Loading...
HomeMy WebLinkAboutVI(F) Discussion/ Action Re: Change Orders #1 & 2 For Boat Ramp Project AGENDA 11-05-96 Ocoee Item VI F vi /o of GOOD JAMES W. SHIRA,P.E. CITY ENGINEER/UTILITIES DIRECTOR 150 N.LAKESHORE DRIVE•OCOEE,FLORIDA 34761 PHONE(407)656-2322 EXT.142•FAX(407)656-7835 MEMORANDUM DATE: October 21, 1996 TO: The Honorable Mayor and Board of City Commissioners FROM: James W. Shira, P.E. City Engineer/Utilit s Director SUBJECT: Change Order-Boat Ramp Project Construction of the boat ramp renovation project is now complete. Two new concrete ramps were constructed,both with a high-friction surface to make boat launching and retrieval safer and easier. The finger docks were reconfigured and covered with new deck material. When the old ramps were exposed, we saw that severe erosion had taken place at the base of both - ramps. This was caused by a combination of the soft soils of the lake bottom and the practice of "power loading"that many boaters use to get their boat onto a trailer. We were concerned that over time,power loading might cause problems with the new ramps, even though the proposed design had an erosion control method included. We worked with our geotechnical consultant and the contractor to determine the best way to prevent future ramp deterioration, and decided on a construction method that essentially"armors"the base of the ramp with steel sheet piling. The sheet piling is driven deep into the lake bottom to prevent scouring from power loading from affecting the integrity of the new ramps. Two change orders are involved, with Change Order No. 1 for the additional sheet piling, and Change Order No. 2 for down-time experienced by the contractor during the period of soil study and ramp re-design. Change Order No. 1 amounts to $3,847.28. Change Order No. 2 was proposed by the contractor at$22, 478.00, but through negotiations was reduced to $11,199.00, bringing the total change order amount for the project to $15,046.28. This project is funded by a grant from the Florida Boater Improvement Fund which is administered by Orange County. The grant amount was s $150,000.00 and the original contract bid amount was $143,032.05. We thus had$6,967.95 available for changes. Since the total change order amount is $15,046.28, a transfer of$8,078.33 from General Fund Contingency is needed. - I recommend that the City Commission authorize the transfer of$8,078.33 from General Fund Contingency to fund this change order, and authorize the Mayor and City Clerk to execute Change Order No. 1 and Change Order No. 2 in the amounts of$3,847.28 and $11,199.00 respectively. THE PRIDE OF WEST ORANGE OZ' *Adjustment as of Change Order No. CHANGE ORDER FORM CITY OF OCOEE,FLORIDA PROJECT: MUNICIPAL BOAT RAMP CHANGE ORDER NO. 1 DATE: November 5, 1996 CONTRACTOR: PREMIER DREDGE&MARINE, INC. OWNER: CITY OF OCOEE, FLORIDA AGREEMENT DATE: MARCH 29, 1996 The following changes are hereby made to the CONTRACT DOCUMENTS: Original CONTRACT PRICE $143,032.05 Current CONTRACT PRICE ADJUSTED by previous CHANGE ORDER* $0.00 Net Increase Resulting from this CHANGE.ORDER $3,847.28 The current CONTRACT PRICE including this CHANGE ORDER $146,879.33 CHANGES ORDERED: GENERAL This change order is necessary to cover changes in the work to be performed under this Contract. The GENERAL CONDITION,SUPPLEMENTARY CONDITIONS, SPECIFICATIONS and all parts of the Project Manual listed in Article 1,Defmitions,of the GENERAL CONDITIONS apply to and govern all work under this change order. Change Order No. 1 REQUIRED CHANGES: Modify ramp design by addition of steel sheet pile retaining wall at base of ramp to reduce potential for erosion under new ramp slabs. Acknowledgments: The aforementioned change,and work affected thereby,is subject to all provisions of the original contract not specifically changed by this Change Order;and, It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original contract other than matters expressly provided herein. CONTRACTOR acknowledges,by its execution and acceptance of this Change Order,that the adjustments in Contract Price shown hereon constitute full and complete compensation and satisfaction for all costs incurred by the CONTRACTOR as a result of this Change Order. No other claim for increased costs of performance will be granted by the OWNER for the Work covered by this Change Order. The CONTRACTOR hereby waives and releases any further claims for cost or time against the OWNER arising from or relating to the matters or Work set forth or contemplated by this Change Order. Change Order Request by: City of Ocoee,Florida RECOMMENDED BY: By: James W. Shira,P.E. Date: November 5, 1996 Title: City Engineer/Utilities Director APPROVED BY: OWNER: City of Ocoee,Florida CONTRACTOR: Premier Dredge&Marine, Inc. By: By: Mayor Title: Attest: Attest: City Clerk By: Title: FOR USE AND RELIANCE ONLY BY THE CITY OF OCOEE,FLORIDA APPROVED AS TO FORM AND LEGALITY This day of , 19 . By: City Attorney *Adjustment as of Change Order No. 1 CHANGE ORDER FORM CITY OF OCOEE,FLORIDA PROJECT: MUNICIPAL BOAT RAMP CHANGE ORDER NO. 2 DATE: November 5, 1996 CONTRACTOR: PREMIER DREDGE&MARINE,INC. OWNER: CITY OF OCOEE,FLORIDA AGREEMENT DATE: MARCH 29, 1996 The following changes are hereby made to the CONTRACT DOCUMENTS: Original CONTRACT PRICE $143,032.05 Current CONTRACT PRICE ADJUSTED by previous CHANGE ORDER* $146,879.33 Net Increase Resulting from this CHANGE ORDER $11,199.00 The current CONTRACT PRICE including this CHANGE ORDER $158,078.33 CHANGES ORDERED: GENERAL This change order is necessary to cover changes in the work to be performed under this Contract. The GENERAL CONDITION, SUPPLEMENTARY CONDITIONS, SPECIFICATIONS and all parts of the Project Manual listed in Article 1, Definitions,of the GENERAL CONDITIONS apply to and govern all work under this change order. Change Order No.2 REQUIRED CHANGES: Material and equipment charges incurred by Contractor due to change in project design. Contractor experienced down time and had equipment rental costs to pay. Acknowledgments: The aforementioned change,and work affected thereby,is subject to all provisions of the original contract not specifically changed by this Change Order; and, It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original contract other than matters expressly provided herein. CONTRACTOR acknowledges,by its execution and acceptance of this Change Order,that the adjustments in Contract Price shown hereon constitute full and complete compensation and satisfaction for all costs incurred by the CONTRACTOR as a result of this Change Order. No other claim for increased costs of performance will be granted by the OWNER for the Work covered by this Change Order. The CONTRACTOR hereby waives and releases any further claims for cost or time against the OWNER arising from or relating to the matters or Work set forth or contemplated by this Change Order. Change Order Request by: City of Ocoee,Florida RECOMMENDED BY: By: James W. Shira,P.E. Date: November 5, 1996 Title: City Engineer/Utilities Director APPROVED BY: OWNER: City of Ocoee,Florida CONTRACTOR: Premier Dredge&Marine, Inc. By: By: Mayor Title: , Attest: Attest: City Clerk By: Title: FOR USE AND RELIANCE ONLY BY THE CITY OF OCOEE,FLORIDA APPROVED AS TO FORM AND LEGALITY This day of , 19 . By: City Attorney