HomeMy WebLinkAboutVII(B) Stormwater Utility Projects Agenda 5-02-2000
Item VII B
"CENTER OF GOOD LIVING-PRIDE OF WEST ORANGE" • -- .MAYOR!COMMISSIONER
Ocoee S.SCOTT VANDERGRIFT
••�o CITY OF OCOEE DANNYHOWELL
RS
a 150 N.LAKESHORE DRIVE
Co" SCOTT ANDERSON
OCOEE,FLORIDA 34761-2258 RUSTY JOHNSON
(407)656-2322 NANCY J.PARKER
6� OF G OOV~` CITY MANAGER
ELLIS SHAPIRO
MEMORANDUM
DATE: April 25, 2000
TO: The Honorable Mayor and City Commissioners
FROM: Ellis Shapiro
City Manager
SUBJECT: Stormwater Utility Projects
Last night, the_City Commission met in workshop session to discuss the status of
our Stormwater Utility fund.
The ultimate purpose of the meeting was to ask the City Commission to give us
direction as to what projects we should try to complete with the $533,000. left in the
Capital Fund.
After some discussion the City Commission majority advised staff and P.E.C. to
work on the following projects:
Project#1 Pioneer Key II Mobile Home Park $150,000
Project#2 Starke Lake Drain Wells 250,000
Project#3 Reflections Roadway and Side-Yard
Underdrains 70.000
Total $470,000
This item is being placed on the agenda of a Regular Meeting in order to get an
official vote to proceed as directed by the City Commission at the Work Session.
Respectfully submitted,
,010."
ES/ps
pow!,�
Protect Ocoee's Water Resources,trV .
- - �- --�- --- _ - _.ram==° - _ —
�a a -I�n=xo—v 7 7__�m�n ������-�ran�.���IP= .�� == ---
&WM 17.lin faltattiM iake r±-41114-gleargrE7I.
Project General Location Anticipated
No. -_ - (and Description) __- _ _ Project Cost
1 Pioneer Key II Mobile Home Park $150,000.
(acquire drainage easements and relocation costs)
2 Starke Lake - $250,000
(construct two 12-inch diameter drainwell replacements)
3 Center Street Ditch (Starke Lake Drainage Basin) $400,000
(construction 100-year retention pond)
4 Reflections Subdivision (Spring Lake Drainage Basin) $70,000
(construction roadway and side-yard underdrains)
5 Miscellaneous Underdrain Projects $100,000
6 Bluford Avenue Near City Hall $150,000
(replace culvert crossing, re-construct approximately 200-feet
of roadway, and install erosion control measures downstream)
7 Lakeshore Drive Outfall Treatment Systems at Oakland Street, $200,000
McKey Street, Magnolia Street and Lafayette Street
(Vortechnics, CDS, or Stormceptor Sediment Removal Systems)
8 Pinewood Lane/Oakwood Lane/Reba Avenue $50,000
(install inlets and pipes)
9 City Hall Ditch (Between Bluford& Starke Lake) $550,000
(Alum Treatment System)
TOTAL g1,920,000
PEG/Professional Engineering Consultants, Inc. Page 18