Loading...
HomeMy WebLinkAboutIII (F) Approval and Authorization for Change Order No. 2 with Maxwell Contracting Inc. in the Amount of $30,000.00 for the Ocoee/Reclaimed Water Main Interconnect Project to Include the Force Main Project at Best Buy/ Toys-R-Us Agenda 10-02-2001 Item III F -cr:N/ER 01 (100)LIVING-PRIDE OF WEST OR NGE" MAYOR.Q,MMISSIONFR Ocoee S. SCOTT VANDERGRIFT oCITY OF OCOEE c„,imis„,yER, Patal -a 150 N. LAKhsnoae DRIVE DANNY IIOWELL �+ p SCOT'r AND6RSON O OCOEIi,FLORIDA 34761-2258 RUSTY]OHNSON (407)90531 W NANCY 1 PARKER FO Of GOOD CIE MANAOIJi .IIM 61.IEASON MEMORANDUM DATE: September 25, 2001 TO: The Honorable Mayor and Board of City Commissioners FROM: David A. Wheeler, P.E. ern/ Assistant City Engineer/Utilities Director SUBJECT: Ocoee/Winter Garden Reclaimed Water Main Interconnect Project Change Order No. 2 for Best Buy - Toys-R-Us Force Main At the June 19th City Commission staff presented a proposal for consideration of funding to install a force main between Best Buy and Toys-R-Us to help alleviate some of the problems we are experiencing on the force main system on SR 50. The Commission approved the transfer of funds from Water/Wastewater Administration - Contingency to the Wastewater Capital account to fund this project and authorized the Engineering Department to proceed with the design and secure cost proposal from the two contractors under contract at that time. The amount of the transfer was $36,000. BACKGROUND The City's existing sanitary sewer force main system is experiencing operating problems because of growth and greater than expected flows. The problem area is the gravity pipelines along SR 50, lift station No. 7 located in the northeast corner of SR 50 and Bluford Avenue, and the force main system along SR 50 from Bluford Avenue to Good Homes Plaza. Utility staff has undertaken a smoke testing program in the Wesmere Subdivision, Cross Creek subdivision, and Enterprise Industrial Park to identify infiltration/inflow sources that need to be repaired to reduce excess flows in the system. Lift station no. 7 is undergoing a major renovation including new control panel with soft start instrumentation and new pumps so that the system will not over pre brize upon POW startup or when other lift stations along the force main come on line. The Maguire Road Project includes renovation to the gravity and force main systems between SR 50 and the bridge over the Turnpike. The force main on SR 50 is a 12 inch pipeline from the west and a 6 inch pipeline from the east; they connect on SR50 between Best Buy and Toys-R-Us and then it is a 12 inch pipeline north to the first entrance into the Mall on Clarke Road where it increases to a 16 inch pipeline and connects with the force main from the mall lift station. See attached figure. This 12 and 6 inch force mains have experienced additional flows with the connections of the Vintage at Lake Lotta apartment complex and the West Oaks Square commercial complex and the increased flows from Good Homes Plaza and Health Central Hospital. This force main will also provide the sanitary sewer access for the proposed Saturn of Ocoee development across from Good Homes Plaza and the proposed Heavener/Kanes Furniture development on the northwest corner of Clarke Road and SR 50. The force main along SR 50 has experienced four breaks over the last year. Three of them within the last two months. Two of these breaks were minor and did not take long to repair but did require the closing of one west bound lane of SR 50 during the repair. The other two breaks were major and required a significant time for lane closures to perform the repair. The City has been in discussions with Department of Transportation, Department of Environmental Protection, and Orange County Environmental Protection Division to determine what can be done to reduce the number of pipeline breaks, eliminate the spills of untreated wastewater into waters of the state, and reduce lane closures to only periodic maintenance that can occur at times of minimal vehicular traffic. All three of the agencies, as well as the City's Engineering and Utility Departments, are very concerned about the problems that have occurred over the last two months. The smoke testing and lift station renovation started early this year before these last three breaks and the Maguire Road project will continue for another year. The City knows that there are problems in this area and have been proactive in resolving them. While we feel that the reduction in infiltration and inflow and the renovations to the lift station will reduce the flows and relieve some of the pressure on this force main, we are proposing an additional project which will also relieve some pressure on this force main. This project is to take the flows generated from Good Homes Plaza, Vintage at Lake Lotta, and West Oaks Square off the force main on SR 50 and direct them to the City's lift station no. 35 at the West Oaks Mall. PROJECT This project involves installing approximately 1000 linear feet of 6 inch pipe from SR 50 to lift station no. 35 at the mall and connections to the existing force main and lift POINT station. The pipeline would be laid in the right-of-way between Best Buy and Toys-R- Us. The design documents were provided to Maxwell Contracting, Inc., contractor on the Ocoee/Winter Garden Reclaimed Water Main Interconnect Project and Prime Construction Group, Inc., contractor on the Reuse Mains - Phases 1 and 2 Project. The original bid prices for both contractors was: Maxwell - $33, 000 and Prime - $38,170. After discussions with both contractors, Maxwell reduced their bid price down to $30,000 and Prime did not adjust their price. The budgeted and actual costs for this project are detailed below: BUDGET ACTUAL Design (surveying out-sourced with design in-house) $5,000 $ 4,800 Permitting (FDOT and FDEP) 1,000 250 Construction 30,000 30,000 Total Project Cost $36,000 $35,050 The plan was to complete the design, permitting, and have construction occur all in this fiscal year. Staff proposed to fast track the project and use one of the existing contractors to reduce the time required to design, permit, bid and then construct the project. This was as presented to the Commission and approved at the June 19th City Commission Meeting. However, two problems arose that affected our plan and caused delays in the schedule. Florida Power was providing information on existing underground facilities but was in the wrong location. The second delay was in obtaining the FDOT and FDEP permits; the permitting did not occur as quickly as staff had hoped. Although both agencies were aware of the importance of the project, no faster permitting was provided. Staff does not have any problems with the bid price and does not believe any other savings will be realized if the project were competitively bid. The City would incur additional cost to prepare a complete bid package and additional delay in time. Appropriate action has been taken to carry forward the appropriated money to this fiscal year. Maxwell is ready to proceed immediately with the work. I recommend that the City Commission approve Change Order No. 2 with Maxwell Contracting, Inc. by increasing their Ocoee/Winter Garden Reclaimed Water Main Interconnect Project contract amount by $30,000.00, to be paid for in accordance with the transfer of the $36,000 to wastewater capital projects as approval given by the City Commission's action on June 19, 2001, and authorize the Mayor and City Clerk to execute Change Order No. 2. Attachments: Change Order No. 2 POINT Ocoee CITY OF OCOEE V .p �a 1 Engineering/Utilities 150 North Lakeshore Drive ��e `p0 Ocoee, Florida 34761-2258 CHANGE ORDER NO. #2 CITY OF OCOEE OCOEE/WINTER CARDEN RECLAIMED WATER MAIN INTERCONNECT PROJECT PROJECT NO. DATE: September 26,2001 CONTRACTOR: Maxwell Contracting,Inc. AGREEMENT DATE: April 18,2000 The following changes are hereby made to the CONTRACT DOCUMENTS. Original CONTRACT PRICE $317,000.00 Current CONTRACT PRICE ADJUSTED by previous CI IANGE ORDER $ 330,002.51 Net Increase Resulting from this CHANGE ORDER $30,000.00 The current CONTRACT PRICE including this CHANGE ORDER $360,002.51 ORIGINAL CONTRACT TIME: IRO Consecutive Calendar Days from Notice to Proceed Date: December 22,2000 Current CONTRACT TIME adjusted by previous CI IANGE ORDERS Date: December 22,2000 Net Increase Resulting from this CHANGE ORDER Days: 320 days Current CONTRACT TIME Including this CHANGE ORDER Date: November 7,2001 00842-1 CHANG ES ORDERED: I. GENERAL This change order is necessary to cover changes in the work to be performed under this Contract. The GENERAL CONDITION, SUPPLEMENTARY CONDITIONS, SPECIFICATIONS and all parts of the Project Manual listed in Article I, Definitions, of the GENERAL CONDITIONS apply to and govern all work under this change order. II. REQUIRED CHANGES Item No.2-A Best Buy-Toys-R-Us Force Main This project includes the installation of a 6 inch force main from SR50 to lift station #35 (West Oaks Mall LS) which will run between Best Buy and Toys-R-Us and include connections to the existing force main on SR50 and the manhole upstream of lift station#35, located on the West Oaks Mall ring road. III. JUSTIFICATION Item No.2-A Best Buy-Toys-R-Us Force Main The City has been experiencing breaks on the existing force main on SR50 and is experiencing increased flows and pressured because of growth. The breaks have resulted in the partial shutdown of SR50 and one incident of untreated wastewater being spilled in to waters of the state; both of these are concerns of FDOT and FDEP. This project will take the lift stations at Good Homes Plaza and Vintages at Lake Lotta off of the SR50 force main and redirect it to lift station#35,which is located on the West Oaks Mall property. IV. NARRATIVE OF NEGOTIATIONS Item No.2-A Best Buy-Toys-R-Us Force Main This item was priced based upon submitted price proposal and negotiated prices. V. PAYMENT Change Order Description Net Increase Unit Unit Price Net Increase Item No. (Decrease)Quantity (Decrease)Price 2-A Best Buy-Toys-R-Us Force Main 30,000.00 Total Net Increase Change Order No.n2 $30,000.00 VI. APPROVAL AND CHANGE AUTHORIZATION This proposed change to the Contract is to be approved by the Ocoee City Commission. Acknowledgements: The aforementioned change, and work affected thereby, is subject to all provisions of the original contract not specifically changed by this Change Order;and, 00842-2 It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original contract other than matters expressly provided herein. CONTRACTOR acknowledges, by its execution and acceptance of this Change Order, that the adjustments in Contract Price and Time shown hereon constitute full and complete compensation and satisfaction for all costs and modifications of performance time incurred by the CONTRACTOR as a result of this Change Order. No other claim for increased costs of performance or modifications of time will be granted by the OWNER for the Work covered by this Change Order. The CONTRACTOR hereby waives and releases any further claims for cost or time against the OWNER arising from or relating to the matters or Work set forth or contemplated by this Change Order RECOMMENDED BY: ACCEPTED BY: CITY OF OCOEE,FLORIDA MAX W ELL CONTRACTING, INC. By: By Signature Signature Date: Date: Title: Title: APPROVED BY: CITY OF OCOEE, FLORIDA By: S. Scott Vandergrift, Mayor Date Attest: Jean Grafton,City Clerk FOR USE AND RELIANCE ONLY BY THE APPROVED BY THE OCOEE CITY CITY OF OCOEE, APPROVED AS TO FORM COMMISSION IN A MEETING HELD ON AND LEGALITY THIS DAY OF 2001 UNDER ,2001. AGENDA ITEM NO. FOLEY & LARDN ER By: City Attorney 00842-3 bh1"-?1-UI NUN I UY RM flAXWr.LL GUN[N'J t ING, INU. hnX NU. J2Ib3LdUbb N. RI Maxwell Contracting , Inc. FACSIMILE COVER SHEET IY): David Wheeler / City of Ocoee Utilities - Engineering FAX #: 1-407-656-7835 FROM: Ronne I_. Maxwell SUBJECT: Toys-R-Us I Best Buy Force Main DATE: September 24, 2001 Total number of pages INCLUDING this cover sheet: 02 Original to Follow: Yes No XX If you do not receive all pages, please call (321) 632-8810 1 COMMENT`,: Irn:;e lui n nrli*:d :vise,i" proposal for your review and approval. If you should nnw any gnestirm:,, picase feel free to contact our office- I You 11.0 BOX 1998 • COCOA, FLORIDA • 32923-1998 PHONE ' (321 ) 632-8810 • FAX: (321 ) 632-8065 Sheetl • m -v 1 s, f Toys-R-Us - Best Buy Force Main j3 Es!: = DESCR!r''Ttril� OUANT;V !ti!TS { UNIT PRICE �ti-T PRICE TOTAL LJNE t o 1 7E10 # , I IN !NUMBERS IN WORDS ITEM PRICE I 1IMobfl zat:cn/Demoniiiz2tion :nc:uding f 1lf-S 5,000.00 Five Thousand &No :C I 5,•;�c.Ji1 3 < 'including Bonds and Insurance ` , I 212'sscor.nect Water Mair and install Caps i 2�E�. I 500.00 Five Hundred&No. _ 00 C . 1.0 00 r ;and Restraints 3; { x I 31 Furnish and Instal!DR-:.?.5 HOPE to be 2651LF 25.00 F S fTwenty Five&No.":' 5,625.00 rT 1 tinstatted in. existing 8 inch water main } ; ! 4 Furnish and tnsta ; DR13.5 HOPE or DRIB PVC i 4501LF i 25.00,Twenty Free&Nor'.0 I 11.250.00 c� ,in the other designated areas including fittings I ! z 1 5 install Connection at Lift Station 1 rEA I 1,000.00 One Thousand&NollOC 1 1,000_00 i 6 Install Connection or.SR 50 incrud+ng 1 EA 4,725.00 Four Thousand Seven 4,725.00 wet tap and plug valve ! Hundred Twenty Five&No/100 i Z. z 7 Sod to match existing at SR 50 20001SF i 0.1C Zero Dollars& 10/100 200.00 8 Seed and Mulch ROW from sidewalk to Ma'! 40001SF C C5 Zero Dollars&05/100 200,00 9 10 1 4 r - x X TOTAL BiD PRICE FOR PROJECT $30,000.00 z i c w r\; o; w ry rx . c c; v T c rv; Page -