Loading...
HomeMy WebLinkAboutVII(F2) Discussion Of Additional Authorization For Maguire Road Design Services For Segments 1 And 2 With PEC - Addendum No 00-4 To PEC's Agreement For Consulting Engineering Services In The Amount Of $61,867.00 Aegeenda�6-06-2000 "CENTER OF GOOD LIVING-PRIDE OF WEST ORANGE" It1vInYOR:'CaMSSIONER 00Coee S.SCOTT VANDERGRIFT — CITY OF OCOEE DANNYHOWRSCOMMISSIONERSELL 150 N.LAKESHORE DRIVE SCOTT ANDERSON At OCOEE,FLORIDA 34761-2258 RUSTY JOHNSON i. (407)656-2322 NANCY J.PARKER 'I CITY MANAGER ELLIS SHAPIRO MEMORANDUM DATE: June 6, 2000 TO: The Honorable Mayor and Board of City Commissioners FROM: James W. Shira, P.E., City Engineer/Utilities Director SUBJECT: Maguire Road Design Services !` During the course of the design of the Maguire Road widening project, several issues arose that were outside the scope of the design proposals submitted by PEC. In order to maintain the design and start-of-construction schedule, and not affect right- of-way acquisition, we directed PEC to perform the required work. There were several issues, including coordination with subdivision'development in progress, development of street lighting alternatives, preparation of landscaping plan alternatives, and assessment of possible existing groundwater contamination in the vicinity of a proposed pond, and a slight redesign of the pond to avoid that possibility. These issues are outlined in the attached letter from PEC along with their requested additional compensation for that work. I respectfully recommend that the City Commission authorize the Mayor and City Clerk to execute Addendum No. 00-4 to PEC's Agreement for Consulting Engineering Services in the requested amount of $61,867.00. JWS/jbw Attachments Po: P61tec'60O'$Wa*R sourc s„ PROFESSIONAL ENGINEERING CONSULTANTS, INC. April 18, 2000 P-0124 Mr. James W. Shira, P.E. City Engineer/Utilities Director City of Ocoee 150 North Lakeshore Drive Ocoee, Florida 32761 Re: Additional Authorization- Maguire Road Dear Mr. Shira: Enclosed is a request for additional authorization for engineering services associated with the Maguire Road design project. The additional design services were provided primarily to coordinate the Maguire Road expansion with other on-going development projects (Ocoee Crossing, Wesmere, Brookstone) and provide additional aesthetic enhancements (lighting and landscaping) to the roadway plans. Additional engineering services were also provided for Moore Road improvements, signalization warrant analysis and design (Tomyn Road and fire station site) and the modifications required for Pond 1 due to potential groundwater contamination. The expanded design services were outside of the original scope of services for the Maguire Road project and were provided at the City's request in a timely and cost-effective manner. The total additional design effort was 844 hours and valued at $61,867. Enclosed is a detailed summary of the manhours per design task. PEC is respectfully requesting an additional authorization of$61,867 for engineering services provided in coordination with the Maguire Road design. As you are aware, the Maguire Road design project is complete and the project was • publicly advertised April 16, 2000. If I can answer any questions, please contact me at 422-8062. Sincerely, PROF SION L ENGINEERING CONSULTANTS, INC. Ke H oper Principal KRH/bk cc: Fursan Munjed, P.E. g:\cler\ld\pro\p00124 engineers "Engineering Our Community" planners surveyors 200 East Robinson Street • Suite 1560 • Orlando,Florida 32801 • 407/422-8062 • FAX 407/849-9401 ADDENDUM NO. 004 TO AGREEMENT FOR CONSULTING ENGINEERING SERVICES CONCERNING ADDITIONAL DESIGN SERVICES FOR THE MAGUIRE ROAD PROJECT This Addendum No. 004 hereinafter called the Addendum, as of this day of 2000, shall constitute an Addendum to the Agreement for Consulting Engineering Services between the City of Ocoee, Florida (the CITY) and Professional Engineering Consultants, Inc., 200 East Robinson Street, Suite 1560, Lake Eola Centre, Orlando, Florida (the CONSULTANT), dated the 21st day of August, 1984, hereinafter referred to as the AGREEMENT. WHEREAS, the CITY and CONSULTANT entered into an AGREEMENT whereby the CITY retained the CONSULTANT to provide professional engineering services as required from time to time, and WHEREAS the CONSULTANT will perform consulting engineering services for the CITY as herein defined. NOW THEREFORE, in consideration of the mutual covenants and promises hereinafter set forth on the part of both parties to be kept and performed, the parties do mutually agree as follows: Section 1 - Services of the Consultant 1.1 The CONSULTANT has performed the Additional Engineering Design Services as outlined in the attached proposal (P-0124) dated April 18, 2000 relative to the provision of consulting engineering services to the CITY. Section 2 - Compensation 2.1 Compensation by CITY for additional engineering design services for the Maguire Road Project is provided under this Addendum shall be computed under Paragraph 6.1.2.3 of the Agreement, utilizing the Hourly Method of Compensation with the compensation for this authorization not-to-exceed $61,867.00 as outlined in the attached proposal (P-0124) and manhour fee. Section 3 - Time of Completion 3.1 The CONSULTANT has provided the additional engineering design services in coordination with the Maguire Road design project. IN WITNESS WHEREOF, the parties have executed this Addendum No. 004 the day the year hereinabove set forth. €4.4t -v-/G(t'Gii,1 i By: ATTEST: nneth R. Hooper, Principal Date: _) --/l BOARD OF CITY COMMISSIONERS CITY OF OCOEE, FLORIDA By: ATTEST: S. Scott Vandergrift, Mayor Date: For the use and reliance of City of Ocoee only. Approved as to form and legality this day of , 2000. City Attorney G:\CLER\ENV\OE\OCOEE100ADN100-4ADN.ADN 2