Loading...
HomeMy WebLinkAboutV(B) Approval and Authorization to Execute Change Order No. 1R-2 to Wharton-Smith Agenda 11-04-2003 Center of Good LIv, Item V B Mayor �b Ing Commissioners S. Scott Vandergrift Danny Howell, District 1 Scott Anderson, District 2 City ManagerCO /j Rusty Johnson, District 3 '_, NancyJ. Parker, District 4 Jim Gleason -�' "'�`� STAFF REPORT TO: The Honorable Mayor and City Commissioners FROM: Ron Strosnider, Fire Chief DATE: October 27, 2003 RE: New Fire Station, Change Order No. 1R-2 ISSUE During the changing of our Engineering Group a previous study that was compiled concerning the Lake Lotta Drainage Basin was not referred to our Architects group prior to the biding for the new Fire Station. Subsequently some work being done by PEC Engineering Group brought it to the attention of the new City's Engineering Group and Architects Design Group. BACKGROUND/DISCUSSION Architects Design Group, Ivey, Harris, Walls Inc., Wharton-Smith and David Wheeler agreed to a recommended fix,to meet the requirements of the Lake Lotta Basin Study. We then resubmitted a letter to St. John's Water Management District for a change to the Project; and they approved the change. The cost for the Civil Changes is $71,768.10. A credit of($2,759) for revised Plumbing and Electrical work brings the total of Change Order No. 1R-2 to $ 69,012.10. The breakdown to Engineering and the Fire Department are as follows. Engineering(Storm Water Reserve) $ 54,190.78 Fire Station (Contingency) $ 14, 821.32 Total $ 69, 012.10 RECOMMENDATION The staff respectfully requests Commission approve Change Order No. 1R-2 to Wharton-Smith for the sum of$69,012.10 City of Ocoee• 150 N Lakeshore Drive•Ocoee,Florida 34761 phone: (407)905-3100•fax: (407)656-8504•www.ci.ocoee.fl.us CHANGE ORDER OWNER ■ Contractor's Job Number—03-007 ARCHITECT • CONTRACTOR • OTHER 0 PROJECT: Ocoee Main Fire Station CHANGE ORDER NUMBER: 1R-2 125 N.Lakeshore Dr. Ocoee,Florida 34761 DATE: October 6,2003 TO CONTRACTOR: Wharton-Smith,Inc. ARCHITECT'S PROJECT NO: 618-99/2.21 750 County Rd. 15 Lake Monroe,Florida 32747 CONTRACT DATE: May 19,2003 CONTRACT FOR: New Construction The Contract is changed as follows: RCO#002* Revisions to Civil Work(plus City Drainage Improvements per Public Works) $ 71,768.10 RCO#003 (CCD#1)Revised Electrical and Plumbing Work(credit) $ (2,756.00) Total $ 69,012.10 *Total Price on Civil Changes=$71,768.10 (includes Public Works request for City Improvements). Fire Station Costs =$17,577.32 (changes due to City comments I permit revisions). Balance of Costs =$54,190.78(Public Works to fund for City Drainage Improvements). Not valid until signed by the Owner,Architect and Contractor. Original Contract Sum was $ 2,422,400.00 Net change by previously authorized Change Orders $ 0.00 The Contract Sum prior to this Change Order was $ 2,422,400.00 The Contract Sum will be changed by this Change Order in the amount of $ 69,012.10 The new Contract Sum including this Change Order will be $ 2,491,412.10 The contract time will be(increased)(decreased)(UNCHANGED)by (0)days Date of Substantial Completion(is-changed-to),(remains the same) April 15,2004 NOTE: This summary does not reflect changes in the Contract Sum,Contract Time,or Guaranteed Maximum Price,which have been authorized by Construction Change Directive. Architects Design Group,Inc. Wharton-Smith,Inc. City of Ocoee ARCHITECT CONTRACTOR OWNER 333 N.Knowles Avenue 750 County Rd. 15 150 N.Lakeshore Drive Address Address Address Winter Park,Florida 32789 Lake Monroe,Florida 32747 Ocoee,Florida 34761 By By By Kevin Ratigan,AIA,Senior Vice President Architects Design Group,Inc. Date Date Date AIA Document G701*Change Order*1987 EDITION•AIA®•®1987 EDITION•