Loading...
HomeMy WebLinkAboutVII(L) Forest Oaks Water Treatment Plant Improvements - Award Of Construction Contract To Florida Contracting Company, Inc, In Th Amount Of 492,985.00 Agenda 9-05-2000 Item VII L "CENTER OF GOOD LIVING-PRIDE OF WEST ORANGE" MAYOR•COMMISSIONER ()Ocoee S.SCOTT VANDERGRIFT CITY OF OCOEE COMMISSIONERS 150 N.LAKESHORE DRIVE DANNY HOWELL SCOTT ANDERSON OOCOEE,FLORIDA 34761-2258 RUSTY JOHNSON (407)905-3100 NANCY J.PARKER CITY MANAGER ELLIS SHAPIRO MEMORANDUM DATE: August 28, 2000 TO: The Honorable Mayor and Board of City Commissioners FROM: David A. Wheeler, P.E.,,6QI / Assistant City Engineer/Utilities Director SUBJECT: Forest Oaks Water Treatment Plant Improvements Award of Construction Contract On Thursday, July 20, 2000, bids were received for the Forest Oaks Water Treatment Plant Improvements Project. The work for these projects generally includes the installation of a 1000 Kw emergency generator with fuel storage tank, new master control center including an upgraded auto transfer switch, landscaping with irrigation along the north property line, and fencing around the entire City property at the plant site. There were two additive alternates included on this project. They were to install vines along the fence for more screening of the plant facilities to the outside and to remove the existing fence that surrounds only the treatment facilities on site. There was also a deductive alternate included to change the new gate to a double leaf swing gate instead of a single leaf rolling gate. - This project was publicly advertised in the Orlando Sentinel and through Central Florida Builder's Exchange, F.W. Dodge Construction Reports, and the Business Alliance. Six contractors submitted bids on this project. Their bids were: CONTRACTOR FOREST OAKS WTP IMPROVEMENTS Florida Contracting Company, Inc. $ 492,985.00 Prime Construction Group, Inc. $ 537,000.00 The M.J. Simpson Corporation $ 555,828.00 ERC General Contracting Services, Inc. $ 572,820.00 CenState Contractors, Inc. $ 596,688.00 Cathcart Contracting Company $ 782,990.40 Engineer's Estimate $ 507,470.60 POW] P Gi_ct 3co%(;S t"dEi";R{Csot i ms ' • Forest Oaks Water Treatment Plant Improvements Award of Construction Contract August 28, 1000 Page Two The construction cost for additive alternate bid item no. 1 bid by Florida Contracting Company, Inc. was $1,600.00 to install vines along approximately 310 linear feet of fencing. The Engineer's Estimate for this work was $ 341.00. The construction cost for deductive alternate bid item no. 2 bid by Florida Contracting Company, Inc. was $ 0.00 to install a double leaf gate instead of a rolling gate. The Engineer's Estimate for this deduction was $ 137.50. The construction cost for additive alternate bid item no. 3 bid by Florida Contracting Company, Inc. was $ 2,685.00 to remove the existing fence. The Engineer's Estimate for this deduction was $ 1,182.50. The attached letter from Ivey, Harris & Walls, Inc. is a recommendation to award the contract to Florida Contracting Company, Inc. in accordance with the base bid. The Engineering Staff concurs with Ivey, Harris & Walls' recommendation to award the Forest Oaks Water Treatment Plant Improvements Project to Florida Contracting Company, Inc. in the amount of$492,985.00. The construction cost of this project is approximately 2.85 percent lower than the engineer's estimate. The project will be funded from the 1997 Utility Bond Issue. Staff does not recommend inclusion of the additive nor deductive alternates at this time; staff prefers to wait until the designed landscaping is installed to see if the vines are necessary and the fence removal can be performed by the plant staff. The intent is to secure bonds and insurance certificates, execute contract documents, and issue the Notice To Proceed as quickly as possible. The construction schedule requires the contractor to be completed within 180 days. Action Items: I recommend that the City Commission authorize the Mayor and City Clerk to execute a contract with Florida Contracting Company, Inc. in the amount of$492,985.00 for the Forest Oaks Water Treatment Plant Improvements Project in accordance with the following steps: • Authorize the Engineering Department to execute the Notices of Intent To Award and secure executed contract documents,bonds and insurance from the contractor. • Authorize the Mayor and City Clerk to execute the contracts with Florida Contracting Company, Inc. at such time as the contract documents are reviewed for compliance by staff and legal counsel, as needed. DAW/jbw Attachments pow Protect Ocoee's f,2ter Rcsoures + • I + + . August 18, 2000 • e AUG 2 2 e.w Mr. David Wheeler, P. E. IVEY, HARRIS a WALLS, Inc. Assistant City Engineer/Utility Director City of Ocoee - PLANNING 150 N. Lakeshore Drive Ocoee, Florida 34761 CIVIL ENGINEERING RE: Forest Oaks Water Treatment Plant LANDSCAPE ARCHITECTURE Review/Evaluation of Bids Submitted Dear Mr. Wheeler: ECOLOGICAL SERVICES We have reviewed the bids submitted for the above referenced project and a TRANSPORTATION DESIGN Tabulation of Bids is attached. Also attached are the bids, the City's bid opening attendee sheet, and the City's completed bid checklist from the bid opening. CONSTRUCTION SERVICES Our attached tabulation of bids includes descriptions of the various errors that we found in the bid forms submitted for the project. In addition, we also acquired project experience information and project contact references for the apparent low bidder, Florida Contracting Company, Inc., and their proposed electrical subcontractor, Janecka Electric Company, Inc. We were able to contact some of the references provided by these companies and review summaries of their previous project experience information. We have no personal previous experience or knowledge regarding these companies. Based on the information obtained and references contacted, the primary focus of previous experience of the apparent low bidder and their electrical subcontractor have not been specifically related to the primary scope of this project. However, the type and complexity of projects for which they have experience generally appears to have been of at least a comparable complexity and/or magnitude. As a result of our review, we could not find any basis for not recommending award of the contract to Florida Contracting Company, Inc. Therefore, we recommend that the City of Ocoee award the construction contract to Florida Contracting Company, Inc. upon receipt of appropriate written verification of the assumptions we have incorporated in the attached Tabulation of Bids. These relate to "derived" unit prices for Bid Item No. 8 - Furnish and Install Site Fencing and Gates, and Additive Alternative Bid Item No. 1 - Vines Along Fence. Should you have any questions regarding the above, please don't hesitate to call us. Sincerely, IVEY, HARRIS & WALLS, INC. Robert J. Rutter, P.E. Senior Engineer 631 South Orlando Avenue ATTACHMENTS: Bids, Opening Attendees, Checklist and Tabulation of Bids Suite zoo Winter Park, Florida 3178q cc: Murry Bullion, P.E., IH&W TELEPHONE: 4o7-671-888o FAX: 4o7-6zq-7883 G:+PROJ101725.061WPWIISCIDWLTR210.WPD WEBPAoE: www.ihw-ufa.tom Page 1 of 2- Ivey,Harris&Walls,Inc. 631 South Orlando Avenue,Suite 200 TABULATION OF BIDS Winter Park,Florida 32789 Bid Opening Date: July 20, 2000 Project: Forest Oaks Water Treatment Plant Improvements • City of Ocoee 150 N.Lakeshore Drive Ocoee,Florida 34761-2258 ITEM ITEM ITEM QUANTITY Cathcart Contracting Co CenState Contractors The M.J.Simpson Corp. Florida Contracting Co.,Inc. NO. DESCRIPTION • UNITS Unit Price Bid Total Unit Price Bid Total Unit Price Bid Total Unit Price Bid Total 1 Permits-Allowance LS 1 S10,000.00 S10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 510,000.00 2 Mobilization,Demobilization,Insurance, LS 1 $39,000.00 $39,000.00 $28,000.00 $28,000.00 $26,000.00 $26,000.00 $24,649.00 S24,649.00 Contractor Fees(Maximum of 5%of Total Bid) 3 Clearing,Grubbing,Grading and Sodding LS 1 $101,709.00 $101,709.00 $7,000.00 $7,000.00 $1,485.00 $1,485.00 $4,000.00 $4,000.00 4 Furnish and Install Concrete Pads LS 1 $8,000.00 $8,000.00 $14,000.00 $14,000.00 $16,500.00 $16,500.00 $14,025.00 514,025.00 5 Furnish and Install Electric Renovations LS 1 $592,133.00 $592,133.00 $508,000.00 $508,000.00 $460,817.00 $460,817.00 $403,488.00 $403,488.00 6 Furnish and Install Site Landscaping LS 1 $9,903.00 $9,903.00 $12,000.00 $12,000.00 $12,542.00 $12,542.00 $14,500.00 $14,500.00 7 Furnish and Install Site Irrigation System LS 1 $4,895.00 $4,895.00 $6,600.00 $6,600.00 $5,384.00 $5,384.00 $8,670.00 $8,670.00 8 Furnish and Install Site Fencing and Gates LF 1,232 $22.20 S27,350.40 $9.00 $11,088.00 $18.75 $23,100.00 S11.08 $13,653.00 S782.990.40 $596,688.00 $555,828.00 $492,985.00 Additive Alternative Bid Item 1-Vines Along Fence LF 310 $3.00 $930.00 3 $930.00 $3.20 $992.00 $5.16 _$1,600.00 Deductive Alternative Bid Item 2-Two 8-foot swing gates LS 1 $300.00 $300.00 300 $300.00 $500.00 $500.00 $0.00 $0.00 inlieu of Slide Gates Add Alt 3-Remove Existing Fence LS 1 $3,500.00 $3,500.00 1,100 $1,100.00 $1,550.00 $1,550.00 $2,685.00 $2,685.00 Notes: (Bid discrepancies are shown in bold italics.) 1. Cathcart Contracting Company did not use Addendum 1 bid form.Thus,bid item no.1($10,000.00 allowance)was not shown.There is an error in extension of unit price for furnishing fencing and gates. 2. The M.J.Simpson Corp.had the unit price for bid item no.8 and the total price as the same.Using a their total bid item no.8 and total base bid price,a$18.75 unit price is derived. 3. Florida Contracting Company,Inc.had the unit price for bid item no.8 and the total price as the same.Using a their total bid item no.8 and total base bid price,a$11.08 unit price is derived. 4. Florida Contracting Company,Inc.had the unit price for additive alternate bid item no.1 and the total price as the same.Using their total additive alternate bid item no.1 total price and • the 310 LF quantity in the bid form,a$5.16/LF unit price is derived. Page 2of2 Ivey,Harris&Walls,Inc. 631 South Orlando Avenue,Suite 200 TABULATION OF BIDS Winter Park,Florida 32789 Bid Opening Date: July 20,2000 Project: Forest Oaks Water Treatment Plant Improvements City of Ocoee _. 150 N.Lakeshore Drive Ocoee,Florida 34761-2258 ITEM ITEM ITEM QUANTITY ERC Prime Construction Group,Inc. Engineer's Cost Opinion N/A NO. DESCRIPTION UNITS Unit Price Bid Total Unit Price Bid Total Unit Price Bid Total Unit Price Bid Total is 1 Permits-Allowance LS _ 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 S10,000.00 S10,000.00 2 Mobilization,Demobilization,Insurance, LS 1 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $23,650.00 $23,650.00 Contractor Fees(Maximum of 5%of Total Bid) 3 Clearing,Grubbing,Grading and Sodding LS 1 $8,500.00 $8,500.00 $65,000.00 $65,000.00 $2,090.00 $2,090.00 4 Furnish and Install Concrete Pads. LS 1 $35,000.00 $35,000.00 $15,000.00 $15,000.00 $12,100.00 $12,100.00 5 Furnish and Install Electric Renovations LS 1 $462,000.00 $462,000.00 $402,768.00 $402,768.00 $419,100.00 $419,100.00 6 Furnish and Install Site Landscaping LS 1 $10,000.00 $10,000.00 $12,000.00 $12,000.00 $12,738.00 $12,738.00 • 7 Furnish and Install Site Irrigation System LS 1 510,000.00 $10,000.00 $6,000.00 $6,000.00 $10,175.00 $10,175.00 8 Furnish and Install Site Fencing and Gates LF 1,232 $10.00 $12,320.00 $1.00 $1,232.00 $14.30 $17,617.60 $572,820.00 $537,000.00 $507,470.60 Additive Alternative Bid Item 1-Vines Along Fence , LF 310 55.00 51,550.00 $4.00 $1,240.00 $1.10 $341.00 Deductive Alternative Bid Item 2-Two 8-foot swing gates LS 1 $1,000.00 $1,000.00 $300.00 $300.00 $137.50 $137.50 inlieu of Slide Gates Add Alt 3-Remove Existing Fence LS 1 $2,000.00 $2,000.00 $1,000.00 $1,000.00 $1,182.50 $1,182.50 Notes: (Bid discrepancies are shown in bold italics.) - 1. Engineer's Cost Opinion did not include this allowance. Page 2 of 2 Ivey,Harris&Walls,Inc. 631 South Orlando Avenue,Suite 200 TABULATION OF BIDS Winter Park,Florida 32789 Bid Opening Date: July 20,2000 Project: Forest Oaks Water Treatment Plant Improvements City of Ocoee _ 150 N.Lakeshore Drive Ocoee,Florida 34761-2258 ITEM ITEM ITEM QUANTITY ERC Prime Construction Group,Inc. Engineer's Cost Opinion N/A NO. DESCRIPTION UNITS Unit Price Bid Total Unit Price Bid Total Unit Price Bid Total Unit Price Bid Total 1 Permits-Allowance LS 1 510,000.00 $10,000.00 $10,000.00 510,000.00 $10,000.00 S10,000.00 't, 2 Mobilization,Demobilization,Insurance, LS 1 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $23,650.00 $23,650.00 Contractor Fees(Maximum of 5%of Total Bid) 3 Clearing,Grubbing,Grading and Sodding LS 1 58,500.00 $8,500.00 $65,000.00 $65,000.00 $2,090.00 $2,090.00 4 Furnish and Install Concrete Pads LS 1 $35,000.00 $35,000.00 $15,000.00 $15,000.00 $12,100.00 $12,100.00 5 Furnish and Install Electric Renovations LS 1 $462,000.00 $462,000.00 $402,768.00 5402,768.00 $419,100.00 $419,100.00 6 Furnish and Install Site Landscaping LS 1 $10,000.00 $10,000.00 $12,000.00 $12,000.00 $12,738.00 $12,738.00 7 Furnish and Install Site Irrigation System LS 1 $10,000.00 $10,000.00 $6,000.00 $6,000.00 $10,175.00 S10,175.00 8 Furnish and Install Site Fencing and Gates LF 1,232 $10.00 $12,320.00 $1.00 $1,232.00 $14.30 $17,617.60 I $572,820.00 I I $537,000.00 I $507,470.60 Additive Alternative Bid Item 1-Vines Along Fence LF 310 55.00 51,550.00 _ $4.00 51,240.00 $1.10 5341.00 Deductive Alternative Bid Item 2-Two 8-foot swing gates LS 1 $1,000.00 $1,000.00 $300.00 $300.00 $137.50 $137.50 inlieu of Slide Gates Add Alt 3-Remove Existing Fence LS 1 $2,000.00 $2,000.00 $1,000.00 $1,000.00 $1,182.50 $1,182.50 Notes: (Bid discrepancies are shown in bold italics.) 1. Engineer's Cost Opinion did not include this allowance. Ivey,Harris&Walls,Inc. Page 1 of 2 631 South Orlando Avenue,Suite 200 TABULATION OF BIDS Winter Park,Florida 32789 Bid Opening Date: July 20, 2000 Project: Forest Oaks Water Treatment Plant Improvements City of Ocoee 150 N.Lakeshore Drive Ocoee,Florida 34761-2258 ITEM ITEM ITEM QUANTITY Cathcart Contracting Co CenState Contractors The M.J.Simpson Corp. Florida Contracting Co.,Inc. NO. DESCRIPTION UNITS Unit Price Bid Total Unit Price Bid Total Unit Price Bid Total Unit Price Bid Total 1 Permits-Allowance LS 1 S10,000.00 S10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 S10,000.00 2 Mobilization,Demobilization,Insurance, LS 1 S39,000.00 $39,000.00 $28,000.00 $28,000.00 $26,000.00 $26,000.00 $24,649.00 $24,649.00 Contractor Fees(Maximum of 5%of Total Bid) 3 Clearing,Grubbing,Grading and Sodding LS 1 $101,709.00 $101,709.00 $7,000.00 $7,000.00 $1,485.00 $1,485.00 $4,000.00 54,000.00 _ 4 Furnish and Install Concrete Pads LS 1 $8,000.00 $8,000.00 $14,000.00 $14,000.00 $16,500.00 $16,500.00 $14,025.00 S14,025.00 5 Furnish and Install Electric Renovations LS 1 $592,133.00 $592,133.00 $508,000.00 $508,000.00 $460,817.00 $460,817.00 $403,488.00 $403,488.00 6 Furnish and Install Site Landscaping LS 1 $9,903.00 $9,903.00 $12,000.00 $12,000.00 $12,542.00 $12,542.00 $14,500.00 $14,500.00 7 Furnish and Install Site Irrigation System LS 1 $4,895.00 $4,895.00 $6,600.00 $6,600.00 $5,384.00 $5,384.00 $8,670.00 $8,670.00 8 Furnish and Install Site Fencing and Gates LF 1,232 $22.20 S27,350.40 $9.00 $11,088.00 S18.75 $23,100.00 S11.08 $13,653.00 S782,990.40 $596,688.00 - $555,828.00 $492,985.00 Additive Alternative Bid Item 1-Vines Along Fence LF 310 $3.00 $930.00 3 $930.00 S3.20 $992.00 $5.16 S1,600.00 Deductive Alternative Bid Item 2-Two 8-foot swing gates LS 1 $300.00 $300.00 300 $300.00 $500.00 $500.00 $0.00 $0.00 inlieu of Slide Gates Add Alt 3-Remove Existing Fence LS 1 $3,500.00 $3,500.00 1,100 $1,100.00 $1,550.00 $1,550.00 $2,685.00 $2,685.00 Notes: (Bid discrepancies are shown in bold italics.) 1. Cathcart Contracting Company did not use Addendum 1 bid form.Thus,bid item no.1($10,000.00 allowance)was not shown.There is an error in extension of unit price for furnishing fencing and gates. 2. The M.J.Simpson Corp.had the unit price for bid item no.8 and the total price as the same.Using a their total bid item no.8 and total base bid price,a$18.75 unit price is derived. 3. Florida Contracting Company,Inc.had the unit price for bid item no.8 and the total price as the same.Using a their total bid item no.8 and total base bid price,a$11.08 unit price is derived. 4. Florida Contracting Company,Inc.had the unit price for additive alternate bid item no.1 and the total price as the same.Using their total additive alternate bid item no.1 total price and the 310 LF quantity in the bid form,a$5.16/LF unit price is derived. Page 2 of 2 Ivey, Harris&Walls, Inc. 631 South Orlando Avenue,Suite 200 TABULATION OF BIDS Winter Park, Florida 32789 Bid Opening Date: July 20, 2000 Project: Forest Oaks Water Treatment Plant Improvements City of Ocoee 150 N. Lakeshore Drive Ocoee, Florida 34761-2258 ITEM ITEM ITEM QUANTITY ERC Prime Construction Group, Inc. Engineer's Cost Opinion N/A NO. DESCRIPTION UNITS Unit Price Bid Total Unit Price Bid Total Unit Price Bid Total Unit Price Bid Total 1 Permits-Allowance LS 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 2 Mobilization,Demobilization, Insurance, LS 1 $25,000.00 $25,000.00 $25,000.00 $25,000.00 $23,650.00 $23,650.00 Contractor Fees(Maximum of 5%-of Total Bid) 3 Clearing, Grubbing, Grading and Sodding LS 1 $8,500.00 $8,500.00 $65,000.00 $65,000.00 $2,090.00 $2,090.00 4 Furnish and Install Concrete Pads LS 1 $35,000.00 $35,000.00 $15,000.00 $15,000.00 $12,100.00 $12,100.00 5 Furnish and Install Electric Renovations LS 1 $462,000.00 $462,000.00 $402,768.00 $402,768.00 $419,100.00 $419,100.00 6 Furnish and Install Site Landscaping LS 1 $10,000.00 $10,000.00 $12,000.00 $12,000.00 $12,738.00 $12,738.00 7 Furnish and Install Site Irrigation System LS 1 $10,000.00 $10,000.00 $6,000.00 $6,000.00 $10,175.00 $10,175.00 8 Furnish and Install Site Fencing and Gates LF 1,232 $10.00 $12,320.00 $1.00 $1,232.00 $14.30 $17,617.60 $572,820.00 $537,000.00 $507,470.60 Additive Alternative Bid Item 1-Vines Along Fence LF 310 $5.00 $1,550.00 $4.00 $1,240.00 $1.10 $341.00 Deductive Alternative Bid Item 2-Two 8-foot swing gates LS 1 $1,000.00 $1,000.00 $300.00 $300.00 $137.50 $137.50 inlieu of Slide Gates Add Alt 3-Remove Existing Fence LS 1 $2,000.00 $2,000.00 $1,000.00 $1,000.00 $1,182.50 $1,182.50 Notes: (Bid discrepancies are shown in bold italics.) 1. Engineer's Cost Opinion did not include this allowance. Page 1 of 2 Ivey, Harris&Walls, Inc. 631 South Orlando Avenue, Suite 200 TABULATION OF BIDS Winter Park, Florida 32789 Bid Opening Date: July 20, 2000 Project: Forest Oaks Water Treatment Plant Improvements City of Ocoee 150 N. Lakeshore Drive Ocoee, Florida 34761-2258 ITEM ITEM ITEM QUANTITY Cathcart Contracting Co CenState Contractors The M.J. Sim son Corp. Florida Contracting Co., Inc. NO. DESCRIPTION UNITS Unit Price Bid Total Unit Price Bid Total Unit Price Bid Total Unit Price Bid Total 1 Permits-Allowance LS 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 2 Mobilization,Demobilization, Insurance, LS 1 $39,000.00 $39,000.00 $28,000.00 $28,000.00 $26,000.00 $26,000.00 $24,649.00 $24,649.00 Contractor Fees(Maximum of 5% of Total Bid) 3 Clearing, Grubbing, Grading and Sodding LS 1 $101,709.00 $101,709.00 $7,000.00 $7,000.00 $1,485.00 $1,485.00 $4,000.00 $4,000.00 4 Furnish and Install Concrete Pads LS 1 $8,000.00 $8,000.00 $14,000.00 $14,000.00 $16,500.00 $16,500.00 $14,025.00 $14,025.00 5 Furnish and Install Electric Renovations LS 1 $592,133.00 $592,133.00 $508,000.00 $508,000.00 $460,817.00 $460,817.00 $403,488.00 $403,488.00 6 Furnish and Install Site Landscaping LS 1 $9,903.00 $9,903.00 $12,000.00 $12,000.00 $12,542.00 $12,542.00 $14,500.00 $14,500.00 7 Furnish and Install Site Irrigation System LS 1 $4,895.00 $4,895.00 $6,600.00 $6,600.00 $5,384.00. $5,384.00 $8,670.00 $8,670.00 8 Furnish and Install Site Fencing and Gates LF 1,232 $22.20 $27,350.40 $9.00 $11,088.00 $18.75 $23,100.00 $11.08 $13,653.00 $782,990.40 $596,688.00 $555,828.00 $492,985.00 I I I I � I I I Additive Alternative Bid Item 1-Vines Along Fence LF 310 $3.00 $930.00 3 $930.00 $3.20 $992.00 $5.16 $1,600.00 Deductive Alternative Bid Item 2-Two 8-foot swing gates LS 1 $300.00 $300.00 300 $300.00 $500.00 $500.00 $0.00 $0.00 inlieu of Slide Gates Add Alt 3-Remove Existing Fence LS 1 $3,500.00 $3,500.00 1,100 $1,100.00 $1,550.00 $1,550.00 $2,685.00 $2,685.00 Notes: (Bid discrepancies are shown in bold italics.) 1. Cathcart Contracting Company did not use Addendum 1 bid form.Thus,bid item no.1 ($10,000.00 allowance)was not shown.There is an error in extension of unit price for furnishing fencing and gates. 2. The M.J.Simpson Corp.had the unit price for bid item no.8 and the total price as the same.Using a their total bid item no.8 and total base bid price,a$18.75 unit price is derived. 3. Florida Contracting Company,Inc.had the unit price for bid item no.8 and the total price as the same.Using a their total bid item no.8 and total base bid price,a$11.08 unit price is derived. 4. Florida Contracting Company,Inc.had the unit price for additive alternate bid item no.1 and the total price as the same.Using their total additive alternate bid item no.1 total price and the 310 LF quantity in the bid form,a$5.16/LF unit price is derived.