VII(A) Discussion/ Action Re: Demolition Of Existing Public Works Facility And Parking Lot Construction For Central Park
STAFF REPORT Agenda 3-3-98 Item VII A ROBERTSMITH PUBLIC WORKS DIRECTOR 560 FLEWELLINGAVE. - OCOEE, FL 34761 PHONE (407) 877-8420 - FAX (407) 877-0392 TO: The Honorable Mayor and Board of City Commissioners FROM: Robert M. Smith, Public Works Director-4---� DATE: February 18, 1998 RE: Demolition of existing Public Works facility Parking Lot construction for Central Park ISSUE: Should the Honorable Mayor and Board of City Commissioners direct the Public Works Director to proceed with the bid process for the demolition of the public works facility and the parking lot construction at Central Park? BACKGROUND AND DISCUSSION: Paperwork is completed and the property at 370 Enterprise Drive officially belongs to the City. The Public Works Department is in the process of moving to the new location and the old facility should be ready for demolition by mid-April. As soon as the demolition is complete the site improvements can begin, namely a landscaped parking lot with 100+ parking spaces. Funding is available in account 315-541.00-6541. Gee and Jenson is providing architectural services as well as a site master plan. It is necessary for the city to have the demolition and site improvements go out to bid. Staff would like to advertise for bids March 8th, with a mandatory pre - proposal meeting scheduled for March 18tH, and bid opening April 8tH RECOMMENDATION: It is respectfully requested that the Honorable Mayor and Board of City Commissioners direct staff to advertise for bids. It is also respectfully requested that a commissioner be appointed to serve on the selection committee along with a staff member from Public Works, Finance, and Community Relations. RMS:jh THE PRIDE OF WEST ORANGE G CITY OF OCOEE REQUEST FOR PROPOSAL FOR DESIGN BUILD SERVICES DESIGN/CONSTRUCTION CRITERIA PACKAGE for v Ocoee ta.o— F G 04' Prepared by: 01 Q O GEE & JENSON Engineers -Architects -Planners, Inc. Project No. 97-044.02 February 24, 1998 SET'N0. INDEX TO DESIGN/CONSTRUCTION CRITERIA PACKAGE THE PROP'C OSER.IS REQUIRED TOOMPARE-THIS DESIGN ^CRITERIA.PACKAGE WITH THE INDEX BELOW FOR COMPLETENESS:IF ANY PAGES ARE -MISSING OR ILLEGIBLE:.IT IS THEIR RESPONSIBILITY TO REQUEST REPLACEMENTS FROM THE OWNER: PROPOSAL REQUIREMENTS, CONTRACT FORMS AND CONDITIONS OF THE CONTRACT COV -1 INDEX -1 thru 2 ADVA EXA-1 EXB-1 thru 9 INBA thru 7 SCH-1 EVAL-1 thru 5 BFL-1 thru 4 AIA/A310 (2 pages) AIA/A305 (4 pages) TSA -1 AIA/A191 (24 pages) AIA/A312 (4 pages) AIA/A312 (4 pages) EXCA thru 70 BIG -1 thru 2 BIJ-1 thru 2 EXE -1 thru 11 Cover Index to Design/Construction Criteria Package Legal Advertisement Exhibit "N'— Location map Exhibit "B" — City of Ocoee Ordinance No. 95-08 Instructions to Proposers Preliminary Project Schedule Evaluation and Contract Award Price Proposal — Lump Sum Bid Bond Contractor's Qualification Statement Certificate of Compliance with Florida Trench Safety Act Standard Form of Agreement between Owner and Design/Builder Performance Bond Payment Bond Exhibit "C" — City of Ocoee Land Development Code, Article VI Design and Performance Standards **Exhibit "D" — (NOT USED)** Proposer Information: Geotechnical Proposer Information: Jurisdictional Agencies Geotechnical Report OUTLINE SPECIFICATIONS DIVISION 1 — GENERAL REQUIREMENTS 01010-1 thru 9 Summary of Work 01045-1 thru 2 Cutting and Patching 01090-1 thru 5 Reference Standards 01200-1 Project Meetings 01300-1 Submittals 01400-1 thru 2 Quality Control 01500-1 thru 4 Construction Facilities & Temporary Controls 01600-1 Material and Equipment 01700-1 thru 2 Contract Closeout 97044.02 INDEX -1 DIVISION 2 — SITE WORK 02070-1 thru 5 02100-1 02200-1 thru 2 02510-1 thru 2 02520-1 02660-1 02700-1 02810-1 thru 2 02830-1 02900-1 DIVISION 3 — CONCRETE Selective Demolition Site Preparation Earthwork Asphaltic Concrete Paving . Portland Cement Concrete Paving Water Distribution Sewerage and Drainage Irrigation Systems Chain Link Fencing and Gates Landscaping 03300-1 thru 4 Concrete Work DIVISION 4 - MASONRY 04200-1 Masonry DIVISION 5 - METALS 05500-1 thru 2 Miscellaneous Metals 05720-1 thru 2 Aluminum Gates DIVISION 6 — WOOD AND PLASTICS (Not Used) DIVISION 7 — THERMAL AND MOISTURE PROTECTION (Not Used) DIVISION 8 — DOORS AND WINDOWS (Not Used) DIVISION 9 - FINISHES 09200-1 thru 4 Lath and Plaster DIVISION 10 - SPECIALTIES 10440-1 thru 3 Specialty Signs DIVISION 11 — EQUIPMENT (Not Used) DIVISION 12 - FURNISHINGS (Not Used) DIVISION 13 — SPECIAL CONSTRUCTION (Not Used) DIVISION 14 — CONVEYING SYSTEMS (Not Used) DIVISION 15 — MECHANICAL (Not Used) DIVISION 16 — ELECTRICAL 16000-1 thru 10 Electrical Systems 97044.02 INDEX -2 DRAWINGS (30 x 42 BLUEPRINTS ATTACHED) DESIGN/CONSTRUCTION CRITERIA DRAWINGS AND RELATED EXHIBITS ARE AS FOLLOWS: A-1 Site Plan A-2 Landscape Plan D-1 Demolition Plan SU -1 Survey G-1 Geotechnical Plan END OF INDEX 97044.02 INDEX -3 LEGAL ADVERTISEMENT Board of City Commissioners City of Ocoee Proposals for Design/Build Services for Department of Public Works Demolition and Parking Lot Additions/ Alterations will be accepted until April 8, 1998, at 10:00 AM. RFPs will be received at Ocoee City Hall, attn: Joyce Meridith, Buyer, 150 N. Lakeshore Drive, Ocoee, FL 34761-2258. Proposals received after the closing time and date will not be accepted or considered. Prospective proposers may secure a copy of the RFP from Joyce Meridith, Buyer at Ocoee City Hall, 150 North Lakeshore Drive, Ocoee, Florida 34761-2258 for a non- refundable fee of $20.00. This package includes the scope of the project, design criteria, proposal format, evaluation criteria, submittal instructions, and selection process. A mandatory pre -proposal conference will be held Wednesday, March 18, 1998, at 2:00 PM at the Ocoee City Hall Commission Chambers. The Proposal shall be submitted in a sealed envelope plainly marked on the outside with the Proposer's name, appropriate title, closing date, and time. The City may, if necessary, require verbal presentations from short-listed firms only. The City reserves the right to waive any informalities, reject any or all proposals, or re - advertise. The selection, if made, will be to the most responsive and responsible Proposer as determined by the City. No facsimile or telegraphic submissions will be accepted. City Clerk 97044.02 ADV -1 March 8, 1998 EXHIBIT "A" VICINITY MAP - OCOEE DEPARTMENT OF PUBLIC WORKS/ CENTRAL PARK SITE 560 FLEWELLING AVENUE, OCOEE, FLORIDA TALLAH PENSACOLA Clty of OCOEE TAMPA[ ACKSONVILLE �IORLANDO MIAMI CLARCONA — a' OCOEE RD. Y a- J ,SITE LEw1S S GAVE F1.EwEt�'`N CLARCON A OCO . 438 SILVER STAR STARKE LAKE a- w CITY HALL `'Ire, g olpF U o lolp G fn WEST COLONIAL DR. 439 o� F� 97044.02 50 C' SCALE: N.T.S. 9� FCOR��q GREEN WAY 408 **END OF EXHIBIT** EXA-1 EXHIBIT "B" ORDINANCE NO. 9548 AN ORDINANCE ADOPTING A NEW CHAPTER 4 OF THE CODE OF ORDINANCES OF THE CITY OF OCOEE RELATING TO THE DESIGY BUILD CONTRACTS; PROVIDING FOR AUTHORITY; PROVIDING FOR FINDINGS AND DETERIVIINATIONS; PROVIDING FOR DEFINITIONS; PROVIDING FOR PREPARATION OF A DESIGN CRITERIA PACKAGE; PROVIDING FOR SELECTION PROCEDURES; PROVIDING FOR DELEGATION OF AUTHORITY; PROVIDING FOR SEVERABILITY; PROVIDING FOR CODIFICATION; PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, Section 287.055(10) (c), Florida Statutes (1993), known as the Consultants' Competitive Negotiation Act ("CCNA"), provides that each municipality shall adopt rules or ordinances for the award of design -build contracts prior to entering into a design -build contract; and WHEREAS, the City Commission of the City of Ocoee desires to enter into design -build contracts and to adopt the ordinances necessary to comply with the CCNA. NOW, THEREFORE, BE IT ENACTED BY THE CITY COMMISSION OF TEE CITY -OF OCOEE, FLORIDA, AS FOLLOWS: SECTION ONE. The City Commission of the City of Ocoee has the authority to adopt this Ordinance pursuant to Article VIII of the Constitution of the State of Florida and Chapter 166 and Section 287.055(10), Florida Statutes. SECTION TWO. FINDINGS AND DE -1 E t IINATION. The City Commission of the City of Ocoee hereby makes the following findings and determinations: A. In view of the rapidly increasing demand for public construction projects in the City of Ocoee, methods for economizing time and costs in the construction of public construction projects need to be developed. EXB-1 B. It is both time and cost effective in certain instances to award a single contract to a design -build firm for the design and construction of a public construction project. SECTION THREE. A .new 'Chapter 4 of the Code of Ordinances', of the City of Ocoee, Florida, i.s.hereby adopted as follows: . CHAPTER 4 DESIGN BUMD CONTRACTS Section 4-1: h rt TiI . This Chapter shall be known and may be cited as the "Design -Build Contract Chapter". Section 4-2. Def_. For the purposes of this Chapter, the following terms shall be defined as follows: A. DESIGN -BUILD FIRM means a partnership, corporation, , or other legal entity which: 1. Is certified under s. 489.119, Florida Statutes, to engage in contracting through a certified or registered general contractor or a certified or registered building contractor as the qualifying acrent; or '=. Is, certified under s. 471.023, Florida Statutes, to practice or to offer to practice engineering; certified under 's. 481.219, Florida Statutes, to practice or to offer to practice architecture; or certified under s. 486.319, Florida Statutes, to practice or to offer to practice landscape architecture. B. DESIGN-BUII.D CONTRACT means a single, contract with a design=build firm for the design and construction of a public' construction project. C. DESIGN CRITERIA PACKAGE means concise, performance -oriented drawings or specifications of the public construction project. The purpose of the design EXB-2 . criteria package is to furnish sufficient information so as to permit design -build firms to prepare a bid or a response to the City's request for proposal, or to permit the City to enter into a negotiated design -build contract. The design criteria package shall specify such performance-based criteria for the public construction project, including, but not limited to, the legal description of the site, survey information. concerning the site, interior space requirements, material quality standards, schematic layouts and conceptual design criteria of the project, cost or budget estimates, design and construction schedules, site development requirements, provisions for utilities, stormwater retention and disposal, and parking requirements, as may be applicable to the project. D. DESIGN CRITERIA PROFESSIONAL means a firm who holds a current certificate of registration under Chapter 481, Florida Statutes, to practice architecture or landscape architecture or a firm who holds a current certificate as a registered engineer under Chapter 471, Florida Statutes, to practice engineering and who is employed by or under contract to the City for the providing of Professional architect services, landscape architect services, or engineering services in connection with the preparation of the design criteria package. Section 4-3. Design Criteria. A. Desipm Criteria Package 1. All design -build projects shall require a design criteria package for the design and construction of the public construction project in order to define the project parameters which are ' to be used to evaluate and govern the proposal. This design criteria package shall consist of concise performance EXB-3 oriented drawings or specifications, or both, of the project. The criteria shall include the requirements set forth in Section C 4-2 t) h ereof. 2. The design criteria package shall be prepared and sealed by a designcriteria ntena :professional employed by or retained by the City. B• D i n Criteria Pmfr�cc; n � 1• Acceptable entities who may act as the design criteriar p ofessional include, but are not limited to: a. Licensed professional engineers, architects and landscape architects employed by the City. b. A Iicensed engineering, architectural, or landscape architectural tecturai firm providing- management services to the City so long as such firm was selected by the City pursuant to Section 287.055 Florida Statutes. C. Engineering, architectural, and landscape architectural firms selected by the City Pursuant to Section 287.055, Florida Statutes, to be the design criteria..professional. 2• A design criteria professional who has-been selected to Prepare the design criteria package shall not be eligible to render services under a design -build contract executed pursuant to the design criteria package. 3 • The City Manager shall, consult with the design ,criteriarof p essional concerning its duties which include, but are not limited to: a• Preparation and sealing of the design criteria package; EXB-4 b. evaluation of the responses or bids submitted by the design -build firms; C. supervision or approval by the City of the detailed working drawings of the project; and d. evaluation of the compliance of the project construction with the design criteria package prepared by the design criteria professional. Section 4-4. Selection Procedures. A. Public Announcement: The City shall publicly advertise in a uniform and consistent manner on each occasion when design -build services are required except in cases of valid public emergencies as declared by the City Commission. The advertisement shall include a general description of the project and shall indicate how, and the time within which, interested design -build firms may apply for consideration. B. Legal Qualification: Any Linn or individual desiring to provide design -build services to the City must first be determined legally qualified. To be legally qualified: 1. Firms must be properly certified to engage in contracting through a certified or registered general contractor or a certified or registered building contractor as the qualifying agent; 2. Firms must be properly certified to practice or to offer to practice engineering, architecture, or landscape architecture; and 3. The firm shall be duly qualified to perform its proposed service under any other applicable law. EXB-5 A Selection Committee appointed by the City Manager shall be used to evaluate and rank the design -build firms and their.responses,for recommendation to the City Commission. The City Manager or his designee shall develop a Request for Proposals (RFP) to solicit proposals from interested, qualified design -build firms. The RFP shall contain as a minimum the following: 1• Thedesign criteria package as defined in Section 4-3A hereof. 2• The criteria, procedures, and standards for .the evaluation of design -build contract proposals, based on price, technical and design aspects of the public construction project, weighted for the project. 3. Requirements for determining qualifications of firms proposing, such as license, list of subcontractors, architect and engineer, and references. 4.. Terms and conditions of proposed agreement. 5• Other items as required' by procedures, laws, ordinances, or prevailing circumstances. E. Selection 1. All information required by the RFP. shall be' submitted in a , sealed envelope. Allproposed designs and price proposal's shall be submitted in a separate sealed envelope submitted with the RFP which will be opened and considered by the Selection Committee for shortlisted firms only. EXB-6 2. The Selection Committee shall review all proposalsexc ( ept the proposed designs and price proposals) and shall shortlist to no Iess than three (3) design -build films as the most qualified, based on the qualifications,, availability, and past work of the firms, including the partners or members mbe.s theref• In evaluating the proposals and preparing the shortli st, the Committee shall consult with the design criteria professional concerning the evaluation of the responses submitted by the design -build firms. Once the committee has shortlisted, the Committee shall open the separate envelo Pes containing the proposed design solutions and the price submitted by the shortlisted firms. The Committee shall then rank the shortlist ed firms based upon the evaluation criteria and procedures set forth within the Request for Proposal. The Committee may, if necessary, require verbal erbal Presentations from all firms in order that the qualifications and/or pro sats Po may be clarified. �• After the Committee has ranked the shortlisted firms based upon the award criteria set forth within the Request for Proposal, the ranking shall be Presented to the City Commission which may approve, disapprove or modify the recommended rankings. Following the ranking b the City ty Commission, the Committee shall attempt to negotiate a contract within the Parameters of the design criteria .package and in accordance with Ci Commission ranking• City F. ontlact I • The Committee shall negotiate adesign-build contract at a price which the Committee determines is fair, competitive and reasonable. Should the EXB-7 Committee be unable to negotiate, a satisfactory contract with the first ranked firm, then the Committee shall formally terminate negotiations with such firm. The Committee shall then undertake negotiations with the second ranked firm and shall continue this process until a satisfactory contract is negotiated. Z. The contract negotiated by the Committee shall be subject to the approval Of the City Commission. G. Public Emergencies 1. If a public emergency is declared by the City Commission, a negotiating committee may be formed by the City Manager, subject to the approved approval of the City Commission, and authorized to negotiate with the best qualified design -build firm available at that time for the design and construction of a capital project. To the extent practical, the negotiating committee shall solicit letters of interest in order to determine the best Qualified design -build firm available at the time. The contract negotiated by such committee shall'be subject to the approval of the City Commission. SEC'T'ION FOUR. SEVERA.BII.ITY. If any section, subsection, sentence, clause, phrase or portion of this Ordinance is for any reason held invalid or unconstitutional by any court of competent jurisdiction, such portion shall be deemed a separate, distinct and independent provision and such holding shall not affect the validity of the remaining portion hereto. SECTION FIVE. CODIFICATION. It is the intention of the City Commission of the City that the provisions of this ordinance shall become and be made a part of the Code of Ordinances of the City; and that sections of this ordinance may be renumbered or relettered and the word "ordinance" may be changed to "chapter", "section", "article", or such other appropriate word I WA or phrase in order to accomplish such intentions; and regardless of whether such inclusion in the code is accomplished, sections of this ordinance may be renumbered or relettered and the correction of typographical errors which do not affect the intent may be authorized by the City Manager, without need of public hearing, by filing a corrected or recodified copy of same with the City Clerk. SECTION SLY. EFFECTIVE DATE, This Ordinance shall become effective immediately upon passage and adoption. PASSED AND ADOPTED this -2 day of M,�Q c t4 1995. APPROVED: ATTEST. CITY OF OCOEE, FLORIDA Grafton, City erk (SEAL) FOR USE AND RELIANCE ONLY BY THE CITY OF OCOEE, FLORIDA APPROVED AS TO F RM AND LEGALITY this ; day of Rtu 1995. FOLEY LARDNER By; y6j City Attorney ► S. Scott Vandergrift, Mayor 1 ADVERTISED 'larch 9 , 1995 READ FIRST TIMM March 7 21995 READ SECOND MfE AND ADOPTED M A'L c M .11 , 1995, UNDER AGENDA IMM NO. La—. ***END OF EXHIBIT*** EXB-9 INSTRUCTIONS TO PROPOSERS INTENT 1. The intent of this solicitation is to obtain proposals for the Design and Construction of Department of Public Works Demolition & Parking Lot Additions/ Alterations and related site -improvements for the City of Ocoee at the existing Public Works/ Central Park Site at 560 Flewelling Avenue, Ocoee, Florida. The solicitation criteria rely upon industry standards, as much as possible, to allow the Proposer a degree of design flexibility while meeting certain specific project requirements. 2. Proposers shall perform sufficient design work prior to submitting proposals to verify quantities and costs. This is a "turn -key" project; Proposers shall anticipate and provide for total assemblies and systems so as to provide the Owner with a complete, operating, and functioning facility when complete. Proposers shall likewise anticipate minor changes in scope of construction during design of the Project for which no additional money will be paid to the Contractor. 3. In order to effectively and equitably evaluate all proposals, the Owner's review committee must receive information sufficiently detailed to clearly describe the Proposer's management plan and capabilities to successfully complete the design and to construct this project. 4. The Owner desires to have beneficial occupancy of this facility beginning November 1, 1998. Refer to page SCH-1 for the Preliminary Project Schedule. Time is of the essence and will be a factor in evaluating the Proposals. DEFINITION OF TERMS 1. Proposal Documents — Request for Proposal: Design/Construction Criteria Package documents include, but are not limited to, the Legal Advertisement, Instructions to Proposers, Price Proposal Form, sample contract forms, design/construction criteria drawings and outline specifications as described in the Index to Design/Construction Criteria Package (Index -1 thru Index -3). The proposal documents also include any Addenda issued prior to receipt of proposals. 2. Base Bid - the amount stated on the Price Proposal Form for which the Proposer offers to perform the Work as described in the Proposal Documents as a base to which Alternate Bid work amounts may be added to or deducted from. 3. Alternate Bid -.the amount stated on the Price Proposal Form which may be added to or deducted from the amount of the Base Bid for a corresponding change in the Work, if accepted. 97044.02 INBA 4. Addenda - written and graphic documents issued. by the Owner prior to the execution of the Contract to modify or interpret the Proposal Documents. PROPOSAL DOCUMENTS 1.. Complete Design/Construction Criteria Packages may be. obtained from the Owner's Representative as stated in the. Legal Advertisement (ADV -1). 2. Complete_ Design/Construction -Criteria Packages shall be used by Proposers in preparation of Proposals; neither the Owner nor.the Design Criteria Professional assume .any responsibility for errors or misinterpretations resulting from the use of incomplete sets. POINT OF CONTACT 1. Joyce Meridith, City of Ocoee shall be the point of contact for all proposers. Contact of any.kind regarding the project with any City of Ocoee personnel other than Joyce Meridith shall be grounds for disqualification. EXAMINATION OF DOCUMENTS AND SITE 1. Proposers shall visit .the .site of the proposed work.and become familiar with the nature and extent of work to be performed and local conditions that may. affect the work. 2. The Proposal Documents were prepared to present an essentially accurate representation of existing conditions, interpreted from available information on the site. The Proposer is not relieved, however, of the responsibility of becoming fully informed as to existing conditions at the site. 3. Proposers shall examine existing site improvements,, existing utilities, and streets to determine all conditions which will affect the Work. 4. Failure of the Proposer to visit the site and ascertain the nature and location of the work shall not relieve Proposer from responsibility for estimating properly the difficulty or cost of successfully performing the work. PRE -PROPOSAL CONFERENCE 1. Proposers may attend a pre -proposal . conference as. stated in the. Legal Advertisement (ADV -1). 2. At this time, any questions on items in the,Design/Construction Criteria Package will be discussed and resolved. INTERPRETATION OF PROPOSAL DOCUMENTS 97044.02 I N B-2 I . All questions requiring clarification or interpretation of the Proposal Documents shall be submitted in writing and shall reach the Owner at least 10 days prior to the date for receipt of proposals. Direct all requests to the attention of Joyce Meridith, Buyer, City of Ocoee, 150 North Lakeshore Drive, Ocoee, Florida 34761-2259. 2. Any modification or interpretation of the Proposal Documents will be made by Addendum to all who are recorded by the Owner as having received a complete set of.Proposal Documents. 3. Interpretations or modifications of Proposal Documents made in any manner other than by Addendum will not be binding. 4. A Proposer, prior to submitting his proposal, shall ascertain that he has received all Addenda issued, and shall acknowledge their receipt in the Price Proposal Form. LEGAL QUALIFICATION OF PROPOSERS 1. Proposers must be legally qualified to provide design -build services as described in City Ordinance #95-08 — Code of Ordinances, Chpt. 4, Section 4-4, Part B. 2. Proposers may be disqualified and their proposals rejected for any of the following specific reasons: a. Reason to believe that collusion exists among Proposers. b. The Proposer is involved in any litigation against the Owner. C. The Proposer has defaulted on any previous contract or is in arrears on any existing contract. PROPOSAL FORMAT A. PRICE PROPOSAL PREPARATION 1. Prepare Price Proposals on the forms provided with all blanks on the Form filled in by typewriter or written in ink. 2. State price amounts in both words and figures. In case of a discrepancy between the two, the amount written in words shall govern. Price Proposal Form shall include lump sum price for the design and construction of the entire work based upon the Design/Construction Criteria Package and as may be presented in the technical considerations and design aspects, including alternate bids. 3. Unit Prices requested on the Price Proposal Form shall be bid. Partial Bids will not be accepted. 97044.02 I N B-3 4. Proposal Forms shall include the legal name and address of the Design/Build Proposer and indicate whether the Proposer is a sole pro- prietor, a partnership, a corporation, or some other legal entity. a. Individual - provide name and post office address. b. Partnership,'- provide name and post office address of each member of the partnership. C. Corporation - provide, name and, .post office address of person signing the form and legal evidence of his authority to do so, names and addresses of the corporation president, secretary and treasurer; name of state where chartered; and affixed with the seal of the corporation, attested by the secretary. 5. Bid Security: a. Each Price Proposal shall be, accompanied by a cashier's check drawn on any State or National Bank in Florida, or an acceptable Bidder's Bond, payable unconditionally to the Owner, in an amount of five percent (5%) of the amount of the total Base Proposal Amount. b. Failure of the successful Proposer to enter into the Contract in accordance with his Proposal, or failure to furnish the required bonds will be just cause for an annulment.of the award with the amount 'of the .bid security being forfeited to the Owner as liquidated damages, not.as a penalty. C. Should a Bid Bond be used, acceptable Surety companies shall be determined from the latest United States Treasury Department's list of companies holding certificates of authority as acceptable Sureties on Federal Bonds. d. The Owner may retain the bid security of those Proposers to whom an award may be considered until successful execution of the Contract and bonds; or the specified time for holding bids has elapsed; or all Proposals have been rejected. B. PROPOSAL INFORMATION PACKAGE PREPARATION 1. Business Experience and Qualifications. Submit the following items: a. The complete legal name, federal taxpayer, identification number, and address of the individual, corporation, partnership or other legal entities submitting the proposal and the name and telephone number for a contact person should be stated: b. AIA/A305 Contractor's Qualification Statement. c. Organization: General description of personnel team who will execute the design, construction, training, and warranty support. ,Describe responsibilities and lines of authority to complete design. 1. Identify specific design firm, and contractual responsibility. 2. The Design/Build Team shall include all licensed professionals required to perform the work. The responsible professionals on the Design/Build Team will be the professionals of record. 97044.02 I N B-4 3. List key, subcontractors; include mechanical, electrical, plumbing. 4. Provide a team organization chart. Clearly identify on-site personnel from off-site; name key subcontractors; include in- house crafts. 5. List concurrent projects under construction. 6. Describe physical location of team members. 7. Resumes of professional and supervisory personnel. d. Similar work executed within the last five years. e. Standard Forms 254 and 255. f. Client References. 2. Financial Statement. 3. Proof of Insurance. a. Worker's Compensation. b. Employer's Liability. C. General Liability. d. Automobile Liability. e. Professional Liability/Errors and Omissions for primary design professional. f. Builder's Risk. 4. Ability to provide a 100% Performance Bond and Payment Bond. 5. Certificate of Compliance with Florida Trench Safety Act. 6. Project Approach. The Proposer will furnish any information they deem worthy of consideration by the Owner as to their capability to perform the design and construction work on this project. a. General description of the Project as understood by the Proposer. b. Technical Considerations — include documentation and description of building architectural, structural, mechanical, and electrical systems, and civil and sitework systems to be incorporated into the construction. C. Preliminary Design/Construction schedule showing major elements of work. d. Information relative to the Proposer's approach to meet the project scope outlined in the Design/Construction Criteria Package. C. PROPOSAL SUBMITTAL 1. Submit the following items at the time and place stated in the Legal Advertisement: a. Five (5) Proposal Information Packages enclosed in a sealed envelope plainly marked on the outside with the appropriate RFP number, project name, opening date and time as stated in the Legal Advertisement. b. Submit One (1) executed Price Proposal Form with Bid Security, enclosed in a separate sealed envelope, plainly marked on the outside with the appropriate RFP number, project name, opening date and time as stated 97044.02 I N B-5 in the Legal Advertisement. This envelope shall be further identified with the Proposer's name and address, and the words "PRICE PROPOSAL ENCLOSED". 2. Deposit Proposal at the designated .location on or before the time and date for receipt of Proposals indicated in the Legal Advertisement. Proposals received after the time and date indicated for receipt of such will.be returned unopened. MODIFICATION AND WITHDRAWAL OF BID 1. A Proposer may withdraw his Proposal prior to the submittal time. Neither Price Proposals nor Proposal Information Packages may be modified after submittal. Proposal may not be withdrawn, canceled or modified. for a period of 45 days after the time and date designated for the receipt of bids. RESERVATIONS The. Owner reserves the right to reject any or all of the submitted qualifications and to waive irregularities or omissions in the proposals. The Owner is not obligated to award a contract to any Proposer. The Owner reserves the right to award the contract to the most responsive Proposer with a resulting negotiated agreement which best serves the interests of the Owner. GOVERNING LAWS AND REGULATIONS 1. Proposers shall be familiar with all federal, state, and local laws, ordinances, rules, and regulations that may in any way affect the Work. PUBLIC ENTITY CRIME INFORMATION STATEMENT All invitations to bid as defined by Section 287.012(11), Florida Statutes, requests for proposals as defined by Section 287.012(16), Florida Statutes, and any contract - document described by Section 287.058, Florida Statutes, shall contain a statement informing persons of the provisions of paragraph (2)(a), of Section 287.133, Florida Statutes, which reads as follows: "A person of affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a bid on a .contract to provide any goods or services to a public entity, .may not submit a bide on a contract with a public entity for the construction of repair of a public building or public work, may not submit bids on leases of real property to a public entity, may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with any public entity, and may not transact business with any public entity in excess of the threshold amount provided in Section 287.017, for CATEGORY TWO for a period of 36 months from the date of being placed on the convicted vendor list." 97044.02 I N B-6 All vendors who submit a Bid or Request for Proposal to the City of Ocoee are guaranteeing that they have read the previous statement and by signing the bid documents are qualified to submit a bid under Section 287.133, (2)(a), Florida Statutes. LIQUIDATED DAMAGES 1. The Owner will incur financial loss if the Work is not substantially complete by the date set forth in the Agreement. The Contractor (and his Surety) shall be liable for liquidated damages in accordance with the Supplementary Conditions and the Agreement. PERFORMANCE BOND AND LABOR AND MATERIAL PAYMENT BOND 1. With the execution and delivery of the Contract, the Proposer shall furnish the following Surety bonds of the forms contained herein: a. Performance Bond guaranteeing full and faithful execution of the Work in an amount equal to 100 percent of the Contract Sum, and including guaranteed repair and maintenance of all defects due to faulty materials and workmanship that appear within one year after completion of contract. b. Labor and Material Payment Bond guaranteeing full and proper protection of all claimants supplying labor and materials in the Work in an amount equal to 100 percent of the Contract Sum. 2. Bonds shall be executed by Surety authorized to do business in the State of Florida and listed on the latest - U.S. Treasury Department list of companies holding certificates of authority as acceptable sureties on Federal Bonds. 3. Bonds executed by an Attorney -in -Fact on behalf of the Surety, shall have affixed thereto a certified and current copy of Power of Attorney, indicating the monetary limit of such power. END OF SECTION 97044.02 I N B-7 OCOEE DEPARTMENT OF PUBLIC WORKS DEMOLITION & NEW PARKING LOT PRELIMINARY PROJECT SCHEDULE Design/Build Firm Activities 1998• . . FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Solicit and Award Design/Build Contract Submit Final Signed/Sealed Plans to Owner's Design Criteria Professional for Criteria Compliance Review Prior to Permit Application (allow 2 weeks for review). Prepare Final Construction Documents Permitting L_ Permits by Others (SJRWMD by Gee & Jenson) two Bidding/Construction CM to Mobilize On -Site S bcontract So icitation Final Benefi om letion p ial Occu anc GEE & JENSON Engineers -Architects • Planners, Inc. EVALUATION AND CONTRACT AWARD DEFINITIONS Deficiency: Any part of a Proposal that fails to satisfy the minimum requirements established in the solicitation. a. The Owner's Selection Committee will identify the solicitation requirement, and describe why the Proposal fails to adequately meet the requirements. All deficiencies discovered will be identified to the Proposer. Failure by a Bidder to rectify a proposal deficiency deemed material will preclude award action to that Proposer. C. The Contract requirements take precedence over deficiencies (or deviations) discovered after award. 2. Deviation: Occurs when a Proposal implies or specifically offers a deviation from specified criteria. The Proposer may or'may not have called the deviation to the Owner's attention. a. A deviation will be treated as a deficiency. b. The Owner's Selection Committee will identify deviations. The contract normally can't be awarded with material deviations. 3. Clarification: Indicates there is a need to communicate with an Proposer for the sole purpose of eliminating minor irregularities, informalities, or apparent clerical mistakes in the Proposal. a. This is achieved by explanation or substantiation, either in response to an inquiry by the Owner or as initiated by the offeror. b. Clarification does not give the Proposer an opportunity to revise or modify its Proposal, except to the extent that corrections of apparent clerical mistakes results in a revision. Clarifications do not require submission of another Proposal. 4. Owner's Selection Committee: Proposals and Presentations will be reviewed and ranked by a Selection Committee appointed by the City Manager. QUALITY SCORING SYSTEM 1. The members of the OSC (Owner's Selection Committee) will review the Proposal Information Packages, with the support of technical advisors as deemed necessary, and score the quality of each evaluation factor. The OSC will score each Proposal against the specified evaluation criteria in the Design/Construction Criteria Package requirements. They will compare Proposals at this time. After Proposals are scored, the OSC will compare relative advantages and disadvantages of Proposals against each other. 97044.02 EVAL-1 2. Quality Review Write-up:"The OSC-will support each evaluation factor score with a very brief narrative, separately listing perceived strengths or 'advantages, weaknesses or disadvantages,, deficiencies, and required clarifications. 3. Scoring Guidelines: The OSC will score each evaluation factor, utilizing the following grading method:. Points Scoring Criteria 0 Proposal doesn't meet the minimum specified requirements for this item. 10-25' Proposal meets some. but-. not all the Design/Construction Criteria Package requirements for this item (some deficiencies which can be corrected). Proposal does not address all required criteria; little or no experience.to the extent that probability of success is questionable without further.explanation by offeror... 30-49 'Proposal meets the minimum design/construction . criteria requirements, but has apparent disadvantages outweighing other advantages- Examples: little or no experience cited; probability of success considered less than full confidence; weak presentation; mimics design/criteria language rather than expressing offeror's . approach or understanding of the Project. 50 Proposal meets:the minimum Design/Construction Criteria Package requirements for this .item, but does not .offer any 'significant advantage .to the Owner over basic requirements. Average , experience or understanding of requirements; good probability of success; adequate presentation. 55-75 Proposal , meets all Design/Construction Criteria Package requirements, and has salient features which offer significant advantage to ' the Owner, i.e. potential cost savings; scheduling advantage; 'process efficiency; aesthetics; function; experience; ease of Owner administration or other criteria established;, strong-, commitment and/or understanding of requirements; high probability of success. 76-100 Same as above, except the degree of advantage is considerably greater. 97044.02 EVAL-2 THE SELECTION PROCESS The Owner's Selection Committee (OSC) shall review all Proposal Information Packages, complete the evaluation grade sheet and total each firm's score. The OSC shall prepare a shortlist of not less than three (3) design build firms with the highest scores. The OSC may require an oral presentation from the Proposers. 2. The Selection Committee shall open the separate price proposals for short listed firms only. The price amount will then be divided by the score (expressed as a decimal) to yield an "Adjusted Bid". The lowest adjusted bid will be recommended for contract award. For example: Base Proposer Bid Firm "A" $1,000,000 Firm "B" $1,300,000 Firm "C" $800,000 — Evaluation Adjusted Score Bid 0.85 $1,176,471 adjusted low bid* 0.95 $1,368,421 0.50 $1,600,000 *Note: The adjustment to the bid is for selection only. The firm's price proposal is the actual contract amount. AWARD OF CONTRACT The Owner will award a firm fixed-price contract to that responsible Proposer whose base bid proposal, conforming to the solicitation, is fair and reasonable, and has been determined to be most advantageous to the Owner, technical (Performance Capability), price and other factors considered. As technical scores and relative advantages or disadvantages become less distinct, differences in price between proposals are of increased importance in determining the most advantageous proposal. Conversely, as differences in price become less distinct, differences in scoring and relative advantages and disadvantages between proposals are of increased importance to the determination. 2. Proposers are reminded to include their best time, technical, and price terms in their Proposal and not to automatically assume that they will have an opportunity to participate in discussions or be asked to submit a revised offer. 3. Until, final award of Contract, the Owner reserves the right to reject any and all Proposals, with or without cause; to waive any informality or irregularity; or to accept the Proposal which is in the best interest of the Owner. 97044.02 EVAL-3 4. Upon acceptance of a Proposal and award of Contract, the successful Proposer shall deliver the executed Contract, along with required bonds and any other items requested, to the Owner.within 10 days. Failure to do so will be deemed as a breach of agreement by the 'Proposer. and result .in forfeiture of bid security as described in, the Instructions to Proposers., 97044.02 EVAL-4 PROPOSAL INFORMATION PACKAGE EVALUATION GRADE SHEET EVALUATION FACTORS D/B FIRMS General Description Technical Considerations Design Aspects Organization & Schedule Presentation Total Points ,Divide by 5 . . Total Score Evaluation Score (Score expressed in decimals) ADJUSTED LOW BID EVALUATION D/B FIRMS Base Bid Evaluation Score Adjusted Bid ***END OF SECTION*** 97044.02 EVAL-5 Price Proposal of PRICE PROPOSAL FORM - LUMP SUM (Name) (Address) to furnish all materials, equipment and labor and to perform all work in accordance with the Design/Construction Criteria Package for final design and construction of the Department of Public Works Demolition, Parking Lot Additions/ Alterations and Related Site Improvements located in Ocoee, Florida. To: Joyce Meridith Buyer City of Ocoee 150 North Lakeshore Drive Ocoee, Florida Gentlemen: The undersigned Proposer has carefully examined the Design/Construction Criteria Package documents and the site of the proposed Work and is familiar with the nature and extent of the work and any local conditions that may in any manner affect the work to be done. The undersigned Proposer agrees to do all the work and furnish all materials called for by the Design/Construction Criteria Package documents, in the manner prescribed therein and to the standards of quality and performance criteria established by the Owner for the lump sum price stated in the spaces herein provided, for each of the items or combination of items stipulated. Lump sum price shall include implementation of all applicablesafety requirements. /100 Dollars '($ ). 97044.20 BFL-1 UNIT PRICES The undersigned agrees, in case of additions to or deductions from the work, the following unit prices will be used in adjusting the Contract Sum: A. 4" Concrete Paving: ADD/DEDUCT per sq.yd. $ B. 6" Concrete Paving: ADD/DEDUCT per sq.yd. $ C. 1-1/2" Asphaltic Concrete Paving with 6". Base: ADD/DEDUCT per sq. yd. D. 2" Asphaltic Concrete Paving with 10" Base: ADD/DEDUCT per sq. yd. E. 2-1/2" Asphaltic Concrete Paving with 12" Base: ADD/DEDUCT per sq. 'yd. F. 15" Reinforced Concrete Pipe — Less than 10 feet deep (installed): ADD/DEDUCT per linear foot $ G. 18" Reinforced Concrete Pipe — Less than 10 feet deep (installed): ADD/DEDUCT per linear foot $ H. 24" Reinforced Concrete Pipe Less than 10 feet deep (installed): ADD/DEDUCT per linear foot $ 30" Reinforced,Concrete Pipe — Less than 10 feet deep (installed): ADD/DEDUCT per linear foot $ J. 36 Reinforced Concrete Pipe — Less than 10 feet deep (installed): . ADD/DEDUCT per linear foot $ K. Manhole. Less than 10_ feet deep (installed)(refer to drawings for type): ADD/DEDUCT per manhole $ L. Type F Inlet — Less than 10 feet deep (installed): ADD/DEDUCT per Inlet: M. Lighted Masonry/ Stucco Enclosure Wall System including Stucco Finish, Masonry Wall, Foundation, Signage, Gate, Concrete Sidewalk to Enclosure Wall, 3" deep Gravel around existing Irrigation Pump/ Well Building and required site preparation (installed). N. DEDUCT Enclosure Wall System and provide St. Augustine Sod and Irrigation in lieu of gravel around exist. pump/ well building: $ 97044.20 BFL-2 O. 4 ft. high chain link fencing system per specification 02830 (installed): ADD/DEDUCT per linear foot: $ P. 6 ft. high chain link fencing system per specification 02830 (installed): ADD/DEDUCT per linear foot: Q. 6ft. high x 10 ft. wide chain link fence swing gate per specification 02830 (installed): ADD/DEDUCT per gate: BID SECURITY Accompanying this Bid is a certified or cashier's check or a bid bond in the amount of made payable to the Owner which may be forfeited as liquidated damages if, in the event this proposal is accepted, the undersigned fails to execute the Agreement and furnish and pay for the required performance and payment bonds for the Owner within 10 days after acceptance of the Proposal; otherwise said certified or cashier's check or bid bond will be returned to the undersigned. TIME The undersigned Proposer agrees to commence work within seven (7) days after the date of written Notice to Proceed, to substantially complete the entire Work by no later than 304 calendar days after the date of written Notice to Proceed, subject to such extensions of time allowed by the Conditions of the Contract, and to achieve Final Completion of the Work by no later than 30 days after the actual date of substantial completion. The undersigned Proposer agrees that this Proposal shall be good and may not be withdrawn for a period of 45 days after the scheduled closing time for receiving proposals. 97044.20 BFL-3 LIQUIDATED, DAMAGES. The undersigned agrees to forfeit to the Owner, as liquidated Aamages for each calendar day elapsing between the date established as the date of substantial completion of, construction and the actual date of such substantial completion of the construction contract work, the amount of $500.00 per calendar day. The undersigned further agrees to forfeit to the Owner, as liquidated damages for each calendar.day elapsing between the date established as the date of final completion and the actual date of final completion of the contract work, the amount of $250.00 per calendar day. ADDENDA Bidder acknowledges the receipt of Addendum No.'s 1. ,2. ,3. ,4. ,5. Dated this , day of (month) (year) 'Contractor: Address: SEAL By: Title: Attachments: Bid Security 97044.20 BFL-4 Bid Bond AIA Document A310 - Electronic Format THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES: CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. KNOW ALL MEN BY THESE PRESENTS, that we (Here insert full name and address or legal title of Contractor) as Principal, hereinafter called the Principal, and (Here insert fill name and address or legal title of Surety) a corporation duly organized under the laws of the State of as Surety, hereinafter called the Surety, are held and firmly bound unto (Here insert fill name and address or legal title of Owner) as Obligee, hereinafter called the Obligee, in the sum of Dollars ($), for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted a bid for (Here insert full name, address and description ofproject) NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. Signed and sealed this day of 19 (Witness) (Witness) (Principal) (Title) (Seal) AIA DOCUMENT A310 - BID BOND - AIA - FEBRUARY 1970 EDITION - THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE N.W., WASHINGTON D.C. 20006-5292. Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format A310-1970 User Document: A310.CON -- 8/15/1997. AIA License Number 102743, which expires on 9/8/2001 -- Page #1 (Surety) (Seal) (Title) AIA DOCUMENT A310 - BID BOND - AIA - FEBRUARY 1970 EDITION - THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE N.W.. WASHINGTON D.C. 20006-5292. Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format A310-1970 User Document: A310.CON -- 8/15/1997. AIA License Number 102743, which expires on 9/8/2001 -- Page #2 up :Wa r_ Contractor's Qualification Statement AIA Document A305 - Electronic Format THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES: CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. This form is approved and recommended by The American Institute of Architects (AIA) and The Associated General Contractors of American (AGC) for use in evaluating the qualifications of contractors. No endorsement of the submitting party or verification of the information is made by AIA or AGC. Copyright 1964, 1969, 1979, 1986 by The American Institute of Architects, 1735 New York Avenue N. W, Washington D.C. 20006-5292. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will be subject to legal prosecution The Undersigned certifies under oath that the information provided herein is true and sufficiently complete so as not to be misleading. SUBMITTED TO: ADDRESS: Corporation [ ] Partnership [ ] Individual [ ] Joint Venture [ ] SUBMITTED BY: Other [ ] NAME: ADDRESS: PRINCIPAL OFFICE: NAME OF PROJECT (if applicable): TYPE OF WORK (file separate form for each Classification of Work): [ ] General Construction [ ] HVAC [ ] Plumbing [ ] Electrical [ ] Other (please specify) 1. ORGANIZATION 1.1 How many years has your organization been in business as a Contractor? 1.2 How many years has your organization been in business under its present business name? AIA DOCUMENT A305 - CONTRACTOR'S QUALIFICATION STATEMENT - 1986 EDITION - AIA - COPYRIGHT 1986 - THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE N.W., WASHINGTON D.C.. 20006-5292.WARNING; Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format A305-1986 User Document: A305.CON -- 8/15/1997. AIA License Number 102743, which expires on 9/8/2001 -- Page #1 1.2.1 Under what other or former names has your organization operated? 1.3 If your organization is a corporation, answer the following: 1.3.1 Date of incorporation: 1.3.2 State of incorporation: 1.3.3 President's name: 1.3.4 Vice-president's name(s): 1.3.5 Secretary's name: 1.3.6 Treasurer's name: 1.4 If your organization is a partnership, answer the following: 1.4.1 Date of organization: 1.4.2 Type of partnership (if applicable): 1.4.3 Name(s) of general partner(s): 1.5 If your organization is individually owned, answer the following: 1.5.1 Date of organization: 1.5.2 Name of owner: 1.6 If the form of your organization is other than those listed above, describe it and name the principals: 2. LICENSING 2.1 List jurisdictions and trade categories in which your organization is legally qualified to do business, and indicate registration or license numbers, if applicable. 2.2 List jurisdictions in which your organization's partnership or trade name is filed. 3. EXPERIENCE 3.1 List the categories of work that your organization normally performs with its own forces. 3.2 Claims and Suits. (If the answer to any of the questions below is yes, please attach details.) 3.2.1 Has your organization ever failed to complete any work awarded to it? 3.2.2 Are there any judgments, claims, arbitration proceedings or suits pending or outstanding against your organization or its officers? 3.2.3 Has your organization filed any law suits or requested arbitration with regard to construction contracts within the last five years? 3.3 Within the last five years, has any officer or principal of your organization ever been an officer or principal of AIA DOCUMENT A305 - CONTRACTOR'S QUALIFICATION STATEMENT - 1986 EDITION - AIA - COPYRIGHT 1986 - THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE N.W., WASHINGTON D.C.. 20006-5292.WARNING; Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format A305-1986 User Document: A305.CON -- 8/15/1997. AIA License Number 102743, which expires on 9/8/2001 -- Page #2 another organization when it failed to complete a construction contract? (if the answer is yes, please attach details.) 3.4 On a separate sheet, list major construction projects your organization has in progress, giving the name of project, owner, architect, contract amount, percent complete and scheduled completion date. 3.4.1 State total worth of work in progress and under contract: 3.5 On a separate sheet, list the major projects your organization has completed in the past five years, giving the name of project, owner, architect, contract amount, date of completion and percentage of the cost of the work performed with your own forces. 3.5.1 State average annual amount of construction work performed during the past five years: 3.6 On a separate sheet, list the construction experience and present commitments of the key individuals of your organization. 4. REFERENCES 4.1 Trade References: 4.2 Bank References 4.3 Surety: 4.3.1 Name of bonding company: 4.3.2 Name and address of agent: 5. FINANCING 5.1 Financial Statement. 5.1.1 Attach a financial statement, preferably audited, including your organization's latest balance sheet and income statement showing the following items: Current Assets (e.g., cash, joint venture accounts, accounts receivable, notes receivable, accrued income, deposits, materials inventory and prepaid expenses); Net Fixed Assets; Other Assets; Current Liabilities (e.g., accounts payable, notes payable, accrued expenses, provision for income taxes, advances, accrued salaries and accrued payroll taxes); Other Liabilities (e.g., capital, capital stock, authorized and outstanding shares par values, earned surplus and retained earnings). 5.1.2 Name and address of firm preparing attached financial statement, and date thereof: AIA DOCUMENT A305 - CONTRACTOR'S QUALIFICATION STATEMENT - 1986 EDITION - AIA - COPYRIGHT 1986 - THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE N.W., WASHINGTON D.C.. 20006-5292.WARNING; Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format A305-1986 User Document: A305.CON -- 8/15/1997. AIA License Number 102743, which expires on 9/8/2001 -- Page #3 5.1.3 Is the attached financial statement for the identical organization named on page one? 5.1.4 If not, explain the relationship and financial responsibility of the organization whose financial statement is provided (e.g., parent -subsidiary). 5.2 Will the organization whose financial statement is attached act as guarantor of the contract for construction? 6. SIGNATURE 6.1 Dated at this day of 19 Name of Organization: By: Title: 6.2 M being duly sworn deposes and says that the information provided herein is true and sufficiently complete so as not to be misleading. Subscribed and sworn before me this day of 19 Notary Public: My Commission Expires: AIA DOCUMENT A305 - CONTRACTOR'S QUALIFICATION STATEMENT - 1986 EDITION - AIA - COPYRIGHT 1986 - THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE N.W., WASHINGTON D.C.. 20006-5292.WARNING; Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format A305-1986 User Document: A305.CON -- 8/15/1997. AIA License Number 102743, which expires on 9/8/2001 -- Page #4 CERTIFICATE OF COMPLIANCE WITH FLORIDA TRENCH SAFETY ACT The Bidder acknowledges that he is solely responsible for complying with the Florida Trench Safety Act (Act) and the Occupational Safety and Health Administration excavation safety standard 29 CFR 1926.650 (Subpart P, as amended). The Bidder further acknowledges that included in the various items of the proposal and in the total bid price are costs for complying with the Act (90-96, Laws of Florida) effective October 1,1990. Signature and Title Date Printed Name and Title 96044.03 TSA -1 Standard Form. of Agreements Between Owner and Design/Builder AIA Document A191 - Electronic Format THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES: CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. Copyright 1985, 01996 The American Institute of Architects, 1735 New York Avenue, NW, Washington, DC 20006-5292. Reproduction of the material herein or substantial quotation of its provisions without the written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. AIA DOCUMENT A191 - OWNER-DESIGN/BUILDER AGREEMENT - SECOND EDITION - AIA® - 01996 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, NW, WASHINGTON, DC 20006-5292 WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution.. This document was electronically produced with permission of the AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format A191 -1996 User Document: A191.CON -- 8/13/1997. AIA License Number 102743, which expires on 9/8/2001 -- Page #1 1996 EDITION TABLE OF ARTICLES PART 1 AGREEMENT 1. Design/Builder 6. Dispute Resolution - Mediation and Arbitration 2. Owner 7. Miscellaneous Provisions 3. Ownership and Use of Documents and 8. Termination of the Agreement Electronic data 9. Basis of Compensation 4. Time 10. Other Conditions and Services 5. Payments PART 2 AGREEMENT 1. General Provisions 8. Changes in the Work 2. Owner 9. Correction of Work 3. Design/Builder 10. Dispute Resolution - Mediation and Arbitration 4. Time 11. Miscellaneous Provisions 5. Payments 12. Termination of the Agreement 6. Protection of Persons and Property 13. Basis of Compensation 7. Insurance and Bonds 14. Other Conditions and Services AIA DOCUMENT A191 - OWNER-DESIGN/BUILDER AGREEMENT - SECOND EDITION - AIA® - 01996 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, NW, WASHINGTON, DC 20006-5292 WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution.. This document was electronically produced with permission of the AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format A191 -1996 User Document: A191.CON -- 8/13/1997. AIA License Number 102743, which expires on 9/8/2001 -- Page #1 Standard Form of Agreements Between Owner and Design/Builder AIA Document A191 - Electronic Format This -document comprises two separate Agreements: Part I Agreement and Part 2 Agreement. ,Before executing the Part I Agreement the parties should reach substantial agreement on the Part 2 Agreement. To the extent referenced in these Agreements, subordinate parallel agreements to A191 consist ofAlA Document A991, Standard Form of Agreements Between Design/Builder and Contractor, and AIA Document B901, Standard Form ofAgreements Between Design/Builder and Architect. PART 1 AGREEMENT 1996 EDITION AGREEMENT made as of the day of in the year of (In words, indicate day, month and year.) BETWEEN the Owner: (Name and address) and the Design/Builder: (Name and address) For the following Project: (Include Project name, location' and a summary description) The architectural services described in Article 1 will be provided by the following person or entity who is lawfully licensed to practice architecture: (Name and address) (Registration Number) (Relationship to Design/Builder) Normal structural, mechanical and electrical engineering services will be provided, contractually through the Architect except as indicated below: (Name, address and discipline) (Registration Number) (Relationship to DesignBuilder) The Owner and the Design/Builder agree as set forth below. AIA DOCUMENT A19l'• OWNER-DESIGN/BUILDER AGREEMENT • SECOND EDITION AIAO. 01996 THE AMERICAN INSTITU'T'E OF ARCHITECTS, 1735 NEW YORK AVENUE, NW, WASHINGTON, DC 20006-5292 • WARNING: Unlicensed photocopying violates U.S. copyright laws, and is subject to legal prosecution.. This document was electronically produced with permission of the AIA and can be reproduced without violation until the date of expiration as.noted below. Electronic Format A191 -1996 User Document: A19LCON -- 8/13/1997. AIA License Number 102743, which expires on 9/8/2001 -- Page #2 TERMS AND CONDITIONS -PART 1 .AGREEMENT ARTICLE 1 DESIGN/BUILDER 1.1 SERVICES 1.1.1 Preliminary design, budget, and schedule comprise the services required to accomplish the preparation and submission of the Design/Builder's Proposal as well as the preparation and submission of any modifications to the Proposal prior to execution of the Part 2 Agreement. 1.2 RESPONSIBILITIES 1.2.1 Design services required by this Part 1 Agreement shall be performed by qualified architects and other design professionals. The contractual obligations of such professional persons or entities are undertaken and performed in the interest of the Design/Builder. 1.2.2 The agreements between the Design/Builder and the persons or entities identified in this Part 1 Agreement, and any subsequent modifications, shall be in writing. These agreements, including financial arrangements with respect to this Project, shall be promptly and fully disclosed to the Owner upon request. 1.2.3 Construction budgets shall be prepared by qualified professionals, cost estimators or contractors retained by and acting in the interest of the Design/Builder. 1.2.4 The Design/Builder- shall be responsible to the Owner for acts and omissions of the Design/Builder's employees, subcontractors and their agents and employees, and other persons, including the Architect and other design professionals, performing any portion of the Design/Builder's obligations under this Part 1 Agreement. 1.2.5 If the Design/Builder believes or is advised by the Architect or by another design professional retained to provide services on the Project that implementation of any instruction received from the Owner would cause a violation of any applicable law, the Design/Builder shall notify the Owner in writing. Neither the Desigii/Builder nor the Architect shall be obligated to perforin any act which either believes will violate any applicable law. 1.2.6 Nothing contained in this Part 1 Agreement shall create a contractual relationship between the Owner and any person or entity other than the Design/Builder. 1.3 BASIC SERVICES 1.3.1 The Design/Builder shall provide a preliminary evaluation of the Owner's program and project budget requirements, each in terms of the other. 1.3.2 The Design/Builder shall visit the site, become familiar with the local conditions, and correlate observable conditions with the requirements of the Owner's program, schedule, and budget. 1.3.3 The Design/Builder shall review laws applicable to design and construction of the Project; correlate such laws with the Owner's program requirements; and advise the Owner if any program requirement may cause a violation .of such laws. Necessary changes to the Owner's program shall be accomplished by appropriate written modification or disclosed as described in Paragraph 1.3.5. 1.3.4 The Design/Builder shall review with the Owner alternative approaches to design and construction of the Project. 1.3.5. The Design/Builder shall submit to the Owner a Proposal, including the completed Preliminary Design Documents, a statement of the proposed contract sum, and a proposed schedule for completion of the Project. Preliminary Design Documents shall consist bf preliminary design drawings, outline specifications or other documents sufficient to establish the size, quality and character of the entire Project, its architectural, structural, mechanical and electrical systems, and the materials and such other elements of the Project as may be appropriate. Deviations from the Owner's program shall be disclosed in the Proposal. If the Proposal is accepted by the Owner, the parties shall then execute the Part 2 Agreement. A modification to the Proposal before execution of the Part 2 Agreement shall be recorded in writing as an addendum and shall be identified in the Contract Documents of the Part 2 Agreement. 1.4 ADDITIONAL SERVICES AIA DOCUMENT A191 • OWNER-DESIGN/BUILDER AGREEMENT • SECOND EDITION • AIAO. 01996 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, NW, WASHINGTON, DC 20006-5292 • WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution.. This document was electronically produced with permission of the AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format A191 -1996 User Document: A191.CON -- 8/13/1997. AIA License Number 102743, which expires on 9/8/2001 -- Page #3 1.4.1 The Additional .Services described under this Paragraph 1.4 shall be provided,,by the Design/Builder and paid for by the Owner if authorized or confirmed'in writing by the Owner. 1.4.2 Making revisions in :the' Preliminary Design Documents; budget or other documents when such revisions are: .1 inconsistent with . •approvals or instructions previously given by the Owner, including revisions made necessary by adjustments in the Owner's program or, Project budget; .2, required by the enactment or revision of codes, laws or regulations subsequent to the preparation of such documents; or .3 due to changes required as a result of the Owner's failure to render decisions in a timely manner. 1.4.3 Providing more extensive 'programmatic criteria than that furnished 'by the Owner as described in Paragraph 2.1.• When authorized, the Desig"uilder shall provide professional services to assist the Owner in the preparation of the program. Programming services may consist of: .1 consultingwith the Owner and other persons or entities not designated in this Part 1 Agreement to define the program requirements of the Project and to review the understanding of such requirements with the Owner; .2 documentation of the, applicable requirements necessary for 'the various Project functions or operations; ::3_ providing a review and analysis of the functional and organizational relationships, requirements, and objectives for the Project; . .4 setting forth' a written program of requirements for,- the or:the Owner's approval which summarizes the Owner's .objectives, schedule, ,constraints, and criteria. 1.4.4 Providing financial feasibility .or other special studies. 1.4.5., Providing planning surveys, site evaluations, or comparative studies of prospective sites. 1.4.6 Providing special surveys, environmental studies, and submissions required for approvals of governmental authorities or others having jurisdiction over the Project. 1.4.7 Providing services , relative to future facilities, systems, and equipment. 1.4.8 Providing services at the Owner's specific request to perform detailed investigations of existing conditions or facilities or to make measured drawings thereof. 1.4.9 Providing services at the Owner's specific request to verify the accuracy of drawings or other information fiimished by the Owner. 1.4.10 Coordinating services in connection with the work of separate persons or entities retained by . the Owner, subsequent to the execution of this Part. l Agreement. 1.4.11 Providing analyses of owning and operating costs. 1.4.12 Providing interior design and other similar services required for or in connection with the selection, procurement or installation, of furniture,, furnishings, and, related equipment. 1.4.13 Providing services for planning tenant .or rental spaces. 1.4.14 Making investigations, inventories of materials or equipment, or valuations and detailed appraisals of existing facilities. ARTICLE 2 OWNER 2.1 RESPONSIBILITIES 2.1.1 The Owner shall provide full information .in a timely manner regarding requirements for the Project, including, .a written program which shall set forth the Owner's°objectives, schedule, constraints and criteria. 2.1.2 The Owner'shall establish and update an overall budget for the Proiect. including 'reasonable contingencies. AIA DOCUMENT A191 - OWNER-DESIGNBLIILDER AGREEMENT SECOND EDITION - AIA® - 01996 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, NW, WASHINGTON, DC 20,006-5292 - WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal . prosecution:. This document was electronically produced with permission of the AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format A191 -1996 User Document: A19LCON -- 8/13/1997. AIA License Number 102743, which expires on 9/8/2001 -- Page 44 This budget shall not constitute the contract sum. 2.1.3 The Owner shall designate a representative authorized to act on the Owner's behalf with respect to the Project. The Owner or such authorized representative shall render decisions in a timely manner pertaining to documents submitted by the Design/Builder in order to avoid unreasonable delay in the orderly and sequential progress of the Design/Builder's services. The Owner may obtain independent review of the documents by a separate architect, engineer, contractor, or cost estimator under contract to or employed by the Owner. Such independent review shall be undertaken at the Owner's expense in a timely manner and shall not delay the orderly progress of the Design/Builder's services. 2.1.4 The Owner shall furnish surveys describing physical characteristics, legal limitations and utility locations for the site of the Project, and a written legal description of the site. The surveys and legal information shall include, as applicable, grades and lines of streets, alleys, pavements, and adjoining property and structures; adjacent drainage; rights-of-way, restrictions, easements, encroachments, zoning, deed restrictions, boundaries and contours of the site; locations. dimensions and necessary data pertaining to existing buildings, other improvements and trees; and information concerning available utility services and lines, both public and private, above and below grade, including inverts and depths. All the information on the survey shall be referenced to a Project benchmark. 2.1.5 The Owner shall furnish the services of geotechnical engineers when such services are stipulated in this Part 1 Agreement, or deemed reasonably necessary by the Design/Builder. Such services may include but are not limited to test borings, test pits, determinations of soil bearing values, percolation tests, evaluations of hazardous materials, ground corrosion and resistivity tests, and necessary operations for anticipating subsoil conditions. The services of geotechnical engineer(s) or other consultants shall include preparation and submission of all appropriate reports and professional recommendations. 2.1.6 The Owner shall disclose, to the extent known to the Owner, the results and reports of prior tests, inspections or investigations conducted for the Project involving: structural or mechanical systems; chemical, air and water pollution; hazardous materials; or other environmental and subsurface conditions. The Owner shall disclose all information known to the Owner regarding the presence of pollutants at the Project's site. 2.1.7 The Owner shall furnish all legal, accounting and insurance counseling services as may be necessary at any time for the Project, including such auditing services as the Owner may require to verify the Design/Builder's Applications for Payment. 2.1.8 The Owner shall promptly obtain easements, zoning variances, and legal authorizations regarding site utilization where essential to the execution of the Owner's program. 2.1.9 Those services, information, surveys, and reports required by Paragraphs 2.1.4 through 2.1.8 which are within the Owner's control shall be furnished at the Owner's expense, and the Design/Builder shall be entitled to rely upon the accuracy and completeness thereof, except to the extent the Owner advises the Design/Builder to the contrary in writing. 2.1.10 If the Owner requires the Design/Builder to maintain any special insurance coverage, policy, amendment, or rider, the Owner shall pay the additional cost thereof, except as otherwise stipulated in this Part 1 Agreement. 2.1.11 The Owner shall communicate with persons or entities employed or retained by the Design/Builder through the Design/Builder, unless otherwise directed by the Design/Builder. ARTICLE 3 OWNERSHIP AND USE OF DOCUMENTS AND ELECTRONIC DATA 3.1 Drawings, specifications, and other documents and electronic data furnished by the Design/Builder are instruments of service. The Design/Builder's Architect and other providers of professional services shall retain all common law, statutory and other reserved rights, including copyright in those instruments of service furnished by them. Drawings, specifications, and other documents and electronic data are furnished for use solely with respect to this Part 1 Agreement. The Owner shall be permitted to retain copies, including reproducible copies, of the drawings, specifications, and other documents and electronic data furnished by the Design/ Builder for information and reference in connection with the Project except as provided in Paragraphs 3.2 and 3.3. 3.2 If the Part 2 Agreement is not executed, the Owner shall not use the drawings, specifications, and other documents and electronic data furnished by the AIA DOCUMENT A191 • OWNER-DESIGN/BUILDER AGREEMENT • SECOND EDITION • AIAW • 01996 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, NW, WASHINGTON, DC 20006-5292 • WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution.. This document was electronically produced with permission of the AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format A191 -1996 User Document: A19LCON -- 8/13/1997. AIA License Number 102743, which expires on 9/8/2001 -- Page 45 Design/Builder without the written permission of the Design/Builder. Drawings, specifications, and other documents and electronic data shall not be used by the Owner or others on other projects, for additions to this Project or for completion of this Project by others, except by agreement in writing and with appropriate compensation to the Design/Builder, unless the Design/ Builder is adjudged to be in default under this Part 1 Agreement or under any other subsequently executed agreement, or by agreement in writing. 3.3 If the Design/Builder defaults in the Design/Builder's obligations to the Owner, the Architect shall grant a license to the Owner to use the drawings, specifications, and other documents and electronic data furnished by the Architect to the Design/Builder for the completion of the Project, conditioned upon the Owner's execution of an agreement to cure the Design/Builder's default in payment to the Architect for services previously performed and to indemnify the Architect with regard to claims arising from such reuse without the Architect's professional involvement. 3.4 Submission or distribution of the Design/Builder's documents to meet official regulatory requirements or for similar purposes in connection with the Project is not to be construed as publication in derogation of the rights reserved in Paragraph 3.1. ARTICLE 4 TIME 4.1 Upon the request of the Owner, the Design/Builder shall prepare a schedule for the performance of the Basic and Additional Services which shall not exceed the time limits contained in Paragraph 10.1 and shall include allowances for periods of time required for the Owner's review and for approval of submissions by authorities having jurisdiction over the Project. 4.2 If the Design/Builder is delayed in the performance of services under this Part 1 Agreement through no fault of the Design/Builder, any applicable schedule shall be equitably adjusted. ARTICLE 5 PAYMENTS 5.2 Subsequent payments for Basic Services, Additional Services, and Reimbursable Expenses provided for in this Part 1 Agreement shall be made monthly on the basis set forth in Article 9. 5.3 Within ten (10) days of the Owner's receipt of a properly submitted and correct Application for Payment, the Owner shall make payment to the Design/Builder. 5.4 Payments due the Design/Builder under this Part 1 Agreement which are not paid when due shall bear interest from the date due at the rate specified in Paragraph 9.5, or in the absence of a specified rate, at the legal rate prevailing where the Project is located. ARTICLE 6 DISPUTE RESOLUTION—MEDIATION AND ARBITRATION 6.1 Claims, disputes or other matters in question between the parties to this Part 1 Agreement arising out of or relating to this Part 1 Agreement or breach thereof shall be subject to and decided by mediation or arbitration. Such mediation or arbitration shall be conducted in accordance with the Construction Industry Mediation or Arbitration Rules of the American Arbitration Association currently in effect. 6.2 In addition to and prior to arbitration, the parties shall endeavor to settle disputes by mediation. Demand for mediation shall be filed in writing with the other party to this Part 1 Agreement and with the American Arbitration Association. A demand for mediation shall be made within a reasonable time after the claim, dispute or other matter in question has arisen. In no event shall the demand for mediation be made after the date when institution of legal or equitable proceedings based on such claim, dispute or other matter in question would be barred by the applicable statute of repose or limitations. 6.3 Demand for arbitration shall be filed in writing with the other party to this Part 1 Agreement and with the American Arbitration Association. A demand for arbitration shall be made within a reasonable time after the claim, dispute or other matter in question has arisen. In no event shall the demand for arbitration be made after the date when institution of legal or equitable proceedings based on such 5.1 The initial payment provided in Article 9 shall be claim, dispute or other matter in question would be barred by made upon execution of this Part 1 Agreement and credited the applicable statutes of repose or limitations. to the Owner's account as provided in Subparagraph 9.1.2. AIA DOCUMENT A191 • OWNER-DESIGNBUILDER AGREEMENT • SECOND EDITION • AIAO • ©1996 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, NW, WASHINGTON, DC 20006-5292 • WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution.. This document was electronically produced with permission of the AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format A191 -1996 User Document: A191.CON -- 8/13/1997. AIA License Number 102743, which expires on 9/8/2001 -- Page #6 6.4 An arbitration pursuant to this Paragraph may be joined with an arbitration involving common issues of law or fact between the Design/Builder and any person or entity with whom the Design/Builder has a contractual obligation to arbitrate disputes. No other arbitration arising out of or relating to this Part 1 Agreement shall include, by consolidation, joinder or in any other manner, an additional person or entity not a party to this Part 1 Agreement or not a party to an agreement with the Design/Builder, except by written consent containing a specific reference to this Part 1 Agreement signed by the Owner, the Design/Builder and all other persons or entities sought to be joined. Consent to arbitration involving an additional person or entity shall not constitute consent to arbitration of any claim, dispute or other matter in question not described in the written consent or with a person or entity not named or described therein. The foregoing agreement to arbitrate and other agreements to arbitrate with an additional person or entity duly consented to by the parties to this Part 1 Agreement shall be specifically enforceable in accordance with applicable law in any court having jurisdiction thereof. 6.5 The award rendered by the arbitrator or arbitrators shall be final, and judgment may be entered upon it in accordance with applicable law in any court having jurisdiction thereof. ARTICLE 7 MISCELLANEOUS PROVISIONS 7.1 Unless otherwise provided, this Part I Agreement shall be governed by the law of the place where the Project is located. 7.2 The Owner and the Design/Builder, respectively, bind themselves, their partners, successors, assigns and legal representatives to the other party to this Part 1 Agreement and to the partners, successors and assigns of such other party with respect to all covenants of this Part 1 Agreement. Neither the Owner nor the Design/Builder shall assign this Part 1 Agreement without the written consent of the other. the responsibility of the Design/Builder. 7.4 This Part 1 Agreement represents the entire and integrated agreement between the Owner and the Design/Builder and supersedes all prior negotiations, representations or agreements, either written or oral. This Part 1 Agreement may be amended only by written instrument signed by both the Owner and the Design/Builder. 7.5 Prior to the termination of the services of the Architect or any other design professional designated in this Part 1 Agreement, the Design/Builder shall identify to the Owner in writing another architect or design professional with respect to whom the Owner has no reasonable objection, who will provide the services originally to have been provided by the Architect or other design professional whose services are being terminated. ARTICLE 8 TERMINATION OF THE AGREEMENT 8.1 This Part 1 Agreement may be terminated by either party upon seven (7) days' written notice should the other party fail to perform substantially in accordance with its terms through no fault of the party initiating the termination. 8.2 This Part 1 Agreement may be terminated by the Owner without cause upon at least seven (7) days' written notice to the Design/Builder. 8.3 In the event of termination not the fault of the Design/Builder, the Design/Builder shall be compensated for services performed to the termination date, together with Reimbursable Expenses then due and Termination Expenses. Termination Expenses are expenses directly attributable to termination, including a reasonable amount for overhead and profit, for which the Design/Builder is not otherwise compensated under this Part 1 Agreement. 7.3 Unless otherwise provided, neither the design for nor the cost of remediation of hazardous materials shall be ARTICLE 9 BASIS OF COMPENSATION The Owner shall compensate the Design/Builder in accordance with Article 5, Payments, and the other provisions of this Part 1 Agreement as described below. 9.1 COMPENSATION FOR BASIC SERVICES AIA DOCUMENT A191 - OWNER-DESIGNBUILDER AGREEMENT • SECOND EDITION • AIAV - (01996 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, NW, WASHINGTON, DC 20006-5292 • WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution.. This document was electronically produced with permission of the AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format A191 -1996 User Document: A19LCON -- 8/13/1997. AIA License Number 102743, which expires on 9/8/2001 -- Page #7 9.1.1 FOR BASIC SERVICES, compensation shall be as follows: 9.1.2 AN INITIAL PAYMENT of Dollars ($ ) shall be made upon execution of this Part 1 Agreement and credited to the Owner's account as follows: 9.1.3 SUBSEQUENT PAYMENTS shall be as follows: 9.2 COMPENSATION FOR ADDITIONAL SERVICES 9.2.1 FOR ADDITIONAL SERVICES, compensation shall be as follows: 9.3 REIMBURSABLE EXPENSES 9.3.1 Reimbursable Expenses are in addition to Compensation for Basic and Additional Services, and include actual expenditures made by the Design/Builder and the Design/Builder's employees and contractors in the interest of the Project, as follows: 9.3.2 FOR REIMBURSABLE EXPENSES, compensation shall be a multiple of ( ) times the amounts expended. 9.4 DIRECT PERSONNEL EXPENSE is defined as the direct salaries of personnel engaged on the Project, and the portion of the cost of their mandatory and customary contributions and benefits related thereto, such as employment taxes and other statutory employee benefits, insurance, sick leave, holidays, vacations, pensions, and similar contributions and benefits. 9.5 INTEREST PAYMENTS 9.5.1 The rate of interest for past due payments shall be as follows: (Usury laws and requirements under the Federal Truth in Lending Act, similar state and local consumer credit laws and other regulations at the Owner's and Design/Builder's principal places of business, at the location of the Project and elsewhere may affect the validity of this provision. Specific legal advice should be obtained with respect to deletion, modification or other requirements, such as written disclosures or waivers.) 9.6 IF THE SCOPE of the Project is changed materially, the amount of compensation shall be equitably adjusted. 9.7 The compensation set forth in this Part 1 Agreement shall be equitably adjusted if through no fault of the Design/Builder the services have not been completed within ( ) months of the date of this Part 1 Agreement. ARTICLE 10 OTHER CONDITIONS AND SERVICES 10.1 The Basic Services to be performed shall be commenced on and, subject to authorized adjustments and to delays not caused by the Design/Builder, shall be completed in ( ) calendar days. The Design/Builder's Basic Services consist of those described in Paragraph 1.3 as part of Basic Services, and include normal professional engineering and preliminary design services, unless otherwise indicated. 10.2 Services beyond those described in Paragraph 1.4 are as follows: (Insert descriptions of other services, identify Additional Services included within Basic Compensation and modifications to the payment and compensation terms included in this Agreement) AIA DOCUMENT A191 • OWNER-DESIGN/BUILDER AGREEMENT • SECOND EDITION • AIAV • 01996 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, NW, WASHINGTON, DC 20006-5292 • WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution.. This document was electronically produced with permission of the AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format A191 -1996 User Document: A191.CON -- 8/13/1997. AIA License Number. 102743, which expires on 9/8/2001 -- Page #8 10.3 The Owner's preliminary program, budget, and other documents, if any, are enumerated as follows: Title Date This Agreement entered into as of the day and year first written above. X I1 (Signature) (Printed name and title) DESIGNBUILDER (Signature) ' (Printed name and title) AlA DOCUMENT A191 • OWNER-DESIGN/BUILDER AGREEMENT • SECOND EDITION • AIAS • 01996 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, NW, WASHINGTON, DC 20006-5292 • WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution.. This document was electronically produced with permission of the AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format A191 -1996 User Document: A19 LCON -- 8/13/1997. AIA License Number 102743, which expires on 9/8/2001 -- Page #9 Standard Form of Agreements Between Owner and Design/Builder AIA Document A191 - Electronic Format AGREEMENT 1996 EDITION AGREEMENT made as of the day of in the year of (In words. indicate day, month and year.) BETWEEN the Owner: (Name and address) and the Design/Builder:. (Name and address) For the following Project: (Include Project name, location and a summary description) The architectural services described in Article 3 will be provided by the following person or entity who is lawfully licensed to practice architecture: (Name and address) (Registration Number) (Relationship to Design/Builder) Normal structural, mechanical and electrical engineering services will be provided contractually. through the Architect except as indicated below: (Name, address and discipline) (Registration Number) (Relationship to Design/Builder) The Owner and the Design/Builder agree as set forth below. AIA DOCUMENT A191 - OWNER-DESIGN/BUILDER AGREEMENT • SECOND EDITION • AIAM • (01996 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, NW, WASHINGTON, DC 20006-5292 - WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal secution.. This document was electronically produced with permission of the AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format A191 -1996 User Document: A191.CON — 8/20/1997. AIA License Number 102743, which expires on 9/8/2001 — Page #10 TERMS AND CONDITIONS -PART 2 AGREEMENT ARTICLE 1 GENERAL PROVISIONS 1.1 BASIC DEFINITIONS 1.1.1 The Contract Documents consist of the -Peo.-1 ^Agfeefil 4e 4he extent -net wed 4,x 414s -Raft -2- Agreem ., this Raft -4 Agreement, as amended, the Design/Builder's Proposal and written addenda to the Proposal identified in Article 14, the Construction Documents approved by the Owner in accordance with Subparagraph 3.2.3 and Modifications issued after execution of' this Part 2 Agreement, .and the Owner's Design Construction Criteria Package. A Modification is a Change Order or a written amendment to this Part 2 Agreement signed by both parties, or a Constrdction Change Directive issued by the Owner in accordance with Paragraph 8.3.. 1.1.2 The term "Work" means the construction and services provided by : the Design/Builder to fulfill the Design/Builder's obligations and complete the proiect. 1.2 EXECUTION, CORRELATION AND INTENT 1).1 It is the intent of the Owner and Design/Builder that Contract Documents include all items necessary for proper execution and completion of the Work. The Contract Documents are complementary, and what is required by one shall be as binding as if required by all; performance by the Design/Builder shall be required only to the extent consistent with and reasonably inferable from the Contract Documents as being necessary to produce the intended results. Words that have well-known technical or construction industry meanings are used in the Contract Documents in accordance with such recognized meanings. 1.2.2 If the Design/Builder believes or is advised by the Architect or by another design professional retained to provide services on the Project that implementation of any instruction received from the Owner would cause a violation of any applicable law, the DesignBuilder shall notify the Owner in writing. Neifkef 4he Desig%Buildef -nef 4.%,—. A:FeWteet-shallObligated-te-peFfefm-any-aefwh ieh- either - believes - 1.2.3 Nothing contained in this 41ai4 -4 Agreement shall. create a contractual relationship between the Owner and any person or entity other than the Design/Builder. 1.3 OWNERSHIP AND USE OF DOCUMENTS 1.3.1 Df %iags;ei ficatie ,. ffind--dtef-A-eettatents-aad- eleetfeaie -data ished -by die DesigFWBuildef -afe iestfufaents4 se ee. eke �t-aad- etlff feN,idefs -e€ pfe€essietal __...__ —,hall retain ,all - e en -law; Defy-a*d atheFeseR-ed fights, ineluding eapyfight-ia 648seifis"M e€ eRciee-fwnisle-by them. DFaIA41gS, speeifiea6ens. and iih aents a l P&FFishe fesgeet-te4his-Pfft-2- Agfeefnent: -fie Q%mef l -be pemained-te-feta-eepies, ifieluding Fepfedeeible eepies, -ef -the dFaMngs, speei€c-atiea -aad ethef-deeufaeats -aed e'�ie -data- €ufeished -1y 4he -Desigfb4Builder- -€ef infeEmatieft -and- re°c...._e-ia-ee eetiefcivitl}fie-01ejeet. ept-as-pfeN4ded- ia SubpaFagfaphS 1.9.2 a a9. 1.3.2 DFa%cings, sped -and eEhe deeuHneats-ate eleetfetriE-dada %ished-W4he-Bb l-aet-be- used-by4he-9%%efethef pFejeets, ibF additiem te 446 Pr-ejeet - f -€ef eemple6en -e€-t#is Pfejeet -by ethef , exeept -1w -agfeemeat -ice Aiitifig -and -yAth-appfepfiate tie i 4e -the DesigH�Buildefz -+mess 4he— Besiga,ildef4 __meat -&f andeF any ethe subsequent4y exeewed- 1.3.3 If the Design/Builder defaults in the Design/ Builder's obligations to the Owner, the Architect shall -grant a license to the Owner to use the drawings, specifications, and other, documents and electronic data furnished by the Architect to the Design/Builder for the completion of the Project, conditioned upon the Owner's execution of an agreement to cure the Design/Builder's default in payment to the Architect for services previously performed, and 4o- indemnil -tl}e , _ hiteet-fegafd49 elms-afising-ffeta- 1.3.4 Sabmissien -ef -ef -the Design Boit a deeements -te -Faeet -af -fef- sittrilaf -m-eeaxeetieft-with-64eRfejeet 4s-aet-te-be- eeastfaepublic-atiea-tadefegafiea-o-�Fi,-,htS Fesen,e in Subpafagr-aph 1.3. 1. .AIA DOCUV(ENT A191 •OWNER-DESIGN/BCIILDER AGREEMENT • SECOND EDITION • AIAW • :101996 THE AMERICAiN INSTITLITE OF ARCHITECTS, 1" '; NEW YORK .AVENUE. NW. WASHINGTON. DC 20006-5292 • WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal :ution.. This document was electronically produced with permission of the AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format A191 -1996 User Document: A 191. CON -- 8/20/1997. AIA License Number 102743, which expires on 9/8/2001 -- Page # 11 ARTICLE 2 OWNER 2.1 The Owner shall designate a representative luthorized to act on the Owner's behalf with respect to the inject. The Owner or such authorized representative shall examine documents submitted by the Design/ Builder and shall render decisions in a timely manner and in accordance with the schedule accepted by the Owner. The Owner may obtain independent review of the Contract Documents by a separate architect, engineer, contractor, or cost estimator under contract to or employed by the Owner. Such independent review shall be undertaken at the Owner's expense in a timely manner and shall not delay the orderly progress of the Work. 2.2 The Owner may appoint an on-site project representative to observe the Work and to have such other responsibilities as the Owner and,,Design/Builder agree in writing. 2.3 The Owner shall cooperate with the Design/Builder in securing building and other permits, licenses and inspections. The Owner shall not be required to pay the fees for such permits, licenses and inspections unless the cost of such fees is excluded from the Design/Builder's Proposal. 4 The Owner shall furnish services of land surveyors, . ,otechnicai engineers, and other consultants for subsoil, air and water conditions, in additien to these pfe-icided uflder- the Rm4! _^_omaement when such services are deemed necessary by the Design/Builder to properly carry out the design services required by this PaFt-2 Agreement. 2.5 The Owner shall disclose,. to the extent known to the Owner, the results and reports of prior tests, inspections or investigations conducted for the Project involving: structural or mechanical systems, chemical, air and water pollution: hazardous materials: or other environmental and subsurface conditions. The Owner shall disclose all information known to the Owner regarding the presence of pollutants at the Project's site. 2.6 The Ownef-s#a4•1 wish -all 4ega4z, and - i siifariee feexselitig ___ . _eec -as -may -be-neeessary-a4-afiy- dme-fef4he F-rejeet ding such aaditi-ag r-- .._.c-as-tlie Ownef -Hiay -rete 49 -ve4y 4he DesigpAti}derls 2.7 Theses infemiatieii, sutveys -acid FepeFtS required--z-ar-agrapli;-2-1- h 2 ,,.1,:eh ithin the Owt}er' eefitr-el shall -be -fln,m''ished-at4keOwner's z�ease. afld 4he b Miall -17e entitled 4e -F,* }} -.pen .h arae'-aad e-=: plete theieA�eixeep 494he extent-tlie- 2.8 If 4he def -requires -tie 4a- maintain aiiy special insumnee of -rider-; -tie Owner hall -pari 4he mel 6es£�theree€,- exrnY'as etheFwise stipulated in lihis Paft 2 A g f 2.9 If the Owner observes or otherwise becomes aware of a fault or defect in the Work or nonconformity with the " Design/Builder's Proposal or the Construction Documents, the Owner shall give prompt written notice thereof to the Design/Builder. 2.10 The Owner shall, at the request of the Design/ Builder, prior to execution of this Pee -4 Agreement and promptly upon request thereafter, furnish to the Design/Builder reasonable evidence that financial arrangements have been made to fulfill the Owner's obligations under the Contract, 2.11 The Owner shall communicate with persons or entities employed or retained by the Design/Builder through the Design/Builder, unless otherwise directed by the Design/Builder. ARTICLE 3 DESIGN/BUILDER 3.1 SERVICES AND RESPONSIBILITIES 3.1.1 Design services required by this Pifft4 Agreement shall be performed by qualified architects and other design professionals. The contractual obligations of such professional persons or entities are undertaken and performed in the interest of the Design/Builder. 3.1.2 The agreements between the Design/Builder and the persons or entities identified in this Paft4 Agreement, and any subsequent modifications, shall be in writing. These agreements, including financial arrangements with respect to this Project, shall be promptly and fully disclosed to the Owner upon request. 3.1.3 The Design/Builder shall be responsible to the AIA DOCUMENT A191 - OWNER-DESIGN/BUILDER AGREEMENT • SECOND EDITION • AIAO • :01996 THE AMERICAN INSTITUTE OF ARCHITECTS, '35 NEW YORK ,AVENUE. NW. WASHINGTON, DC 20006-5292 - WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal lecution.. This document was electronically produced with permission of the AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format A191 -1996 User Document: A19 LCON -- 8/20/1997. AIA License Number 102743, which expires on 9/8/2001 — Page #12 Owner for acts and omissions of the Design/Builder's employees, subcontractors and their agents and employees, and other persons, including the Architect and other design professionals, performing any portion of the Design/Builder's obligations under this Pan 2 Agreement. 3.2 BASIC SERVICES 3.2.1 The Design/Builder's Basic Services are described below and in Article 14. 3.2.2 The Design/Builder shall designate a representative authorized to act on the Design/Builder's behalf with respect to the Project. 3.2.3 The Design/Builder shall submit Construction Documents for review and approval by the Owner. Construction Documents may include drawings, specifications. and other documents and electronic data setting forth in detail the requirements for construction of the Work, and shall: .1 be consistent with the intent of the Owner's Design/Construction Criteria Package Desia , .2 provide information for the use of those in the building trades; and 3 include documents customarily required for regulatory agency approvals. 3.2.4 The Design/Builder, with the assistance of the Owner, shall file documents required to obtain necessary approvals of governmental authorities having jurisdiction over the Project. 3.2.5 Unless otherwise provided in the Contract Documents, the Design/Builder shall provide or cause to be provided and shall pay for design services, labor, materials, equipment, tools. construction equipment and machinery, water, heat, utilities, transportation and other facilities and services necessary. for proper execution and completion of the Work, whether temporary or permanent and whether or not incorporated or to be incorporated in the Work. 3.2.6 The Design/Builder shall be responsible for all construction means, methods, techniques, sequences and procedures, and for coordinating all portions of the Work under this PaFt2 Agreement. 3.2.7 The Design/Builder shall keep the Owner informed of the progress and quality of the Work. 3.2.8 The Design/Builder shall be responsible for correcting Work which does not conform to the. Contract Documents. 3.2.9 The Design/Builder warrants to the Owner that materials and equipment furnished under the Contract will be of good quality and new unless otherwise required or permitted by the Contract Documents, that the construction will be free from faults and defects, and that the construction will conform with the requirements of the Contract Documents. Construction not conforming to these requirements, including substitutions not properly approved by the Owner, shall be corrected in accordance with Article 9. 3.2.10 The Design/Builder shall pay all sales, consumer, use and similar taxes which had been legally enacted at the time the Design/Builder's Proposal was first submitted to the Owner, and shall secure and pay for building and other permits and governmental fees. licenses and inspections necessary for the proper execution and completion of the Work which are either customarily secured after execution of a contract for construction or are legally required at the time the Design/Builder's Proposal was first submitted to the Owner. 3.2.11 The Design/Builder shall comply with and give notices required by laws, ordinances, rules, regulations and lawful orders of public authorities relating to the Project. 3.2.12 The Design/Builder shall pay royalties and license fees for patented designs, processes or products. The Design/Builder shall defend suits or claims for infringement of patent rights and shall hold the Owner harmless from loss on account thereof, but shall not be responsible for such defense or loss when a particular design, process or product of a particular manufacturer is required by the Owner. However, if the Design/Builder has reason to believe the use of a required design, process or product is an infringement of a patent, the Design/Builder shall be responsible for such loss unless such information is promptly furnished to the Owner. 3.2.13 The Design/Builder shall keep the premises and surrounding area free from accumulation of waste materials AIA DOCUMENT A191 - OWNER-DESIGN/BUILDER AGREEMENT - SECOND EDITION - AIAQ - :91996 THE AMERICAN INSTITUTE OF ARCHITECTS, "15 NEW PORK .AVENUE, NW, WASHINGTON, DC 20006-5292 - WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal :cution.. This document was electronically produced with permission of the AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format A191 -1996 User Document: Al91.CON -- 8/20/1997. AIA License Number 102743, which expires on 9/8/2001 -- Page #13 or rubbish caused by operations under this Pe.4 = Agreement. At the completion of the Work, the Design/Builder shall remove from the site waste materials, rubbish, the Design/Builder's tools, construction equipment, machinery, -lid surplus materials. 3.2.14 The Design/Builder shall notify the Owner when the Design/Builder believes that the Work or an agreed upon portion thereof is substantially completed. If Thethe Owner -the def shall issue a Certificate of Substantial Completion which shall establish the Date of Substantial Completion, shall state the responsibility of each parry for security, maintenance, heat, utilities, damage to the Work and insurance, shall include a list of items to be completed or corrected and shall fix the time within which the Design/Builder shall complete items listed therein. Disputes bem,eeR-the-ateDesign'BuildeF-regafding 3.2.15 The Design/Builder shall maintain at the site for the Owner one record copy of the drawings, specifications, product data, samples, shop drawings, Change Orders and other modifications, in good order and regularly updated to record the completed construction. These shall be delivered to the Owner upon completion of construction and prior to final payment. 3 ADDITIONAL SERVICES a.3.1 The services described in this Paragraph 3.3 are not included in Basic Services unless so identified in Article 14, and they shall be paid for by the Owner as provided in this Ra,q-2-Agreement- in addition to the compensation for Basic Services. The services described in this Paragraph 3.3 shall be provided only if authorized or confirmed in writing by the Owner. 3.3.2 Making revisions in drawings, specifications, and other documents or electronic data when such revisions are required by the enactment or revision of codes, laws or regulations subsequent to the preparation of such documents or electroudc data. 3.3.3 Providing consultation concerning replacement of Work damaged by fire or other cause during construction, and furnishing services required in connection with the replacement of such Work. 3.3.4 Providing services in connection with a public hearing, arbitration proceeding or legal proceeding, except where the Design/Builder is a party thereto. 3.3.5 Providing coordination of construction performed by the Owner's own forces or separate contractors employed by the Owner, and coordination of services required in connection with construction performed and equipment supplied by the Owner. 3.3.6 Preparing a set of reproducible record documents or electronic data showing significant changes in the Work made during construction. 3.3.7 Providing assistance in the utilization of equipment or systems such as preparation of operation and maintenance manuals, training personnel for operation and maintenance. and consultation during operation. ARTICLE 4 TIME 4.1 Unless otherwise indicated, the Owner and the Design/Builder shall perform their respective obligations as expeditiously as is consistent with reasonable skill and care and the orderly progress of the Project. 4.2 Time limits stated in the Contract Documents are of the essence. The Work to be performed under this 1aE-4 Agreement shall commence upon receipt of a notice to proceed unless otherwise agreed and, subject to authorized Modifications, Substantial Completion shall be achieved on or before the date established in Article 14. 4.3 Substantial Completion is the stage in the progress of the Work when the Work or designated portion thereof is sufficiently complete in accordance with the Contract Documents so the Owner can occupy or utilize the Work for its intended use. 4.4 Based on the Design/Builder's Proposal, a construction schedule shall be provided consistent with Paragraph 4.2 above. 4.5 If the Design/Builder is delayed at any time in the progress of the Work by an act or neglect of the Owner, Owner's employees, or separate contractors employed by the Owner, or by changes ordered in the Work, or by labor disputes, fire, unusual delay in deliveries, adverse weather conditions not reasonably anticipatable, unavoidable casualties or other causes beyond the Design/Builder's .AIA DOCUMENT .x191 - OWNER-DESIGN/BUILDER AGREEMENT • SECOND EDITION -.-UAW • :,01996 THE AMERICAN INSTITUTE OF ARCHITECTS, --5 NEW YORK .AVENUE. NW. WASHINGTON. DC 20006-5292 • WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal ecution.. This document was electronically produced with permission of the AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format Al 91 -1996 User Document: Al91.CON -- 8/20/1997. AIA License Number 102743, which expires on 9/8/2001 -- Page #14 control, of -by y auther-ized Aw -Fare 9w,aef ung af-bitfarien, or by other causes which the Owner and Design/Builder agree may justify delay, then the Contract Time shall be reasonably extended by Change Order. ARTICLE 5 PAYMENTS 5.1 PROGRESS PAYMENTS 5.1.1 The Design/Builder shall deliver to the Owner itemized Applications for Payment in such detail as indicated in Article 14. 5.1.2 Within ten (10) days of the Owner's receipt of a properly submitted and correct Application for Payment, the Owner shall make payment to the Design/Builder. 5.1.3 The Application for Payment shall constitute a representation by the Design/Builder to the Owner that the design and construction have progressed to the point indicated. the quality of the Work covered by the application is in accordance with the Contract Documents; and the Design/Builder is entitled to payment in the amount requested. 5.1.4 Upon receipt of payment from the Owner, the Design/Builder shall promptly pay the Architect, other ;ign professionals and each contractor the amount to .,ich each is entitled in accordance with the terms of their respective contracts. 5.1.5 The Owner shall have no obligation under this ltHE 2 Agreement to pay or to be responsible in any way for payment to the Architect, another design professional, or a contractor performing portions of the Work. 5.1.6 Neither progress payment nor partial or entire use or occupancy of the Project by the Owner shall constitute an acceptance of Work not in accordance with the Contract Documents. 5.1.7 The Design/Builder warrants that title to all construction covered by an Application for Payment will pass to the Owner no later than the time of payment. The Design/Builder further warrants that upon submittal of an Application for Payment all construction for which payments have been received from the Owner shall be free and clear of liens. claims, security interests or encumbrances in favor of the Design/Builder or any other person or entity performing construction at the site or furnishing materials or equipment relating to the construction. 5.1.8 At the time of Substantial Completion, the Owner shall pay the Design/Builder the retainage, if any, less the reasonable cost to correct or complete incorrect or incomplete Work. Final payment of such withheld sum shall be made upon correction or completion of such Work. 5.2 FINAL PAYMENT 5.2.1 Neither final payment nor amounts retained, if any, shall become due until the Design/Builder submits to the Owner (1) an affidavit that payrolls, bills for materials and equipment, and other indebtedness connected with the Work for which the Owner or Owner's property might be responsible or encumbered (less amounts withheld by the Owner) have been paid or otherwise satisfied; (2) a certificate evidencing that insurance required by the Contract Documents to remain in force after final payment is currently in effect and will not be canceled or allowed to expire until at least 30 days prior written notice has been given to the Owner; (3) a written statement that the Design/Builder knows of no substantial reason that the insurance will not be renewable to cover the period required by the Contract Documents; (4) consent of surety, if any, to final payment; and (3) if required by the Owner, other data establishing payment or satisfaction of obligations, such as receipts, releases and waivers of liens, claims, security interests or encumbrances arising out of the Contract, to the extent and in such form as may be designated by the Owner. If a contractor or other person or entity entitled to assert a lien against the Owner's property refuses to furnish a release or waiver required by the Owner, the Design/ Builder may furnish a bond satisfactory to the Owner to indemnify the Owner against such lien. If such lien remains unsatisfied after payments are made, the Design/Builder shall indemnify the Owner for all loss and cost, including reasonable attorneys' fees incurred as a result of such lien. 5.2.2 When the Work has been completed and the contract fully performed, the Design/Builder shall submit a final application for payment to the Owner. who shall make final payment within 30 days of receipt. 5.2.3 The making of final payment shall constitute a waiver of claims by the Owner except those arising from: .1 liens, claims, security interests or encumbrances arising out of the Contract and unsettled; AIA DOCUNIENT A191 • OWNER-DESIGNBUILDER AGREVvIENT • SECOND EDITION • .A1AoP • 101996 THE .-%.NIERIC.-Lv INSTITUTE OF ARCHITECTS, "15 NEW YORK AVENUE, NW. WASHINGTON, DC 20006-5292 • WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal ecution.. This document was electronically produced with permission of the AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format A191 -1996 User Document: A191.CON -- 8/20/1997. AIA License Number 102743, which expires on 9/8/2001 -- Page #15 2 failure of the Work to comply With the requirements of the Contract Documents; or .3 terms of special warranties required by the Contract Documents. 5.2.4 Acceptance of final payment shall constitute a waiver of all claims by the Design/Builder_ exeept these - preMieasly -made -in ming -ate-identified * 44 - lr���def-as-anseftled-af4he4ime of final-Appiic-atien fes: 5.3 INTEREST PAYMENTS 5.3.1 Payrnents -dae 4he DesigFbguildef andef -#is -Pala -2- Agreefnent-wl Fe -net -paid when ae-sladl bear-nomt fiefn the date due at �he Fate speeified in AFfiele 19, OF in the absenee ef a specified Fate, at the legal Fate pFevailing:wheFe the Pfejeet is-leeated. .11 ARTICLE 6 PROTECTION OF PERSONS AND PROPERTY 6.1 The Design/Builder shall be responsible for initiating, maintaining and providing supervision of all safety precautions and programs in connection with the performance of this PaA 2 Agreement. The Design/Builder shall take reasonable precautions for the safety of, and shall provide reasonable protection to prevent damage, injury or loss to: (1) employees on the Work and other persons who may be affected thereby; (2) the Work and materials and equipment to be incorporated therein, whether in storage on or off the site, under care, custody, or control of the Design/Builder or the Design/Builder's. contractors: and- (3) other property at or adjacent thereto, such as trees, shrubs, lawns, walks, pavements, roadways, structures and utilities not designated for removal relocation, or replacement in the course of construction. 6.3 The Design/Builder shall give notices and comply with applicable laws, ordinances, rules, regulations and lawful orders of public authorities bearing on the safety of persons or property or their protection from damage, injury or loss. 6.4 The Design/Builder shall promptly remedy damage and loss (other than damage or loss insured under property insurance provided or required by the Contract Documents) to property at the site caused in whole or in part by the Design/Builder, a contractor of the Design/Builder or anyone directly or indirectly employed by any of the or by anyone for whose acts they may be liable. ARTICLE 7 INSURANCE AND BONDS 7.1 DESIGN/BUILDER'S LIABILITY INSURANCE 7.1.1 The Design/Builder shall purchase from and maintain, in a company or companies lawfully authorized to do business in the jurisdiction in which the Project is located, such insurance as will protect the Design/Builder from claims set forth below which may arise out of or result from operations under this Paft -2 Agreement by the Design/Builder or by a contractor of the Design/ Builder, or by anyone directly or indirectly employed by any of them, or by anyone for whose acts any of them may be liable: 1 claims under workers' compensation, disability benefit and other similar employee benefit laws that are applicable to the Work to be performed: .2 claims for damages because of bodily injury, occupational sickness or disease, or death of the Design/Builder's employees: 3 claims for damages because of bodily injury, sickness or disease, or death of persons other than the Design/Builder's employees: .4 claims for damages covered by usual personal injury liability coverage which are sustained (1) by a person as a result of an offense directly or indirectly related to employment of such person by the Design/Builder or (2) by another person: .5 claims for damages, other than to the Work itself, because of injury to or destruction of tangible property, including loss of use resulting therefrom: .6 claims for damages because of bodily injury, death of a person or property damage arising out of ownership, maintenance or use of a motor vehicle, and 7 claims involving contractual liability insurance applicable to the Design/Builder's obligations under AIA DOCUMENT A191 • OWNER-DESIGN/BUILDER AGREEMENT • SECOND EDITION • AIAQ • X)1996 THE AMERICAN INSTITUTE OF ARCHITECTS. —15 NEW YORK AVENUE. NW. WASHINGTON. DC 20006-5292 • WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal ecution.. This document was electronically produced with permission of the AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format A191-1996 User Document: A19LCON -- 8/20/1997. AIA License Number 102743. Which expires on 9/8/2001 -- Page #16 Paragraph 11.x. 7.1.2 The insurance required by Subparagraph 7. 1.1 shall be written for not less than limits of liability specified in this 'aft -3 Agreement or required by law, whichever coverage is treater. Coverages, whether written on an occurrence or claims -made basis, shall be maintained without interruption from date of commencement of the Work until date e€-fflal- p"ent -o€ any eevefage fequir-e -to 4%- Maintained after final payment -as mavbe required. 7.1.3 Certificates of Insurance acceptable to the Owner shall be delivered to the Owner immediately after execution of this lit -2 Agreement. These Certificates and the insurance policies required by this Paragraph 7.1 shall contain a provision that coverages afforded under the policies will not be canceled or allowed to expire until at least 30 days' prior written notice has been given to the Owner. If any of the foregoing insurance coverages are required to remain in force after final payment, an additional certificate evidencing continuation of such coverage shall be submitted with the application for final payment. Information concerning reduction of coverage shall be furnished by the Design/Builder with reasonable promptness in accordance with the Design/Builder's information and belief. 7.2 OWNER'S LIABILITY INSURANCE 7.2.1 The Owner shall be responsible for purchasing and �intaining the Owner's usual liability insurance. .Jptionally, the Owner may purchase and maintain other insurance for self-protection against claims which may arise from operations under this -Pwt 4 Agreement. The Design/Builder shall not be responsible for purchasing and maintaining this optional Owner's liability insurance unless specifically required by the Contract Documents. 7.3 PROPERTY INSURANCE 7.3.1 Unless otherwise provided under this Pan -2 Agreement, the Owner shall purchase and maintain, in a company or companies authorized to do business in the jurisdiction in which the principal improvements are to be located, property insurance upon the Work to the full insurable value thereof on a replacement cost basis without optional deductibles. Such property insurance shall be maintained. unless otherwise provided in the Contract Documents or otherwise agreed in writing -by all persons and entities who are beneficiaries of such insurance, until final payment has been made or until no person or entity other than the Owner has an insurable interest in the property required by this Paragraph 7.3 to be insured, whichever is earlier. This insurance shall include interests of the Owner, the Design/Builder, and their respective contractors and subcontractors in the Work. 7.3.2 Property insurance shall be on an all-risk policy form and shall insure against the perils of fire and extended coverage and physical loss or damage including, without duplication of coverage, theft, vandalism. malicious mischief, collapse, falsework, temporary buildings and debris removal including demolition occasioned by enforcement of any applicable legal requirements, and shall cover reasonable compensation for the services and expenses of the Design/Builder's Architect and other professionals required as a result of such insured loss. Coverage for other perils shall not be required unless otherwise provided in the Contract Documents. 7.3.3 If the Owner does not intend to purchase such property insurance required by this -haft -2 Agreement and with all of the coverages in the amount described above, the Owner shall so inform the Design/Builder prior to commencement of the construction. The Design/Builder may then effect insurance which will protect the interests of the Design/Builder and the Design/Builder's contractors in the construction, and by appropriate Change Order the cost thereof shall be charged to the Owner. If the Design/Builder is damaged by the failure or neglect of the Owner to purchase or maintain insurance as de -scribed above, then the Owner shall bear all reasonable costs properly attributable thereto. 7.3.4 Unless otherwise provided, the Owner shall purchase and maintain such boiler and machinery insurance required by this Raf44 Agreement or by law, which shall specifically cover such insured objects during installation and until final acceptance by the Owner. This insurance shall include interests of the Owner, the Design/Builder, the Design/Builder's contractors and subcontractors in the Work, and the Design/Builder's Architect and. other design professionals. The Owner and the Design/Builder shall be named insureds. 7.3.5 A loss insured under the Owner's property insurance shall be adjusted by the Owner as trustee and made payable to the Owner as trustee for the insureds, as their interests may appear, subject to requirements of any applicable mortgagee clause and of Subparagraph 7.3.10. The Design/Builder shall pay contractors their shares of insurance proceeds received by the Design/Builder. and by appropriate agreement, written where legally required for validity, shall require contractors to makepayments to their subcontractors in similar manner. AIA DOCULMENT A191 • OWNER-DESIGN/BUILDER AGREEMENT • SECOND EDITION • AIA0 • :91996 THE AMERICAN INSTITUTE OF ARCHITECTS. '35 NEW YORK AVENUE. NW, WASHINGTON. DC 20006-5292 • WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal secution.. This document was electronically produced with permission of the AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format A191 -1996 User Document: Al91.CON -- 8/20/1997. AIA License Number 102743, which expires on 9/8/2001 -- Page ;#17 7.3.6 Before an exposure to loss may occur, the Owner shall file with the Design/Builder a copy of each policy that includes insurance coverages required by this Paragraph 7.3. ich policy shall contain all generally applicable conditions, ,,etlnitions. exclusions and endorsements related to this Project. Each policy shall contain a provision that the policy will not be canceled or allowed to expire until at least 30 days' prior written notice has been given to the Design/Builder. 7.3.7 If the Design/Builder requests in writing that insurance for risks other than those described herein or for other special hazards be included in the property insurance policy, the Owner shall, if possible, obtain such insurance, and the cost thereof shall be charged to the Design/Builder by appropriate Change Order. 7.3.8 The Owner and the Desigri/Builder waive all rights against each other and the Architect and other design professionals, contractors, subcontractors, agents and employees, each of the other, for damages caused by fire or other perils to the extent covered by property insurance obtained pursuant to this Paragraph 7.3 or other property insurance applicable to the Work, except such rights as they may have to proceeds of such insurance held by the Owner as trustee. The Owner or Design/ Builder, as appropriate, shall require from contractors and subcontractors by appropriate - ,reements, written where legally required for validity, .hilar waivers each in favor of other parties enumerated in this Paragraph 7.3. The policies shall provide such waivers of subrogation by endorsement or otherwise. A waiver of subrogation shall be effective as to a person or entity even though that person or entity would otherwise have a duty of indemnification, contractual or otherwise, did not pay the insurance premium directly or indirectly, and whether or not the person or entity had an insurable interest in the property damaged. 7.3.9 If -regtti r -ed -in -wfiting * -a -paw -in inwestt. -tom Owner -as iFdstee shall, upenaeeuF a nee e€ein ds ure a}S2hefid fur PFePeF pFxvFFmanee of the nrtxeF'S-aat'cds--l:Pie ;- lest -e€ required fiends shall -be aged -agaixst -pr-eeeeds reeeived aeeeent Feeeeds -66 Feee;;ed, whieh -the fixer Shall &6ibute-in-a ,ee-;r44 such agr-eemeat-as4he pafties- tU--_ _ a3aT reae ,—ef n a^ranee with -an bitFatie award -in whieh tease4he-pteeedure-shall-be-as-previded4x- .AFtiele--If-afte stilt-less-aeetheF speeial made- repla t -e€ imaged Wer4E shall -be eeVered -b}L 7.3.10 The Owner as trustee shall have power to adjust and settle a loss with insurers. unless ene of the paFties^ sl?ell ehjee4--wtitrftg+�ie-fie-( UUTO e€ 4ess -te -the meet=s e eNiS -e€ -this-pewer; - -if such ebjeetien -be made. 4#e paFEies shall eetef -irate d4ute reselutien undeF pfeeedufes hided -in z4Ftiele -18: - 4f distkbugea-e€-iesafaflee-pfweeds-bre aFbitfatiefi4s-reqHiFeEk 64e afbitffitffS Will diFeet-Sue-14 7.3.11 Partial occupancy or use prior to Substantial Completion shall not commence until the insurance company or companies providing property insurance have consented to such partial occupancy or use by endorsement or otherwise. The Owner and the Design/ Builder shall take reasonable steps to obtain consent of the insurance company or companies and shall not, without mutual written consent, take any action with respect to partial occupancy or use that would cause cancellation, lapse or reduction of coverage. 7.4 LOSS OF USE INSURANCE 7.4.1 The Owner, at the Owner's option, may purchase and maintain such insurance as will insure the Owner against loss of use of the Owner's property due to fire or other hazards, however caused. The Qwiier- waives @41 rights. ef-aetien-against-the Design>49m4ldef-€e+4essa se-44he- 9wner's-pr-epei:�y;inejudinglosses a to i}re- erether f -ds, hewever eaw—ised— ARTICLE 8 CHANGES IN THE WORK 8.1 CHANGES 8.1.1 Changes in the Work may be accomplished after execution of this Pan 2 Agreement, without invalidating this Part 2 Agreement, by Change Order, Construction Change Directive, or order for a minor change in the Work, subject to the limitations stated in the Contract Documents. 8.1.2 A Change Order shall be based upon agreement between the Owner and the Design/Builder-, a Construction Change Directive may be issued by the Owner without the agreement of the Design/Builder: an order for a minor change in the Work may be issued by the Design/Builder alone. 8.1.3 Changes in the Work shall be performed under applicable provisions of the Contract Documents, and the Design/Builder shall proceed promptly, unless otherwise provided in the Change Order, Construction Change .-UA DOCUMENT A191 • OWNER-DESIGN/BUILDER AGREEIMENT • SECOND EDITION • AIAV - :.01996 THE AMERICAN INSTITUTE OF ARCHITECTS. -35 NEW YORK AVENUE, NW. WASHINGTON. DC 20006-3292 • WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal .secution.. This document was electronically produced with permission of the AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format A191 -1996 User Document: A19 LCON -- 8/20/1997. AIA License Number 102743, which expires on 9/8/2001 --Page #18 Directive, or order for a minor change in the Work. 8.1.4 If unit prices are stated in the Contract Documents or subsequently agreed upon, and if quantities originally itemplated are so changed in a proposed Change Order or —instruction Change Directive that application of such unit prices to quantities of Work proposed will cause substantial inequity to the Owner or the Design/ Builder, the applicable unit prices shall be equitably adjusted. 8.2 CHANGE ORDERS 8.2.1 A Change Order is a written instrument prepared by the Design/Builder and signed by the Owner and the Design/Builder. stating their agreement upon all of the following: 1 a change in the Work; .2 the amount of the adjustment, if any, in the Contract Sum, and 3 the extent of the adjustment, if any, in the Contract Time. 8.2.2 If the Owner requests a proposal for a change in the Work from the DesignBuilder and subsequently elects not to proceed with the change, a Change Order shall be issued to .-nburse the Design/Builder for any costs incurred for -,mating services. design services or preparation of proposed revisions to the Contract Documents. 8.3 CONSTRUCTION CHANGE DIRECTIVES 8.3.1 A Construction .Change Directive is a written order prepared and signed by the Owner, directing a change in the Work prior to agreement on adjustment, if any, in the Contract Sum or Contract Time, or both. 8.3,2 Except as otherwise agreed by the Owner and the Design/Builder. the adjustment to the Contract Sum shall be determined on the basis of reasonable expenditures and savings of those performing the Work attributable to the change. including the expenditures for design services and revisions to the Contract Documents. In case of an increase in the Contract Sum, the cost shall. include a reasonable allowance for overhead and profit. In such case, the Design/Builder shall keep and present an itemized accounting togedier with appropriate supporting data for inclusion in a Change Order. Unless otherwise provided in the Contract Documents, costs for these purposes shall _be limited to the following: .1 costs of labor, including social security, old age and unemployment insurance, fringe benefits required by agreement or custom, and workers' compensation insurance; .2 costs of materials, supplies and equipment, including cost of transportation, whether incorporated or consumed; 3 rental costs of machinery and equipment exclusive of hand tools, whether rented from the Design/Builder or others; .4 costs of premiums for all bonds and insurance permit fees, and sales, use or similar taxes-, .5 additional costs of supervision and field office personnel directly attributable to the change; and fees paid to the Architect, engineers and other professionals. 8.3.3 Pending final determination of cost to the Owner, amounts not in dispute may be included in Applications for Payment. The amount of credit to be allowed by the Design/Builder to the Owner for deletion or change which results in a net decrease in the Contract Sum will be actual net cost. When both additions and credits covering related Work or substitutions are involved in a change, the allowance for overhead and profit shall be figured on the basis of the net increase, if any, with respect to that change. 8.3.4 When the Owner and the Design/Builder agree upon the adjustments in the Contract Sum and Contract Time, such agreement shall be effective immediately and - shall be recorded by preparation and execution of an appropriate Change Order. 8.4 MINOR CHANGES IN THE WORK 8.4.1 The Design/Builder shall have authority to make minor changes in the Construction Documents and construction consistent with the intent of the Contract Documents when such minor changes do not involve adjustment in the Contract Sum or extension of the Contract Time. The Design/Builder shall promptly inform the Owner, in writing, of minor changes in the Construction Documents and construction. AIA DOCUMENT A191 • OWNER-DESIGN/BUILDER AGREEMENT • SECOND EDITION • .-UAaO. 01996 THE AIMER.ICAN INSTITUTE OF ARCHITECTS, -'5 NEW YORK AVENUE, NW, WASHINGTON. DC 20006-5292 • WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal :cution.. This document was electronically produced with permission of the AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format ,x191 -1996 User Document: A191.CON — 8/20/1997. AIA License Number 102743, which expires on 9/8/2001 -- Page #19 8.5 CONCEALED CONDITIONS 8.5.1 If conditions are encountered at the site which are (1) subsurface or otherwise concealed physical conditions —hich differ materially from those indicated in the Contract icuments, or (2) unknown physical conditions of an unusual nature which differ materially from those ordinarily found to exist and generally recognized as inherent in construction activities of the character provided for in the Contract Documents, then notice by the observing party shall be given to the other party promptly before conditions are disturbed and in no event later than 21 days after first observance of the conditions. The Contract Sum shall be equitably adjusted for such concealed or unknown conditions by Change Order upon claim by either party made within 21 days after the claimant becomes aware of the conditions. 8.6 REGULATORY CHANGES 8.6.1 The Design/Builder shall be compensated for changes in the construction necessitated by the enactment or revisions of codes, laws or regulations subsequent to the submission of the Design/Builder's Proposal. ARTICLE 9 CORRECTION OF WORK 9.1 The Design/Builder shall promptly correct Work - -4ected by the Owner or known by the Design/Builder to be .ective or failing to conform to the requirements of the Contract Documents, whether observed before or after Substantial Completion and whether or not fabricated, installed or completed. The Design/Builder shall bear costs of correcting such rejected Work, including additional testing and inspections. 9.2 If, within one (1) year after the date of Substantial Completion of the Work or, after the date for commencement of warranties established in a written agreement between the Owner and the Design/Builder, or by terms of an applicable special warranty required by the Contract Documents, any of the Work is found to be not in accordance with the requirements of the Contract Documents, the Design/Builder shall correct it promptly after receipt of a written notice from the Owner to do so unless the Owner has previously given the Design/ Builder a written acceptance of such condition. 9.3 Nothing contained in this Article 9 shall be construed to establish a period of limitation with respect to other obligations which the Design/Builder might have under the Contract Documents. Establishment of the time period of one (1) year as described in Subparagraph 9.2 relates only to the specific obligation of the Design/Builder to correct the Work, and has no relationship to the time Nvithin which the obligation to comply with the Contract Documents may be sought to be enforced. nor to the time within which proceedings may be commenced to establish the Design/Builder's liability with respect to the Design/Builder's obligations other than specifically to correct the Work. 9.4 If the Design/Builder fails to correct nonconforming Work as required or fails to cam out Work in accordance with the Contract Documents, the Owner. by written order signed personally or by an agent specifically so empowered by the Owner in writing, may order the Design/Builder to stop the Work, or any portion thereof, until the cause for such order has been eliminated, however, the Owner's right to stop the Work shall not give rise to a duty on the part of the Owner to exercise the right for benefit of the Design/Builder or other persons or entities. 9.5 If the Design/Builder defaults or neglects to carry out the Work in accordance with the Contract Documents and fails within seven (7) days after receipt of written notice from the Owner to commence and continue correction of such default or neglect with diligence and promptness, the Owner may give a second written notice to the Design/Builder and, seven (7) days following receipt by the Design/Builder of that second written notice and without prejudice to other remedies the Owner may have, correct such deficiencies. In such case an appropriate Change Order shall be issued deducting from payments then or thereafter due the Design/ Builder, the costs of correcting such deficiencies. If the payments then or thereafter due the Design/Builder are not sufficient to cover the amount of the deduction, the Design/Builder shall pay the difference to the Owner. Such action by the Owner shall be subject to dispute resolution procedures as provided in Article 10. ARTICLE 10 DISPUTE RESOLUTION— MEDIATION AND ARBITRATION 10.1 C-laims, disputes -e+ s -in ques4ien ra5 g Effit Of 8F r-elatiftg-te4his-P,fE-2—>greemeni brea6h thefe8f Shall suit ee-te -albdeeided -by flediatien -f afbitfaiiien.. Stie1� the ief> -of -afbi facie- shall • -be Eendaeted -in aseeFdanee wit# -the Censtf+ietien industfy NFediat:ien -ef Rules-e€4heparrA-Asseeiafien -ift- AIA DOCUMENT .x191 • OWNER-DESIGNBUILDER AGREEMENT • SECOND EDITION • AIAO • .)1996 THE AMERICAN INSTITL:TE OF ARCHITECTS, 1475 NEW YORK AVENUE. NW. WASHINGTON. DC 20006-5292 • WARNING: Unlicensed photocopying violatds U.S. copyright laws and is subject to legal ecution.. This document was electronically produced with permission of the AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format A191 -1996 User Document: A191.CON -- 8/20/1997. AIA License Number 102743, which expires on 9/8/2001 -- Page 420 10.2 l- addkien -ta fief 4e afbitfatiefi.4he partiessh" endeaTef-tesettle dues -dr mediation. Deman -fef� edi shall filed • 'r; .•�h the rhe, r..• ..... ......... shall ..::ca-iir�:izxrrr�++-rrzrcric.�zzxcr--puririvcinr Raft i nt zfnd -A44 -the American Afbitfafien ' iseeiatietl. :' demand fbF mediatienshall be d th .tsenable -4me 44ef 4-heelaim. ►te. -ef athe matte -ia- gnestian 4rras ' arisen. - 4-a -ne Genf shall the � -1'ef- n.edjatiefi be - Ade aAeF •he date ,,.he„ e�}ttital�le eedinb base -e* sae!} claim. dispute-ef ed4eF ��eald�e-bafretl lApplicable statutes 8f Fepese F i s atie s - 10.3 De,..e..a f6F afbilfat;,..t shall he filed ; .,trop, with tate 4e 4his -PAA -2 _1_O—rrTTe-_ ent -and -w'lh American Afbitfatien Asseciatien. A demand F F afbiiFatiea shall -be FHade within -a -feasenable -tifne -a teF 4he cWfn, dlspete-efe64er. -in-questieH4*as afisen.--ln-fie-avefit -44ega4-ef imitable Pfeeeedifi g based -en -tel} hie stap,tes 9f Fepese . lifaitatiens 10.4 An ar-bitfatien ant -+e -this Ai4iele -rfta=,= -be- joined with n fact bem-een 4he Desigf+,4Buildef -and am -pefset} -ef Ontity- with whefnDesi ildef4ias-a eeiitfaetidal abligi Cien- te afbitr'at2disputes.--ale ether_hztrortmtien arising etrt : relating -to 4his -haft -2 -Agreement shall-inelude. 4w- eensekdatien. jeindef ef-i-n-air• eth f-fnaenen-an ie13a1 rsen er of#it?��neE a -party to- this P^ft 2 Agr-eement eF net party -te-anfeefneftt -with the . wept -}- wfitet c :c_ eentaini3;ag-a- spec-i€e fefer-enee4e4hls-Raft -2 bFeefnent ned the Ehe b fAuildeF and any ethef pefsett -of des seug#t -te -be jeiffed. C-ensent 4e,- a bitfatleftifivelviflg-an-adrenal-flefsen of entity�ltail-1 et constitute consent to arbitration of any claim• dispute or etheFiiiatt$f-i-fi -ihe written eeaseiit of 3-a-pefSeR-ef c'ntii -Het-name-efdeseFibed theFein. Tkeefegafngagr-ee eaE4e afbitfaw-ate athefgreements to ztrbkFaEe -A4th -a-n additional pefsei -ef cemity-4al}L eensented-te-by4l+a-paftie$ te t4iisTctrt 2 Aagr-eemeiii shall h.. S€eeifleal cru6tzeuvte- 10.5 The award_� ndefeQ-by-the-afbitfateaFbitfaieFs- shall -4e final, -and Jttdg£nent -FneA- -be —.A -&p -&pen it -in' aeeeFdafiee -Ai ih -applicable -law -in any eetiFt lig ARTICLE 11 MISCELLANEOUS PROVISIONS 11.1 Unless otherwise provided, this Part 2 Agreement shall be governed by the law of the place where the Project is located. 11.2 SUBCONTRACTS 11.2.1 The Design/Builder. as soon as practicable after execution of this Paft -3 -Agreement, shall furnish to the Owner in writing the names of the persons or entities the Design/Builder will engage as contractors for the Project. 11.3 WORK BY OWNER OR OWNER'S CONTRACTORS 11.3.1 The Owner reserves the right to perform construction or operations related to the Project with the Owner's own forces, and to award separate contracts in connection with other portions of the Project or other construction or operations on the site under conditions of insurance and waiver of subrogation identical to the provisions of this Faft-2 Agreement. If the Design/Builder claims that delay or additional cost is involved because of such action by the Owner, the Design/Builder shall assert such claims as provided in Subparagraph 11.4. 11.3.2 The Design/Builder shall afford the Owner's separate contractors reasonable opportunity for introduction and storage of their materials and equipment and performance of their activities and shall connect and coordinate the Design/Builder's construction and operations with theirs as required by the Contract Documents. 11.3.3 Costs caused by delays or by improperly timed activities or defective construction shall be borne by the party responsible therefor. 11.4 CLAIMS FOR DAMAGES 11.4.1 If either party to this Part 2 Agreement suffers injury or damage to person or property because of an act or omission of the other parry, of any of the other party's employees or agents. or of others for whose acts such party is legally liable, written notice of such injury or damage, whether or not insured, shall be given to the other party within a reasonable time not exceeding 21 days after first observance. The notice shall provide sufficient detail to enable the other party to investigate the matter. If a claim of additional cost or time related to this claim is to be asserted, it shall be filed in writing. 11.5 INDEMNIFICATION 11.5.1 To the fullest extent permitted by law, the AIA DOCUMENT A191 - OWNER-DESIGN/BUILDER AGREENJENT • SECOND EDITION -.-UAW • 91996 THE AMERICAN INSTITUTE OF ,ARCHITECTS. "35 NEW YORK AVENUE, NW. WASHINGTON. DC 20006-5292 • WARNING: Unlicensed photocopying violates U.S, copyright laws and is subject to legal .secution.. This document was electronically produced with permission ofthe AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format A191 -1996 User Document: A19 LCON -- 8/20/1997. AIA License Number 102743. which expires on 9/3/2001 -- Page #21 Design/Builder shall indemnify and hold harmless the Owner. Owner's consultants. and agents and employees of any of them from and against claims. damages, losses and expenses, including but not limited to attorneys' fees, arising out of or resulting from performance of the Work, provided It such claim, damage, loss or expense is attributable to oodily injury, sickness, disease or death, or to injury to or destruction of tangible property (other -than the Work itself) including loss of use resulting therefrom, but only to the extent caused in whole or in part by negligent acts or omissions of the Design/Builder, anyone directly or indirectly employed by the Design/Builder or anyone for whose acts the Design/Builder may be liable, regardless of whether or not such claim, damage, loss or expense is caused in part by a party indemnified hereunder. Such obligation shall not be construed to negate, abridge, or reduce other rights or obligations of indemnity which would otherwise exist as to a party or person described in this Paragraph 11.5. 11.5.2 In claims against any person or entity indemnified under this Paragraph 11.5 by an employee of the Design/Builder, anyone directly or indirectly employed by the Design/Builder or anyone for whose acts the Design/Builder may be liable, the indemnification obligation under this Paragraph 11.5 shall not be limited by a limitation on amount or type of damages. compensation or benefits payable by or for the Design/Builder under workers' compensation acts, disability benefit acts or other employee henefit acts. 11.6 SUCCESSORS AND ASSIGNS 11.6.1 The Owner and Design/Builder, respectively, bind themselves, their partners, successors, assigns and legal representatives to the other party to this Part 2 Agreement and to the partners, successors and assigns of such other party with respect to all covenants of this Part 2 Agreement. Neither the Owner nor the Design/Builder shall assign this Fai:t-2 Agreement without the written consent of the other. The Owner may assign this Part 2 Agreement to any institutional lender providing construction financing, and the Design/Builder agrees to execute all consents reasonably required to facilitate such an assignment. If either party makes such an assignment, that party shall nevertheless remain legally responsible for all obligations under this Part 2 Agreement, unless otherwise agreed by the other party. 11.7 TERMINATION OF PROFESSIONAL DESIGN SERVICES 11.7.1 Prior to termination of the services of the Architect or any other design professional designated in this Paft4 Agreement, the Design/Builder shall identity to the Owner in writing another architect or other design professional with respect to whom the Owner has no reasonable objection, who will provide the services originally to have been provided by the Architect or other design professional whose services are being terminated. 11.8 EXTENT OF AGREEMENT 11.8.1 This PfifE -2 Agreement represents the entire agreement between the Owner and the Design/Builder and supersedes prior negotiations, representations or agreements, either written or oral. This Part 2 Agreement may be amended only by written instrument and signed by both the Owner and the Design/Builder. ARTICLE 12 TERMINATION OF THE AGREEMENT 12.1 TERMINATION BY THE OWNER 12.1.1 This Pa# 4 Agreement may be terminated by the Owner upon 14 days' written notice to the Design/Builder in the event that the Project is abandoned. If such termination occurs, the Owner shall pay the Design/Builder for Work completed and for proven loss sustained upon materials, equipment, tools, and construction equipment and machinery, including reasonable profit and applicable damages. 12.1.2 If the Design /Builder defaults or persistently fails or neglects to carry out the Work in accordance with the Contract Documents or fails to perform the provisions of this PafE-2 Agreement, the Owner may give written notice that the Owner intends to terminate this IL-2 Agreement. If the Design/Builder fails to correct the defaults, failure or neglect within seven (7) days after being given notice, the Owner may then give a second written notice and, after an additional seven (7) days, the Owner may without prejudice to any other remedy terminate the employment of the Design/Builder and take possession of the site and of all materials. equipment, tools and construction equipment and machinery thereon owned by the Design/Builder and finish the Work by whatever method the Owner may deem expedient. If the unpaid balance of the Contract Sum exceeds the expense of finishing the Work and all damages incurred by the Owner, such excess shall be paid to the Design/Builder. If the expense of completing the Work and all damages incurred by the Owner exceeds the unpaid balance, the Design/Builder shall pay the difference to the Owner. This obligation for payment shall survive termination of this Part 2 Agreement. AIA DOCUMENT A191 - OWNER-DESIGN/BUILDER AGREEMENT • SECOND EDITION - .-AIAGP • 401996 THE ,AMERICAN INSTITUTE OFARCHITECTS, 1735 NEW YORK AVENUE. NW, WASHINGTON, DC 20006-5292 • WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal ecution.. This document was electronically produced with permission of the AIA and can be reproduced without violation until the date of expiration as noted below, Electronic Format A191 -1996 User Document: A 19 LCON -- 8/20/1997. AIA License Number 102743, which expires on 9/8/2001 -- Page ;#22 12.2 TERMINATION BY THE DESIGN/BUILDER 12.2.1 If the Owner fails to make payment when due, the Design/Builder may give written notice of the Design/ uilder's intention to terminate this NH44 Agreement. If the Design/Builder fails to receive payment within seven (7) days after receipt of such notice by the Owner, the Design/Builder may give a second written notice and, seven (7) days after receipt of such second written notice by the Owner, may terminate this -Pao -2 Agreement and recover from the Owner payment for Work executed and for proven losses sustained upon materials, equipment, tools, and construction equipment and machinery, including reasonable profit and applicable damages. ARTICLE 13 BASIS OF COMPENSATION The Owner shall compensate the Design/Builder in accordance with Article 5, Payments, and the other provisions of this Pan -3 Agreement as described below. 13.1 COMPENSATION 13.1.1 For the Design/Builder's performance of the Work, as described in Paragraph 3.2 and including any other services listed in Article 14 as part of Basic Services, the Owner shall pay the Design/Builder in current funds the Contract Sum as follows: 13.1.2 For Additional Services, as described in Paragraph 3.3 and including any other services listed in Article 14 as Additional Services, compensation shall be as follows: 13.2 REIMBURSABLE EXPENSES 13.2.1 Reiflbtksable -; -Tenses -are -ice additien -to -the sempe>}safien -fef Basie -ate Additienal SeAiees, -and -ine-lude-aePaal- expeadiPdfes-made * eke Design�BuildeF -and-44e DesignJBuilder's p levees -and eentraeteffi 4x -£�ke psi-e€the Pr-ejeet; ass fellewsi 13.3 INTEREST PAYMENTS 13.3.1 The Fate of inter -est fer- post due pa�qneats shall be as fellows: (Usury laws and requirements under the Federal Truth in Lending Act. similar state and local consumer credit laws and other regulations at the Owner's and Design/ Builder's principal places of business, at the location of the Project and elsewhere may affect the validity of this provision. Specific legal advice should be obtained with respect to deledo)i. modifrcanon or other requirements, such as written disclosures or waivers.) ARTICLE 14 OTHER CONDITIONS AND SERVICES 14.1 The Basic Services to be performed shall be commenced on and, subject to authorized adjustments and to delays not caused by the Design/Builder, Substantial Completion shall be achieved in the Contract Time of ( ) calendar days. 14.2 The Basic Services beyond those described in Article 3 are as follows: 14.3 Additional Services beyond those described in Article 3 are as follows: 14.4 The Design/Builder shall submit an Application for Payment on the ( ) day of each month. ,UA DOCUMENT .x191 • OWNER-DESIGN/BUILDER AGREEMENT • SECOND EDITION • AIAQ • 'cv' 1996 THE AMERICAN INSTITUTE OF ARCHITECTS. 1735 NEW YORK AVENUE. NW. WASHINGTON, DC 20006-5292 • WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal secution.. This document was electronically produced with permission of the AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format A191 -1996 User Document: A19LCON — 8/20/1997. AIA License Number 102743, which expires on 9/8/2001 — Page #23 14.5 The Design/Builder's Proposal includes the following documents: (List the documents by specific title and date; include any required performance and payment bonds.) Title Date .14.6 DISPUTE RESOLUTION for same on the other party._ The Parties shall by mutual agreement, select a, mediator within fifteen115 , days of the date of the request for mediation If the parties cannot agree on the selection of a mediator then the Owner shall select the mediator, who, if selected solely by the Owner, shall. be a mediator certified by the Supreme Court of Florida. No suit or other legal proceeding shall be filed until the mediator declares an impasse. which declaration. in anv event._ shall be issued by the mediator not later than sixty (60) days after the initial mediation conference 14.7 ATTORNEYS' FEES In the event that either party seeks to enforce this contract by way of legal action -and the matter is placed in the hands of any attorney, then the prevailing party shall recover its attorneys' fees and the court shall determine the amount of, such fees and allow recovery to said prevailing party in entering a iudgment._ The parties a ree that entitlement to attomevs' fees under this agreement shall be deemed to include all apoellate attomevs' fees 14.8 INDEMNIFICATION Design/Builder acknowledges an agrees that the sum of $100.00 of the compensation received by Design/Builder under this agreement is in consideration for anv'and all indemnifirntinns nrantati by rlacinn/Riiilrlar tinrlor+h;e -c nn+ „r this provision shall be deemed to be a part of the oroiect specifications or bid -documents 14.10 LIQUIDATED DAMAGES - The Design/Builder acknowledges that the Owner will incur damage if the work is not completed within the contract time in an amount that is impracticable to calculate. Therefore the'Parties agree'and acknowledge that The Design/Builder, 'and its Surety, if any, shall. be liable for. and shall Pay the Owner the sum of $500.00 as liquidated damages, and not as aep nalty, for each calendar day of delay, until the work is substantially completed. If after substantial competion, therp oiect is not finally completed in accordance with the 'requirements of the contract documents, the Design/Builder shall pay to the Owner as liquidated damages and not as a penalty, for such delay, the m, of $250.00 per calendar day, until the Proiect'reaches final completion., These liquidated damages'shall be payable .t addition to any additional expenses costs or damages payable by the Design /Builder to the Owner under the contract' documents, for reasons other than late completion and shall not exclude recovery by the Owner of damages for reasons other than delay or late completion. 14.11 NO DAMAGES TO DESIGN/BUILDER FOR DELAY, DISRUPTION OR ACCELERATION Pursuant to Article 4.5 of this agreement, an extension of time shall be the sole remedy available to the Design/Builder for delay, disruption or acceleration. Under no circumstances shall the Design/Builder be entitled to damages for delay, disrution, acceleration or anv extension of performance by the Design/Builder. This Agreement entered into as of the, day and year first written above. OWNER DESIGN/BUILDER (Signature) (Printed name and title) (Signature) (Printed name and title) .AIA DOCUMENT .x191 • OWNER-DESIGN/BUILDER AGREEMENT.-. SECOND EDITION, -.-UAV THE AMERICAN INSTITUTE OF ARCHITECTS. ''735 NEW .YORK ,AVENUE, NW, WASHINGTON, DC 20006-5292 WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal ;ecution.. This document was electronically produced with permission of the ALA and can be reproduced without violation until the date of expiration as noted below," Electronic Format A191 -1996 User Document: A191.CON -- 8/20/1997. AIA License Number 102743, wWch.expires on 9/8/2001 -- Page #24 [i Performance Bond AIA Document A312 - Electronic Format THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES: CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. Any singular reference to Contract, Surety, Owner or Other Party Shall be considered plural where applicable. CONTRACTOR (Name and Address): OWNER (Name and Address): CONSTRUCTION CONTRACT Date: Amount: Description (Name and Location): BOND Date (Not earlier than Construction Contract Date): Amount: Modifications to this Bond: CONTRACTOR AS PRINCIPAL Company: (Corporate Seal) Signature: Name and Title: (Any additional signatures appear on the last page) (FOR INFORMATION ONLY - Name, Address and Telephone) AGENT or BROKER: SURETY (Name and Principal Place of Business) [ ] None SURETY Company: Signature: Name and Title: [ ] See Page (Corporate Seal) OWNER'S REPRESENTATIVE (Architect, Engineer or other AIA DOCUMENT A312- PERFORMANCE BOND AND PAYMENT BOND - DECEMBER 1984 ED. - AIA 0- THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C., 20006-5292 - THIRD PRINTING - MARCH 1987. WARNING; Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. This document was electronically produced with pernussion of the AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format A312-1984 User Document: A312.CON -- 8/15/1997. AIA License Number 102743, which expires on 9/8/2001 -- Page #1 party) AIA DOCUMENT A312• PERFORMANCE BOND AND PAYMENT BOND • DECEMBER 1984 ED. • AIA (• THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C.,'20006-5292 • THIRD PRINTING • MARCH 1987. WARNING; Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format A312-1984 User Document: A312.CON -- 8/15/1997. AIA License Number 102743, which expires on 9/8/2001 -- Page #2 I The Contractor and the Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to the Owner for the performance of the Construction Contract, which is incorporated herein by reference. 2 If the Contractor performs the Construction Contract, the Surety and the Contractor shall have no obligation under this Bond, except to participate in conferences as provided in Subparagraph 3.1. 3 If there is no Owner Default, the Surety's obligation under this Bond shall arise after: 3.1 The Owner has notified the Contractor and the Surety at its address described in Paragraph 10 below that the Owner is considering declaring a Contractor Default and has requested and attempted to arrange a conference with the Contractor and the Surety to be held not later than fifteen days after receipt of such notice to discuss methods of performing the Construction Contract. If the Owner, the Contractor and the Surety agree, the Contractor shall be allowed a reasonable time to perform the Construction Contract, but such an agreement shall not waive the Owner's right, if any, subsequently to declare a Contractor Default: and 3.2 The Owner has declared a Contractor Default and formally terminated the Contractor's right to complete the contract. Such Contractor Default shall not be declared earlier than twenty days after the Contractor and the Surety have received notice as provided in Sub -paragraph 3.1; and 3.3 The Owner has agreed to pay the Balance of the Contract Price to the Surety in accordance with the terms of the Construction Contract or to a contractor selected to perform the Construction Contract in accordance with the terms of the contract with the Owner. 4 When the Owner has satisfied the conditions of Paragraph 3, the Surety shall promptly and at the Surety's expense take one of the following actions: 4.1 Arrange for the Contractor, with consent of the Owner, to perform and complete the Construction Contract; or 4.2 Undertake to perform and complete the Construction Contract itself, through its agents or through independent contractors; or 4.3 Obtain bids or negotiated proposals from qualified contractors acceptable to the Owner for a contract for performance and completion of the Construction Contract, arrange for a contract to be prepared for execution by the Owner and the contractor selected with the Owner's concurrence, to be secured with performance and payment bonds executed by a qualified surety equivalent to the bonds issued on the Construction Contract, and pay to the Owner the amount of damages as described in Paragraph 6 in excess of the Balance of the Contract Price incurred by the Owner resulting from the Contractor's default; or 4.4 Waive its right to perform and complete, arrange for completion, or obtain a new contractor and with reasonable promptness under the circumstances: .1 After investigation, determine the amount for which it may be liable to the Owner and, as soon as practicable after the amount is determined, tender payment therefor to the Owner; or Deny liability in whole or in part and notify the Owner citing reasons therefor. 5 If the Surety does not proceed as provided in Paragraph 4 with reasonable promptness, the Surety shall be deemed to be in default on this Bond fifteen days after receipt of an additional written notice from the Owner to the Surety demanding that the Surety perform its obligations under this Bond, and the Owner shall be entitled to enforce any remedy available to the Owner. If the Surety proceeds as provided in Subparagraph 4.4, and the Owner refuses the payment tendered or the Surety has denied liability, in whole or in part, without further notice the Owner shall be entitled to enforce any remedy available to the Owner. 6 After the Owner has terminated the Contractor's right to complete the Construction Contract, and if the Surety elects to act under Subparagraph 4.1, 4.2, or 4.3 above, then the responsibilities of the Surety to the Owner shall not be greater than those of the Contractor under the Construction Contract, and the responsibilities of the Owner to the Surety shall not be greater than those of the Owner under the Construction Contract. To the limit of the amount of this Bond, but subject to commitment by the Owner of the Balance of the Contract Price to mitigation of costs and damages on the Construction Contract, the Surety is obligated without duplication for: 6.1 The responsibilities of the Contractor for correction of defective work and completion of the Construction Contract; AIA DOCUMENT A312• PERFORMANCE BOND AND PAYMENT BOND • DECEMBER 1984 ED. • AIA ai• THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C., 20006-5292 • THIRD PRINTING • MARCH 1987. WARNING; Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format A312-1984 User Document: A312.CON -- 8/15/1997. AIA License Number 102743, which expires on 9/8/2001 -- Page #3 6.2 Additional legal, design professional and delay costs resulting from the Contractor's Default, and resulting from the actions or failure to act of the Surety under Paragraph 4; and 6.3 Liquidated damages, or if no liquidated damages are specified in the Construction Contract, actual damages caused by delayed performance or non-performance of the Contractor. 7 The Surety shall not be liable to the Owner or others for obligations of the Contractor that are unrelated to the Construction Contract, and the Balance of the Contract Price shall not be reduced or set off on account of any such unrelated obligations. No right of action shall accrue on this Bond to any person or entity other than the Owner or its heirs, executors, administrators or successors. 8- The Surety hereby waives notice of any change, including changes of time, to the Construction Contract or to related subcontracts, purchase orders and other obligations. 9 Any proceeding, legal or equitable, under this Bond may be instituted in any court of competent jurisdiction in the location in which the work or part of the work is located and shall be instituted within two years after Contractor Default or within two years after the Contractor ceased working or within two years after the Surety refuses or fails to perform its obligations under this Bond, whichever occurs first. If the provisions of this Paragraph are void or prohibited by law, the minimum period of limitation available to sureties as a defense in the jurisdiction of the suit shall be applicable. 10 Notice to the Surety, the Owner or the Contractor shall be mailed or delivered to the address shown on the signature page. MODIFICATIONS TO THIS BOND ARE AS FOLLOWS: 11 When this Bond has been fumished to comply with a statutory or other legal requirement in the location where the construction was to be performed, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted here from and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. The intent is that this Bond shall be construed as a statutory bond and not as a common law bond. 12 DEFINITIONS 12.1 Balance of the Contract Price: The total amount payable by the Owner to the Contractor under the Construction Contract after all proper adjustments have been made, including allowance to the Contractor of any amounts received or to be received by the Owner in settlement of insurance or other claims for damages to which the Contractor is entitled, reduced by all valid and proper payments made to or on behalf of the Contractor under the Construction Contract 12.2 Construction Contract: The agreement between the Owner and the Contractor identified on the signature page, including all Contract Documents and changes thereto. 12.3 Contractor Default: Failure of the Contractor, which has neither been remedied nor waived, to perform or otherwise to comply with the terms of the Construction Contract. 12.4 Owner Default: Failure of the Owner, which has neither been remedied nor waived, to pay the Contractor as required by the Construction Contract or to perform and complete or comply with the other terms thereof. (Space is provided below for additional signatures of added parties, other than those appearing on the cover page.) CONTRACTOR AS PRINCIPAL SURETY Company: (Corporate Seal) Company: Signature: Name and Title: Signature: Name and Title: (Corporate Seal) AIA DOCUMENT A312- PERFORMANCE BOND AND PAYMENT BOND - DECEMBER 1984 ED. - AIA 0- THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON. D.C., 20006-5292 - THIRD PRINTING - MARCH 1987. WARNING; Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format A312-1984 User Document: A312.CON -- 8/15/1997. AIA License Number 102743, which expires on 9/8/2001 -- Page #4 Payment Bond AIA Document A312 - Electronic Format CONTRACTOR (Name and Address): SURETY (Name and Principal Place ojBusiness): OWNER (Name and Address): CONSTRUCTION CONTRACT r Date: Amount: Description (Name and Location): BOND Date (Not earlier than Construction Contract Date): Amount: Modifications to this Bond: [ ] None [ ] See Page ^ONTRACTOR AS PRINCIPAL SURETY impany: (Corporate Seal) Company: (Corporate Seal) Signature: Signature: Name and Title: Name and Title: (Any additional signatures appear on the last page) (FOR INFORM4TION ONLY - Name, Address and Telephone) AGENT or BROKER: OWNER'S REPRESENTATIVE (Architect, Engineer or other per'): This bond shall be deemed to be issued pursuant to the provisions of Section 255.05, Florida Statutes and the requiretnents of same are hereby incorporated by reference. ,AIA DOCUMENT A312• PERFORMANCE BOND AND PAYMENT BOND • DECEMBER 1984 ED. • AIA Q-- THE .AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK ,AVENUE, N.W., WASHINGTON, D.C., 20006-5292 • THIRD PRINTING • MARCH 1987. WARNING; Unlicensed photocopying violates U.S. loyright laws and is subject to legal prosecution. This document was electronically produced under license number 296000035 and can be reproduced without violation 1102/01/96. Electronic Format A312-1984 User Document: A312.CON — 8/15/1997. AIA License Number 102743, which expires on 9/8/ 1 The Contractor and the Surety, jointly and severally bind themselves, their heirs, executors, administrators, successors and assigns to the Owner to pay for labor, materials and equipment furnished for use in the performance of the :Istruction Contract, which is incorporated herein by clerence: 2 With respect to the Owner, this obligation shall be null and void if the Contractor: 2.1 Promptly makes payment, directly or indirectly, for all sums due Claimants, and 2.2 Defends, indemnifies and holds harmless the Owner from claims, demands, liens or suits by any person or entity whose claim, demand, lien or suit is for the payment for labor, materials or equipment furnished for use in the performance of the Construction Contract, provided the Owner has promptly notified the Contractor and the Surety (at the address described in Paragraph 12) of any claims, demands, liens or suits and tendered defense of such claims, demands, liens or suits to the Contractor and the Surety, and provided there is no Owner Default. 3 With respect to Claimants, this obligation shall be null and void if the Contractor. promptly makes payment, directly or indirectly, for all sums due. e The Surety shall have no obligation to Claimants under Bond until: 4.1 Claimants who are employed by or have a direct contract with the Contractor have given notice to the Surety (at the address described in Paragraph 12) and sent a copy, or notice thereof, to the Owner, stating that a claim is being made under this Bond and, with substantial accuracy, the amount of the claim. 4.2 Claimants who do not have, a direct contract with the Contractor: .1 Have furnished written notice to the Contractor and sent a copy, or notice thereof, to the Owner, within 90 days after having last performed labor or last furnished materials or equipment included in the claim stating, with substantial accuracy, the amount of the claim and the name of the party to whom the materials were furnished. or supplied or for whom the labor was done or performed; and part from the Contractor, or not received within 30 days of furnishing the above notice any communication from the Contractor by which the Contractor has indicated the claim will be paid directly or indirectly; and .3 Not having been paid within the above 30 days, have sent a written notice to the Surety (at the address described in Paragraph 12) and sent a copy, or notice thereof, to the Owner, stating that a claim is being made under this Bond and enclosing a copy of the previous written notice furnished to the Contractor. 5 if a notice required by Paragraph 4 is given by the Owner to the Contractor or to the Suretv, that is sufficient compliance. 6 When the Claimant has satisfied the conditions of Paragraph 4, the Surety shall promptly and at the Surety's expense take the following actions: 6.1 Send an answer to the Claimant, with a copy to the Owner, within 45 days after receipt of the claim, stating the amounts that are undisputed and the basis for challenging any amounts that are disputed. 6.2 Pay or arrange for payment of any undisputed amounts. 7 The Surety's total obligation shall not exceed the amount of this Bond, and the amount of this Bond shall be credited for any payments made in good faith by the Surety. 8 Amounts owed by the Owner to the Contractor under the Construction Contract shall be used for the performance of the Construction Contract and to satisfy claims, if any, under any Construction Performance Bond. By the Contractor furnishing and the Owner accepting this Bond, they agree that all funds earned by the Contractor in the performance of the Construction Contract are dedicated to satisfy obligations of the Contractor and the Surety under this Bond, subject to the Owner's priority to use the funds for the completion of the work. 9 The Surety shall not be liable to the Owner. Claimants or others for obligations of the Contractor that are unrelated to the Construction Contract. The Owner shall not be liable for payment of any costs or expenses of any Claimant under this Bond, and shall have under this Bond no obligations to make payments to, give notices on behalf of, or otherwise have obligations to Claimants under this Bond. .2 Have either received a rejection in whole or in 10 The Surety hereby waives notice of -any change, AIA DOCUMENT A312• PERFORMANCE BOND AND PAYMENT BOND • DECEMBER 1984 ED. • AIA - THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON. D.C., 20006-5292 • THIRD PRINTING • MARCH 1987. WARNING; Unlicensed photocopying violates U.S. fight laws and is subject to legal prosecution. This document was electronically produced under license number 296000035 and can be reproduced without violation 12101/96. Electronic Format A312-1984 User Document: A312.CON -- 8/15/1997. AIA License Number 102743, which expires on 9/8/ including changes of time, to the Construction Contract or to related subcontracts, purchase orders and other obligations. 11 No suit or action shall be commenced by a Claimant ender this Bond other than in a court of competent isdiction in the location in which the work or part of the work is located or after the expiration of one year from the date (1) on which the Claimant gave the notice required by Subparagraph 4.1 or Clause 4.2.3, or (2) on which the last labor or service was performed by anyone or the last materials or equipment were furnished by anyone under the Construction Contract, whichever of (1) or (2) first occurs. If the provisions of this Paragraph are void or prohibited by law, the minimum period of limitation available to sureties as a defense in the jurisdiction of the suit shall be applicable 12 Notice to the Surety, the Owner or the Contractor shall be mailed or delivered to the address shown on the signature page. Actual receipt of notice by Surety, the Owner or the Contractor, however accomplished, shall be sufficient compliance as of the date received at the address shown on the signature page. 13 When this Bond has been furnished to comply with a statutory or other legal requirement in the location where the construction was to be performed, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed ^orporated herein. The intent is that this Bond shall be ztrued as a statutory bond and not as a common law bond. MODIFICATIONS TO THIS BOND ARE AS FOLLOWS: 14 Upon request by any person or entity appearing to be a potential beneficiary of this Bond, the Contractor shall promptly furnish a copy of this Bond or shall permit a copy to be made. 15 DEFINITIONS 15.1 Claimant: An individual or entity having a direct contract with the Contractor or with a subcontractor of the Contractor to furnish labor, materials or equipment for use in the performance of the Contract. The intent of this Bond shall be to include without limitation in the terms "labor, materials or equipment" that part of water, gas, power, light, heat, oil, gasoline, telephone service or rental equipment used in the Construction Contract, architectural and engineering services required for performance of the work of the Contractor and the Contractor's subcontractors, and all other items for which a mechanic's lien may be asserted in the Jurisdiction where the labor, materials or equipment were furnished. 15.2 Construction Contract: The agreement between the Owner and the Contractor identified on the signature page, including all Contract Documents and changes thereto. 15.3 Owner Default: Failure of the Owner, which has neither been remedied nor waived, to pay the Contractor as required by the Construction Contract or to perform and complete or comply with the other terms thereof. (Space is provided below for additional signatures of added parties, other than those appearing on the cover page.) CONTRACTOR AS PRINCIPAL SURETY Company: (Corporate Seal) Company: Signature: Name and Title: (Corporate Seal) AIA DOCUMENT A312• PERFORMANCE BOND AND PAYMENT BOND • DECEMBER 1984 ED. • AIA at)• THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON. D.C., 20006-5292 • THIRD PRINTING - MARCH 1987. WARNING, Unlicensed photocopying violates U.S. Tight laws and is subject to legal prosecution. This document was electronically produced under license number 296000035 and can be reproduced without violation .02/01/96. Electronic Format A312-1984 User Document: A312.CON — 8/15/1997. AIA License Number 102743, which expires on 9/8/ EXHIBIT "C" ARTICLE VI DESIGN AND PERFORMANCE STANDARDS DESIGN STANDARDS § 6-1 GENERAL PROVISIONS A Site Development Standards Site development standards are established to ensure adequate levels of light, air, and density; to maintain and promote functional compatibility of uses; to promote the safe and efficient circulation of pedestrian and vehicular traffic; to provide for orderly phasing of development; and otherwise protect the public health, safety and general welfare. B. Project Design The natural topography, soils and vegetation should be preserved and utilized, where possible, through the careful location and design of circulation ways, buildings and structures, parking areas, recreation areas, open space, and drainage facilities. Designation of Conservation Areas must be consistent with adopted ordinances regulating such natural areas. The proposed location and arrangement of structures should not be detrimental to existing or planned adjacent land uses. § 6-2 TRAFFIC AND NON -VEHICULAR CIRCULATION A. Streets, Generally (1) Continuation of existing street pattern. The proposed street layout shall be coordinated with the street system of the surrounding area. Streets in the proposed subdivision shall be connected to dedicated streets in adjacent areas where required to provide for proper traffic circulation. (2) Street access to adjoining property. Street stubs to adjoining unplatted areas shall be provided when required to give access to such areas or to provide for proper traffic circulation. Street stubs in excess of two hundred fifty (250) feet shall be provided with a temporary cul-de-sac tum -around. The developer of the adjoining area shall pay the cost of restoring the street to its original design cross-section and extending the street. (3) Intersection design.. Streets shall be laid out to intersect as nearly as possible at right angles. Multiple intersections involving the juncture of more than two (2) streets shall be prohibited. Sight distances from any intersection shall be in accordance with the Florida Department of Transportation "Manual of Uniform Minimum Standards for Design, Construction, and Maintenance for Streets and Highways" (green book). (4) Subdivision entrance roads. Intersections created by construction of subdivision entrance roads connecting to existing arterial and collector roads may require improvements (to be specified by the DRC), such as deceleration/acceleration lanes, left tum lanes, by-pass lanes and signalization. The criteria for determining the need for such improvements will include existing and projected traffic on both roads, horizontal and vertical alignment of the road to which the entrance road is to be connected, future road improvement plans, sight distance, and other criteria Adopted July 21, 1992 18120 EXC-1 EXHIBIT "C" ARTICLE VI deemed appropriate by the City of Ocoee. Recommended. intersection improvements will be addressed by the -Development Review Committee and considered by the Planning and Zoning Commission and the City Commission at the Preliminary Subdivision Plan public hearings: (5) Pave to nearest paved road. All lots shall front on a paved road. A development shall abut, or have its'primary access on, a street paved to City standards of this regulation. This street shall be paved by the developer from the entrance. of the development to the nearest public paved road. Existing unimproved Cityrights-of- way or dirt streets that abut or border subdivisions shall also be paved and improved at the developer's expense. (6) Intersection separation. intersections on streets or roads designated as arterials shall not.be less than one thousand seven hundred sixty (1,760) feet apart and . intersections on streets or roads designated'as collectors. shall not be less than five hundred (500) feet apart, center line measurement. On local streets, intersections with center line offsets of less than one hundred fifty (150) feet shall be prohibited. (7) Street names. Street names shall not be used which,will duplicate or be confused With the names of existing streets. New streets which are an extension of or in alignment.with existing streets shall bear the same name as that borne by such existing ,streets. All courts and circles should have one name only. All street names -shall be approved by the manager of the Orange County 911 System and the City of Ocoee Fire Department. (8) Development on arterial or collector streets. Where.a development abuts or contains an existing or proposed street that is designated by Resolution of City Commission, the developer will be required to reserve or dedicate rights-of-way and will -be required to -construct improvements as determined by the City Commission. To adequately protect abutting residential properties, .the, City Commission may require double frontage lots with screening walls and/or landscaping buffers, or other treatment as may necessary. Such walls, landscape screens or other buffer treatments'shall. not be located in public rights-of-way. These lots shall not have access onto extemal ;roadways and access rights shall be dedicated to the City. (9) Half streets. Half streets shall be prohibited except where a previously platted half street abuts.a tract to,:be subdivided. The second half of the street shall be platted within the tract being subdivided and the entire street shall be improved as determined by the ,City Commission. (10) Additional right-of-way. A proposed subdivision that includes a dedicated street which does not:conform to the minimum right-of-way. requirements of this Code, or other requirements. determined by the City Commission, shall provide for the dedication of additional right-of-way along either one or both sides of said street so that the minimum required right-of-way can be established.. If the proposed subdivision abuts only one side of said street, then 'a minimum of one-half of. the required additional right-of-way shall be'dedicated by such subdivision. Alleys. Alleys shall not be provided in any residential' district: (12) Street name signs. Street name signs with .appropriate block numbers shall be installed at all, intersections. (For illustration; see below) Adopted July 21, 1992 18121 EXC-2 EXHIBIT "C" ST .Q ST OR Q srsn* braTa�.. ► • A4nri�r� P,(at4—.Ninarzvl rliieXmst lrnchss, die Cut ALCOA .411 Q- eque% ",.o/ehb-s Z �' 9=5' 6ahanrs� a pe with �n rwIlecl>yrzed barX- �nd lb meet Jtan�ras of •rchc►r 633.06Fc-79 rtw- ryP< 3A siiee>' ref/ectrve t t BASE I I ZSOO Osj.. Car�rret� I i I I 70P .� � 6'D�a�nel� flash ,..//i9rsoir I i CR0.�SD�N BCiiOdl Loin 6�=Z4, 4 LGt1`CJ Gr ,FA dnby SL dv*rx EXC-3 EXHIBIT "C" ARTICLE VI (13) Street lighting. Street lighting shall be installed by the developer in coordination with Florida Power Corporation. All utilities shall, be installed underground. Upgraded street lighting requires a special agreement with the City. (14) Traffic control. Intersection improvements and traffic control devices, such as acceleration, deceleration, and turning lanes; pavement markings; signalization devices; signage; and other traffic control devices shall be installed within the project area and on abutting streets and highways in accordance with the Florida Department of Transportation's Manual on Uniform Traffic Control Devices, latest edition, or as directed by the City Engineer. § 6.3 ROADWAY DESIGN STANDARDS All streets shall be designed in accordance with the latest editions of the Orange County Road Construction Specifications; the Florida Department of Transportation "Manual of Uniform Minimum Standards for Design, Construction and Maintenance for Streets and. Highways" (green book); and the following minimum standards: A. Roadway Typical Section. Roadway typical section. All roadway. sections shall conform to the standards incorporated herein. Any deviations from these standards will not be allowed without the approval of the . City Engineer. B. Minimum Right -of -Way Width. Right-of-way width shall be as listed below, or a sufficient width to provide for adequate drainage facilities, utilities, and sidewalks, whichever is greater: CLASSIFICATION RURAL (FT) URBAN (FT) Local Street 60 50 Collector Street 60 60 Arterial Street 100 100 C. Minimum Pavement Width. The minimum pavement widths shall be determined by the average daily traffic (ADT) projected for the roadway and shall be in accordance with the following: AVERAGE DAILY TRAFFIC (ADT) PAVEMENT WIDTH (IN FEET) RESIDENTIAL- 0-1500 ESIDENTIAL• 0 - 1500 24 1501-3500 36 Over 3500 36 (with dedicated access) COMMERCIAL/INDUSTRIAL• 28 Adopted. July 21, 1992 18122 EXC-4 EXHIBIT "C" ARTICLE VI Note: Pavement widths shall be measured exclusive of curbs. All roads shall be designed with either Type B or C curbs. Median curb (Type 0) shall be designed along all medians. R/ W 6- i I. - 6" 1 •�lip ' AvEMENT .. • e" • , I - • ..: .. `,,,� � BASE 12" a STABILIZ_D SUSGRAOI: ' °COMPACT'cD •-SUBGRAOE STANOARO CONCRETE CURE AND GUTT i ER ( TYPE W) R/W 1 ,IV OR 2d" I I �F4 9' OR 17' I 9" CR Ir r t _ PAVEMENT STABILIZED SUBGRAOE 12" • ' c COMPACIcO SUSGiAOE STANDARD CONCRETE MIAMI CURB (TYPE Adopted July 21, 1992 18123 EXC-5 EXHIBIT "C" t' - a- �' r TV I STAB(UZED SUSGRAOE TT � ' 'COhnPa�TED .SUBG�ACE • . ', ' ' • - , �•. '•':. . STANDARD CONCRETE MEDIAN CURB ( TYPE T') trw All �PAVEMEN7 t o BASE c rr tZ' STA8ILIZED SUBG�AOE d • :CC) PACTEt7 •SUSG;AOE; I STANDARD CONCRETE RIBBON CURB (TYPE 5C') SLOPE AS ACIACENT PA4VEMEN7 r PAV EMEN T EXC-6 EXHIBIT "C° ARTICLE VI D. (1) Vertical Alignment. (2) Vertical curves shall be required where the algebraic difference in intersecting grades equals or exceeds the following values: Local STREET CLASSIFICATION ALGEBRAIC DIFFERENCE (%) 1.00 L Collector 0.80 II (3) All vertical curves shall be of sufficient length to provide a safe stopping sight distance compatible to the design speed of the roadway. Minimum length of all vertical curves shall be one hundred (100) feet. (4) The minimum grade for subdivision streets with curb and gutter shall be 0.24 percent. (5) Minimum cross slopes and/or super -elevation rates of .0208 feet/foot (one-quarter inch/foot) shall be utilized for the design of all roadways. E. Horizontal Alignment. (1) The minimum radius of inside edge of pavement at right angle curves internal to subdivisions will be thirty-five (35) feet. (2) A two hundred seventy -fire (275) foot minimum radius shall be used on all collector streets with ADT of one thousand five hundred (1,500) or greater, unless super - elevation of the roadway is incorporated in the design. F. Pavement Requirements. (1) Subgrade. The subgrade shall be constructed in accordance with Orange County Road Construction Specifications and shall be compacted to ninety-five (95) percent of the maximum density as determined by AASHTO T-180 test method. In addition, the top six (6) inches shall be stabilized to a minimum Florida bearing value of fifty (50) under curb areas and under limerock base. (2) Base course. The base course shall be constructed in accordance with the Orange County Road Construction Specifications. Subject to the recommendation of the City Engineer, base course materials may be either limerock, or soil -cement with a minimum thickness as follows: Adopted July 21, 1992 18124 EXC-7 EXHIBIT "C" ARTICLE VI Type of Street Umerock Soil -Cement Development Classification (inches) (inches) RESIDENTIAL: Local 6 6 Collector 8 6 COMMERCIAL/INDUSTRIAL Local 8 8 Collector 10 8 Arterial 10 8 (Other materials may be used if the design -is approved by the City Engineer)' (3) Surface course for flexible pavements. Asphaltic concrete surface courses shall comply with the Orange County Road Construction Specifications, latest edition, and shall meet the following minimum average'thickness requirements: SURFACE COURSE THICKNESS TYPE OF DEVELOPMENT (INCHES) Residential 1 Commercial/Industrial 1 5 G. Return Radii. (1) Point of measurement. (a) Urban sections: Face of curb or flow line. (b) Rural sections: Edge of pavement, (2) Minimum requirements. MINIMUM RADIUS* (FEET) RESIDENTIAL Local 25 Collector 35 COMMERCIAL/INDUSTRIAL Local 40 Collector 50 *Minimum radius of returns shall be based on AASHTO requirements for the type vehicle predominant to the industry considered. Adopted July 21, 1992 18125 EXC=8 EXHIBIT "C" ARTICLE VI H.. Sidewalks. All subdivisions shall have four -foot concrete sidewalks on both. sides of all local and collector streets and five-foot sidewalks on all arterial streets. All sidewalks shall be located within the street right-of-way. Sidewalks shall be a minimum of four (4) inches in thickness, except at driveways where the required thickness is six (6) inches with wire mesh to reinforce. Bridges. Bridges shall be constructed of precast concrete, prestressed - concrete, cast -in-place concrete, composite concrete and steel, or steel. Bridge design shall conform to the design criteria of the latest edition, AASHTO standard specifications for highway bridges. Prior to design of bridges, the developer's engineer shall submit design load criteria to the City Engineer. for approval. Materials and methods of construction shall conform to the Department of Transportation standard specifications for road and bridge construction, latest edition. J. Clearing. All roadway rights-of-way shall be cleared and grubbed in accordance with Orange County Road Construction Specifications, latest edition, unless plans for selective clearing and grubbing are submitted and approved by the City Engineer. K . Cul-de-sacs. Cul-de-sacs shall be provided with a paved turnaround radius of at least forty-five (45) feet in residential subdivisions and at least fifty (50) feet in commercial and industrial subdivisions. The right-of-way radius for cul-de-sacs shall be at least fifty-five (55) feet in residential subdivisions and at least sixty (60) feet in commercial and industrial subdivisions. Cul-de-sacs shall have a maximum length of eight hundred (800) feet as measured from a street having two-way access to an outlet. Larger pavement and right-of-way widths shall be required if determined to be necessary for emergency access purposes. Cul-de-sacs shall be designed into subdivisions only in instances where topography or lot layout dictates their need, as opposed to providing looped or continuous street systems. All cul-de-sacs shall have at least two (2) approved "No Parking" signs erected by the developer. § 6-4 OFF STREET PARKING .,STANDARDS A. Intent and Application. It is the intent of these requirements that adequate parking and loading facilities be provided off the street easement or right-of-way for each use of land covered by this ordinance. Requirements are intended to be based on the demand created by each use. There shall be provided at the time of the erection of any building, or at the time any principal building is enlarged or increased in capacity by adding dwelling units, guest rooms, seats or floor area, or before conversion from one type of use or occupancy to another, permanent off- street parking spaces in the amount specified by this section. Such parking spaces may. be provided in a parking garage or properly graded and paved parking lot as provided herein. B. Certificate of.Minimum Parking Requirements. Each application for a building permit or occupational license submitted to the Building Department shall include information as to the location and dimensions of off-street parking and loading spaces and the means of ingress and egress to such spaces. This information Adopted July 21, 1992 18126 EXC-9 EXH I BIT "C" ARTICLE VI shall be in sufficient detail to enable the Building Official to determine whether or not the requirements of this section are met. C. Required Open Space. Off-street parking and loading space shall be in addition, to required open space associated with the permitted use, and shall not reduce or encroach upon the required yards or open space in any manner. The area ,required for off' -street parking shall be in addition to the yard areas herein 'required; except that the side or rear yard required in commercial or industrial districts may be used for an uncovered parking area. D. 'Location of Off -Street Parking The parking space provided herein shall be provided on the same lot where the principal use is located or within four hundred (400) feet from the principal entrances as measured along the' most direct pedestrian walkway. Said land shall be used for no other purpose so long as no other adequate provisions of parking space meeting the requirements of this ordinance have been made for the principal use. E. Joint Parking Facilities. Whenever two (2) or more uses are located together in a common building, shopping center or other integrated building complex, the parking requirements may be complied with by providing a permanent common parking facility, cooperatively established and operated, which contains the requisite number of spaces for each use. The total number of spaces provided shall not be less than the sum of the individual requirements; provided, however, that. when the parking demands of different uses occur at different times, joint use of parking spaces may, be authorized as a special exception by the City Commission that: provided (1) A notarized statement from all property owners involved is presented indicating that the activities of each separate use which creates a demand for parking occur at different times. (2) Such statement must.include an agreement -between the parties involved indicating responsibility for maintenance. (3) Such agreement shall be perpetual F. Off -Street Parking Lots in Residential Districts. Whenever off-street parking lots for more than six (6) vehicles are to be located within or adjacent to a residential district, the following provisions shall apply:, (1) All sides of the lot within or abutting the residential district shall be enclosed with screens. Such screens may be in the form of walls, fences or landscaping, shall be at least three (3) feet in height, and shall be at least fifty (50) percent opaque as viewed from any point along said residential lot line. When landscaping is used for screening, the height and , opacity requirements shall be attained within eighteen (18) months. (2) No -parking shall' be permitted within a front yard setback. (3) All yards shall be' landscaped with grass and shrubs and maintained 1n good condition the year round. Adopted July 21, 1992 18127 EXC10 EXHIBIT "C" ARTICLE VI (4) Driveways used for ingress and egress shall be confined to and shall not exceed twenty-five (25) feet in width, exclusive of curb returns. (5) Whenever lighting is provided, the intensity of light and arrangement of reflectors shall be such as not to interfere with residential district use. (6) The lot may be used only for parking and not for any type of loading, sales, dead storage, repair work, dismantling, servicing or play (recreation) area. (7) Only one entrance and exit sign (maximum two (2) square feet) and a nonilluminated sign no larger than two (2) square feet prescribing parking regulations may be erected at each entrance or exit. No other signs shall be permitted. G. Amount of Off -Street Parking. Off-street parking spaces shall be provided according to the following minimum requirements: (1) Residential, hotel, motel and lodge. (a) Dwelling, single-family or duplex: Two (2) parking spaces for each separate dwelling unit within the structure. (b) Dwelling, multiple -family: The number of spaces provided shall not be less than two and one-quarter times the number of dwelling units. (c) Hotels, motels, boarding or rooming houses or tourist homes: One parking space for each bedroom, plus one additional space for a resident owner or manager and one additional space for each three (3) employees. One parking space for every sic (6) seats in a restaurant facility. (d) Club, lodge or fraternity: One space for each bedroom, plus one parking space for each fifty (50) square feet of floor area used for assembly or recreation. (e) Dormitories: One space for each three (3) beds. (2) Hospital, clinic and nursing home. (a) Hospital: Two (2) spaces for each patient bed, exclusive of bassinets, plus adequate area for the parking of emergency vehicles. (b) Medical or dental clinic: One space per one hundred fifty (150) square feet of gross floor area. (c) Sanatorium, convalescent or nursing home: One space for each six (6) patient beds, plus one space for each staff or visiting doctor, plus one space for each two (2) employees including nurses. (3) Church and school: (a) Church: One parking space for every four (4) seats, or one parking space for every thirty (30) square feet in the largest assembly area, whichever is greater. Adopted July 21, 1992 18128 EXC-11 EXHIBIT "C" ARTICLE VI (b) Elementary school and junior high school: One space for each four (4) seats in the assembly hall or, if no assembly hall, then one space for each two (2). employees including teachers and administrators, plus one space for each thirty (30) students. (c) Senior high school: One parking space for each ten (10) students for which the building was designed, plus one space for each classroom and administrative office. (4) Places of amusement or assembly not listed elsewhere: (a) Places of amusement or assembly containing foxed seats: One space for each three (3) fixed seats provided for patron use. (b) Places of amusement or assembly without fixed seats: One space for each one hundred (100) square feet of floor or ground area used for amusement or assembly. (c) Public or private clubs: One parking space for each one hundred (100) square feet of gross floor space. (5) Office building and post office: (a) Professional office (excluding doctor or dentist): One parking space for each two hundred and fifty (250) square feet of gross floor space. (b) Offlce.building: One space for each three hundred (300) square feet of gross floor area used for office or similar purposes. (c) .Medical office: One space for each two hundred (200) square feet of gross floor area (d) . Post office: Four (4) spaces per service window, plus one space per government vehicle and one space per four (4) employees. (6) Commercial and retail use: (a) Foodstore, supermarket and drugstore: One space for each two hundred (200) square feet of gross square footage. (b) Convenience. stores: One space for each one hundred (100) square feet of nonstorage area. (c) Restaurant, including bar, -grill and 'all similar dining and/or drinking establishments: One space for 'each four (4) fixed seats provided for patron use, plus one parking space for each seventy-five (75) square feet of floor area provided for patron use but not containing foxed seats. (d) Drive; in restaurant or similar use designed for curb type service: Ten (10) parking spaces, plus one parking space for each ten (10) square feet of gross floor space (not including dining area). (ey. . Funeral home: One space for each four (4) seats in the chapel, plus one space for each commercial vehicle. (f) Service station: Three (3) parking spaces for each service bay. Adopted July 21, 1992 18129 EXC-12 EXHIBIT "C" ARTICLE VI (g) Garage: One space for each employee on the largest shift, plus three (3) spaces for each service area or for each three hundred (300) square feet of repair or maintenance space, whichever is the greater. (h) Commercial establishments not otherwise classified: One space for each two hundred (200) square feet of first floor gross area, plus one space for each three hundred (300) square feet of floor area above the first floor, excluding all rooms used for storage. (7) Wholesale and manufacturing: One space for each of the first twenty-five (25) employees of the major shift, plus one space for each one and one-half (1 1/2) additional employees of the major shift. (8) Uses not listed above: For all uses not covered in (a) through (h) above, the Planning and Zoning Commission shall make a recommendation and the City Commission shall determine the parking demand to be created by the proposed use, and the amount of parking thus determined shall be the off-street parking requirement for the permitted use. H. Off -Street Parking Lot Requirements. (1) All parking areas shall be surfaced with a hard, dustless material, shall be properly drained and shall be designed with regard to pedestrian safety. Upon a determination by the Development Review Committee up to twenty five percent (25%) of parking spaces may remain unpaved. A place of worship, or other institutional use without daily parking needs may be allowed to leave fifty percent (50%) of all parking spaces unpaved. The applicant shall supply evidence that the unpaved parking area will not cause erosion, reduce water quality, or any other degradation of the natural or built environment. Also, where light duty or infrequent use of the parking lot may make it desirable, the DRC may approve a grass or mulched surface. Should the use of this lot change appreciably, however, such that a grass or mulched surface is no longer adequate, the City may require the lot to be resurfaced with a more durable material. The location of individual parking spaces shall be clearly marked. Each off-street parking space shall include one hundred eighty (180) square feet in addition to space for access drives and aisles. The minimum size of each space shall be nine (9) feet by twenty (20) feet. Aisles for two-way traffic in parking lots shall be twenty-two (22) feet in width. Aisles for one-way traffic with angle parking may be reduced to fifteen (15) feet in width. Off- street turning and maneuvering space shall be provided for each lot containing sox (6) or more spaces so that no vehicle will be required to back onto or from any public street or alley. (2) Residential driveways, parking spaces, motor courts, sidewalks, etc.: Any residential sidewalk, driveway, parking space or other vehicle circulation area whether of a paved surface such as asphalt, concrete or brick, or of an unpaved surface such as gravel, mulch or dirt shall be set back at least two (2) feet from the side or rear property lines. The provisions of this Code shall also apply to prohibit the diversion of drainage from vehicle parking or circulation areas onto adjacent properties. (3) All off-street parking spaces shall be clearly defined and maintained in a manner that parking spaces, pavement markings, tum arrows, etc., are always easily discernible. (4) Permanent reservation. The area reserved for off-street parking or loading space shall not be reduced in area or changed to any other use unless the permitted use Adopted July 21, 1992 18130 EXC-13 EXHIBIT "C" ARTICLE VI which it serves is discontinued or modified, except where equivalent parking or loading space is provided. (5) Commercial vehicles and trailers of all types, including travel, camping and hauling, and mobile homes shall not be parked or stored on any lot occupied by a dwelling or on any lot in any residential district except in accordance with the following provisions: (a) Not more than one commercial vehicle which does not exceed one and one-half (1 1/2) ton rated capacity per family living on the premises shall be permitted; and in no case shall a commercial vehicle used for hauling explosives, gasoline or liquefied petroleum products be permitted. (b) Not more than one camping or travel trailer or hauling trailer per family living on the premises shall be permitted, and said trailer shall not exceed twenty-four (24) feet in length or eight (8) feet in width; and further provided that said trailer shall not be parked or stored for more than forty- eight (48) hours unless it is located behind the front yard building line. A camping or travel trailer, or camper vehicle, shall not be occupied either temporarily or permanently while it is parked or stored in any residential district, except when it is located in an authorized mobile home park. (c) Disabled vehicles or trailers of any kind or type shall not be parked or stored in any residentially zoned property for more than one month unless in a completely enclosed building or carport. § 5-5 OFF-STREET LOADING STANDARDS A. There shall be provided on the same lot with each building or structure, other than a one - through four -family dwelling hereafter constructed, adequate space for off-street loading, unloading and the maneuvering of commercial vehicles. There shall be no loading or unloading of commercial vehicles on a public street. Off-street maneuvering space shall be provided so that no backing onto or from a public street is required. All loading and maneuvering areas shall be surfaced with a , hard, dustless material; shall be properly drained and shall be designed with regard to pedestrian safety, and shall have direct access to a public street or alley. B. The number of off-street loading berths required by this section shall be considered as the absolute minimum, and the developer shall evaluate his own needs to determine if they are greater than the minimum specked by this section. For purposes of this section, an off- street loading berth shall have minimum plan dimensions of twelve (12) feet by twenty-five (25) feet, and fourteen (14) feet overhead clearance, with adequate means for ingress and egress. The number of off-street loading requirements shall be as follows: (1) Each retail store, storage warehouse, wholesale establishment, industrial plant, factory, freight terminal, market, restaurant, mortuary, laundry, dry cleaning establishment or similar use which has an aggregate gross floor area of: Adopted July 21, 1992 18131 EXC-14 EXHIBIT "C" AREA IN SQUARE FEET SPACES Over 10,000 but not over 25,000 1 Over 25,000 but not over 60,000 2 Over 60,000 but not over 120,000 3 Over 120,000 but not over 200,000 q ARTICLE VI Over 200,000 but not over 290,000 5 Plus, one space for each additional 90,000 over 290,000 or major fraction thereof. (2) A loading space requirement may be modified or waived by the City Commission on application in the case of a bank, theater or other uses where the same is not clearly required. § 6-6 PEDESTRIAN AND BICYCLE FACILITIES. Commercial uses such as shopping centers or other retail centers will be assessed in the development review process to see whether there are provisions made for motorized and non -motorized parking areas. In mixed use and multi -family developments, i.e. activity centers, site plans will be reviewed to see whether provisions have been made to provide bicycle and/or pedestrian ways connecting residential areas to such developments. The City shall review all proposed developments for its accommodation of bicycle and pedestrian needs and may.require large scale developments to -provide parking facilities for bicycles. § 6-7 SURFACE WATER MANAGEMENT. A. General. A stormwater management system shall be designed and installed for the development that will contain, features to provide for: (1) Pollution abatement. Pollution abatement will be accomplished by retention, or detention with filtration, of the runoff generated by the first inch of rainfall from the developed site. (2) Recharge where. possible. Recharge in designated areas where the soils are compatible, (Type A soils as described by the U.S.D.A. Soil Conservation Service) will be accomplished by providing for retention of the total runoff generated by a twenty-five year frequency, twenty-four hour duration storm event from the developed site. (3) Protection from flooding. Protection from flooding will be accomplished by a design that will provide for: (a) The Post -developed peak rate of discharge permitted from the site will not exceed the predeveloped peak rate of discharge from the site during a twenty-five year frequency storm event. Adopted July 21, 1992 18132 EXC-15 EXHIBIT "C" ARTICLE VI (b) In special flood hazard areas, all proposed commercial, industrial and residential structures are to be flood free during a one hundred -year frequency, twenty -four-hour duration storm event. B. Design and Operation Standards (1) Disposition of stormwater runoff. All development will be required to pretreat the runoff generated from the first inch of rainfall from the developed site for pollution abatement purposes. Pretreatment of this volume of runoff is defined as retention (no surface discharge) or detention with filtration (surface runoff) prior to release. The additional volume generated by the site due to development from a twenty -five- year frequency storm event must be controlled by a detention facility and released at a rate of discharge not to exceed the peak rate of discharge of the site in the predeveloped condition and conveyed to a point of legal and positive outfall. Special engineering features to minimize the transport of pollutants remaining in the above-mentioned volume will be incorporated into the design of the outlet control structure. The design of the system will make adequate provision to minimize erosion. All detention facilities that limit the rate of discharge must be designed to provide for one foot of freeboard above the design high water of the pond. (2) Development within areas of special flood hazard (one hundred- year flood). All development within areas of special flood hazard as delineated on the official flood insurance rate maps (FIRM) .or as determined by the City Engineer shall comply with the requirements set forth in Article VII of -this Code. (3) Methods of computing runoff volume and peak rate of discharge. The design method used to establish runoff volume and peak rate of discharge shall be by current techniques. In order to provide for a reasonable measure of consistency, the following methods of computation are encouraged to be used: (a) Basins or subbasins zero to five (5) acres: Rational formula (Q = CIA). (b) Basins or subbasins five (5) to three hundred (300) acres: Hydrograph developed by SCS methods or as modified by the Santa Barbara urban hydrograph method. (c) Developments over three hundred (300) acres: TR -20, U.S.D.A. Soil Conservation Service or U.S.A. Corps of Engineers HEC I. (d) Design storm (minimum). Adopted July 21,1992 18133 EXC-16 Adopted July 21 1992 EXHIBIT "C" FACILITY Bridges Canals, ditches or culverts for drainage external to the development Cross drains, storm sewers Roadside swales for drainage internal to the development Detention basins Retention basins (no positive outfall) ARTICLE VI DESIGN STORM 50 year 25 year 10 year 10 year 25 year 100 year The design frequency for major drainage systems may be increased if deemed necessary by the City Engineer to protect upstream or downstream properties or to comply with other regulations. (e) Storm duration and rainfall intensity. The following guidelines are for use in the design of the stormwater management system. 1. For the rational method, time of concentration (TC) will dictate the intensity. Rainfall intensities for the rational method are to be obtained from the Florida Department of Transportation rainfall curves for Zone 7 and are shown at the back of this Article. 2. For other methods, such as hydrographs, I use of TR -20, HEC I, etc., use the following: a. For time of concentrations between zero and ffteen (15) minutes, use three-hour storm duration. b. For time of concentrations between fifteen (15) and thirty (30) minutes, use six -hour duration. C. For time of, concentrations over thirty (30) ,minutes, use twenty -four-hour storm duration. Rainfall distribution for the above is to be in accordance with Orange County's distribution. A dimensionless curve for Orange County's distribution is shown below. Tabular distributions for ten- year, twenty -five-year and one hundred -year frequency events are also shown. Note: A twenty -four-hour rainfall duration is to be used with all calculations involving the one hundred -year storm frequency event: 18134 EXC-17 EXHIBIT "C" - •.3 RAINFALL RATIO ORANGE COUNTY RaIN FALL DISTR I SUTTON EXC-18 N m W EXHIBIT `tC" J O J Z W O 000000 0^ 1,110 Mt In IONr-- N 0 ^'O ^t0 In In 1:0 '0 Nr- O, 41 C', = O O .• Oto �- Irl z N ^ 0, n •- tT ti O 10;;%0 Oto aD - r^ In %0 O� ^ rn cr to N Cp O, cr O ^ N N r, = a to In In ul In Nu�,pti�m�m��� lL P�O0,m+000.000000000000 O w p Q 00 OtnSO^gnNO0Na0rU01r0nao0�lS0nt!nI.0.OnOtU�cOaUInnOt0OTrnVOpOO pI O O7 0O O O O OOO 00 C., S0InIno88888 EO VO+ 0On00 Ul O O ^ N N N N N N r V r y ry e ' Ir O Z U- O O N rn j. ,r Z 00 ^ N r1In.0 TN•or?9 r--0cy, co t`a=-N=In%a°OcoTO� t"IaDN ^�aDOrn�'or.-M0,0 N Q C O ^ N m r•'1 to U;,6 6 rz t.: rz g N l,ON N M M Sin to N to In In �0 ,O Nl�l�l�Nt�l�l�tL7tDt>Dt>0t>DCOt0tpC6tot7D�I;tot6 ;- -to I cr w p S8 8 Sp8 8 88 8888 p p ppp Q p W = S��gSg8gStnStllStnOtnrjSOOOSppSOOpSOSOSOSOSOSOSO �- ^ toOlnSlnOIn8L 80 S S p p 80 3 0 0 0 0 B N ^ N N frl. rrf ? tf11(1 ,p �D N N C6 CD CT CT O O ' ^ ^ ^ ^ .?'- ^ ^ to 1!1 S t!1 S If1 O to O N O 1 O 000 S VOi O r ��^ ^ CO to C,tT00 --NNr'i rnl N N N N N N N N t V C J O lL 00^ ^N r'. In tT O• 00000 000 N t>o^ ~O m•0� rV Om N�rTO ��NNrn fmr1�m^? t•o�Na.Omt�,^ Nr1 rla 7 t1l N rl tl'I •O O, N •0 O CD Q O O • • s In 1n to In .0 %Q .0 10 10 Q w W = , rr+ ,t>DO^tiCcSrnKmO ul vl m u• N 0 0 ^� N rn rn� V�u�'�.Ob Ama�O��� ��In l�fMrlO.O NmYOi� t�mO.O N co o r Lnw g MKWSC Ind O CT . O f V t•"1 trl a f!'1 vl .O ,O I+ Cpm "O. O O N r'f tai S In tin au O C ^ ^ .0 •O r�mCT CTO ^~^ ^^ ^^^ ^ N N N N.N N tV N N N N N N NNNrn � C , � J O J I�+ to rn CT %0LCLI ? .D O • . �p p+ . tq Z 0 0 C 0 0 0 0 0^^ N rn a �O aD a m v� a�O tin Vl ti a00 T vim. 8 0 0 0^ oo f�++ t'+ r+ a �1 ^ N N t V N N N N N ^ ^ •- N tV N r.'1 M r'1 R1 f'1 r+l fRl f'1 m r'I t�1 S ? 7 ? a a S S Z 7 7 a a M W p INS 8 8 �n Q t/� O W O O ^ W N rn ren r • v1 lin 04 CO t� t70 t7�t7 O O N N " N a0 0 to In topp rn t� CQ tf� a N tiJ In r'1 .o to In ^ r- r'+ O %0 N a0 V � � t��+ S •0 N amp U ti I°.. S _� • • to I!l .O t0 CO m CT C O N rn rn u'+ to •0 .0 r� a0 T O ^--^^^-- ^•"^ N N N N N N N N N tV N NN N N Nm yt J t� U4 O O S S S O O.O O O O O N r•�i a ^ '� r` u' O t^ vl'0 °C Q` O N rn r, a to .o %0 t_ ao = p, p, W Z ul lfl•0 r- Go O+CT�Q, CT CT O+CT CT O,S S S O S J p C . . O to w ZW Q NN tT tOo�•N�' N rn• n �tl- !• CO O. . . . f•S,0eDO rmInIt %0!.-r-mCTOan btiti In .00 � !^-tP-n CO t0�, W OOO to toW On TT. . . tt EXC-19 C -1 EXHIBIT "C" (f) Drainage pond criteria. ARTICLE VI Design criteria for pollution abatement utilizing retention or detention with filtration ponds. The design of ponds for the required retention, or detention with filtration, may be designed as a separate facility, or pollution abatement may be combined into the design of the detention pond required to reduce the peak rate of flow from the developed site to that peak rate of flow prior to the development of the site. All retention ponds, or detention ponds with filtration, will be designed as a dry bottom pond unless specifically approved otherwise by the City Engineer. The bottom of a required retention or detention with filtration pond shall be a minimum of three (3) feet above the estimated seasonal high water table. Where this is not possible due to a high water table, underdrains will be installed with a minimum invert elevation of one foot below the pond bottom, and provided that there is a minimum of two (2) feet of filtration. With the written approval of the City Engineer, wet bottom ponds will be allowed providing that a minimum of six (6) feet of depth below the design low water is designed into the facility. Final seepage rates will be determined by a geotechnical engineer. All necessary calculations to support the above shall be submitted to the City Engineer. 2. Design criteria of detention facilities to reduce peak rate of flow. The detention pond will be sized to limit the peak rate of discharge from the developed site to that discharge generated prior to development. Supporting calculations shall be submitted and will contain, as a minimum, a runoff hydrograph for the developed site and a runoff hydrograph after routing through the proposed detention facility. All routing calculations will be submitted. Credit for seepage to further reduce the peak rate of discharge will not be allowed unless accompanied by supporting documentation prepared by a geotechnical engineer. A minimum of fifty (50) percent of the total volume of water required to reduce the peak discharge of the facility must be evacuated within a twenty -four-hour time period. The remaining fifty (50) percent must be evacuated within an additional seventy- two -hour time period. The outlet structure shall be designed to skim surface pollutants. 3. Design criteria for recharge facilities. Recharge facilities may be, required in developments where Type A soils, as indicated on the soils survey map for Orange County prepared by the U.S.D.A. Soil Conservation Services, are predominant. A detailed soils report prepared by a geotechnical engineer shall be submitted to the City Engineer for review prior to the development of final detailed drainage plans for the site. The report shall contain a recommendation as to whether or not Adopted July 21, 1992 18135 EXC-20 Adopted July 21, 1992 EXHIBIT "C» ARTICLE VI recharge is feasible on the proposed site. The City Engineer, after review of the report and recommendation of the geotechnical engineer, shall make a final written decision regarding whether or not recharge will be required. If recharge is required by the City Engineer, retention of the total runoff generated by a twenty -five-year frequency, twenty -four-hour duration storm event from the developed site will be required. Final seepage rates utilized in the design of the recharge facility will be determined by a geotechnical engineer. All necessary calculations to support the above shall be submitted to the City Engineer. 4. Outfall ditches and canals. and natural watercourses, permitted within residential sites. With the exception of roadside swales open drainage ways shall not be developments or adjacent to school (g) Open drainage ways or retention/detention ponds. 1. Right-of-way and easements. Outfall ditches and canals shall have sufficient right-of-way for the facility plus an unobstructed maintenance berm on one or both sides. Ponds shall have a sufficient easement to allow for installation plus an unobstructed maintenance berm all around the perimeter of the pond. 2. The minimum requirement for maintenance berms is as follows: MINIMUM PONDS MAINTENANCE BERM With fencing 20 feet all around perimeter Without fencing 5 feet 3. Areas adjacent to open drainage ways and ponds shall be graded to preclude the entrance of stormwater except at planned locations. Where retention/detention areas are located on the project periphery, the developer may be required to provide additional landscaping or screening to adequately protect abutting properties. 18136 EXC-21 MINIMUM DITCH OR CANAL WIDTH MAINTENANCE BERM Less than 16 feet 20 feet one side 16 feet to 32 feet 30 feet both sides 32 feet to 55 feet 20 feet on side and 30 feet on the other side Over 55 feet 30 feet both sides MINIMUM PONDS MAINTENANCE BERM With fencing 20 feet all around perimeter Without fencing 5 feet 3. Areas adjacent to open drainage ways and ponds shall be graded to preclude the entrance of stormwater except at planned locations. Where retention/detention areas are located on the project periphery, the developer may be required to provide additional landscaping or screening to adequately protect abutting properties. 18136 EXC-21 Adopted July 21, 1992 EXHIBIT "C" 4. Maximum side slopes. ARTICLE VI ff AINAGE WAYS MAXIMUM SIDE SLOPES our (4) feet deep 3:1 ) feet deep 2:1 PONDS MAXIMUM SIDE SLOPES With fencing 2:1 Without fencing 5:1 5. Minimum bottom width. The minimum bottom width for ponds and open drainage ways shall be four (4) feet. 6. Erosion protection. OPEN DRAINAGE WAYS - GRADE Less than one (1) percent One (1) to two (2) percent Greater than two (2) percent PONDS Side slopes and berms Bottom PROTECTION REQUIRED Grass and mulch Sod Pavement PROTECTION REQUIRED Sod Grass and mulch A dense stand of grass is required to be established within all dedicated rights-of-way and easements. 7. Fencing - Ponds. ren NCING - PONDS PROTECTION REQUIRED four (4) feet depth to None high water Five (5) foot chain link along ur (4) feet depth to perimeter, including ign high water maintenance berms 8. Freeboard - Open drainage ways and ponds: One foot minimum above design storm elevation. 18137 EXC-22 EXHIBIT "C" ARTICLE VI (h) Hydraulic design criteria. 1. Roadway (pavement) drainage design. Good pavement drainage design consists of the proper selection of grades, cross slopes, curb types, inlet location, etc., to remove the design storm rainfall from the pavement in a cost effective manner while preserving the safety, traffic capacity and integrity of the highway and street system. These factors are generally considered to be satisfied, provided that excessive spreads of the water are removed from the vehicular traveled way and that siltation at pavement low points is not allowed to occur. The guidelines included herein will accomplish these objectives. 2. Minimum groundwater and high water clearances. All streets shall be designed to provide a minimum clearance of one foot between the bottom of the base and the estimated seasonal high water table, or the artificial water table induced by an underdrain system. Swale drainage will be permitted only when the wet season water table is a minimum of two (2) feet below the invert of the, swale. 3. Curbs and gutters; types. All roadway drainage not considered suitable for swale and/or'ditch type drainage shall be designed as Miami curb and gutter section. 4. Design storm frequency. The design storm frequency to be utilized for the design of pavement drainage shall be as follows: a Arterial and collector streets: Ten-year, hydraulic gradient line 1.0 foot below gutter line. b.Local streets: Ten-year, hydraulic gradient line 0.5 feet below gutter line. 5. Runoff determination. The peak rates of runoff for which the pavement drainage system must be designed shall be determined by the rational method. The time of concentration, individual drainage areas and rainfall intensity amounts shall be submitted as part of the drainage plans. 6. Stormwater spread into traveled lane. Inlets shall be spaced at all low points, intersections and along continuous grades so as to .prevent the spread of water from exceeding tolerable limits. The acceptable tolerable limit for arterial and collector roadways is defined as approximately one-half the traveled lane width. Acceptable tolerable limits for interior subdivision roadways are defined as a maximum of one inch above the crown of the road. 7. Maximum inlet interception rates. Types I and III (single) inlets shall be located such that a maximum of five (5) cfs shall be intercepted .(Types 11 and IV: Nine (9) cfs maximum.) By-pass flow is limited to a maximum of one cis. Off-site flows from impervious areas more than five -tenths (0.5) acre shall be intercepted prior to right-of-way line. - Adopted July 21, 1992 18138 EXC-23 EXHIBIT "C" ARTICLE VI 8. Inlet types. The curb inlet types to be used shall be the latest version of the Florida Department of Transportation inlet Types I, II, III, IV, and Vlll. Ditch bottom inlets shall be Florida Department of Transportation inlet Types C, D. E and H. 9. Low point inlets. All inlets at low points (sumps) shall be designed to intercept one hundred (100) percent of the design flow without exceeding the allowable spread of water onto the traveled lanes as defined above. On arterial roadways, in order to prevent siltation and to provide, for a safety factor against clogging of single inlet in a sump location, it is required to construct multiple inlets at all sump locations. Preferably three (3) inlets should be constructed on each side of the roadway, one at the low point and one each side at a point two-tenths (0.2) feet higher than the low point 10. Storm sewer design. a. Design discharges. The determination of design flows for a storm sewer system shall be in accordance with the methods and procedures as set forth in Section 6-7 B.(3)(h)4. b. Minimum pipe size. The minimum size of pipe to be used in storm sewer systems is fifteen (15) inches. Designs shall be based upon six-inch increments in sizes above eighteen (18) inches. C. Pipe grade. All storm sewers shall be designed and constructed to produce a minimum velocity of two and five -tenths (2.5) fps when flowing full. No storm sewer system or portion thereof will be designed to produce velocities in excess of ten (10) fps. d. Maximum lengths of pipe. 11 PIPE SIZE (inches) MAXIMUM (feet) 11 15 200 18 300 24. to 36 400 42 and Larger 500 e. Design trailwater. All storm sewer systems shall be designed taking into consideration the tailwater of the receiving facility or body of water. f. Allowable materials. Allowable materials for storm sewers shall be in accordance with the Orange County right-of- way utilization regulations. Adopted July 21, 1992 18139 EXC-24 EXHIBIT "C" 11. Culvert design. ARTICLE VI a. Minimum pipe size. The minimum size of culvert installations under roadways shall be eighteen (18) inches. The minimum size of pipes to be used for driveway crossings shall be fifteen (15) ,inches. b.. Maximum pipe grade. The maximum slope allowable shall be a slope that produces ten (10) fps velocity, within the culvert barrel. Erosion protection and/or energy dissipators may be required to properly control entrance and outlet velocities. C. Maximum lengths of structure. The maximum length of culvert conveyance structure without access shall be as allowed in . Section 6-7 B. (3) (h)10.d. d. Design of tailwater. All culvert installations shall be designed taking into consideration the tailwater of the receiving facility or body of water. e. Allowable headwater. The allowable headwater of a culvert installation should be set by the designer for an economical installation. When endwalls are used, the headwater shall not exceed the top of the endwall at the entrance. If the top of the endwall is inundated, special protection of the roadway embankment and/or ditch slope may be necessary for erosion protection. f. Design procedure. The determination of the required size of a culvert installation can be accomplished by exact mathematical analysis or by the use of design nomographs. The mathematical solution will give precise results, but is time-consuming and somewhat nonproductive when considering the inaccuracies of estimating design flows and floodwater elevations. Copies of criteria and standards for culvert nomographs and culvert size selection procedures are available in the City Engineer's office. C. Drainage Plan Requirements. (1) Drainage map. The project engineer shall include in the construction plans a master drainage map showing all existing and proposed features. The map is to be prepared on a twenty -four -inch by thirty -six-inch sheet on a scale not to exceed one inch equals two hundred (200) feet. Listed below are the features that are to be included on the drainage map: (a) Drainage bounds, including all areas draining to the proposed subdivision (b) Sufficient topographical information with elevations to verify the location of all ridges, -streams, etc. (one -foot contour intervals). (c) High water data on existing structures upstream and downstream for the subdivision. Adopted July 21, 1992 18140 EXC-25 EXHIBIT "C" ARTICLE VI (d) Notes indicating sources of high water data. (e) Notes pertaining to existing standing water, area of heavy seepage, or springs. (f) Existing drainage features (ditches, roadways, ponds, etc.). Existing drainage features are to be shown a minimum of one thousand (1,000) feet downstream of the proposed development unless the ultimate outfall system is a lesser distance. (g) Subdivision layout with horizontal and vertical controls. (h) Drainage features, including location of inlets, swales, ponding areas, etc. (i) Delineation of drainage subareas. Q) Show retention/detention areas and ingress/egress areas for retention/detention facilities. (k) General type of soils (obtain from soil survey of Orange County). (I) Flood hazard classification. (m) Description of current ground cover and/or land use. (2) Subsoil investigation. A subsoil report shall be prepared by a geotechnical engineer experienced in the preparation of this type of report. The contents of the subsoil report will be in accordance with the requirements of this Code. A minimum of two (2) borings will be taken per retention/detention area (3) Stormwater calculations. Stormwater calculations for retention/detention areas, including design high water elevations for twenty -five-year and one hundred -year storm events shall include the following: (a) Storm sewer tabulations including, but not limited to, the following: 1. Location and type of structure. 2. Type and length of line. 3. Drainage subarea tributary to each structure. 4. Runoff coefficient. 5. Time of concentration to structure. 6. Hydraulic gradient. 7. Estimated receiving water elevation with sources of information, if available. 8. Diameter of pipe. 9. Outlet velocity. Adopted July 21, 1992 18141 EXC-26 EXH I BIT "C" ARTICLE VI (b) Drainage plans including, but not limited to, the following: 1. ',.Cross-section of retention/detention facilities. 2. Typical swale, ditch or canal sections. 3. Drainage rights-of-way. 4. Typical fencing detail. 5. Note on the drawing that an erosion control plan will be submitted to the City Engineer for approval prior to preconstruction conference. (c) No land use activity within the City of Ocoee shall be permitted which disrupts, significantly alters, or destroys the functioning of a major natural or preexisting man-made drainage feature or facility. To the extent that such ' will not impair the overall drainage capability of a site and is otherwise feasible, natural drainage features should be maintained during the development process. § 6-8 UTILITIES. A. Potable Water Supply. (1) General. Each lot within a subdivision shall be provided with a connection to an approved central'water supply system. The development of new water facilities and mains, and the expansion of existing water systems, shall be designed by the project engineer in accordance with all applicable state and local criteria. Systems designed for connection to or inclusion within the City of Ocoee water system shall be in accordance with City standards and specifications. (2) Central water "systems. ' Central water systems shall be designed to 'satisfy the domestic water supply and fire protection requirements for the area and shall be designed and constructed for an economic fife of not less than fifty (50) years. The City Engineer shall have the right of final design review approval and inspection of all extensions to the City of Ocoee's central water systems. (3) Fire protection (water supply). (a) General standards. The water system shall be designed and constructed to satisfy both the domestic potable requirements and the fire protection requirements. Fire hydrants and shut-off valves shall be of the type, size, and brand specified by the Southeastern Underwriters' Association and approved by the City of Ocoee Fire Department. (b) The on-site water distribution system for each new subdivision shall be connected to a looped water main of six (6) inches minimum diameter size. 1. Hydrants located within single-family and duplex residential subdivisions shall be connected to water mains of six (6) inches minimum diameter size. In no case shall residential hydrant spacing exceed five hundred (500) feet, measured along the roadway. If an existing hydrant is five hundred (500) feet or more from the immediate entrance of a proposed new development Adopted July 21, 1992 18142 EXC-27 EXHIBIT "C" ARTICLE VI project, a hydrant shall be installed by the developer at that entrance location, and the maximum fire hydrant spacing shall be determined from that hydrant location. 2. Hydrants located in commercial, multifamily, or industrial areas shall be spaced no further than three hundred fifty (350) feet apart as measured along the roadway. The hydrant shall connect to water mains of adequate size to meet the design flow demand, with such mains to be a minimum of six (6) inches in diameter and looped. 3. In areas where no development is proposed or where the development will not occur until later phases, these criteria may be waived or hydrant taps, valves and associated piping can be installed without the hydrant assembly. B. Sanitary Wastewater. (1) Central wastewater systems. A central wastewater system shall be provided in all subdivisions. This provision may be waived if the conditions given in Section 6-8 B.(2) are met. The development of new wastewater facilities and mains, and the expansion of existing wastewater systems, shall be designed by the project engineer in accordance with all applicable state and local criteria. Central wastewater systems shall be designed to satisfy the domestic sewage requirements for the area and shall be designed and constructed for an economic life of not less than fifty (50) years. The City Engineer shall review and approve all City of Ocoee wastewater systems. (2) Individual wastewater disposal systems. All individual wastewater disposal systems are subject to the approval of the Orange County Health Department and other regulatory agencies. Individual wastewater systems which serve only one lot may be permitted when the requirements for a central wastewater system are waived under one of the following conditions and the following criteria can be met: (a) The maximum flow into septic tanks shall be one thousand five hundred (1,500) gallons per acre per day on lots without central water, and the maximum flow into septic tanks shall be two thousand five hundred (2,500) gallons per acre per day on lots which have a central water system. (b); Lot size requirements shall be in accordance with the zoning ordinance, but never less than: Adopted July 21, 1992 18143 EXC-28 RESIDUAL LAND USE FIRE FLOWS PRESSURE Single-family duplex/triplex 500 gpm 20 psi Varies with 1,000 Multi -family gpm minimum 20 psi Commercial/ Varies with 1,000 Industrial gpm minimum 20 psi B. Sanitary Wastewater. (1) Central wastewater systems. A central wastewater system shall be provided in all subdivisions. This provision may be waived if the conditions given in Section 6-8 B.(2) are met. The development of new wastewater facilities and mains, and the expansion of existing wastewater systems, shall be designed by the project engineer in accordance with all applicable state and local criteria. Central wastewater systems shall be designed to satisfy the domestic sewage requirements for the area and shall be designed and constructed for an economic life of not less than fifty (50) years. The City Engineer shall review and approve all City of Ocoee wastewater systems. (2) Individual wastewater disposal systems. All individual wastewater disposal systems are subject to the approval of the Orange County Health Department and other regulatory agencies. Individual wastewater systems which serve only one lot may be permitted when the requirements for a central wastewater system are waived under one of the following conditions and the following criteria can be met: (a) The maximum flow into septic tanks shall be one thousand five hundred (1,500) gallons per acre per day on lots without central water, and the maximum flow into septic tanks shall be two thousand five hundred (2,500) gallons per acre per day on lots which have a central water system. (b); Lot size requirements shall be in accordance with the zoning ordinance, but never less than: Adopted July 21, 1992 18143 EXC-28 (c) (d) Adopted July 21, 1992 EXHIBIT "C" ARTICLE VI One -unit residential. structure: 1. Private well and septic tank: 21,780 'square feet. 2. Central water and septic tank: With swale drainage: 10,890 square feet. With closed drainage: 4 lots per net acre (excluding roads, retention pond tracts, natural water bodies below the normal high water elevation, freshwater swamps, conservation and recreation areas, and landscape buffers and green belts where such areas are in separate tracts). Two -unit residential structure: 1. Private well and septic tank: 21,780 square feet. 2. Central water and septic tank: 10,890 square feet. Three- and Four -unit residential structure: 1. Private well and septic tank: Not allowed. 2. Central water: and septic tank: Three -unit: 13,615 square feet. Four -unit: 16,355 square feet. Five (5) or more units residential structure: Must have central water and sewer. Commercial/industrial: 1. Private well and septic tank: 21,780 square feet (provided sufficient water storage capacity is provided for, fire protection). 2. ''Central water and septic tank: 10,890 square feet. Lakefront lots: 1. 21,890 square feet: Septic tanks with either private ,well 'or central water. Septic tanks, drain fields, and drain field expansion areas shall be located at least one hundred (100) feet from the normal high water elevation of all natural water bodies. In addition, septic tanks, drain fields and drain field expansion, areas shall be located no less than two hundred (200) feet from public water supply wells and no less than seventy-five (75) feet from private water wells. In no case shall septic tanks or drain fields be located in rights-of-way or easements. Individual wastewater systems shall be located in the front yard, unless otherwise approved by the City. As a minimum requirement, the invert of the septic tank effluent opening shall be constructed at the highest elevation of the following criteria, unless Health Department rules are more restrictive: 1. One foot above the one hundred year flood elevation; 18144 EXC-29 EXHIBIT "C" ARTICLE VI 2. Three (3) feet above the elevation of the normal wet season water table; and 3. All other provisions of the City's Comprehensive Plan. (e) In no event are the above regulations to be applied so as to be less restrictive than the Orange County Health Department regulations. C. Other Utilities. Utility lines of all kinds, including but not limited to those of franchised utilities, electric power, telephone and telegraph, cable television, water, wastewater, and gas, shall be constructed and installed beneath the surface of the ground in the street right-of-way and/or a front yard utility easement within new residential subdivisions, unless it is determined by the City Engineer that soil, topographical, or any other compelling conditions make the installation of such utility lines as prescribed herein unreasonable or impracticable. It shall be the developer's responsibility to make the necessary arrangements with each utility in accordance with the utility's established policies. The underground installation of incidental appurtenances, such as transformer boxes, pedestal -mounted terminal boxes for electricity, or similar service hardware necessary for the provision of electric and communication utilities, shall not be required. Belowground installation shall not normally be required for bulk electric power supply lines and communication major feeder lines. Nothing in this section shall be construed to prohibit any entity furnishing utility service within the City of Ocoee from collecting, as a condition precedent to the installation of service facilities, any fee, prepayment, or contribution to aid in the cost of construction which may be required. $ 6-9 OPEN SPACE A. Subdivision Design Standards All subdivision developments shall provide recreational amenities within the site which may include: a swimming pool; spa; clubhouse; tot lot with play equipment; picnic shelter - barbecue area; court game facilities such as tennis, basketball, or racquetball; improved softball or baseball fields. The type of amenities shall be approved by the Director of Planning and provided according to the following schedule: B. Multi -Family Housing Standards Multi -family housing is permitted in certain land use districts subject to Development Permit Review and shall be constructed with the following Open Space requirements: Adopted July 21, 1992 18145 EXC-30 EXHIBIT "C" ARTICLE VI (1) All multi-family,developments with twelve (12) or more dwelling units shall provide thirty (30) percent useable open ,space for passive and active recreational uses. Useable open space areas shall not include: right-of-ways; vehicle parking areas; areas adjacent to or between any structures less than fifteen (15) feet' apart; setbacks; patio or private yards; or, slope areas greater'than eight (8) percent. (2) All multi -family developments shall provide recreational amenities within the site which may include: a swimming pool; spa; clubhouse; tot lot with play equipment; picnic shelter - barbecue area; court game facilities such as tennis, basketball, or racquetball; improved softball or baseball fields. The type of amenities shall be approved by the Director of Planning and provided according to the following schedule: UNITS AMENITIES 0-11 0 12-50 1 51 - 100 2 101 -200 3 201 -360 4 Add one (1) amenity for each 100 additional units or fraction thereof. C.' Planned Unit Development All Planned Unit Development with 12 or more dwelling units shall provide 30% useable open space for passive and active recreational uses. Useable open space areas shall not include: right-of-ways; vehicle parking areas; areas adjacent to or between any structures less than 15 feet apart; setbacks; patios and private yards; or slope areas greater than eight (8) percent. (1) Private Recreation All Planned Unit Developments shall provide recreational amenities within the site which may include; a swimming pool; spa; clubhouse; tot lot with play equipment; picnic shelter - barbecue area; court game facilities such as tennis, basketball, or racquetball; improved softball or baseball fields: The type of amenities shall be approved by the Director of Planning and provided according to the following schedule. UNITS AMENITIES 0-11 0 12=50 1 51 -100 2 101 -200 3 201 - 300 4 Add one (1) amenity for each 100 additional units or fraction thereof. Adopted July 21, 1992 18146 " " EXC-31 EXHIBIT "C" ARTICLE VI D. Maintenance and Completion of Open Space, Amenities, Landscaping and Manufactured Slopes No lot or dwelling unit in the development shall be sold unless a home owners' association has been legally formed with the right to assess all those properties which are jointly owned or benefitted to operate and maintain all of the mutually available features of the development including, but not limited to, open space, amenities, or landscaping. Conditions, Covenants; and Restrictions (CC&R's) may be developed and recorded for the development subject to the review and approval of the City Attorney. The recorded CC&R's shall permit the enforcement. by the City, if required. No lot or dwelling unit shall be sold unless all approved and required open space, amenities, landscaping, or other improvements, or approved phase thereof, have been completed or completion is assured by a financing guarantee method approved by the City. § 6-10 LANDSCAPING A. Landscape or Screening Buffers (1) Screening requirements. A form of screening shall be provided to separate residential subdivisions from abutting arterial or external collector streets. The Intent of the screen is two -fold: (a) It reduces noise generated by traffic and creates a visual barrier. (b) It reinforces the dedication of access rights from double frontage lots. A screening requirement may be waived where existing vegetation is to be retained and it provides a natural screen of at least fifty (50) percent opacity from the abutting arterial or external collector street system. Deed restrictions should be placed on double frontage lots to prohibit the indiscriminate clearing of vegetation. Plant material removal should be minimized during construction. (2) Design standards. The type of plant materials and/or structural materials installed should provide a substantial, long-lasting buffer. Buffers shall be a minimum of fire (5) feet in height and at least fifty (50) percent opaque. The desired height and opacity of plant materials shall be attained within two (2) years after the issuance of the Certificate of Completion by the City of Ocoee. (a) Screening buffers may be constructed in the following form: Vegetative buffers: Minimum ten (10) feet width easement. This type of screen solely incorporates the use of plant materials. 2. Walls: Minimum five (5) feet height. Walls are also a structural barrier for effective screening. The installation of plant materials is encouraged in combination with the use of walls. 3. Berms: Planted earth mounds may be constructed to form landscaped berms. Berms shall have a minimum slope of 4:1 and will be fully sodded or provided with ground cover to minimize erosion. Walls may be used in conjunction with landscaped berms. 4. Landscaped buffer: A landscaped buffer is a combination of vegetation, berms, or walls; it would incorporate the use of two (2) or more of the above forms of screening. Adopted July 21, 1992 18147 EXC-32 EXHIBIT "C" ARTICLE VI (b) Buffer screens for double frontage lots shall not be located on public rights-of-way unless approved by the City Engineer. (c) Plant material standards for landscaping are provided at the end of this Article. (3) Screening design plans. Screening or buffer plans shall be submitted to the Building Official prior to construction or the installation of the required materials. Plans shall identify the location, types, size and spacing of the materials to be used, and the method of irrigation if new landscaping is provided. (4) Maintenance of landscape or other screens. The effectiveness of a landscaped buffer depends upon proper maintenance. Plant material shall be adequately maintained to encourage sufficient growth to meet the screening requirements. Walls shall also be maintained in good repair. The alternative methods for the maintenance of screens include the following: (a) Deed restrictions may be placed on lots that require each owner to maintain that portion of the screen which is on his/her property. (b) Where a homeowners' association and annual funding thereof is required by appropriate, enforceable deed restrictions, the screen may be either on a separately described private parcel of land or on private property in a landscape easement, in common ownership of the homeowners' association of said subdivision, and shall be maintained by the homeowners' association. (c) Permits. After the construction plans have been approved by the City, the developer shall be responsible for acquiring all required permits prior to the commencement of construction, including any City site development permits (ff required), and permits required from other regulatory agencies. B. Arbor Provisions (1) Definitions: (a) Cromw The main mass of branching of a plant above the ground. (b) DBH: Diameter at breast height. "Breast height" is defined to be fifty-four (54) inches above the surface of the ground at the base of plant or tree. (c) Drip Line. The outermost perimeter of the branching structure of a plant as projected vertically to the ground. (d) Grubbing. To clear the ground of roots and stumps. (e) Protected Tree. Any tree that has a DBH of more than eight (8)inches, and which is not otherwise exempted from this code. In addition, all palms with at least four and one-half (4 1/2) feet of clear trunk between the ground level and the lowest frond are declared to be protected trees. In addition, all Specimen and Historic Trees are Protected Trees. (f) Remove. To relocate, cut down, damage, poison, or in any other manner destroy or cause to be destroyed, a tree. Adopted July 21, 1992 18148 EXC-33 EXHIBIT "C" ARTICLE VI (g) Specimen Trees: All native trees with a DBH of twenty-four (24) inches or greater. (h) Staff Forester The staff person assigned to administer this Code under the Director of Planning. The staff forester shall work directly with the U.S. Department of Agriculture's urban forester. (i) Tree Protection Zone. A circular zone around each protected tree defined as that area within a radius of the full drip line around the tree. (2) Permits Required for Trees and Arbors No person shall undertake land clearing. or the removal of any protected tree without first obtaining a permit from the Building Department. In addition to approval by the Building Official, the permit must also be approved by the Staff Forester. An application for land clearing or tree removal shall be made on forms provided by the Building Department and shall contain, at a minimum, the following information: (a) A tree survey consisting of scaled aerial photography or drawing (one inch equals 100 feet or greater) indicating the property boundaries with dimensions and bearings, surrounding streets, north arrow, scale, and existing/proposed development improvements. (b) Stands of trees, including: Location indicating extent of drip line. 2. Common names of major tree classes. 3. Estimated average height. (c) All protected trees, as identified by the Staff Forester, including: 1. Location 2. DBH 3. Common name 4. Estimated height (d) An indication of the trees proposed for removal. (e) The reason for removal. (f) Plans showing typical protective barriers to be used. (3) Tree Protection (a) Before any clearing or grubbing permits are issued by the Building Department, the developer must schedule a walk through with the Staff 'I Forester or his designee, to identify trees to be protected. The developer must give ,at least 24 hours notice to the Staff Forester for the walk through. Adopted July 21, 1992 18149 EXC-34 EXHIBIT "C" ARTICLE VI (b) _ The removal of protected trees shall be minimized to the maximum extent possible and no authorization shall be granted to remove a tree if the developer has failed to take reasonable measures to design and locate the proposed improvements so that the number of protected trees to be removed is minimized. In particular, the design must attempt to preserve specimen and historic trees. (c) No authorization for the removal of.a protected tree shall be granted unless the developer demonstrates one'or more of the following conditions: 1. A permissible use of the site cannot reasonably be undertaken unless specific trees are removed or relocated. 2. The tree is located in such proximity to an existing or proposed structure 'that the safety, utility, or structural integrity of the structure is materially impaired. 3. The tree creates a substantial hazard to motor, bicycle, or pedestrian traffic by virtue of physical proximity to traffic or impairment of vision. 4. The tree is diseased or weakened by age, abuse, storm, or fire and is likely to cause injury or damage to people, buildings or other improvements. 5. Any law or regulation that requires the removal. (4) , Replacement of Removed'Trees (a) All protected trees, identified by the Staff Forester, shall be replaced at a four to one ratio at the expense of the developer. (b) All replacement trees shall be greater than or equal to two (2) inches in diameter at breast height. (c) A. replacement tree may be a tree removed from one location to another on the site, or moved off the site. The Staff Forester shall prescribe measures to ensure the survival of the tree. (d) Replacement trees shall, if practicable, be planted on the development site. If not practicable, replacement trees may be donated, or a fee in lieu may be paid to the City for the purpose of planting trees on public property. The fee in lieu shall be based on the cost of purchasing the requisite size and number of replacement trees. (5) Historic and Specimen Trees (a), A historic tree is one that has been designated by the City Commission as one of notable historical interest and value to the City because of its location or historical association with the community. A public hearing shall be held by the City Commission on the designation with due notice ►:,;, to the owner of the tree. (b) A specimen tree is one that has been officially designated by the City Commission, upon the advise of the Staff Forester, to be of high value because of its type, size, age, or other relevant criteria. A public hearing Adopted July 21, 1992 18156 EXC-35 (6) Adopted July 21, 1992 EXHIBIT "C" ARTICLE VI on the designation shall be held by the City Commission with due notice to the owner of the tree. (c) No historic or specimen trees shall be removed without a finding by the Development Review Committee that the tree is a hazard or that it is not economically or practically feasible to develop the parcel without removing the tree. The developer shall explain, in detail, why the tree is a hazard or why it is not economically or practically feasible to develop the parcel without removing the historic or specimen tree. The Director of Planning shall make a presentation to the Development Review Committee on the application and make. a recommendation as to whether it should be approved or denied. The decision by the Committee on the application shall be made within 10 days of the date the application was filed. The removal fee for specimen trees shall be one hundred dollars ($100) for every inch in DBH. In addition,each tree must be replaced at a four to one ratio. Protection of Trees During Development Activity (a) To ensure the health and survival of protected trees that are not to be removed, the developer shall avoid the kinds of tree injuries during all development activities: 1. Mechanical injuries to roots, trunk, and branches; 2. Injuries by chemical poisoning; 3. Injuries by. grade changes; 4. Injuries by excavation; and S. Injuries by paving. (b) At a minimum, the protective measures described below shall be taken where appropriate to the development activity. The measures shall be planned and undertaken in consultation with the Staff Forester and shall not be construed as limiting the authority of the Development Review Committee, upon the advice of the Staff Forester, to impose additional reasonable requirements as may be necessary to preserve the health of protected trees in particular circumstances. (c) Avoiding Mechanical Injuries 1. Prior to any land preparation or other development activities a protective barrier easily visible to equipment operators shall be placed around all protected trees so as to encompass the entire tree protection zone. 18151 EXC-36 EXHIBIT "C" ARTICLE VI 2. No attachment, wires .(other than supportive wires), signs or permits shall be fastened to any protected tree. 3. No equipment, construction materials, or debris of any kind shall be placed within the protective barrier. 4. Landscaping activities within the bounds of the protective barrier (before and after it is removed) shall be accomplished with light machinery or manual labor. Grubbing and similar activities are prohibited. 5. In lieu of constructing barriers required above, the developer may physically designate large areas containing protected trees where no land preparation or other development activities of any kind will occur. The area shall be designated by placing stakes a maximum of twenty five (25) feet apart and tying ribbon, plastic tape, rope, etc. from stake to stake along the outside perimeter of the area. This perimeter line shall be beyond the tree protection zone of any protected trees growing within the area. 6. Required protective barriers and perimeter lines shall remain in place until all -construction activity, except landscaping, within the protected area, is terminated. (d) Avoiding Injuries Due to Chemical Poisoning 1. No fuel, paint, solvent, oil, thinner, asphalt, cement, grout or any other construction chemical or other material or tools of any kind shall be stored, or allowed in any manner to enter, within a required protective barrier or perimeter line. 2. No equipment shall be cleaned within a required protective barrier or perimeter line. (e) Avoiding Injuries Due to Grade Changes Grade changes shall not be made within the tree. protection zone unless the following protective measures are taken: 1. When raising the, grade, the following measures shall be taken: a. Within the tree protection zone, existing sod/vegetation and leaf, litter shall be removed and the soil loosened without injuring the roots. b. The area within the tree protection zone shall be properly fertilized to improve the vigor and growth of the roots. C. Porous, four -inch, agriculture drain tiles shall be laid over the soil to drain liquids away from the trunk. A drop of at least one eighth (1 /8) inch per foot shall be provided. The drain field shall be designed to provide adequate drainage of the existing configuration of the trees. d. The number of drains shall depend upon soil material; lighter sandy soils and porous gravelly material require fewer drains than heavy non -porous soils. Adopted July 21, 1992 18152 EXC-37 EXHIBIT "C" I.l ProPoiiy conslruclod horrlcado nrolecle Ilro tocol area within I110 (k'll) HIM or a rodlun of 20' WhIchnver is loss. FICURV A EXC-38 EXHIBIT "C" 1 A r?t?r;�� for 7I,Is� dr(jwlrlp allows a gr Id pallor,, of Illoe dralnlr,q a. clrund . of Ir 000. r•rc:u,ri; n EXC-39 I)ry ctrcutollorr. TI oa Woll orourld Inco. on pertnils air orifi wolor (roi ( n' gunk and /1) .Qrountl cn a' clol,od off , ro0ls (arrow). Vorcal ll to clroln owaY Uro contloclod witIl dinin to boll lilns ono Iooso on rIghl intitill Is arldil(oanraol irby bold . cta - IN for 7I,Is� dr(jwlrlp allows a gr Id pallor,, of Illoe dralnlr,q a. clrund . of Ir 000. r•rc:u,ri; n EXC-39 EXHIBIT "C" ARTICLE VI e. Aeration shall be provided by installing vertical tiles along the system. The vertical tiles shall be filled with gravel and capped with a heavy-duty mesh to keep out trash and debris. Dry wells shall be large enough to allow for maximum growth of the tree trunk. Most large shade trees require at least a sixty (60) inch diameter well. For slow growing mature trees, a space of twelve to eighteen (12-18) inches shall be provided between the trunk and the side of the well at every point. g. To prevent washing of material into the well, the dry well casing walls shall be high enough to bring the coping just above the level of the proposed fill. h. Dry well walls shall be constructed of materials that permit passage of air and water. Concrete blocks backed with galvanized screening may be used for the sides of the well. i. Grating or barriers shall be used around openings that are large enough to present a hazard to pedestrians. j. Open wells shall be cleaned regularly to remove sediment, leaves, and debris that might interfere with the free passage of air. k. Large stones shall be placed over the drainage tiles and a layer of smaller stones shall be placed over the remainder of the ground within the drip line. I. A layer of gravel shall be placed over the stones. M. The fill shall be completed with a layer of porous soil. Adopted July 21, 1992 18153 EXC-40 EXHIBIT "C" I vctrrt cm. _U.• unni n ri t.r ` .�r�• �„ .^•� �„�r- r tet... J _ J Dnnl11 Ttt.L _ vrn•rtcnL nnnIM TJ J.0 DIIntHTtLr 1`�cuur EXC-41 EXHIBIT "C" r .. Dny WCLI. VC11TI CnI. TI LCS LOOSE STOIICS SOIL FILL SIIn1.l. _ _ .^.Tollr.S 177 t ,� Lltnlll TI LCS FICUR1: II EXC-42 EXHIBIT "C" .It Orlpli?ai prutSo A tiew made 1 OrIginci grade Dry retainingr- wall _ Mlxluro of lioal rnoss ur /�� oy Y+ gado lea( mold and loll EXC-43 EXHIBIT "C ARTICLE VI 2. When lowering the grade, the following measures shall be taken: a. Roots shall be cut cleanly and re -trimmed after excavation. b. The canopy shall be pruned to aid in maintaining tree vigor. C. When lowering the grade of the soil surrounding a protected tree, the maximum number of tree roots within the tree protection zone shall be preserved by using any of the following methods: 1) Terracing. The area within the tree protection zone is left at the original grade by terracing. ii) Retaining wall. The area within the tree protection zone is left at the original grade by constructing a dry retaining wall. The retaining wall shall be porous to allow for aeration. Terracing and retaining wall. The area within the tree protection zone is left at the original grade by the combined use of terracing and dry retaining wall. r,. Adopted July 21, 1992 18154 EXC-44 EXHIBIT "C" 3. Minor Changes in Grade ARTICLE VI When the change in the grade is minor, as determined by the Staff 'Forester, lesser protective measures than those described above may be taken. The Staff Forester shall approve the use of these methods where. their use will not endanger the health of the protected tree. (f)' Avoiding Injuries Due To Excavations I. Water, sewer, and other utility lines should be routed around the tree protection zones of protected trees. 2. If a line cannot reasonably be routed around the tree protection zone, the line shall be tunnelled beneath the area within the zone. The tunnel shall be offset to one side of the trunk to prevent damage to the main top roots. (g) Avoiding Injury By Paving Within the Drip Line Porous paving may be placed within the tree -protection zone of a protected tree, so long as no damage is inflicted to the tree by grade change, compaction of the soil, or any other cause. (7) Penalties (a) Violations of this Article shall constitute a misdemeanor enforceable in accordance with the provisions specified in Article 1-14 of this Code and Section 1.8 of the City Code or by an injunction or other legal or equitable relief in the circuit court against any person violating this Section, or by both civil injunctive and criminal relief. (b) In addition, for any protective tree removed without a permit, a fine shall be assessed in an amount equal to one hundred dollars ($100) times the diameter at breast height of the removed specimen. (c) Where trees have been removed or damaged in violation of this Section or permit requirements, remedial actions shall be required to restore the property. A restoration plan shall be submitted to the Building Department and .the Staff Forester for approval and may require tree replacement at a ratio not to exceed four (4) to one (1). (d) No Certificate of Occupancy shall be issued for any development until all applicable permit and restoration conditions have been met C. Landscape Permit Requirements. (1) No building, grading, or tree removal permit shall be issued until approval of a required landscape plan for vehicular use areas. Prior to submission of the building plans, the requirements of this section must be met. In cases where a vehicular use area is located on a lot other than that of the principal building, building plans may be submitted for review. (2) The applicant or his authorized agent shall submit to the Building Department three (3) copies of each survey and landscape plan at a scale no greater than one (1) inch equals fifty (50) feet. The proposed landscaping may be super- imposed on Adopted July 21, 1992 18155 EXC-45 EXHIBIT "C° ARTICLE VI a proposed site plan or on a separate sheet, provided all drawings are the same scale. Each survey and landscape plan shall include the following: (a) Name, signature, address and telephone number of property owner, surveyor, and/or designer. (b) North arrow and scale. (c) All dimensions. (d) All required information and data listed below for each drawing: 1. The required survey shall include the following information: a. Legal description of the property. b. All trees and survey data as required by the Sections of this Article. C. Existing structures, buildings, parking spaces, accessways, and public streets. d. Above ground and below ground utility lines and easements. e. Existing natural features and topography at one foot contour intervals. In areas where slopes are twenty (20) percent or greater, a five (5) foot contour interval may be substituted. i) The proposed landscape plan shall include the following: a) All trees, natural features, man-made appurtenances, and structures to be retained upon the site and all topographic changes. b). , All proposed landscaping improvements and plantings or landscaping areas identified. The grade, spacing, size, and name of proposed landscape materials shall be listed on the plan. c) Comments regarding site preparation, tree preservation, methods of installation, and methods of maintenances shall be listed on the plan. D. Required Landscaping (1) Vehicle Use Areas (a) A vehicle use area is any portion of a development site used for circulation, parking, and/or display of motorized vehicles, except junk or automobile salvage yards. Adopted July 21, 1992 18156 EXC-46 EXHIBIT "C" ARTICLE VI (b) All vehicle use areas containing more than one thousand five hundred (1,500) square feet shall be landscaped in accordance with Figures F and G. Figure H identifies the areas of landscaping that may, be counted towards fulfilling the vehicle use area landscaping requirement. 1'Lf1N'1' 1(1;Y ' CANOPY • UNDERS'1'01IY . Si MUDS GI(OUNDCOVEN I.1GUR'.: i' Adopted July 21, 1992 18157 EXC-47 EXHIBIT "C' UCIIICLC UEC MICA LAIIo[CArIMC IEA" igUAoc rr.rr or I r LAIITINC AA[A rive 101 CAIIOry�— oMc 111 I0.I09AEl.ov lucLux l 121 ill}/lo[ , FIGURE C EXC-48 EXHIBIT "C" i l _ ca,o3•���� -covorod Maxk,iurn 6 foul off ) 8 oxc�udad UF1ryES `Aroao @ t`�voor nr c iy _11p ctIvos c un ��7A Maxknurn 6 loot Mlnknum 3 foul _ _1v1kr,kiwrn 3 foot 1 ' Maxknutn 67551, BUILDING bullar doors not c6uFll= — / A,/,Corpora count AM f All Leno ll.,nrs 3 tool �W x Moro ttlati 6 tool 1//////1//, INELICIOLE AREAS F011 LANUSCAf'II40 rtctntr•. n EXC-49 EXHIBIT "C" ARTICLE VI (c) Vehicle use areas designed to accommodate vehicles that are larger or smaller than automobiles, or that do not have designated parking areas, shall meet the requirements of the above figures except that in place of twenty-four (24) parking spaces, the square footage of four thousand eight hundred (4,800) may be used. (2) Street Trees (a) The developer shall plant, within five (5) feet of the right-of-way of each street within a residential development, one (1) shade tree for every fifty (50) linear feet of right-of-way. Except where property on one side of the right-of-way is not owned by the developer, the trees shall be placed alternately on either side of the street. Existing trees and native tree species that need less water and maintenance are preferred. (b) Trees planted pursuant to this section shall be selected from the approved list of trees and shall have a minimum overall height of ten (10) to fifteen (15) feet at the time of planting. The Staff Forester should be consulted in selecting appropriate tree species and planting procedures. Existing tree species and native tree species that are drought tolerant and relatively maintenance free, are preferred. (3) Landscaping Adjacent to Public Rights -of -Way Where paved ground surface areas are located adjacent to sidewalks, streets and other public rights-of-way, landscaping shall be provided between the public rights- of-way and the paved ground surface area. Said landscaping shall include a landscaped bed at least ten (10) feet in width containing an opaque screen of landscaping at least three (3) feet in height.. Said screen may be composed of a berm at least two (2) feet in height or solid brick wall at least three (3) feet in height, or a screen of landscaping at least two and one-half (2 1/2) feet in height at time of planting. If a screen of living landscaped material is utilized, it shall attain opacity and height of three (3) feet within twelve (12) months of planting under normal growing conditions. (4) Landscaping Adjacent to Other Properties (Buffering) Where paved ground surface areas are adjacent to properties zoned exclusively for residential, conservation, or recreational land uses, all land between the paved ground surface area and the property line shall be landscaped. Said landscaping shall include a buffer bed at least ten (10) feet in width, containing either a berm at least two (2) feet in height, or a hedge or other durable screen of landscaping at least sic (6) feet in height. If a berm is utilized, additional landscaping at least three (3) feet in height at time of planting shall be installed. Where said screen of landscaping is composed of living plant material, it shall be thirty-six (36) inches in height at time of planting and shall attain opacity within twelve (12) months under normal growing conditions. A minimum of one (1) tree (at least one and one-half (1 1/2) in DBH and at least ten (10) feet in height) shall be planted for each fifty (50) linear feet of common lot line or fraction thereof. (5) Residential Building Lots All residential building lots shall have, at a minimum, three (3) trees per lot. Said trees shall be at least two (2) inches in DBH and at least ten (10) feet in height. All required yards shall be sodded. Adopted July 21, 1992 18158 EXC-50 EXHIBIT."C" ARTICLE VI (6) Use of Required Areas No accessory structures, garbage or trash collection points or receptacles, parking, or any other functional use contrary to the intent and purpose of this Code shall be permitted in a required landscape area. This does not prohibit the combining of compatible functions such as landscaping and drainage facilities. . E. landscape Design and Material Requirements (1) All landscaping shall be installed according to accepted commercial planting procedures. Soil, free of limerock, pebbles, or other construction debris shall be provided. All landscaped areas shall be protected from vehicle encroachment by wheel stops or, curbing. If curbing is used abutting landscaped areas, it shall be perforated to permit drainage from the paved ground surface area onto the landscaped areas. (2) Landscaping should integrate the proposed development into existing site features through consideration of existing topography, hydrology, soils and vegetation. (3) The functional elements of the development plan, particularly the drainage systems and internal circulation systems for vehicles and pedestrians, should be integrated into the landscape plan. (4) Landscaping should be used to minimize potential erosion through the use of ground covers or any other type of landscape material that aids in soil stabilization. (5) Existing native vegetation should be preserved and used to meet landscaping requirements. (6) Landscaping should enhance the visual environment through the use of materials that achieve.variety with respect to seasonal changes; species of living material selected, textures, colors, and size at maturity. (7) The landscape designer should consider the aesthetic and functional value of Vegetation, both when initially installed and when the vegetation has reached maturity. Newly installed plants should be placed at intervals appropriate to the size of the plant at maturity, and the design should use short- -and long-term elements to satisfy the general design principles of this Section over time. (8) Landscaping should enhance public safety and minimize nuisances. (a) Landscaping should maximize the shading of streets and vehicle use areas. (b) The selection and placement of landscape materials should not obstruct existing or future solar access, but should enhance the use of solar radiation, and conserve the maximum amount of energy. F. Installation of Plants (1) All plants shall be healthy and free of disease and pests, and shall be selected from the list of approved species below. The Staff Forester may authorize the use of ani appropriate species not shown on the lists. The Staff Forester should take steps to have the substituted species added to the list. (2) Plants shall be installed during the period of the year most appropriate for planting the particular species. If compliance with this requires that some or all of the Adopted July'21, 1992 18159 EXC-51 EXHIBIT "C" PLANT MAT ILkL, 1 104' wona 1.2 CANOPY 2Q' .4 U"DEASTORY C 4 �s � � � • �� C7 mss? J w T n Kt n c n EXC-52 PLANT MATERt L / i OCT 3.5 CANOPY 2 1.4 UDERSTORY EXHIBIT "C" i.ammcrT nr r-...-. . -- -- •. - - L r ��. vn[%u EXC-53 M- NT WTS'jJ& / 100' 4.8 CANO'Y 24 UNDERSTdgY 18 SHRUBS W DTH a EXHIBIT "C" 8.4 CANopY 3c 2.7 LtZEFISTORY 22 SHRL16S 8 CANOPY 25 3 UNAERSTORy 24 SHRU3S 8.8 CANOPY 3.3 U DERSTORY 28 St-f2UgS T AAf mc%I-A nr. EXC-54 EXHIBIT "C" PLA1,47 MATERIAL / 100' WIDTH 8 CANOPY 6: 4 UtCERSTORY 24 SHRUBS 9 CAN0Py i-5 UNDERST04RY 27 SHRUBS 10 CANOPY 5 UNDERSTORY 30 SHRUBS 12 CANOPY '6 UNDERSTORY 36 SHRUBS LANDSCAPE STANDARD EXC-55 G. EXHIBIT "C" - ARTICLE v1 landscape be planted at a time after the issuance of a Certificate of Occupancy, the developer shall post a performance bond sufficient to pay the costs of the required, but not yet installed, landscaping before the certificate is issued. (3) Landscaping shall be protected from vehicular and pedestrian encroachment by means of raised planting surfaces, depressed walks, curbs, edges, and the like. (4) The landscaping shall not interfere, at or before maturity, with power, cable television, or telephone lines, sewer or water pipes, or any other existing or proposed overhead or underground utility service. (5) The developer shall provide sufficient soil and water to sustain healthy growth of all plants. Use of Native Plants (1) Forty (40) percent of the total number of individual plants selected from each of the categories of the list of approved species below (trees; shrubs; vines; flowers, herbs, and groundcover; and shore line and water plants) and used to satisfy the requirements of this Code shall be selected from the list of native species in the category. (a) Approved Plants 1. The following are designated as trees: Acer rubrum Red maple Aesculus pavia Red buckeye Agarista populifoia FL Leucothoe Carpinus carolinlana Ironwood Carya floridana Scrub hickory Celtis laevigata Hackbery Cercis canadensis Redbud Chionanthus virginicus Fringe tree Cornus florida Flowering dogwood Cornus foemina Swamp dogwood Crataegus spp. Hawthorn Gordonia lasianthus Loblolly bay Ilex cassine Dahoon holly Ilex opaca American holly Ilex vomitoria Yaupon holly Juniperus silicicola Southern red cedar Liquidambar styraciflua Sweet gum Uriodendron tulipifera Tulip tree Lyonia ferruginea Rusty lyonia Magnolia grandiflora Southern magnolia Magnolia virginiana Sweet bay Morus rubra Red mulberry Myrica cerifera Wax myrtle Osmanthus americanus Wild olive/Deviiwood Persea humilus Soil bay Persea borbonia Red bay Pinus clausa Sand pine Pinus eliottii Slash pine Pinus palustris Long leaf pine Platanus occidentalis Sycamore Adopted July 21, 1992 18160 EXC-56 4 Adopted July 21, 1992 EXHIBIT "C" ARTICLE VI Prunus angustifolia Chickasaw plum Prunus caroliniana Cherry laurel Quercus geminata Sand live oak Quercus incana Bluejack oak Quercus inopina Scrub oak Quercus laevis 'Turkey oak Quercus laurifolia Laurel oak Quercus mytrifolia Myrtle oak Quercus nigra Water oak Quercus shumardii Spanish oak Quercus virginiana Live oak Sabal palmetto Cabbage palm Taxodium ascendens Pond cypress Taxodium distichum Bald cypress Tilia americana Basswood Ulmus alata . Winged elm, Cork elm Ulmus americana American Elm, White elm Vaccinium arboreum Sparklebery Viburnum obovatum Walters Viburnum The following are designated as shrubs: Ardisia escallonioides Aronia arbWolia Asimina obovata Befaria racemosa Bumelia tenax Callicarpa americana Ceratiola ericoides Erythrina herbacea Euonymus americanus Garberia heterophylla Gaylussacia dumosa Gaylussia frondosa Ilex ambigua Ilex glabra Illicium floridanum Illicium parviflorum Lyonia fruticosa Lyonia lucida Psychotria nervosa Passiflora incamata Rhapidophyllum hystrix Rhododendron canescens Rhododendron viscosum Rhus copallina. Rubus spp. Serenoa repens Vaccinium darrowii Vaccinium myrsinites. 18161 EXC-57 Mariberry Red chokeberry Scrub pawpaw Tar flower Tough bumelia Beauty bent' Rosemary Coral bean Strawberry bush Garberia Dwarf huckleberry Dangleberry Carolina holly Gallbeny Florida anise Star anise Staggerbrush Shiny lyonia Wild coffee Passion flower Needle palm Honeysuckle. azalea Swamp azalea Winged sumac Blackberry Saw palmetto Blueberry Florida evergreen 3. 4. 5. Adopted July 21, 1992 EXHIBIT "C" ARTICLE Vi The following are designated vines: Campsis radicans Trumpet vine Gelsemium sempervirens Yellow jasmine Lonicera japonica Japanese honeysuckle Lonicera sempervirens Coral honeysuckle Parthenocissus quinquefolia Virginia creeper Smilax pumila Sarsaparilla vine Vitis rotundifolia Muscadine grape The following are designated as flowers, herbs, and groundcover. Aletris lutea Arisaema triphyllum Aristida spp. Asclepias tuberosa Calagogon tuberosus Clinopodium coccineum Crinum americanum Gaillardia sp. helianthus spp. Hymenocallis crassifolia Hypericum spp. Liatris spp. Lilium catesbaei Lupinus diffusus Nephrolepis exaltata Mitchella repens Opuntia compressa Polypodium aureum Pteris vittata Ruellia caroliniensis Satureja rigida Thelyptersis torresiana Tradescantia ohiensis Viola lanceolata Woodwardia areolata Yucca filamentosa Zamia sp. Colic root Jack in the Pulpit Wire grass Butterfly weed Grass pink Red basil Swamp lily Blanket flower- Black-eyed lowerBlack-eyed susan Spider lily St. Johns wort Blazing stars Pine lily Lupine Sword fem Partridge fem Prickly pear Golden foot fem Ladder brake fem Wild petunia Pennyroyal Mariana maiden fem Spiderwort Bog white violet Netted chain fem Bear grass Coontie The following are designated as shoreline and water plants: Aster carolianus Bidens mitis Blechnum serrulatur Canna flaccida Cephalanthus occidentalis Eleocharis spp. Hibiscus coccineus Hydrocotyle umbellata Iris virginica Itea virginica Juncus effusus Nuphar luteum Nymphaea odorata Orontium aquaticum 18162 EXC-58 Climbing aster Bur -marigold Saw -tooth fem Yellow canna Buttonbush Spikerush Swamp hibiscus Water pennywort Southern blueflags Virginia willow Soft rush Spatterdock Fragrant water4gy Golden club EXHIBIT "C" ARTICLE VI Osmunda cinnomomea Cinnamon fern Osmunda regalis Royal fern Panicum hemitomon Maidencane Peltandra virginica Arrow arum Phragmites autralls Giant reed Pontederia lanceolata Pickerelweed Spartina Bakerii Sand cordgrass Sagittaria lancifolia Duck potato Sagittaria graminea Arrowhead Scirpus califomicus Giant bulrush Thalia geniculata Arrowroot (Fire Flag) Thelypteris palustris Marsh fern Woodwardia areolata Netted chain fern Woodwardia virginica Virginia chain fern 6. The following plants are prohibited and shall not be installed as landscape material: Silk Oak. (Grevillea robusta) Punk Tree ( m e' I a I e u c a quinquenervia) Australian Pine (Casuarina spp.) Brazilian Pepper (Schinus terebinthifolius) Jacaranda (Jacaranda acutifolia) Cama Eucalyptus. ( E u c a l y p t u s camaldulensis) Ear tree (EnteroIobium cyclocarpum) American mulberry (Mores urbra) Chinaberry (melia azedarach) Chinese tallow tree (Sapium sebiferum) Mimosa (Albizia julibrissin) (b) Irrigation The developer shall provide all landscaped areas with an' appropriate irrigation system. Said system shall ,provide at least one outlet for irrigation water within one hundred fifty (150) feet of the plant material. If a landscaped area contains primarily species native to the immediate region, or plants acceptable for xeric landscaping, the Director of Planning may waive the requirement for installation of, the irrigation system. Consideration of a waiver of the irrigation requirement shall include, in addition to the area covered by native vegetation, such local conditions as sun or shade,. use .of fill soil, and depth to water table. (c) Non -living Materials Mulches shall be a minimum depth of two (2) inches and a maximum depth of three (3) inches. Plastic surface covers shall not be used. H. Maintenance and Replacement of Plants (1) Thb'awner of a property shall be responsible for the maintenance of all landscaping and shall keep it in good condition so as to present a neat, healthy, and orderly appearance free of refuse and debris. Periodic inspections shall be conducted by the Staff Forester. The owner of the property shall be notified in writing of Adopted July 21, 1992 18163 EXC-59 EXHIBIT "C" ARTICLE VI violations and will be given thirty (30) days to correct them. Continued violation after thirty days will be referred to the Code Enforcement Board. Deteriorated and destroyed materials must be replaced with plant material consistent with the original landscape plan as to quantity and quality or as approved by the Staff Forester. (2) All required plants shall be maintained in a healthy, pest -free condition. (3) Within six (6) months of a determination by the Staff Forester that a plant is dead or severely damaged or diseased, the plant shall be replaced by the developer in accordance with the standards specked in this Code. Commercial and Industrial Uses Commercial development shall mean commercial facilities designed as a support feature to a residential or industrial project or the general community. Industrial development shall mean manufacturing, processing, and storage operations designed to be compatible with surrounding development. (1) The maximum impervious lot coverage shall not exceed 70 percent of the net land area. (2) Open space shall be provided for each parcel of land at a rate of at least 20 percent of the net land area. (3) Building setbacks from all property lines shall be as required by Table 5.2 in Article V. However, where adjacent to a residential use a minimum 50 foot setback shall be provided. (These setback requirements will not be applciable for the Downtown Redevelopment Area as described in Figure 13 of the Comprehensive Plan.) Building setbacks from streets shall meet the following minimum guidelines: Local Street 25 feet Collector Street 35 feet Arterial Street 50 feet Expressway 75 feet Paved parking and loading areas and fenced stormwater retention facilities shall maintain minimum 10 foot setbacks from all side and rear property lines and 15 foot setbacks from all street right-of-way lines. There shall be a minimum separation of 20 feet between all buildings. Separations shall be increased 10 feet for each additional story of building height over two. (4) The number of access cuts or driveways serving a commercial or industrial development shall be based upon the frontage of the entire site and the functional classification of the street to be accessed and shall be in accordance with the following criteria, unless traffic or safety conditions. require the maximum number to be reduced. Additionally, certain situations may dictate that one or more permitted driveways be limited to a right tum in, right tum out configuration. Adopted July 21, 1992 18164 EXC-60 EXHIBIT "C" Arterial Street ARTICLE VI Site Fronta9e Maximum # of Driveways Less than 400 feet 1 401-800 feet 2 801-1500 feet 3_ More than 1500 feet 4' -(minimum 500 feet separation) Local or Collector Street Site.Frontage Maximum # of Driveways Less than 300 feet 1 301-700 feet 2 701-1200 feet. 3 1201-1800 feet q More than 1800 feet 5 (minimum 400 feet separation) In cases where the developer, desires additional access cuts to serve a project, frontage roads shall be designed and constructed to City standards and constructed by the developer on private property with access and pedestrian easements dedicated to the City of Ocoee. Frontage road access points on arterial streets shall have a minimum separation of 500 feet. Access driveways shall be separated a minimum of 250 feet from an intersection with a collector road and 350 feet from an intersection with an arterial highway. Such distances are to be measured from the centerline of the driveway to the nearest right-of-way line of the intersecting street as measured along the right-of- way.. Where existing boundary lines of a site would limit the separation to a lesser distance than those specified above, permission for construction of an access driveway will be considered. The design of driveways shall* conform to City standards. All vehicular maneuvering areas and parking areas shall be paved to meet City standards: (5) Landscaping shall be provided within each phase of the project in accordance with the provisions of the Ocoee Arbor and Landscaping Ordinance in addition to the following provisions: (a) Trees shall be provided along buffer areas abutting public rights-of-way at a frequency of one tree for every 30 feet of road frontage or fraction thereof. Trees shall be provided along perimeter lot lines, not abutting rights-of-way,at a ratio of one tree for each 50 linear feet or fraction thereof. Existing trees.will be counted to meet this requirement. The application of the perimeter landscaping criteria shall be flexible with preference being given to aesthetically pleasing landscape design over a rigid interpretation of the tree spacing standard; however, no more than 100 contiguous. feet along the perimeter of the property should be void of trees. (b) In addition to required, trees and hedges, all paved areas and fenced stormwater facilities .shall be screened by a continuous berm. Berms shall be a minimum of two feet and no more than five feet in height with side slopes not to exceed 4:1 if sodded. _ Berms shall be supplemented with landscaping in order to provide a minimum 48 inch high screen. Berms constructed adjacent to the public right-of-way shall not exceed 75 feet in Adopted July,21, 1992 18165 EXC-61 EXHIBIT "C' ARTICLE vl length without a landscape break. Overlapping berms may be utilized in lieu of landscape breaks. Additional landscaping shall be provided to screen any on-site uses having a negative impact on adjacent property. (c) Landscaping shall be provided in scattered locations throughout the parking areas in an amount equal to ten percent of the total paved area. Each landscaped area shall be a minimum of 200 square feet. A landscape island shall be provided at the end of each parking area adjacent to the travel lane serving the parking aisle. A minimum of 50 percent of the required trees provided within the interior landscaped area shall be of a large shade tree variety. (d) A landscaped area shall be provided around the base of all buildings oriented toward public rights-of-way or public parking areas. The rear of the building need not be landscaped unless oriented to a public right-of- way. Building landscape area shall be equal to 50 percent of the length of the building base oriented toward the rights-of-way or parking areas, with a minimum width of four feet. At least half of the required landscape area shall contain landscape material other than ground cover with trees provided at a ratio of one tree per 200 square feet of required landscaped area or fraction thereof. (e) All landscaped areas shall be irrigated by a permanent automatic sprinkler system providing 100 percent coverage to ensure the continued life of the landscaping. All areas not covered by buildings, paving or special landscaped features shall be sodded or provided with natural ground cover. The design choice and placement of landscape materials shall not obstruct the cross -visibility' of street traffic, on-site traffic, or pedestrian areas. (6) The erection of signs or advertising material shall at a minimum comply with the standards of the Ocoee Zoning Code (See Article VIII). All signs which exist at the time of commercial/industrial zoning will be considered as nonconforming and shall be removed prior to occupancy of the developed site, unless specifically permitted as part of the building permit or development order. (7) Other Requirements: (a) Service areas visible from a public right-of-way or abutting properties shall be screened by a six foot maintenance free masonry wall or eight foot high landscaped buffer with berms. Landscaping shall be a minimum of 36 inches in height upon planting and attain a height of 48 inches within 12 months with an opacity of 75 percent. (b) Solid waste refuse facilities shall be screened by a six foot masonry wall. Such walls shall screen the refuse receptacle on three sides with the access side oriented towards the interior of the site and away from areas visible to patrons of the site or abutting properties. The access side of the storage area shall be equipped with opaque doors or gates. (c) Maintenance free masonry screening walls on side or rear property lines may be required to buffer surrounding properties from adverse site conditions. Wood fences shall not be permitted. No wall placed on a side or rear lot line shall exceed six feet in height. Landscaping shall be provided in the form of hedge material or shrubs planted adjacent to both sides of the wall equal to 25 percent of its length. Adopted July 21, 1992 18166 EXC-62 EXHIBIT "C" ARTICLE VI (d) Open storage of articles, goods or materials shall not be permitted unless totally screened from the public right-of-way and adjacent properties. Utility fixtures and mechanical: equipment, when outside a structure, shall be screened with walls, fences, dense plant material or berms or a combination of the above, or within a completely enclosed area. Display areas shall not be visible from the right-of-way or abutting properties. (e) All roof mounted equipment shall be screened from view (f) Automatic lighting devices for the illumination of building exteriors shall be installed and maintained in such a manner as to confine direct rays to the premises and prevent direct rays and glare onto adjacent properties or rights-of-way. (g) Sidewalks shall be required along all rights-of-way (other than limited access highways) to provide for and encourage pedestrian movement. Sidewalks along major highways shall be a minimum of seven (7) feet wide.., Sidewalks along arterial and collector streets shall be a minimum of five (5) feet wide. All sidewalks shall be designed to provide access by the handicapped. (h) All utility services including sewer, water, electrical (except transmission lines), telephone and cable television shall be located underground. Any equipment which cannot be located underground must be adequately screened from view from. any street or abutting property. (8) Site development standards for projects containing public, quasi -public, and other similar uses shall be reviewed in accordance with the requirements specified for Commercial/Industrial projects, except where unique circumstances dictate modifications to the standards to protect the health, safety, and general welfare of surrounding residents. J. Miscellaneous Standards (1) General provisions. . (a) The ' project engineer shall certify the design and inspection of the installation of all required improvements such as streets, drainage structures, bridges, bulkheads, and water and wastewater facilities. All plans for improvements shall be prepared by such engineer and, prior to construction, must • be approved by the Development Review Committee, where applicable. (b) Actual building construction on structures for any type of occupancy shall not be commenced on any project until an approved water supply and accessway has been provided to the immediate area of construction. An approved water supply is a functioning, active water main and hydrant system that has been approved and conforms to the requirements of these regulations. An approved accessway is a stabilized driving surface that conforms to the requirements of these regulations and is capable of supporting fire department vehicles and equipment. Adopted July 21, 1992 18167 EXC-63 EXHIBIT "C" (2) Monuments. ARTICLE VI (a) Permanent reference monuments. Permanent reference monuments shall be placed as required by Chapter 177, Florida Statutes, as amended. Monuments shall be set in the ground so that the top is flush or no more than one foot below the finish grade. (b) Permanent control points. Permanent control points shall be set along the street right-of-way or block lines at "PC's", "PRC's", "PCC's" and other changes in direction, excluding those points located by 'PRM's". (c) Permanent benchmarks. Permanent benchmarks to establish mean sea level vertical control shall be installed within the subdivision at intervals not to exceed one thousand (1,000) feet. (3) Easements. (a) Utilities. Utility easements shall be provided in front yard areas. Side and rear yard utility easements may be permitted by the City Commission only when compelling conditions dictate exceptions. Easements shall be a minimum of fifteen (15) feet wide; however, additional width may be required for sewer or drainage easements. (b) Drainage.. Where a proposed subdivision is traversed by or abuts a watercourse, drainage way, canal, or stream, there shall be provided a stormwater easement or drainage right-of-way. Where a new drainage way or canal is required, an easement or right-of-way shall be provided for maintenance purposes. Said easement or right-of-way shall be approved by the City Engineer. (4) Lot standards. (a) Lot size. 1. Minimum area requirements shall be determined based on the water source and sewerage system provided in the subdivision as stated in Section 6-8 B., provided that lot dimensions and size shall not be less than the minimum established in the zoning ordinance. 2. All lots in residential districts which abut arterial streets shall have a minimum depth of one hundred twenty-five (125) feet Width and area of lots laid out for industrial and commercial uses shall be sufficient for the type of development contemplated and adequate to provide off-street parking and vehicle maneuvering, as well as loading and service facilities. (b) Comer lots. Comer lots shall be at least ten (10) feet greater in width than the minimum established in the zoning ordinance, except where the minimum width established in the zoning ordinance exceeds ninety-five (95) feet, no additional width shall be required. (c) Access. Each lot shall have a_. minimum distance of twenty (20) feet abutting a dedicated public paved street or road. The subdivision shall be so designed where remnants and land locked areas are not created. All lots shall have access from an internal subdivision street Lots shall not Adopted July 21, 1992 18168 EXC-64 EXHIBIT "C" ARTICLE VI have access onto external roadways. Lots shall not be approved with access on an unpaved right-of-way or with access by any type of ingress/egress easement. (d) Flag -type lots. Due to access and safety concerns, the use of flag -type lots will be discouraged. No more than two (2) flag lots shall be located adjacent to each other. The minimum lot width for the narrow extension of the lot to the right-of-way shall be twenty (20) feet. The length of the narrow extension shall be minimized and shall not exceed one hundred (100) feet. All setbacks shall be measured from the lot lines and not the right-of-way line. (e) Lot lines. Side lot lines shall be, as nearly as practical, at right angles to straight street lines and radial to curved street lines. In subdivisions which overlap municipal, county, zoning district, or tax district boundaries, lot lines shall follow the boundary lines. (5) Conservation areas. Lots which include a designated conservation area, as defined by the City of Ocoee Comprehensive Plan, must have the minimum lot size required by the zoning ordinance outside of the conservation area. (6) Block lengths. Block lengths shall not exceed one thousand (1,000) feet between intersections. (7) Assembly of construction plans. (a) Plan sheet size. The standard size sheet for construction plans submitted to the City for review shall be twenty-four (24) inches by thirty-sbc (36) inches. (b) Standard detail sheets. Reproducible copies of Orange County standard details on twenty -four -inch by thirty -six-inch size sheets are available on request from the office of the County Engineer for insertion in the construction plans. Engineers are encouraged to use these standard details in order to promote uniform construction methods throughout the City. § 6-11 PUBLIC FACILITIES A. Public School Sites. In proposed subdivisions as defined in Article II, public school sites shall be designated on the preliminary plan prior to acceptance of said plan. Where dedication or reservation of school sites is required, an executed deed(s) or the required reservation and maintenance agreement(s), as noted in subparagraph B.(1) below, shall be approved by the City Commission. For the purpose of this section, population projections shall be made on the basis of three and twenty-five- hundredths (3.25) persons per single-family dwelling unit, and two and five - tenths (2.5) persons per multifamily and mobile home dwelling units; school age population shall be twenty (20) percent of the projected population. (1) Public elementary school sites. One public elementary school site shall be provided to the Orange County School Board if fifty-two (52) percent of the projected school age population will be between three hundred fifty (350) and seven hundred fifty (750) inclusive. Two (2) public elementary school sites shall be Adopted July 21, 1992 18169 EXC-65 EXHIBIT "C" ARTICLE VI provided to the Orange County School Board if fifty-two (52) percent of the projected school age population will be between seven hundred fifty-one (751) and one thousand five hundred (1,500) inclusive. Thereafter, one additional public elementary school site shall be provided to the Orange County School Board for each seven hundred fifty (750) bracket or partial bracket of fifty-two (52) percent of the projected school age population: (2) Public junior high school sites. One public junior high school site shall be provided to the Orange County School Board if twenty-five (25) percent of the projected school age population will be' between eight hundred (800) and one thousand six hundred (1,600) inclusive. Two (2) public junior high school sites shall be provided to the Orange County School Board if twenty-five (25) percent of the projected school age population will be between one thousand six hundred one (1,601) and three thousand two hundred (3,200) inclusive. Thereafter, one additional public junior high school site shall be provided to the Orange County School Board for each one thousand six hundred (1,600) bracket or partial bracket of twenty-five (25) percent of the projected school age population. (3) Public senior high school sites. One public senior high school site shall be provided to the Orange County School Board if twenty-three (23) percent of the projected school age population will be between one thousand fifty (1.050) and two thousand one hundred (2,100) inclusive. Thereafter, one additional public senior high school.site shall be provided to the Orange County School Board for each additional two thousand one hundred (2,100) bracket or partial bracket of twenty-three (23) percent of the projected school age population. School site sizes shall be a minimum of fifteen (15) acres for an elementary school, a minimum of twenty-five (25) acres for a junior high school, and a minimum of forty (40) acres for a senior high school. These acreages shall exclude natural water bodies and conservation areas. B. Procedure for School Sites. Prior to platting the first section of the subdivision, the owner/developer shall submit copies of the following to the City Commission: (1) An executive deed(s) for all school sites; and (2) An agreement(s) between the owner/developer and the Orange County School Board providing for the return of the deeded property should the Orange County School Board fail to utilize said site for school -related development within fifteen (15) years after receiving the deed. OR (3) An agreement(s) between the owner/developer and the school board which "reserves" the school site(s) for a period of not less than twenty (20) years for use by the school board. Said agreements) shall set forth the maintenance and ownership responsibilities during the reservation period and stipulate an agreed upon price for the purchase of said site(s) or outline the methodology for the establishment of a "fair market price" should the school board choose to purchase. The owner/developer shall provide a schematic development plan for the use of the property designated for a school site in the event the property is not used for school related development. Adopted July 21, 1992 18170 EXC-66 EXHIBIT "C" ARTICLE VI After approval by the City Commission, dedication or reservation of land for public school sites shall be made by noting on the plat "dedicated (or reserved) for public site, subject to planned construction by the School Board of Orange County, Florida.' § 6-12 PRIVATE AMENITIES Private open spaces. Developers may include private parks and recreation areas in subdivisions provided that the proposed areas are clearly designated as `tracts' on the plat; are adequate for the intended purposes; and will be owned and maintained by a homeowners' association. Private parks and recreation areas shall be identified on the plat as common areas for the owners of property within the subdivision. For parks or recreation areas over fire (5) acres in size, the applicant may petition the City to own, operate and maintain the park or recreation area. Adopted July 21, 1992 18171 EXC-67 EXHIBIT "C" ARTICLE VI PERFORMANCE STANDARDS § 6-13 PERFORMANCE STANDARDS A. Intent. The purpose of this Section is to establish standards of performance for commercial and industrial activities; to protect residential districts from certain adverse effects of commercial and industrial activities; and to promote a safe and healthy environment in and near commercial and industrial districts. B. Smoke and Particulate Matter. (1) No operation or use in any commercial or industrial district shall discharge into the atmosphere from any single source any air contaminant which is: (a) Equal to or greater than the density designated as Number One on the Ringelmann Chart. Measurement shall be made at the point of emission; (b) Of such opacity as to obscure an observer's view to a degree equal to or greater than the standard described in (1) above, except that when the presence of uncombined water is the only reason for failure to comply, the standards prescribed above shall not apply; (c) However, when a fire box, boiler or combustion device is cleaned or a fire is being started therein, air contaminants, the density of which is equal to Number One on the Ringelmann Chart, may be permitted for a period not to exceed a total of four (4) minutes in any one-hour period. (2) No operation or use in the commercial or industrial districts shall discharge into the atmosphere any air contaminants in excess of a concentration of 0.10 grams per cubic foot per hour at standard conditions. Measurement shall be made at the point of emission. (3) Within any commercial or industrial district, all activities, including on-site transportation movements, paint spraying, grain handling, sand blasting, incineration and salvage operations, shall be conducted in such a manner that air contaminants in excess of a concentration of one hundred (100) micrograms per cubic meter, standard conditions, will not be transported across the property line of the lot on which such activity is located. C. Odor. (1) No use or operation shall be located or operated in any commercial or industrial district which involves the emission of odorous matter which exceeds the odor threshold at the bounding property line or at any point beyond the tract on which the use or operation is located. (2) The odor threshold as herein set forth shall be determined by observation by the Code Enforcement Officer. In any case, where uncertainty may arise, or where the operator or owner of an odor -producing use may disagree with the Code Enforcement' Officer, or where specific measurement of odor concentrating is required, the method and procedure, specified by the American Society for Testing Materials 1391-57 entitled: 'Standard Method for Measuring Odor in Atmospheres' shall be used, and a copy of such publication is hereby incorporated in this ordinance by reference. Adopted July 21, 1992 18172 EXC-68 EXHIBIT "C" D. Vibration. ARTICLE VI No operation or use in any of the commercial or industrial districts shall, at any time, create earthborne vibrations which when measured at the bounding property line of the source of operation exceed the limits set forth in the following table: MAXIMUM PERMITTED VIBRATION in Cycles per Second Acceleration G's Single Am 1 .00062 2 to 5 .00084 5 to 10 .00055 10 to 20 .0014 20 to 50 .004 Over 50 .0092 Vibration shall be measured by normal vibration analysis equipment with associated transducer mounted vertically on two-inch pipe driven into the ground at least three (3) feet. E. Noise (1) At no point on the bounding property line of any use shall the perceived noise level exceed seventy (70) decibels. (2) These regulations shall not apply to aircraft while in flight or while involved in normal landing, take -off or taxiing operations. Such regulations shall, however, apply to the testing of aircraft when not involved in normal landing, take -off or taxiing operations. (3) The maximum perceived noise level limits at the bounding property line of any use may be subject to the corrections listed in the following table: Adopted July 21, 1992 18173 EXC-69 F G. EXHIBIT "C" ARTICLE VI CORRECTION FACTORS FOR MAXIMUM PERCEIVED NOISE LEVEL LIMITS Type of Operation or Character of Noise Correction in PNdb Daytime operation only + 5 Noise source operates less than 2096 of any one (1) hour period + 5* Noise source operates less than 5% of any one (1) hour period + 10* Noise source operates less than 1% of any one (1) hour period + 15* Noise of impulse character (such as hammering) _ 5 Noise of periodic character (such as humming) 5 *NOTE: Only one of these correction factors may be applied to a single site. (4) The sound pressure level shall be measured with a sound level meter with octave band analyzer conforming. to standards prescribed by the American Standards Association as set forth in a pamphlet published by the association, entitled: "American Standard Sound Level Meters for Measurement of Noise and Other Sounds, No. Z 24.3,' published in 1944, and another, pamphlet published by the same association, entitled: "American Standard Specification for an Octave Band Filter Set for the Analysis of Noise and Other Sounds, No. Z 24.10," published in 1953. Glare and Heat. Each use and activity within any district shall be so designed and operated as to prevent the emission of glare and heat of such intensity as to be readily perceptible at any point on the lot line of the property on which the use or activity is located. Industrial Sewage and Waste. Every use and activity within any commercial district or industrial district shall be so designed and operated as to prevent the discharge into any stream, lake and ground or public sewer system, any waste which will be dangerous to persons or animals or which will damage plants or crops beyond the lot line of the property on which the use or activity is located. ***END OF EXHIBIT*** Adopted July 21, 1992 18174 EXC-70 PROPOSER INFORMATION — JURISDICTIONAL AGENCIES ST. JOHNS RIVER WATER MANAGEMENT DISTRICT (SJRWMD) The SJRWMD Orlando office personnel will review the permit application as submitted by the Design Criteria Professional (Gee & Jenson, E -A -P, Inc.) Criteria: Provide design .to satisfy requirements for permit as obtained from the SJRWMD by the Design Criteria Professional. Any designs provided by the Design/Builder not consistent with the requirements of the permit will require permit modification. Application and processing for such permit modification will be the responsibility of the Design/Builder including application fees. FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (FDEP) Two permits may be required from FDEP: Domestic Water: Contact Mr. Joe McNamara Wastewater Collection: Contact Mr. H. Lee Miller • Domestic water permits — this permit is for any new drinking water distribution system and or significant alteration of existing system. The application fee for this permit is typically $500. • Wastewater collection/distribution permit — this permit is for the collection and transmission of wastewater. This type permit is not contemplated for this project. The application fee for this permit is typically $300. Criteria: Comply with all requirements of FDEP Chapter 62-555 Permitting and Construction of Public Water Systems and Chapter 62-604 Collection Systems and Transmission Facilities. These permits should be submitted to the FDEP office on Maguire Road in Orlando (407) 894-7555. 97044.02 BIJ-1 City of Ocoee THE PROJECT SITE IS LOCATED WITHIN THE OCOEE CITY LIMITS. PERMITS RELATED TO IMPROVEMENTS TO THE SITE WILL NEED TO BE OBTAINED FROM THE CITY OF OCOEE. The City of Ocoee .typically requires impact, plans checking fees related permanent and temporary facilities. (see enclosed fee list.) It is the intent of the City of Ocoee to waive the typical City Permit & Impact Fees related to the project. The City will review the Design/ Builder's Signed/ sealed Engineering plans for conformance with the City's requirements. Mr. Jim Washington at the City of Ocoee Building Department at (407) 656-2322 Ext. 133 is the point of contact for construction permits for the project. ACL Railroad (Owned by Florida Central Railroad) Coordinate all aspects of work affecting railroad with Florida Central Railroad. Early coordination with FCR (Florida Central Railroad) is essential to the successful completion of this project. Mr. Bennett Biscan, Florida Central Railroad, P.O. Box 967, Plymouth, FL 32768 (407) 880-8500 *** END OF. SECTION *** 97044.02 BIJ-2 Exhibit"IE " Subsurface Soil Exploration Proposed Parking/Drive Area Department of Public Works Ocoee, Orange County, Florida Ardaman & Associates, Inc. OFFICES Orlando, 8008 S. Orange Avenue. Orlando, Florida 32809. Phone (407) 855-3860 Bartow, 1525 Centennial Drive. Bartow. Florida 33830. Phone (941) 533-0858 Cocoa, 1300 N. Cocoa Blvd.. Cocoa. Florida 32922, Phone (407) 632-2503 Fort Lauderdale, 3665 Park Central Boulevard North. Pompano Beach, Florida 33064, Phone (954) 969-8788 Fort Myers, 9970 Bavaria Road. Fort Myers. Florida 33913. Phone (941) 768-6600 Miami, 2608 W. 84th Street. Hialeah. Florida 33016, Phone (305) 825-2683 Port Charlotte, 740 Tamiami Trail, Unit 3. Port Charlotte. Florida 33954, Phone (941) 624-3393 Port St. Lucie, 1017 S.C. Holbrook Ct., Port St. Lucie. Florida 34952, Phone (561) 337-1200 Sarasota, 2500 Bee Ridge Road. Sarasota. Florida 34239. Phone (941) 922-3526 Tallahassee, 3175 West Tharpe Street. Tallahassee, Florida 32303, Phone (850) 576-6131 Tampa, 1406 Tech Boulevard, Tampa. Florida 33619. Phone (813) 620-3389 West Palm Beach, 2511 Westgate Avenue, Suite 10. West Palm Beach. Florida 33409. Phone (561) 687-8200 MEMBERS: A.S.F.E. American Concrete Institute American Society for Testing and Materials Florida Institute of Consulting Engineers EXE — 1 Exhibit"E" Ardaman & Associates, Inc. 3r'eotechn cal. Environmental and Materials Consultants October 9, 1997 File No. 97-6486 Gee and Jenson 2701 Maitland Center Parkway Suite 150 Orlando, Florida 32751 Attention: Mr. Paul Herwig, P.E. Subject: Subsurface Soil Exploration Proposed Parking/Drive Area Department of Public Works Ocoee, Orange County, Florida Gentlemen: As requested and authorized by you, we have completed a shallow subsurface soil exploration for the subject project. The purposes of performing this exploration were to evaluate the general subsurface conditions within the existing parking area and to provide recommendations for site preparation and pavement design. This report documents our findings and presents our engineering recommendations. SITE LOCATION AND SITE DESCRIPTION The site for the proposed facility is located north of Flewelling Avenue in Ocoee, Orange County, Florida (Section 17, Township 22 S, Range 28 E). The general site location is shown superimposed on the 1956 (photorevised 1980) Winter Garden, Florida, U.S.G.S. quadrangle map presented on Figure 1. The site is currently an asphaltic concrete paved parking/drive area surrounding an existing public works building. PROPOSED CONSTRUCTION AND GRADING, It is our understanding that the proposed development includes the demolition of the existing Department of Public Works facility and the construction of a paved parking area approximately 350 feet by 130 feet in plan area for automobile parking. We understand that no truck traffic is anticipated. We understand that the existing pavement is to be left in-place to the extent possible. Where new pavement is to be placed, we have assumed that site grading will include up to 1 foot of fill. REVIEW OF SOIL SURVEY MAPS Based on the 1989 Soil Survey for Orange County, Florida prepared by the U.S. Department of Agriculture Soil Conservation Service, the predominate near surface soil type at the site is identified ar.^.g "c' n -c:`�. _ _ ca -2 �x �;,cu _ ..rdr. - .nrin 32?^i-3003 ?hone 4071 365-3&60 FAX 11071 869-8121 ...,... ; ,.; - _... .. a: r • -r* °.. Sarasota. rascta. Tallahm Tallahassee. -arca. IN. Pal3a <r _ .. _ _......... EXE -2 Gee and Jenson Exhibit "E" File No. 97-6486 -2- as the "Tavares -Urban land complex" soil series. The "Tavares -Urban land complex" soil series is covered by asphalt, concrete, and other impervious surfaces which obscure or alter the soils so that their identification is not feasible. According to the Soil Survey, the seasonal high water table for this soil, series is dependant on the functioning of established drainage system in the area. ..FIELD EXPLORATION PROGRAM The field exploration program consisted of performing six hand auger borings within the existing parking area. They were drilled using, a hand-held, 3 -inch diameter, bucket auger to a depth of 8 feet except at the location of HAB-6 where an obstruction prevented advancing the auger below 2 feet deep.. Representative soil samples recovered during performance of the borings were visually classified in the field and representative portions of the samples were transported to our laboratoryin sealed sample jars for further classification. If encountered, the groundwater level at each of the boring locations was measured upon completion of drilling. . The locations of the borings are schematically illustrated on a -site plan shown on Figure 1, These locations were determined in the field by tape measurements from existing site features and other points of reference, and should be considered accurate only to. the degree implied by the method of measurement used. LABORATORY TESTING PROGRAM Representative soil samples obtained during our field sampling operation were packaged and transferred 'to our laboratory for further visual examination and classification. The soil samples were visually classified in general accordance with the Unified Soil Classification System (ASTM D-2488). The resulting soil descriptions are shown on the soil boring profiles presented on Figure 1. GENERAL SUBSURFACE CONDITIONS, General Soil Profile The results of the field exploration and laboratory testing programs are graphically summarized on the soil boring profiles ,presented on Figure 1. The stratification of the boring profiles represents our interpretation of the field boring logs and the results of laboratory examinations of the recovered samples. The stratification lines represent the approximate boundary between soil types. The actual transitions may be more gradual than implied. The results of the test borings indicate that fine ,sand was encountered below the existing parking/drive area to the termination depth of the borings. As an exception, Boring HAB-6 encountered fine sand with clay and reached refusal upon encountering buried brick, debris at a depth of 2 feet. Boring HAB-4 also encountered buried brick debris at a depth of 1 foot. The above soil profile is outlined in general .terms only. Please refer to Figure 1 for soil profile details. 14 Gee and Jenson Exhibit "E" File No. 97-6486 -3- Measured Groundwater Level As shown on Figure 1, the groundwater level was not encountered in any of the borings on the date indicated. This does not necessarily imply that the groundwater will not be encountered at these locations or within the vertical reaches of the borings in the future. Fluctuations in groundwater levels should be anticipated throughout the year primarily due to seasonal variations in rainfall and other factors that may vary from the time the borings were conducted. NORMAL SEASONAL HIGH GROUNDWATER LEVEL The normal seasonal high groundwater level each year is the level in the August -September period at the end of the rainy season. The water table elevations associated with a 100 -year flood level would be much higher than the normal seasonal high groundwater level. The normal high water levels would more approximate the normal seasonal high groundwater levels. The seasonal high groundwater level is affected by a number of factors. The drainage characteristics of the soils, the land surface elevation, relief points such as drainage ditches, lakes, rivers, swamp areas, etc., and distance to relief points are some of the more important factors influencing the seasonal high groundwater level. Based on our interpretation of the site conditions using the boring logs, we estimate the normal seasonal high groundwater level at the boring locations to be greater than 5 feet below the ground surface. ENGINEERING EVALUATION AND RECOMMENDATIONS General The following are our recommendations for overall site preparation and asphalt pavement construction which we feel best suited for the proposed facility and existing soil conditions. The recommendations are made as a guide for the design engineer, parts of which should be incorporated into the project's specifications. Test Pit Exploration Where new pavement is proposed or where the existing pavement exhibits signs of distress indicative of problems with pavement support, the character of the shallow soils in the parking area should be further explored to verify that unsuitable materials and deleterious debris are not present within or covered by fill. We recommend excavating test pits through existing fill materials to further explore the nature of the in-place soils. Test pits can be excavated before or during the initial phases of construction. The test pit excavations should be monitored by a geotechnical engineer or his representative. Unsuitable materials, if encountered, should be removed and replaced with suitable compacted fill. Stripping and Grubbing It is our understanding that the portions of the existing pavement are to remain. Where new pavement is proposed, the parking area should be stripped of all surface vegetation, stumps, Gee and Jenson Exhibit "E" File No. 97-6486 -4- debris, organic topsoil, bricks, rubble or other deleterious materials, as encountered. Special care should be taken to ascertain. that all existing underground structures are removed from the proposed. construction area. If pipes are not removed or plugged, they may serve as conduits for subsurface erosion .resulting in excessive settlements. Overexcavated areas resulting from the - removal of underground structures should be backfilled as described under the "Suitable Fill Material and the Compaction of Fill Soils" Section, later in this report. The existing building slab and foundation elements within 1 foot of the pavement subgrade should be removed. During the grubbing operation, roots with a diameter greater than %2 inch, stumps, or small roots in a dense state, should be grubbed, and completely removed. The actual depth(s) of stripping and. grubbing must be determined by visual observation and judgment during the earthwork operation. Proof -rolling We recommend proof -rolling the cleared surface to locate any unforeseen soft areas or unsuitable surface or near -surface soils, to increase the density of the very loose to loose fine sand soils within the top 3 to 4' feet, and to prepare the existing surface for the addition of the fill soils (as required). Proof -rolling should consist of at least 3 passes,of a self-propelled compactor capable of achieving the necessary density requirements. Due to the close proximity of existing structures heavy vibratory compaction equipment should not be used Each pass should overlap the preceding pass by 30 percent to achieve complete coverage. If deemed necessary, in areas that continue to "yield", remove all deleterious material and replace with clean, compacted sand backfill. The proof -rolling should occur after cutting and before filling. A density, equivalent to or greater than 95 percent of the modified Proctor (ASTM D-1557) maximum dry density value for a depth of 1 foot must be achieved beneath the stripped and grubbed ground surface. Additional passes and/or overexcavation and recompaction may be required if these minimum density .requirements are not achieved. The soil moisture should be adjusted as necessary during compaction. Care should be exercised to avoid damagingany neighboring structures while the .compaction operation is underway. Prior to commencing compaction, occupants of adjacent structures should be notified and the existing condition (i.e. cracks) of the structures documented with photographs and survey (if deemed necessary). Compaction should cease if deemed detrimental'to adjacent structures and Ardaman & Associates notified immediately'. Suitable Fill Material and the Compaction of Fill Soils All fill materials should be free of organic materials, such as roots and vegetation. As a general guide to aid the contractor, we recommend using fill with 3 to 10 percent by dry weight of material passing the U.S. Standard No. 200 sieve size. The fine sand and fine sand with clay (Strata No. 1 and 2, as shown on Figure 1) are ' suitable as fill materials and, with proper moisture control, should densify using conventional compaction methods. Soils with more than 10 to 12 percent passing the No. 200 sieve will be more difficult to compact due to their inherent nature to retain soil moisture. Gee and Jenson Exhibit "E" File No. 97-6486 -5- All structural fill should be placed in level lifts not to exceed 12 inches in uncompacted thickness. Each lift should be compacted to at least 95 percent of the modified Proctor (ASTM D-1557) maximum dry density value. The filling and compaction operations should continue in lifts until the desired elevation(s) is achieved. If hand-held compaction equipment is used, the lift thickness should be reduced to 6 inches. Typical Pavement Section - Limerock Base A limerock base course 6 inches thick overlying an 6 -inch thick stabilized subbase can be used provided that grading and drainage plans preclude periodic saturation of the base material. The periodic saturation of a limerock base material could lead to premature pavement distress. A minimum clearance of 18 inches must be maintained between the bottom of the limerock base and the seasonal high groundwater table. The limerock should be compacted to 98 percent of the modified Proctor (ASTM D-1557, AASHTO) maximum density value. A 6 -inch thick subbase having a minimum Limerock Bearing Ratio (LBR) of 40 percent must be achieved beneath the limerock base. The natural soils may have to be stabilized with suitable clayey soil or aggregate in order to achieve the required LBR value. The stabilized subbase must be compacted to 98 percent of the modified Proctor maximum dry density (ASTM D-1557, AASHTO T-180). Wearing Surface A 1 Y2 -inch (minimum) layer of Type S-1 11 asphaltic concrete should be used for a wearing surface. Specific requirements for the Type S -III asphaltic concrete wearing surface are outlined in Section 331 in the Florida Department of Transportation, Standard Specifications for Road and Bridge Construction, 1996 Edition. The latest specifications of Florida Department of Transportation shall govern the design and placement of the base and asphaltic concrete wearing surface. The above minimum requirements will satisfactorily support Class C vehicular traffic.` If a heavier traffic pattern is anticipated, the design section should be increased accordingly. Reference: "Flexible Pavement Design Manual for New Construction and Pavement Rehabilitation" Florida Department of Transportation. (1993) Gee and Jenson Exhibit "E" File No. 97-6486 -6- QUALITY ASSURANCE We recommend establishing a comprehensive quality assurance program to verify that all site preparation and pavement construction is conducted in accordance with the appropriate plans and specifications. Materials testing and- inspection services should be provided by Ardaman & Associates. For the pavements, the results of stripping, grubbing and proof -rolling should be verified by on-site inspections and observations. Subgrade and subbase densities and Limerock Bearing Ratio tests should be performed. The base course should be tested for density and thickness. In-situ density values should be compared to laboratory Proctor moisture -density results for each of the different natural and fill soils encountered. Samples of the asphaltic concrete should be obtained and tested in the laboratory for Marshall stability; flow, asphalt content, and aggregate gradation. Also, the asphaltic concrete thickness should be verified in the field. CLOSURE The analyses and recommendations submitted herein are based upon the data obtained from the soil borings presented,on Figure 1. This report does not reflect any variations which may occur adjacent to or between the borings. The nature and extent of the variations between the borings may not become evident until during construction. If variations then appear evident, it .will be necessary to re-evaluate the recommendations presented in this report after performing on-site observations during the construction period and noting the characteristics of the variations. This study is based on relatively shallow explorations and is not intended to be an evaluation for sinkhole potential. Based on the results of all borings conducted for this exploration, no soil conditions resembling sinkhole activity, were encountered. It is also noted that this report does not include an evaluation of the environmental (ecological or hazardous/toxic material related) condition of the site and subsurface. This report has been prepared for the exclusive use of Gee & Jenson in accordance with generally accepted soil and foundation engineering practices. In the event any changes occur in the design, nature, or location of the proposed facility, we should review the applicability of conclusions and recommendations in this report. We also recommend a general review of final design and specifications by our office to make sure that earthwork and foundation recommendations are properly interpreted and implemented in the design specifications. Gee and Jenson Exhibit "E" File No. 97-6486 -7- We are pleased to be of assistance to you on this phase of your project. When we may be of further service to you or should you have any questions, please contact us. Very truly yours, ARDAMAN & ASSOCIATES, INC. William L. Fox, E.I. Michael S. Wi son, P.E. Staff Engineer Senior Project Engineer Florida Registration No. 46088 WLF/MSW/CHC/kjl/ks 97-64N.SSE (WLF 1N) Exhibit "E" APPENDIX Auger Boring Procedure Exhibit "E" AUGER BORINGS Auger borings.are used when a relatively large, continuous sampling of soil strata close to ground surface is desired. A 4 -inch diameter, continuous flite, helical auger with a cutting head at its end is screwed into the ground in 5 -foot sections. It is powered by the rotating action of the Kelly bar of a rotary drill rig. The sample is recovered by withdrawing the auger out of the ground without rotating it. The soil sample so obtained, is classified and representative samples put in bags or jars and brought back to the laboratory for classification testing. Exhibit "E" (� U r int 5 ano wi i M CLAY (SP -SC) O LIGHT BROWN TO BROWN ® O3 LIMEROCK ■ O4 ASPHALT/CONCRETE O ORANGE—BROWN DO LIGHT GRAY TO GRAY HAB GNE SP,SP—SM HAND AUGER BORING LOCATION GROUNDWATER NOT ENCOUNTERED ON DATE DRILLED. ` SM,SC,CH UNIFIED SOIL CLASSIFICATION SYSTEM 12 q f 130 Ardaman & Associates, Inc. ° Geotechnical, Environmental and Materials Consultants IS AT THEIR VANATIONS :1�im Aim ON TK so O SUBSURFACE SOIL EXPLORATION Seo T}IE RATOfi. THE T_ AIM TK PROPOSED PARKING AREA M" �I DEPARTMENT OF PUBLIC WORKS DATA ON r Dm NOT ORANGE COUNTY, FLORIDA f E LOCATIONS DRAWN BY: SEF I CHECKED -BY: DATE: 10/02/97 FILE N0. AP FIGURE: 97-6486 i 1 **EM OF EXHIBIT "E"** EXE -11 01010 -SUMMARY OF WORK PROJECT DESCRIPTION 1. The.project consists of the final design, permitting and construction of additions and alterations to an existing parking lot and related site improvement, demolition of an approx. 7,500 s.f. one story pre-engineered metal building (Ocoee Department of Public Works Bldg.) and demolition of accessory facilities at the approx. 2 acre Public Works. compound. The existing Public Works compound makes up the southeastern portion of the existing City Owned site known as `Central Park'. The project is located within the city limits -at 560 Flewelling Avenue, Ocoee, Florida. 2. The work includes final construction documents, permitting and construction of additions and alterations to an existing parking lot and related site improvements including asphaltic concrete paving, concrete paving, parking lot striping and signage, grading/ drainage, stormwater management system, coordination of installation of new parking lot lighting by others, landscaping, irrigation, site utilities and masonry/stucco enclosure around existing pump/ well building. Work also includes demolition. Work also includes aluminum swing gate, building mounted cast aluminum letters, building mounted manually changeable letter message boards, electrical systems and certain items of equipment. SPECIFICATIONS. 1. The specifications have been edited to the extent that allows the Design/Builder to make selections from technically acceptable options. If there are any conflicts between the specifications and any other design criteria, the most stringent requirements govern. 2. The specifications included herein are for general design/construction criteria requirements only. They specify minimum requirements that shall be required in the final design and construction of this Project. Final Specifications.shall be prepared by the Design/Builder, incorporating these requirements. 97044.02 01010-1 EXISTING SITE CONDITIONS 1. The Design/Builder shall design and construct all site features and utilities required. The site design criteria drawings represent the Owner's minimum general requirements and may be revised for alignment or coordination adjustments. Site work includes, but is not limited to, all necessary paving, grading, drainage, lighting, utilities, irrigation and landscaping. Coordinate all site work with adjacent areas; coordinate connection of utilities performed by others. 2. Perform field reconnaissance, engineering and land surveys, and site investigations to verify the existing conditions and to obtain additional information and design data for the accomplishment of the contract work. WORK SEQUENCE 1. Conduct the Work in phases to provide the least possible interference to the activities of the Owner's personnel and to permit an orderly transfer of personnel and equipment to the new facilities. 2. Sequence and phase Work in accordance with approved Progress Schedule. DEMOLITION AND REFUSE DISPOSAL 1. Demolition: a. Where required, demolish existing building foundations, pavement, curbs, sidewalks, fences, and other related facilities not utilized in the design or by facilities adjacent to the project. Remove and dispose of the demolished items off site in accordance with federal, state and local environmental regulations. b. Cut, cap and abandon, or remove utilities as required and insure that water, sewer and fuel lines are watertight. 2. Refuse Disposal: a. Provide and maintain refuse disposal containers. Cleaners shall not be poured, drained, or washed into plumbing fixtures or sanitary or storm sewers. Clean and remove debris, dirt, dust, and stains attributable to or resulting from the work effort to the satisfaction of the Owner prior to acceptance of the job. b. Pay costs of refuse disposal, such as handling, transportation dumping fees as applicable, and similar cost. Provide the Owner with a copy of the federal, state and local permit or license, which reflects such agency's disposal authorization. 97044.02 01010-2 PAVING, GRADING AND DRAINAGE 1.. Grading and earthwork shall be. based upon, but riot limited to, the Geotechnical Reports provided in the Design Criteria Package. Use these reports for compaction and foundation requirements, location of groundwater elevations, presence of satisfactory and unsatisfactory material, and backfilling methods. Also review the comments contained in Proposerinformation — Geotechnical provided in the Design Criteria Package. 2. Site Paving: a. :, Provide parking, handicapped access, pavement marking and site signs, site lighting, curbs and wheelstops. b. Design pavement for the vehicles and wheel loads anticipated for the specific use of the facility. The minimum thickness of asphalt shall be 1 1/2 inches. Design flexible and rigid pavement in accordance with Florida Department of Transportation (FDOT) standards and the Geotechnical Report. C. Provide parking. lot facilities in accordance with City of Ocoee Land Development Code,' Article VI Design and Performance Standards (refer to Exhibit "C" of the specifications). Provide disabled parking stalls to meet applicable Americans with Disabilities Act Accessibility Guidelines (ADAAG) requirements. 3.' Grading: a. Provide grading design to minimize grading and earthwork. Provide any fill required for the project; any excess material will be placed for landscape berms as directed by the Owner.: b.. Do not begin earthwork until materials and equipment for that specific portion of the job are on site. Accomplish rough grading in the area of utility cuts immediately after backfilling excavated trenches and testing for compliance. Accomplish final grading, including the placing of topsoil, if required, as soon as possible. Stabilize within 10 days after backfilling. c. Protect side slopes and back slopes immediately upon completion of rough grading. Plan earthwork and conduct in such a manner as to minimize the duration of exposure of unprotected soils.. Utilize appropriate methods to prevent erosion and transport of sediment to existing surface drains, swales and ditches. Minimize dust at all times; including non -work hours, weekends, and legal. holidays. Soil at the site and at other areas disturbed by the Design/Build Contractor's operations shall be sprinkled or treated .with dust suppressors as necessary to control- dust. Dry power brooming shall not be permitted; vacuum; wet mop, wet sweep, or wet power broom instead. d. Ensure all grading is. coordinated with adjacent sites. 4. Drainage: a. Application to St. John's River Water Management District (SJRWMD) for stormwater management permits is being conducted by the Design Criteria Professional (Gee & Jenson, E -A -P, Inc.). Final construction documents by the Design/Builder are to be consistent with the SJRWMD approved 97044.02 01010-3 stormwater management plan/ permit for the site. Design/Builder shall be responsible for the design preparation of final construction documents for the parking lot drainage and stormwater collection system, drainage conveyance system to the stormwater pond system. Stormwater pond system as shown has been designed based upon an offline concept. Design/Builder shall be responsible for the design and preparation of splitter box consistent with the SJRWMD permit and the offline concept. Final construction documents by the Design/Builder shall comply with SJRWMD and City of Ocoee Land Development Code criteria. Dependant upon the requirements, utilize inlets, culverts, pipes, slab covered drainage trenches, french drains, swales and overland sheet flow. 1). Parking Areas: Minimum cross slope of 1 percent with a minimum longitudinal slope of 0.4 percent. 2). Swales or Ditches: Minimum longitudinal slope of 0.4 percent. Grassed side slopes — 25 percent maximum. 3). Sidewalks: Design shall meet Florida Accessibility Code. UTILITIES General: a. Existing utilities are indicated on the survey drawings. The Design/Build Contractor shall expect to encounter, within the construction limits of the Project, utilities not shown on the drawings and not visible. If such utilities interfere with construction operations, immediately notify the Owner to obtain a determination by the Owner as to the necessity for removal or relocation. Upgrading the existing utilities outside the limits of construction is not a part of this Project. b. Existing, utilities to be taken out of service shall be analyzed to determine if .they are to be removed or abandoned in place. Do not interrupt existing utilities without obtaining written permission from the Owner in advance of the outage. C. Coordinate existing and new utilities. 2. Water Distribution: a. The existing City of Ocoee water utility shall _remain in service. b. Size the site distribution system to provide the design flows at any existing fire hydrants with a residual flow pressure of not less than 20 psi. C. Design, install, and provide materials for any new or relocated water systems and services to meet current SJRWMD,.AWWA, Florida Department of Environmental Protection (FDEP), Orange County, City of Ocoee, and NFPA standards. 3. Sanitary Sewer Collection: a. The existing septic tank and drainfield serving the Public Works Building is to be demolished and removed. There are no new sewage systems included in the work. 97044.02 01010-4 3. Electrical: The existing Florida: Power Utility on-site shall remain in service. Determine and. provide 'electrical services to the Parking Lot and related site improvements including,., but not limited to, specific requirements for the transformers, utility meters, distribution panels; lighting methods, etc. 5. Communications: There are no new communication services included in the work. IRRIGATION 1. Design and provide new irrigation lines, heads and controls connected to existing Central Park irrigation system for landscaped areas. The existing fully operational pump/ well irrigation system is located in the one story masonry pump/ well building within the public works compound. , The system currently :serves the existing ballfields. The Design/Build Contractor shall provide the required irrigation systems for the Parking Lot and related site improvements beginning from this connection point. The Owner will provide specifications on the existing pump and line to the Design/Builder. 2. Provide permanent. irrigation for all landscaped areas. LANDSCAPING 1. Design and provide landscaping in ,conformance with City of Ocoee Land Development Code requirements. , 2. Replace/ repair existing landscaped areas disturbed by construction operations unless otherwise noted. WATER QUALITY 1. Comply with the surface water management requirements and regulations promulgated by SJRWMD. 2. Construct proper stormwater management and control. Exercise due caution relative to provisions for stormwater management, erosion .and sedimentation control during construction. ARCHITECTURAL DESIGN CONDITIONS AND CRITERIA 1. Design and construct in accordancewith the criteria. contained herein using industry standard materials and efficient practices. The improvements design and materials selected shall be high quality, durable and easily maintained. The Design/Build Contractor shall be responsible for the professional quality, technical accuracy, and coordination of final designs, drawings, specifications, and other documents or 97044.02 01010-5 publications upon which construction is based. 2. The design criteria provided by the Owner represents the Owner's minimum requirements and may be revised to accommodate specific equipment or other coordination adjustments. The exterior character and appearance of the improvements shall be in general conformance with City of Ocoee ordinances. 3. Systems Requirements: (Refer to technical specifications for additional requirements applicable to systems, products, and materials). a. Provide exterior walking surfaces with a textured or other finish to resist slippage by pedestrians. b. Allow for expansion and contraction to minimize cracking and deterioration of building component materials. c. Safety, security and maintenance are important criteria for designing and constructing gate. 4. Functional Requirements: a. All facilities shall comply with the Americans with Disabilities Act Accessibility Guidelines (ADAAG). 5. Bioenvironmental Requirements: a. Do not use materials containing asbestos, tremolite, actinolite, or anthopholite. b. Do not use paints, sealants or epoxies containing isocyanates (an ingredient of polyurethane). C. Do not use materials that may release formaldehyde, mercury, mineral spirts, or any other toxins or irritants. SIGNAGE 1. Provide specialty building mounted signage and changeable letter message board. 2. Provide DOT type site signage. STRUCTURAL 1. Design and construct the foundation system of reinforced concrete spread footings supporting masonry walls. 2. Provide concrete housekeeping pads for electrical equipment. 3 Design and provide expansion joints, control joints, construction joints, isolation joints etc., to prevent uncontrolled stress cracks in the structure. 4. Design exterior equipment mountings to withstand the wind loads per ASCE requirements. PLUMBING 97044.02 01010-6 1. Design and construct a complete storm drainage system as required for the parking lot. Maintain existing plumbing systems serving existing buildings. Where existing service lines conflict with addition/ alternation construction, make the necessary modifications to those service lines to achieve the Design Criteria at no additional cost to the Owner. ELECTRICAL 1. Design and construct a complete electrical system for the parking lot and associated site including, but not limited to, electrical service and distribution, parking lot lighting, site lighting, lightning protection and grounding. 2. Electrical Service: a. Provide electrical service from existing underground primary distribution by Florida Power Corporation. b. Provide a KWH utility meter in accordance with Florida Power Corporation requirements. C. Route secondary service feeders in concrete encased duct banks to main distribution panel only when installed under streets, roads, driveways or parking lots. 3. Electrical Distribution: a. Main distribution panels shall have an ampere capacity 20 percent greater than the design connected load, with 20 percent spare capacity for future loads. b. Provide main over current protection disconnecting means, a transient voltage surge suppression system (TVSS), and a 20 percent spare and space capacity. C. Base electrical design on non-linear loads. d. Distribute power and apply for all equipment and devices as per manufacturer's recommendations. e. Provide individual combination starting and disconnecting equipment for all motors except packaged and pre -wired units. Motors shall be energy efficient type. Provide combination starters at the motor location. f. Provide exterior receptacle with weatherproof cover at each parking lot light and within 25 feet of irrigation equipment. g. Provide complete operational systems and equipment to power lighting and irrigation systems and exterior convenience receptacles. j. Design such that the feeder voltage drop does not exceed 3 percent and overall circuit voltage drop does not exceed 5 percent at the load. Derate circuits for maximum ambient temperature and number of conductors per raceway. k. Rate electrical distribution equipment for the required fault current levels. Provide short circuit and coordination study for the distribution system. 97044.02 01010-7 4. Wiring Methods: a. Provide wiring devices of specification grade type with brushed stainless steel cover plates. Provide explosion -proof wiring devices where required by code. 5. Grounding: Grounding of the service entrance to two grounding rod electrodes, bonding to the water service, bonding to building steel, grounding wire at electrical/communication room, grounding of separately derived system to service ground, and the routing of a "green" equipment grounding conductor with all circuits per NEC Article 250. Ground system Resistivity shall not exceed 5 Ohms. 6. Coordinate Installation of New Parking Lot Lighting by Others: Demolish and remove existing wood pole and pole mounted parking lot luminaires. Install underground conduit and pull wire per directive of Florida Power Corp. Coordinate installation of new parking lot lighting system by other: Florida Power Corp. With the exception of site preparation and under ground conduit, Florida Power Corp. is to provide complete system installation including, but not limited to, poles, pole accessories, fixtures, reflectors, vandal resistant reflector shrouds, lamps, grounding, transformer, wiring and electrical service to parking lot lighting system. Style of new Florida Power Corp. parking lot lighting systems: "Hi -line", prefinished (black) cast aluminum 'antique look' street lamps, and double armature with tulip style luminaires. Purchase and installation of Florida Power Corp. parking lot light system is NOT IN CONTRACT. The Owner will contract directly with Florida Power Corp. for the purchase and installation of the Florida Power Corp. parking lot lighting system. The Design/ Builder will provide construction documents with parking lot lighting layout, .conduct site preparation, install underground conduit/ pull wire per Florida Power Corp. directive and coordinate with the electric utility for installation of the system by the electric utility. 7. Lightning Protection: Provide a lightning protection of irrigation and lighting systems in accordance with UL and NFPA, and bearing the "Master C Label". 97044.02 01010-8 DESIGN/BUILD CONTRACTOR USE OF PREMISES 1. Limit use of the premises to construction activities to allow for Owner use of existing facilities to remain and for access by utility owners. 2. Portions of the site beyond areas of construction are not to be disturbed. 3. Do not dispose of organic and hazardous material on site, either by burial or by burning. 4. Working hours: a. Perform work only between the hours of 7:00 a.m. and 6:00 p.m. on weekdays, Monday through Friday, and on weekend Saturdays. b. Work on Sundays and holidays, or beyond the weekday time limits require prior written consent of the owner and then only in compliance with the owner's directions. END OF SECTION 97044.02 01010-9 SECTION 01045 - CUTTING AND PATCHING GENERAL 1. Requirements for Structural Work: Do not cut and patch structural elements in a manner that would reduce their load -carrying capacity or load -deflection ratio. 2. Operational and .Safety Limitations: Do not cut and patch operating elements or safety related components in a manner that would result in reducing their capacity to perform as intended, or result in increased maintenance, or decreased operational. life or safety. 3. 'Visual Requirements: Do,not cut and patch construction exposed on the exterior, in a manner that would, in the Architect's/Engineer's opinion, reduce the facility's aesthetic qualities, or result in visual evidence of cutting and patching. Remove and replace Work cut and patched in a visually unsatisfactory manner. 4. Use materials that are identical to existing materials. If identical materials are not available or cannot .be used where -exposed surfaces are involved, use materials that match existing adjacent surfaces to the fullest extent possible with regard to visual effect. 5. Use materials whose installed .performance will equal or surpass that of existing materials. EXAMINATION 1. Before cutting existing. surfaces, examine surfaces to be cut and patched and conditions under which cutting and patching is to be performed. Take corrective action before proceeding. 2. Review areas of potential interference and conflict with trades involved. Coordinate procedures and resolve potential conflicts _before proceeding. EXECUTION 1. Provide temporary support of Work to be cut. 2. Protect existing construction during cutting and patching to prevent damage. Provide protection from adverse weather conditions for portions of the Project that might be exposed during cutting and patching operations. 97044.02 01045-1 3. Avoid interference with use of adjoining areas or interruption of free passage to adjoining areas. 4. Employ skilled workmen to perform cutting and patching. Proceed with cutting and patching at the earliest feasible time and complete without delay. 5. Cut existing construction using methods least likely to damage elements to be retained or adjoining construction. a. In general, where cutting is required use hand or small power tools designed for sawing or grinding, not hammering and chopping. Cut holes and slots neatly to size required with minimum disturbance of adjacent surfaces. Temporarily cover openings when not in use. b. To avoid marring existing finished surfaces, cut or drill from the exposed or finished side into concealed surfaces. C. Cut through concrete and masonry using a cutting machine such as a carborundum saw or diamond core drill. d. By-pass utility services such as pipe or conduit, before cutting, where services are shown or required'to be removed, relocated or abandoned. Cut-off pipe or conduit in walls or partitions to be removed. Cap, valve or plug and seal the remaining portion of pipe or conduit to prevent entrance of moisture or other foreign matter after by-passing and cutting. 6. Patch with durable seams that are as invisible as possible. Comply with specified tolerances. a. Inspect and test patched areas to demonstrate integrity of the installation. b. Restore exposed finishes of patched areas and extend finish restoration .into retained adjoining construction in a manner that will eliminate evidence of patching and refinishing. END OF SECTION 97044.02 01045-2 SECTION 01090 - REFERENCE STANDARDS REFERENCE STANDARDS 1. For Products specified by reference to an association or trade standard, comply with requirements and recommendations stated in that standard, except when requirements are _modified by the Contract Documents, or applicable codes establish stricter standards. 2. Where compliance 'with an industry standard is required, comply with standard in effect- -as of date of Contract Documents except when a particular date of a standard is indicated. 3. Each entity engaged . in construction on the Project is required to be familiar with industry standards applicable to that entities' construction activity. Copies. of applicable standards are not bound with the Contract Documents. SCHEDULE OF TRADE REFERENCES Acronyms or abbreviations which: may be used in the Specifications or other Contract Documents mean the recognized name of the trade association, standards generating organization, authority having jurisdiction or other entity applicable to the context of the text provision. AA Aluminum Association AABC Associated Air Balance Council AAMA American Architectural Manufacturer's Association AAN American Association of Nurserymen AASHTO American Association of State Highway and. Transportation Officials ACI American Concrete Institute ACIL American Council of Independent Laboratories ACPA American Concrete Pipe Association ADAAG Americans with DisabilitiesAct Guidelines ADC Air Diffusion Council AGA American Gas Association AHA American Hardboard Association AHAM Association of.Home Appliance Manufacturers Al Asphalt Institute AIA American Institute of Architects AIHA American Industrial Hygiene. Association AISC 'American Institute of Steel Construction AISI American Iron and Steel Institute AITC American Institute of Timber Construction .97044.02 01090=1 ALI Associated Laboratories ALSC American Lumber Standards Committee AMCA Air Movement and Control Association ANSI American National Standards Institute APA American Plywood Association API American Petroleum Institute ARI Air Conditioning and Refrigeration Institute ARMA . Asphalt Roofing Manufacturers Association ASA Acoustical Society of America ASC Adhesive and Sealant Council ASHRAE American Society of Heating, Refrigerating and Air -Conditioning Engineers ASME American Society of Mechanical Engineers ASPE American Society of Plumbing Engineers ASSE American Society of Sanitary Engineering ASTM ASTM AWI Architectural Woodwork Institute AWPA American Wood Preservers' Association AWPB American Wood Preservers Bureau AWS American Welding Society AWWA American Water Works Association BHMA Builders' Hardware Manufacturers Association BIA Brick Institute of America CAGI Compressed Air and Gas Institute CBM Certified Ballast Manufacturers Association CDA Copper Development Association CGA Compressed Gas Association CISPI Cast Iron Soil Pipe Institute CRI Carpet and Rug Institute , CRSI Concrete Reinforcing Steel Institute CTI Ceramic Tile Institute of America DHI Door and Hardware Institute DLPA Decorative Laminate Products Association EIA Electronic Industries Association EIMA Exterior Insulation Manufacturers Association FACBC Florida Accessibility Code for Building Construction FCI Fluid Controls Institute FGMA Flat Glass Marketing Association FM Factory Mutual Engineering and Research FTI Facing Tile Institute GA Gypsum Association HEI Heat Exchange Institute. HI Hydronics Institute HMA Hardwood Manufacturers Association ICEA Insulated Cable Engineers Association Inc. IEC International Electrotechnical Commission 97044.02 01090-2 IEEE Institute of Electrical and Electronic Engineers IESNA Illuminating Engineering Society of North America IGCC Insulating Glass Certification Council ILI Indiana Limestone, Institute of America IRI Industrial Risk Insurers ISA Instrument Society of America LPI Lightning Protection Institute MBMA Metal Building Manufacturer's Association MCAA Mechanical Contractor's Association of America MIA Marble Institute of America MUSFA Metal Lath/Steel Framing Association MSS Manufacturers Standardization Society of the Valve and. Fittings Industry NAAMM National Association of Architectural Metal Manufacturers NAPA National Asphalt Pavement Association NAPF National Association of Plastic Fabricators (Now DLPA) NBGQA National, Building Granite Quarries Association NBHA National Builder's Hardware Association (Now DHI) NCMA National Concrete Masonry Association NCRPM National Council on Radiation Protection and Measurement NEC National Electric Code NECA National Electrical Contractors Association. NEII National Elevator Industry, Inc. NEMA National Electrical Manufacturers Association NFPA National Fire Protection Association N.F.P.A. National Forest Products Association NHLA National: Hardwood Lumber Association NLGA National Lumber Grades Authority NOFMA National Oak Flooring Manufacturers Association NPA National Particleboard Association NPCA National Paint and Coatings Association NRCA National Roofing Contractors Association NSF National Sanitation Foundation NTMA . National. Terrazzo and Mosaic Association NWMA National .Woodwork Manufacturers Association (Now NWWDA) . NWWDA National Wood Window and Door Association (Formerly NWMA) PCI Prestressed Concrete Institute PDI Plumbing and Drainage Institute' PEI Porcelain Enamel.lnstitute RFCI. Resilient Floor Covering .Institute RIS Redwood Inspection Service RMA Rubber Manufacturers Association SDI Steel Deck Institute S.D.I. Steel Door Institute 97044.02 01090-3 SGCC SHLMA SIGMA SJI SMACNA SPIB SPRI SSPC SWI Safety Glazing Certification Council Southern Hardwood Lumber Manufacturers Association (Now HMA) Sealed Insulating Glass Manufacturers Steel Joist Institute Sheet Metal and Air Conditioning Association Southern Pine Inspection Bureau Single Ply Roofing Institute Steel Structures Painting Council Steel Window Institute Association Contractor's National TCA Tile Council of America TIMA Thermal Insulation Manufacturer's Association TPI Truss Plate Institute UL Underwriters Laboratories WCLIB West Coast Lumber Inspection Bureau WCMA Wall Covering Manufacturers Association WRI Wire Reinforcement Institute WSC Water Systems Council WSFI Wood and Synthetic Flooring Institute WWPA Western Wood Products Association W.W.P.A. Woven Wire Products Association SCHEDULE OF GOVERNMENT AGENCY REFERENCES Acronyms or abbreviations referenced in the Contract Documents indicate names of standard or Specification producing agencies of the federal government. CE Corps of Engineers (U.S. Department of the Army) CFR Code of Federal Regulations CPSC Consumer Product Safety Commission CS Commercial Standard DOC Department of Commerce DOT Department of Transportation EPA Environmental Protection Agency FAA Federal Aviation Administration (U.S. Department of Commerce) FCC Federal Communications Commission FHA Federal Housing Administration (U.S. Department of Housing and Urban Development) FS Federal Specification (General Services Administration) GSA General Services Administration MIL Military Standardization Documents (U.S. Department of Defense) NBS National Bureau of Standards (U.S. Department of Commerce) 97044.02 01.090-4 OSHA Occupational Safety and Health Administration (U.S. Department of Labor) PS Product Standard of NBS (U.S. Department of Commerce) REA Rural Electrification Administration (U.S. Department of Agriculture) USDA U.S. Department of Agriculture USPS U.S. Postal Service END OF SECTION 97044.02 01090-5 01200 - PROJECT MEETINGS PRECONSTRUCTION CONFERENCE 1. Schedule a pre -construction conference and organizational meeting at the Project site or other convenient location 7 days after execution of the Agreement and prior to commencement of construction activities. 2. Attendees: The Owner, the Design/Build Contractor and its architects, engineers, superintendent, major subcontractors, manufacturers, and suppliers. PREINSTALLATION CONFERENCES 1. Conduct a pre -installation conference at the site before each construction activity that requires coordination with other construction. 2. Review the progress of other construction activities and preparations for the particu- lar activity under consideration at each pre -installation conference. PROGRESS MEETINGS 1. Conduct progress meetings at the Project site at 2- week intervals. Notify meeting, attendees of scheduled meeting dates at least 10 working days in advance of meeting. 2. Attendees: The Owner, the Design/Build Contractor and its architect, engineer, superintendent, major subcontractors, suppliers and other entities concerned with current progress who are familiar with the Project. REPORTING 1. No' later than 5 days after each meeting date, distribute copies of minutes of the meeting to each party present and to other parties who should have been present. Include a brief summary, in narrative form, of progress since the previous meeting and report. END OF SECTION 97044.02 01200-1 01300 - SUBMITTALS SUBMITTAL PROCEDURES 1. Coordinate preparation and processing of submittals with performance of. construction activities. 2. Submit copies of final submittals to the Owner which have been approved or approved as noted by the Architect/Engineer. 3. Allow sufficient review time, including time for resubmittals. . 4. Place a permanent label or title block on each submittal for identification. FINAL DESIGN CONTRACT DOCUMENTS 1. Submit fully coordinated AutoCAD drawings which indicate compliance with Design Criteria indicated. 2. Submit final specifications in CSI (Construction Specifications Institute) 16 Division, 3 -Part Section format. PROGRESS SCHEDULE 1. Bar -chart schedule: Fully_ developed, horizontal bar -chart type contractor's design and construction schedule. 2. Submit to Owner within 7 days of the date of the notice to proceed. SHOP DRAWINGS . 1. Submit newly prepared information, drawn to accurate scale. 2. Do not reproduce contract documents or copy standard information as the basis of shop drawings 3. Include fabrication and installation drawings, setting diagrams, schedules, patterns, templates and similar drawings. 4. Submit 7 blue- or black -line and 1 set of reproducible prints for review. PRODUCT DATA 1. Include printed information such as manufacturer's installation instructions, catalog cuts and standard color charts. 2. Mark each copy to show applicable choices and options. 3. Submit 7 copies for review. SAMPLES 1. Full-size, fully fabricated samples cured and finished as specified and physically identical with the material or product proposed. 2. Mount, display, or package samples to facilitate review of qualities indicated 3. Submit 5 samples of finish items for review. END OF SECTION 97044.02 01300-1 01400 - QUALITY CONTROL 1. Specific quality control requirements for individual construction activities shall be specified in the Sections that specify those activities. Those requirements, including inspections and tests, cover production of standard products as well as customized fabrication and installation procedures. . 2. Inspections, test and related actions specified are not intended to limit the Design/Build Contractor's quality control procedures that facilitate compliance with Contract Document requirements. 3. Requirements for the Design/Build Contractor to provide quality control services required by the Architect, Owner, or authorities having jurisdiction are not limited by provisions of this Section. DESIGN/BUILD CONTRACTOR RESPONSIBILITIES 1. The Design/Build Contractor shall engage the services of an independent agency to perform inspections and tests specified. 2. Provide and pay for costs of retesting and other related costs when: a. Results of required inspections, tests or similar services prove unsatisfactory and do not indicate compliance with Contract Document requirements, regardless of whether the original test was the Design/Build Contractor's responsibility. b. Construction is revised or replaced by the Design/Build Contractor, where tests were required on original construction. C. Additional testing is needed or required by the Design/Build Contractor. d. Additional trips to the project are necessary by an agency when scheduled times for tests and inspections are cancelled and the agency is not notified sufficiently in advance of cancellation to avoid the trip. 3. Cooperate with agencies performing required inspections, tests and similar services and provide reasonable auxiliary services as requested. 4. Coordinate the sequence of activities to accommodate required services with a minimum of delay and coordinate activities to avoid the necessity of removing and replacing construction to accommodate inspections and tests. 5. Schedule times for inspections, tests, taking samples and similar activities. SUBMITTALS Independent testing agencies will submit 2 copies of certified written reports of each inspection, test or similar service to Design/Build Contractor and its Architect/Engineer. QUALIFICATION OF SERVICE AGENCIES 97044.02 01400-1 1. Inspection and testing service agencies engaged by the Design/Build Contractor, including independenttesting laboratories, shall be prequalified as complying with "Recommended Requirements for Independent Laboratory Qualification" by the American Council of Independent Laboratories, and specialize- in the types of inspections and tests to be performed.. 2. Each independent inspection and testing agency engaged on the Project shall be authorized by authorities having jurisdiction to operate in the State in which the Project is located. 3. Inspection and testing agencies engaged by the Design/Build Contractor shall be acceptable to the Owner. REPAIR AND PROTECTION 1. Upon completion of inspection, testing, sample -taking and similar services, repair damaged construction and restore substrates and finishes to eliminate deficiencies, including deficiencies in visual qualities of exposed finishes. 2. Protect construction exposed by or for quality control service activities, and protect repaired construction. 3. Repair and protection is the Design/Build Contractor's responsibility, regardless of the assignment of responsibility for inspection, testing or similar services. END OF SECTION 97044.02 01400-2 01500 -CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS MATERIALS AND EQUIPMENT 1. Provide new materials and equipment suitable for the use intended. 2. Provide potable water approved by local health authorities. INSTALLATION 1. Locate facilities where they will serve the project adequately.. Maintain and modify as required. 2. Do not remove until facilities are no longer needed or are replaced by authorized use of completed permanent facilities. TEMPORARY UTILITIES 1. Engage the appropriate local utility company to install temporary service. 2. Install water distribution piping for constructionfrom existing service until permanent water service is in use. Pay cost of extensions from service. 3. Provide weatherproof, grounded electric power service and. distribution system during construction.. � Pay. costs of temporary service; power. used, connections, metering and extensions from service. 4. Provide temporary lighting for areas of.work when natural light is not adequate, and for areas accessible to the public. 5. Provide temporary connections to existing sewers to remove effluent that can be discharged lawfully. If sewer facilities cannot be lawfully used, provide containers to remove and dispose of off site in a lawful manner. a. Filter out contaminants before discharge., . b.' Provide earthen embankments around excavations and subgrade construc- tion. 6. Provide temporary telephone service. TEMPORARY CONSTRUCTION AND SUPPORT FACILITIES 1. Storage and Fabrication Sheds: Noncombustible construction, sized, furnished and equipped to accommodate materials and equipment involved, including temporary utility service. 2'.. Temporary Roadways: -Construct and maintain to adequately withstand exposure to traffic during the construction period. 3. Sanitary Facilities: Provide temporary toilets, wash facilities and drinking water fixtures to comply with regulations and health codes for the type, number, location, operation and maintenance of fixtures and facilities. 4. Provide temporary enclosure for protection of construction in progress and completed, from exposure, .foul weather, other construction operations and similar activities. 5. Provide facilities for hoisting materials. 97044.02 01500-1 6. Collect waste from construction areas daily. Handle hazardous, dangerous, or unsanitary waste materials separately from other waste by containerizing properly. Dispose of material in a lawful manner. 7. Temporary Offices: Prefabricated or mobile units or similar job -built construction with lockable entrances, operable windows and serviceable finishes, superintendent office, toilet room and conference room with adequate space and seating for conducting progress meetings of 6 to 8 persons. Provide heated and air-conditioned units on foundations adequate for normal loading. Provide copy machine, fax machine, fax phone line and two telephone voice lines. 8. Erect a project identification sign on site: size 4 ft. x 8 ft., constructed of 2 x 4 lumber frame and 3/ inch MDO exterior grade plywood painted and professionally lettered. SECURITY AND PROTECTION FACILITIES 1. Install and maintain temporary fire protection facilities of the types needed to protect against fire losses. 2. Comply with local standards and code requirements for erection of structurally adequate barricades, warning signs, and lights. 3. Install substantial temporary enclosures of storage areas and partially completed areas of construction with locking entrances to prevent unauthorized entrance, vandalism, theft and similar violations of security. 4. Provide protection, operate temporary facilities and conduct construction in ways and by methods that comply with environmental regulations, and minimize the possibility that. air, waterways and subsoil might be contaminated or polluted, or that other undesirable effects might result. 5. Install a gated, lockable 6 ft. tall chain_ link fence at full perimeter of construction area. OPERATION, TERMINATION AND REMOVAL 1. Maintain temporary facilities in good operating condition until removal. 2. Remove each temporary facility when the need has ended, or when replaced by authorized use of a permanent facility, or no later than substantial completion. a. Remove temporary paving. b. Remove materials contaminated with road oil, asphalt and other petrochem- ical compounds. C. Repair or replace street paving, curbs and sidewalks at the temporary entrances, as required by the governing authority and the owner. 3. At substantial -completion, clean and renovate permanent facilities that have been used during the construction period. DESIGN/BUILD CONTRACTOR'S USE OF PREMISES 1. Contractor shall have use of the premises for construction operations. The Contractor's use of the premises is limited only by the Owner's right to perform construction operations with its own forces or to employ separate contractors on portions of the project. The Contractor is required to avoid disturbing the existing 97044.02 01500-2 wooded and wetland areas. The Contractor is also required to avoid disturbing the existing Wastewater Treatment Plant Facility. 2. Confine operations to areas within Contract limits indicated. Portions. of the site beyond the areas of construction operations are not to -be disturbed, without authorization by the Owner. 3. Keep existing driveways- and entrances serving adjacent premises clear and available to the Owner, the Owner's employees and the Public at all times. a. Do not use these areas for parking or storage of materials. b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on site. 4. Do not dispose of organic and hazardous material on site, either by burial or by burning. OWNER USE OF. PREMISES 1. The Ocoee Wastewater Treatment Plant, located. on the site, will be continuously operated 24 hours a day before, during and after construction. The plant is enclosed full perimeter with a. chain link/barbed wire fence and an electronic entrance gate. The existing asphalt entry road to the plant needs to be maintained' clear for service truck and employee access 24 hours/day. Coordinate the relocation of the entry road and .electronic gate in such a waythat access is maintained. ENVIRONMENTAL PROTECTION 1. Provide protection, operate Jemporary facilities and conduct construction in ways and by methods that comply with environmental regulations, and minimize the possibility that air, waterways and subsoil might be contaminated or polluted, or that other undesirable effects might result. 2. Preservation of Water Quality: Exercise extreme care to minimize degradation' of water quality at the site. Insure compliance with .the water quality standards of the State of Florida. 3. Provide tree barricades around existing wooded'areas to remain undisturbed. It is the responsibility of the General Contractor to keep these barricades intact throughout the construction phase. TRAFFIC REGULATION 1. Provide materials and labor necessary to regulate vehicular and pedestrian traffic around and through the Project in accordance with the requirements 'of the City of Ocoee. 97044.02 01500-3 2. Provide and maintain points of access to adjacent commercial and residential properties at all times. Notify in writing, the police, fire and other emergency departments and agencies when and where work is to be accomplished at least 2 days prior to beginning work. 3. Provide and maintain adequate detour facilities and traffic direction at roads and streets blocked to traffic. Obtain approval of detour routes and methods from local governing authorities prior to implementing. a. Maintain minimum of two lanes of traffic flow (one lane each direction) at all times during the Project. b. Hire off-duty police officers or security service for traffic direction and control. Local police will not be available for routine traffic control. TREE PROTECTION 1. Comply with the City of Ocoee Land Development Code, Article VI, Section 6-10 Landscaping, paragraph B. Arbor Provisions, regarding protection of existing trees. (Refer to Section 02900 and Exhibit "C" of the specifications.) 2. Protect tree root systems from damage from run-off or spillage of construction fluids and from flooding or erosion. 3. Engage a qualified arborist to perform trimming, pruning, repair and relocation of trees where required. 4. Repair trees damaged by construction operations. 5. Replace dead and critically damaged trees with new trees of same size and species. END OF SECTION 97044.02 01500-4 SECTION 01600 - MATERIAL AND EQUIPMENT QUALITY ASSURANCE 1. To the fullest extent possible, provide products of the same kind, from a single source. 2. When the Design/Build Contractor is given the option of selecting between two or more products for use on the Project, the product selected shall be compatible with products previously selected, even if previously selected products were also options. 3. Except for required labels and operating data, do not attach or imprint manufacturer's or producer's nameplates or trademarks on exposed surfaces of products which will be exposed to view in occupied spaces or on the exterior. PRODUCT DELIVERY, STORAGE, AND HANDLING 1. Deliver, store and handle products in accordance with the manufacturer's recommendations, using means and methods that will prevent damage, deterioration and loss, including theft. 2. Deliver products to the site in the manufacturer's original sealed container or other packaging system, complete with labels and instructions for handling, storing, unpacking, protecting and -installing. 3. Inspect products upon delivery to ensure compliance with the Contract Documents, and to ensure that products are undamaged and properly protected. 4. Store products at the site in a manner that will facilitate inspection and measurement of quantity or counting of units. 5. Store heavy materials away from the project structure in a manner that will not endanger the supporting construction.. 6. Store products subject to damage bythe elements above ground, under cover in a weathertight enclosure, with ventilation adequate to prevent condensation. Maintain temperature and humidity within range required by manufacturer's instructions. MANUFACTURER'S INSTALLATION INSTRUCTIONS 1. Handle, install, connect, condition, clean, and adjust products in accordance with such instructions and in conformance with specified requirements. 2. Do not proceed with work.without clear instructions. END OF SECTION 97044.02 01600-1 01700 - CONTRACT CLOSEOUT SUBSTANTIAL COMPLETION 1. When work is considered substantially complete, submit written notice to Design/Build Contractor's Architect that the work is complete and ready for inspection. 2. Within 5 days of receipt of notice, Architect will jointly inspect Project with the Owner and advise of unfulfilled requirements. When Owner and Architect concur that work is substantially complete, Architect shall prepare the certificate of substantial completion following inspection. FINAL COMPLETION When work is considered complete, submit written certification to the Architect that the work is completed and ready for final inspection. Submit the following: a. Final payment request with releases. b. Updated final statement. C. Certified copy of Architect's final inspection list, stating that each item has been completed or otherwise resolved for acceptance. d. Final meter readings for utilities. e. Consent of surety to final payment. f. Final liquidated damages settlement statement. g. Final, continuing insurance coverage complying with insurance requirements. 2. Owner and Architect will jointly inspect the work upon receipt of notice. RECORD DOCUMENT SUBMITTALS 1. Record drawings: Provide and maintain one set of reproducible prints of Final Design Contract Drawings and one clean, undamaged set of shop drawings. Mark the set to show the actual installation where the installation varies from the work as originally shown. Give particular attention to concealed elements that would be difficult to measure and record at a later date. a. Mark new information not shown on contract drawings or shop drawings. b. Note related change order numbers where applicable. C. Organize record drawing sheets into manageable sets, bind with durable paper cover sheets, and print suitable titles, dates and other identification on the cover of each set. 2. Record specifications: Provide and maintain one complete copy of the Final Design Project Manual, including addenda, and one copy of other written construction documents such as change orders and modifications issued in printed form during construction. a. Mark to show variations in actual -work performed. b. Give particular attention to substitutions, selection of options and elements that are concealed or cannot otherwise be readily discerned later by direct observation. 3. Record Product Data: Maintain one complete copy of each product data submittal. 97044.02 01700-1 4. At contract closeout, deliver one copy of record documents to Owner. OPERATION AND MAINTENANCE DATA 1. Prepare data in the form of an instructional manual with table of contents and directory information of.Design/Build Contractor; names, addresses, and telephone numbers of subcontractors and suppliers; product data; drawings; and written text. 2. Provide manual for materials and finishes of instructions for care and maintenance. 3. Provide manual for equipment and. systems. a. Panelboard circuit directories., b. As -installed color coded wiring diagrams. C. Operating procedures. d. Maintenance requirements. e. Parts list, illustrations, assembly drawings and diagrams required for maintenance. f. Charts of valve tag numbers. g. Testing and balancing reports. 4. Provide instruction of Owner personnel 10 days before substantial. completion inspection. 5. Submit 2 copies 10 days prior to substantial completion inspection. WARRANTY REQUIREMENTS 1.. When work covered by a warranty has failed and been corrected by replacement or rebuilding, reinstate the warranty by written endorsement, equal to the original warranty with an equitable adjustment for depreciation. 2. Written warranties made to the Owner are in addition to implied warranties, and shall not limit the duties, obligations, rights and remedies otherwise available under the law, nor shall warranty periods be interpreted as limitations on time in which the owner can enforce such other -duties, obligations, rights, or remedies. 3. The Owner reserves the right to reject warranties and to limit selections to products with warranties. 4. When a special warranty is required, submit draft for approval prior to final execution. FINAL CLEANING 1. Complete cleaning operations before requesting inspection for certification of substantial completion and maintain until final completion: 2. Remove temporary protection and facilities installed for protection of the work during construction. 3. Do not burn waste materials. Do not bury debris or excess materials on the Owner's property. Do not discharge volatile, harmful or dangerous materials into drainage systems. Remove waste materials from the site and -dispose of in a lawful manner. END OF SECTION 97044.02 01700-2 SECTION 02070 - SELECTIVE DEMOLITION GENERAL 1: Provide minimum of 72 hours advance notice to Owner of demolition activities, which will impact Owner's normal operations. 2. Owner assumes no responsibility for actual condition of items or structures to be demolished. 3. Owner,will maintain conditions existing at time of commencement of contract insofar as practicable. However, variations within structure may occur by Owner's removal and salvage operations prior to start of selective demolition work. 4. Explosives: Use of explosives will not be permitted.. PREPARATION 1. Prior to commencement of selective demolition work, examine areas in _which work will be performed., Verify that existing areas to be. demolished are unoccupied .and discontinued in use: 2. Photograph existing conditions of structure, surfaces, equipment or surrouw nding- properties, hich, could be misconstrued as damage resulting from selective demolition work; 'submit photographs and report of existing, damage with Architect/Engineer prior to starting work. 3. Provide shoring, bracing, or support to.prevent movement, settlement or collapse of structures to be demolished and adjacent facilities to. remain. 4. Protections: Provide temporary barricades .and other forms of protection as required to protect Owner's personnel and general public from injury due to demolition -work. a. Protect existing facilities that are to remain in place -and become exposed during demolition operations. b. Cover and protect equipment and fixtures to remain from soiling or damage when demolition work is performed in areas from which such items have not been removed. 5. Maintain existing utilities, keep in service, -and protect against damage during demolition operations. 97044.02 02070-1 . EXECUTION 1. Perform selective demolition work in a systematic manner. Use such methods as required to complete required work in accordance with demolition schedule and governing regulations. a. Demolish concrete and masonry in small sections. Cut concrete and masonry at junctures with construction to remain using power driven masonry saw or hand tools; do not use power driven impact tools. b. Provide services for effective air and water pollution controls as required by local' authorities having jurisdiction. C. Demolish foundation walls to a depth of not less than 12 in. below existing ground surface. Demolish and remove below grade wood or metal construction. Break up and remove below -grade concrete slabs. 2. Conduct selective demolition operations and debris removal in a manner to ensure minimum interference with roads, streets, walks, and other adjacent occupied or used facilities. 3. Use water sprinkling, temporary enclosures, and other suitable methods to limit dust.and dirt rising and scattering in air to- lowest practical level. Comply with governing' regulations pertaining to environmental protection. 4. If unanticipated utilities conflicting with ,intended function or design are encountered, investigate and measure both nature and extent of the conflict. a. Submit report to Architect/Engineer in written, accurate detail. b. Pending receipt of clarification from Architect/Engineer rearrange selective demolition schedule as necessary to continue overall job progress without delay. 5. Remove debris, rubbish and other materials resulting from demolition operations from building site. Transport and legally dispose of materials off site. 6. If -hazardous materials are encountered during demolition operations, comply with applicable regulations, laws, and ordinances concerning removal, handling and protection against exposure or environmental pollution. 7. Burning of removed materials is not permitted on project site. 97044.02 02070-2 SALVAGE MATERIALS 1. Protect- and prepare items `indicated for 'salvage/ removal by others' by capping -off utility connections. . 2. Items indicated as 'demolish and remove' may be salvaged and/ or sold by the Design/ Builder at his/ her discretion. 3. Historic artifacts, including cornerstones and their contents,- commemorative ontents;commemorative plaques and tablets, antiques, and other articles of historic significance remain the property of the Owner. Notify Architect/Engineer if such ,items are encountered and obtain acceptance regarding method of removal and salvage for Owner. .CLEANING AND REPAIR 1. Upon completion of demolition work, remove tools, equipment and demolished materials from site. Remove protections and ' broom clean areas. 2. Repair demolition performed in excess of that required. Return structures and surfaces to remain to condition existing prior to commencement,of selective demolition work. 3. Repair 'adjacent construction or surfaces soiled .or damaged by selective demolition work at no cost to Owner. 97044.02 02070-3 M r t�i'T�'f!t#'�i • 1 i��}'Tw •'{ll rf 02100 - SITE PREPARATION NOTIFICATIONS 1. Notify any corporation, company, individual or local authority owning conduits, wires, pipes or equipment on site that is affected by demolition work. 2. Arrange for removal or relocation of existing affected items and pay costs or fees for removal or relocation. PREPARATION 1. Verify that abandoned utilities are disconnected and capped. 2. Shore, brace, needle pin and otherwise support existing structures to remain. DEMOLITION 1. Cut and remove existing structures and equipment as required. 2. Do not damage or disturb existing items to remain or adjacent structures. CLEARING AND GRUBBING 1. Remove from site - trees, brush, shrubs, down timber, rotted wood, rubbish, other vegetation and incidental structures. 2. Remove from ground - stumps 1/2 inch diameter and larger, roots and stubs, organic matter and debris. 3. Remove debris from demolition and clearing daily, transport to off-site disposal area. Do not burn materials on-site. END OF SECTION 97044.02 02100-1 02200 - EARTHWORK SITE CONDITIONS 1. Locate existing underground utilities and provide support and protection during earthwork operations. 2. Should uncharted or incorrectly charted utilities be encountered during excavation, consult utility owner immediately for. directions. 3. Repair damaged utilities to satisfaction of utility owner. 4. Do not interrupt existing utilities serving facilities occupied and used by owner or others except when permitted in writing and then only after acceptable temporary utility services have been provided. SOIL INVESTIGATION DATA 1. Investigation: Proposer Information — Geotechnical and Environmental (BIG -1 thru 31) is provided to the Design/Build Contractor for use in the Final Design but is not a warranty of subsurface conditions. 2. Interpretation: a. Contractor is expected to examine the site and the subsurface investigation reports and then decide for themselves the character of the materials to be encountered. b. The Owner and Owner's Representative disclaim any responsibility for the accuracy, true location and extent of the soils investigation that will be prepared by others., They, further disclaim responsibility for interpretation of the data by the Design/Build Contractor, as in their projection of soil -bearing values, rock profiles, soil stability, and the presence, level and extent of underground water. EXCAVATION 1. Excavate to subgrade elevations indicated, regardless of character of materials and obstructions encountered. 2. Unauthorized Excavation: Removal of materials beyond indicated subgrade elevations or dimensions without specific direction of Owner's Representative. 3. Additional Excavation: Removal of unsuitable. bearing materials encountered at required sub -grade elevations when directed by Owner's Representative. 4. Provide materials for shoring and bracing to comply with local codes and authorities having jurisdiction. 5. Do not allow water to accumulate in excavations. Provide and maintain pumps, well points, sumps, suction and discharge lines, and other dewatering system components. COMPACTION 1. Determine in accordance with ASTM D 1557. 97044.02 02200-1 2. Structures, building slabs and steps, pavements: Compact subgrade and each 12 in. Layer to 95 percent max. Density. 3. Lawn or unpaved areas: Compact subgrade and each 6'in. Layer to 85 percent max. Density. 4. Walkways: compact subgrade and each 6 in. Layer to 90 percent max. Density. BACKFILL AND FILL 1. In Excavations: Satisfactory excavated or borrow material. 2. Under Grassed Areas: Satisfactory excavated or borrow material. 3. Under Walks and Pavements: Subbase material. 4. Under Steps: Subbase material. 5. Under Building Slabs: Drainage fill material. 6. Under Piping and Conduit: Subbase material. 7. Backfill excavations promptly as work is completed, inspected, tested, and approved. [e] :JAI I71�[r7 1. Uniformly grade areas within limits, including adjacent transition areas. 2. Grade areas adjacent to structures to drain away from structures and to prevent ponding. FIELD QUALITY CONTROL 1. Field Density7ests: ASTM D 1556 or ASTM D 2167, as applicable. a. Footing Subgrade: One test for each strata. b. Paved Areas and Building Slab: One test of subgrade and each fill layer for every 2000 sq. Ft. Area or building slab. C. Foundation Wall Backfill: 2 tests. DISPOSAL OF EXCESS AND WASTE MATERIALS 1. Stockpile or spread acceptable excess excavated material in designated areas on owner's property. 2. Remove excess excavated -material, trash, debris and waste materials and dispose of it off Owner's property. END OF SECTION 97044.02 02200-2 SECTION 02510 - ASPHALTIC CONCRETE PAVING MATERIALS 1. Base Course Aggregate: Sound, angular crushed stone, crushed gravel, or crushed slag, sand, stone or slag screenings. 2. Surface Course Aggregate: Crushed,stone, crushed gravel, crushed slag, and .sharp -edged natural sand.. 3. Mineral Filler: Rock or slag dust, hydraulic cement, or other inert material,'complying with AASHTO M 17 (ASTM D242). 4. Asphalt Cement: AASHTO M 226 (ASTM D 3381) for viscosity graded material and AASHTO M 20 (ASTM D 946) for penetration graded material. 5: Prime Coat: Cut-back asphalt type; AASHTO M 82 (ASTM D 2027) MC -30, MC -70, or MC -250. 6. Tack Coat: Emulsified asphalt; AASHTO M 140 (ASTM D 977) or M 208 (D 2397); SS -1, SS -1 H, CSS -1 or CSS -1 H, diluted with one part water to one part emulsified asphalt. 7. Herbicide Treatment: Commercial chemical for weed control, registered by environmental protection agency. 8. Lane Marking Paint: Chlorinated rubber -alkyd type, AASHTO M 248 (FS TT -P-115), type 111. . , -9. Wheel Stops: Precast, 3,500 psi concrete, approximately 6 in. high, 9 in. wide, and 7 ft. long, with chamfered corners and drainage slots on underside. ASPHALT -AGGREGATE. MIXTURE . 1: Provide plant -mixed, hot -laid asphalt -aggregate mixture complying with ASTM D 3515 and as recommended by local paving authorities to suit project conditions. SURFACE PREPARATION 1. Proof roll prepared subbase surface. 2. Apply herbicide treatment. chemicals in strict compliance with manufacturer's recommended dosages and application instructions prior to application of prime coat. 3. Apply prime coat at rate of 0.20 To 0.50 gal. per sq. yd.; penetrate and seal, but not flood, surface. 4. Apply tack coat to contact surfaces of previously constructed asphalt or concrete at rate -of 0.05 to 0.15 gal. per sq. yd. of surface. PLACING/ROLLING MIX 1. Place asphalt concrete mixture on prepared surface, to required grade, cross section and compacted thickness of 2 inches. 2. Joints between successive days' work, to have same texture, density and smoothness as other sections of paving course. 97044.02 02510-1 3. Begin rolling when mixture will bear roller weight without excessive displacement. Compact mixture with hot hand tampers or vibrating plate compactors in areas inaccessible to rollers. SURFACE MARKINGS AND WHEEL STOPS 1. Apply 2 coats of white color, chlorinated -rubber base traffic lane marking paint, factory mixed, quick drying, and non-bleeding. 2. Secure wheel stops to asphalt concrete surface with 2, 1/2 in. diameter galvanized steel dowels. : FIELD QUALITY CONTROL 1. Test completed asphalt concrete courses for compliance with requirements for thickness and surface smoothness. Repair or remove and replace unacceptable paving as directed by Owner's Representative. 2. Completed compacted thickness tolerances: a. Base course: 1/2 in., plus or minus. b. Surface course: 1/4 in., plus or minus. 3. Surface Smoothness Tolerances: Check finished surface of each asphalt concrete course for smoothness, using 10 ft. Straightedge applied parallel with, and at right angles to centerline of paved area. a. Base Course Surface: 1/4 in. b. Wearing Course Surface: 3/16 in. C. Crowned Surfaces: Test with crowned template centered and at right angle to crown. Maximum allowable variance from template, 1/4 in. END OF SECTION 97044.02 02510-2 02520 - PORTLAND CEMENT CONCRETE PAVING 1. Forms: Steel or wood. 2. Welded Wire Mesh: ASTM A 185, flat sheets. 3. Reinforcing Bars: Deformed, ASTM A 615, Grade 40. 4. Concrete and Related Materials: Refer to Section 03310. DESIGN MIX 1. Compressive Strength: $000 psi, at 28 days. 2. Slump: 3 inch. 3. Air Content: 5 to 8 percent. 4. Refer to Section 03310 for additional requirements. PLACEMENT, CURING AND FINISH 1. Refer to 03310. END OF SECTION 97044.02 02520-1 02660 - WATER DISTRIBUTION QUALITY ASSURANCE 1. Comply with national standard plumbing code. 2. Comply with requirements of local water utility. MATERIALS 1. Identification Materials: Underground type plastic tape line markers and plastic laminate tags for nonmetallic pipe. 2. Copper Tube: ASTM B 88, Type K. 3. Ductile Iron Pipe: AWWA C 151. 4. Steel Pipe: AWWA C 200, schedule 40. 5. Polybutylene Pipe: AWWA C 922 and ASTM D 2662. 6. Polyvinyl Chloride Pipe: ASTM D 1785, schedule 40. 7. Polyethylene Pipe: AWWA C 901. 8. Gate Valves: AMA C 500, 175 psi. 9. Butterfly Valves: AWWA C 504, 150 psi. 10. Check Valves: AWWA C 508, swing, 150 psi. 11. Yard Hydrants: 3/4 inch, non -freeze, cast iron., 12. Valve Pits: 'Precast concrete. 13. Pipe Line Strainers: UL, 175 psi, y type or basket. 14. Meters: Turbine type, UL, 175 psi. 15. Detector Check Valves: UL, 175 psi. 16: Fire Hydrants: Cast iron body, 150 psi, 5-1/4 inch opening, 271/2 inch nozzles. INSTALLATION 1. Install piping in accordance with appropriate standards and local ordinances. FIELD QUALITY CONTROL 1. Contractor shall conduct piping tests before joints are covered and after thrust blocks are placed. a. Hydrostatic tests: 200 psi for 2 hours or 50 psi above maximum static pressure if greater than 150 psi. 2. Contractor shall disinfect potable water, system by flushing with plain water and chlorine solution. END OF SECTION 97044.02 02660-1 02700 -SEWERAGE AND DRAINAGE QUALITY ASSURANCE 1. Comply with national standard plumbing code. 2. Comply with local environmental agency regulation. MATERIALS 1. Identification Materials: Underground type plastic tape line markers and plastic laminate tags for nonmetallic pipe. 2. Cast Iron Sewer Pipe: ASTM A 74, hub and spigot ends. 3. ABS Sewer Pipe: ASTM D 2751, SDR 35 and SDR 42. 4. PVC Sewer Pipe: ASTM D 3033, type PSP, SDR -35. 5. RCP Drainage Pipe: Class II, ASTM C76. 6. Cleanouts: Pipe extension to grade with round, cast iron access cover and frame. 7. Catch Basins: Precast reinforced concrete; ductile iron 26 inch dia. heavy duty flat grate. INSTALLATION 1. Install piping in accordance with governing authorities having jurisdiction. 2. Contractor shall provide testing and inspection as required for approval by local authorities. END OF SECTION 97044.02 02700-1 02810 - IRRIGATION SYSTEMS MATERIALS 1. Pressure Pipe: Galvanized steel pipe, ASTM A 120, schedule 40. 2. Circuit Pipe (downstream from circuit valves): PVC plastic pipe, ASTM D 1785, schedule 40. 3. Pipe Fittings: PVC solvent weld type, ASTM D 2466 socket fittings with ASTM D 2564 solvent cement. 4. Valves: a. Manual Circuit Valves: Globe valves. b. Key Operated Valves: Manual valves, fitted for key operation. - c. Automatic Circuit Valves: Globe valves operated by low-power solenoid, normally closed, manual flow adjustment. d. Automatic Drain Valves: Designed to open for drainage when line pressure drops below 3.psi. 5: Sprinkler Heads: a. Flush Surface: Fixed pattern, with screw type flow adjustment. b. Bubbler: Fixed pattern, with screw type flow adjustment. C. Shrubbery: Fixed pattern, with screw type flow adjustment. d. 'Pop Up Spray: 'Fixed pattern, with screw type flow adjustment and stainless steel retraction spring. e. Pop Up Rotary Spray: Gear drive, full circle and adjustable part circle type. f.- Pop Up Rotary Impact: Impact drive, full circle and part circle as indicated. g. Above Ground Rotary Impact: Impact drive, full circle and part circle as indicated. 6. Valve Box: Precast concrete. 7. Valve Cover and Frame: Cast iron with provision for locking. 8. Drainage Backfill: Cleaned gravel or crushed stone, graded from 3 in. max. to 3/4 in. min. 9. Flex Risers: Flexible PVC tubing with PVC fittings at each end. 10. U 'Pin: No. 11 gauge galvanized steel. pin, U shaped with 9 in. length. AUTOMATIC CONTROL"SYSTEM 1. Low voltage system manufactured expressly for control of automatic circuit valves of underground irrigation systems. 2. Exterior Control Enclosure: "Manufacturer's standard weatherproof enclosure with locking cover, complying with NFPA 70 (national electric code). 3. Interior Control Enclosure: Manufacturer's standard with locking cover, complying with NFPA 70. 4. Transformer: To convert building service voltage to control voltage of 24 volts. 5. Circuit Control: Each circuit variable from approximately 5 to 60 minutes. 6. Timing Device: Adjustable, 24 hour and 7 or 14 day clocks to operate any time of day and skip any day in a 7 or 14 day period; manual or semi-automatic operation without disturbing preset automatic operation. 97044.02 02810-1 7. Wire: Type UF, No. 14 gauge single strand copper with 4/64 in. PVC insulation, UL approved for direct burial. 8. Wire Connectors: Direct burial, 2 piece PVC. TRENCHING AND BACKFILLING 1. Excavate straight and true with bottom uniformly sloped to low points. 2. Trench Size: 4 in. wide by 3 in. depth below invert of pipe. INSTALLATION 1. Connect to building piping. 2. Backflow Preventer: Provide union on downstream side. 3. Water Hammer Arrester: Install between connection to building main and circuit valves. 4. Circuit Valves: Install in valve box, arranged for easy adjustment and removal. 5. Piping: Lay pipe on solid subbase, uniformly sloped without humps or depressions. TESTING 1. Contractor shall provide testing of systems. a. Hydrostatic Test: Test water piping and valves, before backfilling trenches, to a hydrostatic pressure of not less than 100 psi. b. Operational Testing: Perform operational testing after hydrostatic testing is completed, backfill is in place, and sprinkler heads adjusted to final position. END OF SECTION 97044.02 02810-2 SECTION 02830 - CHAIN LINK FENCING AND GATES MATERIALS 1. Fabric: No. 9 ga. steel wire, 2 'in. mesh, with both top and bottom selvages twisted and barbed, one-piece fabric width, galvanized, ASTM A 392, Class II. . 2. End, Corner and Pull Posts: 2.875 in. OD steel pipe, 5.79 lbs. per lin. ft. 3. Line Posts: 2.375 in. OD steel pipe, 3.65 lbs. per lin. ft. 4. Tension Wire: 7 ga., locate at bottom and top of fabric. 5. Wire Ties: 11 ga. galvanized steel wire to match fabric core material. 6. Post Brace Assembly: 1.66 in. OD steel pipe, 2.27 lbs/ft. diagonal at end and at both sides of corner and pull posts. 7. Post Tops: Weathertight closure cap with loop to receive tension wire or,toprail. 8. Stretcher Bars: 3/16 in. x 3/4 in. x height of fabric; one for each end post; 2 for each corner and pull post. 9. Barbed Wire Supporting Arms: Single 45 deg. arm; for 3 strands barbed wire, one for each post. 10. Barbed Wire: 2 strand, 12-1/2 ga. galv. steel wire with 14 ga. 4 -point barbs spaced not more than 5 in. O.C. 11. Gate: padlockable swing gates where indicated with can bolt at each leaf. 12. Finishes: a. Wire Fabric: Vinyl Coated (P.V.C.) thermally fused and bonded 10 mil. coating. Meets ASTM E-1499 Class A and ASTM D1499. Lifetime warranty on finish. Color: black. b. Posts, supports, accessories: Polyester Powder Coating (3 mil.). Meets ASTM F-934 and ASTM F01234. 15 yr. warranty on finish. Color: black. INSTALLATION 1. Excavate holes for posts to diameters and 10 ft., spacings. 2. Place concrete around posts and vibrate; check each post for vertical and top alignment; extend concrete footings 2 in. above grade and trowel to a crown to shed water. 3. Install tension.wires through post cap loops before stretching fabric and tie to each post cap. Fasten fabric to tension wire 24 in. O.C. 4. Leave approximately 2 in. between finish grade and bottom selvage. Pull. fabric taut and tie to posts; rails, and tension wires. 5. Pull barbed wire taut and install securely to extension arms and terminal arms. END OF SECTION 97044.02 02830-1 02900 - LANDSCAPING MATERIALS 1. Topsoil: Fertile, friable, natural loam, surface soil, free of subsoil, organic matter, trash, and rock. 2. Soil Amendments: Lime, peat, bonemeal; sand, perlite and manure. 3. Mulch: Shredded bark, wood chips or pine needles. 4. Fertilizer: 5-10-5 for trees and shrubs; 50 percent organic nitrogen for lawns. 5. Deciduous Trees: Balled and burlapped of height and caliper scheduled. 6. Deciduous Shrubs: Balled and burlapped of type and height scheduled. 7. Coniferous and Broadleaf Evergreens: Balled and burlapped of type and shape indicated. 8. Sod: St. Augustine sod pads, not dormant, immediately around Recreation Center Building. Provide Bermuda Sod at Multi -Sport Field. Provide Bahia seed adjacent to Parking Lot and Entrance Drive. Repair/replace existing sod where disturbed by; construction. 9. Ground Cover: Established plants in removable containers on integral peat pots. - 10. Wood Headers and Edging: All heart redwood. 11. Steel Edging: 10 gage, with steel stakes. 12. Gravel: River rock, 1-1/2 in. to 3 in. size, tan -beige color. 13. Plastic Sheet: 8 mil black polyethylene. 14. Filtration Fabric: Water permeable fiberglass or polypropylene. PLANTING 1. 2. 3. 4. 5. Provide landscaping in accordance with the City of Ocoee Land Development Code; Article VI, Section 6-10 Landscaping. Grass Sod: Loosen subgrade soil to depth of 4 inches and add 4 inches topsoil! Lay sod to form solid mass; roll lightly; anchor on slopes with bamboo or wood pegs. Groundcover and Bedding Plants: Loosen subgrade 6 inches and add 8 inches of prepared planting soil; roll lightly before digging in plants. Trees and Shrubs: Excavate pits, beds, and trenches at least half again as wide as ball diameter and depth same as ball plus 3 inches. When set place backfill; water and mulch. Provide one year maintenance for landscaped areas. END OF SECTION 97044.02 02900-1 03300 - CONCRETE WORK FORM MATERIALS 1. Exposed Finish Concrete: - Plywood, metal, metal -framed plywood faced, or panel -type materials. 2. Form Coatings: Commercial formulation compound that will not bond with, stain, nor adversely affect concrete surfaces, and will not impair subsequent treatments of concrete surfaces. REINFORCING MATERIALS 1. Reinforcing Bars: ASTM A 615, Grade 60, deformed, sizes as required by design. 2. Steel Wire: ASTM A 82, plain., cold -drawn steel.. . 3. Welded Wire Fabric: ASTM A 185, welded steel. wire fabric. 4. Welded Deformed Steel Wire Fabric: ASTM A 497. 5. Supports for Reinforcement: Wire bar type complying with CRSI specifications. CONCRETE MATERIALS 1. Portland Cement: ASTM C. 150, Type I. 2. Fly Ash: ASTM C 618, Type C or Type F. 3. Normal Weight Aggregates: ASTM C 33. 4. , Lightweight Aggregates: ASTM C 330. 5. Water: Drinkable. 6. Air -entraining Admixture: ASTM C 260. . 7.. Water Reducing Admixture: ASTM C 494, Type A, and containing not more than 0.1 percent chloride ions. 8. High Range Water Reducing Admixture (super plasticizer): ASTM C 494, Type F or Type G and containing not more than 0.1 percent chloride ions. 9. Water Reducing Non -chloride Accelerator Admixture: ASTM C 494, Type E, and containing not more than 0.1 percent chloride ions. 10. Water Reducing Retarding Admixture: ASTM C 494, Type D, and containing not more than 0.1 percent chloride ions. 11. Prohibited Admixtures: Calcium chloride thyocyanates. RELATED MATERIALS 1. Reglets: 26, gage galvanized sheet steel. 2. Waterstops: Rubber material, flat, dumbbell or centerbulb type. 3. Vapor Retarder: Water resistant barrier paper of kraft papers laminated with glass fiber reinforcement and over coated .with black polyethylene each side. 4. Non -shrink Grout: CRD -C 621, factory premixed grout. 5. Bonding Compound: Polyvinyl acetate or acrylic base. 6. Epoxy Adhesive: ASTM C 881, 2 component material. 97044.02 03300-1 PROPORTIONING AND DESIGN OF MIXES 1. Prepare design mixes for each type and strength of concrete by either laboratory trial batch or field experience methods as specified in ACI 301. 2. Limit use of fly ash to not exceed 25 percent of cement content by weight. 3. Do not begin concrete production until mixes have been reviewed by Owner's Representative. 4. Design mixes to provide normal weight concrete with the following properties: a. 4000 psi 28 day compressive strength; w/c ratio, 0.44 Maximum (non -air -entrained), 0.35 Maximum (air -entrained). b. 3000 psi 28 -day compressive strength; w/c ratio, 0.58 Maximum (non -air -entrained), 0.46 Maximum (air -entrained). C. 2500 psi 28 -day compressive strength; w/c ratio, 0.67 Maximum (non -air -entrained), 0.54 Maximum (air -entrained). 5. Use admixtures only as approved in design mixes. CONCRETE MIXING 1. Job site mixing not allowed. 2. Transit Ready Mix Concrete: ASTM C 94 as herein specified. FORMWORK AND REINFORCING INSTALLATION 1. Design, erect, support, brace, and maintain formwork to support vertical and lateral, static, and dynamic loads that might be applied until such loads can be supported by concrete structure. 2. Place vapor retarder sheeting with longest dimension parallel with direction of pour, lap joints 6 in. and seal. 3. Accurately position, support, and secure reinforcement in conformance with CRSI's recommended practice for details and methods of placement and supports. 4. Place reinforcement to obtain at least minimum coverages for concrete protection. 5. Install welded wire fabric in as long lengths as practicable. 6. Set and build into work anchorage devices and other embedded items required for other work that is attached to, or supported by, cast -in-place concrete. 7. Coat contact surfaces of forms with a form -coating compound before reinforcement is placed. JOINTS 1. Locate and install construction joints between pours. 2. Place construction joints perpendicular to main reinforcement. Continue reinforcement across construction joints. 3. Construct contraction joints in slabs -on -ground as follows: a. Saw cut 1/8 in. x 1/4 slab depth. b. Inserts 1/4 in. wide x 1/4 of slab depth. Tool slab edges round on each side of insert. 97044.02 03300-2 CONCRETE PLACEMENT 1. Comply with ACI 304, recommended practice for measuring, mixing, transporting, and placing concrete, and as herein specified.. 2. Deposit concrete continuously or in layers of such thickness that no concrete will be placed on concrete which has hardened. 3.. Deposit concrete in forms in horizontal layers not. deeper than 24 in. And in a manner to avoid inclined construction joints. 4. Consolidate placed concrete by mechanical vibrating equipment supplemented by hand spading, rodding, or tamping. 5. Do not use vibrators to transport concrete inside forms. 6. Deposit and consolidate concrete slabs in a continuous operation, within limits of construction joints. 7. Maintain reinforcing in proper position during concrete placement operations. FINISH OF FORMED SURFACES 1. Rough Form Finish: Surfaces not exposed -to -view. Repair defective areas, patch and rub down fins and projections. 2. Smooth Form Finish: Surfaces exposed -to -view or covered with a coating. Repair and patch defective areas, with fins or other projections completely removed and smoothed. MONOLITHIC SLAB.FINISHES 1. Float Finish: Apply to surfaces to receive trowel finish and other surface finishes. a. Power float. b. Hand float if area is small or inaccessible to power units. C. Immediately after leveling, refloat surface to a uniform, smooth, granular texture. 2. Trowel Finish: Apply to surfaces to 'be exposed -to -view, and slab surfaces to be covered with resilient flooring, carpet systems, paint, or other thin film finish coating system. a. After floating, begin first trowel finish operation using a power driven trowel. Begin final troweling when surface produces a ringing sound as trowel is moved over surface. Consolidate concrete surface by final hand -troweling operation, free of trowel marks, uniform in texture and appearance, and with . surface leveled to tolerances - of FL30/FL20 (as per ASTM E 1155 test methods). Grind smooth surface defects which would telegraph through applied floor covering system. 3. Fine Broom Finish: Apply to surfaces to receive ceramic or quarry tile installed with thin -set mortar. Apply trowel finish, then immediately follow with slightly scarifying surface by fine brooming. 4. Light Broom Finish with Smooth Troweled Borders: Apply to exterior concrete platforms, steps, and ramps, walks and other pedestrian traffic areas. Apply float . finish, then immediately slightly roughen concrete surface by brooming with soft 97044.02 03300-3 fiber bristle broom perpendicular to main traffic route. Provide 3" wide smooth troweled border at both sides of each score line/control joint and construction joint. 5. Heavy Broom Finish: Apply to paving slabs, and toppings in vehicular traffic areas where indicated. Apply as specified for light broom finish except use a stiff fiber bristle broom to produce heavier texture. 6. Raked Finish: Apply to sloped curbs and paving in vehicular traffic areas where indicated. Apply as specified for broom finish except use a metal rake to produce Y in. deep grooved surface. CONCRETE CURING AND PROTECTION 1. Start initial curing as soon as free water has disappeared from concrete surface after placing and finishing. Keep continuously moist for not less than 7 days. 2. Continue final curing for at least 7 days�in accordance with ACI 301 procedures. 3. Perform curing of concrete by curing and sealing compound, by moist curing, by moisture -retaining cover curing, and by combinations thereof. - CONCRETE SURFACE REPAIRS I. Repair and patch defective areas with cement mortar immediately after removal of forms. 2. Cut out honeycomb, rock pockets, voids over 1/4 in. In any dimension, and holes left by tie rods and bolts, down to solid concrete. 3. Remove and replace concrete having defective surfaces if defects cannot be repaired to satisfaction of Owner's Representative. 4. Perform repairs with prior approval of Architect for method and procedure, using specified epoxy adhesive and mortar. QUALITY CONTROL TESTING DURING CONSTRUCTION 1. Sampling Fresh Concrete: ASTM C 172, except modified for slump to comply with ASTM C 94. 2. Slump: ASTM C 143; one test at point of discharge for each 50 cubic yards. 3. Air Content: ASTM C 231 pressure method; one for each day's pour. 4. Concrete Temperature: Test hourly when air temperature is 80 deg. F and above; and each time a set of compression test specimens made. 5. Compression Test Specimen: ASTM C 31; one set of 4 standard cylinders for each compressive strength test. 6. Compressive Strength Tests: ASTM C 39; one set for each day's pour exceeding 5 cu. yds. plus additional sets for each additional 50 cu. yds.; one specimen tested at 7 days, 2 specimens tested at 28 days, and one specimen retained in reserve. END OF SECTION 97044.02 03300-4 04200 - MASONRY MATERIALS 1. Concrete Block: a. Grade N, Type I, ASTM C-90. b. Nominal Face Dimensions: 16 in. long x 8 in. high x thicknesses indicated. C. Split Face Units: Manufacturer's standard non -colored CMU. Split face/2 rib 7-5/8" thick units for wainscot; split face (no rib) 8-5/8" thick units with chamfered top edge for decorative band. d. Hollow Leadbearing Block: ASTM C 90, normal weight aggregate. 2. Special Shapes: Lintels, corners, jambs, sash, control joints, headers, boding and other special conditions. 3. Bond Breaker Strips: No. 15 asphalt -saturated organic roofign felt complying with ASTM D 226, Type I. 4. Joint Reinforcement: Standard weight galvanized wire truss with prefabricated corner and tee units. 5. Cell Insulation: Preformed extruded polystyrene closed -cell foam inserts or loose granular insulation. 6. Mortar: ASTM C 270, proportion mix, Type N. 7. Grout: ASTM C 476, fine. INSTALLATION 1. Provide temporary bracing of masonry until structure is complete and cured. 2. Install continuous horizontal reinforcing at 16 in. O.C. vertically, lap ends 6 in., use prefab corner and tees. 3. Lay units in common running bond with joints struck flush concave joints. 4. Allowable Tolerances: Maximum variation from plumb, surface flatness, level of joint lines, and plan location shall not exceed 1/4 in. in 10 ft. END OF SECTION 97044.02 04200-1 05500 = PRE -FABRICATED PRODUCTS 1. Area Drains: Medium duty cast iron grating and frames. FINISHES 1. Standard shop paint on fabricated ferrous metal items, except those indicated to be galvanized. 2. Galvanized Finish: Zinc coating, ASTM A 123. 3. Aluminum Finish: Mill finish. INSTALLATION 1.. Install items in accordance with approved shop drawings and manufacturer's instructions. 2. Install plumb and level, anchored rigid and secure, and in true alignment with related and adjoining work. 3. Field weld members in accordance with AWS D1.1. Grind sight exposed welds smooth. 4. Provide anchoring devices and fasteners required for properly installing -items. END OF SECTION 97044.02 05500-2 MATERIALS SECTION 05720 -ALUMINUM GATES 1. Aluminum gates at masonry/stucco enclosure walls at mechanical yard and dumpster. 2. Source Products/Manufacturers: a. Aluminum Tube Railings; Inc. b. Architect approved equivalent. 3. General: Provide metal.free from surface blemishes where exposed to view in the finished unit. Exposed -to -view surfaces exhibiting pitting, seam marks, roller marks, stains, discolorations, or other imperfections on finished units -are not acceptable. 4. Aluminum: Alloy and temper recommended by aluminum producer and finisher for type of use and finish indicated, and with not less than the strength and durability properties of the alloy and temper designated below for each aluminum form required: a., Extruded Bar and shape: ASTM B 221, 6063-T6 b. Extruded Pipe and Tube: ASTM B 429, 6063-T6 c. Drawn Seamless Tube: ASTM B. 483, 6063-T832 d. Plate and Sheet: ASTM B 209, 6061-T6 e. Die and Hand Forgings: ASTM B 247, 6061-T6 f. Castings: ASTM B 26, 356-T6 5. Fasteners for Anchoring Gates to Other Construction: Select fasteners of the type, .grade and class required to produce connections that are suitable for anchoring railing to other types of construction indicated. a. For aluminum gates, provide fasteners fabricated from type 304 or type 316 stainless steel. 6. Fasteners for Interconnecting Railing, Components: Use fasteners of same basic metal as the fastened metal, unless otherwise indicated. Do not use metals that are. corrosive or incompatible with materials joined. a. Provide concealed - fasteners for interconnecting gate components and for attaching them to other work, except where otherwise indicated. b. Provide concealed fasteners for interconnecting gate components and for attaching them to other work, except where exposed fasteners are unavoidable or are the standard fastening method for the gate system indicated. c. Provide Phillips flathead machine screws for exposed fasteners, unless otherwise indicated. 7. Cast -in -Place and Post -installed Anchors: Anchors of type indicated below fabricated from corrosion -resistant materials with capability to sustain, without failure, a load equal to 6 times the load imposed when installed in unit masonry and equal to 4 times the load imposed when 97044.02 05720-1 installed in concrete, as determined by testing per ASTM E 488 conducted by a qualified independent testing agency. a. Cast -in-place anchors. b. Chemical anchors. c. Expansion anchors. d. Undercut anchors. 8. Finish: Comply with NAAMM "Metal Finishes Manual" for recommendations relative to applying and designating finishes. a. Class I, Color Anodic Finish: AA-M12C222/A44 Mechanical Finish: Nonspecular as fabricated Chemical Finish: Etched, medium matte Anodic Coating: Architectural Class I, integrally colored or electrolytically deposited color. coating 1 mil. (minimum) complying with AAM 606.1 or AAMA 608.1. 9. Color to be selected by Owner from manufacturer's standard colors. END OF SECTION 97044.02 05720-2 09200 - LATH AND PLASTER PRODUCTS Source Products/Manufacturers or Architect approved equivalent: a. Metal Support Systems: Dale Industries. b. Accessories: Fry Reglet Corp. C. Lath and Plasters: United States Gypsum Co. 2. Furring and Lathing Materials: Channels: Cold rolled steel, 0.0598 in. min. thickness of base metal (uncoated), allowable bending stress of 18,000 psi, protected with galvanizing complying with ASTM A 525 for G60 coating designation. Carrying Channels: 1-1/2 in. deep x 7/16 in. wide flanges, 508 lbs. per 1000 ft. galvanized. Furring Channels: 3/4 in. deep x 7/16 in. wide flanges, 316 lbs. per 1000 ft. galvanized. b. Hanger Anchorage Devices: Screws, cast -in-place concrete inserts or other devices appropriate for anchorage to the form of structural framing indicated. C. Vertical Metal Furring: (1.) Channel Furring and Braces: Cold rolled steel, 0.0598 in. min. thickness of base (uncoated) metal, allowable bending stress of 18,000 psi, protected with galvanizing, 3/4 in. deep x 7/16 in. wide flanges, 316 lbs. per 1000 ft. (2.) Z -Furring Members: Manufacturer's standard screw type zee shaped furring members formed from zinc coated (galvanized) steel sheet, 0.0179 in. min. base (uncoated) metal thickness; complying with ASTM A 525, Coating Designation G 60. (3.) Furring Brackets: Serrated arm type, 0.0329 in. min. thickness of base (uncoated) metal, adjustable from 1/4 in. to 2-1/4 in. wall clearance for channel furring. d. Expanded Metal Lath: Fabricate expanded metal lath from zinc coated (galvanized) steel sheet to produce lath complying with ASTM C 847. (1.) Diamond Mesh Lath: Self furring, 3.4 lbs. per sq. yd. with asphalt - impregnated paper factory -bonded to back and complying with FS UU-13-790, for Type I, Grade B, Style 2. e. Gypsum Sheathing: ASTM C 79, 5/8" in. (water repellant paper). f. Lath Attachment Devices: (1.) Tie Wire: Galvanized soft annealed steel tie wire. a. 16 gage for framing members. b. 18 gage for metal lath and accessories. (2.) Hanger Wire: 8 gage galvanized annealed steel wire. Building Paper: Asphalt impregnated paper complying with FS UU-B-790, for 97044.02 09200-1 Type I, Grade B, Style 62. h. Portland Cement Plaster Accessories: (1.) Metal Corn er.Reinforcement: Expanded large mesh diamond mesh lath, zinc coated steel. (2.) Metal Corner Beads: Small nose corner beads fabricated from zinc alloy, with expanded flanges of large mesh diamond lath. (3.) Casing Beads: Square edged style, zinc coated steel, with ex- panded flanges and removable protective tape. (4.) Control Joints: Prefabricated, zinc coated steel, one piece type of non -perforated screeds in M shaped configuration, with expanded flanges. (5)Expansion Joints: Prefabricated, zinc coated steel, consisting of a pair of casing beads with back flanges formed to provide slip joint action, adjustable for joint widths from 1/8 in. to 5/8 in. 3. Portland Cement Plaster Materials a. Base Coat Cement: Portland cement, ASTM C 150, .Type I or 111. b. Finish Coat Cement: Portland cement, ASTM C 150, Type I, white. C. Lime: Special hydrated lime for finishing purposes, ASTM C 206, Type S. d. Sand Aggregate for Base Coats: ASTM C 897. e. Aggregate for Finish Coats: ASTM C 897 manufactured or natural sand, white in color. 4. Miscellaneous Materials a. Water: Clean, fresh, potable. b. Bonding Compound for Gypsum Plaster: ASTM C 631. C. Bonding Agent for Portland Cement Plaster: ASTM C 932. d. Acoustical Sealant: ASTM C 919, non -oxidizing, skinning paintable types for exposed applications; non-drying, non -hardening; non -skinning type for concealed applications. e. Sound Attenuation Blankets: FS HH -1-521, Type I; semi-rigid mineral fiber blanket without membrane, Class 25 flame spread, thicknesses as indicated. f: Thermal Insulation: FS HH -17521, Type I except for identification marking paragraph 3.7.1; semi-rigid mineral fiber blanket without membrane; Class 25 flame spread; U value of 4.17; designed for use with Z furring members; of thickness and widths to fill completely void formed by Z furring members. 5. Portland Cement Plaster Mixes a. Comply with ASTM C 926 for1portland cement plaster base and finish coat mixes as applicable to plaster bases, materials and other requirements indicated. b. Portland Cement Plaster Base Coat Compositions: (1.) Three Coat Work: a. Scratch Coat: One part portland cement, 1-2 parts masonry 97044.02 092002 cement, 2-1/2-4 parts sand. b. Brown Coat: One part portland cement, 1-2 parts masonry cement, 3 to 5 parts sand. (2.) Two Coat Work: Base Coat: One part portland cement, 3/4-1-1/2 parts lime, 3 to 4 parts sand. c. Job Mixed Portland Cement Plaster Finish Coat: One part portland cement, 3/4 to 1-1/2 parts lime, 3 parts sand. EXECUTION Install lathing and furring materials indicated for gypsum plaster to comply with ASTM C 841. Install lathing and furring materials indicated for portland cement plaster to comply with ANSI A42.3. Install supplementary framing, blocking, and bracing at terminations in the work and for support of fixtures, equipment services, heavy trim, grab bars, wall accessories, furnishings, and similar work. Where lathing and metal support system abuts building structure horizontally, and where partition/wall work abuts overhead structure, isolate the work from struc- tural movement sufficiently to prevent transfer of loading into the work from the building structure. Install slip. or cushion type joints to absorb deflections but maintain lateral support. Apply metal lath with long dimension perpendicular to supports. Attach self -furring metal lath over concrete and masonry with power driven fasteners and masonry nails, spaced at 12 in. o.c. Lap metal lath panels 1/2 in. at sides and one in. at ends minimum. Stagger end laps Wire tie metal lath to furring channels and to adjacent lath panels at 6 in. o.c. Screw attach to metal studs with self -tapping screws at 6 in. o.c. Miter or cope accessories at corners; install with tight joints and in alignment. Attach accessories securely to plaster bases to hold accessories in place and alignment during plastering. 9. Corner Reinforcement: Install at external corners. 10. Corner Bead: Install at external corners. 11. Casing Beads: Install at terminations of plaster work unless otherwise indicated. Control Joints; Install control joints at locations indicated, or if not indicated, at 97044.02 09200-3 locations complying with the following criteria and approved by Architect/ - Engineer. Where an expansion or control joint occurs in surface of construction directly behind plaster membrane. Where distance between control joints exceed 10 ft. in either direction. C. Where area within panels exceed 100 sq. ft. Where panel sizes or dimensions change. Extend joints full width or height of plaster membrane. 13. Plaster Application Prepare monolithic surfaces for bonded base coats and use bonding compound or agent to comply with requirements -of referenced plaster application standards for conditioning of monolithic surfaces. Tolerances: Maximum deviation of 1/8 in. in 10 ft. from a true plane in finished plaster surfaces, as measured by a 10 ft. straightedge placed at any loca- tion on surface. Grout hollow metal frames, bases and similar work occurring in gypsum plastered areas, with base coat plaster material, and prior to lathing where necessary. Except where full grouting is indicated or required for fire resistance rating, grout 6 in. lengths at each anchorage. Plaster flush with metal frames and other built-in metal items or accessories which act as a plaster ground, unless otherwise indicated. Where plaster is not terminated at metal by casing beads, cut base coat free from metal before plaster sets and groove finish coat at the junctures with metal. Apply portland cement plaster materials, compositions, and mixes to comply with ASTM C 926. Apply portland cement plaster in 3 coat work to a total thickness of 3/4 in. Finish Coat: Fine grain sand floated & textured machine applied finishes (see drawings for designations); match Architect's/Engineer's sample for texture and color. f. Moist cure portland cement plaster base and finish coats to comply with ASTM C 926, including recommendations for time between coats and curing in Annex A2 Design Considerations. END OF SECTION 97044.02 09200-4 10440 - SPECIALTY SIGNS PRODUCTS 1. Outdoor Changeable Letter Message Boards in Cabinets: Fabricate signs to comply with requirement indicated including, dimensions, design, and details, and quality, thickness and finish of materials. Use metals and shapes of sufficient thickness, with reinforcing, if needed, to produce sufficient flatness, free of "oil canning", and to impart sufficient strength for size, design and application indicated. a. Perimeter Frame and Cover Design: Provide perimeter frame of dark bronze anodized radiused extruded aluminum. Provide additional trim and blocking required to mount unit on curved wall. Provide padlockable top hinged swinging glazed cover of radiused anodized aluminum/ glazing hung on continuous vandal resistant hinges. b. Provide the manufacturer's standard semi -recessed mounted assembly, fabricated to sizes indicated, consisting of the sign board housing with perimeter frame, sides and back, operable transparent covers with vandal resistant hardware, and other features as indicated. (1.) Colors: White background, black changeable letters. (2.) Graphic Content and Style: Provide the manufacturers standard assortment of letters to suit the capacity of message boards. (3.) Letters: Provide molded plastic letters with tabs for engaging grooves, of size indicated. Type style: Helvetica Regular. 2. Cast Aluminum Wall Mounted Letters: Form letters and numbers by casting. Produce characters with smooth, flat faces, sharp corners, precisely -formed lines and profiles, free from pits, scale, sand holes or other defects. Cast lugs into threaded mounting studs. a. Letter style: Helvetica Regular b. Material: Anodized Aluminum. C. Color: Dark Bronze Duranodic Finish. d. Mounting: surface mounted, projected 3. Finishes a. Colors.and Surface Textures: For exposed sign material that required selection of materials with integral or applied colors, surface textures or other characteristics related to appearance, provide color matches indicated, or if not indicated, as selected by the Owner from the manufacturer's standards. b. Metal Finishes: Comply with NAAMM "Metal Finishes Manual" for finish designations and applications recommendations. C. Anodized Aluminum Finishes: Class I Color Anodized Finish: Provide AA- M12C22-A42 (non -specular as fabricated mechanical finish with chemical etch in a medium matte 0.7 mil. minimum thick integrally colored anodic coating. Bronze Anodized Aluminum. 97044.02 10440-1 EXECUTION a. General: Locate sign units and accessories where shown, using mounting methods of the type described and in compliance with the manufacturers instructions. b. Install .sign units level, plumb and at the height indicated, with sign surfaces free from distortion or other defects in appearance. PRODUCTS Source Products/Manufacturers a. Message Board: Poblocki & Sons, Milwaukee, WI, Model E — Single Faced. b. Cast Letter: A.R.K. Ramos, The Southwell Co., Nelson -Harkins 2. Materials a. Glass: W clear polycarbonate. b. Aluminum Extrusion: Provide aluminum extrusions of alloyed and temper recommended by the aluminum producer or finisher for the type of use and finish indicated, and with not less than the strength and durability properties specified in ASTM B221 for 6063-T5. C. Aluminum Castings: Provide aluminum casting of alloy and temper recommended by the aluminum producer and finisher for the casting process used and for the use and finish indicated. d. Anchors and Inserts: Use non-ferrous metal or hot -dipped galvanized anchors and inserts for exterior installations and elsewhere as required for corrosion resistance. Use toothed steel or lead expansion bolt devices for drilled -in-place anchors. Furnish inserts, as required, to be set into concrete or masonry word. e. Fasteners: Provide screws, bolts, and other exposed fastening devices of the same material as the items being fastened. Fasteners: stainless steel. Provide types gages and lengths to suit installation conditions. Use theft - proof fasteners. f. Changeable Message Board: (1.) Hinges: Provide vandal resistant stainless steel continuous hinges. (2.) Lock: Furnish each cover with the manufacturer's standard lock; key all locks alike. Furnish 2 keys per lock. END OF SECTION 97044.02 10440-2 SECTION 16000 - ELECTRICAL SYSTEMS CODES, REGULATIONS & STANDARDS 1. All electrical systems and installation shall conform to the latest edition of the following codes, standards and regulations: a. National Electrical Code (NEC) b. National Electrical Safety Code (ANSI C-2) P. American National Standards Institute (ANSI) d. National Electrical Manufacturer's Association (NEMA) e.. Life Safety Code (NFPA 101) f. National Fire Protection Association Fire Codes (NFPA)., g. National Board of Fire Underwriters (NBFU)' h:. Underwriters Laboratories i. Institute of Electrical & Electronics Engineers j.. American Society for Testing and Materials (ASTM) RACEWAYS & FITTINGS 1. Rigid Metal Conduit -Galvanized Steel (RMC=GS): - Hot dipped galvanized, ANSI Standard C80.1, Federal Specification WW -C-581, and Underwriters' Laboratories Standard UL6: .2. Electrical Metallic Tubing (EMT): ANSI Standard C80.3, Federal Specification WW - C -563, W C-563, and Underwriters Laboratories Standard UL 797: 3. Rigid Nonmetallic, Conduit (RNC -PVC): Polyvinylchloride, Schedule 40, NEMA Standard TC-2,and UL Standard 651., 4. Rigid Nonmetallic Conduit (RNC -PVC -1): Polyvinylchloride designed only for concrete encasement below grade outdoors; UL Standard 651A and Federal Specifications. WC -1094A, Type I. 5. Rigid Nonmetallic, Power .and Communications Utility Duct :Conduit (RNC-P&C- PVC): Type EB (for concrete encasement) and DB (for direct burial); NEMA Standards TC -6 or TC -8 and ASTM F512. Intermediate and base spacers located no more than 8 ft. intervals to maintain a minimum horizontal and vertical'separation of minimum 2 in. unless otherwise indicated. 6. Flexible Metal Conduit (FMC): Federal Specification WW -C-566 and Underwriters' Laboratories Standard UL -1: 7. Flexible Metal Conduit Liquid Tight (FMC -LT): Steel, galvanized inside and outside, with continuous copper ground.and moisture and.oil proof extruded PVC jacket. 8. Flexible Nonmetallic Conduit Liquid Tight (FNC-LT): Polyvinylchloride with a rigid PVC spiral completely surrounded by flexible PVC: Conduit and fittings shall be UL listed. 9.Wireways: National Electrical Code Article 362 and Underwriters Laboratories, -Inc. 10. Surface Metal . Raceway:" National Electrical Code Article 352 Part A and Underwriters Laboratories, Inc. 97044.02 16000-1 11. Auxiliary Gutters: National Electrical Code Article 374 and Underwriters Laboratories, Inc. 12. Raceway Fittings: Designed for use with the type of raceways on which they are installed, and for the types of environments in which the raceways are located. 13. Conduit fittings for installation in hazardous locations: Suitable for use in the Class, Division, and Group indicated. SUPPORTING DEVICES 1. Channel and angle support systems, hangers, anchors, ! sleeves, brackets, fabricated items, and fasteners are designed to provide secure support from the building structure for electrical components. a. Material: Steel, protected from corrosion with zinc coating or with treatment of equivalent corrosion resistance using approved alternative finish or inherent material characteristics. b Metal Items for Use Outdoors or in Damp Locations: Hot -dip galvanized steel. 2. Steel channel supports have 9/1.6 -inch (14 -mm) diameter holes at a maximum of 8 inches (203 mm) o.c., in at least 1 surface. . a. Fittings and accessories mate and match with channels and are from the same manufacturer. 3. Nonmetallic Channel and Angle Systems: Structural -grade, factory -formed, fiberglass -resin channels and angles with 9/16 -inch (14 -mm) diameter holes at a maximum of 8 inches (203 mm) o.c., in at least 1 surface. a. Fittings and accessories mate and match with channels or angles and are from the same manufacturer. b. Fitting and Accessory Material: Same as channels and angles; except metal items may be stainless steel. 4. Raceway and Cable Supports: Manufactured clevis hangers, riser clamps, straps, threaded C -clamps with retainers, ceiling trapeze hangers, wall brackets; and spring steel clamps or "click"- type hangers. 5. Pipe Sleeves: ASTM A 53, Type E, Grade A, Schedule 40, galvanized steel, plain ends. 6. Cable Supports for Vertical Conduit: Factory -fabricated assembly consisting of threaded body and insulating wedging plug for non -armored electrical cables in riser conduits. Plugs have number and size of conductor gripping holes as required to suit individual risers. Body constructed of malleable iron casting with hot -dip galvanized finish. 7. Expansion Anchors: Carbon -steel wedge or sleeve type. 8. Toggle Bolts: All -steel springhead type. 9. Powder -Driven Threaded Studs: Heat-treated steel. POWER, LIGHTING, GROUNDING, and CONTROL CONDUCTORS 97044.02 16000-2 1. All conductors shall be copper, except fiber optic'cable (if used). Except where used for grounding, conductors #8 AWG and larger shall be stranded. Solid conductor for No: 10 AWG and smaller. 2. Power, lighting & grounding conductors shall not be smaller than #12 AWG, except that lighting fixture tap conductors per NEC 24073 Exception 2 and. NEC 210-19 (C) may be #14, AWG: . 3. Control conductors shall not be smaller than #14 AWG. 4. 600V insulated conductors for general use in.raceways: Type THHN or THWN. Lighting fixture tap conductors shall be type THHN or other insulation rated not less than 90'C... 5. 600V insulated conductors for general use underground feeders: type UF, copper conductor, 90`C insulation, in raceway. 6.. Class 2 and Class -3 Control Circuits: Type THHN/THWN, in raceway. 7. Connectors and Splices: Units- of size, ampacity rating, material,. type', and class suitable for service of intended use, CONCRETE EQUIPMENT BASES 1. Concrete:. 3000 -psi (20:7-MPa), 28 -day compressive strength. GROUND RODS 1. Ground. Rods shall be copper clad steel, 5/8" x 10'., single ground rods maybe either plain or sectional type. -Multiple ground rods may be sectional with exothermic welded couplings driven in tandem:. . METER SOCKETS 1.. Meter sockets comply with serving utility company requirements. PAINTING „1.. For Equipment:.. Provided by equipment manufacturer and selected to match equipment finish. 2. For, Non -equipment Surfaces: Matching type and color of undamaged, existing adjacent finish. 3. For'Galvanized Surfaces:. Zinc -rich paint recommended by item. manufacturer. SWITCHBOARDS 1. Dead front type, completely metal enclosed, self-supporting, consisting of panels or cubicles, containing circuit breakers and fusible switch assemblies. When used as service equipment, switchboard shall comply with Article 230 of the NEC.. All switchboard components shall be front accessible. 97044.02 16000-3 2. Switchboard Main Bus: Copper or plated aluminum of sufficient size to comply with UL standards, for temperature rise. Voltage, phase, ampacity, and bracing of switchboard bus and size of neutral. bus as indicated. Provide a ground bus and lugs mechanically and electrically connected to each structure of the switchboard. Tightly bolt main bus and tap connections for maximum conductivity. Provide suitable means for terminating the service entrance conductor. 3. Circuit Breakers: Molded case, stationary mounted, draw out type of capacities, interrupting rating and number.of poles required. 4. Current Limiting Circuit Breakers: Combination time delay, thermal trip, and fault current limiting protection in one complete assembly with ampere and interrupting ratings as required. Provide means to trip breaker if a fuse blows so as to prevent against single phasing. 5. Switchboards shall be factory assembled, wired and tested before delivery. Design shipping sections for bolting together at installation site, bonderized and painted, interior and exterior, in standard finish as provided by manufacturer. DISTRIBUTION PANELBOARDS 1. Panelboard assembly enclosed in a code gauge steel cabinet with flush or surface trim as indicated by owner, with ample wiring gutters on top, sides and bottom. Include hinged doors covering switching device handles in panel trims, except that panelboards having individual metal clad externally operable deadfront units may, be supplied without such doors. 2. Door Hardware: Semi -flush type cylinder lock and catch, except that doors over 48 in. in height shall have a vault handle and 3 point catch, complete with lock, arranged to fasten door at top, bottom and center. Locks shall be keyed alike with other panelboards. 3'. Circuit Directory: Locate on inside of door under clear plastic protector. 4. Panel bus structure shall be for voltage, phase, capacity and number and size of branch circuits required to serve the project plus 20% spare. Bus bars shall be copper or plated aluminum. Unless otherwise noted, a full size copper or plated aluminum neutral bar shall be included. Panelboard shall contain a copper or plated aluminum equipment ground bus. 5. Panelboards shall be of the dead front type equipped with branch circuit breakers, of sizes and interrupting rating indicated. Provide breakers with instantaneous trip on short circuit and time delay on overloads, and be mechanically trip free from the handle. 2 and Tie handles are not acceptable. BRANCH -CIRCUIT PANELBOARDS 1. Panelboard assembly cabinets of code gauge steel with ample wiring gutters for wires and connections, minimum of 4 in. on each side; minimum 20 in. wide. Include hinged doors covering switching device handles in panel trims. 2. Door Hardware: Semi -flush type cylinder lock and catch. Locks shall be keyed alike with other panelboards. 97044.02 16000-4 3. Circuit Directory: Locate on inside of door under clear plastic protector. 4. Branch Circuits: Quick make, quick break, thermal magnetic circuit breakers of the number of poles, type, size and interrupting rating indicated. Ground fault interrupting breakers shall be provided as required by NEC. Provide main circuit breaker on panels if fused disconnect is not used. 5, Design panelboards for voltage, phases and capacity required. Bus bars shall be copper or plated aluminum. Provide a neutral bar and aground bar in each panel. ENCLOSED CIRCUIT BREAKERS AND MOLDED CASE SWITCHES 1. Molded case type of overcurrent trip rating, number of poles, voltage, and interrupting capacity as required. Minimum interrupting capacity of 10,000 AIC on 208 or 240 volt systems and 14;000 AIC on'480 volt systems. 2. When circuit breakers are used for service entrance equipment, provide with neutral bar. Provide with equipment ground bar. 3: Circuit breakers used for overcurrent protection of refrigeration or air conditioning equipment shall be HACR rated. 4. Metal Nameplate: Locate on front cover indicating type and catalog number. Provide padlock cover or handle capable of being locked in the "OFF" position. 5. Enclosed molded case switches shall comply with the above except they shall not have overcurrent trip capability. . SAFETY SWITCHES 1. . Heavy duty, fusible or non -fusible as required, quick make, quick break; horsepower rated. Switches shall be of number of poles, amps, and volts required., 2. Switch nameplate shall -indicate switch type, catalog number, and horsepower ratings. Switch handles shall be capable of being locked in the "OFF" position. MANUAL MOTOR STARTERS 1. Types as required. Where starters control motors without internal overload protection, the starters shall contain overload protection of melting alloy or bimetallic type in each ungrounded conductor serving the motor. 2. Switches: Surface or flush mounted as required, NEMA 1 general purpose enclosure unless otherwise indicated by owner. 3. Provide switches with pilot light where indicated by owner. LIGHTING CONTACTORS 1. Designed to control all types of lighting loads, either electrically held or mechanically held, with number of poles; voltage and current -rating as required. 2. Enclosures: NEMA 1 in dry locations and NEMA 3R in damp or wet locations. 3. Electrically Held Types: Single coil type -with coil designed for continuous operation at the control voltage indicated. 97044.02.. 16000-5 4. Mechanically Held Types: 2 coil type with coil -clearing contacts and with coils designed for operation at the control voltage indicated. TIME SWITCHES 1. Provide single pole single . throw for single circuit 120 volt or 277 volt direct connected loads, and double pole single throw for multiple circuit or 208 volt, 240 volt or 480 volt direct connected loads. 2. Where loads are direct connected through the switch contacts, the current rating of the contacts shall not be less than the rating of the branch circuit breaker. 3. Enclosures: NEMA 1 in dry locations and NEMA 3R in damp or wet locations. 4. Operation: Mechanical, 24 hour cycle, with seven day provision for deleting any or all days of a weekly period and with: electrically wound spring operated carryover capable of continuing operation of the timer mechanism for a minimum period of 10 hours during a power outage.. PHOTOELECTRIC CONTROLS & RECEPTACLES Controls: EEI-NEMA standard locking type and with voltage rating required. Controls shall have a turn on light level of approximately one footcandle and a time delay to prevent transfer of contacts duringmomentary light flashes such as sweeping vehicle headlights or lightning. 2. Receptacles: EEI-NEMA standard locking type with 1/2 in. male conduit thread or wall bracket suitable for the type of mounting required. The receptacles shall be capable of being turned horizontally and locked in position to facilitate aiming of the control. DRY TYPE TRANSFORMERS 1. 600V class, 60 hertz, 2 winding, single or 3-phase, of kVA and primary and secondary voltages, required to serve the project, with standard full voltage capacity taps above and below normal 2. Sound levels shall be in accordance with the applicable NEMA -ANSI standards according to KVA rating. OUTLET AND DEVICE BOXES 1. Lighting outlet boxes on exterior conduit systems: Cast aluminum or galvanized malleable iron, with threaded hubs, designed to fit the fixtures to be installed. Provide gaskets and stainless steel fasteners for fixtures installed on boxes in damp and wet locations. 2. Device boxes on exterior conduit systems: Type FS or FD with external threaded hubs, cast aluminum or galvanized malleable iron, suitable for the wiring devices to be installed. 97044.02 16000-6 3. Weatherproof Covers: Provide for boxes in damp and wet locations, installed with gaskets and stainless steel fasteners. 4. In wet locations, conduits entering sheet metal equipment enclosures shall terminate with gasketed hubs. 5. Surface metal raceway device boxes: National Electrical Code Article 352 Part A and Underwriters Laboratories, Inc. requirements. 6. Provide standard deep type concrete rings with, appropriate covers for floor slab construction. 7. Conduit Bodies: Cast aluminum or galvanized malleable iron of the type, shape and size to suit each location, constructed with threaded conduit ends, removable cover, gaskets and corrosion resistant screws. 8. Provide corrosion resistant, punched steel box knockout closures, conduit locknuts and malleable iron conduit bushings of type and size to fit respective use and installation. Where grounding connections are required, bushings shall have terminals for bonding jumper. JUNCTION AND PULL BOXES 1. Aluminum, galvanized steel, or galvanized malleable iron boxes of the size required by Article 370 of NEC for the number, size, and position of conduits and conductors entering the box. Provide full access screw covers, for surface or flush installation, mounted with corrosion resistant machine screws. 2. Where intermediate cable supports are necessary because of box dimensions, provide reinforced flange and removable #12 gauge galvanized channels for supports of conductors. 3. PVC or reinforced glass fiber composition of the size required by NEC -370 for the number, size, and position of conduits and conductors entering the box. Provide full access screw covers, for surface or flush installation, mounted with corrosion resistant machine screws. Provide grounding lug. 4. Concrete construction, sized per NEC -370, with traffic rated covers of cast iron with legend where as required by owner. Provide grounding lug. GROUND RODS 1. Characteristics: Copper clad steel, 5/8 in. x 10 ft. 2. Single ground rods: Either plain or sectional type. 3. Multiple ground rods: Sectional type with exothermic welded couplings driven in tandem. WIRING DEVICES AND COVER PLATES 1. Straight blade and locking receptacles: NEMA Standard WD -1; where applicable for weatherproof rating; NEMA WD -5, ivory color where ivory is manufactured. Recep- tacles shall be NEMA standard blade configurations. 97044.02 16000-7 2. Special purpose receptacles shall be as required. A mating plug shall be'furnished to the Owner for each special purpose receptacle required. 3. Toggle switches: NEMA Standard WD -1, ivory handles, where ivory is manufactured, rated for 120/277V ac, with grounding screw, and shall have the same current rating as the branch circuit to which they are connected and be the configurations required. 4. Flush Cover Plates: Appropriate type and size for the boxes and devices installed, ASTM 302/18-8 nonmagnetic stainless steel. Plates for use with devices in exposed masonry construction shall be sized to cover the masonry opening. 5. Surface Mounted Device Box Covers: Covers for Type FS/FD boxes shall be the four corner screw type. Covers in damp and wet locations shall be polycarbonate or cast metal, with gaskets and stainless steel hardware. - 6. Safety Receptacles: Straight blade, duplex receptacles, ivory color, designed to prevent accidental shock from the insertion of a foreign object into the power slots (NEMA 5-15R). 7. Isolated Ground Receptacles with Surge Suppression: Straight blade receptacles with isolated ground and surge suppressor, UL listed Standards 1449 and 498, blue color, NEMA 5-1 5R'config u ration unless otherwise indicated by owner. 8. Characteristics - Locking Weatherproof Covers: a. Flush Mounting: Key lock, weatherproof cover plate with flush enclosure consisting of adapter, frame, and cover for GFI receptacles. Provide 2 keys for each unit installed. . b. Box Mounting: Key lock, weatherproof vertical opening cover designed for device, 302 stainless steel base plates, covers, hinge pins, springs, and screws. Provide 2 keys for each unit. FUSES 1. All fuses rated 600 volts or less and used for service entrances, and main, feeder, or general branch -circuit protection shall be Underwriters Laboratories listed, current -limiting fuses with 200,000 ampere interrupting rating and shall be so labeled. Fuses used for supplementary protection (other than branch -circuit protection) shall be as specified above or shall be U.L. approved or component recognized for such purposes. Select fuse classes and sizes to provide a fully coordinated selective protection system. All fuses provided shall be furnished by the same manufacturer. 2. Current -Limiting Fuses 601-6000 Amperes: Fuses rated over 600 amperes shall be current -limiting, U.L. Class L fuses, and shall have a..minimum time delay of 10 seconds at 500% rating. 3. Current -Limiting Fuses 600 Amperes or Less: Fuses rated 600 amperes and below shall be true dual -element, current -limiting, U.L. Class RK -1 or Class RK -5 fuses, and shall have .a. minimum time delay of 10 seconds at 500% rating with non - fatiguing, thermally reversible, spring-loaded overload elements in all ampere ratings. 97044.02 16000-8 4. Fuses rated 600 amperes and below may also be dual -element, current -limiting, U.L. Class J fuses, which shall have a minimum time delay of 10 seconds at 500% rating -while providing IEC -"Type 2 protection. . SECONDARY VOLTAGE PROTECTION 1: Voltage Surge Capacitors: Rated 650V ac phase to ground; 3 pole, minimum 14 AWG black wire .leads and one white ground lead; Non -PCB; indoor and outdoor mounting. 2. Lightning Arresters: Rated 650V ac phase to ground; one, 2, or 3 pole, minimum 14 AWG black wire leads and one white ground lead; non -PCB; indoor and. outdoor mounting in knockouts or on brackets. Source Products/Manufacturers: EXTERIOR LIGHTING 1. Electrical Code Compliance: Comply with applicable local. code requirements of the authority having jurisdiction and NEC Articles 225, 250, 410, and 501 as applicable to installation, and construction of exterior building lighting fixtures. 2 NEMA Compliance: Comply with applicable requirements of NEMA Stds Pub/No. LE 2 pertaining to lighting equipment. 3. IES Compliance: Comply with IES RP -8, 19, 20 and PBA 5 pertaining to exterior, parking, and roadway lighting practices and fixtures. . 4. UL Compliance: Comply with requirements of UL standards, including Stds 486A and B, pertaining to exterior lighting fixtures. Provide exterior lighting fixtures and components which are UL -listed and labeled. 5. NFPA Compliance: Comply with applicable requirements of NFPA 780, "Lightning Protection Code," pertaining to installation of exterior lighting fixtures. 6. General: Provide lighting fixtures, of sizes, types and ratings approved by owner; complete with, but not limited to, housings, energy, efficient ballasts, starters and wiring: 7. Wiring: Provide electrical wiring within fixtures which are suitable for connection to branch circuit wiring as follows: a. NEC Type AF for 120 -volts, minimum No. 18 AWG. b. NEC Type SF -2 for 277 -volts, minimum No. 18 AWG. 8. Fluorescent -Lamp Ballasts: Provide low-temperature, high power -factor, low energy fluorescent lamp ballasts, capable of operating lamp types approved by owner. 9. High -Intensity -Discharge Lamp Ballasts: Provide HID lamp ballasts, of ratings, types and makes as recommended by lamp manufacturer, which properly mates and matches lamps to electrical supply by providing appropriate voltages. and impedances for which lamps are designed. Design ballasts to operate lamp within the lamp's power trapezoid requirements. 10. Lamps: Provide HID type and wattage (Metal Halide, Mercury Vapor, High Pressure Sodium) approved by owner. 97044.02 16000-9 11. New parking lot lighting system shall illuminate parking lot with one FC average maintained at ground level and not more than a 12 to one maximum to minimum ratio. Prepare construction documents indicating parking lot lighting layout, conduit and pullwire. Demolish and remove existing wood pole and pole mounted parking lot luminaires. Install underground conduit and pull wire per directive of Florida Power Corp. for new parking lot lighting system. Coordinate installation of new parking lot lighting system by other: Florida Power Corp. With the exception of site preparation and under ground conduit, Florida Power Corp. is to provide complete system installation including, but not limited to, poles, pole accessories, fixtures, reflectors, vandal resistant reflector shrouds, lamps, grounding, transformer, wiring and electrical service to parking lot lighting system. Style of new Florida Power Corp. parking lot lighting systems: "Hi -line", prefinished (black) cast aluminum 'antique look' street lamps, and double armature with tulip style luminaires. Purchase and installation of Florida Power Corp. parking lot light system is NOT IN CONTRACT. The Owner will contract directly with Florida Power Corp. for the purchase and installation of the Florida Power Corp. parking lot lighting system. The Design/ Builder will provide construction documents with parking lot lighting layout, conduct site preparation, install underground conduit/ pull wire per Florida Power Corp. directive and coordinate with the electric utility for installation of the system by the electric utility. 12. Site lights to uplight masonry/ stucco enclosure walls and signage: Provide ground mounted fixtures with fully adjustable yoke on cast aluminum outlet box recess mounted into concrete foundation. (1-F032T8/ 120v/ LIM/ #4305 or approved equivalent) Provide electrical service to site lights via underground conduit and wiring. 13. Control exterior lighting by photocell controls for dusk to dawn operation, in addition, provide for switched manual operation. END OF SECTION 97044.02 16000-10 i r� \ LLJ 7W W6-�O [,Own -j _ ZZa-z BOJ t OOwp ' w� LY U' < z J i- �ZEL OL� Z�Om J xoO-J Qw '111z O LL uj OC�- 10 �� v Of :. iW-1 H Cf7 U o W � p CD - Q W m f U Lel r-) Q V) W m LLJ W C.? U Q i of W n- m o F- 72' 1- V W I W J U NLL < o cy w \ a- W m U3 �_ }- <L 4- QF -- <C O U Q I � � _ n � LU _ f_L p cn � I W 0 I 0 'T, ®0 I•- °< g cy U �— z M W z LL- Z:> tr �- CD O� � O> Z W CL' 0 O o C'1 Z - Q C) CL � � p � W LL- WpFQ t� Cnp�-1¢WQ w rn cn m w O U C? (� O Z: O m V U- W� Q ¢ p n W C) U W Lwi.I���OZ}< Z W z Z LL W Q\ U Z WU`Z Q �WUWQ= °- �' r-4 o.. t!i C) M O U O= 0 U) LLJ m W ¢ O CD O p� z N O uj � O (n o %- ry W U3 w o (n 0- z F- w W� Z J W Z z <[ oF- o¢ d CW.) `� U W Z V) � :Z) Z m W ©d W � O E= W i- W J W i <L W W Z� cn Q (!) t -- V_ W ��p-s DUH �d�,W U Q O = ppWWp< LLJ O� W: W O L\L J d 0 m m cn x 0' z � O cr- O W CL tOL� O 0- < a- w CL Q O L.Li0= U caw Q z�Q�w�w� \w O_� w cry �o �wzmow < Q It U V) u- Z OZ w�(P) CnW�z��o0 0 Z C�0 z O z UV) (nJ W Zin -Z0wp� Q CL w <�0 W w Q U t-- W 2 :;E o z U ¢ W QQ C� z_ z� O W wm�w !- Q��o -- :5 Q D _ LLQ �o� �� �O Z - W y �~ �' - Lt W o �.� O �U �(_7 cyto �W W J d Jo�sO� C�=U n CD O C\! V) W O O W� �o<w�p�m Y ct LL- C' O <t v �w Jo Q0 =z 4-Z _ "— C// U o� ��QUQ Ow W �� Z O� QWNN (nQwvp W x Q r p= z F- iU) cn m L'" !- Q (/) (n W 5 Q W Q W w � - ILL o W o � c� (�—n o <t oo o LW— V) cD z Z � cr c� D n z � l � � � `C o Q CL CD (� z CJ n- mW � � d U Z r p J i- � Lw u� >- OZ J CL 0 z z (n E cn (n W C -� �'� (J) 0 Q z LL -CJ J ._, \ W J � -Scn QQm�mCD �� CL 0_ (nom O (nom '� -rQ CT] � D W W W z V) �} ��� O d U _1 0 -� Q \O Z a p U W (J) W r] f- LL Z> Z W �j F- J m O U Z D L �C W LLJ 0 C LLJ M O V) w z W z� P w w W Q �n W p O W (!) - > C) �- o O>¢� (n [� t- O o z c¢n O� W � C� < Q = O t - U —� Q �Q��ouvW mwa�`L0 �¢ j z <ti- v �� �¢ o� J �� zo''' L<i O — O O WW ww �_ wwd0 -1ryU5 W C -i tet= <C U� CL. v Of :. iW-1 H Cf7 U o W � p CD - Q W m f U Lel r-) Q V) W m LLJ W C.? U Q i of W n- m o F- 72' 1- V W I W J U NLL < o cy w \ a- W m U3 �_ }- <L 4- QF -- <C O U Q I � � _ n � LU _ f_L p cn � I W 0 I 0 'T, ®0 I•- °< g cy U WZ O U) _mO . p w ��>- N a c� Z 5 Lta tY m o z ELJwN W M_j - 0 wW NU)�� ��` W �s J�''O <atOw N50 UN mCYw <C Z D Q L� CL D Z dp Z O� C� O W Ow m Lw+-Cr- =) 0- CC¢OU M o W W - LLJ u)OO W I-- NNN<COU � NdL.,ZWC? m (Z)< W F_- U Q NJ 7- ZD Oat (!� F" (O� O C� �j cT F- L� �'- H-Z CL W Vj Q U t�1 dF-Z> W Z -Z U U Z � w< ¢N�zmJ J LY U � m C7 ZU Om 1- U W U ry Q dWL)oWo C� J- W �j ¢ -j :D W LsJ �UQCDw Wa m til O m `�md 4C L� V) m Wa Z U W LLJZ Z J O> <L mLL-Lm�¢Z-W MNmmO Z Z O LV O= F- Z W ¢ UZ Lv U <� m¢ N �_ ¢_ ww W-N CL (!7 W �� U M LLJ w W O Jm p¢ W O Q W J U U Ca Ll H aw 0� -j N p z w zLi Wa -L ¢p¢LZal� W J- w > --�z C7 d" -, �....,zw� -� LL W > a ¢ 0 m000< O CL U m w p O H O --� L� Uw w 0 wcn w 0 0E-� ¢ Z E-o d 0 `� CL c�z z O NUWOOw w w N ca U t- NN W C� OW z L Vi m w Z -+ ? N E- \mt%J zNw z w U o- Cif Z- E F- w LY �' U W Z O a N L_,... SLY w `�WaZ�tn m Li! O ¢ a U) V) Lt CL 0 ¢ N a- D m Z O Z m ¢ O- Ls! U Z O CL � C� ¢ LLI F-- w Z � F- ¢ � G 7 Z h O w�¢� U)- cn-gyp W W �a D CO (!� d Y a O d �w � O p L¢- O CL W w z CLUQ:: U C7 Z VO �z O J OQwZ0 J O i= d N W\U N p m C%J VOCQ<L0 U> t- F JZ d C� U ¢ w w t1 w w y4 m0�W¢t-l- Z D0 H p M Fw-O UNe Z� �_ Uf- �w Z CN M W Z W ¢ O WL- d O dJ Z L1J O LY J W m N Z ¢ m d Lt Z E O �, ¢ J Z i� d W_ t < Z J Z O = U CL U m m W m O �W N w N W�- W L- O mx \tZ Z Z O r) W U N W- F- 0 w Z N W Z m m L iJ m O w �— f� .S II CL' = aJ Z Y � C� -j LJ US•� <w rl w� 2: W _L�W< LLJ U 3: N LL-W m Z z W SNL=-tz-; N O w F-- ern O H Z Q d � Uw N _l = L-N z��LiJU� ¢a ¢oz d CL w�0 d <O=mL-O woC�.�Z �U �mH>•-m W ZQLO pLrZ O LiL= WEU w wz z O ¢J U rW ZOowN¢U z omO W w O O z - z Ow W� zw� w z<[amd -O z<L:UU z00-0-O z - U a J o U � �m \per W�j'L-v w F- ti J W O¢¢ U¢J� - W O Z U- E- = M W w J¢ I- L-'- LL.LLJ �" �O Z m o' '- - U tr m !YO L- U N N �' w L1J -Lm ��O U Q m _ rr� CD p O w ZD a cn -j O O ;7 Z w -JL m zLLLJ co cn Q O' ¢ (� cV x d - E w N d¢ ry N0 w L- �_ LLJ �- O = z N � X N t- = Z� 0- CL' CL l O d N \ tZ- WCf) N U p W� ¢ W U¢ W U- -D w OU�m i W O JO m H LLI Lit UCD Z O z 0 0 - C7 S C� L i.! Z ikf Z LLI LY O �¢ d C-) p� Li N Z m ESE L-- Z a_ 0 Z Z z C� J w C7 m < N a F LL_ U J f O a- ry Q W W J --- J Jdw w (3— adc��N=N :z U5 m t- d rI O CLC}' N � p _j J W o z way � �� x mO W W Z¢ O M L- O W zzN � � � U o o¢ U a -L N < N w U p\O �y W Cr->=W W X O O W N U I- L,j U) W Ow d i- Q Z Z >-- a Li to ¢ �j`' z a- Qm CD Q- Q Q J �[ ZU Wz Z�-L� wQ Li < W � > �0 �n-ry � W U�� � r� CD < � 0 < I <// J pC>U= �¢ �m 5 Z U �P- mU) w N o 1�_ = Z CL' Q wUOui C� WW N Z O O d J _! F- Q W J L� < tiJ -1 J Ww <C 0 ZQZ C 7 t;✓ p- CL J�Na_�Q O O Imo_ W <w Ow �d��¢t-a =Lr t--d O �m p W N Ww as F-F- cz Of --i LL na¢O� ry 1-1-� N rrj •cL� cn � ° - F_ C) LLJ J O 0 �in ¢ `- ¢ O Y zomz: �0 (n5U a Z <� Z� Z = � x -OF_ a_ o win ��w ¢ ¢o O_j w� C L2F--' w L,J F,_F Z C, Q�< F- U FY U Z 5 1- `i Q F- � Lm m � 0 w K W �wm--i U o U zU Om c��= owoQ Jo Q= WU C?YW< IZ oMOW CD O O =W L_C 02--o�_.Q°— =��F ma o¢U-) W O z J L W W �LiJ zQ0O— Q LliU v V) o F OLitz a-� -WW2 ¢W�z�cr, °�mcw o� F=�Z)� _r uiw U t!) 0 Y <p � 7 p0,''of i_ Jc-w� ¢_ O W W 0<�pNQ�p -JaW O 2W a Ute¢ 7� in 0m �+�<1,I O mC� ~ 2 Iw-o ZW - UZV)=:) J �Wj�oH w V)� W w� o \a_ O 0 W E c) p o w o W o 0° ow W m Z cWn � �UJU5 Ono H �0 O QQ Fz- x5F-vi Q°a-QQz� as _j --i0 .jo:Q-v v �W U U z O Wm � _j0��*_m ,�wov� _ L�,� Li ¢ . <=Oc�nwo <= 0 00 °1 Z C] Ua- L -Z Ow � mWwZ�J� a_ ww K0W UJC:) _Z W � - W �� !rU Da- 4 Q wW �Z< QZCp WO0 �r_ O �w Z W <M QC_)= U OM o -LA 0 � O w t- o F_ - a_ Li U `� Q U J 0_ i- = Z .- - Z - F- U Z n ¢��f�"p � ow w — z 0= <LLI (�%¢� V{o{-- w0-¢� cn N , wU) Z F- L'- � F Q � O \ w (= U O < LLJ - < W W � F- d n F -a O W U- M OF -W W ¢Z6�jiWO Fes- , m0 W 0O O 00 WZwZ ¢Uo�¢a Oc�v�i�`i a_( -)M o¢��S �F- o� z Z I © o Q "-' �O c.) �Z � ,- C) ¢`z ZJ=,=(n -'¢ a-0_ >. JC�� o ma-�x WOJF-OZ� x2<tc Z �z�m°o�~ �x w(=n O � � w =¢ \o � w w SCD � �,,o<c J Li > W (� O i- U u Cti 0 1- 0 Z i- 2 V) > U O Q < 0 CC 0-� r 1 O ,_,, z a- 0 V) ) - wLaJ o CD �' ¢ w O z, � � D_ w ca _w� 2 W� W W Cn > 2 0Z co U Z W�<WW F �W ® Q - F-0F�J �� F- 2W \�= U<m 0¢� o U V- Z Q � m - Z F- J U a_ F- o (n -1 I� 7- O W LTJ < uj - w� WQ¢� Ww U) O Q J J w �� L,yyFl:w � o Jn-v�-,� 0 cr W �0L0 _<L _ FS -d t --m � Q � � (Wn �� F_F (_ � Qd p<p -I 0® MCM W � N � 4 t,C) F-_ . 0 F_ O F__ O F_ >- J_ � Q_ _J Cn __! 0 J Q_ <L w F' W F r_ F- K w F__ ¢ W > p 0 J p : 0 _ (/) O . _ (!1 D 0 F- t- U) F- Z F_ z = }. W ¢ >- p >-W Oz Op p0 0 to mQ .)- w w Z J °°w Z)0 )-I- D )_F- � Q JM ¢Cn Z < Fes--. J D O < a- Z m� m W m m W m m F-- Q F- F - o >a o� az o JZ 0 0 � pQ � Q F=. w 6 Q Sox �� >o >o • 6 z w www �o ¢ Z o K w o 0 O U O o c.) O �- z t - R yy-- w Z F- a- W- J W g J J F- Z F- J 2 w P U OF- W 0 �_ tYQF_ W= WD W W0 W W D O \C�-F OZ W W a_ (n -� X w \ W Z m m K Z m W Z m K J X w W U Q_ F_ w w}_ LLJ z W ¢ Q F- � W F: F_ O W< O w O<Z Z P m L,0 tz e~< F��I0 wY wY w °° Uo o ; > w ocC) Z F_ W j w OQ O J�O > Q Q > �� > (n W O� U Q -(j F -Z U w g I 1 Li ¢ Q O > F- O > F- O t i J m U U) Z O F=- F_ F- F- cn a w O C °� 0 J m I m 2 H cn Z x O Fi Z Fn F- O <C F- K W O ¢ Z Q W Q Q W Q Z p <C E- Z p CK w- W U F_ w -F- UO ¢ 2�} V)_ �� -F- UO � wQ Z 000 w �Qz ? v) �J a o5�z � of~ � o (n �J Q Zw O w55 �!\' Li O F- Z 00 w LiKw Ox p 00 O p0 O Z Z 00 < C- :2 Ow ¢ UQw - 0 0 p Z 2 �cchO �w )_ � Lim o O Z (f) ¢_ ww 2Z w F- W Z F- \ Y W w W ¢ W W J F= Y Y ~ Z r. N 0 w- W �Q(n Z LL CE U OK F -?-(j Of _j L�W r �W Cf 5 U 00' Z�00 0 �(),-Z w K 1- J w Z Q U) F- O F_ U U m W Z Q ¢ w F- F- >- 0- o (/) g Z O `� a- W � J K Z> 0 N S W Z W 5; W Z �- Z ¢ 2 �� U Z F- K P- - Z --� w L+ -=O w ¢ m O F-� � F_ ¢W -) >-2F= Q >-2� ¢ O ~� i OmW w �F~ K F_Z J U UW L'F �O(n �WJ (nW_I Z U QF- W O� >- p w > O _ 0 u)- _ Ul - _ U W W J W (� F- O a- ZZU V) ¢ ZZ Q 0W -OZ Y U O Y V O Z �'Ow Q0~ _ < O- Z F- \ Z 2 Z- Z )_ ¢ \ Z w m Z U) 0 F- Lit V W (n Z LY a- � - 2 J Q Y Q E- Li- ---F Z Fes- 1. ) <[ (/) Z K F_ w a_ Z W _J 0 Z U W LL_ Z F. � w 0 0 W F- � O K F-- O ►- - O F-' w 0 0 W 0 F_ F� F-- W F= V 0 Z F= Q J YO Z UW 0 KLnp ¢ _J\ O F -J\ m Z UW >-W WD D Z(nQ O mY U ZO >-- (f) Z a-xV w(/_)a- w~Ln w O w~O w O >- (n w>KO O UX'.) wO O F- F- O Z Z ¢ >- K 0¢ F- g w 0- Z� -5 0 } O D( 0 >' w p¢ O U >_ >- W 0 0� >- Z Q 0 U) J W F- Q 0 >- W Cn O a_ _j � Q Z Q ¢ Z ¢ o >_ w 0� Z Q Q J Q 0 ¢ w w p W _j f- F- K >'< U Ll- - O w t] 0- J CD - J F_ F- LL' Z w 0 --J J w W J >Q Oa -Z 0 �H -� OQ W �WOQ W W Z O=OJ CK F_ OH_j FY F- U) J 0Q Fnw c) - CnLi-O (nom UF- 2 O 20 w F=w w Q i w WOK 2�a W O ~cn� W O w F- F=w Z\00 O wOi- L�OJ QO 0z= O w -F Z �� O 2F_ � O �xm � J (nXm -� Z 0 �� _0Ld -F 02- Hw J 2� ZUiV � W0 00 p< M 0< 0E -LL_ 0W0 Oto OwV oto 00 02 �UZp0 0 0<0 O Ca zQ KWO C7 C�� C� � W� Z 0 >-D �FLZ >_ �liZ >_ - V Z 63W OQOZ Z `Z �°� Z U 0 Z Z ZYK Z O 02 O 00� m OUF m y OpF= m � Z 0 nw J JZY Y 00LCj m Y F- (n O H F_ F- F- h LX !L W K O W a' O W F W Q 2 w 2 O � w (n0 F_(n cn O¢ (nK = K 0 Y=<< 0 1 X Y=< 0 1 X Yz � (n2 = O¢m<t ¢ p w Yp Q >C Z 0 w x x F- X 2 X V 0 0 \ (n LY F- W L a_ W W F- n- 2 W K F_ 2 x C7 F- C� Li V) ¢ 2 2 \ O K m Q w4 ZF-w wO w� w �Z 2 wOZ O 2 �F Q 0 wQ O w �; �� F,) F�F 0 OQ I�! C>¢ p >ZO �O >UF- s0 >UF_ �O FSI 0 W� � >ZF� -3: � iF_ W�� �Q Z O �� m�U(n Lj_ W mKW LL_ Z mK W Lr_~ Z > © Z_j �p OZ Z Q� LL Z O� LLCDO O J O O m O O ¢ ww 0� 2 ¢OV OW ¢OU O� O m O 0 -Z ¢F- 00 2 2 22 Um G U F- Z Q Z (r Q Z K UCD OK K U K i1J>_ 0W W wF_ w� w � Ww W 0ZZ-1 Zo 2 C')\� Zo 00 C�\� ZO Ow W � Z CK�V)1-0 O C�Wp� ZW O K< Z_rK KO a_ K �_ a_ ZZOU OF- - ZOO OF= ZDOQ OF^ K �= w _- LL U_ Zzw 0a_ L- Q F _ F- 0 V ¢ F-- V F- F- Z F- U Q F- Z F- C > <i F�F F- Lr O Q <L i= �- F- Q O (n O O O 0 �j m 0 to Ww (nQ ww (nQ Ww 0 > �O�W W (n0 W0 QO X�<ZL 4Z ¢� �p �p x�OLi �ZZ� x�FO ��� x�0- a QO �O m(nw� � x(on� rJi<ZC � J W Y <C Q WDZ\ �O ~ W U �O Q wU �0 Q m F_ ¢(n 0 ¢ ¢ w- <� = Zw= =K =w = 0(n = W Q0 OUZ LLJWY OV w wWY OV W = O(n UF- 00 (n V (n c) Q O K U? Li) F- LtJ U) (� (i7 U U W tx Z Z U 2 K Z Z V (� V) W f- W (� L, U W W W 1= O (� W JZ QF- J J2 J¢ J > U _L <(K W Z \� ¢ZF__ \Q ¢ZFQ- \Q _) > U ZQ OQ ¢ QKw vJ ¢ OY >0 O 02 00 K5 O CLwH Z(n� KO Z(n2 20 Z(n2 00 Kj F_ 0n 2 2WZ ZO 2 SCC ZF-:2 -3z �W � OLY � LLJ_r(n-J 0W - LclUw OW W LdC-)w OW LLJ 7E M OK W 0 Zw W wZZ 0: W w¢ °`Uw W W WK W W Lew w LLF->-D o -Z K� tLZa_ cL�TT KZ (� W w �w RZOK K KF -0 D_w W 02 >¢0 OZ 02 0(� 2(!) 0 20U)m �_)z 20- DD CL 20E- 0_12 0K 2Cn W¢U2 2 200 OD 21 oQ ooe e6 00 o 0 0 0 _. t , , ; 4, m 0 0 CA) v LY c+, 6 z z ' O (nwQ w Q W E- 14 Z Z W U O +�+ CD N q' t W W Z Q S W a- W O O= Q) .�, ° 0 O: Cha 0 0 �j1 L. ° En . W Z Z W W W OOv� O W - 0 C6 >1> 'DN 0 Z ' m W U } U Z Z NYU if, � U 0 0-0�N E �v W 0J I m - NZ 134 NO 0= p O7 c W cq N ix UX O W O n QU ° O m J w > . Z 1 O oW II W ° mmW O N Mt) U w W z Z Q= c (if LLJ CL 0 ry L OWQX�Q v Z En > 1 -� Q O ° .oE o m m mm m o -o >, rtl»° fn o; to 0it II III III( I III ' I IiII mfiII II11 CII II UII II II °Op) wL v •� -p E N� aooaoo -cw Lm ,, x j 0)�N_jo `° ' O 0 >1 N W�IE 1 a) c o II OC m a) u En En N >1cn Q) m W >a p A ( L- U -C -"V) a� 3 •�% J yf j O 'n O O O+, O C Z -0Q m 0) V >+s Q)� U: p w N U m x c_ 00 mo - to U o Q mS aJ °ca) ° N cIIU O o Ld �teO E3 0L cvp° v cE W 0 O d WOv nU 70 p "41W Oov 0 N iv OOZ o ° ow aw o vb �. W z cn E1 Z (n Q p L c° +> O o ul ° ° •U O w w U �� O p h6 c °° o o N Lo a o o •J O 4•+ O W Z lY J U CL 0 b -~ Z -0 a U Q) M c. &n Oc 01 c to J U W D_ W W J cy 0 1hh &s C7 0 Q) O 0 7 w w tW- < Q `.7h 3 n) m o a °tn o vvi0 -a U Z •ate di tY U (ifo o cp U f �9 > c ° °- o o ° v o a) Q U O W w W U W W -� tY �%j1 1 - _ Q w > Y z � L w W 5 Y p° s O S- s -0 c° E P4 ° > 3 I- U w > ro } O c 3 O ma° v c 01 O Q Q Q O m S O Z 1� J v o 0 > ° 4, °°� 0 0 U a_ F- > m U m m U) o 0 -v c a� c U) 11 II II II it II II ii II II it II 'j o ° v v c' L. ° w 1 °) -c ° '- a) a) +' p g o c0 F2 ., W E- • > J� \ •O ° v c o •' ' Q' E -v U E c `J _ v c ?� ❑ D D U z 0 c N o .T O c'0 v c :D E E E� \ Q p c E N o c 0 a) o-0 -c 3 .c rn rn 0 a c c 3 c o c (D 0 Z c 0 O _ _ c o� 7 `o X r° o 139 Y _0 cf)a' E o o cD rn I 2r mW '= c� rz 0-0 O)a� O O E \ry(O >1 W c U ° OU d ° U O O .0 p c ° \/ + U a) E U 3 O w' 1h h W I c I" -0 O Ou s 3 S 0- tx\ h '�a Q O pU -) a)OO �U N Q) . fn vZ N w _0 _ /.DAO \ •1� O L- ;.=, ° 0 O0 �.. Q)+J �- L O �'-' 0 dam. --`'- 140 1 \ 1yhL o o °' w m > v o t- z z LL w (f) w ° :3N r d Lo CO 1 0j \� _"---- `!_ `��•-------" "'- IL��--------_ "--- -\_ -_ ---- 141 0 °- o p in, 42 cr �° �° " ao• �`_ ,�-_ 143 + + . �h \ , ` 144 \ x �6oa 14S w + z SPRINKLER f/ m ,� x . , X, + Q of o CONTROLS yEo �y X x \ of U CED ,FF X \} % 1 a _ AREA OVER + X + 6 \ \\ o W O �ayCb A ¢LLJ o X + ,�h• �y� \ \ d h \ 0 ` fy Co. \ GATE y 1y0 \ h +ao +` + ,yh A o n ek �y0o, \ X +1 DY' � \ h� k �c + \ \ +� \1 p X o \ \ + o° y ��• 6 A L L F I E L D +� `� 1 r 4��o.rO k a-0� 1 SCOREBOARD + \ rolb CAryx0 lt:h' X Xco X \\� '\ h� h ,� ,� yahlb ' Cb Cb tO* N ` - 146.64 { +°��6 ro X+ 1 46 >K o + 6 �h' tk ! \ 40 ��6 `kyry �tK 6 / o + `e�' 143 14S 146 k 1 X t.�, + + 1 t6• , A -." � R� 1 Dc�' 16 RETENTION AREA X 1 X .1�` RAILROAD Ticc (p \ 1*\� X -aK hX X + + � -�'� _-- y 147.62 X_ _ X F F = DUGOUT 146.55 ��rO' _� �+ e `1 h' h�. ay6 143 47,69 \ +. ry. 1 X �, 1h `y /� /1�h r 1 1h + p _ + h 0 X X.41 D.h s- -� + t*� + Ds / ) + I P A* y .SPRINKLER k h0 \ CONTROL 5 6pXE18 + cn` �r Eo 1 � I Q �!. OJ !! ph h E o , 1 % O 0 u a � O h J Ot d F A ---"" 1 9 ¢ i X , b k a + Y tl• 14' •1 d tXi 1 0 �.#A50PvR WALL -PLn - F A h O':.. 1 h 2 1 l E + i C h ONE STORY MASON WAL C� p�J 'o •. ti h c LK E �1 �_"�- tr vdA MASONRY BUILDING Ca p,6 X ++� A. P�- O o a /� `11(RFSTROOMS) O h1 �6• y h -0 bry 1y0• 16 , n� . �� \ yQ �-- 1 a �h +`y ' yryu �^�� y0� NA RAILROAD TIES DUGOLFT b1� �h0 -- >� ,�9 h 11 6+ >x ^h N4;1-. ri I ONRY STORAGE -''1 F.F m148. hcy T 1 / o ,cs � �A. p iF BUILDING / �„x /PAVE�4EN 1� yh + O� `y ` CONCRETE WA F.F.+-147:99 x h h 0 O 0 1rO 9� O BRICK 1 t h �- 0 , Z 1. 121 p 1 1� �� hh 148.4 ��0 h+ , O AS ROSIdN A. h��^ �y1y b� `k A XD ��� e.e 2+ oh 50.55 WALL �h� s 3 C rR L ° + yo oy.°� ----,� $Lvt R� 14a' �- N �,� e l year A°� \x1 Fj 1 1y CK�ER INLET t �ro 9{l♦M Oe E Y4A - BRICK P TER 8fi INV.=148.34 b < •1 O 10 °' S, + 1 L}{ 5 TOP= 151.21 r v `'� C`► ti' � �R ,y. \ a y`L /�h� _ �/ 'b X �- �h� _� b.rE O g' COC y0q ° ��1 1°' �h ASPHALT CURB {y SIGN h W ZW O / 1.0' WIDE WALL +X �\� IN 150.20 a TOP OF WALLS x \ ` / �� a1 ELEV.` 55.77 X, +y y ..> 17.8 �O NRY WA O ."'' �t� p y�0 .y ,y�� S 1;1' +- U ST S i + p �h`1 )C S yti y0 �� -- - - y0 ��� h v p VC �'�i i 00 ?0 1bO h1 hrO ,yh' s - ~ 11 /� y ,S 6 y1, ytii�X + Oh \ �h,� O. 5 �� P=151.06 �``�^ �. �,�,� ,S ?, 1 1 �+ rL 1 0+ x� E .y .�hh z � o X per'' X yti '`f�' 6 y �`o� ' 1 ry 9 c,+ 14 / ��y \ �i S7 0 9 MASONRY WALL 0 $ �? A L £ -'� U �� E 4:11 OV 5 yR / 6 yti• ��, •. �s W � ,. X ,/ _,_..-- //�} �'�u � �zs ,�y ABOVE GROUND rL o FUEL TANKS +h y5 0 Q ON CONCRETE SLABry fy'� lrj- s1 �L .`wry \ ��UM D / � ! i y � y C91 -/d. k + rV O hh O `�O ek �S �h�Rh 9 �y rL�U S�8 GATE 1 yrL yrL y`1 i� h ti� ?S rLry a dU ry 1� yti• �h byT . h 6 h W METER & 1 50 . +> GATE + . 1 R BREAKER BOX 1y� yr . yv \ 1 ONE STORY `si + 00 s yti & LIGHT O fr1 a fro sj g0' .,� FRAME STORAGE h 1h� • 152.44 U yy BUILDING 1yry 0 F ( /2 "� 0 N h h 1 ; METAL HATCH FOR ��-~'"rr y ! yry^h S•Sj % d,� 24 + F..-153.32 e h U ti' O , \ p tK SERVICING GAS PUMP �yrL• 1SUD . _f�p + t� oy. ryj EQUIPMENT • 900? } 1yrL �S `s1 1� U. y GAS - 2 F h FRAME STORAGE 12• i 1 tEL PUMP, ..._._ GU � -- � � E � � N � � ryrO,y1 `)? AREA CONCRETE MAIN DISCONNECT, • rL� t' N 1°' �h`V gyri,• t `y SLAB h �S EMERGENCY SHUTOFF x ,�y 152.50 yrL6rL +�h 0 N C E T E 1h`i , ,,�1• BRICK h 1 �yy0 & ELECTRIC METF� E ry. OU C S h h0' F X r, ?s �S Sh h O 0 a -� s S2S E \ h`1 Art, U y m r- 1yry MAIN lhry , 18 h 1 50 0, GONGOa 0x yry�' DISCONNECT p �+ O+ 29 ca PAWE�E ,S �ti X y. �yrL r ONE N 5(Ofc(G ).? �� 1yS 1 OU E 152.85 gfit 151.0 o, O 1 d �y1 \ X OUIID rL0 O yci° 1 D 1hry "r N M� F 6153,35 �yh �hh' c F• + E� h � , Ea � jj ` yy� yy. oU �yti� 153° i ti GENERATOR F IRREGULAR '� G 1y� ON SLAB x �hh' ASPHALT �'� O 1N '1y h X hh• ajb` + yti 152.9 EMENT O� O� , hh StQ MET �FFiCF.Sjh p� `L�o ry. ONE E 92 � o GARS F ,.152. •.`h'hrOl \ �• h y.• �,g' F• hri. a�, 1 DRAIN FIELD X FRAME BUILDING THIS AREA o 153 g P ry + h o f (AIR COMPRESSOR)S oIO �•yc h . ,hh 6 � PROPANE STORAGE z93 Oh ryOh 1y6 153.34 ,1y 1yh u TANK TANK S2 yti' �S o°) 7- 1 `y 153.19 6°VALVE & E yy. vr4 'FF .9 ,hy Oti �o h 153.43 6"-8"REDUCER g yti' rL+. yry. yy' s 2 x ,y�� ' +` o� sv+ Ea ,h E y❑ yti X 9 , Ca c3\ 11.7' a _ EXCAVATION hCONCa ry W A %- �" ' �y gFL-'' \ . m� 7 4!1 153.43 h .� THIS AREA �h �+ S u' O o /� / O j h ♦`� WL�CONCRETE & o rh f�f BACKSTOP 153.33 KSTOP 153.33 53.41 T '10 _ rMETAL STAIRS ,`, + 0 tXbt t8 Dip '+ + L6`bCONCRETE x � SLAB ENTERS p( f.: h . GR UND .c?o ----co, h h f a h h 0 O .hla h-0NE STORY hCOVERE hh rL4� hti ? hfy 1 h ♦hrL h 1 �h MASONRY BUILDING h \ S h -. h ra h ti . d wm•I WELL PUMP h u y �hh -}° . --- S3 L X h E �y F.F.=153.28 . 2 - --�� t y - -"' OU 4. h p X t '� • 1h •� ry ONE STORY + h L X y L h 1h yti yti �� _F•. yy. y'� MASONRY ORAGE ,- -- N X X 1h rL �SS9 hp x h' + BU ING--'" 1y yhb F.F. 53.53 6'�� ..�--••.' �y'h�O T y. PLANTER I �y�o 18 oa r, �ryIOO a. IRREGULAR 4 +�y `' FS S h MIL h �y X yry4) ASPHALT BROKEN ASPHALT hS �y^� GATE h6 1 ' yy� 1y • • y� 2 150.47 TOP OF PIPE --� o ` MIL 1 • D, THIS AREA X 1 5 • , O PAVEMENT 0 k 6� WOOD FENCE �hh• 5 O. + T0� PIPE SS tih � hyg...--•"'J'�" • k �K, o -X /- rya' ITE BENCH _MARK �y e 'ss CaND1al5E w� X ,h�' ,y°`• IRON ROD W/TRAV CAP • 'Ssj y vo 4L� y�_o, X/��� ASPavEs�� / ELEVATION= 153.837 T y.14 y�i0 3 +�yS �X " OUy 2..PVC & 6" AC UN y��y 5ryy 0lL E y�ALyC ,yh ,A CONTI H , ` �h 4, CpNCRE1 • �R) TRIPLE r=' y°`' r SITE BENCH MARK o m �o r `_ • IRON ROD W/TRAV CAP Yo `' 'ss 1S4 gCL •yy ELEVATION= 152.958 0 yo o, s yam-- o __ • + o- • ,S , use ..--yy • t o �--�' yti •s � yti• • y�. is Oh ry x�L 6"WL �0, h yh1 ` 153 +g�L l„r ;yti• �,�•L_ �,��'a�A° .,h`�' _ , `r2 ?NIL. h a. fats of • � • ti h h' r"-'•' hrl;" `i`� g"NIL---"`y.m ..•,_y � y�p0+,52, r' c' • • rcvENT S2, 3.03 • �yh INE OF PA F - E MIALK ° CSIR 1r �S�S IGN �rl ryy �-' - 4> CplyCft • • t Orb `s Q --' 1h� h�O ryryE� yrL• SIG �y ao gcL do • • ;�AVEENT �7 ,152 �S, y`L' + 1� O ss e 152 , �O O yo • + �A G �y1 huh ,y� tihti� + 151.3+ hh 6► ham• 'b r 151 G� vaA �y,�y , yea N51. 6"wL b 3✓GN ryry0 . y06+ ,h ' � Sao •y w + 1yO 0y $� 08 1 1y�00 f 1hh �h r ry y 66 ' + � �y1� �h1� T r ' • ' RAILROAD + CONTROL PANEL A Eb h c ,v g. r r r _ IL L_ ' i ow r 129 a", g- Rr y. •• + in, ^ ' • �- •._ t ... ° J too � - „ Jj / OMM 1 ' ♦ �• i �' � •` � ` . '• i• '�• � +fi• 11 \� O O e O { o O C 1 r. � A F N E M m 1 • o T • a • Lp Z 1 s • , D y, z O �1 e LE ` fi t r , r 1 L J !A ! r Vs a , 3 L A d . t ca, I f i r _ S t. C �f. s..il. .i •t � '� `_tom'• � � S M _ <n ♦ 4 .r ! I ��' � : •�i. :! ;4 ��:-:.,i-Tsai• -�.} � �� ,•W -�-''r � - .I 1. •; 1. ._�(. WISE ALLE* - e ..: ..� - 1911 - •. „_. �..,_ cn _.► ♦ -� y� sa , _',, .{ O Z cn rdO to �1 Jco m ♦ ,(• _ pyx ojo = m V �q Z Ca M S i B D i e _ .._ Z _ y ` 051 ♦ W \\ O 7C_yl ♦ ♦ e_ _ \ ♦ DEPTH -FEET W t o cn o v, o t TT1`�I a ' r ♦ i e r r o w \ �� r ` O 2 � 1 m W G7 M -i 1 <_ m r r— m 02C)NN.- OOOOYAY pnm2� umiaim'0p<>imn S< CN< O 00 ' z6ApaZZ mYjn2 O�YC ����C 0 f*� M YPOrmi�00OrzAm z CO Ila O 1 r'' i � I _ N <o�r< 0 0 w 0=1? v rn _- -Z ZY�O .c' :.'D'imOdyornZyNoms (On OmZmr Z UI .y '+ D y ]Cbs. S Z m • < ��=AZOZt Oir-.imppCOrD+I m Z rpt z `>CDO-•ILZnZCr�<ptw/tp W Z Z V)„D,rOCDOz-Yi InnDOAm10 � .•.r0 f1 'iT ��Oom�umi m'_r O m Z m*0X'0`^AOZCwKAz N+�A )m m N MF-<z=>z ZZm� a00-i� 0 < O rt•.�� 1 Z n = t0 :.m�p� m zzm� <� PNO\A =x N 0 D . z �N m Ln Ln w C i_+i m m O N A O_ to r*7 tD MmYmpzr;0il'rs n0<m �cmii �) O (r1 (p Z OhC2�mmCr� mN mtn w 'T7 O v /� fnD(Y7CODC�NOS�w m O n [� 0 VJ Zo _mDO'�wzca OZ-Y•1mDC Wooso D mm< NA�Dtn �Obn O Z Q mt>E-v 0DZ�ZAm 00 t Z �am;o:,E A-iY�vmiO tn• 00l W m=• Cr,Zt �XSmZOv NOANO N l NC: .�O •'�ygymyu-•1�_1-I- m-•,ns�O... zm�Nn F- z 00 000 C ro c1 C En -1 D< W N OO A N Z (A O m Dmf fY tO�lyp DYOvr�j any O- 25 D' < D -Z - -a , Zs N -o tJ zOOmrmsi ==SSZzm t7 I O 2 Z W� (n-iz�nm mmmmOwz 0 U) m °� OOOG m S 14 T C D N O O lO m Z 0 D m m m r 0 /� 0 00 D D 0 m ".f 0 C m ai O D m n O O O C7 N w rr z j �_7 M_ m ccl A Q m --1 v Tl -4 Z tr7l n Q ! j Z O _� MF D D n O G7 D -i O n rZi �/y�q CO ,^ O cn �14 /� : N rn Z W j. __4 D 0 D (n z 't1 > Q (D n n _r O " 0 i11 0 m m o �y = D = D ® 5 0 G7 _ ' o !n0 :3 >CY, C V, Q -< w 0 p 0 Z to to �.� o z o z N n rnv Q m .w. D NU) 00 M, � 3Ml C7 A' o a • tU �. Q � r M ..� Ux o ` o _ o y tz