Loading...
HomeMy WebLinkAboutIII (B) Approval and Authorization to Extend Ocoee's Reclaimed Water Main to Orchard Park Subdivision Agenda 1-07-2003 Item HI B e Ceptet of Good / Vlav ,tv 4r `Sh itlg Comm ionem S. Scott Vandergrift , L :�M Danny Howell, District I Scott Anderson. Dist rict city 1lnnaacr �� Hush ,Johnson. District: S dim Cl etson VilaCy 1. I':nizr District I MEMORANDUM DATE: December 29, 2002 TO: The Honorable Mayor andp„„ Board of City Commissioners FROM: Rosanne M. Gavri lovic eThC Engineer ) i THROUGH: David Wheeler, P.E. ./P--6) gy Director of Public Works SUBJECT: Reclaimed Water Main Extension to Orchard Park Subdivision The Orchard Park Subdivision is a 141 lot single-family subdivision located on the southeast corner of the intersection of Clarke Road and Clarcona-Ocoee Road. It is within the City of Ocoee's city limits and the Orange County utility service boundary. Many residents contact us on a regular basis regarding irrigation service to this subdivision. This is mainly because Orange County has stopped issuing irrigation meters until the City decides on one of the following two options. The plan was originally to construct a temporary jumper from the Orange County potable water lines to the City of Ocoee's dry-line reclaimed water system. The estimated cost to install the jumper,which includes the taps and a reduced pressure zone backilow preventer(required by DEP), is approximately S10,000.00. Staff then looked at a better alternative, which is connecting them directly to the City's reclaimed water main, located on the west side of Clarke Road. City staff would purchase and install the materials to make the connection and contract out the directional drill under Clarke Road. The estimated cost is as follows: 8" Directional Drill S5000 (contract) 1200' G' PVC C900 pipe S3600 (material only) Gate valves, fitting , etc. S 1400 Total cost $10,000 By using City labor, the estimated cost savings is S20,000 (S3.00/If vs. 520.00/l1). The Engineering Department is proposing to pay for this project with the 1997 Utility Bond Issue. City of Ocoee • 15(1 N I ide:shore Drive• Ocoee. Florida 31761 phone: 0071 9U7i-3I00 • tii: (I07)606-.¢5(4 • w c ci nmec ll us The estimated flow from the subdivision is 120,000 gpd. Rather than using the potable water supplied by Orange County, staff is proposing to extend our reclaimed line to service this subdivision for a number of reasons: 1) cost is approximately the same; 2) conservation of water resources; and, most importantly, 3) the additional flow to the reclaimed water system will help the City re-gain a portion of the Wastewater Treatment Plant flow capacity, which was reduced by DEP at the time of the permit renewal. This project will be completed in 2-3 weeks, depending on the scheduling of the directional drill. I recommend that the City Commission authorize the use of S10,000 from of the 1997 Utility Bond Issue to fund this project, approve the proposed connection of Orchard Park to the City's reclaimed water system and authorize the Engineering and Utilities Departments to proceed.