Loading...
HomeMy WebLinkAboutVII(H) Discussion/ Action Re: Stormwater Projects . . Agenda 10-7-97 o . " o % Item VII H 4�� i e ; a O 11 of coo9.`�a`�� JAMES W.SHIRA,P.E. CITY ENGINEER/UTILITIES DIRECTOR 150 N.LAKESHORE DRIVE•OCOEE,FLORIDA 34761 PHONE(407)656-2322 EXT.142•FAX(407)656-7835 MEMORANDUM DATE: September 30, 1997 TO: The Honorable Mayor and Board of City Commissioners FROM: James W. Shira, P.E. City Engineer/Utilities irector SUBJECT: Stormwater Projects We have been contacted by two property owners asking for assistance in solving drainage problems which affect them. The first request came from the owner of the home at 2001 Shari Lynn Terrace. The existing storm inlet in front of this residence has begun to subside, and could soon pose a danger to traffic due to loss of the underlying roadbed. We contacted Sunshine Building and Development Corp., one of the firms under contract with the city for an estimate. This firm was contacted because of their knowledge of the area, having made a similar repair to a sanitary manhole on Shari Lynn several years ago. Their quote to replace the inlet and restore the road is $10,440.00. The second request came from the owner of a home on the north side of Century Oak Drive at the intersection of Abbey Ridge in Silver Glen subdivision. At this location, stormwater runoff runs down the curb along Abbey Ridge with such velocity that it runs across Century Oak, runs over the curb, and down the homeowner's driveway into the garage. The installation of two new inlets on Abbey Ridge just south of the intersection will intercept this flow before it reaches the intersection. We contacted all of the firms under contract with the city, and received proposals from two. Those proposals were from Prime Construction Group, Inc. in the amount of $37,321.00 and Sunshine Building and Development Corp. in the amount of$16,116.50. We have completed construction of all of the Group I stormwater drainage projects, and as we reported on August 20, 1997, actual costs for the Group I projects totaled $352,000 under the CIP estimate. These two proposed projects, with a combined cost of$26,556.50, will be funded from the Group I savings, with the balance of the Group I savings being allocated for additional projects to be approved by the City Commission. ®�- THE PRIDE OF WEST ORANGE I recommend that the City Commission authorize Sunshine Construction and Development Corp. to proceed with repairs to the inlet on Shari Lynn immediately, in the interest of public safety. The authorization would be for no more than$10,440.00 without prior approval from the City for any additional amount. I also recommend that the City Commission authorize Sunshine Construction and Development Corp, to begin construction of the two new inlets on Abbey Ridge for the not-to-exceed amount of$16,116.50. C:ALL_DATA/WORD/jws97/commission/storm.doc r, v I �1 I I 1 i • 51 I,y n,, i' i Ti u> ` v . L .V.. ,a f.;l;,JfJ ` 071 �I�,R ;(10,1I' fr, i1 E G f • • Sunshine Buildingand ,bevelopment Corp. „:. POST OFFICE BOX 180958/CASSELBERRY,FLORIOA 3271q-0la5$/PHONE(407)339-6721/FAX: (407)331-7542 • September 23, 1997 : . City of Ocoee i 150 N. Lakeshore DriVe t Ocoee, Florida 34761 ' ; : i• • i Attn: Dave Wheeler , i ;l(',t'ii(,` Dear Dave: As requested by you our price for the underdrtirl and paving work at Shari Lynn Terrace'as described to`us.yest�rday is $ 10,440.00. ;{' ' The breakdown is as follows: ' Mobilization • • • $ 1300.00 Excavate Road 3' 100.cy @$'.O0 $ 700.00 Fill Roadway 8, Compact 70.cy @ $8.50 $ 595.00 Remove Curb 20 If @ $15, $ 300.00 12" Compacted Sub Base 74 sy • $ 100.00 6" Asphalt Base $ 3500.00 1" Asphblt Top 74 sy @ 12.50 ; $ 925.00 Traffic Control $ 900.00 Installation of Curb 20 If @ $15.00 $ 300.00 6' Und4rdrain 501f @ 36.40': $ 1820.00 Total $10440.00 Thank you for the opportunity to quote you'on this repair. Very truly yours, : • John T. Bush •? ((� Presidont . i •RWB:rw : . I l Sunshine Building and Development Corp. POST OFFICE BOX 180958/CASSELBERRY, FLORIDA 32718-0958/PHONE(407)339-6721 /FAX: (407)331-7542 September 3, 1997 Engineering Department • City of Ocoee 150 N. Lakeshore Drive Ocoee, Florida 34761 Attn: Ernie Kovacs Gentlemen: As requested by you our lump sum price for the Additional Abbeyridge Road Stormwater Inlets is $ 16,116.50. This is according to your letter of August 21, 1997. Thank you for the opportunity to quote you on this project. Very truly yours, • 7j°h6n ui RWB:rw PRIME CONSTRUCTION GROUP, INC. 5528 Force Four Parkway Telephone(407)856-8180 Post Office Box 590507 (407)856-8182 Orlando, FL. 32809-0507 September 2, 1997 Mr. Ernie Kovacs CITY OF OCOEE ENGINEERING 150 North Lakeshore Drive Ocoee, Florida 34761 RE: Additional Abbeyridge Road Stormwater Inlets, Bid Date: September 3rd, 1997 Time: 2:00 P.M. Dear Mr. Kovacs, We can perform the above horizontal construction project for $ 37,321.00 complete as shown on the bid drawings supplied to our office dated August 21St, 1997. We will need 30 days to substantially complete the project from the NTP date. The roadway will be closed to traffic for approximately two weeks during construction, but passage.for emergency vehicles will not be hindered. Please contact us if you would like us to perform the work for you. Sincerely, . Reynolds C. Holiman Vice President