Loading...
HomeMy WebLinkAboutIII (F) Approval and Authorization for Mayor and City Clerk to Execute Change Order No. 2 in the Amount of $3,320.00 for the Starke Lake South Drainage Well Agenda 10-15-2002 eCenter of Good I. P Item III F Vlavor .tb 'Oho (',omen tuners S. Scott l ndergrift __p,•, 9u Danny Hosv ell, I.)t to ut 1 �+ Scott lnde on. District 2 Cnt ltaotgurJj Rusty Johnson, District 3 Jim Gleason 'b :.„„rerrais Name .I Porker, District 1 MEMORANDUM DATE: October 9, 2002 TO: The Honorable Mayor and Board of City Commissioners THRU: James W. Shim, P.E., City Engineer, Engineering/Utilities Department FROM: Richard Lee, Engineer I, Engineering/Utilities Department /1[- SUBJECT: Change Order#2—Starke lake South Drainage Well Attached for your review and action is Change Order#2 for the aforementioned project. The new changes shown on the attached documents involve changes such as the deletion of four items, equating to the sum of S8,160.00 and the inclusion of four new items possessing a sum of S11,480.00. The total amount requested for change order#2 =$3,320.00. Item #4 on Invoice#1 reflects the installation of a security fence. This item was deleted because a security fence was not utilized during construction, thereby saving $3,960.00. Item # 9 references 40 linear foot (LP) of 15-inch RCP. The cost of this item was deleted, because the decision to utilize an alternate piping material (15-inch HDPE) proved to be more beneficial. Installing HDPE in lieu of RCP saved approximately $600.00. Items #10, & #1 l (mitered end section and trash rack) were deleted and then added because of a change in regards to the end treatment for the inlet pipe. It was determined that a concrete headwall instead of a mitered end section was a preferred alternative due to the location of certain control elevations that became apparent during construction. The cost for the new trash rack decreased by $350.00. There were no added costs for changing the mitered end section to a headwall. The overall saving on these items was $350.00. The addition of 36 LE of sheet piling was added to the present list of items to be constructed because the actual elevation shots during construction revealed that the inlet pipe to the drainage well would be exposed to the environment. In an attempt to protect the pipe and create an environment that is aesthetically pleasing, it was decided that the installation of sheet piles along the portion of exposed pipe would be beneficial for the City. This added item was estimated to he SR,230.00. City of Douce• 150 N t,keshore Drive •Ocoee, Florida 34761 phone: (407) 905-3100 • fax: (407)656-8504• ,virm.ci.ocoee.11.us As stated above, all of these items combined would equate to a change order of an additional $3,320.00, which is an increase of approximately 4.15% of the original contract price. As you may recall, the negotiated contract for construction services between Henderson Wilder and the City was $157,030.00. The monies allocated for this project was $250,000.00 (Design and Construction). The projected expenditures (Design and Construction) to date, which includes the new changes from the second change order, are $196,690.00. This equates to an overall saving of$53,310.00 for both design and construction services. Presently, the southern drainage well is installed and awaiting permission for constructing the sheet piling. The percent completion for the overall project, both North and South Drainage Wells is approximately 71.4%. I recommend that the City Commission authorize the Mayor and City Clerk to execute Change Order#2 in the amount of$3,320.00. RL Attachments Ocoee CITY OF OCOEE �j� Engineering/Utilities �yji'' 150 North Lakeshore Drive Ocoee, Florida 34761-2258 CHANGE ORDER NO. a CITY OF OCOEE PROJECT NO. ' 330(,) DATE: 10-10-02 CONTRACTOR: Henderson Wilder AGREEMENT DATE: January 15,2002 [he following changes arc hereby made to the CONTRACT DOCUMENTS. Original CONTRACT PRICE $157,030.00 Current CONTRACT PRICE ADJUSTED by previous CHANGE ORDER $158,905.00 Net Increase(Decrease) Resulting from this CI IANGE ORDER $3,320.00 The current CONTRACT PRICE including this CHANGE ORDER $162,225.00 ORIGINAL CON RACE lIME: 120 Consecutive Calendar Days from Notice to Proceed Date: August 8,2002 Current CONTRACT TIME adjusted by previous CHANGE ORDERS Date: N/A Net Increase Resulting from this CHANGE ORDER Days: 117 Current CONTRACT TIME Including this CHANGE ORDER Date: December 1,2002 00R42-1 CHANGES ORDERED: GENERAL This change order is necessary to cover changes in the work to be performed under this Contract. The GENERAL CONDITION. SUPPLEMENTARY CONDITIONS, SPECIFICATIONS and all parts of the Project Manual listed in Article I,Definitions, of the GENERAL CONDITIONS apply to and govern all work under this change order. II. REQUIRED CHANGES • Refer to Exhibit II Ill. JUSTIFICATION—Refer to Exhibit B,New Items Added I. The concrete headwall is more cost effective anti easier to install in-lieu of the proposed mitered end section. 2. The trash rack is needed to prevent large debris from entering the drainage well. 3. The cost associated with constructing IIDPE is less than that of the RCP. 4. Sheet Piles are necessary in order to protect the exposed inlet pipe. IV. NARRATIVE OF NEGOTIATIONS N/A V. PAYMENT Change Order Description Net Increase Unit Unit Price Net Increase Item Nos. (Decrease)Quantity (Decrease)Price Security knee. l S'-RCI',MNS,&Trash -($8,160.00) 1S -(S8,160.001 -I$8.160,001 4,930.& 11 Rack 12,3_&4 Concrete Headwall, trash Rack, IS'-I!DPP, SI 198000 IS $1148000 $11,480.00 Sheet Pile S3,320.00 'total Net Increase(Decrease)Change Order No. 2 VI, APPROVAL AND CHANGE AUTHORIZATION This proposed change to the Contract is to be approved by the Ocoee City Commission. 00842-2 Acknowledgements: The aforementioned change,and work affected thereby, is subject to all provisions of the original contract not specifically changed by this Change Order;and, It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original contract other than matters expressly provided herein. CONTRACTOR acknowledges,by its execution and acceptance of this Change Order,that the adjustments in Contract Price and Time shown hereon constitute full and complete compensation and satisfaction for all costs and modifications of performance time incurred by the CONTRACTOR as a result of this Change Order. No other claim for increased costs of performance or modifications of time will be granted by the OWNER for the Work covered by this Change Order. 'Ike CONTRACTOR hereby waives and releases any further claims for cost or time against the OWNER arising from or relating to the matters or Work set forth or contemplated by this Change Order. RECOMMENDED BY: ACCEPTED BY: CITY OF OCOEE,FLORIDA _ By: BY Signature Signature Date: Date: Title: Title: APPROVED BY: CITY OF OCOEE, FLORIDA Owner By: S. Scott Vandergri ft, Mayor Date Attest: Jean Grafton,City Clerk FOR USE AND RELIANCE ONLY BY THE APPROVED BY THE OCOEE CITY CITY OF OCOEE, APPROVED AS I O FORM COMMISSION IN A MEETING FIELD ON AND LEGALITY TI IIS DAY OF ,20 UNDER ,20 . AGENDA ITEM NO. FOLEY&LARDNER By: City Attorney 00842-4 EXHIBIT B Items Deleted from Invoice#l: ITEM # DESCRIPTION AMOUNT ACTION 4 Security Fence $3,960.00 Delete 9 15- RCP $2.800.00 Delete 10 Mitered End Section $750.00 Delete 11 Trash Rack $650.00 Delete New Items Added: ITEM # DESCRIPTION AMOUNT ACTION 1 Concrete Headwall S750.00 Add 2 Trash Rack $300.00 Add 3 15" (IIDPE) $2,200.00 Add 4 Sheet Pile Wall $8,230.00 Add CITY OF OCOEE STARKE LAKE SOUTH DRAIN WELL REPLACEMENT IINVOICE#1 ITEM UNIT UNIT COST QUANTITY AMOUNT COMPLETED AMOUNT 1.MOBILIZATION US $3,800.00 1 $3,800.00 50% $1,900.00 2.TURBIDITY BARRIER LIN.FT. $20.00 150 FT. $3,000.00 150 FT. $3,000.00 3.SILT FENCE LIN.FT, $3.00 200 FT. $600.00 200 FT. $600.00 i 4.SECURITY FENCE LIN.FT. $18.00 220 FT. $3,960.00 5.NEW WELL US $37,500.00 1 $37,500.00 40% $15,000.00 6.VIDEO LOG US $650.00 1 $650.00 7.GEOPHYSICAL LOG US $1,000.00 1 $1,000.00 NEW WELL STRUCTURE US $10,500.00 1 $10,500.00 • 9.15 INCH RCP TO LAKE LIN.FT. $70.00 40 FT. $2,800.00 4 10.MITERED END SECTION US $750.00 _ 1 $750.00 4 11.TRASH RACK US $650.00 1 $650.00 12.COMPACTED FILL CU. YD. $20.00 60 YDS $1,200.00 13.SOD&GRADING SQ.YD. $5.00 400 YDS $2,000.00 14.ABANDON OLD WELL US $4,000.00 1 $4,000.00 15.REMOVE OLD WELL BOX US $4,500.00 1 $4,500.00 18.AS BUILT DRAWINGS US $1,200.00 1 $1,200.00 17.CONSTRUCTION BOND US $1,952.75 1 $1,952.75 100% $1,952.75 TOTAL OF ORIGINAL PROPOSAL $80,062.75 CHANGE ORDER#1 ADDITIONAL 12 IN. CASING 25 FT. @ $75.00 PER FT.-- $1,875.00 TOTAL COMPLETED THROUGE 4/29/02-----------------__---_----------_ $24,327.75