MEMORANDUM
DATE: July 29, 2002
TO: The Honorable Mayor and Board of City Commissioners
FROM: David Wheeler, P.E. ../ZO
Assistant City Engineer/Utilities Director
SUBJECT: Approval and Authorization to Award Purchase Order for Paving to
Orlando Paving Company for Paving Prima Vista Subdivision
As a part of this year's fiscal budget, one of the City Commission's special projects was the
overlay of the streets in the Prima Vista Subdivision. At the request of the City Manager, the
Public Works Department looked for another public contract we could attach to with the
possibility of awarding the project.
Seminole County has an ongoing yearly paving contract which the City of Ocoee can attach to
and use the same prices. That contract, #A/B-378-99/GG, is with Orlando Paving Company
(OPC). One portion of that Seminole County contract requires OPC to furnish all labor,
equipment, and material to pave streets. The Orange County contract does not have a similar
section, Orange County Public Works has their own equipment and only buys the paving
materials.
The ability to attach to or"piggyback" onto the Seminole County contract will save the City time
and money in preparing a hid package to go out on the street under a competitive bid process. In
addition, staff does not believe the City will be able to obtain any better pricing than what is
included in the Seminole County contract. When staff initially approached OPC about an
estimate for the project, they pointed us to their Seminole County contract to use for
"piggybacking". The City is currently buying asphalt for patches from OPC in accordance with
the Orange County contract, that is the reason staff approached them first about the cost estimate.
The Seminole County contract provides for the furnishing of labor, equipment, and material for
paving using type S-3 for $49.15 per ton. The costs to supply material only, under the Seminole
County contract, to the job site is $38.05 per ton. Therefore the installation costs for labor and
equipment is $10.10 per ton, which is a very good cost for installation. By comparison, under
the Orange County contract to furnish material only to the job site, the cost is $36.50 per ton.
The difference being in transportation costs.
City of Ocoee• 150 N Lakeshore Drive•Ocoee, Florida 34761
phone: (407)905-3100• fax: (407)656-8504 •www.ci.ocoee.tl.us
The attached cost estimate from OPC represents milling a small portion of Sabina! Street to
provide an even surface, the raising of the stormwater and sanitary manhole covers to the new
grade, and the paving of all the streets in the Prima Vista subdivision. The estimate also includes
paving Lakewood Avenue south of Orlando Avenue; this is the only other street in this area that
needs paving. OPC's cost to perform this work is $75,111.00.
The City Commission allotted a portion of their discretionary contingency to pay for the paving
of the Prima Vista subdivision. The cost estimate provided by the Public Works Department and
used as the basis for approving this project under the discretionary contingency was a not to
exceed amount of$85,000. According to the Finance Department, there is approximately
$52,000 remaining in this contingency account. However, there is approximately $30,000
remaining under the Street Maintenance Department accounts for Road Repairs, Paving and
Drainage Improvements, and Electric Expense, which could cover the difference between the
funds remaining in the discretionary contingency and the cost estimate to be used for the
Purchase Order.
I recommend that the City Commission approve the attachment (piggybacking) to the Seminole
County contract (#A/B-378-99/GG) to execute a Purchase Order with Orlando Paving Company
in the amount not to exceed $75,111.00.
I recommend that the City Commission fund the project by encumbering $50,000 from the
Commission Discretionary Contingency account with the remainder, $25,111, to be transferred
from a combination of the Street Maintenance Department accounts for Road Repairs, Paving
and Drainage Improvements, and Electric Expense accounts to cover the difference.
I recommend that at the time Orlando Paving Company is ready to perform the work, the
decision be made by the City Manager to possibly change order out the paving of Lakewood
Avenue, should funds not be available from the Street Maintenance Department accounts for
Road Repairs, Paving and Drainage Improvements, and Electric Expense accounts. This action
would not spend $8,847 and reduce the final Purchase Order amount to $66,264.00, with the
savings being realized in the Street Maintenance Department accounts.
Attachment
DEPARTMENT OF FISCAL SERVICES
.l J SEMINOLE COUNTY'
PURCHASING DIVISION FLORIDA'S NATURAL CHOICE
January 23, 2002
Orlando Paving Company
PO Box 547186
Orlando, FL 32854
Attn: Wayne Evans - Vice President
Subject: NOTICE OF SECOND RENEWAL
A/B-378-99/GG Annual Bid Agreement
h of & Cold Asphaltic Concrete
Dear Mr. Evans:
On January 23, 2002 the Seminole County Purchasing Manager approved Second
Renewal of subject agreement to your firm in accordance with terms and conditions of the
bid documents, and the proposed price increase, per attached detail. The period of
performance is January 24, 2002 through January 23, 2003.
All purchases must be ordered via a numbered Seminole County Purchase Order or
Release Order. Appropriate County departments and divisions as well as other
governmental agencies will be furnished Annual requirement Data Sheets.
Thank you for your service to Seminole County. We appreciate your business.
Sincerely,
d --d- -
Gloria M. Garcia,ZITPB
Senior Bti er
GNAG
C: Jim Inda- Project Manager, Orlando Pavinw
Ira Barrow -Manager, Road Operations
1101 EAST FIRST STREET SANFORD FL 32771-1468 TELEPHONE (407) 665-7116 FAX (407) 665-7956
hit p://www.to.semi nol e.fl.us
4cr 6 5 7956 F.02
DEPARTMENT OF FISCAL SERVICES •
�k
PURCHASING DIVISION SEAENOLE COLThrly
FLORIDA'S NATURAL CHOICE
January 3, 2002
Orlanco Paving Company
P.O. Box 547196
Orlando, Florida 32854-7186
Attention: James E. Inda — Project Manager
Subject: NOTICE OF SECOND RENEWAL
A/8-378-99/Cc Annual Bid Agreement
Hot & Cold Asphaltic Concrete
Dear Mr. Inda:
The above referenced contract is due to expire on January 23, 2002. In accordance
withthe terms and conditions, it may be renewed for an additional twelve (12) month
period provided all prices, terms and conditions remain the same.
If your firm agrees to renew for the additional time period, please reply in writing by
January 12. 2002. (Or you may Fax to 407-665-7956 and follow-uD with original via
mails) You may use the comment section below for your response.
We appreciate your interest in doing business with Seminole County, and trust we may
continue a ,mutually satisfactory business relationship,
S:ncereiy,
Gloria M. Garcia, PB
Senior Buyer •
Comments: ly Agree to renew 0 D,sagre? to -
renew
Au:horiz c :— - --c
JGC atJ'o
DP t?
11'_I E.S- CP,-,' c -_-_ _ __—. .c_ F_-.. nR4& , S� oc5-112o r:.,t a„I-6d5-795E
•
PR1LF EEFECTI—BRL41R] 14. 2001
1 RID RESPONSE FORM
1._ -REVISED- ,
-REVISED-
i'
______ ______.
Icl accordance t '. t,:r„
F conditions t-� J-C lc a :Lcrs.
e i01 r le _� OB 0 bidder
YARD JOB NIT; AND OR I A_N es _kr S rnuc Count:.'_ FOB, CO V'Tt"
. . ..mot .. ?.
UNIT PRICE UNIT PRICE UNIT PRICE UNIT PRICE 1 T ou!—�
ITEM j DESCRIPTION 0-50
51-150 151- 300 Over 300
11
Tons/Job Tons/Job I Tons/Job
- 1 Alt::—..1:: I ;B� — — Tons/Job
Zane. Labor !
,
L0 ]50 tons
25 S 1 450 togs n 5 .5 tons n 22A00 tons(a'
s Tors"` '---�
I _ u: s S EY7 S/ .S'
Si( ?Ton S S3or Total of all
:on ^^ ton �:a .won_. _ �.�, �-s d
ti o
_ 0 Isiaz93�Is3 GIs / 3grs 6 cY Is o �.�ism. f'——. 150 tons( :1:450 tons e 12.400 toad _ _
T I I Hot c l .ton "+s S /'L ion 5 S">,-4` 1 5 Y 9ton Total .-�o{ all
_ '� P IcCo -se I Eton
_� t - -Towis _ - Jpnces reflected�" o 50tons
_ = g' u 5� s ! .5ILOJI 3'835 $t 0 - . I
p <.I`7501ors@1- ons e oe
an
G2 �11r .._s r t ttI
- Unit To.al I = '.0
_ I S 5435Z.-=l S /. 50
i 0 o 1 50 tons(a7. _i.I 150 tons (d 300 tons2(a?� 12 /o `=/o C S / 3- /- •,
o - - 2.000 tons
S St ` '7Y. < ton S 57, I
Con-se n,::m ton ^ o_ rti' >Sc.-r._: x^ton Total o ail
oc:
C;.2 paces reflected
- Urn Total 5 54.3Sxf $ // //7 5 :r.4 0
so :re
1 0 --IS
/ / 5 /o! /c Is /337 -J--
o s`_ 5 z'ti� r :00 Cori OJO ons r II a
., "� S
7 �l - 'C 7. � ra., d a of i �'
Unit T .
6.0 S -4 i --I1 S / c1.g� S SC36.1 S bi`i *--�15 //J
: 9 ar 1
1 �, - J tons ( 53 tons txj 1300 tons(q2 0
. / '_.�00 tons�� I 1
T°:,
G � uS � Is /� 796 `� - !9's93
PRICE EFFECTIVE FEBRUARY 14. 200]
S0 S .5 //o. aLl S /, R 3/ SAS / GC3 , S / / c 4� �.i s /
j tors c 11 S :cos EE 300 .or a. n `
00.ons c �'—�-
7/Z- �$ ' S 7, c,:�5 C/ o il Tara. of al.
:z9zctec
` Lrn roof 5 � of I in S0
t�IS /3os7. =1SV U5 Is /a-) /< o ls�9 P—_ i 30 tons fal i li0 tone CS c gTC
! ?neer ro'lected
I LeeTry GIs ,S� F/ 5 /2..7�-2—rs /7 5 Q 1 s i/ 8 co 11 s /�
i/ Sec oSo-_.
I E11 I DESCRIPTION UNIT PRICE UNIT PRICE UNIT PRICE
0-3.000 3.00 i-10-000 I
Over 10.000
L 10.0 I Sq. Yd. S. Yd. Sq. Yd.
500 S Y ¢ 1600 S.Y. c I 1500 Sl" is
1.000 Sq. Yd-1'r 5 r]_cc F 5 _
\1 j:, S.Y_ Ste_ II otai o[ xii prices
Bituminous Surface ^
Treatment Sinr S l- ^ 'e=.eP ;n 10.0 p Ie Course. i
i Coil Totals
S Soo et-- ls . .4-1 S z5 ; � .::.
ITE11 DESCRIPTIOS, UNIT PRICE UNIT PRICE L"�' er PRICE
0-3,000 3.001-10.000 Ocer 10.00000 '
11.0 — Sq_ Yd. Sq.:d. Sq.Yd. tl
500 S.Y. m 1 1000 S.Y. as 11500 S_Y_ra 11r —A
✓ L000 Sq. YdJl-r S li
s S 5�= Sl' S ?r.T3 Toil c;all prices
Bituminous Surface li SY-. ^ /-i- _
Treatment Double C'1 ^�
1 i Course.
i -1 ink Totals S "7r 5/ N
1� U � l s 5c— S CD 6.,,J5 I ! g
(County-Wide)-lr
`- Mobilization charge for
24 hour emergency _ o�j, , _ _ -
response of ---
1 Labor'EquinJ3Iaterials: -- - - - _ -
II
'1 Unit Totals �� S i� ao
o -it
TOTAL - IIS
ALTERNATE I [3; i.7
PRICE EFFECTIVE FEBRI_ARY 14. 2001
1
ITEII )L C RIP IION l T _ I [ NI1 'RICE
I IT PRICE UNIT PRICE
0 1000 I NIT PRICE
0 P' ,
O er 3000_ Sq. ]d S 1 d. II
Sped
'" - '- ' �� '" � . I Estimated . Estimated �� Estimated
0' qumuin 500S.A. quantityquantity Estimated
Ea'u:n Alaterals a quantity 3000
0005.1'. E
I.0 e a nd San+ I S /Li Se. l I S S .._5,7 Sa. 1-d. 5 2 Sc.
! - L tTo:als S SG(moo / Sa.c� aa:.�7 Sa]'d.
-.- .et Coat S a'Sa. 1 d. I S t l I S .7 S: — 5 5 So i_
t� j. Sc. 1'_d. 5 Sc n=.
I IL_.tota's IS ` .'5,-- IS I ( 7 _. S .i2. q vs
IIL 7d S / vy p_ S ��o
Total Total S
Alternate II 55/ 85". 1
11 II
ITEM ' DESCRIPTION UNIT PRICE
LNI7 PRICE UNIT PRICE
b 0-1000 NOON-_'000 Over 2000
ii Sq. l d_ Sq. rd. Sa. Yd.
-I= 4 IiI occ Estimated
Estimated Estimated
-ate quantity-1000 quantity 1500 quantity __[
_._.a lt_.ert-_s I S.Y. `a 9 0
pkis' I S.Y. a 5.1. .a _
�-- i5 ._---- iS
St to
Unit totals i 55-0__1;-:-C-
I Se_ A'5oar $ 5 00
_ _ t-CI - - :Total Total 5
J \ nitzrnate`w I /" /Spp
II ITEM ' DESCRIPTION
Estimated Di Anr u an:¢v II tel
Quantities11
TO�2_
lta _ S
Tar Pa e : mark e 1 200C I
SolidSn 000 _ . C: • Z3 - S i < ` 1
_
T- -_Pa+_men: Mar.:n_-Paint-Sun Sim 15000 LE - s-9 _ _ ' S RS
II i Te= Pavement Nlarkme-Part-Stoo Ba: - 5 _ i s -cc,—I 50 tac§ : d c = ! c _I
If I TOTAL ALTERNATE 1V _ 1 '
ITE>I DESCRIPTION
F.U.R YL4\-T Totals F.O.B. JOB
oms, • -- TE =04b of estimated 0 of es;maredunr:lM -._ _ls quantity 1
quatnnn
. _ \` TS 37--d -
t - e � '7.�. 1 ms S
n ?sonalu
_ .ne1000 tons "� 1
35 •-
al C - trx 5:iutos :Cr -
_ n _ �7� �c __oc c.� �� c - .
mos
15d. - - _ /� =III
3 a-
<7 /7= _ -
Re.:sed Sic .^ goose !or .
PRICE EFFECTIVE FEBRFARY 14.2001
'on W ou1 — roc . 000 tors f ., s
0.0 G Tons /1 .29ai Go s
.srs
_ mnz 750 tors 7.� 21 S'rt`0 tons W
'000 Tons1 pnait S a ( � r r :
I \V0Tons1 .-tal S S / S. tonsIS
- I ion x 1000 tons I '
oR. 1000 tons / S
� Total F.O.B Plat.: S Ord_ =. G. = . � ���S ii
1 ' Total . s
-1 - .. - 1 Alternate V i53: tis II
ITEM DESC
RIPTION
F.O.B.70B SITE in-place TOTALS
VI. Alternate VI(County-R'Ides Labor Eauin.,l-lanais
1.0 ' IOU Tons.yr- Speed Burros S I
97. — I S
ton
0 Ix TONI-^ Vhsc. Aspna!: Areas - Tope III - 'tot I S _ ���
\6x - ') '-] it S
tor. 3 (..3 II
L =.0 L0 Tons gr Misr. Aspnai: ?=eas - Type S-Ii1 - Hot S
a.O � Eacly 7"r-Manhole Ring Adjustment 'tor •) . 3.
4djustment I S
I
c.0 Ta c I 'ea a, ., Tj c,
ach r-Nats- al -_ or simaar cover S 1
a ssu-nent !1 S
1 5 01 24.0C° S.F.-`1 r -Plage pat:omens m or:mem fabric r' S
uooli Coons-,- -o bonding adent
i -.. 00 S p-} Plane pavement r tn.orcment fab..c - S �C �� _ ���- ��
tragrzr su Dll a Conne. sen.¢bond:n_ s i r -71 7Sca_
TOTAL BID OFFER (ALTERNATES I - VI = $ r o
_ C~ C (c i6
PRICE EFFECTIVE FEHRL-.ARY 14. 1001
l :e: r
._, ai U- ,ie`,- Paax:M-_^ ci 2 days Receipt Of C -R0`
On pacz,
In-dace Delivery (Labor. EqulpmentNatehals maximum of 10 calendar days to
begin work After Receipt of Order (ARO).
C. Emergency Response maximum of 24 hours to respond and begin work After
Receipt of Order (ARO)
D_ Warranty- Materals /Labor
Vert y aH uni: pnces and price extensions in bidlevaica ion total, above.
I- u.de i Name:
ORLANDO PAVING COMPANY Aurhorz-d Si�ature' r _ • ;��
Address: 'o�wJ 1�`/'.
P.O. BOX 547186
Prn:ed Same: r
1.11
C:7> S Zir
l ��ti�ra
ORLANDO, FLORIDA 32854-7186 � �i VI/
R nandu Add ess. SAME AS ABOVE 1 r Ie Nine =407
:_l Free Sumbec( 1 740-5779
Z�
same as above Iou Fret \nmber19Gf 1
Bids may not'be nt:hdraen for a period of 60 days after bid opening. AU items bid musr be in corm Banc. with the
--_d spedfcaao.^-5. Any Bidder taking exception shall indicate those exceptions on mmeany letterhead and attach
to their bid_
Any cuesned _.� I hou be _ _
rd
Bidder hereby acknowledges this addendum:
•
SI_nature:
Care:
•
Bidder(F'Irm submitting bidl:
Faimre to acunowledge receipt of this addendum may resurt in disqualincation of your cad s-ubminal
As acknowledgment of receipt of Addendum.
attach this addendum immediately behind the Bid Response Form
Csdne M Garda CA AA
Alen'or dlddr-
-a
lOrlando Paving Company
A Division of Hubbard Construction Company
PO Box 547186•Orlando.FL 32B54-71 B8•(407)740-5779
June 17, 2002
Mr. James Elmore
City of Ocoee
Streets/Stormwater Supervisor
370 Enterprise Street
Ocoee, Florida 34761
Re: Prima Vista Subdivision
Minor Asphalt Milling &Asphalt Overlay
Piggyback off of Seminole Co. Contract A/B-378-99/GG
Through January 23, 2003
Dear Mr. Elmore:
Attached is a copy of the Seminole County contract for Hot Mix. Below you will find the pricing
cost to piggyback off of this contract.
1. Banderas Approx.3,547 S.Y. 200 tns. S-II
2. Trancas Court Approx. 740 S.Y. 45 tns. S-II
3. Pacheco Court Approx. 740 S.Y. 45 tns. S-II
4. Aldama Court Approx. 1,733 S.Y. 95 Ins. S-II
5. Caborca Court Approx.1,975 S.Y. 110 tns. S-II
6. Palomas Ave. Approx.1,990 S.Y. 110 Ins. S-II
7. Sasabe St. Approx. 400 S.Y. 25 Ins. S-II
8. Sabinal St. Approx.4,550 S.Y. 255 tns. S-II
9. Gallego Ave. Approx.2,480 S.Y. 140 tns. S-II
10. Homigas St. Approx.1,340 S.Y. 75 tns. S-II
11. Homigas Court Approx.1 015 S.Y. 60 Ins. S-II
12. S. Lake Wood Ave. Approx.3,210 S.V. 180 tns. S-II
1,340 tns. S-II
1,340 tns. of S-Ill @ $49.15 = $65,861.00
1" Milling Approx. 2,000 S.Y. on Sabinal St. = $ 4,000.00
21 Manhole risers @$250.00 each = $ 5,250.00
Estimated Cost to piggyback of Seminole Co. = $75,111.00
cc: Wayne Evans