Loading...
HomeMy WebLinkAbout09-18-18 Presentation Ocoee P3 Fire Station 1 Headquartered in Orlando Design & Construction – Orlando office (soon to be Ocoee) Sales & Marketing – Jacksonville office Experienced Summit’s executive team has completed commercial projects totaling 15,000,000+ square feet Reputation for cost efficient designs with high quality construction History of On-Time completions Financially solid: $40.0 million+ bonding capacity 2 P3 Program Utilizes Prototype Designs with Options Six prototypes 2-bay, 3-bay, and 4-bay designs Single-story and two-story options Savings from reduced architectural/engineering costs Best practices design Proven construction methods Accelerated Project Delivery—”One Stop Shopping” No separate bids for Design, Engineering, and Construction Project can be completed within one year Long term municipal lease financing provided Optional furniture and specialized equipment packages available 3 Project risk transferred to Summit: Maximum Guaranteed Price Scheduling Cost overruns Construction delays Third Party Architect or Engineer appointed by Municipality for project review and oversight 4 5 6 Three-Bay Fire Station Design Single story station of approximately 10,878 sq. ft. Includes all necessary “dirty rooms” separate from living quarters Three double deep truck apparatus bays to accommodate fire trucks and EMS vehicles Eleven individual bunk rooms sharing three full bathrooms Individual bunk room and bathroom for station chief (12 total bunk rooms) Individual office space Oversized training room to accommodate joint training (fire, EMS, police) Report writing areas, TV lounge, exercise room State of the art kitchen, outdoor patio and grill area 7 Procurement Method Allows municipality to award design and construction contract to one firm No separate bid for design criteria package saves time, money, confusion, and hassle Transfers project and financial risk to developer Requirements Municipality must provide notice of unsolicited proposal Florida Administration Register and local paper Notify local municipalities impacted (if any) Third party architect/engineer hired by municipality to review proposal and oversee construction process 8 Municipal Lease Purchase Agreement Annual appropriation clause Not considered Statutory Debt Does not reduce Municipal Bond Capacity No voter approval or referendum required Provides budget flexibility No revenue pledge Lease payment commences after fire station completion Up to 20 year fixed rate financing Private placement with regional and national lenders Low issuance costs 9 Summit solicits finance proposals from lenders on Ocoee’s behalf In-house Summit finance specialist can issue formal Finance RFP and assist Ocoee through documentation/funding process Value added service—no charge to Ocoee Lender finances 100% of project cost (including issuance costs, consultant fee) upfront into an escrow account Summit paid draws through escrow agent as project is completed Ocoee does not make a lease payment until fire station is built Financing typically completed within 3-4 weeks including city commission approval 10