Loading...
HomeMy WebLinkAboutVI(J) Discussion/ Action Re: Award On Kissimmee Avenue/ Story Road And Marshall Farms Road/ Maguire Road Intersection Improvements ( AGENDA 12-17-96 O_Coee I Item VI J. a rfa oa G000`�a JAMES W. SHIRE.,P.E. CITY ENGINEER/UTILTI'IES DIRECTOR 150 N.LAKESHORE DRIVE•OCOEE,FLORIDA 34761 PHONE(407)656-2322 EXT.142•FAX(407)656-7835 MEMORANDUM DATE: December 12, 1996 TO: The Honorable Mayor and Board of City Commissioners FROM: David Wheeler, P.E. v06.,,,,r Assistant City Engineer/Utilities Director SUBJECT: Story Road/Kissimmee Avenue and Marshall Farms/Maguire Road Intersection Improvements Project On December 10, 1996, bids were received for the Story Road/Kissimmee Avenue and Marshall Farms/Maguire Road Intersection Improvements Project, Bid No. B97-02. This project has finally reached the point of construction and relief to these intersections. To refresh your memory on this project, the attached drawing portrays the general layout of the proposed improvements. The intersection of Maguire Road- Kissimmee Avenue and Geneva Road- Story Road will be improved to provide left turn, right turn and straight through lanes for each road plus signalization and the intersection of Maguire Road and Marshall Farms Road will be converted to a"T"intersection with turn lanes to allow for better traffic flow and reduced congestion. The ancillary improvements include installation of curb and gutter to handle drainage,upgrade of the stormwater collection/drainage system in the immediate area, relocation/upsizing of the water main in this area and additional signage. Attached is a letter from PEC which includes the bid tabulations for the project. I concur with PEC's recommendation to award this project to Southland Construction, Inc. for the sum of $1,163,718.10. The total bid for this project was approximately $34,000 below the engineer's estimate of$1,198,000. The intent is to issue the Notice To Proceed no later than the middle of January so that construction can begin before the end of the month. All other utility companies have already started on their respective utility relocations or have planned to coordinate with the contractor's construction schedule. All additional property required for this project has either been purchased or is in the final stages of negotiations and all temporary construction easements have been executed. The construction schedule requires the contractor to be completed within 180 days. THE PRIDE OF WEST ORANGE 04.— This project is budgeted under the Road Impact Fund. I recommend that the City Commission authorize the Engineering Department to execute the Intent To Award and secure executed contract document, bonds and insurance from the contractor. Additionally, I recommend that the City Commission authorize the Mayor and City Clerk to execute the contract with Southland Construction, Inc. in the amount of$1,163,718.10 in accordance with their bid at such time as the contract documents are reviewed for compliance by staff and legal counsel, as needed. DAW/jbw Attachments PEC PROFESSIONAL ENGINEERING CONSULTANTS, INC. December 13, 1996 0E-254/2-1.0 Mr. James W. Shira, P.E. City Engineer/Utilities Director City of Ocoee 150 North Lakeshore Drive Ocoee, Florida 34761 Re: Story Road Intersection Project Ocoee Bid Number B97-02 Bid Analysis Dear Mr. Shira: We have reviewed the bids submitted for the above referenced Project. The packages were checked to determine completeness (items 1-8 as listed in Paragraph 12.2 of Section 100), mathematical accuracy of the bid tabulation sheet and extensions, and a review of the unit prices to evaluate reasonableness. Particular attention was given to the apparent low bidder, Southland Construction, Inc., regarding their prices compared to the engineer's estimate. The Southland Construction,Inc., JCB Construction Corp., and Bergeron Land Development, Inc. all had complete packages. The package from Central Florida Construction and Development Corp. (CFCD)was missing some of the forms. A detailed list of the missing or incomplete forms is provided in Attachment"A". The bids were tabulated for review and comparison purposes. The tabulations are documented in Attachment"B". The review of the mathematical extensions identified errors in two of the bids. CFCD submitted a bid listed as $1,282,210.81. Our audited figure for the total was $1,283,274.26 (a difference of$1,063.45). The second error was found in JCB Construction's bid which was off by $0.05. Neither of these errors affect our final recommendation. A review of the unit prices presented by the low bidder was performed to determine if any of the unit prices were deemed unusual. Generally,the unit prices were within the range of the estimated prices with the exception of some of the asphalt items and some of the water main items. Overall, however, the bid appears sound and no readdressing of the unit prices is anticipated. In additional to the above analysis,we were able to contact five of the eight references listed in the • Similar Projects Table on page 301-3 of the Bid Form: The details of these contacts is presented in Attachment "C". In summary, the contractor received above average remarks with regard to work quality, timeliness and performance. The only slightly negative comment pertained to some claim experience by one of the contacts (see comments No. 3). The contact indicated it was only intended as a caution and that he felt they were reasonable in dealing with such issues. His overall experience with Southland was positive. engineers planners surveyors 200 East Robinson Street • Suite 1560 • Orlando, Florida 32801 • 407/422-8062 • FAX 407/849-9401 Mr. James W. Shira, P.E. December 13, 1996 Page 2 The concentrated grouping of the bid amounts also indicate the project received reasonable bids. The low bidder was 3%below the engineer's estimate. Based on all the aforementioned points, we recommend the City proceed with awarding the contract to Southland Construction, Inc. Please call me if you have any questions or need additional information. Sincerely, PROFESSIONAL ENGINEERING CONSULTANTS, INC. Steven M. Kreidt, P.E. Senior Project Manager Attachments Copy: David Wheeler, Ocoee Ken Hooper, PEC g:\hwy\proj_doc\OE-254\shira.102 • i I i i I a+ I • O•\ 'I o I 1 i9: 1 Ali m i i i r a,,� I I • 0-0, moov v i I CD I Of 1 CC i - I I }I I O i i i • I—: I NI. i . i I i 1 • END CONSTRUCTION MARSHALL FARMS i • p STAiierm ROAD I " i i i • `' • MAGUIRE ROAD i r i / `' KISSIMMEE AVE i i I j ` / i i . •V 1 N• , . / /•-- w z // ' i'/ STORM RD. / KISSIMMEE AVE. ;/ Air / AND MARSHALL FARMS RD. / MAGUIRE RD. BEGIN CONSTRUCTION INTERSECTION IMPROVEMENT PROJECT STAl5.80D0 PEaZLefrl DOWLING CONSUL IS. IlC 12/1 1/96 PEC PROFESSIONAL ENGINEERING CONSULTANTS, INC. ATTACHMENT"A" CENTRAL FLORIDA CONSTRUCTION&DEVELOPMENT CORP. Page 300-1 & 300-2 not provided. • Page 300-20 not complete Page 481-1 Official Address not complete Receipt of Addendum 2 not confirmed. By Section 001000, Article 12.11, this Bid is incomplete and is rejected. g:\clerical\highway\pec\oe-254\cfcdrej.lst engineers planners surveyors 200 East Robinson Street • Suite 1560 • Orlando, Florida 32801 • 407/422-8062 • FAX 407/849-9401 PEC PROFESSIONAL ENGINEERING CONSULTANTS, INC. ATTACHMENT"B" BID OPENING DECEMBER 10, 1996 CITY OF OCOEE,FLORIDA STORY ROADIKISSIIV MEE AVENUE and MARSHALL FARMS ROAD/MAGUIRE ROAD INTERSECTION IMPROVEMENTS 1. Southland Construction, Inc. (Apparent Low Bidder) $1,163,718.10 2. JCB Construction, Inc. $1,183,688.40 3. Central Florida Construction&Development Corp. $1,282,210.81 4. Bergeron Land Development, Inc. $1,520,000.00 Engineer's Estimate $1,198,518.05 g:\clericaNughway\pec\oe-254\bid.lst engineers planners surveyors 200 East Robinson Street • Suite 1560 • Orlando, Florida 32801 • 407/422-8062 • FAX 407/849-9401 m . - 8 U .t•�'�i:y; :`;: C § Gi a a b V. 2 oo 4 N O h N M O O Ol O Cl tvi+1 O' S C S 0 S S N N a N OV O 4 :>:�' ! vi o Ge - - e�f vi eS a oo a Dr erg vi `i eS N m H vi e3 Ge a 1d . vi eS e+i eS fV A »Ei:tt O� H 0o Y1 O� H H N H H H N t� M H H H H H H H H H H pq `^_1 7 H H H H H H H H H H H H H C 0 S C vl S C C o C - eenn, C C C voi vo cre N o C C C C C C C C C C C C O W O :: :i'<'i C o F. vi C vi 0c ... Oi te1 O C C eV a b eV v1 O C C C C C O O C C C O .b Ile ,u:::: ::j;:j;: O O O H H H H H a a V H H H H V O C O vl O O O vl v1 O vl O Viii �/ pl Yj en N co) b H H fA G9 H 00 O O N 00 00 50 N N N 00 W f i.!i4::$ H en H H H H H H H H H V1 H ""'::::ii:i: O O O N N O 2. .� v1 wl 50 O M O O v1 7: 00 N 0o O M 10 N 00 Cl O Ce\ l0 vt G 'Tip:«'r"Yi i s O O O N O .••e M M N v1 aT N N N — 0 of a M M 00 Cn M N Cs v1 v1 Cl '0 0 '(i::iv)':::: oC C Cl 50 v1 C 00 'le' vpi N NC p eT Cl fV Cl '0 a 0G C N Cl tN FP: Or f` Cl O .7 fr" k" M a en o0o en N 00 H O Cl l� e0 en 0o NV coo N N as 30 a '0 so. oho V voi b N 00 O f- p ` el a H H o v N see" Cl" a N c3 5o" 50 en 50 f3 N H N e�f' en �f v ree e`f •o cn" O E:iS?:>. h oo H N 14 } r 00 H H H N H H N 0o H H H H H H H H H �1 4 O f t 7.?::;'i H H H H fA H H H H H H H gam ' C v1 O O .Ni of •V vl O O v1 N •CC-.. 0 en O Coen 00 en CO ON N Cr, 00 Cl vl .... C Cl 7 0 o .. O N t` Cl a en N M O 10 e0 0o 01 e0 Cl Cl v1 N VI 00 N Cn :;...'»:3: Ce vi Cii d O N oei d vi vi 1D 00 vi tS ri lG oo fV a Oi Cl Cl C b 0o y OP. .:< :•i;ii h - H N N H H H H H H i�A GSA H H H H v�1 < V < l� l 19.1 en as N N -1 C (aly E:ii?i: H Cr f6A H H H H H H f6A H H fMA H W o ice'_f ry:i:'" 'r:i: H U sS W ryai i':i: ....:........:.. .............. ................ .............. ................ _ .............. ::::;•::.i.T.i.,,i., C 0 S 0 0 0 7i S 0 N S 0 N r h'0 S N S 2 . 8C0 S 80C S S 08 S 8 :�h ' riC CCONaenn - '000GCPlClCNa SCCCpCSCSCCCV .. k'. hOO t N C '0 Cl Cs N O ta` S 00 N r. N M 00 Mn N M O NO O C O S N O O o .....i:'' ..._el'O eel H H O O er 00 yr eel rI f•r of to n mr ter O tn.' H l0 V el esr co" rr vi er eS so n vs N V V1 O H N H N H H CA N 00 . in H CA H H CA H H CA H 'J:%::>y ?A VHl H H H CA H fAgi M 0 D.i: iiii:U U :i:::::ii:::::: O O O O O o vl O O vl vl v1 O M O h O O O O O O O O OC O O O O 1-, ("�['t;'^1.e1�:.:'.: S OO O O h b 10 t` v1 O N N N O N O oo vl O O O O S O O O pOO O O O u;.;.'L.j;y:. S N d do H C Ni f6A H H H H '0 '0 H IIA N N N en 0 N N N S C o O 0N 0 N O ":•`' M H CO NI Pf e+i e`r Pr eel f`r M GII :i*: '... E:::ij:: H V1 H H H H H H H H H H H H o1 69 o U :i::%''.»:. U :"' C C C C S C C 000 C o C 0 0 0' 0 0 0 oe O O o 0 0 0 0 0 0 0 0 0 0 0 0C W -` :::;;<;. ;.jy; 0 M O O 0 O O o v1 O O O O O O O O O 0 GUj ^:'»>: 0 0 ... of CO N N N ' eV N '1 vi rNe 0 ri N lC o 0 0 0 o o o o C O o ••vf�"`t. `•' o0 00 •0 oC Cl vl 0o en 0 M t� en a Cl O o O 0 oC C o O o W m S S G O fA G R v1 v1 'v co 01 v 10 to vl a en S S O O S to v1 O l0 v v1 00 TTr:"c.;;:;': vi 1p to t; a tz 00 N' N e1r vi 10" en vi ter e.I or mro eS e1r '0 Ni '0a{ to .- :::4i h '0 H H 10 N N h Cl H fA H N H H fA N 00 '0 H H H Ge G H H H 4! H y 5.y�v''+:': H H H H H H H H H H H fA H f9 IG� F"4::C.it::`: 0 :1.4 U `"'"''�"'''''' S O 1oi1 S S 000. 4 O �C O .0-� O S S C C C vol' O O S S S O O O C C 00 C O W g 3 P >:`L:y,';:j S co+1 H S G�9 H H G V3 H H � Ge H Gr9 H e-i N C C S• S S S S N '0 N en S W <+e O eV O H H H H N O O O O vl lD v1 N l0 N en SD 64 MOn// 0� r� ':">' vi H H ee cri v" tJ• f f t i eS en t3 tJ en H �sy .;i ?::>S£ H SO H H H H H H H H H H H CA Tt Ul O O z::::i: te) CI it v..F U 43 A l:ii :i :N O O S Ol S S O O 7, O p O v S S O P O S vll 6 S S O S S S S O O O O O O O 9 :t :':��ii:�:� O C C phi 4 C N N eti e.1 O 0o eV C V YKr�i a O oC pC C pC C pC pC C C C O O u:ii�i: '. C C 0 Cl 'II% S `en 1M0 v Owl .M.e N a l0 O N Ool 000 N Cl .N.i Vl N ton N O Cl Ol S v01 V 0 2 N M::>`i i i:i: o vi o 0o v mr e3 mr e3 of vi N' fA r o t: e+i CZ ear M. rT lei v m v < e3 IX W ':':E'»> H H CCM H H 11A Cl H H H H H H ,..7., H Ge H H H H H H H H H H H H MCI ::::::::::: H R+ fy, F Ffn ii: i:::ii w Fx4 g ,M :.M O O O. O S vOi. 10n 10n co0 S N S O O N Vol O .�� O O O O S S O S O O O O O eVe� 0 �::�:::i C h fV pp C et O •el 00 C f`7 fe1 1p ee1 O Op C OC O O O O O O O pC O F.e W U:y E::::;:;: O vN H O H H H y H MH 1 MH MH H H H H Oa Y1 N Vl M V01 01 05 S M M 00 n W $<:>i::: fai C 1'.':, ..... H N H 0 G9 H 64 H H H H H 64 6, H IIPIOII w ^ ^ o CI) h y W h y coU iii- r�::<'u:::i:::: k o 00 0 ^ d ..fYY: 11, `° X X `' v X 0 t` '� a p en^ fA en rn y c c •. 0 c o o c y' _ 0 V V V V V Q ep -. p o x S o Q0Q 0 o V t t F. H e, . • v1 lX X U fa W tie ^ b w b 8 n Ur 'U (5 a ea g }� g gi g p chi P. 0+ 4i F F F . y X V C $ V�i' $ W q `� `� p .e� U Uri U qri q p 0 c. `� .Fp .Fp .p 0 0 0 0 0 'f� tp�i/fy 6 >n 7 b h rA W Rl O y u o 0 0 0 0 U g 3 3 Q7 Qa W H al i+ y u . eeaee W A • i f'- 01 1 1 .0 0 oa u u al al u d u u a. o o `r ::::'."'''" ? ..e ..e ..e N N — M h t` a N M co a v1 M 10 10 N co en .... .r N ' .-e .... h .... N VI M P V 00 N v1 '7 n N 00 tS 14 N O O R. Ge '0 vl '0 00 CT •0' P. CS vl 5 .... N ,::,:i:;? f 50 b 00" yr C .:::i::::i<::: ..1 N Ot::;;:::: zzs: w 1 'i <:>:' < 222 2ti � � y � � c � a' � a� ,• e ¢ e < < < ad ¢ ¢ ad a •.ei:i y y y y fA W W W W W W W W W W W W :::::iiii:iii: 74 0:::::::::::::: 0 'G::.::i:' 5 M 1 N en v vt 10 vl N •0. v1 40. CO O MN AA "? e Me 1 v.lenen en vl Ol C tV� O u.. 74 N r d _ o til1 n ; b _ N N N t7 1; t75w 7 V — v h v .. . .. .. N N . . O O O } O N 10 N N N N 21 enn e n ee fe en een C 4 4 4 4 4 'Cl <vl ea vV V al a w STORY ROAD/IQSSIMIVIEE AVENUE and MARSHALL FARMS ROAD/MAGUIRE ROAD INTERSECTION BID TABULATION(Audited) Bid Opening 12/10/96 ENGINEER'S SOUTHLANID JCB CENTRAL FLORIDA BERGERON LAND ESTIMATE CONSTRUCTION, INC. CONSTRUCTION,. INC. CONSTRUCTION& DEVELOPMENT,INC. DEVELOPMENT CORP. x MivD.::: fi1Ni......::. UA.?T:: ::::>:: ......>::::::»»...... .....:>:<....„:I?,I;SCRIk�1p <:>::>::>::::....::<::>::» :>:>:::>`::::>:>:<::: s171.i1 '::1'xti E::::>::::::>•:TOxAT.PJftxCE:::<::iui:9i?x :: RICi .»::::>3'Q l t'itTCF:z: >L.N ESttCE::::>:::>TOTAT31'R10E> :::>IJNITPRIG :>: : 'UTaA1'PRIC kRTG ::::>:::::: . ................................ Q............ ......... ....... ................. )tl.............. ....................... . ............................................................ ................................. ................... .................................................. ...................... E..:::.U,NI� . .. ......`1'OTA)'r:PI21C.'>;: (lnNumb is;'` '::```>Number§:..;<._. .. 1nNuiilSefs':>•'. ;;:::::n: u `bem> ..(ln;::>in ns:e Num is N hers >:<> O'";:Nulriters�`. n �dm�' 'N bets<s:: 1ti:.iVufn ;ber4:: �: :>:::;:%:siiriiliefs::: ;::e.i(Tu:::<:.:.:>:::< . 430-11-323 LF 391 Concrete Pipe Culvert (SSXClass Il)(15") $30.00 S11,730.00 S21.00 $8,211.00 $18.50 $7,233.50 S20.04 $7,835.64 $30.00 S11,730.00 430-11-325 LF 202 Concrete Pipe Culvert (SSXClass III)(18") $26.00 $5,252.00 $23.00 $4,646.00 $21.50 S4,343.00 S22.11 $4,466.22 $32.00 $6,464.00 430-11-329 LF 350 Concrete Pipe Culvert (SSXClass III)(24") $30.00 S10,500.00 $27.00 $9,450.00 S28.00 S9,800.00 $27.86 $9,751.00 $37.00 $12,950.00 430-12-325 LF 162 Concrete Pipe Culvert(CDXClass III)(18") $25.00 $4,050.00 S23.00 $3,726.00 S24.50 S3,969.00 $29.01 S4,699.62 $32.00 $5,184.00 430-12-329 LF 43 Concrete Pipe Culvert(CDXClass III)(24") $32.00 S1,376.00 S28.00 S1,204.00 $28.00 $1,204.00 $34.76 $1,494.68 $39.00 $1,677.00 430-14-323 LF 59 Concrete Pipe Culvert (SDXClass III)(15") $28.00 $1,652.00 $22.00 $1,298.00 $18.50 $1,091.50 $20.04 S1,182.36 $30.00 $1,770.00 430-14-325 LF 219 Concrete Pipe Culvert (SDXClass]II)(18") $25.00 $5,475.00 $23.00 S5,037.00 $21.50 $4,708.50 S22.11 S4,842.09 $32.00 S7,008.00 430-14-329 LF 304 Concrete Pipe Culvert (SDXClass III)(24") $32.00 $9,728.00 $28.00 $8,512.00 $28.00 S8,512.00 S27.86 S8,469.44 $37.00 $11,248.00 430-14-338 LF 153 Concrete Pipe Culvert (SDXClass III)(36") $45.00 $6,885.00 $43.00 $6,579.00 $45.00 S6,885.00 $42.26 $6,465.78 $57.00 $8,721.00 430-111-201 LF 16 Pipe Corr.Alum.Arch Culvert(GA 14)(28"x20"SS) S40.00 S640.00 $43.00 S688.00_ $100.00 $1,600.00 $27.14 $434.24 $57.00 S912.00 430-141-105 LF 431 Concrete Pipe Culvert(SS)(HE M)(29"x45") $65.00 S28,015.00 $46.00 S19,826.00 S48.00 $20,688.00 $48.35 S20,838.85 $62.00 S26,722.00 430-141-108 LF 589 Concrete Pipe Culvert(SS)(HE III)(34"x53") $85.00 S50,065.00 S57.00 $33,573.00 $61.00 S35,929.00 $59.36 S34,963.04 $72.00 $42,408.00 430-141-109 LF 535 Concrete Pipe Culvert(SS)(HE BT)(38"x60") $80.00 S42,800.00 S72.00 S38,520.00 $74.00 $39,590.00 $71.30 S38,145.50 $84.00 $44,940.00 430-982-225 EA 4 Mttered End Section(CDXConcrete Round PipeX18") S800.00 S3,200.00 S600.00 $2,400.00 S450.00 $1,800.00 S892.40 $3,569.60 $500.00 S2,000.00 430-982-229 EA 1 Mitered End Section(CDXConcrete Round PipeX24") S500.00 S500.00 $700.00 S700.00 $600.00 $600.00 S1,010.85 $1,010.85 $575.00 S575.00 430-984-223 EA 6 Mitered End Section(SDXConcrete Round PipeJ(15") S400.00 $2,400.00 S600.00 .$3,600.00 $450.00 $2,700.00 $861.93 $5,171.58 $475.00 $2,850.00 430-984-225 EA 12 Mitered End Section(SD)(Concrete Round Pipe)(18") S430.00 $5,160.00 S600.00 S7,200.00 $450.00 $5,400.00 $892.40 S10,708.80 $500.00 $6,000.00 430-984-229 EA 7 lOtered End Section(SDXConcrete Round Pipex24") S850.00 S5,950.00 $700.00 $4,900.00 S600.00 $4,200.00 $1,010.85 $7,075.95 S575.00 $4,025.00 430-984-238 EA 5 Mitered End Section(SDXConcrete Round Pipex36") $1,500.00 $7,500.00 $1,300.00 S6,500.00 $2,500.00 $12,500.00 S1,660.02 $8,300.10 $1,450.00 $7,250.00 430-985-238 EA 1 Mitered End Section(BO)(_Concrete Round Pipe)(36") S1,000.00 $1,000.00 $1,300.00 S1,300.00 $1,400.00 S1,400.00 S1,660.02 $1,660.02 S1,450.00 S1,450.00 430-985-409 EA 1_Mitered End Section(Ellip.Pipe)(38"x60"BO) $1,660.00 $1,660.00 S1,900.00 $1,900.00 $2,200.00 S2,200.00 $2,471.35 $2,471.35 $3,100.00 $3,100.00 440-1-20 LF 1,104 Underdrain(Type II) $10.00 $11,040.00 S11.00 $12,144.00 $18.00 $19,872.00 $15.30 S16,891.20 $21.00 S23,184.00 440-70 EA 1 Underdrain InspectionBox S550.00 $550.00 S700.00 S700.00 $1,100.00 $1,100.00 $1,396.10 $1,396.10 $900.00 S900.00 520-1-10 LF 5,118 Concrete Curb&Gutter(Type F) $8.00 S40,944.00 $9.00 $46,062.00 $6.50 $33,267.00 $9.43 S48,262.74 $7.00 $35,826.00 520-2-4 LF 137 Concrete Curb(Type D) $10.00 S1,370.00 $12.00 $1,644.00 $9.00 S1,233.00 $12.76 $1,748.12 S8.50 S1,164.50 520-2-9 LF 93 Concrete Header Curb $20.00 $1,860.00 $12.00 S1,116.00 S7.70 $716.10 S12.95 $1,204.35 $7.50 S697.50 520-70-19 SY _ 89 Traffic Separator(Conc.XType I,Option II) $30.00 $2,670.00 $55.00 S4,895.00 $28.00 $2,492.00 $61.07 $5,435.23 $26.00 S2,314.00 522-2 SY 1,715 Concrete Sidewalk(6"Thick) , $20.00 $34,300.00 $22.00 $37,730.00 S21.00 S36,015.00 $23.60 S40,474.00 S20.00 S34,300.00 524-1-1 SY 147 Ditch Pavement(Cone.)(3") $20.00 $2,940.00 S70.00 $10,290.00 $26.00 $3,822.00 $57.50 $8,452.50 S25.00 S3,675.00 530-3-4 TN 59.9 RipRap(Rubble)(Ditch ' ', .) $20.00 S1,198.00 $60.00 $3,594.00 $100.00 $5,990.00 $174.57 S10,456.74 $65.00 S3,893.50 550-2-1 LF 261 Fencing-Type B(with Barb Wire Attachment) S7.50 $1,957.50 S7.00 $1,827.00 S7.00 $1,827.00 $7.48 $1,952.28 $6.50 $1,696.50 550-3-2 EA 6 Fence Comer Post Assembly $100.00 S600.00 S90.00 S540.00 $93.00 S558.00 S96.60 S579.60 S505.00 $3,030.00 550-5-1 EA 22 Fence Pull&End Post Assembly S150.00 $3,300.00 $90.00 $1,980.00 S93.00 $2,046.00 S96.60 $2,125.20 $1,850.00 S40,700.00 550-74-3 LF 505 Reset Existing Fence(Barbed Wire) $15.00 $7,575.00 S3.00 S1,515.00 S3.00 $1,515.00 S2.99 $1,509.95 $2.60 $1,313.00 File: f cleericellhighway\data\OE-254\BID.WIC4 2 12/13/96 I STORY ROAD/IQSSIMMEE AVENUE and MARSHALL FARMS ROAD/MAGUIRE ROAD INTERSECTION 'I BID TABULATION(Audited) Bid Opening 12/10/96 ENGINEER'S SOUTHLAND JCB CENTRAL FLORIDA BERGERON LAND ESTIMATE CONSTRUCTION, INC. CONSTRUCTION, INC. CONSTRUCTION& DEVELOPMENT,INC. DEVELOPMENT CORP. :>ITEM:NU::>:::;::>:1I1.!ljt;:> . CTAN'I' >:> iiiI ::`:>;s :::>:':>::>?> ::DE$:. ,.. . .:::> r;:>::>::>::»:z:;>;:>:::>::>:z:>::::>::::>':-::>::>::[: ::>::UNIT[ RICE :>TOTAx PRICE:':<:UNIT:PRIC1 E:>:>TO ALPRICE:: ::<UNITPRICE::>::::::TOTAL:PRICE: :::'VNITPRICE::::s>;:>4TOT :;.P ICE :::::> T: RI :::»:::: .............................Q.-.... .........GRIPT.IO�I..... ::::::............ ::i*........... ............................. ................................ ..:....................................................... ............................... ............. AI...l2ICE......;J:NaT`P. CE.....TOT`AX�.PRiC'E:: ;;:�Niiiii*s) :1.0. ib;:)::iii.` �:;::;;::;::: .;;<ti N bets'<>�.;<`'< � N m ers .:... .. Nutntiers' � >s>i l�iutiers::s�� � �::>::�:l!Tufniicrs`:�:��:']i::�>:�:;�::;a ii;: ::.�...::::.:::.:::..::::::::::::::::::::::::::.::::: :....:::::::::::::::. .:::::::::::..:..::::::::::::::::.:... .:.... ..........::.::::::.:.:..::::.......... ::.: ...:.................. ..... ...............)':.... :.::�?...... .. ... :... ... ................. btt'S:::>::*'' ri.11T mhpYs::<:::: V 550-79-30 EA 1 Fence Gate(Sliding)(Cantilever) $2,400.00 $2,400.00 $1,800.00 $1,800.00 $1,800.00 $1,800.00 $1,897.50 $1,897.50, $1,650.00 $1,650.00 570-5 TN 0.7 Fertilizer orDolomite Limestone S250.00 $175.00 $250.00 $175.00 S278.00 $194.60 $258.75 $181.13 $250.00 $175.00 570-9 MG 14 Water For Grass $50.00 $700.00 $20.00 $280.00 $67.00 $938.00 $34.50_ $483.00 $10.00 $140.00 575-1 SY 14,426 Sodding $2.00 $28,852.00 $1.30 $18,753.80 S1.35 $19,475.10 $1.41 $20,340.66 S1.10 $15,868.60 620-1-1 LF 90 Grounding Electrode $4.00 $360.00 S6.00 $540.00 $5.00 $450.00 $6.37_ $573.30 $6.00 $540.00 630-1-12 LF 851 Conduit $3.50 $2,978.50 $2.50 $2,127.50 $6.50 $5,531.50 $2.67 $2,272.17 $2.50 $2,127.50 632-7-1 PI 1 Cable(Signal) $1,800.00 $1,800.00 $1,200.00 $1,200.00 $1,650.00 $1,650.00 $1,301.80. $1,301.80 $1,150.00 $1,150.00 634-4-112 PI 1 Span Wire Assembly(Diagonal) $1,000.00 $1,000.00 $500.00 $500.00 $1,200.00 $1,200.00 $547.40_ $547.40 $500.00 $500.00 634-5-1 LF 20 Fiberglass Insulator $8.00 $160.00 $11.00 $220.00 $16.50 $330.00 $11.61 $232.20 $10.00 $200.00 635-1-11 EA 11 Pull&Junction Boxes $250.00 $2,750.00 $170.00 $1,870.00 $225.00 $2,475.00 $182.64_ $2,009.04 $160.00 $1,760.00 639-1-12 AS 1 Electrical Power Service $200.00 $200.00 $600.00 $600.00 $833.00 $833.00 $669.30 $669.30 $590.00 $590.00 639-2-1 LF 10 Electrical Service Wire 1 $2.00 $20.00 $2.50 $25.00 $3.50 $35.00 $2.64 $26.40 $2.50 $25.00 641-15-144 EA 1 Concrete Strain Poles(Type VI) $3,400.00 $3,400.00 $2,300.00 $2,300.00 $3,300.00 $3,300.00 $2,464.45_ $2,464.45 $2,150.00 $2,150.00 641-15-146 EA 1 Concrete Strain Poles(Type VI) $3,200.00 $3,200.00 $2,400.00 $2,400.00 $3,900.00 $3,900.00 $2,549.55 $2,549.55 $2,250.00 $2,250.00 650-1-131 AS 2 Traffic Signal(12"Std.X3-Sect.)(1-Way) $500.00 $1,000.00 $500.00 51,000.00 $600.00 $1,200.00 $553.15. $1,106.30 $500.00 $1,000.00 650-1-132 AS 1 Traffic Signal(12"Std.X3-Sect.)(2-Way) $900.00 $900.00 $850.00 $850.00 $1,200.00 $1,200.00 $899.30 $899.30 $800.00 $800.00 650-9-151 AS 4 Traffic Signal(12"Std.X5-Sect.)(1-Way) $800.00 $3,200.00 $840.00 $3,360.00 $950.00- $3,800.00 $884.06 $3,536.24 $800.00 $3,200.00 659-106 EA 32 Signal Head Auxiliaries(Tunnel Visors) $8.00 $256.00 $0.60 $19.20 $9.50 $304.00 $0.64 $20.48 $6.00 $192.00 660-1-103 EA 4 Inductive Loop Detector(Type 3) $150.00 $600.00 $150.00 $600.00 $160.00 $640.00 $156.11. S624.44 $140.00 $560.00 660-1-104 EA 8 Inductive Loop Detector(Type 4) $150.00 $1,200.00 $170.00 $1,360.00 $200.00 $1,600.00 $177.67, $1,421.36 $160.00 $1,280.00 660-2-102 AS 4 Loop Assembly(Type B) $450.00 $1,800.00 $500.00 $2,000.00 $675.00 $2,700.00 $525.26 $2,101.04 $460.00 $1,840.00 660-2-106 AS 8 Loop Assembly(Type FX6k40) $500.00 $4,000.00 $800.00 $6,400.00 $850.00 $6,800.00 $525.26 $4,202.08 $720.00 $5,760.00 670-113-000 AS 1 Actuated Solid State Controller Assembly $8,000.00 $8,000.00 $8,000.00 $8,000.00 $6,700.00 $6,700.00 $8,490.45 $8,490.45 $7,400.00 $7,400.00 690-10 PI l Remove Traffic Signal Head Assemby $50.00 $50.00 $200.00 $200.00 $28.00_ $28.00 $233.45 $233.45 $200.00 $200.00 690-30 EA 2 Remove Poles $800.00 $1,600.00 $600.00 $1,200.00 $2,200.00 $4,400.00 $681.95 $1,363.90 $600.00 $1,200.00 690-50 EA 1 Remove Controller Assembly ' $200.00 $200.00 $170.00 S170.00 $220.00 $220.00 $181.70 $181.70 $160.00 $160.00 690-90 PI 1 Remove Cabling& Conduit $200.00 $200.00 $130.00 S130.00 S350.00 $350.00 $146.05 S146.05 $130.00 $130.00 700-40-1 AS 3 R1-1(30"x30") $250.00 $750.00 $230.00 $690.00 S135.00 $405.00 $189.75 $569.25 $180.00 $540.00 AS 1 R1-2(36"336536") $250.00 $250.00 $230.00 $230.00 $167.00 $167.00 $189.75' S189.75 $280.00 $280.00 AS 2 R2-1(24"x36") $250.00 $500.00 $230.00 $460.00 $135.00 $270.00 $189.75' $379.50 $180.00 $360.00 AS 1 W1-2L(30"x30") $250.00 $250.00 $230.00 $230.00 $135.00 $135.00 $189.75! $189.75 $180.00 $180.00 AS 1 W10-1(18"Diameter) I $250.00 '$250.00 $230.00 $230.00 $135.00 $135.00 $189.75 $189.75 $150.00 $150.00 AS 1 W11-7(30"x30") $250.00 $250.00 $230.00 $230.00 $130.00 $130.00 $189.75 $189.75 $180.00 $180.00 700-41-1 AS 4 Sim(Multi-Post) $2,500.00 $10,000.00 $1,400.00 $5,600.00 $1,650.00 $6,600.00 $69.00 $276.00 $1,400.00 $5,600.00 700-46-11 AS 32 Slim Existing_(RemoveXSinglePost) S50.00 $1,600.00 $50.00 $1,600.00 $17.00 $544.00 $17.25 $552.00 $50.00 $1,600.00 File: SeleariceNrighway\data\OE-254\13ID.W1C4 3 12/13/96 STORY ROAD/IQSSIMMEE AVENUE and MARSHALL FARMS ROAD/MAGUIRE ROAD INTERSECTION BID TABULATION(Audited) Bid Opening 12/10/96 ENGINEER'S SOUTHLAND JCB CENTRAL FLORIDA BERGERON LAND i ESTIMATE CONSTRUCTION, INC. CONSTRUCTION, INC. CONSTRUCTION& 'DEVELOPMENT,INC. DEVELOPMENT CORP. I'1'E(►GNU:>:>:>::::UN1 `g.!0I?i4NT:>::»>::::>::::>::::>:::<:>::>::>:::::»::>:::::>::::>::»>::::DES :::: ::::::>::::>::::>:::::>::::>::::>::::>::»>::::: ::::::: . ::>. »::<:::<:. T <:>: :>:::: - »::>:: i:::: > :;O.. _.;: .. GRti?TXU�?.. ....................................... ...UNI'1'.1'RI+�........�..A,1..P12XCE........13,P?�`.1'RICE.....xQ'�At,1'RTC . ...?G1N�:1'�Cg ...'.C..xA,L.i'i�C <:: ::::::C3Ni > .. ;;<:::�>; :. ::>::»: ..................... E.. .......T.PRIGg. ..:.�'gTA.1::P . .... :.: . ............... .,m,,,............... . ........x:x.:::::::: ..�:.::::::::::..::.:::._:::.........:.:..:........... .................... .............................. ..... ....................... ................... . RICg..... mo PRICE:::::: TO:........... ....................... ................. ........ .. .. ....................... ........................ .................... .................................................... . ............. ........................................................... .................................... ... ... ..TAI,PRICE. ::.(I„.Ngmbe ;>::;:::. um e"Id is:; '<:.: N bels:i >: ::>:::::1Yuii1�:: :":>��> >:::::>: bel'a .. .... h lYmtiCis � ril!Tuiobers >>: :>:, .•.1Vuiribehs` :»fi::.<�>�::><E:: .. ...... .........)........... ................. ......... ... ......... .... .... . ...... .... ..... mboS:::>::::.:<:> n?lvumbers::>::>:»>. �Numbos;::>::::::»: h:iVu ;:�; ........ ...... .......................................... ............. .......... ........................�........�.................�.... ...�.................).............................�:... � ................ ... .. (�.... ........ ......... ...... mhos:.: 700-46-12 AS 2 Sign Existing(Remove)(Multi-Post) $300.00 S600.00 $160.00 S320.00 $300.00 S600.00 S287.50 S575.00 $150.00 S300.00 700-46-21 AS 1 Sign Existing(RelocateXSingle Post) $80.00 S80.00 $100.00 $100.00 $28.00 $28.00 $28.75 $28.75 1 $90.00 $90.00 700-48-11 EA 4 Sign Panel(100 or Less) $120.00 S480.00 $600.00 $2,400.00 $70.00 S280.00 $69.00 S276.00 S600.00 $2,400.00 706-1-12 EA - 218 Reflective Pavement Marker,Bidirectional Amber $3.50 S763.00 S4.00 $872.00 S4.50 S981.00 $4.26 S928.68 $4.00 $872.00 EA 133 Reflective Pavement Marker,Bidirectional Colorless Red $3.50 S466.00 S4.00 $532.00 S4.50 S598.50 $4.26 S566.58 $4.00 $532.00 711-4 EA 40 Directional Arrows(Thermoplastic) $40.00 $1,600.00 $30.00 $1,200.00 $31.00 $1,240.00 $49.16 $1,966.40 $30.00 $1,200.00 711-31 IF 68 Skip Traffic Stripe,Thermoplastic(6"White,6'-10'Skip) _ $2.00 S136.00 $0.50 $34.00 $0.50 $34.00 $0.80 $54.40 $0.50 $34.00 711-34 LF 32 Skip Traffic Stripe,Thermoplastic(6"Yellow,10'-30'Skip) $1.00 $32.00 $0.50 S16.00 $0.50 S16.00 $0.86 $27.52 $0.50 $16.00 711-35-81 LF 272 Solid Traffic Stripe,Thermoplastic(8"White) $1.00, S272.00 $0.60 S163.20 $0.60 S163.20 $0.86 S233.92 $0.60 $163.20 711-35-181 LF 33 Solid Traffic Stripe,Thermoplastic(18"White) $2.00 $66.00 S1.80 $59.40 $1.80 $59.40 S2.59 S85.47 $1.80 $59.40 711-35-241 LF 204 Solid Traffic Stripe,Thermoplastic(24"White) $2.50 S510.00 $2.00 $408.00 $2.50 $510.00 $3.11 S634.44 $2.00 $408.00 711-36-181 IF 183 Solid Traffic Stripe,Thermoplastic(18"Yellow) $2.50 S458.00 $1.80 $329.40 S1.80 S329.40 $2.59 S473.97 $1.80 S329.40 711-37-61 NM 1.689 Solid Traffic Stripe,Thermoplastic(6"White) $2,000.00 $3,378.00 $2,000.00 $3,378.00 $2,100.00 $3,546.90 $1,983.75 $3,350.55 $1,900.00 $3,209.10 711-38-61 NIv1 1.427 Solid Traffic Stripe,Thermoplastic(6"Yellow) $2,500.00 $3,568.00 $2,000.00 $2,854.00 $2,100.00 $2,996.70 $3,018.75 $4,307.76 $1,900.00 $2,711.30 1693-8 LS 1 Relocate Existing Valve Pit $3,200.00 $3,200.00 $2,200.00 S2,200.00 S700.00 $700.00 $1,000.00 $1,000.00 $3,400.00 $3,400.00 1 IF 820 Furnish&Install 12"Ductile Iron Pipe $16.00 $13,120.00 $30.00 S24,600.00 $24.00 S19,680.00 $27.57 $22,607.40 $37.00 $30,340.00 2 IF 920 Furnish&Install 12"D.LP.or P.V.C.Pipe(Contractor's Option) $16.00 $14,720.00 $12.00 $11,040.00 $20.00 $18,400.00 $23.12 $21,270.40 $27.00 $24,840.00 3 IF 20 Furnish&Install 10"Ductile Iron Pipe $15.00 S300.00 $11.00 S220.00 $24.50 S490.00 $24.23 $484.60 $41.00 S820.00 4 IF 30 Furnish&Install 6"Ductile Iron Pipe $13.00 S390.00 $7.00 $210.00 $19.00 $570.00 $19.66 $589.80 $29.00 $870.00 5 IF 20 Furnish&Install 4"Ductile Iron Pipe $11.00 S220.00 $20.00 S400.00 $19.00 $380.00 $31.82 S636.40 $29.00 $580.00 6 IF 60 Furnish&Install 2"P.V.C. $8.00 S480.00 $2.00 S120.00 S12.00 S720.00 $14.72 S883.20 SI1.00 S660.00 7 EA 4 Furnish&Install 12"Gate Valve&Box $1,000.00 $4,000.00 $1,200.00' $4,800.00 $1,300.00 $5,200.00 $1,718.31 $6,873.24 $1,350.00 $5,400.00 8 EA 2 Furnish&Install 10"Gate Valve',&Box $900.00 $1,800.00 $1,000.00 $2,000.00 $1,055.00 $2,110.00 S678.50 $1,357.00 $1,100.00 $2,200.00 9 EA 1 Furnish&Install 8"Gate Valve&Box _ S750.00 S750.00 S700.00 S700.00 $800.00 S800.00 $678.50 S678.50 $800.00 $800.00 10 EA 1 Furnish&Install 4"Gate Valve&Box $550.00 S550.00 S400.00 $400.00 S450.00 S450.00 S460.00 S460.00 $550.00 S550.00 11 EA 2 Furnish&Install 6"Gate Valve&Box $400.00 S800.00 $500.00 $1,000.00 $600.00 $1,200.00 $460.00 $920.00 S600.00 $1,200.00 12 EA 1 Furnish&Install 2"Gate Valve&Box S300.00 S300.00 $240.00 S240.00 $250.00 S250.00 $184.00 $184.00 _ _ $350.00 $350.00 13 EA 2 Furnish&Install Offset Air Release Valve&Vault $2,400.00 $4,800.00 $1,500.00 $3,000.00 $2,800.00 $5,600.00 $3,069.12 $6,138.24 $2,900.00 $5,800.00 14 LS 1 Furnish&Install(By Open Cut)12"D.LP.within 30"-Steel S19,600.00 S19,600.00 S10,000.00 S10,000.00 S4,100.00 $4,100.00 $10,568.15 S10,568.15 S25,000.00 S25,000.00 - Casing at Sta.30+00(Includes Casing Spacers&Closed Ends) 15 LS 1 Furnish&Install(By Open Cut)j6"D.LP.within 18"-Steel $7,150.00 $7,150.00 $5,000.00 $5,000.00 $1,750.00 $1,750.00 $5,589.69 $5,589.69 $14,000.00 S14,000.00 Casing at Sta.17+35*(Includes Casing Spacers&Closed Ends) 16 T LS 1 Furnish&Install(BY Open Cut)2"P.E.Service Line within 4"-Steel $2,750.00 $2,750.00 S1,100.0 $1,100.001 $1,750.00 $1,750.00 $1,960.75 $1,960.75 $2,000.00 $2,000.00 Casing at Sta.17+84± ' I I File: l:\elearical\highway\data\OE-254\B1D.WK4 4 12/13/96 STORY ROAD/KISSIMMEE AVENUE i and MARSHALL FARMS ROAD/MAGUIRE ROAD INTERSECTION i BID TABULATION(Audited) Bid Opening 12/10/96 ENGINEER'S SOUTHLAND JCB CENTRAL FLORIDA BERGERON LAND ESTIMATE CONSTRUCTION, INC. CONSTRUCTION, INC. CONSTRUCTION& DEVELOPMENT,INC. DEVELOPMENT CORP. Nq........UNX't'...wRm. U A,� P. C .......Tq ... .... 1'RI ...... . . > . ::>>>::'f .: :.:.;;:.;:: .: ;::. ;::::::;:. . .... . <.: , :; .xTF,A�. . A.NT................................................ SG��Xq�t............................................. ...1JN!(x..XtJf.E........ ..xA�.>'JRl(GIG........U,NXT .. Ci;:.....x4'i`AT>i'I�Ci . ...Ili!�2�'.I'Jftl(Cg........g7fA,LPlEtJ(�Cg.. ...i?1KITY7litG1�......TUTA.L.P� L7N17�1?. Cir.�:... . . ..Q........................ ... ......................... ..... ........................ ............................................................ ........................................................... .................................... Gl�...... ltx . ......7fOTA�1.'12IC�. >....„:Numbet9'ii i iiiiii:i` ±Nuimfbers i:iii :ii:i::.•"..;.uuibeis�ii'ii:iiiiii:i:il::.....: bers.:iii:i %:i nNumberS;i?;_'?i?i.i:%.Nu!ibe Num N l+i ttitiers':€€':€` �':;iirNuinti�rs� :>:: > :::i::i::;i;::;::;t:::i:<:s::i:::::i::i::i::i::i::i::s:�i::ii::::i':;;;::::;:i:>ii;i::i::i::i::i::i;::;::ii::i::::i::i::i::i::; ;is::i::i::i:;'riii::;;:i:::;:. isy;z:::::;: .;:;;::::i:::;:::�::>;i::::;::i: :i: :: : . . ...............)..........(�.�1........... ..:..:......... ..... .: fibers.... .... T1 mbkfx::::::::::(In:PIumti@Ys ` ''= >' » o<i< w< si <<»'; ' > > >°_'< > <<` » <: '> ` <i>i > < '<> <<`>m »>` ` > <>>` u'< oum>`'»>»> 17 IS 1 Furnish&Install(By Open Cut)2"P.E.Service Line within 4"-Steel $2,790.00 $2,790.00 S960.00 S960.00 $1,750.00 $1,750.00 $1,991.23 "$1,991.23 S2,000.00 $2,000.00 Casing at Sta.25+59± 18 LS 1 Connect to Existing 10"A.C.Watermain(Sta.13+27±) $1,000.00 $1,000.00 $2,300.00 $2,300.00 $2,250.00 S2,250.00 $2,905.48 $2,905.48 $2,100.00 • $2,100.00 19 LS 1 Connect to Existing 12" Watennain(Sta 21+61t) $1,000.00 $1,000.00 $500.00 $500.00 $1,850.00 $1,850.00 $1,716.95 $1,716.95 $2,300.00 $2,300.00 • 20 LS 1 Connect to Existing 10"A.C.Watermain(Sta.30+74±) $1,000.00 $1,000.00 $2,300.00 $2,300.00 S1,250.00 $1,250.00 $2,905.48 $2,905.48 $2,100.00 $2,100.00 21 EA 1 Furnish&Install 2"Single Water Service $200.00 $200.00 $600.00 $600.00 S465.00 $465.00 $1,208.65 $1,208.65 $500.00 $500.00 22 EA 1 Furnish&Install 2"Double Water Service S220.00 $220.00 $800.00 $800.00 S500.00 $500.00 $1,430.51 S1,430.51 $550.00 S550.00 23 EA 7 Connect Water Service to Existing Water Service Connection S50.00 $350.00 $370.00 $2,590.00 $350.00 S2,450.00 $1,233.03 $8,631.21 S250.00 $1,750.00 24 LS 1 Furnish&Install New Fire Hydrant $900.00 $900.00 $1,600.00 $1,600.00 $2,000.00 S2,000.00 $2,061.95 $2,061.95 $2,100.00 $2,100.00 25 LS 1 Remove Existing Fire Hydrant S200.00 $200.00 $340.00 $340.00 $160.00 $160.00 $903.90 $903.90 $500.00 S500.00 26 LF 1,750 Remove&Dispose of Existing 10"A.C.Watermain $18.00 S31,500.00 $8.00 S14,000.00 $15.00_ $26,250.00 $6.78 $11,865.00 $18.00 $31,500.00 27 LF 15 Remove&Dispose of Existing 12"Watermain $8.00 S120.00 $22.00 $330.00 $11.00 $165.00 $6.78 $101.70 $30.00 S450.00 28 LF 15 Remove&Dispose of Existing 6"Watermain $6.00 $90.00 $19.00 $285.00 $11.00 $165.00 $6.78 $101.70 $30.00 $450.00 29 LF 850 Remove&Dispose of Existing 2"Watennain S2.00 S1,700.00 $3.00 $2,550.00 $4.50, $3,825.00 $5.46 $4,641.00 $15.00 S12,750.00 30 LS 2 Furnish&Install Forcetnain Conflict Transition $6,000.00 S12,000.00 $3,200.00 $6,400.00 $3,200.00 $6,400.00 $5,373.95 $10,747.90 $3,100.00 $6,200.00 31 LS 1 Furnish&Install 4"F.M.Connection&Stub at Sta.31+54t $2,300.00 $2,300.00 $3,700.00 $3,700.00 $2,200.00, $2,200.00 $3,850.20 S3,850.20 $3,200.00 $3,200.00 32 EA 6 Adjust Height of Existing Valve Boxes Located in Pavement to S160.00 S960.00 $100.00 $600.00 S300.00 $1,800.00 S241.50 $1,449.00 $150.00 S900.00 Proposed Grade 33 LS 1 Adjust Height of Air Release Valve Manhole to Proposed Grade S300.00 $300.00 $600.00 S600.00 S300.00 $300.00 S488.75 $488.75 $600.00 $600.00 (Kissimmee Avenue,Sta.33+35t) :'2 uditeJ`<E<<:>::<::><<:<:ii:i:i:i:i ::i::`;>:i:tii: :::i:::i:i:k:ii:'ii::iiii: fi:i::i:::i::ii::i*isisisi�:'::>:::>;:i ii:i si si::isisi'::>:>:?<:i si :<><:>?: i:i:ii:iii:i:§i;;:.::.< :: :iii i+:isiii::iiisisii isisisii:i::ii:: 1;:,.�::1.i fit :i::i sisi:ii:isi::isisi:i:: i:ii: ii:i:i:::i::�11:::;:88.35 :>isi i'::><:>i<iii:: :i'::::ii::::i>;:::;,,:8 ;;74:,26;::i:::isi:::;:::::< :: :<::::::::::::::::..::.,,:::::..:0 TQTAIi:BDI:AMOUNT. ........................................... .............................................................................5 i98 18.05....................... i,::i..........$1ib3718.i0 .......................................31 183 688 35 ................................... $ 83 .4.26 ................... audte'ai i i""i::i:::G:::::::::::: ::::i:?' : i i;i::i:i i:i i%:::::i is i::isi::::::i'::isi':i:: ::: is2 is i i:::i sii::'isii:::i::i$1 98 5 :::::: :32: i:iaiNi::i i:ii:i:::i:i::: ,71 i::ii:::i:::::i::i:i:::Ni.iiMi : 5::ii:4(: isii i::: i::iii:::i:::'i:isi::$12 2`2::i : ::::i::: Ei :i':isi:' iiiisS ::,0 00: s:>:i:: :; z; :i;:;;::::i:i:�:<�i:iii: TOTA'Z BM''►1(30 h ......... .... ............................................. .... :................... .. ...................................................................... 1 i98 518.05 .................................... :i*::163 718.i0 .....................................SI i83 d88:40........................................51382 I0.81 ........ ...............*K:::..... :mmummgg :;;`%':11V`Cl' ?iif2:i:i:i:::i:i:':i:i:;:: `:: ` i ` 'i'% iisii:ii:isiE'>:iiiisi:':::i:; % E :i:f:f%v:i':z:?`i::::i:::i ::I:isi:'`:isii::i:iii::" : 'r,i46::'.'• :i; ? : :}`%"': '`:'.i :i<::ik:ii:i:i;: i :istii:i:i:'isiii::i ii`:isi:isii:iiii:::%3`:?Mtii ':: %:: ::' ::ii isii:i"::i`::i::::iEA's::: : ??: i':i'`'`'nii ii'> `:iom:isisi:isi::i i>:::::: :: .........................$0.00 ... ......... ...::.... 50.b0 .................... ................. ($0.0t'..........................................�1,063.d5\.....................................................$O.bO File: £•\clearieel\highway\data\0E-254113m.WK4 5 12/13/96 ATTACHMENT "C" 10. Complete the following Table regarding experience with projects similar to the work proposed under this Contract. . • et`sI�T ;�::Date of Contract ::::::�>:::.......... :>:;:..:..:;;:::;:::::>:;;<:..::;;::..::�;::>:;•:<;:.:..::.... ..:.... :.<.. .: .::;::.>:<:::.;:::..:.;._:::>::;;»:<:�::;;.:::::.. ^h►de•ContactPlame and•Phoae ::,:..:•:::.�:....::::::.;::>:.:;•;:.:.:::;.:::.,...::::: 1993 S.R.-15 (Hoffner Avenue FDOT(W.J. Irvine)904-736-5455 $163,915.00 1 ) & S.R. 436) 719 S. Woodland Blvd. Orange County Deland, FL 32720 • 2) 1996 John Young/E.W. Express Orlando-Orange County $3,286,497.00 OOCEA Project No. Expressway Authority • 75008-3520-220 Bill .McElvy 407-425-8606 3 ) 1996 Ivey Lane Road/UtilitiesOrange County Highway Const. $4,536,278.00 Rehabilitation 4200 S. JY Parkway Orlando, FL Antonio Lazado 407-836-7210 4) 1996 OOCEA Maintenance OOCEA $1,860',190.00 • 525 S. Magnolia Ave. Bill McElvy 407-425-8606 5) 1996 S.R. 520 FDOT(Jim Hopfinger)690-3230 $1,490,632.00 4150 S. Fisk Blvd. Rockledge, FL 6) 1996 Hiawassee Road . Orange County Board of Comm. $4,050,000.00 Antonio Lazada 836-7030 • 7 ) • 1994 Bermuda Avenue Phase II Osceola county $3,874,117.00 Iry Chance 407-847-1200 Kissimmee, FL 1. o Access Road Seminole Community College $1,950,000.00 8). Seminole Community College • 1 ) Not Available (Note: Small Contract ) 2) Project Completion: February, 1997 2 ) Owner Comments: Very capable fi"r.m& positive experience 3) Project Completion: May/June,, 1997 Owner Comments : Good contractor,, quality work, timely. Some_ claim history,, but reasonable. 4) Project Completion: Ongoing work assignments. Owner Comments: Very capable firm, positive experience 5) Project Completion: Completed. • Owner Comments : Positive experience,, quality work, performed most of the work themselves. 6) Project Completion: Wrapping up work. Owner Comments: Good contractor,, quality work,, timely. Some claim history,, but reasonable. 7) Not available. 00301-3 OE254 •