Loading...
HomeMy WebLinkAboutIII (E) Approval and Authorization to proceed with Kaiser Climbing Excavator Conversion to Panolin Biologically Degradable Hydraulic Fluid at a cost of $3,796.62 Agenda 8-5-97 Item III E "CENTER OF GOOD LIVING-PRIDE OF WEST ORANGE" MAYOR•COMMISSIONER S.SCOTT VANDERGRIFT Ocoee COMMISSIONERS CITY OF O C O E E DANNY HOWELL O tioir o 150 N. LAKESHORE DRIVE SCOTT ANDERSON a OCOEE,FLORIDA 34761-2258 SCOTT A.GLASS NANCY J.PARKER c�, (407) 656-2322 X4}1::. ,� CITY MANAGER ` Of Gp00 ELLIS SHAPIRO STAFF REPORT TO: The Honorable Mayor and Board of City Commissioners FROM: Richard Corwin, Public Works Director DATE: July 29, 1997 RE: Kaiser Climbing Excavator Conversion to Panolin Biologically Degradable Hydraulic Fluid ISSUE: Whether or not to convert the hydraulic fluid in the Kaiser Climbing Excavator to biologically degradable fluid. BACKGROUND: The Kaiser Climbing Excavator was purchased with the hydraulic system charged with conventional petroleum based fluid. As this equipment is used to maintain stormwater ditches in the City, a leak or failure of the hydraulic system poses the potential for contamination of the drainage ditches and adjoining lakes. Also, the equipment head hydraulic motor and pins and bushings require overhaul. During the mid-year budget amendment funds were allocated for the hydraulic fluid replacement and inadvertently placed in the 6400 capital equipment account. The equipment supplier, Pioneer Hydraulic, has provided a quote of $3,796.62, to perform the hydraulic fluid conversion and the equipment head repairs. RECOMMENDATION: Staff respectfully requests permission to proceed with the above listed repairs to this critical piece of equipment. RC:jh N5C144._ C/4