Loading...
HomeMy WebLinkAboutVII (B) Discussion/ Action re: Bids for Driveway at FireStation No. 4 Agenda 5-04-99 Item VII13 "CENTER OF GOOD LIVING-PRIDE OF WEST ORANGE" MAYOR• oMMISSIONER S. SCOTT VANDERGRIFT �`/!Ocoee CITY OF OCOEE COMMIS o°Ewrts O/ �, U DANNY HOWELL �� — 150 N. LAKESHORE DRIVE SCOTT ANDERSON ���...iii O. Rum'toHNSON v �� 0 OQDEP,FLORtnn 34761-2258 NANCY J.PARKER C (407)656-2322 f'j} ,�? CITY MANAGER 4 C� GOOD s> ELLIS SHAPIRO MEMORANDUM DATE: April 28, 1999 TO: The Honorable Mayor and Board of City Commissioners FROM: James W. Shira, P.E., City Engineer/Utilities Director�0 SUBJECT: Driveway Reconstruction -Fire Station #4 �( On April 6, 1999 we solicited bids for the reconstruction of the failed driveway on the south side of Fire Station#4. On April 23`d, two bids, and one "no bid" were received. The low bid was submitted by Prime Construction Group in the amount of$86,300. The other bid was from Wharton-Smith in the amount of$97,000, and Georgetown Enterprises submitted a "no bid". The driveway will be reconstructed to its original line and grade, but will be constructed of concrete rather than asphalt. In addition,the reconstruction will provide an underdrain system to address the high groundwater table problem. This reconstruction will be funded from the Fire Impact Fee fund. I recommend that the City Commission authorize Prime Construction Group, Inc. to proceed with reconstruction of this driveway in accordance with their bid, for a not-to-exceed fee of $86,300. Attachment lv "(ENTER U6(1000 LI VING-PH[I Ni OF JUST ORANGE MAYOR•COMM ISSION LR S.SCO'PI VANDER(;RIFT Ocoee CITY OF OCOEE (I>'„I,.'IoNIR> 0� n. Q CANNY DERS.l. 4'� ISO N.TAKFSIIORF DRIVE SCOTT ANDERSON C. ���.1A d OCOFE FLORIDA 34761-2258 RUSTY 1011NSON NANCY J.PARKER v (407)656-2322 -11% CM'MANAGER fq OfG000 ELLIS SHAPIRO MEMORANDUM DATE: April 23, 1999 TO: James W. Shira, P.E. City Engineer/Utilities Director FROM: Tony Wierzbicki, E.I. ; L�- EngineerI SUBJECT: Fire Station #4 Driveway Reconstruction The bid opening on Fire Station #4 Driveway Reconstruction was held this morning in the Engineering Conference Room at 10:05 AM. The results are shown in the following table: Contractor Bid Type of Bond Georgetown Enterprises, Inc. No Bid N/A Prime Construction Group, Inc. S86,300.00 Check in the amount of 5% of the Bid Wharton-Smith, Inc. S97,000.00 Bid Bond 1 have reviewed each of the bid packages for content and verified quantity and dollar values. Each hid appears to be complete and the prices quoted have been verified.