Loading...
HomeMy WebLinkAboutIII (C) Approval and Authorization for Mayor and City Clerk to Execute Change Order No. 3 in the Amount of $9,000.00 with Henderson Wilder for Starke Lake Drainwells Project Agenda 3-18-2003 cCenter of Good fiv Item III C Mayor tSh' it) (Umm issioncre S Scott V ntdergri nabiltmtDanny Howell, District 1 Scott Anderson, City AInn v6i r y1 E I Ituet o luhn u. District 3 'Jim Glennn K -4111PC Nancy 1 Ptirlittr. District I MEMORANDUM DATE: March t I,2003 TO: The I lonorable Mayor and Board of City Commissioners THRU: David Wheeler, P.E., Public Works Director FROM: Richard Lee,Engineer I, Engineering/ Utilities Department eL, SUBJECT: Starke Lake Drain Wells Project Change Order No.3 With Henderson Wilder Attached for your review and action is Change Order# 3 for the aforementioned project. The new changes shown on the attached documents involve additional work needed to enhance the productivity of the newly installed Southern Drainage Well. The total amount requested for change order#3 =S9,000.00. The additional work involves setting up the drill rig, cleaning the existing well, installing pollution control devices, replacement of sod as needed, and drilling to a depth that would coincide with the beginning of the upper layer of the Avon Park limestone, also known as the "marker bed." As stated above, all of these items combined would equate to a change order of an additional $9,000.00, which is an increase of approximately 5.73% of the original contract price. As you may recall, the negotiated contract for construction services between I lenderson Wilder and the City was $157,030.00. The monies allocated for this project was $250,000.00 (Design and Construction). The projected expenditures (Design and Construction) to date, which includes the new changes from the third change order, are $205,690.00. This equates to an overall saving of$44,310.00 for both design and construction services. The percent completion for the overall project. both North and South Drainage Wells is approximately 100%. The more recent change order constitutes additional work needed to optimize the performance of the southern well. Presently, the southern drainage well is constructed and awaiting permission to continue with additional drilling. City of Ocoee • I50 N Lakediorc Drive•Ocoee, Florida 3d76I phone: (.107)905-3I00• tay_(-!07)636-850I • miricci.ocnaun.us I recommend that the City Commission authorize the Mayor and City Clerk to execute Change Order#3 in the amount of$9,000.00 with I lenderson Wilder. RL Attachments ��eOenter of Good L Jr,�tl> CITY OF OCOEE Engineering/Utilities 3y> 150 North Lakeshore Drive Ocoee. Florida 34761-2258 CHANGE ORDER NO. 3 CITY OF OCOEE PROJECT NO. DATE: 03-I1-03 CONTRACTOR: -_ Henderson Wilder AGREEMENT DATE: January 15. 2002 "The following changes are hereby made to the CONTRACT DOCUMENTS. Original CONTRACT PRICE $157,030.00 Current CONTRACT PRICE ADJUSTED by previous CHANGE ORDER $162,225.00 Net Increase(Decrease) Resulting from this CHANGE ORDER $9,000.00 [he current CONTRACT PRICE including this CHANGE ORDER $171,225.00 ORIGINAL CONTRACT TIME: 120 Consecutive Calendar Days from Notice to Proceed Date: Auoust 8. 2002 Current CONTRACT.'IME adjusted by previous CHANGE ORDERS Date: _. N/A Net Increase Resulting tram this CHANGE ORDER Days: 60 Current CONTRACT TIME Including this CHANGE ORDER Dale May 14,2003 00842-i CHANGES ORDERED: I. GENERAL This change order is necessary to cover changes in the work to be performed under this Contract. The GENERAL CONDITION, SUPPI.EMENTARY CONDITIONS,SPECIFICATIONS and all parts of the Project Manual listed in Article I. Definitions, of the GENERAL CONDITIONS apply to and govern all work under this change order. II. REQUIRED CHANGES • Refer to Exhibit B III. JUSTIFICATION—Refer to Exhibit B,New Items Added(Items 1-4) 1. Mobilization is needed to place the drill rig on-site. 2. Turbidity barriers arc standard erosion control devices that are necessary during construction 3. Extra drilling is necessary in the attempt to improve the efficiency of the existing well. 4. Sod replacement is required as part of a contingency for destroying existing sod. IV. NARRATIVE OF NEGOTIATIONS N/A V. PAYMENT Change Order Description Net Increase Unit Unit Price Net Increase Item Nos. (Decrease)Quantity (Decrease)I'riee Mobilization.and Well Cleaning,turbidity Se.00 IS 8900000 S9,000.00 I-d barriers.drilling sod replacement S9,000,00 Total Net Inereae(Decreaael Change Order No. 3 VI. APPROVAL AND CHANCE AUTHORIZATION This proposed change to the Contract is to be approved by the Ocoee City Commission. 00842-2 Acknowledgements: The aforementioned change,and work affected thereby,is subject to all provisions of the original contract not specifically changed by this Change Order; and, It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original contract other than matters expressly provided herein. CONTRACTOR acknowledges, by its execution and acceptance of this Change Order, that the adjustments in Contract Price and Time shown hereon constitute full and complete compensation and satisfaction for all costs and modifications of performance time incurred by the CONTRACTOR as a result of this Change Order. No other claim for increased costs of performance or modifications of time will be granted by the OWNER for the Work covered by this Change Order. The CONTRACTOR hereby waives and releases any further claims for cost or time against the OWNER arising from or relating to the matters or Work set forth or contemplated by this Change Order. RECOMMENDED BY: ACCEPTED BY: CITY OF OCOEE FLORIDA By: _ _ By: Signature Signature Date: _ Date: _ Title: _ Title: APPROVED BY: CITY OF OCOEE, FLORIDA Owner By: S. Scott Vandergrift, Mayor Date Attest: Jean Grafton,City Clerk POR USE AND RELIANCE ONLY BY THE APPROVED BY THE OCOEE CITY CITY OF OCOEE, APPROVED AS TO FORM COMMISSION IN A MEETING HELD ON AND LEGALITY THIS DAY OF ,20 UNDER ,20 AGENDA ITEM NO. FOLEY& LARDNER Bv: City Attorney 00842-3 EXHIBIT B New Items Added: Item Numbers DESCRIPTION AMOUNT ACTION I - 4 Mobilization and Well $9000.00 Add Cleaning, Turbidity Barrier, Drilling, Sod Replacement