STAFF REPORT
TO: The Mayor and Board of City Commissioners
�
FROM: Bruce Nordquist, CLP, Director of Recreation \. 1''
DATE: April 14, 2000
RE: Family Aquatic Center at Beech Multipurpose Recreation Facility
ISSUE:
Should the Mayor and City Commissioners approve the site plan for the Beech Multi-purpose
Recreation Facility Family Aquatic Center?
BACKGROUND & DISCUSSION:
The City commission selected the firm, Borelli & Associates to design the Family Aquatic Center
for the Beech Multi-purpose Recreation Facility. Borelli & Associates have met with the
Recreation Advisory Board on two occasions with presentations on the Family Aquatic Center.
Attached (`A') find a schematic site plan that the board and staff have reviewed and discussed.
The users of this pool facility will include the leisure swimmers, senior citizens, wheelchair bound
citizens and the entire family. The pool will have a play area with fountains, rainfall umbrella and
spray jets for the entire family to enjoy. The pool will be a zero entry level with a four foot depth
in the lap area. The site plan will allow for future growth to include the addition of a competition
pool.
Borelli & Associates were informed of the proposed budget for the pool facility and the schematic
site plan was rendered with this information in mind (attachment `B'). Borelli & Associates have
prepared a 15 minute presentation on the proposed Beech Multi-purpose Recreation Facility
Family Aquatic Center.
STAFF RECOMMENDATION;
Staff respectfully recommends that the Mayor and City Commissioners approve the schematic site
plan for the Family Aquatic Center. If approved this will allow Borelli& Associates to fmalize
the site plan and allow the staff to put the design package out to bid.
Attachments: Schematic Site Plan for Family Aquatic Center
Preliminary Cost Estimate
CJe
'WaIt knout cfrp,
L3
C ' '
1 �� LAP SWIM FAMILY ACTIVITY AREA m v \1 a a \
,�
>i 19,500 SQ. FEET DECK (4 LANES) W/ RAINFALL FEATURE, N. POOL EQUIPMENT m 1
\ FLOOR SPRAY JETS EN L( C OSED)
-
AP'') A PLAY FEATURE /
NDNsmy6.a3IN
3Mnip31IHDav �' SECONDARY ENTRANCE \ \ /
s31YIJossY \ BUILDING ADDITION
1
\\ I 11132l2109 170' - \\ \ i WITH RESTROOMS •�
o / i r ►♦ ♦♦ W ) 1
!Ems p
___0___
r ( - I Z� � Y ► L.).,
�..1..♦ ?* i
X0 L'2_ - 2, .„, ,..._ LU EZ7:
\ Y A N 5 .,. • -.t. • z 0 C_--. u \\0
< 1$ tt c° Immm \E
. . _ 0 ,_,,,--
._,,,_ ., , ,
< N , , `,, \ , N
,-, . .,,,
v ►♦♦♦♦♦♦♦♦ I
1,If:.�
. '.::-.':"..::-:.:"Ii — \ I
L., mi:x:::::::::::::::::....., 1
I 0 r Z >-
e
\v/
^IA_ EXISTING ASPHALT ,,, 0;i:i:iaiii<:`'>:#>?><>.;y DROP-OFF 4.
F�� PARKING LOT Or ,--\ EXISTING ASPHALT W
PARKING LOT F' Q
V W
1 ,. Q W
' SITE FOR FUTURE 0
kit
x COMPETITION POOL ENTRY PLAZA W U
V0
4 • FENCE W/GATE �--1 EXISTING ASPHALT PAVEMENT
B
City of Ocoee
Family Aquatic Center
Preliminary Cost Estimate
Item Quantity Unit Unit Cost' Total
Activity Pool w/Lap Swim Area 5,600 SF $70.00 $392,000
Water Feature 1 (Bollards w spray jets) 1 $4,045.00 $4,045
Water Feature 2 (Model 107) 1 $20,995.00 520,995
Water Feature 3 (Rain Drop Umbrella) 1 $5,722.50 $5,723
Equipment Enclosure and Holding Tanks 1 $20,000 $20,000
Site Costs and Utility Extensions 1 $30,000.00 $30,000
Concrete Pool Deck wl Stain Finish 19,800 SF $3.75 $74,250
Misc. Concrete Paving(gray concrete) 3,320 SF $2.75 $9,130
8' Chain Link Fence wl Gates 638 f_F $7.25 $4,626
Sod 2,000 SF $0.25 $500
Irrigation Modifications 1 LS $1,500.00 $1,500
Palm Trees(Saba) Palmettos) 4 EA $150.00 $600
Magnolia Grandiflora(65 gal) 1 EA $500.00 $500
Shrubs(incl. mulch; 100 EA $15.00 $1,500
Subtotal $565,368
Contractor Overhead & Profit (15%) $84,805.20
Subtotal $650,173
Contingency(10%) $65,017
Subtotal $715,191
A/E Design Fees $81,850
Total 5797,041
Borrelli and Associates
4/7100