Ocoee Item VI C 2
o
yjf+of Goo RICHARD RICHARD W. CORWIN
PUBLIC WORKS DIRECTOR
560 FLEWELLING AVE. •OCOEE,FL 34761
PHONE(407)877-8420•FAX(407)877-0392
STAFF REPORT
DATE: August 13, 1997
TO: The Honorable Mayor and City Commissioners
FROM: Richard Corwin, Public Works Director
RE: Proposed Public Works Facility: Environmental Assessment Report
up-date & Property Survey
ISSUE:
To have the proposed Public Works Site at 370 Enterprise Street survey and
Environmental Assessment Phase 1 up-date report approved for the purposes of
proceeding with the acquisition of the subject property.
BACKGROUND:
Commission direction was given at the regular commission meeting of May 20,
1997 for the Public Works Director to proceed with negotiations for the purpose
of acquiring the property at 370 Enterprise Street to serve as the new Public
Works Facility. A signed agreement has been obtained by the City Attorney. To
begin condemnation action it is necessary to obtain a survey of the subject
property and an update of the Phase 1 Environmental Site Assessment (ESA)
report completed in mid-1994 by Universal Engineering Sciences.
Quotes for surveying services were received from Southeastern Surveying &
Mapping Corp., $950, and GAI Consultants, $1,550.
RECOMMENDATION:
Staff recommends approval for Universal Engineering Sciences to provide an up-
dated phase 1 Environmental Assessment report at a cost of $1,500 and
Southeastern Surveying & Mapping Corp. to provide surveying services at a cost
of $965.
Rc/
cc: Ellis Shapiro, City Manager
attachments
0
THE PRIDE OF WEST ORANGE zrs
AUG-l13-1997 10:30 CITY OF OCOEE ENGINEERING 407 656 7835 P.01•
• 777 �1I
Ir 1
'�-'•• , R.Krick,t'.S.M.
•
: L„ � 1�,_ +►"y�� Myron F.Ufdd0,P,S.M
, ome K Meed,P.S.M.
• r. WSWWSW..• t! ■ a
1IJames L Patarsan,P.S.M.
SOUTHEASTERN SURVEYING*MAPPING CORP.
, July 31; 1.997
•
• Mr. lames W. Shiro, P.F. VIA PAX: 407-656-7835
City of Ocoee •
150 N. Lakeshore Drive
• Ocoee, H., 34761
RE: West Orange Industrial Park Unit ld., Lot K, Plat Book 5, Page 84, Ocoee, Florida
Dear Jim ,
MPOW We are pleased to submit our proposal for surveying services on the above referenced project.
•
: • SCOPJ OF WORK:
• Provide a.Boundary Survey in accordance with. Chapter ( 10}17-6 J.A.C. t) include the
•
following:
1. Bstablish the location of all boundary corners and. reset any missing corners.
Z. Locate all improvements and utilities, as evidenced by above•Sround features or
as masked by the designated utility company representative.
• The ISnal product will be (6) certified bluoline prints and an,ACM) file of same on disk
for your use.
Our fee for the above referenced work will be Mae Hundred.Sixty klve Dollars & 00/100 •
($965.00). We anticipate completion of the above described work within two weeks after
receipt of a written, notice to proceed. Payment is expected within thirty days from date of
invoice,
lA*' .We look forward to the opportunity to work with you on this project,
Sincerely,
Gory 1iKrick, P.S.M.
President/Project Manager
r\NPOopA7ri1morvaR1Amoco ivy53G'MI
•
• 025 South Semotan Boulevad,salts 112, WlntQr Park,FkKlda 3i!u2 407/878.577R Pax 4,7/s7u-3437
•
■ '
RUG-13-1997 10:39 CITY OF OCOEE ENGINEERING 407 656 7835 P.02
, page 2,
If the above scope, period of service and method of compensation meets with your approval.,
please execute below and fax to Southeastern Surveying &Mapping Corp. as notice to proceed.
ACCEPTED BY:
Authorized Signature Printed Name Date
GBK:d1.
ice'►LAC/w�wrr
. • • . . G� , 7= �.
Wyk
TOTAL P.02
N
JUL-31-97 THU 03:00 PM GAI CONSULTANTS SE FAX NO. 407 843 1070 P, 01/02
T R A NSMI T T A L
To: Mr. Richard C(rwi:
Company: City of Ocoee
Phone No.: ( )
From: Steven D. Vaughn, P.E., PLS
Date: July 31, 1997
Project No.: 27.50
-444 Pages (Inc. cover): 2 _
Message: Professional land surveying prop sal for Boundary Survey of
West Orange Industrial Park Unit II Lot K. located at 370 Enter rrii1n7
s�
Street. Ocoee Florida
- r dF' led �y Mbr4. 1 d�71G 'C
Pile a-re C 7 Inc /T /770 a 14-✓i
c. s .H J . )4/_ ,
g
a 1
f QNSULTANTS
ORIGINAL WILL:
_X Follow via mail
Follow via overnight delivery
GAI CONSULTANTS-SE Not be sent
201 E. Pine St., Ste. 200
Orlando, Florida 32801
Phone: (407) 423-8398 If you have experienced a problem in receiving this transmission - please
FAX: (407) &43-1070 contact us immediately, at (407) 423-8398.
FAXED TO: (4071_877-0392 _
JUL-31-97 THU 03:00 PM GAI CONSULTANTS SE FAX NO. 407 843 1070 P. 02/02
Q
CONSULTANTS GAI Consultants-Southeast, Inc.
201 Ease Pine Street,
July 31, 1997 Suite 200
Orlando, FL 32801-2715
407/423-8398
FAX 407/8431070
City of Ocoee
150 N. Lakeshore Drive
Ocoee, FL 34761
Attn: James W. Shira, F.E.
City Engineer/Utilities Director
Re: Professional Land Surveying Proposal for
Boundary Survey of West Orange Industrial Park
Unit II,Lot K, located at
370 Enterprise Street, Ocoee,Florida
Dear Jim:
Thanks again for including GAY Consultants-Southeast,Inc. (GAI-SE)in your procurement process
for the above captioned service.
GAI-SE will provide the mentioned survey and above ground improvements per the Florida Adopted
Minimum Technical Standards for Land Surveying for a lump sum fee of$1,550.00.
We shall provide the City with a signed and sealed hard copy of the survey and if requested an
Electronic AutoCadd file,
If you or Mr. Richard Corwin are in acceptance of this proposal please advise so we may
anticipate/schedule accordingly. GAI-SE should be able to provide the survey within ten (10)
working days or less.
Should you have any questions or need to further discuss this fee or schedule,please call me as we
want to provide this service.
Sincerely,
GAT Consultants-Southeast. Inc.
144e.,..,
01
Steven D. Vaughn, P. ., PLS
Principal In Charge
/clg
■ Pirrst)urgh,PA Orlando, FL Rirleigh,NC ChnrIc4ton, WV Philadelphia, PA Fe. Wayne, ]N
Offices In:
UNIVERSAL •Orlando
1 , •Gainesville
ENGINEERING SCIENCES •Fort Myers
•St tt Island
Consultants In Geolechnical Engineering• •St.Augustine
•Daytona Beach
Environmental Sciences•Construction Materials Testing July 30, 1997 •West Palm Beach
City of Ocoee
560 Flewelling Avenue
' Ocoee', Florida 34761-2303
Attention: Mr. Richard Corwin
Reference: Phase I Environmental Site Assessment Update Proposal
Ron Allen Trucking Facility
370 Enterprise Road
Ocoee, Florida
UES Proposal No. 9707-177
•
Dear Mr. Corwin:
Universal Engineering Sciences, Inc. (UES) is pleased to submit our proposal to conduct an
update of our Phase I Environmental Site Assessment (ESA) report completed for Rick Masney
Trucking in mid-1994 (UES Project No. 17829-001-01). Our report will include a summary of the
Contamination Assessment work recently completed by UES for the Florida Department of
Environmental Protection as designated by the Logan Family Trust.
We will also provide you with a rough cost estimate for completion of remaining assessment and
cleanup activities associated with petroleum product contamination previously identified at the
site. This rough cost estimate will be provided under separate cover, or if you prefer, could be
incorporated into the text of the Phase I ESA report. The intent of this rough cost estimate is to
determine if the total cost of cleanup activities (including those already completed) should be
anticipated to exceed $300,000.00.
SCOPE OF WORK
The Phase I ESA Update will follow ASTM E 1527-94 and will include: (1) a review of
environmental records to assess past uses and the potential for past on-site hazardous waste
disposal; (2) a site reconnaissance to evaluate existing site conditions; (3) review of historical
aerial photographs and land uses; and (4) a written report that documents work performed, the
results of the assessment, and our conclusions and recommendations.
The scope of work does not include an evaluation of asbestos, site geotechnics (soils,
foundations, site retention, etc.) or construction materials testing. Universal Engineering
Sciences can provide these additional services, and we would be pleased to develop an
appropriate scope of work and cost estimate for these services, if you wish.
SCHEDULE
We understand the time sensitive nature of this investigation. As we understand it, you will need
our report within two weeks from the date of authorization. If your schedule needs should change,
please advise us.
3532 Maggie Blvd. • Orlando, FL 32811 • (407) 423-0504
UES Proposal No. 9707-177
July 30, 1997July 30, 1997
Page 2
PROPOSAL
We propose to conduct the Phase I Environmental Assessment Update in accordance with our
General Conditions for a fee of$1,500. This fee proposal shall remain effective for sixty days.
If you should require more than sixty days to formally authorize us to proceed, we request that
you permit us to update our proposal to account for any changes in costs. A Work
AOthorization/Proposal Acceptance form is attached for signature. Please return one signed copy
and we will proceed.
Universal Engineering Sciences appreciates this opportunity to offer our services, and we are
looking forward to the assignment. Please call if you have any questions.
Respectfully submitted,
• Universal Engineering Sciences, Inc.
David C. Beerbower, P.G.
Vice President- Environmental Services
DCB:dls
Enclosures: Project Approach
Work Authorization/Proposal Acceptance Form (2)
General Conditions
cc: Inge Logan; Logan Family Trust
UNIVERSAL ENGINEERING SCIENCES, INC.
PROPERTY ENVIRONMENTAL ASSESSMENT
Universal's project approach provides increasingly detailed data in a series of phases. This approach gives
the client an "early warning" of potentially serious hazardous waste problems and permits decision points at
the completion of each Phase. Through our cost-effective approach, the client is able to use existing
information for critical decisions on whether to proceed with either more detailed studies or site acquisition. This
assessment should become part of your due diligence for all commercial and industrial real estate transactions.
PHASE I - Preliminary Environmental Site Assessment
* Review historical land use activities and ownership of the subject property.
* Examination of historical aerial photography.
* Review of site and nearby property by environmental scientist/engineer.
* Regulatory agency file review.
* Summary report to recommend appropriate action.
PHASE II - Preliminary Contamination Assessment
* Based on Phase I results, analyze soil and groundwater samples at selected locations for key chemical
indicators of hazardous waste.
* Report describing detected chemicals, state or federal action levels, and recommended actions.
PHASE III - Contamination Assessment Report
* Assess the full extent of contamination and analyze soil and groundwater samples for specific chemical
contaminants.
* Perform detailed soil and hydrogeologic investigations.
* Prepare contamination assessment report and recommendations for cleanup approach.
A Site Specific, Confidential Proposal Can Be Prepared At Your Request