III (B) Approval and Authorization for Mayor and City Clerk to Execute Change Order No. 1 with Pooley Enterprises for Freedom Park Project
• Agenda 3-18-2003 Item HI B e colter of Coot'[Ip' NOcor �N� t) ( nm n v nu rs S Scntt A ,ndergrlft �^ • m� ,s lit Danny Itntcl]. Dist ri l I M © ° E Soot l Anderson. Di furt2 n( rt} VInn.w: r,J RE Ku ,Johnson. lh lrir[ 3 dim (Llea:+wn s �'11►1 Noncv Parkur, Ih n let t MEMORANDUM DATE: March 10, 2003 TO: The Honorable Mayor and Board of City Commissioners FROM: David A. Wheeler, P.E. Director of Public Works SUBJECT: Freedom Park Project Change Order No. 1 with Pooley Enterprises, Inc. Attached for your review is Change Order Request No. I on the Freedom Park Project with Pooley Enterprises, Inc. This change order request was initiated by City Staff in the Public Works Department to allow for the usage of the reuse pipelines in the Windsor Landings subdivision so that water can be provided to the reuse meter connections as designed and constructed as part of the subdivisions infrastructure. The project consists of the construction of the City park in the south end of Ocoee. The pat-k will include a soccer field, ball field, restroom facilities, parking lot/roller hockey court, and other amenities. The Public Works Utilities Department is using the fire line as a connection from the Orange County Utilities system to the Ocoee reuse system. Ocoee does not have reuse water for this area at this time. The work consists of replacing the designed backflow prevention device on the lire line with a FDEP upgraded device. In addition, the contractor will install a tee and gate valves at the approximate location of the reuse blow off on Braclock Drive. This will allow the city to make the connection between the two pipelines and begin providing irrigation service to the residents of Windsor Landings subdivision through the reuse system. At such time as the City installs a pipeline along Maguire road from Moore Road south to the Windsor Landings subdivision, the City will be able to actually provide reuse water to this area. The cost of the work is $2,505.85 and will be paid for by the Public Works Department from the Water Operating Account. The upgrade of the backflow prevention device costs more than $1,500, therefore it requires a separate action item as a capital purchase. The attachment is a copy of Change Order No. I which will amend the contract with Pooley Enterprises, Inc. The original construction contract cost was $645,239.32. This change order increased the contract amount by $2,505.85, to a contract amount of$647,745.17. I recommend that the City Commission approve Change Order No. 1 with Pooley Enterprises, Inc. by increasing the contract amount by $2,505.85, with no extension in contract time, and authorize the Mayor and City Clerk to execute Change Order No. 1. I request that the City Commission authorize the transfer of $1,776.75 from the Public Works Water Operating Account to Public Works Capital Improvements to pay for the upgrade of the hackflow prevention device to an RPZ type device. Attachment 1) Change Order No. I DA Wfjbw CITY OF OCOEE Q:CO Engineering/Utilities RE 150 North Lakeshore Drive Ocoee, Florida 34761-2258 CHANGE ORDER NO. #1 CITY OF OCOEE Freedom Park PROJECT NO. DATE: February 27, 2003 CONTRACTOR: Pooley Enterprises, Inc. AGREEMENT-DATE: September 17,2002 The following changes are hereby made to the CONTRACT DOCUMENTS. Original CONTRACT PRICE S 645,239.32 Current CONTRACT PRICE ADJUSTED by previous CIIANGE ORDER S 64523932 Net Increase Resulting from this CHANGE ORDER $2,505.85 The current CONTRACT PRICE including this CIIANGE ORDER S 647,745.17 ORIGINAL CONTRACT TIME: 180 Consecutive Calendar Days from Notice to Proceed Date:_ May 2,2003 Current CONTRACT TIME adjusted by previous CHANGE ORDERS Date: Mav2,2003 Net Increase Resulting from this CHANGE ORDER Days:_ O Days. Current CONTRACT TIME Including this CIIANGE ORDER Date: Mav3 2003 CHANGES ORDERED: I. GENERAL 'this change order is necessary to cover changes in the work to be performed under this Contract. The GENERAL CONDITION, SUPPLEMENTARY CONDITIONS, SPECIFICATIONS and all parts of the Project Manual listed in Article I, Definitions,of the GENERAL CONDITIONS apply to and govern all work under this change order. II. REQUIRED CHANGES Item A: Replace the double detector check backflow prevention device with a reduced pressure zone hackflow prevention device and install a 8 inch x 4 inch tee with an 8 and 4 inch gate valve in the area of the reuse stubout on Braeloch Drive in the Windsor Landings subdivision. III. JUSTIFICATION Item A: These items are needed to allow for the connection of Orange County's potable water main to Ocoee's reuse main to provide water for irrigation to the homes in the Windsor Iandings subdivision_ Ocoee does not have reuse water service in the area at this time and with the development already"plumbed" for reuse service,Orange County and Ocoee believe this is the hest plan to allow for the residences to irrigate their yards at this time. IV. NARRATIVE OF NEGOTIATIONS Item A: I'rices were negotiated. V. PAYMENT Orange Order Description Net Increase (lilt hull Price Net Increase Item No. (Decrease)Quantity (Decrease)Price Item A Master Jumper Pol able In Reuse IS PAOSs5 • Total Net Increase Change Order No. MI S2,505.85 VI. APPROVAL AND CHANGE AUTHORIZATION This proposed change to the Contract is to be approved by the Ocoee City Commission. Acknowledgements: The aforementioned change, and work affected thereby,is subject to all provisions of the original contract not specifically changed by this Change Order;and, It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original contract other than matters expressly provided herein. CONTRACTOR acknowledges, by its execution and acceptance of this Change Older,that the adjustments in Contract Price and Time shown hereon constitute full and complete compensation and satisfaction for all costs and modifications of performance time incurred by the CONTRACTOR as a result of this Change Order. No other claim for increased costs of performance or modifications of time will be granted by the OWNER for the Work covered by this Change Order. The CONTRACTOR hereby waives and releases any further claims for cost or time against the OWNER arising from or relating to the matters or Work set forth or contemplated by this Change Order. RECOMMENDED BY: ACCEPTED BY: CITY OF OCOEE, FLORIDA POOLEY ENTERPRISES,INC. By: By: Signature Signature Date: Date: Title: Title: APPROVED BY: CITY OF OCOEE, FLORIDA By:_ S. Scott VandergriR,Mayor Datc Attest: Jean Grafton,City Clerk FOR USE AND RELIANCE ONLY BY TIIE APPROVED BY THE OCOEE CITY CITY OF OCOEE,APPROVED AS TO FORM COMMISSION IN A MEETING HELD ON AND LEGALITY THIS DAY OF ,2003 UNDER 2003_ AGENDA ITEM NO. POI.EY & IA DN ER By: City Attorney al CITY OF OCOEE REQUEST FOR PROPOSAL Engineering/Utilities FOR PROPOSED CHANGE O - 150 North Lakeshore Drive (407) 905-3100 (REP) '% Ocoee, Florida 34761-2258 (407)656-7835 -fax NO. PROJECT DATA NAME: Freedom Park PROJECT NO: LOCATION. south Ocoee on Thornbrooke Drive DATE: January 20.2003 OTHER: Modifications to the water service piping REFERENCE. TO(CONTRACTOR): Pooley Enterprises Inc. Please provide the undersigned a proposal for the following change in the work within seven(7)calendar days after receipt of this request. The written proposal must clearly delineate the scope of the proposed change in the work providing an itemized estimate of the time and all material and labor(by trade),subcontract and overhead costs and fees. Any amount claimed for subcontracts must be similarly supported. DESCRIPTION of change in work: Change out the double detector check valve backflow assembly to a reduced pressure zone backflow assembly and install a 4"xB"tee with gate valves at a location near the blowolf assembly on the City's reuse pipeline. All this work will take place on the fire pipeline to the project. The City will furnish the two gate valves to the contractor. The 2"potable water main will be switched from schedule 40 PVC to HDPE polytubinq per City standards. Change Order Type: Deletion XXX Addition _ Revision _ Other. ( Constraints of Change. Per the approval of Orange County Utilities Initiated by: XXX Changes in Owner Requirements Unforeseen Conditions Others:( ) Proposal must be received by: ATTACHMENTS(Listing of attached documents that support description): 1. Contractor Request for Information No. 4. 2 Plan Revisions' sketch by City 5. 3. 6. 4 OWNER: Johnny Farmer,Ocoee Parks&Recreation d CONTRACTOR: Gary Ameral, Pooley Enterprises, Inc. 4 ENGINEER: Joe Kolb VHB Inc. a FIELD: Rod Winfrey,Ocoee Utility Inspections 4 CONSTRUCTION ADMINISTRATOR. 4 OTHER. David Wheeler.Ocoee Public Works 4 SUBCONSULTANT: Date Received From Contractor: Date Returned to Contractor With Comments. Date Returned to City: PRICING INFORMATION: Method of Pricing. A. 4 Established Contract Unit Price(s) B. XXX Negotiated Unit Price(s)(including Overhead and Profit) C. A Negotiated Lump Sum(including Overhead and Profit) D. A Actual Cost of Work plus Fixed Percent for Overhead and Profit E. A A combination of A,B,C, D DESCRIPTION OF WORK: XXX By General Contractor A By Subcontractor ITEM OF WORK QUANTITY PRICE TOTAL Replace schedule 40 PVC with HDPE Polytubing LS - 316.25 Switch double detector check backflow to RPZ backflow LS 1,776 75 Furnish and install 4"x8"tee and install gate valves as furnished by City LS 412.85 Attach additional pages if necessary. NET TOTAL COST OF THIS CHANGE PROPOSAL b 2,505.85 EXTENSION OF CONTRACT TIME. As part of this Change Proposal the Contractor requests an extension of the contract time in the amount of additional days. Provide thorough documentation in support of the request for additional time: A requirement of this Change Proposal will be to provide record drawing information for all of the affected items of work RECOMMENDATION BY ENGINEER/CONSTRUCTION ADMINISTRATOR. Comments: Process as change order no.1 —to be paid for by the Public Works Water Operating Account Signature of Engineer/Construction Administrator, _ Date: ACCEPTANCE BY OWNER. Comments: Signature- Date' ,of aurce to Om cast_.and corms of RIP thu dal of _. . 199 Id"" Im.nP) o.0.0