Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
VII (K) Change Order No. 2 with Wharton Smith, Inc. for Water Distribution Mains - Phase 1 Project
Agenda 12-21-99 Item VII K "CENTER OF GOOD LAVING-PRIDE OF WEST ORANGE" MAYOR•COMMISSIONER Ocoee S.SCOT'VANDERGRIFT O� fY COMMISSIONERS DANNY CITY OF OCOEE _ �� a = COUTA WNERO v a 150 N. LAKESHORE DRIVE scan ANDERSON OCOEE, FLORIDA 34761-2258 RUM 1011NSON wry �?V (407)656-2322 NANCY 1. PARKER r`"4 OF cOO i a v MANAGER LT.LIS SHAPIRO MEMORANDUM DATE: December 10, 1999 TO: The Honorable Mayor and Board of City Commissioners FROM: David Wheeler, P.E. 4Qn/ Assistant City Engineer/Utilities Director SUBJECT: Water Distribution Mains - Phase 1 Project Change Order Request No.2 Attached for your review is Change Order Request No. 2 on the Water Distribution Mains - Phase 1 Project with Wharton-Smith, Inc. The Phase 1 Project included a new water main along Wurst Road from Peters Avenue to the lamela WTP, along hackney-Prairie Road from the Forest Oaks WTP to Rich Drive, and the cleaning and testing of the existing force main on Clarke Road. This change order request was initiated by City Staff to enhance the project and allow for future expansion and better operation and maintenance of the distribution system. The items included in this change order arc: Item 2-A - Additional Valves and Fittings on Wurst Road at Peters Avenue: Under Change Order No. 1, the pipeline to the west of the intersection of Wurst Road and Peters Avenue was deleted due to the inability to obtain temporary construction easements. To allow for the contractor to complete his project, a plug was required to test against. To allow for expansion, the tee and gate valves were required for future expansion west along Wurst Road and north along Peters Avenue. The cost to perform this additional work was $3,500.00, with no increase in contract time. Item 2-B - Additional Fittings on Wurst Road at Foxfire Drive: At the intersection of Wurst Road and Foxfire Drive there is a sanitary sewer force main, water main, and stormwater collection structure and pipeline. To maintain required separations the new 12 inch pipeline needed to he lowered to clear these pipelines. The original design did not take into account the significant depth of the existing utilities. There are no record drawings for the existing facilities in this area. In addition, the existing Sprint telephone cables arc not installed in a path parallel to the edge of Wurst Road, from west to east they move closer to the pow urt. , IrIeseErrt.: road, and the horizontal layout of the pipeline was corrected at the same time. The cost to perform this additional work was $2,000.00, with no increase in contract time. Item 2-C-Additional Valves and Fittings on Hackney-Prairie Road at Rich Drive: The new 16 inch pipeline from the Forest Oaks WTP was designed to connect to the recently installed pipeline in the Remington Oaks Development along Hackney-Prairie Road. Connection to the 12 inch pipeline on Rich Drive was not included. To allow for minimal disruptions and no loss of pressure or flow associated with a maintenance repair, the connection to the 12 inch pipeline was required. This involved the installation of a cross and two gate valves to connect all three pipelines. The cost to perform tins additional work was $7,000.00, with no increase in contract time. The total cost for this change order is $12.500.00 with no extension on the contract time. The dollars for this change order will come from the project's construction contingency. This change order amounts to approximately 3.19 percent of the original bid price of$392,000.00. I recommend that the City Commission approve Change Order No. 2 with Wharton-Smith, Inc. by increasing the contract amount by $12,500.00, with no extension in contract time, and authorize the Mayor and City Clerk to execute Change Order No. 2. Attachment 1) Change Order No. 2 POWt Ocoee CITY OF OCOEE ip 40 ' Engineering/Utilities 150 North Lakeshore Drive o ,* Ocoee, Florida 34761-2258 CHANGE ORDER NO. #2 CITY OF OCOEE Water Distribution Mans - Phase I PROJECT NO. DATE: December 10, 1999 CONTRACTOR: Wharton-Smith, Inc. AGREEMENT DATE: February 16, 1999 The following changes are hereby made to the CONTRACT DOCUMENTS. Original CONTRACT PRICE $392,000.00 Current CONTRACT PRICE ADJUSTED by previous CI IANGE ORDER S 317,980.00 Net Increase Resulting from this CHANGE ORDER $ 12,500.00 The current CONTRACT PRICE including this CHANGE ORDER $330,480.00 ORIGINAL CONTRACT TIME: 150 Consecutive Calendar Days from Notice to Proceed Date: July 27, 1999 Current CONTRACT TIME adjusted by previous CHANGE ORDERS Date: July 27, 1999 Net Increase Resulting from this CHANGE ORDER Days: 0 days Current CONTRACT TIME Including this CHANGE ORDER Date: July 27, 1999 00842-I CHANGES ORDERED: GENERAL This change order is necessary to cover changes in the work to be performed under this Contract. The GENERAL CONDITION, SUPPLEMENTARY CONDITIONS, SPECIFICATIONS and all parts of the Project Manual listed in Article I, Definitions, of the GENERAL CONDITIONS apply to and govern all work under this change order. II. REQUIRED CHANGES Item 2a-RPC 003: Addition of a 12 inch tee, two gate valves and appurtenances at the end of the pipeline on Wurst Road at Peters Avenue. Item 2b-RPC 004: Addition of fittings and appurtenances to work around existing Sprint telephone cables and City water, sewer and stormwater pipelines and structures at the intersection of Wurst Road and Foxfire Drive. Item 2c-RPC 005: Addition of a cross, two gate valves and appurtenances at the connection to the existing pipelines on I lackney-Prairie Road at Rich Drive. Ill. JUSTIFICATION Item 2a- RPC 003: Under change order no. I, the pipeline to the west of the intersection of Wurst Road and Peters Avenue was deleted do to the inability to obtain temporary construction easements. To allow for the contractor to complete his project, a plug was required to test against. To allow for expansion the tee and gate valves were required for future expansion west along Wurst Road and north along Peters Avenue. Item 2h- RPC 004: The existing Sprint telephone cables are not installed in a path parallel to the edge of Wurst Road;from west to cast they move closer to the road. At the intersection of Wurst Road and Foxfire Drive there is a sanitary sewer force main, water main, and stormwater collection structure and pipeline. To maintain required separations the new 12 inch pipeline needed to be lowered to clear these pipelines and the horizontal layout of the pipeline was corrected at the same time. Item 2c-RPC 005: The new 16 inch pipeline from the Forest Oaks WTP was designed to connect to the recently installed pipeline in the Remington Oaks Development along Hackney-Prairie Road. Connection to the 12 inch pipeline on Rich Drive was not included. To allow for minimal disruptions and no loss of pressure or flow associated with a maintenance repair, the connection to the 12 inch pipeline was required. This involved the installation of the cross and the two gate valves. IV. NARRATIVE OF NEGOTIATIONS Item 2a-RPC 003: Contract prices were used for the valves and negotiated prices for the fittings. Item 2b- RPC 004: Negotiated prices were used for the fittings. Item 2c-RPC 005: Contract prices were used for the 12 inch valve and negotiated prices for the 16 inch valve and the fittings. 00842-2 V. PAYMENT Change Order Description Net Increase Unit Linn Price. Net Increase Item No. (Decrease)Quantity (Decrease)Price I a:IOC 003 Valves and Goings at Wars)Road and Peters $3,500 00 Avenue Ib'.RPC 004 Fittings at Worst Road'and Foxlirc Drive $2,001400 Ic RPC 005 Valves and fittings at I lackncy-Prairie Road $7.000.00 and Rich Drive Total Net Increase for Change Order No.#2 SI 2,500.00 VI. APPROVAL AND CHANCE AUTHORIZATION This proposed change to the Contract is to be approved by the Ocoee City Commission_ Acknowledgements: The aforementioned change, and work affected thereby, is subject to all provisions of the original contract not specifically changed by this Change Orden and, It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original contract other than matters expressly provided herein. CONTRACTOR acknowledges, by its execution and acceptance of this Change Order, that the adjustments in Contract Price and Time shown hereon constitute full and complete compensation and satisfaction for all costs and modifications of performance time incurred by the CONTRACTOR as a result of this Change Order. No other claim for increased costs of performance or modifications of time will be granted by the OWNER for the Work covered by this Change Order. The CONTRACTOR hereby waives and releases any further claims for cost or time against the OWNER arising from or relating to the matters or Work set forth or contemplated by this Change Order. 00842-3 RECOMMENDED BY: ACCEPTED BY: CITY OF OCOEE,FLORIDA By: By: Signature Signature Date: Date: _ Title: Title: APPROVED BY: CITY OF OCOEE, FLORIDA Owner By: S.Scott Vandergrift, Mayor Date Attest: Jean Grafton,City Cleric FOR USE AND RELIANCE ONLY BY THE APPROVED BY THE OCOEE CITY CITY OF OCOEE,APPROVED AS TO FORM COMMISSION IN A MEETING HELD ON AND LEGALITY THIS DAY OF , 199 UNDER , 199 AGENDA ITEM NO. FOLEY& I,ARDNER By: _ City Attorney 00842-4 Ocoee CITY OF OCOEE REQUEST FOR PROPOSAL 'KO Engineering/Utilities FOR PROPOSED CHANGE I 150 North Lakeshore Drive (407)656-2322 ext. 142 (RFP) \e,c„}' Ocoee, Florida 34761-2258 (407)656-7835 -fax NO._DO 3 PROJECT DATA: NAME. LityG7' i0 di In If 7a1-n /")[,,nr / /(GSL I _ PROJECT NO: LOCATION. L.urSy tt L4 et - _ _ DATE OTHER. 1 ` Pe ie/S Oven ii t REFERENCE: TO(CONTRACTOR): WAG, 4'?" Sm �/4, c. Please provide the undersigned a proposal for the following change in the work within seven(7)calendar days after receipt of this request. The written proposal must clearly delineate the scope of the proposed change in the work providing an itemized estimate of the time and all material and labor(by trade),subcontract and overhead costs and fees Any amount claimed forsubcontractsc must be similarly supported. p DESCRIPTION oofff change in work ,4/ Y/t gm< 6r' /n C- �/ e ��i.- Gt) )-/wtj y /IOQf 67 /"LJLJ 4vtnw1 +) t" a74 ([ 0 /A X /l n . 7"A4 nLr1A r./-114 Jdiftt1,e4 jc, l it in r1e �/ IC ,nth Get - .✓awes On J.[L. n4r"//� t.,� vr.s :Si�' C,i'f`S ry[_ .rALe /Le . Change Order Type. d Deletion G)Addition 4 Revision 4 Other:( ) [ A 3 Constraints of Change- J G�' C � ✓r rn t C'�� /ter � RVSL 4 hie i 1. Initiated by: ©Changes in Owner Requirements A Unforeseen Conditions A Others:( ) Proposal must be received by: ATTACHMENTS(Listing of attached documents that support description): 1 Contractor Request for Information No. 2. Plan Revisions: 3. 6. DOWNER 40r.✓/ U4t4 e, C,ry GF Ccer e.. &CONTRACTOR ./C - ic.. /7Gnia Of S��/ Zx ar G ENGINEER:&✓ff y/Onaft/y fitL, iG.. IIIIDDD�"',FIELD:FOnA- 6raoi. CMr OY °tree- d CONSTRUCTION ADMINISTRAT Rr A OTHER'. A SUBCONSULTANT. Date Received From Contractor: Date Returned to Contractor With Comments: Date Returned to City. -_ 00847-I PRICING INFORMATION Method of Pricing. tnt d Established Contract Unit Price(s) IyVt[31 4 Negotiated Unit Price(s)(including Overhead and Profit) C. A Negotiated Lump Sum(including Overhead and Profit) D. A Actual Cost of Work plus Fixed Percent for Overhead and Profit E. 4 A combination of A, B,C,D DESCRIPTION OF WORK'. 4 By General Contractor d By Subcontractor ITEM OF WORK QUANTITY PRICE TOTAL c l) la Kit ma Toe w�-4ct.ass of ii S 4 a,e, p/ti 1 Ma el00, (ea' Eq.n3rNeGl 9 /. . V B 24 f..0 MS /2 Gr.l- Vc tuts ,d/6;ccess cfle.s j 1rk306, z16GG. ` (r tc fvn flat/ clot Locoeerh) Attach additional pages if necessary. NET TOTAL COST OF THIS CHANGE PROPOSAL $ 3, Soo f e EXTENSION OF CONTRACT TIME: �' As part of this Change Proposal the Contractor requests an extension of the contract time in the amount of G additional days. Provide thorough documentation in support of the request for additional time: A requirement of this Change Proposal will be to provide record drawing information for all of the affected items of work RECOMMENDATION BY ENGINEER/CONSTRUCTION ADMINISTRATOR: Comments: TA,'s N/// a /4or✓ Fr F.,1H Ie_ P.K/pn3icn Signature of Engineer/Construction Administrator: a/j4--47/ C, 4�/`Yx"r— Date ACCEPTANCE BY OWNER,0 Comments. fl 73 Rj Co. a Signature: ./9'-..—s� / y- l'At Date: ,of _ agree to the costs and terms of RFP (Name) Rompany) (No) this day of _ , 199 (day) (month) (tow) 00847-2 !!!OCOB° CITY OF OCOEE REQUEST FOR PROPOSAL Engineering/Utilities FOR PROPOSED CHANGE \,\' 150 North Lakeshore Drive (407) 656-2322 ext. 142 (RFP) \• °\fo Ocoee, Florida 34761-2258 (407) 656-7835 -fax NO. 0i3 y PROJECT DATA. /� NAME Uc'ft/ �/J7(7. n �"rG ..,c 194.5e./ PROJECT NO: LOCATION. (,/ursy Al 6 e DATE ff __. . _._. OTHER'. F(X h/(v IJr.JJ✓L_. ,�// REFERENCE TO(CONTRACTOR). LJhOF lcrl ' Sr. dlr /nr. Please provide the undersigned a proposal for the following change in the work within seven(7)calendar days after receipt of this request. The written proposal must clearly delineate the scope of the proposed change in the work providing an itemized estimate of the time and all material and labor(by trade),subcontract and overhead costs Aand fees. Any amount claimed for subcontracts must be similarly supported. DESCRIPTION of change in work: Ara rn47 r', Ylinci /U Lipp It, Oro i.nd e,Ai /^4_- Sere-it fP.le"An,e- cobIts gnvl C,y vC.�[-^ .1t✓t/ 4 sic,,n .✓c!e/• �,.rc.a. /.n P�77c^61 c irc. -/ „ e„.3 Change Order Type: A Deletion ty,CoAddition d Revision A Other. ( Constraints of Change: ex's-nGe fc.;/, /a.4 ✓C-fE- /n Len Initiated by. DChanges in Owner Requirements 4 Unforeseen Conditions A Others:( ) Proposal must be received by: ATTACHMENTS(Listing of attached documents that support description). t. Contractor Request for Information No. 2. Plan Revisions: 3. 6. d OWNER: LDC✓io 1.--)`1Le/tzr CJ' oT Ofeee 4 CONTRACTOR: kit k ,I�„y1 e U4czytn ,- otA7.4 ENGINEER.&err_ hnni$A J i96c L A 4 FIELD. Fr,4k oral, _-_ CIs7 >� ()roe d CONSTRUCTION ADMINISTRATOR'. _ A OTHER: A SUBCONSULTANT: Date Received From Contractor: _ Date Returned to Contractor With Comments: Date Returned to City: 00847-I Ocoee CITY OF OCOEE REQUEST FOR PROPOSAL u\�®�� Engineering/Utilities FOR PROPOSED CHANGE y 150 North Lakeshore Drive (407)656-2322 ext. 142 (KEPI <d„ " Ocoee, Florida 34761-2258 (407) 656-7835 -fax No. 00 c PROJECT DATA'. /� NAME. ✓✓6fcr i1iA.iL'bid i2Ln (Y7 Jill ' /9%Gse- / _ PROJECT NO: LOCATION' HOr./C n / - /"/0/'r l_ /tz ed _. . _ -. ... DATE OTHER: zfr.h a,,yt- REFERENCE'. TO(CONTRACTOR): 1J/,4 tic - Sr" ire InC_ Please provide the undersigned a proposal for the following change in the work within seven(7)calendar days after receipt of this request. The written proposal must clearly delineate the scope of the proposed change in the work providing an itemized estimate of the time and all material and labor(by trade),subcontract and overhead costs and fe/es. Any amount claimed for subcontracts mustus be similarly supported. /� DESCRIPTION of change in work'. kid,f,.-nt / ✓elyts .c ,m r//72-^gS ?t G//pw Fe/ CSC un /�zn C oticCc// �/cysfoe . Mt- f.ry;ys z3e%,11c M._.r. !e " X/2 ' C/0J.5 '/6 fi//,p( s lec v� ,_4a - IL " 5a/�l .54e ve- e -0/ -IA y__.-I.ap vc /yes .-,e,le- , it " c -,d i4 - rice -/o ✓c/t-e- - Change Order Type: /goA Deletion O3Addition A Revision A Other:( ) Constraints of Change. e,'/fc! pp ctL tit'i fir Sy$71,..rrt.... Initiated by. Changes in Owner Requirements 4 Unforeseen Conditions 4 Others. ( ) Proposal must be received by: ATTACHMENTS(Listing of attached documents that support description)'. 1. Contractor Request for Information No. _ 4. .. 2 Plan Revisions: 5 3 _.. 6 4 OWNER: A d Oh&a, C'.>.gp- Oe ec 4 CONTRACTOR knq.e /(r,4/'c-2'. jy44/✓^, 5—r�44 4 ENGINEER Gco/.r 4..ne 15c/f Pit �ie 4 FIELD:FC � p, ap L/ /cdf/_vi °rte.( A CONSTRUCTION ADMINISTRATOR: _ A OTHER: 4 SUBCONSULTANT: Date Received From Contractor. Date Returned to Contractor With Comments- Date Returned to City. - 00847-I PRICING INFORMATION: Method of Pricing: A A Established Contract Unit Price(s) B A Negotiated Unit Price(s)(including Overhead and Profit) C. 4 Negotiated Lump Sum(including Overhead and Profit) D. 4 Actual Cost of Work plus Fixed Percent for Overhead and Profit E. A A combination of A,B.C.D DESCRIPTION OF WORK: A By General Contractor A By Subcontractor ITEM OF WORK QUANTITY PRICE TOTALat /6X/x Mt Crns I z 7Oe. 0 zl hi gn? sr.i,v/ S/evva 1 SGG- t) ,b Mr it/i/J 5 kt VC, I 7001 4) /6.. /75 cr4, Vo/vt, r z, 80G. r' ,z " PIT 6 /c, vc/vc. r / 306, JAttach additional pages if necessary. NET TOTAL COST OF THIS CHANGE PROPOSAL $ 7 orio. EXTENSION OF CONTRACT TIME: As part of this Change Proposal the Contractor requests an extension of the contract time in the amount of Q additional days. Provide thorough documentation in support of the request for additional time. A requirement of this Change Proposal will be to provide record drawing information for all of the affected items of work RECOMMENDATION BY ENGINEER/CONSTRUCTION ADMINISTRATOR. Comments: tic/to/gel/ Jler baT>tct Gptt4 lien CC deftt itt 6.-iitn ay571e-M odnd ,Ind.-..w, Zl D4 /u4 C.S Signature of Engineer/Construction Administrator: c 4,27 ,✓/ Date: ACCEPTANCE BY OWNER: Comments: /ro GC55 '4a t CO. 2. Signature: _Z _-7./, . 77✓../4✓ Date. .of agree to the costs and terms of RPP (Name) IC ompmo mml this day of . 199 (day) {month) - (veal) 00847-2 PRICING INFORMATION'. Method of Pricing: A. 4 Established Contract Unit Price(s) ®B 4 Negotiated Unit Price(s)(including Overhead and Profit) C. 4 Negotiated Lump Sum(including Overhead and Profit) D. 4 Actual Cost of Work plus Fixed Percent for Overhead and Profit E. 4 A combination of A,B, C, D DESCRIPTION OF WORK: 4 By General Contractor d By Subcontractor ITEM OF WORK QUANTITY PRICE - TOTAL d 12.) lI 1el p 980, `D mS /Se.,ol ( (Y PCB. J yO, (II 90e MS Beni 33 530, " Attach additional pages if necessary NET TOTAL COST OF THIS CHANGE PROPOSAL $ A 000, EXTENSION OF CONTRACT TIME:As part of this Change Proposal the Contractor requests an extension of the contract time in the amount of 0 additional days. Provide thorough documentation in support of the request for additional time: A requirement of this Change Proposal will be to provide record drawing information for all of the affected items of work RECOMMENDATION BY ENGINEER/CONSTRUCTION ADMINISTRATOR'. Comments: atgeda do s./Gr�— 4�Canp p-,771 ink-n fpd filer/ /rP C,lG4/9^c-[S Signature of Engineer/Construction Administrator: oat- jAt.„ V ✓k✓ Date: ACCEPTANCE BY OWNER Comments: /g/tDC a SA1_ Cl•G'.. �z - -- - Signature: inV_ ' /'� 'L✓'/'Y /"" _-_ Date: I, ,of _ agree to the costs and terms or REP (N.mc) rfumram) Mot. this day of , 199 OM) (month) them) 00847-2