Loading...
HomeMy WebLinkAboutIII (G) Approval and Authorization for Change Order #1 in the Amount of $4,054.00 to the Contract with Weller Pools for the Family Aquatic Center Agenda 10-02-2001 •' • _- Item HI C •/ .•4 40 al ' C. orb J� ROBERT SMITH or c••• PUBLIC WORKS DIRECTOR 370 I.NTF It P It ISIN Si_•OCOII I.,P LORIDA 347G I PHONE 007)877-R42I1• FAX f4W1877-0302 STAFF REPORT TO: The Honorable Mayor and Board of CityCommissioners FROM: Bob Smith, Public Works Director k/ DATE: September 25, 2001 RE: Change Order#1 - Family Aquatic Center ISSUE: Should the Honorable Mayor and Board of City Commissioners approve and authorize change order#1 to the Family Aquatic Center contract? BACKGROUND AND DISCUSSION: The attached change order request from Weller Pools lists nine (9) small additive and deletion items necessary for the completion of the Family Aquatic Center. The nine (9) items have a total additive price of$4,054.00. I have verified with the Finance Director that funds are available in the Capital Projects Fund. RECOMMENDATION: Staff respectfully requests approval of change order#1 as illustrated on the attached document. BS:jh attachment THE PRIDE OF WEST ORANGE 2000 EDITION AIA DOCUMENT G701-2000 Change Order (Insrrurumrs on reverse side) PROJECT: CHANGE ORDER NUMBER: O1 OWNER ❑ DATE: September 21, 2001 ARCHITECT ❑ City of Ocoee - -- "' '-- Fanily Aquatic Center ARCHITECT'S PROJECT NUMBER: ITB-01-05 CONTRACTOR ❑ Ocoee, FL CONTRACT DATE: June 5, 2001 FIELD ❑ TO CONTRACTOR. CONTRACT FOR: Pool Amenity Area OTHER ❑ i.rarvc mW wLLr.$) Weller Pool Constructors, inc. 1821 S. Orange Blossom Trail • Apopka, FL 32703 THE CONTRACT IS CHANGED AS FOLLOWS: Jnrl 1. VPI¢aAlq(ow whkrIalrel amount fillrebielableto pre410241 c2ccumiCn29 - Y prPun�n..l See attached Weller Pool Constructors, Inc. letter dated September 13, 2001 rhc origmal U onto«s )Ir,,,,,.,, ,vd M„,rorourIA Iwas 5_626,5_00 _ 'The net change by previously vuth orired Change Orders$ -B- — The(Contract Sum)1G,,,....,trrd`I„>;,,.su I\(«) prior to this Change Order was s 626,500_ The(Contract Sum)1C v..eeti.'w' x ow') )will be(increased)(Aeereae ' ) (u+kiken)rrl)by this Change Order in the amount of$ 4,054 The nee,(Contract Sum)(C "Inds I F'r. .-.)including this Change Order will be s 630,554 The Contract Tone will be(i isw.. 9)Id,.ee.n I) RlnClmngedi b). zero - I 0 1 d:1... The date of Substantial Completion as of the date of this Change Order therefore is unchanged NOTE: Thu Change Owlet doer not include changes to the Contract Sum.Contrail Tune or curroulord>hnnnun Prise which IraW been authorized I Construction Change Diteuive for which t cost or tide are to dispute aole6 rilrol in,Snhp: r.L,taph T .6 of AlA D«umant,Amt. Not valid until signed by the Architect,Contractor and Owner. 8311CCe.al & Astrdates mailer Rol Oistnr hus City of flrnm ARCHITECT aired arse, CONTRACTOR r I ioin,l `\Vbi..fir, _• (92000 A I A® AIA DOCUMENT G701-2000 -- - - CHANGE ORDER BY - BY BY DATE DATE DATE 02000 The American i 11 1 I Architects.Reprodocte of the material her.in or sub f t' l quotarron of ris The American Institute powisions without written permission of the AIA violates the copyright laws of the United Stater d wrII wry,I of Architects the violator to legal prosecution 1116 New Ynrk Ave.(ue, N W WARNING.Unlicensed photocopying violates us.copyright laws and will subject the violator to legal prose vier. Washinuturir D C 20006 5!Y2 r Weller Pool sV c 102 S.ore e ne;` 1 i September 13,2001 Apopka,Florida 3270: Phone)407)0ao-gage Mr. Bob Smith, Public Works Director (FC 01 7orn0sA;w m City of Ocoee 370 Enterprise Street WELLER Ocoee, FL 34761 Re. City of Ocoee—Family Aquatic Center Scope of Work Changes r ASS SA Sossima Dear Bob: POOLS Furthering my letter of August 1617 and August 28th, please find the additional pricing for the Scope of Work Changes. The following is a list of the changes that hate been incorporated into the project. 1 believe that I have compiled all of them. Please look these over and let me know if you have any questions with regard to credits and/or charges or if I have left anything off I 1 Reduce Pool Depth 'd Swim Lanes to Accommodate Slope in Poo_I Floor: Total Additional Costs S 1.378.00 3) Relocate Existing Fencing at Electrical 1 ranslormer& Add Gate: Total Additional Costs $ 943.00 3) Elimination of 4' Sanitary [Inc Relocation & Repair Cleanout: Total Savings ($ 208.00) 1) Chance from Deck Stain to Integral Color Concrete: Total Savings ($ 8.024.00) 5) Change Deck Trough Grate from Galvanized to Polyethylene: Total Additional Costs $1,198 (integral w/#7) 6) Potable Water Supply Point of Connection: Total Additional Costs 52065 7) Rerouting of Water Run-Off from Building: Total Additional Costs SI.800 (integral w/#5) 8) Changes To Electrical Gear Based Upon Drawing Discrepancies: Total Additional Costs 53 996 9) Add of Concrete Deck @Picnic Pavilion Total Additional Costs S 976 Sincerely, WELLER POOL CONSTRUCTORS, INC. r c John R. Tuhela Vice President Jrt�l Visit our website at: wellerpools.com