Loading...
HomeMy WebLinkAboutItem III (D) Approval and Authorization for Mayor and City Clerk to execute Professional Engineering Proposal -HVAC System for City Hall and Police Department with Brian Cumming & Associates, Inc AGENDA 2-20-96 Item III D "CENTER OF GOOD LIVING - PRIDE OF WEST ORANGE" Ocoee JLV,I vJAIN L%Gl�ul\LC1 COMMISSIO ERS w ► •• n CITY OF OCOEE RUSTY JOH SON SCOTT AND RSON Co ( 0 150 N.LAKESHORE DRIVE SCOTT A.GLASS f+� �t� OCOEE,FLORIDA 34761-2258 JIM GLEA ON (407)656-2322 CITY MANAGER f40 Of GOOD�` ELLIS SHA?IRO MEMORANDUM TO: The Honorable Mayor and Board of City Commissioners FROM: Ellis Shapiro, City Manager DATE: February 12,1996 RE: PROFESSIONAL ENGINEERING SERVICES - HVAC SYSTEM FOR CITY HALL AND POLICE DEPARTMENT Since moving into City Hall and the Police Building, we have had continuing problems with the air conditioning system both in City Hall and in the Police Department. In City Hall, we have lost at least one compressor and there have been several outages requiring major repair within our warranty period. Along with the major repairs, the system purportedly engineered for the comfort of our employees has not been comfortable at all. I know each of you have been unhappy about the lack of regulation of either hot or cold in the Commission Chambers as well. While City Hall has been bad, the Police building has been worse. Since moving in, the Police Department's building has suffered with a humidity problem that has made the building impossible to occupy. Leaks in the duct work have not only resulted in rotted ceiling panels, but also the necessity to disconnect the fire alarm system as well. In all cases, we have notified the architect and contractor of these problems in a timely manner, and while numerous visits have been made, the problems continue. To this end, we feel we can not continue to operate with this system without getting down to what is causing the problem which is creating the discomfort of our employees, and who is at fault for these problems with the possibility of future litigation in mind. The attached proposal by Brian Cumming & Associates, Inc. is the first step in getting to the underlying cause of the problem. This firm has done similar reports for other municipalities and cities that have resulted in successful resolutions. The Staff would recommend that the City Commission approve this proposal for an amount not to exceed $6,000.00 from Contingency so that we can get professional direction for the repair of this system and/or possible litigation of this issue in the future. Respectfully Submitted, ES:fdg Attachment % ., Brian Cumming & Associates, Inc. B. 3191 Maguire Blvd. •Suite 180•Orlando, FL 32803 ", (407)897-1288•Fax/Da ta:(407)897-1445 February 9, 1996 Mr. Ellis Shapiro, City Manager City of Ocoee 150 North Lakeshore Drive Ocoee, Florida 34761 Re: Ocoee City Hall/Police Station Professional Engineering Services Proposal Dear Mr. Shapiro: Per your request, this is a proposal to provide professional engineering services involving investigation of the comfort and humidity problems in the Ocoee Police Station / City Hall. As we discussed, the are numerous comfort and humidity problems that have been occurring since occupancy of the building. It is my understanding previous attempts to correct the problem by the Installing Contractor and Architect / Engineer have been unsuccessful. To determine the cause of the problem, I recommend that the investigation include the following scope of work: 1. Review existing design construction documents, As Built documentation, and maintenance records. 2. Perform field investigations and measurements on the HVAC systems serving areas that complaints are occurring. This will not include the level of measurements needed for litigation, but will give an indication and documentation of the problems. 3. Perform cooling/heating load calculations, psychometric analysis of the problem areas to determine if equipment installed matches actual load. 4. Provide a professional engineering report indicating findings and recommendations. The findings will identify any deficiencies that are contributing to the problems, including: • Design deficiencies • Installation deficiencies • Maintenance deficiencies The report will also include recommendations on what can be done immediately to improve the comfort problems until the final solution can be implemented. We propose to provide these services on an hourly basis as stated on the attached fee schedule. Based upon the information received, I estimate the engineering fee to provide this investigation Mechanical•Electrical•Plumbing•Fire Protection•Indoor Air Quality Services•Energy Management•Facilities Planning Ci of Ocoee(Mr. Ellis Shapiro) City P ) Ocoee Police Station/City Hall Re: Professional Engineering Services Proposal February 9, 19% Page 2 will range between $3,000 - $5,000. In the course of the investigation, I may require the use of a independent mechanical contractor and/or testing agency. These costs should not exceed an additional $1,000 and will be billed as reimbursable expenses, if they are used. If you have any questions regarding this proposal, please contact me. To accept, please sign below. We look forward to serving you on this project with quality engineering service and design. Sincerely, Accepted By: BRIAN CUMMING&ASSOCIATES, INC CITY OF OCOEE Brian S. Cumming, P.E. Signature Principal Printed or Typed Name BSC/klh Date Enclosure cc: File Enclosure-Fee Schedule s:\proposal\ctyocoee.doc K A tt:. FEE SCHEDULE HOURLY RATES Our Firm's hourly rates are as follows: • Senior Engineer/Principal $85.00/Hour • Project Leader/Project Engineer $75.00/Hour • Engineer/Senior Designer $65.00/Hour • Designer $55.00/Hour • Draftsperson $45.00/Hour • Secretarial $30.00/Hour s:lmarketng\introduclfeesched.doc