Item 13 Approval of RFQ #19-008 Construction Manager at Risk for Fullers Cross Road and Ocoee-Apopka Road Intersection Improvements Guaranteed Maximum Price Contract Authorization
t I Ocoee i Iarida AGENDA ITEM COVER SHEET Meeting Date. June 2, 2020 Item # 13 Reviewed By Contact Name: Stephen C. Krug Department Director: Contact Number: 6002 City Manager: Subject: RFQ#19-008 Construction Manager At Risk for Fullers Cross Ro d and Ocoee-Apopka Road Intersection Improvements Guaranteed Maximum Price Contract Authorization. District 1, Brinson. Background Summary: The Commission awarded the Construction Manager At Risk (CMR) contract for the Fullers Cross Road and Ocoee-Apopka Road Intersection Improvements at the September 17, 2019 meeting to Oelrich Construction, Inc., (Oelrich), and approved the pre-construction services portion of the contract on November 5, 2019. Oelrich, VHB Engineers and City staff diligently worked on the next step in the CMR process which is to negotiate the Guaranteed Maximum Price (GMP) and completion dates based on a collaborative value engineering process of all involved. From the inception of the concept between the City and County to jointly improve the intersection, the region has experienced an unprecedented surge in construction industry costs The City and County have evaluated the GMP proposal from Oelrich and have determined the pricing to be in line with current industry standards, however this pricing was above the funding limits set in the original Interlocal Agreement approved in 2018. An Amendment to the Interlocal Agreement between the City and County has increased the limits of the joint funding to allow the project to proceed to the construction phase The County will be contributing $1,100,000.00 to the total cost of the project. The City's increase is funded through Road Impact Fees Public Works is requesting Commission approval for the GMP at $2,038,974.00 for the project with elements that include adding left and right turn lanes, stormwater improvements and new traffic signalization. Issue: Request City Commission approval of the Guaranteed Maximum Price for the Fullers Cross Road and Ocoee-Apopka Road Intersection Improvements Construction Manager At Risk contract with Oelrich Construction, Inc. Recommendations: Recommend approval of the Guaranteed Maximum Price of the Construction Manager At Risk contract, RFQ #19-008, with Oelrich Construction, Inc., of Jonesville, Florida, of $2,038,974.00, authorizing the Mayor, City Clerk and Staff to execute the required contract documents and for the City Manager and staff to approve additional work up to the limit of his purchasing authority and up to the allowable budget for unforeseen conditions. Attachments: Oelrich GMP Proposal. Financial Impact: The cost for the Guaranteed Maximum Price is adequately funded by Road Impact Fees and with funding from Orange County up to $1,100,000.00. Type of Item: (please mark with an 'x') Public Hearing For Clerk's Dept Use: Ordinance First Reading X Consent Agenda Ordinance Second Reading Public Heanng Resolution Regular Agenda X Commission Approval Discussion&Direction Original Document/Contract Attached for Execution by City Clerk Original Document/Contract Held by Department for Execution Reviewed by City Attorney N/A Reviewed by Finance Dept Rebecca Roberts N/A Reviewed by ( ) N/A 0 , * 4A , A 1't* isk , n , . 1 . _, _ . ,........ ,,,.iiiiiiii,...., ift...., , iimPw' t aspo - 4 , 1 tlihk .i. 4,, ,,ilk City of Ocoee Fullers Cross Road and Apopka Road Intersection Improvements Guaranteed Maximum Price Revision 1 April 3, 2020 , , 0 -��iVhb. OELRICH CONSTRUCTION INC. OELRICH CONSTRUCTION INC. April 3, 2020 Steve Krug City of Ocoee 301 Maguire Road, Ocoee, FL. 34761 Re: City of Ocoee Fullers Cross Road and Ocoee Apopka Road Intersection Improvements Guaranteed Maximum Price Proposal Revision 1 Mr.Steve Krug: Oelrich Construction, Inc. is pleased to present this Guaranteed Maximum Price proposal for the construction required to complete the improvements to the intersection at Fullers Cross Road and Ocoee Apopka Road Intersection Improvements as specified on the Construction Plan Approval documents provided by VHB Engineers dated 11/22/2019. The Guaranteed Maximum Price for this project is: Two Million,Thirty-Eight Thousand, Nine Hundred Seventy-Four Dollars $2,038,974.00 Please find the attached GMP overview, GMP breakdown, Qualifications,Schedule, Construction Management Team,and List of Construction Documents that are included as part of this Guaranteed Maximum Price proposal. We appreciate the opportunity to be a part of this project,and we look forward to its successful completion. Please feel free to contact me at any time if you have any questions. Sincerely, Oelrich Construction,Inc. Gainesville Office: 275 NW 137th Drive,Suite A Jonesville,FL 32669 Orlando Office: 428 S.Dillard St.,Suite 103 Matthew Marino Winter Garden,FL 34787 Preconstruction Manager oelrichconstruction.com te1:352-745-7877 CGC1510579 0 TABLE OF CONTENTS OELRICH CONSTRUCTION INC. Fullers Cross Road and Ocoee Apopka Road Intersection Improvements Contents Exhibit A—GMP Overview Page 04 Exhibit B—GMP Breakdown Page 05 Exhibit C—Qualifications Page 08 Exhibit D—Project Schedule Page 11 Exhibit E—Construction Management Team Page 12 Exhibit F—Construction Documents Page 13 AnilOelrich Construction,Inc. I Offices in Gainesville & Orlando I 352-745-7877 0 Fullers Cross Road and Ocoee Apopka Road OELRICH Intersection ImprovelncntS CONSTRUCTION Exhibit A -Guaranteed Maximum Price Proposal Overview Ocoee Fullers Cross Road and Ocoee Apopka Road Intersection Improvements Oetrich Construction Inc Guaranteed Maximum Price Overview Bid Package 12/20/2019 4/3/2020 Over/ Package Description GMP GMP (Under) 1 BP 31A Sitework $ 1,502,802 $ 1,307,417 $ (195,385) BP34A Transportation $ 326,654 $ 326,654 $ - Total of Bid Packages $ 1,829,456 $ 1,634,071 $ (195,385) Contingency $ 54,884 $ 49,022 $ (5,862) Staffing Costs $ 90,232 $ 90,232 $ - General Conditions $ 49,491 $ 50,951 $ 1,460 Total of Project Costs $ 2,024,062 $ 1,824,276 $ (201,246) Builders Risk Insurance $ 8,501 $ 7,662 $ (839) Payment and Performance Bonds $ 23,316 $ 23,316 $ - General Liability Insurance $ 22,129 $ 19,982 $ (2,147) Permit $ 12,703 $ 12,703 $ - Impact Fees $ - $ - $ - Subtotal $ 2,090,711 $ 1,887,939 $ (204,232) CM Fee $ 167,257 $ 151,035 $ (16,222) Total Amount $ 2,257,968 $ 2,038,974 $ (220,454) Oelrich Construction,Inc. I Offices in Gainesville & Orlando I 352-745-7877 Ailli 0 Fullers Cross Road and Ocoee Apopka Road OELRICH Intersection Improvements CONSTRUCTION Exhibit B - Guaranteed Maximum Price Proposal Breakdown Ocoee Fullers Cross Road and Ocoee Apopka Road Intersection Improvements Oelrich Construction,Inc. Guaranteed Maximum Price Proposal April 3,2020 Item Description Qty Unit Labor Material Subcontractor Totals Sub Totals unit price I amount unit price I amount unit price I amount Project Duration 22 weeks Project or Program Area 3,000 sf Number of Building Levels 1 level General Conditions Project Manager-Ryan Minton 8 weeks 3,119 24,948 - - 24,948 Supenntendent-Cozart Lawrence 22 weeks 1,335 29,372 - - 29,372 Senior Supenntendent-Ethan Newport 3 weeks 3,183 9,549 - - 9,549 Project Engineer-Sean Strayer 15 weeks 1,757 26,362 - - 26,362 Document Reproduction 3 sets - 275 825 - 825 Safety Supplies 1 Is - 300 300 - 300 Testing Services 1 Is - - - 3,500 3,500 3,500 Temporary Electricity 5 months - 70 350 - 350 Temporary Water 6 months - 50 300 - 300 Field Office Rental 6 months - 475 2,850 - 2,850 Field Office Pump Service 6 months - 150 900 - 900 Copies and Copy Machine 6 months - 156 936 - 936 Cell Phone and Communications 6 months - 125 750 - 750 Sanitary Facilities,Toilets 6 months - 95 570 - 570 Office Supplies 1 Is - 750 750 - 750 Jobsite Security 6 months - 110 660 - 660 Small Toots 1 Is - 500 500 - 500 Vehicle Fuel 6 months - 450 2,700 - 2,700 Jobsite Vehicle 6 months - 450 2,700 - 2,700 Traffic Control MOT 80 days - 250 20,000 - 20,000 Temporary Fencing 400 if - 5 70 2,280 - 2,280 Temporary Double Gates 2 ea - 250 500 - 500 Temporary Project Signs 1 Is - 600 600 - 600 Temporary Protection 1 Is - 1,000 1,000 - 1,000 Temporary Weather Protection 1 Is - 1,000 1,000 - 1,000 Continuous Cleaning 22 days - 140 3,080 - 3,080 Dumpsters 10 pulls - 350 3,500 - 3,500 Closeout Submittalset al 1 Is - 150 150 - 150 As-Builts 1 sets - 250 250 - 250 141,14< Oelrich Construction,Inc. I Offices in Gainesville & Orlando I 352-745-7877 Mill 0 Fullers Cross Road and Ocoee Apopka Road OELRICH Intersection Improvements CONSTRUCTION Exhibit B - Guaranteed Maximum Price Proposal Breakdown BP-31A Skework Sitework Package 1 Is - - - - - GC - - - Mobilization 1 Ls - - 35,000.00 35,000 35,000 Construction Staking 1 Is - 18,000.00 18,000 18,000 As-builts 1 Is - - 13,500.00 13,500 13,500 Project Management 5 months - - 3,500.00 17,500 17,500 Construction Parking Areas 1 Is - - 15,000 00 15,000 15,000 NPDES Monitoring 20 wk - 650.00 13,000 13,000 MOT 5 months - 12,500.00 62,500 62,500 Erosion Control&Demo - - - j Silt Fence 5,335 If - - 2 15 11,470 11,470 Erosion Control Maintenance 5 months - - 2,500.00 12,500 12,500 Sweeper(Twice a week) 5 months - - 1,500.00 7,500 7,500 Bahia Sod 22,343 sy - - 3.15 70,380 70,380 ROW Cleanng&Haul Off 1 Ls - - 45,000 00 45,000 45,000 Removal of Headwalls 65 Lf - - 150.00 9,750 9,750 Removal of Chain Link Fence 550 Lf - - 3 50 1,925 1,925 Removal of Guard Railing 165 Lf - - 10.00 1,650 1,650 Removal of Sidewalks 2,511 sf - 2 00 5,022 5,022 Asphalt Demo 2,500 sf - - 200 5,000 5,000 Remove and Relocate Signs 4 ea - - 450.00 1,800 1,800 Waterline Relocation 1 ea - - 12,500 00 12,500 12,500 Earthworks - . - Earthwork and Grading 1 Is - 175,000 00 175,000 175,000 DemuscWUnsuitable and Replace with Clean Fill 1 Is 22.50 23 23 Storm - - Proposed Ditch Block 7 ea - - 2,200 00 15,400 15,400 24'RCP 32 Lf . - 85.00 2,720 2,720 24'Headwall 1 ea . - 6,50000 6,500 6,500 8'x6'Box Culvert 40 Lf - 1,450 00 58,000 58,000 Double Wing Wall 1 ea - - 35,000 00 35,000 35,000 6'UnderDrain 1,625 If - - 18.25 29,656 29,656 Clean Out 11 ea - 500.00 5,500 5,500 0utfall for 6'Pipe 7 ea - - 750.00 5,250 5,250 Fittings 1 Is - 2,50000 2,500 2,500 Fine Aggregate Sandfor Backfill of Underdrain 481 to - - 65.00 31,265 31,265 Rip Rap in Lieu of Armor Flex 1,900 sf - - 8 50 16,150 16,150 Roadway - - 12'Stabilized Sub-base 5,057 sy - 5 25 26,549 26,549 8'Base 5,057 sy - - 12 50 63,213 63,213 Prime&Sand 5,057 sy - - 1 50 7,586 7,586 4'SP 12.5 4,597 sy - . 36.75 168,940 168,940 Tack 11,281 sy - - 150 16,922 16,922 1 5'SP 12 5 11,281 sy - - 15 22 171.697 171,697 Milting 6,684 sy - - 3 50 23,394 23,394 Guard Railing 165 If - - 8500 14,025 14,025 4'Sidewalk 2,393 sf 625 14,956 14,956 1'Maximum Overbuild 1,734 sy - - 12.50 21,675 21,675 Signage&Striping 1 Is - - 36,500.00 36,500 36,500 1,307,417 ' Oelrich Construction,Inc. I Offices in Gainesville & Orlando I 352-745-7877 AM! 0 Fullers Cross Road and Ocoee Apopka Road OELRICH Intersection Improvements CONSTRUCTION INC. Exhibit B - Guaranteed Maximum Price Proposal Breakdown BP-34A Transportation Traffic Signals Package 1 Is - 319,654 319,654 319,654 Mobilization - - - Conduit,Open Trench 130 if - - - - Conduit,Directional Bore 320 If - - - - Signal Cable-New or Reconstructed Intersection 1 Pl - - - Pull&Splice Box,13"x 24'cover size 13 ea - - Electrical Power Service 1 as - - - - Electrical Service Wire 60 If - - - Prestressed concrete pole,Type P-II Service Pole 1 ea - - - Prestressed concrete pole,Shallow pole removal-30'> 2 ea - - - - Aluminum signal poles,pedestal style 2 ea - - Steel mast arm assembly,Single arm 60' 4 ea - - - - Vehiculartraffic signal,3 section 8 as - - - - Vehiculartraffic signal,4 section 4 as - - - Pedestrian signal 2 as - - - - Vehicle detection system,cabinet equipment 1 ea - - - - - Vehicle detection system,above ground equipment 4 ea - - - - - Signal priority and preemption system,cabinet 1 ea - - - - - Signal priority and preemption system,detectro 4 ea - - - - - Pedestiran detector 2 ea - - - - - Traffic controller assem ply,NEMA,2 preemption 1 as - - - - - Removal of one traffic controller assembly 1 ea - - - - - Managed field ethernet switch 1 ea - - - - - Overhead mounted,internally illuminated sign 4 ea - - - - - Drill shah QC Testing 1 Is - - 7,000 7,000 7,000 326.654 Cost of Work Subtotal 1,775,254 1,775,254 Construction Contingency 3.00% 49,022 Subtotal 49,022 1,824,276 Builders Risk Insurance 7,662 Payment and Performance Bond 23,316 General Liability Insurance 0.98% 19,982 Permit 12,703 Impact Fees - Subtotal 63,663 1,887,939 CM Fee 8.00% 151,035 Total Project 2,038,974 Oelrich Construction,Inc. I Offices in Gainesville & Orlando I 352-745-7877 AIM Fullers Cross Road and Ocoee Apopka Road OELRICH Intersection Improvements CONSTRUCTION INC. Exhibit C - Constuction Approval Plan Documents: Qualifications This estimate includes the improvements of the intersection at Fullers Cross Road and Ocoee Apopka Road. This estimate is based on the Construction Approval Plans produced by VRB Engineers dated November 22nd 2019,the City of Ocoee Engineering Standards Manual produced by the City of Ocoee dated February 20th, 2012, site meetings and discussions, and the qualifications below. Division 01- General Conditions • The estimated project construction duration will be twenty-two (22) weeks. • Work will be accomplished during normal work hours. This will include various activities which will cause loud noises. • A Builder's Risk Insurance and a General Liability Insurance policy has been included in this proposal. • A Payment and Performance Bond has been included in this proposal. • We have included costs for permit fees. • We have not included costs for impact fees. • No provisions for temporary power/water are included in this proposal. It is assumed that we will have some form of available power and water from the building for the duration of the project. • We have included temporary protection for existing finishes required. • We have included provisions for temporary job site office trailer. • All required temporary enclosures, storage facilities, dumpsters, toilets, signage, etc. have been included as a part of the project. • Hazardous materials removal or mitigation is not included in our price or schedule. • Relocation or repair of existing M/E/P/FP Systems to accommodate new systems not specifically presented on the project scope of work is excluded. We are not responsible for the existing building systems. • Moving or relocation of existing furniture, fixtures, and equipment is not included. • Costs are included for material testing and inspections. • A Construction Contingency of 3% is included to cover estimating variances, and unexpected events in the construction process and schedule. The estimate does not include separate owner or design contingencies. Division 02- Existing Conditions • We have included all silt fence and erosion control as well as the continued maintenance for the duration of the project. • We have included all maintenance of traffic devices, mobilization, maintenance, and demobilization. • We have included all demolition including but not limited to: removal of the existing right of way, removal of all headwalls, removal of existing chain link fencing, removal of existing guardrails, removal of existing concrete sidewalks, removal of existing asphalt as specified. • We have included the removal and relocation of four(4) existing signs. • We have included the relocation of one (1) waterline. • We have included the use of a street sweeper up to two (2) times per week. 111111 0elrich Construction,Inc 1275 NW 137th Drive,Suite A,Jonesville,Florida I Office 352-745-7877 Cj• Fullers Cross Road and Ocoee .Apopka Road OELRICH Intersection Improvements CONSTRUCTION INC. Exhibit C - Constuction Approval Plan Documents: Qualifications Division 03- Concrete • We have included all concrete sidewalks as per the Construction Plans. Division 05- Metals • We have included the furnish and erection of all structural steel as per the structural drawings. Division 31- Earthwork • We have included all Earthwork and grading as per the Construction Plans. • We have included to de-muck any unsuitable soils and replace with clean fill. Removal of muck/unsuitable and replacement shall be quantified by the geotechnical engineer. • We have included the construction of a temporary construction parking/storage area. Division 32- Exterior Improvements • We have included all 12" stabilized sub-base, 8" base, prime and sand, tack, milling, 4" SP, 1.5" SP, and 1" maximum overbuild. • We have included sodding the disturbed areas with bahai sod. • We have included the following for storm and run off: seven (7) proposed ditch blocks, 24" RCP, new 24" headwall, new 8' x 6' box culvert, new double wing wall, all 6" underdrain, eleven (11) clean outs, all fittings, and all fine aggregate sand for backfill of underdrain. • Includes approximately one thousand nine hundred (1,900) square feet of Rip Rap in lieu of Armor Flex ditch lining. Division 33- Utilities • We have excluded the removal and relocation of any telephone or power poles. Division 34- Transportation • We have included all conduit for signalization units, both open trenched and directionally bored. • We have included all signal cable, both new and reconstructed. • We have included thirteen (13) pull and splice boxes,with cover size 13" x 24". • We have included all electrical service wire. • We have included one (1) prestressed concrete service pole. • We have included two (2) 30' prestressed concrete poles. • We have included two (2) aluminum signal poles. • We have included four(4) steel mast arm assemblies with 60'arms. • We have included eight (8), three section, vehicular traffic signals. • We have included four(4), four section, vehicular traffic signals. • We have included two (2) pedestrian signals. • We have included one (1) vehicle detection system,cabinet equipment. • We have included four(4) above ground equipment's for vehicle detection system • We have included one (1) signal priority and preemption system cabinet. • We have included four(4) detectors for signal priority and preemption system. Oelrich Construction,Inc 1275 NW 137th Drive,Suite A,Jonesville,Florida I Office 352-745-7877 Fullers Cross Road and Ocoee Apopka Road OELRICH Intersection Improvements CONSTRUCTION INC. Exhibit C - Constuction Approval Plan Documents:Qualifications • We have included two (2) pedestrian detectors. • We have included one (1) traffic controller assembly. • We have included the removal of one (1) existing traffic controller assembly. • We have included one (1) managed field ethernet switch. • We have included four(4) internally illuminated, overhead mounted signs. • The lead time of the mast arm poles is approximately 17 weeks from approval. • We have included all MOT throughout the duration of the job. The city will be responsible for supplying any police officers for shut down of the intersection. Oelrich Construction,Inc 1275 NW 137th Drive,Suite A,Jonesville,Florida I Office 352-745-7877 AIM 0 Fullers Cross Road and Ocoee Apopka Road- OELRICH Intersection Improvements CONSTRUCTION Exhibit D—Project Schedule hstesas ow Rtaad as Usurer Apara..ru atwno0 W n.mpr•..n.MN o '�.ts n... p.m tart n• - 1 >n n Ip. L.• O 1 I 11•Itticin s w : »'iSlniult+�i l.1,tlu : .T_y,j:±. _____i ,i1.. ai .Iali .1aT uimi tt:t1 M l t2 l u In PIIBWMi7lYC71011 23Mt4ry law!/17K! - - F CG/.s)r.�.:oN Homer d Award 1day Tua W17/19 .3 none.$el 102%0aaan.eras 1 dry fn si/32/19 N 111a'd rs•r.....W S.bco ?actoe.Odng•GMP lG day Pa.11/11/191-.. -.Sul........ar Made,e.GMP n..ele5 ueverOpma,ll • S GMP Rey yra ApprsMl 39 days Mon12/23/19 �. - ..GMP Renew Si Approval I f.tr Many..Rppre.ral 1 day R.S/W70 City Manager Aaprm-al 7 Pc..r..loa 25 day. Mo.,S/11/20 •.,007,00• P • 1 Set tomratt,r(i SUOntWs 00ay1 MOn S/1L20 Matron:lead Sane 9 I Mandllo lead de OS days Mon SaS/a. --_--a. --.----. 10 CORP RUCTION /17 slays Mon6/tS/20 e M t esleetra.a MOT 10 days Mon G/1Sf20 .M0ldtI s alon s MOT I If 1d6lr1Rtaan-Mane 1.TIt..swrala 32 days men 0/2S/20 f ,,... 1 13 Of.6 Grub Slays MCn6/19/20 • ..Clear Ot Grub- • M Amor at*n1 rivi.,..r, Sdry, Weer 776/20 • •octal.al treaties ISno ,Gado 2 drys Mew 7/13/20 Maga.Gra ds —n wren,enanuon 0 days Wed 2/13/10 .I Mem.. 17 1slalaSaarn 01 Stb ddc 3.3aa Wed7/22/20 of Snags.. a antes*tilts 7 day, M 7M/70 Asphalt tort, • Stasswns 1de, Wed7ro/20 %Mg:, --30 Swabs anon Step I days 11u1/3W20 9 Haut..Pr. Si—. .6 tarlNtlen•Phaw 2.NW w.ttr 32 days Ww7/20/m (emu,.<uon-M3M t•NW Quadrant u near a Gob 9 days Wed 7R1/70 a.0 Gob 21 Rwdadan of gran.., 0don Wed•nnd e.w.Y.n.e Mil.:.. dO Rased bide £days Fn!/IaflO •-Re warn Orally 23 bamboond SWp•do 4drys Toe418120 • Inst.sear of Sue9rad. 20 Mehl*iih. 7dyes Tad M9/7e Aaphalllne n Serymd 1day 11u427120 1Swr.ne 2• S.p,d1Mar,Pr.p 100,5, in Wang , Sagr..Ifa..:un P..y 29 Ca6blRtket•Phase 1-SW QuakMl 2E day Thu!/1/10 1---, Coostorcbon Phase 3-SW Quadrant a0 CHara Grub aches n5.a3/20 • ..Clear re Gore at %go..tSnr of Oohs., •dry. WedOrea0 • ..10.•,0n of gold,. _ writ,wade 2 days tau 9/17/20 !fussy.a✓. Ii IUWYtmn of Sib&add 3days Mon9/21/20 '.IbNliabOP of laegead.l U asphalt ldl, 7days Mg%nano •Aaahait Uhs SS Arow 1d.y Men0/2a/30 t suns., a Srpaa000,at, loam 1w9/27/10 ' s:gn.h..w.►t•P 37 Caalmities, PTAs*a-St Nadine Wdays MOO 9/21K0 1 C•aanatl•a-PNa••-ISE pad alaat 30 Clear 6 Grub a days Mon 9/70/70 • Clew•Grub • Rak.suen aluuna s 4de, r..10/2/20 • ,•Newlin,.flhR*:•. nap Wade 10rys MY IWW10 ..1a..9h b... a1 Cueoert Extension 3 days Men 10/12/20 •j,Calved Eaten_, o In.to..an nlLbp.w• idryt 17u10/1V713 • ImtsIIado1 of Sasy”d. M Melva lift, £days T.l10/20/20 g A.pl.ahl:h. 44 Vrpm3 1day t1u7W2l/20 t Sr Splay 43 SpNWaOan Prep IOd*, Fel10/23/20 • I1 Si gn•lald0n Prop M Tral6t 9p,aErarian 6 days Fri 11/E/20 Trade,Sl0n11aat4, 47 Set Mac •dry. f.i11/6f20 S.,To.Me Signal. y Set Parana Port !Oar. Mu 11/11/10 •7n Ptde.alan poi.. ry anal COOWISOen 7dq0 Men ll/1420 etion M MOa Rfeayx. Sdars Mon11/1fJ20 MIIIWRnur e St anal 5707..d 2 days Mon 11/21/20 17 FY.a1 S 32 PROLCT a3OSS001 1•dayt Waei1/2S/20 1 SI 11010.Seta Dernaeauadon 2dm. Wend 11/29/20 MOT a •O•r•ebuoaen SI jf Io.slm e.e,ions 1 days PM 11/77/70 anal & ia,a u 1 iitaimilittimalaial 21leu Mon ta/loa. t a/aa !1 Haan host 10 day Tay 12/1/70 P.....I.t... J4.1 wTlserr0OSf0OP11 4drys Toe 12/15/20 .iheron*Stnpo9 0..IPa�lOe IIddr1 fr.17/1M0 012/ta Oelrich Construction.Inc. I Offices in Gainesville&Orlando I 352-745-7877 Fullers Cross Road and Ocoee Apopka Road OELRICH Intersection Improvements CONSTRUCTION Exhibit E — Construction Management Team NAME TITLE Ryan Minton Project Manager Ethan Newport Senior Superintendent Sean Strayer Assistant Project Manager Cozart Lawrence Superintendent Oelrich Construction,Inc 1275 NW 137th Drive,Suite A,Jonesville,Florida I Office 352-745-7877 AIME Fullers Cross Road and Ocoee Apopka Road OELRICH Intersection Improvements CONSTRUCTION INC. Exhibit F - Construction Plan Approval Documents: Drawings SHEET# NAME DATE Cover Page 11/22/2019 C0.00 Signature Sheet 11/22/2019 C1.00 Legend Sheet 11/22/2019 C1.01 Existing Conditions,Demolition and Erosion Control Plan Fullers Cross 11/22/2019 C1.02 Existing Conditions,Demolition and Erosion Control Plan Fullers Cross 11/22/2019 C1.03 Existing Conditions,Demolition and Erosion Control Plan Fullers Cross 11/22/2019 C1.04 Existing Conditions,Demolition and Erosion Control Plan Fullers Cross 11/22/2019 Cl 05 Existing Conditions,Demolition and Erosion Control Plan Fullers Cross 11/22/2019 C1.06 Master Site Plan 11/22/2019 C1.07 Typical Sections 11/22/2019 C1.08 Typical Sections 11/22/2019 C1.09 Typical Sections 11/22/2019 C1.10 Typical Sections 11/22/2019 C1.11 Typical Details 11/22/2019 C2.00 Fullers Cross Plan 11/22/2019 C2.01 Fullers Cross Plan 11/22/2019 C2.02 Fullers Cross Plan 11/22/2019 C2.03 Ocoee Apopka Road Plan 11/22/2019 C2.04 Ocoee Apopka Road Plan 11/22/2019 C2.05 Box Culvert Data Table 11/22/2019 T-1 Signalization General Notes 11/22/2019 T-2 Signalization Plan 11/22/2019 T-3 Mast Arm Tabulation 11/22/2019 T-4 Pole Schedule 11/22/2019 T-5 Guide Sign Worksheet 11/22/2019 S-1 Signing&Pavement Marking Plan(1) 11/22/2019 S-2 Signing&Pavement Marking Plan(2) 11/22/2019 S-3 Signing&Pavement Marking Plan(3) 11/22/2019 S-4 Signing&Pavement Marking Plan(4) 11/22/2019 S-5 Signing&Pavement Marking Plan(5) 11/22/2019 Oelrich Construction,Inc 1275 NW 137th Drive,Suite A,Jonesville,Florida I Office 352-745-7877 AM= J ,r 11C9 Fullcrs Cross Road and Ocoee Apopka Road OELRICH Intersection Improvements CONSTRUCTION INC. Exhibit F - Construction Plan Approval Documents:Specifications SECTION# NAME DATE 1.01 General 02/20/2012 1.02 Reference Materials 02/20/2012 1.03 Pre-Construction Conference 02/20/2012 1.04 Utility Coordination 02/20/2012 1.05 Utility Construction 02/20/2012 1.06 Start of Construction 02/20/2012 1 07 Construction Completion 02/20/2012 1 08 Off-site Pollution Protection 02/20/2012 1 09 Inspections 02/20/2012 1 09 01 Periodic 02/20/2012 1.09.02 Substantial Completion 02/20/2012 109.03 Final 02/20/2012 1.10 Transfer of Private Ownership 02/20/2012 1 11 Property Ownerships 02/20/2012 1.12 Plans and Specifications 02/20/2012 1.12.01 General 02/20/2012 1.12.02 Master Plan 02/20/2012 1.12.03 Plan and Profile 02/20/2012 1.12.04 Details 02/20/2012 1 12.05 Scale 02/20/2012 1.12.06 Complete Submittals 02/20/2012 3.01 General 02/20/2012 3.01.01 Conformance with City Policy 02/20/2012 3.01.02 Use of Natural Features 02/20/2012 3.01.03 Consideration of Soil and Flood Hazards 02/20/2012 3.01.04 Special Considerations 02/20/2012 3.01.05 Record Drawing Requirements 02/20/2012 3.02 Streets and Other Pavements 02/20/2012 3.02.01 General 02/20/2012 3.02.02 Minimum Standards for Right-of-Way Improvement 02/20/2012 3.02.03 Additional Right-of-Way and/or Pavement Width 02/20/2012 3.02.04 Access 02/20/2012 3.02.05 Paved Access to Nearest Paved Public Road 02/20/2012 3 02 06 Commercial/Industrial Driveways and Internal Circulation 02/20/2012 3.03 Easements 02/20/2012 3.04 Survey Monuments 02/20/2012 3.05 . Curbs and Gutters 02/20/2012 Oelrich Construction,Inc 1275 NW 137th Drive,Suite A,Jonesville,Florida I Office 352-745-7877 AEU! 0 Fullers Cross Road and Ocoee Apopka Road OELRICH Intersection Im I rovements CONSTRUCTION INC. Exhibit F - Construction Plan Approval Documents:Specifications SECTION# NAME DATE 3.06 Stormwater Management 02/20/2012 3.06.01 General Requirements 02/20/2012 3.06.02 Stormwater Management 02/20/2012 3.06.03 Guidelines for Berms 02/20/2012 3.07 Decorative Entrances 02/20/2012 3.08 Owner/Developer Control During Construction 02/20/2012 3.09 Erosion Control 02/20/2012 3.09.01 Stormwater Pollution Prevention Plan(SWPPP) 02/20/2012 3 09 02 Stockpiling Material 02/20/2012 3 09 03 Exposed Area Limitation 02/20/2012 3.09.04 Inlet Protection 02/20/2012 3 09 05 Temporary Seeding 02/20/2012 3.09.06 Temporary Seeding and Mulching 02/20/2012 3.09.07 Temporary Grassing 02/20/2012 3.09.08 Temporary Re-grassing 02/20/2012 3.09.09 Maintenance 02/20/2012 3.09.10 Permanent Erosion Control 02/20/2012 3.09.11 Permanent Seeding 02/20/2012 3.09.12 Permanent Seeding and Mulching 02/20/2012 3.09.13 Permanent Sodding 02/20/2012 3.09.14 Strip Sodding 02/20/2012 3.09.15 Re-grassing 02/20/2012 3.09.16 Additional Fertilization 02/20/2012 3.10 Phased Development 02/20/2012 3.11 Traffic Control During Construction 02/20/2012 3.12 Traffic Signal Pre-Emption System 02/20/2012 4.01 General 02/20/2012 4.02 Definitions 02/20/2012 4.03 Exclusions 02/20/2012 4.04 General Regulations 02/20/2012 4.05 Restoration and Management 02/20/2012 4.06 Utility Accommodation 02/20/2012 4.06.01 General 02/20/2012 4.06.02 Light and Utility Poles 02/20/2012 4.06.03 Mailboxes and Newspaper Boxes 02/20/2012 Oelrich Construction,Inc 1275 NW 137th Drive,Suite A,Jonesville,Florida I Office 352-745-7877 1111 Fullers Cross Road and Ocoee Apopka Road OELRICH Intersection Improvements CONSTRUCTION INC. Exhibit F - Construction Plan Approval Documents: Specifications SECTION# NAME DATE 4 06 04 Other Structures 02/20/2012 4 06.05 Underground Installations 02/20/2012 4.06.06 Aerial Crossings 02/20/2012 4 06 07 Excavation 02/20/2012 4.07 Inspection 02/20/2012 4.08 Operational Safety 02/20/2012 4.09 Existing Uses 02/20/2012 5 01 General Development Standards 02/20/2012 5 01 1 General 02/20/2012 5 01.2 Environmental Considerations 02/20/2012 5.02 Clearing and Grubbing • 02/20/2012 5 03 Erosion Control 02/20/2012 5.04 Dust Control • 02/20/2012 5 05 ! Surface Removal 02/20/2012 5.06 Restoration 02/20/2012 5.07 Finished Floor Elevations 02/20/2012 6.01 General 02/20/2012 6 02 Soil Borings and Subsurface Investigations 02/20/2012 6.03 Existing Utilities 02/20/2012 6.04 Materials 02/20/2012 6.04.01 General 02/20/2012 6.04.02 Structural Fill 02/20/2012 6.04.03 Common Fill 02/20/2012 6.04.04 Select Common Fill 02/20/2012 6.04 05 Bedding Rock . 02/20/2012 6.05 Sheeting and Bracing in Excavations 02/20/2012 6.05.01 General 02/20/2012 6.05.02 Miscellaneous Requirements 02/20/2012 6.06 I Dewatering,Drainage and Flotation 02/20/2012 6.06.01 General 02/20/2012 6.06 02 Additional Requirements 02/20/2012 6.07 Excavation 02/20/2012 6.07.01 General 02/20/2012 6 07 02 Excavation for Structures 02/20/2012 6.07.03 Trench Excavations 02/20/2012 Oelrich Construction,Inc 1275 NW 137th Drive,Suite A,Jonesville,Florida I Office 352-745-7877 AIM 0 Fullers Cross Road and Ocoee Apopka Road OELRICH Intersection Improvements CONSTRUCTION INC. Exhibit F - Construction Plan Approval Documents:Specifications SECTION# NAME DATE 6.08 Bedding and Backfill 02/20/2012 6 08 01 General 02/20/2012 6.08.02 Bedding and Backfill for Structures 02/20/2012 6.08.03 Bedding and Backfill for Pipes 02/20/2012 6.09 Compaction 02/20/2012 6.09.01 General 02/20/2012 6.09.02 Percentages of Maximum Density Requirements ; 02/20/2012 6.09 03 Compaction Tests 02/20/2012 6.10 Grading 02/20/2012 6.11 Maintenance 02/20/2012 6.12 Inspection and Quality Assurance 02/20/2012 6.12.01 Inspection 02/20/2012 6.12.02 Quality Assurance 02/20/2012 7.01 General 02/20/2012 7.02 Clearing and Grubbing 02/20/2012 7.03 Disposal of Unsuitable Materials 02/20/2012 8.01 General 02/20/2012 8.02 Excavation 02/20/2012 8.03 Unsuitable Material 02/20/2012 8 04 Suitable Material 02/20/2012 8.05 Disposal of Excess Material 02/20/2012 8.06 Placing Embankment 02/20/2012 8.07 Shoulders,Ditches,and Slopes 02/20/2012 9.01 Description 02/20/2012 9.02 Subbase Requirements 02/20/2012 9.03 Stabilization 02/20/2012 9.04 Construction 02/20/2012 9.05 Testing 02/20/2012 10.01 Description 02/20/2012 10.02 Use of Soil Cement Approval 02/20/2012 10.03 Design Mix 02/20/2012 10.03.01 Minimum Requirements 02/20/2012 10.03.02 Notification 02/20/2012 10.04 Materials 02/20/2012 10.04.01 Portland Cement 02/20/2012 • Oelrich Construction,Inc 1275 NW 137th Drive,Suite A,Jonesville,Florida I Office 352-745-7877 AMIE • • Fullers Cross Road and Ocoee Apopka Road OELRICH Intersection Im•rovements CONSTRUCTION INC. Exhibit F - Construction Plan Approval Documents: Specifications SECTION If NAME DATE 10.04 07 Water 02/20/2012 10.04.03 Soil 02/20/2012 10.04.04 Soil Cement Mix Types 02/20/2012 10.05 Equipment 02/20/2012 10.06 Construction Methods 02/20/2012 10.06.01 Responsibility 02/20/2012 10 06.02 Preparation 02/20/2012 10 06 03 Delivery of Materials 02/20/2012 10 06.04 Application of Water and Moist Mixing 02/20/2012 10 06 05 Compaction 02/20/2012 10.06.06 Finishing 02/20/2012 10 06 07 Surface Requirements(Scalping of Hard-Planing) 02/20/2012 10.06.08 Prime/Curing 02/20/2012 10 06 09 Construction Joints 02/20/2012 10.06.10 Thickness 02/20/2012 10.07 Opening to Traffic 02/20/2012 10.08 Maintenance 02/20/2012 10.09 Inspection 02/20/2012 11.01 General 02/20/2012 11.02 Materials 02/20/2012 11.03 Equipment 02/20/2012 11.04 Transporting Limerock 02/20/2012 11.05 Spreading Limerock 02/20/2012 11.06 Compacting and Finishing Base 02/20/2012 11.07 Prime/Curing 02/20/2012 11.08 Testing Surface 02/20/2012 11.09 Tests 02/20/2012 11.10 Deficiencies 02/20/2012 11 11 Opening to Traffic 02/20/2012 11 12 Maintenance 02/20/2012 12.01 General 02/20/2012 12.02 Materials 02/20/2012 12.02.01 Prime Coat 02/20/2012 12.02.02 Track Coat 02/20/2012 12.03 Equipment 02/20/2012 Oelrich Construction,Inc 1275 NW 137th Drive,Suite A,Jonesville,Florida I Office 352-745-7877 AM.! Fullers Cross Road and Ocoee Apopka Road OELRICH Intersection Improvements CONSTRUCTION INC. Exhibit F - Construction Plan Approval Documents:Specifications SECTION# NAME DATE 12.04 Cleaning the Base 02/20/2012 12.05 Weather Limitations 02/20/2012 1206 Application of Prime Coat 02/20/2012 12 07 Application of Tack Coat 02/20/2012 13.01 General 02/20/2012 13 02 Asphaltic Concrete Mixes 02/20/2012 1303 ' Mechanical Spreading and Screeding Equipment 02/20/2012 1304 Construction Methods 02/20/2012 13.05 Finishing Surface Requirements 02/20/2012 1306 Submittals 02/20/2012 14.01 General 02/20/2012 14 02 Subgrade Preparation 02/20/2012 14.02.01 General 02/20/2012 14.02 01 Subgrade Material 02/20/2012 14.03 Materials,Proportioning and Construction for Rigid Pavements 02/20/2012 14.03.01 Strength Required 02/20/2012 14.03 02 Slump 02/20/2012 14.04 Equipment 02/20/2012 14.04 01 Forms 02/20/2012 14.04.02 Ready Mixed Plants 02/20/2012 14.04 03 On-Site Central Mix Plants 02/20/2012 14.04 04 Paver 02/20/2012 14.05 Mixing and Placing for Rigid Pavement 02/20/2012 14.05.01 General 02/20/2012 14.05.02 Transporting Concrete 02/20/2012 14.05 03 Concrete Time Limit 02/20/2012 14.05 04 Placing Concrete 02/20/2012 14.05 05 Placing in Cold Weather 02/20/2012 14.06 Finishing 02/20/2012 14.06 01 General 02/20/2012 14.06 02 Final Surface Finish 02/20/2012 14.06 03 Pavement Exposed to Rain During Construction 02/20/2012 14.07 Curing for Rigid Pavement 02/20/2012 14.07 01 General 02/20/2012 14.07.02 Cracks 02/20/2012 Oelrich Construction,Inc 1275 NW 137th Drive,Suite A,Jonesville,Florida I Office 352-745-7877 API" Fullers Cross Road and Ocoee Apopka Road OELRICH Intersection Improvements CONSTRUCTION INC. Exhibit F - Construction Plan Approval Documents: Specifications SECTION# NAME DATE 14.08 I Joints in Rigid Pavements 02/20/2012 14 08.01 General 02/20/2012 14 08.02 Construction Joints 02/20/2012 14.08.03 Joint Sealing 02/20/2012 14.09 Final Acceptance for Rigid Pavements 02/20/2012 14.09.01 General Acceptance for Rigid Pavement 02/20/2012 14.09.02 Opening to Traffic 02/20/2012 14.09.03 Testing of Concrete 02/20/2012 15 01 General 02/20/2012 15 02 Inspections and Tests 02/20/2012 16.01 General 02/20/2012 16.02 Pipe 02/20/2012 16.02.01 Concrete Pipe 02/20/2012 16.02.02 Alternative Material Pipes 02/20/2012 16.03 Laying Pipe 02/20/2012 16.04 Backfilling 02/20/2012 16.05 Pipe Foundations 02/20/2012 16.06 Tests 02/20/2012 17.01 General 02/20/2012 17 02 Materials 02/20/2012 17.03 Foundations 02/20/2012 17.04 Forms 02/20/2012 17.05 Placing and Curing Concrete 02/20/2012 17 06 Masonry Construction 02/20/2012 17.07 Precast Inlets and Manholes 02/20/2012 17 08 Placing Pipe 02/20/2012 17.09 Flow Channels 02/20/2012 17.10 Inlet Placement 02/20/2012 17 11 Manhole Covers and Rings 02/20/2012 17.12 Diameter 02/20/2012 17.13 Access 02/20/2012 18.01 General 02/20/2012 18.02 Materials 02/20/2012 18.02 01 Filter Fabric 02/20/2012 18.02.02 Plpe Wrap 02/20/2012 Oelrich Construction,Inc 1275 NW 137th Drive,Suite A,Jonesville,Florida I Office 352-745-7877 AMIE Fullers Cross Road and Ocoee Apopka Road OELRICH Intersection Improvements CONSTRUCTION INC. Exhibit F - Construction Plan Approval Documents:Specifications SECTION# NAME DATE 18.02 03 Filter Aggregate(Fine Aggregate) 02/20/2012 18.02.04 Filter Aggregate(Other) 02/20/2012 18.02.05 Pipe 02/20/2012 18.03 Excavation Trench 02/20/2012 18.04 Placing the Filter Fabric 02/20/2012 18.05 Laying the Pipe 02/20/2012 18 06 Placing and Compacting Filter Aggregate 02/20/2012 18.07 Backfill Above Filter Aggregate 02/20/2012 18.08 Acceptance of Underdrains 02/20/2012 18.09 Acceptance of Underdrains 02/20/2012 19.01 General 02/20/2012 19 02 Materials 02/20/2012 19 03 Forms 02/20/2012 19 04 Construction Methods 02/20/2012 19.05 Joints 02/20/2012 19.06 Finishing 02/20/2012 19.06 01 Surface Requirements 02/20/2012 19.06.02 Repair of Minor Defects 02/20/2012 19.06.03 Final Finish 02/20/2012 19.07 Curing 02/20/2012 19.08 Backfill and Compaction 02/20/2012 19.09 Requirements for Machine-Laying 02/20/2012 19.10 Handicap Ramps 02/20/2012 20.01 General 02/20/2012 20.02 Materials 02/20/2012 20.02.01 General 02/20/2012 20 02.02 Concrete Mix 02/20/2012 20 02.03 Framing Materials 02/20/2012 20.02.04 Chain Link Fabric(Fences and Gates) 02/20/2012 20.02.05 Manual Operating Gates 02/20/2012 20 02.06 Accessories 02/20/2012 20.03 Installation 02/20/2012 20.04 Electrical Grounds 02/20/2012 20.05 Decorative Gates 02/20/2012 21.01 General 02/20/2012 Oelrich Construction,Inc 1275 NW 137th Drive,Suite A,Jonesville,Florida I Office 352-745-7877 Fullers Cross Road and Ocoee Apopka Road OELRICH Intersection Improvements CONSTRUCTION IN(' . Exhibit F - Construction Plan Approval Documents:Specifications SECTION# NAME DATE 21.02 Materials 02/20/2012 21.03 Construction Methods 02/20/2012 2104 Sodding 02/20/2012 21 05 Clean-Up 02/20/2012 21.06 Watering 02/20/2012 22 01 General 02/20/2012 22.02 Materials 02/20/2012 22 03 Installation 02/20/2012 22 03 01 Painted Markings 02/20/2012 22.03.02 Thermoplastic Traffic Markings 02/20/2012 22.03.03 Reflective Pavements Markers 02/20/2012 22.03 04 Striping Design 02/20/2012 23.01 Median Separation Requirements 02/20/2012 23.02 Minimum Widths 02/20/2012 23.03 Openings 02/20/2012 23.04 Special Considerations 02/20/2012 24.01 General 02/20/2012 24.02 Dedication of Additional Right-of-Way 02/20/2012 24.03 Right Turn Deceleration and Storage Lanes 02/20/2012 24.04 Acceleration Lanes and Tapers 02/20/2012 24.05 Left Turn Deceleration and Storage Lanes 02/20/2012 24.06 Alternate Storage Lengths for Left Turn Lanes 02/20/2012 24.07 Bypass Lanes 02/20/2012 24.08 Exceptions 02/20/2012 24.09 Reverse Curves 02/20/2012 25 01 General 02/20/2012 25.02 Required Submittals 02/20/2012 25.03 Design Considerations 02/20/2012 25.04 Design Specifications 02/20/2012 25.04.01 Location 02/20/2012 25 04.02 Width 02/20/2012 25.04 03 Angle 02/20/2012 25.05.04 Radii 02/20/2012 25 04 05 Grade 02/20/2012 25.04.06 Construction Specifications 02/20/2012 Oelrich Construction,Inc 1275 NW 137th Drive,Suite A,Jonesville,Florida I Office 352-745-7877 AlE1111 Fullers Cross Road and Ocoee Apopka Road OELRICH Intersection Improvements CONSTRUCTION INC. Exhibit F - Construction Plan Approval Documents:Specifications SECTION# NAME DATE 25.05 Handicap Ramps 02/20/2012 25.06 Existing Driveways and Access Points i 02/20/2012 26.01 Jack and Bore Operations 02/20/2012 26.01.01 General 02/20/2012 26 01.02 Pipe Material 02/20/2012 26.01.03 Inspection 02/20/2012 16 01.04 Other Judications 02/20/2012 26.01.05 Workmanships 02/20/2012 26 01.06 Pipe Handling 02/20/2012 26.01.07 Work Coordination 02/20/2012 26 01 08 Dewatering 02/20/2012 26.01.09 Carrier Pipe Support 02/20/2012 26.01.10 Jacking Pits 02/20/2012 26.01.11 Miscellaneous Requirements 02/20/2012 26 02 Pressure Pipe Restraint 02/20/2012 26.02 01 General 02/20/2012 26.02.02 Thrust Block Construction 02/20/2012 26.02 03 Restrained Joint Construction 02/20/2012 26.02.04 Mechanical Restraining Devices 02/20/2012 26.03 Pressure Connection 02/20/2012 26.03.01 General 02/20/2012 26.03 02 Tapping Sleeves 02/20/2012 26.03.03 Tapping Vales 02/20/2012 26.03 04 Notification and Connection to Existing Mains 02/20/2012 26.03.05 Construction Details 02/20/2012 27.01 General 02/20/2012 27.01.01 Type of Sewers 02/20/2012 27.01.02 Design Period 02/20/2012 27.01.03 Location 02/20/2012 27.01 04 Design Calculations 02/20/2012 27.02 Design Standards 02/20/2012 27.02 01 Average Daily Flow(ADF) 02/20/2012 27.02.02 Peak Flow 02/20/2012 27.03 Manholes 02/20/2012 27.03 01 General 02/20/2012 Oelrich Construction,Inc 1275 NW 137th Drive,Suite A,Jonesville,Florida I Office 352-745-7877 Fullers Cross Road and Ocoee Apopka Road OELRICH Intersection Im•rovements CONSTRUCTION INC. Exhibit F - Construction Plan Approval Documents:Specifications SECTION# NAME DATE 27.03.02 Location 02/20/2012 27 03.03 Manhole Base 02/20/2012 27 03.04 Rings and Covers 02/20/2012 7.03.05 Top Elevation 02/20/2012 27 03 06 Coating 02/20/2012 26 03 07 Joint Sealer 02/20/2012 27.03.08 Connections to Manholes 02/20/2012 27.03.09 Non-Shrink Mortar 02/20/2012 27.03.10 Stubs and Stoppers 02/20/2012 27 03 11 Bulkheading Stub Channels 02/20/2012 27.04 Service Connections 02/20/2012 27.04 01 General 02/20/2012 27.04 02 Size and Length 02/20/2012 27.04.03 Slope 02/20/2012 27.04.04 Connection 02/20/2012 27.05 Line Locations . 02/20/2012 28.01 General 02/20/2012 28.02 Design Criteria 02/20/2012 28.03 Materials 02/20/2012 28.03 01 PVC Gravity Sewer Pipe 02/20/2012 28.03.02 DIP Gravity Sewer Pipe 02/20/2012 28.03.03 Coating and Linings(Iron Pipe) 02/20/2012 28.03.04 Non-Shrink Mortar 02/20/2012 28.03.05 Sanitary Manholes 02/20/2012 28.04 Installation 02/20/2012 28 04.01 General 02/20/2012 28.04.02 Pipeline Trenching 02/20/2012 28 04.03 Sheeting,Shoring,and Bracing 02/20/2012 28.04.04 Dewatering and Drainage 02/20/2012 2804.05 Stabilization 02/20/2012 28 04.06 Bedding of Piping 02/20/2012 28.04.07 Trench Backfilling 02/20/2012 28.04.08 Pipe Laying and Jointing 02/20/2012 28 04.09 Branches 02/20/2012 28.04.10 Laterals 02/20/2012 Oelrich Construction,Inc 1275 NW 137th Drive,Suite A,Jonesville,Florida I Office 352-745-7877 Fullers Cross Road and Ocoee Apopka Road OELRICH Intersection Improvements CONSTRUCTION INC. Exhibit F - Construction Plan Approval Documents:Specifications SECTION# NAME DATE 28.04.11 Protection of Water System Crossing 02/20/2012 28 04.12 Downstream Protection 02/20/2012 28.05 Connections 02/20/2012 28.05.01 Transition Connections 02/20/2012 28.05.02 Connections to Existing Lines 02/20/2012 28.05.03 Tall Riser Connections 02/20/2012 28.05 04 Connections to Manholes 02/20/2012 28.05 05 Connections to Wet Walls 02/20/2012 28.05.06 Conflicting Structures and Protection of Sanitary Sewer at Utility Crossing 02/20/2012 28.06 Testing 02/20/2012 28.06 01 PVC Ring Deflection 02/20/2012 28.06.02 Infiltration/Exfiltration 02/20/2012 28 07 CCTV Inspections Standards 02/20/2012 28.07 01 Part 1—General 02/20/2012 28 07.01.01 Scope of Work 02/20/2012 28 07 02 Part 2—Products 02/20/2012 28.07.02.01 CCTV Inspections Equipment 02/20/2012 28.07.02.02 Gravity Mail Inspections CCTV Data 02/20/2012 28.07.03 Part 3—Execution 02/20/2012 28 07.03.01 Gravity Main Requirements Before CCTV Inspection 02/20/2012 28.07.03.02 Notification 02/20/2012 28 07.03.03 Televising of Gravity Mains 02/20/2012 28.07.03.04 CCTV QA/QC Inspection Procedures and Causes for Rejection of CCTV Work 02/20/2012 28.07.03.05 Gravity Main Inspection CCTV Report 02/20/2012 28 07.03.06 Causes for Rejection of Gravity Mains 02/20/2012 28.07.03.07 Acceptance 02/20/2012 28.08 Testing Prior to Surfacing 02/20/2012 28.08.01 General 02/20/2012 28 08.02 Test Procedure , 02/20/2012 28.09 Final Inspections 02/20/2012 28.10 Grease Interceptors 02/20/2012 28.11 Identifications 02/20/2012 29.01 General 02/20/2012 29.02 Design Criteria 02/20/2012 29.02.01 Design Period 02/20/2012 Oelrich Construction,Inc 1275 NW 137th Drive,Suite A,Jonesville,Florida I Office 352-745-7877 Fullers Cross Road and Ocoee Apopka Road OELRICH Intersection Improvements CONSTRUCTION Exhibit F - Construction Plan Approval Documents: Specifications SECTION 4 NAME DATE 29.02.02 Design Calculations 02/20/2012 29 02 03 Sanitary Sewer Collection System Hydraulic Modeling 02/20/2012 29.02.04 Velocity and Diameter 02/20/2012 29.02.05 Design Friction Losses 02/20/2012 29 02 06 Design Pressure and Restraint 02/20/2012 29 02.07 Termination 02/20/2012 29 02 08 Air Release and Vacuum Relief Valves 02/20/2012 29.02.09 Aerial Crossings 02/20/2012 29 02 10 Underwater Crossings 02/20/2012 29 02 11 Additional Requirements 02/20/2012 29.03 Materials 02/20/2012 29 03 01 PVC Pipe 02/20/2012 29.03.02 PVC Joints 02/20/2012 29.03 03 Fittings for PVC Pipe 02/20/2012 29.03 04 Ductile Iron Pipe 02/20/2012 29.03 05 Fittings 02/20/2012 29.03.06 Joints for DIP 02/20/2012 29.03.07 Coatings and Linings for DIP 02/20/2012 29.03.08 Polyethylene Encasement 02/20/2012 29.03 09 Directional Drill/HOPE 02/20/2012 29.04 Valves 02/20/2012 29.04.01 Plug Valves 02/20/2012 29.04.02 Check Valves 02/20/2012 29.04 03 Air Release Valves 02/20/2012 29.04.04 Tapping Sleeves and Valves 02/20/2012 29.04.05 Valve Boxes 02/20/2012 29.05 Installation 02/20/2012 29.05.01 General 02/20/2012 29.05.02 Pipe Laying 02/20/2012 29.05.03 Push-on Joints 02/20/2012 29 05.04 Mechanical Joints 02/20/2012 29 05.05 Flange Joints 02/20/2012 29.05.06 Connections at Structures 02/20/2012 29 05.07 Pipe Cutting 02/20/2012 29.05.08 Pipe Restraint 02/20/2012 Oelrich Construction,Inc 1275 NW 137th Drive,Suite A,Jonesville,Florida I Office 352-745-7877 Fullers Cross Road and Ocoee Apopka Road OELRICH Intersection Improvements CONSTRUCTION INC. Exhibit F - Construction Plan Approval Documents:Specifications SECTION# NAME DATE 29.05.09 Polyethylene Encasement 02/20/2012 29.05.10 Aboveground Pipe Support 02/20/2012 29.05.11 Connections 02/20/2012 29.05.12 Valve Installation 02/20/2012 29.05.13 Valve Boxes 02/20/2012 29.05.14 Air and Vacuum Valves 02/20/2012 29.05.15 Terminal Discharge 02/20/2012 29.06 Identification 02/20/2012 29.07 Cross Connection Control 02/20/2012 29.08 Hydrostatic Testing 02/20/2012 30.01 General 02/20/2012 30.02 Lift Station Standards and This Article 02/20/2012 30.03 Site 02/20/2012 30.04 Buoyancy 02/20/2012 30.05 Excavation and Backfill 02/20/2012 30.06 Grading 02/20/2012 30.07 Handling 02/20/2012 30.08 Wet Wells 02/20/2012 30.09 Pipe,Valves and Fittings 02/20/2012 30 09 01 General 02/20/2012 30.09.02 Pipe Material 02/20/2012 30.10 Pumps 02/20/2012 30.10.01 General 02/20/2012 30.10.02 Installation 02/20/2012 30.10.03 Pump Warranty 02/20/2012 30.11 Motors 02/20/2012 30.11.01 General Requirements 02/20/2012 30.11.02 Heat Sensors 02/20/2012 30.11.03 Cables 02/20/2012 30.12 Shop painting 02/20/2012 30.13 Telemetry Systems 02/20/2012 30.14 Electrical Power and Control System 02/20/2012 30.14.01 General 02/20/2012 30.14.02 Control Panel 02/20/2012 30.14.03 Pump Alternator 02/20/2012 Oelrich Construction,Inc 1275 NW 137th Drive,Suite A,Jonesville,Florida I Office 352-745-7877 ALI• Fullers Cross Road and Ocoee Apopka Road OELRICH Intersection Improvements CONSTRUCTION INC. Exhibit F — Construction Plan Approval Documents:Specifications SECTION# NAME DATE 30.14.04 Motor Starter and Selector Switches 02/20/2012 30 14.05 Motor Circuit Protectors 02/20/2012 30.14.06 Power Supply and Main Disconnect 02/20/2012 30 14.07 Circuit Breakers 02/20/2012 3014.08 Emergency Power Receptacle 02/20/2012 30.14.09 Wiring 02/20/2012 30.14.10 Terminal Points 02/20/2012 30.14.11 Engraved Nameplates 02/20/2012 30 14 12 Surge Protector 02/20/2012 30 14 13 Elapsed Time Meters 02/20/2012 30.14.14 Convenience Receptacle 02/20/2012 30 14 15 Control Terminal Blocks 02/20/2012 30.14.16 Control Power Transformers 02/20/2012 30.14.17 Control Relay 02/20/2012 30.14 18 Electrical Schematic 02/20/2012 30.14 19 Phase Monitor 02/20/2012 30.14.20 Battery Backup 02/20/2012 30.14 21 Operation 02/20/2012 30.14.22 Housing 02/20/2012 30.14 23 Testing and Warranty 02/20/2012 30.15 Lights and Alarms 02/20/2012 30.15.01 Indicator Lights 02/20/2012 30.15.02 High Level Alarm 02/20/2012 30.16 Electrical Grounding System 02/20/2012 30.16.01 General 02/20/2012 3016.02 Material and Installation 02/20/2012 30.17 Standby Power Generator System 02/20/2012 30.17.01 General 02/20/2012 30.17.02 Generator Set General 02/20/2012 3017.03 Requirements 02/20/2012 3017.04 Tests 02/20/2012 3017.05 Ratings 02/20/2012 30.17.06 Engine 02/20/2012 30 17.07 Generator 02/20/2012 30.17.08 Engine Generator Control Panel 02/20/2012 Oelrich Construction,Inc 1275 NW 137th Drive,Suite A,Jonesville,Florida I Office 352-745-7877 AIME Fullers Cross Road and Ocoee Apopka Road OELRICH Tntcrscction Improvements CONSTRUCTION INC. Exhibit F - Construction Plan Approval Documents:Specifications SECTION# NAME DATE 30.17.09 Battery Charger 02/20/2012 30.17.10 Battery 02/20/2012 3017.11 Base and Mounting 02/20/2012 30 17.12 Utility Connections 02/20/2012 30.17.13 Cooling System 02/20/2012 30 17.14 Fuel System 02/20/2012 30.17.15 Exhaust System 02/20/2012 30.17.16 Weatherproof Enclosure 02/20/2012 30.17 17 Automatic Transfer Switch 02/20/2012 30.17 18 Warranty 02/20/2012 30.18 Fencing 02/20/2012 30.19 Tools and Spare Parts 02/20/2012 30.20 Pump Station Water System 02/20/2012 30.21 Inspection and Testing 02/20/2012 30.22 Lift Station Services 02/20/2012 30.23 Required Submittals 02/20/2012 30.24 Minor Lift Station 02/20/2012 31 01 General Consideration 02/20/2012 31.01.01 Type of Water Mains 02/20/2012 31.01.02 Design Period 02/20/2012 31.01.03 Location 02/20/2012 31.02 Design Basis 02/20/2012 31.02.01 Average Daily Flow and Peak Flow 02/20/2012 31 02.02 Fire Flow Requirements 02/20/2012 31.02.03 Design Calculations 02/20/2012 31 02.04 Potable Water System Hydraulic Modeling 02/20/2012 31.03 Details of Design and Construction 02/20/2012 31 03.01 Pressure 02/20/2012 31.03.02 Diameter 02/20/2012 31 03.03 Dead Ends 02/20/2012 31.03.04 Valves 02/20/2012 31 03.05 Air Relief Valves 02/20/2012 31.03.06 Fire Hydrants 02/20/2012 31 03.07 Chamber Drainage 02/20/2012 31.03.08 Disinfection Following Repair or Replacement 02/20/2012 Oelrich Construction,Inc 1275 NW 137th Drive,Suite A,Jonesville,Florida I Office 352-745-7877 1.11 • Fullers Cross Road and Ocoee Apopka Road OELRICH Intersection Improvements CONSTRUCTION INC. Exhibit F - Construction Plan Approval Documents: Specifications SECTION# NAME DATE 31.04 Water Metering 02/20/2012 31 04 01 General 02/20/2012 31 04 02 Single Family,Duplex,and Multi-Family Subdivisions 02/20/2012 31.04.03 Commercial,Industrial,and Institutional Projects 02/20/2012 31.04.04 Shopping Centers 02/20/2012 31 04 05 Meter Installation 02/20/2012 31.04.06 Meter Sizing ' 02/20/2012 31 05 Water Services and Connections 02/20/2012 31.06 Service Pipe,Stops,Fittings,and Services Saddles 02/20/2012 31.06 01 Service Pipe 02/20/2012 31.06.02 Stops 02/20/2012 31.06.03 Fittings 02/20/2012 31.06.04 Service Saddles 02/20/2012 31.07 Water Main Materials 02/20/2012 31.07.01 General 02/20/2012 31 07.02 Ductile Iron Pipe 02/20/2012 31.07.03 Fittings 02/20/2012 3107.04 Joints 02/20/2012 31.07.05 Coatings and Linings 02/20/2012 31.07.06 Polyethylene Encasement 02/20/2012 31.07.07 Resilient Seat Gate Valves 02/20/2012 3107.08 Butterfly Valves 02/20/2012 31.07.09 Valve Boxes 02/20/2012 31.07.10 Air Release Valves 02/20/2012 31.08 Water Main Installation 02/20/2012 3108.01 General 02/20/2012 31 08.02 Pipe Handling 02/20/2012 31 09 Valve Installation 02/20/2012 31.10 Identification 02/20/2012 31.11 Separation of Water Mains and Sewers 02/20/2012 31.11.01 General 02/20/2012 31.11 02 Horizontal Separation 02/20/2012 31.1103 Vertical Separation 02/20/2012 31.1104 Crossing of Water Mains and Sewers 02/20/2012 31.12 Trench Preparation and Pipe Bedding 02/20/2012 Oelrich Construction,Inc 1275 NW 137th Drive,Suite A,Jonesville,Florida I Office 352-745-7877 AMIN Fullers Cross Road and Ocoee Apopka Road OELRICH Intersection Improvements CONSTRUCTION INC. Exhibit F - Construction Plan Approval Documents:Specifications SECTION# NAME DATE 31.12.01 Trench Preparation and Pipe Bedding 02/20/2012 31.12 02 Pipe Preparation,Handling and Laying 02/20/2012 31.12.03 Trench Dewatering and Drainage Control 02/20/2012 31.12.04 Survey Line and Grade 02/20/2012 31.12.05 Laying of Pipes on Curves 02/20/2012 31 12.06 Pipe Restraining and Thrust Block 02/20/2012 31.12.07 Bedding and Backfill for Pipes 02/20/2012 31 13 Hydrostatic Tests 02/20/2012 31.13.01 General 02/20/2012 31.13.02 Testing Criteria 02/20/2012 31.13.03 Procedure for Pressure Test 02/20/2012 31.13 04 Procedure for Leakage Test 02/20/2012 31.14 Disinfection of Water Mains 02/20/2012 31.14.01 General 02/20/2012 31.14.02 Flushing 02/20/2012 31.14.03 Disinfection Criteria 02/20/2012 31.14.04 Form of Applied Chlorine 02/20/2012 31.14.05 Point of Application 02/20/2012 31.14.06 Chlorinating Valves and Hydrants 02/20/2012 31 14.07 Operation of City Valves 02/20/2012 31.14.08 Retention Period 02/20/2012 31.14.09 Final Flushing and Testing 02/20/2012 31.14.10 Repetition of Flushing and Testing 02/20/2012 31 15 Fire Hydrants 02/20/2012 31.15.01 Material 02/20/2012 31.15 02 Painting 02/20/2012 31.15.03 Construction Details 02/20/2012 31.15.04 Location and Spacing 02/20/2012 31.16 Cross Connection Control 02/20/2012 32 01 General Considerations 02/20/2012 32.01.01 Types of Reclaim Water Supply Mains 02/20/2012 32.01 02 Design Period 02/20/2012 32 01 03 Location 02/20/2012 32 02 Design Basis 02/20/2012 32 02 01 Average Daily Flow and Peak Flow 02/20/2012 Oelrich Construction,Inc 1275 NW 137th Drive,Suite A,Jonesville,Florida I Office 352-745-7877 Fullers Cross Road and Ocoee Apopka Road OELRICH Intersection Improvements CONSTRUCTION INC. Exhibit F — Construction Plan Approval Documents:Specifications SECTION# NAME DATE 32.02 02 Reclaim System Hydraulic Modeling • 02/20/2012 32 03 Details of Design and Construction 02/20/2012 32.03 01 Pressure 02/20/2012 32 03 02 Diameter 02/20/2012 32.03 03 Dead Ends 02/20/2012 32.03.04 Valves 02/20/2012 32.03.05 Air Relief Valves 02/20/2012 32.03.06 Chamber Drainage 02/20/2012 32 04 Reclaim Metering 02/20/2012 32 04 01 General 02/20/2012 32.04.02 Single Family,Duplex,and Multi-Family Subdivisions 02/20/2012 32.04 03 Commercial,Industrial,and Institutional Projects 02/20/2012 32.04.04 Shopping Centers 02/20/2012 32.04.05 Meter Installation 02/20/2012 32.04.06 Meter Sizing 02/20/2012 32 05 Reclaim Services and Connections 02/20/2012 32.06 Service Pipes,Stops,Fittings,and Service Saddles 02/20/2012 32.06.01 Service Pipes 02/20/2012 32.06.02 Stops 02/20/2012 32.06 03 Fittings 02/20/2012 32.06 04 Service Saddles 02/20/2012 37.07 Reclaim Main Materials 02/20/2012 32.07.01 General 02/20/2012 32.07.02 Pipe Material 02/20/2012 32.07.03 Fittings 02/20/2012 32.07.04 Joints 02/20/2012 32.07.05 Resilient Seat Gate Valves 02/20/2012 32.07.06 Valve Boxes 02/20/2012 32.07.07 Air Release Valves 02/20/2012 32.08 Reclaim Main Installation 02/20/2012 32.08.01 General 02/20/2012 32.08.02 Pipe Storage and Staging 02/20/2012 32.09 Valve Installation 02/20/2012 32.10 Identification 02/20/2012 32.11 Separation of Water Mains and Sewers 02/20/2012 Oelrich Construction,Inc 1275 NW 137th Drive,Suite A,Jonesville,Florida I Office 352-745-7877 AMIE Fullers Cross Road and Ocoee Apopka Road OELRICH Intersection Improvements CONSTRUCTION INC, Exhibit F - Construction Plan Approval Documents:Specifications SECTION# NAME DATE 32.11.01 General 02/20/2012 32.12 Trench Preparation and Pipe Bedding 02/20/2012 32 12.0 Trench Preparation and Pipe Bedding 02/20/2012 32.12.02 Pipe Preparation,Handling and Laying 02/20/2012 32 12.03 Trench Dewatering and Drainage Control 02/20/2012 32.12.04 32.12.04 02/20/2012 32.12.05 Laying of Pipes on Curves 02/20/2012 32.12.06 Pipe Restraining and Thrust Block 02/20/2012 32 12.07 Bedding and Backfill for Pipes 02/20/2012 32.13 Hydrostatic Tests 02/20/2012 32.13 01 General 02/20/2012 32.13.02 Testing Criteria 02/20/2012 32.13.03 Procedure for Pressure Test 02/20/2012 32.13.04 Procedure for Leakage Test 02/20/2012 34.14 Final Flushing and Testing 02/20/2012 32.14 01 Pigging/Swabbing Procedures 02/20/2012 32.15 System Blowoffs and Supply Hydrant 02/20/2012 32.15.01 Spacing 02/20/2012 33.01 General Considerations 02/20/2012 33.01.01 Type of Horizontal Installation 02/20/2012 33.02 Design Basis 02/20/2012 33.02.01 General 02/20/2012 33.02.02 Location 02/20/2012 33.03 Details of Design and Construction 02/20/2012 33.03.01 General 02/20/2012 33.03.02 Scope of Work 02/20/2012 33.03.03 Quality Assurance 02/20/2012 33.04 Products 02/20/2012 33.04.01 General 02/20/2012 33.04 02 Drilling System 02/20/2012 33.04.03 Pipe 02/20/2012 33.04.04 Drilling Fluids 02/20/2012 33.05 Execution 02/20/2012 33.05.01 Personnel Requirements 02/20/2012 33.05 02 Work Plan 02/20/2012 Oelrich Construction,Inc 1275 NW 137th Drive,Suite A,lonesville,Florida I Office 352-745-7877 -® AIII Fullers Cross Road and Ocoee Apopka Road OELRICH Intersection Improvements CONSTRUCTION INC. Exhibit F - Construction Plan Approval Documents: Specifications SECTION# NAME DATE 33.05.03 Coordination of the Work 2/20/2012 33.05.04 Procedure 2/20/2012 33.05.05 Installation 2/20/2012 33.05.06 Field Testing 2/20/2012 34.01 General 2/20/2012 34.02 Design Standards 2/20/2012 34.03 Design Storm(minimum) 2/20/2012 34.04 Drainage Area Geometry 2/20/2012 34.05 Material and Design Specifications 2/20/2012 34 06 Flood Prone Areas 2/20/2012 Oelrich Construction,Inc 1275 NW 137th Drive,Suite A,Jonesville,Florida I Office 352-745-7877 AIME ' _�`'"•✓ lei .1. . A . .. i---- • ,, .. , . . i . .',./.....„:_,,,y ,./ ,, /.. . . 6 . ' . ' -':------------H--------- 1 1 -----,..,5 352.745.7877 OELRICHCONSTRUCTION.COM 0 © © 275 NW 137th Drive,Ste A Jonesville, FL 32669