HomeMy WebLinkAboutIII (F) Approval and Authorization for Mayor and City Clerk to Execute Change Order No. 2 in the Amount of $3,320.00 for the Starke Lake South Drainage Well Agenda 10-15-2002
eCenter of Good I. P Item III F
Vlavor .tb 'Oho (',omen tuners
S. Scott l ndergrift __p,•, 9u Danny Hosv ell, I.)t to ut 1
�+ Scott lnde on. District 2
Cnt ltaotgurJj Rusty Johnson, District 3
Jim Gleason 'b :.„„rerrais Name .I Porker, District 1
MEMORANDUM
DATE: October 9, 2002
TO: The Honorable Mayor and Board of City Commissioners
THRU: James W. Shim, P.E., City Engineer, Engineering/Utilities Department
FROM: Richard Lee, Engineer I, Engineering/Utilities Department /1[-
SUBJECT: Change Order#2—Starke lake South Drainage Well
Attached for your review and action is Change Order#2 for the aforementioned project.
The new changes shown on the attached documents involve changes such as the deletion of four
items, equating to the sum of S8,160.00 and the inclusion of four new items possessing a sum of
S11,480.00. The total amount requested for change order#2 =$3,320.00.
Item #4 on Invoice#1 reflects the installation of a security fence. This item was deleted because
a security fence was not utilized during construction, thereby saving $3,960.00.
Item # 9 references 40 linear foot (LP) of 15-inch RCP. The cost of this item was deleted,
because the decision to utilize an alternate piping material (15-inch HDPE) proved to be more
beneficial. Installing HDPE in lieu of RCP saved approximately $600.00.
Items #10, & #1 l (mitered end section and trash rack) were deleted and then added because of a
change in regards to the end treatment for the inlet pipe. It was determined that a concrete
headwall instead of a mitered end section was a preferred alternative due to the location of
certain control elevations that became apparent during construction. The cost for the new trash
rack decreased by $350.00. There were no added costs for changing the mitered end section to a
headwall. The overall saving on these items was $350.00.
The addition of 36 LE of sheet piling was added to the present list of items to be constructed
because the actual elevation shots during construction revealed that the inlet pipe to the drainage
well would be exposed to the environment. In an attempt to protect the pipe and create an
environment that is aesthetically pleasing, it was decided that the installation of sheet piles along
the portion of exposed pipe would be beneficial for the City. This added item was estimated to
he SR,230.00.
City of Douce• 150 N t,keshore Drive •Ocoee, Florida 34761
phone: (407) 905-3100 • fax: (407)656-8504• ,virm.ci.ocoee.11.us
As stated above, all of these items combined would equate to a change order of an additional
$3,320.00, which is an increase of approximately 4.15% of the original contract price.
As you may recall, the negotiated contract for construction services between Henderson Wilder
and the City was $157,030.00. The monies allocated for this project was $250,000.00 (Design
and Construction). The projected expenditures (Design and Construction) to date, which
includes the new changes from the second change order, are $196,690.00. This equates to an
overall saving of$53,310.00 for both design and construction services.
Presently, the southern drainage well is installed and awaiting permission for constructing the
sheet piling. The percent completion for the overall project, both North and South Drainage
Wells is approximately 71.4%.
I recommend that the City Commission authorize the Mayor and City Clerk to execute Change
Order#2 in the amount of$3,320.00.
RL
Attachments
Ocoee CITY OF OCOEE
�j� Engineering/Utilities
�yji'' 150 North Lakeshore Drive
Ocoee, Florida 34761-2258
CHANGE ORDER NO. a
CITY OF OCOEE
PROJECT NO. ' 330(,)
DATE: 10-10-02 CONTRACTOR: Henderson Wilder
AGREEMENT DATE: January 15,2002
[he following changes arc hereby made to the CONTRACT DOCUMENTS.
Original CONTRACT PRICE $157,030.00
Current CONTRACT PRICE ADJUSTED by previous CHANGE ORDER $158,905.00
Net Increase(Decrease) Resulting from this CI IANGE ORDER $3,320.00
The current CONTRACT PRICE including this CHANGE ORDER $162,225.00
ORIGINAL CON RACE lIME:
120 Consecutive Calendar Days from Notice to Proceed Date: August 8,2002
Current CONTRACT TIME adjusted by previous CHANGE ORDERS Date: N/A
Net Increase Resulting from this CHANGE ORDER Days: 117
Current CONTRACT TIME Including this CHANGE ORDER Date: December 1,2002
00R42-1
CHANGES ORDERED:
GENERAL
This change order is necessary to cover changes in the work to be performed under this Contract. The
GENERAL CONDITION. SUPPLEMENTARY CONDITIONS, SPECIFICATIONS and all parts of the
Project Manual listed in Article I,Definitions, of the GENERAL CONDITIONS apply to and govern all
work under this change order.
II. REQUIRED CHANGES
• Refer to Exhibit II
Ill. JUSTIFICATION—Refer to Exhibit B,New Items Added
I. The concrete headwall is more cost effective anti easier to install in-lieu of the proposed mitered end
section.
2. The trash rack is needed to prevent large debris from entering the drainage well.
3. The cost associated with constructing IIDPE is less than that of the RCP.
4. Sheet Piles are necessary in order to protect the exposed inlet pipe.
IV. NARRATIVE OF NEGOTIATIONS N/A
V. PAYMENT
Change Order Description Net Increase Unit Unit Price Net Increase
Item Nos. (Decrease)Quantity (Decrease)Price
Security knee. l S'-RCI',MNS,&Trash -($8,160.00) 1S -(S8,160.001 -I$8.160,001
4,930.& 11 Rack
12,3_&4 Concrete Headwall, trash Rack, IS'-I!DPP, SI 198000 IS $1148000 $11,480.00
Sheet Pile
S3,320.00
'total Net Increase(Decrease)Change Order No. 2
VI, APPROVAL AND CHANGE AUTHORIZATION
This proposed change to the Contract is to be approved by the Ocoee City Commission.
00842-2
Acknowledgements:
The aforementioned change,and work affected thereby, is subject to all provisions of the original contract not
specifically changed by this Change Order;and,
It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original
contract other than matters expressly provided herein.
CONTRACTOR acknowledges,by its execution and acceptance of this Change Order,that the adjustments in
Contract Price and Time shown hereon constitute full and complete compensation and satisfaction for all costs and
modifications of performance time incurred by the CONTRACTOR as a result of this Change Order. No other claim
for increased costs of performance or modifications of time will be granted by the OWNER for the Work covered by
this Change Order. 'Ike CONTRACTOR hereby waives and releases any further claims for cost or time against the
OWNER arising from or relating to the matters or Work set forth or contemplated by this Change Order.
RECOMMENDED BY: ACCEPTED BY:
CITY OF OCOEE,FLORIDA _
By: BY
Signature Signature
Date: Date:
Title: Title:
APPROVED BY:
CITY OF OCOEE, FLORIDA
Owner
By:
S. Scott Vandergri ft, Mayor Date
Attest:
Jean Grafton,City Clerk
FOR USE AND RELIANCE ONLY BY THE APPROVED BY THE OCOEE CITY
CITY OF OCOEE, APPROVED AS I O FORM COMMISSION IN A MEETING FIELD ON
AND LEGALITY TI IIS DAY OF ,20 UNDER
,20 . AGENDA ITEM NO.
FOLEY&LARDNER
By:
City Attorney
00842-4
EXHIBIT B
Items Deleted from Invoice#l:
ITEM # DESCRIPTION AMOUNT ACTION
4 Security Fence $3,960.00 Delete
9 15- RCP $2.800.00 Delete
10 Mitered End Section $750.00 Delete
11 Trash Rack $650.00 Delete
New Items Added:
ITEM # DESCRIPTION AMOUNT ACTION
1 Concrete Headwall S750.00 Add
2 Trash Rack $300.00 Add
3 15" (IIDPE) $2,200.00 Add
4 Sheet Pile Wall $8,230.00 Add
CITY OF OCOEE STARKE LAKE SOUTH DRAIN WELL REPLACEMENT
IINVOICE#1
ITEM UNIT UNIT COST QUANTITY AMOUNT COMPLETED AMOUNT
1.MOBILIZATION US $3,800.00 1 $3,800.00 50% $1,900.00
2.TURBIDITY BARRIER LIN.FT. $20.00 150 FT. $3,000.00 150 FT. $3,000.00
3.SILT FENCE LIN.FT, $3.00 200 FT. $600.00 200 FT. $600.00
i 4.SECURITY FENCE LIN.FT. $18.00 220 FT. $3,960.00
5.NEW WELL US $37,500.00 1 $37,500.00 40% $15,000.00
6.VIDEO LOG US $650.00 1 $650.00
7.GEOPHYSICAL LOG US $1,000.00 1 $1,000.00
NEW WELL STRUCTURE US $10,500.00 1 $10,500.00
• 9.15 INCH RCP TO LAKE LIN.FT. $70.00 40 FT. $2,800.00
4 10.MITERED END SECTION US $750.00 _ 1 $750.00
4 11.TRASH RACK US $650.00 1 $650.00
12.COMPACTED FILL CU. YD. $20.00 60 YDS $1,200.00
13.SOD&GRADING SQ.YD. $5.00 400 YDS $2,000.00
14.ABANDON OLD WELL US $4,000.00 1 $4,000.00
15.REMOVE OLD WELL BOX US $4,500.00 1 $4,500.00
18.AS BUILT DRAWINGS US $1,200.00 1 $1,200.00
17.CONSTRUCTION BOND US $1,952.75 1 $1,952.75 100% $1,952.75
TOTAL OF ORIGINAL PROPOSAL $80,062.75
CHANGE ORDER#1 ADDITIONAL 12 IN. CASING 25 FT. @ $75.00 PER FT.-- $1,875.00