MEMORANDUM
DATE: January 14, 2002
TO: Jim Gleason, City Manager
FROM: James W. Shira, P.E., City Engineer/Utilities Director
SUBJECT: Starke Lake Drainwells
On January 9, 2002 we received a quote from Henderson Wilder, a sole proprietor, for
the construction of the two replacement drainwells on Starke Lake.
This contractor proposes to construct two new drainwells to current Florida Department
of Environmental Protection and St Johns River Water Management District standards,
and plug and abandon the existing wells in accordance with those same standards, for a
combined price of $153,200.00. He anticipates a total construction time of
approximately 120 days for both wells.
This price is based on our best estimate of the casing and total depths that will be
needed. If additional depth is required, each additional foot will be paid for at the unit
price stated in his quote. This is unfortunately an unknown factor and can be
determined only by actual drilling of the new drainwell shaft.
Our original estimate of this construction and replacement cost was $250,000.00, so
you can see that this is a significant savings from what we anticipated.
This is primarily due to the familiarity of this firm with the requirements of FDEP and
the SJRWMD. This firm has installed several drain wells in the central Florida area for
Orange County and the City of Orlando, and in Ocoee, this firm installed the new
drainwell and plugged and abandoned the old well on Lake Lilly.
The attached memo titled "Sole Source Justification"was prepared by Dr. Devo
Seereram,P.E., the consulting geotechnical engineer we used for the preparation of the
design and specifications for the Starke Lake drainwell replacements. Dr. Seereram
prepared the memo for an Orange County project, and I am enclosing it because it sets div
POWt
1l omnt Orincc x 4'fater Ee:cvrces AL)
out many of the reasons that Henderson Wilder is well-suited for the City's proposed
project.
In addition to the City of Orlando projects listed in the memo, Henderson Wilder has
completed more than a dozen other new wells for Orange County and other
municipalities, and has completed over 100 well closures of various types.
I believe that this firm is the best suited in the area for this work, and at the quoted
price, I believe we will have a very economical drainage improvement.
Due to the approach of the spring rainy season, the importance placed on this project
by the City Commission and area residents, and the anticipated 120 construction time, I
think it would be appropriate to ask that this be declared an emergency in order to
allow us to proceed at once. If the City Commission agrees that this is an emergency
situation, we need authorization to enter into a contract with Henderson Wilder for a
fee of $153, 200.00, subject to the need for additional depth as noted above.
P01Nr
Pi ctect 4cate's Vlatm Resm¢es
SOLE SOURCE JUSTIFICATION
\:nnc nl Cnntraaori Ilenderson Plilder.Contractor (Solo-plop)letor)
VVoter AAell Contrmctor Florida I icense ='2 s I
Stale Cerlilied Iilda Conir]ctur. (Ii(t)0598S
i'ini_st Renal' to Banana 13uv Ihainage AAell
. e.c.ms Hi SOIL_yBake.
7 I lender son AA ilder is a licensed hate'hell a cnntmotot in the()rlvndo Ilea. I lc has ocoi
is wars eyperi<n:e AS a specialty nontechnical Lonlraeloi. a orking on deep hells lot
at least 20 yeas. 'Or WIhhil possesses the ncecssary equipment and evperian e to
perinrm the Mork required under this contract. I Id sets hilnaell apart how the typical
h aiet hell dontraetat ill that he undeistarlLs and pet hunts the imll ash unite hod,
doss died milli the mrr:ell pots.'
7 Iteeenild the PDHI' has stalled allohith repairs and 'enlacement ol• .Lnnttvats'
hi ainane hells as mum r niodillsationa. I lendeison A1dhci hats horded oil numerous
drain hall repairs within the last Iwo(2)years in the City of(hlandn indittdmt,
I I ake \lonic:es-
• I eke of the AAStuds.
Vath Sheet.
I. Trans Street_
• South Street. and
0 1 alto Tennessee.
7 IIILAI)P.RS()y W ILDhtVAAS I IIEPHIAIIL('ON I R A(TO120A 1.11 i(1A1.A
HI•('I V11,1 .111.0AAI l) DRAIN VAElk ILI(1'I..1(ILAIILAp I'RO.IIL( IS IA'
(TN IIU I. FLORID,1.
7 AIle AA ilder has also recent, domplcicd tei)C l ement hock on leav end ()1.m..e I. ouulm
diaiu.Lchdls including I A/aloe. Lake I.illy and(Lunt m Road s Is I!eh.ca gird
VA‘vkmY Ithallonship eitll nnrniA stall.
7 AIle. AA Ilder own the egnipntanl to video tape hells.
7 Uccru.e nlhis leeeRi eonstrnelion eyperienee mm ith drainage hells cnnibined h Oh his
ki,lorlc:d e spec iene' in the()rl.indo:u a AIle. AFilde! I I than nn I lmiiliai h I th the
• nslnretr nis ems regturad by the El)I I' for drain aell mspeeGon iepla eonienl. and
d andonrn 4
h. AVilder has been connartcd to perlimn 'Rick logs or al lead Make 112I wells HI
Uran0C count, Ile iti )'cn 13niiliar kith the c& I III010I1 dcIa]l kind Ih. rcnr;im•
cnnditlnla ImoI)cd in such reoFk.
▪ AIr. Wilder has a good ororl:ins relationship with the 11)1 P permit rccieo Stahl
responsible fol drainage well modification permits_ Ile also has a good making
relationship Willi other municipal entitle,: such as the (Cilc of Orlando and the('ilv or
Ilmn1nlc S pI rii .
▪ Ali 1A ildai Eras a good orl.ln<• tclntnmehlp uilh lire locll corms ran c,1Irultanis
irn.,ly ad in designing and penntiting drain reel] Ieplacancnt prnjea..
HENDERSC :Sir)
OR
State Certified Bldg.Contractor LA _' 4 gj,gtJ k h p1 1143 Meadow Lane
#CB0005988 • 1 `\ese f`(C i Orlando, Fl. 32807
Water Well Contractor (407)277-6079
, Smexg- J.,ekc
FL#2516 �, y�1�'ILPZ ' Fax(407)275-1339
1L1AiN wf1.14 fro' ^ gefidersDN
91e 7-brat Awroi.ri✓T FoR
kM wells = 1/53 )00. s'
P/PAse ADV/se_
CITY OF OCOEE, STARKE LAKE r.i-r Lfl.Orlci' t, NORTH WELL
No. Item Unit Unit Cost Quantity Amount
1 Mobilization US $3,800.00
2 Turbidity Barrier Per Lin. Ft. $20.00 150 Ft. $3,000.00
3 Silt Fence Lin. Ft. $3.00 200 Ft. $600.00
4 Security Fence - Lin. Ft. $18.00 180 Ft. $3,240.00
5 New Well US $38,000.00 1 $38,000.00 .
6 Video Log of New Well US $650.00 1 $650.00
7 Geophysical Log US $1,000.00 1 $1,000.00
8 New Well Trructure US $10,500.00 1 $10,500.00
9 15"RCP to lake Lin. Ft. $70.00 25 $1,750.00
10 Mitered End Section US $750.00 1 $750.00
11 Trash Rack US $650.00 1 $650.00
12 Compacted Fill Cu.Yard $20.00 60 Yds $1,200.00
13 Sod&Grading Square Yard $5.00 350 Yds $1,750.00
14 Abandon Old Well US $4,000.00 1 $4,000.00
15 Remove Old Well Box US $3,000.00 1 $3,000.00
16 As Built Drawings US $1,200.00 1 $1,200.00
TOTAL COST PER ABOVE UNIT QUANTITIES $75,090.00
NOTE: Item#5, New Well Includes a maxium of 80 ft. of 18" casing,
140 ft of 12"casing 8 350 ft total depth. If greater depths are
required, the unit costs will be as noted below.
17 18" bore hole &casing Lin. Ft. $95.00
18 12"bore hole&casing Lin. Ft. $75.00
19 12 " open hole Lin. Ft. $40.00
HENDERSON WILDER, CONTRACTOR
State Certified Bldg.Contractor 1143 Meadow Lane
#CBC005988 Orlando, Fl. 32807
Wafer Well Contractor (407)277-6079
FL#2516 Fax(407)275-1339
CITY OF OCOEE, STARKE LAKE DRAINAGE WELL REPLACEMENT, SOUTH WELL
No. Item Unit Unit cost Quantity Amount
1 Mobilization US $987006:49O x+&t•" 1 $3,800.00
2 Turbidity Barrier Lin. Ft $20.00 150 ft. $ 3,000.00
3 Silt Fence Lin. Ft $3.00 200 $ 600.00
4 Security Fence Lin. Ft. $18.00 220 ft. $ 3,960.00
5 New Well US $37,500.00 1 $37,500.00
6 Video Log of New Well US $650.00 1 $ 650.00
-7 Geophysical Log US $1,000.00 1 $ 1,000.00
8 New Wel! Structure US $10,500.00 1 $10.500.00
9 15" RCP to lake Lin. Ft. $70.00 40 $ 2,800.00
10 Mitred End Section US $750.00 1 $ 750.00
11 Trash Rack US $650.00 ! $ 650.00
12 Compacted fill Cu. Yard $20.00 60 $ 1,200.00
13 Sod & Grading Square Yard $5.00 400 $ 2,000.00
14 Abandon Old Well US $4,000.00 1 $ 4,000.00
15 Remove old well Box US 4,500.00 1 $ 4,500.00
16 As Built Drawings US $1,200.00 1 $ 1,200.00
$78,110.00
NOTE Item#5, New Well Includes a maxium of 80 ft. of 18"casing,
125 ft. of 12"casing, and 350 ft. total depth. If Greater depths are
required,the unit costs will be as noted below.
18" bore hole &casing Lin. Ft. $95.00
12" bore hole&casing Lin. Ft. $75.00
12" open hole Lin. Ft. $40.00