Loading...
HomeMy WebLinkAboutIII (F) Approval and Authorization for Forest Lake Golf Course to Construct Reclaimed Water Line Agenda 11-17-98 Ocoee Item III F o� x. 4 o _i 0 1 a, Oi ' o 04. Of Goon JAMES W. SHIRA,P.E. CITY ENGINEER/UTILITIES DIRECTOR 150 N.LAKESHORE DRIVE•OCOEE,FLORIDA 34761 PHONE(407)656-2322 EXT. 142•FAX(407)656-7835 MEMORANDUM DATE: November 12, 1998 TO: The Honorable Mayor and Board of City Commissioners FROM: James W Shira, P.E. City Engineer/Util' es Director SUBJECT: Reuse Water Service for Orlando Memorial Gardens Cemetery The Orlando Memorial Gardens Cemetery located adjacent to and north of the Forest Oaks Golf course, was identified as an ideal site for reclaimed water irrigation in the City's Reuse Feasibility Study. The cemetery property is located within the City's reuse service area. As a part of the construction associated with the Western Beltway, Forest Oaks Golf Course is performing some additional construction to allow for continued operation of the City's and the Golf Course's combined reuse irrigation system and other site amenities between the Expressway and golf course. The portion of that work that involves our combine effort involves placing three steel sleeves and piping under the to-be-constructed roadway to allow for continued use of the existing reuse ponds and irrigation system and the interconnect with Winter Garden's effluent disposal site. When the golf course was designed and constructed it was known that certain piping changes would be required and the golf course agreed to bear that expense when required. The City has always viewed reuse irrigation at the Orlando Memorial Gardens Cemetery property as a vital portion of its reuse service area. In addition,the Orlando Memorial Gardens Cemetery has always viewed using Ocoee reuse water as its primary source of irrigation water. The willingness between all three parties involved has always been in place regarding service to the cemetery, but the work was delayed until the Beltway plans were finalized. Since Forest Oaks Golf Course will be performing a significant amount of construction itself on its property,they proposed to have their contractor install the pipeline to the Memorial Gardens Cemetery as a part of their project with the City funding only the pipeline to the cemetery. The attached proposal would allow for the installation of a pipeline for service to the Memorial Gardens Cemetery at a cost of $72,821.55. The work would begin almost immediately and be completed within the next three months. Staff and PEC have reviewed the layout and construction costs and have determined that they are within an acceptable range for performing this work. Funding for this project will be from the Utility o� THE PRIDE OF WEST ORANGE ' �' Revenue Bond Issue; this project was identified in the list of projects included in the report for the bond issue. Reimbursement to the Forest Lake Golf Club of Ocoee would be on a monthly payment request basis. I recommend the Mayor and City Commission approve the proposal submitted by Forest Lake Golf Club of Ocoee for the installation of a reuse pipeline to serve the Memorial Gardens Cemetery in the amount of$72,821.55 and authorize the Engineering Department to notify Forest Lake Golf Club of Ocoee to begin the work immediately. Attachments x. athe October 16, 1998 Mr. Jim Shira City of Ocoee Dear Jim, Please find below the estimate to install the necessary sleeving, piping, controls, wiring, valves and flow control devices to put Memorial Gardens Cemetery on the Forest Lake Effluent Distribution System. The base work of installing the steel sleeving and Yellowmine pipe needs to be decided on quickly, since the Western Beltway Notice to Proceed has been issued and Hubbard Construction is scheduled to commence work during the month of November in the golf course area. These prices are based on the work being done prior to the Beltway Construction proceeding. Unit Amount Unit Cost 10" Steel Casement Sleeve 360 $ 43.79 $15,765.52 6" Yellowmine Pipe 380 $ 7.93 $ 3,013.79 6" Class 200 Pipe To: Memorial Gardens Cemetery 3940 $ 6.90 $27,172.41 To: Orange County Pauper's Cemetery 1260 $ 6.90 $ 8,689.66 6" 45 degree Els with Megalug fittings 1 $1,344.83 $ 1,344.83 Lump Sum Power wire, communications cable, etc. 1 $2,482.76 $ 2,482.76 Lump Sum Ductile iron fittings, valves and flow meters 1 $4,827.59 $ 4,827.59 If necessary: Jack& Bore under West Orange Trail 60 $ 40.00 $ 2,400.00 Field Satellite to control water cycles 1 $2,125.00 $ 2,125.00 Design, Construction Coordination, 1 $5,000.00 .$ 5,000.00 Programming & Scheduling Total $72,821.55 Hopefully, this will provide all of the information necessary for the City to proceed with this work. We look forward to working with the City in improving the Disposal System. Sin erely y rs, Kenn th C Ezel , resident ' � •; ; NOV ; 419981.1 FOREST LAKE GOLF CLUB OF OCOEE 10521 Clarcona-Ocoee Road • P.O. Box 158 • Ocoee, Florida 34761 • Phone: (407) 654-4653