Loading...
HomeMy WebLinkAboutItem #06 - Silver Glen Reclaim Water Distribution System - Change Order No. 2 AGENDA ITEM COVER SHEET Meeting Date: April 17, 2007 Item # (0 Contact Name: Contact Number: Steven Frey 407 -905-3100, ext. 1505 Reviewed By: Department Director: City Manager: Subject: Silver Glen Reclaim Water Distribution System Change Order No.2 Background Summary: The Silver Glen Reclaimed Water Distribution System project is providing reuse service to the 245 residences in the Silver Glen subdivision. The project is a retrofit of the reuse piping into an existing development that was completed before the City moved into the reuse distribution business and required developments to install reuse pipelines within the subdivision. The project includes the installation of four, six, and eight inch pipelines, appropriate fittings and valves, and service lines to the customers. Young's Communications Co., Inc., the contractor of record for the project, is nearing completion of the reclaim water distribution system in the Silver Glen subdivision. During the course of the project, several small sections of sidewalk needed to be removed to facilitate installation of pipe fittings, valves, connections, and services. Upon completion of the distribution pipe installation, the sidewalks were replaced. This item of work was not included in the original bid itemization for the project. The sidewalk removal and replacement was approved at each location on an as needed basis; there were other locations that the contract chose to remove and replacement sidewalk for his convenience that are not being reimbursed by the City. The negotiated cost for this work is $11,456.20 with no adjustment in contract time. The new contract value including Change Order NO.2 is $819,863.10 with no adjustment in contract time. The change order is attached for review. Issue: Change Order No. 2 is needed to cover the cost of removal and replacement of sidewalks as part of the installation of reclaim water distribution lines in the Silver Glen subdivision. Recommendations: The Engineering Department recommends that the City Commission approve Change Order No. 2 for the sidewalk replacement and increase the construction contract by $11,456.20, with no adjustment in contract time, and authorize the Mayor and City Clerk to execute the change order. Attachments: Silver Glen Reclaim Water Distribution System Change Order No. 2 Financial Impact: This change order will result in an increase of the project's construction contract by $11,456.20. Funds are available for this change order from the 2003 Utility Bond Issue and the grant from the St. Johns River Water Management District. Type of Item: (please mark with an "x') Public Hearing _ Ordinance First Reading _ Ordinance Second Reading Resolution x Commission Approval Discussion & Direction For Clerk's Deat Use: _____ Consent Agenda Public Hearing _____ Regular Agenda ~ Original Document/Contract Attached for Execution by City Clerk _____ Original Document/Contract Held by Department for Execution Reviewed by City Attorney Reviewed by Finance Dept. Reviewed by 0 N/A N/A N/A 2 CITY OF OCOEE Engineering 150 North Lakeshore Drive Ocoee, Florida 34761 CHANGE ORDER NO. 2 CITY OF OCOEE Silver Glen Reclaimed Water Distribution Svstem DATE: March 30, 2007 CONTRACTOR: Young's Communications Co., Inc. AGREEMENT DATE: November 6, 2006 The following changes are hereby made to the CONTRACT DOCUMENTS. Original CONTRACT PRICE $ 787,637.05 Current CONTRACT PRICE ADJUSTED by previous CHANGE ORDER $ 808,406.90 Net Increase Resulting from this CHANGE ORDER $ 11,456.20 The current CONTRACT PRICE including this CHANGE ORDER $ 819,863.10 ORIGINAL CONTRACT TIME: 420 Consecutive Calendar Days from Notice to Proceed Date: April 10, 2007 Current CONTRACT TIME adjusted by previous CHANGE ORDERS Date: April 10, 2007 Net Increase Resulting from this CHANGE ORDER Days: 0 Davs Current CONTRACT TIME Including this CHANGE ORDER Date: AorillO, 2007 00842-1 CHANGES ORDERED: I. GENERAL This change order is issued pursuant to the applicable provisions of the Contract Documents and is intended to provide an equitable adjustment in the Contract Sum to accommodate an unprecedented market condition. II. REQUIRED CHANGES Item A: Remove and replace concrete sidewalk. III. JUSTIFICATION Item A: Minimal amounts of existing sidewalk were required to be removed to facilitate installation of the new reclaim watermain. Sidewalk removal was kept to a minimum through to the use of directional drilling rather than open cut. The few instances where removal and replacement occurred were due to setup of directional drill equipment, utility conflict resolution, and fitting Goints, valves, t-connections, etc.) installations. IV. NARRATIVE OF NEGOTIATIONS Item A: No bid price was obtained for this item since it was not an anticipated expense. Through verbal negotiation with the contractor and unit cost comparison to other projects, a unit price of$8.35 per square foot was agreed upon. V. PAYMENT Change Order Description Net Increase Unit Unit Price Net Increase Item No. (Decrease) Quantity (Decrease) Price Item A Remove and Replace Concrete Sidewalk 1,372 s.f. $8.35 $ 11,456.20 Total Net Increase Change Order No. #2 $11,456.20 VI. APPROVAL AND CHANGE AUTHORIZATION This proposed change to the Contract is to be approved by the Ocoee City Commission. 00842-2 Acknowledgements: The aforementioned change, and work affected thereby, is subject to all provisions ofthe original contract not specifically changed by this Change Order; and, It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original contract other than matters expressly provided herein. CONTRACTOR acknowledges, by its execution and acceptance of this Change Order, that the adjustments in Contract Price and Time shown hereon constitute full and complete compensation and satisfaction for all costs and modifications of performance time incurred by the CONTRACTOR as a result of this Change Order and/or relating to or arising out of the reasons and justifications for this Change Order.. No other claim for increased costs of performance or modifications of time will be granted by the OWNER for the Work covered by this Change Order. Nothing contained in this action by the City shall be deemed to constitute a waiver or an estoppel to assert its rights or remedies under the Contract Documents nor shall it be deemed to set a precedent for an equitable adjustment for any other materials required by the Work. The CONTRACTOR hereby waives and releases any further claims for cost or time against the OWNER arising from or relating to the matters or Work set forth or contemplated by this Change Order and/or relating to or arising out of the reasons and justifications for this Change Order. RECOMMENDED BY: ACCEPTED BY: CITY OF OCOEE. FLORIDA YOUNG'S COMMUNICATIONS CO.. INC. By: By: Signature Signature Date: Date: Title: Title: APPROVED BY: CITY OF OCOEE. FLORIDA By: S. Scott Vandergrift, Mayor Date Attest: Beth Eikenberry, City Clerk FOR USE AND RELIANCE ONLY BY THE CITY OF OCOEE, APPROVED AS TO FORM AND LEGALITY THIS DAY OF ,2007. APPROVED BY THE OCOEE CITY COMMISSION IN A MEETING HELD ON , 2007 UNDER AGENDA ITEM NO. FOLEY & LARDNER By: City Attorney 00842-3