Item III D
"CENTER OF GOOD LIVING-PRIDE OF WEST ORANGE" MAYOR•COMMISSIONER
O
coee S.SCOTT VANDERGRIFT
CITY O F O C O E E COMMISSIONERS
DANNY HOWELL
150 N.LAKESHORE DRIVE
SCOTT ANDERSON
OCOEE,FLORIDA 34761-2258 RUSTY JOHNSON
407 656-2322
NANCY J.PARKER
CITY MANAGER
ELLIS SHAPIRO
MEMORANDUM
DATE: March 10, 2000
TO: The Honorable Mayor and Board of City Commissioners
FROM: David Wheeler, P.E. -Q/►d.1
Assistant City Engineer/Utilities Director
SUBJECT: Reuse Pumping and Storage Facilities
Replacement of Florida Power Corporation Service
Attached for your review is an Authorization and Agreement with the Florida Power Corporation
to replace a portion of the overhead service feed into the wastewater treatment plant property
with underground service. The existing power feed into the plant property needs to be changed
so as to not conflict with the maintenance of the reuse transfer pump station. The Reuse
Pumping and Storage Project included the construction of a two 2 million gallon storage tanks
(one for reuse storage and one for reject storage), a transfer pump station, a system high service
pump station, expansion of the golf course pump station, and associated piping, stormwater
improvements and site work.
The existing power feed crosses over the transfer pumping station for the reuse system. In the
event that the pumps need maintenance and need to be removed, the potential for contact with
the electrical lines could be realized. This contact could damage the pump and/or station, disrupt
power service to the plant site, and cause harm to any person assisting with the pump removal.
The relocation of the power service should have been included with the Reuse Pumping and
Storage Facilities project from the beginning. Milmir Construction Inc. has installed the
underground conduits as a change to their contract.
Florida Power Corporation does their own installations and has proposed to perform the work for
the lump sum price of$6,992.72. This is less than their original estimate of$10,000, with the
reduction based upon seeing Milmir's work after installation. In addition, by the City paying for
this work direct, we are realizing a savings of the contractor markup on this work. This work
will be paid for as part of the Reuse Pumping and Storage Facilities project under the 1997
Utility Bond Issue.
I recommend that the City Commission accept Florida Power Corporation's proposal in the
amount of $6,992.72, and authorize the Mayor and City Clerk to execute the Authorization and
Agreement.
Pow ,. Coles
Pco3Egctop'oe,e`s;Wutorltesourc�s F T
- • AUG 20 '99 , 08:57AM MID FLORIDA DIVISION
11011.
•eeie et Florida
!f « Power
I•wr tie CO APO RArsON
August 20, 1999
David Wheeler
City of Ocoee
150 N. Lakeshore Drive
Ocoee, FL 34761
Re: Water Treatment Plant on A.D. Mims Road
Dear Mr, Wheeler:
The approximate cost to bury the existing power lines between the pad mounted transformer ".
and the existing power line on the south side of the new pumping station is $10,000. This cost
is for 500 feet and is based on your contractor providing FPC an acceptable PVC duct system
as outlined below:
1. All PVC to be Schedule 40, 4 inch, with 36 inches minimum cover.
2. All bends to be pre-bends, minimum 36 inch radius.
. 3. PVC to be glued together with minimum of 6" bells.
4. PVC bends at poles to be installed up against poles.
5. PVC bends at transformer to be installed as directed by FPC.
6. Jet line pull string to be blown through duct system.
7. FPC to inspect entire system before it is back filled.
Please call me at (407)646-8569 with any additional questions you may have.
•
•
Sincerely,
FLORIDA POWER CORPORATION
Joel Mastrogiacomo
Apopka Engineering
APOPKA ENGINEERING: 275 Ponkan Road • Apopka • Florida 32712
Phone (407)648-8669 Fax(407)846.3674
A Florida Progress Company
:.•••••ems Florida FEB 15 2000
::= Power . ._
:•�� CORPORATION
.SOO -
2/7/00
CITY OF OCOEE
DAVID WHEELER
150 N.LAKESHORE DRIVE
OCOEE,FL 34761
RE: Invoice# 2000-0514
Dear DAVID WHEELER:
Enclosed are documents on which your signature is needed before line work can be scheduled.
Please sign each copy and return original(s)using the provided envelope.
V Authorization and Agreement form necessary for Florida Power Corporation to perform
the service you requested at the subject location. Payment must accompany returned form.
Proposal/Agreement Letter
If you have any questions,please call: Joel Mastrogiacomo
(407)646-8569
Sincerely,
FLORIDA POWER CORPORATION
Apopka Engineering Office:275 Ponkan Road Apopka,Florida 32712 (407)886-7332
A Florida Progress Company
Florida
+ AUTHORIZATION AND AGREEMENT
X WORK AUTHORIZATION PROJECT ID A61AW 00-0254UG NUMBER 2000-0514
CUSTOMER REPRESENTATIVE'S NAME `REPRESENTATIVE'S TITLE
CITY OF OCOEE DAVID WHEELER
ADDRESS CITY STATE,ZIP
150 N. LAKESHORE DRIVE OCOEE FL 134761
Work Description REIMBURSEMENT
COST TO CONVERT EXISTING OVERHEAD ELECTRIC LINE TO UNDERGROUND. CUSTOMER TO PROVIDE A 4 INCH SCHEDULE
40 PVC A MINIMUM OF 36 INCHES DEEP.
Florida Power Corporation is not responsible for damage to,or costs arising from unknown uderground facilities,landscaping or driveways in trench
route.
Billiing Method TERMS OF PAYMENT
CONTRACT PRICE $6,992.72 0 In Advance ❑ On or before 20 days ❑ OTHER
after completion of - explain below
OTHER TERMS OF PAYMENT OWNERSHIP OF COMPLETED PROJECT 1 Date check received
d❑ FPC ❑ CUSTOMER
AGREEMENT
The Customer Is responsible for the cost,repair or replacement of(1)any sod,trees,shrubbery or other plants damaged In the normal course of
performing or gaining access to the above work,and(2)and damage to non-FPC underground wires,conduit,pipes or other utility facilities that have
not been staked or located by owner of the facilities. Contract price and terms of payment become Invalid lithe signed Agreement is not received by
FPC on or before...30 DAYS.
The undersigned hereby authorizes and employs Florida Power Corporation to perform the above job and to furnish labor,necessary facilities or
equipment,and/or materials for the above Job and agrees to pay In accordance with terms of payment as noted above.
SIGNATURE OF ABOVE CUSTOMER OR REPRESENTATIVE //�� DATE
Se A ttoc.il 601 Sf4I' nu Ave. I 4 ?
AUTHORIZATFON
Reporting Location RA Code 'AUTHORIZING SUP ISOR ISSUE DATE
Apopka 563 Warren DiNapoli 2/7/00
ACCOUNTING INFORMATION
DATE(MONTH YEAR) J.E.(MONTH NUMBER) SEQ ACTIVITY COMMENT
CONVERT OVERHEAD TO UNDERGROUND
CHARGES(Debit) CREDITS
PRIMARY I RA I EAC .I ACTIVITY PRIMARY II RA EAC ACTIVITY TASK $AMOUNT
ACCOUNT TASK ACCOUNT
14220 563 364 563 811 AA6110 43410X $776.06
14220 563 365 563 811 AA6110 43410X $539.31
14220 563 563 809 AA6110 43410W $5,677.35
TO:CONTROLLER'S DEPARTMENT Total $6,992.72
Please open Job Order for accumulating costs. Work Order Number
REQUESTED BY DATE 70670-29496
I
ACTIVITY TASK
COMPLETION DATE
ENGR ID: JMM
REQUESTED BY DATE
•
ACCESS file on server fsakopsU:Uatabasevype waives
APPROVED BY:
CITY OF OCOEE,FLORIDA
By:
S. Scott Vandergrift,Mayor Date
Attest:
Jean Grafton,City Clerk
FOR USE AND RELIANCE ONLY BY THE APPROVED BY THE OCOEE CITY
CITY OF OCOEE,APPROVED AS TO FORM COMMISSION IN A MEETING HELD ON
AND LEGALITY THIS DAY OF ,2000 UNDER
,2000. AGENDA ITEM NO.
FOLEY&LARDNER