Loading...
HomeMy WebLinkAboutVII(F) Discussion/ Action Re: Award Of Construction Contract For Phase 3 Part 3 Water Distribution Mains Project Agenda�� 10-05-99 "CENTER OF GOOD LIVING-PRIDE OF WEST ORANGE" 1��NTrifoR•I;L iissIoNER °CO@A. S.SCOTT VANDERGRIFT 0( ..•z-a CITY OF OCOEE COMMISSIONERS I� a 150 N.LAKESHORE DRIVE v p ELL SCOTT ANDERSON �, v OCOEE,FLORIDA 34761-2258 RUSTY JOHNSON 41- ' •° �`A�� (407)656-2322 NANCY J.PARKER or G00v CITY MANAGER ELLIS SHAPIRO MEMORANDUM DATE: : September 30, 1999 TO: The Honorable Mayor and Board of City Commissioners FROM: David Wheeler,Assistant City Engineer/Utilities DirectoW9,,V SUBJECT: Phase 3 Part 3 Water Distribution Mains Project Award of Construction Contract On Tuesday, September 28, 1999, bids were received for the Phase 3 Part 3 Water Distribution Mains Project. The attached figure shows the general layout of this project and all the water distribution main projects constructed this year.. The work in this project generally includes the installation of a new 12 inch water main along Eleventh Street from the new main on Clarcona- Ocoee Road to Peters Street, along Peters Street from the new main on Wurst Road to Vignetti Park and through Vignetti Park to Adair Street to connect to the existing main in front of the Recreation Center. • Three of the four contractors prequalified under Continuing Horizontal Construction Services program submitted bids on these projects. Their bids were: CONTRACTOR PHASE 3/Part 1 WATER MAINS Prime Construction Group, Inc. $192,692.00 Georgetown Enterprises, Inc. $224,569.40 Phillips&Jordan,Inc. $573,209.49 Engineer's Estimate $240,500.00 Wharton-Smith, Inc. chose not to bid on this project due to work on other projects. These water pipelines were identified in the Water Master Plan as vital to the City's ability to meet current and projected future demands on the City's water system. This project will enhance the water system's ability to provide adequate pressure and flow to our customers during high PowIProtectocum.s Water flrsourcaa fix. r"k"aT demand periods and to aide in minimizing reduction in pressure and flow at times when repairs are required within the distribution system. The attached letter from PEC, Inc. is a recommendation to award the contract to Prime Construction Group, Inc. in accordance with the base bid. The project will be funded from the 1997 Utility Bond Issue. The Engineering Staff concurs with PEC's recommendation to award the Phase 3 Part 3 Water Main Project to Prime Construction Group, Inc. in the amounts of $192,692.00. This construction cost of this project is approximately 19.88 percent lower than the engineer's estimate. The intent is to secure bonds and insurance certificates, execute contract documents, and issue - the Notice To Proceed as quickly as possible. The construction schedule requires the contractor to be completed within 150 days. Action Items: 1. I recommend that the City Commission authorize the Mayor and City Clerk to execute a contract with Prime Construction Group, Inc. in the amount of$192,692.00 for the Phase 3 Part 3 Water Distribution.Main Project in accordance with the following steps: • Authorize the Engineering Department to execute the Notices of Intent To Award and secure executed contract documents,bonds and insurance from the contractor. • Authorize the Mayor and City Clerk to execute the contracts with Prime Construction Group, Inc. at such time as the contract documents are reviewed for compliance by staff and legal counsel, as needed. DAW/jbw Attachments Pow Protect Ocace's Wat rNeSiiarces'( PEC PROFESSIONAL ENGINEERING CONSULTANTS, INC. September29, 1999 \\\IK\ SEp -gg2.3.3/1.0 Mr, James W. Shira, P.E. City of Ocoee 150 N. Lakeshore Drive Ocoee, FL 34761 SUBJECT: City of Ocoee Water Distribution Mains - Phase III, Part 3 RE: Recommendation.of Award Dear Mr. Shira: On Tuesday, September 28, 1999, the City received sealed bids for the referenced project from three (3) contractors. The attached tabulation of bids represents a summary of unit prices provided by each of the bidders. The bid tabulation indicates Prime Construction Group, Inc. as the apparent low bidder with a total bid price of$192,692.00. The second apparent low bidder is Georgetown Enterprise, Inc. with a total bid price of$224,569.40. The highest total bid price is$514,272.24(corrected from$573,209.49 due to an extension mathematical error) submitted by Phillips and Jordan, Inc. The engineer's construction estimate was $250,000.00. The bid proposal of the apparent low bidder is complete and properly executed (except as noted on the attached Bid Checklist forms). They have acknowledged receipt of the addendums and have submitted proposals to comply with other City bidding requirements. While these special requirements must be verified by the City, we believe that this bid proposal is in conformance in all material respects to the invitation for bids and is therefore a responsive bid. Based upon our review of the submittals from each of the bidders, and with the understanding that these contractors have been pre-qualified for the City's Continuing Construction Services Program, we recommend that the above referenced construction. contract be awarded to Prime Construction Group, Inc. engineers 'Engineering Our Community' plannersC - q ^ Florida ^ (� / Ann o / /, surveyors 200 Cast Rob Ison Street � � ... 550 � O•ian'do� F 32301 • 407/422-8052 . FAX 40 849-9401 Mr. James W. Shira, P.E. September 29, 1999 Page 2 If you have any questions or comments, please contact me at your earliest convenience. Sincerely, PROFESSIONAL ENGINEERING CONSULTANTS, INC. 41 Arthur R. Austin, P.E.Principal Manager - Environmental Department ARA/cs Attachments: Bid Tabulation Bid Checklists G:\...\007ckm.ROA cc: Mr. David Wheeler, P.E., City of Ocoee Mr. Ken Hooper, PEC Mr. Geoff Hennessy, PEC Ms. Cynthia K. Malone, PEC