Loading...
HomeMy WebLinkAboutVI (G) Discussion/ Action re: Change Order No. 5 for Southland Construction Company for Kissimmee Avenue/Story Road and Maguire/Marshall Farms Road Intersection Improvement Project Agenda 8-19-97 - - Item VI G • 0a ylf+or GOO` ?tl JAMES W. SHIRA,P.E. CITY ENGINEER/UTILITIES DIRECTOR 150 N.LAKESHORE DRIVE•OCOEE,FLORIDA 34761 PHONE(407)656-2322 EXT.142•FAX(407)656-7835 MEMORANDUM DATE: August 14, 1997 TO: The Honorable Mayor and Board of City Commissioners FROM: David Wheeler, P.E/J'Q ia,/ Assistant City Engineer/Utilities Director SUBJECT: Story Road/Kissimmee Avenue and Marshall Farms Road/Maguire Road Intersection Improvements Project Change Order Request No. 5 Attached for your review is Change Order Request No. 5 on the Story Road/Kissimmee Avenue and Marshall Farms Road/Maguire Road Intersection Improvements Project with Southland Construction, Inc. This change order request was initiated by City staff to enhance the project, allow for slope stabilization at some drainage structures, comply with the negotiated agreement with Mr. Adams, reimburse the City for utility system repairs, and provide some enhancements to the project's appearance. The items included in this change order are: No. 5-A - Slope Stabilization at the Maguire Road Outfalls The original design provided for a discharge into a ditch that drained approximately twenty feet into the receiving waters. Change Order No. 3 included the extension of the discharge piping on both sides of the street to the receiving waters and two structures. After the installation of the structures, it was determined that some slope stabilization would be required to hold the bank in place at each outfall. The initial concept was significantly scaled back do to cost considerations, with the final plan calling for compacted fill held in place with stacked and reinforced cement bags. The cost for this slope stabilization at the Maguire Road outfalls is $2,373.36, with an increase in contract time of one day. THE PRIDE OF WEST ORANGE No. 5-B - Guardrail and Slope Stabilization at the Geneva Street Outfall The original design called for the outfall to be a mitered end section with riprap at the receiving water. After the installation of the piping, structures and riprap, it was determined that a guardrail would be needed to prevent any possible serious vehicular accidents into the ditch. To install the guardrail the bank would need to be regraded and require stabilization against washouts. Approximately 135 linear feet of guardrail will be installed along the southern side of Geneva Street at the Stuchi Ditch and the bank will be stabilized with stacked and reinforced cement bags. The cost for this guardrail and slope stabilization is $8,152.22, with an increase in contract time of one day. No. 5-C - 8" Water Main to Adams Manufacturing, Inc. The agreement between the City and Adams Manufacturing, Inc. for the additional right-of-way on Kissimmee Avenue required the City to install an 8" water main across Kissimmee Avenue to provide improved water service to Adams Manufacturing, Inc. This requirement was not included in the original design of this project because the agreement was not completely negotiated and executed until months after the start of construction. The cost for the 8" water main for Adams Manufacturing is $3,957.72, with an increase in contract time of two days. No. 5-D - Ditch Bottom Inlet at the Horse Farms The original design provided for a mitered end section on the north side of the driveway into the horse farm. After the construction of the new roadway in this area, staff determined that a different drainage structure would be required to meet new grade elevations and enhance drainage. After discussions with the design engineer, it was decided to install a ditch bottom inlet which would match the new grading and improve the drainage characteristics at this location. The cost for this additional structure at the driveway to the horse farms is $1,600.00, with no increase in the contract time. No. 5-E - Driveway Changes for Amber Electric and Run-About-Car Lot In the original design, additional driveways were included at the request of both property owners. These additional driveways were based upon the possible site enhancements proposed by both property owners. As construction proceeded and in discussions with both property owners about the effects of the project construction on their businesses, staff talked with them about the driveways. Both property owners proposed new driveway layouts that reduced the number of driveways on Kissimmee Avenue and Geneva Street. This change resulted in a decrease in construction costs. The reduction in costs for these driveway changes for Amber Electric and Run-About-Car Lot is $1,009.50, with no increase in the contract time. No. 5-F - Substitute of ABC Asphalt for Limerock Base Material The original design for the roadway called for stabilized subgrade with limerock base for a support base to the asphalt courses. At two locations, west end of Story Road and north end of Kissimmee Avenue, it was decided to substitute "ABC type" asphalt for the subgrade and limerock to eliminate the additional traffic constraints that would be caused by the construction of the original design. Each of these areas is at the ends of project on these two streets and would require one lane closure/construction and three days of"setup"time to meet the original design. Each location would require a total of six days to completed the work. Staff recommended the design change and agreed to pay for the increase in cost for material only. In addition it has allowed the contractor to catch up on some of the rain delays which he is entitled to under the conditions of the contract. The cost for this substitute material at these two locations is $2,145.50, with no increase in the contract time. No. 5-G - Reimbursement for Sewer Repairs In the performance of construction activities on Kissimmee Avenue, Southland Construction Company damaged the City's forcemain. Although Southland had equipment and material available to perform the repairs, the City provided labor to shutdown/startup our system and provide emergency pumping of some lift stations while the repairs were performed. Southland agreed to reimburse the City for this assistance. The cost of this assistance will reduce the contract amount by $1,339.62. The total cost for this change order is $15,879.68 with a time extension of four days on the contract time. The dollars for this change order will come from the project's construction contingency. This change order amounts to approximately 1.36 percent of the original bid price of$1,163,718.10. The total cost for all change orders, to date, will transfer$121,209.02 from the construction contingency to Southland's contract. The $30,000 difference between the actual amount and the City's share is a reimbursement from Sprint Telephone Company. To date approximately 10.42 percent of the 10.0 percent construction contingency has been committed to the project. I recommend that the City Commission approve Change Order No. 5 with Southland Construction, Inc. by increasing the contract amount by $15,879.68, with an extension in contract time of four days, and authorize the Mayor and City Clerk to execute Change Order No. 5. Attachment CHANGE ORDER NO. 5 CITY OF OCOEE STORY ROAD/KISSIMMEE AVENUE AND MAGUIRE ROAD/MARSHALL FARMS ROAD INTERSECTION IMPROVEMENTS PROJECT PROJECT NO. B-97-02 DATE: August 14, 1997 CONTRACTOR: SOUTHLAND CONSTRUCTION, INC. AGREEMENT DATE: DECEMBER 17, 1996 The following changes are hereby made to the CONTRACT DOCUMENTS. Original CONTRACT PRICE S 1,163,718.10 Current CONTRACT PRICE ADJUSTED by previous CHANGE ORDER $1,299,047.44 Net Increase(Decrease)Resulting from this CHANGE ORDER $15,879.68 The current CONTRACT PRICE including this CHANGE ORDER $1,314,927.12 ORIGINAL CONTRACT TIME: 180 Consecutive Calendar Days from Notice to Proceed Date: July 25, 1997 Current CONTRACT TIME adjusted by previous CHANGE ORDERS Date: September 16, 1997 Net Increase Resulting from this CHANGE ORDER Days: 4 Current CONTRACT TIME Including this CHANGE ORDER Date: September 20, 1997 CHANGES ORDERED: I. GENERAL This change order is necessary to cover changes in the work to be performed under this Contract. The GENERAL CONDITIONS, SUPPLEMENTARY CONDITIONS, SPECIFICATIONS and all parts of the Project Manual listed in Article 1,Definitions,of the GENERAL CONDITIONS apply to and govern all work under this change order. II. REQUIRED CHANGES Extension of Contract Time. By this change order Section 00500,Agreement Article 3 Contract Time shall be modified as follows: 3.1 will be amended to ready within 237 consecutive calendar days of the effective date of the Notice to Proceed. III. JUSTIFICATION Item 5-A. RFP No.23. The slope stabilization measures constructed to date in these two areas did not provide a sufficient level of protection from erosion. $2,373.36, 1 additional day Item 5-B. RFP No.24. The original plan for this area did not include provision for a guardrail. With the reconstruction and widening of Geneva Street it is anticipated that traffic will increase and speed will pick up. Hence installation of 100±LF of guardrail just north of the drainage ditch seems prudent. Included in this proposal is the installation of sand cement rip rap for additional slope protection. $8,152.72, 1 additional day. Item 5-C. RFP No.25. This work is to satisfy an obligation to the landowner that was included in the agreement with the city for additional right-of-way. $3,957.72,2 additional days. Item 5-D. RFP No.26. The installation of this ditch bottom inlet will allow the grades in this area to be raised substantially. $1,600.00. Item 5-E. RFP No. 27. Two of the landowners in this area opted to delete a planned driveway to their property in return the drives that will be constructed will be wider than originally designed. The net effect to the city is a credit of$1,009.50. Item 5-F. RFP No.29. Allowing the contractor to use asphalt base material instead of Dura Rock in these two areas provides a means of keeping two lanes open for traffic,versus a one lane only situation that would last for seven days. The benefits to the city are a safe and smooth flow of traffic through a construction area and a shorter period of inconvenience to the public. Item 5-G. This item provides reimbursement to the city for costs incurred for repairing damage to the sanitary sewer force main in Kissimmee Avenue. IV. NARRATIVE OF NEGOTIATIONS Item 5-A. RFP No.23. In discussions with the contractor,he agreed to provide the sand cement rip rap at$275 vs $325 cy. This reduced the cost to$2,376.36. Item 5-B. RFP No. 24. This item was priced and repriced by the contractor. The price went from$9,960.22 to the agreed upon final price of$8,252.22. Item 5-C. RFP No.25. This item of work was priced several times. The$2,957.72 figure represents the final agreed upon cost. Item 5-D. RFP No.26. $1,600 is the final negotiated price. Item 5-E. RFP No.27. This$1,009.50 reflects the reduction in the scope of work required. Item 5-F. RFP No.29. This cost is a negotiated figure and represents a premium for material costs only. Item 5-G. This dollar amount represents actual costs incurred by city forces. V. PAYMENT Change Order Description Net Increase Unit Unit Price Net Increase Item No. (Decrease)Quantity (Decrease)Price 5-A RFP No.23. Slope stabilization. US $2,373.36 $2,373.36 1 day 5-B RFP No.24. Guardrail and slope US $8,152.22 $8,152.22 stabilization 1 day 5-C RFP No. 25. 8"waterline US $3,957.72 $3,957.72 2 days 5-D RFP No.26. Install ditch bottom inlet. US $1,600.00 $1,600.00 5-E RFP No.27. Driveway changes US <$1,009.50> <$1,009.50> 5-F RFP No.29. Substitute ABC US $2,145.50 $2,145.50 5-G Deduct to reimburse city. <$1,339.62> <$1,339.62> Total Net Increase)Change Order No. 5 515,879.68 VI. APPROVAL AND CHANGE AUTHORIZATION This proposed change to the Contract is to be approved by the Ocoee City Commission. • Acknowledgements: The aforementioned change,and work affected thereby, is subject to all provisions of the original contract not specifically changed by this Change Order;and, It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original contract other than matters expressly provided herein. CONTRACTOR acknowledges,by its execution and acceptance of this Change Order,that the adjustments in Contract Price and Time shown hereon constitute full and complete compensation and satisfaction for all costs and modifications of performance time incurred by the CONTRACTOR as a result of this Change Order. No other claim for increased costs of performance or modifications of time will be granted by the OWNER for the Work covered by this Change Order. The CONTRACTOR hereby waives and releases any further claims for cost or time against the OWNER arising from or relating to the matters or Work set forth or contemplated by this Change Order. Change(s)Ordered by: City of Ocoee RECOMMENDED BY: ACCEPTED BY: CITY OF OCOEE, FLORIDA SOUTHLAND CONSTRUCTION, INC. By: By: Signature Signature Date: Date: Title: Title: APPROVED BY: CITY OF OCOEE,FLORIDA Owner By: S. Scott Vandergrift, Mayor Date Attest: Jean Grafton,City Clerk FOR USE AND RELIANCE ONLY BY THE APPROVED BY THE OCOEE CITY CITY OF OCOEE,APPROVED AS TO FORM COMMISSION IN A MEETING HELD ON AND LEGALITY THIS DAY OF , 199 UNDER , 199 AGENDA ITEM NO. FOLEY&LARDNER By: City Attorney C_oZ--cvy) 5- Ocoee°\ CITY OF OCOEE q REQUEST FOR PROPOSAL Engineering/Utilities FOR PROPOSED CHANGE 150 North Lakeshore Drive (407) 656-2322 ext. 142 (RFP) `'of G000"' Ocoee, Florida 34761-2258 (407)656-2731 -fax NO. 23 PROJECT DATA: NAME: Story Rd/Kissimmee Ave&Marshall Farms Rd/Maguire Rd Intersection Improvements PROJECT NO: B97-02 LOCATION: Ocoee, Florida DATE: June 19, 1997 OTHER: REFERENCE:PEC Sketches TO(CONTRACTOR): Southland Construction, Inc. Please provide the undersigned a proposal for the following change in the work within seven(7)calendar days after receipt of this request. The written proposal must clearly delineate the scope of the proposed change in the work providing an itemized estimate of the time and all material and labor(by trade),subcontract and overhead costs and fees. Any amount claimed for subcontracts must be similarly supported. DESCRIPTION of change in work: Construct slope stabilization at 24"storm outfalls located at Sta. 13+00±Rt. 13+85±Lt Maguire Road Change Order Type: 0 Deletion 0 Addition • Revision 0 Other:( Constraints of Change: Initiated by: ❑ Changes in Owner Requirements 0 Unforeseen Conditions 0 Others:( ) Proposal must be received by: 6/27/97 ATTACHMENTS(Listing of attached documents that support description): 1. Contractor Request for Information No. 4. Sketch B 2. Plan Revisions:PEC Sketches dated 6/11/97 5. Sheet 1 of 1 3. A sheet 1 of 2 and sheet 2 of 2 6. ❑ OWNER: James W.Shira,P.E.,City of Ocoee 0 CONTRACTOR:SOUTHLAND CONSTRUCTION, INC. O ENGINEER: Steve Kreidt, PEC 0 FIELD: Rod Winfrey,Streets&Drainage Inspector O CONSTRUCTION ADMINISTRATOR:Fred Gardner ❑ OTHER: Ted Moore,Engineering/Utilities Inspector ❑ SUBCONSULTANT: Date Received From Contractor: Date Returned to Contractor With Comments: Date Returned to City: D\ALL_DATA\WORD\CONTRACTDOCS\REP Page 1 08/13/97 PRICING INFORMATION: Method of Pricing: A. 0 Established Contract Unit Price(s) B. ❑ Negotiated Unit Price(s)(including Overhead and Profit) C. 0 Negotiated Lump Sum(including Overhead and Profit) D. ❑ Actual Cost of Work plus Fixed Percent for Overhead and Profit E. 0 A combination of A,B,C, D DESCRIPTION OF WORK: ❑ By General Contractor 0 By Subcontractor ITEM OF WORK QUANTITY PRICE TOTAL Attach additional pages if necessary. NET TOTAL COST OF THIS CHANGE PROPOSAL 52,373.36 EXTENSION OF CONTRACT TIME: As part of this Change Proposal the Contractor requests an extension of the contract time in the amount of 1 additional day. Provide thorough documentation in support of the request for additional time: A requirement of this Change Proposal will be to provide record drawing information for all of the affected items of work RECOMMENDATION BY ENGINEER/CONSTRUCTION ADMINISTRATOR: Comments: I recommend that this proposal be accepted and incorporated into Change Order No.5 Signature of E.tgin r/Construction Administratbr� O/Y� (,. Cf Date: 8/13/97 ACCEPTANCE BY OWNER: Comments: �C c 4 �CO� ' /-►G���c/04- /el i'L C , 4/, �f Signature: /.J� /A/Z/L.44.,4-✓ Date: 4 4 .r /L�/ ILL//' 1 fl4f(Name) ^� ,of �� agree to the costs and terms of RFP 2 this l ee) ( V „ day of fQ6 tg9/^ (Company) (No.) (day) (month) (Year) D:\ALL_DATA\WORD\CONTRACTDOCS\ttFP Page 2 08/13/97 JUL-17-97 THU 09:29 SOUTHLAND CONSTRUCTION FAX NO, 14078864348 P. 03/07 Southland Coast., Inc. Slope stabilization at Magure 7/17/97 RFP#23-Revised Bid Unit Item No. Description Quantity Unit Price Amount Unit Price adjustments _ New items (Proposed Unit Price) A Station 13+00 +/- Remove/Dispose of 24"MES — 1 Each 150.00 150.00 Station 13+00+/- (F 8, I)24" RCP Class 3 8 LF 44.00 352.00 Station 13+00 +/- Rip Rap(Sand Cement) Endwall 2.5 CY 275.00 687.50 Station 13+00+/- Cut Notched Weir(C Inlet) (8"x8") 1 Each 110.00 110.00 • Station 13+85+/- Rip Rap(Sand Cement) Endwall 3 CY 275.00 825.00 Extended job site general conditions 1 Days 192.86 192.86 Extended MOT 1 Days 56.00 56.00 2,373.36 Proposed Net Change in the Contract Amount 2,373.36 Notes: Add 1 contract day per agreement Page 1 Pqrq PEC/PROFESSIONAL ENGINEERIN JU 9 di G CONSULTANTS, INC. N 16 t�J� 200 E. Robinson Street, Suite 1560 Orlando, Florida 32801 (407) 422-8062 (407) 849-9401 (FAX) FACSIMILE TRANSMISSION COVER SHEET To: Fred Gardner FAX No: 407-656-7835 Company: City of Ocoee Date: June 12, 1997 Time: 10:50 AM Job No: 0E-254-3.0 From: Robert P. Rudd, P.E. Subject: Project Memorandum - Slope Stablization Special Instructions: Hard copy to follow in the mail. Total Number of Pages (including this cover sheet): 7 IF YOU DO NOT RECEIVE ALL THE PAGES PLEASE CALL US AS SOON AS POSSIBLE AT . (407) 422-8062 Operator: Hope Woodland G:\CLER\CONS'I\OE10E-254\CITY\0021 N.FAX PEC/PROFESSIONAL ENGINEERING CONSULTANTS, INC. Suite 1560, Eola Park Centre 200 E. Robinson Street Orlando, Florida 32801 (407)422-8062 JOB No. Off-25 4- 3.0 / 3-y:o ! 6.2 Time Dale &_/z -97 Project Memor ® ndum Sheet I . Of Project Name: Store R�, f k Record ot: El Telephone Conversation ❑ Meeting CIInstructions ElConstruction Inspection V U Notes: nnf�� \ \ 1 A4zc\,,eD 2 „a11 Ir r3rc,U;rn _LA _AI;t11 tI � - ��Yr1{ H� nclnr rM cr s rrooroco-)) 0ofrrcN� m t •"'1C C I10;1h1 c4"),r,- ' 44 r 4�}�pj, 8t�1J 64+' t n�P ov'i't-Us ley L el al- .STR l 3 4 0 o +/- R f G•r �T{� 1 t/1 +/- rf r nrC ����\J Ll1 ArriLi-nrrJ4. ,.{r,f- u�•I) \p. rY C�ILic� nc 6- I -Q7 i+ ( a-cc 0) 47+ no ,,( r•nA 41?4- LIhick 4,0 be )7 +0- in Drc 11r ,A - • L_ c.1 From: Copies to: /1 /-� ��c,) ! �'7rdnrr QO F-G (�ncr EC/ Professional Engineering Consul/on/s, Inc. ►r 9/-' k..,I;f- /° ❑ By: ❑ - ❑ Title: PECPROFESSIONAL ENGINEERING CONSULTANTS, INC. P s u r ve yors 200 East Robinson Street Suite 1560 Orlando, Florida 32801 407/422-8062 Fax 407/849-9401 PROJECT: 5i-orr FA, / KiSsimmce Ave. JOB NO. OE-25{� - 3.0 MADE BY: RPR,;,>< CHECKED BY: DATE: 6-/1- 9 7 SHEET / OF z ! � ` i 1 ! rI _ 1 1 1 i 1 �I :- —r- }_-1 1 I _"_ .w 1 I :. : 1 L.1_ t s ; t _Li ' i T 1 - ' 4 • .�.__ 1 l GcA+'Tc K trcil _� :� t ! _ /i t ; , 1 , I—TI »____� ' . • I , ,--- 1_.. ,. - . .--_ - - tirl F—i i 1 -i :: _; Imo-'- _i -r 1 ll i f - _Cr ! 2" RCP i f T—t 1 r—r- _ i ` - 1 eP 1�' I cif ....,__i_ : -( [..1._ • . 11 . , _ , , : ,_. , ., , . ,_. .. ._. .. _, i ,_ . , . , , , „ . • , : , : , ,_-r-f--, I i-i----7 ! ..-. - 7 f T77- ! ! , : - i i ."!.; : ! ; ' , ' ! i ; ! ! ! ' ! • , . • • ! ! ' ' ! • f_ • +-i ' _ t- :_filed 7.1 FIoOr `ry--014)_,i.=fir) �.z ic D•_cs jn _$71 n_dzr3s__` . --- _ — • , i 1 1 11 Tt , : 1 L_ L i ' ! i ` i i i '' 1 f I ' i ! i i i -`_s_.._ . ' I —4-t i ' L_• -L-_ r ill k, i , , , sn c 1 i T 1 1 1 1 i_ 1 ! 1 + IL 1 i i i •'i `T 3 > l. 1111-11 __i_ -. 1 L1+ 1_ r Y+44 ( ,7;z i� ., .T ' : ,. L -.cD la"7C T_� I-7 fi , K -9 i ,� i j .--1—•-� Y , + # -��4 1 : ' i b-alx.5 _ - 1-, r i ; ii• 1 •�oiiLs t ! -�_.. lti rT/� I Li' i i . I , 1 i 1 ' 1 : i 1 t ---1 ! .1 1 1 1 . i i ' 1 ■ , : 1 11 1 1 I r -t :. ■■\ ■■ t ■ 1 1 : I i i ■��_ 1/ Y-f ! • 1_ i 1■■■ Ma ■■■ i ■■ ■ I i 1 1 1 1 "_i • '--1-- ' ' I ■■■■a . ■■■■A1 • t ■ 1 �� 1 1 I . , f I I i 11 i_' _I_ -1 _i 1 rL'J!_ _)ii . �...,.,. ,�= ..i_I Willi rra + I ■■■■■■■a■ I n ■■!•■a■�■■iu ' ■■ ■■ I a�_I Get p4 I! I I 1 t . I1 , 1 I I , 1 . ,ea id delTA.ry i ' IIrjuI1 , 11I ► i ! 1 I . 1 I ■■■t■ , ■■■■■� I ! . L. •g t i ,xi . c .�fi plat..a ■ 1 ■■ ._:- p� t■ 1 1 ■■ U■■■■�■BU f_ Nw ®■■■■ ■■■■■/■ ■■■■�■ 1 I 1 ■■■t■■■I♦■■■ ■� ■■ i i 1 i . ■I■ I i ! it! 1 ! ( 1 I I 11111111111M■�■0■■ I I I I Mains 1 1 t t i 1 - I I I R_ - I I I I , iii I t ■�■■ i i 1 ■M■V■ i �■■■■■■■■ , 1 1 I ■■ i ■ 1 i 1 I I ! i i } 1 ■■ ' . •' ' mans . 1_ : 1 1 1 I _ i I ■ - 1 1 1I t } 1 , i I ! t , 111 . t1r 1 1 - 1 1 I i I r - 1 j , 1 , - j?..- I i 1 ! 1 i 1- 1 I , - ' 1 1 i- i 1 1 1 1 i 1 i ; tit I 1 t ' 't-?-'-._� 7 # I i I i I j I 1 ! I ' 1 ' .Ty_ i i 1 I r 1- _� L; I I t I i I I , : T I r 1 L t_ _ -i--1-- 1 i-t. +rt- 1 t t 1 1 ILL! Ili 1 1 I i i-t-' 1_• 11 1i111 -� ! '._1 �"-'?.-.i-; T j i T { I , i t�- - I . r Jr �-a_. • -- -I t 1 . i I l i ! Ii ; _• t _. i+-�• ' i T_,_- Tom_ _ i • t l + ' ' -4- ' -r-i-1+-1.-' .I-'1 . r •e_-1'• . '1 i Tt_ -t-�-�'__ • _- . 1 _ 1-. -- - -., 1 ,-I- i pEC/PROFESSIONAL ENGINEERING CONSULTANTS, INC. 200 East Robinson Street Suite 1560 Orlando, Florida 32801 407/422-8062 Fax 407/849-9401 PROJECT: for.... P-) / kr.55,m,r-,- A+e. JOB NO. 4�-25'9_3-o MADE BY: RPR1.rl,/ CHECKED BY: DATE: 6 -/) -Q 7 SHEET 2 OF 2- i 1 1 ^ I 1 1 1 I I 1 I i _ i i I 1 ( � 1 i i j i 1 1 1 I I �- 1 { i __ ' i �'_!•. -! 1 l 1 } _1-t-'-. • T';T1�., .1,.E-T i. ' 1 ' f 1 .- ' f -r. I 1 , 1 ___71;1,____1iLrt,1'.- 1. • 1 T-. �- ;__,—, -- i T 1 t , ` i t i- I r i ,c-- - j 3. �_ pfi,3 ice_: .._! . _ erne~.` ,vrit t . • (/ - 1-, i ; ; . ,_`_ _1 1 (`2� a Cif S L 2 r j. Ila7 t • __Q[J. , i _ • j t- _ - lJ s ra ^ f I _ iL:72 1Ct LTi45 s __ -r_ J- rr- ^T' ..._ _! _1_ I ' 1 ' I • ` i i ` _i _-. - 4-t.4- 1 -�--}- , _ice._:_.,._Imo_ L`. Qal s4c + . ' G19 . , 1 t---- I ram__ i 1.! 17i t I `i I L I j Li 1 i i : I -4--- �L i.+.. ' ` "i'_ '_1_ ;-r 11-: ._ _ '; itt; �-sr. o. . ' t pc r 1i (sic .c 1 et... rrh / - 1I i 1 i ' i I 1 ! 1� I.Oc . gin avi !v. '_a _i _-;_ i --1-4:-.` I ' r I i i i I _ 1 i i i ! i i 1 I I a _, , •_. 1 : ! i j • 3— T_ 1 1 t ---L-, : ■ i ' -[-! , , ' 1 ,2, , 1 I y. , i 1 , , : ' k I • t -7 t, 1 `I .V1. -77-I ' . 046. ,y'.� '/# 4.r 1 : i -,._, 1 1 F I 1 . 't i 7' ! ; {{ 1 i 1 1 , I I i ! t I t i t t ' LL 1: - _ i•_ i'I-f-- !--I : • ! i t I 1 i , . 'i I , , i , i , , . s 1 1 i , , ,-1 . + ; 1 . 1 1 ; ; 1 1 ;'-'. 1 I , I 1 op , ' 1 I 1 ' 1 I. ! . i t t i ■u■■■r - ■a■■ii■�i■n■■i= Ii 1 ■ ' ■■ `1 . • , i i C_, - , 1 i . , 1 it , , t iirr-_ ; !...4.._,_ alitilirAtantlainummassmois 11"'Pr i 7 1 . i (� l�■ ■■I NM ' ■' 1 ■ 1 ! I 1 ' I . , i I ' I_ 1 ■ ■sw■■■■■■/ ■!� lift.■i■■■■■B` ■ ` i i t 1 . •1 ; 41. 11r --4 • MUU■■■■■■■■■Y ■ v�■■■>•■■■' i •. 1 !r8-{--#1.L� i----� I I mill ' u■■1■■■■I �r ■>v I saillillisiii rip-_,_.1 MEMI 1- 1 t + f 1 i 1 ' ' F. IT !_Elli L� - -' JCL It 1 il ! ILt ► I ' ' I _�■■■■■ 1 P I I i I 1 i 11 Y 1 1 T__• I I I i I 1 1 , I!1 ! - I I l f >7T•.t . i i ■ , i I i I ,I I_I 1 1 1 � III / 1 1 � y ! IIIII ■■� -1 ■■ 11 fi■■■■■■■ 1 . 1 ' t I . i iI 1 ; lift -iii. iiii1 1 I ■■■■111111■■■■■■q■'r"�■■ 1 , 1 in 1L_i ' i }.4, I I L4...1 �._i- L -I ` ; ! I. I i 11 I i 1 1 "1 i , ' I I 1 I i . . • 1 i i i t , _ , . r . i-- 1 i I i 1 I.i1 i i i ; 1 1 1 i 1 ! Z ! t j_ t 1 i I I I . : : r ! j I I L !.L 1 ' ' i'.--''t-1-4.4_.__r ,_4.44-1- ;:- L_�_f ; I_ 1 1 1 ■ I i I t I I i 1 1 _mil 1 1-_i--. i i I -, ! t _, jti..',�.i_ i I 1-t i j ;._��...i A. i , I r�.I , 1 1 } 1 , t t ii l- ilt ! LI 1__I t 1 I !J± Lt •- ±t__ 1-r-' ;- , ;Iti t 1 -1 1 1 i I 1 i_i -T --f i ' • `—r ,-� f 1 I4 I i- ._ 1 i I ' I • 1 iT 1 i -L 1 1 -L __ �'._ • • y_ i 1. i J , 1 -1 _ i : TL t !�.I_r -1 1. - --.. -- - ---- - -- -- • • • I • • • • • - Pcr.7� //IF5 O. S /60 1 /� = S' L.8 �� 22). 3 - 3 D C.y o s I'd 'rcntci; I - e 75 2/c. . = 52 S 1/ - CLt el.n8 " Noti /, � C ._ ' 1 e 45 76o • • Trj 9i-9 1 r 47 • • • • • • • • • • • • • • • • pECIPROFESSIONAL ENGINEERING CONSULTANTS, INC. e n g i n e e r s p l a n n e r s s u r v e y o r s 200 East Robinson Street Suite 1560 Orlando, Florida 32801 407/422-8062 Fax 407/849-9401 PROJECT: 5or., /0./ 2.-i5sr'mn^--r /1i/e . JOB NO. Ie-251- J o MADE BY: w 4) CHECKED BY: DATE: 6-I l- 9 7 SHEET / OF / } 1 Y ,_I , i 1 1 i 1 ; r : 1 e � , , dvT--r t �: -! r ,„ i t i . t , , i ' i i 1 1 r r' Sidi RuE2 jf�Bi _,pep _—t- ' ! _ , - - 1-• ..4. I ! '-, , — -{ ---1--,--m--1 ', : r?-1-7-r :; , „ ,4,/ .-17....kir-r-j._Fr- 17 V . : i , ! ! . , ; . , I ,21tL___L_I I , , , , , I-1-- __r_l_L 1 1.c• i-'7--r; .1_1 i -lr I. _t__T r.- r1 ..-1.,__t_I , !--7 FP, I TA_.....,._,I _rt-t.....„..H 7_._..L--- .i_,....i _._ ..„ , ; __'..4_. -.T,':__-_i_____' ..._._rr.t__L7,1-,.._,_I._iT. ',-1...1-1-7—.7_;i. , 1.-- L Lam+ � � � F �- - ! ; , `j— 4IJT4TIJI , li '�"' -_i,----1'C-1. I i :fHJH '//� I .�/. 1 ! }. ' �'i f !/.1 . 1 . i!r . ..-_ i 1 1 i 3 1 1 1 i , I f J ` 1 { i � L�,�_._.r �i ! ! r_-_'!-'t_I_! i 1 r'�- : i ! r t 1 / .�- ! t 1 ' I i _--1'-i. , 44. I 1 a 1 ., :44, . 4_4.4,4.4_.. :...44_,___ li . 1 ! ,. , , , , -. it I E ( r-}- t- ,_-t' r_t_i ! ' Y . . , 1 : 1 ;PAP, ' ' t I 1. T= - t -r~�i�-{- f111I ! it } 111II f-1 �t • - 1 , ii Is , . ! i , 1 f . : 111 + `T T: 1 L 1 . i I f__• __f _1 i i } i • •• } �_<_I i i }.. 1 •i . , :s. . 1._ i j f 1 j + 1 I , iI �i ' 1 _ ��_ I� I i i Ong s�s 1RR as , n� 'T i 1 ■ 1 I - Nu i _ �� �Mu MO/ n1♦I!a ; i T i t ! !oh I CtU ! I 1 . 1 ! i ! MUM 'A1, ! 1 1 1 1 1 1 1 i 1 . I I ! I i .i_j _LI ( 1 1 1 1. 1 i I 1 1 1 - 1_ ' ; ' ' I ' 1.._. 1 ' i1 1 : .1 ! I t `l ? ' 1 ! I 1 '. I i till .. ; i i Ins se I ! ! ( 1 1 i-r]F- i i I 1 I I 1 I 1 1 ' ' I 1 !" 'f—� -_r-.-II i -! ' -K11 , 1 I ! i i ( L . 1 t 1 ! i 1 11 �. 7�(_ 1 T. -uatL �f[Cs i i 1 L ! i 1 ! I !_:_.-> /�<i i- i i I_ : • I 1 1 1 1 i 1 i 1 1 I i 1 i 1 l 1 �11 1 Y I _ 1 +�1 'yam + i 1 i i 1 . I '�.} - 1 I i1 t41W ' i ( - i.T r l i l 1 1 1 1 , 1 1 . ! IL4 +-±W ± jLJ4rJJ i i , ' i ; ' ir.�.. i I ; 1 ! Hr - t �T i?_! is i i.' t , - - ..i._)--1.-1.--1._ 1 ' _1 T — IZ -Tti--- t • • • • • • • v 5 • • • • • • • • • • 4-•.t. • • t-' ;l • •• .H II - / .. ,...... .. H N • • '•1 ^J caz/erm 6- 6 Ocoee CITY OF OCOEE REQUEST FOR PROPOSAL Engineering/Utilities FOR PROPOSED CHANGE 150 North Lakeshore Drive (407)656-2322 ext. 142 (RFP) `'o•G000°4 Ocoee, Florida 34761-2258 (407)656-2731 -fax NO. 24 PROJECT DATA: NAME: Story Rd/Kissimmee Ave&Marshall Farms Rd/Maguire Rd Intersection Improvements PROJECT NO: B97-02 LOCATION: Ocoee, Florida DATE: June 19, 1997 OTHER: REFERENCE:PEC Sketch TO(CONTRACTOR): Southland Construction, Inc. Please provide the undersigned a proposal for the following change in the work within seven(7)calendar days after receipt of this request. The written proposal must clearly delineate the scope of the proposed change in the work providing an itemized estimate of the time and all material and labor(by trade),subcontract and overhead costs and fees. Any amount claimed for subcontracts must be similarly supported. DESCRIPTION of change in work: Construct revised outfall at east end of Geneva Street in accordance with attached sketch. Change Order Type: ❑ Deletion ❑ Addition • Revision 0 Other: ( Constraints of Change: Initiated by: ■ Changes in Owner Requirements 0 Unforeseen Conditions 0 Others:( ) Proposal must be received by: 6/27/97 ATTACHMENTS(Listing of attached documents that support description): 1. Contractor Request for Information No. 4. 1 of 1 dated 6/16/97 2. Plan Revisions: 5 3. PEC Sketch 6 ❑ OWNER: James W.Shira,P.E.,City of Ocoee 0 CONTRACTOR:SOUTHLAND CONSTRUCTION, INC. ❑ ENGINEER: Steve Kreidt, PEC 0 FIELD: Rod Winfrey,Streets&Drainage Inspector ❑ CONSTRUCTION ADMINISTRATOR:Fred Gardner 0 OTHER: Ted Moore, Engineering/Utilities Inspector ❑ SUBCONSULTANT: Date Received From Contractor: Date Returned to Contractor With Comments: Date Returned to City: D:WLL_DATA\WORD\CONTRACTDOCS\RFP Page I 08/13/97 PRICING INFORMATION: Method of Pricing: A. 0 Established Contract Unit Price(s) B. 0 Negotiated Unit Price(s)(including Overhead and Profit) C. 0 Negotiated Lump Sum(including Overhead and Profit) D. 0 Actual Cost of Work plus Fixed Percent for Overhead and Profit E. 0 A combination of A,B,C, D DESCRIPTION OF WORK: ❑ By General Contractor 0 By Subcontractor ITEM OF WORK QUANTITY PRICE TOTAL Attach additional pages if necessary. NET TOTAL COST OF THIS CHANGE PROPOSAL $8,152.22 EXTENSION OF CONTRACT TIME: As part of this Change Proposal the Contractor requests an extension of the contract time in the amount of 1 additional days. Provide thorough documentation in support of the request for additional time: A requirement of this Change Proposal will be to provide record drawing information for all of the affected items of work RECOMMENDATION BY ENGINEER/CONSTRUCTION ADMINISTRATOR: Comments: I recommend that this proposal be accepted and incorporated into Change Order No.5. Signature of.EagiFteer/Construction Administratorp C � .p44,Luk Date: 8/13/97 ACCEPTANCE BY OWNER:Comments: dry-,L?.—/tC// — /n C.c-,, r/c.ft_ d '1 /G) 0, G �s Signature: c:—►-s/r c. 41/��i..c.4/ 1"" Date: 4,..gy t-e s 7/ 111 if 1 7 1, ,of agree to the costs and terms of RFP Z K 'L (Name) (Company) o this `C day o)f j�/ et,g , 199 ) (day) (month) (year) D:ALL_DATA\WORD\CONTRACTDOCS\RFP Page 2 08/13/97 l •Lti y '97 MON 14:05 SOUTHLAND CONSTRUCTION FAX NO. 14078864348 P. 01 tt+�4 0 • • . *, [4 !NV 1 t • ,,,tSouthland Const., Inc. Slope.stabilization and guardrail at Geneva' ,,. 1 . , i:7f2. /g , 3, 1 I ' II, I I�I� ' 11 'RFF?#24-Revision 3 � �, i �� ' H 4 it ; f Bid Unit • j:• } f Item No. Description Quantity Unit Price Amount `• .i I Unit Price adjustments i I r I; • i New items (Proposed Unit Price) r•;"1, - E Geneva Outfall Remove/Replace Riprap 0 Ton 85.00 - E Geneva Outfall Regrade Ditch 1 LS 1,000.00 1,000.00 E Geneva Outfall Rip Rap(Sand Cement) (Gravity Wall 12.7 CY 275.00 3,492.50 '' ' • ' Guard rail items Guardrail 137.5 LF 16.26 2 235.85 � ' Type II End Anchor 1 EA 501.19 501.19 Type IV End Anchor 1 EA 673.82 673.82 Miscellaneous asphalt 0 Tons 80.00 - Extended job site general conditions 1 Days 192.86 192.86 Extended MOT 1 Days 58.00 56.00 8,152.22 Proposed Net Change in the Contract Amount 8,152.22 Notes: 1 Guard rail should be installed before riprap 2 Add 1 contract day per agreement , i it li fit ! ' Page 1 il PEC/PROFESSIONAL ENGINEERING CONSULTANTS, INC. e n g i n e e r s planners surveyors 200 East Robinson Street Suite 1560 Orlando, Florida 32801 407/422-8062 Fax 407/849.9401 PROJECT St.r^i RI / JCIST;mtry- AL,,,, JOB NO. OE-Z -3.0 MADE BY: RP,4udd CHECKED BY: DATE: c-IC - 97 SHEET / .OF / _i4itI — ! — • �r l nsiruc-t, t , ! r r1�. LY/�_c _ �i_ , r ' -Fitt f } i \ I CbnS fr ,,. �i�tn� _ • � 1 I t I I � g'., , 1- NI '... } lI • t i I- ,-, . � 1 �- f T rya r � I I ! 1 } I I •-F-�r..-j-r L 1- ; '-1 ' - , I Mil T. 1 , 4. 'r iI1T 1 :1 I_ 1 ' � H I , 1 I I -f - I -} 1 I i iI , II = 1 � � irIMIRMEN 1 :.: `�!4 r -X 11 Iri 1,--t-- ,4--i- i I, i t : tr_-_-,_:.---...., ..1-L.,._, .. ,, ;._;1•• ---1-:ii, st--t.'— -'• 1 I 'lir'. in II III, �� H. .Y�i.l I f... : j t t-. , 1 . .-,_ ..,_:4-1 i • r ; - fi t .■ —I D r , 4--, I ZO L '' . .L.t � '- II r -' 1 + .:1 _ . . Send-C.mcei. waif I- \ (..1 ruing 'i_ ..---- ,4.---}- ,.-'i.. ' *\Milt t I , L , r111� y� , alli t- - A. c s I rf-r ^ ILA. 1 d. � otii rPIIIIIIMIIIIIIMIN- at} ti' ,• ' ■. .. :-_51 i-ii- i ii.L HJ , , . .LP, -A,, i , /-1 , I ins! ._1:_;__i__!... I 1 : I ihni:, I l p 4. --114--4---1-7:-i---. . . '-‘ ....1:--1-4-r- - . --: .: i. .:.]:--::::,_•-.--''r' 7: ,4), ', '',-mall II. Egliilliall .111111- '. :-..-2,1. ' I i I f . 1 �� F ,.....I 4, ( ._ . i ,P 7 ■■rill�.sv E ■ ■■.■■ _ ICI pr;, I ' I I 1 ' i �!II 11 iI �` L . I '— i 11 f 11 7ea(t-Ln J _ .�ons>''rac l /2.7 GY I I . F=A c�v.T s, a,, i. :ter • CQ 5 -�. Ocoee CITY OF OCO E E REQUEST FOR PROPOSAL PPa $ Engineering/Utilities FOR PROPOSED CHANGE o+ �� 150 North Lakeshore Drive (407)656-2322 ext. 142 (RFP) or coot'`> Ocoee, Florida 34761-2258 (407) 656-2731 -fax NO. 25 PROJECT DATA: NAME: Story Rd/Kissimmee Ave&Marshall Farms Rd/Maguire Rd Intersection Improvements PROJECT NO: B97-02 LOCATION: Ocoee, Florida DATE: 7/8/97 OTHER: REFERENCE: Sketch TO(CONTRACTOR): Southland Construction, Inc. Please provide the undersigned a proposal for the following change in the work within seven(7)calendar days after receipt of this request. The written proposal must clearly delineate the scope of the proposed change in the work providing an itemized estimate of the time and all material and labor(by trade),subcontract and overhead costs and fees. Any amount claimed for subcontracts must be similarly supported. DESCRIPTION of change in work: Install 8"DI Waterline on Kissimmee Avenue at Sta.38+44 22'Rt.To 42"Lt. Contractor to install 6"x 8" increaser at 6"valve,then install 8"DIP. Property owner's domestic water service is to be connected to new 8"line. Connection to existing 10"ACP to be made by wet tap. Change Order Type: 0 Deletion 0 Addition 0 Revision 0 Other: ( Constraints of Change: City will provide used 10"x 6"TS&valve. Contractor to clean valve and sleeve and install new gasket provided by city. Initiated by: 0 Changes in Owner Requirements • Unforeseen Conditions 0 Others:( ) Proposal must be received by: ATTACHMENTS(Listing of attached documents that support description): 1. Contractor Request for Information No. 4. 2. Plan Revisions: 5 3. Sketch dated 7/8/97 6. ❑ OWNER: James W. Shira, P.E.,City of Ocoee 0 CONTRACTOR:SOUTHLAND CONSTRUCTION, INC. ❑ ENGINEER: Steve Kreidt,PEC 0 FIELD: Rod Winfrey,Streets&Drainage Inspector O CONSTRUCTION ADMINISTRATOR: Fred Gardner ❑ OTHER: Ted Moore,Engineering/Utilities Inspector ❑ SUBCONSULTANT: Date Received From Contractor: Date Returned to Contractor With Comments: Date Returned to City: D-\ALL_DATAMORD\CONTRACfDOCS\RFP Page 1 08/13/97 PRICING INFORMATION: Method of Pricing: A. ❑ Established Contract Unit Price(s) B. 0 Negotiated Unit Price(s)(including Overhead and Profit) C. 0 Negotiated Lump Sum(including Overhead and Profit) D. 0 Actual Cost of Work plus Fixed Percent for Overhead and Profit E. 0 A combination of A, B,C,D DESCRIPTION OF WORK: ❑ By General Contractor ❑ By Subcontractor ITEM�OF WORK QUANTITY PRICE TOTAL Attach additional pages if necessary. NET TOTAL COST OF THIS CHANGE PROPOSAL $3,957.72 EXTENSION OF CONTRACT TIME: As part of this Change Proposal the Contractor requests an extension of the contract time in the amount of 2 additional days. Provide thorough documentation in support of the request for additional time: A requirement of this Change Proposal will be to provide record drawing information for all of the affected items of work RECOMMENDATION BY ENGINEER/CONSTRUCTION ADMINISTRATOR: Comments: I recommend that this proposal be accepted and that it be incorporated into Change Order No.5. Signature of-Cr/Construction Administrato> e�+�/ Date: 8/13/97 ACCEPTANCE BY OWNER:Comments: 4j t`c.c1c -/Cp7/ — i 17 C.cC c fC �r I't 7 C,i �.S Signature: o<9=.—t/( 9 /) .%) /1-1-,, /J �/ Lj Date: /7i I A., ..7 � �%f/ ,y of agree to the costs and terms of RFP �1 this l day (Namof e) /�/ L L , 199 '(Company) (No-) (day) (month) (year) D:\ALL_DATA\WORD\CONfRACTDOCS\RFP Page 2 08/13/97 JUL-17-97 THU 09:29 SOUTHLAND CONSTRUCTION FAX NO. 14078864348 P. 04/07 Southland Const., inc. Revised water service to Adams property 7/17/97 RFP#25-Revised Bid Unit Item No. Description Quantity Unit Price Amount Unit Price adjustments New items (Proposed Unit Price) (Install Only) Used 10"x 6"T S&Valve 1 EA 700.00 700.00 j 8" DIP Water Main 80 LF 22.00 1,760.00 8"45 Deg Bends w Megalugs 2 EA 120.00 240.00 8"90 1 EA 145.00 145.00 6"x 8" Increaser 1 EA 290.00 290.00 8" MJ Cap tapped 3/4" 1 EA 175.00 175.00 8"Megalugs for Joint Restraint 2 EA 75.00 150.00 By city Domestic Water Service Cnctn(3/4") 0 EA 420.00 - Extended job site general conditions 2 Days 192.86 385.72 Extended MOT 2 Days 56.00 112.00 3,957.72 Proposed Net Change in the Contract Amount 3,957.72 Notes: Request 2 additional days due to impact on schedule Page 1 i 4/a 7o ScAf/e �$,, 5 r , / 85%/4 f:-/)17 1 - , -:' - lncnEMS5':7 t l . d \ .r}' I b"A� 2 „ r?l A - * r;. rl IWs „..4 , 0 -J" ,.. ir 4 7 ,- CON$ '. 8'OF :IQ'PVC " PE 0.43 y, _ , DIvsr.�A itit �-- z- TO 3:OUTSIDE R/W STA.n CON$ .:CONC. COLLAR c NNL& DISK STAMPED INDEX NO. 280 I / 5556' IW/.EL.I17.65 , Z . SET ROO& CAP ° I STAMPED �� r S 14 I i 15'3556 RP) FUTURE 10':PVC /./C h96 . 7 BY OTHERS CONST.TYPE B FENCE " p W/ BARB WIRE ATTACHMENT S INDEX NO.452 CONST. 29 LF OF POLE RELOCA7t ED 291x45' HERCP r BY OTHERS ' _ CONST. 33 LF. 1 L. 1 L OF TYPE 11 --+CONST. 30 LFI _ _ UNDERDRAIN 'CANTILEVER $UDE GA; INDEX NO.286 TYPE 'B'FENCE INDEX NO.45.,1 TCE STRUCTURE �158 CONS`>*.-130-I.F. CONST. 13C LF OF OF TYPE II l UNDERDRAIN 29'x S HE P —--- \___1I.{ — — - INDEX NO.286 I5 ,�,_ ' 3'TCE 7 ( j ice' R/W UNE '" Illi I -t— f-- CS-15),) - - --- - -111,� 1 sa trj . x — Ali __—i —fall.%_— ......o., Awassmiagiv=1 4 • : -,. p/apjair-1:r....- ,.._. ...... _____, AIL -- 45'HERCP - ir 87 r,�...+ �IZ4�0(�'LTJ TYPE-F C & G '•iC N ' '�=- ' ----------- - 1 9.3 h.� .� -- 1 € CONST.KISSIMMEE AV : 24' ,...", 4 _ , 39' — t / � E X '; -T J (I 122.16 p ,Y1' ' E 30 / avE. N _ EXI. -- x.µ. _-' •20. / T.) 1 r'la -`' CONY f � CDNC FLUwE13J0'AT'){ ' ' - .. 't - - INP X, NO.203 - .-- - C o Ocoee CITY OF OCOEE REQUEST FOR PROPOSAL o Engineering/Utilities FOR PROPOSED CHANGE 150 North Lakeshore Drive (407) 656-2322 ext. 142 (RFP) °r c000`'+`? Ocoee, Florida 34761-2258 (407) 656-2731 -fax NO. 26 PROJECT DATA: NAME: Story Rd/Kissimmee Ave&Marshall Farms Rd/Maguire Rd Intersection Improvements PROJECT NO: B97-02 LOCATION: Ocoee, Florida DATE: 7/8/97 OTHER: REFERENCE: Sketch dated 6/26/97 TO(CONTRACTOR): Southland Construction, Inc. Please provide the undersigned a proposal for the following change in the work within seven(7)calendar days after receipt of this request. The written proposal must clearly delineate the scope of the proposed change in the work providing an itemized estimate of the time and all material and labor(by trade),subcontract and overhead costs and fees. Any amount claimed for subcontracts must be similarly supported. DESCRIPTION of change in work: Remove MES at Sta.23+75 30 LT on Maguire Road. Install modified type"C"inlet. Index No.232 Change Order Type: 0 Deletion 0 Addition ■ Revision 0 Other:( Constraints of Change: Initiated by: 0 Changes in Owner Requirements ■ Unforeseen Conditions ❑ Others:( ) Proposal must be received by: ATTACHMENTS(Listing of attached documents that support description): 1. Contractor Request for Information No. 4. 2. Plan Revisions: Sketch by PEC dated 6/26/97 5. 3. Pages 1,2,3 6 ❑ OWNER: James W.Shira, P.E.,City of Ocoee 0 CONTRACTOR:SOUTHLAND CONSTRUCTION,INC. ❑ ENGINEER: Steve Kreidt, PEC ❑ FIELD: Rod Winfrey,Streets&Drainage Inspector O CONSTRUCTION ADMINISTRATOR: Fred Gardner 0 OTHER: Ted Moore, Engineering/Utilities Inspector ❑ SUBCONSULTANT: Date Received From Contractor: Date Returned to Contractor With Comments: Date Returned to City: D.ALL_DATA\WORD\CONTRACTDOCS\RFP Page 1 08/13/97 PRICING INFORMATION: Method of Pricing: A. 0 Established Contract Unit Price(s) B. 0 Negotiated Unit Price(s)(including Overhead and Profit) C. • Negotiated Lump Sum(including Overhead and Profit) D. 0 Actual Cost of Work plus Fixed Percent for Overhead and Profit E. 0 A combination of A, B,C, D DESCRIPTION OF WORK: 0 By General Contractor ❑ By Subcontractor ITEM OF WORK QUANTITY PRICE TOTAL Attach additional pages if necessary. NET TOTAL COST OF THIS CHANGE PROPOSAL $1,600.00 EXTENSION OF CONTRACT TIME: As part of this Change Proposal the Contractor requests an extension of the contract time in the amount of -0- additional days. Provide thorough documentation in support of the request for additional time: A requirement of this Change Proposal will be to provide record drawing information for all of the affected items of work RECOMMENDATION BY ENGINEER/CONSTRUCTION ADMINISTRATOR: Comments: I recommend that this proposal be accepted and incorporated into Change Order No. 5. Signature of Ong nit/Construction Administrators _S C Date: 8/13/97 ACCEPTANCE BY OWNER: Comments: lCc-..f.-r'ccf- i.-sC,z. .--/ /0 C. r/. laS Signature: /_,-- C. 4,--�c.C/e.-�., Date: , if c�,5)4 / /5 7/ I, ,of agree to the costs and terms of RFP (Name) I `�`� .— , t 99- (Company) (No) this ( day of Y (day) (month) (year) DULL_DATA\WORD\CONTRACTDOCS\RFP Page 2 08/13/97 JUL-19-97 SAT 09:49 SOUTHLAND CONSTRUCTION FAX NO. 14078864348 P. 02/02 Southland Const., Inc. Remove MES at 23+75 LT Maguire 7/19/97 RFP#26 Bid Unit Item No. Description Quantity Unit I Price Amount Unit Price adjustments New items (Proposed Unit Price) Type C Inlet Modified 1 EA 1,250.00 1,250.00 18" RCP 8 LF 25.00 200.00 Concrete Pad 0 SY 25.00 - Remove/Dispose of 18"MES 1 EA 150.00 150.00 1,600.00 Proposed Net Change in the Contract Amount 1,600.00 Notes; • Page 1 �, <„ o, 1J. 1 u1 au, 64a vain PE(.. 2 V10U2/O04 .. i PEIClRoFESsIoNAL ENGINEERING CONSULTANTS, INC. planners s u r v e y o r s 200 East Robinson Street Suite 1560 Orlando, Florida 32801 407/422-8062 Far ax 407/849.9401 PROJECT: /WjQ61,1A5 P-€24-4) I47) 2DYFiMID'.l75 • JOB NO. OE-2S4 MADE BY: 44 M94 CHECKED BY:_ DATE: G/zG/4 r? sHE I OF__�_ - IRIPRI*1- : I, PIPIT --111Milp I* 111/1>,, , a C s .... . L:� Ail tt '--- R , - % mi �i ��� R ii C 4-;}i- - • .T-1_,--,.• -.- - I e_ ■ ■ ■■ mil' t • Ir SIR ,, kw........THIE: .-Nim Ins , • Ill , i al II -1-1-4, : •-i-i':-r- 1--rTt-• i ; -- .---r- -:•: 4 °a r ,_D"Ri ,,...iiiiitp,a --_, , setlik : : t ram'"--'� �' a- ..f_i_i_i_:_4_7:_ it, issi II . .-r-r-ri -1- - • ••• 4-1---- --j-H-1- • ..-- .- ----r5r" ....;luut......:,,-;kit . al --- . --, . -f----a NE - -1. '.-:-Li-; :i.-.7-71 .1-.-- - - 16- ilisjialliin In 1- --q-1-i-f-4---1 Ft il.-1.4tiiiit i-14-4-1- --: -rim: , is: r: . t,,,,..,, M., . • .. _L-T---,-- ..-77 11"ii Ma' Ul'u'attl. I- •-•:--t- -4 - 1' N i ■mi`i`m iamb cc- tII iIiLhiiiTj 1.. t�l .-._.-irogi i- - cm .rincuLcii-r4-4--.i-- - Li Frr-EL,-- - :.-t..J-.,••:rtulnidamicw21 .1 • - -4--. r,--1- -I ..± -I ,-- IT 1 I .1-f-t 1.--..\ --It - -. --st - -7- N1'° RIMINI laic a _I: :.:F-1- • i --f. •-__• :" : si. Ibi ri is I 1 ......_ ....LIT .+1.... +Hi_ :. ::::i1::,:-.---..cr. :....- Wm -1--4-. - --- ---11 • f • • t- I - - :II: --III 111111 IIIII, llill 1 'II In if '1 -.L.I I i4JiiiiJ - '�:.,_L +"' }4-t - 118.4. ilk ri_ 1 f-1-1 _ri- . .. ■ *.mil l.1■ihrt . .....::: w 1II ■ '- mi t' . , rt.-T r 1.�-1- 1j-i-- --- - i- li I.-4- ��� 1 I ' i 1 +r r I�- 11 ifillb . _ i 4-i- _ .._!-.-rmil.+4TF f pipt, Ali ip. : - , AMOR. I i-- P II■II■.■A i1 n • ■ { ■ti■■ pa.�- '• T_`...I r matitt �i■■,I■i C , 1.1 . --1 -i_-. T _.aa IIIiI1I1i1t ' {_ .a-lila! a .- IIIllh! r t �..flki '_!: {_� 1 1 i ii .: :.! ■iiIi�- Ii!Ir't�{! �..��,..:. C"'-' _ C_.. - ■•■_ ■ - -- Ri qiiiiiill-ii. : 11 " ' i' I m-1-1-T-117-1 Fi 1 r TF., 1 I !rill 1:4- c Fit, til:_i•- Ili oil ±f-Li 1 it+4- .....E..tr.:-._ --: 1 it It, . :Iv" 1 it -7 ,if-rt i _FL_ I-'''- - - .-1- ILI - aI {a :_ . �-H_.: '-1- tt-+ : - ._...* 1IiIiFfliou1i _ •, _ Hif ._ski alit. t ON -,, ,, - .C.1 407 849 9402 PEC 2tJ 003/004 PEC/PROFESSIONAL ENGINEERING CONSULTANTS, INC_ 9 s planners 200 Cast Robinson s u r v e y o r s Street SAG 1560 Orlando, Florida 32801 407/422.8062 Fax 407/848-9401 PROJECT: MADE 8l': /t'J JOB NO.Q=,2S DAD BY DATE: 4/2d/' . SHEET z OF_S___` 1 —1 — —IT Ili+ ". .:::: ra. magi wa: . f---f . 1.--itt-i- - - • -L _ _ _ ...r. ..1.. -7- . 1111111111111 _ MO Ili; I, I --- - -"""' I g-_ ,,,,, . , nin: HUI% El a ,,„ • si —ite guli..E.:... . ; , - in , lt ..-.77 - • ■:'r "sun■= ■ ■ IP bdr.,i i!4&jfllr tf1tzlMI te ! . ■ate _■R. ' T..: :..Lj-e ai. lir01 lINi fIPi/l d - Ili. ■■ 1p:: ■ 11 q _�� -}-.y'•_, i p ■_ II 1 ill .1-77 7 III . i I. —i- t— Pt 1 , ---ii 1 a II '' -11; il -7- -------4-t-- ---1-1.7-ii--.1: !L11III 7 ::. �C -I _: jJ1 1 IIIJIIihu11!dJ1f ` 4, 7} ..c :±.1 —art"}'_ J�._j ■ norgio., .;"4. 1` t! ; ;----1-4 1 . -1 litT.I...1..41-__ii. h. 4.. . .§._ n I ...-m--. Iiikti 1111., 04 ,_L_ -I-Y:4-._.7.----4.--,, - :.:s ..---f- •- :--ksfilli mdieraziniumurd miiiiiM•gimilluit-fisi !Ai :!- -- ,-, --i-i- __, • • _..., • ii_. 4_ ce= �' -C i _ 7_:• ` - _ _ _; ill i 1 a ,,, . ,vitt .` :IL. .T. ;-, ---11----I -T_-T jj+ t. ± 1Tj+frg ■ , ■1llffl_1_ 1 - .F'_-.-r.---_.--._---,Nm--_y..W j1, -REi-Mt k.I 1J41aI'!-l11iihi hlli4t ::::_,•,.1.. I,.1-_.,.0.f q• •. _1...-,-1 14:...,—=-I—L L-_-1,1::-_J-:,: ■ _1-.. ■ ■ ..... ._ i •+, i. -(- ■utr n1 -■■Ci3i;� N �C i - - ■. i-• :_ _ -1-- - 4-ftti H -i- -:--.-;: wrinu 1 1{- , _ .- 1 i 1,- Lr ..k7- -..- . -.-'a• ■■ ■■■ s - I-_• J in T om+-'-T-T- .1.. _ ': ±s - --17 ,-• --r ' '' -I j--I-1 1 • ' 1--1-11---f- .._.1 , =>14111vill :, _1 ■ MOO. milmmiSiimAiiliiikL4 , - - , • - • 1 , , 1, m.rn„si ircripithillim 1 i 1 __ disjoin al allailbrimitilhiblie-t- .i- -- - .- 4_,.. I .-I. - +i :- . • mei ars ii, pr s • rpm _Li "f":""j. - — — ia " - - • 1:77 �-�-;-�- - Eli ! �i�■ . ■ems 41.41 _ - F � -�._ .. 'J. --J--- r -_-_,-_,-.....±.L nil g prak*fit 3 : 111. ..4d-;. . .1175 ...,. ._ _ - --1----. ;--4-44- . ' - , ...-. . .. .:. . . gin— N 6 ilir • -- _■ ■■ Ii1iiiH '4 suns IL -+Y- --�` ._ ... ,- ; !1itJ4iL : 1• _. 11 ;- 101 y�... � - - ■ l-- - - .. . . -tr !!P1 •- 1 ' ._ ■■ n - - g 7 - -- ::.--H _ . a aii:g 1 ■a 11'■■ - . �' .L_-_ iw ' 1i1--�-% ■ . t liii , - -.ji■i ..g JUOIIL L iiiL4 ..-tf i .uuit,iur t0:15 (]1 401 849 9402 PEC 2 6004/004 PE'CIPROFESSIQNAL ENGINEERING CONSULTANTS, INC. a n g i n p o r s planners 200 East Robinsontrga� S s p r ° e Y o r a un9 1560 Orlando, Florida 32801 407/4224082 Fax .. 4 � �07/8t8.810! PROJECT:_ MADE BY: A75(� CHECKED BY: JOB N0. OE-Z5-4 DATE G�7Gly 4 SHEET _OF .3 jj' i. I ' ■ 1 •■ NCC -C._......,_•,_, ...r. . i. -.-.-, .. .. ■ ■■ ' .:.,..._.,1.........t...,.-i `,■ .. : ie. I II . • Mil. ....;NH; Ili!:J4-7044it..'. ': '-' ..9" :4.: Cr. 4 1-• -- ■ -�-TLC. - A� ,/, /p7�� 1 H ,' L •- 1. .1_ r_-__:_i ___I alf-iv,_iv.-e, -„v._ 11 ■■gs I — smu■�■I _ ■ • , • ■ ------1.41-lib. 7 7_,_i_f_....11. 191. L ...,_ . I a • II 1 • ill -.• 41 __,...,..L a-1i-,--:21_„,,, : _ _. - _-_-.-r--_-i.-Milk__ -r-- IN I milleirri. - - - 1-- - -4-.--..-f.-t 2:I Ent .-1.7. 1-1-.: .. - -1 g smi ;77 ,;,-:j - Mallal • - ow ■/■ '1 ' rr- _ - _1 I -"I: i . .,__ : . ....., _,..,_,_,_fiS ■ ■ .. 1, - - :: 1 '- --- -- _, 1 ' ,.1-_-_j:_:-_. ,..,r iy . . ,_. . • *rill _1_10 I ail milli& 1-- 411. .._riii--.,:-14-1-f-t. - ---1-- 71 .-4±14-+ -- ::::.•,.•Eri m 144- - - --- li LI-1 i I I 1 1-.-. --t. -- • - 1-1-4-LI: i 1- _ r... ..,,,,:_._:.__,,,,, .: oi.. .,--14.11 1_1: Tr-.a ._.'_ -.L... -7-ir_ _ . , �,.1 l ,}. _ me i$iii _ frgii m■..■a■.il.n �. - - �i■ , •■ f f- P --4-1"....-f*-4 4 ' 1-41 r• -- 1,21:-Aiat77:411P - railif 71- IER • op WI-I-. :7 r____„_ .,___-_1:_x__,_-.•• - . i .. ,....... _., ....,,..:,. ,_ in. , . -. :.:-_-_-. ,-__,_,_-___,..„..;-.:,:„...i. -L - f , 1 !-! ,..4-r---!---; .-r- ii"- --; if -11k' I Ma. 1 lizi.T.:t_i.-_0.:4_ I_,. _,__...._1_1_:.t_l_._, : :.:.1 17'1.1.rosion- 4 , Cm h._ar...-rne . ..._. _ .____. _____,.___-14- - • • 11 , iistrilimpri '_iii 14 51. - i -Li. —--1-_--f:fil--, '_ ...,__: 4._,..,, , �. _1_■ r.i' J •a 1:L • - -I I I. 1- -NEIMIKOMIIMP101--,'-.'ill'--F •-- -4-'Y a- m i _ ,c .�_. _.��- - IIII - tt , __... ...... . • _ _, .... za,,,;. . . pi:IIMIZI .-1.--.1. . 1 I .-i --r-] .1 Li Nis- 141- J4-1-- 011 ;;. g —lift r.71. Ell . • nilimairrq- Ici.ni-:,-._. 1::-• --- - II--i-,-..i,-:Li.-J-7-1_,--A• -j...1-..-1-.3-:: • I .UID:■ .� -1-� ■ ..'_ - -u --n ..r, -:-•-4 4 -77--F-_._, _ ____ -;I.--..--ELI_:"... !-T — 41:1-1: iimir.- .....1-41.1-4-411.1._ ±--1 t . ....._,- ji . 4 1. 11 C o S4cy-y-) _E Ocoee CITY OF OCOEE .. \o REQUEST FOR PROPOSAL .'a Engineering/Utilities FOR PROPOSED CHANGE 150 North Lakeshore Drive (407)656-2322 ext. 142 (RFP) r,4f`' Gaon°4`r� Ocoee, Florida 34761-2258 (407) 656-2731 -fax No. 27 PROJECT DATA: NAME: Story Rd/Kissimmee Ave&Marshall Farms Rd/Maguire Rd Intersection Improvements PROJECT NO: B97-02 LOCATION: Ocoee, Florida DATE: 8/13/97 OTHER: REFERENCE: PEC Sketches TO(CONTRACTOR): Southland Construction, Inc. Please provide the undersigned a proposal for the following change in the work within seven(7)calendar days after receipt of this request. The written proposal must clearly delineate the scope of the proposed change in the work providing an itemized estimate of the time and all material and labor(by trade),subcontract and overhead costs and fees. Any amount claimed for subcontracts must be similarly supported. DESCRIPTION of change in work: Revise driveway construction and associated piping on Kissimmee Avenue Rt. Change Order Type: 0 Deletion 0 Addition • Revision 0 Other: ( Constraints of Change: Contract unit prices will be used to determine cost of changes. Initiated by: 0 Changes in Owner Requirements 0 Unforeseen Conditions • Others:( Proposal must be received by: ATTACHMENTS(Listing of attached documents that support description): 1. Contractor Request for Information No. 4. 2. Plan Revisions: PEC marked up plan sheets 5. 3. 6. O OWNER: James W.Shira,P.E.,City of Ocoee 0 CONTRACTOR:SOUTHLAND CONSTRUCTION, INC. ❑ ENGINEER: Steve Kreidt, PEC 0 FIELD: Rod Winfrey,Streets&Drainage Inspector ❑ SUBCONSULTANT: 0 OTHER: Ted Moore,Engineering/Utilities Inspector Date Received From Contractor: Date Returned to Contractor With Comments: Date Returned to City: D:\ALL_DATA\WORD\CONTRACTDOCS\RPP Page I 08/13/97 PRICING INFORMATION: Method of Pricing: A. 0 Established Contract Unit Price(s) B. 0 Negotiated Unit Price(s)(including Overhead and Profit) C. • Negotiated Lump Sum(including Overhead and Profit) D. 0 Actual Cost of Work plus Fixed Percent for Overhead and Profit E. 0 A combination of A, B,C, D DESCRIPTION OF WORK: 0 By General Contractor 0 By Subcontractor ITEM OF WORK QUANTITY PRICE TOTAL Attach additional pages if necessary. NET TOTAL COST OF THIS CHANGE PROPOSAL $<-1009.50> EXTENSION OF CONTRACT TIME: As part of this Change Proposal the Contractor requests an extension of the contract time in the amount of -0- additional days. Provide thorough documentation in support of the request for additional time: A requirement of this Change Proposal will be to provide record drawing information for all of the affected items of work RECOMMENDATION BY ENGINEER/CONSTRUCTION ADMINISTRATOR: Comments: I recommend we accept the contractor's proposal and incorporate it in Change Order#5. Signature of-Lagiaeei Construction Administrates j1 C . /3 9 Date: 8/ / ACCEPTANCE�B/Y OWNER: Oti Comments: �7C1 c !C / %mot /C• C r Signature: C, s . Date:AL:f� 3,4 /� �f/7 t, ,of S agree to the costs and terms of RFP v (Name) "�`!� (Company) (No.) this � day of //'a-Vd1 , 199 % � . (day) (month) (year) D:\ALL_DATA\WORD\CONTRACTDOCS\RFP Page 2 08/13/97 • AUC-07-97 THU 15:24 SOUTHLAND CONSTRUCTION FAX NO. 14078864348 P. 02 Southland Const., Inc. Revised driveways at Kissimmee 8/7/97 RFP#27 Bid Unit Item No. Description Quantity Unit Price Amount Unit Price adjustments 032 430-11-32 15"(Cl III)(SD)conc. pipe culvert -22 LF 22.00 (484.00) 047 430-984-2 15" MES(SD) Conc. round pipe -2 Ea 600.00 (1,200.00) 033 430-11-32 18"(CI 11l)(SS)conc. pipe 44 LF 23.00 1,012.00 048 430-984-2 18"MES (SD)Conc. round pipe 0 Ea 600.00 059 522-2 6"Conc. Sidewalk -55.5 SY 21.00 (1,165.50) (1,837.50) New items (Proposed Unit Price) Re-stock 15" RCP 24 LF 2.00 48.00 Remove existing CMP 31+93.8 45 LF 5.00 225.00 Remove previously installed 18" RCP 17 LF 15.00 255.00 Form 18" MES at 34+08.07 2 Ea 150.00 300.00 • 828.00 Proposed Net Change in the Contract Amount (1,009.50) Notes: 1 Impact on schedule not determined-reserve request for additional time Page 1 mac. s't-cm_ b -i_ • ` Ocoee CITY OF OCOEE ��Ej c REQUEST FOR PROPOSAL - Engineering/Utilities FOR PROPOSED CHANGE 150 North Lakeshore Drive (407)656-2322 ext. 142 (RFP) nay,''or Goo J a`ro Ocoee, Florida 34761-2258 (407) 656-2731 -fax NO. 29 PROJECT DATA: NAME: Story Rd/Kissimmee Ave&Marshall Farms Rd/Maguire Rd Intersection Improvements PROJECT NO: B97-02 LOCATION: Ocoee, Florida DATE: 8/11/97 OTHER: REFERENCE:Southland letter 7/24/97 TO(CONTRACTOR): Southland Construction, Inc. Please provide the undersigned a proposal for the following change in the work within seven(7)calendar days after receipt of this request. The written proposal must clearly delineate the scope of the proposed change in the work providing an itemized estimate of the time and all material and labor(by trade),subcontract and overhead costs and fees. Any amount claimed for subcontracts must be similarly supported. DESCRIPTION of change in work: Contractor to install ABC base material in lieu of Durarock in two areas of the project where it is necessary to put traffic back on the areas the same day. Change Order Type: ❑ Deletion • Addition ❑ Revision ❑ Other: ( ) Constraints of Change: These are the only areas on the project where the city will pay the premium cost to use ABC vs Durarock. Total quantity 250 sy. Additional cost not to exceed 2145.50. Initiated by: 0 Changes in Owner Requirements 0 Unforeseen Conditions 0 Others:( ) Proposal must be received by: ATTACHMENTS(Listing of attached documents that support description): 1. Contractor Request for Information No. 4. 2. Plan Revisions: 5 3. 6. • OWNER: James W. Shira, P.E.,City of Ocoee • CONTRACTOR:SOUTHLAND CONSTRUCTION, INC. • ENGINEER: Steve Kreidt,PEC ■ FIELD: Rod Winfrey,Streets&Drainage Inspector ❑ SUBCONSULTANT: ■ OTHER: Ted Moore, Engineering/Utilities Inspector Date Received From Contractor: Date Returned to Contractor With Comments: Date Returned to City: D:\ALL_DATA\WORD\CONTRACTDOCS\RFP Page I 08/i3/97 PRICING INFORMATION: Method of Pricing: A. 0 Established Contract Unit Price(s) B. ❑ Negotiated Unit Price(s)(including Overhead and Profit) C. ■ Negotiated Lump Sum(including Overhead and Profit) D. 0 Actual Cost of Work plus Fixed Percent for Overhead and Profit E. 0 A combination of A, B,C,D DESCRIPTION OF WORK: 0 By General Contractor 0 By Subcontractor tfigePitl ` ITEM OF WORK ' ,. (;, 9 C2UANTITY ( �,� Provide ABC in lieu of Durarock 250 sy 2145.50 2145.50 Attach additional pages if necessary. NET TOTAL COST OF THIS CHANGE PROPOSAL $2,145.50 EXTENSION OF CONTRACT TIME: As part of this Change Proposal the Contractor requests an extension of the contract time in the amount of additional days. Provide thorough documentation in support of the request for additional time: A requirement of this Change Proposal will be to provide record drawing information for all of the affected items of work RECOMMENDATION BY ENGINF.1ER/CONSTRUCTION ADMINISTRATOR: Comments: I recommend that this additional cost be incorporated in Change Order No. 5 Signature of Fagi /Construction Administrat�J�,LE a . , Date: 8/13/97 ACCEPTANCE BY OWNER: Comments: 4 er��� i ��f:�.sc t4 !-tT�G C. o. Signature: /.J1'41..--1/./i C , �yL��.ti Date: /7 Ca`cf.,.,J 'It IF? ` A ! ,of S G� this ' �% da a of G�� �(�Per) agree to the costs and terms of RFP 1-5Y , 199 (No) (day) (month) (year) DAALL_DATA\WORD\CONTRACTDOCSTYP Page 2 08/13/97 ASOUTHLAND CONSTRUCTION, INC. V I_, I� Ate I1 P •. OX 2389 10 -{Cl "fit�tDA-32794 89 August 7, 1997 •I s;9.-9644._ „¢ FAX(407)886-4348 Mr. Fred Gardner City of Ocoee 150 North Lakeshore Drive Ocoee, Florida 34761 Re: Story Road Project ABC base at Maguire and Story Road Dear Fred: We will accept your figure of$2,145.50 for additional compensation to install ABC base at the above referenced locations. If there is anything else we need to do or provide to close this issue please advise. Sincerely, / )5r/t, R. Keith Carr General Manager CC: Banks Allen George Smalley 172 WEST FOURTH STREET • APOPKA, FLORIDA 5 -G • • _ _ off*or GOOD JAMES W. SHIRA,P.E. CITY ENGINEER/UTILITIES DIRECTOR 150 N.LAKESHORE DRIVE•OCOEE,FLORIDA 34761 PHONE(407)656-2322 EXT.142•FAX(407)656-7835 August 13, 1997 Mr. Keith Carr Southland Construction, Inc. 172 West 4`h Street Apopka, Florida 32703 Dear Keith: The letter attached is a listing of personnel and equipment utilized by the city to repair the force main in Kissimmee Avenue that was damaged during the mixing operations on June 18, 1997. The $1,339.62 figure represents the costs incurred by the city as a result of the damage. I feel that the most expedient method of reimbursement to the city is through a deductive Change Order item. Thank you very much for your help and cooperation in bringing this issue to closure. Sincerely, CITY OF OCOEE mac % Fred C. Gardner Construction Administrator FCG/jbw Attachment pc: James W. Shira, P.E., City Engineer/Utilities Director David 'Wheeler, Assistant City Engineer/Utilities Director Robert Holland, Utilities Superintendent C ALL_DATA/WORD/fred/story/forcemain costdoc THE PRIDE OF WEST ORANGE Hourly Rate Hours Total Jerry Bolton $22.83 3 $68.49 Jimmy Butler $19.53 3 $58.59 Shwn Sorenson $13.16 3 $39.48 Randy Blackburn $15.77 3 $47.31 Mike McCall $15.09 3 $45.27 John Cockrell $30.60 3 $91 .80 Robert Howell $22.83 3 $68.49 Bob Clark $14.45 3 $43.35 David Robert $13.16 3 $39.48 Steve Berry $15.23 3 $45.69 Brian Pauline $13.89 3 $41 .67 Vactor Truck $125.00 3 $375.00 Sludge Truck $125.00 3 $375.00 $446.54 3 $1 ,339.62