MEMORANDUM
TO: The Honorable Mayor and Board of City Commissioners
FROM: James W. Shira, P.E., City Engineer
DATE: October 7, 2002
RE: Old Winter Garden Road / Blackwood Avenue Intersection
Improvements Design
Attached for your review and approval is a proposal from PEC for modification of the design
drawings for the Old Winter Garden Road/ Professional Parkway widening project.
These proposed modifications arc due to the recent construction of the Super Wal-Mart. During
the design of that project, several intersection improvements were noted that were required by
the Wal-Mart project. It was also apparent that if Wal-Mart built those improvements in the
existing right-of-way, our widening project, built in the soon-to-be-expanded right-of-way,
would tear them out again. This made no sense, so an agreement was reached whereby the Wal-
Mart improvements were postponed until the road widening, and would be incorporated into that
road widening.
In the Wal-Mart development agreement, Wal-Mart agreed to pay for the cost of a temporary
signal at this intersection and certain intersection improvements (together, the Wal-Mart Offsite
Roadway Improvements). Due to right-of-way constraints, it was agreed that Wal-Mart would
pay the estimated cost of those improvements to the city and that the city would include the
construction of the improvements in the Old Winter Garden Road project.
Based on an estimate prepared by PEC in June 2001, we believed the cost of design, construction
and administration to be approximately $360,000. Further review of the work resulted in an
estimated cost range of$300,000 to $350,000. The engineer for Wal-Mart provided us with a
detailed breakdown of the work and an estimate of$342,320 which was within our estimated
range. We agreed that the $342,320 figure was acceptable, and in early December 2001 we
received a check from Wal-Mart for that amount and the funds were deposited to the city's
account.
CR
i
The City or Ocoee • 150 N Lakeshore Drive•Ocoee, Florida 34761
phone: (407)905-3100• lax: (407)656-8504 • www.ci.oiniee.fl.us
The attached proposal is for the survey, design and permitting phase of the work. The
construction and construction administration phases will be the subject of future proposals.
I recommend that the City Commission authorize the Mayor and City Clerk to execute
Amendment No. 01 to Addendum No. 99-10 to PEC's continuing contract and authorize PEC to
proceed with the survey, design and permitting of the Wal-Mart Offsite Roadway Improvements.
J WS/jbw
Attachments
PROFESSIONAL ENGINEERING CONSULTANTS, INC.
September 25, 2002
Mr. James Gleason
City Manager
City of Ocoee
150 North Lakeshore Drive
Ocoee, FL 34761
RE: Amendment for Additional Authorization
Dear Mr. Gleason:
Enclosed is an amendment to Addendum 99-10 to authorize PEC to modify the construction
plans for Old Winter Garden Road/Professional Parkway to accommodate the ingress/egress
improvements necessary for the new Walmart development. Walmart has agreed to pay the
City the total cost for design, inspection and construction of the traffic improvements. By
having these improvements incorporated into the Old Winter Garden Road/Professional
Parkway Roadway Plans, no wasted construction or reconstruction will occur.
The fee for the additional design effort is $30,000 to be reimbursed by Walmart per previous
agreement.
If I can answer any questions, please contact me at (407) 422-8062.
Sincerely,
PROFESSIONAL ENGINEERING CONSULTANTS, INC.
Torn Kelley, P.E.
Principal
G lencarmGm+AYTEoococewmcndum‘amendm zv-iw do-
Enclosure
- trl, i.., . •] . :' bi, '•I,.k 4[i.a1a 9401
AMENDMENT NO. 01 TO ADDENDUM NO. 99-10 TO
AGREEMENT FOR CONSULTING ENGINEERING SERVICES
INCLUDING
ENGINEERING SERVICES FOR
CITY OF OCOEE
OLD WINTER GARDEN ROAD ADDITIONAL ENGINEERING SERVICES
RE: WALMART OFF-SITE ROADWAY IMPROVEMENTS
This Amendment No. 1 to Addendum 99-10 hereinafter called the Amendment, as of this
day of 2002, shall constitute an Addendum to the Agreement
for Consulting Engineering Services between the City of Ocoee, Florida (the CITY) and
Professional Engineering Consultants, Inc., 200 East Robinson Street, Suite 1560, Lake Eola
Centre, Orlando, Florida (the CONSULTANT), dated the 21st day of August, 1984,
hereinafter referred to as the AGREEMENT.
WHEREAS, the CITY and CONSULTANT entered into an AGREEMENT whereby the
CITY retained the CONSULTANT to provide professional engineering services as required
from time to time, and WHEREAS the CONSULTANT will perform consulting engineering
services for the CITY as herein defined.
NOW THEREFORE, in consideration of the mutual covenants and promises hereinafter set
forth on the part of both parties to be kept and performed, the parties do mutually agree as
follows:
Section 1 - Services of the Consultant
1.1 The CONSULTANT shall perform the Engineering Services as outlined in the
attached letter dated June 12, 2001 relative to the provision of construction
administration services to the CITY.
Section 2 - Compensation
2.1 Compensation by CITY for engineering services for Old Winter Garden Road
Additional Engineering Services (Re: Walmart Off-Site Roadway Improvements) is
provided under this Addendum shall be computed under Paragraph 6.1.2.3 of the
Agreement, utilizing the Lump Sum Method of Compensation with the compensation
for this authorization not-to-exceed$30,000.00 as outlined in the attached letter dated
June 12, 2001 and manhour fee.
Section 3 - Time of Completion
3.1 The CONSULTANT shall provide the design services within a 90 day period (3
months) from the notice-to-proceed.
IN WITNESS WHEREOF, the parties have executed this Amendment No. 01 to Addendum
No. 99-10 the day the year hereinabove set forth.
10-'21i By:
ATTEST: Tom Kelley, P. ., P teip
Date: 7/2. 6,/GT
BOARD OF CITY COMMISSIONERS
CITY OF OCOEE, FLORIDA
By:
ATTEST: S. Scott Vandergrift, Mayor
Date:
For the use and reliance
of City of Ocoee only.
Approved as to form and
legality this
day of , 2002.
City Attorney
c:\clerical\HIGHWAY\PECCOCOLaAddcI1do Am4OIto99-10tkwp2
PEC
PROFESSIONAL ENGINEERING CONSULTANTS, INC. 0E-359
June 12, 2001
2-1.0
Mr. James W. Shiro, P.E.
City Engineer/Utilities Director
City of Ocoee
150 N. Lakeshore Drive
Ocoee, FL 34761
RE: Old Winter Garden Road Project and Wal*mart Project
Dear Jim:
Following is the revised probable cost estimate for the required Wal*mart improvements
along Old Winter Garden Road that will be constructed as part of the City's roadway project
consistent with our meeting of June 4, 2001. These improvements consist of:
(1) Intersection signalization at Old Winter Garden Road and Blackwood Avenue.
(2) Construction of two westbound right turn lanes along Old Winter Garden Road.
(3) Construction of the southbound right turn lane at Blackwood Avenue and Old Winter
Garden Road intersection.
(4) Construction of the Blackwood Avenue improvements south of Old Winter Garden
Road.
Probable Costs:
1. Construction: $300,000
2. Survey/Design/Permitting: 530,000<
3. Construction Administration: S30,000
• Total $360,000
Wal*mart will still be required to construct the sidewalk along Old Winter Garden Road and
for providing the eastbound left turn lanes improvements along Old Winter Garden Road by
restriping the existing median areas. Also, Wal*mart will be required to construct
stormwater pipe (S-80) and plug it at the east end.
Very truly yours,
PROFESSIONAL ENGINEERING CONSULTANTS, INC.
Munjed,Fursan
�Associate Principal
0:tIn t1GHWA WECOE-359016g]a
cc: Donald Carter
eng;neers "Engineering Our Community"
planners
surveyors 200 East Robinson Street • Suite 1560 • Orlando. Florida 32801 • 407;_2-8062 • FAX 407/849-9401