Loading...
HomeMy WebLinkAboutVII(D) Discussion/ Action Re: Award Of Bid For City Hall/Police Station Siding And Trim Replacement Project Agenda 2-3-98 "CENTER OF GOOD LIVING-PRIDE OF WEST ORANGE" IteWllAy i COMMISSIONER S. SCOTT VANDERGRIFT Ocoeecr41n r RS COMMISSIONE CITY OF OCOEE COMMISSIONERS SCOTT ANDERSON• Q 150 N.LAKESHORE DRIVE SCOTT A.GLASS p OCOEE,FLORIDA 34761-2258 NANCY J.PARKER (414 � (407)656-2322 CITY MANAGER 41..e OF Gov ELLIS SHAPIRO TO: The Honorable Mayor and Board of City Commissioners FROM: Bob Smith, Public Works Director Don Flippen, Building and Zoning Official Donald Carter, Finance Supervisor Fred Gardener, Construction Administrator DATE: January 28, 1998 RE: City Hall/Police Station Siding and Trim Replacement Project The City received two bids on the City Hall/Police Station Siding and Trim Replacement Project. Golden Hammer Contractors, Inc. and Frank Casserino Construction, Inc. (see attachment A). City staff, along with John Cassidy, the city's consultant on this project held interviews with each bidder. Based upon these interviews, it is felt that Golden Hammer Contractors, Inc. is the appropriate choice for this project. They submitted the low bid and have far superior experience in handling the Hardiboard product. City staff recommends that the scope of work be limited to replacement of the siding and trim of the existing structures and the addition of a canopy connecting City hall and the Police Station (Alternate 2C). Based upon this recommendation the following is the proposed budget for the project: Construction Cost- Siding and Trim Replacement $ 173,269 Canopy connecting City Hall to Police Station 6,437 Admin&miscellaneous cost (See Attachment B) 32,198 Total Cost $ 211,904 At this time it should be mentioned that there could be additional unknown costs involved in this project. Once the existing siding and trim is removed, other structural defects may be found which will have to be addressed at that time. The buildings have been settling since construction. An engineering study was performed by Universal Engineering and it was determined that settlement has stopped and additional settlement is not predicted. Also, staff is asking for consideration of closing a portion of Lakeshore Drive, behind City hall to be used as a staging area while this project is being completed. Estimated construction time is 90 to 120 days. The City is currently gathering information for the pending litigation regarding the original construction of the City Hall Complex. In the very near future Stephen Bull,.the city's representative in this matter will come before you to discuss in detail our plan of action. ACTION REQUESTED Staff recommends the Honorable Mayor and Board of City Commissioners : a) award the contract for the Siding and Trim Replacement Project to Golden Hammer Contractors, Inc. b) approve the proposed budget and recommended financing for the project and c) authorize the partial closing of Lakeshore Drive. "CENTER OF GOOD LIVING-PRIDE OF WEST ORANGE" MAYOR•COMMISSIONER S. SCOTT VANDERGRIFT Ocoee COMMISSIONERS o� Feiv CITY OF OCOEE DANNY HOWELL .s` t`` • 150 N.LAKESHORE DRIVE SCOTT ANDERSON v ���aaa..dvj . OCOEE FLORIDA 34761-2258 SCOTT A.GLASS NANCY J.PARKER }:a (407)656-2322 CITY MANAGER Of G00� ELLIS SHAPIRO TO: The Honorable Mayor and Board of City Commissioners FROM: Donald Carter, Finance Supervisor DATE: January 28, 1998 RE: Financing of the City Hall/Police Station Siding and Trim Replacement Project The estimated total cost for the City Hall/Police Station Siding and Trim Project is $ 211,904. The recommended financing sources for this project are as follows: General Fund Budget/Facilities Maint. $ 71,500 Capital Project Reserve Fund 140,404 ATTACHMENT A CITY OF OCOEE SIDING AND TRIM REPLACEMENT BID#98-01 12/10/97 GOLDEN HAMMER FRANK CASSERINO BASE BID 173,269 254,175 ALTERNATES: 2A-TWO CANOPIES AT THE CITY HALL(EACH) 9,012 2,870 2B-CANOPY AT NORTH ELEVATION OF THE POLICE STATION 7,467 3,720 2C-CANOPY CONNECTING CITY HALL AND POLICE STATION 6,437 1,890 3-SUBSTITUTE WOOD LAP SIDING AND WOOD VERTICAL SIDING IN LIEU OF FIBER CEMENT LAP SIDING AND FIBER CEMENT VERTICAL SIDING -13,632 18,300 DAYS TO COMPLETE 100 90 Page 1 ATTACHMENT B CITY OF OCOEE SIDING AND TRIM REPLACEMENT BID#98-01 ADMINISTRATION AND MISCELLANEOUS COST RFI'S & BID ANALYSIS 600 SITE VISITS/MISC. ADMIN 9,450 MEETINGS & MISC. 1,200 COATING QUALITY CONTROL 9,611 REINSTALL HURRICANE SHUTTERS 5,317 SUBSTRATE REPAIRS 5,000 PUNCH LIST 1,200 TOTAL 32,378 Page 1