STAFF REPORT
TO: The Honorable Mayor and Board of City Commissioners
FROM: David A. Wheeler, P.E., Director of Public Works iji.o,✓
DATE: December 8, 2003
SUBJECT: Proposal for Engineering Services—Water Main Re-design for the Old
Winter Garden Road/Professional Parkway Project
With Professional Engineering Consultants, Inc.
ISSUE
Should the Mayor and City Commissioners approve the Addendum to the Agreement for
Consulting Engineering Services with Professional Engineering Consultants, Inc. (PEC). The
addendum is for the re-design of the relocation of the water main on Old Winter Garden Road in
the vicinity of the Citrus Medical Plaza development.
BACKGROUND/DISCUSSION
PEC has completed its desi n of the improvements for the Old Winter Garden Road project
fisting underground utilities. The water main in the vicinity of _.
ealth Central needed to be relocated because of conflicts with proposed stormwater facilities.
The Citrus Medical Plaza development is planned to be located on the vacant property across
Old Winter Garden Road from Health Central.
As part of the approval of the development, they agreed to reimburse the City for the re-design of
the water main to allow for their sewage force main to be located in the road right-of-way. The
developer also agreed to pay for certain improvements included in the roadway improvements
project as opposed to having them torn out and replaced when the project was under
construction.
PEC has performed the re-design of the water main in the subject area and included that re-
design in the roadway plans. The water main re-design has also been permitted through FDEP.
PEC's cost to the City is $3,552.00 for the re-design. Attached is a copy of the proposal from
PEC. This cost plus the cost for items included in the roadway construction will be passed onto
Mr. Berry Walker representing Assisted Care Living at Forest Cove, Ltd. The total cost of the
re-design fees and the construction elements is $22, 589.00.
RECOMMENDATION
Staff recommends that the City Commission approve Addendum 03-04 to the Agreement for
Consulting Engineering Services with Professional Engineering Consultants, Inc. for the re-
design of the water main to accommodate the Citrus Medical Plaza in the amount of$3,552.00
and authorize the Mayor and City Clerk to execute the addendum.
ADDENDUM NO. 03-04 TO
AGREEMENT FOR CONSULTING ENGINEERING SERVICES
INCLUDING
ENGINEERING SERVICES FOR
CONSTRUCTION ADMINISTRATION/INSPECTION SERVICES FOR
CITY OF OCOEE
OLD WINTER GARDEN ROAD/PROFESSIONAL PARKWAY
WATER MAIN RE-DESIGN
This Addendum No. 03-04 hereinafter called the Addendum, as of this day of
2003,shall constitute an Addendum to the Agreement for Consulting Engineering
Services between the City of Ocoee,Florida(the CITY)and Professional Engineering Consultants,
Inc., 200 East Robinson Street, Suite 1560, Lake Eola Centre, Orlando, Florida (the
CONSULTANT),dated the 21st day of August, 1984,hereinafter referred to as the AGREEMENT.
WHEREAS, the CITY and CONSULTANT entered into an AGREEMENT whereby the CITY
retained the CONSULTANT to provide professional engineering services as required from time to
time, and WHEREAS the CONSULTANT will perform consulting engineering services for the
CITY as herein defined.
NOW THEREFORE, in consideration of the mutual covenants and promises hereinafter set forth
on the part of both parties to be kept and performed, the parties do mutually agree as follows:
Section 1 - Services of the Consultant
1.1 The CONSULTANT shall perform the Engineering Services as outlined in the attached
proposal(P-3182) dated June 24,2003 relative to the provision of design phase services and
construction administration services to the CITY.
Section 2 - Compensation
2.1 Compensation by CITY for engineering services for the Reclaimed Water Booster Pumping
Facility and Construction Administration/Inspection Services is provided under this
K:\ENV\DOCUMENT\OE\OCOEE\2003ADN\03-04ADN.wpd I
Addendum shall be computed under Paragraph 6.1.2.3 of the Agreement,utilizing the Lump
Sum Method of Compensation with the compensation for this authorization not-to-exceed
$3,552 as outlined in the attached proposal(P-3182) and manhour fee.
Section 3 - Time of Completion
3.1 The CONSULTANT shall provide the construction administration services within a 365
calendar day period(12 months) from the notice-to-proceed for construction as outlined in
the attached proposal.
IN WITNESS WHEREOF, the parties have executed this Addendum No. 03-04 the day the year
here' 0,0 a set fort .
II -1.4- -I By: e%l S74
Attest: Kenneth R. Hooper, Prin ipal
Date: Zi/070 3
BOARD OF CITY COMMISSIONERS
CITY OF OCOEE,FLORIDA
By:
S. Scott Vandergrift, Mayor Date
Attest:
Jean Grafton, City Clerk
FOR THE USE AND RELIANCE ONLY BY APPROVED BY THE OCOEE CITY
THE CITY OF OCOEE, APPROVED AS TO COMMISSION IN A MEETING HELD ON
LEGALITY THIS DAY OF , 2003 UNDER
, 2003. AGENDA ITEM NO.
FOLEY&LARDNER
By:
City Attorney
K:\ENV\DOCUMENT\OE\OCOEE\2003ADN\03-04ADN.wpd 2
PEC
PROFESSIONAL ENGINEERING CONSULTANTS, INC.
June 24, 2003 P-3182/MK-04
OE/PR003
Mr. David A. Wheeler, P.E.
Public Works Director
City of Ocoee
150 N. Lakeshore Drive
Ocoee, FL 34761
SUBJECT: Old Winter Garden Road/Professional Parkway
Water Main and Force Main Relocation Plans
RE: Proposal for Engineering Services -Water Main Re-design
Dear Mr. Wheeler:
We are pleased to present the attached proposal for Additional Engineering Services related
to the required re-design of approximately 1,600 feet of 12-inch water main. The water main
re-design was required due to a proposed permitted 4-inch force main which was scheduled
to be constructed(by others)in the same corridor as our proposed 12-inch water main. The
12-inch water main re-design extend along Professional Parkway from Blackwood Avenue
to Division Avenue.
We performed the engineering re-design services described herein for $3,552.
Enclosed for your review is the engineering design man-hour cost estimate shown in
Attachment A.
We appreciate the opportunity to provide our services for this assignment. If you have any
questions or require additional information,please do not hesitate to contact the undersigned.
Sincerely,
PROFESSIONAL ENGINEERING CONSULTANTS, INC.
Kenneth R. Hooper
Principal
KRH/CKM/cs
K:\...\OE\PRO03\P-3182
Enclosures:
(1) Attachment A-Engineering Design Man-hour Cost Estimate
cc: Tom Kelley P.E., PEC
engineers Cynthia Malone, P.E., PEC"Engineering Our Community"
planners
surveyors 200 East Robinson Street•Suite 1560.Orlando,Florida 32801 .407/422-8062•FAX 407/849-9401
Mr. David Wheeler, P.E. P-3182/MK-04
June 24, 2003 OE/PR003
Page 2
Attachment A- Professional Parkway Utility Design
WATER MAIN RE-DESIGN COST ESTIMATE
Raw Hourly TASK A TOTAL LABOR
LABOR CLASS Hourly Rate @ Water Main HOURS COST
Rate 2.92 Mult. Re-Design
Direct Labor
Project Manager $43.60 $127.31 0 0 $0
Senior Engineer $36.00 $105.12 5 5 $526
Engineer $27.00 $78.84 16 16 $1,261
Const.Adm.Mgr. $36.00 $105.12 0 0 $0
CADD $19.50 $56.94 31 31 $1,765
Word Processor $14.00 $40.88 0 •
0 $0
Sub-Total Hours 52 52
Sub-Total Labor $3,552 $3,552
Avg.Hrly Rate $68.31
Total Costs
Total Costs $3,552 $3,552