TABLE OF CONTENTS
Section
CRA BOARD DIRECTORY1
BUDGET MEETING AGENDA2
CRA BOARD MEETING MINUTES –May07, 20193
BUDGET MESSAGE4
FY 2019/ 2020REVENUES AND EXPENDITURES5
PROPOSED BUDGET DETAIL6
-CIP CAPITAL IMPROVEMENTS
CRA RESOLUTION NO. 2019-7
NOTICE OF PUBLIC MEETING8
PROPOSED FY 2019/ 2020CRA BOARD MEETING DATES9
UPDATE ON EXISTING PROJECTS10
(For information only, this will not be presented at the CRA Board Meeting)
CRA Board
Directory
City of Ocoee orth
phone: (407) 905-905-3167ocoeecra.com
_____________
CITY OF OCOEE, FLORIDA
COMMUNITY REDEVELOPMENT AGENCYDIRECTORY
September17,2019
Board Members
Richard Firstner(407) 905-3112 officerfirstner@ocoee.org
Commissioner/CRA Chair
Vacant
CRA Vice Chair
Rusty Johnson(407) 905-3112 office rjohnson@ocoee.org
Mayor/CRA Board Member
Rosemary Wilsen(407) 905-3112 office rwilsen@ocoee.org
Commissioner/CRA Board Member
Larry Brinson, Sr.(407) 905-3112 office lbrinson@ocoee.org
Commissioner/CRA Board Member
George Oliver III(407) 905-3112 office goliver@ocoee.org
Commissioner/CRA Board Member
Randy June(407) 325-1422 office randy@jec3.com
Orange County CRA Board Member
Staff
Rob Frank (407) 905-3100 x 1500office rfrank@ocoee.org
City Manager/Executive Director
Craig Shadrix(407) 905-3100 x 1081officecraig.shadrix@ocoee.org
Assistant City Manager
Ginger Corless(407) 905-3100 x 1028office vcorless@ocoee.org
CRA Administrator
Gilda Shaw(407) 905-3100 x 1027 office gshaw@ocoee.org
Administrative Assistant
Legal Counsel
Scott A. Cookson, Esq.(407) 581-9800scookson@shuffieldlowman.com
Shuffield, Lowman & Wilson, PA
CRA Board
Budget Meeting
Agenda
City of Ocoee orth
phone: (407) 905-905-3167ocoeecra.com
_____________
COMMUNITY REDEVELOPMENT AGENCYANNUAL BUDGETMEETING
Ocoee Commission Chambers
150 North Lakeshore Drive
Ocoee, Florida
September17, 2019AGENDA5:00p.m.
CALL TO ORDER
I.Roll Call and Determination of Quorum
II.Public Comments
III.Approvalof Minutes of the May07, 2019,CRARegularMeeting
IV.StaffLead Presentation & Discussion, CRA Administrator Corless
a)Resignation of Board Member Todd Duncan
b)ProposedFY 2019-2020Budget(Approvalby Resolution)
c)SetFY2019/2020CRABoardMeeting Dates
V.Florida Redevelopment Association,Assistant City Manager Shadrix
VI.Board Comments
ADJOURNMENT
PLEASE NOTE: IN ACCORDANCE WITH FLORIDA STATUTE 286.0105: ANY PERSON WHO DESIRESTO
APPEAL ANY DECISION AT THIS MEETING WILLNEED A RECORD OF THE PROCEEDINGS AND FOR THIS
PURPOSE MAY NEED TO ENSURE THAT A VERBATIM RECORD OF THE PROCEEDINGS IS MADE WHICH
INCLUDES THE TESTIMONYAND EVIDENCE UPON WHICH THE APPEAL IS BASED.
ALSO, IN ACCORDANCE WITH FLORIDA STATUTE286.26: PERSONS WITH DISABILITIES NEEDING
ASSISTANCE TO PARTICIPATE IN ANY OF THESE PROCEEDINGS SHOULDCONTACT THE OFFICE OF THE
CITY CLERK, 150 N.LAKESHORE DRIVE, OCOEE, FL 34761, (407)905 -3105 48 HOURSIN ADVANCE OF
THE MEETING.
1-1
CRA Board Meeting
May07, 2019
Meeting Minutes
City of Ocoee orth
phone: (407) 905-905-3167ocoeecra.com
_____________
COMMUNITY REDEVELOPMENT AGENCY REGULAR MEETING
Ocoee Commission Chambers
150 North Lakeshore Drive
Ocoee, Florida
May 7, 2019MINUTES5:00 p.m.
I.Roll Call and Determination of Quorum
CRAVice-Chair Firstnercalled the Community Redevelopment Agency Board to order at 5:01
PMin the Commission Chambers of City Hall. City Clerk Sibbittcalled roll and declared a
quorum present.
Roll Call:Vice Chair Firstner,Member Brinson, Member Wilsen, Member Johnson,Member
Oliver, Member Duncan and Member June.
Also Present:City Manager Frank, Assistant City Manager Shadrix, City Attorney Cookson, and
City Clerk Sibbitt.
II.Selection of Chair
Vice-Chair Firstnerannounced that due to Mr. Grogan not being re-elected,and as he was Chair
for the CRA Board, nomination for a New Chair will be needed. He further opened the floor for
nominations for Chair.
MemberWilsen, seconded by MemberOliver, moved to nominate Vice Chair
Firstner as CRA Board Chair. Motion carried 7-0.
MemberWilsen, seconded by MemberJohnson, moved to nominate Member
Duncan as CRA Board Vice-Chair. Motion carried 7-0.
III.Public Comments-None
CRA Regular Meeting 5-7-2019 Page 1
IV.Approval of Minutes of the February 19, 2019, CRA Regular Meeting
Member Wilsen, seconded by Member Oliver, moved to approve the CRA Regular
Meeting Minutes ofFebruary 19, 2019, as presented. Motion carried7-0.
V.Staff Led Presentation & Discussion
A)Administrative Assistant,Gilda Shaw
Deputy Development Services Director/CRA Administrator Corlessintroduced her new
administrative assistant,Gilda Shaw,to the Board.
B)Annual Report
Deputy Development Services Director/CRA Administrator Corlessannounced the CRA
Annual Report for 2017-2018 has been distributed and was completed a month before the State’s
deadline. Copies have been uploaded on the website and can also be found at the offices of the
CRA and City Clerk. To date 54 copies of the Annual Report have been distributedto interested
community members and potential developers within the community.New legislation has
increasedthe information that is required in the Annual Report,and future reports will include
those requirements which will be further explained in this presentation.
C)Legislative Update
Deputy Development Services Director/CRA Administrator Corlessexplained House Bill 9
(HB 9)which was recently adopted by theSenate and is going before the Governor.This bill
increases accountability and transparency requirements without unduly limiting CRA operations
or planning.The CRA staff and City arepleased to announce they have already implemented many
of the requirements that are within this new legislation, to include:updating the CRA by-laws to
follow the City’s procurement policy and processes,Redevelopment Area BoundaryMap and total
acreage of the Redevelopment Area to be provided on CRA website,and meeting deadline of
st
March 31for the filing and distribution of the audit report.
Additional amendments under HB 9 arethat the 3-year clause for Capital Projects was removed,
thus giving the CRA a bit more freedom;additionally, funds dedicated to Capital Projects can only
be re-appropriated if the budget is amended by the CRA Board due to delay,redesign, or if they
are reassigned in the next annual budget.
New Audit and Reporting Requirementsare also contained in HB 9 which were provided to the
City’s Finance Director.
The House Bill further addresses the termination of all CRA’swhich will sunset on Sept. 30, 2039,
unless the governing bodies that created the agency agree by majority vote to extend the term.The
CRA for Ocoee, however, entered into an interlocal agreement with Orange County to sunset in
2036.
Asit relates to the new annual report requirements, the CRA staff and City arealready following
most of the requirements. The requirements that are in the process of being implemented are: a
CRA Regular Meeting 5-7-2019 Page 2
summary regarding how CRA has achieved the redevelopment goals as outlined in the plan,and
total number of projects started and completed are to be listed along with the costs.Amount
expended on affordable housingis also a new annual report requirement; however, as the CRA did
not incorporate this into the redevelopment plan, this will not need to be addressed.
D)Ethics Training
Deputy Development Services Director/CRA Administrator CorlessannouncedState Statutes
require 4 hours of ethics training for each Board member each calendar year.The ethicstraining
the elected officials are required to complete will count toward this training. The CRA Office will
be keeping track of those who complete their training and those who cannot attend an ethics class;
theFlorida Institute of Government offers online courses.
E)Current ProjectsUpdate
Deputy Development Services Director/CRA Administrator Corlessupdated the Board on the
following projects:
Old Winter Garden Road Median Landscaping–Phase II has startedand is scheduled to be
th
completed by May 15.Phase I was completed last fiscal year; however, BrightView will be
replacing the SilverySunproof Liriope with Blue Daze as well asone of the SabalPalms. These
replacements are covered under the warranty.
Wellness Park–The property and stormwater management agreements have been transferred to
the Cityand a temporary fence was installed around the park, per FDOT. This fence will be
eliminated once construction on the park begins. The design of the Wellness Park isunderway and
estimated to cost between $1.5and $1.9 million. Once staff has the plans in hand, they will apply
for grant funds to leverage increment revenues. A highlight of the Wellness Park will be explained
in a design statement which will also be utilized when applying for grants. The statement will read
as follows: Creatingan urban park that provides the visitor access to wellness through the careful
placement of fitness equipment, a perimeter walking path,and places to sit and contemplate.
N. Blackwood Avenue Streetscape–All surveying is complete and roadway design is 30%
complete, including integration of the roundabout at Montgomery. Staff will be looking at
alternative ways to get this project built, such as seeking partnerships. City Center West Orange
will begin their roadway work this summer which will improve the road and provide connectivity.
A pedestrian sidewalk will also be installed which was not in their original plans. CRA staff is
working with City Center West Orange to incorporate an iconic sign in the roundabout, as this
development will be a major economic hub for activity for the CRA. The signage will not be
provided, just placement for it.
SR 50 Median Landscape Grant–Grant has been obtained and biddocuments are under final
review by FDOT; staff hopesto bid by June. Even though this is not a matching grant,there are
non-refundable costs the CRA will incur which areestimated at $150,000. Staff will need to secure
a consultant to provide construction observation services over the project,as well as seek a price
quote from the City’s Continuing Landscape Architect, GAI, for the design. FDOT does not allow
the designer to provide construction observation services; hence, the requirement for the two
entities.
CRA Regular Meeting 5-7-2019 Page 3
Bluford Corridor Plan–Concept Planning is complete. The corridor incorporates Old Winter
Garden Road to Orlando Avenue,and from a conceptual standpoint,Orlando Avenue and how it
connects to Delaware Street. The design statement for this project will read as follows: Goal is to
create an aesthetically pleasing corridor, while providing a safe and comfortable walking and
biking environment. Connecting people to schools, homes, shopping, entertainment, work and
places to play.The concept plan includes character areas along the right-of-way. The estimated
construction cost is between $2.8and $3.5 million, excluding road resurfacing/striping and moving
overhead utilitiesunderground.The next step is designing,which staff will be working with
Finance on to securean Engineer & Design Team through an RFP. Member Juneinquired about
the property onthe southwest corner of Bluford Avenue and SR50. Assistant City Manager
Shadrixexplained they have had several meetings with the WestgateResort owners regarding
their propertyanda masterplan has been developed. He furtherexplained the details of the
development and shared once the final masterplan is approved an update will be brought back
before the CRA Board as part of their project briefing. Discussion ensued.
Maine Street Park (CCWO)–The park is being designed and constructed by City Center West
Orangebut will be a City park. The design concept is to include historic interpretations by
providing a nice urban walk area, arbor screens, walkway, and dog waste containers. Staff is
working with St. John’s Water Management District to decide whether it will be a dry or wet pond.
City is seeking a wet pond but there may be some additional cost.
Clarke Road Median Refresh–CRA Staff has been receiving quite a few comments from the
public on the condition of the Clarke Road median from State Road 50 up to the entrance of the
mall. If the board feels this is something they wish CRA staff to move forward with,then they will
do an in-house design tomove forward with pricing for this project. Consensusof the CRA
Board wasto move forward with Maine Street Park at City Center West Orange and
Clarke Road Median Refresh as recommended by CRA Staff.
F)CRABoard Mid-Summer Update
Deputy Development Services Director/CRA Administrator Corlessshared this can be
provided by email.
VI.Confirm Next RegularCRA Board Meeting
Deputy Development Services Director/CRA Administrator Corlessannounced the next
meeting will be the annual budget meeting, which is scheduled for Tuesday, September 17, 2019
at 5:00 PM.
VII.Board Comments
Member Duncaninquired if they could be provided an update sheet which listsall the CRA
projects. Deputy Development Services Director/CRA Administrator Corlessadvised there
was a condensed summary of projects provided in their agenda packet.She furthershared staff is
in the process of doing a project spreadsheet which willbe providedto themin their mid-summer
email.
CRA Regular Meeting 5-7-2019 Page 4
Member Wilseninquired if anything has been discussed about the wrapping of the signal boxes.
Deputy Development Services Director/CRAAdministrator Corlessshared most of the boxes
within the CRA are FDOT traffic signal boxes which they can not touch. Commissioner
Wilsen inquired about the painted signal boxes in Orlando.Deputy Development Services
Director/CRA Administrator Corlessexplained that Orlando has a painting project through the
Orlando Public Art Program which allows them to paint the boxes.Further discussion ensuedabout
branding the boxes with Fifty West logo verses public art.
ADJOURNMENT
The meeting was adjourned at 5:55 PM.
Attest:APPROVED:
_________________________________________________________
Melanie Sibbitt, SecretaryRichard Firstner,Chair
CRA Regular Meeting 5-7-2019 Page 5
CRA Board
Budget Message
City of Ocoee orth
phone: (407) 905-905-3167ocoeecra.com
_____________
MEMORANDUM
TO:Ocoee Community Redevelopment Agency Board
FROM:Ginger Corless, Deputy Development ServicesDirector/CRA Administrator
DATE:July 29, 2019
RE:Budget Message for Fiscal Year 2019-2020
The economic outlook for Fifty West is good, as new businesses relocate, existing businesses
look to expand, and current projects under construction become operational. Staff is
pleasedto present the CRAbudget for Fiscal Year(FY)2019-2020 for your review and
consideration. The estimated revenue for FY 2019-2020is$3,234,280.00.There isa4.5%
increasein the estimated city/county incrementdue to the increase in property values and
new businesses.The estimated increment was calculated based on the City’s
proposedmillage of 5.25,County’s current millage of and the Orange County
propertyvaluation for the Fifty West Redevelopment District as of May 31, 2019.
Historical Increment Assessment
$1,600,000.00
$1,400,000.00
$1,200,000.00
$1,000,000.00
City
$800,000.00
COUNTY
$600,000.00
TOTAL
$400,000.00
$200,000.00
$0.00
FY 15-16FY 16-17FY 17-18FY 18-19FY 19-20
FY 2019 - 2020 Estimated Revenues
Estimated CityIncrement Contribution$734,457.00
Estimated CountyIncrement Contributions$620,399.00
Estimated Starting Cash Balance $1,879,424.00
Total $3,234,280.00
City of Ocoee orth
phone: (407) 905-905-3167 ocoee.org
_____________
CRA Budget Memo
July29, 2019
Page 2of 2
The CRA must adopt, by resolution, a balanced budget.Therefore, it is important that
estimated revenues and expenditures are the same. If revenues increase or decrease after
FY 2018-2019 closes, the FY 2019-2020 budget must be updated to maintain a balanced
budget. In the past, the CRA has approved the Executive Director or his designee to update
any resulting budget change accordingly, including increasing or decreasing the CRA
Reserves.
FY 2019 -2020 Proposed Expenditures
Personnel Services$377,365.00
Operating Expenses$390,100.00
Capital$2,466,815.00
Total$3,234,280.00
Personal Services
Operating Expenses
Capital
To build in flexibility thecapital expenditures($2,466,815)are dividedinto three (3)
categories:
On-going Projects from FY 18/19($1,485,000)
New Projects($775,000)
Acquisition/Incentive Programs($206,815)
o Includes a CRA Vehicle
The budget detail is provided in sections 5 –6. Section 7 provides a copy of the Resolution
required to adopt the budget. Section 8 provides a copy ofthe advertisement that ran on
th
September 5announcingthe Ocoee Community Redevelopment Agency Fiscal Year (FY)
th
2019-20Budget meeting to be held on September 17, at5:00 p.m.
CRA Board
FY 2019/2020
Revenues and
Expenditures
City of Ocoee orth
phone: (407) 905-905-3167ocoeecra.com
_____________
- --
620,399.00734,457.00
Budget
1,879,424.001,879,424.001,354,856.003,234,280.00
2020 Tentative
-
1,505,382.001,505,382.001,233,066.001,233,066.002,738,448.00
2019 Budgeted
-
2,012.97
662,282.00662,282.00
1,105,406.211,107,419.181,769,701.18
2018 Actuals
110.80110.80
286,727.00286,727.00480,381.00480,381.00767,218.80
2017 Actuals
Account Description
BEGINNING CASH BALANCEMISCELLANEOUS REVENUEINTEREST EARNINGSCONTRIBUTIONSCITY CONTRIBUTION
Account
130Revenue30-000036-000036-110031-110038-1100
Function
FundTrans TypeCash BalanceCash Balance TotalOther RevenuesOther Revenues TotalTaxesTaxes TotalGrand Total
000
$0$0$0$0
500
36004000$600$350$500$500$150
695.6
2162629542120001050010000
5204.9$3,500$1,000$1,000$1,000$2,000$2,500$5,000
229291235000
1100.552006.55$75,000$15,000$10,000
84298.83$390,100
2020
Budget
Tentative
377,365.43
0
500
-
75004000$350$350$500$500$500$150
1200010000
$3,500$1,000$1,000$2,000$2,250$5,000
150000
$50,000$15,000$10,000
$240,000$516,100
2019
Budgeted
-
4080$163$361$262$448
4320.4$1,494$2,076$1,607$1,345$2,855$3,205
1886.13$15,000
10241.9968530.02$147,006$264,881
2018 Actuals
$28$34
-
$163$128$920
6538.54987.5896.17822.31221.93$2,459$1,120$7,975
$13,367
$113,681$153,342
2017 Actuals
Account Description
OTHER SERVICESREGULAR SALARIESOVERTIME PAYPTO BUYOUTFICA TAXESRETIREMENT CONTRIBUTIONSHEALTH INSURANCELIFE INSURANCEDENTAL/VISION INSURANCEACCIDENT/DISABILITY INSURANCEWORKERS' COMP
INSURANCELEGAL FEESPROFESSIONAL SERVICESCONTRACTUAL SERVICESTRAVEL EXPENSETELEPHONE EXPENSEPOSTAGE & FREIGHTAUTO LIABILITY INSURANCEVEHICLE PARTS REPAIRSEQUIP MAINT CONTRACTSPRINTING
AND BINDINGNEWSLETTER EXPENSERESERVE FOR CONTINGENCADMINISTRATION LEGAL ADSMISCELLANEOUSOFFICE SUPPLIESPOL SUPPLIESOPERATING SUPPLIESCOPYING EXPENSECOMPUTER PERIPHERALS - SOFTWARE UNDER
$1000BOOKS/SUBSCRIPTIONSPROFESSIONAL DUESTRAINING EXPENSECOMMUNITY PROMOTIONSPUBLIC RELATIONS DEVELOPMENTTRANSFERS OUTTRANSFERS OUT-DEBT SER
110112001400151021002200230023012302230324003101312834004000410042004501460546064700480049004901490251005200520252165401540254058200820590009100
5235
Account
130516-00CRA
Group
FundDeptDivisionPersonnel ServicesPersonnel Services TotalOperating ExpensesOperating Expenses Total
$0$0$0$0
$40,000
2020
Budget
$2,426,815$2,466,815$3,234,280
Tentative
$0
2019
$2,222,348$2,222,348$2,738,448
Budgeted
$196,227$196,227$461,107
2018 Actuals
$0
$153,342
2017 Actuals
Account Description
LAND PURCHASEPAVING & DRAINAGE IMPROVEMENTSEQUIPMENTCAPITAL IMPROVEMENTSVEHICLESCPUs - LAPTOPS - SOFTWARE
610063006400630264016405
Account
Group
CapitalCapital TotalGrand Total
CRA Board
Proposed Budget
Detail
City of Ocoee orth
phone: (407) 905-905-3167ocoeecra.com
_____________
FY 2019-2020 CRA BUDGET DETAIL & CIP WORK PROGRAM
The following provides a more detailed overview of the CRA’s budget and capital work
program.
PERSONNEL$377,365
This accountcovers salary, FICA,and benefit costs forthe CRA Administrator, the CRA
Administrative Assistant,and a percentage of theAssistant City Manager and the City
Manager personnelcost. This line item is new to the CRA. In past budgets, employee related
costs were assigned to the “Transfers Out” category.
OPERATING EXPENSES$390,100
3101 Legal Expense -$12,000
Legal costs associated with potential acquisitions, legal review of documents,
attendance at CRA Board meetings and other legal issues pertaining to
implementation of the CRA Plan and/or amendment, or other planning documents;
as well as, the day to day activities of the office of the CRA.This amount is the same
as FY 18-19.
3128 Professional Services/Other –$10,500
The allocation includes funds to support annual report design, marketing, and
graphic services including promotional materials and advertising for Fifty West.This
account was increased from $7,500 to better reflect the use experienced in 2018-
2019.
3400 Contractual Services –$235,000
Provides funds for graphic design services for the creation of materials and displays.
Economic development marketing services.
Planning services related to implementing the CRA’s vision,including additional small
area studies and small design projects that are not yet identified within the Capital
Projects’category.
Landscape and ground maintenance for State Road 50 and other CRA rights-of-
way.
This account was increased from $150,000 to account for the added landscape
maintenance for the CRA.
4000 Travel Expense -$10,000
4100 Telephone Expense -$4,000
City of Ocoee orth
phone: (407) 905-905-3167ocoee.org
_____________
Proposed Budget Detail
July30, 2019
Page 2of 3
4200 Postage and Freight -$500
4700 Printing and Binding -$3,500
For various print jobs, such as the CRA Annual Report, CRA Target Area Special
Development Plan Booklets, and miscellaneous printing and binding.
4800 Newsletter Expense –$1,000
Provides funds for outside printing of newsletter and flyers.
4900 Reserve for Contingency –$75,000
In order to provide greater flexibility to the Board for future endeavors, excess
revenues,and unexpended capital funds have been placed into the fund to
facilitate the implementation of projects or development opportunities not yet
identified.This account was increased from $50,000 in FY 18-19.
4901 Administrative Legal Ads –$600
4902 Miscellaneous Expense -$350
5100 Office Supplies -$500
5200 POL Supplies-$500
5202 Operating Supplies -$1,000
5216 Copying Expense -$1,000
5235 Computer Equipment/Software -$2,000
5401 Books/Subscriptions -$150
5402 Professional Dues -$2,500
5405 Training Expense -$5,000
8200 Community Promotions -$15,000
Provides funding for sponsorship of local events and Founders’ Day.
8205 Public Relations Development –$10,000
Provides funds for a variety of expanded promotional activities designed to broaden
CRA awareness including participation at the national and local ICSC conferences,
business promotional programs, and specialty public relations activities.
Proposed Budget Detail
July30, 2019
Page 3of 3
6302 Capital Improvements-$2,46,815
The following provides details for each of the three (3) capital improvement program
categories.
Ongoing Projects fromFY 2018/2019($1,485,000)
o N BlackwoodAvenue($100,000)–The total construction cost of this projectis
currently estimated at $1,200,000. Based on timing of theCity Center
development,staffestimatesexpending$100,000in FY 19-20 and the remainder
inFY 20-21and FY 21-22.
o SR 50 –SR429Median Landscaping($615,000)–FDOT grant for $775,000, and
City/CRAportion is around $615,000.This includes the ConstructionInspections
services(CEI), maintenance costs throughestablishment period,and the non-
reimbursablecosts.
o WellnessPark($520,000) – Total construction is currently estimated at $1,800,000.
Weestimateinitiatingconstructioninmidtolate2020andexpending
approximately $50,000. Staff will alsobe seeking additional funding
sources thatwilldecreaseCRAdollarsinFY2021.
o S. Bluford StreetscapeDesign & Engineering($250,000),this will have to go out to
bid since the project is over 2 million. The estimated construction cost isover
$3,000,000.CRAStaffishoping to get the design underway inDecember2019.
estimated design fee isbetween$200,000 - $250,000. Staff will needto secure
supplemental fundingforthis project. Constructionisnotestimatedtocommence
untilFY 2020 - 2021.
New Projects ($775,000)-Miscellaneous beautification and/or capital projects that
meet theintent as defined by the Community Redevelopment Plan, but not yet
identified.
Acquisition/Incentives($6,815)–Thisitem covers the cost of potential appraisal or
site assessment costs; furthermore, it provides funding for potential developer
incentives.
6401 Vehicles - $40,000.00
CRA staff need a vehicle in order to perform inspections within the CRA, as well as to
take potential business owners, developers, and other interested parties,
organizations and/or agencies on tours of the Fifty West Redevelopment District. The
CRA Division once had a vehicle; but, when that vehicle was decommissioned, a
replacement car was not provided. CRA staff will have the CRA/Fifty Westlogo
placed on the vehicle along with contact information.
CRA Board
Capital Improvements
Program (CIP)
FY 19-20 throughFY 23-24
City of Ocoee orth
phone: (407) 905-905-3167ocoeecra.com
_____________
CRA 5-Year Capital Improvement Program (CIP)
FY 2019-2020; 5.25 Mil
Sum of 5
FY 19-20 FY 20-21 FY 21-22 FY 22-23 FY 23-24 Years
On-going Projects
$ 1,485,000 $ 3,963,805 $ 3,550,000 $ 3,000,000 $ - $ 11,998,805
N. Blackwood Avenue Roadway
Redesign & Streetscape$ 100,000 $ 550,000 $ 550,000 $ - $ - $ 1,200,000
Design - CPH$ -
Construction - this needs to be done in
concert with CCWO - could phase over
2 years$ 100,000 $ 550,000 $ 550,000 $ - $ - $ 1,200,000
SR 50 Landscape Median Landscape
Grant$ 615,000 $ - $ - $ - $ -$ 615,000
Design - CPH
City is responsible for about $550,000,
total grant is for $775,000 - is
reimbursement. Total construction cost $ 550,000 $ 550,000
CEI$ 65,000 $ - $ - $ - $ - $ 65,000
Wellness Park$ 520,000 $ 1,413,805 $ - $ - $ - $ 1,923,805
Design, Fence & Survey$ 10,000
Construction$ 500,000 $ 1,400,000 $ - $ - $ - $ 1,900,000
Design$120,350
Construction Ph Svcs $23,805$ 10,000 $ 13,805 $ 23,805
S. Bluford Streetscape$ 250,000 $ 1,000,000 $ 1,500,000 $ 1,500,000 $ - $ 4,250,000
Design - project will have to be phased$ 250,000 $ 250,000
Construction will be in 3 phases$ 1,000,000 $ 1,500,000 $ 1,500,000 $ - $ 4,000,000
Sum of 5
FY 19-20 FY 20-21 FY 21-22 FY 22-23 FY 23-24 Years
New Projects
$ 775,000 $ 500,000 $ 250,000 $ 500,000 $ 1,500,000 $ 3,525,000
Maguire Rd Ph. 5 Design Review$ 50,000 $ 50,000
Misc. Project(s)Not Yet Defined$ 500,000 $ 500,000 $ 250,000 $ 500,000 $ 1,500,000 $ 3,250,000
Maine Street Park Interpretative Signs
and Site Amenities$ 50,000 $ 50,000
Mast Arm Bluford & Geneva$ 175,000 $ 175,000
Sum of 5
FY 19-20 FY 20-21 FY 21-22 FY 22-23 FY 23-24 Years
Acquisitions & Incentives
$ 206,815 $ 300,000 $ 500,000 $ 500,000 $ 1,000,000 $ 2,506,815
Acquisition Dollars for FY 19-20 should
be directed in the vicinity of target
area 1$ 166,815 $ 300,000 $ 500,000 $ 500,000 $ 1,000,000
CRA Vehicle$ 40,000
Sum of 5
FY 19-20 FY 20-21 FY 21-22 FY 22-23 FY 23-24 Years
Final Budget
$ 2,466,815 $ 4,763,805 $ 4,300,000 $ 4,000,000 $ 2,500,000 $ 18,030,620
Summary
On-Going Projects$ 1,485,000 $ 3,963,805 $ 3,550,000 $ 3,000,000 $ - $ 11,998,805
New Projects$ 775,000 $ 500,000 $ 250,000 $ 500,000 $ 1,500,000 $ 3,525,000
Acquisitions/Incentives (incl. Vehicle)
$ 206,815 $ 300,000 $ 500,000 $ 500,000 $ 1,000,000 $ 2,506,815
$ 18,030,620
Total$ 2,466,815 $ 4,763,805 $ 4,300,000 $ 4,000,000 $ 2,500,000
* Only the projects in FY 19-20 are funded
CRA Board
Budget Resolution
City of Ocoee orth
phone: (407) 905-905-3167ocoeecra.com
_____________
CRA RESOLUTION NO. 2019-
A RESOLUTION OF THE OCOEE COMMUNITY
REDEVELOPMENT AGENCY ADOPTING A BUDGET FOR
FISCAL YEAR 2019-2020; PROVIDING FOR BUDGET
ADJUSTMENTS AND THE APPROPRIATION OF FUNDS;
PROVIDING FOR SEVERABILITY; PROVIDING AN
EFFECTIVE DATE.
WHEREAS, the Ocoee Community Redevelopment Agency (the “CRA”) was
created pursuant to Part III, Chapter 163, Florida Statutes, and Ordinance No. 2006-007 of the City
of Ocoee, Florida; and
WHEREAS, the CRA is a dependent special district under Chapter 189, Florida
Statutes, known as the Uniform Special District Accountability Act (the “Special District Act”);
and
WHEREAS, the Special District Act requires all special districts, including
dependent special districts, such as the CRA, to adopt a budget for each fiscal year by resolution.
NOW, THEREFORE, BE IT RESOLVED BY THE OCOEE COMMUNITY
REDEVELOPMENT AGENCY, AS FOLLOWS:
SECTION 1. Authority.The CRA has the authority to adopt this Resolution
pursuant to the Special District Act.
SECTION 2. Adoption of Budget.The governing body of the CRA does hereby
approve and adopt a budget for the CRA for Fiscal Year 2019-2020. A copy of the budget is
attached hereto as Exhibit “A”and incorporated herein by reference.
1
SECTION 3. Budget Adjustments.As of the date of adoption of the Budget for
Fiscal Year 2019-2020, the governing body of the CRA maynothavereceived the final
calculations regarding tax increment revenuesand/or carried forward moniesto be deposited into
the Community Redevelopment Trust Fund for the Community Redevelopment Area which will
be available for use by the CRA for Fiscal Year 2019-2020. Accordingly, the governing body of
the CRA does hereby direct that tax increment revenuesreceived and/or monies carried forward
in excess of the projected budgeted revenues be allocated to the 4900 Reserve for Contingency
line item as set forth in Exhibit “A”and that any shortfalls in the projected budgeted tax increment
revenues and/or monies carried forward be deductedfrom the 4900 Reserve for Contingency line
item as set forth in Exhibit ”A”.The Executive Director of the CRA is hereby authorized to
administratively make any adjustments to the budget which may be required to implement the
provisions of this section.
SECTION 4. Appropriations.There are hereby expressly appropriated out of
anticipated revenues all funds and monies necessary to meet the appropriations stipulated by and
in the attached budget.
SECTION 5. Severability.If any section, subsection, sentence, clause, phrase or
portion of this Resolution is for any reason held invalid or unconstitutional by any court of
competent jurisdiction, such portion shall be deemed a separate, distinct and independent provision
and such holding shall not affect the validity of the remainingportion hereto.
SECTION 6. Effective Date.This Resolution shall become effective immediately
upon passage and adoption, and the budget adopted and approved by this Resolution shall be
effective as of October 1, 2019.
2
th
PASSEDAND ADOPTEDthis 17ofSeptember, 2019.
APPROVED:
ATTEST:OCOEE COMMUNITY
REDEVELOPMENT AGENCY
______________________________________________________
Melanie Sibbitt,SecretaryRichard Firstner,Chair
(SEAL)
FOR USE AND RELIANCE ONLY
BY THE OCOEE COMMUNITY
REDEVELOPMENT AGENCY,
APPROVED AS TO FORM AND LEGALITY
th
This17day of September, 2019.
SHUFFIELD, LOWMAN & WILSON, PA
By:_____________________________
Scott Cookson,City Attorney
3
000
$0$0$0$0
500
36004000$600$350$500$500$150
695.6
2162629542120001050010000
5204.9$3,500$1,000$1,000$1,000$2,000$2,500$5,000
229291235000
1100.552006.55$75,000$15,000$10,000
84298.83$390,100
2020
Budget
Tentative
377,365.43
0
500
-
75004000$350$350$500$500$500$150
1200010000
$3,500$1,000$1,000$2,000$2,250$5,000
150000
$50,000$15,000$10,000
$240,000$516,100
2019
Budgeted
-
4080$163$361$262$448
4320.4$1,494$2,076$1,607$1,345$2,855$3,205
1886.13$15,000
10241.9968530.02$147,006$264,881
2018 Actuals
$28$34
-
$163$128$920
6538.54987.5896.17822.31221.93$2,459$1,120$7,975
$13,367
$113,681$153,342
2017 Actuals
EXHIBIT A
Account Description
OTHER SERVICESREGULAR SALARIESOVERTIME PAYPTO BUYOUTFICA TAXESRETIREMENT CONTRIBUTIONSHEALTH INSURANCELIFE INSURANCEDENTAL/VISION INSURANCEACCIDENT/DISABILITY INSURANCEWORKERS' COMP
INSURANCELEGAL FEESPROFESSIONAL SERVICESCONTRACTUAL SERVICESTRAVEL EXPENSETELEPHONE EXPENSEPOSTAGE & FREIGHTAUTO LIABILITY INSURANCEVEHICLE PARTS REPAIRSEQUIP MAINT CONTRACTSPRINTING
AND BINDINGNEWSLETTER EXPENSERESERVE FOR CONTINGENCADMINISTRATION LEGAL ADSMISCELLANEOUSOFFICE SUPPLIESPOL SUPPLIESOPERATING SUPPLIESCOPYING EXPENSECOMPUTER PERIPHERALS - SOFTWARE UNDER
$1000BOOKS/SUBSCRIPTIONSPROFESSIONAL DUESTRAINING EXPENSECOMMUNITY PROMOTIONSPUBLIC RELATIONS DEVELOPMENTTRANSFERS OUTTRANSFERS OUT-DEBT SER
110112001400151021002200230023012302230324003101312834004000410042004501460546064700480049004901490251005200520252165401540254058200820590009100
5235
Account
130516-00CRA
Group
FundDeptDivisionPersonnel ServicesPersonnel Services TotalOperating ExpensesOperating Expenses Total
$0$0$0$0
$40,000
2020
Budget
$2,426,815$2,466,815$3,234,280
Tentative
$0
2019
$2,222,348$2,222,348$2,738,448
Budgeted
$196,227$196,227$461,107
2018 Actuals
$0
$153,342
2017 Actuals
Account Description
LAND PURCHASEPAVING & DRAINAGE IMPROVEMENTSEQUIPMENTCAPITAL IMPROVEMENTSVEHICLESCPUs - LAPTOPS - SOFTWARE
610063006400630264016405
Account
Group
CapitalCapital TotalGrand Total
CRA Board
Notice of Public
Meeting
City of Ocoee orth
phone: (407) 905-905-3167ocoeecra.com
_____________
Proposed FY 2019/2020
CRA Board Meeting Dates
City of Ocoee orth
phone: (407) 905-905-3167ocoeecra.com
_____________
MEMORANDUM
TO:Ocoee Community Redevelopment Agency Board
FROM:Ginger Corless, Deputy Development Services Director/CRA Administrator
DATE:September 17, 2019
RE:Proposed City of Ocoee CRA Meeting Schedule for FY 2019/2020
Pursuant to the Bylaws of the CRA, below are possible dates to be considered for
the four (4) meetings for Fiscal Year 2019/2020:If these dates don’t work CRA is to
propose new dates.
1.Meeting#1:
thth
Tuesday, November 5or 19at 5:00 p.m. (before City Commission meeting)
2.Meeting #2:
Tuesday, February 18th at 5:00 p.m. (before City Commission meeting)
rdth
Alternate dates –March 3or 17at 5:00 p.m. (before City Commission
Meeting)
th
*Tuesday, February 4is state of the City
3.Meeting #3:
thth
Tuesday,May 5or 19at 5:00 p.m.(before City Commission meeting)
4.Meeting #4:
stth
Tuesday, September 1or 15at 5:00 p.m.(before City Commission Meeting)
Staff request CRA adoption of FY 2019-2020 meeting calendar.
OcoeeCRAorth
phone: (407) 905-905-3167ocoeecra.com
_____________
CRA Board
Updated on
Existing Projects
City of Ocoee orth
phone: (407) 905-905-3167ocoeecra.com
_____________
CRA Projects
A Year in Review
2018-2019
Over the past fiscal year (FY2018-2019), CRA staff have been very busy in
initiating, implementingand monitoringprojects throughout the Fifty West
Redevelopment District.The following provides an update on theseprojects,as
well as,a glimpse to the activities planned for next fiscal year.
Beautifying Fifty West
Where once barren soil and dying plants represented the state of beautification
within Fifty West, landscaping is now flourishing in the medians of S. Blackwood
Avenue, Old Winter Garden Road and Clarke Road.The design concept for re-
landscapingthe medianswas based on integrating native palms, oaks and
grasses along with easy to maintain shrubs such as Burford Holly and Petite
Oleander. Medjool Date Palms, European Fan Palms and Crape Myrtles were
placed to punctuate the median with a sense of sophistication.
The first step on both phases included the removal of all old plant material and 6”
of the existing dirt. A prepared planting mix was then installed to promote strong
growth of the new plantings. The irrigation was redesigned and installed from a
single point system to three (3) zones, one for turf, one for shrubs and one for
trees/palms. This along with installingplants withsimilar watering requirements
together, met the City’s goals for water conservation in the landscape.
S. Blackwood Avenue Refresh–The S. Blackwood Avenue
Streetscape was constructednearly a decade ago. As
with any landscape, there comes a time when plant
material degrades and needs to be replaced. Keeping
with the CRA’s edict to provide well-designed and
maintained streetscapes, staff was directed to clean up
the S. BlackwoodAvenuelandscape.
The City’s Design Studio developed a plan that
removed many of the shrubs that were dead and/or
served to catch trash. Crape Myrtles were installed and
the dead palms removed and replaced. Sod replaced
many of the shrub bedsto not only increase the ease of
maintenance, but also,to provide a strong foundation
for tree and palm growth. To further assist with the
clean-up, the City’s Public Works Streets Crew pruned
the palm trees, removing the dead and dying fronds.
This project was completed in November 2018 for
$67,262.00.
Old Winter Garden Road Median Landscape
Refreshwas one of the firstnew
beautification projects undertaken by the
CRA in over a decade. The project was
completed in two-phases. The first phase
addressed the medians between Maguire
Road and S. Blackwood Avenue; this project
was actually completed in the previous fiscal
year, but set the tone for the entire refresh
project.Thesecond phase continued the
landscape theme from S. Blackwood Avenue east to Hempel Avenue. The
landscape design for each of the phaseswas provided though the City’s Design
Studio and the installation by the City’s landscape contractor, BrightView
Landscape Services.
Phase 1, Maguire Road to S. Blackwood Avenue was completed in April 2018, for
$154,899.01. Phase II –S. Blackwood Avenue to just west of Hempel Avenue was
installed for $211,251.50.The total cost to improve the median landscaping (Phase
I and Phase II) was $366,150.51. Only $211,251.50 of the$366,150.51was
expended in FY 2018-2019.
Associated Costsfor FY 2018-2019 Fifty West Beautification Efforts
Old Winter Garden Road Phase 2$211,251.50
S. Blackwood Avenue Refresh$67,262.00
Grand Total$278,513.50
Clarke Roadmedians are next to be refreshed.
On May 7, 2019 the CRA Board provided
direction for CRA staff to prepare a landscape
plan for the medians that arelocated within
Redevelopment District, SR 50 north to
Matthew Paris Boulevard. Staff has completed
the design and processeda purchase order in
the amount of $95,986.00 forthe City’s
landscape contractor, BrightView Landscape
Services. We anticipate completing this project
in October 2019.
SR 50, the Pulse of Fifty West
State Road (SR) 50 traverses through the center of the Fifty West Redevelopment
District. The Florida Department of Transportation (FDOT) completed the six-laning
of SR50between SR 429 and Good HomesRoad in June of 2018. Once the paving
was complete and the heavy equipment left, the City was left with large
expanses ofgrassmediansand a roadway that was void of street lights between
SR 429 and just west of Lake Lotta.
FDOTLandscape Grant-In 2018, the
City was awarded a $775,000 grant
to beautify the corridor by adding
palms, trees and understory plant
materialsto the medians.This
project has seen a major delay
based on the FDOT design review
process. The City had to request a
variance due to the speed within
the City is 45 MPH and result in the
inability to include any trees. Now
that all plans are pending final
approval, we estimate the landscape package to hit the streets for bids this fall.
We have been assured by FDOT that we are not in jeopardy of losing the funds.
The total design for SR 50 is approximately $1.3million dollars for the approximate
3-mile section.
Please note, the CRA’s portionof the project is only between SR 429 and Clarke
Road. The section of SR 50 east of Clarke Road to Good Homes Road cannot be
paid with CRA funds.The FDOT Grant will not pay for such items as irrigation, some
site preparation, maintenance of traffic (MOT) and CEI services.
CPH was enlisted to prepare the landscape construction documents to meet
FDOT requirements. The approval process has taken over nine (9) months. By the
end of September,it is estimated thatthe City will have processedpayments to
CPHin the amount$38,049.55for this fiscal year.Prior to October 1, 2018, the City
paid CPH the amount of $7,499.34. The total design costs estimated to be paid to
CPH by the September 30, 2019,is $45,549.00 (includes funds from both FY2017-
2018and FY2018-2019).
Since the CRA’s meeting inMay, the Construction Engineering Inspection (CEI)
services have been secured through GAI Southeast’s continuing landscape
architecture contract for $64,545. CEI services are required by FDOT. GAI will be
responsible for inspecting the project to ensure that the installation meets the
State’s approved plans.
SR 50 Streetlighting–The City was contacted in August2019byFDOT and Duke
Energy regarding the design and installation of the streetlightson SR 50 beginning
east of SR 429 and ends west of Good Homes Road. The installation of the
streetlights is being engineered by SRD Engineers, installed by Duke Energy and
the installation paid for by FDOT.FDOT is requiring that the City enter into a
maintenance agreement with the FDOT.FDOT will reimburse the City 90% of the
annual cost. CRA and Public Works Department staff are waiting to hear back
from SRD Engineers and hope to have a more thorough report at the November
2019 CRA Board meeting.
Planning Activities led toFramework
for the Bluford Avenue Corridor
S. Bluford Avenue is a critical local
connector road for the City,as well as
forFifty Westin that it connects SR 50 to
City Center and Downtown.On May 7,
2019, the CRA was presented the
concept for the development of
Bluford Avenue between Old Winter
Garden Road north to Orlando
Avenue. Included in this concept was
the development of a 10’ multipurpose
path on the east side of the roadway to provide safe pedestrian connections not
just between developments,but also,proposing safe routes toOcoee Middle and
Elementary schools. CRA funds, $25,390, were used to prepare the concept plans
and conceptual cost estimate;toimplement the project as designed will cost
over three million dollars. CRA staff are in the process of preparing a scope of
services to go out to bid for a consultant to engineer the project and prepare the
construction documents. The professional services are estimated to be around
$250,000. The design and engineering fees have been identified in the FY 2019-
2020 CRA budget.It is anticipated that the project will need to be implemented
in three (3) phases and alternative funding will need to be secured to leverage
CRA funds.
In FY 2019-2020, the CRA is partnering with the City to replace the existing signal
span wire system at the intersection of BlufordAvenueand GenevaStreetwith a
Master ArmSystem. The CRA’s share of the intersection improvements is estimated
at $175,000.
Wellness Park
Designing Parks that Embrace Healthy Community Initiatives
In May 2019, the CRA was informed that
the FDOT property had been deeded
over to the City and the fence had been
installed, per FDOT’s requirement. Our
consultant, GAI,received the requested
site surveys andis currently developing
60% construction documentsfor the
park.The park currently is scheduled to
include four (4) outdoor exercise areas
that include a total of ten (10) pieces of
exercise equipment. Each of the
exercise areas will be located
underneath a sunshade. The park will
also include awalking loop and a
ceremonial plaza.
The cost to construct Wellness Park is in the vicinity of $1,900,000. This project will
be presented to the CRA Board at theNovember meeting.
This fiscal year$95,725.79is estimated to be expended ontheWellness Park,
including the design, survey and fencing through September 2019.The design is
scheduledto be completedin December of 2019. CRA staff will be looking to
secure grants to construct the park through such groups asthe West Orange
Health Care District.
Gateways to City Center
When constructed, City Center will serve as a major destination not just for the
Redevelopment District, but for the City as a whole. Over the past year, staff has
been working with several initiativesthat will serve to enhance the entrances to
City Center at Maine Street and N. Blackwood Avenue.
Maine Street Parkwill be developed at
the corner of Bluford Avenue and
MaineStreet, where there is an existing
retention pond. This pond is being
enlarged and a park developed that
includes a walkway around the pond,
seating areas, enhanced landscape
and overlooks at either end of the pond
where once the historic Maine Street
traversed.
Whereas, the CRA is not paying for
construction of thepark, $50,000 has
been allocated in the FY 2019-2020
budgetto design and fabricate historical interpretive exhibits, and for detailing at
each of the overlooks.
N. Blackwood Avenuewill be the primary access to City Center from SR 50.
Recognizing the importance of this connection, staff is working with an
engineering and landscape architecture consultant to design a new Streetscape.
Improvements include a roundabout at Montgomery Avenue, enlarged medians,
landscaping and new streetlight. Based on the change in direction to incorporate
a roundabout, this project has been delayed. Survey has been completedand
the consultant is nearly at 60% complete with the construction documents.The
consultant expects to complete the plans in early fall.
The estimated construction cost is currently $1,200,000.In FY2018-2019,the CRA
expended $32,833.01on the design and survey. The FY 2019-2020 capital budget
includes $100,000 to complete the design and initiate right-of-way acquisition
needed for the roundabout. Staff will be working with City Center regarding the
timing for construction and implementation partnerships.
Small Area Plans “Public-Private” Partnerships
Staff has been working with property
owners of prime redevelopment locations
within Fifty West to visualize the potential
of their property and the role it can play
in implementing the CRA Redevelopment
Plan and the Target Areas Special
Development Plan. Working with GAI
Consultants we envisioned what the
areas south of SR 50, between Bluford
Avenue and Maguire Road could look like in the future. The cost of this exercise
was$22,500.
Furthermore, we are proceeding in
developing a Master Infrastructure Plan
for Target Area 1. Professional Services
for the Target Area 1 Infrastructure
Master Plan was initiated in August 2019
and is expected to be complete
towards the end of the calendar year.
The CRA Board will be presented
additional information on this Plan at
their November 2019 meeting. The total
cost of the Target Area Infrastructure
Master Plan is$35,000.
Maintaining the Public Realm
Staffschedules weekly inspections of
the entire CRA. Issues such as poor
landscape maintenance, potential
code violations, condition of retention
ponds and trash are documented.
Staff immediatelyrequests support
from other departments,such as
Code Enforcement and Public Works
to assist with any issues. They also
inspectthe quality of work that is
being performed by the CRA’s
landscapemaintenance contractor.
In FY 2018-2019,the CRA is estimated
to spend $44,352.00 for the SR 50 landscape maintenance services.
FY 2018-2019 Updated Expenditures
At the November CRA Board meeting, CRA staff will provide an updatedreview
of the expenditures for FY 2018-2019.