Loading...
HomeMy WebLinkAboutVII (D) Discussion/ Action re: Design Fee Proposal for Reclaimed Water Retrofit Project from Hartman & Associates for Silver Glen and Waterside Agenda 5-04-99 Item VII "CENTER OF GOOD LIVING-PRIDE OF WEST ORANGE" MAYOR•lOMMISSIONER S. SCOTT VANDERGRIFT Ocoee CITY OF OCOEE COMMISSIONERS UDANNYHOWELL Kpli3 r - 150 N. LAKESHORE DRIVE SCOTT ANDE.RSON �i���iiiRUSTY JOHNSON v O OCOEE,FLORIDA 34761-2258 NANCY L PARKER (407)656-2322 4� CIIY MANAoeR Of G00°♦> ELLIS SHAPIRO MEMORANDUM DATE: April 28, 1999 TO: The Honorable Mayor and Board of City Commissioners FROM: James W. Shira, P.E., City Engineer/Utilities Director SUBJECT: Design Fee Proposal for Reclaimed Water Retrofit Project Attached for your review and action is a proposal from Hartman& Associates for the design of a reclaimed water system in Silver Glen and Waterside subdivisions. Both of these subdivisions would he supplied with reclaimed water from the line we will soon install along Clarke Road. As you are aware,the construction of the reclaimed system tanks, pumps and on-site piping has begun at the wastewater treatment plant. We have also begun work on converting part of the old sewage force main along Clarke Road into a reclaimed water transmission main. We will mechanically clean this line and chlorinate it for disinfection. This line will be combined with a new line to be built leading from the plant site, at which point we will have a complete reclaimed water transmission line from the plant to the mall. We will tap this transmission line at each point where we intend to provide service. The attached proposal from Hartman provides for complete surveying, permitting, design and construction observation of a reclaimed system for both subdivisions. I recommend that the City Commission authorize Hartman & Associates to proceed with design and associated services for a reclaimed water system in Silver Glen and Waterside subdivisions in accordance with their proposal dated April 23, 1999 for a not-to-exceed fee of 82,980.00. Attachment cl 1�, • MARTIAN & ASSOCIATES, INC. "•�������� engineers.hydrogeologisls, surveyors&management consultants „ „" April 23, 1999 HAI #98-037.M5 Mr. James W. Shira, P.E. City Engineer/Utilities Director City of Ocoee 150 N. Lakeshore Drive Ocoee, Florida 34761-2258 Subject: Quotation for Professional Engineering Services Waterside and Silver Glen Reclaimed Water Distribution System Dear Mr. Shira: In accordance with a continuing professional consultant agreement with the City, dated September 1, 1998, Hartman & Associates, Inc. (HAI) is pleased to provide you with this proposal to provide professional engineering services for design and construction of approximately 18,500 linear feet of piping for a reclaimed water distribution system in the Waterside and Silver Glen Subdivisions within the City of Ocoee incorporated area. The work covered under this specific proposal is described as follows: Preliminary design documents including plan sketches and specifications will be prepared for review by the City. The site will then be surveyed utilizing aerial photogrammctry as required to prepare detailed construction drawings. Upon completion of the construction documents, an opinion of probable construction cost will be provided. During the bidding phase, HAI shall provide assistance to written questions and in preparation of any addenda which may result from those questions. Upon receiving bids, HAI shall provide a written review and recommendation for award of the contract. During the construction phase, HAI shall review shop drawings, assist in response to Requests for Information and Requests for Proposed Changes, and provide site observations of the project every other week. Upon completion of construction, HAI shall provide a certification of construction in accordance with the construction documents and record drawings of the completed construction. Finally, digital files of the record drawings shall be forwarded to the City. You will find the staff assigned to this project arc highly capable members of the firm who can make decisions necessary for the effective prosecution of the assignment and can assure you this project will be a top priority. Hal Schmidt will be the Principal-in-Charge throughout the duration of this project. In addition, I will be the project manager assisted primarily by Mr. Michael J. Hudkins, P.E. for the duration of this project. As with all or our projects, we arc committed to providing a quality and cost-effective project for the Waterside and Silver Glen Reclaimed Water Distribution System Project. The Scope of Services for this project is described in detail in Exhibit A of this proposal. A preliminary project schedule has been included as part of Exhibit A. The total not-to-exceed costs for the basic services associated with this project without further authorization from the City of Ocoee is$82,980.00. 201 I[WI PINE FIRE Er • SUITE (nnu • OR(NDO.II. i2801 TELEPIIGNI (+u-)8341955 • FAX(In-)S333-9u • ,....cconsultlnl.cnm OIiLANI)O FORT Ul'II Rs Pi_AVIAIIO] I'C KSON%HAI: Mr. James W. Shim, P.E. April 23, 1999 Page 2 If this Agreement is acceptable to the City, please return (1) executed copy to our office for our records. If you have any further questions,please do not hesitate to contact me. Very truly yours, Hartman & Associates, Inc. Witness J. Richard Voorhees, P.E. Senior Project Manager Witness City of Ocoee Witness Authorized Signature Witness Date MJH/ska/98-037.M5/corresp/Shira.mj h cc: Mr. David A. Wheeler, P.E., City of Ocoee Harold E. Schmidt, P.E.,HAI Michael J. Hudkins, P.E., HAI Ada Terrero,HAI EXHIBIT A SCOPE OF SERVICES SCOPE OF SERVICES This scope of services is divided into four (4) tasks encompassing the design phase, permitting phase, bidding phase, and construction phase for the proposed Waterside and Silver Glenn Reclaimed Water Distribution System Project. A) Design Phase 1. Prepare preliminary design documents, including sketches depicting preliminary pipeline routes and preliminary specifications, of the reclaimed water distribution system for City staff review. 2. Surveying services utilizing aerial photogrammetry as required to prepare detailed construction drawings shall be provided. HAI shall use one of the City's three selected survey firms to provide surveying services to set ground control aerial targets and obtain horizontal location of underground utilities. HAI shall use Aerial Cartographics of America, Inc. to secure aerial photography and to prepare raster image files of the two subdivision areas. The City shall supply record drawings of the two subdivision areas for horizontal and vertical location of the sanitary and storm sewers. 3. Upon acceptance of the preliminary design by the City, complete the detailed design of the reclaimed water distribution system. HAI will utilize City of Ocoee standards for specifications for materials and for construction details for reuse main systems. The City shall provide AutoCad 14 disc files of City Reuse Water System Details. 4. HAI will provide the City of Ocoee with four (4) copies of documents and conduct review meetings at the 30, 60, and 100 percent complete stages of the project. Documents submitted to the City of Ocoee for review at these percent complete stages shall include at a minimum the following: a. 30 percent submittal: Preliminary reuse pipeline drawings, probable cost, listing of equipment, and a preliminary listing of technical specifications. b. 60 percent submittal: Updated reuse pipeline drawings that incorporate the comments received from the City of Ocoee, project specifications in CSI format, and an updated opinion of probable cost. MIH/ska/corresp/exhibita.mjh HAI#98-037.M5 -1- 042399 c. 100 percent submittal: Updated engineering drawings (complete) and specifications (technical and bidding) incorporating the comments received from the City of Ocoee and an updated opinion of probable cost. Review meetings will be held following the City of Ocoee's review of each of the submittal stages to discuss concerns and/or comments that the City of Ocoee's may have regarding these submittals. The project team will document each review meeting with the City of Ocoee, as well as our meetings with the necessary regulatory agencies. These notes will then be transcribed and furnished to the City of Ocoee within one (I) week following the meeting for their records. 5. Prepare for review and approval by the City of Ocoee and its legal counsel and other advisors contract agreement forms, insurance requirements general conditions, supplementary conditions, bid forms, invitation to bid and instructions to bidders, and assist in the preparation of other related documents. 6. Incorporate the final comments received from the City of Ocoee regarding the l00 percent review submittal and prepare final Bidding Documents (engineering drawings and specifications) for bid. 7. Provide City of Ocoee with a revised opinion of probable cost based on the final design plans and specifications (e.g. bidding requirements and specifications). B) Permitting Phase 1. Prepare and submit applications for applicable permits from the Florida Department of Environmental Protection, Florida Department of Transportation, Orange County, St. Johns River Water Management District, and the City of Ocoee in accordance with the permitting agencies for the construction of the reclaimed water distribution system as required. Respond to up to two (2) requests for additional information from the applicable permitting agencies. HAI assumes that a Florida Department of Environmental Protection(FDEP) General Reuse Permit has previously been obtained by others and that no additional FDEP permitting is required for completion of this project The City of Ocoee shall pay all required permitting fees. MJH/ska/corresp/exhibita.mjh HAI #98-037.M5 -2- 042399 C) Bidding Phase 1. Provide the City with one set of original bidding documents to be used for printing of bid sets to be used during the bidding process. The City will be responsible for advertising and bidding the project. Construction drawings shall be on 24-inch by 36-inch mylar, 3 mil single side matte finish, and the project manual shall be on 8 1/2-inch by 11-inch white paper, 20/50 lb, single sided, set up for two sided copying. HAI will also provide Microsoft Word Office 97 files of the contract documents and specifications to the City. 2. Provide assistance in response to written questions received during the bidding process. Provide assistance in the preparation of any addendum which may need to be sent out in response to questions and/or changes in the design. 3. Provide a written review and a recommendation on award based upon the bids received. D) Construction Phase 1. Attend and participate in the Pre-Construction Conference to be conducted by the City with the selected Contractor. 2. Review shop drawings and other required Contractor submittals for the project up to two (2) times per submittal for general conformance with the Contract Documents. Additional reviews above the required two (2), will be conducted and all costs associated with these reviews will be borne by the Contractor. 3. Review and assist the City in response to Requests For Information (RFIs) from the Contractor. 4. Assist the City in review of Requests for Proposed Changes in the design which may result in contract Change Orders. 5. Provide every other week observations of the project and provide the City with a written report of that construction observation. A full-time Resident Project Representative (RPR) is not included in these scope of services. Should the City desire full-time RPR services, a separate contract for those services shall be negotiated prior to construction. 6. Assist the City in the Substantial and Final Completion Inspections and provide the City and applicable permitting agencies with a certification of construction in accordance with plans and specifications of the Project. MJH/ska/corresp/exhibita.mjh HAI #98-037.M5 -3- 042399 7. HAI will prepare Record Drawings for the project based on red line information provided by the Contractor. HAI shall not accept any responsibility or liability for incorrect or misleading information provided by the Contractor. HAI shall provide the City with Autocad Version 14 digital files of the Record Drawings. MJH/ska/corresp/exhibita.mjh HAI 498-037.M5 -4- 042399 COMPENSATION FOR ENGINEER'S SERVICES Task Description Task Budget A-1 Design Phase $ 39,000.00 A-2 Surveying $ 21,000.00 A-3 Aerial Photogrammetry $ 7,000.00 B Permitting Phase $ 3,000.00 C Bidding Phase $ 1,980.00 D Construction Phase $ 9,500.00 Direct Costs/Printing/Misc. $ 1,500.00 Total $ 82,980.00 MJII/ska/corresp/exhibita.mjh HAI#98-037.M5 -5- 042399 TABLE 1 ESTIMATED PROJECT SCHEDULE Days from the Notice to Proceed Execution of Engineering Services Contract 0 Aerial Photogrammetry 14 Survey Underground Utilities 45 30 Percent Completion of Construction Documents and Review at Meeting 80 60 Percent Completion of Construction Documents and Review at Meeting 100 Permit Application Submittal 110 Final of Construction Documents and Review at Meeting 130 Advertisement for Bids 135 Contract Award 160 Estimated Substantial Completion Date 340 Contract Completion and Submittal of Record Drawings 380 Note: (1) Time required to complete location of underground utilities is within four (4) weeks of the utility locate/flagging which is to be performed by a utility locating service (SUNSHINE). Project schedule is contingent upon timely completion of utility locates by locating service. MJH/ska/corresp/exhibita.mjh HAI #98-037.M5 -6- 042399 TABLE 3 THE CITY OF OCOEE, FLORIDA LIFT STATION NO. 22 RELOCATION AND UPGRADE PRELIMINARY/LIST OF DESIGN DRAWINGS Sheet Drawing No. No. Title 1 --- COVER SHEET 2 G-1 LOCATION MAP, GENERAL NOTES AND DRAWING INDEX 3 G-2 LEGEND AND ABBREVIATIONS Mechanical M-1 RECLAIMED WATER MAIN PLAN STA TO STA 2 M-2 RECLAIMED WATER MAIN PLAN STA TO STA 3 M-3 RECLAIMED WATER MAIN PLAN STA TO STA 4 M-4 RECLAIMED WATER MAIN PLAN STA TO STA 5 M-5 RECLAIMED WATER MAIN PLAN STA TO STA 6 M-6 RECLAIMED WATER MAIN PLAN STA TO STA 7 M-7 RECLAIMED WATER MAIN PLAN STA TO STA 8 M-8 RECLAIMED WATER MAIN PLAN STA TO STA 9 M-9 RECLAIMED WATER MAIN PLAN STA TO STA 10 M-10 RECLAIMED WATER MAIN PLAN STA TO STA 11 M-11 RECLAIMED WATER MAIN PLAN STA TO STA 12 M-12 RECLAIMED WATER MAIN PLAN STA TO STA 13 M-13 RECLAIMED WATER MAIN PLAN STA TO STA 14 M-14 RECLAIMED WATER MAIN PLAN STA TO STA 15 M-15 RECLAIMED WATER MAIN PLAN STA TO STA 16 M-16 MISCELLANEOUS DETAILS MIHlska/corresp/exhibita.mjh HAI 498-037.M5 -7- 042399