HomeMy WebLinkAboutVII(F1) Award Of Bid For Maguire Road Improvement Segments 1 And 2 To Ryan Incorporated Eastern In The Amount Of $9,628,208.66 Agenda 6-06-2000 "CENTER OF GOOD LIVING-PRIDE OF WEST ORANGE" Item MA ORI COMMISSIONER Ocoee S.SCOTT VANDERGRIFT , CITY OF OCOEE COMMISSIONERS .� ' rfiA 'C 150 N.LAKESHORE DRIVE DANNY HOWELL SCOTT ANDERSON OCOEE,FLORIDA 34761-2258 • RUSTY JOHNSON 4>_ r _..14. (407)656-2322 NANCY J:PARKER OF :GOO CITY MANAGER ELLIS SHAPIRO MEMORANDUM DATE: May 30, 2000 TO: Mayor Scott Vandergrift Commissioner Parker Commissioner Johnson Commissioner Howell Commissioner Anderson FROM: Jim Shira, P.E., Director of Engineering and Utilities SUBJECT: Maguire Rd. Improvements Project - Segments 1 and 2 Attached for your review is a tabulation of the bids received on May 18,2000,for this project,as well as a • recommendation from PEC that the contract be awarded to the low bidder,Ryan Incorporated Eastern. Ryan submitted the apparent low bid,but had several math errors in their bid.Correction of those math errors made their bid even lower,bringing it to$9,628,208.66,which is$60,257.29 below the next lowest bid which was submitted by Hubbard Construction Company. Ryan is an FDOT qualified contractor in accordance with our bid requirements,and their references provided positive comments regarding their past work. I recommend that the City Commission: 1. Award the contract for the Maguire Road Improvements Project- Segments 1 and 2 to Ryan Incorporated Eastern in the amount of$9,628,208.66,and 2. Authorize the Mayor and City Clerk to execute the Agreement with Ryan Incorporated Eastern once all appropriate documents have been delivered to the City. CZ- Protect Ocoee`$WaterResources PEC PROFESSIONAL ENGINEERING CONSULTANTS, INC. May 30, 2000 OE-352-353/2.1 Mr. James W. Shira, P.E. Utilities Director/City Engineer City of Ocoee 150 N. Lakeshore Drive Ocoee, FL 34761 SUBJECT: Maguire Road Improvements - Segment 1 and 2 RE: Recommendation of Award Dear Mr. Shira: On Thursday, May 18, 2000, the City of Ocoee received sealed construction bids for the referenced project from six (6) contractors. The attached tabulation of bids depicts a summary of unit prices provided by each respective Bidder. Mathematical errors, omitted items or incorrect extensions, are noted in the summary. The bid tabulation summary indicates Ryan Incorporated Eastern as the apparent low bidder with a corrected total bid price of $9,628,208.66. The second apparent low bidder is Hubbard Construction Company with a total bid price of $9,688,465.95, and the third apparent low bidder is Bergeron Construction Company with a corrected total bid price of$10,653,840.00. The highest total bid price is$14,081,985.45 submitted by Johnson Brothers Corporation. The Engineer's construction estimate is $9,808,522.11. The bid proposals of the three (3) apparent low bidders are complete and properly executed except as noted on the attached Bid Checklist and Reference form. Our review of the Ryan Incorporated Eastern Bid Form indicated multiplication and addition errors that resulted in a reduced Total Bid Price as noted here and in our tabulation and checklist. They have acknowledged receipt of all Addenda as prescribed and have submitted proposals to comply with the other City bidding requirements. We believe that these bid proposals are in conformance in all material respects to the invitation for bids and are therefore responsive bids. Based upon the information presented in the bid proposal Questionnaire,each of the three (3) apparent low bidders are licensed contractors in the State of Florida and appear to possess the manpower and equipment necessary to perform the classes of work contemplated within the time specified(720-day construction period). We have contacted the references listed in the Questionnaire for each of the three (3) apparent low bidders. A summary of this survey is presented in the attached "Bid Checklist and Reference" forms. As these summaries show, these contractors have all performed satisfactorily on their past projects and completed the past projects within the contract time. Our review of the materials provided by Ryan Incorporated Eastern indicates they have a substantial background in large infrastructure construction projects although they do not have an extensive background as a prime public roadway contractor. Furthermore, PEC has verified that Ryan Incorporated Eastern is FDOT prequalified to perform the type of construction work noted in the bid document. Also, we received a positive engineers "Engineering Our Community" planners surveyors 200 East Robinson Street • Suite 1560 • Orlando,Florida 32801 • 407/422-8062 • FAX 407/849-9401 Mr. James W. Shira, P.E. OE-352-353/2.1 May 30, 2000 Page 2 recommendation concerning a public roadway project of comparable size in which Ryan Incorporated Eastern served a prime contractor for the City of Pembroke Pines. Furthermore, it is noted that Ryan proposes to utilize a bridge subcontractor, LeWare Construction Company,to construct the replacement bridge over the Florida Turnpike. We are aware that LeWare has an established positive reputation as a bridge builder in Florida. Based on our review of the qualification submittals from each of the three(3)apparent low bidders, our conversations with the respective references and our analysis of the bid tabulation,it appears that Ryan Incorporated Eastern is the lowest responsible, responsive bidder at the corrected bid total amount of$9,628.208.66. If you have any questions or comments, please contact me at your earliest convenience. Sincerely, PROFESSIONAL ENGINEERING CONSULTANTS, INC. athleen N. rok, P.E. Senior Engin r KNG/cs G:\...\001 DROA Enclosures: Bid Tabulation Bid Checklists Bid References cc: Arthur R. Austin, P.E., PEC, Inc. Fursan Munjed, P.E., PEC, Inc. BID TABULATION CITY OF OCOEE MAGUIRE ROAD IMPROVEMENTS(SEGMENT 1&2) PAGE 1 BID DATE: MAY 18,2000 RYAN INC.EASTERN HUBBARD CONST.CO. ITEM NO. ITEM DESCRIPTION UNIT QTY. UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE ROADWAY 101-1 MOBILIZATION(INCLUDING BONDS,GENL REQUIREMENTS&INDEMNIFICATION) LS 1 $1,085,000.00 $1,085,000.00 $700,000.00 $700,000.00 102-1 MAINTENANCE OF TRAFFIC LS 1 $210,000.00 $210,000.00 $180,000.00 $180,000.00 10499 EROSION CONTROL LS 1 $40,000.00 $40,000.00 $40,000.00 $40,000.00 110-1-1 CLEARING&GRUBBING(45.51 ACRES) LS 1 $200,000.00 $200,000.00 $500,000.00 $500,000.00 110-7-1 MAIL BOX(F&I) EA 8 $125.00 $1,000.00 $150.00 $1,200.00 120-1 EXCAVATION,REGULAR CY 113,028 $1.95 $220,404.60 $3.00 $339,084.00 120-6 EMBANKMENT CY 49,021 $1.00 $49,021.00 $5.00 $245,105.00 120-99 EARTHWORK(MOORE ROAD) LS 1 $15,000.00 $15,000.00. $10,000.00 $10,000.00 160-4 TYPE"B"STABILIZATION SY 93,948 $2.25 S211,383.00 $1.00 $93,948.00 162-3-101 FINISH SOIL LAYER(GRASS)(6") SY 44,694 $1.50 $67,041.00 $0.50 $22,347.00 285-707-248 OPTIONAL BASE(BASE GROUP 7) SY 2,718 $7.00 $19,026.00 $13.00 $35,334.00 285-709-327 OPTIONAL BASE(BASE GROUP 9)(6"ABC-3, MARSHALL 1000)(ONLY) SY 13,276 } $13.50 $179,226.00 $15.00 $199,140.00 285-709-990 OPTIONAL BASE(BASE GROUP 9),(10" LIMEROCK LBR 100)(ONLY) SY 60,415 $7.25 $438,008.75 $7.00 $422,905.00 300-1-1 BITUMINOUS MATERIAL(PRIME COAT) GA 249 $2.00 $498.00 $6.00 $1,494.00 300-1-3 BITUMINOUS MATERIAL(TACK COAT) GA 7,046 $1.00 $7,046.00 $1.00 $7,046.00 327-70-5 MILLING EXISTING ASPHALT PAVEMENT(2"AVG) SY 1,262 $2.75 $3,470.50 $4.00 $5,048.00 327-70-6 MILLING EXISTING ASPHALT PAVEMENT(1-1/2" AVG) SY 3,969 $2.85 $11,311.85 $1.50 $5,953.50 331-72-14 TYPE S ASPHALTIC CONCRETE(1-1/2") SY 5,085 $3.60 $18,306.00 $4.50 $22,882.50 331-72-20 TYPE S ASPHALTIC CONCRETE(2") SY 146 $30.00 $4,380.00 $8.00 $1,168.00 331-72-24 TYPE S ASPHALTIC CONCRETE(2-1/2") SY 76,275 $5.15 $392,816.25 $6.45 $491,973.75 337-7-2 ASPHALT CONC.FRICTION COURSE(INC BIT) (RUBBER)(FC-2) TN 33.5 $258.00 , $8,643.00 $120.00 $4,020.00 337-7-3 ASPHALT CONC.FRICTION COURSE(INC BIT) (RUBBER)(FC-3) TN 4,019.5 $61.00 $245,189.50 $58.00 $233,131.00 339-1 MISCELLANEOUS ASPHALT PAVEMENT TN 330.1 $67.00 $22,116.70 $90.00 $29,709.00 400-1-11 CLASS I CONCRETE(RETAINING WALLS) CY 6.2 $500.00 $3,100.00 $600.00 $3,720.00 400-1-15 CLASS I CONCRETE(MISCELLANEOUS) CY 10.0 $450.00 $4,500.00 $500.00 $5,000.00 425-1-351 INLETS(CURB TYPE P-5)(<10') EA 64 $1,940.00 $124,160.00 $2,800.00 $179,200.00 425-1-352 INLETS(CURB TYPE P-5)(>10') EA 1 $2,600.00 $2,600.00 $4,200.00 $4,200.00 425-1-361 INLETS(CURB TYPE P-6)(<10') EA 19 $2,060.00 $39,140.00 $3,100.00 $58,900.00 425-1-451 INLETS(CURB TYPE J-5)(<10') EA 14 $2,900.00 $40,600.00 $4,300.00 $60,200.00 BID TABULATION • CITY OF OCOEE MAGUIRE ROAD IMPROVEMENTS(SEGMENT 1&2) PAGE 2 BID DATE: MAY 18,2000 RYAN INC.EASTERN HUBBARD CONST.CO. ITEM NO. ITEM DESCRIPTION UNIT QTY. UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE 425-1-452 INLETS(CURB TYPE J-5)(>10') EA 1 $3,850.00 $3,850.00 $5,200.00 $5,200.00 425-1-461 INLETS(CURB TYPE J-6)(<10') EA 5 $3,200.00 $16,000.00 $4,600.00 $23,000.00 425-1-471 INLETS(CURB TYPE 7)(<10') EA 1 $1,180.00 $1,180.00 $2,700.00 $2,700.00 425-1-501 INLETS(DBI TYPE A)(<10') EA 1 $960.00 $960.00 $2,200.00 $2,200.00 425-1-521 INLETS(DBI TYPE C)(<10) EA 10 $1,125.00 $11,250.00 $1,800.00 $18,000.00 425-1-531 INLETS(DBI TYPE C) (MOD.)(<10) EA 6 $1,185.00 $7,110.00 $2,500.00 $15,000.00 425-1-541 INLETS(DBI TYPE D)(<10) EA 2 $2,050.00 $4,100.00 $3,300.00 $6,600.00 425-1-571 INLETS(DBI TYPE G)(<10) EA 3 $2,615.00 $7,845.00 $2,700.00 $8,100.00 425-1-881 INLETS(BARRIER WALL,RIGID,CURB& GUTTER)(<10) EA 4 $1,290.00 $5,160.00 $3,500.00 $14,000.00 425-1-882 INLETS(BARRIER WALL,RIGID,CURB& GUTTER)(>10') EA 2 $4,000.00 $8,000.00 $6,000.00 $12,000.00 425-2-41 MANHOLES(P-7)(<10) EA 13 $1,090.00 $14,170.00 $1,800.00 $23,400.00 425-2-42 MANHOLES(P-7)(>10) EA 2 $1,535.00 $3,070.00 $3,000.00 $6,000.00 425-2-71 MANHOLES(J-7)(<10) EA 7 $2,785.00 $19,495.00 $3,600.00 $25,200.00 425-2-72 MANHOLES(J-7)(>10) EA 2 $3,500.00 $7,000.00 $4,100.00 $8,200.00 425-2-103 MANHOLES(TYPE 7 TOP)(PARTIAL) EA 1 $1,135.00 $1,135.00 $1,500.00 $1,500.00 425-11 MODIFY EXISTING DRAINAGE STRUCTURE EA 5 $1,585.00 $7,925.00 $1,500.00 $7,500.00 430-11-223 CONCRETE PIPE CULVERT(15") LF 17 $42.00 $714.00 $75.00 $1,275.00 430-11-225 CONCRETE PIPE CULVERT(18") LF 7,905 $26.00 $205,530.00 $27.00 $213,435.00 430-11-229 CONCRETE PIPE CULVERT(24") LF 3,011 $34.00 $102,374.00 $35.00 $105,385.00 430-11-233 CONCRETE PIPE CULVERT(30") LF 3,023 $40.00 $120,920.00 $42.00 $126,966.00 430-11-238 CONCRETE PIPE CULVERT(36") LF 1,826 $51.00 $93,126.00 $50.00 $91,300.00 430-11-240 CONCRETE PIPE CULVERT(42") LF 556 $58.00 $32,248.00 $65.00 $36,140.00 430-11-241 CONCRETE PIPE CULVERT(48") LF 1,553 $70.00 $108,710.00 $85.00 $132,005.00 430-31-125 CORRUGATE STEEL PIPE CULVERT (BITUMINOUS COATED)(18") LF 46 $26.00 • $1,196.00 $70.00 $3,220.00 430-142-011 ELLIPTICAL CONC.PIPE CULVERT(43"X68") LF 128 $90.00 $11,520.00 $130.00 $16,640.00 430-144-103 ELLIPTICAL CONC.CULVERT(SIDE DRAIN)(HE 111)(19"X30") LF 248 $32.00 $7,936.00 $40.00 $9,920.00 430-150-116 DUCTILE IRON PIPE(6") LF 970 $17.20 $16,684.00 $25.00 $24,250.00 430-982-229 MITERED END SECTION(24") (CONCRETE PIPE ROUND)(CD) EA 2 $835.00 $1,670.00 $600.00 $1,200.00 430-982-238 MITERED END SECTION(36") (CONCRETE PIPE ROUND)(CD) EA 1 $1,210.00 $1,210.00 $1,000.00 $1,000.00 430-984-403 MITERED END SECTION(19"X30") (ELLIPTICAL CONCRETE CULVERT)(SD) EA 2 $865.00 $1,730.00 $700.00 $1,400.00 BID TABULATION CITY OF OCOEE MAGUIRE ROAD IMPROVEMENTS(SEGMENT 1&2) PAGE 3 BID DATE: MAY 18,2000 RYAN INC.EASTERN HUBBARD CONST.CO. ITEM NO. . ITEM DESCRIPTION UNIT QTY. UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE 43D-985-225 MITERED END SECTION(18") (CRP) EA 1 $565.00 $565.00 $600.00 $600.00 430-985-229 MITERED END SECTION(24") (CRP) EA . 2 $835.00 $1,670.00 $700.00 $1,400.00 430-985-233 MITERED END SECTION(30") (CRP) EA 2 $1,075.00 $2,150.00 $1,100.00 $2,200.00 430-985-240 MITERED END SECTION(47) (CRP) EA 2 $1,565.00 $3,130.00 $1,500.00 $3,000.00 430-985-241 MITERED END SECTION(48") (CRP) EA 1 $2,165.00 $2,165.00 $1,800.00 $1,800.00 515-1-2 PIPE HANDRAIL(ALUMINUM)(3-RAIL) LF 1,584 $86.50 $137,016.00 $20.00 $31,680.00 520-1-10 CONCRETE CURB&GUTTER(TYPE F) LF 30,661 $7.40 $226,891.40 $7.00 $214,627.00 520-2-1 CONCRETE CURB(TYPE A) LF 313 $9.50 $2,973.50 $9.00 $2,817.00 520-3 • VALLEY GUTTER,CONCRETE LF 200 . $14.00 $2,800.00 $14.00 $2,800.00 520-5-11 CONCRETE TRAFFIC SEPARATOR(4'WIDE) (TYPE I) LF 1,647 $12.10 $19,928.70 $13.00 $21,411.00 520-70-9 CONCRETE TRAFFIC SEPARATOR(VARIABLE WIDTH) SY 401 $33.50 $13,433.50 $35.00 $14,035.00 521-1 CONCRETE BARRIER WALL LF 182 $175.00 $31,850.00 $150.00 $27,300.00 521-72-5 CONCRETE BARRIER WALL(RIGID-CURB& - GUTTER) LF 1,625 $113.00 $183,625.00 $70.00 $113,750.00 522-1 CONCRETE SIDEWALK(4"THICK) SY 13,942 $13.50 >#n18$ 17iQ4€'. $17.00 $237,014.00 522-2 CONCRETE SIDEWALK(6"THICK) SY 1,660 $18.00 $29,880.00 $25.00 $41,500.00 524-1-1 CONCRETE DITCH PAVEMENT(NON REINFORCED)(3") SY 33 $32.25 $1,064.25 $20.00 $660.00 534-70 CONCRETE BLOCK RETAINING WALL SY 567 $50.20 $28,463.40 $42.00 $23,814.00 544-75-14 IMPACT ATTENUATOR VEHICULAR (QUADGUARD) EA 2 $33,440.00 $66,880.00 $25,000.00 $50,000.00 550-2 FENCING(TYPE B)(STANDARD 6') LF 620 $5.80 $3,596.00 $5.00 $3,100.00 550-3-2 CORNER POST ASSEMBLY(TYPE B FENCE) EA 8 $92.00 $736.00 $100.00 $800.00 550-6-1 END POST ASSEMBLY(TYPE B FENCE) EA 4 $72.00 $288.00 $50.00 $200.00 550-74-2 FENCING(TYPE B) LF 295 - $8.25 $2,433.75 $5.00 $1,475.00 575-1 SODDING SY 44,694 $1.20 $53,632.80 $1.20 $53,632.80 SUBTOTAL-ROADWAY $5,490,195.25 $5,695,060.55 - BRIDGE 110-3 REMOVAL OF EXISTING STRUCTURES LS 1 $103,000.00 $103,000.00 $120,000.00 $120,000.00 400-2-4 CLASS II CONC.(SUPERSTRUCTURE) CY 671.4 $540.00 $362,556.00 $400.00 $268,560.00 400-2-5 CLASS II CONC.(SUBSTRUCTURE) CY 393.1 $540.00 $212,274.00 $500.00 $196,550.00 400-2-10 CLASS II CONC.(APPROACH SLABS) CY 138.6 $335.00 $46,431.00 $150.00 $20,790.00 • BID TABULATION . CITY OF OCOEE MAGUIRE ROAD IMPROVEMENTS(SEGMENT 1&2) . PAGE 4 BID DATE: MAY 18,2000 RYAN INC.EASTERN HUBBARD CONST.CO. ITEM NO. ITEM DESCRIPTION UNIT QTY. UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE 400-7 BRIDGE FLOOR GROOVING SY 1,730 $3.10 $5,363.00 $3.00 $5,190.00 400-147 COMPOSITE NEOPRENE PADS CF 14.5 $1,030.00 $14,935.00 $500.00 $7,250.00 400-148-1 TRAFFIC RAILING(F&I)(BARRIER) LF 575 $206.00 $118,450.00 $120.00 $69,000.00 415-1-4 REINFORCING STEEL(SUPERSTRUCTURE) LB 106,811 $0.54 $57,677.94 $0.50 $53,405.50 415-1-5 REINFORCING STEEL(SUBSTRUCTURE) LB 51,494 $0.54 $27,806.76 $0.50 $25,747.00 415-1-9 REINFORCING STEEL(APPROACH SLABS) LB 22,634 $0.54 $12,222.36 $0.50 $11,317.00 450-1-4 PRESTRESSED BEAM(TYPE V) . LF 3,161 $180.00 $568,980.00 $100.00 $316,100.00 455-3-4 PREST.CONC PILING(FURNISHED)(24"SQ.) LF 3,406 $67.00 $228,202.00 $60.00 $204,360.00 455-4-4 PREST.CONC PILING(DRIVEN)(24"SQ.) LF 3,406 • $1.03 $3,508.18 $1.00 $3,406.00 455-15 PREFORMED PILE HOLES EA 4 • $515.00 $2,060.00 $200.00 $800.00 455-137 DYNAMIC TEST LOAD EA 2- $1,545.00 $3,090.00 $2,000.00 $4,000.00 455-140-14 TEST PILES(FURNISHED)(24"SQ.) LF . 235 $310.00 $72,850.00 $500.00 $117,500.00 455-141-14 TEST PILES(DRIVEN)(24"SQ.) LF 235 $5.15 $1,210.25 $1.00 $235.00 460-70-3 ALUMINUM RAILINGS(PEDESTRIAN/BICYCLE) LF 154 $50.00 $7,700.00 $30.00 $4,620.00 548-10 RETAINING WALL SYSTEM(PERMANENT) SF 7,946 $23.85 -$189,512.10 $25.00 $198,650.00 SUBTOTAL-BRIDGE • $2,037,828.59 $1,627,480.50 SIGNING&PAVEMENT MARKING . 700-40-1 SIGN,SINGLE POST(LESS THAN 12 SF) AS 52 . $162.00 $8,424.00 $160.00 $8,320.00 700-40-2 SIGN,SINGLE POST(12--25) AS 3 $844.00 $2,532.00 $820.00 $2,460.00. 700-46-11 SIGN EXISTING(REMOVE)(SINGLE POST) AS 25 $1.05 $26.25 $15.00 $375.00 700-46-12 SIGN EXISTING(REMOVE)(MULTI-POST) • AS 1 $61.80 $61.80 $100.00 $100.00 700-46-21 SIGN EXISTING(RELOCATE)(SINGLE POST) AS 17 $50.00 $850.00 $50.00 $850.00 705-10-11 OBJECT MARKER(POST MOUNTED)(TYPE I) EA 42 $86.50 $3,633.00 $85.00 $3,570.00 706-3 RETRO REFLECTIVE PAVEMENT MARKERS, - BI-DIRECTIONAL EA 1,259 $4.00 $5,036.00 $3.50 $4,406.50 710-30 REFLECTIVE PAINT(ISLAND NOSE)(YELLOW) SY 32 $13.00 $416.00 $5.00 $160.00 711-3 PAVEMENT MESSAGES,THERMOPLASTIC EA 12 $125.00 $1,500.00 $60.00 $720.00 711-4 DIRECTIONAL ARROWS,THERMOPLASTIC EA 101 $42.00 $4,242.00 $30.00 $3,030.00 711-5-1 GUIDELINES,THERMOPLASTIC(WHITE) LF 68 $0.67 $45.56 $1.00 $68.00 711-31 SKIP TRAFFIC STRIPE,THERMOPLASTIC(6" WHITE)(10'-30'SKIP) GM 3.318 • $0.56 ..,.......,. <<€ $18f . $500.00 $1,659.00 711-34 SKIP TRAFFIC STRIPE,THERMOPLASTIC(6" - YELLOW)(6'-10'SKIP) LF 962 $0.57 $548.34 $0.60 $577.20 711-35-81 SOLID TRAFFIC STRIPE,THERMOPLASTIC(8" • WHITE) LF 2,607 $0.74 $1,929.18 $1.00 $2,607.00 BID TABULATION ' CITY OF OCOEE MAGUIRE ROAD IMPROVEMENTS(SEGMENT 1&2) • ' PAGE 5 BID DATE: MAY 18,2000 RYAN INC.EASTERN HUBBARD CONST.CO. ITEM NO. ITEM DESCRIPTION UNIT QTY. UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE 711-35-121 SOLID TRAFFIC STRIPE,THERMOPLASTIC(12' WHITE) LF • 6,486 . • $1.13 $7,329.18 $1.00 $6,486.00 711-35-181 SOLID TRAFFIC STRIPE,THERMOPLASTIC(18" WHITE) LF 579 $2.01 $1,163.79 $2.00 $1,158.00 . 711-35-241 SOLID TRAFFIC STRIPE,THERMOPLASTIC(24" WHITE) LF 994 • $2.88 $2,862.72 $2.00 $1,988.00 711-36-181 SOLID TRAFFIC STRIPE,THERMOPLASTIC(18" • YELLOW) LF 1,528 $2.06 $3,147.68 $2.00 $3,056.00 711-37-61 SOLID TRAFFIC STRIPE,THERMOPLASTIC(6" WHITE) NM . 5.466 $1.52 ?? r # B3E_'` $1,400.00 $7,652.40 711-38-61 SOLID TRAFFIC STRIPE,THERMOPLASTIC(6" • YELLOW) NM 4.822 $2.50 NOPPRMAiii $1,600.00 $7,715.20 SUBTOTAL-SIGNING&PAVEMENT MARKING $43,769.72 $56,958.30 SIGNALS 620-1-1 GROUNDING,ELECTRODE(FURNISH&.INSTALL) LF 1,170 •. . $4.15 $4,855.50 $4.00 $4,680.00 - 630-1-12 CONDUIT(FURNISH&INSTALL) • • (UNDERGROUND) • LF 2,520 $4.10 $10,332.00 $4.00 $10,080.00 • 630-1-13 CONDUIT(FURNISH&INSTALL) (UNDERPAVEMENT) LF 2,252 $8.75 . $19,705.00 $8.00 $18,016.00 632-7-1 CABLE(SIGNAL)(FURNISH&INSTALL) PI • 5 $2,895.00 $14,475.00 $2,800.00. $14,000.00 634-4-113 SPAN WIRE ASSEMBLY(F&I)(TWO WIRE)(BOX) PI 1 $1,940.00 $1,940.00 $1,900.00 $1,900.00 634-4-413 . SPAN WIRE ASSEMBLY(ADJUST) PI 1 $745.00 $745.00 $800.00 $800.00 634-5-1 FIBERGLASS INSULATOR(F&I) LF 20 • $16.00 $320.00 $20.00 $400.00 635-1-11 PULL AND JUNCTION BOXES EA 61 $230.00 $14,030.00 $200.00 $12,200.00 639-1-12 ELECTRICAL POWER SERVICE(OVERHEAD) AS 1 $625.00 $625.00 $200.00 $200.00 639-1-22 ELECTRICAL POWER SERVICE(UNDERGROUND) AS 3 $550.00 ' $1,650.00 $600.00 $1,800.00 639-2-1 ELECTRICAL SERVICE WIRE(FURNISH AND INSTALL) LF 80 $2.40 $192.00. $3.00 . $240.00 641-15-146 CONCRETE STRAIN POLES(F&I WITH FOUNDATION)(TYPE N-VI) EA 4 $2,750.00 $11,000.00 $2,000.00 $8,000.00 648-11-00 MAST ARMS(F&I)(STEEL,SINGLE ARM) EA 2 $8,075.00 $16,150.00 $6,000.00 $12,000.00 648-11-28 MAST ARMS(F&I)(STEEL,SINGLE ARM) EA . 1 $8,810.00 $8,810.00 $6,000.00 $6,000.00 . 648-11-40 MAST ARMS(F&I)(STEEL,SINGLE ARM) EA. 1 $10,655.00 $10,655.00 $7,000.00 $7,000.00 648-11-42 MAST ARMS(F&I)(STEEL,SINGLE ARM) EA • 2 $11,395.00 $22,790.00 $8,000.00 $16,000.00 648-11-48 MAST ARMS(F&I)(STEEL,SINGLE ARM) EA 1 $12,895.00 $12,895.00 $8,000.00 $8,000.00 648-11-50 MAST ARMS(F&I)(STEEL,SINGLE ARM) EA 1 . $13,430.00 $13,430.00 $9,000.00 $9,000.00 BID TABULATION CITY OF OCOEE MAGUIRE ROAD IMPROVEMENTS(SEGMENT 1&2) PAGE 6 BID DATE: MAY 18,2000 RYAN INC.EASTERN HUBBARD CONST.CO. ITEM NO. ITEM DESCRIPTION UNIT QTY. UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE_ 648-11-52 MAST ARMS(F&I)(STEEL,SINGLE ARM) EA 2 - $14,995.00 $29,990.00 $9,000.00 $18,000.00_ 648-11-58 MAST ARMS(F&I)(STEEL,SINGLE ARM) EA 1 $16,085.00 $16,085.00 $10,000.00 $10,000.00 650-1-131 TRAFFIC SIGNAL 12"STANDARD(F&I)(3 SECTION,1 WAY) AS 19 $535.00 $10,165.00 $500.00 $9,500.00 650-1-331 TRAFFIC SIGNAL 12"STANDARD(INSTALL)(5 ' SECTION,1 WAY) AS 12 $160.00 $1,920.00 $150.00 $1,800.00 650-9-151 TRAFFIC SIGNAL 12"STANDARD(F&I)(5 SECTION,1 WAY) AS 5 $865.00 $4,325.00 $800.00 $4,000.00 650-9-351 TRAFFIC SIGNAL 12"STANDARD(INSTALL)(5 SECTION,CLSTR) AS 2 $205.00 $410.00 $200.00 $400.00 653-111 PEDESTRIAN SIGNAL(F&I)(12'INCANDESCENT, 1 WAY) AS 30 $790.00 $23,700.00 $700.00 $21,000.00 659-101 SIGNAL HEAD AUXILIARIES(F&I)(BACK PLATES, 3 SECTION) EA 2 $125.00 $250.00 $200.00 $400.00 659-103 SIGNAL HEAD AUXILIARIES(F&I)(DISCONNECT HANGER) EA 8 $250.00 $2,000.00 $250.00 $2,000.00 659-106 SIGNAL HEAD AUXILIARIES(F&I)(TUNNEL VISOR) EA 82 $1.30 $106.60 $2.00 $164.00 659-108 SIGNAL HEAD AUXILIARIES(STEEL PEDESTAL) EA 3 $825.00 $2,475.00 $800.00 $2,400.00 659-118 SIGNAL HEAD AUXILIARIES(F&I)(BACK PLATES, 5 SECTION) EA 2 $125.00 $250.00 $300.00 $600.00 660-1-101 INDUCTIVE LOOP DETECTOR(F&I)TYPE 1,1 CH. R,S) EA 18 $130.00 $2,340.00 $125.00 $2,250.00 660-1-102 INDUCTIVE LOOP DETECTOR(F&I)TYPE 2,1 CH. R,S,TD) EA 6 $150.00 $900.00 $200.00 $1,200.00 660-2-102 LOOP ASSEMBLY(F&I)(TYPE B) AS 20 $615.00 $12,300.00 $600.00 $12,000.00 660-2-106 LOOP ASSEMBLY(F&I)(TYPE F)(6'X 40') AS 18 $620.00 $11,160.00 $600.00 $10,800.00 663-70 VEHICLE DETECTOR ASSEMBLIES AS 3 $6,060.00 $18,180.00 $5,000.00 $15,000.00 665-11 PEDESTRIAN DETECTOR(F&I)(POLE/CONTROL CABINET MOUNTED) EA 30 $98.00 ' $2,940.00 $100.00 $3,000.00 670-113-211 ACT.SOLID STATE CONTRLR ASMBLY(F&I) AS 1 - $10,670.00 $10,670.00 $8,000.00 $8,000.00 670-113-231 ACT.SOLID STATE CONTRLR ASMBLY(F&I) (D-44,DUAL RING&PHASE) AS 2 $10,040.00 $20,080.00 $7,000.00 $14,000.00 670-131-000 ACT.SOLID STATE CONTRLR ASMBLY(INSTALL) AS 1 $1,150.00 $1,150.00 $1,000.00 $1,000.00 680-106 SYSTEM CONTROL EQUIPMENT(F&I) (COMMUNICATIONS INTERFACE) EA 1 $495.00 $495.00 $500.00 $500.00 680-111 SYSTEM CONTROL EQUIPMENT(F&I)(ROADSIDE MASTER) EA 1 $3,650.00 $3,650.00 $3,000.00 $3,000.00 680-115 SYSTEM CONTROL EQUIPMENT(F&I) (AUTODIAUANS EXT COMM MODEM) EA 1 $175.00 $175.00 $200.00 $200.00 • BID TABULATION CITY OF OCOEE MAGUIRE ROAD IMPROVEMENTS(SEGMENT 1&2) PAGE 7 BID DATE: MAY 18,2000 RYAN INC.EASTERN HUBBARD CONST.CO. ITEM NO. ITEM DESCRIPTION UNIT QTY. UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE 690-10 REMOVE TRAFFIC SIGNAL HEAD ASSEMBLY EA 8 $24.00 $192.00 $30.00 $240.00 690-20 REMOVE PEDESTRIAN SIGNAL ASSEMBLY EA 8 $24.00 $192.00 $25.00 $200.00 690-30 REMOVE POLES EA 4 $930.00 $3,720.00 $900.00 $3,600.00 690-31 REMOVE SIGNAL PEDESTAL EA 2 $200.00 $400.00 $200.00 $400.00 690-50 REMOVE CONTROLLER ASSEMBLY EA 1 $280.00 $280.00 $300.00 $300.00 690-80 REMOVE SPAN WIRE ASSEMBLY EA 2 $185.00 $370.00 $200.00 $400.00 690-90 REMOVE CABLING AND CONDUIT PI 2 $370.00 $740.00 $400.00 $800.00 690-100 REMOVE MISCELLANEOUS SIGNAL EQUIPMENT PI 2 $185.00 $370.00 $200.00 $400.00 700-48-48 SIGN PANEL(OVERHEAD)(RELOCATE)(15 OR LESS) EA 2 $112.00. $224.00 $200.00 $400.00 700-89-1 ELECTRICALLY POWERED OVERHEAD SIGN (INTERNALLY ILLUMINATED) EA 10 $1,305.00 $13,050.00 $1,000.00 $10,000.00 SUBTOTAL-SIGNALS $359,854.10 $288,270.00 LANDSCAPE 571-1 PLASTIC EROSION MAT SY 4,166 $1.40 $5,832.40 $2.00 $8,332.00 575-1-1 BAHIA SODDING SY 5,167 $1.15 $5,942.05 $1.20 $6,200.40 580-301-1 STAKING&GUYING,TREES EA 143 $13.50 $1,930.50 $13.00 $1,859.00 580-301-2 STAKING&GUYING,PALMS EA 106 $33.70 $3,572.20 $33.00 $3,498.00 580-326-2 PINE NEEDLE MULCH,BALES SY 17,528 $1.45' $25,415.60 $1.40 $24,539.20 581-2 LANTANA MONTEVIDENSIS/TRAILING LANTANA ,(PURPLE) EA 1,178 $6.45 $7,598.10 $6.20 $7,303.60 LANTANA MONTEVIDENSIS/TRAILING LANTANA (YELLOW) EA 1,852 $6.45 $11,945.40 $6.30 $11,667.60 MUHLENBERGIA CAPILLARIS/'MUHLY GRASS EA 5,158 $7.05 $36,363.90 $6.00 $30,948.00 582-2 ELAEANUS PUNGENS/SILVERTHORN EA 1,406 $14.50 $20,387.00 $14.10 $19,824.60 PLUMBAGO AURICULATA/LEADWORT EA 4,275 $6.85 , $29,283.75 $6.60 $28,215.00 RAPHIOLEPIS INDICA/INDIAN HAWTHORN EA 1,526 $14.55 $22,203.30 $14.00 $21,364.00 ZAMIA PUMILA/COONTIE EA 1,552 $26.35 $40,895.20 $25.60 $39,731.20 583-4 PINUS ELLIOTTI/SLASH PINE EA 65 $155.00 $10,075.00 $150.00 $9,750.00 SABAL PALMETTO/SABAL PALM EA 106 $134.00 $14,204.00 $130.00 $13,780.00 LAGERSTROEMIA INDICA 'TUSCARORAVTUSCARORA CRAPE MYRTLE EA 30 $155.00 $4,650.00 $150.00 $4,500.00 QUERCUS VIRGINIANA/LIVE OAK EA 20 $151.00 $3,020.00 $150.00 $3,000.00 BID TABULATION CITY OF OCOEE MAGUIRE ROAD IMPROVEMENTS(SEGMENT 1&2) PAGE 8 BID DATE: MAY 18,2000 RYAN INC.EASTERN HUBBARD CONST.CO. ITEM NO. ITEM DESCRIPTION UNIT QTY. UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE LAGERSTROEMIA INDICA'NATCHEZ/NATCHEZ CRAPE MYRTLE EA 28 $155.00 $4,340.00 $150.00 $4,200.00 SUBTOTAL-LANDSCAPE $247,658.40 $238,712.60 SUBTOTAL-ROADWAY PROJECT $8,179,306.06 $7,906,481.95 ROADWAY PROJECT TOTAL $8,179,306.06 $7,906,481.95 ALLOWANCES A.01 CITY OF OCOEE PERMIT(S)ALLOWANCE ALW 1 $65,000.00 $65,000.00 $65,000.00 $65,000.00 A.02 CITY OF OCOEE OFFICE EQUIPMENT ALW 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 CITY OF OCOEE ALLOWANCES TOTAL $75,000.00 $75,000.00 SPRINT TELEPHONE UTILITY IMPROVEMENTS T.01 SPRINT TELEPHONE MANHOLES TO BE REMOVED W/JPA EA 17 $900.00 $15,300.00 $1,200.00 $20,400.00 T.02 SPRINT TELEPHONE CONDUIT TO BE REMOVED W/JPA LF 8,854 $9.15 $81,014.10 $14.00 $123,956.00 SPRINT TELEPHONE UTILITY SUBTOTAL $96,314.10 $144,356.00 SPRINT TELEPHONE UTILITY TOTAL $96,314.10 $144,356.00 HELLER BROTHERS GROVES SITE IMPROVEMENTS H.01 PERFORM ALL SITE IMPROVEMENTS (STRIPPING,GRADING AND COMPACTING) ADDRESSED BY HELLER BROS.GROVES AND CITY OF OCOEE "FIRST AMENDMENT TO PURCHASE AND SALE AGREEMENT'(GENERAL CONDITIONS APPENDIX B)AND AS INDICATED ON THE DRAWINGS LS 1 $125,000.00 $125,000.00 $70,000.00 $70,000.00 HELLER BROTHERS IMPROVEMENTS TOTAL $125,000.00 $70,000.00 UTILITIES IMPROVEMENTS U.01 FURNISH&INSTALL 16"RECLAIMED WATER MAIN,D.I.OR PVC(Circle choice of mat) LF 6,930 $41.10 $284,823.00 $60.00 $415,800.00 U.02 FURNISH&INSTALL 12"RECLAIMED WATER MAIN,D.I.OR PVC(Circle choice of mat) LF 720 $39.90 $28,728.00 $52.00 $37,440.00 BID TABULATION CITY OF OCOEE MAGUIRE ROAD IMPROVEMENTS(SEGMENT 1&2) PAGE 9 BID DATE: MAY 18,2000 RYAN INC.EASTERN HUBBARD CONST.CO. ITEM NO. ITEM DESCRIPTION UNIT QTY. UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE U.03 FURNISH&INSTALL 6"RECLAIMED WATER MAIN, D.I.OR PVC(Circle choice of mat) LF 215 $22.50 $4,837.50 $28.00 $6,020.00 U.04 FURNISH.&INSTALL 4"RECLAIMED WATER MAIN, D.I.OR PVC(Circle choice of mat) LF 60 $27.80 $1,668.00 $31.00 $1,860.00 U.05 FURNISH&INSTALL 16"WATER MAIN,D.I.OR PVC(Circle choice of material) LF 1,650 • $40.50 $66,825.00 $63.00 $103,950.00 U.06 FURNISH&INSTALL 12"WATER MAIN,D.I.OR PVC(Circle choice of material) LF 7,100 $31.60 $224,360.00 $37.00 $262,700.00 U.07 FURNISH&INSTALL 8" WATER MAIN,D.I.OR PVC(Circle choice of material) LF 480 $34.30 $16,464.00 $52.00 $24,960.00 U.08 FURNISH&INSTALL 6"WATER MAIN,D.I.OR PVC (Circle choice of material) LF 180 $29.00 $5,220.00 $36.00 $6,480.00 U.09 FURNISH&INSTALL 4"WATER MAIN,D.I.OR PVC (Circle choice of material) LF 45 $20.00 $900.00 $55.00 $2,475.00 U.10 FURNISH&INSTALL 12"PVC FORCE MAIN LF 2,140 $26.60 $56,924.00 $36.00 $77,040.00 U.11 FURNISH&INSTALL 6"PVC FORCE MAIN LF 459 $22.00 $10,098.00 $40.00 $18,360.00 U.12 FURNISH&INSTALL 6"DR 14 PVC FORCE MAIN LF 266 $26.00 $6,916.00 $80.00 $21,280.00 U.13 FURNISH&INSTALL 4"DR 14 PVC FORCE MAIN LF 180 $27.00 $4,860.00 $26.00 $4,680.00 U.14 FURNISH&INSTALL 12"GRAVITY SEWER LF 1,182 $60.00 $70,920.00 $54.00 $63,828.00 U.15 FURNISH&INSTALL 12"C900,DR 25 GRAVITY SEWER LF 186 $60.00 $11,160.00 $80.00 $14,880.00 U.16 RETIRE EXISTING 8"GRAVITY SEWER LINE LF 270 $5.00 $1,350.00 $7.00 $1,890.00 U.17 REMOVAL AND DISPOSAL OF PIPE (NON-ASBESTOS) LF 8,595 $6.90 $59,305.50 $7.00 $60,165.00 U.18 REMOVAL AND DISPOSAL OF ASBESTOS PIPE LF 1,725 $9.60 $16,560.00 $10.00 $17,250.00 U.19 16"RECLAIMED WATER MAIN BRIDGE CROSSING (STA.488+83 TO STA.492+01) LS 1 $64,910.00 $64,910.00 $80,000.00 $80,000.00 U.20 FURNISH&INSTALL 16"GATE VALVE AND BOX EA 13 $3,770.00 $49,010.00 $4,000.00 $52,000.00 U.21 FURNISH&INSTALL 12'GATE VALVE AND BOX EA 24 $1,340.00 / $32,160.00 $1,500.00 $36,000.00 U.22 FURNISH&INSTALL 8"GATE VALVE AND BOX EA 7 $710.00 $4,970.00 $800.00 $5,600.00 U.23 FURNISH&INSTALL 6"GATE VALVE AND BOX EA 3 $500.00 $1,500.00 $700.00 $2,100.00 U.24 FURNISH&INSTALL 4"GATE VALVE AND BOX EA 4 $425.00 $1,700.00 $600.00 $2,400.00 U.25 FURNISH&INSTALL 12"PLUG VALVE AND BOX EA 1 $2,185.00 $2,185.00 $3,000.00 $3,000.00 U.26 FURNISH&INSTALL 6"PLUG VALVE AND BOX EA 1 $820.00 $820.00 $1,200.00 $1,200.00 U.27 FURNISH&INSTALL FIRE HYDRANT ASSEMBLY EA 14 $2,150.00 $30,100.00 $2,600.00 $36,400.00 U.28 FURNISH&INSTALL AIR RELEASE VALVE ASSEMBLY EA 8 $1,180.00 $9,440.00 $3,700.00 $29,600.00 U.29 RELOCATE 54"RWM AIR RELEASE VALVE ASSEMBLY(STA.432+50+/-) EA 1 $4,500.00 $4,500.00 $10,000.00 $10,000.00 BID TABULATION CITY OF OCOEE MAGUIRE ROAD IMPROVEMENTS(SEGMENT 1&2) PAGE 10 BID DATE: MAY 18,2000 RYAN INC.EASTERN HUBBARD CONST.CO. ITEM NO. ITEM DESCRIPTION UNIT QTY. UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE U.30 FURNISH&INSTALL BLOW-OFF VALVE ASSEMBLY EA 2 $340.00 $680.00 $800.00 $1,600.00 U.31 GROUT FILL EXISTING STEEL CASING(STA. 434+10+/-) LF 70 $73.60 $5,152.00 $22.00 $1,540.00 U.32 GROUT FILL EXISTING STEEL CASING(STA. 459+55+/-AND 453+15+/-) LF 130 $79.25 $10,302.50 $21.00 $2,730.00 U.33 FURNISH&INSTALL SANITARY MANHOLES (DEPTH 12'-16') EA 4 $4,175.00 $16,700.00 $4,400.00 $17,600.00 'U.34 CORE BORE AND CONNECT TO EXISTING MANHOLE(STA.459+00+/-) LS 1 $3,275.00 $3,275.00 $3,200.00 $3,200.00 U.35 CONSTRUCT DOGHOUSE MANHOLE(STA. 509+75+/-) LS 1 $3,800.00 $3,800.00 $7,600.00 $7,600.00 U.36 ADJUST EXISTING MANHOLES AND VALVES TO FINISH GRADE LS 1 $4,030.00 $4,030.00 $2,200.00 $2,200.00 U.37 CONNECT 2"PVC WATER SERVICE(STA. 191+60+/-) EA 1 $1,980.00 $1,980.00 $2,600.00 $2,600.00 'U.38 CONNECT 1"HDPE WATER SERVICE(STA. 459+50+/-) EA 1 $720.00 $720.00 $800.00 $800.00 U.39 CONNECT 1"HDPE WATER SERVICE(STA. 501+00+/-) ,. EA 1 $630.00 $630.00 $600.00 $600.00 U.40 CONNECT TO EXISTING 1-1/2"WATER SERVICE (STA.507+24=/-) EA 1 $525.00 $525.00 . $1,300.00 $1,300.00 • U.41 CONNECT EXISTING 4"WATER SERVICE(STA. 513+60+/-) EA 1 $5,715.00 $5,715.00 $7,300.00 $7,300.00 U.42 12"WATER MAIN CONFLICT TRANSITION(STA. 29+00+/-) LS 1 $4,000.00, $4,000.00 $5,000.00 $5,000.00 , U.43 12"WATER MAIN CONFLICT TRANSITION(STA. 433+00+/-) LS 1 $4,000.00 $4,000.00 $5,000.00 $5,000.00 U'44 FURNISH&INSTALL CONCRETE PROTECTIVE CAP LF 775 $16.60 $12,865.00 $44.00 $34,100.00 BID TABULATION CITY OF OCOEE MAGUIRE ROAD IMPROVEMENTS(SEGMENT 1&2) PAGE 11 BID DATE: MAY 18,2000 RYAN INC.EASTERN HUBBARD CONST.CO. ITEM NO. ITEM DESCRIPTION UNIT QTY. UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE U.45 FOR ANY WORK ITEMS NOT INCLUDED IN THE ABOVE BID ITEMS,SUPPLY ALL MATERIALS AND FURNISH ALL LABOR AND EQUIPMENT,PERFORM ALL WORK REQUIRED,PAY ALL COSTS NECESSARY FOR A COMPLETE AND OPERATIONAL SYSTEM PER THE INTENT OF THE SPECIFICATIONS AND CONTRACT DRAWINGS. LS 1 $5,000.00 $5,000.00 $100.00 $100.00 UTILITIES SUBTOTAL $1,152,588.50 $1,492,628.00 UTILITIES PROJECT TOTAL $1,152,588.50 $1,492,628.00 PROJECT GRAND TOTAL $9,628,208.66 $9,688,465.95 G:\...\O E-352/353\B I D TA B (4)Multiplication Errors(-$22,956.17)(Shaded) (1)Addition Error(-$33,671.82) Total Error(-$56,627.99) BID TABULATION CITY OF OCOEE MAGUIRE ROAD IMPROVEMENTS(SEGMENT 1&2) PAGE 12 - BID DATE: MAY 18,2000 _ BERGERON LAND DEV. GRANITE CONST.CO, ITEM NO. ITEM DESCRIPTION UNIT QTY. UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE ROADWAY 101-1 MOBILIZATION(INCLUDING BONDS,GENL REQUIREMENTS&INDEMNIFICATION) LS 1 $1,000,000.00 $1,000,000.00 $1,078,700.00 $1,078,700.00 102-1 MAINTENANCE OF TRAFFIC LS 1 $450,000.00 $450,0,30.00 $800,000.00 $800,000.00 104-99 EROSION CONTROL LS 1 $20,000.00 $20,000.00 $70,000.00 $70,000.00 110-1-1 CLEARING&GRUBBING(45.51 ACRES) LS 1 $350,000.00 $350,000.00 $265,000.00 $265,000.00 110-7-1 MAIL BOX(F&I) EA 8 $100.00 $800.00 $100.00 $800.00 120-1 EXCAVATION,REGULAR CY 113,028 $5.00 $565,140.00 $5.50 $621,654.00 120-6 EMBANKMENT CY 49,021 $2.00 $98,042.00 $8.00 $392,168.00 120-99 EARTHWORK(MOORE ROAD) LS 1 $8,000.00 $8,000.00 $30,000.00 $30,000.00 160-4 TYPE"B"STABILIZATION SY 93,948 $3.00 $281,844.00 $2.00 $187,896.00 162-3-101 FINISH SOIL LAYER(GRASS)(6") SY 44,694 $1.00 $44,694.00 $0.50 $22,347.00 285-707-248 OPTIONAL BASE(BASE GROUP 7) SY 2,718 $10.00 $27,180.00 $12.00 $32,616.00 285-709-327 OPTIONAL BASE(BASE GROUP 9)(6"ABC-3, MARSHALL 1000)(ONLY) SY 13,276 $14.00 $185,864.00 $14.00 $185,864.00 285-709-990 OPTIONAL BASE(BASE GROUP 9),(10" LIMEROCK LBR 100)(ONLY) SY 60,415 $6.50 $392,697.50 $7.00 $422,905.00 300-1-1 BITUMINOUS MATERIAL(PRIME COAT) GA 249 $2.00 $498.00 $2.00 $498.00 300-1-3 BITUMINOUS MATERIAL(TACK COAT) GA 7,046 $1.00 $7,046.00 $1.00 $7,046.00 327-70-5 MILLING EXISTING ASPHALT PAVEMENT(2"AVG) SY 1,262 $6.00 $7,572.00 $5.20 $6,562.40 327-70-6 MILLING EXISTING ASPHALT PAVEMENT(1-1/2" AVG) SY 3,969 $3.00 $11,907.00 $2.50 $9,922.50 331-72-14 TYPE S ASPHALTIC CONCRETE(1-1/2") SY 5,085 $4.00 $20,340.00 $3.50 $17,797.50 331-72-20 TYPE S ASPHALTIC CONCRETE(2") SY 146 $30.00 $4,380.00 $30.00 $4,380.00 331-72-24 TYPE S ASPHALTIC CONCRETE(2-1/2') SY 76,275 $5.00 $381,375.00 $5.00 $381,375.00 337-7-2 ASPHALT CONC.FRICTION COURSE(INC BIT) (RUBBER)(FC-2) TN 33.5 $250.00 $8,375.00 $250.00 $8,375.00 337-7-3 ASPHALT CONC.FRICTION COURSE(INC BIT) (RUBBER)(FC-3) TN 4,019.5 $61.00 $245,189.50 $61.00 $245,189.50 339-1 MISCELLANEOUS ASPHALT PAVEMENT TN 330.1 $65.00 $21,456.50 $76.00 $25,087.60 400-1-11 CLASS I CONCRETE(RETAINING WALLS) CY 6.2 $900.00 $5,580.00 $400.00 $2,480.00 400-1-15 CLASS I CONCRETE(MISCELLANEOUS) CY 10.0 $400.00 $4,000.00 $400.00 $4,000.00 425-1-351 INLETS(CURB TYPE P-5)(<10') EA 64 $2,500.00 $160,000.00 $2,500.00 $160,000.00 425-1-352 INLETS(CURB TYPE P-5)(>10) EA 1 $3,200.00 $3,200.00 $2,700.00 $2,700.00 425-1-361 INLETS(CURB TYPE P-6)(<10') EA 19 $2,800.00 $53,200.00 $2,700.00 $51,300.00 425-1-451 INLETS(CURB TYPE J-5)(<10') EA 14 $3,600.00 $50,400.00 $4,000.00 $56,000.00 BID TABULATION CITY OF OCOEE MAGUIRE ROAD IMPROVEMENTS(SEGMENT 1&2) PAGE 13 BID DATE: MAY 18,2000 BERGERON LAND DEV. GRANITE CONST.CO. ITEM NO. ITEM DESCRIPTION UNIT QTY. UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE 425-1-452 INLETS(CURB TYPE J-5)(>10') EA 1 $4,700.00 $4,700.00 $5,000.00 $5,000.00 425-1-461 INLETS(CURB TYPE J-6)(<10') EA 5 $4,000.00 $20,000.00 $3,500.00 $17,500.00 425-1-471 INLETS(CURB TYPE 7)(<10') EA 1 $2,700.00 $2,700.00 $3,600.00 $3,600.00 425-1-501 INLETS(DBI TYPE A)(<10') EA 1 $1,300.00 $1,300.00 $2,100.00 $2,100.00 425-1-521 INLETS(DBI TYPE C)(<10') EA 10 $1,200.00 $12,000.00 $2,100.00 $21,000.00 425-1-531 INLETS(DBI TYPE C) (MOD.)(<10') EA 6 $1,400.00 $8,400.00 $2,100.00 $12,600.00 425-1-541 INLETS(DBI TYPE D)(<10') EA 2 $2,100.00 $4,200.00 $2,000.00 $4,000.00 425-1-571 INLETS(DBI TYPE G)(<10) EA 3 $2,500.00 $7,500.00 $2,600.00 $7,800.00 425-1-881 INLETS(BARRIER WALL,RIGID,CURB& GUTTER)(<10') EA 4 $1,900.00 $7,600.00 $2,600.00 $10,400.00 425-1-882 INLETS(BARRIER WALL,RIGID,CURB& GUTTER)(>10') EA 2 $3,800.00 $7,600.00 $3,200.00 $6,400.00 425-2-41 MANHOLES(P-7)(<10) EA 13, $1,900.00 $24,700.00 $2,100.00 $27,300.00 425-2-42 MANHOLES(P-7)(>10) EA 2 $2,200.00 $4,400.00 $2,100.00 $4,200.00 425-2-71 MANHOLES(J-7)(<10') EA 7 $2,900.00 $20,300.00 $4,000.00 $28,000.00 425-2-72 MANHOLES(J-7)(>10') EA 2 $3,600.00 $7,200.00 $4,000.00 $8,000.00 425-2-103 MANHOLES(TYPE 7 TOP)(PARTIAL) EA 1 $1,100.00 $1,100.00 $1,000.00 $1,000.00 425-11 MODIFY EXISTING DRAINAGE STRUCTURE EA 5 $650.00 $3,250.00 $700.00 $3,500.00 430-11-223 CONCRETE PIPE CULVERT(15") LF 17 $38.00 $646.00 $35.00 $595.00 430-11-225 CONCRETE PIPE CULVERT(18") LF 7,905 $26.00 $205,530.00 $40.00 $316,200.00 430-11-229 CONCRETE PIPE CULVERT(24") LF 3,011 $38.00 $114,418.00 $44.00 $132,484.00 430-11-233 CONCRETE PIPE CULVERT(30") LF 3,023 $45.00 $136,035.00 $46.00 $139,058.00 430-11-238 CONCRETE PIPE CULVERT(36") LF 1,826 $57.00 $104,082.00 $57.00 $104,082.00 430-11-240 CONCRETE PIPE CULVERT(42") LF 556 $63.00 $35,028.00 $70.00 $38,920.00 430-11-241 CONCRETE PIPE CULVERT(48") LF 1,553 $74.00 $114,922.00 $80.00 $124,240.00 430-31-125 CORRUGATE STEEL PIPE CULVERT (BITUMINOUS COATED)(18") LF 46 $32.00 $1,472.00 $40.00 $1,840.00 430-142-011 ELLIPTICAL CONC.PIPE CULVERT(43"X68") LF 128 $110.00 $14,080.00 $150.00 $19,200.00 430-144-103 ELLIPTICAL CONC.CULVERT(SIDE DRAIN)(HE 111)(19"X30") LF 248 $46.00 $11,408.00 $42.00 $10,416.00 430-150-116 DUCTILE IRON PIPE(6") LF 970 $18.00 $17,460.00 $20.00 4 $19,400.00 430-982-229 MITERED END SECTION(24") (CONCRETE PIPE ROUND)(CD) EA 2 $700.00 $1,400.00 $800.00 $1,600.00 430-982-238 MITERED END SECTION(36") (CONCRETE PIPE ROUND)(CD) EA 1 $1,300.00 $1,300.00 $1,100.00 $1,100.00 430-984-403 MITERED END SECTION(19"X30") (ELLIPTICAL CONCRETE CULVERT)(SD) EA 2 $650.00 $1,300.00 $800.00 $1,600.00 BID TABULATION CITY OF OCOEE MAGUIRE ROAD IMPROVEMENTS(SEGMENT 1&2) PAGE 14 BID DATE: MAY 18,2000 BERGERON LAND DEV. GRANITE CONST.CO. ITEM NO. ITEM DESCRIPTION UNIT QTY. UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE 430-985-225 MITERED END SECTION(18") (CRP) EA 1 $650.00 $650.00 $800.00 $800.00 430-985-229 MITERED END SECTION(24") (CRP) EA 2 $700.00 $1,400.00 $900.00 $1,800.00 430-985-233 MITERED END SECTION(30") (CRP) EA 2 $950.00 $1,900.00 $1,200.00 $2,400.00 430-985-240 MITERED END SECTION(42") (CRP) EA 2 $1,500.00 $3,000.00 $1,400.00 $2,800.00 430-985-241 MITERED END SECTION(48") (CRP) EA 1 $1,700.00 $1,700.00 $1,600.00 $1,600.00 515-1-2 PIPE HANDRAIL(ALUMINUM)(3-RAIL) LF 1,584 $23.00 $36,432.00 $22.00 $34,848.00 520-1-10 CONCRETE CURB&GUTTER(TYPE F) LF 30,661 $7.50 $229,957.50 $6.75 $206,961.75 520-2-1 CONCRETE CURB(TYPE A) LF 313 $17.00 $5,321.00 $8.75 $2,738.75 520-3. VALLEY GUTTER,CONCRETE LF 200 $27.00 $5,400.00 $13.15 $2,630.00 520-5-11 CONCRETE TRAFFIC SEPARATOR(4'WIDE) (TYPE I) LF 1,647 $10.00 $16,470.00 $11.75 $19,352.25 520-70-9 CONCRETE TRAFFIC SEPARATOR(VARIABLE WIDTH) SY 401 $35.00 $14,035.00 $32.50 $13,032.50 521-1 CONCRETE BARRIER WALL LF 182 $115.00 $20,930.00 $140.00 $25,480.00 521-72-5 CONCRETE BARRIER WALL(RIGID-CURB& GUTTER) LF 1,625 $80.00 $130,000.00 $50.00 $81,250.00 522-1 CONCRETE SIDEWALK(4"THICK) SY 13,942 $17.00 $237,014.00 $17.00 $237,014.00 522-2 CONCRETE SIDEWALK(6"THICK) SY 1,660 $30.00 $49,800.00 $23.00 $38,180.00 524-1-1 CONCRETE DITCH PAVEMENT(NON REINFORCED)(3") SY 33 $45.00 $1,485.00 $40.00 $1,320.00 534-70 CONCRETE BLOCK RETAINING WALL SY 567 $50.00 $28,350.00 $25.00 $14,175.00 544-75-14 IMPACT ATTENUATOR VEHICULAR (QUADGUARD) EA 2 $30,000.00 $60,000.00 $29,700.00 $59,400.00 550-2 FENCING(TYPE B)(STANDARD 6') LF 620 $7.00 $4,340.00 $5.60 $3,472.00 550-3-2 CORNER POST ASSEMBLY(TYPE B FENCE) EA 8 $80.00 $640.00 $90.00 $720.00 550-6-1 END POST ASSEMBLY(TYPE B FENCE) EA 4 $80.00 $320.00 $70.00 $280.00 550-74-2 FENCING(TYPE B) LF 295 $7.00 $2,065.00 $8.00 $2,360.00 575-1 SODDING SY 44,694 $1.20 $53,632.80 $1.15 $51,398.10 SUBTOTAL-ROADWAY $6,209,653.80 $6,969,810.85 BRIDGE 110-3 REMOVAL OF EXISTING STRUCTURES LS 1 $125,000.00 $125,000.00 $120,000.00 $120,000.00 400-2-4 CLASS II CONC.(SUPERSTRUCTURE) CY 671.4 $550.00 $369,270.00 $350.00 $234,990.00 400-2-5 CLASS II CONC.(SUBSTRUCTURE) CY 393.1 $550.00 $216,205.00 $450.00 $176,895.00 400-2-10 CLASS II CONC.(APPROACH SLABS) CY 138.6 $325.00 $45,045.00 $120.00 $16,632.00 BID TABULATION CITY OF OCOEE MAGUIRE ROAD IMPROVEMENTS(SEGMENT 1&2) PAGE 15 BID DATE: MAY 18,2000 BERGERON LAND DEV. GRANITE CONST.CO. ITEM NO. ITEM DESCRIPTION UNIT QTY. UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE 400-7 BRIDGE FLOOR GROOVING SY 1,730 $3.00 $5,190.00 $1.85 $3,200.50 400-147 COMPOSITE NEOPRENE PADS CF 14.5 $1,000.00 $14,500.00 $670.00 $9,715.00 400-148-1 TRAFFIC RAILING(F&I)(BARRIER) LF 575 $200.00 $115,000.00 $70.00 $40,250.00 415-1-4 REINFORCING STEEL(SUPERSTRUCTURE) LB 106,811 $0.55 $58,746.05 $0.40 $42,724.40 415-1-5 REINFORCING STEEL(SUBSTRUCTURE) LB 51,494 $0.55 $28,321.70 $0.40 $20,597.60 415-1-9 REINFORCING STEEL(APPROACH SLABS) LB 22,634 $0.55 $12,448.70 $0.40 $9,053.60 450-1-4 PRESTRESSED BEAM(TYPE V) LF 3,161 $190.00 $600,590.00 $100.00 $316,100.00 455-3-4 PREST.CONC PILING(FURNISHED)(24"SQ.) LF 3,406 $72.00 $245,232.00 $40.00 $136,240.00 455-4-4 PREST.CONC PILING(DRIVEN)(24"SQ.) LF 3,406 $1.00 $3,406.00 $1.00 $3,406.00 455-15 PREFORMED PILE HOLES EA 4 $500.00 $2,000.00 $100.00 $400.00 455-137 DYNAMIC TEST LOAD EA 2 $1,500.00 $3,000.00 $25,000.00 $50,000.00 455-140-14 TEST PILES(FURNISHED)(24"SQ.) LF 235 $500.00 $117,500.00 $300.00 $70,500.00 455-141-14 TEST PILES(DRIVEN)(24"SQ.) LF 235 $5.00 $1,175.00 $1.00 $235.00 460-70-3 ALUMINUM RAILINGS(PEDESTRIAN/BICYCLE) LF 154 $32.00 $4,928.00 $32.00 $4,928.00 548-10 RETAINING WALL SYSTEM(PERMANENT) SF 7,946 $24.00 $190,704.00 $17.00 $135,082.00 SUBTOTAL-BRIDGE $2,158,261.45 $1,390,949.10 SIGNING&PAVEMENT MARKING 700-40-1 SIGN,SINGLE POST(LESS THAN 12 SF) AS 52 $200.00 $10,400.00 $160.00 $8,320.00 700-40-2 SIGN,SINGLE POST(12-25) AS 3 $250.00 $750.00 $820.00 $2,460.00 700-46-11 SIGN EXISTING(REMOVE)(SINGLE POST) AS 25 $15.00 $375.00 $1.00 $25.00 700-46-12 SIGN EXISTING(REMOVE)(MULTI-POST) AS 1 $150.00 $150.00 $60.00 $60.00 700-46-21 SIGN EXISTING(RELOCATE)(SINGLE POST) AS 17 $80.00 $1,360.00 $50.00 $850.00 705-10-11 OBJECT MARKER(POST MOUNTED)(TYPE I) EA 42 $90.00 $3,780.00 $85.00 $3,570.00 706-3 RETRO REFLECTIVE PAVEMENT MARKERS, BI-DIRECTIONAL EA 1,259 $3.50 $4,406.50 $3.60 $4,532.40 710-30 REFLECTIVE PAINT(ISLAND NOSE)(YELLOW) SY 32 $5.00 $160.00 $5.00 $160.00 711-3 PAVEMENT MESSAGES,THERMOPLASTIC EA 12 $60.00 $720.00 $80.00 $960.00 711-4 DIRECTIONAL ARROWS,THERMOPLASTIC EA 101 $30.00 $3,030.00 $35.00 $3,535.00 711-5-1 GUIDELINES,THERMOPLASTIC(WHITE) LF 68 $0.50 $34.00 $0.40 $27.20 711-31 SKIP TRAFFIC STRIPE,THERMOPLASTIC(6" WHITE)(10'-30'SKIP) GM 3.318 $550.00 $1,824.90 $950.00 $3,152.10 711-34 SKIP TRAFFIC STRIPE,THERMOPLASTIC(6" YELLOW)(6-10'SKIP) LF 962 $0.40 $384.80 $0.35 $336.70 711-35-81 SOLID TRAFFIC STRIPE,THERMOPLASTIC(8" WHITE) LF 2,607 $0.50 $1,303.50 $0.50 $1,303.50 BID TABULATION CITY OF OCOEE MAGUIRE ROAD IMPROVEMENTS(SEGMENT 1&2) PAGE 16 BID DATE: MAY 18,2000 BERGERON LAND DEV. GRANITE CONST.CO. ITEM NO. ITEM DESCRIPTION UNIT QTY. UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE 711-35-121 SOLID TRAFFIC STRIPE,THERMOPLASTIC(12' WHITE) LF 6,486 $0.90 $5,837.40 $1.00 $6,486.00 711-35-181 SOLID TRAFFIC STRIPE,THERMOPLASTIC(18" • WHITE) LF 579 $1.30 $752.70 $1.40 $810.60 711-35-241 SOLID TRAFFIC STRIPE,THERMOPLASTIC(24" WHITE) LF 994 $1.80 $1,789.20 $1.60 $1,590.40 711-36-181 SOLID TRAFFIC STRIPE,THERMOPLASTIC(18" YELLOW) LF 1,528 $1.50 $2,292.00 $1.50 $2,292.00 711-37-61 SOLID TRAFFIC STRIPE,THERMOPLASTIC(6" WHITE) NM 5.466 $1,400.00 $7,652.40 $1,525.00 $8,335.65 711-38-61 SOLID TRAFFIC STRIPE,THERMOPLASTIC(6" YELLOW) NM 4.822 $1,700.00 $8,197.40 $1,770.00 $8,534.94 SUBTOTAL-SIGNING&PAVEMENT MARKING $55,199.80 $57,341.49 SIGNALS 620-1-1 GROUNDING,ELECTRODE(FURNISH&INSTALL) LF 1,170 $5.00 $5,850.00 $4.00 $4,580.00 630-1-12 • CONDUIT(FURNISH&INSTALL) (UNDERGROUND) LF 2,520 $4.00 $10,080.00 $4.00 $10,080.00 630-1-13 CONDUIT(FURNISH&INSTALL) (UNDERPAVEMENT) LF 2,252 $9.00 $20,268.00 $8.50 $19,142.00 632-7-1 CABLE(SIGNAL)(FURNISH&INSTALL) PI 5 $2,900.00 $14,500.00 $2,800.00 $14,000.00 634-4-113 SPAN WIRE ASSEMBLY(F&I)(TWO WIRE)(BOX) PI 1 $1,900.00 $1,900.00 $1,900.00 $1,900.00 634-4-413 SPAN WIRE ASSEMBLY(ADJUST) PI 1 $750.00 $750.00 $700.00 $700.00 634-5-1 FIBERGLASS INSULATOR(F&I) LF 20 $16.00 $320.00 $15.00 $300.00 635-1-11 PULL AND JUNCTION BOXES EA 61 $230.00 $14,030.00 $220.00 $13,420.00 639-1-12 ELECTRICAL POWER SERVICE(OVERHEAD) AS 1 $610.00 $610.00 $600.00 $600.00 639-1-22 ELECTRICAL POWER SERVICE(UNDERGROUND) AS A 3 $550.00 $1,650.00 $530.00 $1,590.00 639-2-1 ELECTRICAL SERVICE WIRE(FURNISH AND INSTALL) LF 80 $2.40 $192.00 $2.35 $188.00 641-15-146 CONCRETE STRAIN POLES(F&I WITH FOUNDATION)(TYPE N-VI) EA 4 $2,700.00 $10,800.00 $2,700.00 $10,800.00 648-11-00 MAST ARMS(F&I)(STEEL,SINGLE ARM) EA 2 $8,000.00 $16,000.00 $7,800.00 $15,600.00 648-11-28 MAST ARMS(F&I)(STEEL,SINGLE ARM) EA 1 $9,000.00 $9,000.00 $8 600.00 $8,600.00 648-11-40 MAST ARMS.(F&I)(STEEL,SINGLE ARM) EA 1 $10,500.00 $10,500.00 $10,300.00 $10,300.00 648-11-42 MAST ARMS(F&I)(STEEL,SINGLE ARM) EA 2 $11,500.00 $23,000.00 $11,000.00 $22,000.00 648-11-48 MAST ARMS(F&I)(STEEL,SINGLE ARM) EA 1 $13,000.00 $13,000.00 $12,500.00 $12,500.00 648-11-50 MAST ARMS(F&I)(STEEL,SINGLE ARM) EA 1 $13,500.00 $13,500.00 $13,000.00 $13,000.00 BID TABULATION CITY OF OCOEE MAGUIRE ROAD IMPROVEMENTS(SEGMENT 1&2) PAGE 17 BID DATE: MAY 18,2000 - BERGERON LAND DEV. GRANITE CONST.CO. ITEM NO. ITEM DESCRIPTION UNIT QTY. UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE 648-11-52 MAST ARMS(F&I)(STEEL,SINGLE ARM) EA 2 $15,000.00 $30,000.00 $14,600.00 $29,200.00 648-11-58 MAST ARMS(F&I)(STEEL,SINGLE ARM) EA 1 $16,000.00 $16,000.00 4 $15,600.00 $15,600.00 650-1-131 TRAFFIC SIGNAL 12"STANDARD(F&I)(3 SECTION,1 WAY) AS 19 $530.00 $10,070.00 $520.00 $9,880.00 650-1-331 TRAFFIC SIGNAL 12"STANDARD(INSTALL)(5 SECTION,1 WAY) AS 12 $160.00 $1,920.00 $160.00 $1,920.00 650-9-151 TRAFFIC SIGNAL 12"STANDARD(F&I)(5 SECTION,1 WAY) AS 5 $850.00 $4,250.00 $840.00 $4,200.00 650-9-351 TRAFFIC SIGNAL 12"STANDARD(INSTALL)(5 SECTION,CLSTR) AS 2 $200.00 $400.00 $200.00 $400.00 653-111 PEDESTRIAN SIGNAL(F&I)(12"INCANDESCENT, 1 WAY) AS 30 $800.00 $24,000.00 $760.00 $22,800.00 659-101 SIGNAL HEAD AUXILIARIES(F&I)(BACK PLATES, 3 SECTION) EA 2 $150.00 $300.00 $120.00 $240.00 659-103 SIGNAL HEAD AUXILIARIES(F&I)(DISCONNECT HANGER) EA 8 $250.00 $2,000.00 $250.00 $2,000.00 :'. 659-106 SIGNAL HEAD AUXILIARIES(F&I)(TUNNEL VISOR) EA 82 $2.00 $164.00 $1.25 $102.50 659-108 SIGNAL HEAD AUXILIARIES(STEEL PEDESTAL) EA 3 $800.00 $2,400.00 $800.00 $2,400.00 659-118 SIGNAL HEAD AUXILIARIES(F&I)(BACK PLATES, 5 SECTION) EA 2 $130.00 $260.00 $125.00 $250.00 660-1-101 INDUCTIVE LOOP DETECTOR(F&I)TYPE 1,1 CH. • R,S) EA 18 $130.00 $2,340.00 $125.00 $2,250.00 660-1-102 INDUCTIVE LOOP DETECTOR(F&I)TYPE 2,1 CH. R,S,TO) EA 6 $150.00 $900.00 $150.00 $900.00 660-2-102 LOOP ASSEMBLY(F&I)(TYPE B) AS 20 $600.00 $12,000.00 $600.00 $12,000.00 660-2-106 LOOP ASSEMBLY(F&I)(TYPE F)(6'X 40') AS 18 $600.00 $10,800.00 $600.00 $10,800.00 663-70 VEHICLE DETECTOR ASSEMBLIES AS 3 $6,000.00 $18,000.00 $6,000.00 $18,000.00 665-11 PEDESTRIAN DETECTOR(F&I)(POLE/CONTROL CABINET MOUNTED) EA 30 670-113-211 ACT.SOLID STATE CONTRLR ASMBLY(F&I) � $100.00 � $3,000.00 $100.00 $3,000.00 AS • 1 $10,500.00 $10,500.00 $10,400.00 $10,400.00 670-113-231 ACT.SOLID STATE CONTRLR ASMBLY(F&I) (D-4-4,DUAL RING&PHASE) AS 2 $10,000.00 $20,000.00 $9,800.00 $19,600.00 670-131-000 ACT.SOLID STATE CONTRLR ASMBLY(INSTALL) AS 1 $1,150.00 $1,150.00 $1,100.00 $1,100.00 680-106 SYSTEM CONTROL EQUIPMENT(F&I) (COMMUNICATIONS INTERFACE) EA 1 $500.00 $500.00 $500.00 $500.00 680-111 SYSTEM CONTROL EQUIPMENT(F&I)(ROADSIDE MASTER) EA 1 $3,600.00 $3,600.00 $3,500.00 $3,500.00 680-115 SYSTEM CONTROL EQUIPMENT(F&I) (AUTODIAUANS EXT COMM MODEM) EA 1 $170.00 $170.00 $170.00 $170.00 BID TABULATION CITY OF OCOEE MAGUIRE ROAD IMPROVEMENTS(SEGMENT 1&2) PAGE 18 BID DATE: MAY 18,2000 BERGERON LAND DEV. GRANITE CONST.CO. ITEM NO. ITEM DESCRIPTION UNIT QTY. UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE 690-10 REMOVE TRAFFIC SIGNAL HEAD ASSEMBLY EA 8 $23.00 $184.00 $25.00 $200.00 690-20 REMOVE PEDESTRIAN SIGNAL ASSEMBLY EA 8 $23.00 $184.00 $25.00 $200.00 690-30 REMOVE POLES EA 4 $900.00 $3,600.00 $900.00 $3,600.00 690-31 REMOVE SIGNAL PEDESTAL EA 2 $200.00 $400.00 $200.00 $400.00 690-50 REMOVE CONTROLLER ASSEMBLY EA 1 $270.00 $270.00 $270.00 $270.00 690-80 REMOVE SPAN WIRE ASSEMBLY EA 2 $180.00 $360.00 $180.00 $360.00 690-90 REMOVE CABLING AND CONDUIT PI 2 $360.00 $720.00 $360.00 $720.00 690-100 REMOVE MISCELLANEOUS SIGNAL EQUIPMENT PI 2 $180.00 $360.00 $180.00 $360.00 700-48-48 SIGN PANEL(OVERHEAD)(RELOCATE)(15 OR LESS) EA 2 $110.00 $220.00 $100.00 $200.00 700-89-1 ELECTRICALLY POWERED OVERHEAD SIGN (INTERNALLY ILLUMINATED) EA 10 $1,300.00 $13,000.00 $1,300.00 $13,000.00 SUBTOTAL-SIGNALS $359,972.00 $349,922.50 LANDSCAPE 571-1 PLASTIC EROSION MAT SY 4,166 _ $1.40 $5,832.40 $1.40 $5,832.40 575-1-1 BAHIA SODDING SY 5,167 $1.15 $5,942.05 $1.15 $5,942.05 580-301-1 STAKING&GUYING,TREES EA 143 $10.50 $1,501.50 . $13.00 $1,859.00 580-301-2 STAKING&GUYING,PALMS EA 106 $27.00 $2,862.00 $30.00 $3,180.00 580-326-2 PINE NEEDLE MULCH,BALES SY 17,528 $1.00 $17,528.00 $1.40 $24,539.20 581-2 LANTANA MONTEVIDENSIS/TRAILING LANTANA (PURPLE) EA 1,178 $5.50 $6,479.00 $6.30 $7,421.40 LANTANA MONTEVIDENSIS/TRAILING LANTANA (YELLOW) EA 1,852 $5.50 $10,186.00 $6.30 $11,667.60 MUHLENBERGIA CAPILLARISPMUHLY GRASS EA 5,158 $6.00 $30,948.00 $7.00 $36,106.00 582-2 ELAEANUS PUNGENS/SILVERTHORN EA 1,406 $12.50 $17,575.00 $14.00 $19,684.00 PLUMBAGO AURICULATA/LEADWORT EA 4,275 $7.00 ' $29,925.00 $6.60 $28,215.00 • RAPHIOLEPIS INDICA/INDIAN HAWTHORN EA 1,526 $12.50 $19,075.00 $14.00 $21,364.00 ZAMIA PUMILA/COONTIE EA 1,552 $26.00 $40,352.00 $25.00 $38,800.00 583-4 PINUS ELLIOTTI/SLASH PINE EA 65 $152.00 $9,880.00 $150.00 $9,750.00 SABAL PALMETTO/SABAL PALM EA 106 $120.00 $12,720.00 $130.00 $13,780.00 LAGERSTROEMIA INDICA TUSCARORA'/TUSCARORA CRAPE MYRTLE EA 30 $152.00 $4,560.00 $150.00 $4,500.00 QUERCUS VIRGINIANA/LIVE OAK ._ EA 20 $150.00 $3,000.00 $150.00 $3,000.00 BID TABULATION CITY OF OCOEE MAGUIRE ROAD IMPROVEMENTS(SEGMENT 1&2) PAGE 19 BID DATE: MAY 18,2000 BERGERON LAND DEV. GRANITE CONST.CO. ITEM NO. ITEM DESCRIPTION UNIT QTY. UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE LAGERSTROEMIA INDICA'NATCHEZ'/NATCHEZ CRAPE MYRTLE EA 28 $152.00 $4,256.00 $150.00 _ $4,200.00 SUBTOTAL-LANDSCAPE $222,621.95 $239,840.65_ SUBTOTAL-ROADWAY PROJECT $9,005,709.00 $9,007,864.59 ROADWAY PROJECT TOTAL $9,005,709.00 $9,007,864.59 ALLOWANCES A.01 CITY OF OCOEE PERMIT(S)ALLOWANCE ALW 1 $65,000.00 $65,000.00 $65,000.00 $65,000.00 A.02 CITY OF OCOEE OFFICE EQUIPMENT ALW 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 CITY OF OCOEE ALLOWANCES TOTAL $75,000.00 $75,000.00 SPRINT TELEPHONE UTILITY IMPROVEMENTS T.01 SPRINT TELEPHONE MANHOLES TO BE REMOVED W/JPA EA 17 $500.00 $8,500.00 $1,000.00 $17,000.00 T.02 SPRINT TELEPHONE CONDUIT TO BE REMOVED W/JPA LF 8,854 $15.00 $132,810.00 $10.00 $88,540.00 SPRINT TELEPHONE UTILITY SUBTOTAL $141,310.00 $105,540.00 SPRINT TELEPHONE UTILITY TOTAL $141,310.00 $105,540.00 HELLER BROTHERS GROVES SITE IMPROVEMENTS H.01 PERFORM ALL SITE IMPROVEMENTS (STRIPPING,GRADING AND COMPACTING) ADDRESSED BY HELLER BROS.GROVES AND CITY OF OCOEE "FIRST AMENDMENT TO PURCHASE AND SALE AGREEMENT'(GENERAL CONDITIONS APPENDIX B)AND AS INDICATED ON THE DRAWINGS LS 1 $200,000.00 $200,000.00 $250,000.00 $250,000.00 HELLER BROTHERS IMPROVEMENTS TOTAL $200,000.00 $250,000.00 UTILITIES IMPROVEMENTS U.01 FURNISH&INSTALL 16"RECLAIMED WATER MAIN,D.I.OR PVC(Circle choice of mat) LF 6,930 $42.00 $291,060.00 $45.00 $311,850.00 U.02 FURNISH&INSTALL 12'RECLAIMED WATER MAIN,D.I.OR PVC(Circle choice of mat) LF 720 $47.00 $33,840.00 $40.00 $28,800.00 BID TABULATION CITY OF OCOEE MAGUIRE ROAD IMPROVEMENTS(SEGMENT 1&2) PAGE 20 BID DATE: MAY 18,2000 BERGERON LAND DEV. GRANITE CONST.CO. ITEM NO. ITEM DESCRIPTION UNIT QTY. UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE U.03 FURNISH&INSTALL 6"RECLAIMED WATER MAIN, D.I.OR PVC(Circle choice of mat) LF 215 $30.00 $6,450.00 $30:00 $6,450.00 U.04 FURNISH&INSTALL 4"RECLAIMED WATER MAIN, D.I.OR PVC(Circle choice of mat) LF 60 $32.00 $1,920.00 $30.00 $1,800.00 U.05 FURNISH&INSTALL 16"WATER MAIN,D.I.OR • PVC(Circle choice of material) LF 1,650 $42.00 $69,300.00 $45.00 $74,250.00 U.06 FURNISH&INSTALL 12"WATER MAIN,D.I.OR PVC(Circle choice of material) LF 7,100 $36.00 $255,600.00 $45.00 $319,500.00 U.07 FURNISH&INSTALL 8" WATER MAIN,D.I.OR PVC(Circle choice of material) LF 480 $59.00 $28,320.00 $46.00 $22,080.00 U.08 FURNISH&INSTALL 6"WATER MAIN,D.I.OR.PVC (Circle choice of material) LF 180 $44.00 $7,920.00 $30.00 $5,400.00 U.09 - FURNISH&INSTALL 4"WATER MAIN,D.I.OR PVC (Circle choice of material) LF 45 $63.00 $2,835.00 $42.00 $1,890.00 U.10 FURNISH&INSTALL 12"PVC FORCE MAIN LF 2,140 $29.00 $62,060.00 $30.00 $64,200.00 U.11 FURNISH&INSTALL 6"PVC FORCE MAIN LF 459 $16.00 $7,344.00 $20.00 $9,180.00 U.12 FURNISH&INSTALL 6"DR 14 PVC FORCE MAIN LF 266 $25.00 $6,650.00 $20.00 $5,320.00 U.13 FURNISH&INSTALL 4"DR 14 PVC FORCE MAIN LF 180 $15.00 $2,700.00 $28.00 $5,040.00 U.14 FURNISH&INSTALL 12"GRAVITY SEWER LF 1,182 $33.00 $39,006.00 $58.00 $68,556.00 U.15 . FURNISH&INSTALL 12"C900,DR 25 GRAVITY SEWER LF 186 $41.00 $7,626.00 $50.00 $9,300.00 U.16 RETIRE EXISTING 8"GRAVITY SEWER LINE LF 270 $14.00 $3,780.00 $5.00 $1,350.00 U.17 REMOVAL AND DISPOSAL OF PIPE (NON-ASBESTOS) LF 8,595 $8.00 $68,760.00 $10.00 $85,950.00 U.18 REMOVAL AND DISPOSAL OF ASBESTOS PIPE LF 1,725 $15.00 $25,875.00 $17.00 $29,325.00 U.19 16"RECLAIMED WATER MAIN BRIDGE CROSSING (STA.488+83 TO STA.492+01) LS 1 $57,000.00 $57,000.00 $80,000.00 $80,000.00 U.20 FURNISH&INSTALL 16"GATE VALVE AND BOX EA 13 $4,000.00 $52,000.00 $3,900.00 $50,700.00 U.21 FURNISH&INSTALL 12"GATE VALVE AND BOX EA 24 $1,400.00 $33,600.00 $1,500.00 $36,000.00 U.22 FURNISH&INSTALL 8"GATE VALVE AND BOX EA _ 7 $900.00 $6,300.00 $1,020.00 $7,140.00 U.23 FURNISH&INSTALL 6"GATE VALVE AND BOX EA 3 $600.00 $1,800.00 $750.00 $2,250.00 U.24 FURNISH&INSTALL 4"GATE VALVE AND BOX EA 4 $500.00 $2,000.00 $600.00 $2,400.00 U.25 . FURNISH&INSTALL 12"PLUG VALVE AND BOX EA 1 $2,400.00 $2,400.00 $2,500.00 $2,500.00 U.26 FURNISH&INSTALL 6"PLUG VALVE AND BOX EA 1 $1,000.00 $1,000.00 $1,100.00 $1,100.00 U.27 FURNISH&INSTALL FIRE HYDRANT ASSEMBLY EA 14 $2,400.00 $33,600.00 $3,500.00 $49,000.00 U.28 FURNISH&INSTALL AIR RELEASE VALVE ASSEMBLY EA 8 $3,000.00 $24,000.00 $2,600.00 $20,800.00 U.29 RELOCATE 54"RWM AIR RELEASE VALVE ASSEMBLY(STA.432+50+/-) EA 1 $3,800.00 $3,800.00 , $2,900.00 $2,900.00 BID TABULATION CITY OF OCOEE MAGUIRE ROAD IMPROVEMENTS(SEGMENT 1&2) PAGE 21 BID DATE: MAY 18,2000 BERGERON LAND DEV. GRANITE CONST.CO. ITEM NO. ITEM DESCRIPTION _UNIT QTY. UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE U.30 FURNISH&INSTALL BLOW-OFF VALVE ASSEMBLY EA 2 $220.00 $440.00 $720.00 $1,440.00 U.31 GROUT FILL EXISTING STEEL CASING(STA. 434+10+/-) LF 70 $29.00 $2,030.00 $42.00 $2,940.00 U.32 GROUT FILL EXISTING STEEL CASING(STA. 459+55+/-AND 453+15+/-) LF 130 $27.00 $3,510.00 $42.00 $5,460.00 U.33 FURNISH&INSTALL SANITARY MANHOLES (DEPTH 12-16') EA 4 $3,300.00 $13,200.00 $3,600.00 $14,400.00 U.34 ' CORE BORE AND CONNECT TO EXISTING MANHOLE(STA.459+00+/-) LS 1 $1,000.00 $1,000.00 $2,600.00 $2,600.00 U.35 CONSTRUCT DOGHOUSE MANHOLE(STA. 509+75+/-) LS 1 $3,000.00 $3,000.00 $4,800.00 $4,800.00 U.36 ADJUST EXISTING MANHOLES AND VALVES TO FINISH GRADE LS 1 $3,000.00 $3,000.00 $5,000.00 $5,000.00 U.37 CONNECT 2 PVC WATER SERVICE(STA. 191+60+/-) EA 1 $1,400.00 $1,400.00 $1,000.00 $1,000.00 U.38 CONNECT 1"HDPE WATER SERVICE(STA. 459+50+/-) EA 1 $800.00 $800.00 $750.00 $750.00 U.39 CONNECT 1"HDPE WATER SERVICE(STA. 501+00+/-) EA 1 $800.00 $800.00 $600.00 $600.00 U.40 CONNECT TO EXISTING 1-1/2"WATER SERVICE (STA.507+244-) EA 1 $900.00 $900.00 $1,000.00 $1,000.00 U.41 CONNECT EXISTING 4"WATER SERVICE(STA. 513+60+/-) EA 1 $7,000.00 $7,000.00 $600.00 $600.00 U.42 12'WATER MAIN CONFLICT TRANSITION(STA. 29+00+/-) LS 1 $5,000.00 $5,000.00 $10,000.00 $10,000.00 U.43 12'WATER MAIN CONFLICT TRANSITION(STA. 433+00+/-) LS 1 $5,000.00 $5,000.00 $10,000.00 $10,000.00 U.44 FURNISH&INSTALL CONCRETE PROTECTIVE CAP LF 775 $60.00 ' $46,500.00 $65.00 $50,375.00 BID TABULATION CITY OF OCOEE MAGUIRE ROAD IMPROVEMENTS(SEGMENT 1&2) PAGE 22 BID DATE: MAY 18,2000 BERGERON LAND DEV. GRANITE CONST.CO. ITEM NO. ITEM DESCRIPTION UNIT QTY. UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE U.45 FOR ANY WORK ITEMS NOT INCLUDED IN THE ABOVE BID ITEMS,SUPPLY ALL MATERIALS AND FURNISH ALL LABOR AND EQUIPMENT,PERFORM ALL WORK REQUIRED,PAY ALL COSTS NECESSARY FOR A COMPLETE AND OPERATIONAL SYSTEM PER THE INTENT OF THE SPECIFICATIONS AND CONTRACT DRAWINGS. LS 1 $1.00 $1.00 $10,000.00 $10,000.00 UTILITIES SUBTOTAL $1,232,127.00 $1,425,996.00 UTILITIES PROJECT TOTAL $1,232,127.00 $1,425,996.00 PROJECT GRAND TOTAL $10,654,146.00 $10,864,400.59 G:l..\O E-352/353\B I D TA B 1 *(1)Multiplication Error(+306.00)(Shaded) BID TABULATION CITY OF OCOEE MAGUIRE ROAD IMPROVEMENTS(SEGMENT 1&2) PAGE 23 BID DATE: MAY 18,2000 CONE&GRAHAM,INC. JOHNSON BROS.CORP. ITEM NO. ITEM DESCRIPTION UNIT QTY. UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE ROADWAY 101-1 MOBILIZATION(INCLUDING BONDS,GENL REQUIREMENTS&INDEMNIFICATION) LS 1 $1,244,681.00 $1,244,681.00 $1,200,000.00 $1,200,000.00 102-1 MAINTENANCE OF TRAFFIC LS 1 $1,437,200.00 $1,437,200.00 $1,000,000.00 $1,000,000.00 104-99 EROSION CONTROL LS 1 $37,789.00 $37,789.00 $75,000.00 $75,000.00 110-1-1 CLEARING&GRUBBING(45.51 ACRES) LS 1 $713,186.00 $713,186.00 $400,000.00 $400,000.00 110-7-1 MAIL BOX(F&I) EA 8 $150.00 $1,200.00 $200.00 $1,600.00 120-1 EXCAVATION,REGULAR CY 113,028 $1.26 $142,415.28 $4.50 $508,626.00 120-6 EMBANKMENT CY 49,021 $5.00 $245,105.00 $15.00 $735,315.00 120-99 EARTHWORK(MOORE ROAD) LS 1 $37,771.00 $37,771.00 $75,000.00 $75,000.00 160-4 TYPE"B"STABILIZATION SY 93,948 $2.13 $200,109.24 $3.80 $357,002.40 162-3-101 FINISH SOIL LAYER(GRASS)(6") SY 44,694 $1.59 $71,063.46 $1.50 $67,041.00 285-707-248 OPTIONAL BASE(BASE GROUP 7) SY 2,718 $6.93 $18,835.74 $12.00 $32,616.00 285-709-327 OPTIONAL BASE(BASE GROUP 9)(6"ABC-3, MARSHALL 1000)(ONLY) SY 13,276 $15.15 $201,131.40 $13.50 $179,226.00 285-709-990 OPTIONAL BASE(BASE GROUP 9),(10" LIMEROCK LBR 100)(ONLY) SY 60,415 $7.43 $448,883.45 $10.00 $604,150.00 300-1-1 BITUMINOUS MATERIAL(PRIME COAT) GA 249 $5.45 $1,357.05 $2.00 $498.00 300-1-3 BITUMINOUS MATERIAL(TACK COAT) GA 7,046 $0.95 $6,693.70 $1.00 $7,046.00 327-70-5 MILLING EXISTING ASPHALT PAVEMENT(2"AVG) SY 1,262 $3.48 $4,391.76 $2.20 $2,776.40 327-70-6 MILLING EXISTING ASPHALT PAVEMENT(1-1/2" AVG) SY 3,969 $1.20 $4,762.80 $1.50 $5,953.50 331-72-14 TYPES ASPHALTIC CONCRETE(1-1/2") SY 5,085 $4.55 $23,136.75 $3.50 $17,797.50 331-72-20 TYPES ASPHALTIC CONCRETE(7') SY 146 $6.95 $1,014.70 $30.00 $4,380.00 331-72-24 TYPES ASPHALTIC CONCRETE(2-1/2") SY 76,275 $6.45 $491,973.75 $5.00 $381,375.00 337-7-2 ASPHALT CONC.FRICTION COURSE(INC BIT) (RUBBER)(FC-2) TN 33.5 $105.00 $3,517.50 $250.00 $8,375.00 337-7-3 ASPHALT CONC.FRICTION COURSE(INC BIT) (RUBBER)(FC-3) TN 4,019.5 $58.00 $233,131.00 $61.00 $245,189.50 339-1 MISCELLANEOUS ASPHALT PAVEMENT TN 330.1 $92.00 $30,369.20 $70.00 $23,107.00 400-1-11 CLASS I CONCRETE(RETAINING WALLS) CY 6.2 $600.00 $3,720.00 $600.00 $3,720.00 400-1-15 CLASS I CONCRETE(MISCELLANEOUS) CY 10.0 $500.00 $5,000,00 $400.00 $4,000.00 425-1-351 INLETS(CURB TYPE P-5)(<10') EA 64 $2,400.00 $153,600.00 $3,100.00 $198,400.00 425-1-352 INLETS(CURB TYPE P-5)(>10) EA 1 $2,660.00 $2,660.00 $5,600.00 $5,600.00 425-1-361 INLETS(CURB TYPE P-6)(<10') EA 19 $2,800.00 $53,200.00 $3,700.00 $70,300.00 425-1-451 INLETS(CURB TYPE J-5)(<10') EA 14 $3,200.00 $44,800.00 $4,900.00 $68,600.00- BID TABULATION CITY OF OCOEE MAGUIRE ROAD IMPROVEMENTS(SEGMENT 1&2) ' PAGE 24 BID DATE: MAY 18,2000 CONE&GRAHAM,INC. JOHNSON BROS.CORP. ITEM NO. ITEM DESCRIPTION UNIT QTY. UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE 425-1-452 INLETS(CURB TYPE J-5)(>10') EA 1 $4,500,00. $4,500.00 $6,700.00 $6,700.00 425-1-461 INLETS(CURB TYPE J-6)(<10') , EA 5 $3,600.00 $18,000.00 $5,000.00 $25,000.00 425-1-471 INLETS(CURB TYPE 7)(<10') EA 1 $2,600.00 , $2,600.00 $3,800.00 $3,800.00 425-1-501 INLETS(DBI TYPE A)(<10') EA 1 $1,200.00 $1,200.00 $2,000.00 $2,000.00 425-1-521 INLETS(DBI TYPE C)(<10') EA 10 $1,100.00 $11,000.00 $2,000.00 $20,000.00 425-1-531 INLETS(DBI TYPE C) (MOD.)(<10) EA 6 $1,400.00 , $8,400.00 $2,500.00 $15,000.00 425-1-541 INLETS(DBI TYPE 0)(<10') EA 2 $1,950.00 $3,900.00 $3,700.00 $7,400.00 425-1-571 INLETS(DBI TYPE G)(<10') EA 3 $2,750.00 $8,250.00 $3,400.00 $10,200.00 425-1.881 INLETS(BARRIER WALL,RIGID,CURB& GUTTER)(<10) .EA 4 $2,550.00 $10,200.00 $2,100.00 $8,400.00 425-1-882 INLETS(BARRIER WALL,RIGID,CURB& GUTTER)(>10') EA 2 _ $2,900.00 $5,800.00 $10,000.00 $20,000.00 425-2-41 MANHOLES(P-7)(<10) EA 13 $1,350.00 $17,550.00 $2,000.00 $26,000.00 425-2-42 MANHOLES(P-7)(>10') EA 2 $1,500.00 $3,000.00 $3,000.00 $6,000.00 , 425-2-71 MANHOLES(J-7)(<10) EA 7 $3,960.00 $27,720.00 $4,500.00 $31,500.00 425-2-72 MANHOLES(J-7)(>10) EA 2 $3,360.00 $6,720.00 $5,500,00 $11,000.00 425-2-103 MANHOLES(TYPE 7 TOP)(PARTIAL) EA 1 $1,600.00 $1,600.00 $2,000,00 $2,000.00 425-11 MODIFY EXISTING DRAINAGE STRUCTURE EA 5 $1,900.00 $9,500.00 $1,500.00 $7,500.00 430-11-223 CONCRETE PIPE CULVERT(15") LF 17 $27.00 $459.00. $85.00 $1,445.00 430-11-225 CONCRETE PIPE CULVERT(18") LF 7,905 $27.90 $220,549.50 $50.00 $395,250.00 430-11-229 CONCRETE_PIPE CULVERT(24") IF 3,011 $38.00 $114,418.00 $60.00 $180,660.00 430-11-233 CONCRETE PIPE CULVERT(30") LF 3,023 $45.50 $137,546.50 $70.00 $211,610.00 430-11-238 CONCRETE PIPE CULVERT(36") LF 1,826 $58.00 $105,908.00 $80.00 $146,080.00 430-11-240 CONCRETE PIPE CULVERT(42") LF 556 $71.00 $39,476.00 $100.00 $55,600.00 430-11-241 CONCRETE PIPE CULVERT(48") LF 1,553 $83.00 $128,899.00 $100.00 $155,300.00 430-31-125 CORRUGATE STEEL PIPE CULVERT (BITUMINOUS COATED)(18") , LF 46 $25.00 $1,150.00 $40.00 $1,840.00 .430-142-011 ELLIPTICAL CONC.PIPE CULVERT(43"X68") LF 128 $110.00 $14,080.00 $200.00 $25,600.00 430-144-103 ELLIPTICAL CONC.CULVERT(SIDE DRAIN)(HE 111)(19"X30") LF 248 $43.00 $10,664.00 $50.00 $12,400.00 430-150-116 DUCTILE IRON PIPE(6") LF 970 $37.00 $35,890.00 $40.00 $38,800.00 430-982-229 MITERED END SECTION(24") (CONCRETE PIPE ROUND)(CD) EA 2 $750.00 $1,500.00 $1,000.00 $2,000.00 430-982-238 MITERED END SECTION(36") (CONCRETE PIPE ROUND)(CD) EA 1 $890.00 $890.00 $2,000.00 $2,000.00 430-984-403 MITERED END SECTION(19"X30") (ELLIPTICAL CONCRETE CULVERT)(SD) EA 2 $690.00 $1,380.00 $1,500.00 $3,000.00 BID TABULATION • CITY OF OCOEE . MAGUIRE ROAD IMPROVEMENTS(SEGMENT 1&2) PAGE 26 BID DATE: MAY 18,2000 CONE&GRAHAM,INC. JOHNSON BROS.CORP. ITEM NO. ITEM DESCRIPTION UNIT QTY. UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE 430-985-225 MITERED END SECTION(18") (CRP) EA •1 $590.00 $590.00 -$2,500.00 $2,500.00 430-985-229 MITERED END SECTION(24") (CRP) EA 2 $790.00 $1,580.00 $1,000.00 $2,000.00 430-985-233 MITERED END SECTION(30") (CRP) EA 2 $910.00 $1,820.00 $1,600.00 $3,200.00 430-985-240 MITERED END SECTION(42") (CRP) EA 2 $1,100.00 $2,200.00 $2,300.00 $4,600.00 430-985-241 MITERED END SECTION(48") (CRP) EA 1 $1,310.00 $1,310.00 $3,000.00 $3,000.00 515-1-2 PIPE HANDRAIL(ALUMINUM)(3-RAIL) LF 1,584 $88.50 $140,184.00 $84.00 $133,056.00 520-1-10 CONCRETE CURB 8 GUTTER(TYPE F) LF 30,661 $6.75 $206,961.75 $8.00 $245,288.00 520-2-1 CONCRETE CURB(TYPE A) LF 313 $8.75 $2,738.75 $9.00 $2,817.00 520-3 VALLEY GUTTER,CONCRETE LF 200 $13.15 $2,630.00 $10.00 $2,000.00 520-5-11 CONCRETE TRAFFIC SEPARATOR(4'WIDE) (TYPE I) LF 1,647 $11.75 $19,352.25 $18.00 $29,646.00 520-70-9 CONCRETE TRAFFIC SEPARATOR(VARIABLE WIDTH) SY 401 • $32.50 $13,032.50 $32.00 $12,832.00 521-1 CONCRETE BARRIER WALL LF 182 $100.00. $18,200.00 $110.00 $20,020.00 521-72-5 CONCRETE BARRIER WALL(RIGID-CURB& • GUTTER) LF 1,625 $120.00 $195,000.00 $70.00 $113,750.00 522-1 CONCRETE SIDEWALK(4"THICK) SY 13,942 $16.95 $236,316.90 $20.00 $278,840.00 522-2 CONCRETE SIDEWALK(6"THICK) SY 1,660 $23.25 $38,595.00 $28.00 $46,480.00 524-1-1 CONCRETE DITCH PAVEMENT(NON REINFORCED)(3") _ SY 33 $100.00 $3,300.00 $40.00 $1,320.00 534-70 CONCRETE BLOCK RETAINING WALL SY 567 $58.00 $32,886.00 $40.00 $22,680.00 • 544-75-14 IMPACT ATTENUATOR VEHICULAR (QUADGUARD) EA 2 $32,460.00 $64,920.00 $30,000.00 $60,000.00 550-2 FENCING(TYPE B)(STANDARD 6') LF 620 $8.00 $4,960.00 $6.10 $3,782.00 550-3-2 CORNER POST ASSEMBLY(TYPE B FENCE) EA 8 $124.00 $992.00 $91.00 $728.00 550-6-1 END POST ASSEMBLY(TYPE B FENCE) EA 4 $83.00 $332.00 $100.00 $400.00 550-74-2 FENCING(TYPE B) LF 295 $10.00 i $2,950.00 $15.00 $4,425.00 575-1 SODDING SY 44,694 $1.15 $51,398.10 $1.30 $58,102.20 SUBTOTAL-ROADWAY $7,857,698.03 $8,768,245.50 BRIDGE 110-3 REMOVAL OF EXISTING STRUCTURES LS 1 $90,000.00 $90,000.00 $250,000.00 $250,000.00 400-2-4 CLASS II CONC.(SUPERSTRUCTURE) CY 671.4 $450.00 $302,130.00 $500.00 $335,700.00 400-2-5 CLASS II CONC.(SUBSTRUCTURE) CY •393.1 $450.00 $176,895.00 $500.00 $196,550.00 400-2-10 CLASS II CONC.(APPROACH SLABS) CY 138.6 $300.00 $41,580.00 $400.00 $55,440.00 r BID TABULATION CITY OF OCOEE MAGUIRE ROAD IMPROVEMENTS(SEGMENT 1&2) PAGE 28 BID DATE: MAY 18,2000 CONE&GRAHAM,INC. JOHNSON BROS.CORP. ITEM NO. ITEM DESCRIPTION UNIT QTY. UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE 400-7 BRIDGE FLOOR GROOVING SY 1,730 $2.50 $4,325.00 $2.00 $3,460.00 400-147 COMPOSITE NEOPRENE PADS CF 14.5 $600.00 $8,700.00 $800.00 $11,600.00 400-148-1 TRAFFIC RAILING(F&I)(BARRIER) LF 575 $110.00 $63,250.00 $300.00 $172,500.00 415-1-4 REINFORCING STEEL(SUPERSTRUCTURE) LB 106,811 $0.47 $50,201.17 $0.60 $64,086.60 415-1-5 REINFORCING STEEL(SUBSTRUCTURE) LB 51,494 $0.47 $24,202.18 $0.60 $30,896.40 415-1-9 REINFORCING STEEL(APPROACH SLABS) LB 22,634 $0.47 .. $10,637.98 $0.60 $13,580.40 450-1-4 PRESTRESSED BEAM(TYPE V) LF 3,161 $120.00 $379,320.00 $200.00 $632,200.00 455-3-4 PREST.CONC PILING(FURNISHED)(24"SQ.) LF 3,406 $50.00 $170,300.00 $64.00 $217,984.00 455-4-4 PREST.CONC PILING(DRIVEN)(24"SQ.) LF 3,406 $1.00 $3,406.00 $1.00 $3,406.00 455-15 PREFORMED PILE HOLES EA 4 $200.00 $800.00 $2,900.00 $11,600.00 455-137 DYNAMIC TEST LOAD EA 2 $2,000.00 $4,000.00 $3,300.00 $6,600.00 455-140-14 TEST PILES(FURNISHED)(24"SQ.), LF 235 $250.00 $58,750.00 • $64.00 $15,040.00 455-141-14 TEST PILES(DRIVEN)(24"SQ.) LF 235 $1.00 $235.00 $1.00 $235.00 460-70-3 ALUMINUM RAILINGS(PEDESTRIAN/BICYCLE) LF 154 $35.00 $5,390.00 $30.00 $4,620.00 548-10 RETAINING WALL SYSTEM(PERMANENT) SF 7,946 $23.00 $182,758.00 $32.00 $254,272.00 SUBTOTAL-BRIDGE $1,576,880.33 $2,279,770.40 SIGNING&PAVEMENT MARKING ' 700-40-1 SIGN,SINGLE POST(LESS THAN 12 SF) AS 52 $158.00 $8,216.00 $160.00 $8,320.00 700-40-2 SIGN,SINGLE POST(12-25) AS 3 $820.00 $2,460.00 $800.00 $2,400.00 700-46-11 SIGN EXISTING(REMOVE)(SINGLE POST) AS 25 $1.00 $25.00 $1.00 $25.00 700-46-12 SIGN EXISTING(REMOVE)(MULTI-POST) AS 1 $60.00 $60.00 $60.00 $60.00 700-46-21 SIGN EXISTING(RELOCATE)(SINGLE POST) AS 17 $48.00 $816.00 $48.00 $816.00 705-10-11 OBJECT MARKER(POST MOUNTED)(TYPE I) EA 42 $84.00 $3,528.00 $84.00 $3,528.00 706-3 RETRO REFLECTIVE PAVEMENT MARKERS, • BI-DIRECTIONAL EA 1,259 $3.80 $4,784.20 $3.50 $4,406.50 710-30 REFLECTIVE PAINT(ISLAND NOSE)(YELLOW) SY 32 $12.50 $400.00 $4.50 $144.00 711-3 PAVEMENT MESSAGES,THERMOPLASTIC EA 12 $120.00 $1,440.00 $60.00 $720.00 711-4 DIRECTIONAL ARROWS,THERMOPLASTIC EA 101 $41.50 $4,191.50 $30.00 $3,030.00 711-5-1 GUIDELINES,THERMOPLASTIC(WHITE) LF 68 $0.65 $44.20 $0.40 $27.20 711-31 SKIP TRAFFIC STRIPE,THERMOPLASTIC(6" WHITE)(10'-30'SKIP) GM 3.318 $540.00 $1,791.72 $525.00 $1,741.95 711-34 SKIP TRAFFIC STRIPE,THERMOPLASTIC(6" YELLOW)(6'-10'SKIP) LF 962 $0.55 • $529.10 $0.40 $384.80 711-35-81 SOLID TRAFFIC STRIPE,THERMOPLASTIC(8" WHITE) LF 2,607 $0.72 $1,877.04 $0.50 $1,303.50 BID TABULATION CITY OF OCOEE MAGUIRE ROAD IMPROVEMENTS(SEGMENT 1&2) PAGE 27 BID DATE: MAY 18,2000 CONE&GRAHAM,INC. JOHNSON BROS.CORP. ITEM NO. ITEM DESCRIPTION UNIT QTY. UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE 711-35-121 SOLID TRAFFIC STRIPE,THERMOPLASTIC(12" WHITE) LF 6,486 $1.10 $7,134.60 $0.90 $5,837.40 711-35-181 SOLID TRAFFIC STRIPE,THERMOPLASTIC(18" WHITE) LF 579 $1.95 $1,129.05 $1.30 $752.70 711-35-241 SOLID TRAFFIC STRIPE,THERMOPLASTIC(24" WHITE) LF 994 • $2.80 $2,783.20 $1.80 $1,789.20 711-36-181 SOLID TRAFFIC STRIPE,THERMOPLASTIC(18" YELLOW) LF 1,528 $2.00 $3,056.00 $1.50 $2,292.00 711-37-61 SOLID TRAFFIC STRIPE,THERMOPLASTIC(6" WHITE) NM 5.466 $1,480.00 $8,089.68 $1,400.00 $7,652.40 711-38-61 SOLID TRAFFIC STRIPE,THERMOPLASTIC(6" YELLOW) NM 4.822 $2,425.00 $11,693.35 $1,600.00 $7,715.20 SUBTOTAL-SIGNING&PAVEMENT MARKING $64,048.64 $52,945.85 SIGNALS 620-1-1 GROUNDING,ELECTRODE(FURNISH&INSTALL) LF 1,170 $4.05 $4,738.50 $4.60 $5,382.00 630-1-12 CONDUIT(FURNISH&INSTALL) (UNDERGROUND) LF 2,520 $3.95 $9,954.00 $5.10 $12,852.00 630-1-13 CONDUIT(FURNISH&INSTALL) (UNDERPAVEMENT) LF 2,252 $8.50 $19,142.00 $18.00 $40,536.00 632-7-1 CABLE(SIGNAL)(FURNISH&INSTALL) PI 5 $2,810.00 $14,050.00 $1,800.00 $9,000.00 634-4-113 SPAN WIRE ASSEMBLY(F&I)(TWO WIRE)(BOX) PI 1 $1,884.00 $1,884.00 $1,000.00 $1,000.00 634-4-413 SPAN WIRE ASSEMBLY(ADJUST) PI 1 $724.00 $724.00 $500.00 $500.00 634-5-1 FIBERGLASS INSULATOR(F&I) LF 20 $15.00 $300.00 $10.00 $200.00 635-1-11 PULL AND JUNCTION BOXES EA 61 $222.00 $13,542.00 $200.00 $12,200.00 639-1-12 ELECTRICAL POWER SERVICE(OVERHEAD) AS 1 $606.00 $606.00 $1,000.00 $1,000.00 639-1-22 ELECTRICAL POWER SERVICE(UNDERGROUND) AS 3 $536.00 $1,608.00 $1,000.00 $3,000.00 639-2-1 ELECTRICAL SERVICE WIRE(FURNISH AND INSTALL) LF 80 $2.35 $188.00 $4.00 $320.00 641-15-146 CONCRETE STRAIN POLES(F&I WITH FOUNDATION)(TYPE N-VI) EA 4 $2,668.00 $10,672.00 $2,500.00 $10,000.00 648-11-00 MAST ARMS(F&I)(STEEL,SINGLE ARM) EA 2 $7,840.00 $15,680.00 $6,600.00 $13,200.00 648-11-28 MAST ARMS(F&I)(STEEL,SINGLE ARM) EA 1 $8,555.00 $8,555.00 $7,600.00 $7,600.00 648-11-40 MAST ARMS(F&I)(STEEL,SINGLE ARM) EA 1 $10,344.00 $10,344.00 $8,600.00 $8,600.00 648-11-42 MAST ARMS(F&I)(STEEL,SINGLE ARM) EA 2 $11,063.00 $22,126.00 $9,600.00 $19,200.00 648-11-48 MAST ARMS(F&I)(STEEL,SINGLE ARM) EA 1 $12,518.00 $12,518.00 $11,000.00 $11,000.00 648-11-50 MAST ARMS(F&I)(STEEL,SINGLE ARM) EA 1 $13,040.00 $13,040.00 $12,000.00 $12,000.00 BID TABULATION CITY OF OCOEE MAGUIRE ROAD IMPROVEMENTS(SEGMENT 1&2) PAGE 28 BID DATE: MAY 18,2000 CONE&GRAHAM,INC. JOHNSON BROS.CORP. ITEM NO. ITEM DESCRIPTION UNIT QTY. - UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE 648-11-52 MAST ARMS(F&I)(STEEL,SINGLE ARM) EA 2 $14,560.00 $29,120.00 $13,000.00 $26,000.00 648-11-58 MAST ARMS(F&I)(STEEL,SINGLE ARM) EA 1 $15,616.00 $15,616.00 $13,000.00 $13,000.00 650-1-131 TRAFFIC SIGNAL 12"STANDARD(F&I)(3 SECTION,1 WAY) AS 19 $521.00 $9,899.00 $700.00 $13,300.00 650-1-331 TRAFFIC SIGNAL 12"STANDARD(INSTALL)(5 SECTION,1 WAY) AS 12 $155.00 $1,860.00 $300.00 $3,600.00 650-9-151 TRAFFIC SIGNAL 12"STANDARD(F&I)(5 SECTION,1 WAY) AS 5 $840.00 $4,200.00 $1,000.00 $5,000.00 650-9-351 TRAFFIC SIGNAL 12"STANDARD(INSTALL)(5 SECTION,CLSTR) AS 2 $199.00 $398.00 $400.00 $800.00 653-111 PEDESTRIAN SIGNAL(F&I)(12"INCANDESCENT, 1 WAY) AS 30 $765.00 $22,950.00 $800.00 $24,000.00 659-101 SIGNAL HEAD AUXILIARIES(F&I)(BACK PLATES, 3 SECTION) EA 2 $123.00 $246.00 $76.00 $152.00 659-103 SIGNAL HEAD AUXILIARIES(F&I)(DISCONNECT HANGER) EA 8 $245.00 $1,960.00 $300.00 $2,400.00 659-106 SIGNAL HEAD AUXILIARIES(F&I)(TUNNEL VISOR) EA 82 $1.25 $102.50 $3.00 $246.00 659-108 SIGNAL HEAD AUXILIARIES(STEEL PEDESTAL) EA 3 $800.00 $2,400.00 $800.00 $2,400.00 659-118 SIGNAL HEAD AUXILIARIES(F&I)(BACK PLATES, 5 SECTION) EA 2 $200.00 $400.00 $200.00 $400.00 660-1-101 INDUCTIVE LOOP DETECTOR(F&I)TYPE 1,1 CH. R,S) EA 18 $125.00 $2,250.00 $100.00 $1,800.00 660-1-102 INDUCTIVE LOOP DETECTOR(F&I)TYPE 2,1 CH. R,S,TD) EA 6 $145.00 $870.00 $200.00 $1,200.00 660-2-102 LOOP ASSEMBLY(F&I)(TYPE B) AS 20 $596.00 $11,920.00- $700.00 $14,000.00 660-2-106 LOOP ASSEMBLY(F&I)(TYPE F)(6'X 40') AS 18 $600.00 $10,800.00 $900.00 $16,200.00 663-70 VEHICLE DETECTOR ASSEMBLIES AS 3 $5,882.00 $17,646.00 $6,600.00 $19,800.00 665-11 PEDESTRIAN DETECTOR(F&I)(POLE/CONTROL CABINET MOUNTED) EA 30 $95.00 $2,850.00 $76.00 $2,280.00 670-113-211 ACT.SOLID STATE CONTRLR ASMBLY(F&I) AS 1 $10,361.00 $10,361.00 $9,600.00 $9,600.00 670-113-231 ACT.SOLID STATE CONTRLR ASMBLY(F&I) (D-4-4,DUAL RING&PHASE) AS 2 $9,746.00 $19,492.00 $8,600.00 $17,200.00 670-131-000 ACT.SOLID STATE CONTRLR ASMBLY(INSTALL) AS 1 $1,114.00 $1,114.00 $2,800.00 $2,800.00 680-106 SYSTEM CONTROL EQUIPMENT(F&I) (COMMUNICATIONS INTERFACE) EA 1 $481.00 $481.00 $500.00 $500.00 680-111 SYSTEM CONTROL EQUIPMENT(F&I)(ROADSIDE MASTER) EA 1 $3,545.00 $3,545.00 $4,500.00 $4,500.00 680-115 SYSTEM CONTROL EQUIPMENT(F&I) (AUTODIAUANS EXT COMM MODEM) EA 1 $170.00 $170.00 $500.00 $500.00 BID TABULATION CITY OF OCOEE MAGUIRE ROAD IMPROVEMENTS(SEGMENT 1&2) PAGE 29 BID DATE: MAY 18,2000 CONE&GRAHAM,INC. JOHNSON BROS.CORP. ITEM NO. ITEM DESCRIPTION UNIT QTY. UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE 690-10 REMOVE TRAFFIC SIGNAL HEAD ASSEMBLY EA 8 $23.00 $184.00 $25.00 $200.00 690-20 REMOVE PEDESTRIAN SIGNAL ASSEMBLY EA 8 $23.00 $184.00 $25.00 $200.00 690-30 REMOVE POLES EA 4 $900.00 $3,600.00 $2,000.00 $8,000.00 690-31 REMOVE SIGNAL PEDESTAL EA 2 $193.00 $386.00 $400.00 $800.00 690-50 REMOVE CONTROLLER ASSEMBLY EA 1 $270.00 $270.00 $200.00 $200.00 690-80 REMOVE SPAN WIRE ASSEMBLY EA 2 $180.00 $360.00 $200.00 $400.00 690-90 REMOVE CABLING AND CONDUIT PI 2 $360.00 $720.00 $200.00 $400.00 690-100 REMOVE MISCELLANEOUS SIGNAL EQUIPMENT PI 2 $180.00 $360.00 $500.00 $1,000.00 700-48-48 SIGN PANEL(OVERHEAD)(RELOCATE)(15 OR LESS) EA 2 $109.00 $218.00 $400.00 $800.00 700-89-1 ELECTRICALLY POWERED OVERHEAD SIGN (INTERNALLY ILLUMINATED) EA 10 $1,267.00 $12,670.00 $1,800.00 $18,000.00 SUBTOTAL-SIGNALS $349,274.00 $379,268.00 LANDSCAPE 571-1 PLASTIC EROSION MAT SY 4,166 $1.37 $5,707.42 $1.40 $5,832.40 575-1-1 BAHIA SODDING SY 5,167 $1.11 $5,735.37 $1.10 $5,683.70 580-301-1 STAKING&GUYING,TREES EA 143 $13.14 $1,879.02 $13.00 $1,859.00 580-301-2 STAKING&GUYING,PALMS EA 106 $32.73 $3,469.38 $33.00 $3,498.00 580-326-2 PINE NEEDLE MULCH,BALES SY 17,528 $1.42 $24,889.76 $1.40 $24,539.20 581-2 LANTANA MONTEVIDENSIS/TRAILING LANTANA (PURPLE) EA 1,178 $6.27 $7,386.06 $6.30 $7,421.40 LANTANA MONTEVIDENSIS/TRAILING LANTANA (YELLOW) EA 1,852 $6.27 $11,612.04 $6.30 $11,667.60 MUHLENBERGIA CAPILLARISfMUHLY GRASS EA 5,158 $6.84 $35,280.72 $6.80 $35,074.40 582-2 ELAEANUS PUNGENS/SILVERTHORN EA 1,406 $14.13 $19,866.78 $14.00 $19,684.00 PLUMBAGO AURICULATA/LEADWORT EA 4,275 $6.63 , $28,343.25 $6.60 $28,215.00 RAPHIOLEPIS INDICA/INDIAN HAWTHORN EA 1,526 $14.13 $21,562.38 $14.00 $21,364.00 ZAMIA PUMILA/COONTIE EA 1,552 $25.57 $39,684.64 $26.00 $40,352.00 583-4 PINUS ELLIOTTI/SLASH PINE EA 65 $151.32 $9,835.80 $150.00 $9,750.00 SABAL PALMETTO/SABAL PALM EA 106 $130.74 $13,858.44 $130.00 $13,780.00 LAGERSTROEMIA INDICA 'TUSCARORA'/TUSCARORA CRAPE MYRTLE EA 30 $151.32 $4,539.60 $150.00 $4,500.00 QUERCUS VIRGINIANA/LIVE OAK EA 20 $147.03 $2,940.60 $150.00 $3,000.00 BID TABULATION CITY OF OCOEE MAGUIRE ROAD IMPROVEMENTS(SEGMENT 1&2) PAGE 30 BID DATE: MAY 18,2000 CONE&GRAHAM,INC. JOHNSON BROS.CORP. ITEM NO. ITEM DESCRIPTION UNIT QTY. UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE LAGERSTROEMIA INDICA'NATCHEZ/NATCHEZ CRAPE MYRTLE EA 28 $151.32 $4,236.96 $150.00 $4,200.00 SUBTOTAL-LANDSCAPE $240,828.22 $240,420.70 SUBTOTAL-ROADWAY PROJECT $10,088,729.22 -$11,720,650.45 ROADWAY PROJECT TOTAL $10,088,729.22 $11,720,650.45 ALLOWANCES A.01 CITY OF OCOEE PERMIT(S)ALLOWANCE ALW 1 $65,000.00 $65,000.00 $65,000.00 $65,000.00 A.02 CITY OF OCOEE OFFICE EQUIPMENT ALW 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 CITY OF OCOEE ALLOWANCES TOTAL $75,000.00 $75,000.00 SPRINT TELEPHONE UTILITY IMPROVEMENTS T.01 SPRINT TELEPHONE MANHOLES TO BE REMOVED W/JPA EA 17 $790.00 $13,430.00 $700.00 $11,900.00 T.02 SPRINT TELEPHONE CONDUIT TO BE REMOVED • W/JPA LF 8,854 $8.00 $70,832.00 $20.00 $177,080.00 SPRINT TELEPHONE UTILITY SUBTOTAL $84,262.00 $188,980.00 • SPRINT TELEPHONE UTILITY TOTAL $84,262.00 $188,980.00 HELLER BROTHERS GROVES SITE IMPROVEMENTS H.01 PERFORM ALL SITE IMPROVEMENTS (STRIPPING,GRADING AND COMPACTING) ADDRESSED BY HELLER BROS.GROVES AND CITY OF OCOEE "FIRST AMENDMENT TO PURCHASE AND SALE AGREEMENT'(GENERAL CONDITIONS APPENDIX B)AND AS INDICATED ON THE DRAWINGS LS 1 $115,665.00 $115,665.00 $150,000.00 $150,000.00 HELLER BROTHERS IMPROVEMENTS TOTAL $115,665.00 $150,000.00 UTILITIES IMPROVEMENTS U.01 FURNISH&INSTALL 16"RECLAIMED WATER MAIN,D.I.OR PVC(Circle choice of mat) LF 6,930 $59.20 $410,256.00 $67.00 $464,310.00 U.02 FURNISH&INSTALL 12"RECLAIMED WATER MAIN,D.I.OR PVC(Circle choice of mat) LF 720 $48.00 $34,560.00 $63.00 $45,360.00 BID TABULATION CITY OF OCOEE MAGUIRE ROAD IMPROVEMENTS(SEGMENT 1&2) PAGE 31 BID DATE: MAY 18,2000 CONE&GRAHAM,INC. JOHNSON BROS.CORP. ITEM NO. ITEM DESCRIPTION UNIT QTY. UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE U.03 FURNISH&INSTALL 6"RECLAIMED WATER MAIN, D.I.OR PVC(Circle choice of mat) LF 215 $33.00 $7,095.00 $47.00 $10,105.00 U.04 FURNISH&INSTALL 4"RECLAIMED WATER MAIN, _ D.I.OR PVC(Circle choice of mat) LF 60 $28.00 $1,680.00 $55.00 $3,300.00 U.05 FURNISH&INSTALL 16"WATER MAIN,D.I.OR PVC(Circle choice of material) LF 1,650 $56.90 $93,885.00 $75.00 $123,750.00 U.06 FURNISH&INSTALL 12"WATER MAIN,D.I.OR PVC(Circle choice of material) LF 7,100 $46.00 $326,600.00 $55.00 $390,500.00 U.07 FURNISH&INSTALL 8" WATER MAIN,D.I.OR PVC(Circle choice of material) LF 480 $44.00 $21,120.00 $80.00 $38,400.00 U.08 FURNISH&.INSTALL 6"WATER MAIN,D.I.OR PVC (Circle choice of material) LF 180 $34.00 $6,120.00 $63.00 $11,340.00 U.09 FURNISH&INSTALL 4"WATER MAIN,D.I.OR PVC (Circle choice of material) LF 45 $30.00 $1,350.00 $100.00 $4,500.00 U.10 FURNISH&INSTALL 12"PVC FORCE MAIN LF 2,140 $40.00 $85,600.00 $50.00 $107,000.00 U.11 FURNISH&INSTALL 6"PVC FORCE MAIN . LF 459 $34.00 $15,606.00 $35.00 $16,065.00 ' _ U.12 FURNISH&INSTALL 6"DR 14 PVC FORCE MAIN LF 266 $31.00 $8,246.00 $40.00 $10,640.00 U.13 FURNISH&INSTALL 4"DR 14 PVC FORCE MAIN LF 180 $28.00 $5,040.00 $45.00 $8,100.00 U.14 FURNISH&INSTALL 12"GRAVITY SEWER LF 1,182 $36.00 $42,552.00 $50.00 $59,100.00 U.15 FURNISH&INSTALL 12"C900,DR 25 GRAVITY SEWER LF 186 $48.00 $8,928.00 $55.00 $10,230.00 U.16 RETIRE EXISTING 8"GRAVITY SEWER LINE LF 270 $12.00 $3,240.00 $20.00 $5,400.00 U.17 REMOVAL AND DISPOSAL OF PIPE (NON-ASBESTOS) LF 8,595 $9.00 $77,355.00 $12.00 $103,140.00 U.18 REMOVAL AND DISPOSAL OF ASBESTOS PIPE LF 1,725 $13.00 $22,425.00 $20.00 $34,500.00 U.19 16"RECLAIMED WATER MAIN BRIDGE CROSSING (STA.488+83 TO STA.492+01) LS • 1 $64,300.00 $64,300.00 $100,000.00 $100,000.00 U.20 FURNISH&INSTALL 16"GATE VALVE AND BOX EA 13 $3,900.00 $50,700.00 $4,500.00 $58,500.00 U.21 FURNISH&INSTALL 12"GATE VALVE AND BOX EA 24 . $1,310.00 $31,440.00 $2,000.00 $48,000.00 U.22 FURNISH&INSTALL 8"GATE VALVE AND BOX EA 7 $910.00 $6,370.00 $1,200.00 $8,400.00 U.23 FURNISH&INSTALL 6"GATE VALVE AND BOX EA 3 $650.00 $1,950.00 $1,000.00 $3,000.00 U.24 FURNISH&INSTALL 4"GATE VALVE AND BOX EA 4 $480.00 $1,920.00 $800.00 $3,200.00 U.25 FURNISH&INSTALL 12"PLUG VALVE AND BOX EA 1 $2,450.00 $2,450.00 $2,600.00 $2,600.00 U.26 FURNISH&INSTALL 6"PLUG VALVE AND BOX EA 1 $1,100.00 $1,100.00 $1,300.00 $1,300.00 U.27 FURNISH&INSTALL FIRE HYDRANT ASSEMBLY EA 14 $2,700.00 $37,800.00 $3,200.00 $44,800.00 U.28 FURNISH&INSTALL AIR RELEASE VALVE ASSEMBLY EA 8 $2,600.00 $20,800.00 $3,800.00 $30,400.00 U.29 RELOCATE 54"RWM AIR RELEASE VALVE ASSEMBLY(STA.432+50+/-) EA 1 $2,900.00 $2,900.00 $7,600.00 $7,600.00 BID TABULATION CITY OF OCOEE MAGUIRE ROAD IMPROVEMENTS(SEGMENT 1&2) ' PAGE 32 BID DATE: MAY 18,2000 CONE&GRAHAM,INC. JOHNSON BROS.CORP. ITEM NO. ITEM DESCRIPTION UNIT QTY. UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE U.30 FURNISH&INSTALL BLOW-OFF VALVE ASSEMBLY EA 2 $720.00 $1,440.00 $2,000.00 $4,000.00 U.31 GROUT FILL EXISTING STEEL CASING(STA. 434+10+/-) LF 70 $22.00 $1,540.00 $55.00 $3,850.00 U.32 GROUT FILL EXISTING STEEL CASING(STA. 459+55+/-AND 453+15+/-) LF 130 $26.00 $3,380.00 $65.00 $8,450.00 U.33 FURNISH&INSTALL SANITARY MANHOLES (DEPTH 17-16') EA 4 $2,750.00 $11,000.00 $4,700.00 $18,800.00 U.34 CORE BORE AND CONNECT TO EXISTING MANHOLE(STA.459+00+/-) LS 1 $2,400.00 $2,400.00 $2,500.00 $2,500.00 U.35 , CONSTRUCT DOGHOUSE MANHOLE(STA. 509+75+/-) LS 1 $3,600.00 $3,600.00 $6,000.00 $6,000.00 U.36 ADJUST EXISTING MANHOLES AND VALVES TO FINISH GRADE LS 1 $150.00 $150.00 $3,200.00 $3,200.00 U.37 CONNECT 2"PVC WATER SERVICE(STA. 191+60+/-) EA 1 $980.00 $980.00 $3,500.00 $3,500.00 U.38 CONNECT 1"HDPE WATER SERVICE(STA. 459+50+/-) EA 1 $590.00 $590.00 $2,000.00 $2,000.00 ' U.39 CONNECT 1"HDPE WATER SERVICE(STA. 501+00+/-) EA 1 $520.00 $520.00 $2,000.00 $2,000.00 CONNECT TO EXISTING 1-1/2"WATER SERVICE (STA.507+244-) EA 1 $1,600.00 $1,600.00 $2,000.00 $2,000.00 U.41 CONNECT EXISTING 4"WATER SERVICE(STA. 513+60+/-) EA 1 $1,750.00 $1,750.00 $7,000.00 $7,000.00 U.42 12"WATER MAIN CONFLICT TRANSITION(STA. • 29+00+/-) LS 1 $4,600.00 $4,600.00 $15,000.00 $15,000.00 U.43 12"WATER MAIN CONFLICT TRANSITION(STA. 433+00+/-) LS 1 $4,200.00 $4,200.00 $15,000.00 $15,000.00 U'44 FURNISH&INSTALL CONCRETE PROTECTIVE CAP LF 775 $52.00 $40,300.00 $85.00 $65,875.00 BID TABULATION CITY OF OCOEE MAGUIRE ROAD IMPROVEMENTS(SEGMENT 1&2) PAGE 33 BID DATE: MAY 18,2000 CONE&GRAHAM,INC. JOHNSON BROS.CORP. ITEM NO. ITEM DESCRIPTION UNIT QTY. UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE U.45 FOR ANY WORK ITEMS NOT INCLUDED IN THE ABOVE BID ITEMS,SUPPLY ALL MATERIALS AND FURNISH ALL LABOR AND EQUIPMENT,PERFORM ALL WORK REQUIRED,PAY ALL COSTS NECESSARY FOR A COMPLETE AND OPERATIONAL SYSTEM PER THE INTENT OF THE SPECIFICATIONS AND CONTRACT DRAWINGS. LS 1 $5,000.00 $5,000.00 $35,000.00 $35,000.00 UTILITIES SUBTOTAL $1,476,438.00 $1,947,715.00 UTILITIES PROJECT TOTAL $1,476,438.00 $1,947,715.00 PROJECT GRAND TOTAL $11,840,094.22 $14,082,345.45 G:\...\0 E-3521353\B I DTA B 2 BID CHECKLIST PROJECT DATA BIDDER INFORMATION Owner: City of Ocoee Name: Ryan Incorporated Eastern Location: 150 N. Lakeshore Drive Address: 10125 West Colonial Drive, Suite 203A Ocoee, FL 34761 Ocoee, FL 34761 • Contract: Maguire Road Improvements Contractor's No.: CG-0057408 Segment 1 and 2 Corrected Bid Amount: $9,628,208.66 Verified Bid Position: 1st Apparent Low Bidder Acknowledges all Addenda? Indemnification (Minimum$500) Balanced Bid (Section 00300)? Corrected Bid Amount? ':?i<iii ''`?z (4) Multiplication Errors (1) Addition Error Verified Bid Position? Mobilization less than 5% of bid? ✓ Conditional bid? Schedule of Base Bid Manufacturers? Bid Proposal properly signed? Serious bid omissions? .................. .................. .................. .................. .................. Unauthorized alterations of form? al > Questionnaire Completed (Section 00301)? Subcontractors less than 50% of bid amount (Section 00301)? Project Experience References (Section 00301)? Compliance with Florida Trench Safety Act (Section 00301A)? .................... ................... Drug-Free Workplace Certification >I< 1€II (Section 00301B)? MBE/WBE Submittal (Section 00301C)? N/A 5% Bid Bond (Section 00410)? >» Corporate Authority (Section 00410)? Power of Attorney? Noncollusion Affidavit (Section 00480)? ::.................. Certification of Non-Segregated Facilities (Section 00481)? Sworn Statement on Public Entity Crimes (Section 00482)? Non-Discriminatory Labor Practices (Section 00483)? . ............. in box for properly completed Bid. G:1...1BIDCKL -1- 0E-352-353/2.0(05/25/00) BID CHECKLIST PROJECT DATA BIDDER INFORMATION Owner: City of Ocoee Name: Hubbard Construction Company Location: 150 N. Lakeshore Drive Address: 1936 Lee Road Ocoee, FL 34761 Winter Park, FL 32789 Contract: Maguire Road Improvements Contractor's No.: CG-0051030 Segment 1 and 2 Corrected Bid Amount: $9,688,465.95 Verified Bid Position: 2nd Apparent Low Bidder .....:........................................ Acknowledges all Addenda? .................... .................... .................... .................... .................... .................... Indemnification (Minimum$500) Balanced Bid (Section 00300)? ROAN Corrected Bid Amount? Verified Bid Position? Mobilization less than 5% of bid? Conditional bid? Schedule of Base Bid Manufacturers? Bid Proposal properly signed? Serious bid omissions? .................. Unauthorized alterations of form? ................... .................. .................... .................... .................... ................... .................... Questionnaire Completed (Section 00301)? Subcontractors less than 50% of bid amount (Section 00301)? gmagd Project Experience References E»>» (Section 00301)? Compliance with Florida Trench Safety Act (Section 00301A)? Drug-Free Workplace Certification (Section 00301B)? MBE/WBE Submittal (Section 00301C)? N/A 5% Bid Bond (Section 00410)? Corporate Authority (Section 00410)? Power of Attorney? .................... ................... .................... .................... ................... Noncollusion Affidavit (Section 00480)? >>» Certification of Non-Segregated Facilities (Section 00481)? Sworn Statement on Public Entity Crimes (Section 00482)? Non-Discriminatory Labor Practices 12. 1111111 (Section 00483)? i•ii.MAE in box for properly completed Bid. o:\...\BIDCxr. -2- 0E-352-353/2.0(05/25/00) BID CHECKLIST PROJECT DATA BIDDER INFORMATION Owner: City of Ocoee Name: Bergeron Land Development, Inc. Location: 150 N. Lakeshore Drive Address: 2710 Michigan Avenue Ocoee, FL 34761 Kissimmee, FL 34744 Contract: Maguire Road Improvements Contractor's No.: RU-0060401 Segment 1 and 2 Corrected Bid Amount: $10,653,840.00 ............. Verified Bid Position: 3rd Apparent Low Bidder ............::................. ............... ::::::..:..... e'ems .............. Acknowledges all Addenda? Indemnification (Minimum$500) Balanced Bid (Section 00300)? Corrected Bid Amount? €` ' < (1) Multiplication Error Verified Bid Position? Mobilization less than 5% of bid? Conditional bid? Schedule of Base Bid Manufacturers? «>»l " `> Bid Proposal properly signed? Serious bid omissions? Unauthorized alterations of form? `'` ? ................... Questionnaire Completed (Section 00301)? Subcontractors less than 50% of bid amount INOINigl' (Section 00301)? .................... Project Experience References <s> (Section 00301)? Compliance with Florida Trench Safety Act emingiiii (Section 0030.1A)? Drug-Free Workplace Certification >I<'€''v (Section 00301B)? MBE/WBE Submittal (Section 00301C)? N/A 5% Bid Bond (Section 00410)? Corporate Authority (Section 00410)? Power of Attorney? Noncollusion Affidavit (Section 00480)? «< Certification of Non-Segregated Facilities (Section 00481)? Sworn Statement on Public Entity Crimes (Section 00482)? '> >> Non-Discriminatory Labor Practices (Section 00483)? g:;;:i.i4iR in box for properly completed Bid. 0.1 \BIDCKL -3- 0E-352-353/2.0(05/25/00) CITY OF OCOEE MAGUIRE ROAD IMPROVEMENTS -SEGMENT 1 AND 2 ILn Contact Person Jim Harvey Alex Panzeri Joe McLaughlin Date Contacted 05/19/00 05/19/00 05/22/00 Organization Taylor, Woodrow, Kenco, Ltd. Gables Residential Public Works Telephone No. (561) 622-1730 (561)997-9700 (954)431-4500 Project Name Addison Reserve Polo Lakes Pines Blvd. Between I-75 and Highway 27 Contract Amount $30,000,000 $1,730,000 $9,500,000 Owner Taylor, Woodrow, Kenco, Ltd. Gables Residential City of Pembroke Pines Completed on Schedule Yes OK Yes Change Orders OK OK Normal Comments: Excellent job. Mostly earthwork and golf Ryan, Inc. Eastern has worked on several Ryan, Inc. Eastern was prime contractor on course. Are planning to do future work with projects for Gables Residential. Has this roadway project in Broward Co. Work Ryan. They have performed well on other performed very well. Utilities work is very completed ahead of schedule. Contractor projects in area. good. Ryan's management is very accessible very capable and reliable. Subcontracted and responsive, maintenance of traffic. No problems encountered. G:\ BIDREF 0E-352/353/2.0(05/25/00) CITY OF OCOEE MAGUIRE ROAD IMPROVEMENTS-SEGMENT 1 AND 2 gionieggnaMEMBOAVEMBRiegiteml]iiiiiga ,$iienniginlitfift:DAti*;:ekttitit#4111NEEM iNEEEM.41.0.4NikeyAleptitsiititiltEEMEM Contact Person Larry Wehner Larry Harlos David Lewis Date Contacted 05/19/00 05/19/00 05/19/00 Organization Jacksonville Transportation Authority Walt Disney Imagineering Walt Disney Imagineering Telephone No. (904)630-3181 (407)566-1900 Project Name Southside Beach Interchange Allstar Phase 3 and Others . 1-4 Collector Distribution Road Contract Amount $10,000,000 $4,869,000 $13,888,000 . Owner Jacksonville Transportation Authority • Walt Disney Corporation Walt Disney Corporation Completed on Schedule Yes Yes Yes Change Orders .0K Fair Normal Comments: Good recommendation. Will certainly allow Hubbard has performed very well on all work Hubbard performed very well during a very Hubbard to bid on future work. Only minor performed for Walt Disney. Work is rainy period. Completed work on-time. problems with construction work. Hubbard completed on time. All change negotiations Management is honest and straight forward. has completed other projects for JTA with are fair. Recommendation-Good. - satisfactory results. G:\...\BIDIEF 0E-352/353/2.0(05/25/00) CITY OF OCOEE MAGUIRE ROAD IMPROVEMENTS-SEGMENT 1 AND 2 ......................................................... i$f is ?i::'f.�%:iiiii$}i}:iS�''`%i:;{L�::}}:is "`•:ii%:i::iiiii:::}iJ}iii}}}ii}}}ii::i}}}i?}iii;:;:;:;:;:}}}::siY%:%:i.:;:;:;:;:::<?;:};:;:{:i::i:}}iiiiiiii}ii}i�iiiiiriiii':ii::?<i iiiii::ii:?%iiij:$ii};::;':Y.S<%'iiii}ii::: ::i:!;y;S:%:::yi(iii;yyr::iii::::iiiii}:yi:jii;:i?y;'li??i:}i::::iii:::�::i:::i::::ii::i:ti%ri;:;is:::i:{;i•..:::i::::i'::i':i::: :j;:y::.Li:::vi::iii:::::i:::�'iiiii$ii9 i::iiiiii::i::i:::�ii:i:i:::i::i::i::::ii:^�: .........•...�.�........�..........is�}iiiii:ii}i:4}... ............:.•.•::........:.•iiiii}iii>i}iii:4:;iii:....��.�•.••••..•:.�.�.�....is4%.i::.•..•'....•....:titi..�.�..•..,:.�:::.:::w:::v.................. .. ... .:..:::::.:v:::.�::::::::::::::::::::::::.:::::..:::::::. .:.::'T: :.. .:.::::.::.::..::::...:::• :.:.::.:..:.....:w::.�.......:::•:• .......... .............................._....... ,............................................ .............�.........................::::.:,.:�:::.:::::::::::::::::::.�::.:........,�..,..:.:u�ty`.�::::::::::::::::::::,::::,;,:.,..........�aicEc�.D�r�e > :a�.'�ran��ta��......., Contact Person • Steve Crug Mike Weirfitz Steve Lang Date Contacted 05/19/00 05/22/00 05/22/00 Organization Seminole County Public Works Orange County Public Works FDOT Telephone No. (407)665-1130 (407) 836-7914 (904)943-5351 Project Name C.R. 427 and Tuskawilla Road Several O.C.P.W. Projects South Orange Blossom Trail Contract Amount $24,000,000(Both) $ $11,717,938 Owner Seminole County Orange County FDOT Completed on Schedule Yes Yes Yes Change Orders Normal Normal Normal Comments: They do-good work. There have been only No problem with Bergeron. They do good Finished project ahead of schedule and usual problems. Project is on schedule work. received$500,000 bonus from FDOT. proceeding well. Difficult project required much coordination, traffic control, etc. G:\...\BIDREF 0E-352-353/2.0(05/25/00)