Loading...
HomeMy WebLinkAboutVII (C) Discuss Addendum to Contract with PEC Additional Design Services - Maguire Road Project Agenda 1-18-2000 Item VII C "CENTER OF GOOD LIVING-PRIDE OF WEST ORANGE" MAYOR•COMMISSIONER 00alee S. SCOTT VANDERGRIFT CITY OF OCOEE DANNYHOWELL COMMISSIONERS 150 N.LAKESHORE DRIVESCOTT ANDERSON en OCOEE,FLORIDA 34761-2258RUSTY 70HNSON (407)656-2322 NANCY J.PARKER CITY MANAGER ELLIS SHAPIRO MEMORANDUM DATE: January 12, 2000 TO: The Honorable Mayor and Board of City Commissioners FROM: James W. Shira, P.E., City Engineer/Utilities Directory SUBJECT: Design Proposal — Maguire Road Widening Project Attached for your review and approval is a design proposal from Professional Engineering Consultants, Inc. This proposal covers several aspects of the project: 1. Design of a stormwater pond located on the east side of Maguire Road, north of the Turnpike and south of the walk-in clinic. This will require development and submission of a permit modification application to St. Johns River Water Management District. 2. Design and permitting of a sanitary sewer line and force main relocation to an existing lift station made necessary by construction of the above pond. 3. Design and permitting of the relocation of existing water utilities on both Moore Road and Roberson Road in the area of their intersection with Maguire Road to accommodate the existing 54 inch diameter Conserve II reclaimed water main. 4. Design and permitting of an extension of a 12"water main on Moore Road to connect to facilities installed earlier as part of the Plantation Grove P.U.D. project. Items 1 and 2 are due to revisions in the proposed stormwater pond location. Our initial search for drainage pond locations indicated that the Heller Bros. property south of Professional Parkway would be the most viable location for a pond. After extensive negotiations with Heller Bros. representatives we were unable to reach an agreement on an acceptable price for their land. We then determined that the next best location was a parcel located just north of the Turnpike on the west side of Maguire Road. Again, after extensive negotiations with the owner we were unable to reach an agreement for a price for this parcel either. IP 111 A Protect Ocaeu`s Watar Resnurcns 0 We then investigated a parcel of land just south of Colony Plaza Hotel. This parcel was also determined to be suitable so we started design of a pond on that site. During this time a permit application was prepared and submitted to St. Johns River Water Management District in order to keep the project schedule on track. We were recently informed that the Colony Plaza parcel was under contract to a purchaser who felt that their project would not be viable if we used that parcel for a pond. About this same time Heller Bros. representatives contacted us and said that they wanted to reopen negotiations for a pond site on their property. After discussion we were able to reach an agreement which covered a retention pond site and the right-of-way required to widen Professional Parkway. Because the SJRWMD permit has already been submitted and is under review we now need to prepare and submit a permit revision. We also need to design the stormwater pond as well as sanitary sewer gravity lines and a force main which must be moved from their current location in order to construct the pond. Moving these lines means that.we have to prepare and submit an FDEP permit and we must prepare plans and specifications for those utilities for inclusion in the Maguire Road plan set. Items 3 and 4 are required in order to construct Moore Road improvements which are shown on the Plantation Grove Commercial Phase 2 and 3 Land Use Plan. When the Plantation Grove Commercial Phase 2 and 3 plan was submitted to the city a portion of Moore Road was shown as being widened to four-lanes. At the time these plans were being prepared, plans for Maguire Road were also under development. It was not clear whether Plantation Grove Commercial Phase 2 and 3 or Maguire Road would be under construction first. In order to reduce confusion and potential redundant construction it was decided that the Moore Road four-laning would be included as part of the Maguire Road project. The developer agreed to reimburse the city for the cost of Moore Road improvements required by Plantation Grove Commercial Phase 2 and 3 development. That cost was determined to be $135,031.00. A copy of the note on the Plantation Grove Commercial Phase 2 and 3 Land Use Plan which spells out this requirement is attached for your information. The work on Roberson Road which is referenced in Item 3 above is due to a conflict between the existing 54"Conserve reclaimed water line and our proposed 12"water main and roadway improvements. This conflict was not discovered earlier because we relied on plans provided by Conserve which showed the location and depth of their facility. When we began design work on Moore Road improvements we determined that their were inconsistencies between the Conserve plans and actual site conditions. Because of these inconsistencies we did some more detailed survey on Roberson and found problems there also which required some redesign of the water main and stormwater facilities. The current schedule for Maguire Road calls for a bid opening on March 30, 2000, and for a Notice to Proceed to be issued to the selected contractor on April 25, 2000. I recommend that the City Commission authorize the Mayor and City Clerk to execute Addendum No. 00-1 to PEC's contract for the not-to-exceed amount of$47,740.00. JWS/jbw Attachment ED 0 Pratect ncoees 4'Vater illsources; r� r .1 M W a w 0 3g W0 �W 1-0 S LL Fz 0 zu=r3 O rr O 0 ZZray O Oi Zi O Il��l L C omw 2 =maws W MC Z < WNWCL MW 0 yas oWma g LL, CL app c U) W r M N V1 0: 4 N m00� m �W. .O MG:1939 < Z z< WF�>W N VI4 170 we 0 z z 02 9H Z12 Z tW U�Zm d < W mmdgggZ < OX Jd Mw y 8 0 a ;r j0 z 0<. c �3g o N togrc 3LLr j WW d W QY0W0 yQW J mO JW(/QW�=0 m y w oQ- S2 z OW WwZF N O W W w WW w F:5 z is O a 7 <N r 3 J OI <0 a N W 0 0 W 0O w U Z a p 0 W o = y=j r Z N Ow 4y NW OHO y� � � W Fu U dz m O9L og �y 0 3 K W m 1<a W U 0 0-006 K Br os�ad3 8 4 < = mW O W p a�Mw on: WF 0 W 0 = N oW gF <m 0 Z 0 W W m W12 Eoo oy N `WW' U <�O xNOZ 0Wf/1 O in < N W 0 W 0 EO W W < W ` SZ W W O 3 U _ Q zW - J Wa M W gz <.2 W 95 0 VIM �ll z <9 6CL O g3 50 # .J. E.,.,, ���c Y•� r f " �f �r � � � � � �., •� �y a ``azo ,�.s- ,✓" .,r- � _ < K ti ,yIL t �'W' L f � x• t °`%% z y %"n =tie `* L6 W ZZ i� F - IL 4 13 V19 s ~ W _ a W o,c a °a > W W 6 N 1, G, C `.,, a""`^ 0 K m CN N n `O O O K W_ W O W U �O'„,Z ".,.,.... 4".. .,,," W (/� •y O J O X W< O J 0 `"f "�' W; W la W K Z 3 O O Z O (W7 Q O W WIL`�• „x Z rI�tn � ZGS Wa low K ddb m Z1 W 2 N ILWO� Z Ow � .• W Z W r U Ng O W ``F U'� Zxo 0wz 0 Uy= 00 WO M� QW W <IIImJJa OSK Z1L 003 1^z =N WO IS- �Z F W 3 Z W U UO OZ N < �la Mm OF. O0 r NN�1 U �” gW0 N� <N Z ZO W OC r0 M a F O Z W W rz�a— ao �` mo aWaW J o o a �No= 070 z O ZZ dN R0 U N 00 _ W 7 W�� rN �V <�'�� <= n C� s VW01 W 3 W =;cj5 = s Z WUp_�� N4Qg cW. �m m m0 N 00 4 _ Wo �(/N�l rZW WW 00Z <O_WZ ' < 3a Z r2 3 W d W �4< 00 3 fL'a ZM lawMNo9 ow r' v=i Nrz in 5 r< N �00^ ZCIL d ZZ N� Or- W O Q'J r SS 1<� mZ W p ZW r ww80 Ma r0NW OS �O WIZ O KW < < WO N Q Z Wma<O W= l.4jSWN Zr W �a0 ylaW Z �W S WS S < O p 0 d O t1c o0W r N Ira 4rWZ55l14W y y=yZl>pg iS oZ En ; Xw J o z ig p 7a N WW "'W>Kcw,O F_ >60 W 30 O O �C O K O f=n 0W d Oml>J yWO N 3r� =UNpdO ,< 0, Z U 00 'r 0�3p] N 0_0ac 0_ <m WOO r046�1il NZ6 O Wy.S J 4 �❑ p� Z< 0 N�K 0�6yZli- 0 w Z U' lap 'U <�< 4 =N ; ? W W .7 p pZ LL W WN< v0{J 0 06K =OW in wa: �'6W 0 0U 0 M 1 O 0m L..LL= ai 0 =o= i�=0 Z� 3N o m IL 0 �0r W <UN VUx WO z zoo Z� 7 �Sr 2N30W Ua0 < �F 3 mm is OR m'L s O 1... W W r o �n t W l.� 4 W y1 Z IL00.4 aW a Fw 1 z� .Ony ad ly. N lW/��mq lay Np =� WO ' Uj = _' mfg/ O9jVW OZ Z a71 WO'J l=..Nw 0' V1 OWO lCW�1 N W p m R iN p•� 0W� F FZO E>=WQ X 0000 0 M= N Km'n< CL:3 c O (�N W O�Wla 1W'0 E� � NOZ< NNT S =IwCO Ozt- NZW a. 3 W JU �� 0 0W Z< J<.- 0 NOZ 600 6Sw O 0r - _ <`U` fa �m 130 d0 - gJ`Z`OZO <U N Z-0 a'U IaZ Wr < m S<W O Z O p MICLMyl MWN W SU Wy�F.< pppm m J !L r1 1 ��xx y' W Ir 4QF��� UUWU UY< N Z IA OW FO, < 1-K �l �� C10i.0 � Z 7 �W< < N<O <� Wm r it �Q �K .00 p - N M Y N N a N N 0 o w.(„ �'" "3i Z .., 2 O 00 f Aopa 1 0 W O E 6<. N W BE Z3� Ce o ��{ qiq WWW MZ i� ma z U60 N O � o Z W Z W � t l�., QQ2Qy 0 00N p-0 VU da M W W W N= W Oml <Ft 1 U> W /� Wt Z 401 U d' O G m� U J i (/�ad Z N <OaNa �• CO �N � \ W W m 3' _ / GI` W 0 ORIn '7 0=�_ rj O y`l� — 7 m � p � 8 � < � U' W Oso � IL C3 & FCL �o N N ADDENDUM NO. 00-1 TO AGREEMENT FOR CONSULTING ENGINEERING SERVICES INCLUDING ENGINEERING SERVICES FOR MAGUIRE ROAD - POND 5 -REVISED LOCATION This Addendum No. 00-1 hereinafter called the Addendum, as of this day of 2000, shall constitute an Addendum to the Agreement for Consulting Engineering Services between the City of Ocoee, Florida (the CITY) and Professional Engineering Consultants, Inc., 200 East Robinson Street, Suite 1560, Lake Eola Centre, Orlando, Florida(the CONSULTANT), dated the 21st day of August, 1984, hereinafter referred to as the AGREEMENT. • WHEREAS, the CITY and CONSULTANT entered into an AGREEMENT whereby the CITY retained the CONSULTANT to provide professional engineering services as required from time to time, and WHEREAS the CONSULTANT will perform consulting engineering services for the CITY as herein defined. NOW THEREFORE, in consideration of the mutual covenants and promises hereinafter set forth on the part of both parties to be kept and performed, the parties do mutually agree as follows: Section 1 - Services of the Consultant 1.1 The CONSULTANT shall perform the Engineering Services as outlined in the attached proposal dated January 6, 2000 relative to the provision of consulting engineering services to the CITY. • Section 2 - Compensation 2.1 Compensation by CITY for engineering services for the Maguire Road-Pond 5- Revised Location is provided under this Addendum shall be computed under Paragraph 6.1.2.3 of the Agreement, utilizing the Lump Sum Method of Compensation with the compensation for this authorization not-to-exceed $47,740.00 as outlined in the attached proposal and man-hour fee. Section 3 - Time of Completion 3.1 The CONSULTANT shall provide the engineering services within a 120 day period from the notice to proceed as outlined in the attached proposal. IN WITNESS WHEREOF, the parties have executed this Addendum No. 00-1 the day the ear hereinabove set forth. By: ATTEST: Kenneth R. Hooper, Principal Date: /" b p°D BOARD OF CITY COMMISSIONERS CITY OF OCOEE, FLORIDA By: ATTEST: S. Scott Vandergrift, Mayor Date: For the use and reliance of City of Ocoee only. Approved as to form and legality this day of , 2000. City Attorney O:\CLER\ENV\OE\OCOEE100-1.WPD 2 4 PROFESSIONAL ENGINEERING CONSULTANTS, INC. January 6, 2000 P-9326 MK-03 Mr. James W. Shira, P.E. City Engineer/Utilities Director City of Ocoee 150 N. Lakeshore Drive Ocoee, FL 34761 RE: Maguire Road -Pond 5 Revised Location Proposal for Additional Services Dear Jim: We are pleased to present this proposal for engineering services related to the above- referenced project. The engineering services include permitting, design & preparation of construction plans associated with the relocation of Pond 5 from its "current" proposed location at the Colony Plaza parcel to the Heller Property at the northeast corner ofMaguire Road and the Florida Turnpike. The revisions include drainage modifications to the Maguire Road construction plans and calculations,permit application package and quantities. Additionally,these revisions would require the relocation of several utilities within these improvements. The attached materials include a detailed description of all utility work. The drainage design cost associated with these improvements is $33,262 and the utilities design cost is $14,478. A detailed breakdown of these costs is attached to this letter. We appreciate the opportunity to provide our services for this assignment. If you have any questions or require additional information, please advise. Very truly yours, PROFESSIONAL ENGINEERING CONSULTANTS, INC. Fursan S. Munjed Associate Attachment cc: Ken Hooper G:\CLER\LD\PRO\P-932 6.W PD engineers "Engineering Our Community" planners cI INP'/rlrC 200 East Robinson Street • Suite 1560 • Orlando, Florida 32801 ^ 407/422-8062 • FAX 407:849-9401 PRELIMINARY ENGINEERING MANHOUR&FEE ESTIMATE ect Name: Maguire Road(Segment 2)-Pond 5 ription: Revised Location(Second Revision) kared By: Puna!'Monied Date: 12/22/99 TOTAL SE;PrOject:Manager: Engineer/PS M Sr.En i neer En_gineer Cadif TeClinician Clerical Man Hourly Man ,,,Hourly Mtn.......—Hotly Man ,,,litoutly. Man ....11ofirly::: Man —:Hourly.••• MiudititirC Salary(ost tyag Hours Rate Hours _ _Rate Hours Rate _ Hours _ Rate = Hours _ Rate Hours _ Rate . nage Analysis 6 $34.88 12 $32.00 12 $24.72 12 $20.34 12 $16.74 6 $14.37 60 •$1,421.10 $23.69 nage Design 18 $34.88 38 $32.00 38 $24.72 38 $20.34 38 $16.74 18 $14.37 188 /$4,450.90 $23.68 • • illThOlkiiii30/111_____:•_54.[Abat00_ $831:001 24 248. $2368 • Total Contract Fee Computation (Check Appropriate Block) *Total Activity Salary Costs $5,872 (a) Overhead Additives 1.95 $11,450( )Initial Estimate (X)Revised Estimate Subtotal(Salary&Overhead) $17,322 (b) Direct Reimbursables(Out-of-Pocket) $1,500 (c) R/W and Survey Work $7,540 (d) Geotechnical Work (UN) $2,000 (e) Continuous Simulation Modeling(Devo) $4,900 TOTAL MAXIMUM FEE $3 362_ lericanhighweyWata\mk-03\mag2pd.5.wk4 • • • 12/22/1999 15:56 4076471667 SS&MC PAGE 01 324 N. Orlando Avenue -.5��► ` ' ng, ' - Maitland, Florida 32751-4702 1� r t Phone # (407) 647-8898 I -ri Eaz # (407) 647-1667. E-mail SSMC96@aol.com Date ��c_.22 l9 9 g Fax# S Q-9 - `3�o2 To � L A v.41 Go From GA tl-•- . Vitt c ti of Re • Number of pages ik including this page Message: � a NA Q • RECEIVED DEC 2 2 1999 P.E.C. Ir2C. CRUM WORK COPY 12. N r AT.11am.ATC`R . .m CNE COPY S ROUTE If there is any problem receiving this message please call(407)647-88t The information contained in this facsimile message is intended only for the personal and confidential use of the recipient named above. Review,dissemination, distribution.or copying of-this message by others is prohibited. • '�1i7..1..onc latFAXCNIViRWr[XX: 12/22/1999 15:56 4076471667 SS&MC PAGE 82 SOUTHEASTERN SURVEYING&MAPPING CORP. DESIGN&RIGHT-OF-WAY SURVEY ESTIMATE - HOURS WPI NO. N/A STATE PROJECT NO. N/A • S.R.NO. N/A COUNTY Orange PROJECT LIMITS Maguire Road Pond 5 Revision No.2,City of Ocoee,Orange County, Florida LENGTH: MILES FEET METERS LANES DIVIDED RURAL ITEM • PARTY DAYS COMMENTS 2 4 _ - fI. Geodetic Baseline Control - L N/A 2. Alignment(Project Control) .5 3. Reif:ranee.Points - N/A 4. Aerinl'target Placement - N/A 5. Bench levels .5 6. Topography 2 7. Rdwy X•Scctions/Profilas • N/A 8. Side Street Surveys _ 9. Underground Utilitica(8 Test Holes) 1 Verify Horizontal and Vertical Position . 10. Drainnge Survey • N/A 11. Bridge Survey N/A /W 12. Qutfall&DetRA Survey - I N/A 13. Jurisdictional Linc Survey - N/A 14. Stakeout for Borings 1 15. Section Lino Ties - 16. Subdivision Tics&Property Line Ties - N/A 17. Maintained RAW Survey - N/A 18. Mean I Iigh WatcrlSafe Upland Line Survey - N/A 19. R/W Monumcntation - N/A 20. Stake R/W Parcels - N/A 21. Supplemental Surveys (Boundary) 2 N/A TOTALS _ DAYS , 7 1 o I o if 2 MAN CREW: 7 /days x 640.00 per day = S 4,480,00 OFFICE SUPPORT FOR DESIGN TOPOGR9.PHIC SURVEY _ Project Manager 2 Hours at S 80.00 per hour = $ 160.00 Prolbssionnl land Surveyor 2 Hours at S 80.00 per hour = S 160.00 r Sr.'rechnieinn 8 Hours at S 65.00 ' per hour = $ 520.00 Draftsperson 24 Hours at S 55.00 per hour = S 1,320.00 Prepare legal Descriptions 3 Parcels S 300,00 each = S 900.00 RIGHT-OF-WAY MAPPING Cover Sheet Hours at per hour i S 0.00 Key Sheet Hours at .... per hour = $ 0.00 5 Sheets(I"=50') Hours at per hour S 0.60 QC/QA Hours at per hour - S 0.00 TOTAL AMOUNT(including overhead,fringe benefits&operating margin)- S7,540.00 - n Date: December 22,1999 Prepared by: Gary B.Krick.P.S.M. Vi a?:7C 11 T/_ BWPODATAWrIvo alkPC043WOmyN"It°4•M4 ",%r i `l r_ II/1J♦umm J:xY'a'�.y t r .1'c r3 i` pp QIIA'f•I J�AJI: w 1 SE S P4 �` �,(x) C II S 0 C I A T E S, INC. x - 'Dki• ii !:i 161r' ,, Geotechnical, Environmental Geotechnics &Materials Engineering lire s December 21, 1999 . hart Project No. W99-G-344 r <, r - Mr. Fursan Munjed, P.E. Professional Engineering Consultants, Inc. :; • J�sr�as4=�_,- 200 East Robinson Street, Suite 1560 em #4 Orlando, Florida 32801 RE: Proposal to Provide a Subsurface Exploration ;;;; '4g4 and Geotechnical Engineering Evaluation Maguire Road/Relocation of Pond 5 :;,.; -�,,., , Orange County, Florida 4 - : _1 Dear Mr. Munjed: 3z , ` Nodarse & Associates, Inc. (N&A) is pleased to present this proposal to provide a ., .>s subsurface exploration and geotechnical engineering evaluation for the above-referenced • = project. The purpose of the exploration is to obtain geotechnical engineering data to assist ', in the design of a stormwater pond at the above-referenced site. This proposal outlines our r,.•:. , r : understanding of the project, presents a recommended scope of services and contains a �:.�, time and cost estimate for providing those services. --•_ SITE AND PROJECT DESCRIPTION j The project concerns the relocation of proposed Stormwater Pond No. 5 for the Maguire 4; g _ Road Project. We understand that Pond No. 5 will now be moved to a tract of land ;_:4 northeast from the intersection of Maguire Road and Florida's Turnpike. The pond will be approximately 4 acres in size. r-' - : PROPOSED SCOPE OF SERVICES `,,; The proposed scope of services is based on the supplied information and our experience ` ;Y in the area with sites and projects similar to this one. Our exploration is planned to include f=k the following: `- ~'' : ��.(E, Stake boring locations and clear utilities at the site. :.v:a ST•`-e3 " • Mobilize truck mounted rotary drilling equipment to the site. .44 ' 3 ?.J l L EJ ON OUR EXFERIENCE • ,,>taa _ _...__ ,.,,.,ram„ —o� nno,ne 117aa 407J40.6110 • FAX 407.740.6112 e-mail: nodarse@nodarse.cor Professional Engineering Consultants, Inc. Project No. W98-G-344 litl0DARSE Page 2 & NSSOCIHIES, INC. • Perform two (2) auger borings to a depth of 20 feet in the proposed stormwater pond. • Obtain one (1) sample for permeability testing. • Perform visual classification and required laboratory testing of the soil samples obtained from the borings. Laboratory testing may include grain size and/or Atterberg limit analysis to verify visual classification of soil types. The exploration will be supervised by a qualified geotechnical engineer registered in the state of Florida, and the results of the exploration will be presented in a geotechnical engineering report. This report will address the following items: • Existing site conditions. • Exploration, testing and sampling methods. • Subsurface soil conditions encountered and soil classifications. • Depth to groundwater at the time of the exploration and estimated seasonal high groundwater levels. • A discussion of general site preparation techniques, fill compaction, etc. • Stormwater recovery analysis is not included in this proposal. PROJECT SCHEDULE Based on our present schedule, we are prepared to mobilize to begin the field operations on this project within about three (3) to five (5) working days of your authorization to proceed. We anticipate the field portion of the study to be completed in approximately one (1) day. Engineering analysis, necessary laboratory work and report preparation should be completed within approximately five (5) working days after the completion of field work. ESTIMATED COSTS A Scope of Services and Fee Estimate is attached to this proposal and will be applicable for services on this project. The final cost of services will be computed from actual units of work performed in accordance with this Scope of Services and Fee Estimate. For Professional Engineering Consultants, Inc. Project No. W98-G-344 INLIODARSE Page 3 - i R t f O C I " T ! S, INC. budgetary planning,we estimate the total cost of services for the described exploration will be approximately $1,995.00. In computing this budget figure, we have assumed the site is accessible to our field crew, that we have right of entry to the site and that we will not experience excessive delays due to rubble at borehole locations or for other reasons beyond our control. If such conditions are encountered that could cause the cost of the exploration to exceed the budget figure, we will notify the client and obtain approval for the additional work before we proceed. AUTHORIZATION To authorize us to proceed with this project, please execute and return to us a copy of the attached Proposal Acceptance Sheet. Authorization should be indicated by the person or firm responsible for payment of our invoice. Please note the attached Acceptance Sheet forms a part of this proposal and that our terms are "Net 30 Days." CLOSURE N&A appreciates the opportunity to submit this proposal, and we look forward to working with you on this project. If you have any questions, or if we can provide any additional information, please feel free to call us at your convenience. Sincerely, DARSE & ASSOCIATES, INC. 10G---A enna McMaster, E.I. Daniel C. Stanfill, P.E. Project Engineer Vice President W 99-344.PRO:D CS 12-99/sc Attachments: Scope of Services and Fee Estimate Agreement SCOPE OF SERVICES AND FEE ESTIMATE PROJECT NAME PROJECT LOCATION N&A PROJECT NO. DES OF kTORg .. QTY: RAVE iTNIT . : A1�I0U�IT I. FIELD EXPLORATION A. Mobilization of Crew and Mudbug Equipment 1 $ 300.00 lump sum $ 300.00 B. Auger Borings 40 $ 8.00 per If. 320.00 C. Site Reconnaissance/Utility Coordination -Senior Engineering Technician 4 $ 40.00 per If. 160.00 Subtotal $ 780.00 II. LABORATORY TESTING A. Visual Examination/Stratify -Senior Engineering Technician 1 $ 40.00 per hour $ 40.00 B. Natural Moisture Content Test 2 $ 10.00 per test 20.00 C. Single Sieve Grain Size Analysis 2 $ 30.00 per test 60.00 D. Organic Content Test 1 $ 35.00 per test 35.00 E. Atterberg Limits 1 $ 65.00 per test 65.00 F. Permeability Test 1 $ 150.00 per test 150.00 Subtotal $ 370.00 III. ENGINEERING AND TECHNICAL SERVICES A. Senior Project Engineer 2 $ 80.00 per hour $ 160.00 B. Project Engineer 6 $ .70.00 per hour 420.00 C. CADD Operator 4 $ 40.00 per hour 160.00 D. Word Processing 3 $ 35.00 per hour 105.00 Subtotal $ 845.00 TOTAL $ 1,995.00 From:Devo Seereeram 298-9011 (40/) fo:Fursan hkupea Date:1 I1//Ieee ume: 1u.uo.ih r.ye i ui Devo Seereeram, Ph.D., P.E. Consulting Geotechnical Engineer 5633 Partridge Dr, Orlando, Fl 32810 Tel: 407-290-2371,Fax: 407-298-9011 email: devo@iag.net • FACSIMILE COVER PAGE To: Fursan Munjed • Company: PEC Fax #: 407-849-9402 Subject: Maguire Road Pond Sent: 12/17/1999 at 10:06:10 AM Pages: 4 (including cover) MESSAGE: SEE attached proposal as requested by Kevin Perko. • please call if there are any questions. RECEIVED DEC 1, 7, 1999 P.Q.G. I?' . GRIM° i„ • T.�•w2�.�inorx ~ • 'FILE TO. .. . • • From:Devo Seereeram 298-9011 (407) To:Fursan Munjed Date:12/17/1999 Time:10:06:12 AM Page 2 of 4 PROJECT MEMORANDUM to: Kevin S. Perko, P.E., C.P.E.S.C. Professional Engineering Consultants, Inc. 200 E. Robinson Street, Suite 1560 Orlando, FL 32801 phone: 422-8062 fax: 849-9401 from: Devo Seereeram, Ph.D., P.E., Professional Geotechnical Engineer 5633 Partridge Drive, Orlando, Florida 32810 phone: 407-290-2371 fax: 407-298-9011 e-mail: devo@iag.net www.iag.net/—devo GPS: N 28° 36' 45.4" W 81°27' 27.6" subject: ESTIMATED FEE FOR REVISED MODEL & REPORT PREPARATION DUE TO RELOCATION OF POND 5 • Geotechnical Engineering &Modeling Services Continuous Simulation Modeling of Lake Lilly/Lake Pearl with • Supplemental Bleed-down Flow from Proposed Maguire Road Pond Maguire Road Phases II and III & Professional Parkway City of Ocoee, Orange County, Florida project#: 99-121.50 date: December 17, 1999 (9:44am) Per our telephone conversation on December 16; 1999, it is our understanding that Pond 5 will be relocated to the open area opposite the originally proposed location. Attached is our fee estimate for collecting the geotechnical data, revising & re-running the model, revising & printing/binding the reports. As you will note, almost $500 of the budget is allocated for reproducing the report as there is a lot of color graphics. This will be considered a supplement to our previous contract with all applicable terms and conditions. Please call or e-back if any questions. — P.S. If proposal is acceptable, please forward revised pond footprint so we can start the geotech work. Stage-area data & basin parameters can follow. From:Devo Seereeram 298-9011 (407) To:Fursan Munjed Date:12/17/1999 Time:10:06:12 AM Page 3 of 4 DEVO . SEEREERAM, Ph.D., P.E. Consulting Geotechnical Engineer 5633 Partridge Drive Orlando, Florida 32810 e-mail:devo@iag.net GPS:N 28°36'45.4" W 81°27'27.6" www iag.net/--devo &www.iag.nei/--devo2 Phone: 407-290-2371 Fax: 407-298-9011 ESTIMATE FOR GEOTECHNICAL ENGINEERING SERVICES Date December 17,1999 Quote No. SEP99G-xx I Project No. 99-121.50 To: �l, Kevin S. Perko, P.E., C.P.E.S.C. M s m! 7*1 Professional Engineering Consultants, Inc. 'AMOK� . 200 E. Robinson Street, Suite 1560 Orlando, FL 32801 i Phone:422-8082 Fax:849-9401 Title of Project: CONTINUOUS SIMULATION MODELING OF LAKE LILLY/LAKE PEARL WITH SUPPLEMENTAL BLEED- DOWN FLOW FROM PROPOSED MAGUIRE ROAD POND 5 CITY OF OCOEE, ORANGE COUNTY, FLORIDA Services to be performed during the calendar months: January 2000 ESTIMATED FEE: $4,892.50 SEE ATTACHED ITEMIZATION From:Devo Seereeram 298-9011 (407) To:Fursan Mulled trace: 17I L 1I I a umd: Iu:uo:IL rn ragd 4 of 4 DETAILED ITEMIZATION OF FEE ESTIMATE TABLE I. ITEMIZATION OF WORK EFFORT&ASSOCIATED COST Unit Description of Work item ' Unit Rate Quantity Amount HELD 8.LAB WORK Senior engineering technician(Henry Towns) hr $50.00 8.0 $400.00 Project engineer(Natushka or Daniel) hr $65.00 0.0 $0.00 Senior engineer(Devo) hr $85.00 0.0 $0.00 Mobilization of drilling equipment sum $150.00 1.0 $150.00 Power auger borings ft S7.50 75.0 $562.50 Visual classification of soil samples hr $40.00 2.0 $80.00 Fines fraction & moisture content tests each $30.00 0.0 $0.00 DATA REVIEW 8, INTERPRETATION Project engineer(Natushka or Daniel) hr $65.00 3.0 $195.00 Senior engineer(Devo) hr $85.00 2.0 $170.00 WORMY/MR MODELING Project engineer(Natushka or Daniel) hr $65.00 16.0 $1,040.00 Senior engineer(Devo) hr $85.00 10.0 $850.00 PREPARATION OF GEO1KCHl 11CAL REPORT Senior Engineer(Devo) hr $85.00 4.0 S340.00 Project Engineer(Natushka or Daniel) hr $65.00 4.0 $260.00 CADD Graphics hr $35.00 8.0 $280.00 Report printing &binding each $30.00 16.0 $480.00 ?ROJKCT COORDIu 1At1O�1 Senior Engineer hr $85.00 1.0 $85.00 TOTAL $4,892.50 PEC PROFESSIONAL ENGINEERING CONSULTANTS, INC. - December 27, 1999 P-9322 MK-04 Mr. James W. Shira, P.E. City Engineer/Utilities Director City of Ocoee 150 N. Lakeshore Drive Ocoee, FL 34761 RE: Proposal for Additional Services for Maguire Road Utilities Sections 1 and 2 Dear Mr. Shira: We are pleased to present this proposal for Engineering Services related to the above- referenced project. The engineering services include permitting, design and preparation of construction plans for the additional requested services to be included in the Maguire Road Utility plans as detailed below. 1. Relocate 8-inch sanitary sewer line, 1-inch water main and 4-inch force main in the West End Professional Park Subdivision to accommodate the relocation of Pond #5. Based on hydraulic considerations and pipe size for the sanitary sewer will be increased to a 10-inch sanitary line. 2. Relocate existing City of Ocoee potable water utilities on Moore Road and design associated provisions to accommodate the 54-inch Orange County Consery II line as needed for the road widening for the associated project. 3. Relocate existing City of Ocoee potable water utilities on Roberson Road and design associated provisions to accommodate the 54-inch Orange County Consery II line, as needed for the road widening for the associated project. 4. Additional provisions to include proposed design GTC Engineering Corporation (GTC) for a 12-inch water main along Moore Road and Maguire Road. This task includes PEC designing the extension of the 12-inch water main connecting the existing 12-inch water main at Plantation Grove Shopping Center (STA 434+40) to the proposed water main by--GTC Engineering Corporation (GTC) (STA 432+80). Attachment A presents the man-hour estimates and cost estimates for your review. We anticipate a one (1) month time extension for the design portion of the project. engineers planners onn Stroot . SIiita 1;An . nrlanrin FInriria 32801 • 407/422-8062 • FAX 407/849-9401 Mr. James W. Shira, P.E. P-9322 December 27, 1999 MX-04 Page 2 We propose to perform the Engineering Services described herein based on a lump sum compensation method not to exceed $12,478 without further authorization from the City. These fees do not include fees for soils and survey subconsultants, since these tasks will be or have been completed under the roadway design portion of this contract. We appreciate the opportunity to provide our services for this assignment. If you have any questions or require additional information,please do not hesitate to contact the undersigned. Very truly yours, PROFESSIONAL ENGINEERING CONSULTANTS, INC. Kenneth R. Hooper Principal KRH/cs G:1...1PR099\P-9322 • Enclosures: (1) Attachment A-Man-hour Estimates/Cost Estimates cc: Tom Kelley PE, PEC Arthur R. Austin, P.E., PEC Fursan Munjed, P.E., PEC Kathleen N. Gierok, P.E., PEC Mr. James W. Shira, P.E. P-9322 December 27, 1999 MK_04 Page 3 ATTACHMENT "A" MAN-HOUR ESTIMATES Task Task Description/ Labor Classification/ Hours No Scope of Services P.M. Sr. E. Engr. Tech. CAD WP Total 1 West End Subdivision 2 20 5 0 20 5 52 2 Moore Road 2 20 5 0 20 5 52 3 Roberson Road 3 25 5 0 25 5 63 4 Proposed Water Main Design (By Others) 1 10 5 0 10 5 31 Total Tasks 1 through 4 8 75 20 0 75 20 198 COST ESTIMATES Hourly x Rate TASK 1 TASK 2 TASK 3 TASK 4 TOTAL LABOR LABOR CLASS Rate @ 2.95 HOURS COST Multi. Direct Labor Project Manager $38.00 $112.10 2 2 3 1 8 $897 Senior Engineer $25.00 $73.75 20 20 25 10 75 $5,531 Engineer $18.00 $53.10 5 5 5 5 20 $1,062 Technician $19.00 $56.05 0 0 0 0 0 $0 CADD $17.00 $50.15 20 20 25 10 75 $3,761 Word Processor $13.00 $38.35 5 5 5 5 20 $767 Sub-Total Hours 52 52 63 31 198 Sub-Total Labor $3,159 $3,159 $3,891 $1,808 $12,018 Avg. Hrly Rate $60.76 $60.76 $61.76 ' $58.33 External Associates Sub-Total Ext. Associates $0 $0 $0 $0 $0 Other Direct Costs Reproduction/ Printing $20 $20 $20 $20 $80 Computer Support/ Plotting $75 $75 $75 $75 $300 Telephone $5 $5 $5 $5 $20 Mileage $5 $5 $5 $5 $20 Postage $5 $5 $5 $5 $20 Fax $5 $5 $5 $5 $20 Sub-Total ODC $115 $115 $115 $115 $460 Total Costs - Total Costs $3,274 $3,274 $4,006 $1,923 $12,478 PROFESSIONAL ENGINEERING CONSULTANTS, INC. January 6, 2000 P-9322 MK-04 Mr. James W. Shira, P.E. City Engineer/Utilities Director City of Ocoee 150 N. Lakeshore Drive Ocoee, FL 34761 RE: Proposal for Additional Services for Maguire Road Utilities Sections 1 and 2 Dear Mr. Shira: We are pleased to present this proposal for Engineering Services related to the above- referenced project. The engineering services include permitting, design and preparation of construction plans for the additional requested services to be included in the Maguire Road Utility plans as detailed below. 1. Relocate 8-inch sanitary sewer line, 1-inch water main and 4-inch force main in the West End Professional Park Subdivision to accommodate the relocation of Pond #5. Based on hydraulic considerations and pipe size for the sanitary sewer will be increased to a 10-inch sanitary line. 2. Relocate existing City of Ocoee potable water utilities on Moore Road and design associated provisions to accommodate the 54-inch Orange County Consery II line as needed for the road widening for the associated project. 3. Relocate existing City of Ocoee potable water utilities on Roberson Road and design associated provisions to accommodate the 54-inch Orange County Consery II line, as needed for the road widening for the associated project. • 4. Additional provisions to include proposed design GTC Engineering Corporation (GTC) for a 12-inch water main along Moore Road and Maguire Road. This task includes PEC designing the extension of the 12-inch water main connecting the existing 12-inch water main at Plantation Grove Shopping Center (STA 434+40) to the proposed water main by GTC Engineering Corporation (GTC) (STA 432+80). Attachment A presents the man-hour estimates and cost estimates for your review. We anticipate a one (1) month time extension for the design portion of the project. engineers "Engineering Our Community" planners cu vevnrs 200 East Robinson Street • Suite 1560 • Orlando, Florida 32801 • 407/422-8062 • FAX 407/849-9401 Mr. James W. Shira, P.E. P-9322 January 6, 2000 MK-04 Page 2 We propose to perform the Engineering Services described herein based on a lump sum compensation method not to exceed $14,478 without further authorization from the City. These fees do not include fees for soils and survey subconsultants, since these tasks will be or have been completed under the roadway design portion of this contract. We appreciate the opportunity to provide our services for this assignment. If you have any questions or require additional information, please do not hesitate to contact the undersigned. Very truly yours, PROFESSIONAL ENGINEERING CONSULTANTS, INC. Ken eth R. Hooper Principal KRH/cs G:\...\PRO99\P-9322 Enclosures: (1) Attachment A - Man-hour Estimates/Cost Estimates cc: Tom Kelley PE, PEC Arthur R. Austin, P.E., PEC Fursan Munjed, P.E., PEC Kathleen N. Gierok, P.E., PEC Mr. James W. Shira, P.E. P=9322 January 6, 2000 MK-04 Page 3 ATTACHMENT "A" MAN-HOUR ESTIMATES Task Task Description/ Labor Classification/Hours No Scope of Services P.M. Sr.E. Engr. Tech. CAD WP Total 1 West End Subdivision 2 20 5 0 20 5 52 2 Moore Road 2 20 5 0 20 5 52 3 Roberson Road 3 25 5 0 25 5 63 4 Proposed Water Main Design(By Others) 1 10 5 0 10 5 31 Total Tasks 1 through 4 8 75 20 0 75 20 198 COST ESTIMATES Hourly x Rate TASK 1 TASK 2 TASK 3 TASK 4 TOTAL LABOR LABOR CLASS Rate @ 2.95 HOURS COST Multi. Direct Labor Project Manager $38.00 $112.10 2 2 3 1 8 $897 Senior Engineer $25.00 $73.75 20 20 25 10 75 $5,531 Engineer $18.00 $53.10 5 5 5 5 20 $1,062 Technician $19.00 $56.05 0 0 0 0 0 $0 CADD $17.00 $50.15 20 20 25 10 75 $3,761 Word Processor $13.00 $38.35 5 5 5 5 20 $767 Sub-Total Hours 52 52 63 31 198 Sub-Total Labor $3,159 $3,159 $3,891 $1,808 $12,018 Avg. Hrly Rate $60.76 $60.76 $61.76 $58.33 External Associates L.J. Nodarse&Associates, Inc. $2,000 $0 $0 $0 $2,000 Sub-Total Ext. Associates $2,000 $0 $0 $0 $2,000 Other Direct Costs Reproduction/Printing $20 $20 $20 $20 $80 Computer Support/Plotting $75 $75 $75 $75 $300 Telephone $5 $5 $5 $5 $20 Mileage - $5 $5 $5 $5 $20 , Postage $5 $5 $5 $5 $20 Fax $5 $5 $5 $5 $20 Sub-Total ODC $115 $115 $115 $115 $460 - Total Costs Total Costs $5,274 $3,274 $4,006 $1,923 $14,478