Loading...
HomeMy WebLinkAboutIV(B)2a Status Report on Forest Oaks Water Well Maim 07/05/88 ITEM Imo. IVB.2(a) THOMAS R. ISON TELEPHONE(407) 656-2322 Ocoee AMAYOR•COMMISSIONER # G CITY OF OCOEE v •• O COMMISSIONERS 150 N.LAKESHORE DRIVE RUSTY JOHNSON OCOEE,FLORIDA 32761 ' 0000 LESTER DABBS,JR. JOHN BATEMAN VARD J. HAGERmbe 2001 aQ ) s� CITY MANAGER OCOEE TEDDY C. RYAN,JR. ABICENTENNIALCOMMUNITY STAFF REPORT TO: THE HONORABLE MAYOR AND BOARD OF CITY COMMISSIONERS FROM: JOHN COCKRELL, WATER DEPARTMENT SUPERVISOR DATE: JUNE 30, 1988 SUBJECT: FOREST OAKS WELL # 1/M-003 ISSUE What action should the Ocoee City Commission take regarding the defective condition of Well #1 at the Forest Oaks Water Treatment Plant? BACKGROUND On June 17, 1986 the Ocoee City Commission accepted the Forest Oaks Water Treatment Plant. The capacity of this plant was to be 2450 gallons per minute (GPM) provided by two wells. This capacity was to have provided service for 1749 single-family residences. Performance of the plant was secured by a two-year bond posted by the Developer which expires August 5, 1988. DISCUSSION Although Well #2 (the west well) has met its design criteria, Well #1 (the east well) has not. In reviewing the file on this particular well, I found various letters, reports, and memoranda which indicate that the design pumping rate of the well should be between 1100 and 1200 GPM. I have also seen documentation in the file attesting to the well's ability to produce that flow. However, subsequent to a discovery by City Staff that the well was not producing its designed rate, the City Commission authorized Ardaman & Associates to conduct an investigation to determine the true capacity of the well. Subsequently, Ardaman conducted the necessary test and has determined that the sustained pumping rate of the well should not exceed 700 GPM. A copy of Ardaman's report dated May 16, 1988 in which this conclusion was discussed was then transmitted to the Developer, Mr. A. Wayne Rich, by our letter dated May 23, 1988. In response to that letter, Mr. Rich apparently authorized Michael D. Sims & Associates to review Ardaman's report and to make appropriate recommendations. "CENTER OF GOOD LIVING—THE PRIDE OF WEST ORANGE" In his report dated June 14, 1988, Mr. Sims concludes that the well is capable of producing at least 1000 GPM even with the restriction posed by the 7" casing (the well was originally designed to be a 10" well) although it cannot achieve this rate without restoration of the well bore to its originally-drilled depth including an additional 50 feet to allow for future caving or sloughing. RECOrMRENDATION It is respectfully recommended that the Honorable Mayor and Board of City Commissioners approve the following action: 1. That the City of Ocoee provide formal notice to the Developer, the surety for the bond, the well's design engineer, the City's consulting engineer that provided services to the City for this particular project, and the contractor that this well is defective and that a demand be made on all of these parties for actions necessary to correct these defects. This demand must be made prior to the expiration of the bond on August 5. 2. That the Developer be allowed to undertake the restorative effort recommended by Mr. Sims entirely at the Developer's cost. We should note that the Staff is not convinced that this restorative effort will effect a permanent solution to the problems but feel that the Developer should be given this opportunity. Such permission should be given with the expressed stipulation that by granting the Developer this opportunity, the City is not releasing any of its rights to obtain a permanent solution to the capacity problem which would be consistent with sound engineering practice. Furthermore, the City's approval must be given with the additional stipulations that the Developer must accomplish this work within a time period agreed upon by the City and that such approval will not prejudice our recovery rights under the terms of the bond and the Developer's Agreement. DLF/jgr cc: Teddy C. Ryan, Jr. , City Manager Dennis L. Finch, Assistant City Manager William F. Lichtler, Ardaman & Associates Todd L. Johnson, Hartford Insurance Co. (Surety) A. Wayne Rich, Amick Construction Co. (Developer) William Goodman, Residential Communities of America (Developer) Michael D. Sims & Associates Walter Kuhrt, Jr. , P.E. , Kuhrt & Associates, Inc. (Design Engineer) Stephen R. Miller, P.E. , Miller, Miller, Sellen, and Einhouse, Inc. (Consulting Engineer) Meredith Corporation (Contractor) R. Duke Woodson, City Attorney Ardaman &Associates, Inc. 111.0%4. June 29, 1988 File Number 87-082 Consultants in Soils, :-vcrocecicay, Foundations and Mater als Testing City of Ocoee 150 Lakeshore Drive Ocoee, Florida 32761 Attention: Mr. John Cockrell, Ocoee Water Superintendent Subject: Report - Forest Oaks Water Well No. 1, Evaluation and Recommendation by Michael D. Sims & Associates, Inc. Gentlemen: As requested by Mr. John Cockrell, Mr. William F. Lichtler has reviewed the subject report. We have several specific comments and an overall comment on the conclusions and recommendations. 1. The caliper log performed on May 11, 1988 shows the top of the 7-inch casing at 121 feet which is the maximum depth at which the intake of the existing pump could be set. Measurement of the pump column by Layne-Atlantic during the pump test on May 9, 1988 (120.3 feet) indicate that the foot valve was within about a foot of the top of the 7-inch liner casing. 2. The geophysical logs indicate that the open hole part of the well extends from 609 feet to 1142 feet for a total open hole length of 533 feet. The driller's log shows the original open hole depth after the well was completed on 6/12/85 to be from 609 to 1168 feet for a total open hole length of 559 feet.' As the driller's log generally is the original source of data on well construction unless geophysical logs are run at the time the well is completed, this indicates that there is 26 feet of fill in the bottom of the well. Dividing 26 by the original open hole length of 559 feet indicates that only 4.65 percent of the producing part of the well has been filled in. 3. Examination of the geophysical logs does not reveal any data that would accurately determine the distribution of major producing zones where water enters the well bore during pumping. The most likely looking zones on the caliper log are between 840 and 846 feet where a cavity at least 34.5 inches in diameter was encountered and between 609 and 700 feet where numerous small cavities are present. A horizontally extensive 34-inch cavity is capable of yielding a large quantity of water. The log does not show significant cavities between 1000 feet and 1142 feet except a 10-inch diameter cavity at 1135 feet. The other geophysical logs do not indicate zones of potential major inflow to the well nor does the driller's log. In our opinion, the most practical way to 8008 S Orange Avenue. P 0 Sox 30 Orlardo. FOr:ga 32859-3003 t3051 855-3860 •Offices .n: 3artow. Eracent: _aucercate -=cr Myer:: 'A ami. Na G�e 5 Pjnarn a - 'y Seacr era peach .._--- City of Ocoee File Number 87-082 -2- determine the pattern of inflow of water to the well bore during pumping is to conduct a current meter survey during pumping. 4. We believe that a roughness coefficient (lower numbers indicate greater roughness) of c=130 (new pipe) is too high a number when calculating the friction loss in the 7-inch diameter pipe. The 7-inch casing is at least 3 years old and judging by the condition of the pump column that was in the well and presumably was new when installed in 1984 a coefficient of c=120 (5 years old) to c=110 (10 years old) is more likely. These coefficients indicate 14 to 16 feet of drawdown, respectively. Using a mid value of 15 feet leaves only about 3±1 feet of drawdown attributable to drawdown in the aquifer and friction loss in the open hole part of the well which is only 6 inches in diameter at some depths. As stated in Ardaman & Associates, Inc. report to the City of Ocoee dated May 25, 1988, the roughness coefficient of the 7-inch diameter casing and consequently the drawdown in the well can be expected to increase with time. We believe that most of the drawdown measured during the pumping test on May 9, 1988 was due to friction loss in the well. Some drawdown in the aquifer must take place to move water to the well, however, we believe that this factor is minior in Well No. 1. 5. We can make no definitive statements as to the accuracy of the measurements of either discharge or drawdown during the June 11, 1985 pumping test. However, an increase of more than 50 percent (9 feet to 14 feet) in drawdown when the pumping rate was increased 10 percent (1000 to 1100 gpm) is not the usual aquifer response during a pumping test. Our general comments are: i) that using a roughness coefficient of c=130 to calculate friction loss in the 7-inch diameter casing liner is unrealistic; (ii) there is no definitive data in the geophysical logs to indicate that the major producing zone of the well is near the bottom-of the well (1000 to 1142 feet); (iii) estimating the error in measurement during the June 11, 1985 pumping test at 15 to 20 percent is speculative; and (iv) we are not optimistic that removing the 26 feet of fill in the bottom of the well and deepening it another 50 feet will significantly • increase the specific capacity of the well. If we can be of further assistance or if you have any questions, please contact us. Very truly yours, ARDAMAN & ASSOCIATES, INC. 4,z)e,/:/eel:>p)/o . `7et -rLitlx William F. Lichtler Senior Hydrogeologist WFL:ed Ardaman&Associates,arc. Ardaman & Associates, Inc. /MA May 16, 1988 Consultants in Soils, Hydrogeology, File Number 87-082 Foundations and Materials Testing City of Ocoee 150 Lakeshore Drive Ocoee, Florida 32761 Attention: Mr. John Cockrell • Subject: Pumping Test Conducted by Layne Atlantic Company on Well No. 1 (East Well) at Forest Oaks Wellfield Gentlemen: As requested by Mr. John Cockrell, Mr. William Lichtler oversaw the pumping test conducted by Layne Atlantic Company on Well No. 1 (east well) at the Forest Oaks Wellfield. The original schedule was for Layne to set the pump on May 4, 1988 and conduct a preliminary test with a longer test if needed on May 5, 1988. Problems arose with inserting the pump bowls in the well on May 4, 1988. The bowls were modified and the pump was emplaced in the well on May 5, 1988. Further problems arose in connecting the 6-inch discharge line to the 8-inch orifice pipe, but on May 6, 1988, a preliminary run was performed to test the equipment. Present were: Mr. John Cockrell, Ocoee Water Superintendent; Messrs. Walter Wood and Douglas Hern, MIchael D. Sims & Associates; Mr. Ned De Marce, Berry Goodman, Inc.; Mr. William Lichtler, Ardaman & Associates, Inc.; and a three-man crew from Layne Atlantic Company. The static water level in the well was measured by steel tape using the wetted tape technique at 71.79 feet below the top -of the 10-inch diameter casing at 11:25. The water level, as measured using the airline installed in the well, was within 0.2 feet of that measured with the steel tape. The orifice used to measure discharge of the well was a 6-inch knife edge plate in an 8-inch pipe. The Layne orifice tables used to calculate discharge in relation to the manometer readings are calculated using a knife edge orifice plate. The manometer opening is located 33 inches from the orifice plate rather than the 24 • inches as indicated in the book; however, Layne personnel on the job said that they have used this setup for many years and it has been calibrated within 2 percent against calibrated flow meters. The static water level in the well at 12:50 was 71.85 feet below the top of the casing. Well No. 2 had not been pumping for more than 20 hours. The pump test • was started at 13:25; however, at 13:27 the coupling above the pump bowls broke and the test was postponed until May 9, 1988. 8008 S Orange Avenue, P.O.Box 13003.Orlando.Florida 328,9 3003(305)855-3880 Olfirre in•lnrtow.Rrnrirntnn.Cnrnn, Fnri I nndr.dnIn. Fon t4vnr'.Miami,Nnrine,Panama City Benrh.fiivinra Rnarh,Snrnxnta,Tallah -, , City of Ocoee File Number 87-082 -2- On May 9, 1988 the water level in the well, as measured by steel tape, was 73.19 feet below the new measuring point at the airline access hole (one foot above the top of the casing) at 14:37 hours. The water level in the well, as indicated by the airline gage reading, corresponded to the steel tape reading within 0.2 feet and had remained steady for more than one hour. The reading showed that the bottom end of the airline was 28.5 to 29 feet below the static water level. The length of the airline was reported by Layne as 103.6 feet below the access hole placing the end at 30.4 feet below the water surface. Present at the test were: Mr. John Cockrell, Ocoee Water Superintendent; Mr. Walter Wood, Michael D. Sims ac Associates; Mr. WIlliam Lichtler, Ardaman & Associates, Inc.; and a three-man crew from Layne Atlantic Company. The test was started at 14:38 and the pumping rate was steadily increased toward the goal of 1100 gallons per minute (gpm). As the pumping rate reached approximately 950 to 975 gpm, as indicated by the manometer-discharge rating curve, the airline readings on the gage reached the bottom peg on the gage indicating that the water level was below the bottom end of the airline and drawdown in the well was greater than 28.5 to 29 feet. At this time (14:45) the Layne crew chief (Gary) shut down the engine to avoid the possibility of drawing the water level below the pump bowls as the airline gage could no longer show the water level. The end of the airline was reported to be approximately 7 feet above the pump bowls. A conference was held and it was agreed upon by all present that the well could not be pumped at 1100 gpm, therefore, It was decided to pump the well at approximately 800 gpm which corresponds to a manometer reading of about 26 inches. The airline reading at a pumping rate of 800 gpm produced an airline reading of 10 feet which corresponds to a drawdown of 18 to 19 feet (specific capacity of 43 gpm per foot of drawdown). The reading stabilized within approximately 5 minutes and remained at that level for 15 minutes. The switch on the engine malfunctioned several times and shut down the engine; however, each time the water level returned to the static level within 5 minutes and stabilized at 18 to 19 feet of drawdown at 800 gpm 15 minutes after the test was restarted. Detailed readings of pumping rates and drawdowns were taken by the Layne crew and will be forwarded when available. The two major causes of drawdown in a well are: (1) lowered water levels in the aquifer which are necessary to create a gradient and cause the water to move to the well and (2) friction loss within the well casing and open hole part of the well as the water moves up to the pump intake. The aquifer drawdown Is a function of the transmissibility and storage coefficient of the aquifer and leakance. The drawdown due to friction loss is a function of the type, diameter and length of the casing, the diameter and roughness of the open hole and the location of the zones contributing water to the well. • City of Ocoee File Number 87-082 -3- The aquifer transmissibility varies greatly from well to well depending on the number and size of water bearing cavities penetrated by the well. The drillers log for the open hole part of the well from 609 feet to 1168 feet does not mention cavities penetrated; however, the log lists hard light brown limerock and dolomite between 970 and 1168 feet and this type of formation often contains cavities that yield large quantities of water. The well is constructed, according to the drillers log, with a 7-inch liner from 125 feet to 609 feet (confirmed by geophysical logging from 121 to 609 feet) in the 10-inch well. Calculations based on 500 feet of casing with the generally accepted roughness value of C=100 for old pipe, 800 gpm and a casing size of 7-Inch diameter, indicate a head loss of approximately 19 feet (see graph). The calculations indicate that most of the drawdown in the well is due to friction loss in the 7-inch diameter casing liner in the well with little loss due to open bore friction or aquifer drawdown. The rapid stabilization of drawdown levels and the rapid recovery support this conclusion. We believe that the maximum withdrawal rate from this well with Its present construction should not exceed 800 gpm as the pump cannot be set lower due to the 7-inch casing at 121 feet. Water levels with long-term production pumping at 800 gpm would probably be lower than 19 feet below current static levels due to likely increased drawdown with long-term pumping, interference from Well No. 2, natural decline in regional water levels and interference from nearby wells, therefore, it is recommended that the permanent pump be designed to produce water at a rate of approximately 700 gpm. If you have any questions, please do not hesitate to contact us. Very truly yours, ARDAMAN ec ASSOCIATES, INC. iirf/,,ez.ze. 40e:01 William F. Lichtler Senior H dro ologist Herbert G. Stangland, Jr., .E. Senior Water Resources E ineer Florida Registration No. 16713 WFL:cc EXPLANATION 250— FLOW=800 GPM ROUGHNESS VALUE-C = 100 LENGTH OF PIPE = 500 FEET DIAMETER OF PIPE a 7 INCHES _ HEAD LOSS - 19 FT. t • DATA POINT FROM WILLIAMS & HAZEN TABLE A CALCULATED USING FORMULA W U. FORMULA 0150— H=4.727L r O 1 1.85 WD4.87 L C J = H.19 FT. H=HEAD LOSS (FEET) 100— OFLOW (CFS) C=ROUGHNESS D=DIAMETER OF PIPE (FEET) L=LENGTH OF PIPE (FEET) 50— r 0— I 4 6 6 7 8 9 10 12 14 18 DIAMETER OF PIPE IN INCHES HEAD LOSS THRU 500 FT. OF PIPE Nor Ardaman& Associates,Inc. , Gnaltiq En jne�n i�f�ilE.�hdEM�Nr. F.nnbtinni,n id N4twiE TStinI CITY OF OCOEE SOURCE: WILLIAMS & HAZEN 1933 HYDRAULIC TABLES JOHN WILEY& SONS "AAMNEY. SEF ICNECREOEr IDATE: 5/9/88 F87-ae2gENO. APPROVED/2. S 4464 NOSB47