MEMORANDUM
DATE: June 17, 1997
TO: The Honorable Mayor and Board of City Commissioners
FROM: James W. Shira, P.E.
City Engineer/Utilitie• Director
SUBJECT: Timber Ridge Trail Extension
In February of this year the Sawmill Homeowner's Association conveyed two tracts of land in
the Sawmill subdivision to the City.
The City agreed to construct certain road improvements within the limits of one of the tracts to
provide an adjacent parcel of land with access to Timber Ridge Trail. The City agreed to have
this work completed within 180 days of the date of the conveyance. Immediately after the
conveyance we began work on survey and design. We estimated that the construction cost of the
improvements would be approximately $7,000.00. We solicited bids from the six firms currently
under continuing contracts for horizontal construction, and received bids from two of those
firms. The higher of the two bids is $23,746.35 and the low bid is $17,999.00.
The project is very small as road construction jobs go, and the economies of scale that a
contractor normally realizes are not available on this job. This fact, coupled with our need for a
quick completion caused the per foot price to more than double from what we expected.
I recommend that the City Commission authorize the transfer of$11,000.00 from General Fund
Contingency, which has a balance today of$73,185.00,to Capital Improvements to fully fund
the project, and authorize Prime Construction Group, Inc. to construct the project.
JWS/j hw
THE PRIDE OF WEST ORANGE OnI
SeiL
£J
PRIME CONSTRUCTION GROUP, INC.
5528 Force Four Parkway Telephone(407)856-8180
Post Office Box 590507 (407) 856-8182
Orlando, FL 32809-0507
June 17th, 1997
Mr. Ernie Kovacs
CITY OF OCOEE ENGINEERING
150 North Lakeshore Drive
Ocoee, Florida 34761
RE: Timber Ridge Trail Extension, Bid Date: June 17th, 1997 Time: 2:00 P.M.
Dear Mr. Kovacs,
We can perform the above project for $ 17,999.00 complete as shown on the bid
drawings and in accordance with Orange County Road Construction Specifications. We
will need thirty days to substantially complete the project from the NTP date. Please
contact�us if you would like us to perform the work for you.
Sincefei�%,
4, '
. ith, Jr.
Pr: ident
06/17/97 12:31 21 21902
Sunshine Building and Development Corp.
POST OFFICE BOX 180958/CASSELBERRY,FLORIDA 3271E-0958/PHONE(407)339-6721/FM: (407)331-7542
June 16, 1997
Engineering Department
City of Ocoee
150 N. Lakeshore Drive
Ocoee, Florida 34761
Attn: Ernie Kovacs
Gentlemen:
As requested by you our lump sum price for the Timber Ridge Trail
Extension as outlined by you in your letter of June 10, 1997 is $ 23,746.35_
This pricing includes labor and material for:
84 LF extension Miami curbs and roadway paving
matching existing roadway construction on Timber Ridge
Trail
Installation of a 16' concrete driveway
Relocation of existing fence and gate
Grading as required
Installation of a 10' x 14' curb as shown on plans
Thank you for the opportunity to quote you on this project.
Very truly yours,
00/17/97 12:31 t' a 001
SUNSHINE BUILDING AND
DEVELOPMENT CORP.
P.O. Box 180956
Casselber7y, FL 32718.0956
Phone (407) 339.6721FAX(407) 331-7642
al II i67 45u
FAX O0yER SHEET
DATE; TIME:
TO: C�=4' if 6c-0(70 PHONE �Ps� 2322 T' � LIZ
�n�v// av FAX �lJ.S G> — 3s
47Ttii: R s
FROM: PHONE