Loading...
HomeMy WebLinkAboutVII(A) Fire Station No. 4 Driveway Agenda 9-07-99 tem VII A. "CENTER OF GOOD LIVING-PRIDE OF WEST ORANG MAYOR•COMMISSIONER Ocoee S. SCOTT VANDERGRIFT Cy �_ CITY OF OCOEE �ru • p COMMISSIONERS r 150 N.LAKESHORE DRIVE DANNY HOWELL � RUSTY JOHNSON OCOEE,FLORIDA 34761-2258 SCOTT ANDERSON �, 'yj �� (407)656-2322 NANCY J.PARKER Of GOGOO'0 CITY MANAGER ELLIS SHAPIRO MEMORANDUM DATE: August 31, 1999 TO: The Honorable Mayor and Board of City Commissioners FROM: James W. Shira, P.E., City Engineer/Utilities Director SUBJECT: Fire Station No. 4 Driveway The low bid amount for this contract was $86,300.00 submitted by Prime Construction Group, Inc. Before beginning construction of the driveway, we had to remove all of the material that had been placed by the original contractor since it was of very poor quality. Once that was done, we were able to see what the underlying soils and groundwater conditions were like. Based on our analysis of the actual site conditions, we determined that we needed to modify the inlet structure and the underdrain system from the original design, and we also added reinforcing to the driveway curbing to strengthen it. To complete the work as quickly as possible, and allow the fire department to begin using this driveway, I negotiated a price for the additional work, and authorized it as a field change. The agreed-upon fee for this additional work was $4,579.20. Attached for your review is a copy of a letter from Prime dated May 27, 1999 which provides a breakdown of this amount. The original contract amount of$86,300.00 and this proposed additional fee of$4,579.20 will both be part of the ongoing litigation between the city and the original fire station construction contractor. I recommend that the City Commission authorize an increase in the contract amount for this project of$4,579.20, making the total authorized contract amount$90,879.20, and authorize payment of this amount to Prime Construction Group, Inc. Attachment Protect£1cIie','S W'ator Resources t: �l� JUN.11.1999 12:00PM 11c. rr7 r.cec • PRIME CONSTRUCTION GROUP, INC. 5528 Force Four Parkway Telephone 407-856-8180 Post Office Box 590507 Fax 407-856-8182 Orlando,FL 32859-0507 FL License#CGC 037504 May 27'", 1999 Mr. James Shirai PE CITY OF OCOEE 150 N. Lakeshore Drive Ocoee, Florida 34761 RE: Fire Station #4 Driveway Reconstruction Additional Work Dear Mr. Shiro: Please find the following breakdown of costs for the approved, additional work on the above referenced project. I. Additional "E" Box replacing the existing "F" Structure. Cost $2,500.00 II. Adding the#6 Rebar between the "F" curb & driveway slab. Cost $607.20 III. Adding the Wire Mat to the Driveway Slab. Cast $1,472.00 The total increase of this purchase order is Four Thousand, Five Hundred, Seventy-nine and 20/100 Dollars ($4,579.20). Please review these costs and advise PCG of the method of invoicing. Sincerely, alt ames A. Har rove Sr. Project Manager JAH/sks