71t. vo/vim d 6ox sA /,3X"° /6A S z ao c,6
1. 2-0 11s71p// 6', 4.11,1 slatvc• l GS z, 4Oa w
„d v i /s 43�)
1.1. itt.ci ,c,//y 6i,11 5., el;S'G(}, ”
b-dotc/- MG,4 QC, CSS �/aiccn�
VGpeRd (PIG
/9'i 92,0, vu