Loading...
HomeMy WebLinkAboutVII(B) Stormwater Utility Projects Agenda 5-02-2000 Item VII B "CENTER OF GOOD LIVING-PRIDE OF WEST ORANGE" • -- .MAYOR!COMMISSIONER Ocoee S.SCOTT VANDERGRIFT ••�o CITY OF OCOEE DANNYHOWELL RS a 150 N.LAKESHORE DRIVE Co" SCOTT ANDERSON OCOEE,FLORIDA 34761-2258 RUSTY JOHNSON (407)656-2322 NANCY J.PARKER 6� OF G OOV~` CITY MANAGER ELLIS SHAPIRO MEMORANDUM DATE: April 25, 2000 TO: The Honorable Mayor and City Commissioners FROM: Ellis Shapiro City Manager SUBJECT: Stormwater Utility Projects Last night, the_City Commission met in workshop session to discuss the status of our Stormwater Utility fund. The ultimate purpose of the meeting was to ask the City Commission to give us direction as to what projects we should try to complete with the $533,000. left in the Capital Fund. After some discussion the City Commission majority advised staff and P.E.C. to work on the following projects: Project#1 Pioneer Key II Mobile Home Park $150,000 Project#2 Starke Lake Drain Wells 250,000 Project#3 Reflections Roadway and Side-Yard Underdrains 70.000 Total $470,000 This item is being placed on the agenda of a Regular Meeting in order to get an official vote to proceed as directed by the City Commission at the Work Session. Respectfully submitted, ,010." ES/ps pow!,� Protect Ocoee's Water Resources,trV . - - �- --�- --- _ - _.ram==° - _ — �a a -I�n=xo—v 7 7__�m�n ������-�ran�.���IP= .�� == --- &WM 17.lin faltattiM iake r±-41114-gleargrE7I. Project General Location Anticipated No. -_ - (and Description) __- _ _ Project Cost 1 Pioneer Key II Mobile Home Park $150,000. (acquire drainage easements and relocation costs) 2 Starke Lake - $250,000 (construct two 12-inch diameter drainwell replacements) 3 Center Street Ditch (Starke Lake Drainage Basin) $400,000 (construction 100-year retention pond) 4 Reflections Subdivision (Spring Lake Drainage Basin) $70,000 (construction roadway and side-yard underdrains) 5 Miscellaneous Underdrain Projects $100,000 6 Bluford Avenue Near City Hall $150,000 (replace culvert crossing, re-construct approximately 200-feet of roadway, and install erosion control measures downstream) 7 Lakeshore Drive Outfall Treatment Systems at Oakland Street, $200,000 McKey Street, Magnolia Street and Lafayette Street (Vortechnics, CDS, or Stormceptor Sediment Removal Systems) 8 Pinewood Lane/Oakwood Lane/Reba Avenue $50,000 (install inlets and pipes) 9 City Hall Ditch (Between Bluford& Starke Lake) $550,000 (Alum Treatment System) TOTAL g1,920,000 PEG/Professional Engineering Consultants, Inc. Page 18