Loading...
HomeMy WebLinkAboutVII (C) Discussion/ Action re: Public Works Fueling Facility • • : : Agenda 5-19-98 41/4 o Item VII C •Of G000` ROBERT SMITH PUBLIC WORKS DIRECTOR 560 FLEWELLINGAVE.•OCOEE,FL 34761 PHONE(407)877-8420•FAX(407)877-0392 STAFF REPORT TO: The Honorable Mayor and Board of City Commissioners FROM: Robert M. Smith, Public Works Director 'if.� DATE: May 7, 1998 RE: Public Works Fueling Facility ISSUE: With regard to the relocation of the Public Works fueling facility, should a change from a design criteria package and a design/build construction contract be authorized to Gee and Jenson to produce design drawings and complete construction bid documents? BACKGROUND AND DISCUSSION: Work Order#14 originally authorized Gee and Jenson to develop a design criteria package for the subject contract. Gee and Jenson completed the work and a RFP was issued. Immediately after the RFP was issued several companies in this line of work contacted the Public Works Director to express their concerns that companies in this line of work do not have in house design capabilities. After discussions with the City Manager it was decided that it was in the best interest of the City to amend Work Order#14, authorizing Gee and Jenson to provide complete design drawings and construction documents. The amendment issued clarifying this project was not a design/build. RECOMMENDATION: Staff has reviewed the attached amendment proposed by Gee and Jenson and finds all proposed costs to be fair and reasonable. Therefore, staff recommends authorizing the Mayor and City Clerk to execute the attached Amendment#1 to Work Order#14. RS:jh attachment 0- THE PRIDE OF WEST ORANGE GEE&JENSON Engineers•Architects•Planners,Inc. SINCE 1951 2701 Maitland Center Parkway,Suite 150 April 9, 1998 M 32 Telephone(407)6 0-1666�1 Fax(407)660-2852 Robert Smith Director of Public Works City of Ocoee Public Works Department 370 Enterprise Street Ocoee, Florida 34761 Re: Removal/Relocation for Ocoee Public Works Vehicle Fueling Station Subject: Amendment#1: Professional Services for Vehicle Fueling Station Relocation to Work Order 414: Dept. of Public Works-Building Programming/Site Master Plan Dear Mr. Smith: Gee & Jenson is pleased to provide the attached revised Amendment 41 for your approval. Per Mr. Shapiro's request, we have modified the previously submitted proposal (3/19/98) as follows: 1.) Rewrite Amendment 41 to increase the scope of Work Order T14. Delete new Work Order 43. 2.) Substantially reduced additional services fees by S4,560.00. We are available to begin Amendment 41 immediately. We appreciate the opportunity to submit this proposal. Please call if you have any questions. Very truly yours. aura E.Nemeth_, A.I.A. Senior Associate Attachments: Amendment 41 to W.O. =14 Estimate (Fee Back-up) 4/2/98 cc: Paul HerwiQJGee&Jenson t 9'09111 a,nend=1 cover letter. c^gineenng a EB CCO293a•arcadecture =A CCCC656•Lanascace Arcntrec;ure•LC C000050•Lana Surverng LB 000293a e f..' • AMENDMENT NO. 1 TO WORK ORDER#14: DEPARTMENT OF PUBLIC WORKS FACILITY 370 ENTERPRISE STREET, OCOEE, FLORIDA BUILDING PROGRAMMING/ SITE MASTER PLAN (March 3, 1998)' FOR DESIGN CRITERIA PROFESSIONAL SERVICES AGREEMENT • BETWEEN GEE & JENSON ENGINEERS-ARCHITECTS-PLANNERS, INC. AND THE CITY OF OCOEE (December 5, 1995) Ladies and Gentlemen: THIS IS AN AMENDMENT TO THE AGREEMENT made as of May 11, 1998 between GEE & JENSON ENGINEERS-ARCHITECTS-PLANNERS, INC., hereinafter referred to as GEE & JENSON AND CITY OF OCOEE, hereinafter referred to as CITY, whose address is 150 N. Lakeshore Drive, Ocoee, Florida 34761-2258. GEE & JENSON has made an agreement dated December 5, 1995 with the CITY which is • herein referred to as the Prime Agreement and which provides for GEE & JENSON's furnishing professional services in connection with the Projects described therein. Delete and replace Work Order#14 (3/3/98), pages 1, 3, 4 & 5 of 8 with Work Order#14 (3/3/98, rev. 4/2/98), pages 1, 3, 4 & 5 of 8 that are attached and made a part hereof. EXTENT OF THIS AGREEMENT The extent of this Agreement includes this Amendment (consisting of pages 1 & 2) together with Work Order #14 (3/3/98, rev. 4/2/98) and the Prime Agreement between GEE & JENSON and CITY. IN WITNESS WHEREOF, these parties hereto have made and executed this Work Order on this 11th day of May, 1998, for the purposes stated herein. GEE & JENSON ENGINEERS-ARCHITECTS-PLANNERS WITNESS: DESIGN CRITERIA PROFESSI AL By: c7i Z riZeZ. Thomas C. Orlowski, AIA, Senior Vice President Date: .f // / ATTEST: BOARD OF CITY COMMISSIONERS CITY OF OCOEE, FLORIDA: Jean Grafton, City Clerk S. Scott Vandergrift, Mayor Date: FOR USE AND RELIANCE ONLY Approved by Ocoee City Commission BY THE CITY OF OCOEE. At a meeting held on 19 under Agenda Item No . APPROVED AS TO FORM AND LEGALITY THIS DAY OF , 199 FOLEY & LARDNER By: CITY ATTORNEY WORK ORDER FOR Rev. 4/2/98 DESIGN CRITERIA PROFESSIONAL SERVICES AGREEMENT WORK ORDER NO. 14 PROJECT: DEPARTMENT OF PUBLIC WORKS FACILITY AT 370 ENTERPRISE STREET, OCOEE, FLORIDA CITY: OCOEE, FLORIDA DESIGN CRITERIA. PROFESSIONAL: GEE & JENSON ENGINEERS-ARCHITECTS- PLANNERS, INC. Execution of the Work Order by City shall serve as authorization of DESIGN CRITERIA PROFESSIONAL to provide for the above project, professional services as set out in the documents which are attached hereto and made a part hereof. ATTACHMENTS: (X) Building Programming/Site Master Plan DESIGN CRITERIA PROFESSIONAL shall provide said services pursuant to this Work Order, its attachments. exhibits and that certain Agreement dated December 5, 1995, as amended between CITY and DESIGN CRITERIA PROFESSIONAL which is- incorporated herein by reference as if it had been set out in its entirety. Whenever the Work Order conflicts with said Agreement. the Agreement shall prevail. TIME FOR COMPLETION: The work authorized by this Work Order shall be completed within one hundred twenty (120) days from the date this Work Order is executed by the CITY. COMPENSATION: The CITY shall compensate DESIGN CRITIERA PROFESSIONAL Twenty Four Thousand Six Hundred Twenty Dollars (S24.620.00). plus $1,500.00 for Reimbursable Expenses. DESIGN CRITERIA PROFESSIONAL shall perform 1 of 8 Attachment "A" (Page 1 of 2) (Rev. 4/2/98) Design Criteria Professional Services/Professional Design Services for New Department of Public Works Facility at 370 Enterprise Street, Ocoee. FL Work Order#14 — Building Programming/Site Master Plan Including Removal/Relocation of Ocoee Public Works Vehicle Fueling Station Scope of Work: • NEW DEPARTMENT OF PUBLIC WORKS FACILITY Professional Services to be provided by the Design Criteria Professional: 1. Develop a building program and conceptual floor plan. 2. Develop a project schedule and construction budget: 3. Prepare a preliminary building and site code review. 4. Prepare a preliminary site evaluation and a conceptual site maser plan including future expansion at this adjacent parcel. Submittals by the Design Criteria Professional to the City: Provide one submittal of five (5) sets of the Programming/Site Master Plan Documents. Meetings: The Design Criteria Professional shall attend two (2) Design Criteria Professional/Owner meetings. These meetings shall be conducted in a workshop format. The purpose of these meetings shall be to discuss and exchange information with the established City's representative(s) with regard to the program requirements for the facility. Program needs may be items such as hours of operation, security, type of activities planned for facility, number of persons utilizing facility, vandalism, immediate/future square footage needs and construction budget. VEHICLE FUELING STATION Project Description: The Project consists of the final design, permitting and construction administration for the Removal, Relocation and new installation of the existing Ocoee Department of Public Works Vehicle Fueling Station and related site work. The existing Vehicle Fueling Station is located at the old Public Works Department Compound at 560 Flewefling Avenue, Ocoee, Florida. The Vehicle Fueling Station's new location shall be at the New Public Works Compound at 370 Enterprise Street, Ocoee, Florida. The project includes: selective demolition, site improvements, earthwork, asphaltic concrete paving, concrete paving, striping and signage, site utilities; removal/ relocation/ installation of two existing above ground 10,000 gallon fuel storage tanks (unleaded, diesel) on concrete slab with concrete containment wall to match existing containment system; concrete raised curb fuel dispensing island with two relocated exiting dispensing pumps (unleaded, diesel) and relocated existing card reader controller (Phoenix 8,000, Durakey model) to match existing dispensing system; underground pump system to match existing; above ground pump controller and shut off and related electrical systems. Provide all new conduit, pipe connections, accessories as required to provide a fully functioning Vehicle Fueling Station at the new site. 3 of 8 Attachment "A" (Page 2 of 2) (Rev. 4/2/98) Design Criteria Professional Services/Professional Design Services for New Department of Public Works Facility at 370 Enterprise Street, Ocoee, FL Work Order#14— Building Programming/Site Master Plan Including Removal/Relocation of Ocoee Public Works Vehicle Fueling Station Scope of Work Professional Services to be provided: 1. Prepare Signed/Sealed Geotechnical Report (Refer to Exhibit#1) 2. Prepare Signed/Sealed Construction Documents• 3. Permitting Assistance 4. Provide a Statement of Probable Cost and Project Schedule 5. Attend Pre-Bid Conference, Prepare Addenda, Evaluate Bid Proposals 6. Construction Administration Services to include: Process Pay Applications, Review Shop Drawings, Conduct Field visits at appropriate intervals 7. Fuel,tank registration with FDEP at new site The following services are NOT included in the work: 1. Stormwater Engineering and Permitting 2. Fire Protection System 3. Parking Lot Lighting 4. Landscape Design 5. Environmental Engineering and Permitting 6. Permit Fees and Tank Registration Fees 7. Additional Services beyond the stated Scope of Work Submittals by the Design Criteria Professional to the City: 1. Provide one submittal of ten (10) sets of Bid Documents. 2. Provide one submittal of ten (10) sets of signed and sealed Construction Documents. Meetings: The Design Professional shall attend pre-bid meeting and conduct field visits at appropriate intervals of construction. Items to be provided by the City for both projects: 1. The City shall appoint a representative who shall on the City's behalf attend above stated meetings, issue directives with regard to the Work, authorize the Work, prepare review comments with regard to the Work and approve the Work. The City's representative shall be: Robert Smith Director of the Department of Public Works - Name Title 2. A Boundary Topographic/Utility Survey of both sites; Fueling Station Equipment As-Built Drawings & Specifications and Tank Registration Data. 4o= _ Attachment "B" (Page 1 of 1) (Rev. 4/2/98) Design Criteria Professional Services/Professional Design Services New Department of Public Works Facility at 370 Enterprise Street, Ocoee, FL Work Order#14- Building Programming/Site Master Plan, Removal/Relocation of Vehicle Fueling Station Fees Worksheet Compensation 1. Basic Architectural/Engineering Services a. Programming/Site Master Plan $10,400.00 b. Geotechnical Report for Vehicle Fueling Station (Refer to Exhibit#1) $ 2,750.00 c. Construction Documents/Permit Assistance/Bidding/ Construction Administration for Vehicle Fueling Station $11,470.00 2. Reprographics Reimbursables: reproducibles, blueprints, photocopies. $ 1,500.00 (These charges will be billed at cost as they arise. The total amount shown is the amount Not To Be Exceeded unless approved in writing by the City. The following rate schedule represents in-house printing costs. Printing company rates may vary.) Photocopies: $0.15 per page (8 1/2 x 11-14) $0.20 per page (11x17) Reproducibles: $1.50 per S.F. Blueline Prints: $0.40 per S.F. Method of Payment • The Design Criteria Professional shall invoice amount due based on the percent of the total work order services actually performed and completed. Invoices shall be submitted to the City once monthly. We understand that the City shall retain 10% of the total work order fee until one hundred percent (100%) of the work order services are actually performed and completed. 5 of 8