Loading...
HomeMy WebLinkAboutItem 09 Approval of RFQ #1705 Engineering Design Services Downtown Streetscape with CPH, Inc., Change Order Nos. 3 & 4. ocoee florida AGENDA ITEM COVER SHEET Meeting Date: September 15, 2020 Item # Reviewed By: Contact Name: Stephen C. Krug Department Director: Contact Number: 6002 City Manager: Subject: Engineering Design Services Downtown Streetscape RFQ #17 5 with CPH, Inc., Change Order Nos. 3 & 4. Commissioner Wilsen, District 2. Background Summary: The Engineering Design Services for the Commission approved Downtown Streets were awarded to CPH, Inc., under RFQ #1705. In coordinating the concurrent design projects for West Oakland Avenue, the Downtown Master.Stormwater Park, the new City Hall campus, Bill Breeze Park and East Oakland Avenue, revisions were required to the designs while in progress. The revisions are divided into two (2) Change Orders for the separate portions of Oakland Avenue in order to simplify the tracking of the additional work. Change Order No. 3, West Oakland.Ave., incorporates a baffle box design which eliminated the need for a temporary pond site and any associated property acquisition. The baffle box will also provide additional long-term stormwater treatment for drainage entering the Stormwater Park. The plans were separated into two elements to allow the construction of the new City Hall project to proceed as scheduled independent of the West Oakland streetscape improvements and the Stormwater Park. Change Order No. 4, East Oakland Ave., incorporates revisions to allow the Lakewood and East Oakland portions:to proceed to construction which will complete the southern improvements to Bill Breeze park and provide the stormwater treatment,for the completed City Hall campus improvements. McKey St. will be advertised for construction at a time concurrent with the. new City Hall site improvements in order to have simultaneous completion dates. McKey St. will be the major construction access point for the new City Hall. Public Works negotiated the total fees for this work at $67,680.00. Public Works recommends approval of the work with CPH, Inc. Issue: Request the City Commission to approve Change Order Nos. 3 & 4 for the Engineering Design Services RFQ # 1705 with CPH, Inc. Recommendations: Recommend the City Commission approve Change Order Nos. 3 & 4 to the Engineering Design Services for the Downtown Streets Redevelopment plan with CPH, Inc., under RFQ # 1705, for the total not to exceed cost of $67,680.00 as funded in the Stormwater Division's Capital Outlay budget. Also recommend the City Manager and staff be authorized to approve change orders to this contract up to. the limit of his purchasing authority for each change order, and up to the budgeted amount for this project for all change orders. Attachments: CPH Change Order No. 3, RFQ #1705. CPH Change Order No. 4, RFQ #1705. Financial Impact: The cost of the Design work is adequately funded in the Stormwater Division's Capital Outlay budget. Type of Item: (please mark with an "x") Public Hearing For Clerk's Dept Use: Ordinance First Reading X Consent Agenda Ordinance Second Reading 0 Public Hearing Resolution Regular Agenda X Commission Approval Discussion& Direction Original Document/Contract Attached for Execution by City Clerk Original Document/Contract Held by Department for Execution Reviewed by City Attorney N/A Reviewed by Finance Dept. N/A. Review ed by ( ) N/A 2 ocoee florida CITY OF OCOEE 150 North Lakeshore Drive Ocoee,Florida 34761 DOWNTOWN STREETSCAPE RFQ#1705 CHANGE ORDER NO. 3 DATE:_September 1,2020 PURCHASE ORDER:_1426537 The following changes are hereby made to the CONTRACT DOCUMENTS. Original CONTRACT PRICE $615,477.56 Current CONTRACT PRICE ADJUS 1'hD by previous CHANGE ORDERS $763,975.56 Net Increase(Decrease)Resulting from this CHANGE ORDER $43,400.00 The current CONTRACT PRICE including this CHANGE ORDER $807,375.56 Original CONTRACT COMPLETION DATE: N/A Current CONTRACT COMPLETION DA1'h adjusted by previous CHANGE ORDERS N/A Net Increase Resulting from this CHANGE ORDER N/A Current CONTRACT COMPLETION DA FE,including this CHANGE ORDER N/A 1 CHANGES ORDERED: I. REQUIRED CHANGES Roadway design for the portion of Oakland Avenue between Taylor Street to Bluford Avenue: • Separation of the original W. Oakland Ave. set into two plan sets: one for the drainage improvements to accommodate the future City Hall campus and for the remainder of the streetscape improvements. • Redesign of the stoiniwater system to utilize a baffle box treatment system in place of a temporary pond. • Redesign of the stormwater system to address Downtown Master Stormwater Park plan revisions and City Hall campus. • Additional permitting for the revised plan sets for West Oakland Ave. II. JUSTIFICATION In coordinating the concurrent design projects for West Oakland Ave, the Downtown Master Stormwater Park and the new City Hall campus, revisions were required to the work covered under RFQ #1705 with CPH. The addition of the baffle box design eliminated the need for a temporary pond site and any associated property acquisition. The baffle box will also provide additional long-term stormwater treatment for drainage entering the Stormwater Park. Separating the plans into two elements allows the construction of the new City Hall project to proceed as scheduled independent of the West Oakland streetscape improvements and the Stormwater Park. III. NARRATIVE OF NEGOTIATIONS Public Works negotiated with the Engineer to the amount submitted. IV. PAYMENT Funding for the work will be through the Stormwater Division's Capital Outlay budget. V. APPROVAL AND CHANGE AUTHORIZATION This proposed change to the Contract requires approval by the Ocoee City Commission or the City Manager, dependent upon project approval authority, in order to supplement the project budget to fund the changes. It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original contract other than matters expressly provided herein. CONTRACTOR acknowledges, by its execution and acceptance of this Change Order, that the adjustments in Contract Price and Time shown hereon constitute full and complete compensation and satisfaction for all costs and modifications of performance time incurred by the CONTRACTOR as a result of this Change Order. No other claim for increased costs of performance or modifications of time will be granted by the OWNER for the Work covered by this Change Order. The CONTRACTOR hereby waives and releases any further claims for cost or time against the OWNER arising from or relating to the matters or Work set forth or contemplated by this Change Order. 2 RECOMMENDED BY: ACCEPTED BY: CITY OF OCOEE, FLORIDA CPH By: Il izi 1 By: Si nature Signature g ture / Date: C3/2/2-b�0 Date: 9//2.P Title: CE7-y liVCidet- Title: S2 /Ytce�a,,/ia APPROVED BY: CITY OF OCOEE, FLORIDA By: / / Date: 9— Z Z0 StephenUC.Krug,Pull c Works Director By \d O Date: 1_44:70 Rebecca Roberts,Director of Finance By: Date: Robert D. Frank, City Manager By: Date: Rusty Johnson, Mayor Attest: City Clerk FOR USE AND RELIANCE ONLY BY THE APPROVED BY THE CITY OF OCOEE CITY OF OCOEE,APPROVED AS TO FORM COMMISSION IN A MEETING HELD ON AND LEGALITY THIS DAY OF ,20_UNDER ,20_ AGENDA ITEM NO. By: City Attorney 3 CITY OF OCOEE DOWNTOWN STREETSCAPE (OAKLAND AVE, TAYLOR ST, McKEY ST, AND KISSIMMEE AVE) FINAL DESIGN SCOPE OF SERVICES Additional Services No. 2A CPH understands the CITY is planning a number of improvements to the downtown area, including the City Hall site, Bill Breeze Park improvements, the waterfront improvements, and Stormwater Master Plan. Due to the nature of these improvements, the CITY has asked CPH to prepare a scope for the following additional tasks: TASK 1 — PROJECT ADMINISTRATION CPH will provide general project management, including, but not limited to communication and coordination with the CITY and their other consultants, preparing project billing, preparing invoice report, and tracking project budget and schedule, and attend general project meetings. Primarily this includes coordination with GAI, Inc. to maintain a cohesive design integration of the proposed streetscape improvements with the Downtown Stormwater Master Pond design. TASK 3—DESIGN SERVICES 3.1 —Roadway Design Services CPH will prepare Plan Revisions for: • Separation of the original W. Oakland Ave. set into two plans sets: one for the drainage improvements only and one for the remainder of the streetscape improvements. • Redesign of the stormwater system on W. Oakland Ave. to utilize a baffle box instead of a temporary pond. • Redesign of W. Oakland Ave. stormwater system to address Downtown Stormwater Pond plan revisions and the City Hall outfall. • Additional permitting for the revised plans sets for Oakland Avenue. This work effort includes the separation of the W. Oakland Ave. plan set into two sets: one for the drainage improvements only from Bluford Ave. to the existing culvert crossing beneath Cumberland Ave and another set for the remainder of the improvements. This separation requires re-work of the drainage system so that it will function with the existing outfall at the Cumberland Ave. culvert crossing, as well as the proposed outfall in the Downtown Stormwater Pond. Additional re-work was needed to remove the originally proposed temporary pond and replace it with a baffle box in order to obtain the SJRWMD permit for the project so that it could be constructed prior to the Downtown Stormwater Pond. Based on the CITY's review of each submittal phase, CPH will address comments, and move forward with preparing the subsequent submittal. If significant revisions to the plans are requested resulting in the estimated Staff-Hours to be exceeded, requested revisions will be addressed as additional services. SERVICES NOT INCLUDED The following services are not provided as part of this Scope of Services and will require an amendment if requested: 1. Post Design Services 2. Construction Engineering and Inspection Services 3. Right-of-Way or Easement acquisition services 4. Permits or authorization not specifically mentioned in this Scope of Services 5. Any other issues not specifically described in this proposal COMPENSATION Labor CONSULTANT will perform the Scope of Services contained in this Agreement as identified on each task on a lump-sum basis, as identified in the corresponding task of the Scope of Services. The following is the breakdown of fees for each task. W. OAKLAND AVE. & CUMBERLAND AVE. —Splitting out storm sewer into separate sets, baffle box design coordination, and GAI coordination for Master Stormwater Pond Task Task Description Billing Method Fee 1.0 Project Administration Lump Sum $7,600.00 3.1 Roadway Design Services Lump Sum $35,800.00 W. OAKLAND AVE. &CUMBERLAND AVE. TOTAL Lump Sum $43,400.00 It is understood that fees for the subject project, including but not limited to, application fees, impact fees, above ground utility relocation design fees, utility connection fees, review fees, etc., will be paid directly by the CITY. CONSULTANT will submit invoices on a monthly basis to the CITY for payment. Lump Sum tasks will be billed as percent complete. In addition to the labor compensation outlined above, CPH shall be reimbursed directly for project specific expenditures such as, but not limited to travel, printing and reprographics, meals, postage, and phone usage. Reimbursable expenses will be billed at their actual cost, without increase. • City of Ocoee-Downtown Streetscape Final Design Phase O!Ii,INC.. W.OAKLAND AVE.&CUMBERLAND AVE.-splitting out the storm sewer into Its own se, baffle box design coordination,GAl coordination for Master stormwaterPond Sr.Project Manager Professional Engineer Project Engineer Design Technician Administrative Reimbursable TOTALS $ 150.00 $ 130.00 $ 115.00 $ 95.00 $ MOOExpenses UT..j..'�f TOTAL 11 {aUri Eakir./.SSVCi lnaaM/�(TI f, Yam, �� t�� EXTENDED EXTENDED EXTENDED EXTENDED MAN EXTENDED MAN TASK COST ate MAN HOURS COST MAN HOURS COST MAN HOURS COST MAN HOURS COST HOURS COST COST HOURS 1.0 Project Administration 56 $ 7,600.00 16 $ 2,400.00 40 $ 5,200.00 $ - $ - $ - 56$ 7,600.00 3.1 Roadway Design 332 $ 35,800.00 16 $ 2,400.00 60 $ 7,800.00 80 $ 9,200.00 160 $ 15,200.00 16 $ 1,200.00 332$ 35,800.00 . 388 $ 43,400.00 32$ 4,000.00 100 $ 13,000.00 80$ 9,200.00 160$ 15,200.0D 16 $ 1,200.00 $ - 388 $ 43,400.00 ocoee florida CITY OF OCOEE 150 North Lakeshore Drive Ocoee,Florida 34761 DOWNTOWN STREETSCAPE RFQ#1705 CHANGE ORDER NO. 4 DATE:_September 1,2020 PURCHASE ORDER:_1426537 The following changes are hereby made to the CONTRACT DOCUMENTS. Original CONTRACT PRICE $615,477.56 Current CONTRACT PRICE ADJUSTED by previous CHANGE ORDERS $807,375.56 Net Increase (Decrease) Resulting from this CHANGE ORDER $24,280.00 The current CONTRACT PRICE including this CHANGE ORDER $831,655.56 Original CONTRACT COMPLETION DATE: N/A Current CONTRACT COMPLETION DATE adjusted by previous CHANGE ORDERS N/A Net Increase Resulting from this CHANGE ORDER N/A Current CONTRACT COMPLETION DA IE including this CHANGE ORDER N/A 1 CHANGES ORDERED: I. REQUIRED CHANGES Roadway design for the portions of Oakland Avenue between Lakewood Avenue and Lakeshore Drive, Lakewood Avenue between McKey Street and East Oakland Avenue, and McKey Street between Bluford Avenue and Lakewood Avenue: • Separation of the original McKey Street/Lakewood Avenue/East Oakland Avenue set into two plan sets: one for McKey St. only and one for Lakewood Ave./E. Oakland Ave. • Additional petntitting for the revised plan sets. II. JUSTIFICATION In coordinating the concurrent design projects for East Oakland Ave, the new City Hall campus and the Bill Breeze Park improvements, revisions were required to the work covered under RFQ #1705 with CPH. The revisions allow the Lakewood and East Oakland portions to proceed to construction which provide the southern improvements to Bill Breeze park and the stormwater treatment for the completed City Hall campus improvements. McKey St. will be advertised for construction at a time concurrent with the new City Hall site improvements in order to have simultaneous completion dates. McKey St. will be the major construction access point for the new City Hall. III. NARRATIVE OF NEGOTIATIONS Public Works negotiated with the Engineer to the amount submitted. IV. PAYMENT Funding for the work will be through the Stormwater Division's Capital Outlay budget. V. APPROVAL AND CHANGE AUTHORIZATION This proposed change to the Contract requires approval by the Ocoee City Commission or the City Manager, dependent upon project approval authority, in order to supplement the project budget to fund the changes. It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original contract other than matters expressly provided herein. CONTRACTOR acknowledges, by its execution and acceptance of this Change Order, that the adjustments in Contract Price and Time shown hereon constitute full and complete compensation and satisfaction for all costs and modifications of performance time incurred by the CONTRACTOR as a result of this Change Order. No other claim for increased costs of perfonnance or modifications of time will be granted by the OWNER for the Work covered by this Change Order. The CONTRACTOR hereby waives and releases any further claims for cost or time against the OWNER arising from or relating to the matters or Work set forth or contemplated by this Change Order. 2 RECOMMENDED BY: ACCEPTED BY: CITY OF OCOEE, FLORID CPH By: /-12e By: Signature Signature Date: 9/ /2- ® Date: 9 f z0Z-1" Title: ( 7V //A _ 2 Title: ,.5 !ie ei te,,�fia APPROVED BY: CITY OF OCOEE, F ORIDA By: • i Date: Z--e)Zc� Stephen i Krug,Public orks Director By e o t aQ 6,/, Date: Qt i.ti‘Zito Rebecca Roberts,Director of Finance By: Date: Robert D.Frank, City Manager By: Date: Rusty Johnson, Mayor Attest: City Clerk FOR USE AND RELIANCE ONLY BY THE APPROVED BY THE CITY OF OCOEE CITY OF OCOEE,APPROVED AS TO FORM COMMISSION IN A MEETING HELD ON AND LEGALITY THIS DAY OF ,20_UNDER ,20_ AGENDA ITEM NO. By: City Attorney 3 CITY OF OCOEE DOWNTOWN STREETSCAPE (OAKLAND AVE, TAYLOR ST, McKEY ST, AND KISSIMMEE AVE) FINAL DESIGN SCOPE OF SERVICES Additional Services No. 2B CPH understands the CITY is planning a number of improvements to the downtown area, including the City Hall site, Bill Breeze Park improvements, the waterfront improvements, and Stormwater Master Plan. Due to the nature of these improvements, the CITY has asked CPH to prepare a scope for the following additional tasks: TASK 1 — PROJECT ADMINISTRATION CPH will provide general project management, including, but not limited to communication and coordination with the CITY and their other consultants, preparing project billing, preparing invoice report, and tracking project budget and schedule, and attend general project meetings. Primarily this includes coordination with other firms to maintain a cohesive design integration of the proposed streetscape improvements with the City Hall improvements. TASK 3—DESIGN SERVICES 3.1 —Roadway Design Services CPH will prepare Plan Revisions for: • Separation of the original McKey Street/Lakewood Ave./E. Oakland Ave. plan set into two plan sets: one for McKey St. only and One for Lakewood Ave./E. Oakland Ave. • Additional permitting for the revised plans sets McKey Street and Lakewood Avenue/E. Oakland Avenue. This work includes the separation of the plans for McKey Street into two separate plan sets, as described above. This separation requires re-work of both the proposed grading and drainage systems at the intersection of McKey Street and Lakewood Ave., in order that the proposed improvements on Lakewood Ave. would continue to function properly even if the McKey Street improvements had not yet been built. Additional permitting will be required for the separate set of plans as they will be advertised separately from the original project. Based on the CITY's review of each submittal phase, CPH will address comments, and move forward with preparing the subsequent submittal. If significant revisions to the plans are requested resulting in the estimated Staff-Hours to be exceeded, requested revisions will be addressed as additional services. SERVICES NOT INCLUDED The following services are not provided as part of this Scope of Services and will require an amendment if requested: 1. Post Design Services 2. Construction Engineering and Inspection Services 3. Right-of-Way or Easement acquisition services 4. Permits or authorization not specifically mentioned in this Scope of Services 5. Any other issues not specifically described in this proposal COMPENSATION Labor CONSULTANT will perform the Scope of Services contained in this Agreement as identified on each task on a lump-sum basis, as identified in the corresponding task of the Scope of Services. The following is the breakdown of fees for each task. MCKEY ST., LAKEWOOD AVE., & E. OAKLAND AVE.—Splitting out plans into two sets, baffle box design coordination Task Task Description Billing Method Fee 1.0 Project Administration Lump Sum $4,920.00 3.1 Roadway Design Services Lump Sum $19,360.00 MCKEY ST. TOTAL Lump Sum $24,280.00 It is understood that fees for the subject project, including but not limited to, application fees, impact fees, above ground utility relocation design fees, utility connection fees, review fees, etc., will be paid directly by the CITY. CONSULTANT will submit invoices on a monthly basis to the CITY for payment. Lump Sum tasks will be billed as percent complete. In addition to the labor compensation outlined above, CPH shall be reimbursed directly for project specific expenditures such as, but not limited to travel, printing and reprographics, meals, postage, and phone usage. Reimbursable expenses will be billed at their actual cost, without increase. • • • • City of Ocoee-Downtown Streetscape Final Design Phase _ _ - -- - - _ _ CPH INC, MCKEYST.,LAKEWOOD AVE,&E.OAKIAND AVE.-splitting set Into two sets,baffle boo design coordination Sr.Project Manager Professional Engineer Project Engineer Design Technician Administrative Re TOTALS p� $ 150.00 $ 130.00 $ 115.00 $ 95.00 $ 75.00 Expenses - — q��!;, ^ 'N'+r TOTAL . .}P8 a.z,t` t '°'µ' ,}AS AN'! Ta} �` EXTENDED EXTENDED EXTENDED EXTENDED MAN EXTENDED MAN TASK COST DLR$ MAN HOURS COST MAN HOURS COST MAN HOURS COST MAN HOURS COST HOURS COST COST HOURS 1.0 Project Administration 40 $ 4,920.00 8 $ 1,200.00 24 $ 3,120.00 $ - $ - 8 $ 600.00 40$ 4,920.00 3.1 Roadway Design 176 $ 19,360.00 16 $ 2,400.00 32 $ 4,160.00 40 $ 4,600.00 80 $ 7,600.00 8 $ 600.00 176 $ 19,360.00 216 $ 24,280.00 24$ 3,600.00 56$ 7,280.00 40$ 4,600.00 80$ 7,600.00 16$ 1,200,00 $ - 216$ 24,280.00