Loading...
HomeMy WebLinkAboutIII (C) Approval and Acceptance of Change Order to PEC Design Fee ($20,584.00 approved April 28, 1993) for Maguire/Marshall Farms Intersection in the amount of $8,640.00 AGENDA 7-16-96 o� Ocoee Item III C # C ;p �f�rf+os Goo `N,`s JAMES W.SHIRA,P.E. CITY ENGINEER/UTILITIES DIRECTOR 150 N.LAKESHORE DRIVE•OCOEE,FLORIDA 34761 PHONE(407)656-2322 EXT.142•FAX(407)656-7835 MEMORANDUM DATE: July 8, 1996 TO: The Honorable Mayor and Board of City Commissioners FROM: James W. Shira, P.E City Engineer/Utilitie Director SUBJECT: Maguire / Marshall Farms Intersection On April 28, 1993 the City Commission authorized PEC to design the intersection improvements at this intersection and at the intersection of Maguire Road and Story Road. PEC's design fee for the Maguire/Marshall Farms intersection was $20,584.00, and the design was completed for that fee, including preparation of permit applications. Within the past few months, we have been working on right-of-way acquisition, and have identified the parcels of additional right-of-way that are required. During initial investigation, our appraiser came upon a document which indicated the possible presence of soil contamination on one of the affected parcels. This contamination is due to leakage from old fuel tanks on the property formerly owned by Central Harvesting. The contamination on the parcel affected by our project is characterized as a "trace amount" and may not have affected us during construction, but we did not want to take a chance. We directed PEC to perform a re-design of the project in the area of the questionable soil conditions. Our instructions were to re-design the project in such a way that the suspect parcels would not be needed. State and County environmental agencies are aware of the contamination, and the site is on a list which will result in clean up as funds become available. In addition to eliminating the need for the suspect parcels, PEC was able to utilize the latest revision of FDOT's driveway criteria to reduce or eliminate the need for construction easements, thus reducing the amount we will spend for these temporary easements. In the interest of time, I authorized PEC to proceed with the re-design. They have submitted the attached itemization of their fee for the work involved. This is in line with the fee we QL THE PRIDE OF WEST ORANGE C discussed, and their extra work resulted in a revised plan which eliminated the requirement for the City to obtain any property from the suspect parent tract. I recommend that the City Commission approve the amount of$8,640.00 as a change order to PEC's original design fee of$20,584.00 as approved on April 28, 1993. JWS/jbw PEC - 7 PROFESSIONAL ENGINEERING CONSULTANTS, INC. I JUN == IvvV I May 31, 1996 0E-254/2- . Mr. James W. Shira, P.E. City Engineer/Utilities Director City of Ocoee 150 North Lakeshore Drive Ocoee, Florida 34761 Re: Story Road Redesign v 'A' Ree."aluaticn Dear Mr. Shira: Presented herewith are the costs incurred for the reevaluation and subsequent redesign of a portion of the Story Road Intersection Project. The thrust of the reevaluation was to minimize and possibly eliminate the need for additional R/W in the vicinity of the parcels at the southern end of the project. These subject parcels are on the west side of Maguire Road and were identified as possible contamination sites. The original design was heavily influenced by the presence of a 4 x 8 - 4" buried telephone duct bank. During this effort, we obtained accurate horizontal and vertical locations of the duct bank in order to design an alternative solution. Additionally,we used the new FDOT driveway slope criteria and revisited a number of the driveway connections. This criteria was published after the original plans were completed in 1993. The revised driveways have resulted in reduced temporary construction easements in some cases as well as a complete elimination of the easements in other cases. Enclosed for your review is the Fee Breakdown detailing the activities. The cost of these activities is $8,640. Listed below is a description ofthe required design services and corresponding fee. A. Survey Services $440 B. Drainage System Reevaluation $1400 C. Final Design $2380 D. Legal Descriptions & Sketches $840 E. Drainage Design Documentation $400 F. Plans Update $2700 G. Direct Reimbursables $480 TOTAL $8,640 engineers Manners surveyors 200 East Robinson Street • Suite 1560 • Orarco. F cnoa 32801 • 407 422-8062 FAX 407'849-9401 Mr. James W. Shira, P.E. May 31, 1996 Page 2 The plans have been updated to include the revisions noted above. No permit modifications will be required for these changes. We appreciate the opportunity to provide the City with engineering services for this assignment and trust the information provided herein is sufficient for your review. Please call if you have any questions or need additional information. Sincerely, PROFESSIONAL ENGINEERING CONSULTANTS, INC. Steven Kreidt, P.E. Project Manager copy: Ken Hooper .approved for Professional Engineering Consultants, Inc. Name Officer's Title Date