HomeMy WebLinkAboutVII(L) Forest Oaks Water Treatment Plant Improvements - Award Of Construction Contract To Florida Contracting Company, Inc, In Th Amount Of 492,985.00 Agenda 9-05-2000
Item VII L
"CENTER OF GOOD LIVING-PRIDE OF WEST ORANGE" MAYOR•COMMISSIONER
()Ocoee S.SCOTT VANDERGRIFT
CITY OF OCOEE COMMISSIONERS
150 N.LAKESHORE DRIVE DANNY HOWELL
SCOTT ANDERSON
OOCOEE,FLORIDA 34761-2258 RUSTY JOHNSON
(407)905-3100 NANCY J.PARKER
CITY MANAGER
ELLIS SHAPIRO
MEMORANDUM
DATE: August 28, 2000
TO: The Honorable Mayor and Board of City Commissioners
FROM: David A. Wheeler, P.E.,,6QI /
Assistant City Engineer/Utilities Director
SUBJECT: Forest Oaks Water Treatment Plant Improvements
Award of Construction Contract
On Thursday, July 20, 2000, bids were received for the Forest Oaks Water Treatment Plant
Improvements Project. The work for these projects generally includes the installation of a 1000
Kw emergency generator with fuel storage tank, new master control center including an
upgraded auto transfer switch, landscaping with irrigation along the north property line, and
fencing around the entire City property at the plant site.
There were two additive alternates included on this project. They were to install vines along the
fence for more screening of the plant facilities to the outside and to remove the existing fence
that surrounds only the treatment facilities on site. There was also a deductive alternate included
to change the new gate to a double leaf swing gate instead of a single leaf rolling gate. -
This project was publicly advertised in the Orlando Sentinel and through Central Florida
Builder's Exchange, F.W. Dodge Construction Reports, and the Business Alliance. Six
contractors submitted bids on this project.
Their bids were:
CONTRACTOR FOREST OAKS WTP IMPROVEMENTS
Florida Contracting Company, Inc. $ 492,985.00
Prime Construction Group, Inc. $ 537,000.00
The M.J. Simpson Corporation $ 555,828.00
ERC General Contracting Services, Inc. $ 572,820.00
CenState Contractors, Inc. $ 596,688.00
Cathcart Contracting Company $ 782,990.40
Engineer's Estimate $ 507,470.60
POW]
P Gi_ct 3co%(;S t"dEi";R{Csot i ms ' •
Forest Oaks Water Treatment Plant Improvements
Award of Construction Contract
August 28, 1000
Page Two
The construction cost for additive alternate bid item no. 1 bid by Florida Contracting Company,
Inc. was $1,600.00 to install vines along approximately 310 linear feet of fencing. The
Engineer's Estimate for this work was $ 341.00. The construction cost for deductive alternate
bid item no. 2 bid by Florida Contracting Company, Inc. was $ 0.00 to install a double leaf gate
instead of a rolling gate. The Engineer's Estimate for this deduction was $ 137.50. The
construction cost for additive alternate bid item no. 3 bid by Florida Contracting Company, Inc.
was $ 2,685.00 to remove the existing fence. The Engineer's Estimate for this deduction was $
1,182.50.
The attached letter from Ivey, Harris & Walls, Inc. is a recommendation to award the contract to
Florida Contracting Company, Inc. in accordance with the base bid. The Engineering Staff
concurs with Ivey, Harris & Walls' recommendation to award the Forest Oaks Water Treatment
Plant Improvements Project to Florida Contracting Company, Inc. in the amount of$492,985.00.
The construction cost of this project is approximately 2.85 percent lower than the engineer's
estimate. The project will be funded from the 1997 Utility Bond Issue. Staff does not
recommend inclusion of the additive nor deductive alternates at this time; staff prefers to wait
until the designed landscaping is installed to see if the vines are necessary and the fence removal
can be performed by the plant staff.
The intent is to secure bonds and insurance certificates, execute contract documents, and issue
the Notice To Proceed as quickly as possible. The construction schedule requires the contractor
to be completed within 180 days.
Action Items:
I recommend that the City Commission authorize the Mayor and City Clerk to execute a contract
with Florida Contracting Company, Inc. in the amount of$492,985.00 for the Forest Oaks Water
Treatment Plant Improvements Project in accordance with the following steps:
• Authorize the Engineering Department to execute the Notices of Intent To Award and
secure executed contract documents,bonds and insurance from the contractor.
• Authorize the Mayor and City Clerk to execute the contracts with Florida Contracting
Company, Inc. at such time as the contract documents are reviewed for compliance by
staff and legal counsel, as needed.
DAW/jbw
Attachments
pow
Protect Ocoee's f,2ter Rcsoures +
•
I + + .
August 18, 2000 • e
AUG 2 2 e.w
Mr. David Wheeler, P. E. IVEY, HARRIS a WALLS, Inc.
Assistant City Engineer/Utility Director
City of Ocoee - PLANNING
150 N. Lakeshore Drive
Ocoee, Florida 34761 CIVIL ENGINEERING
RE: Forest Oaks Water Treatment Plant LANDSCAPE ARCHITECTURE
Review/Evaluation of Bids Submitted
Dear Mr. Wheeler: ECOLOGICAL SERVICES
We have reviewed the bids submitted for the above referenced project and a TRANSPORTATION DESIGN
Tabulation of Bids is attached. Also attached are the bids, the City's bid opening
attendee sheet, and the City's completed bid checklist from the bid opening. CONSTRUCTION SERVICES
Our attached tabulation of bids includes descriptions of the various errors that we
found in the bid forms submitted for the project. In addition, we also acquired project
experience information and project contact references for the apparent low bidder,
Florida Contracting Company, Inc., and their proposed electrical subcontractor,
Janecka Electric Company, Inc. We were able to contact some of the references
provided by these companies and review summaries of their previous project
experience information. We have no personal previous experience or knowledge
regarding these companies.
Based on the information obtained and references contacted, the primary focus of
previous experience of the apparent low bidder and their electrical subcontractor have
not been specifically related to the primary scope of this project. However, the type
and complexity of projects for which they have experience generally appears to have
been of at least a comparable complexity and/or magnitude.
As a result of our review, we could not find any basis for not recommending award of
the contract to Florida Contracting Company, Inc. Therefore, we recommend that the
City of Ocoee award the construction contract to Florida Contracting Company, Inc.
upon receipt of appropriate written verification of the assumptions we have
incorporated in the attached Tabulation of Bids. These relate to "derived" unit prices
for Bid Item No. 8 - Furnish and Install Site Fencing and Gates, and Additive
Alternative Bid Item No. 1 - Vines Along Fence.
Should you have any questions regarding the above, please don't hesitate to call us.
Sincerely,
IVEY, HARRIS & WALLS, INC.
Robert J. Rutter, P.E.
Senior Engineer
631 South Orlando Avenue
ATTACHMENTS: Bids, Opening Attendees, Checklist and Tabulation of Bids Suite zoo
Winter Park, Florida 3178q
cc: Murry Bullion, P.E., IH&W
TELEPHONE: 4o7-671-888o
FAX: 4o7-6zq-7883
G:+PROJ101725.061WPWIISCIDWLTR210.WPD WEBPAoE: www.ihw-ufa.tom
Page 1 of 2-
Ivey,Harris&Walls,Inc.
631 South Orlando Avenue,Suite 200 TABULATION OF BIDS
Winter Park,Florida 32789 Bid Opening Date: July 20, 2000
Project: Forest Oaks Water Treatment Plant Improvements •
City of Ocoee
150 N.Lakeshore Drive
Ocoee,Florida 34761-2258
ITEM ITEM ITEM QUANTITY Cathcart Contracting Co CenState Contractors The M.J.Simpson Corp. Florida Contracting Co.,Inc.
NO. DESCRIPTION • UNITS Unit Price Bid Total Unit Price Bid Total Unit Price Bid Total Unit Price Bid Total
1 Permits-Allowance LS 1 S10,000.00 S10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 510,000.00
2 Mobilization,Demobilization,Insurance, LS 1 $39,000.00 $39,000.00 $28,000.00 $28,000.00 $26,000.00 $26,000.00 $24,649.00 S24,649.00
Contractor Fees(Maximum of 5%of Total Bid)
3 Clearing,Grubbing,Grading and Sodding LS 1 $101,709.00 $101,709.00 $7,000.00 $7,000.00 $1,485.00 $1,485.00 $4,000.00 $4,000.00
4 Furnish and Install Concrete Pads LS 1 $8,000.00 $8,000.00 $14,000.00 $14,000.00 $16,500.00 $16,500.00 $14,025.00 514,025.00
5 Furnish and Install Electric Renovations LS 1 $592,133.00 $592,133.00 $508,000.00 $508,000.00 $460,817.00 $460,817.00 $403,488.00 $403,488.00
6 Furnish and Install Site Landscaping LS 1 $9,903.00 $9,903.00 $12,000.00 $12,000.00 $12,542.00 $12,542.00 $14,500.00 $14,500.00
7 Furnish and Install Site Irrigation System LS 1 $4,895.00 $4,895.00 $6,600.00 $6,600.00 $5,384.00 $5,384.00 $8,670.00 $8,670.00
8 Furnish and Install Site Fencing and Gates LF 1,232 $22.20 S27,350.40 $9.00 $11,088.00 $18.75 $23,100.00 S11.08 $13,653.00
S782.990.40 $596,688.00 $555,828.00 $492,985.00
Additive Alternative Bid Item 1-Vines Along Fence LF 310 $3.00 $930.00 3 $930.00 $3.20 $992.00 $5.16 _$1,600.00
Deductive Alternative Bid Item 2-Two 8-foot swing gates LS 1 $300.00 $300.00 300 $300.00 $500.00 $500.00 $0.00 $0.00
inlieu of Slide Gates
Add Alt 3-Remove Existing Fence LS 1 $3,500.00 $3,500.00 1,100 $1,100.00 $1,550.00 $1,550.00 $2,685.00 $2,685.00
Notes: (Bid discrepancies are shown in bold italics.)
1. Cathcart Contracting Company did not use Addendum 1 bid form.Thus,bid item no.1($10,000.00 allowance)was not shown.There is an error in extension
of unit price for furnishing fencing and gates.
2. The M.J.Simpson Corp.had the unit price for bid item no.8 and the total price as the same.Using a their total bid item no.8 and total base bid price,a$18.75 unit price is derived.
3. Florida Contracting Company,Inc.had the unit price for bid item no.8 and the total price as the same.Using a their total bid item no.8 and total base bid price,a$11.08 unit price is derived.
4. Florida Contracting Company,Inc.had the unit price for additive alternate bid item no.1 and the total price as the same.Using their total additive alternate bid item no.1 total price and •
the 310 LF quantity in the bid form,a$5.16/LF unit price is derived.
Page 2of2
Ivey,Harris&Walls,Inc.
631 South Orlando Avenue,Suite 200 TABULATION OF BIDS
Winter Park,Florida 32789 Bid Opening Date: July 20,2000
Project: Forest Oaks Water Treatment Plant Improvements
City of Ocoee _.
150 N.Lakeshore Drive
Ocoee,Florida 34761-2258
ITEM ITEM ITEM QUANTITY ERC Prime Construction Group,Inc. Engineer's Cost Opinion N/A
NO. DESCRIPTION UNITS Unit Price Bid Total Unit Price Bid Total Unit Price Bid Total Unit Price Bid Total
is
1 Permits-Allowance LS _ 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 S10,000.00 S10,000.00
2 Mobilization,Demobilization,Insurance, LS 1 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $23,650.00 $23,650.00
Contractor Fees(Maximum of 5%of Total Bid)
3 Clearing,Grubbing,Grading and Sodding LS 1 $8,500.00 $8,500.00 $65,000.00 $65,000.00 $2,090.00 $2,090.00
4 Furnish and Install Concrete Pads. LS 1 $35,000.00 $35,000.00 $15,000.00 $15,000.00 $12,100.00 $12,100.00
5 Furnish and Install Electric Renovations LS 1 $462,000.00 $462,000.00 $402,768.00 $402,768.00 $419,100.00 $419,100.00
6 Furnish and Install Site Landscaping LS 1 $10,000.00 $10,000.00 $12,000.00 $12,000.00 $12,738.00 $12,738.00 •
7 Furnish and Install Site Irrigation System LS 1 510,000.00 $10,000.00 $6,000.00 $6,000.00 $10,175.00 $10,175.00
8 Furnish and Install Site Fencing and Gates LF 1,232 $10.00 $12,320.00 $1.00 $1,232.00 $14.30 $17,617.60
$572,820.00 $537,000.00 $507,470.60
Additive Alternative Bid Item 1-Vines Along Fence , LF 310 55.00 51,550.00 $4.00 $1,240.00 $1.10 $341.00
Deductive Alternative Bid Item 2-Two 8-foot swing gates LS 1 $1,000.00 $1,000.00 $300.00 $300.00 $137.50 $137.50
inlieu of Slide Gates
Add Alt 3-Remove Existing Fence LS 1 $2,000.00 $2,000.00 $1,000.00 $1,000.00 $1,182.50 $1,182.50
Notes: (Bid discrepancies are shown in bold italics.) -
1. Engineer's Cost Opinion did not include this allowance.
Page 2 of 2
Ivey,Harris&Walls,Inc.
631 South Orlando Avenue,Suite 200 TABULATION OF BIDS
Winter Park,Florida 32789 Bid Opening Date: July 20,2000
Project: Forest Oaks Water Treatment Plant Improvements
City of Ocoee _
150 N.Lakeshore Drive
Ocoee,Florida 34761-2258
ITEM ITEM ITEM QUANTITY ERC Prime Construction Group,Inc. Engineer's Cost Opinion N/A
NO. DESCRIPTION UNITS Unit Price Bid Total Unit Price Bid Total Unit Price Bid Total Unit Price Bid Total
1 Permits-Allowance LS 1 510,000.00 $10,000.00 $10,000.00 510,000.00 $10,000.00 S10,000.00 't,
2 Mobilization,Demobilization,Insurance, LS 1 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $23,650.00 $23,650.00
Contractor Fees(Maximum of 5%of Total Bid)
3 Clearing,Grubbing,Grading and Sodding LS 1 58,500.00 $8,500.00 $65,000.00 $65,000.00 $2,090.00 $2,090.00
4 Furnish and Install Concrete Pads LS 1 $35,000.00 $35,000.00 $15,000.00 $15,000.00 $12,100.00 $12,100.00
5 Furnish and Install Electric Renovations LS 1 $462,000.00 $462,000.00 $402,768.00 5402,768.00 $419,100.00 $419,100.00
6 Furnish and Install Site Landscaping LS 1 $10,000.00 $10,000.00 $12,000.00 $12,000.00 $12,738.00 $12,738.00
7 Furnish and Install Site Irrigation System LS 1 $10,000.00 $10,000.00 $6,000.00 $6,000.00 $10,175.00 S10,175.00
8 Furnish and Install Site Fencing and Gates LF 1,232 $10.00 $12,320.00 $1.00 $1,232.00 $14.30 $17,617.60
I $572,820.00 I I $537,000.00 I $507,470.60
Additive Alternative Bid Item 1-Vines Along Fence LF 310 55.00 51,550.00 _ $4.00 51,240.00 $1.10 5341.00
Deductive Alternative Bid Item 2-Two 8-foot swing gates LS 1 $1,000.00 $1,000.00 $300.00 $300.00 $137.50 $137.50
inlieu of Slide Gates
Add Alt 3-Remove Existing Fence LS 1 $2,000.00 $2,000.00 $1,000.00 $1,000.00 $1,182.50 $1,182.50
Notes: (Bid discrepancies are shown in bold italics.)
1. Engineer's Cost Opinion did not include this allowance.
Ivey,Harris&Walls,Inc.
Page 1 of 2
631 South Orlando Avenue,Suite 200 TABULATION OF BIDS
Winter Park,Florida 32789 Bid Opening Date: July 20, 2000
Project: Forest Oaks Water Treatment Plant Improvements
City of Ocoee
150 N.Lakeshore Drive
Ocoee,Florida 34761-2258
ITEM ITEM ITEM QUANTITY Cathcart Contracting Co CenState Contractors The M.J.Simpson Corp. Florida Contracting Co.,Inc.
NO. DESCRIPTION UNITS Unit Price Bid Total Unit Price Bid Total Unit Price Bid Total Unit Price Bid Total
1 Permits-Allowance LS 1 S10,000.00 S10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 S10,000.00
2 Mobilization,Demobilization,Insurance, LS 1 S39,000.00 $39,000.00 $28,000.00 $28,000.00 $26,000.00 $26,000.00 $24,649.00 $24,649.00
Contractor Fees(Maximum of 5%of Total Bid)
3 Clearing,Grubbing,Grading and Sodding LS 1 $101,709.00 $101,709.00 $7,000.00 $7,000.00 $1,485.00 $1,485.00 $4,000.00 54,000.00 _
4 Furnish and Install Concrete Pads LS 1 $8,000.00 $8,000.00 $14,000.00 $14,000.00 $16,500.00 $16,500.00 $14,025.00 S14,025.00
5 Furnish and Install Electric Renovations LS 1 $592,133.00 $592,133.00 $508,000.00 $508,000.00 $460,817.00 $460,817.00 $403,488.00 $403,488.00
6 Furnish and Install Site Landscaping LS 1 $9,903.00 $9,903.00 $12,000.00 $12,000.00 $12,542.00 $12,542.00 $14,500.00 $14,500.00
7 Furnish and Install Site Irrigation System LS 1 $4,895.00 $4,895.00 $6,600.00 $6,600.00 $5,384.00 $5,384.00 $8,670.00 $8,670.00
8 Furnish and Install Site Fencing and Gates LF 1,232 $22.20 S27,350.40 $9.00 $11,088.00 S18.75 $23,100.00 S11.08 $13,653.00
S782,990.40 $596,688.00 - $555,828.00 $492,985.00
Additive Alternative Bid Item 1-Vines Along Fence LF 310 $3.00 $930.00 3 $930.00 S3.20 $992.00 $5.16 S1,600.00
Deductive Alternative Bid Item 2-Two 8-foot swing gates LS 1 $300.00 $300.00 300 $300.00 $500.00 $500.00 $0.00 $0.00
inlieu of Slide Gates
Add Alt 3-Remove Existing Fence LS 1 $3,500.00 $3,500.00 1,100 $1,100.00 $1,550.00 $1,550.00 $2,685.00 $2,685.00
Notes: (Bid discrepancies are shown in bold italics.)
1. Cathcart Contracting Company did not use Addendum 1 bid form.Thus,bid item no.1($10,000.00 allowance)was not shown.There is an error in extension
of unit price for furnishing fencing and gates.
2. The M.J.Simpson Corp.had the unit price for bid item no.8 and the total price as the same.Using a their total bid item no.8 and total base bid price,a$18.75 unit price is derived.
3. Florida Contracting Company,Inc.had the unit price for bid item no.8 and the total price as the same.Using a their total bid item no.8 and total base bid price,a$11.08 unit price is derived.
4. Florida Contracting Company,Inc.had the unit price for additive alternate bid item no.1 and the total price as the same.Using their total additive alternate bid item no.1 total price and
the 310 LF quantity in the bid form,a$5.16/LF unit price is derived.
Page 2 of 2
Ivey, Harris&Walls, Inc.
631 South Orlando Avenue,Suite 200 TABULATION OF BIDS
Winter Park, Florida 32789 Bid Opening Date: July 20, 2000
Project: Forest Oaks Water Treatment Plant Improvements
City of Ocoee
150 N. Lakeshore Drive
Ocoee, Florida 34761-2258
ITEM ITEM ITEM QUANTITY ERC Prime Construction Group, Inc. Engineer's Cost Opinion N/A
NO. DESCRIPTION UNITS Unit Price Bid Total Unit Price Bid Total Unit Price Bid Total Unit Price Bid Total
1 Permits-Allowance LS 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00
2 Mobilization,Demobilization, Insurance, LS 1 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $23,650.00 $23,650.00
Contractor Fees(Maximum of 5%-of Total Bid)
3 Clearing, Grubbing, Grading and Sodding LS 1 $8,500.00 $8,500.00 $65,000.00 $65,000.00 $2,090.00 $2,090.00
4 Furnish and Install Concrete Pads LS 1 $35,000.00 $35,000.00 $15,000.00 $15,000.00 $12,100.00 $12,100.00
5 Furnish and Install Electric Renovations LS 1 $462,000.00 $462,000.00 $402,768.00 $402,768.00 $419,100.00 $419,100.00
6 Furnish and Install Site Landscaping LS 1 $10,000.00 $10,000.00 $12,000.00 $12,000.00 $12,738.00 $12,738.00
7 Furnish and Install Site Irrigation System LS 1 $10,000.00 $10,000.00 $6,000.00 $6,000.00 $10,175.00 $10,175.00
8 Furnish and Install Site Fencing and Gates LF 1,232 $10.00 $12,320.00 $1.00 $1,232.00 $14.30 $17,617.60
$572,820.00 $537,000.00 $507,470.60
Additive Alternative Bid Item 1-Vines Along Fence LF 310 $5.00 $1,550.00 $4.00 $1,240.00 $1.10 $341.00
Deductive Alternative Bid Item 2-Two 8-foot swing gates LS 1 $1,000.00 $1,000.00 $300.00 $300.00 $137.50 $137.50
inlieu of Slide Gates
Add Alt 3-Remove Existing Fence LS 1 $2,000.00 $2,000.00 $1,000.00
$1,000.00 $1,182.50 $1,182.50
Notes: (Bid discrepancies are shown in bold italics.)
1. Engineer's Cost Opinion did not include this allowance.
Page 1 of 2
Ivey, Harris&Walls, Inc.
631 South Orlando Avenue, Suite 200 TABULATION OF BIDS
Winter Park, Florida 32789 Bid Opening Date: July 20, 2000
Project: Forest Oaks Water Treatment Plant Improvements
City of Ocoee
150 N. Lakeshore Drive
Ocoee, Florida 34761-2258
ITEM ITEM ITEM QUANTITY Cathcart Contracting Co CenState Contractors The M.J. Sim son Corp. Florida Contracting Co., Inc.
NO. DESCRIPTION UNITS Unit Price Bid Total Unit Price Bid Total Unit Price Bid Total Unit Price Bid Total
1 Permits-Allowance LS 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00
2 Mobilization,Demobilization, Insurance, LS 1 $39,000.00 $39,000.00 $28,000.00 $28,000.00 $26,000.00 $26,000.00 $24,649.00 $24,649.00
Contractor Fees(Maximum of 5% of Total Bid)
3 Clearing, Grubbing, Grading and Sodding LS 1 $101,709.00 $101,709.00 $7,000.00 $7,000.00 $1,485.00 $1,485.00 $4,000.00 $4,000.00
4 Furnish and Install Concrete Pads LS 1 $8,000.00 $8,000.00 $14,000.00 $14,000.00 $16,500.00 $16,500.00 $14,025.00 $14,025.00
5 Furnish and Install Electric Renovations LS 1 $592,133.00 $592,133.00 $508,000.00 $508,000.00 $460,817.00 $460,817.00 $403,488.00 $403,488.00
6 Furnish and Install Site Landscaping LS 1 $9,903.00 $9,903.00 $12,000.00 $12,000.00 $12,542.00 $12,542.00 $14,500.00 $14,500.00
7 Furnish and Install Site Irrigation System LS 1 $4,895.00 $4,895.00 $6,600.00 $6,600.00 $5,384.00. $5,384.00 $8,670.00 $8,670.00
8 Furnish and Install Site Fencing and Gates LF 1,232 $22.20 $27,350.40 $9.00 $11,088.00 $18.75 $23,100.00 $11.08 $13,653.00
$782,990.40 $596,688.00 $555,828.00 $492,985.00
I I I I � I I I
Additive Alternative Bid Item 1-Vines Along Fence LF 310 $3.00 $930.00 3 $930.00 $3.20 $992.00 $5.16 $1,600.00
Deductive Alternative Bid Item 2-Two 8-foot swing gates LS 1 $300.00 $300.00 300 $300.00 $500.00 $500.00 $0.00 $0.00
inlieu of Slide Gates
Add Alt 3-Remove Existing Fence LS 1 $3,500.00 $3,500.00 1,100 $1,100.00 $1,550.00 $1,550.00 $2,685.00 $2,685.00
Notes: (Bid discrepancies are shown in bold italics.)
1. Cathcart Contracting Company did not use Addendum 1 bid form.Thus,bid item no.1 ($10,000.00 allowance)was not shown.There is an error in extension
of unit price for furnishing fencing and gates.
2. The M.J.Simpson Corp.had the unit price for bid item no.8 and the total price as the same.Using a their total bid item no.8 and total base bid price,a$18.75 unit price is derived.
3. Florida Contracting Company,Inc.had the unit price for bid item no.8 and the total price as the same.Using a their total bid item no.8 and total base bid price,a$11.08 unit price is derived.
4. Florida Contracting Company,Inc.had the unit price for additive alternate bid item no.1 and the total price as the same.Using their total additive alternate bid item no.1 total price and
the 310 LF quantity in the bid form,a$5.16/LF unit price is derived.