HomeMy WebLinkAboutItem 09 Update on New City Hall Project - Approval of Exterior Design Concepts and Process Moving Forward ocoee florlda AGENDA ITEM COVER SHEET Meeting Date: 10/15/2019 Item # Reviewed By: Contact Name: Jamie Croteau Department Director: Charles Smith Contact Number: 407-905-3159 City Manager: Robert F t,e) ��• Subject: Update on New City Hall Project, Approval of Exterior Design Concepts and Process Moving Forward Background Summary: On August 6th the City Commission approved an Amendment to the Wharton-Smith Design-Build Services Agreement for the New City Hall. The Amendment addressed how to incorporate civil design and development into the contract, added geotechnical testing/evaluation, and included changes to the design team. Although conceptual designs were previously presented to the City, none were felt to be consistent with the character of the City; nor did the designs or the space program fit with the long-term expectations of Staff or the Commission. With the approval of Amendment 1, Wharton-Smith brought HKS Architects, Inc. (HKS) onto the City Hall Design Team. HKS has prepared three exterior concepts for the Commission to review and approve. The three designs relate to three possible types of construction methods for the building -tilt-up, brick veneer, and pre-cast. Each method of construction has pros and cons and provides a different aesthetic. HKS and Wharton- Smith will present each design and present the anticipated floor plan for the Commission Chambers and Legislative Area. Once the design concept has been chosen by Commission, HKS will begin to fully develop floor plans for the building and interior design for the building will begin. For expediency, staff is requesting once the design concept has been established by the Commission that the specifics of the internal floor plan, and interior furnishings for the building fall to the City Manager, or his designee, for approval. Staff is still anticipating breaking ground in the April/May timeframe, spending approximately 15 months in the bidding/construction phase and allocating 1-2 months for the closeout and move-in functions. Issue: Staff is requesting that the City Commission select a design concept and authorize staff to continue with the design process allow the internal specifics of the building to fall to the City Manager for approval. Recommendations: Motion for Mayor and City Commission to authorize the City Manager move forward with the design option selected by Council and to approve and to allow the City Manager approve the specifics of the internal floor plan and furnishings. Attachments: None Financial Impact: Staff anticipates bringing back a cost and associated funding strategy at the end of the design phase. Type of Item: (please mark with an `x') Public Hearing For Clerk's Dept Use: Ordinance First Reading Consent Agenda Ordinance Second Reading Public Hearing Resolution % Regular Agenda X Commission Approval Discussion& Direction Original Document/Contract Attached for Execution by City Clerk Original Document/Contract Held by Department for Execution Reviewed by City Attorney 1 N/A Reviewed by Finance Dept. L C`W\t� N/A Reviewed by 0 N/A 2