Loading...
HomeMy WebLinkAboutItem 12 Approval of Engineering Design Services for East Oakland Avenue from South Lakewood Avenue to North Lakeshore Drive with CPH, Inc. ocoee florida AGENDA ITEM COVER SHEET Meeting Date: September 17, 2019 Item # Ia Reviewed By: / Contact Name: Stephen C. Krug Department Director: Contact Number: 6002 City Manager: �Wr��/��� r '-- Subject: Engineering Design Services for East Oakland Ave from South akewood Ave to North Lakeshore Drive with CPH, Inc. Commissioner Wilsen, District 2. Background Summary: The Engineering Design Services for the Commission approved Downtown Streets were awarded to CPH, Inc., under RFQ #1705. In coordinating with the City Hall/Park Master Plan, it was determined the design of Oakland Avenue between Lakewood Ave. and Lakeshore Dr. would best benefit the City by assigning the project to CPH, Inc., as the firm is also designing the adjoining portions of McKey and Lakewood around the new City Hall complex. The improvements to this portion of Oakland will include highly technical permitting of underground drainage features to treat stormwater from the Lakeshore Center/Maguire House parking areas along with the adjacent Lakewood and McKey upgrades. Public Works negotiated the fee for this work at $47,176.00. Public Works recommends approval of the work with CPH, Inc. Issue: Request the City Commission to approve the Engineering Design Services for East Oakland Avenue with CPH, Inc. Recommendations: Recommend the City Commission approve the Engineering Design Services for the Downtown Streets Redevelopment plan with CPH, Inc., under RFQ # 1705, for East Oakland between Lakewood Ave. and Lakeshore Dr. for the not to exceed cost of $47,176.00 as funded in the Stormwater Division's Capital Outlay budget. Also recommend the City Manager and staff be authorized to approve change orders to this contract up to the limit of his purchasing authority for each change order, and up to the budgeted amount for this project for all change orders. Attachments: CPH Scope of Services. Financial Impact: The cost of the Design work is adequately funded in the Stormwater Division's Capital Outlay budget. Type of Item: (please mark with an 'x) Public Hearing For Clerk's Dept Use: Ordinance First Reading X Consent Agenda Ordinance Second Reading Public Hearing Resolution Regular Agenda X Commission Approval Discussion& Direction Original Document/Contract Attached for Execution by City Clerk Original Document/Contract Held by Department for Execution Reviewed by City Attorney N/A Reviewed by Finance Dept. ` p_IpD _ � N/A Review ed by ( ) N/A 2 o ili) CITY OF OCOEE DOWNTOWN STREETSCAPE (OAKLAND AVE, TAYLOR ST, McKEY ST, AND KISSIMMEE AVE) FINAL DESIGN SCOPE OF SERVICES Additional Services No. 2 TASK 1 — PROJECT ADMINISTRATION CPH will provide general project management, including, but not limited to communication and coordination with the CITY, preparation of meeting materials and documentation, preparing project billing, preparing invoice report, and tracking project budget and schedule, and attend general project meetings. In addition to the design specific meetings identified below, CPH anticipates up to three (3) stakeholder/coordination meetings as required by the project. TASK 2—SURVEYING SERVICES 2.1 — Topographic Survey: CPH will perform a Topographic Survey as per Chapter 5J-17 of the Florida Administrative Code in compliance with the Standards of Practice of Surveying and Mapping of the State of Florida overlap (see attached "Survey Site Exhibit"for limits). • Topographic survey of E. Oakland Ave, from just west of Lakewood Dr to Lake Shore Dr. • A certified right of way map will not be provided. • Location of trees/shrubbery (size and type only). • Location of all visible improvements within rights of way together with visible utilities. The project coordinate system will be based horizontally on the North American Datum 83 (NAD 83). The project will be referenced to state plane coordinates by field locating published control points. The National Geodetic Survey control points will be researched and verified in the field. This base of reference will be used to establish the coordinate system for the project. The project will be based on the North American Vertical Datum 88 (NAVD 88). The project will be referenced to these published elevations by field locating published benchmarks. The National Geodetic Survey benchmarks will be researched and verified in the field. The following related services are not included in the scope of this proposal, and may or may not be required, but can be provided at an additional fee: ALTA/NSPS Land Title Survey, As- built Survey, Platting, Soil Borings, Wetland Location/Delineation, Ordinary High Water/Mean High Water and Underground Utility Location/Designation. TASK 3—DESIGN SERVICES 3.1 —Roadway Design Services CPH will prepare the Construction Plans and provide Plan Revisions for: • Oakland Avenue, from Lakewood Avenue to Lakeshore Drive • Oakland Avenue Baffle Box to provide water quality treatment This work effort includes updating the Lakewood Dr plans to accommodate revisions to E. Oakland and the adjacent Lakeshore Park improvements including on-street parking and stormwater improvements. These plans are for the use of the CITY to bid and build the project, and ensure the project is built as designed and to specifications. CPH will design the roadway improvements in accordance with the applicable CITY, FDOT, MUTCD, and ADA design criteria. The Final Design will include the reconstruction/repair techniques for the roadway, horizontal and vertical alignments revisions, and proper cross- section analysis to ensure proper vehicular and ADA connections to existing grade within the CITY's right-of-way or identified easements, and to maintain proper drainage. Based on the CITY's review of each submittal phase, CPH will address comments, and move forward with preparing the subsequent submittal. If significant revisions to the plans are requested resulting in the estimated Staff-Hours to be exceeded, requested revisions will be addressed as additional services. 3.2—Landscape Design Services Based upon the CITYs acceptance of the roadway plans, CPH will coordinate with the City on specific plant material and hardscape elements, and prepare Landscape Plans. The Landscape Plans will be responsive to review comments from the CITY. CPH will review plant material selection in the concept plan based on site conditions and adjacent Lakeshore Park improvements. This drawing will be a construction document added to McKey Streetscape drawing set and include modification to the plant list with plant species, quantity and specification updates. 3.3—Irrigation Design Services Pursuant to CITYs approval of the Final Landscape Plan described above, CPH will prepare an irrigation plan for an automatic irrigation system that responds to the requirements of the landscape design, CITYs design criteria, and the existing irrigation design for Bluford Avenue Streetscape. This drawing will be a construction document and include adjustments to the materials list, watering schedule, irrigation details and general notes regarding implementation requirements as needed. The irrigation drawings will be modified to include the revisions necessary for the removal of the palm tree planters described above. TASK 4—PERMITTING SERVICES Permitting is anticipated with the St Johns River Water Management District (SJRWMD) for the addition of the Baffle Box. The original permitting scope of work McKey St. and Lakewood Ave was exempt as it was maintaining the existing conveyance systems. CPH anticipates a Standard ERP will be require for the construction of the Baffle Box. CPH will coordinate with and obtain stormwater data from SM&E for the City Hall site and accommodate the runoff through the proposed baffle box. CPH will begin the coordination with SM&E and SJRWMD immediately following the authorization of this change order. CPH will schedule and attend a pre-application meeting with SJRWMD upon receipt of the stormwater data and begin preliminary baffle box sizing and placement. Upon completion and City review of the 60% Plans, CPH will prepare and submit the appropriate permit applications to SJRWMD. CPH will address comments provided by the permitting agencies that pertain to the required design standards. Any modifications requested that are not code or design standards issues, or modifications requested by the permitting agencies that require significant plan revisions (as agreed upon by the CITY and CPH) will be addressed as additional services. Any other permits that may arise during the design or review process, and not outlined above, will be handled as an additional service. Permitting and/or application fees will be the responsibility of the City. TASK 5—GEOTECHNICAL SERVICES CPH will utilize Bechtol Engineering and Testing, Inc (BET) (as a sub-consultant) to perform the geotechnical exploration. Please refer to the proposal as submittal by BET. SERVICES NOT INCLUDED The following services are not provided as part of this Scope of Services and will require an amendment if requested: 1. Post Design Services 2. Construction Engineering and Inspection Services 3. Right-of-Way or Easement acquisition services (except services listed above). 4. Permits or authorization not specifically mentioned in this Scope of Services 5. Any other issues not specifically described in this proposal COMPENSATION CONSULTANT will perform the Scope of Services contained in this Agreement as identified on each task on a lump-sum basis, as identified in the corresponding task of the Scope of Services. The following is the breakdown of fees for each task. E. OAKLAND AVENUE Task Task Description Billing Method Fee E01. Project Administration Lump Sum $3,940.00 E02.2 Surveying Lump Sum $4,995.00 EO3.1 Roadway Design Services Lump Sum $24,070.00 E03.2 Landscape Design Services Hourly/NTE $3,085.00 EO3.3 Irrigation Design Services Hourly/NTE $935.00 EO4. Permitting Lump Sum $7,650.00 EO5. Geotechnical (Sub) Lump Sum $1,943.00 Estimated Expenses $558.00 E. OAKLAND TOTAL Lump Sum $47,176.00 It is understood that fees for the subject project, including but not limited to, application fees, impact fees, above ground utility relocation design fees, utility connection fees, review fees, etc., will be paid directly by the CITY. CONSULTANT will submit invoices on a monthly basis to the CITY for payment. Lump Sum tasks will be billed as percent complete. In addition to the labor compensation outlined above, CPH shall be reimbursed directly for project specific expenditures such as, but not limited to travel, printing and reprographics, meals, postage, and phone usage. Reimbursable expenses will be billed at their actual cost, without increase. City of Ocoee-Downtown Streetscape Final Design Phase OAKLAND AVENUE-East Oakland and Cumberland Survey Sr.Project Manager Professional Engineer Project Engineer Design Technician Sr.CAD Technician Prin Landscape Architect $ 150.00 $ 130.00 $ 115.00 $ 95.00 $ 85.00 $170.00 SUMMARY SUMMARY TASK Task FINAL DESIGN•ROADWAY/STREETSCAPE/UTILETY TASKS TASK MAN COST EXTENDED EXTENDED EXTENDED EXTENDED MAN EXTENDED MAN EXTENDED HOURS MAN HOURS COST MAN HOURS COST MAN HOURS COST MAN HOURS COST HOURS COST HOURS COST O $ - $ - $ - $ _ $ $ - $ - 1.D Project Administration 32 $ 3,940.00 12 $ 1,800.00 $ - 16 $ 1,840.00 $ - $ _ $ - O $ - $ - $ $ - $ - $ - 5 - 2.2 Topographic Surveying Services 58 $ 4,995.00 2 $ 300.00 $ - 4 $ 460.00 $ - 4 $ 340.00 $ - O $ - 5 - $ _ $ - 5 - $ - $ - 3.1 Roadway Design 242 $ 24,070.00 4 $ 600.00 20 $ 2,600.00 40 $ 4,600.00 116 $ 11,020.00 60 $ 5,100.00 $ - O S - $ - $ - S _ 5 - $ - $ 3.2 Landscape Design Services 33 $ 3,085.00 1 $ 150.00 $ - 1 5 115,00 $ - 12 $ 1,020.00 1 $ 170.00 O $ $ - $ - $ - $ . $ - $3.3 Irrigation Design Services 11 $ 935.00 $ - 5 - $ - $ - 4 $ 340.00 $ - O $ - $ - $ $ - $ . $ - $ - 4.0 Permitting 62 $ 7,650.00 $ 40 $ 5,200.00 20 $ 2,300.00 $ $ - O $ - $ - $ - $ _ $ $ - $ - 5.0 Geotechnical Services(SUB) 0 $ 1,943.00 Refer to Proposal from Bechtol Engineering and Testing $ - 5 - $ - $ - O $ - 5 - $ - $ - $ - $ - $ - Expenses(1.25%) 0 $ 558.00 $ - $ $ - $ - $ - $ - O $ - $ - $ - $ - $ . $ - $ - O 5 - $ - 0 S - $ - $ - $ $ - 438 )$ 47,176.00( I 131$ 2,850.00( 601$ 7,800.00( 811$ 9,315.00 1 1161$ 11,020.00 1 801$ 6,800.00( 11$ 170.00 I }§ § § § § § § !; w a .`i : < : § / ! : ! { , a . a , a . ; . , , !'g , . . . , F '' ! ) � ,, ,,,,,,,,,,, ,,,,, \ / , !| v, IN , tocr e ! 8 { 3 -� ,,,,,,,,,, ,,, ,,,,, , \ | §_ . |� } ƒ \ §8 ® ff �_ :9 « 1E8 8 8 \ � \,,,,,,,,,,,,,, \ \ / || - Z 2 8 y 3H r.1 ,, , \ \ f i§ M { � \)I ,,,\ ,,,,,,,,,,,,V), ~¥ ,1 . 1� ' ' ' 8 ' ' . . . . . . . . . . . . : | (§ - - ; a \ 0 - • R. : e y \ '51 \,\ ,,, ,,,,, \ 1 } §§ 0 , z e 4 ) P ,, ,,,,,\,\ ,,, ,,,,, \ { /.1 71 BECHTOL ENGINEERING AND TESTING, inc. BET Project No. G17175 TO: Mr. Kurt Luman, P.E. CPH, Inc. 500 Fulton Street Sanford, Florida 32771 RE: Supplemental Fee Proposal/Subcontract AGREEMENT - Geotechnical Services Roadway Improvements Downtown Streets Ocoee, Florida Dear Mr. Luman: As requested, Bechtol Engineering and Testing, Inc. (BET) is pleased to submit a Fee Proposal to provide supplemental geotechnical services relative to proposed roadway improvements at the above referenced site. The purpose of BET's services would be to evaluate existing pavement section and subgrade soils characteristics in the areas of the proposed improvements, and based on these characteristics, to provide appropriate subgrade soil preparation recommendations. Based on the results of field and laboratory studies, BET will issue a report summarizing their findings, evaluations and recommendations. BET's proposed scope of services and associated fees are outlined on the attached Technical Plan and Cost Estimate. If the outlined scope of services, fees, and payment terms meet with your approval, please execute the Technical Plan and Cost Estimate and return to BET's office via mail, e-mail or FAX. BET appreciates the opportunity to submit this proposal and looks forward to working with you in the very near future. If you should have any questions,or whenever BET may be of service, please do not hesitate to call. Respectfully, Bechtol Engineering and Testing, Inc. Z. Pate. Love B. Patel Project Engineer N:\documents\AA GEO DOCS 2007-Present\Geo 2017\G17175 Supplemental Geotechnical Proposal.wpd CONSULTING GEOTECHNICAL,ENVIRONMENTAL,AND MATERIALS TESTING ENGINEERS 605 West New York Avenue,Suite A•DeLand,FL 32720-5243•Telephone(386)734-8444 FAX(386)734-8541 TECHNICAL PLAN AND COST ESTIMATE - GEOTECHNICAL SERVICES TO: Mr. Kurt Luman, P.E. RE: Roadway Improvements CPH, Inc. Downtown Streets 500 Fulton Street Ocoee, Florida Sanford, Florida 32771 BET Project Number: G17175 ITEM UNIT UNITOS UNIT COST TOTAL COST 1.0 FIELD SERVICES 1.1 Site Reconnaissance and Boring Layout/Utility Coordination hour 2 $85.00 $170.00 1.2 Mobilization of Men and Equipment-Core and Drill Rigs site 1 450.00 450.00 1.3 Pavement Cores,Patch Core Holes each 2 85.00 170.00 1.4 Standard Penetration Test Borings:-- lineal foot 0 15.00 0.00 1.5 Auger Borings: lineal foot 16 13.00 208.00 Proposed Roadway Realignment/Construction Areas:2 @ 8' 1.6 Field Permeability Test test 0 150.00 0.00 1.7 MOT-Traffic Control hour 2 150.00 300.00 Subtotal-Field Services 1298.00 2.0 LABORATORY SERVICES 2.1 Stratification and Visual Classification of Soil Samples hour 1 $85.00 $85.00 2.2.2 Wash 200 Sieve Analysis test 0 45.00 0.00 2.2.3 Liquid and Plastic Limits(As Required) test 0 95.00 0.00 2.2.4 Moisture Content Determination test 0 15.00 0.00 Subtotal-Laboratory Services 85.00 3.0 ENGINEERING AND TECHNICAL SERVICES 3.1 Principal Geotechnical Engineer hour 1 $175.00 $175.00 3.2 Senior Project Engineer hour 2 120.00 240.00 3.3 Senior Engineering Designer hour 1 90.00 90.00 3.4 Clerical Services hour 1 55.00 55.00 Subtotal-Engineering and Technical Services 560.00 TOTAL ESTIMATED FEE: $1,943.00 SUBMITTED BY: APPROVED BY: Love B. Patel Project Engineer Date: 01/28/2019 Date: Signer hereby accepts all general terms and conditions on reverse side of this agreement,and warrants their full authority to bind CLIENT.