MEMORANDUM
TO: The Honorable Mayor and Board of City Commissioners
FROM: James W. Shira, P.E., City Engineer/Utilities Director//�
DATE: July 26, 2002
RE: Street Lights
Attached for your review are three street light options provided to us by Florida Power
for use along Lakeshore Drive. Two of the light fixtures proposed by Florida Power are
similar to the light fixtures recommended by Commissioners Johnson and Parker, and
the third fixture is quite different. The cost of each option and a photo of each is
included in the attached memo to Mr. Gleason.
Depending on the option selected, the City's initial cost would range from $4,462.71 to
$6,189.48, and monthly power and rental costs would range from $569.10 to $725.13.
Please note in the attached memo, that the option with the highest initial cost has the
lowest monthly cost.
We also received requests from the public for street light installations at two other
locations.
The first was a request to install street lights on Hackney-Prairie Road from Clarke Road
to the east end of Remington Oaks subdivision. Florida Power supplied a cost estimate
for this project based on thirteen 250 watt "cobra-head"fixtures on 35 foot tall concrete
poles.
The initial cost for this will be $6,918.31 and the monthly power and rental cost will be
$211.46. The initial cost will be charged to the Streets division operating account and
the monthly cost will be charged to the Streets division Electric Expense account.
The second request was for two street lights on Economic Court in front of the Red
Roof Inn. Florida Power provided two estimates for this project. The first (Economi
Court Option #1) uses 250 watt"cobra-head"fixtures on 35 foot tall concrete pole
with overhead wiring. The initial cost for this option is $387.24 and the monthly co is \i
The City of Ocoee• ISO N Lakeshore Dm°c •OCOCc.Florida 34761
phone: (407)9115-3100 • fax: (707)656-SSI1J • www.ci.ocAce.11.us
$ 25.22. The second (Economic Court Option #2) uses 250 watt black "shoebox"
fixtures similar to those installed on the Red Roof Inn property, and 35 foot tall
decorative concrete poles with underground wiring. The initial cost for this option is
$295.96 and the monthly cost is $63.30.
Both the Hackney-Prairie Road lights and the Economic Court lights would be charged
to the public works accounts referred to above.
All of these options are summarized below:
• Lakeshore Drive — 21 lights
o Option #1 - 175 watt"Sanibel"fixtures on 22 foot tall pole - $4,462.71 initial
cost, $725.13 monthly cost ( $8,701.56 annually).
o Option #2 - 100 watt "Flagler" fixture on 16 foot tall pole - $5,294.88 initial
cost, $738.15 monthly cost ($8,857.80 annually).
o Option #3 - 100 watt"Ocala"fixture on 16 foot tall pole - $6,189.48 initial
cost, $569.10 monthly cost ($6,829.20 annually).
• Hackney-Prairie Road — 13 lights
O 250 watt "cobra-head" fixtures on 35 foot tall poles - $6,918.31 initial cost,
$211.46 monthly cost ($2,537.52 annually).
• Economic Court — 2 lights
o Option #1 - 250 watt "cobra-head"fixture on 35 foot tall pole with overhead
wiring - $387.24 initial cost, $25.22 monthly cost ($302.64 annually).
o Option #2 - 250 watt "shoebox"fixture on 35 foot tall pole with underground
wiring - $295.96 initial cost, $63.30 monthly cost ($759.60 annually).
These figures are presented to the City Commission for review. The figures above for
Lakeshore Drive are slightly different than those that had been presented by the Public
Works department on May 21 ($4,463 initial cost and $675.00 monthly cost).
If the City Commission wants to proceed with any or all of these three projects, we
need the following:
O Lakeshore Drive - Proceed? (yes/no) If yes, which option? (1, 2 or 3)
o Economic Court — Proceed? (yes/no) If yes, which option? (1 or 2)
o Hackney-Prairie Road — Proceed? (yes/no)
o Authorization to transfer appropriate amount from General Fund Contingency
account # 001-516-00-4900 to fund the initial cost(s) of the selected option(s).
Center of Good/
Mayor `8be )J 4 I� Commissioners
S_ Scott Vandergrift •,�) {,r fx+MMw Danny Howell, District 1
Scott Anderson, District
City Manager ` Y Rusty Johnson. District 3
Jim Gleason 2 4 a2 Nancy I Parker. District 4
LicCi
MEMORANDUM
TO: Jim Gleason, City Manager
FROM: James W. Shira, P.F.., City Engineer/Utilities Director
DATE: July 19, 2002
RE: Lakeshore Drive / Downtown Streetlights
Juan DaCosta provided cost data for three options. Two options use light fixtures very similar to
those preferred by Commissioners Johnson and Parker,and the third option uses a very different
fixture. All of the prices are based on 21 lights. Pictures of each of the three are attached.
The first option is to use a 175 watt fixture called "Sanibel" on a 22 foot pole. This is the one
most unlike those preferred by Commissioners Johnson and Parker. Total monthly rent for this
option is $725.13, and there is a one-time up front cost of$4,462.71.
The second option uses a 100 watt fixture called "Flagler" on a 16 foot pole. Total monthly rent
is $738.15, and there is a one-time up front cost of$5,294.88.
The third option uses a 100 watt fixture called "Ocala" on a 16 foot pole. Total monthly rent is
$569.10, and there is a one-time up front cost of$6,189.48.
Once a decision has been made as to the preferred option,Juan can be directed to begin ordering
materials.
J W S/bw
Attachments
The City of Ocoee• 150 N Lakeshore Drive •Ocoee, Florida 34761
phone: (407)905-3100 • fax: (407)656-8504• www.ci.ucoee.11.us
JUL 19 '02 12:27PM MID FLORIDA DIVISION P.2
411e) Lighting Solutions
•411 ,.•.
Proposal
Rorida Power 07/19/2002
ftttilltz.58 EMT/.:4 ri;IWO FPC Contact: Juan DaCosta
Office: 407 646-8573
FAX: 407 646-8574
Project Project ID:
CITY OF OCOEE Project Summary
Design and Install lighting.
Location STARKE LAKE
Contact JIM SHIRA 407 905-3100
< .c v±". yi'.w,. •-�c .r ..ki ,M .�. .,�4..t
21 175 WATT SANIBEL MH BLK $15.34 $3,07 $2.94
21 22' SANIBEL SINGLE MNT $13.18 N/A N/A
Month) $598,92 $64.47 $61.74
21 fixtures Total- Rent, Maintenance and Energy" $725.13
21 poles Up front costs(CIAC), if applicable $4,462.71
"excludes taxes and other associate charges
SANIBEL
apr' . " t
4,\ • ht • Premier
Or 77"
Lamp HPS: jipPee
MH: 175 Watt
Mounting Height: 20# t =
Pole: Decorative Concrete
The beauty of this stylish fixture is its remarkable versatility.
Its sleek simplicity,with a gently curved bracket that helps
cast light downward, is at home virtually anywhere, from
more formal traditional neighborhoods to beachfront
communities and other casual locales.
WW
s 0-
' :✓ k+[
1.411460)
{
I i -i 1 IJ .J9',r,1 _
•
.ice Y,;afw•
R, m
z
Florida Power A Progress Energy Company
P.
JUL 19 '02 12:27PM MID FLORIDA DIVISION
Lighting Solutions
Proposal
Florida 07/19/2002
fs egress Eraargy 4:1 y'o FPC Contact: Juan DaCosta
Office: 407 646-8573
FAX: 407 646-8574
Project Project ID:
CITY OF OCOEE Project Summary
Location STARKE LAKE Design and install lighting.
Contact JIM SHIRR 407 905-3100
21 100 WATT HPS PLAGLER $14.86 $1.47 $1.95
21 16' WASHINGTON CONCRETE $16.92 N/A N/A
Monthl S667.38 $30.87 $39.90
•
21 fixtures Total- Rent,Maintenance and EnerBY-' $738,15
21 poles Up front costs (CIAC), if applicable $5,294.88
""excludes taxes and other associate charges
FLAGLER
AL
• Premier
. lighting
...
Lamp HPS: 100 Watt
Mounting Height: 12'
Pole: Decorative Concrete
Features include gold finial and band.
A gold finial and band accent ,
this large decorative globe,
which glitters in the daylight,
adding a warm,traditional
touch even when it isn't
illuminating the landscape.
Unrivaled for beauty,it's also
an efficient performer,mini-
mizing wasted upward light. k , a ' ,',
A
X
m
w !ii N
ili ; < ;, ,M
�t .. .. a
_ ,. - - m
NNW Z
"1"11 _
0 --..-
Florida Power
A Progress Energy Company
' JUL 19 '02 12:28PM MID FLORIDA DIVISION P.4
Lighting Solutions
Proposal
/19/2002
Florida Power 07
Piopress Energy r2cel:a:7; FPC Contact: Juan DaCosta
Office; 407 646-8573
FAX: 407 646-8574
Project Project ID:
CITY OF OCOEE Project Summary
Design and install lighting, 3
Location STARKE LAKE
Contact JIM SHIRA 407 905-3100
21 100 WATT HPS OCALA $7.00 $1.28 $1.95
21 16' WASHINGTON CONCRETE $16.92 N/A N/A
Monthly $502.32 $26.88 $39.90
21 fixtures Total- Rent,Maintenance and Energy" $568.10
21 poles Up front costs (CIAC), if applicable $6,189,48
`"excludes taxes and other associate charges
OCALA
GAS`Jd/ 0K'`-
- 0,1" 7? ød 3
.,.. ,..,
: „t, • Premier
t
c ,,
A,.
,.
., ..:,
s,.A..,.,- ,., ..? ligh
ng
,,,,, , ..._
Lamp HPS: 100 Watt
Mounting Height: 12'
Pole: Decorative Concrete
If the look is familiar,it's probably
because you've seen lights like
fa
this lining streets across America
for years. a
Our version of the traditional
favorite is crafted with a durable ..
acrylic and designed to bring •;; •,1f
back the"good old days:' 111011.-,lint "
� FFFFr
1
�t�.
4 . r
1 .-,. xiI- ,r.. / �_f m
r .1�3 Via,
l 0
� m
_• „,ii
-_z Z
II
0 Florida Power ,, `, c/ I:•:lllifl -c <•% i I1 �.I
A Progress Energy Company , :y;� "i ;Alp-a< III
por $ 01
oprr• did tfj
Decorative Concrete
premier poles
The Washington, Victorian,and Colonial are decorative concrete poles
that can withstand the harsh Florida sunlight and provide a high-end
decorative look to your premium lighting. Available in 12' mounting
heights.
WASHINGTON CTORIA C LO AL
t
bl
i
x
r" _-;----=—__ . ; i ''''''
� „ .3 t Ai ' fir.
6 _
. ,. „ ., fil
. 1
Y I Xi
_ y
„., y
0
:, % ,�
.. i" m
N
5 Florida Power
A Progress Energy Company
Mayor ire Center of Good L111/7 Commissioners
S. Scott Vandergrift �,,,„ . .a Danny Howell, District 1
(� Scott Anderson, District 2
City Manager eOC`��,J E ,z Rusty Johnson, District 3
Jim Gleason .' " s4'_�
-..... ,.� :-... , .. Nancy J.Parker, District 4
Ati
MEMORANDUM
TO: Jim Gleason, City Manager
FROM: James W. Shim,P.E., City Engineer/Utilities Director
DATE: July 19, 2002
RE: Hackney-Prairie Road Streetlights
Juan DaCosta provided cost data for this project.
The project will entail installation of 13 streetlights from Clarke Road east to the east boundary
of Remington Oaks subdivision. These will be 250 watt"cobra-head"fixtures on 35 foot
concrete poles.
Total monthly rental for these lights will be$211.46 and there will be a one-time up front cost of
$6,918.31. This is a public road, so all of these costs are general fund liabilities,not liabilities of
a homeowner's association.
•
Once a decision has been made to proceed with this project, Juan can be directed to begin
ordering materials.
JWS/jbw
The City of Ocoee• 150 N Lakeshore Drive•Ocoee,Florida 34761
phone:(407)905-3100•fax:(407)656-8504•www.ci.ocoee.fl.us
JUL 24 '02 01:55PM MID FLORIDA DIVISION
Lighting Solutions
Proposal
Florida.
Power 07/24/2002
A POGprasa Fairyrnmrxw FPC Contact: Juan DaCosta
Office: 407 646-8573
FAX: 407 646-8574
Project
Project ID:
Red Roof Inn Project Summary
Design and install lighting.
Location 11241 W. Colonial Dr uG Feb
Contact Jim Shira 407 905-3100
2 250w HPS SHOEBOX Black $9.98 $1.32 $4.29
2 35 foot PROMENADE CONCRETE $16.06 N/A N/A
Monthl $52.08 $2.64 $8.58
2 fixtures Total- Rent, Maintenance and Energy** $63.30
2 poles Up front costs (CIAC),if applicable $295.96
"excludes taxes and other associate charges
JUL 24 '02 01:55PM MID FLORIDA DIVISION
Lighting Solutions
Proposal
Florida Power 07/24/2002
-'f'rograss E6rpy`'^' ;'�' FPC Contact: Juan DaCosta
Office: 407 646-8573
FAX: 407 646-8574
Project Project ID:
Red Roof Inn Project Summary
Design and install lighting.
Location 11241 W. Colonial Dr
®M P—aD
Contact Jim Shira 407 905-3100
�t. �1+._ >. .-.7.., •• :�r t..r� �...>•x+�. �_v4 ::tL}G�+'•a'r•"\w'�1`�; .y�`.9=,�rv_.;�,_,,,c,� �>tu :r.�._:i •rr'-
6.. ��' ,.�.•y �f:.�K' }.::�=;�w eVr.�i i�r v�'! .a ''�' :._�•�.�} .t. •:' "4• *�tiT�.S:,.t.�-..�,. _ r:3�. .+.'1, .r C' rr...��:i•,_?•.='t� a
�i +.. sr t r'' ..�;,. =4{t.,, " v:,r,`•_:� ''•'s' ,�;! F� ,>r rar S a .ii`
G;« �. .fK•^ A� :.q:�..5��5•n i1:it Y'.'fe •i} +•'C_f T '•�••G�y., .�v: - � _ _
ice_ L•: 1i1..,}•'�y. _ y 1:Ji--^4.: t �, _ _ n,Y��^ l.:f.y,.�.:r.: _ \•t1
ti • [.
n..v......tir J: R: 'SK' .'..5." 'J.". 'P ;j.{ya. �+f.1'•.•.
-
tr
2
250w HPS cutoff rdwy $3.31 $1.32 $4,13
2 35 foot CONCRETE $3.86 N/A N/A
Monthly $14.32 $2.64 $8.26
x.-:a:»•:t. `?Y:.:'"'i4"t. �•s' "•e''.a:re- ;:-rµxc;€• ':'r'v.}.::r;• ^_... ;A��• '°3^^_:v 7 1 _l."m'A'�
..:. ..-... .+.i.....:'.:..-•J::.- ..._.n.. r�::��«. .r:.• x.. �f r•:s` ..- _Jx �A'sY�. b-r._ram ... .: .: __.."r
2 fixturos Total- Rent, Maintenance and Energy'" $25.22
2 poles Up front costs (CIAC), if applicable $387.24
excludes taxes and other associate charges
•
JUL 19 '02 12:29PM MID FLORIDA DIVISION P.5
Lighting Solutions
Proposal
Florida Power 07,19,2CO2
Progress EA+rrg,/i:c, ;,.:7f FPC Contact: Juan DaCosta
Office: 407 646-8573
FAX: 407 646-8574
Project Project ID:
CITY OF OCOEE Project Summary
Design and install lighting.
Location HACKNEY PRAIRIE RD
Contact JIM SHIRA 407 905-3100
h,`ti S" 17 �Q ♦ t ".. ` 'ti r x'% S•a s - _ a'. } - r ? �,:r .._. �a-i-3'.''S:G.
xrJ'9 ".1w v.{ T-x �, '!L f...,7 ;wra;•Cxl`4 :K n f.�.(�,.;y';.,.��;LY.` v:
•:.
3
250 WATT HPS OH RDWY $3.31 $1.32 $4.13
10
250 WATT HPS UG RDWY $7.42 $1.32 $4.29
10 35' CONCRETE CL1 $3.86 N/A N/A
Monthly $151.40 $17.16 $55.29
13 fixtures Total- Rent, Maintenance and Energy" $211.46
10 poles Up front costs (CIAC), if applicable $6,918.31
" excludes taxes and other associate charges