Loading...
HomeMy WebLinkAboutVII(A) Award Of Construction Contract To Maxwell Contracting, Inc For The Ocoee/Winter Garden Reuse Interconnect Water Main Project Agenda 3-21-2000 "CENTER OF GOOD LIVING-PRIDE OF WEST ORANGE" IMeAYOR•COMAMISSIONER Ocoee S. SCOTT VANDERGRIFT 0 ,, o CITY OF O C O E E COMMISSIONERS '� { 3 DANNY HOWELL ���aaa...��� ;a. 150 N.LAKESHORE DRIVE SCOTT ANDERSON OCOEE,FLORIDA 34761-2258 RUSTY JOHNSON y�, O ..��Z` (407)656-2322 NANCY J.PARKER Op GOO CITY MANAGER ELLIS SHAPIRO MEMORANDUM DATE: February 25, 2000 TO: The Honorable Mayor and Board of City Commissioners FROM: David A. Wheeler, P.E. 0<9.+✓ Assistant City Engineer/Utilities Director SUBJECT: Ocoee/Winter Garden Reuse Interconnect Water Main Project Award of Construction Contract On Thursday, February 17, 2000, bids were received for the Ocoee/Winter Garden Reuse Interconnect Water Main Project. The work for this project generally includes the installation of a new 16 inch reclaimed water main from the Winter Garden effluent disposal site on Ocoee/Apopka Road east to Ocoee's effluent disposal site, the Forest Lakes Golf Course. The attached figure shows the general layout of this project. The pipeline will connect to Winter Garden's transmission main along Ocoee/Apopka Road at their site and travel cross country and connect to Ocoee's transmission main in the area of the number three tee box on the golf course property. The pipeline will be installed on Winter Garden and Ocoee/Forest,Lakes Golf Course property and require an underground crossing of the West Orange Trail. This project was publicly advertised in the Orlando Sentinel and through Central Florida Builder's Exchange, F.W. Dodge Construction Reports, and the Business Alliance. Six contractors submitted bids on this project. Their bids were: CONTRACTOR OCOEE/WINTER GARDEN INTERCONNECT RECLAIMED MAIN Maxwell Contracting, Inc. $ 317,000.00 Kenco, Inc. $ 323,460.00 Gibbs &Register, Inc. $ 336,000.00 Cathcart Contracting Company, Inc. $ 348,725.76 Prime Construction Group, Inc. $ 350,388.95 Masci Construction, Inc. $ 388,123.00 Engineer's Estimate $ 325,000.00 profeet dp,06.s 4'l4t r ilesnurcest This reclaimed water pipeline project will allow for the flow of water in either direction. The primary plan is to take Winter Garden's reclaimed/effluent for use by the golf course; therefore freeing Ocoee's reclaimed/effluent to be used along Clarke Road. In addition, during periods of excessive rainfall, Ocoee can pump reclaimed/effluent to Winter Garden's disposal site and if needed to Lake Apopka through the Winter Garden WWTP outfall. The attached letter from PEC, Inc. is a recommendation to award the contract to Maxwell Contracting, Inc. in accordance with the base bid. The Engineering Staff concurs with PEC's recommendation to award the Ocoee/Winter Garden Reuse Interconnect Water Main Project to Maxwell Contracting, Inc. in the amounts of$317,000.00. The construction cost of this project is approximately 2.46 percent lower than the engineer's estimate. The project will be funded from the 1997 Utility Bond Issue. The intent is to secure bonds and insurance certificates, execute contract documents, and issue the Notice To Proceed as quickly as possible. The construction schedule requires the contractor to be completed within 180 days; there is a scheduling stipulation of not working on the golf course property until after May 1st. Action Items: I recommend that the City Commission authorize the Mayor and City Clerk to execute a contract with Maxwell Contracting, Inc. in the amount of $317,000.00 for the Ocoee/Winter Garden Reuse Interconnect Water Main Project in accordance with the following steps: • Authorize the Engineering Department to execute the Notices of Intent To Award and secure executed contract documents, bonds and insurance from the contractor. • Authorize the Mayor and City Clerk to execute the contracts with Maxwell Contracting, Inc. at such time as the contract documents are reviewed for compliance by staff and legal counsel, as needed. DAW/jbw Attachments ® 0 Protect fleece` Weter Resources<._ + + ji' 1, i, �� _ ! ,G` 74 , uS +�.• - - {�` t Z' P1 s,n Ali: 4 , , . _...,„,. j*_ ?� t ,... ,• er t II 1 '-'N , . ../,'.'''-.1.1.194ftie N., , ',en ..., 7 4 pF..-- , : ^,jk # ..Y'4 'dW` ' T z *.• A-+14.- C t' - 1 2 XS? ' ,.o. :- - _,i, (� may' V rtro; .' �' , .k1". .-- 4,, ; __;';.;"re': ... -- --..$ _ 1,1'1 I X 1./N0L:f, li'lle—/Ai'_1:'•#ti,"t t J.' -'., tA � 1 sWIS , • �. Wad,t '-T ,;' '' Z _� -rte t , T ��� ilit } f. 1 Ce N ° f`rr ° 4SNA '' J\ i'in 1_,.,,, '1 -4''' 't• £I; y� y cq t 1 �, 5sY a '- I----7, .r' ate _ • 4. ).1; F, g + -_�" .,;,..-."--..;.?:.-,-,..4,4, ? -�. , y. -,-• „\' /'x � p� �r R lav y✓:� mss' .-,4,.7.�! .Y • t`hr5 - LIAI.n �i .-_7-"I = I sue .1,kd ''_..-. ' _A 0 Ii'''- ' �1.. -71'...40.2t,"-- Id s' r Y<(*� k£ M...1'. a 7 +'_. , 1 ti-'r , ..-4•1".,,,, ,L,k t 5:044 .•. pip it,k:,T '"��"'" r-.+.y.» 1 1.-,.. s: zMt ,. si ' di, G i tea s s rf di � AI S f i .� % ? • r ."� lard - 6 C ,� ja �s- Via' '4 ' . f N A _ J 4 --- * � 1 - •J►- - - ----- - i y, •= \ ..��, �� 408•__ !PC 1 d ;' 3. 'Y. Ali -7`"ts 4 I. lel. moi. y/ 1 fey. 4C Sf9ffi11 'i`-. f '44 11, ..� , i .M-. t s ; y`/� 40. .. �� Tom* -a • - `-(ll__ }g W-.J 0. li r i 1I. " - 10r ` w,• "' ..`.- `.' .`sem , N CITY OF OCOEE A 0.5 0 0.5 Miles NEW REUSE SYSTEM PEC ,(1-; FEB 2 8 2000 , PROFESSIONAL ENGINEERING CONSULTANTS, INC. ` ., `�✓ February 25, 2000 of 3-3.0 Mr. James W. Shira, P.E. Utilities Director/City Engineer City of Ocoee 150 N. Lakeshore Drive Ocoee, FL 34761 SUBJECT: Ocoee/Winter Garden Reuse Interconnect Water Main RE: Recommendation of Award Dear Mr. Shira: On Thursday, February 17, 2000, the City of Ocoee received sealed construction bids for the referenced project from seven (7) contractors. The attached tabulation of bids represents a summary of unit prices by each respective Bidder. Mathematical errors, omitted items or incorrect extensions, if any, are noted at the end of the summary. The bid tabulation shows Maxwell Contracting, Inc. as the apparent low bidder with a total bid price of$317,000.00. The second apparent low bidder is Kenko, Inc. with a total bid price of$323,460.00, and the third apparent low bidder is Gibbs& Register, inc. with a total bid price of $341,000.00. The highest total bid price is $395,938.50 submitted by C.F.E. Corporation, while the Engineer's construction estimate is $325,000.00 including contingencies. The bid proposals of the three(3) apparent low bidders are complete and properly executed except as noted on the attached Bid Checklist and Reference form. They have acknowledged receipt of all Addenda as prescribed and have submitted proposals to comply with the other City bidding requirements. While these special requirements must be verified by the City, we believe that these bid proposals are in conformance in all material respects to the invitation for bids and are therefore responsive bids. Based upon the information presented in the bid proposal Questionnaire,each of the three (3) apparent low bidders are licensed contractors in the State of Florida and seem to possess the manpower,facilities and equipment necessary to perform the classes of work contemplated within the time specified. We have also contacted the references listed in the Questionnaire for each of the three (3) apparent low bidders. A summary of this survey is presented in the attached "Bid Checklist and Reference" forms. As these summaries show, these contractors performed satisfactorily on their past projects and completed the past projects within the contract time. Based on our review of the qualification submittals from each of the three(3)apparent low bidders, our conversations with the respective references and our analysis of the bid tabulation, we find that Maxwell Contracting, Inc. is the lowest responsible, responsive bidder. Therefore, we recommend that the above referenced construction contract be awarded to Maxwell Contracting, Inc. based upon the total bid proposal of$317,000.00. engineers "Engineering Our Community" planners surveyors 200 East Robinson Street • Suite 1560 • Orlando, Florida 32801 • 407/422-8062 • FAX 407/849-9401 Mr. James W. Shira, P.E. February 25, 2000 Page 2 If you have any questions or comments, please contact me at your earliest convenience. Sincerely, PR FESSIONAL ENGINEERING CONSULTANTS, INC. Kathleen N. Gi k, P.E. Senior Engineer KNG/cs G:\...\023DROA Enclosures: Bid Tabulation Bid Checklists Bid References cc: Charlie Tinch, Utilities Director, City of Winter Garden Arthur R. Austin, P.E., PEC, Inc. BID TABULATION CITY OF OCOEE/WINTER GARDEN OCOEE/WINTER GARDEN REUSE INTERCONNECT WATER MAIN 150-180 DAY CONTRACT TIME BID DATE: FEBRUARY 17,2000 PAGE 1 OF 3 Maxwell Contracting,Inc. Kenko,Inc. Gibbs&Register,Inc. ITEM NO: ITEM DESCRIPTION QTY. , UNIT UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE . UNIT PRICE TOTAL PRICE 1.01 Mobilization,Demobilization,Bonds and Permits(Maximum of 5%of Total Bid). 1 LS $15,800.00 $15,800.00 $6,000.00 $6,000.00 $10,000.00 $10,000.00 1.02 General Requirements-Division 1 (except as . follows under this item). 1 LS $5,000.00 $5,000.00 $1,000.00 $1,000.00 $15,000.00 $15,000.00 • a. Field Engineering and Exploratory Excavation. 1 LS . $3,255.50 $3,255.50 $6,000.00 $6,000.00" $4,000.00 $4,000.00 b. Record Drawing Preparation. 1 LS $3,000.00 $3,000.00 $1,000.00 $1,000.00-- $4,000.00 " $4,000.00 c. Color Audio-Video Preconstruction Record. 1 LS $1,500.00 $1,500.00 $1,500.00 $1,500.00 $1,000.00 $1,000.00 1.03 Indemnification($1,000 minimum). 1 LS $1,000.00, $1,000.00. $1,000.00 $1,000.00 $1,000.00 $1,000.00 _ 1.04 Construction Permits Allowance(refer to Specification Section 01025-1.02.E.1). 1 Allow. $3,500.00 $3,500.00 $3,500.00 $3,500.00 $3,500.00 $3,500.00 1 05" 16-inch Reuse Main,D.I.or PVC(Circle choice of material). 4,090 LF $35.00 $143,150.00 $32.00 $130,880.00 $34.00 $139,060.00 1.06 16-Inch Gate Valve and Box. 1 -EA $5,000.00 $5,000.00 $4,000.00 $4,000.00 $6,000.00 $6,000.00 Removal and Disposal of Unsuitable Material, - . . 1.07_ . including removal and replacement/compaction " of overburden. . a. From clearing/stripping limits to 3 feet. 50 CY $3.00 $150.00 $15.00 $750.00 $20.00 $1,000.00 b. From'3 feet to 5 feet below grade. 50 , CY $4.00 $200.00 $15.00 $750.00 $25.00 $1,250.00 c. From 5 feet to 7 feet below grade. 50 CY $5.00 $250.00 $15.00 $750.00 $30.00 $1,500.00 1.08 Asphalt Pavement Surface Removal and Repair. 17 SY $35.00 $595.00 $39.00 $663.00 $100.00 $1,700.00 1.09 Remove and Replace Concrete Cart Path. 23 SY $30.00 $690.00 $26.00 $598.00 $50.00 $1,150.00 . r 1.10 Seed and Mulch(15'maximum pay width). 6,784 SY . $0.50 $3,392.00 $1.00 $6,784.00 $0.40 $2,713.60 1.11 Silt Fence. 4,035 LF $0.50 $2,017.50 $1.00 $4,035.00 $4.00 $16,140.00 - 1.12 Tree Clearing and Removal. 1 LS $2,500.00, $2,500.00 $3,750.00 $3,750.00 $5,000.00 $5,000.00 Construction of ALL Ocoee Valve Flow Control . 1.13 Station related Improvements Including within the Ocoee Valve Flow Control Station site as defined in these Contract Documents. . 1 LS $51,000.00 $51,000.00 $62,000.00 $62,000.00 $45,986.40 $45,986.40 Construction of ALL Winter Garden Valve Flow Control Station related improvements including 1.14 within the Winter Garden Valve Flow Control Station site as defined in these Contract Documents. 1 LS $74,000.00 $74,000.00 $87,000.00 $87,000.00 $80,000.00 $80,000.00 For any Work items not Included in the above • bid items,supply all materials and fumish all ' 1 15 labor and equipment,perform all Work required pay all costs including permit fees,taxes, . insurance,overhead and profit necessary for a complete and operational system per the intent of the Specifications and Contract Drawings. 1 LS $1,000.00 $1,000.00 $1,500.00 $1,500.00 $1,000.00 $1,000.00 TOTAL BASE BID(Total of Bid Items 1.01 through 1.15) $317,000.00 S323,460.00 $341,000.00 NOTE:'BID PRICES WRIT-TEN IN NUMBERS AND WORDS DID ' NOT MATCH.BASED ON THE PROJECT MANUAL SECTION 00100,PARAGRAPH 122,IN THE CASE OF A CONFLICT, WORDS SHALL TAKE PRECEDENCE - 0i..WEJ16eBIDTAB.WB2(02125100) BID TABULATION CITY OF OCOEE/WINTER GARDEN OCOEE/WINTER GARDEN REUSE INTERCONNECT WATER.MAIN 150-180 DAY CONTRACT TIME BID DATE: FEBRUARY 17,2000 PAGE 2 OF 3 Prime Construction Group,Inc. Cathcart Contracting,Inc. Masci Construction,Inc. - ITEM - - - - NO. ITEM DESCRIPTION QTY. UNIT UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL.PRICE . 1 01 Mobilization,Demobilization,Bonds and • Permits(Maximum of 5%of Total Bid). 1 LS $10,000.00 $10,000.00 $17,350.00 $17,350.00 $15,000.00 $15,000.00 1.02 General Requirements-Division 1 (except as follows under this item). 1 LS $8,000.00 $8,000.00 $30,000.00 $30,000.00 $500.00 $500.00 ..... a. Field Engineering and Exploratory Excavation. 1 LS $300.00 $300.00 $2,500.00 $2,500.00 $3,500.00 $3,500.00 b. Record Drawing Preparation. ' 1 LS $200.00 $200.00 $7,500.00 $7,500.00 $3,000.00 `$3,000.00 .. c. Color Audio-Video Preconstruction Record.' - 1 LS $500.00 $500.00 $500.00 $500.00 $500.00 $500.00 • 1.03 Indemnification($1,000 minimum). 1 LS $1,000.00 $1,000.00 $1,000.00 $1,000.00 $1,000.00 $1,000.00 1.04 Construction Permits Allowance(refer to Specification Section 01025-1.02.E.1). 1 Allow. $3,500.00 $3,500.00 $3,500.00 $3,500.00 ,$3,500.00 $3,500.00 1 05 16-Inch Reuse Main,D.I.or PVC(Circle choice of material). 4,090 LF $26.00 $106,340.00 $30.25 $123,722.50 $38.00 $155,420.00 1.06 16-Inch Gate Valve and Box. 1 EA $4,600.00 $4,600.00 $1,000.00 $1,000.00 $3,500.00 $3,500.00. Removal and Disposal of Unsuitable Material, ' 1.07 including removal and replacement/compaction of overburden. a. From clearing/stripping limits to 3 feet. 50 CY $10.00 $500.00 $6.00 $300.00 $20.00 '• $1,000.00 b. From 3 feet to 5 feet below grade. 50 CY , $12.00 $600.00 * $7.00 $350.00 $50.00 $2,500.00 c. From 5 feet to 7 feet below grade. 50 CY $15.00 $750.00- $8.00 $400.00 • $50.00 ' $2,500.00 - 1 08 Asphalt Pavement Surface Removal and ' Repair. 17 SY $100.00 $1,700.00 $60.00 $1,020.00 $35.00 $595.00 1.09 Remove and Replace Concrete Cart Path. 23 SY $40.00 $920.00 $40.00 $920.00 $30.00 ' . $690.00 1.10 Seed and Mulch(15'maximum pay width). 6,784. , SY $0.30 $2,035.20 - $0.39 $2,645.76 $0.50 $3,392.00 1.11 Silt Fence. 4,035 LF $1.25 $5,043.75 , $0.50. ' $2,017.50 $1.00 $4,032.00 • 1.12 Tree Clearing and Removal.. 1` LS $25,000.00 $25,000.00 $30,000.00 $30,000.00 $20,000.00 $20,000.00 Construction of ALL Ocoee Valve Flow Control 1.13 Station related Improvements including within the Ocoee Valve Flow Control Station site as defined in these Contract Documents. - 1 LS " • " $79,000.00 $79,000.00 $51,000.00 $51,000.00 $69,091.00 $69,091.00 Construction of ALL Winter Garden Valve Flow Control Station related improvements including 1.14 within the Winter Garden Valve Flow Control Station site as defined in these Contract • - Documents. 1 LS $90,000.00 $90,000.00 $73,000.00 $73,000.00 $98,300.00 $98,300.00 For any Work items not Included In the above bid Items,supply all materials and furnish all 1.15 labor and equipment,perform all Work required pay all costs Including permit fees,taxes, Insurance,overhead and profit necessary for a complete and operational system per the intent of the Specifications and Contract Drawings. 1 LS $5,000.00 $5,000.00 $0.00 $0.00 $100.00 S100.00 TOTAL BASE BID(Total of Bid Items 1.01 through 1.15) $344,988.95 S348,725.76 $388,120.00 NOTE:'BID PRICES WRITTEN IN NUMBERS AND WORDS DID NOT MATCH.BASED ON THE PROJECT MANUAL SECTION 00100,PARAGRAPH 12.2,IN THE CASE OFA CONFLICT, - WORDS SHALL TAKE PRECEDENCE. 0...10E-31e1BIDTAB.WB2(02125100) BID TABULATION CITY OF OCOEE/WINTER GARDEN OCOEE/WINTER GARDEN REUSE INTERCONNECT WATER MAIN 160-180 DAY CONTRACT TIME BID DATE: FEBRUARY 17,2000 PAGE 3 OF 3 C.F.E.,Corp. ITEM NO. ITEM DESCRIPTION QTY. UNIT UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT.PRICE TOTAL PRICE 1 01 Mobilization,Demobilization,Bonds and Permits(Maximum of 5%of Total Bid). 1 LS $19,250.00 $19,250.00 1.02 General Requirements-Division 1 (except as follows under this item). 1 LS $4,500.00 $4,500.00 • a. Field.Engineering and Exploratory Excavation. 1 LS $5,100.00 $5,100.00 b. Record Drawing Preparation: 1 LS $6,710.00 $6,710.00 c. Color Audio-Video Preconstruction Record. 1 LS $2,000.00 $2,000.00 1.03 Indemnification($1,000 minimum). 1 LS $1,000.00 $1,000.00 1.04 Construction Permits Allowance(refer to Specification Section 01025-1.02.E.1). 1 Allow. $3,500.00 $3,500.00 1.05 16-Inch Reuse Main,D.I.or PVC(Circle choice of material). 4,090 LF $37.85 $154,806.50 1.06 16-Inch Gate Valve and Box 1 EA $4,785.00 $4,785.00 Removal and Disposal of Unsuitable Material, 1.07 Including removal and replacement/compaction of overburden. . a. From clearing/stripping limits to 3 feet. 50 CY $13.20 $660.00 b. From 3 feet to 5 feet below grade. 50 CY $15.75 $787.50 c. From 5 feet to 7 feet below grade. 50 CY $18.20 $910.00 1.08 Asphalt Pavement Surface Removal and Repair. 17 SY $45.30 $770.10 1.09 Remove and Replace Concrete Cart Path. 23 SY $40.00 $920.00 1.10 Seed and Mulch(15'maximum pay width). 6,784 SY $0.35 $2,374.40 1.11 Silt Fence. 4,035 LF $2.00 $8,070.00 1.12 Tree Clearing and Removal. 1 LS $14,000.00. $14,000.00 Construction of ALL Ocoee Valve Flow Control 1.13 Station related improvements Including within the Ocoee Valve Flow Control Station site as defined in these Contract Documents. 1 LS $50,995.00 $50,995.00 . Construction of ALL Winter Garden Valve Flow Control Station related improvements Including 1.14 within the Winter Garden Valve Flow Control Station site as defined in these Contract • Documents. 1 LS $79,500.00 $79,500.00 For any Work items not included in the above bid items,supply all materials and furnish all 1 15 labor and equipment,perform all Work required pay all costs Including permit fees,taxes, insurance,overhead and profit necessary for a complete and operational system per the intent of the Specifications and Contract Drawings. 1 LS $35,300.00 $35,300.00 TOTAL BASE BID(Total of Bid Items 1.01 through 1.15) $395,938.50 NOTE:'BID PRICES WRITTEN IN NUMBERS AND WORDS DID NOT MATCH.BASED ON THE PROJECT MANUAL SECTION 00100,PARAGRAPH 12.2,IN THE CASE OF A CONFLICT, WORDS SHALL TAKE PRECEDENCE. OS..10E-31MBIDTAB.WB2(02/25100) BID CHECKLIST PROJECT DATA BIDDER INFORMATION Owner: City of Ocoee/Winter Garden Name: Maxwell Contracting, Inc. • Location: 150 N. Lakeshore Drive Address: 395 South Range Road, Suite C Ocoee, FL 34761 Cocoa, FL 32926 Contract: Ocoee/Winter Garden Reuse Contractor's No.: CU-CA53966/GG-CA44529 Interconnect Water Main (Corrected) Bid Amount: $317,000.00 Verified Bid Position: 1st A.L.B. TiliRINECilinkiOnemmeM :<'Ye. Acknowledges all Addenda? Indemnification (Minimum $1,000)? Balanced Bid (Section 00300)? << Corrected Bid Amount? •:4N] . Verified Bid Position? Mobilization less than 5% of bid? .................. Conditional bid? • 111413 Schedule of Base Bid Manufacturers? ` .NI Bid Proposal properly signed? Serious bid omissions? 111011.11 Unauthorized alterations of form? gaga Questionnaire Completed 11111,111 (Section 00301)? Subcontractors less than 50% of bid amount (Section 00301)? Project Experience References "" "'''> (Section 00301)? Compliance with Florida Trench Safety _€ ''. ±`< " Act (Section 00301A)? Drug-Free Workplace Certification ' ? (Section 00301 B)? . MBE/WBE Submittal (Section 00301C)? > ' -'_< ' .. .......... 5% Bid Bond (Section 00410)? 11111eill Corporate Authority (Section 00410)? Power of Attorney? Noncollusion Affidavit (Section 00480)? < ' > Certification of Non-Segregated Facilities >` << (Section 00481)? Sworn Statement on Public'Entity Crimes > <' (Section 00482)? Non-Discriminatory Labor Practices ; < < (Section 00483)? higaill in box for properly completed Bid. G:'...\BIDCKLST -1- 0E-316/2.1 (02/24/00) BID CHECKLIST PROJECT DATA . BIDDER INFORMATION Owner. City of Ocoee/Winter Garden Name: Kenko, Inc. . Location: 150 N. Lakeshore Drive Address: 12301 Central Avenue, N.E., Suite 100 Ocoee, FL 34761 Blaine, MN 55434 Contract: Ocoee/Winter Garden Reuse •Contractor's No.: CU-0056707 Interconnect Water • (Corrected) Bid Amount: $323,460.00 Verified Bid Position: 2nd A.L.B. s : women s 111111111111111111111111111111111111111111111111111.111111 .. .<::::::'<::> . .:::::::::: :> : .. . .. ......... ....... Acknowledges all Addenda? ; ` 1 [ . Indemnification (Minimum $1,000)? •''` 1 Balanced Bid (Section 00300)? NM, / Corrected Bid Amount? Verified Bid Position? Mobilization less than 5% of bid? << .................... Conditional bid? Schedule of Base Bid Manufacturers? 1141111 • Bid Proposal properly signed? • 110.111 Serious bid omissions? 111011 Unauthorized alterations of form? . 111101111 Questionnaire Completed (Section <`111 '1111 00301)? • Subcontractors.less than 50%.of bid amount(Section 00301)? Project Experience References ;..•/.>11111 (Section 00301)? •Compliance with Florida Trench Safety 1111 ` Act(Section 0030IA)? Drug-Free Workplace Certification (Section 00301 B)? MBE/WBE Submittal (Section 00301C)? 1111111111 5% Bid Bond (Section 00410)? Corporate Authority (Section 00410)7 113.41, Power of Attorney? >»>11€ 11 Noncollusion Affidavit (Section 00480)? Certification of Non-Segregated Facilities >'> <11 (Section 00481)? Sworn Statement on Public Entity Crimes <> `> €><<' (Section 00482)? • Non-Discriminatory Labor Practices (Section 00483)? ..................... • MAN in box for properly completed Bid. GA...\BIDCKLST -2- OE-316/2.1 (02/24/00) BID CHECKLIST • PROJECT DATA , BIDDER INFORMATION Owner. City of Ocoee/Winter Garden Name: Gibbs & Register, Inc. Location: 150 N. Lakeshore Drive Address: 438 N. Dillard Street Ocoee, FL 34761 Winter Garden, FL 34787 Contract: Ocoee/Winter Garden Reuse Contractor's No.: CG-CA06294 Interconnect Water Main (Corrected) Bid Amount: $341,000.00 :..:....::::..:::..... Verified Bid Position: 3rd A.L.B. 1111312.5,1464iiiiitMENIMMI IlitaggettifigignitingiaillaingniENEE. ........... ::: ' Via:::<>< > > >E><« <{«<E'-<N><< M' <'_{ > Acknowledges all Addenda? 11 1 • Indemnification (Minimum $1,000)? <> !` Balanced Bid (Section 00300)? Corrected Bid Amount? €11141 Verified Bid Position? 1 `' ' Mobilization less than 5% of bid? ............ Conditional bid? Schedule of Base Bid Manufacturers? . • ✓ Incomplete. Bid Proposal properly signed? < ` Serious bid omissions? Unauthorized_alterations of form? Questionnaire Completed (Section €11<1 ' < }11 00301)? Subcontractors less than 50% of bid sins amount(Section 00301)? Project Experience References11111 `1?'"`1 (Section 00301)? • Compliance with Florida Trench Safety gstati Act (Section 00301A)? Drug-Free Workplace Certification 011101.1 - (Section 00301 B)? MBE/WBE Submittal (Section 00301C)? « < ` 5%.Bid Bond.(Section 00410)? ' ` No Bond amount written. Corporate Authority (Section 00410)? getOiligit Power of Attorney? Noncollusion Affidavit (Section 00480)? Certification of Non-Segregated Facilities 111<` (Section 00481)? Sworn Statement on Public Entity Crimes 111 (Section 00482)? Non-Discriminatory Labor Practices 1111101111 (Section 00483)? • in box for properly completed Bid.. G:\...\BIDCKLST -3- 0E-316/2.1 (02/24/00) CITY OF OCOEENVINTER GARDEN OCOEEMIINTER GARDEN REUSE INTERCONNECT WATER MAIN iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii Contact Person James Duncan, P.E. Charles Hargrove • . Mark Luthie, P.E. Date Contacted 02/22/00 02/22/00 . 02/22/00 Organization City of Cocoa City of Sanford City of St. Cloud Telephone No. •(407) 639-7659 (407) 330-5681 (407) 957-7264 Project Name Several Recent Projects Second Street Storm Sewer Narcoossee Water Service Contract Amount $30K to $617K • $1,742,898 $347,000 Owner City of Cocoa, Utilities Department City of Sanford City of Titusville Completed on Yes Yes Yes Schedule Change Orders OK OK OK. Comments: Like working with Maxwell. Honest They do good work. Quality of work is Very good. Completed on time and Contractor. Keeps construction good. Very responsive, within budget. No concerns with management alert to changes and Communication with Superintendent working with Maxwell on future cost proposals. Fair and savy was very good. projects. Contractor that is well respected. GA...1131DREF I OE-316/2.1(02/24/00) ' • CITY OF OCOEENVINTER GARDEN OCOEE/WINTER GARDEN REUSE INTERCONNECT WATER MAIN REFERENCES FOR KENKO, INC iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii Contact Person Dan Holdemess Matt Vaughn Russ Mullins • Date Contacted 02/22/00 . 02/23/00 02/22/00 Organization City of Coralville TMS Mojave Water Agency Telephone No. (319) 351-1266 . (918) 596-9585 . .(760) 240-9201 . . Project Name Coralville Sewer ?Tulsa 36" Sewer • MWA Pipelines Contract Amount $2,472,193 $4,276,000 $6,147,195 Owner City of Coralville . Tulsa Metropolitan Sewer MWA Completed on Yes Early • Yes Schedule • Change Orders Minimal OK OK Comments: Did a good job. Completed work on Pleased with their work. Constructed Excellent reference. Performed work time with only minor delays during 3 miles of deep, difficult sanitary ahead of schedule. Have performed clean up phase. Minimal change sewer. Well equipped and staffed. • several projects. Tough and honest. . orders. Completed early with no significant Very few claims or change orders. problems. Will use them anytime. G:1..ABIDREF 2 OE-316/2.1 (02J24100) ' • • • . . • . . , ' • • CITY OF OCOEE/VVINTER,GARDEN , OCOEENVINTER GARDEN REUSE INTERCONNECT WATER MAIN REFERENCES FOR GIBBS &REGISTER, INC Immoggemioikag: Contact Person Roger Densberger . Bob Leacock Reggie Ryan Date Contacted 02/22/00 02/22/00 02/23/00. • Organization City of Altamonte Springs Sverdrup Orange County Utilities Telephone No. (407) 830-3871 (407) 903-5001 - (407) 836-7272 Project Name Spring Lake Road Improvements • OUC/Kirkman Water Plant Clarcona Contract Amount $729,429.44 . $1,148,000 $132,598 Owner City of Altamonte Springs Orlando Utilities Commission Orange County Utilities Completed on Yes Yes Yes . Schedule • Change Orders OK OK OK Comments: Good work. Performed well on utility, Did a good job. No problems. They They are a good Contractor. paving'and roadway projects in past. have worked with G&R on other Excellent workmanship. Slow to Have needed administrative projects as well. No concerns with • close out the project but perform assistance but have been no problem using them on future work. . actual work very'well: to work with. OE-316/2.1(02124/00)